ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG1_RL1 / TSGR1_101-e / Inbox / drafts / 6.2.1.3 Scheduling of multiple DL-UL transport blocks / TP for email#2

upload
Drag and drop documents here or click to upload

  sort by name/desc           sort by date/desc           sort by size/desc
icon R1-200xxxx Text proposal on clarification of sub-PRB symbol counter reset.docx 2020/05/28 8:11 78,7 KB
icon R1-20xxxxx SPS.docx 2020/05/28 22:43 72,5 KB
icon TP on scheduling gap for multicast.docx 2020/05/28 15:29 89,7 KB

3 items.