ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG3_Iu / TSGR3_109-e / Inbox / Drafts / CB # 78_NRbeamLevelMeasInter-RAT_E-CID

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon DRAFT_R3-20xxxx CR Introducing NR beam level measurement in inter-RAT measurement in E-CID measurement over LPPa..docx 2020/08/20 5:41 51,7 KB
icon DRAFT_R3-20xxxx CR Introducing NR beam level measurement in inter-RAT measurement in E-CID measurement over LPPa_v1_DCM.docx 2020/08/20 16:22 53,2 KB
icon DRAFT_R3-20xxxx CR Introducing NR beam level measurement in inter-RAT measurement in E-CID measurement over LPPa_v1_DCM2_Nok.docx 2020/08/24 9:38 52,9 KB
icon DRAFT_R3-20xxxx CR Introducing NR beam level measurement in inter-RAT measurement in E-CID measurement over LPPa_v1_DCM3_Nok.docx 2020/08/24 10:51 52,9 KB
icon DRAFT_R3-20xxxx CR Introducing NR beam level measurement in inter-RAT measurement in E-CID measurement over LPPa_v1_DCM_Nok.docx 2020/08/21 21:47 57,1 KB

5 items.