ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG3_Iu / TSGR3_110-e / Inbox / Drafts / CB # NRQoE5-Signalling_flow / Phase 2

upload
Drag and drop documents here or click to upload

  sort by name/desc           sort by date/desc           sort by size/desc
icon draft R3-207072_TP for TR38.890 Management based signalling for NR QoE.docx 2020/11/09 13:30 102,9 KB
icon draft R3-207072_TP for TR38.890 Management based signalling for NR QoE_ZTE.docx 2020/11/10 3:04 136,2 KB
icon draft R3-207072_TP for TR38.890 Management based signalling for NR QoE_ZTE_ZTE2.docx 2020/11/10 10:26 136,7 KB
icon draft R3-207073_TP for TR38.890 Signalling-based signalling for NR QoE.docx 2020/11/10 1:49 74,2 KB
icon draft R3-207213 was R3-207191 Signalling-based signalling for NR QoE.docx 2020/11/12 9:44 76,1 KB
icon draft R3-207213 was R3-207191 Signalling-based signalling for NR QoE_Ericsson.docx 2020/11/12 11:09 79,1 KB
icon draft R3-20xxxx was R3-206370 LS to SA5 v1.docx 2020/11/09 22:41 35,6 KB
icon draftR3-207073_TP for TR38.890 Signalling-based signalling for NR QoE_Ericsson.docx 2020/11/10 17:15 78,6 KB
icon draftR3-207073_TP for TR38.890 Signalling-based signalling for NR QoE_Ericsson_SS.docx 2020/11/11 6:36 77,5 KB
icon draftR3-207073_TP for TR38.890 Signalling-based signalling for NR QoE_Ericsson_SS_SS2.docx 2020/11/11 9:11 79,1 KB
icon draftR3-20xxxx TP for TR38.890 Management based signalling for NR QoE_Ericsson.docx 2020/11/10 17:15 171,9 KB
icon draftR3-20xxxx TP for TR38.890 Management based signalling for NR QoE_Ericsson_ZTE.docx 2020/11/11 3:15 151,5 KB
icon draftR3-20xxxx TP for TR38.890 Management based signalling for NR QoE_Ericsson_ZTE_ZTE2.docx 2020/11/11 8:54 151,6 KB
icon draft_R3-206899 SOD on NRQoE5-Signalling_flow_Phase2.docx 2020/11/09 7:57 74,7 KB
icon draft_R3-206899 SOD on NRQoE5-Signalling_flow_Phase2_Nokia.docx 2020/11/10 9:30 69,2 KB
icon draft_R3-206899 SOD on NRQoE5-Signalling_flow_Phase2_Nokia_ZTE.docx 2020/11/10 10:26 79,4 KB
icon draft_R3-207201 TP for TR38.890 Management based signalling for NR QoE_Ericsson_V1.docx 2020/11/12 8:50 149,5 KB
icon draft_R3-207201 TP for TR38.890 Management based signalling for NR QoE_Ericsson_V1_Ericsson.docx 2020/11/12 11:09 188,2 KB
icon draft_R3-207201 TP for TR38.890 Management based signalling for NR QoE_Ericsson_ZTE_ZTE2_ZTE3.docx 2020/11/12 7:12 151,6 KB
icon draft_R3-207201 TP for TR38.890 Management based signalling for NR QoE_Ericsson_ZTE_ZTE2_ZTE3_ZTE4.docx 2020/11/12 8:07 152,8 KB

20 items.