ETSI logo

www.3gpp.org / FTP / tsg_ran / WG5_Test_ex-T1 / TSGR5__108_Bangalore / Inbox / drafts

upload
Drag and drop documents here or click to upload

  sort by name/desc           sort by date/desc           sort by size/desc
icon draft1_R5-254309_PRD20v1c0.zip 2025/09/05 8:54 1822,2 KB
icon draft_PRD21 5G NR bands and CADC configurations list_v1.14.0_20250728.zip 2025/07/28 9:41 6084,9 KB
icon draft_PRD21 5G NR bands and CADC configurations list_v1.14.0_20250808.zip 2025/08/08 6:51 6409,3 KB
icon draft_R5-253709_WIDs_after_RAN#108.docx 2025/07/21 8:12 3199,1 KB
icon draft_R5-253915_PRD21_v.1.14.0.zip 2025/09/05 6:43 10041,9 KB
icon Draft_R5-253927 Disc of A-IoT Device Conformance testing-20250808.pptx 2025/08/08 10:53 230,3 KB
icon Draft_R5-253928_New WID on UE Conformance - A-IoT_20250808.docx 2025/08/08 10:53 34,4 KB
icon Draft_R5-253960_New WID on UE Conformance - Channel raster enhancement.docx 2025/08/14 2:52 35,1 KB
icon Draft_R5-254043 New WID on UE Conformance IOT NTN TDD.docx 2025/08/14 19:00 41,2 KB
icon draft_R5-254309_PRD20v1c0.zip 2025/09/04 8:49 1821,8 KB
icon Draft_R5-254431_New_WID_TRP-TRS_MIMO-OTA_Ph3.doc 2025/08/15 17:27 89,5 KB
icon jumbo_HW_R5-25xxxx_R19_CADC_basket_38.521-1_deltaTIB_RIB.docx 2025/08/07 3:53 236,4 KB
icon LATE_draft_11.4.1a_38523-1.docx 2025/08/21 10:40 125,1 KB
icon R5-25xxxx New WID on Enhanced requirements and conductive test methodology for NR NTN and IoT NTN.docx 2025/08/14 3:06 38,2 KB
icon R5-25xxxx New WID on UE Conformance -Low-power wake-up signal and receiver for NR_v2.doc 2025/08/13 2:20 88,5 KB
icon R5-25XXXX Remove applicability for NR IDC TC 8.2.6.5.1.docx 2025/08/20 10:29 45,8 KB
icon R5-25xxxx_38.523-1_10.1.8.1.docx 2025/08/19 4:40 163,8 KB
icon R5-25xxxx_521-3_Add_RIB_EN-DC_R15_KDDI.docx 2025/08/15 0:43 123,6 KB
icon R5-25xxxx_521-3_Add_RIB_EN-DC_R16_KDDI.docx 2025/08/15 0:43 124,5 KB
icon R5-25xxxx_521-3_Add_TIB_EN-DC_R15_KDDI.docx 2025/08/15 0:43 123,3 KB
icon R5-25xxxx_521-3_Add_TIB_EN-DC_R16_KDDI.docx 2025/08/15 0:43 124,8 KB

21 items.