ETSI logo

www.3gpp.org / ftp / Meetings_3GPP_Sync / RAN4 / Inbox / Drafts / [118][327] Rel-19 RRM perf_Part3_NTN / draft CR / 1. (e)RedCap UE with FR1-NTN

upload
Drag and drop documents here or click to upload

  sort by name/desc           sort by date/desc           sort by size/desc
icon CR to be merged was R4-2601740 Draft CR 38.133 Cleanup requirements NR_NTN_Ph3-Perf.docx 2026/02/11 15:27 478,8 KB
icon Revised R4-2600219 Draft CR on test case for Rel-19 NR NTN phase 3.docx 2026/02/11 11:01 341,1 KB
icon Revised R4-2600219 Draft CR on test case for Rel-19 NR NTN phase 3_v1.docx 2026/02/11 16:05 341,3 KB
icon revised R4-2601551 draftCR on intra-frequency measurement delay test RedCap.docx 2026/02/12 7:13 149,8 KB
icon Revised R4-2601738 Draft CR 38133 SAN handover RedCap NTN.docx 2026/02/12 11:16 128,5 KB
icon Revised R4-2601739 Draft CR 38133 SAN CHO RedCap NTN.docx 2026/02/12 11:16 140,4 KB

6 items.