Last Allocated Document: SP-150371

Temporary Document List - Ordered by TD

Colour Key:
No Conclusion
Conclusion Reached
Document Revised
Proposed for Block Approval
Proposed for Block Noting
Document Withdrawn
Document Not Handled

To use hyperlinks, this file must be placed above Folder 'Docs'

Created: 2015-06-18 19:18     START OF LIST

Agenda TD LongTitle Source Summary Doc_Type Doc_For Decision Rev_By Rev_Of LS_Source_file Comment
7.7 SP-150172 LS from TSG RAN ITU-R Ad Hoc: Letter to ITU on Update submission for LTE-Advanced toward Rev. 2 of Rec. ITU-R M.2012 TSG CT Overall description: ITU-R Working Party 5D (WP 5D) is developing Revision 2 of the Recommendation M.2012 ('Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications [...]. LS In Action Agreed over e-mail CP-150221 For e-mail comment and forwarding to PCG. Feedback LS before: April 24, 2015. Outgoing This was agreed over e-mail. The LS was repackaged to forward to the PCG in SP-150173.
7.7 SP-150173 LS from TSG RAN ITU-R Ad Hoc: Letter to ITU on Update submission for LTE-Advanced toward Rev. 2 of Rec. ITU-R M.2012 TSG SA Overall description: ITU-R Working Party 5D (WP 5D) is developing Revision 2 of the Recommendation M.2012 ('Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications [...]. LS OUT Action Forwarded to the PCG SP-150172 This LS was agreed over e-mail and forwarded to the PCG.
2 SP-150174 Draft agenda for TSG SA meeting #68 TSG SA Chairman Draft agenda for TSG SA meeting #68 Agenda Approval Approved The draft agenda was reviewed and approved.
4.1 SP-150175 Draft Report of TSG SA meeting #67 TSG SA Secretary Draft Report of TSG SA meeting #67 containing revision marks of changes on the distributed draft. Report Approval Approved The draft report was approved and revision marks will be accepted and placed on the FTP server as version 1.0.0.
13.1 SP-150176 LS from CT WG1: LS on Rel-13 MCPTT work CT WG1 CT WG1 would like to inform SA6 that, in light of the project plan proposal on Rel-13 MCPTT that was presented at CT#67 in CP-150184, CT WG1 has had some preliminary discussion about the stage 3 Rel-13 MCPTT wo [...]. LS In Information Noted C1-151620 This incoming LS was noted
15.2.31 SP-150177 LS from ETSI TC ITS: Reply LS on information regarding V2X study in 3GPP ETSI TC ITS ETSI TC ITS thanks 3GPP SA for their LS on information regarding V2X study in 3GPP. ETSI TC ITS would like to inform 3GPP about the availability of the ITS standards Release 1 (see the Technical Report TR 101 6 [...]. LS In Information Noted ITS(15)000063r1 Response to SP-150166 This incoming LS was noted
13.41 SP-150178 LS from GSMA RAG: LS on VoLTE Roaming Architecture GSMA RAG Introduction As announced in the previous communication from GSMA PSMC (PSMC 131 Doc 201, SP-150139) on a new VoLTE roaming architecture option called 'S8 Home Routed (S8HR)', Networks Group (NG) would like to [...]. LS In Information Noted RAG 14 Doc 013 This LS was reviewed and noted.
15.2.2 SP-150179 LS from SA WG1: Response to Reply LS on Security Framework for Cellular IoT SA WG1 SA WG1 thanks SA WG3 for their LS in S3-151198. SA WG1 is aware of the reply from GERAN 2 to SA WG3 in GPC150120. SA WG1 is also aware of the SIDs agreed at SA#67 in Shanghai as attached to SA's outgoing LS in [...]. LS In Information Noted S1-151528 This incoming LS was noted
15.2.31 SP-150180 LS from SA WG1: LS on V2X Study in 3GPP SA1 SA WG1 SA WG1 would like to thank ETSI ITS for sending SA WG1 a Reply LS on information regarding V2X study in 3GPP (ITS(15)000063 rev1/S1-151448), inviting SA WG1 to keep ETSI ITS informed of the progress of the stud [...]. LS In Information Withdrawn S1-151605 WITHDRAWN (Not SA WG1 approved)
15.2.31 SP-150181 LS from SA WG1: Reply LS on LTE based Vehicular Communication SA WG1 SA WG1 would like to thank RAN for sending SA WG1 an LS on LTE based Vehicular Communication (RP-142312/S1-151227/=S1-150039), which informed SA WG1 of a potential RAN study on LTE-based Vehicular Communication [...]. LS In Information Noted S1-151629 This LS was reviewed and noted.
15.2.2 SP-150182 LS from SA WG2: Response to Reply LS on Security Framework for Cellular IoT SA WG2 SA WG2 thanks SA WG3 for their LS in S3-151198. SA WG2 is aware of the reply from GERAN 2 to SA WG3 in GPC150120. SA WG2 is also aware of the SIDs agreed at SA#67 in Shanghai as attached to SA's outgoing LS in [...]. LS In Information Noted S2-151382 This incoming LS was noted
15.2.20 SP-150183 LS from SA WG2: Reply LS on IMS Emergency Session over WLAN SA WG2 SA WG2 would like to inform GSMA Networks Group RILTE that SA WG2 has started to work on the feasibility of supporting emergency services over WLAN. The study will be split up into 2 phases. If deemed appropr [...]. LS In Information Noted S2-151431 This LS was reviewed and noted.
12.2 SP-150184 LS from SA WG4: LS on codec support in IMS-WebRTC for WLAN and fixed access SA WG4 SA WG4 would like to thank CT WG1 for their CR on IMS-WebRTC following SA WG4 communication from SA WG4#82. [...] Assuming a WLAN connected to EPC (TS 24.229 Annex R), handover is defined between EPS (E-UTRAN+E [...]. LS In Information Noted S4-150401 This LS was reviewed and noted.
13.1 SP-150185 LS from SA WG6: Reply to Document C1-151620: LS on Rel-13 MCPTT work SA WG6 SA WG6 would like to thank CT WG1 (CT WG1) for contacting SA WG6 for clarification related to Mission Critical Push to Talk (MCPTT). Requested actions to SA WG6: 1. CT WG1 kindly asks SA WG6 to take into accou [...]. LS In Information Noted S6-150292 This incoming LS was noted
6 SP-150186 LS from TTC: Liaison to 3GPP on TTC's white paper future mobile networking TTC It is a great honor to inform you that TTC provides herewith our white paper on future mobile networking. Since September 2014, TTC has studieSince September 2014, TTC has studied future mobile networking arou [...]. LS In Information Noted TTC liaison on WP_20150409 This incoming LS was noted
6 SP-150187 LS from NGMN: Liaison on NGMN 5G White Paper NGMN The intention of this liaison is to inform 3GPP about the NGMN 5G vision, requirements, guidelines and way forward outlined in the NGMN 5G White Paper. Please share the NGMN 5G White Paper with all your relevan [...]. LS In Information Noted NGMN_150323 It was noted that SA WG1 will use input on this as part of the SMARTER Work Item. This was then noted.
13.1 SP-150188 LS from APT Wireless Group: Liaison Statement to 3GPP regarding scope and status relevant to PPDR work items and study items APT Wireless Group The APT AWG would like to thank 3GPP for their liaison statement no. SP-140886 received from TSG SA Meeting #66 (10-12 December 2014, Maui, USA) and would like to seek confirmation of the Table attached as Anne [...]. LS In Action Postponed AWG-18-OUT-06-R1-PPDR-LS-to-3GPP This was reviewed and it was decided to postpone this LS to TSG SA meeting #69.
15.2.2 SP-150189 LS from GERAN WG1: LS on LTE/UMTS coexistence studies for FS_IoT_LC GERAN WG1 GERAN WG1 are making progress with their work on the 'Study Item on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things' (FS_IoT_LC) and documenting it in TR 45.820. Currentl [...]. LS In Information Noted GPC150305 This incoming LS was noted
6 SP-150190 LS from ETSI ISG Chairman: Liaison about ETSI ISG IP6 creation and interaction with other groups ETSI ISG Chairman Dear Madam, Dear Sir, We are pleased to inform you that ETSI has successfully held the first meeting of their newly created Industry Specification Group on IPv6 Integration on 22-23 April, 2015. The ETSI 'IPv [...]. LS In Information Noted IP6(15)001031 This incoming LS was noted
13.41 SP-150191 LS from SA WG3LI: Reply LS on VoLTE Roaming Architecture SA WG3LI SA WG3 LI would like to thank GSMA PSMC for their LS on VoLTE Roaming architecture. SA WG3 LI identified that LI in VPLMN for inbound roamers is the issue, and that LI in HPLMN for outbound roamers is not an i [...]. LS In Action Responded S3i150145 Related to SP-150139 (TSG SA meeting #67). Response drafted in SP-150350. Final response in SP-150371.
13.41 SP-150192 LS from SA WG3LI: Reply to LS on VoLTE Roaming Architecture GSMA SA WG3LI GSMA NG requested SA WG3-LI to review the S8HR candidate roaming architecture, consider the LI service impacts and indicate the scope of the work to address those impacts. This Liaison Statement response descr [...]. LS In Information Noted S3i150153 This LS was reviewed and noted.
13.41 SP-150193 LS from GSMA RAG: LS on VoLTE Roaming Charging GSMA RAG Introduction: GSMA Networks Group (NG) is currently assessing the scenario where operators would implement VoLTE Roaming according to the S8HR (Home Routing) architecture. In that context, questions on charging [...]. LS In Information Noted RAG 15 Doc 007 This LS was reviewed and noted.
6 SP-150194 LS from SA WG5: Reply LS on Extension of 3GPP Service-Information AVP SA WG5 SA WG5 thanks oneM2M TP for their LS on Extension of 3GPP Service-Information AVP. We understand that oneM2M has chosen to reuse the 3GPP offline charging framework and has defined the M2M-Information AVP as a [...]. LS In Information Noted S5-153289 This incoming LS was noted
6 SP-150195 LS from SA WG2: LS on 3GPP Rel-13 MTC features for service capability exposure SA WG2 The 3GPP System Architecture Working Group 2 (SA WG2) wishes to inform GSMA, OMA and oneM2M of the work done during Release 13 on Machine Type Communications (MTC) features that allows an application to take ad [...]. LS In Information Noted S2-152032 This incoming LS was noted
7.4 SP-150196 SA WG4 Status Report at TSG SA#68 SA WG4 Chairman Status Report of SA WG4 activities to TSG SA#68 REPORT Presentation Noted The SA WG4 Chairman was thanked for this report, which was then noted.
11 SP-150197 CRs to TS 26.346 on 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)' (Release 11 to Release 13) SA WG4 26.346 CR0455R1; 26.346 CR0456R1; 26.346 CR0457R1; 26.346 CR0465; 26.346 CR0466; 26.346 CR0472 CR Pack Approval Approved This CR Pack was Block Approved
11 SP-150198 CRs to TS 26.346 on 'Multiple TMGIs in SDP (TEI11)' (Release 11 to Release 13) SA WG4 26.346 CR0469R4; 26.346 CR0470R2; 26.346 CR0471R2 CR Pack Approval Approved This CR Pack was Block Approved
12.4 SP-150199 CRs to TS 26.114 on 'Codec for Enhanced Voice Services (EVS_codec)' (Release 12) SA WG4 26.114 CR0311; 26.114 CR0314R2 CR Pack Approval Approved This CR Pack was Block Approved
12.4 SP-150200 CR to TS 26.442 on 'Codec for Enhanced Voice Services (EVS); ANSI C code (fixed-point) (EVS_codec)' (Release 12) SA WG4 26.442 CR0009 CR Pack Approval Approved This CR Pack was Block Approved
12.4 SP-150201 CR to TS 26.443 on 'Codec for Enhanced Voice Services (EVS); ANSI C code (floating-point) (EVS_codec)' (Release 12) SA WG4 26.443 CR0005 CR Pack Approval Approved This CR Pack was Block Approved
12.4 SP-150202 CR to TS 26.444 on ‘Update of test vectors for the EVS codec (EVS_codec)' (Release 12) SA WG4 26.444 CR0004 CR Pack Approval Approved This CR Pack was Block Approved
12.4 SP-150203 CR to TS 26.445 on ‘Corrections to the Algorithmic Description (EVS_codec)' (Release 12) SA WG4 26.445 CR0004R1 CR Pack Approval Approved This CR Pack was Block Approved
12.4 SP-150204 CR to TS 26.447 on 'Corrections to the description of the packet loss concealment algorithm (EVS_codec)' (Release 12) SA WG4 26.447 CR0003 CR Pack Approval Approved This CR Pack was Block Approved
12.4 SP-150205 CR to TR 26.952 on 'Inclusion of verification results (EVS_codec)' (Release 12) SA WG4 26.952 CR0002R2 CR Pack Approval Approved This CR Pack was Block Approved
13.12 SP-150206 TR 26.923 Study on Media Handling Aspects of IMS-based Telepresence (Release 13) v. 1.0.0 SA WG4 Abstract of document: This Technical Report provides a study on the media handling aspects of IMS-based telepresence in 3GPP services. This includes the investigation of the following areas: - Media codecs (spe [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG4
12.41 SP-150207 CR to TS 26.114 on 'Integrating H.265 (HEVC) into 3GPP MTSINP MO (HEVC)' (Release 12) SA WG4 26.114 CR0315 CR Pack Approval Approved This CR Pack was Block Approved
12.45 SP-150208 CRs to TS 26.346 and TR 26.849 on 'MBMS Improvements (MI, MI-EMO & MI-MooD)' (Release 12 & Release 13) SA WG4 26.346 CR0448; 26.346 CR0449; 26.346 CR0450; 26.346 CR0451; 26.346 CR0452; 26.346 CR0453; 26.849 CR0001R1 CR Pack Approval Approved This CR Pack was Block Approved
12.52 SP-150209 CRs to TS 26.114, TS 26.131, TS 26.132, TS 26.346 on 'Technical Enhancements and Improvements (TEI12)' (Release 12 & Release 13) SA WG4 26.114 CR0317R2; 26.114 CR0319R1; 26.131 CR0065R3; 26.132 CR0083R2; 26.346 CR0444R4; 26.346 CR0458R1; 26.346 CR0459R1; 26.346 CR0460R3; 26.346 CR0461R3; 26.346 CR0476R2 CR Pack Approval Approved This CR Pack was Block Approved
13.25 SP-150210 CR to TS 26.114 on 'Video Region-of-Interest Signalling (ROI)' (Release 13) SA WG4 26.114 CR0318R4 CR Pack Approval Approved This CR Pack was Block Approved
13.30 SP-150211 Revised WID on eDASH update for mosaic services (eDASH) SA WG4 Objective: The objective of the work item is to address relevant enhancements for DASH-based services in 3GPP services and networks. The work item addresses normative aspects and operational guidelines to addre [...]. WID Approval Approved This updated WID was approved.
13.30 SP-150212 CR to TS 26.244 on 'Adding Quality Metadata Carriage and orientation information in the 3GPP file format (eDASH)' (Release 13) SA WG4 26.244 CR0056R1 CR Pack Approval Approved This CR Pack was Block Approved
13.39 SP-150213 New BB WID on Media and Quality Aspects of SRVCC Enhancements (SETA-S4) SA WG4 Objective: The SA WG4 work is structured as follows: - Identify relevant scenarios, especially with Codec Mode Control from AMR-WB and EVS to AMR-WB in CS and EVS in CS; - Analyse Speech quality aspects and Med [...]. WID Approval Revised SP-150361 This was left for off-line discussion and revised in SP-150361
13.44 SP-150214 CR to TS 26.346 on 'Signalling independent Units (TEI13)' (Release 13) SA WG4 26.346 CR0464R4 CR Pack Approval Postponed Proposal to send this back to SA WG4 in SP-150333. This was returned to SA WG4 for further discussion (postponed).
16 SP-150215 New WID on Development of super-wideband and fullband P.835 test framework, databases, and performance specification (DESUDAPS) SA WG4 Objective: - Define appropriate noise types, levels, and background noise simulation methods for database development. - Develop a suitable P.835 subjective test plan framework, including reference signals and [...]. WID Approval Approved This new WID was approved.
7.6 SP-150216 SA WG6 Status Report to TSG SA Plenary SA WG6 Chairman Status Report of SA WG6 activities to TSG SA#68 REPORT Presentation Noted The SA WG6 Chairman was thanked for this report, which was then noted.
13.1 SP-150217 Update to the MCPTT WID SA WG6 Changes Deliverable details, Rapporteur and supporting company list. WID Approval Revised SP-150356 This was considered for update to include corrections and other proposed WID updates. This was revised also to merge SP-150269 in SP-150356
13.1 SP-150218 Presentation of TR 23.779 v1.0.0: Study on application architecture to support Mission Critical Push To Talk over LTE (MCPTT) services (Release 13) SA WG6 Abstract of the contribution: 3GPP TR 23.779 contains the results of the Stage 2 study and evaluation of possible 3GPP technical system solutions for the Mission Critical Push To Talk over LTE (MCPTT) applicati [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG6
13.33 SP-150219 TR 26.922 Video Telephony Robustness Improvements Extensions; Performance Evaluation (VTRI_EXT) (Release 13) v. 1.0.0 SA WG4 Abstract of document: The present document reports the study on video telephony robustness improvements extensions in Multimedia Telephony Service for IMS and provides recommendation on their applicability for [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG4
7.9 SP-150220 TSG GERAN Status report to TSG SA#68 TSG GERAN Chairman Status Report of TSG GERAN activities to TSG SA#68 REPORT Presentation Noted The TSG GERAN Chairman was thanked for this report, which was then noted.
7.2 SP-150221 SA WG2 Status Report to TSG SA Plenary SA WG2 Chairman Status Report of SA WG2 activities to TSG SA#68 REPORT Presentation Noted The SA WG2 Chairman was thanked for this report, which was then noted.
10 SP-150222 8 CRs to 23.228 on OMR and TEI10 (Rel-10, Rel-11, Rel-12, Rel-13) SA WG2 23.228 CR1123R2; 23.228 CR1124R2; 23.228 CR1125R2; 23.228 CR1126R2; 23.228 CR1117; 23.228 CR1118; 23.228 CR1119; 23.228 CR1120 CR Pack Approval Approved This CR Pack was Block Approved
11 SP-150223 3 CRs to 23.228 on RAVEL (Rel-11, Rel-12, Rel-13) SA WG2 23.228 CR1108; 23.228 CR1109; 23.228 CR1110 CR Pack Approval Approved This CR Pack was Block Approved
11 SP-150224 2 CRs to 23.272 on TEI11, eMPS (Rel-11, Rel-12) SA WG2 23.272 CR0945; 23.272 CR0946 CR Pack Approval Approved This CR Pack was Block Approved
12.2 SP-150225 2 CRs to 23.228 on IMS_WebRTC (Rel-12, Rel-13) SA WG2 23.228 CR1115R1; 23.228 CR1116R1 CR Pack Approval Approved This CR Pack was Block Approved
12.14 SP-150226 8 CRs to 23.002, 23.303 on ProSe (Rel-12) SA WG2 23.002 CR0282; 23.303 CR0151R3; 23.303 CR0158R1; 23.303 CR0163; 23.303 CR0170R2; 23.303 CR0173R2; 23.303 CR0160R2; 23.303 CR0165R1 CR Pack Approval Approved This CR Pack was Block Approved
12.15 SP-150227 4 CRs to 23.468 on GCSE_LTE (Rel-12, Rel-13) SA WG2 23.468 CR0058R1; 23.468 CR0059R1; 23.468 CR0063R2; 23.468 CR0064R1 CR Pack Approval Approved This CR Pack was Block Approved
12.22 SP-150228 2 CRs to 23.682 on MTCe-UEPCOP (Rel-12, Rel-13) SA WG2 23.682 CR0101R1; 23.682 CR0102R1 CR Pack Approval Approved This CR Pack was approved
12.25 SP-150229 2 CRs to 23.401 on CNO_ULI (Rel-12, Rel-13) SA WG2 23.401 CR2860R3; 23.401 CR2861R3 CR Pack Approval Approved This CR Pack was Block Approved
12.52 SP-150230 14 CRs to 23.060, 23.203, 23.216, 23.228, 23.237, 23.401 on TEI12 (Rel-12, Rel-13) SA WG2 23.060 CR1950R1; 23.060 CR1951R1; 23.401 CR2830R1; 23.401 CR2831R1; 23.203 CR0890R8; 23.203 CR0905R6; 23.228 CR1128R2; 23.228 CR1129R2; 23.401 CR2875R1; 23.401 CR2876R1; 23.203 CR0940R5; 23.203 CR0941R5; 23.216 [...]. CR Pack Approval Approved This CR Pack was Block Approved
13.11 SP-150231 1 CR to 23.203 on UPCON (Rel-13) SA WG2 23.203 CR0978R2 CR Pack Approval Approved This CR Pack was Block Approved
13.14 SP-150232 2 CRs to 23.203, 23.228 on eWebRTCi (Rel-13) SA WG2 23.203 CR0976R3; 23.228 CR1134R2 CR Pack Approval Approved This CR Pack was Block Approved
13.16 SP-150233 6 CRs to 23.303 on eProSe-Ext-SA WG2 (Rel-13) SA WG2 23.303 CR0164R1; 23.303 CR0166R1; 23.303 CR0168R2; 23.303 CR0169R2; 23.303 CR0174R1; 23.303 CR0175R2 CR Pack Approval Approved This CR Pack was Block Approved
13.18 SP-150234 5 CRs to 23.060, 23.236, 23.401 on DECOR (Rel-13) SA WG2 23.060 CR1953R7; 23.236 CR0051R3; 23.236 CR0053R2; 23.401 CR2837R11; 23.401 CR2864R3 CR Pack Approval Approved This CR Pack was Block Approved
13.20 SP-150235 10 CRs to 23.002, 23.401, 23.682 on AESE (Rel-13) SA WG2 23.002 CR0284R2; 23.203 CR0975R2; 23.401 CR2872R2; 23.682 CR0109R1; 23.682 CR0113R3; 23.682 CR0114R2; 23.682 CR0116R2; 23.682 CR0117R1; 23.682 CR0118R3; 23.682 CR0119R4 CR Pack Approval Approved This CR Pack was approved
13.21 SP-150236 14 CRs to 23.002, 23.060, 23.401, 23.682 on MONTE (Rel-13) SA WG2 23.002 CR0283R2; 23.060 CR1960R2; 23.060 CR1961R5; 23.060 CR1968R2; 23.401 CR2850R2; 23.401 CR2851R2; 23.401 CR2871R2; 23.682 CR0093R6; 23.682 CR0096R2; 23.682 CR0097R5; 23.682 CR0099R1; 23.682 CR0100R4; 23.682 [...]. CR Pack Approval Partially approved Proposed revision of 23.682 CR0099R1 in SP-150339. 23.682 CR0099R1 was revised in SP-150339 and the remaining CRs were approved.
13.22 SP-150237 9 CRs to 23.060, 23.401, 23.682 on GROUPE (Rel-13) SA WG2 23.060 CR1956R2; 23.060 CR1967R3; 23.060 CR1971R2; 23.401 CR2843R2; 23.401 CR2853; 23.401 CR2866R3; 23.401 CR2877R1; 23.682 CR0094R6; 23.682 CR0095 CR Pack Approval Approved This CR Pack was approved
16 SP-150238 5 CRs to 23.060, 23.401, 23.682 on HLcom (Rel-13) SA WG2 23.060 CR1965R3; 23.401 CR2862R3; 23.682 CR0106R3; 23.682 CR0108R2; 23.682 CR0115R4 CR Pack Approval Approved This CR Pack was approved
13.44 SP-150239 11 CRs to various specifications on TEI13 (Rel-13) SA WG2 23.060 CR1893R5; 23.203 CR0977R1; 23.216 CR0332R2; 23.246 CR0392R1; 23.272 CR0939R6; 23.401 CR2865; 23.402 CR1360R1; 23.402 CR1366R2; 23.237 CR0481R1; 23.292 CR0228R1; 23.401 CR2857R1 CR Pack Approval Approved This CR Pack was Block Approved
13.2 SP-150240 Presentation of TR 23.797 version 1.0.0: Study on architecture enhancements to support Isolated E-UTRAN Operation for Public Safety (Release 13) SA WG2 Abstract of document: The report TR 23.797 studies and evaluates architecture enhancements to support operation of an E-UTRAN formed by one or more eNBs which have been deployed without (i.e. Nomadic) or have l [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-13)
13.9 SP-150241 Presentation of TR 23.718 version 1.0.0: Architecture Enhancement for Flexible Mobile Service Steering; (Release 13) SA WG2 Abstract of document: TR 23.718 is the technical report of Flexible Mobile Service Steering (FS_FMSS). The present document studies and evaluates architectural enhancements required for 3GPP systems to provide [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG2
13.19 SP-150242 Presentation of TR 23.861 version 2.0.0: Network based IP flow mobility (Release 13) SA WG2 Abstract of document: Network-based IP Flow Mobility Support between 3GPP and Trusted/Untrusted WLAN accesses. Changes since last presentation to TSG Meeting #66: - Completed the study and resolved all the key [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-13)
13.20 SP-150243 Presentation of TR 23.708 version 2.0.0: Architecture Enhancements for Service Capability Exposure (Release 13) SA WG2 Abstract of document: The TR 23.708 studies and evaluates architecture enhancements for a service capability exposure framework wherein 3GPP system provided service capabilities are exposed via one or more stan [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-13)
13.22 SP-150244 Presentation of TR 23.769 version 2.0.0: Group based Enhancements (Release 13) SA WG2 Abstract of document: The TR 23.769 studies and evaluates architectural enhancements for group based enhancements (GROUPE). System improvements for GROUPE include following key issues: - Key issue 1: Message de [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-13)
15.2.4 SP-150245 Presentation of TR 23.709 version 2.0.0: Study on Optimizations to Support High Latency Communications; Stage 2 (Release 13) SA WG2 Abstract of document: The TR 23.709 studies and evaluates architecture enhancements to support applications that communicate with devices that are not reachable for a long period over the 3GPP IP connectivity a [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-13)
15.2.20 SP-150246 Presentation of TR 23.771 version 1.0.0: Study on system impacts of IMS emergency sessions over WLAN (Release 13) SA WG2 Abstract of document: TR 23.771 studies the support of Emergency services over WLAN ('FS_SEW Study Item). This study is divided in 2 phases where the phase 1 considers simpler deployments cases such as: - suppo [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG2
15.2.1 SP-150247 Presentation of TR 23.770 version 1.0.0: Study on System Impacts of Extended DRX Cycle for Power Consumption Optimization; (Release 13) SA WG2 Abstract of document: The TR 23.770 studies the core network and NAS impacts in UE of extending DRX cycle for both idle mode and connected mode, solutions in the core network to support it, and interactions bet [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG2
13.2 SP-150248 Updated WID for Isolated E-UTRAN Operation for Public Safety SA WG2 Objective: The SA WG2 objectives are as follows: 1. Document in an informative annex in the relevant specification (TS 23.401) the implementation and deployment guidelines for 'operation of public safety networ [...]. WID Approval Revised SP-150358 This needed to be revised to update the expected completion to TSG SA#70 in SP-150358
13.18 SP-150249 Updated WID: Dedicated Core Networks (DECOR) SA WG2 Objective: The objective of this work item is to enable the deployment of dedicated core networks where each dedicated core network is dedicated to UEs sharing the same characteristics. The specific dedicated c [...]. WID Approval Approved This updated WID was approved.
13.19 SP-150250 Revised WID: IP Flow Mobility support for S2a and S2b Interfaces (NBIFOM) SA WG2 Objective: The objective of this work item is to define the IFOM functionality for GTP-based S2a and S2b over WLAN based on the use-cases, the service requirements and the NBIFOM Rel-13 conclusions as captured [...]. WID Approval Approved This updated WID was approved.
15.2.20 SP-150251 Update to the SID on Feasibility study on the Support of Emergency services over WLAN (FS_SEW) SA WG2 Objective: To study the mechanisms needed to support IMS Emergency sessions over WLAN (both in the Trusted -S2a - and in the untrusted -S2b- cases). The study will be split up into 2 phases. If deemed appropri [...]. WID Approval Approved This Updated Study WID was approved.
16 SP-150252 New WID on Optimizations to Support High Latency Communications SA WG2 Objective: The objective of this work item is to specify enhancements for applications that communicate with devices that are not reachable for a long period over the 3GPP IP connectivity and being able to supp [...]. WID Approval Approved This new WID was approved.
16 SP-150253 New WID on Support of Emergency services over WLAN - Phase 1 SA WG2 Objective: Objective of this feature is to specify a solution for the Support of Emergency calls over WLAN based on conclusions reached in TR 23.771 for the phase 1 of the FS_SEW study (Study on the Support of [...]. WID Approval Approved This new WID was approved.
16 SP-150254 New Work Item on Extended DRX cycle for Power Consumption Optimization SA WG2 Objective: Objective is to specify the solutions to the identified issues as captured in the conclusions of TR 23.770 to extend the DRX cycle in idle for GERAN, UTRAN and E-UTRAN. The specified solutions will r [...]. WID Approval Revised SP-150369 KDDI asked to be added to the supporting companies. This new WID was revised accordingly in SP-150369
17 SP-150255 New Study on S8 Home Routing Architecture for VoLTE SA WG2 Objective: This study aims to identify the specification changes needed to enable S8HR as a routing architecture for VoLTE. The following key issues (non exhaustive-list) will be part of the SA WG2 scope of th [...]. WID Approval Approved This new WID was approved.
13.1 SP-150256 SA WG2 Exception Sheet for MCPTT SA WG2 Expected Completion Date: SA#69 (September 2015) Service(s) impacted: MCPTT Specification(s) affected: To Be Determined Task(s) within work which are not complete: The exception is to address any potential feat [...]. Exception Approval Approved This Rel-13 exception was approved.
13.2 SP-150257 Rel-13 Work Item Exception for IOPS SA WG2 Expected Completion Date: SA#69 (September 2015) Service(s) impacted: IOPS Service Specification(s) affected: TS 23.401 Task(s) within work which are not complete: Document in an informative annex in the releva [...]. Exception Approval Revised SP-150359 This needed to be revised to update the expected completion to TSG SA#70 in SP-150359
13.9 SP-150258 Rel-13 Work Item Exception for FMSS SA WG2 Expected Completion Date: September, 2015 Service(s) impacted: Service traffic steering in (S)Gi-LAN Specification(s) affected: TS 23.203 Policy and charging control architecture Task(s) within work which are [...]. Exception Approval Approved This Rel-13 exception was approved.
13.14 SP-150259 Rel-13 Work Item Exception for eWebRTCi SA WG2 Expected Completion Date: Initially planned as SA#68 (June 2015). Exception requested for SA#69 (September 2015). Service(s) impacted: Enhancements of WebRTC interworking with IMS. Specification(s) affected: 23 [...]. Exception Approval Approved This Rel-13 exception was approved.
13.16 SP-150260 Rel-13 Work Item Exception for eProSe-Ext-SA2 SA WG2 Expected Completion Date: September 2015 (SA#69) Service(s) impacted: Proximity-based services Specification(s) affected: TS 23.303, TS 23.002 Task(s) within work which are not complete: The preliminary study p [...]. Exception Approval Approved This Rel-13 exception was approved.
13.19 SP-150261 Rel-13 Work Item Exception for NBIFOM SA WG2 Expected Completion Date: September, 2015 Service(s) impacted: None identified Specification(s) affected: TS 23.203, TS 23.xxx Task(s) within work which are not complete: It is expected for 3 additional time u [...]. Exception Approval Approved This Rel-13 exception was approved.
16 SP-150262 Rel-13 Work Item Exception for HLcom SA WG2 Expected Completion Date: SA#69 September 2015 Service(s) impacted: High latency communication Specification(s) affected: TS 23.682, TS 23.401, TS 23.060 Task(s) within work which are not complete: Update the H [...]. Exception Approval Approved This Rel-13 exception was approved.
16 SP-150263 Rel-13 Work Item Exception for eDRX SA WG2 Expected Completion Date: September 2015 (SA plenary #69) Service(s) impacted: Delay tolerant data services Specification(s) affected: 23.401 General Packet Radio Service (GPRS) enhancements for Evolved Univers [...]. Exception Approval Approved This Rel-13 exception was then approved.
16 SP-150264 Rel-13 Work Item Exception for SEW1 SA WG2 Expected Completion Date: SA#69 (September 2015) Service(s) impacted: Emergency services over WLAN Specification(s) affected: 23.402 , 23.167, 23.271, 23.203, 23.228 Task(s) within work which are not complete: [...]. Exception Approval Approved This Rel-13 exception was approved.
13.41 SP-150265 LS from SA WG2: Reply LS on VoLTE Roaming Architecture SA WG2 SA WG2 would like to thank GSMA PSMC and GSMA RAG for their LS on VoLTE Roaming architecture. SA WG2 would like to inform the above groups that SA WG2 has approved a new study item whose aim is to identify the [...]. LS In Information Noted S2-152117 This LS was reviewed and noted.
7.1 SP-150266 SA WG1 Report to TSG SA#68 SA WG1 Chairman Status Report of SA WG1 activities to TSG SA#68 REPORT Presentation Noted The SA WG1 Vice Chairman was thanked for this report, which was then noted.
13.7 SP-150267 Stage 1 CRs on ACDC-ST1 SA WG1 22.011 CR0214R2 CR Pack Approval Approved This CR Pack was Block Approved
12.2 SP-150268 Stage 1 CRs on IMS_WebRTC SA WG1 22.228 CR0211R1; 22.228 CR0212R1 CR Pack Approval Approved This CR Pack was Block Approved
13.1 SP-150269 Updated WID on MCPTT SA WG1 Updates Rapporteur and adds to Justification: - Ministry of Public Safety and Security (MPSS) of , Korea has defined the functional requirements which include MCPTT components such as 'Compiling of Group Call', [...]. WID Approval Merged into SP-150356 This was merged with SP-150217 into SP-150356
14.2 SP-150270 Stage 1 CRs on Multimedia Priority Service (MPS) Modifications (MPS_Mods) SA WG1 22.153 CR0019R3; 22.153 CR0020R2; 22.153 CR0021R2; 22.011 CR0210R2; 22.011 CR0211R2; 22.011 CR0212R2; 22.011 CR0213R2 WID Approval Approved This CR Pack was Block Approved
14.3 SP-150271 Stage 1 CRs on Enhancing Location Capabilities for Indoor and Outdoor Emergency Communications (ELIOT) SA WG1 22.071 CR0080R2; 22.071 CR0081R1 CR Pack Approval Approved This CR Pack was Block Approved
14.4 SP-150272 Stage 1 CRs on Enhancements to Domain Selection between VoLTE and CDMA CS (eDSVCC) SA WG1 22.101 CR0499R3 CR Pack Approval Approved This CR Pack was Block Approved
16 SP-150273 New WID on Control of Applications when Third party Servers encounter difficulties (CATS) SA WG1 Objective: The objective is to specify following service requirements to control traffic from UE to the affected application on a third party server or the third party server itself while not affecting other tr [...]. WID Approval Approved Mediatek reported that the affected specifications list was incomplete and others may need to be added later. This new WID was approved.
16 SP-150274 Stage 1 CRs on Control of Applications when Third party Servicers encounter difficulties (CATS) SA WG1 WITHDRAWN: Stage 1 CRs on Control of Applications when Third party Servicers encounter difficulties (CATS) CR Pack Approval Withdrawn WITHDRAWN
16 SP-150275 New WID on Evolution to and Interworking with eCall in IMS (EIEI) SA WG1 Objective: The objective of this work item is to specify requirements for an eCall based on IMS emergency calls to overcome current limitations of the service and to prepare for the long-term phase out of CS co [...]. WID Approval Approved This new WID was approved.
16 SP-150276 Stage 1 CRs on Evolution to and Interworking with eCall in IMS (EIEI) SA WG1 22.101 CR0496R3; 22.101 CR0497R2; 22.101 CR0498R2 CR Pack Approval Approved This CR Pack was Block Approved
15.2.25 SP-150277 TR 22.802 v.2.0.0 on Study on Need for multiple APNs (FS_MAPN) for approval SA WG1 Abstract of document: The scope of this TR is: - to provide details about the use cases where there is a need of control of APNs; - to identify potential new requirements to fulfil the use cases; - to identify [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-14)
15.2.27 SP-150278 TR 22.899 v.2.0.0 on Enhancements to User Location Reporting Support (FS_eULRS) SA WG1 Abstract of document: TR 22.899 contains use cases for enhanced location reporting, when the LCS function is not deployed. It also identifies the potential requirements, which include: - When LCS system is not [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-14)
15.2.28 SP-150279 TR 22.818 v.2.0.0 on Control of Applications when Third party Servers encounter difficulties (FS_CATS) SA WG1 Abstract of document: This TR identifies potential requirements that will enable the 3GPP network to control traffic from UE to an application on a third party server or the third party server itself while not [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-14)
16 SP-150280 New WID on study on Enhancement to FMSS for Rel-14 SA WG1 Objective: The objective is to study use cases and propose potential requirements to enhance flexible mobile service steering developed in Rel-13. Some candidate scenarios are listed in the following: 1. Suppo [...]. WID Approval Approved This new Study WID was approved.
13.44 SP-150281 Request for Exception for Enhancement of ePDG Selection Mechanisms Rogers Communications, China Mobile, Intel, Qualcomm Inc., Alcatel-Lucent Network Operators deploying S2b VoWiFi solutions identified an urgent need to enhance ePDG selection procedures to support the location based ePDG selection and accommodate various roaming use cases. OTHER Discussion Noted This was covered by other discussions and agreements and was noted.
13.44 SP-150282 Rel-13 Work Item Exception for TEI13 CRs for Enhancements of ePDG Selection Mechanisms Rogers Communications, China Mobile, Intel, Qualcomm Inc., Alcatel-Lucent, Deutsche Telekom, Telecom Italia Expected Completion Date: September, 2015 (SA#69) Service(s) impacted: Voice service over WiFi (S2b) Specification(s) affected: TS 23.402 Task(s) within work which are not complete: The consideration of the pro [...]. Exception Approval Revised SP-150351 This was left for further off-line discussion and was revised in SP-150351
12.52 SP-150283 2 CRs to 23.401 on TEI12 (Rel-12, Rel-13) SA WG2 23.401 CR2868R1; 23.401 CR2869R1 CR Pack Approval Revised NOTE: Updates to these CRs are provided by LG Electronics and Alcatel-Lucent in SP-150284. Revised in SP-150284
12.52 SP-150284 2 updated CRs to 23.401: Clarification on Network Triggered Service Request (Rel-12, Rel-13) LG Electronics, Alcatel-Lucent Propose to update two CRs to TS 23.401 entitled Clarification on Network Triggered Service Request. 23.401 CR2868R2; 23.401 CR2869R2 CR Pack Approval Approved Proposed revision of CRs in SP-150283 This CR Pack was approved
16 SP-150285 WID on MBMS Enhancements Stage 2 for Rel-13 Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics Rel-13 work item to do normative work on MBMS Enhancements WID Approval Noted Related documents and the general way forward with the MBMS_Enh work was discussed and this was then noted.
16 SP-150286 Rel-13 Work Item Exception for MBMS_enh_St2 Nokia Networks Exception sheet for the MBMS_enh_St2 feature Exception Approval Noted Related documents and the general way forward with the MBMS_Enh work was discussed and this was then noted.
16 SP-150287 Way forward for work on Rel-13 MBMS enhancements Motorola Solutions Moving forward with GCSE and MBMS enhancements for Rel-13, work should proceed under TEI13 (rather than MBMS_enh SID or WID), with cat B/C CRs (and potentially liaison statements to other groups) being the vehi [...]. OTHER Approval Noted Related documents and the general way forward with the MBMS_Enh work was discussed and this was then noted.
19.1 SP-150288 Explicit identifications of application impacts in 3GPP templates Motorola Solutions Proposes that the Secretariat reviews and revises, as appropriate, the 3GPP templates, with the goal of adding, where necessary, an identifiable 'Application' category for relevant specs targeted outside tradit [...]. OTHER Approval Noted This should be further discussed between companies and the proposal was noted.
7.3 SP-150289 SA WG3 Status Report SA WG3 Chairman Status Report of SA WG3 activities to TSG SA#68 REPORT Presentation Noted The SA WG3 Chairman was thanked for this report, which was then noted.
13.41 SP-150290 Revised WID Lawful Interception Rel-13 (LI13) SA WG3 Objective: The objective of this work item is to enhance the 3GPP LI service to accommodate Release 13 service enhancements and extensions. Enhancements to specifications TS 33.106, TS 33.107 and TS 33.108 will [...]. WID Approval Approved This updated WID was approved.
15.2.5 SP-150291 Revised WID Study on Security aspects of Integration of Single Sign-On (SSO) frameworks with 3GPP networks SA WG3 Objective: The objective of this Study Item is to investigate the security aspects of the service requirements specified by SA WG1 in TS 22.101, clause 26, on the integration of SSO frameworks with 3GPP network [...]. WID Approval Revised SP-150368 This updated Study WID was revised to change 9.x.x to 9.5.5 in SP-150368
13.24 SP-150292 Revised WID Security Assurance Specification for 3GPP network products (SCAS) SA WG3 The present contribution proposes updating the approved WID to implement the proposal in section S3-151141 'Discussion of way forward for SCAS' about including requirements that are expected to apply to more th [...]. WID Approval Approved This updated WID was approved.
15.2.5 SP-150293 TR 33.895: Study on Security aspects of integration of Single Sign-On (SSO) frameworks with 3GPP operator-controlled resources and mechanisms SA WG3 Abstract of document: The TR contains a study on the security aspects of the service requirements specified by SA WG1 on the integration of SSO frameworks with 3GPP networks for various operator authentication [...]. TR Approval Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG3
13.14 SP-150294 TR 33.872: Security enhancements to support webRTC interworking SA WG3 Abstract of document: The TR contains a study on security issues following the potential modifications of the IMS architecture and stage 2 procedures as required by the support of eWebRTCi (Enhancements to WEBR [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG3
13.24 SP-150295 TR 33.916: Security Assurance Methodology for 3GPP network products SA WG3 Abstract of document: TR 33.916 defines the complete Security Assurance Methodology (SECAM) evaluation process (evaluation, relation to SECAM Accreditation Body, roles, etc.) as well as the components of SECAM [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG3
10 SP-150296 Release 10 CRs on Lawful Interception (LI10) SA WG3 33.106 CR0137; 33.106 CR0138; 33.106 CR0139; 33.106 CR0140 CR Pack Approval Approved This CR Pack was Block Approved
12.48 SP-150297 Release 12 CRs on Lawful Interception (LI12) SA WG3 33.107 CR0172; 33.107 CR0173; 33.108 CR0267; 33.108 CR0268; 33.108 CR0269; 33.108 CR0270; 33.108 CR0271; 33.108 CR0272; 33.108 CR0273 CR Pack Approval Approved This CR Pack was Block Approved
13.41 SP-150298 Release 13 CRs on Lawful Interception (LI13) SA WG3 33.106 CR0141; 33.106 CR0142 CR Pack Approval Approved This CR Pack was Block Approved
13.16 SP-150299 Release 13 CRs on enhancements of Proximity Based Services (eProSe) SA WG3 33.303 CR0066 CR Pack Approval Approved This CR Pack was Block Approved
12.14 SP-150300 Release 12 CRs on Proximity based Services (ProSe) SA WG3 33.303 CR0057R1; 33.303 CR0058R1; 33.303 CR0060R1; 33.303 CR0062R1; 33.303 CR0063R1; 33.303 CR0064R1; 33.303 CR0065; 33.303 CR0067; 33.303 CR0068 CR Pack Approval Approved This CR Pack was Block Approved
8.5 SP-150301 Release 8 CRs on Generic Bootstrapping Architecture Push Function (GBAPush) SA WG3 33.223 CR0024; 33.223 CR0025; 33.223 CR0026; 33.223 CR0027; 33.223 CR0028 CR Pack Approval Approved This CR Pack was Block Approved
12.22 SP-150302 Release 12 CRs on Specification of the TUAK Algorithm Set (STAS) SA WG3 35.936 CR0001R1 CR Pack Approval Approved This CR Pack was Block Approved
13.1 SP-150303 2 CRs to 22.179 on MCPTT HOME OFFICE 22.179 CR0031; 22.179 CR0032. Telefonica submitted the document S1-151042 to SA WG1#70 meeting in Los Cabos Mexico in April. The Telefonica paper had 11 questions related to the MCPTT requirements, these questi [...]. CR Pack Approval Revised SP-150354 This was revised accordingly in SP-150354 for 'Change 1'and SP-150355 for 'Change 4'
7.5 SP-150304 SA WG5 Status Report SA WG5 Chairman Status Report of SA WG5 activities to TSG SA#68 Report Presentation Noted The SA WG5 Chairman was thanked for this report, which was then noted.
13.40 SP-150305 Revised WID Energy Efficiency related Performance Measurements SA WG5 Objective: For the use cases, requirements and/or global KPIs provided by ETSI TC EE related to energy efficiency, by cooperation with RAN WG2 and if needed with other 3GPP WGs, to - identify whether or not th [...]. WID Approval Approved This updated WID was approved.
13.42 SP-150306 New WID Enhanced S2a Mobility Over Trusted WLAN access to EPC – Charging SA WG5 Objective: Objective of this work item is to specify for the Trusted WLAN Access Gateway (TWAG) specified in TS 23.402: - Offline charging from TWAG for traffic routed to the PDN GW over S2a, also considering h [...]. WID Approval Noted Update proposed in SP-150344 This WID was noted
13.42 SP-150307 New WID Announcements for IMS Online Charging (ANIMO) SA WG5 Objective: The objective of this work item is to start the normative work on announcement notification mechanisms and information in Ro interface. Normative work will address the following aspects: 1- Announcem [...]. WID Approval Approved This new WID was approved.
13.40 SP-150308 New WID Management of mobile networks that include virtualized network functions SA WG5 Objective: The objective of this building block is to provide solutions for the management of mobile networks that include VNFs which can be part of EPC or IMS. The scope of this building block includes: 1. Con [...]. WID Approval Revised SP-150362 This was revised to update supporting companies to SP-150362
13.40 SP-150309 New WID Management concept, architecture and requirements for mobile networks that include virtualized network functions SA WG5 Objective: The scope of this work task is to specify the management concepts, the NFV management requirements for operators and to provide the management architecture for mobile networks that include VNFs which [...]. WID Approval Revised SP-150363 This was revised to update supporting companies to SP-150363
17 SP-150310 New Study Item on Overload Control for Diameter Charging Applications SA WG5 Objective: The objective of this study item is to study overload control mechanisms for Rf and Ro interfaces based on the conclusion of the Study Item FS_DOCME. For 3GPP Charging Diameter interfaces, the Diamet [...]. WID Approval Approved This New Study WID was approved.
15.2.23 SP-150311 TR 32.849: Study on Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks. SA WG5 Abstract of document: The objective of this study item is to document missing elements and information with regard to the roaming architecture for Voice over IMS with Local Breakout. This TR collects and evalu [...]. TR Approval Approved This TR was approved and placed under Change control (Rel-13)
13.42 SP-150312 TR 32.843: Study on Inter-PLMN PS domain online charging SA WG5 Abstract of document: The document intends to study in a first phase, based on high level scenarios for Flow Based Charging, relying on defined TS 23.203 [72] PCC roaming architectures with Gy crossing PLMNs, t [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG5
13.40 SP-150313 Rel-13 CRs on WLAN Management (WLAN-OAM) SA WG5 32.401 CR0031R2 CR Pack Approval Approved This CR Pack was Block Approved
13.40 SP-150314 Rel-13 CRs on Energy Efficiency related Performance Measurements (OAM-PM_EE) SA WG5 32.425 CR0148R2; 32.425 CR0157R1 CR Pack Approval Approved This CR Pack was Block Approved
13.40 SP-150315 Rel-13 CRs on Multi-Broadcast Single Frequency Network (MBSFN) Minimization of Drive Tests (MDT) enhancement (MBSFN_MDT) SA WG5 32.421 CR0074R1; 32.422 CR0078R2; 32.441 CR0019R2; 32.442 CR0238R2; 32.446 CR0060R1 CR Pack Approval Approved This CR Pack was Block Approved
11 SP-150316 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) SA WG5 28.652 CR0010; 28.652 CR0011; 28.652 CR0012; 28.652 CR0013; 32.101 CR0056; 32.421 CR0073; 32.422 CR0271; 32.441 CR0018 CR Pack Approval Approved This CR Pack was Block Approved
12.50 SP-150317 Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) SA WG5 32.300 CR0031R1 CR Pack Approval Approved This CR Pack was Block Approved
13.42 SP-150318 Rel-13 CRs on ULI and release causes for charging enhancement for VoLTE (ULRELC-CH) SA WG5 32.251 CR0404R1; 32.298 CR0527R1; 32.299 CR0643R1 CR Pack Approval Approved This CR Pack was Block Approved
11 SP-150319 Rel-11 CRs of Charging of System Improvements to Machine-Type Communications (SIMTC-CH) SA WG5 32.251 CR0397R1; 32.251 CR0398R1; 32.251 CR0399R1 CR Pack Approval Approved This CR Pack was Block Approved
13.40 SP-150320 Rel-13 CRs on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization (SON-NM-CCO) SA WG5 28.628 CR0010R3 CR Pack Approval Approved This CR Pack was Block Approved
8.5 SP-150321 Rel-8 CRs on Charging Management (CH8) SA WG5 32.299 CR0644; 32.299 CR0645; 32.299 CR0646; 32.299 CR0647; 32.299 CR0648; 32.299 CR0649 CR Pack Approval Approved This CR Pack was Block Approved
9 SP-150322 Rel-9 CRs on Charging Management (CH9) SA WG5 32.260 CR0310 CR Pack Approval Approved This CR Pack was Block Approved
10 SP-150323 Rel-10 CRs on Charging Management (CH10) SA WG5 32.299 CR0650R1; 32.299 CR0651R1; 32.299 CR0652R1; 32.299 CR0653R1 CR Pack Approval Approved This CR Pack was Block Approved
11 SP-150324 Rel-11 CRs on Charging Management (CH11) SA WG5 WITHDRAWN: Rel-11 CRs on Charging Management (CH11) CR Pack Approval Withdrawn WITHDRAWN
12.49 SP-150325 Rel-12 CRs on Charging Management (CH12) SA WG5 32.260 CR0308R1; 32.260 CR0309R1; 32.299 CR0639; 32.299 CR0640 CR Pack Approval Approved This CR Pack was Block Approved
13.42 SP-150326 Rel-13 CRs on Charging Management (CH13) SA WG5 32.251 CR0405R1; 32.260 CR0312; 32.260 CR0316R1; 32.297 CR0021R1; 32.297 CR0022R1; 32.298 CR0528R1; 32.299 CR0632R1; 32.299 CR0655R1; 32.299 CR0656R1; 32.299 CR0657 CR Pack Approval Approved This CR Pack was Block Approved
12.49 SP-150327 Rel-12 CRs on Short Message Service - Service Center Offline Charging (SMS-SC-CH) SA WG5 32.274 CR0031 CR Pack Approval Approved This CR Pack was Block Approved
12.49 SP-150328 Rel-12 CRs on Charging using an Alternative Roaming Provider (Stage 2/3) (CHARP) SA WG5 32.299 CR0633R1; 32.299 CR0634R1 CR Pack Approval Approved This CR Pack was Block Approved
13.42 SP-150329 Rel-13 CRs on Charging on enhancements for IMS Service Continuity (CHeISC) SA WG5 32.260 CR0307R1; 32.260 CR0311R1; 32.260 CR0313 CR Pack Approval Approved This CR Pack was Block Approved
13.42 SP-150330 Rel-13 CRs on Announcements for IMS Online Charging (ANIMO) SA WG5 32.260 CR0317R1 CR Pack Approval Approved This CR Pack was Block Approved
12.31 SP-150331 Rel-12 CRs on Application Based Charging (ABC) SA WG5 32.251 CR0400; 32.251 CR0401R1; 32.251 CR0402R1; 32.251 CR0403R1; 32.299 CR0641R1; 32.299 CR0642R1 CR Pack Approval Approved This CR Pack was Block Approved
12.14 SP-150332 Rel-12 CRs on Charging Aspects of Proximity-based Services (Prose-CH) SA WG5 32.277 CR0007R1; 32.277 CR0008R1; 32.277 CR0009; 32.298 CR0525R1; 32.298 CR0526; 32.299 CR0635; 32.299 CR0636; 32.299 CR0637R2; 32.299 CR0638R1 CR Pack Approval Approved This CR Pack was Block Approved
13.44 SP-150333 On CR 26.346-464: Signal Independent Units Qualcomm Incorporated Qualcomm has identified issues with CR26.346-0464 which we believe need to be addressed by SA WG4. Therefore this document proposes that SA does not approve the CR, thereby handing it back to SA WG4 such that S [...]. OTHER Approval Noted Related to SP-150214. This was agreed and the contribution was noted.
13.14 SP-150334 Rel-13 Work Item Exception for Study on security enhancements to Web Real Time Communication (WebRTC) access to IP Multimedia Subsystem (IMS) SA WG3 Expected Completion Date: 09/2015 Service(s) impacted: WebRTC Specification(s) affected: TR 33.872, TS 33.203, Task(s) within work which are not complete: Completing study on security aspects of WebRTC NAT trav [...]. Exception Approval Approved This Rel-13 exception was approved.
13.1 SP-150335 Appraisal and concerns on MCPTT standardisation TCCA TCCA welcomes the efforts made in SA WG6 to find consensus on the way forward with MCPTT. Further TCCA wishes to underline that MCPTT as well as future WIDs MCDATA and MCVIDEO are critical topics - the life of [...]. OTHER Discussion Noted This contribution was noted
19.2 SP-150336 Support team report MCC Director Report of MCC activities to TSG SA#68 REPORT Presentation Revised SP-150345
5 SP-150337 Cellular Internet of Things: Potential impact on SA work area from 'clean slate' part of GERAN's study on 'Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things' when using an existing RAN-CN interface Vodafone Provides background and rationale to the GERAN study; identifies the likely need for a future SA WID for a new RAT that uses a largely-unmodified existing RAN-Core Network interface; and starts the process of i [...]. OTHER Presentation Noted LSs to SA WG1 and SA WG2 were drafted in SP-150348 and SP-150349 and this presentation was then noted.
7.2 SP-150338 Structuring of AESE, MONTE, GROUPE, and HLcom related CRs to TS 23.682 Intel This paper proposes to incorporate SA WG2 agreed CRs to TS 23.682 for AESE, MONTE, GROUPE, and HLcom topics in structured way in order to improve overall readability of the specification OTHER Presentation Approved This guidance was approved and should be referenced in the TS change history.
13.21 SP-150339 Architectural updates for Monitoring feature Intel, Alcatel-Lucent, Huawei, Cisco This paper provides the reasons why a revision 2 of CR 0099 to TS 23.682 (in SA WG2 pack SP-150236) is necessary. 23.682 CR0099R2 CR Pack Approval Approved Proposed update to 23.682 CR0099R1 in SP-150236. Approved. MCC were asked to take the implementation guide into account when implementing this CR.
16 SP-150340 TEI13 exception request for non-exclusionary work on Rel-13 MBMS enhancements Motorola Solutions Exception sheet for the MBMS_enh_St2 feature Exception Approval Not Handled Related to SP-150287, alternative to SP-150286. Not Handled
7.8 SP-150341 Status report of TSG CT#68 TSG CT Chairman TSG CT Status Report to TSG SA#68 Report Presentation Noted The TSG CT Chairman was thanked for this report, which was then noted.
7.8 SP-150342 Draft meeting report of TSG CT#68 MCC Draft report of TSG CT meeting #68 Report Information Noted This was provided for information and was noted.
7.8 SP-150343 IETF Status report TSG CT Chairman IETF dependencies Status report Report Presentation Noted The TSG CT Chairman was thanked for this report, which was then noted.
13.42 SP-150344 New WID Enhanced S2a Mobility Over Trusted WLAN access to EPC – Charging Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Objective: Objective of this work item is to specify for the Trusted WLAN Access Gateway (TWAG) specified in TS 23.402: - Offline charging from TWAG for traffic routed to the PDN GW over S2a, also considering h [...]. WID Approval Approved Proposed update to SP-150306 This new WID was approved
19.2 SP-150345 Support team report MCC Director Report of MCC activities to TSG SA#68 REPORT Presentation Noted SP-150336 The MCC Director was thanked for this report, which was then noted.
2 SP-150346 TSG SA#68 Time Plan TSG SA Chairman A time plan for Information to delegates of TSG SA#68. OTHER Information Noted SP-150347 This was reviewed and will be updated as the meeting progresses to finalise the schedule for different agenda items. This was revised accordingly in SP-150347 This contribution was noted
2 SP-150347 TSG SA#68 Time Plan TSG SA Chairman A time plan for Information to delegates of TSG SA#68. OTHER Information Noted SP-150346 This contribution was noted
5 SP-150348 [DRAFT] LS to SA WG1 on cellular IoT work TSG SA To: SA WG1 LS OUT Approval Withdrawn This was withdrawn
5 SP-150349 [DRAFT] LS on considerations for clean slate CIoT for Rel-13 TSG SA To: SA WG2 LS OUT Approval Revised SP-150366 This was revised to remove 'draft' in SP-150366
13.41 SP-150350 Reply to SA WG3-LI LS on VoLTE Roaming Architecture impact on LI service TSG SA To: SA WG3-LI. CC: SA WG2 LS OUT Approval Revised SP-150367 Response to SP-150191. This was further discussed off-line and revised in SP-150367
13.44 SP-150351 TEI13 Work Item Exception for Enhancement of ePDG Selection Mechanisms Rogers Communications, China Mobile, Intel, Qualcomm Inc., Alcatel-Lucent, Deutsche Telekom, Telecom Italia Expected Completion Date: September, 2015 (SA#69) Service(s) impacted: Voice service over WiFi (S2b) Specification(s) affected: TS 23.402 Task(s) within work which are not complete: The consideration of the pro [...]. Exception Approval Revised SP-150365 SP-150282 Alternative proposal in SP-150353
16 SP-150352 Rel-13 Work Item Exception for eDRX SA WG2 Expected Completion Date: September 2015 (SA plenary #69) Service(s) impacted: Delay tolerant data services Specification(s) affected: 23.401 General Packet Radio Service (GPRS) enhancements for Evolved Univers [...]. Exception Approval Withdrawn SP-150263 This contribution was withdrawn
13.44 SP-150353 TEI13 Work Item Exception for Enhancement of ePDG Selection Mechanisms Blackberry Counter proposal to SP-150351. Exception Approval Noted Counter proposal to SP-150351. This was noted.
13.1 SP-150354 CR 'Change 1' to 22.179 on MCPTT HOME OFFICE 22.179 CR0031R1 CR Pack Approval Approved SP-150303 This CR Pack was approved
13.1 SP-150355 CR 'Change 4' to 22.179 on MCPTT HOME OFFICE 22.179 CR0032R1 CR Pack Approval Approved SP-150303 This CR Pack was approved
13.1 SP-150356 Update to the MCPTT WID SA WG6 Changes Deliverable details, Rapporteur and supporting company list. WID Approval Approved SP-150217 Revision of SP-150217, merging SP-150269. This WID was approved
15.2.2 SP-150357 LS from TSG RAN: LS on architecture for Clean Slate CIOT TSG RAN As per recent PCG decision, TSG RAN expects to start a Work item on Clean Slate Cellular IOT in RAN #69. As part of that, RAN would like to ensure that the E-UTRAN based architecture is suitable for Clean Sla [...]. LS In Action Responded RP-151087 Response in SP-150366
13.2 SP-150358 Updated WID for Isolated E-UTRAN Operation for Public Safety SA WG2 Objective: The SA WG2 objectives are as follows: 1. Document in an informative annex in the relevant specification (TS 23.401) the implementation and deployment guidelines for 'operation of public safety networ [...]. WID Approval Approved SP-150248 This WID was approved
13.2 SP-150359 Rel-13 Work Item Exception for IOPS SA WG2 Expected Completion Date: SA#69 (September 2015) Service(s) impacted: IOPS Service Specification(s) affected: TS 23.401 Task(s) within work which are not complete: Document in an informative annex in the releva [...]. Exception Approval Approved SP-150257 This Rel-13 exception was approved (exception granted until December 2015)
18.1 SP-150360 Work Plan review at TSG SA#68 MCC Work Plan Manager Work Plan review at TSG SA#68 Work Plan Presentation Noted The MCC Work Plan Manager was thanked for this report, which was then noted.
13.39 SP-150361 New BB WID on Media and Quality Aspects of SRVCC Enhancements (SETA-S4) SA WG4 Objective: The SA WG4 work is structured as follows: - Identify relevant scenarios, especially with Codec Mode Control from AMR-WB and EVS to AMR-WB in CS and EVS in CS; - Analyse Speech quality aspects and Med [...]. WID Approval Approved SP-150213 This new WID was approved
13.40 SP-150362 New WID Management of mobile networks that include virtualized network functions SA WG5 Objective: The objective of this building block is to provide solutions for the management of mobile networks that include VNFs which can be part of EPC or IMS. The scope of this building block includes: 1. Con [...]. WID Approval Approved SP-150308 This new WID was approved
13.40 SP-150363 New WID Management concept, architecture and requirements for mobile networks that include virtualized network functions SA WG5 Objective: The scope of this work task is to specify the management concepts, the NFV management requirements for operators and to provide the management architecture for mobile networks that include VNFs which [...]. WID Approval Approved SP-150309 Approved. SA WG5 were asked to investigate and present to TSG SA the implications for coordinated work with ETSI ISG NFV with this WID.
7.7 SP-150364 Issues to report to TSG SA#68 TSG RAN Chairman Report on issues from TSG RAN#68 OTHER Discussion Noted The TSG RAN Chairman was thanked for this report, which was then noted.
13.44 SP-150365 TEI13 Work Item Exception for Enhancement of ePDG Selection Mechanisms Rogers Communications, China Mobile, Intel, Qualcomm Inc., Alcatel-Lucent, Deutsche Telekom, Telecom Italia Expected Completion Date: September, 2015 (SA#69) Service(s) impacted: Voice service over WiFi (S2b) Specification(s) affected: TS 23.402 Task(s) within work which are not complete: The consideration of the pro [...]. Exception Approval Approved SP-150351 This Rel-13 exception was approved
5 SP-150366 LS on considerations for clean slate CIoT for Rel-13 TSG SA To: SA WG2 LS OUT Approval Approved SP-150349 Response to SP-150357. This outgoing LS was approved
13.41 SP-150367 Reply to SA WG3-LI LS on VoLTE Roaming Architecture impact on LI service TSG SA To: SA WG3-LI. CC: SA WG2 LS OUT Approval Revised SP-150370 SP-150350 Revised in SP-150370
15.2.5 SP-150368 Revised WID Study on Security aspects of Integration of Single Sign-On (SSO) frameworks with 3GPP networks SA WG3 Objective: The objective of this Study Item is to investigate the security aspects of the service requirements specified by SA WG1 in TS 22.101, clause 26, on the integration of SSO frameworks with 3GPP network [...]. WID Approval Approved SP-150291 This Updated Study WID was approved
16 SP-150369 New Work Item on Extended DRX cycle for Power Consumption Optimization SA WG2 Objective: Objective is to specify the solutions to the identified issues as captured in the conclusions of TR 23.770 to extend the DRX cycle in idle for GERAN, UTRAN and E-UTRAN. The specified solutions will r [...]. WID Approval Approved SP-150254 This New WID was approved
13.41 SP-150370 Reply to SA WG3-LI LS on VoLTE Roaming Architecture impact on LI service TSG SA To: SA WG3-LI. CC: SA WG2 LS OUT Approval Revised SP-150371 SP-150367 Orange suggested adding that SA WG3-LI should initiate a parallel study on the confidentially issue. The text was revised accordingly in SP-150371
13.41 SP-150371 Reply to SA WG3-LI LS on VoLTE Roaming Architecture impact on LI service TSG SA To: SA WG3-LI. CC: SA WG2 LS OUT Approval Approved SP-150370 This outgoing LS was approved

Created: 2015-06-18 19:18     END OF LIST

Last Allocated Document: SP-150371