ETSI logo

www.3gpp.org / ftp / Meetings_3GPP_Sync / RAN4 / Inbox / Drafts / [116bis][311] Rel-19 Demodulation_Part1 / simulation results

upload
Drag and drop documents here or click to upload

  sort by name/desc           sort by date/desc           sort by size/desc
icon R4-2515039 Simulation results summary for SBFD demodulation.xlsm 2025/10/14 8:14 33,2 KB
icon R4-2515039 Simulation results summary for SBFD demodulation_v01_ZTE.xlsm 2025/10/16 6:55 32,6 KB
icon R4-2515039 Simulation results summary for SBFD demodulation_v02_ZTE_Huawei.xlsm 2025/10/16 7:12 32,8 KB
icon R4-2515039 Simulation results summary for SBFD demodulation_v02_ZTE_Huawei2.xlsm 2025/10/16 7:21 32,8 KB
icon R4-2515039.zip 2025/10/17 6:41 29,7 KB
icon R4-2515040 Simulation results summary for NTN Phase 3 demodulation.xlsm 2025/10/14 8:14 59,2 KB
icon R4-2515040 Simulation results summary for NTN Phase 3 demodulation_Huawei.xlsm 2025/10/16 8:25 59,6 KB
icon R4-2515040.zip 2025/10/17 6:41 54,8 KB

8 items.