Tdoc List

2016-01-29 12:11

Tdoc Title Source Doc-type Doc-for Agenda Avail Treated Decision Wdrn Replaced-by Replaces
S5-161000 Agenda WG Chairman agenda 2 Yes Yes approved No
S5-161001 Report from last SA5 meeting ETSI Secretariat report 4.1 Yes Yes approved No
S5-161002 SA5 status report at last SA meeting WG Chairman report 4.2 Yes Yes noted No
S5-161003 SA5 results at last SA meeting WG Chairman report 4.2 Yes Yes noted No
S5-161004 Time Plan for OAM&P WG Chairman other 6.1 Yes Yes revised No S5-161276
S5-161005 OAM Executive Report from THIS Meeting SA5 Vice Chair (Huawei) report 6.1 Yes Yes revised No S5-161311
S5-161006 Leaders meeting agenda WG Chairman agenda 5.1 Yes Yes noted No
S5-161007 Leaders meeting minutes WG Chairman report 5.1 Yes Yes noted No
S5-161008 CH Agenda and Time Plan CH SWG Chair agenda 7.1 Yes Yes approved No
S5-161009 CH Detailed Report from LAST Meeting CH SWG Chair report 7.1 Yes Yes approved No
S5-161010 CH Executive Report from THIS Meeting CH SWG Chair report 7.1 Yes Yes approved No
S5-161011 CH Detailed Report from THIS Meeting CH SWG Chair report 7.1 No No reserved No
S5-161012 SA5 Meeting Calendar WG Chairman other 5.4 Yes Yes revised No S5-161278
S5-161013 SA5 Working Procedures Vice Chair (Huawei) other 5.1 Yes Yes noted No
S5-161014 SA5 Meeting Facility Requirements Vice Chair(ORANGE) other 5.1 No Yes withdrawn Yes
S5-161015 Process for management of draft TSs/TRs WG Chairman other 5.1 Yes Yes noted No
S5-161016 CR Quality Check ETSI Secretariat other 5.1 Yes Yes noted No
S5-161017 Deliverables due for the NEXT SA Plenary ETSI Secretariat other 5.5 Yes Yes noted No
S5-161018 Ongoing SA5 WIDs SA5 Vice Chair (Huawei) other 5.5 Yes Yes noted No
S5-161019 SA5 3GPP Work Plan ETSI Secretariat other 5.5 Yes Yes noted No
S5-161020 List of Rapporteurs ETSI Secretariat other 5.1 Yes Yes noted No
S5-161021 Minutes of New Work Item proposals - OAM&P SA5 Vice Chairman (Orange) report 6.2 Yes Yes noted No
S5-161022 Minutes of OAM&P Maintenance and Rel-14 small Enhancements MCC report 6.3 Yes Yes noted No
S5-161023 Minutes for Study on OAM support for Licensed Shared Access Rapporteur(Nokia Networks) report 6.6.3 Yes Yes revised No S5-161359
S5-161024 Minutes for Energy Efficiency related Performance Measurements Rapporteur(Nokia Networks) report 6.4.1 Yes Yes noted No
S5-161025 Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions Rapporteur(China Mobile) report 6.5.1.1 Yes Yes noted No
S5-161026 Minutes for Configuration Management for mobile networks that include virtualized network functions Rapporteur(ZTE) report 6.5.1.2 Yes Yes noted No
S5-161027 Minutes for Fault Management for mobile networks that include virtualized network functions Rapporteur(Huawei) report 6.5.1.3 Yes Yes noted No
S5-161028 Minutes for Performance management for mobile networks that include virtualized network functions Rapporteur(Intel) report 6.5.1.4 Yes Yes noted No
S5-161029 Minutes for Lifecycle management for mobile networks that include virtualized network functions Rapporteur (Nokia Networks) report 6.5.1.5 Yes Yes noted No
S5-161030 Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function Rapporteur(Cisco) report 6.6.1 Yes Yes noted No
S5-161031 Minutes for Study on KQIs for Service Experience Rapporteur (Huawei) report 6.6.2 Yes Yes noted No
S5-161032 IPR and legal declaration WG Chairman other 3 Yes Yes noted No
S5-161033 Minutes of Study on OAM support for assessment of energy efficiency in mobile access networks Rapporteur (Orange) report 6.6.4 Yes Yes noted No
S5-161034 Status of email approvals Vice Chair(ORANGE) other 5.1 No No reserved No
S5-161035 Minutes of Study on OAM aspects of SON for AAS-based deployments Rapporteur (Nokia Networks) report 6.6.5 Yes Yes noted No
S5-161036 Rel-13 CR 32.240 Introduction of Monitoring Event charging Ericsson CR Approval 7.4.2 Yes Yes agreed No
S5-161037 Rel-13 CR 32.251 Charging Id Assignment for NBIFOM Ericsson CR Approval 7.4.1 Yes Yes revised No S5-161249
S5-161038 Rel-13 CR 32.298 Charging Id assignment for NBIFOM Ericsson CR Approval 7.4.1 Yes Yes revised No S5-161250
S5-161039 Rel-13 CR 32.299 Charging Id assignment for NBIFOM Ericsson CR Approval 7.4.1 Yes Yes revised No S5-161251
S5-161040 LSout SA2 Charging Id assignment for NBIFOM Ericsson LS out Approval 7.4.1 Yes Yes revised No S5-161252
S5-161041 Rel-13 CR 32.299 Correction for Variable-Part-Type AVP values Ericsson CR Approval 7.3 Yes Yes agreed No
S5-161042 pCR 32.856 – Proposed text for Introduction ORANGE pCR Agreement 6.6.4 Yes Yes approved No
S5-161043 pCR 32.856 Proposed text for clause 4.2.1 ORANGE pCR Agreement 6.6.4 Yes Yes revised No S5-161322
S5-161044 pCR 32.856 Proposed text for clauses 4.2.2 and 4.2.3 ORANGE pCR Agreement 6.6.4 Yes Yes revised No S5-161323
S5-161045 pCR 32.856 proposed text for clause 4.3 ORANGE pCR Agreement 6.6.4 Yes Yes revised No S5-161324
S5-161046 Rel-13 CR 32.260 Correction for UE identification associated with inter-UE transfer Ericsson CR Approval 7.3 Yes Yes agreed No
S5-161047 Rel-13 CR 32.298 Correction for UE identification associated with inter-UE transfer Ericsson CR Approval 7.3 Yes Yes agreed No
S5-161048 Rel-13 CR 32.299 Correction for UE identification associated with inter-UE transfer Ericsson CR Approval 7.3 Yes Yes agreed No
S5-161049 Rel-13 CR 32.260 Correction of 2xx trigger for BYE request to align offline and online charging Ericsson, Alcatel-Lucent CR Approval 7.3 Yes Yes revised No S5-161263
S5-161050 Clarification for APFunction visibility Nanjing Ericsson Panda Com Ltd CR 6.3 Yes Yes revised No S5-161207
S5-161051 CR 52.402 Add usage of measurements for EE ORANGE, Nokia Networks CR Agreement 6.4.1 Yes Yes revised No S5-161233
S5-161052 Rel-11 CR 28.623 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161208
S5-161053 Rel-12 CR 28.623 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161209
S5-161054 Slides for ETSI NFV workshop on modelling (revised) WG chairman other Information 4.3 Yes Yes noted No
S5-161055 Rel-11 CR 28.633 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161211
S5-161056 Rel-12 CR 28.633 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161212
S5-161057 Rel-11 CR 28.656 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161214
S5-161058 Rel-12 CR 28.656 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161215
S5-161059 Rel-11 CR 28.706 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161217
S5-161060 Rel-12 CR 28.706 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161218
S5-161061 Rel-11 CR 28.733 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161220
S5-161062 Rel-12 CR 28.733 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161221
S5-161063 Rel-11 CR 28.653 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161223
S5-161064 Rel-12 CR 28.653 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes revised No S5-161224
S5-161065 SA5 Meeting Facility Requirements - Proposed updates SA5 Vice Chairman other Approval 5.1 Yes Yes revised No S5-161277
S5-161066 pCR to TR 32.860 CAC problem statement Cisco Systems Inc. pCR Approval 6.6.1 Yes Yes noted No
S5-161067 pCR to 32.860 Section title clarification Cisco Systems Inc. pCR Approval 6.6.1 No No withdrawn Yes
S5-161068 pCR to 32.860 Short term load balancing decision Cisco Systems Inc. pCR Approval 6.6.1 Yes Yes revised No S5-161332
S5-161069 pCR to 32.860 Potential solutions 1 and 2 Cisco Systems Inc. pCR Approval 6.6.1 Yes Yes noted No
S5-161070 CR R14 to 32.838 on Common Channel Optimization Cisco Systems Inc. CR Approval 6.3 Yes Yes revised No S5-161226
S5-161071 CR R14 to 32.838 Table 7.8.4 Cisco Systems Inc. CR Approval 6.3 Yes Yes not pursued No
S5-161072 pCR 28.525 Requirements for VNF package on-boarding Cisco Systems Inc. pCR Approval 6.5.1.5 Yes Yes revised No S5-161299
S5-161073 pCR 28.525 VNF Package Enabling UC and Requirements Cisco Systems Inc. pCR Approval 6.5.1.5 Yes Yes revised No S5-161300
S5-161074 pCR 28.525 VNF Package Disabling UC and Requirements Cisco Systems Inc. pCR Approval 6.5.1.5 Yes Yes revised No S5-161301
S5-161075 LSout to CT4 on Addition of AVP code definitions Alcatel-Lucent LS out Approval 7.1 Yes Yes revised No S5-161246
S5-161076 pCR TS 28.510 add correction to CM use cases Intel Corporation (UK) Ltd pCR Approval 6.5.1.2 Yes Yes revised No S5-161283
S5-161077 pCR TS 28.520 add PM data collection methods Intel Corporation (UK) Ltd pCR Approval 6.5.1.4 Yes Yes revised No S5-161293
S5-161078 pCR TS 28.520 add VNF related VR PM use case and requirement Intel Corporation (UK) Ltd pCR Approval 6.5.1.4 Yes Yes revised No S5-161295
S5-161079 pCR TS 28.525 Update business level use cases and requirements on LCM NTT DOCOMO pCR Approval 6.5.1.5 Yes Yes revised No S5-161237
S5-161080 pCR TS 28.500 Moving business level use cases on LCM from 28.525 NTT DOCOMO pCR Approval 6.5.1.1 Yes Yes revised No S5-161236
S5-161081 pCR TS 28.525 Adding new requirements on change notification subscriptions NTT DOCOMO pCR Approval 6.5.1.5 Yes Yes revised No S5-161302
S5-161082 pCR TS 28.510 Adding use case and requirements on querying VNF instance information NTT DOCOMO pCR Approval 6.5.1.2 Yes Yes revised No S5-161284
S5-161083 S5-161083 pCR TS 28.515 Updating business and specification level requirements on FM NTT DOCOMO pCR Approval 6.5.1.3 Yes Yes revised No S5-161289
S5-161084 pCR TS 28.500 Moving business level requirements on FM from TS 28.515 NTT DOCOMO pCR Approval 6.5.1.1 Yes Yes revised No S5-161240
S5-161085 pCR TS 28.515 Removing business level use cases on FM moved to TS 28.500 NTT DOCOMO pCR Approval 6.5.1.3 Yes Yes approved No
S5-161086 pCR TS 28.500 Moving business level use cases on FM from TS 25.515 NTT DOCOMO pCR Approval 6.5.1.1 Yes Yes approved No
S5-161087 Way forward for the LSA study Nokia Networks discussion Decision 6.6.3 Yes Yes noted No
S5-161088 Presentations NFV ISG Information Modelling Workshop (Part 1) SA5 Vice Chairman other Information 4.3 Yes Yes noted No
S5-161089 pCR Add Introduction to draft TR 32.865 Nokia Networks pCR Decision 6.6.5 Yes Yes revised No S5-161335
S5-161090 Skeleton TR 32.865 Study on OAM aspects of SON for AAS Nokia Networks other Decision 6.6.5 Yes Yes revised No S5-161333
S5-161091 pCR Add scope to draft TR 32.865 Nokia Networks pCR Decision 6.6.5 Yes Yes revised No S5-161336
S5-161092 pCR Add use case on Cell Splitting to draft TR 32.865 Nokia Networks pCR Decision 6.6.5 Yes Yes revised No S5-161337
S5-161093 pCR draft TS 28.510 Add business level use case of auto-scaling configuration ZTE Corporation pCR Approval 6.5.1.2 Yes Yes revised No S5-161285
S5-161094 pCR draft TS 28.510 Add specification level use case of auto-scaling configuration ZTE Corporation pCR Approval 6.5.1.2 Yes Yes revised No S5-161298
S5-161095 pCR draft TS 28.525 Add business level use case of VNF software update ZTE Corporation, China Mobile pCR Approval 6.5.1.5 Yes Yes noted No
S5-161096 pCR TS 28.511 Adding MO creation and configuration procedure flow Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.2 Yes Yes revised No S5-161287
S5-161097 VNF platform and application Ericsson Inc. discussion Decision 6.5.1.1 Yes Yes noted No
S5-161098 Define naming conventions for requirement tags consistent for all new NFV specifications Huawei Tech.(UK) Co., Ltd discussion Approval 6.5.1.1 Yes Yes revised No S5-161244
S5-161099 pCR TS 28.510 Adding contents for definition and concepts Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.2 Yes Yes revised No S5-161288
S5-161100 pCR 28.515 Clarification on NE alarm correlation in NFV context use case Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.3 Yes Yes revised No S5-161290
S5-161101 NFV Fault Management WI Status Report Huawei Tech.(UK) Co., Ltd other Information 6.5.1.3 Yes Yes noted No
S5-161102 pCR TS 28.525 Add requirements for NS lifecycle management Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.5 Yes Yes revised No S5-161318
S5-161103 pCR TS 28.525 Adding VNF instance termination use cases and specification level requirements Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.5 Yes Yes revised No S5-161319
S5-161104 pCR TS 28.525 Adding specification level requirements on VNF instance scaling Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.5 Yes Yes revised No S5-161321
S5-161105 pCR TR 32.862 Combining the access phase for the different scenarios in Section 5 Huawei Tech.(UK) Co., Ltd pCR Approval 6.6.2 Yes Yes merged No S5-161325
S5-161106 pCR TR 32.862 Editorial Clean up Huawei Tech.(UK) Co., Ltd pCR Approval 6.6.2 Yes Yes revised No S5-161326
S5-161107 Rel-13 CR 32.150 Add missing link to properties of SupportIOC instance Ericsson, Nokia Networks, Orange CR Approval 6.3 Yes Yes revised No S5-161227
S5-161108 pCR 32.855 - Solutions evaluation RED Technologies SAS pCR Approval 6.6.3 Yes Yes revised No S5-161360
S5-161109 Rel-13 CR 32.152 Correct the visibility properties of SupportIOC instance Ericsson, Nokia Networks, Orange CR Approval 6.3 Yes Yes revised No S5-161228
S5-161110 CR R8 32153-800 Corrcting references Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161111 Rel-13 CR 32.300 Correction of Distinguished Name convention for SupportIOC instance Ericsson CR Approval 6.3 Yes Yes revised No S5-161229
S5-161112 CR R9 32153-900 Correcting references Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161113 CR R10 32153-a10 Correctinjg references Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161114 CR R11 32153-b10 Correcting References Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161115 CR R12 32153-c00 Correcting references Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161116 CR R13 32153-c00 Correcting references Ericsson LM CR Approval 6.3 Yes Yes revised No S5-161230
S5-161117 CE R8 32642-850 Correcting references Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161118 CR R9 32642-930 Correcting references Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161119 CR R10 32642-a30 Correcting references Ericsson LM CR Approval 6.3 No No withdrawn Yes
S5-161120 CR R10 32642-a30 Correcting reference Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161121 CR R11 32642-b41 Correcting references Ericsson LM CR Approval 6.3 Yes Yes agreed No
S5-161122 pCR R14 Definition of NS in 28500 Ericsson LM pCR Approval 6.5.1.1 Yes Yes revised No S5-161245
S5-161123 Rel-13 CR 32.251 Correction for Access Availability Change Reason Ericsson CR Approval 7.4.1 Yes Yes revised No S5-161253
S5-161124 pCR R14 32.862 Correcting rate to ratio Ericsson LM pCR Approval 6.6.2 Yes Yes approved No
S5-161125 Rel-13 CR 32.298 Correction for Access Availability Change Reason Ericsson CR Approval 7.4.1 Yes Yes revised No S5-161254
S5-161126 pCR R14 32.862 Unclear play stall ratio measurements Ericsson LM pCR Approval 6.6.2 Yes Yes approved No
S5-161127 Rel-13 CR 32.299 Correction for Access Availability Change Reason Ericsson CR Approval 7.4.1 Yes Yes revised No S5-161255
S5-161128 Rel-13 CR 32.275 Correction of interactions of Announcement service and MMTel supplementary services Ericsson CR Approval 7.3 Yes Yes revised No S5-161264
S5-161129 Rel-13 CR 32.251 ULI for untrusted wireless access network correction Ericsson CR Approval 7.3 Yes Yes agreed No
S5-161130 Rel-13 CR 32.298 ULI for untrusted wireless access network correction Ericsson CR Approval 7.3 Yes Yes revised No S5-161265
S5-161131 Rel-13 CR 32.299 ULI for untrusted wireless access network correction Ericsson CR Approval 7.3 Yes Yes revised No S5-161266
S5-161132 pCR draft TS 28.520 Adding business level use case of updating performance Threshold Monitor in virtualized network ZTE Corporation pCR 6.5.1.4 Yes Yes revised No S5-161296
S5-161133 pCR draft TS 28.520 Adding specification level use case of updating performance Threshold Monitor in virtualized network ZTE Corporation pCR 6.5.1.4 Yes Yes revised No S5-161297
S5-161134 pCR draft TS 28.515 Adding business level use case of NE alarm correlation in the context of NFV including physical resource alarms ZTE Corporation pCR 6.5.1.3 Yes Yes noted No
S5-161135 TS 28.500 Add the NFV Management layer concept Huawei Tech.(UK) Co., Ltd,Nokia Networks pCR 6.5.1.1 Yes Yes noted No
S5-161136 New WID Study on Next Generation Evolved Network Management Huawei Tech.(UK) Co., Ltd WID new 6.2 Yes Yes revised No S5-161327
S5-161137 TS 28.500 Add the relationship between VNF and NE Huawei Tech.(UK) Co., Ltd pCR 6.5.1.1 Yes Yes revised No S5-161280
S5-161138 Rel-11 CR TS 28.620 Editorial cleanup ORANGE, Ericsson CR Agreement 6.3 Yes Yes not pursued No
S5-161139 Rel-12 CR TS 28.620 Editorial cleanup ORANGE, Ericsson CR Agreement 6.3 Yes Yes not pursued No
S5-161140 Rel-13 CR TS 28.620 Editorial update ORANGE, Ericsson CR Agreement 6.3 Yes Yes not pursued No
S5-161141 pCR on TR 32.855 v 0.5.0 Ericsson pCR Agreement 6.6.3 No No withdrawn Yes
S5-161142 pCR R14 32.862 Access phases for streaming Ericsson LM pCR Approval 6.6.2 Yes Yes merged No S5-161325
S5-161143 pCR draft TS 28.500 Adding the management architecture China Mobile pCR Approval 6.5.1.1 Yes Yes revised No S5-161281
S5-161144 pCR draft TS 28.500 Add the definitions China Mobile pCR Approval 6.5.1.1 Yes Yes revised No S5-161282
S5-161145 Updated WID Concept, architecture and requirements for mobile networks that include virtualized network functions China Mobile WID revised Approval 6.5.1.1 Yes Yes revised No S5-161347
S5-161146 New SID on Study of filtering of PM measurements Ericsson LM SID new Approval 6.2 Yes Yes revised No S5-161294
S5-161147 pCR TS 28.510 add VNF related VR performance alarms use cases and requirements Intel Corporation (UK) Ltd pCR Approval 6.5.1.3 Yes Yes revised No S5-161291
S5-161148 pCR TS 28.525 add VNF instantiation use case and requirements Intel Corporation (UK) Ltd pCR Approval 6.5.1.5 Yes Yes noted No
S5-161149 pCR TS 28.525 add VNF termination use case and requirements Intel Corporation (UK) Ltd pCR Approval 6.5.1.5 Yes Yes revised No S5-161320
S5-161150 pCR on TR 32.860: Recommendations for Load Information Exchange Interoperability issues in clause 4.2.1.2 NEC EUROPE LTD pCR Approval 6.6.1 Yes Yes noted No
S5-161151 pCR TR 38.855 conclusion on interaction at NM level Nokia Networks pCR Approval 6.6.3 Yes Yes approved No
S5-161152 pCR TR 38.855 add missing description of functional split alternative Nokia Networks pCR Approval 6.6.3 Yes Yes revised No S5-161328
S5-161153 pCR TR 38.855 add architectural option LC part of RPT Nokia Networks pCR Approval 6.6.3 Yes Yes approved No
S5-161154 pCR TR 38.855 supported scenarios and standardization impacts Nokia Networks pCR Approval 6.6.3 Yes Yes revised No S5-161358
S5-161155 Meeting Report IFA-SA5 Call#5 (Dec 17th 2015) SA5 Vice Chairman report Approval 6.5.1.1 Yes Yes noted No
S5-161156 Rel-13 CR 32.425 Add measurements of components on IP Throughput P.I. Works CR Approval 6.3 Yes Yes revised No S5-161231
S5-161157 Rel-13 CR 28.627 Correction of Business level requirements for Handover Parameter Optimization P.I. Works CR Approval 6.3 Yes Yes revised No S5-161232
S5-161158 DP Gy Session Optimization - IMS Use Case Ericsson discussion Discussion 7.2 Yes Yes noted No
S5-161159 WI Resource optimization for PS domain online charging sessions Ericsson WID new Approval 7.2 Yes Yes revised No S5-161248
S5-161160 Rel-11 CR TS32250 Correct Definition of Basic Service in MSC-Server CDR and MTRF CDR ZTE Corporation CR 7.3 Yes Yes not pursued No
S5-161161 Rel-12 CR TS32250 Correct Definition of Basic Service in MSC-Server CDR and MTRF CDR ZTE Corporation CR 7.3 Yes Yes not pursued No
S5-161162 Rel-13 CR TS32250 Correct Definition of Basic Service in MSC-Server CDR and MTRF CDR ZTE Corporation CR 7.3 Yes Yes not pursued No
S5-161163 Rel-13 CR 32 251 Extend the definition of PDN connection charging identifier for NBIFOM ZTE Corporation CR 7.4.1 No No withdrawn Yes
S5-161164 Rel-13 CR 32 299 Extend the definition of PDN connection charging identifier for NBIFOM ZTE Corporation CR 7.4.1 No No withdrawn Yes
S5-161165 Rel-13 CR 32 298 Extend the definition of PDN connection charging identifier for NBIFOM ZTE Corporation CR 7.4.1 No No withdrawn Yes
S5-161166 Rel-13 PCR 32.850 KI#1 Evaluation and Recommendation ZTE Corporation pCR 7.5.1 Yes Yes revised No S5-161268
S5-161167 LSout on SIP message extention to enable IMS offline charging completeness check ZTE Corporation LS out 7.5.1 Yes No withdrawn Yes
S5-161168 Rel-13 PCR 32.869 Alternative solution 1 ZTE Corporation pCR 7.5.2 Yes Yes revised No S5-161304
S5-161169 Rel-13 PCR 32.869 Alternative solution 2 ZTE Corporation pCR 7.5.2 Yes Yes noted No
S5-161170 pCR TR 32.850 Porposal for Section 3 "Definitions, symbols and abbreviations" Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes revised No S5-161270
S5-161171 pCR TR 32.850 Proposal for Section 6.1.5 "Evaluation and Recommendation" Deutsche Telekom AG pCR Approval 7.5.1 Yes No withdrawn Yes
S5-161172 pCR TR 32.850 Proposal for Section 6.2.6 Recommendation Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes approved No
S5-161173 pCR TR 32.850 Proposal for Section 7 Recommendation Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes revised No S5-161269
S5-161174 pCR TR 32.850 EDITHELP comments on TR32.850 Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes noted No
S5-161175 pCR TR 32.850 Proposal for Section 2 References Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes revised No S5-161271
S5-161176 Rel-13 CR 32.299 Introducing new AVPs for MONTE charging Huawei Technologies France CR Approval 7.4.2 Yes Yes revised No S5-161260
S5-161177 Rel-13 CR 32.298 Introduction of CDR parameters for MONTE Charging Huawei Technologies France CR Approval 7.4.2 Yes Yes revised No S5-161261
S5-161178 Rel-13 CR 32.297 MONTE charging impact of CDR files format and transfer Huawei Technologies France CR Approval 7.4.2 Yes Yes revised No S5-161262
S5-161179 Rel-13 pCR draft TS 32.278 MONTE CDR parameters alignment Huawei Technologies France pCR Approval 7.4.2 Yes Yes revised No S5-161258
S5-161180 Rel-13 pCR draft TS 32.278 MONTE charging information definition and bindings Huawei Technologies France pCR Approval 7.4.2 Yes Yes revised No S5-161259
S5-161181 pCR TR 32.850 Solution of EDITHELP comments Deutsche Telekom AG draftCR Approval 7.5.1 Yes Yes revised No S5-161272
S5-161182 Update on discussions on SA5 structure SA5 chair team report Decision 5.1 Yes Yes endorsed No
S5-161183 Rel-13 CR 32.251 Introduce NBIFOM charging for per IP-CAN bearer charging Alcatel-Lucent CR Approval 7.4.1 Yes Yes revised No S5-161256
S5-161184 Rel-13 CR 32.251 Clarify RAT Type in NBIFOM charging Alcatel-Lucent CR Approval 7.4.1 Yes Yes withdrawn Yes
S5-161185 Outputs NFV ISG Information Modelling Workshop (Louisville, Jan 13-14) SA5 Vice Chairman report Information 4.3 Yes Yes noted No
S5-161186 Presentations NFV ISG Information Modelling Workshop (Part 2) SA5 Vice Chairman other Information 4.3 Yes Yes noted No
S5-161187 pCR TR 32.850 Clarify ICID for correlation Alcatel-Lucent pCR Approval 7.5.1 Yes Yes revised No S5-161267
S5-161188 OAM&P SWG action list OAM&P SWG Chairman other Information 6.1 Yes Yes revised No S5-161338
S5-161189 Resubmitted LS from SA3 ccSA5 Reply LS to CT4 on the start of work on Diameter Base Protocol Update S3-152460 LS in 7.1 Yes Yes noted No
S5-161190 LS from ETSI NFV on Response to 3GPP SA5 liaison on clarifications on FM and PM flows ETSI ISG NFV LS in 6.1 Yes Yes noted No
S5-161191 LS from BBF to SA5 on Broadband Forum Organizational Changes Broadband Forum LS in 5.3 Yes Yes noted No
S5-161192 LS from CT3 to SA5 on Reply LS on OCS address for Gy and Gyn inter-PLMN C3-155314 LS in 7.1 Yes Yes noted No
S5-161193 LS from CT4 to SA5 on progress of the work on Diameter Base Protocol Update C4-152375 LS in 7.1 Yes Yes replied to No
S5-161194 Ls from ETSI INT to SA5 on Validation project for the Conformance Test Specifications for the Diameter Protocol over the Rf and the Ro reference points ETSI INT LS in 7.1 Yes Yes replied to No
S5-161195 LS from RAN2 cc SA5 on DRB Handling in LWRI R2-157127 LS in 5.3 Yes Yes noted No
S5-161196 LS from RAN3 to SA5 on Reply LS on RAN Sharing Enhancements for LTE R3-152873 LS in 6.1 Yes Yes revised No S5-161205
S5-161197 LS from SA2 to SA5 on Confirmation of Presence Reporting Area in MONTE S2-154237 LS in 7.4.2 Yes Yes noted No
S5-161198 LS from SA2 cc SA5 on Mobile Equipment Identity Signalling over WLAN S2-154415 LS in 7.1 Yes Yes noted No
S5-161199 LS from TSG SA ccSA5 on Application Architecture related SI/WI proposals not related to Critical Communications SP-150848 LS in 5.3 Yes Yes noted No
S5-161200 New WID Study on Implementation for the Partitioning of Itf-N China Mobile WID new Approval 6.2 Yes Yes revised No S5-161206
S5-161201 pCR to TR 29.819 – Update Conclusion on Changes and Clarifications of the rules for Diameter Extensibility Alcatel-Lucent pCR Approval 7.1 Yes Yes revised No S5-161306
S5-161202 pCR TR 29.819 - Set of new other changes Alcatel-Lucent pCR Approval 7.1 Yes Yes revised No S5-161307
S5-161203 Definitions in 3GPP specs MCC other Information 5.2 Yes Yes noted No
S5-161204 LS from Small Cell Forum to SA5 on Enhancements to TR-196 Small Cell Data Model Small Cell Forum LS in discussion 6.1 Yes Yes replied to No
S5-161205 LS from RAN3 to SA5 on Reply LS on RAN Sharing Enhancements for LTE R3-152873 LS in - 6.1 Yes Yes replied to No S5-161196
S5-161206 New WID Study on Implementation for the Partitioning of Itf-N China Mobile SID new Approval 6.2 Yes Yes agreed No S5-161200
S5-161207 Clarification for APFunction visibility Nanjing Ericsson Panda Com Ltd CR - 6.3 Yes Yes agreed No S5-161050
S5-161208 Rel-11 CR 28.623 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161052
S5-161209 Rel-12 CR 28.623 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161053
S5-161210 Rel-13 CR 28.623 Make the XML schema well formed Ericsson CR discussion 6.3 Yes Yes agreed No
S5-161211 Rel-11 CR 28.633 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161055
S5-161212 Rel-12 CR 28.633 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161056
S5-161213 Rel-13 CR 28.633 Make the XML schema well formed Ericsson CR discussion 6.3 Yes Yes agreed No
S5-161214 Rel-11 CR 28.656 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161057
S5-161215 Rel-12 CR 28.656 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161058
S5-161216 Rel-13 CR 28.656 Make the XML schema well formed Ericsson CR discussion 6.3 Yes Yes agreed No
S5-161217 Rel-11 CR 28.706 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161059
S5-161218 Rel-12 CR 28.706 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161060
S5-161219 Rel-13 CR 28.706 Make the XML schema well formed Ericsson CR discussion 6.3 Yes Yes agreed No
S5-161220 Rel-11 CR 28.733 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161061
S5-161221 Rel-12 CR 28.733 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161062
S5-161222 Rel-13 CR 28.733 Make the XML schema well formed Ericsson CR discussion 6.3 Yes Yes agreed No
S5-161223 Rel-11 CR 28.653 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161063
S5-161224 Rel-12 CR 28.653 Make the XML schema well formed Ericsson CR Approval 6.3 Yes Yes agreed No S5-161064
S5-161225 Rel-13 CR 28.653 Make the XML schema well formed Ericsson CR discussion 6.3 Yes Yes agreed No
S5-161226 CR R14 to 32.838 on Common Channel Optimization Cisco Systems Inc. CR Approval 6.3 Yes Yes revised No S5-161342 S5-161070
S5-161227 Rel-13 CR 32.150 Add missing link to properties of SupportIOC instance Ericsson, Nokia Networks, Orange CR Approval 6.3 Yes Yes agreed No S5-161107
S5-161228 Rel-13 CR 32.152 Correct the visibility properties of SupportIOC instance Ericsson, Nokia Networks, Orange CR Approval 6.3 Yes Yes agreed No S5-161109
S5-161229 Rel-13 CR 32.300 Correction of Distinguished Name convention for SupportIOC instance Ericsson CR Approval 6.3 Yes Yes agreed No S5-161111
S5-161230 CR R13 32153-c00 Correcting references Ericsson LM CR Approval 6.3 Yes Yes agreed No S5-161116
S5-161231 Rel-13 CR 32.425 Add measurements of components on IP Throughput P.I. Works CR Approval 6.3 Yes Yes revised No S5-161343 S5-161156
S5-161232 Rel-13 CR 28.627 Correction of Business level requirements for Handover Parameter Optimization P.I. Works CR Approval 6.3 Yes Yes agreed No S5-161157
S5-161233 CR 52.402 Add usage of measurements for EE ORANGE, Nokia Networks CR Agreement 6.4.1 Yes Yes revised No S5-161344 S5-161051
S5-161234 LS to ETSI NFV on cooperation guidelines between SA5 and ETSI NFV Ericsson LS out Approval 6.5.1 Yes Yes approved No
S5-161235 Cooperation guidelines between SA5 and ETSI ISG NFV Ericsson other discussion 6.5.1 Yes Yes agreed No
S5-161236 pCR TS 28.500 Moving business level use cases and requirement on LCM from 28.525 NTT DOCOMO pCR Approval 6.5.1.1 Yes Yes approved No S5-161080
S5-161237 pCR TS 28.525 Moving business level use cases and requirements on LCM to 28.500 NTT DOCOMO pCR Approval 6.5.1.5 Yes Yes approved No S5-161079
S5-161238 pCR TS 28.525 Update business level use cases and requirements on LCM NTT DOCOMO pCR Approval 6.5.1.5 Yes Yes approved No S5-161079
S5-161239 LS from ONF to SA5 on Prepublication of SDN architecture issue 1.1 ONF LS in discussion 5.3 Yes Yes noted No
S5-161240 pCR TS 28.500 Moving business level requirement on FM from TS 28.515 NTT DOCOMO pCR Approval 6.5.1.1 Yes Yes approved No S5-161084
S5-161241 pCR TS 28.515 Moving business-level requirement on FM to TS 28.500 NTT DOCOMO pCR Approval 6.5.1.1 Yes Yes approved No
S5-161242 Rel-11 CR 28.627 Correction of Business level requirements for Handover Parameter Optimization P.I. Works CR discussion 6.3 Yes Yes agreed No
S5-161243 Rel-12 CR 28.627 Correction of Business level requirements for Handover Parameter Optimization P.I. Works CR discussion 6.3 Yes Yes agreed No
S5-161244 Define naming conventions for requirement tags consistent for all new NFV specifications Huawei Tech.(UK) Co., Ltd discussion Endorsement 6.5.1.1 Yes Yes endorsed No S5-161098
S5-161245 pCR R14 Definition of NS in 28500 Ericsson LM pCR Approval 6.5.1.1 Yes Yes approved No S5-161122
S5-161246 LSout to CT4 on Addition of AVP code definitions Alcatel-Lucent LS out Approval 7.1 Yes Yes approved No S5-161075
S5-161247 Reply to: Ls from ETSI INT to SA5 on Validation project for the Conformance Test Specifications for the Diameter Protocol over the Rf and the Ro reference points current meeting LS out approval 7.1 Yes Yes approved No
S5-161248 WI Resource optimization for PS domain online charging sessions Ericsson WID new Approval 7.2 Yes Yes agreed No S5-161159
S5-161249 Rel-13 CR 32.251 Charging Id Assignment for NBIFOM Ericsson CR Approval 7.4.1 Yes Yes agreed No S5-161037
S5-161250 Rel-13 CR 32.298 Charging Id assignment for NBIFOM Ericsson CR Approval 7.4.1 Yes Yes agreed No S5-161038
S5-161251 Rel-13 CR 32.299 Charging Id assignment for NBIFOM Ericsson CR Approval 7.4.1 Yes Yes agreed No S5-161039
S5-161252 LSout SA2 Charging Id assignment for NBIFOM Ericsson LS out Approval 7.4.1 Yes Yes agreed No S5-161040
S5-161253 Rel-13 CR 32.251 Correction for Access Availability Change Reason Ericsson CR Approval 7.4.1 Yes Yes agreed No S5-161123
S5-161254 Rel-13 CR 32.298 Correction for Access Availability Change Reason Ericsson CR Approval 7.4.1 Yes Yes agreed No S5-161125
S5-161255 Rel-13 CR 32.299 Correction for Access Availability Change Reason Ericsson CR Approval 7.4.1 Yes Yes agreed No S5-161127
S5-161256 Rel-13 CR 32.251 Introduce NBIFOM charging for per IP-CAN bearer charging Alcatel-Lucent CR Approval 7.4.1 Yes Yes agreed No S5-161183
S5-161257 Exception sheet for Charging Aspects of IP Flow Mobility support for S2a and S2b Interfaces ZTE WI exception request discussion 7.4.1 Yes Yes approved No
S5-161258 Rel-13 pCR draft TS 32.278 MONTE CDR parameters alignment Huawei Technologies France pCR Approval 7.4.2 Yes Yes approved No S5-161179
S5-161259 Rel-13 pCR draft TS 32.278 MONTE charging information definition and bindings Huawei Technologies France pCR Approval 7.4.2 Yes Yes approved No S5-161180
S5-161260 Rel-13 CR 32.299 Introducing new AVPs for MONTE charging Huawei Technologies France CR Approval 7.4.2 Yes Yes agreed No S5-161176
S5-161261 Rel-13 CR 32.298 Introduction of CDR parameters for MONTE Charging Huawei Technologies France CR Approval 7.4.2 Yes Yes agreed No S5-161177
S5-161262 Rel-13 CR 32.297 MONTE charging impact of CDR files format and transfer Huawei Technologies France CR Approval 7.4.2 Yes Yes agreed No S5-161178
S5-161263 Rel-13 CR 32.260 Correction of 2xx trigger for BYE request to align offline and online charging Ericsson, Alcatel-Lucent CR Approval 7.3 Yes Yes agreed No S5-161049
S5-161264 Rel-13 CR 32.275 Correction of interactions of Announcement service and MMTel supplementary services Ericsson CR Approval 7.3 Yes Yes agreed No S5-161128
S5-161265 Rel-13 CR 32.298 ULI for untrusted wireless access network correction Ericsson CR Approval 7.3 Yes Yes agreed No S5-161130
S5-161266 Rel-13 CR 32.299 ULI for untrusted wireless access network correction Ericsson CR Approval 7.3 Yes Yes agreed No S5-161131
S5-161267 pCR TR 32.850 Clarify ICID for correlation Alcatel-Lucent pCR Approval 7.5.1 Yes Yes approved No S5-161187
S5-161268 Rel-13 PCR 32.850 KI#1 Evaluation and Recommendation ZTE Corporation pCR - 7.5.1 Yes Yes approved No S5-161166
S5-161269 pCR TR 32.850 Proposal for Section 7 Recommendation Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes approved No S5-161173
S5-161270 pCR TR 32.850 Porposal for Section 3 "Definitions, symbols and abbreviations" Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes approved No S5-161170
S5-161271 pCR TR 32.850 Proposal for Section 2 References Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes approved No S5-161175
S5-161272 pCR TR 32.850 Solution of EDITHELP comments Deutsche Telekom AG pCR Approval 7.5.1 Yes Yes approved No S5-161181
S5-161273 Cover sheet Presentation of TS 32.278 to SA for Approval Huawei TS or TR cover discussion 7.4.2 Yes Yes approved No
S5-161274 Latest draft TS 32.278 Telecommunication management; Charging management; Monitoring Event charging Rapporteur (Huawei) draft TS discussion 7.4.2 No Yes left for email approval No
S5-161275 Presentation of TR 32.850 to SA for Approval Rapporteur (Deutsche Telekom) TS or TR cover Approval 7.5.1 Yes Yes approved No
S5-161276 Time Plan for OAM&P WG Chairman other - 6.1 Yes Yes noted No S5-161004
S5-161277 SA5 Meeting Facility Requirements - Proposed updates SA5 Vice Chairman other Agreement 5.1 Yes Yes approved No S5-161065
S5-161278 SA5 Meeting Calendar WG Chairman other - 5.4 Yes Yes agreed No S5-161012
S5-161279 Reply to: LS from Small Cell Forum to SA5 on Enhancements to TR-196 Small Cell Data Model Alcatel-Lucent, Cisco LS out approval 6.1 Yes Yes revised No S5-161339
S5-161280 TS 28.500 Add the relationship between VNF and NE Huawei Tech.(UK) Co., Ltd pCR - 6.5.1.1 Yes Yes approved No S5-161137
S5-161281 pCR draft TS 28.500 Adding the management architecture China Mobile pCR Approval 6.5.1.1 Yes Yes revised No S5-161345 S5-161143
S5-161282 pCR draft TS 28.500 Add the definitions China Mobile pCR Approval 6.5.1.1 Yes Yes revised No S5-161346 S5-161144
S5-161283 pCR TS 28.510 add correction to CM use cases Intel Corporation (UK) Ltd pCR Approval 6.5.1.2 Yes Yes approved No S5-161076
S5-161284 pCR TS 28.510 Adding use case and requirements on querying VNF instance information NTT DOCOMO pCR Approval 6.5.1.2 Yes Yes revised No S5-161350 S5-161082
S5-161285 pCR draft TS 28.525 Add high level use case of enabling or disabling the auto-scaling of a VNF instance(s) ZTE Corporation pCR Approval 6.5.1.5 Yes Yes revised No S5-161363 S5-161093
S5-161286 pCR draft TS 28.510 Add specification level use case of auto-scaling configuration of a VNF instance ZTE Corporation pCR Approval 6.5.1.2 No No withdrawn Yes
S5-161287 pCR TS 28.511 Adding MO creation and configuration procedure flow Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.2 Yes Yes approved No S5-161096
S5-161288 pCR TS 28.510 Adding contents for definition and concepts Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.2 Yes Yes revised No S5-161351 S5-161099
S5-161289 pCR TS 28.515 Updating business and specification level requirements on FM NTT DOCOMO pCR Approval 6.5.1.3 Yes Yes approved No S5-161083
S5-161290 pCR 28.515 Clarification on NE alarm correlation in NFV context use case Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.3 Yes Yes approved No S5-161100
S5-161291 pCR TS 28.510 add VNF related VR performance alarms use cases and requirements Intel Corporation (UK) Ltd pCR Approval 6.5.1.3 Yes Yes revised No S5-161353 S5-161147
S5-161292 Next steps for NFV modelling activity Vice Chair (Huawei) other discussion 4.3 Yes Yes noted No
S5-161293 pCR TS 28.520 add PM data collection methods Intel Corporation (UK) Ltd pCR Approval 6.5.1.4 Yes Yes revised No S5-161355 S5-161077
S5-161294 New SID on Study of filtering of PM measurements Ericsson LM WID new Approval 6.2 Yes Yes revised No S5-161340 S5-161146
S5-161295 pCR TS 28.520 add VNF related VR PM use case and requirement Intel Corporation (UK) Ltd pCR Approval 6.5.1.4 Yes Yes revised No S5-161356 S5-161078
S5-161296 pCR draft TS 28.520 Adding business level use case of updating performance Threshold Monitor in virtualized network ZTE Corporation pCR - 6.5.1.4 Yes Yes approved No S5-161132
S5-161297 pCR draft TS 28.520 Adding specification level use case of updating performance Threshold Monitor in virtualized network ZTE Corporation pCR - 6.5.1.4 Yes Yes approved No S5-161133
S5-161298 pCR draft TS 28.525 Add specification level use case of enabling or disabling the auto-scaling of a VNF instance(s) ZTE pCR discussion 6.5.1.5 Yes Yes noted No S5-161094
S5-161299 pCR 28.525 Requirements for VNF package on-boarding Cisco Systems Inc. pCR Approval 6.5.1.5 Yes Yes approved No S5-161072
S5-161300 pCR 28.525 VNF Package Enabling UC and Requirements Cisco Systems Inc. pCR Approval 6.5.1.5 Yes Yes revised No S5-161361 S5-161073
S5-161301 pCR 28.525 VNF Package Disabling UC and Requirements Cisco Systems Inc. pCR Approval 6.5.1.5 Yes Yes approved No S5-161074
S5-161302 pCR TS 28.525 Adding new requirements on change notification subscriptions NTT DOCOMO pCR Approval 6.5.1.5 Yes Yes approved No S5-161081
S5-161303 Latest draft TR 32.850 “Study on Determination of Completeness of Charging Information in IMS” Rapporteur (Deutsche Telekom) draft TR Approval 7.5.1 No Yes left for email approval No
S5-161304 Rel-13 PCR 32.869 Alternative solution 1 ZTE Corporation pCR - 7.5.2 Yes Yes approved No S5-161168
S5-161305 Latest draft TR 32.869 “Study on Overload Control for Diameter Charging Application ZTE draft TR discussion 7.5.2 No Yes left for email approval No
S5-161306 pCR to TR 29.819 – Update Conclusion on Changes and Clarifications of the rules for Diameter Extensibility Alcatel-Lucent pCR Approval 7.1 Yes Yes endorsed No S5-161201
S5-161307 pCR TR 29.819 - Set of new other changes Alcatel-Lucent pCR Approval 7.1 Yes Yes endorsed No S5-161202
S5-161308 Reply to: LS from CT4 to SA5 on progress of the work on Diameter Base Protocol Update current meeting LS out approval 7.1 Yes Yes approved No
S5-161309 Revised Study Item on Overload Control for Diameter Charging Applications SA5 SWG CH Chair WID revised Agreement 7.5.2 Yes Yes agreed No
S5-161310 New WID filtering of PM measurements Ericsson LM WID new Approval 6.2 Yes Yes agreed No S5-161340
S5-161311 OAM Executive Report from THIS Meeting SA5 Vice Chair (Huawei) report - 6.1 No Yes approved No S5-161005
S5-161312 pCR draft TS 28.525 Add high level use case of enabling or disabling the auto-scaling of a VNF instance(s) ZTE Corporation pCR Approval 6.5.1.5 No Yes left for email approval No S5-161363
S5-161313 Work Plan Status Vice Chair (Huawei) other Information 5.5 No Yes left for email approval No
S5-161314 Reserved Charging SWG other discussion 7.3 No No withdrawn Yes
S5-161315 Reserved Charging SWG other discussion 7.3 No No withdrawn Yes
S5-161316 Reserved Charging SWG other discussion 7.3 No No withdrawn Yes
S5-161317 Reserved Charging SWG other discussion 7.3 No No withdrawn Yes
S5-161318 pCR TS 28.525 Add requirements for NS lifecycle management Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.5 Yes Yes approved No S5-161102
S5-161319 pCR TS 28.525 Adding VNF instance termination use cases and specification level requirements Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.5 Yes Yes approved No S5-161103
S5-161320 pCR TS 28.525 add VNF termination use case and requirements Intel Corporation (UK) Ltd pCR Approval 6.5.1.5 Yes Yes revised No S5-161362 S5-161149
S5-161321 pCR TS 28.525 Adding specification level requirements on VNF instance scaling Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.5 Yes Yes approved No S5-161104
S5-161322 pCR 32.856 Proposed text for clause 4.2.1 ORANGE pCR Agreement 6.6.4 Yes Yes approved No S5-161043
S5-161323 pCR 32.856 Proposed text for clauses 4.2.2 and 4.2.3 ORANGE pCR Agreement 6.6.4 Yes Yes revised No S5-161370 S5-161044
S5-161324 pCR 32.856 proposed text for clause 4.3 ORANGE pCR Agreement 6.6.4 Yes Yes approved No S5-161045
S5-161325 pCR R14 32.862 Access phases for streaming Ericsson LM pCR Approval 6.6.2 Yes Yes revised No S5-161367 S5-161142
S5-161326 pCR TR 32.862 Editorial Clean up Huawei Tech.(UK) Co., Ltd pCR Approval 6.6.2 Yes Yes approved No S5-161106
S5-161327 New WID Study on Next Generation Evolved Network Management Huawei Tech.(UK) Co., Ltd WID new - 6.2 Yes Yes noted No S5-161136
S5-161328 pCR TR 32.855 add missing description of functional split alternative Nokia Networks pCR Approval 6.6.3 Yes Yes approved No S5-161152
S5-161329 draft TR 32.855 Rapporteur (Nokia Networks) draft TR discussion 6.6.3 No Yes left for email approval No
S5-161330 Presentation sheet 32.855 Rapporteur (Nokia Networks) TS or TR cover discussion 6.6.3 No Yes left for email approval No
S5-161331 List of issues from NFV ISG Information Modelling Workshop Vice Chair (Huawei) discussion discussion 4.3 Yes Yes noted No
S5-161332 pCR to 32.860 Short term load balancing decision Cisco Systems Inc. pCR Approval 6.6.1 Yes Yes approved No S5-161068
S5-161333 Skeleton TR 32.865 Study on OAM aspects of SON for AAS Nokia Networks draft TR Decision 6.6.5 Yes Yes approved No S5-161090
S5-161334 Summary of 3GPP SA5-ETSI ISG NFV cooperation guidelines Vice Chair (Huawei) other discussion 6.5.1 Yes Yes noted No
S5-161335 pCR Add Introduction to draft TR 32.865 Nokia Networks pCR Decision 6.6.5 Yes Yes approved No S5-161089
S5-161336 pCR Add scope to draft TR 32.865 Nokia Networks pCR Decision 6.6.5 Yes Yes approved No S5-161091
S5-161337 pCR Add use case on Cell Splitting to draft TR 32.865 Nokia Networks pCR Decision 6.6.5 Yes Yes approved No S5-161092
S5-161338 OAM&P SWG action list Vice Chair (Huawei) other Information 6.1 Yes Yes noted No S5-161188
S5-161339 Reply to: LS from Small Cell Forum to SA5 on Enhancements to TR-196 Small Cell Data Model Alcatel-Lucent, Cisco LS out approval 6.1 Yes Yes approved No S5-161279
S5-161340 New WID filtering of PM measurements Ericsson LM WID new Approval 6.2 Yes Yes revised No S5-161310 S5-161294
S5-161341 Reply to: LS from RAN3 to SA5 on Reply LS on RAN Sharing Enhancements for LTE Ericsson LS out approval 6.1 No Yes left for email approval No
S5-161342 CR R14 to 32.838 on Common Channel Optimization Cisco Systems Inc. CR Approval 6.3 Yes Yes agreed No S5-161226
S5-161343 Rel-13 CR 32.425 Add measurements of components on IP Throughput P.I. Works CR Approval 6.3 Yes Yes agreed No S5-161231
S5-161344 CR 52.402 Add usage of measurements for EE ORANGE, Nokia Networks CR Agreement 6.4.1 Yes Yes agreed No S5-161233
S5-161345 pCR draft TS 28.500 Adding the management architecture China Mobile pCR Approval 6.5.1.1 Yes Yes approved No S5-161281
S5-161346 pCR draft TS 28.500 Add the definitions China Mobile pCR Approval 6.5.1.1 Yes Yes approved No S5-161282
S5-161347 Updated WID Concept, architecture and requirements for mobile networks that include virtualized network functions China Mobile WID revised Approval 6.5.1.1 Yes Yes revised No S5-161374 S5-161145
S5-161348 draft TS 28.500 Rapporteur (China Mobile) draft TS discussion 6.5.1.1 No Yes left for email approval No
S5-161349 Draft TR 28.510 Rapporteur (ZTE) draft TR discussion 6.5.1.2 No Yes left for email approval No
S5-161350 pCR TS 28.510 Adding use case and requirements on querying VNF instance information NTT DOCOMO pCR Approval 6.5.1.2 Yes Yes approved No S5-161284
S5-161351 pCR TS 28.510 Adding contents for definition and concepts Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.2 Yes Yes revised No S5-161375 S5-161288
S5-161352 Draft TS 28.511 Rapporteur (ZTE) draft TS Approval 6.5.1.2 No Yes left for email approval No
S5-161353 pCR TS 28.510 add VNF related VR performance alarms use cases and requirements Intel Corporation (UK) Ltd pCR Approval 6.5.1.4 No Yes left for email approval No S5-161291
S5-161354 Draft TS 28.515 Rapporteur (Huawei) draft TS discussion 6.5.1.3 No Yes left for email approval No
S5-161355 pCR TS 28.520 add PM data collection methods Intel Corporation (UK) Ltd pCR Approval 6.5.1.4 No Yes left for email approval No S5-161293
S5-161356 pCR TS 28.520 add VNF related VR PM use case and requirement Intel Corporation (UK) Ltd pCR Approval 6.5.1.4 Yes Yes approved No S5-161295
S5-161357 Draf TS 28.520 Rapporteur (Intel) draft TS discussion 6.5.1.4 No Yes left for email approval No
S5-161358 pCR TR 32.855 supported scenarios and standardization impacts Nokia Networks pCR Approval 6.6.3 Yes Yes approved No S5-161154
S5-161359 Minutes for Study on OAM support for Licensed Shared Access Rapporteur(Nokia Networks) report - 6.6.3 Yes Yes noted No S5-161023
S5-161360 pCR 32.855 - Solutions evaluation RED Technologies SAS pCR Approval 6.6.3 Yes Yes revised No S5-161373 S5-161108
S5-161361 pCR 28.525 VNF Package Enabling UC and Requirements Cisco Systems Inc. pCR Approval 6.5.1.5 Yes Yes approved No S5-161300
S5-161362 pCR TS 28.525 add VNF termination use case and requirements Intel Corporation (UK) Ltd pCR Approval 6.5.1.5 Yes Yes approved No S5-161320
S5-161363 pCR draft TS 28.525 Add high level use case of enabling or disabling the auto-scaling of a VNF instance(s) ZTE Corporation pCR Approval 6.5.1.5 Yes Yes revised No S5-161312 S5-161285
S5-161364 pCR draft TS 28.525 Add specification level use case of enabling or disabling the auto-scaling of a VNF instance(s) ZTE pCR discussion 6.5.1.5 No Yes withdrawn Yes
S5-161365 Draft TS 28.525 Rapporteur(Nokia Networks) draft TS discussion 6.5.1.5 No Yes left for email approval No
S5-161366 Draft TR 32.860 Rapporteur (Cisco) draft TR discussion 6.6.1 No Yes left for email approval No
S5-161367 pCR R14 32.862 Access phases for streaming Ericsson LM pCR Approval 6.6.2 No Yes left for email approval No S5-161325
S5-161368 Draft TR 32.862 Rapporteur (Huawei) draft TR discussion 6.6.2 No Yes left for email approval No
S5-161369 Cover sheet TR 32.862 Rapporteur (Huawei) TS or TR cover discussion 6.6.2 No Yes left for email approval No
S5-161370 pCR 32.856 Proposed text for clauses 4.2.2 and 4.2.3 ORANGE pCR Agreement 6.6.4 Yes Yes approved No S5-161323
S5-161371 Draft TR 32.856 Rapporteur (Orange) draft TR discussion 6.6.4 No Yes left for email approval No
S5-161372 Draft TR 32.865 Rapporteur (Nokia Networks) draft TR discussion 6.6.5 No Yes left for email approval No
S5-161373 pCR 32.855 - Solutions evaluation RED Technologies SAS pCR Approval 6.6.3 Yes Yes approved No S5-161360
S5-161374 Updated WID Concept, architecture and requirements for mobile networks that include virtualized network functions China Mobile WID revised Approval 6.5.1.1 Yes Yes agreed No S5-161347
S5-161375 pCR TS 28.510 Adding contents for definition and concepts Huawei Tech.(UK) Co., Ltd pCR Approval 6.5.1.2 Yes Yes approved No S5-161351