ETSI logo

www.3gpp.org / ftp / tsg_ran / WG4_Radio / TSGR4_118 / Inbox / Drafts / [118][325] NR_IoT_NTN_Maintenance_RRM

upload
Drag and drop documents here or click to upload

  sort by name/desc           sort by date/desc           sort by size/desc
icon Pre-meeting 2026/02/02 11:58
icon WF 2026/02/16 9:12
icon draft LS on PRACH scheduling.docx 2026/02/16 9:12 48,4 KB
icon Rev R4-2600825 CR on correction of SMTC enhacement requirement for NTN phase 3_v01_CMCC.docx 2026/02/16 9:12 120,4 KB
icon Revised R4-2600216 (NR_NTN_Ph3-Core) CR on RRM core maintenance for NTN Phase 3.docx 2026/02/16 9:12 49 KB
icon Revised R4-2601737 CR 38133 Applicability (e)RedCap NTN core.docx 2026/02/16 9:12 116 KB
icon Revised R4-2601737 CR 38133 Applicability (e)RedCap NTN core_v2.docx 2026/02/16 9:12 115,5 KB
icon revised_R4-2601375_(NR_NTN_Ph3-Core)Modification on RedCap NTN cell reselection.docx 2026/02/16 9:12 34,5 KB
icon Rev_R4-2600825 CR on correction of SMTC enhacement requirement for NTN phase 3.docx 2026/02/16 9:12 124,4 KB

9 items.