ETSI logo

www.3gpp.org / ftp / Email_Discussions / RAN2 / [RAN2#113-e] / [Post113-e][702][V2X] Update of MAC CR (R2-2102186) (OPPO)

upload
Drag and drop documents here or click to upload

  sort by name/desc           sort by date/desc           sort by size/desc
icon Draft R2-2102198 CR on Correction of mode2 operation v2.docx 2021/03/01 1:17 94,6 KB
icon Draft R2-2102198 CR on Correction of mode2 operation v3.docx 2021/03/01 1:21 94,5 KB
icon Draft R2-2102198 CR on Correction of mode2 operation v4-LG.docx 2021/03/01 23:51 95,6 KB
icon Draft R2-2102198 CR on Correction of mode2 operation v5-rapporteur.docx 2021/03/02 6:23 92,2 KB
icon Draft R2-2102198 CR on Correction of mode2 operation.docx 2021/02/22 2:14 90,4 KB
icon Draft summary on spec structure for re-evalution and pre-emption.docx 2021/02/22 2:14 63 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v01_LG.docx 2021/02/23 1:46 63,8 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v02_Ericsson.docx 2021/02/23 12:41 66,1 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v03_OPPO.docx 2021/02/24 9:35 65,6 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v04_Apple.docx 2021/02/25 2:21 70,7 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v05_vivo.docx 2021/02/25 3:40 71,7 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v06_HW.docx 2021/02/25 6:39 70,2 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v07_CATT.docx 2021/02/25 9:51 84,3 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v08_QC.docx 2021/02/25 22:38 72,6 KB
icon Draft summary on spec structure for re-evalution and pre-emption_v09_rapporteur.docx 2021/02/26 1:21 72,9 KB

15 items.