| 1 | Opening of the meeting | Frank |
| 2 | Approval of the agenda | Frank |
| 2.1 | Handling of Postponed Work | Frank |
| 2.2 | IPR Call and Antitrust Reminder | Frank |
| 3 | Meeting reports | Frank |
| 4 | General | S2-109 |
| 4.1 | Common issues and Incoming LSs | Frank |
| 4.2 | LS (S2-151434, S2-151440) on VoLTE Roaming, Replies and related SID proposal | Frank |
| 4.3 | Joint Meetings | Frank |
| JM1 | Joint Meeting with SA WG6 (TBD) - any potential tdocs are under 6.2 | Erik |
| JM2 | Tentative Joint Meeting with RAN WG2 on ProSe group priority - any related tdocs are under 6.10 | Frank |
| 4.4 | Elections | Frank |
| 5 | Pre-Rel-13 Essential Corrections | S2-109 |
| 5.1 | 3GPP Packet Access Maintenance | Frank |
| 5.2 | QoS and PCC Maintenance | Krisztian |
| 5.3 | Non-3GPP Access Maintenance | Krisztian |
| 5.4 | IMS-Related Maintenance | Erik |
| 5.5 | IMS Maintenance | Erik |
| 6 | Release 13 | S2-109 |
| 6.1 | Release 13 Maintenance | S2-109 |
| 6.1.1 | Rel-13 3GPP Pkt Access Maintenance | Frank |
| 6.1.2 | Rel-13 PCC/QoS Maintenance | Krisztian |
| 6.1.3 | Rel-13 Non-3GPP Access Maintenance | Krisztian |
| 6.1.4 | Rel-13 IMS-Related Maintenance | Erik |
| 6.2 | Mission Critical Push to Talk over LTE (MCPTT) | Erik |
| 6.3 | Dedicated Core Networks (DECOR) | Erik |
| 6.4 | IP Flow Mobility support for S2a and S2b interfaces (NBIFOM) | Krisztian |
| 6.5 | Architecture Enhancements for Service Exposure (AESE) | Frank |
| 6.6 | Monitoring Enhancements (MONTE) | Frank |
| 6.7 | Group based Enhancements (GROUPE) | Frank |
| 6.8 | Enhanced CSFB (eCSFB) | Not_On_Agenda |
| 6.9 | Enhancements to WEBRTC ineroperability (eWebRTCi) | Krisztian |
| 6.10 | Extended Proximity-based Services TR Phase (eProSe-Ext-SA2TR) | Erik |
| 6.11 | SRVCC Enhancements for Transcoding Avoidance (SETA) | Not_On_Agenda |
| 6.12 | Optimizations to Support High Latency Communications (FS_HLCom) | Frank |
| 6.13 | Flexible Mobile Service Steering (FMSS) | Frank |
| 6.14 | MBMS Enhancements (MBMS_enh) | Frank |
| 6.15 | Feasibility study on Extended DRX cycle for Power Consumption Optimization (FS_eDRX) | Frank |
| 6.16 | Feasibility study on IOPS (FS_IOPS_St2) | Frank |
| 6.17 | Feasibility study on the Support of Emergency services over WLAN (FS_SEW) | Krisztian |
| 6.18 | Study on architecture enhancements of cellular systems for ultra low complexity and low throughput Internet of Things (FS_AE_CIoT) | Not_On_Agenda |
| 6.19 | TEI13 Category F - Minor Corrections (Clean up, etc.), non-essential | Not_On_Agenda |
| 6.20 | TEI13 Category B/C - Enhancements and Improvements only | S2-109 |
| 6.20.1 | TEI13 Category B/C for 3GPP Packet Access | Frank |
| 6.20.2 | TEI13 Category B/C for PCC/QoS | Not_On_Agenda |
| 6.20.3 | TEI13 Category B/C for Non-3GPP Access | Not_On_Agenda |
| 6.20.4 | TEI13 Category B/C for IMS, IMS-Related, Emergency, Other | Erik |
| 7 | Project Planning and Management | Frank |
| 7.1 | New and Revised Work Items, Cover sheets for completed work items | Frank |
| 7.2 | Review of the Work Plan | Frank |
| 7.3 | Planning future meetings | Frank |
| 8 | AOB | Frank |
| 9 | Close of the Meeting | Frank |