ETSI logo

www.3gpp.org / ftp / tsg_ran / WG2_RL2 / TSGR2_111-e / Inbox / Drafts / [Offline-403][eMTC R16] Clarification on subframe level resource reservation (ZTE)

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon [Phase2 Ext111e-403] 2020/09/04 9:35
icon draft 36.331 CR_Clarification on subframe level resource reservation for eMTC-v0.docx 2020/08/25 16:59 35,5 KB
icon Summary of subframe level resource reservation for eMTC-v0-ZTE.doc 2020/08/21 10:35 117 KB
icon Summary of subframe level resource reservation for eMTC-v1-HW.doc 2020/08/24 16:42 126 KB
icon Summary of subframe level resource reservation for eMTC-v2-QC.doc 2020/08/24 17:39 145 KB
icon Summary of subframe level resource reservation for eMTC-v3-Sequans.doc 2020/08/25 9:42 150,5 KB
icon Summary of subframe level resource reservation for eMTC-v4-Eri.doc 2020/08/25 10:14 156 KB
icon Summary of subframe level resource reservation for eMTC-v5-Nokia.doc 2020/08/25 11:17 188 KB
icon Summary of subframe level resource reservation for eMTC-v6-ZTE.doc 2020/08/25 16:58 164 KB

9 items.