Tdoc List

2020-03-09 18:23

Agenda Topic TDoc Title Source Type For Avail Treated Decision Wdrn Replaced-by Replaces
1 Opening of the meeting R5‑200000 Agenda WG Chairman agenda Information Yes
YesRAN5#86 Electronic Meeting has full decision power. Review of the IPR obligations, Antitrust and US EAR regulations - please refer to the ‘Reminder for IPR Declaration’ (page 15); ‘Antitrust Guidance’ (page 15) and ‘Statement on US EAR’ (page 16) in R5-200000.
approved No    
    R5‑200001 Agenda - mid week session WG Chairman agenda Information No
Yes
withdrawn Yes    
    R5‑200002 Agenda - closing session WG Chairman agenda Information No
Yes
withdrawn Yes    
    R5‑200003 RAN5#86 E-meeting Timeline, Scope, Process WG Chairman agenda Information Yes
Yes
endorsed No    
2 Reports                      
2.1 Live Reports R5‑200004 RAN5 Leadership Team WG Chairman other Information Yes
Yes
noted No    
    R5‑200005 RAN5#85 WG Minutes ETSI Secretariat report Approval Yes
Yesopen until Fri.
approved No    
    R5‑200006 RAN5#85 WG Action Points ETSI Secretariat report Information Yes
Yes
noted No    
    R5‑200007 Latest RAN Plenary notes WG Chairman report Information Yes
Yes
noted No    
    R5‑200008 Latest RAN Plenary draft Report WG Chairman report Information Yes
Yes
noted No    
    R5‑200009 Post Plenary Active Work Item update ETSI Secretariat other Information Yes
Yesopen until Fri. Sprint: pls. update the WP table.
revised No R5‑200896  
    R5‑200896 Post Plenary Active Work Item update ETSI Secretariat other Information Yes
Yes
noted No   R5‑200009
2.2 General Reports for information R5‑200010 RAN5 SR to RP#86 WG Chairman report Information Yes
Yes
noted No    
    R5‑200011 TF160 SR to RP#86 WG Chairman report Information Yes
Yes
noted No    
    R5‑200012 RAN Chair Report to SA#86 WG Chairman report Information Yes
Yes
noted No    
    R5‑200238 GCF 3GPP TCL after GCF CAG#61 Ericsson other Information Yes
Yes
noted No    
    R5‑200479 3GPP RAN5 CA status list (pre-RAN5#86-e meeting) Ericsson other Information No
Yes
withdrawn Yes    
3 Incoming Liaison Statements R5‑200017 Reply LS on MOP for intra-band EN-DC TSG WG RAN4 LS in Information Yes
YesRAN5 Vice Chair RF: deferred until 20.2. Huawei: all the actions in RAN5 LS seem to have been taken care effectively, no further clarification is needed from RAN4. No reply LS needed.
noted No    
    R5‑200018 Reply LS on 5G-NR FR2 Transmitter & Receiver Testability Issues MSG TFES LS in Information Yes
Yesconclusion upfront postponed to RP#87.
withdrawn Yes    
    R5‑200019 dummy LS2 ETSI LS in Information No
Yes
withdrawn Yes    
4 RAN5 General Issues                      
4.1 New Work Item proposals - for intro only R5‑200683 Views on the NR FR1 TRP/TRS requirement specification Apple (UK) Limited WID new Decision No
Yes
withdrawn Yes    
    R5‑200684 Views on the NR FR1 TRP/TRS requirement specification Apple (UK) Limited WID new Decision Yes
YesRAN5 Chair: outside the meeting scope.
withdrawn Yes    
    R5‑200862 New SID on NR FR1 and EN-DC FR1 UE TRP and TRS Guangdong OPPO Mobile Telecom. SID new Information Yes
YesRAN5 Chair: is outside the meeting scope. Due to the reduced scope of E-meeting this topic cannot be part of the agenda. Suggestion is to make use of the RAN5 main exploder following the completion of RAN5#86-e meeting to collect RAN5 feedback on SID as well as the discussion paper. Guangdong OPPO Mobile Telecom: We have discussed with the parties that have strong views on this topic in RAN and mores discussions are still ongoing. We expect there will be some initial level agreement before going to the F2F meeting. And we will report the latest progress information for reference before the next F2F discussion.
withdrawn Yes    
4.2 General Discussion Papers                      
4.2.1 5GS R5‑200157 Discussion paper on NR test frequencies for PCells to achieve full bandwidth testing of NR bands Ericsson discussion Endorsement Yes
YesAll proposals accepted. r1 was produced. Based on comments from Rohde & Schwarz. The changes is editorial to correct duplicated clause numbers and the associated references in the discussion paper.
revised No R5‑201004  
    R5‑201004 Discussion paper on NR test frequencies for PCells to achieve full bandwidth testing of NR bands Ericsson discussion Endorsement Yes
YesNoted with all proposals accepted
noted No   R5‑200157
    R5‑200241 Discussion of ambiguity of Ninfo in TBS calculation Huawei,Hisilicon discussion Approval Yes
YesQualcomm and Motorola Mobility commented. Huawei: prefer to go with option 2 a little bit if this is not too difficult for TTCN implementation. By option 1, strictly speaking we don’t have a full TBS test, and we don’t know when RAN1 can make a choice, that may need a long time. ZTE: The following conclusion made in last RAN1 meeting clearly states that there is no consensus in RAN1 to address this issue in Rel-15. Conclusion On the issue of ambiguity with regards to the definition of N_info, there is no consensus in RAN1 to make specificiation change in Rel-15. For further discussion on whether to fix this in Rel-16 In the RAN1 email reflector, RAN1 is discussing whether the CR R1-2000558 should be treated in the upcoming e-meeting. The proposal from the Chair is not to treat this issue in this e-meeting because of the above RAN1 conclusion. " Issue #26(R1-2000558, Nokia): Based on the comments so far, I propose we do not take this issue for email discussion." And RAN2 also has no plan to define any mechanism to report UE behavior on it. So from our understanding, it is a proper assumption to assume that a real network will skip the "abnormal" cases by implementation. Therefore, we support Option 1 ( skip the specific TBS size) so that it is more aligned with this assumption. RAN5 Chair: no consensus on a way forward. There seems to be the following views expressed to date: 1. Wait for RAN1 to conclude at their current e-meeting and revisit this topic again in RAN5#87. 2. Accept and proceed with option 1 - skip the specific TBS size Will be postponed to the next RAN5#87 meeting. Impact on TC 7.1.1.4.2.3. ->proposal for RAN5 to go ahead with Option 1: skip the specific TBS size. Conclusion: RAN5 accepted the solution 'skip the specific TBS size'. Proponents to submit CRs to RAN5#87 meeting to introduce this solution into test specifications. TTCN implementation shall be dependent on prose update.
noted No    
    R5‑200245 Feature priority inputs for the RAN5 5GS work plan MCC TF160 discussion Information Yes
Yeslate doc. Ericsson: defer until RAN5#87? Conclusion: Noted with information collected to be used for 5GS Phase planning.
noted No    
    R5‑200792 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200793 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200809 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200845 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200846 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200847 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200848 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200850 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200851 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200852 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200853 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision Yes
Yesoutside the meeting scope.
withdrawn Yes    
4.2.2 All other topics                      
4.3 RAN5 PRDs/Templates R5‑200013 RAN5#86 LS Template WG Chairman other Information Yes
Yes
noted No    
4.4 Meeting schedule for 2020-21 R5‑200014 Meeting schedule for 2020 WG Chairman other   Yes
Yes
noted No    
4.5 Tdocs for mid-week joint session                      
4.5.1 RF group docs for WG review/verdict - original A.I. retained                      
4.5.2 Sig group docs for WG review/verdict - original A.I. retained R5‑200286 Update TS38.508-2 Table A.4.3.2B.2.3.12-1 CGC Inc. CR Agreement No
Yeslate doc
withdrawn Yes    
4.5.3 Other open issues from joint sessions - original A.I. retained                      
4.5.4 UE Application Layer Data Throughput Performance TEI11_Test / TEI15_Test (TR 37.901)                      
4.5.5 GCF Test Optimisation                      
4.5.6 5GS                      
4.5.7 Other                      
5 RF Functional Area                      
5.1 Review action points (fm A.I. 2.1)                      
5.2 Review incoming LS (fm A.I. 3) & new subject discussion papers                      
5.3 Open Work Items                      
5.3.1 Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest                      
5.3.1.1 TS 36.508                      
5.3.1.2 TS 36.521-1 R5‑200772 Update of TC 8.2.2.3.1_A.4 TDD PDSCH Open Loop Spatial Multiplexing 2x2 for CA (5DL CA) SGS Wireless CR Agreement Yes
Yesout of scope of meeting, SGS agreed to withdraw
withdrawn Yes    
5.3.1.3 TS 36.521-2                      
5.3.1.4 TS 36.521-3                      
5.3.1.5 TS 37.571-1                      
5.3.1.6 TS 37.571-3                      
5.3.1.7 TS 37.571-5                      
5.3.1.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.1.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.1.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.1.11 Discussion Papers / Work Plan / TC lists                      
5.3.2 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest                      
5.3.2.1 TS 38.508-1 R5‑200331 CR to 38.508-1 to introduce DFF Range Length Keysight Technologies UK Ltd CR Agreement Yes
Yesno cl. aff. r1 was produced. Comments from R&S for the need of improvement of the text in one of the steps.
revised No R5‑200899  
    R5‑200899 CR to 38.508-1 to introduce DFF Range Length Keysight Technologies UK Ltd CR Agreement Yes
Yescontained no revision marks.
revised No R5‑201232 R5‑200331
    R5‑201232 CR to 38.508-1 to introduce DFF Range Length Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200899
    R5‑200433 Correction to powerControlOffset for performance tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200434 Correction to RACH configuration for RRM tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200435 Correction to TDD UL-DL Config for performance test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200437 Correction to TRS configuration for RRM tests Anritsu, Keysight Technologies CR Agreement Yes
Yesr1 was produced. - Merge changes from R5-200871(KS) - Added n NZP-CSI-RS-Resources for NZP CRI RS. Added entries are conditioned with CRS_RS_RMC. - Added Keysight as co-source company.
revised No R5‑201197  
    R5‑201197 Correction to TRS configuration for RRM tests Anritsu, Keysight Technologies CR Agreement Yes
Yes
agreed No   R5‑200437
    R5‑200566 Addition of NR SUL connection diagrams Huawei,Hisilicon CR Agreement Yes
Yescover +NR r1 was produced. Comments from R&S. r2 was produced. i. Based on offline comments, update UE diagrams for SUL. Adding UE connection diagrams in which NR SUL and NR NUL transmitted on the same antenna.(Figure A.3.2.3.6 and A.3.2.3.8) ii. Adding Figure A.3.1.2.4: Test Equipment connection for NR SUL TX-tests with additional Spectrum Analyzer iii. Delete extra chapter title: A.3.1.2 Transmitter tests using Spectrum Analyser?
revised No R5‑200966  
    R5‑200966 Addition of NR SUL connection diagrams Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200566
    R5‑200594 Corrections on test frequencies for EN-DC band combinations including FR1 and FR2 in 38.508-1 ZTE Corporation CR Agreement Yes
Yeswas wrong WIC r1 was produced. For joint.
revised No R5‑200900  
    R5‑200900 Corrections on test frequencies for EN-DC band combinations including FR1 and FR2 in 38.508-1 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200594
    R5‑200595 Corrections on test frequencies for EN-DC band combinations including FR2 in 38.508-1 ZTE Corporation CR Agreement Yes
Yeswas wrong WIC r1 was produced. For joint.
revised No R5‑200901  
    R5‑200901 Corrections on test frequencies for EN-DC band combinations including FR2 in 38.508-1 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200595
    R5‑200596 Corrections on uplink EN-DC configurations for test frequencies in 38.508-1 ZTE Corporation CR Agreement Yes
Yeswas wrong WIC r1 was produced. For joint.
revised No R5‑200902  
    R5‑200902 Corrections on uplink EN-DC configurations for test frequencies in 38.508-1 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200596
    R5‑200671 TRS configuration messages definition for RF in 38.508-1 Keysight Technologies UK Ltd CR Agreement Yes
Yesfor email agreement r1 was produced.
revised No R5‑201246  
    R5‑201246 TRS configuration messages definition for RF in 38.508-1 Keysight Technologies UK Ltd CR Agreement Yes
Yescorresponding RAN4 CR R4-2002918 has been agreed. Email agreed.
agreed No   R5‑200671
    R5‑200742 Addition of IFF DFF Hybrid Setup for FR2 2AoA RRM test Anritsu CR Agreement Yes
Yesr1 was produced. Remove the description about QZ Size to be aligned with updated associated discussion paper R5-200020r1.
revised No R5‑201189  
    R5‑201189 Addition of IFF DFF Hybrid Setup for FR2 2AoA RRM test Anritsu CR Agreement Yes
Yes
agreed No   R5‑200742
    R5‑200871 Update CSI-RS Meas config for RRM message exceptions Keysight Technologies UK Ltd CR Agreement Yes
Yesalready covered Anritsu R5-200437r1.
withdrawn Yes    
5.3.2.2 TS 38.508-2 R5‑200688 Updates on UE capability for Rel-15 NR CA configuration NTT DOCOMO INC. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201162  
    R5‑201162 Updates on UE capability for Rel-15 NR CA configuration NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑200688
5.3.2.3 TS 38.509                      
5.3.2.4 TS 38.521-1                      
5.3.2.4.1 Tx Requirements (Clause 6) R5‑200036 Correction of reference numbers in TS 38.521-1 CMCC CR Agreement Yes
Yesr1 was produced. r2 was produced.
revised No R5‑200971  
    R5‑200971 Correction of reference numbers in TS 38.521-1 CMCC CR Agreement Yes
Yes
agreed No   R5‑200036
    R5‑200344 Corrections to TC 6.3A.3 transmit On OFF time mask for CA FR1 China Unicom CR Agreement Yes
Yesr1 was produced. The Po_NominalWithGrant should set to -106dBm because only even value for Po_NominalWithGrant is allowed (step size 2) in TS38.311. The associated discussion paper is R5-200478r1.
revised No R5‑200962  
    R5‑200962 Corrections to TC 6.3A.3 transmit On OFF time mask for CA FR1 China Unicom CR Agreement Yes
Yes
agreed No   R5‑200344
    R5‑200396 Cleaning up of power class 2 test cases in FR1 Huawei, HiSilicon, CMCC CR Agreement Yes
Yesr2 was produced. Keysight: R5-200396 is also addressing the topic of the UE Tx Diversity in the proposed HPUE tests. However, my understanding is that there is not yet RAN4 consensus and response to “R5-198688 - LS on the testability of FR1 Tx diversity” so meanwhile only 1 UE Tx antenna should still be considered. Huawei: RAN4’s ongoing discussion is limited to MIMO mode with one layer and two antenna ports. That’s not the same as whats in this CR. For MOP testing it’s reasonable to measure the sum of power on both antenna connectors. This problem faces urgent industry need and we need to figure out a way forward in this meeting. Without clearly defining the test method, the validation and conformance testing of UE with 2 Tx antennas will be blocked. Ericsson and R&S agreed with Keysight. Probably withdrawn.
revised No R5‑201196  
    R5‑201196 Cleaning up of power class 2 test cases in FR1 Huawei, HiSilicon, CMCC CR Agreement Yes
YesRAN4 dependency R4-2000117 for email agreement r1 was produced. Qualcomm disagreed: TxD is out of scope for RAN 5 test procedure because there is no core requirement for it. The means for such UE declaration within the spec (signaling based or 38.508-2 PICS based or some other means) does not exist as of today. Without a means to implement a UE declaration, the proposed NOTE in 6.2.1 is un-testable. r2 was produced. Qualcomm agreed: pls. align r2 with what is endorsed in slide # 4 of R5-201181, text in Sections 6.2.1.4.2 Step # 4, 6.2.2.4.2 Step # 4 and 6.5.2.4.1.4.2 Step # 7 (and maybe other places) from “exception” to “message exception”.
revised No R5‑201247 R5‑200396
    R5‑201247 Cleaning up of power class 2 test cases in FR1 Huawei, HiSilicon, CMCC CR Agreement Yes
YesRAN4 CR was not approved. More discussion in RAN5 is needed to coordinate the understanding of current core specification. Postponed to next meeting. Verdict is not having any impact to R5-201196r2 and we can proceed with implementation of the final version of the CR into TS38.521-1."
agreed No   R5‑201196
    R5‑200397 Updating power configuration for PRACH time mask Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200438 Clarification of measurement interval of frequency error in FR1 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200439 Correction to 6.2.3 A-MPR test case Anritsu CR Agreement Yes
Yesr1 was produced. Corrected the test ID numbering in test requirement Tables in 6.2.3.5-4, 6.2.3.5-5. ericsson: Some changes conflict with R5-200767. r2 was produced.
revised No R5‑200972  
    R5‑200972 Correction to 6.2.3 A-MPR test case Anritsu CR Agreement Yes
Yes
agreed No   R5‑200439
    R5‑200440 Correction to 6.3.4.3 Power Control Relative power tolerance Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200441 Correction to SEM and ACLR test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200442 Correction to transmit modulation quality test in FR1 Anritsu CR Agreement Yes
Yesr1 was produced. Place of new paragraph regarding DC location in SUL test is corrected from 6.4C.2.1 to 6.4C.2.
revised No R5‑200973  
    R5‑200973 Correction to transmit modulation quality test in FR1 Anritsu CR Agreement Yes
Yes
withdrawn Yes   R5‑200442
    R5‑200443 Correction to UL power window description for 6.3.4.4 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200567 Update of test description for NR test case 6.2.2-MPR Huawei,Hisilicon CR Agreement Yes
Yesmissed +"test description for"
withdrawn Yes    
    R5‑200568 Update of test requirements for NR test case 6.5D.2.2 and 6.5D.2.4 Huawei,Hisilicon CR Agreement Yes
Yesmissed +"test requirements for" r1 was produced. Cover update.
revised No R5‑200974  
    R5‑200974 Update of test requirements for NR test case 6.5D.2.2 and 6.5D.2.4 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200568
    R5‑200569 Update of NR SUL test cases Huawei,Hisilicon CR Agreement Yes
Yes+ "test configurations for" r1 was produced.Correcting Title in the coversheet to solve 3GU issue. Adding content of table 6.4C.2.1.4-2 for PRACH message content in 6.4C.2. Correcting a mistake in the line above Table 6.4C.2.1.4-1. Based on offline comment, updating Test Channel bandwidth for Non-SUL carrier in Table 6.2C.3.4-1 to eliminate replication errors.
revised No R5‑200975  
    R5‑200975 Update of NR SUL test cases Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200569
    R5‑200570 Update of NR test case 6.5.3.2-Spurious emission for UE co-existence Huawei,Hisilicon CR Agreement Yes
YesSecoex
agreed No    
    R5‑200639 Update of Minimum requirements of 6.2.2 UE maximum output power reduction CAICT CR Agreement No
Yes
withdrawn Yes    
    R5‑200640 Update of Minimum requirements of 6.2.2 UE maximum output power reduction CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200658 Update of 6.1 common part of Tx in TS38.521-1 China Unicom CR Agreement Yes
Yes
agreed No    
    R5‑200659 Core spec alignment for test case 6.3.4.3 Relative power tolerance Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200664 Correction of UL configuration for almost contiguous allocation in 6.2.2 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200666 Update measurement bandwidth references in 6.5.4 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200693 Update for 6.5.3.2 Spurious emission for UE co-existence Qualcomm Korea CR Agreement Yes
Yes
agreed No    
    R5‑200694 Update for 6.5.3.3 Additional spurious emissions Qualcomm Korea CR Agreement Yes
Yesr1 was produced. r2 was produced. Corrected typo in table numbering for new table added for NS_45 Added Editor’s note to indicate TP analysis for NS_05 and NS_45 are TBD.
revised No R5‑200892  
    R5‑200892 Update for 6.5.3.3 Additional spurious emissions Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑200694
    R5‑200696 Correct power window settings Qualcomm Korea CR Agreement Yes
YesDiscussion paper 0695 offline discussions To be withdrawn pending further agreements on the MUr value.
withdrawn Yes    
    R5‑200725 Correction of A-SE for NS_04 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200726 Update of NR test case 6.2.4-ConfigTP Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Coversheet correction.
revised No R5‑200976  
    R5‑200976 Update of NR test case 6.2.4-ConfigTP Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200726
    R5‑200755 Removing text from a Void clause Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200756 Aligning A-MPR clause with TS 38.101-1 Rel-15 Ericsson CR Agreement Yes
Yeslate doc r1 was produced. • Correcting Test applicability in 6.2.3.2 for NS_05U and NS_100. • Adding references to ACLR requirements for test case 6.5.2.4. • Correcting references to ACLR requirements in Table 6.2.3.3.1-1 for NS_03U, NS_05U and NS_43U.
revised No R5‑200906  
    R5‑200906 Aligning A-MPR clause with TS 38.101-1 Rel-15 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200756
    R5‑200757 Correction of A_MPR test for NS_05 and NS_05U Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200759 Update of test case 6.2.3 UE A_MPR, NS_37 Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200761 Update of test case 6.2.3 UE A_MPR, NS_38 Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200763 Update of test case 6.2.3 UE A_MPR, NS_39 Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200765 Corrections of NS_43 in 38.521-1 section 6 Ericsson, SoftBank Corp. CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200767 Corrections of NS_43U in 38.521-1 section 6 Ericsson, SoftBank Corp. CR Agreement Yes
Yeslate doc changes in R5-200439r1 conflict.
agreed No    
    R5‑200769 Corrections of NS_18 in 38.521-1 section 6 Ericsson CR Agreement Yes
Yeslate doc totally different title: "Adding test of A_MPR for NS_18 to clause 6.2.3". Revised after the meeting.
revised No R5‑201238  
    R5‑201238 Corrections of NS_18 in 38.521-1 section 6 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200769
5.3.2.4.2 Rx Requirements (Clause 7) R5‑200037 Update of TC 7.7A.1 CMCC, Huawei, Hisilicon CR Agreement Yes
Yesr1 was produced. The test procedure has been updated to fix the overlap with R5-200727. The header has been changed into e-meeting format. The Source of the coversheet have been changed.
revised No R5‑200907  
    R5‑200907 Update of TC 7.7A.1 CMCC, Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200037
    R5‑200461 Update of 7.6A.3.1 Out-of-band blocking for 2DL CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200462 Update of 7.6A.4.1 Narrow band blocking for 2DL CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200463 Update of 7.8A.2.1 Wide band Intermodulation for 2DL CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200571 Update of NR test case 7.4A Maximum input level for CA Huawei,Hisilicon CR Agreement Yes
Yescorrected coversheet title from old: Update of NR test case 7.4A.1-MaxIL 2DL CA r1 was produced. Undone some changes to resolve overlapping with R5-200391 and R5-200727.
revised No R5‑200977  
    R5‑200977 Update of NR test case 7.4A Maximum input level for CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200571
    R5‑200572 Update of NR test case 7.6A.2 Inband Blocking for CA Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Cover.
revised No R5‑200978  
    R5‑200978 Update of NR test case 7.6A.2 Inband Blocking for CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200572
    R5‑200641 Core spec alignment for 7.6.3 and 7.8 CAICT CR Agreement Yes
Yesr1 was produced.
revised No R5‑200893  
    R5‑200893 Core spec alignment for 7.6.3 and 7.8 CAICT CR Agreement Yes
Yes
agreed No   R5‑200641
    R5‑200700 Removal of square brackets for DCI format for test cases in 7.6 and 7.7 of SA FR1 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200727 Cleaning up of Rx 2DL CA test cases in FR1 Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Cleaning up overlapping with R5-200391. Deleting subclause 7.7A.1 to fix the overlap with R5-200037.
revised No R5‑200979  
    R5‑200979 Cleaning up of Rx 2DL CA test cases in FR1 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200727
5.3.2.4.3 Clauses 1-5 / Annexes R5‑200022 Updates of MU and TT in TS 38.521-1 NTT DOCOMO, INC. CR Agreement Yes
YesThere is no agreement for -1 MU and TT during this meeting except for Huawei’s papers (0392_Dp, 0393_CR)
withdrawn Yes    
    R5‑200038 Update of Clause 4 in TS 38.521-1 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yesr1 was produced. Editorial wording changes.
revised No R5‑200908  
    R5‑200908 Update of Clause 4 in TS 38.521-1 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yes
agreed No   R5‑200038
    R5‑200337 Update of clause 5 to TS 38.521-1 in R15 China Unicom CR Agreement Yes
Yesr1 was produced: Removed band combos n77D/n78D/n79D and n77E/n78E/n79E from Table 5.5A.1-1 to align with core spec TS38.101-1.
revised No R5‑200909  
    R5‑200909 Update of clause 5 to TS 38.521-1 in R15 China Unicom CR Agreement Yes
Yes
agreed No   R5‑200337
    R5‑200391 Adding statistical testing condition in Annex H for CA testing Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced.
revised No R5‑200924  
    R5‑200924 Adding statistical testing condition in Annex H for CA testing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200391
    R5‑200393 Adding MU and TT for FR1 Rx CA test cases Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.2.5 TS 38.521-2 R5‑200039 Correction of reference numbers in TS 38.521-2 CMCC CR Agreement Yes
Yescoversheet spec + data r1 was produced.
revised No R5‑200980  
    R5‑200980 Correction of reference numbers in TS 38.521-2 CMCC CR Agreement Yes
Yes
agreed No   R5‑200039
    R5‑200332 CR to 38.521-2 to properly define Link and Meas Angles Keysight Technologies UK Ltd CR Agreement Yes
Yesdependent on a RAN4 CR R4-2000198. for email agreement RAN4 CR had to be revised to R4-2002734 to make small editorial changes. Not pursued.
not pursued No    
    R5‑200861 Update to SA FR2 Spurious Emission Test Case Anritsu CR Agreement Yes
Yesmerged into R5-200023 (Docomo).
withdrawn Yes    
5.3.2.5.1 Tx Requirements (Clause 6) R5‑200223 Correction to TC 6.3.4.4 Aggregate power tolerance LG Electronics CR Agreement Yes
Yesr1 was produced. Offline discussion with Ericsson. r2 was produced. - Alignment to latest Core Spec - The scheduling pattern is modified in figure 6.3.4.4.4.2-1 for RAN4 alignment(R4-2000003). - The power window is modified in test procedure from E///’s comments.
revised No R5‑200894  
    R5‑200894 Correction to TC 6.3.4.4 Aggregate power tolerance LG Electronics CR Agreement Yes
Yesfor email agreement Email agreed.
agreed No   R5‑200223
    R5‑200224 Introduction of New TC 6.4A.2.3.2 In-band emissions for 3UL CA LG Electronics CR Agreement No
Yes
withdrawn Yes    
    R5‑200368 Addition of new test case 6.3A.1.4 Minimum output power for 5UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200369 Addition of new test case 6.3A.1.5 Minimum output power for 6UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200372 Addition of new test case 6.3A.1.6 Minimum output power for 7UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200374 Addition of new test case 6.3A.1.7 Minimum output power for 8UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200375 Addition of new test case 6.4A.2.1.4 Error vector magnitude for 5UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200376 Addition of new test case 6.4A.2.1.5 Error vector magnitude for 6UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200377 Addition of new test case 6.4A.2.1.6 Error vector magnitude for 7UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200380 Clarification of UEsetting for FR2 in TS38.521-2 Conformance test Sporton International Inc. CR Agreement Yes
Yesoutside of meeting scope.
withdrawn Yes    
    R5‑200382 Addition of new test case 6.4A.2.1.7 Error vector magnitude for 8UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200383 Update of test cases for Error vector magnitude for CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200444 Clarification of measurement interval of frequency error in FR2 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200445 Correction to transmit modulation quality tests in FR2 Anritsu CR Agreement Yes
Yesadding the same sentence from core requirement in general section will not provide enough clarity in each test case. Will come back in next meeting
withdrawn Yes    
    R5‑200467 Update of absolute power tolerance for test point 3 Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. .docx
revised No R5‑201060  
    R5‑201060 Update of absolute power tolerance for test point 3 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200467
    R5‑200555 Additions to Initial Conditions and Messages for SRS time mask with UL MIMO Samsung R&D Institute UK CR Agreement Yes
Yes"Addition to SRS time mask with UL MIMO test case document was not treated since UL-MIMO out of scope of e-meeting"
not treated No    
    R5‑200557 Clarify absolute power tolerance for CA TP3 Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No    
    R5‑200559 Beam correspondence TC message contents clarifications Samsung R&D Institute UK CR Agreement Yes
Yesr1 was produced. Changed the derivation path in the additional message contents. r2 was produced.
revised No R5‑200910  
    R5‑200910 Beam correspondence TC message contents clarifications Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑200559
    R5‑200642 Updates to test case relative power tolerance 6.3.4.3 Ericsson CR Agreement Yes
YesR&S: didn't agree to remove the associated editor’s note. r1 was produced.
revised No R5‑201161  
    R5‑201161 Updates to test case relative power tolerance 6.3.4.3 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200642
    R5‑200652 Correction of Editor's note of 6.2.2 and 6.3.2 of SA FR2 R15 CAICT CR Agreement No
Yes
withdrawn Yes    
    R5‑200654 Correction of Editor's note of 6.2.2 and 6.3.2 of SA FR2 R15 CAICT CR Agreement No
Yes
withdrawn Yes    
    R5‑200655 Correction of Editor's note of 6.2.2 and 6.3.2 of SA FR2 R15 CAICT CR Agreement No
Yes
withdrawn Yes    
    R5‑200656 Correction of Editor's note of 6.2.2 and 6.3.2 of SA FR2 R15 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200800 Update of Standalone FR2 A-MPR test case Ericsson CR Agreement Yes
Yes
agreed No    
5.3.2.5.2 Rx Requirements (Clause 7) R5‑200466 Update of FR2 REFSENS Huawei, HiSilicon CR Agreement Yes
YesCovered by R5-200602 from Qualcomm.
withdrawn Yes    
    R5‑200602 Updates to reference sensitivity test case Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No    
5.3.2.5.3 Clauses 1-5 / Annexes R5‑200023 Updates of MU and TT in TS 38.521-2 NTT DOCOMO, INC. CR Agreement Yes
Yesr1 was produced. 1) Brackets of Rx Spur (band n257, 34 to 40 GHz) was removed based on the endorsement of R5-201034. 2) Editor’s note in OFF power was removed based on the MU completion of R5-200744r2 (TR 38.902 CR). 3) Editor’s note and offset value of General Spurious was updated based on the R5-200744r2. 4) Some missing test cases for UL CA are introduced to the Annex F.
revised No R5‑201192  
    R5‑201192 Updates of MU and TT in TS 38.521-2 NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑200023
    R5‑200040 Update of Clause 4 in TS 38.521-2 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yesr1 was produced. Editorial wording changes. Associated supporting paper R5-200046r1.
revised No R5‑200911  
    R5‑200911 Update of Clause 4 in TS 38.521-2 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yes
agreed No   R5‑200040
    R5‑200319 CR to 38.521-2 on CDF/PDF Scaling Factor Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200320 CR to 38.521-2: Correction to TRP grid Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200418 Update of Operating bands and Channel arrangement of SA FR2 R15 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200465 Update of rx beampeak search Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. .docx
revised No R5‑201059  
    R5‑201059 Update of rx beampeak search Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200465
    R5‑200593 Correction of the FR2 RMC slot patterns for MOP test cases Apple (UK) Limited CR Agreement Yes
Yeswas wrong AI. r2 was produced. RAN4 dependency. Apple submitted similar CR in RAN4.
revised No R5‑200912  
    R5‑200912 Correction of the FR2 RMC slot patterns for MOP test cases Apple (UK) Limited CR Agreement Yes
Yesfor email agreement rev -. Needs final revision! No revision marks!
revised No R5‑201243 R5‑200593
    R5‑201243 Correction of the FR2 RMC slot patterns for MOP test cases Apple (UK) Limited CR Agreement No
Yesfor email agreement RAN4 agreed R4-200003 again no revision marks
revised No R5‑201244 R5‑200912
    R5‑201244 Correction of the FR2 RMC slot patterns for MOP test cases Apple (UK) Limited CR Agreement Yes
Yesfor email agreement Email agreed
agreed No   R5‑201243
    R5‑200667 Alignment of Table A.3.1-1 in 38.521-2 to core spec 38.101-2 Keysight Technologies UK Ltd CR Agreement Yes
YesRAN4 dependency, R4 spec correction needed as TRS config in RAN4 spec 38.101-1/2 causes TRS and SSB to collide in the same slot for email agreement r1 was produced.
revised No R5‑201248  
    R5‑201248 Alignment of Table A.3.1-1 in 38.521-2 to core spec 38.101-2 Keysight Technologies UK Ltd CR Agreement Yes
Yescorresponding RAN4 CR R4-2002918 has been agreed. Email agreed.
agreed No   R5‑200667
5.3.2.6 TS 38.521-3 R5‑200740 Update to EN-DC tests with 3CCs and above Anritsu CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200863 Update to NSA FR2 Spurious Emission Test Case Anritsu CR Agreement Yes
Yesr1 was produced. Editorial errors corrected. merged into R5-200024 (Docomo).
revised No R5‑200981  
    R5‑200981 Update to NSA FR2 Spurious Emission Test Case Anritsu CR Agreement Yes
Yes
withdrawn Yes   R5‑200863
5.3.2.6.1 Tx Requirements (Clause 6) R5‑200115 Updates of test parameter for MOP and Spurious co-existence NTT DOCOMO, INC. CR Agreement Yes
YesRelated/Conflicted CRs (0400, 0447) are still under discussion however this CR is covered by the other CRs in any case.
withdrawn Yes    
    R5‑200381 Clarification of UEsetting for FR2 in TS38.521-3 Conformance test Sporton International Inc. CR Agreement Yes
Yesoutside of meeting scope.
withdrawn Yes    
    R5‑200399 Adding common uplink configuration of E-UTRA carrier for EN-DC testing Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced.
revised No R5‑200925  
    R5‑200925 Adding common uplink configuration of E-UTRA carrier for EN-DC testing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200399
    R5‑200400 Updating MOP for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. Revision is based on the understanding that SA MOP requirements would apply to non-overlapping transmission. r3 was produced. Removed ‘The test case is incomplete’ from Editor’s note so that the case remains complete based on 38.101-3 rapporteur’s comment. The test case has already fulfilled coverage of core requirements. Any further investigation of additional scenario can be carried without changing the test case back to incomplete.
revised No R5‑201055  
    R5‑201055 Updating MOP for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200400
    R5‑200401 Updating configured output power for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. Similar changes as in R5-200405r2.
revised No R5‑200926  
    R5‑200926 Updating configured output power for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200401
    R5‑200404 Updating MOP for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. SA MOP requirements apply to non-overlapping transmission.
revised No R5‑201183  
    R5‑201183 Updating MOP for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesfor email agreement Ericsson disagreed: The provisions on MIMO support for EN-DC on 38.101-3 clause 6.1 are part of one of five options discussed by RAN4 for resolving the power class ambiguity. The RAN5 CRs for email agreement are assuming that “Option 1” is selected by RAN4. RAN4 discussions have not been concluded, which implies that the requirements are still open in this scenario (even if there are some text in 38.101 which contradicts this). Ericsson does not support Option 1 since this does not resolve the ambiguity in network signaling, and would like to remove the provision in section 6.1 of 38.101-3. RAN5 should not agree any CRs before RAN4 agreement has been reached, and the core specifications has been updated (depending on the option agreed). The 5 options mentioned above are also the reason why the related RAN5 discussion on power class 2 for single or dual UE Tx couldn’t be agreed. For the above reasons, Ericsson cannot agree to these CRs at this meeting and would like to continue discussing the subject and resolve it in coming meetings after RAN4 discussions have finalized.
postponed No   R5‑200404
    R5‑200405 Updating configured output power for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. r3 was produced. The test procedure step 3 is updated to cover all scenarios in a more general way.
revised No R5‑200927  
    R5‑200927 Updating configured output power for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200405
    R5‑200408 Updating MOP for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. SA MOP requirements apply to non-overlapping transmission.
revised No R5‑201185  
    R5‑201185 Updating MOP for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesfor email agreement Ericsson disagreed. See R5-201183.
postponed No   R5‑200408
    R5‑200409 Updating configured output power for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. Similar changes are captured as R5-200405r2.
revised No R5‑200928  
    R5‑200928 Updating configured output power for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200409
    R5‑200446 Correction to FR1 EN-DC Spurious Test Case Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200447 Correction to FR1 Inter-band EN-DC tests with exceptional requirement Anritsu CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200448 Correction to LTE specialSubframePatterns in Maximum Output Power Test Case Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200449 Correction to tdm-PatternConfig in FR1 EN-DC Maximum Output Power Test Case Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200630 Correcting usage of modifiedMPR-Behaviour Ericsson CR Agreement Yes
Yesr1 was produced. r2 was produced.
revised No R5‑201198  
    R5‑201198 Correcting usage of modifiedMPR-Behaviour Ericsson CR Agreement Yes
Yes
agreed No   R5‑200630
    R5‑200650 Updates to 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC Ericsson CR Agreement Yes
Yesr1 was produced.
revised No R5‑200982  
    R5‑200982 Updates to 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No   R5‑200650
    R5‑200651 Updates to 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200653 Updates to 6.2B.2.2, UE Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200657 Updates to 6.2B.2.3 and 6.2B.3.3 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200670 Update reference in Test Requirement section of 6.5B.4.3.5 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200724 Core spec alignment of EN-DC MOP and configured output power Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. Fixing the overlapping with R5-200651 and R5-200653
revised No R5‑200929  
    R5‑200929 Core spec alignment of EN-DC MOP and configured output power Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200724
    R5‑200730 Correction to reference table number for TC 6.2B.2.3 and TC 6.2B.2.4 LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑200771 Corrections to 6.2B.3.1, UE A_MPR for Intra-band Contig EN_DC Ericsson CR Agreement Yes
Yeslate doc r1 was produced. R&S: In Table 6.2B.3.1.4.1-1 and Table 6.2B.3.1.4.1-2 there is a “B or B” entry. Should this just be B, or something else? In the test procedure you insert: “For TDD slots with transient periods are not under test.” which is coming from LTE. In NR we usually apply “For TDD, only slots consisting of only UL symbols are under test.” r2 was produced. • The insertion of a new column to existing tables is removed and replaced by a new table including the new column. The old table is removed. • “B or B” for Test ID 45 in Table 6.2B.3.1.4.1-1 and Table 6.2B.3.1.4.1-2 is replaced by “B or C”. • Clarification to Test procedure step 3 that “For TDD, only slots consisting of only UL symbols are under test.”
revised No R5‑200983  
    R5‑200983 Corrections to 6.2B.3.1, UE A_MPR for Intra-band Contig EN_DC Ericsson CR Agreement Yes
Yes
agreed No   R5‑200771
    R5‑200801 Update of Non-Standalone FR2 A-MPR test case Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200814 Correction to Test Case 6.5B.3.3.2 ROHDE & SCHWARZ CR Agreement Yes
Yesoverlap has been cleared since CR R5-200722 has been withdrawn.
agreed No    
5.3.2.6.2 Rx Requirements (Clause 7) R5‑200041 Addition of Clause 7.5B.0.3a CMCC CR Agreement Yes
Yesr1 was produced.
revised No R5‑200984  
    R5‑200984 Addition of Clause 7.5B.0.3a CMCC CR Agreement Yes
Yes
agreed No   R5‑200041
    R5‑200043 Update of TC 7.5B.1 ACS for for intra-band contiguous EN-DC 2CCs CMCC CR Agreement Yes
Yesr1 was produced.
revised No R5‑200964  
    R5‑200964 Update of TC 7.5B.1 ACS for for intra-band contiguous EN-DC 2CCs CMCC CR Agreement Yes
Yes
agreed No   R5‑200043
    R5‑200044 Update of TC 7.5B.2 ACS for for intra-band non-contiguous EN-DC 2CCs CMCC CR Agreement Yes
Yescover: add +non-! wrong data. r1 was produced. r2 was produced.
revised No R5‑200963  
    R5‑200963 Update of TC 7.5B.2 ACS for for intra-band non-contiguous EN-DC 2CCs CMCC CR Agreement Yes
Yes
agreed No   R5‑200044
    R5‑200668 Correction of reference clause for 7.3B.2.3 Reference Sensitivity Test Procedure Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200669 Correction on invalid CBW in 7.3B.2.3 Keysight Technologies UK Ltd CR Agreement Yes
Yeschanges contained in R5-200813.
withdrawn Yes    
    R5‑200728 Correction of test cases in 7.6B.2 Inband blocking for DC CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200731 Correction of test cases in 7.6B.3 Out-of-band blocking for DC CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200732 Correction of test cases in 7.6B.4 Narrow band blocking for DC CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200733 Correction of test cases in 7.7B Spurious response for DC CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200751 Correction of REFSENS for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yesseveral comments by R&S. r1 was produced.
revised No R5‑201165  
    R5‑201165 Correction of REFSENS for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200751
    R5‑200813 Correction of Reference Sensitivity Test Case 7.3B.2.3 ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. Removal of changes to tables 7.3B.2.3.4.2.1-3c and -3k in order to resolve overlap with CR R5-200751. Typo corrections on cover sheet. No technical changes. r2 was produced. Correction of the test requirement in Table 7.3B.2.3.5-4 based on Keysight's comment.
revised No R5‑200995  
    R5‑200995 Correction of Reference Sensitivity Test Case 7.3B.2.3 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200813
    R5‑200859 Update of 7.3B.2 Reference sensitivity for EN-DC NTT DOCOMO INC. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201191  
    R5‑201191 Update of 7.3B.2 Reference sensitivity for EN-DC NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑200859
5.3.2.6.3 Clauses 1-5 / Annexes R5‑200024 Updates of MU and TT in TS 38.521-3 NTT DOCOMO, INC. CR Agreement Yes
Yesr1 was produced.1) Editor’s note (FR2 Spurious tests) was updated since corresponding SA test cases were updated. 2) Some missing test cases are introduced into Annex F. 3) Editor’s note (FR2 SC) was removed since this test case was already completed at the last RAN5#85. r2 was produced. OFF power (Inter-FR2, 2CCs), which is not implemented to the latest spec was introduced in this version.
revised No R5‑201193  
    R5‑201193 Updates of MU and TT in TS 38.521-3 NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑200024
    R5‑200042 Update of Clause 4 in TS 38.521-3 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yesr1 was produced. Editorial wording changes.
revised No R5‑200913  
    R5‑200913 Update of Clause 4 in TS 38.521-3 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yes
agreed No   R5‑200042
    R5‑200776 TS 38.521-3 Section 1-5 and Annex updates to align with core specification Qualcomm communications-France CR Agreement Yes
Yes
agreed No    
5.3.2.7 TS 38.521-4 R5‑200322 CR to 38.521-4 to introduce isolation procedure Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200663 Replacing derivation paths to 38.331 Ericsson CR Agreement Yes
Yesr1 was produced. Corrected table numbering in sub-clause 8.2.2.2.1.1.4.3_1 Elements and brackets added back to Table 6.2.2.1.1.1.4.4_1-2, Table 6.2.2.2.1.1.4.4_1-2 and Table 8.2.2.2.1.1.4.3_1-2
revised No R5‑201090  
    R5‑201090 Replacing derivation paths to 38.331 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200663
5.3.2.7.1 Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6) R5‑200271 Update to Demod TC 5.2.3.2.1_1 Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No    
    R5‑200450 Addition of message exceptions for Type2 QCL information Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200452 Core alignment to 4Rx PDCCH Demod Test Cases Anritsu CR Agreement Yes
YesRAN4 dependency : R4-2000081->2447 for email agreement r1 was produced.
revised No R5‑201245  
    R5‑201245 Core alignment to 4Rx PDCCH Demod Test Cases Anritsu CR Agreement Yes
YesEmail agreed.
agreed No   R5‑200452
    R5‑200453 Correction to FR1 2Rx PDSCH demodulation test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200454 Correction to FR1 4Rx PDSCH demodulation test cases Anritsu CR Agreement Yes
Yesr1 was produced. Recovering the hierachical structure of 5.4.3.3 and updating the wording of 5.4.3.2.
agreed No    
    R5‑200455 Correction to measurement uncertainty and test tolerance for CQI test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200456 Correction to PDCCH demod TCs Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200660 Correcting CQI value in test procedure Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200682 Correction to Applicability rules for Performance tests Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑200710 Update of TC 5.2.2.1.3_1 2Rx FDD PDSCH mapping Type B Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200711 Update of TC 5.2.3.1.2_1 4Rx FDD PDSCH mapping Type A and CSI-RS overlapped Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200712 Update of TC 5.2.3.1.3_1 4Rx FDD PDSCH mapping Type B Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200713 Update of TC 5.2.3.2.2_1 4Rx TDD PDSCH mapping Type A and CSI-RS overlapped Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200714 Update of TC 5.2.3.2.3_1 4Rx TDD PDSCH mapping Type B Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200715 Update of TC 6.2.3.1.1.1 4Rx FDD periodic CQI reporting Huawei, HiSilicon CR Agreement Yes
Yeschanges are fully contained in CR R5-200455 from Anritsu.
withdrawn Yes    
    R5‑200716 Update of TC 6.2.3.2.1.1 4Rx TDD perioidc CQI reporting Huawei, HiSilicon CR Agreement Yes
Yeschanges are fully contained in CR R5-200455 from Anritsu.
withdrawn Yes    
    R5‑200717 Update of TC 6.4.2.1_1 2Rx FDD RI reporting Huawei, HiSilicon CR Agreement Yes
YesR&S: In Table 6.4.2.1_1.4.3.1-2 CSI-RS-ResourceMapping for NZP-CSI-RS, Row3 is applied. However, Row3 is not a possible IE according to TS 38.331. In Table 6.4.2.1_1.4.3.1-3: CSI-RS-ResourceMapping for ZP-CSI-RS, “Row5” is not a valid value for frequencyDomainAllocation: only row1, row2, row4 and other are allowed. r1 was produced. Corrected the configuration of IE CSI-RS-ResourceMapping.
revised No R5‑201068  
    R5‑201068 Update of TC 6.4.2.1_1 2Rx FDD RI reporting Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200717
    R5‑200729 Core spec alignment for FR1 4Rx FDD PDSCH Type A Demodulation performance LG Electronics CR Agreement Yes
Yes
agreed No    
5.3.2.7.2 Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8) R5‑200661 Correction to test case 8.2.2.2.1.1 2 Rx, TDD FR2 periodic CQI reporting under AWGN performance for both SA and NSA Ericsson CR Agreement Yes
Yestab: r1 was produced.
revised No R5‑200914  
    R5‑200914 Correction to test case 8.2.2.2.1.1 2 Rx, TDD FR2 periodic CQI reporting under AWGN performance for both SA and NSA Ericsson CR Agreement Yes
Yes
agreed No   R5‑200661
5.3.2.7.3 Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10) R5‑200334 Addition of FR2 Demod sustained data rate test case Qualcomm Technologies Int CR Agreement Yes
Yesr1 was produced. Added editor’s note for pending MU/TT analysis. r2 was produced.
revised No R5‑201180  
    R5‑201180 Addition of FR2 Demod sustained data rate test case Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No   R5‑200334
5.3.2.7.4 Clauses 1-4 / Annexes R5‑200045 Update of Clause 4 in TS 38.521-4 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yesr1 was produced. Editorial wording changes.
revised No R5‑200915  
    R5‑200915 Update of Clause 4 in TS 38.521-4 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yes
agreed No   R5‑200045
    R5‑200451 Core alignment for FR2 demod test case Anritsu CR Agreement Yes
Yesr1 was produced. Changes in Annex B is removed to solve overlap with R5-200672(BV).
revised No R5‑200985  
    R5‑200985 Core alignment for FR2 demod test case Anritsu CR Agreement Yes
Yes
agreed No   R5‑200451
    R5‑200672 Updated to Annex A and B for performance tests Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑200718 Update of Test Tolerance in Annex F Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.2.8 TS 38.522 R5‑200145 TP and format updated for TS 38.522 Bureau Veritas, CMCC, Ericsson, Huawei, ROHDE & SCHWARZ, Sporton, Qualcomm, CAICT CR Agreement Yes
Yesr1 was produced. Based on the outcome of R5-200046 discussion. r2 was produced. - updated D004 to include n65; - removed PC2 standalone TC based on R5-200396 CR outcome; - RRM TC branch condition updated; - Completed SA FR1 TCs removed NOTE 1 r3 was produced. - summary change of 10 included for TS38.521-3 completed TCs; - Removed TS38.521-3 NOTE 5 for non LTE anchor agnostic TCs; - removed HPUE condition since no longer needed; - TS38.521-3 TC 7.6B.3.3 and 7.7B.3 are not completed yet, NOTE1 is added; - summary change of 11 included for TS38.521-4 completed TCs; - More completed SUL list in TS38.521-1
revised No R5‑201036  
    R5‑201036 TP and format updated for TS 38.522 Bureau Veritas, CMCC, Ericsson, Huawei, ROHDE & SCHWARZ, Sporton, Qualcomm, CAICT CR Agreement Yes
YesRAN4 dependency R4-2001396 for email agreement Email agreed.
agreed No   R5‑200145
    R5‑200287 Update TS38.522 Table 4.1.2-1a CGC Inc. CR Agreement Yes
Yesalready considered in the TS38.522 jumbo CR R5-2000145.
withdrawn Yes    
    R5‑200302 Correction of applicability of L1-RSRP measurements for beam reporting test cases Ericsson CR Agreement Yes
Yesmerged to R5-200145.
withdrawn Yes    
5.3.2.9 TS 38.533 R5‑200701 Correction to Test Applicability for 4.6.2.1 EN-DC FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201104  
    R5‑201104 Correction to Test Applicability for 4.6.2.1 EN-DC FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V., , Keysight Technologies CR Agreement Yes
Yesdifferent CR title in final doc: Correction to Message Exception for 4.5.1.3 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode (wrong doc was submitted).
revised No R5‑201242 R5‑200701
    R5‑201242 Correction to Test Applicability for 4.6.2.1 EN-DC FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V., , Keysight Technologies CR Agreement Yes
Yes
agreed No   R5‑201104
    R5‑200822 Correction to Test Applicability for 4.3.2.2.2 Non-contention based random access test in FR1 for PSCell in EN-DC Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200823 Correction to SRS Configuration for 4.4.3.1 EN-DC FR1 timing advance adjustment accuracy Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200824 Correction to Test Parameters for 4.5.1.1 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRev# R4-2002135. r1 was produced.
revised No R5‑201105  
    R5‑201105 Correction to Test Parameters for 4.5.1.1 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200824
    R5‑200825 Correction to Test Procedure for 4.5.1.2 EN-DC FR1 radio link monitoring in-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201106  
    R5‑201106 Correction to Test Procedure for 4.5.1.2 EN-DC FR1 radio link monitoring in-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200825
    R5‑200826 Correction to Message Exception for 4.5.1.3 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Merges the changes from KEYS CR R5-200844.
revised No R5‑201070  
    R5‑201070 Correction to Message Exception for 4.5.1.3 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200826
    R5‑200827 Correction to Message Exception for 4.5.1.4 EN-DC FR1 radio link monitoring In-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesMerged with Keysight's R5-200857.
withdrawn Yes    
    R5‑200828 Correction to Message Exceptions for 4.6.1.3 EN-DC FR1 event-triggered reporting with gap in non-DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesMerged with R&S's R5-200620.
withdrawn Yes    
    R5‑200829 Correction to Message Exception for 4.6.1.5 EN-DC FR1 event-triggered reporting without gap in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200830 Correction to Test Applicability for 4.6.2.2 EN-DC FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced?
revised No R5‑201071  
    R5‑201071 Correction to Test Applicability for 4.6.2.2 EN-DC FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200830
    R5‑200831 Correction to Test Applicability for 4.6.2.5 EN-DC FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced?
revised No R5‑201072  
    R5‑201072 Correction to Test Applicability for 4.6.2.5 EN-DC FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200831
    R5‑200832 Correction to Test Applicability for 4.6.2.6 EN-DC FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced?
revised No R5‑201073  
    R5‑201073 Correction to Test Applicability for 4.6.2.6 EN-DC FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200832
    R5‑200833 Correction to Test Applicability for 6.3.2.2.2 Non-Contention based random access test in FR1 for NR standalone Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200834 Correction to SRS Configuration for 6.4.3.1 NR SA FR1 timing advance adjustment accuracy Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200835 Correction to Test Parameter for 6.5.1.1 NR SA FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Added a change which is RAN4 dependent on R4-2002135 being discussed currently in RAN4 e-meet. r2 was produced.
revised No R5‑201074  
    R5‑201074 Correction to Test Parameter for 6.5.1.1 NR SA FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200835
    R5‑200836 Correction to Test Procedure for 6.5.1.2 NR SA FR1 radio link monitoring in-sync test for PCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Added a change which is RAN4 dependent on R4-2002135 being discussed currently in RAN4 e-meet. Also took care of offline comments received. r2 was produced.
revised No R5‑201075  
    R5‑201075 Correction to Test Procedure for 6.5.1.2 NR SA FR1 radio link monitoring in-sync test for PCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200836
    R5‑200837 Correction to Message Exception for 6.5.1.3 NR SA FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Added a change which is RAN4 dependent being discussed currently in RAN4 e-meet. Also took care of offline editorial comments received. The dependent RAN4 CR number is R4-2002135. r2 was produced.
revised No R5‑201076  
    R5‑201076 Correction to Message Exception for 6.5.1.3 NR SA FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesfor email agreement Email agreed.
agreed No   R5‑200837
    R5‑200838 Correction to Message Exception for 6.5.1.4 NR SA FR1 radio link monitoring In-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Added a change which is RAN4 dependent being discussed currently in RAN4 e-meet. Also took care of offline editorial comments received. The dependent RAN4 CR number is R4-2002135. r2 was produced.
revised No R5‑201077  
    R5‑201077 Correction to Message Exception for 6.5.1.4 NR SA FR1 radio link monitoring In-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200838
    R5‑200839 Correction to Message Exception for 6.6.1.5 NR SA FR1 event-triggered reporting without gap in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200840 Correction to Test Applicability for 6.6.2.1 NR SA FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201078  
    R5‑201078 Correction to Test Applicability for 6.6.2.1 NR SA FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200840
    R5‑200841 Correction to Test Applicability for 6.6.2.2 NA SA FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201079  
    R5‑201079 Correction to Test Applicability for 6.6.2.2 NA SA FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesrev -. Revised after the meeting.
revised No R5‑201240 R5‑200841
    R5‑201240 Correction to Test Applicability for 6.6.2.2 NA SA FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑201079
    R5‑200842 Correction to Test Applicability for 6.6.2.5 NR SA FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201080  
    R5‑201080 Correction to Test Applicability for 6.6.2.5 NR SA FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200842
    R5‑200843 Correction to Test Applicability for 6.6.2.6 NR SA FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201081  
    R5‑201081 Correction to Test Applicability for 6.6.2.6 NR SA FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200843
    R5‑200844 Update TC 4.5.1.3 Keysight Technologies UK Ltd CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200849 Update RLM non DRX test cases Keysight Technologies UK Ltd CR Agreement Yes
Yesr1 was produced. Removed overlapping with R5-200824.
revised No R5‑201166  
    R5‑201166 Update RLM non DRX test cases Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200849
    R5‑200857 Update 4.5.1.4 test case Keysight Technologies UK Ltd, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Merged changes with R5-200827 to solve overlapping
revised No R5‑201167  
    R5‑201167 Update 4.5.1.4 test case Keysight Technologies UK Ltd, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200857
    R5‑200866 Clarification 4.4.1.1 test procedure Keysight Technologies UK Ltd, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Correction in T eval interval. r2 was produced.
revised No R5‑201168  
    R5‑201168 Clarification 4.4.1.1 test procedure Keysight Technologies UK Ltd, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200866
    R5‑200880 Correction to Test Parameters for 4.6.1.1 Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Offline editorial comments r2 was produced.
revised No R5‑201082  
    R5‑201082 Correction to Test Parameters for 4.6.1.1 Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200880
    R5‑200881 Correction to Test Parameters for 4.6.1.2 Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Offline editorial comments
revised No R5‑201083  
    R5‑201083 Correction to Test Parameters for 4.6.1.2 Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200881
5.3.2.9.1 EN-DC with all NR cells in FR1 (Clause 4) R5‑200274 Test tolerance update inter-frequency SS-RSRP NSA ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced.
revised No R5‑201039  
    R5‑201039 Test tolerance update inter-frequency SS-RSRP NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200274
    R5‑200275 Test tolerance update intra-frequency SS-RSRQ NSA ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. Correction in the Highest allowed reported value for Test 3 for NC and EC, as pointed out by Ericsson as part of the TT analysis review.
revised No R5‑201040  
    R5‑201040 Test tolerance update intra-frequency SS-RSRQ NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200275
    R5‑200276 Test tolerance update inter-frequency SS-RSRQ NSA ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. RAN4 dependent: R4-2001373. for email agreement Email agreed.
agreed No    
    R5‑200277 Test tolerance update intra-frequency SS-SINR NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200278 Test tolerance update inter-frequency SS-SINR NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200308 Correction of RRM Test Case 4.6.3.1 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201045  
    R5‑201045 Correction of RRM Test Case 4.6.3.1 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200308
    R5‑200309 Correction of RRM Test Case 4.6.3.2 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201046  
    R5‑201046 Correction of RRM Test Case 4.6.3.2 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200309
    R5‑200310 Correction of RRM Test Case 4.6.3.3 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201047  
    R5‑201047 Correction of RRM Test Case 4.6.3.3 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200310
    R5‑200311 Correction of RRM Test Case 4.6.3.4 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. This CR is RAN4 dependant. r2 was produced.
revised No R5‑201048  
    R5‑201048 Correction of RRM Test Case 4.6.3.4 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200311
    R5‑200422 Correction to EN-DC FR1 event-triggered reporting test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200426 Correction to test description of RRM TC 4.6.1.3 and 4.6.1.6 Anritsu CR Agreement Yes
Yesr1 was produced. Editorial.
revised No R5‑201057  
    R5‑201057 Correction to test description of RRM TC 4.6.1.3 and 4.6.1.6 Anritsu CR Agreement Yes
Yes
agreed No   R5‑200426
    R5‑200428 Correction to UE transmit timing accuracy test case Anritsu CR Agreement Yes
YesRAN4 dependency : R4-2000168 for email agreement Email agreed.
agreed No    
    R5‑200472 Update FR1 Test Tolerance of 4.5.2.3 interruptions on NR SCC in sync Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. 1.SCell addition procedure was added in step3 2.Message exceptions to configure “sCellToAddModList” and “SMTC” were added 3. Corrected some editorial errors.
revised No R5‑201063  
    R5‑201063 Update FR1 Test Tolerance of 4.5.2.3 interruptions on NR SCC in sync Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency on R4-2001596 for email agreement Email agreed.
agreed No   R5‑200472
    R5‑200473 Update FR1 Test Tolerance of 4.5.2.4 interruptions on NR SCC in async Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. 1.SCell addition procedure was added in step3 2.Message exceptions to configure “sCellToAddModList” and “SMTC” were added 3. Corrected some editorial errors.
revised No R5‑201064  
    R5‑201064 Update FR1 Test Tolerance of 4.5.2.4 interruptions on NR SCC in async Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency on R4-2001596 for email agreement Email agreed.
agreed No   R5‑200473
    R5‑200474 Update FR1 Test Tolerance of 4.5.2.5 E-UTRAN SCC in sync Huawei, HiSilicon CR Agreement Yes
Yesproblems have not been resolved in RAN4 and RAN5.
withdrawn Yes    
    R5‑200475 Update FR1 Test Tolerance of 4.5.2.6 E-UTRAN SCC in async Huawei, HiSilicon CR Agreement Yes
Yesproblems have not been resolved in RAN4 and RAN5.
withdrawn Yes    
    R5‑200561 Addition of RRM Test Case 4.5.4.1 minimum requirements Samsung R&D Institute UK CR Agreement Yes
Yes"EN-DC with all NR cells in FR1 (Clause 4) Test case is not a GCF/PVG priority test and is not 100% complete , out of scope of e-meeting agenda "
not treated No    
    R5‑200563 Discussion on UE UL Carrier Reconfiguration Delay Samsung R&D Institute UK discussion   Yes
Yes"EN-DC with all NR cells in FR1 (Clause 4) Test case is not a GCF/PVG priority test and is not 100% complete , out of scope of e-meeting agenda "
not treated No    
    R5‑200608 Corrections to SS-RSRP meas accuracy NSA tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200620 Correct message contents event triggered measurement tests Rohde & Schwarz, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Merged the changes from R5-200828. r2 was produced. Include two other message exception tables.
revised No R5‑201160  
    R5‑201160 Correct message contents event triggered measurement tests Rohde & Schwarz, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200620
    R5‑200785 Update of EN-DC SSB-based RLM TC 4.5.1.1, 4.5.1.2, 4.5.1.3 and 4.5.1.4 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200786 Update of EN-DC CSI-RS-based RLM TC 4.5.1.5, 4.5.1.6, 4.5.1.7 and 4.5.1.8 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
5.3.2.9.2 EN-DC with at least 1 NR Cell in FR2 (Clause5)                      
5.3.2.9.3 NR Standalone in FR1 (Clause 6) R5‑200279 Test tolerance update inter-frequency SS-RSRP SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200280 Test tolerance update intra-frequency SS-RSRQ SA ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. Correction in the Highest allowed reported value for Test 3 for NC and EC, as pointed out by Ericsson as part of the TT analysis review.
revised No R5‑201041  
    R5‑201041 Test tolerance update intra-frequency SS-RSRQ SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200280
    R5‑200281 Test tolerance update inter-frequency SS-RSRQ SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200282 Test tolerance update intra-frequency SS-SINR SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200283 Test tolerance update inter-frequency SS-SINR SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200312 Correction of RRM Test Case 6.6.4.1 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. CR is RAN4 dependant. r2 was produced.
revised No R5‑201049  
    R5‑201049 Correction of RRM Test Case 6.6.4.1 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200312
    R5‑200313 Correction of RRM Test Case 6.6.4.2 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201050  
    R5‑201050 Correction of RRM Test Case 6.6.4.2 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200313
    R5‑200314 Correction of RRM Test Case 6.6.4.3 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201051  
    R5‑201051 Correction of RRM Test Case 6.6.4.3 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200314
    R5‑200315 Correction of RRM Test Case 6.6.4.4 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yes36.533 typo. weird bar. r1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201052  
    R5‑201052 Correction of RRM Test Case 6.6.4.4 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200315
    R5‑200420 Core alignment for event-triggered reporting test cases Anritsu CR Agreement Yes
Yesr1 was produced. Empty cells in Table 6.3.1.5.5-1 are removed. (Editorial correction). RAN4 dependency : R4-2000166
revised No R5‑200986  
    R5‑200986 Core alignment for event-triggered reporting test cases Anritsu CR Agreement Yes
YesRAN4 dependency R4-2000166 for email agreement RAN4 CR was agreed in RAN4#94-e. Email agreed.
agreed No   R5‑200420
    R5‑200421 Correction to Active UL BWP for intra-frequency event triggered reporting with gap Anritsu CR Agreement Yes
YesRAN4 dependency : R4-2000161 for email agreement RAN4 CR was agreed in RAN4#94-e. Email agreed.
agreed No    
    R5‑200423 Correction to FR1 NR SA E-UTRA cell re-selection test cases Anritsu CR Agreement Yes
YesRAN4 dependency : R4-2000163 for email agreement RAN4 CR was agreed in RAN4#94-e. Email agreed.
agreed No    
    R5‑200424 Correction to message contents in 6.6.1.5 and 6.6.1.6 Anritsu CR Agreement Yes
Yesr1 was produced. Editorial.
revised No R5‑201056  
    R5‑201056 Correction to message contents in 6.6.1.5 and 6.6.1.6 Anritsu CR Agreement Yes
Yes
agreed No   R5‑200424
    R5‑200425 Correction to NR SA FR1 SS-RSRP measurement accuracy tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200607 Re-submission R5-197804 not implemented ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200609 Corrections to SS-RSRP meas accuracy SA tests ROHDE & SCHWARZ CR Agreement Yes
YesCR: "Test tolerance update inter-frequency SS-RSRP SA". r1 was produced.
revised No R5‑201030  
    R5‑201030 Corrections to SS-RSRP meas accuracy SA tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200609
    R5‑200705 Correction to TC 6.1.1.2 FR1 inter-freq re-selection Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200706 Update of TC 6.3.2.1.1 FR1 RRC re-establishment Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. Corrected SMTC configuration in message exceptions.
revised No R5‑200987  
    R5‑200987 Update of TC 6.3.2.1.1 FR1 RRC re-establishment Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200706
    R5‑200707 Update of TC 6.3.2.1.2 inter-freq RRC re-establishment Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. Corrected SMTC configuration in message exceptions.
revised No R5‑200988  
    R5‑200988 Update of TC 6.3.2.1.2 inter-freq RRC re-establishment Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200707
    R5‑200708 Update of TC 6.3.2.3.1 FR1 RRC redirection Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency: R4-2001602 for email agreement Email agreed.
agreed No    
    R5‑200709 Update of TC 6.3.2.3.2 inter-freq RRC redirection Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency: R4-2001602 for email agreement Email agreed.
agreed No    
    R5‑200787 Update of NR CSI-RS-based RLM TC 6.5.1.5, 6.5.1.6, 6.5.1.7 and 6.5.1.8 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200788 Update of NR SSB-based RLM TC 6.5.1.1, 6.5.1.2, 6.5.1.3 and 6.5.1.4 MediaTek Inc. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201190  
    R5‑201190 Update of NR SSB-based RLM TC 6.5.1.1, 6.5.1.2, 6.5.1.3 and 6.5.1.4 MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑200788
5.3.2.9.4 NR standalone with at least one NR cell in FR2 (Clause7)                      
5.3.2.9.5 E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)                      
5.3.2.9.6 Clauses 1-3 / Annexes R5‑200284 Test tolerance update measurement tests Annex F ROHDE & SCHWARZ CR Agreement Yes
YesRAN4 dependency R4-2001565 for email agreement Email agreed.
agreed No    
    R5‑200305 Test Tolerance and Measurement Uncertainty in Annex F for L1-RSRP measurement test cases Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu) affect also annex F.
revised No R5‑201044  
    R5‑201044 Test Tolerance and Measurement Uncertainty in Annex F for L1-RSRP measurement test cases Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200305
    R5‑200306 Reference SSB configuration correction Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200307 Correction of Cell configuration mapping table for SA FR2 RRM Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No    
    R5‑200427 Correction to the simulated cell for cell-reselection test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200429 Update of maximum test system uncertainty for FR1 RRM Test Anritsu CR Agreement Yes
Yesr1 was produced. Offline comments from Ericsson, R&S.
revised No R5‑201058  
    R5‑201058 Update of maximum test system uncertainty for FR1 RRM Test Anritsu CR Agreement Yes
Yes
agreed No   R5‑200429
    R5‑200476 Update of FR1 Test Tolerance in Annex F Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. 1. Removed the rows for 4.5.2.5 and 4.5.2.6, because the related TT analysis was withdrawn.
revised No R5‑201169  
    R5‑201169 Update of FR1 Test Tolerance in Annex F Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200476
    R5‑200562 Addition of RRM Cell configuration mapping table for EN-DC FR1 Test Case 4.5.4.1 Samsung R&D Institute UK CR Agreement Yes
Yes"EN EN-DC with all NR cells in FR1 (Clause 4) Test case is not a GCF/PVG priority test and is not 100% complete , out of scope of e-meeting agenda"
not treated No    
    R5‑200564 Correction to Statistical testing of delay and UE measurement performance in RRM tests Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No    
    R5‑200565 Addition of RRC message content exceptions for UE UL Carrier Reconfiguration Delay Samsung R&D Institute UK CR Agreement Yes
Yes"EN-DC with all NR cells in FR1 Test case is not a GCF/PVG priority test and is not 100% complete , out of scope of e-meeting agenda"
not treated No    
    R5‑200606 Cell mapping update measurement tests Annex E ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200610 Correct message contents measurement tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200743 Update to test applicability per permitted test method Anritsu CR Agreement Yes
Yeswrong spec on cover: r1 was produced.
revised No R5‑200916  
    R5‑200916 Update to test applicability per permitted test method Anritsu CR Agreement Yes
Yes
agreed No   R5‑200743
    R5‑200818 Correction to cell mapping Annex E Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200858 Corrections to Table H.3.1-8 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
5.3.2.10 TS 36.508                      
5.3.2.11 TS 36.521-3                      
5.3.2.12 TS 37.571-1                      
5.3.2.13 TS 37.571-3                      
5.3.2.14 TS 37.571-5                      
5.3.2.15 TR 38.903 ((NR MU & TT analyses) R5‑200163 Add Annex A.2 handling of common Test Tolerance Topics for FR2 ANRITSU LTD CR Agreement Yes
Yes
agreed No    
    R5‑200272 Test tolerance analysis inter-frequency SS-RSRP and intra-frequency SS-SINR ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. r2 was produced?
revised No R5‑201037  
    R5‑201037 Test tolerance analysis inter-frequency SS-RSRP and intra-frequency SS-SINR ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200272
    R5‑200273 Test tolerance analysis SS-RSRQ and inter-frequency SS-SINR ROHDE & SCHWARZ CR Agreement Yes
Yesdifferent title: inter-frequency SS-RSRP!!! r1 was produced. r2 was produced?
revised No R5‑201038  
    R5‑201038 Test tolerance analysis SS-RSRQ and inter-frequency SS-SINR ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200273
    R5‑200303 Test Tolerance analysis for CSI-RS-Based L1-RSRP measurement test cases Ericsson CR Agreement Yes
Yeswrong WIC or AI???? r1 was produced. Several corections. This CR is RAN4 dependant. r3 was produced. includes further editorial corrections of .xls.
revised No R5‑201042  
    R5‑201042 Test Tolerance analysis for CSI-RS-Based L1-RSRP measurement test cases Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 for email agreement Email agreed.
agreed No   R5‑200303
    R5‑200304 Test Tolerance analysis for SSB-Based L1-RSRP measurement test cases Ericsson CR Agreement Yes
Yeswrong WIC or AI? r1 was produced. Several corections. This CR is RAN4 dependant. r2 was produced. includes further editorial corrections of .xls.
revised No R5‑201043  
    R5‑201043 Test Tolerance analysis for SSB-Based L1-RSRP measurement test cases Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 for email agreement Email agreed.
agreed No   R5‑200304
    R5‑200329 CR to 38.903 on XPD Verification Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200335 Addition of MU table for FR2 Demod test cases Qualcomm Technologies Int CR Agreement No
Yeslate doc Addition of MU table for FR2 Demod scenarios depends on the FR2 MU elements discussion for mode 1/2 Document not produced before meeting start.
withdrawn Yes    
    R5‑200470 FR1 Test tolerance analysis for interruptions deactivated NR SCC Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency: R4-2001596 for email agreement Email agreed.
agreed No    
    R5‑200471 FR1 Test tolerance analysis for interruptions deactivated E-UTRAN SCC Huawei, HiSilicon CR Agreement Yes
Yesproblems have not been resolved in RAN4 and RAN5.
withdrawn Yes    
    R5‑200744 Update to FR2 TRx Measurement Uncertainties Anritsu CR Agreement Yes
Yeswrong spec on cover: r1 was produced. r2 was produced. Outcome of FR2 TRx MU discussion is reflected.
revised No R5‑200918  
    R5‑200918 Update to FR2 TRx Measurement Uncertainties Anritsu CR Agreement Yes
Yes
agreed No   R5‑200744
5.3.2.16 TR 38.905 (NR Test Points Radio Transmission and Reception ) R5‑200047 Update TPanalysis of TC 7.5B.1 ACS for for intra-band contiguous EN-DC within FR1 2CCs CMCC CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200402 Updating TP of MOP for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200403 Updating TP of configured output power for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. The structure of TP analysis is updated. Analysis of P-max selection is added. The number of test points is updated.
revised No R5‑201182  
    R5‑201182 Updating TP of configured output power for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200403
    R5‑200406 Updating TP of MOP for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesfor email agreement Ericsson disagreed. See R5-201183.
withdrawn Yes    
    R5‑200407 Updating TP of configured output power for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. The structure of TP analysis is updated. The analysis of (n)71AA is corrected. The number of test points is updated. r2 was produced.
revised No R5‑201184  
    R5‑201184 Updating TP of configured output power for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200407
    R5‑200410 Updating TP of MOP for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency R4-2001316 for email agreement Ericsson disagreed. See R5-201183.
withdrawn Yes    
    R5‑200411 Updating TP of configured output power for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. The structure of TP analysis is updated. Analysis of P-max selection is added. The number of test points is updated. r2 was produced.
revised No R5‑201186  
    R5‑201186 Updating TP of configured output power for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200411
    R5‑200412 Editorial change of replacing zip file of FR2 6.3.1 by v2 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200419 Update of test point analysis for 7.6A.3 Out-of-band blocking for CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200459 Update of test point analysis for 7.6A.4 Narrow band blocking for CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200460 Update of test point analysis for 7.8A Wide band Intermodulation for CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200573 Update of 38.905 FR1 7.6A.2.1 Huawei,Hisilicon CR Agreement Yes
Yescover title: Addition of TP analysis for FR1 In-band blocking for CA (2DL CA) Reissued as R5-200885 because of title change.
withdrawn Yes    
    R5‑200885 Addition of TP analysis for FR1 In-band blocking for CA Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. zip TP file added.
revised No R5‑200990  
    R5‑200990 Addition of TP analysis for FR1 In-band blocking for CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200885
    R5‑200574 Addition of Test point selection for FR1 in SUL test cases Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200603 Test Point analysis for FR2 ref sens for CA Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No    
    R5‑200758 Correction of NS_05 test points analysis Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200760 Test points analysis for NS_37 A-MPR FR1 test case Ericsson CR Agreement Yes
Yeslate doc
revised No R5‑201237  
    R5‑201237 Test points analysis for NS_37 A-MPR FR1 test case Ericsson CR Agreement Yes
Yes
agreed No   R5‑200760
    R5‑200762 Test points analysis for NS_38 A-MPR FR1 test case Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200764 Test points analysis for NS_39 A-MPR FR1 test case Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200766 Test points analysis for NS_43 A-MPR FR1 test case Ericsson, SoftBank Corp. CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200768 Test points analysis for NS_43U A-MPR FR1 test case Ericsson, SoftBank Corp. CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200770 Test points analysis for NS_18 A-MPR FR1 test case Ericsson CR Agreement Yes
Yeslate doc missing cl. aff. Revised after the meeting.
revised No R5‑201239  
    R5‑201239 Test points analysis for NS_18 A-MPR FR1 test case Ericsson CR Agreement Yes
Yes
agreed No   R5‑200770
    R5‑200799 Updated test point analysis for FR2 A-MPR test case Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200815 Update of Test Point Analysis for UE Coexistence for DC_3A-n41A and DC_8A-n41A ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
5.3.2.17 Discussion Papers / Work Plan / TC lists R5‑200020 IFF DFF Hybrid setup for FR2 RRM 2AoA Test Anritsu discussion Endorsement Yes
Yesr1 was produced. Outcome of offline discussion among MU crews.
revised No R5‑201154  
    R5‑201154 IFF DFF Hybrid setup for FR2 RRM 2AoA Test Anritsu discussion Endorsement Yes
YesNoted and endorsed
noted No   R5‑200020
    R5‑200035 Discussion on how to update Clause 4.1 in TS 38521-1-2-3-4 CMCC, Huawei, Hisilicon, Telecom Italia, China Unicom, CAICT discussion Endorsement Yes
Yesr1 was produced. Editorial wording changes.
revised No R5‑200919  
    R5‑200919 Discussion on how to update Clause 4.1 in TS 38521-1-2-3-4 CMCC, Huawei, Hisilicon, Telecom Italia, China Unicom, CAICT discussion Endorsement Yes
Yesfile was 0kB! Noted and proposal endorsed and implemented in CR 0038, 0040, 0042, 0045.
noted No   R5‑200035
    R5‑200046 Discussion on how to update TS 38.522 CMCC, Bureau Veritas, Huawei, Hisilicon, China Unicom, CAICT, TEJET, SRTC, Sporton discussion Endorsement Yes
YesRRM rapporteur Adrian's proposal of removing the original proposal 3 has also been accepted before the meeting. Deadline 21.2. for endorsement. Long discussion with Samsung. • R&S suggestion to remove Proposal 3--Accepted. Proposal 3 has been removed from R5-200046 already before the e-meeting started. • E///: some further confirmations are needed from Vijay. And the potential needed actions can be taken in the 38.522 Jumbo CR (R5-200145) directly without impacts on the paper (R5-200046). • Samsung: help to further clarify the problems/observations/suggestions. Problem/Observation 1, 2 and 3 have been addressed by implementing Proposal 1 and 2 in the Jumbo CR (R5-200145) already. -> ONLY Proposal 1 and 2 can be endorsed. r1 was produced. As per the offline discussion, consensus has been reached on Proposal 3. Due to the objection from Samsung, there are no consensus on Proposal 1 or 2.
revised No R5‑201017  
    R5‑201017 Discussion on how to update TS 38.522 CMCC, Bureau Veritas, Huawei, Hisilicon, China Unicom, CAICT, TEJET, SRTC, Sporton discussion Endorsement Yes
Yes
noted No   R5‑200046
    R5‑200116 On testability issue for FR2 NTT DOCOMO, INC. discussion Endorsement Yes
Yesr1 was produced. Concrete relaxation value is proposed according to submissions in this e-meeting.
revised No R5‑201034  
    R5‑201034 On testability issue for FR2 NTT DOCOMO, INC. discussion Endorsement Yes
Yes
noted No   R5‑200116
    R5‑200117 Review on test point for FR1 TRx NTT DOCOMO, INC. discussion Endorsement No
Yes
withdrawn Yes    
    R5‑200159 FR2 RRM MU and choice of test cases to evaluate ANRITSU LTD discussion Endorsement Yes
Yesr1 was produced.
revised No R5‑201155  
    R5‑201155 FR2 RRM MU and choice of test cases to evaluate ANRITSU LTD discussion Endorsement Yes
YesNoted and endorsed
noted No   R5‑200159
    R5‑200160 FR2 TT analysis for 38.533 5.7.1.1+7.7.1.1 Intra-freq SS-RSRP ANRITSU LTD discussion Endorsement Yes
Yesnoted and proposals endorsed
noted No    
    R5‑200161 FR2 TT analysis for 38.533 5.7.1.2+7.7.1.2 Inter-freq SS-RSRP ANRITSU LTD discussion Endorsement Yes
Yesnoted and proposals endorsed
noted No    
    R5‑200316 On AP#85.28: n259 MU Estimate Keysight Technologies UK Ltd discussion Endorsement Yes
YesNoted. Any agreeable aspects were consolidated in R5-200118. noted no proposals endorsed
noted No    
    R5‑200317 On Beam Peak Searches for different test configurations Keysight Technologies UK Ltd discussion Endorsement Yes
Yes"This contribution addresses the need to perform TX and RX beam peak searches for different test configurations document out of scope scope of e-meeting , no associated CR KEYS agreed to withdraw"
withdrawn Yes    
    R5‑200318 CDF/PDF Scaling Factor Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and proposals endorsed
noted No    
    R5‑200321 NR FR2 Demodulation MU Table Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced. Offline discussions with Qualcomm, Anritsu, and R&S.
revised No R5‑201156  
    R5‑201156 NR FR2 Demodulation MU Table Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200321
    R5‑200323 End-to-End System Simulations for Min. Isolation Requirements Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced. changes were based on feedback from R&S and Qualcomm.
revised No R5‑201157  
    R5‑201157 End-to-End System Simulations for Min. Isolation Requirements Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200323
    R5‑200324 On PC1 MUs Keysight Technologies UK Ltd discussion Endorsement Yes
Yes"This contribution reviews the MU elements and values for PC1 devices. PC1 FR2 MU out of scope of e-meeting, KEYS agreed to withdraw"
withdrawn Yes    
    R5‑200325 On NR FR2 Demodulation MUs Keysight Technologies UK Ltd discussion Endorsement No
Yeslate doc. document not produced before meeting start
withdrawn Yes    
    R5‑200326 Quality of Quiet Zone MU and XPD MU for Spurious Emissions Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced. Following offline discussions with TE vendors, it was agreed to adopt the QoQZ values proposed in R5-200735 instead.
revised No R5‑200998  
    R5‑200998 Quality of Quiet Zone MU and XPD MU for Spurious Emissions Keysight Technologies UK Ltd discussion Endorsement Yes
YesNoted and endorsed.
noted No   R5‑200326
    R5‑200327 On the MU Element “Uncertainty of an absolute gain of the calibration antenna” for Spurious Emissions Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
noted No    
    R5‑200328 On XPD Verification Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
noted No    
    R5‑200330 On RRM MUs including AP#85.22 Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced. With regards to P2, based on additional discussions and feedback received, more time is needed for a framework for 1 AoA TC MUs and whether this should be a function of the 2 AoA test system or not. The goal is to revisit this discussion in the next meeting. Close the official AP#85.22. r2 was produced.
revised No R5‑201053  
    R5‑201053 On RRM MUs including AP#85.22 Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200330
    R5‑200392 Discussion on MU and TT of FR1 CA Rx test cases Huawei, HiSilicon discussion Discussion Yes
YesNoted and proposal endorsed and implmented in CR 0393.
noted No    
    R5‑200394 Discussion on FR1 MOP testing for PC2 UE Huawei, HiSilicon, CMCC discussion Discussion Yes
YesKeysight disagreed. Noted and no proposal endorsed
noted No    
    R5‑200395 Discussion on handling of HP-UE requirements in FR1 Huawei, HiSilicon, CMCC discussion Discussion Yes
Yesr1 was produced. noted and proposal endorsed
revised No R5‑201181  
    R5‑201181 Discussion on handling of HP-UE requirements in FR1 Huawei, HiSilicon, CMCC discussion Discussion Yes
Yes
noted No   R5‑200395
    R5‑200398 On ACLR test metric for FR2 Huawei, HiSilicon discussion Discussion Yes
YesNo proposals endorsed. Noted.
noted No    
    R5‑200478 Discussion on FR1 UL CA power calculation for TC transmit on off time mask China Unicom discussion Discussion Yes
Yesr1 was produced. In Proposal 1. It is proposed to select PO_NominalWithGrant=-106dBm/180kHz for PCC and SCC in TC 6.3A.3.1. Becasue PO_NominalWithGrant value can only set to even ( step size 2) • Updated Table 2.1-1 for power calculation of transmit ON/OFF time mask for 2UL CA. The discussion paper is about recalculate the transmit on power for 2UL CA by reduce 6dB for PO_NominalWithGrant in Single carrier TC, to avoid impact of MPR on transmit on power. The associated CR is R5-200344r1.
revised No R5‑200920  
    R5‑200920 Discussion on FR1 UL CA power calculation for TC transmit on off time mask China Unicom discussion Discussion Yes
YesNoted and proposal endorsed and implemented in CR 0344.
noted No   R5‑200478
    R5‑200556 Discussion on FR2 absolute power control TP3 Samsung R&D Institute UK discussion Discussion Yes
Yesnoted and proposal1 endorsed
noted No    
    R5‑200560 Discussion on OFF Power for the SRS time mask with UL MIMO test case Samsung R&D Institute UK discussion   Yes
Yes"Discussion on EIRP OFF power document not produced before FR2 MU pre-meeting deadline, and has reference to UL-MIMO which is out of scope of e-meeting."
not treated No    
    R5‑200695 Discussion on uplink power control window size Qualcomm Korea discussion Endorsement Yes
Yesr1 was produced. Agreement to add a MUr (relative power control MU) to the range of measurement of UE tx power ( power window size), MUr value needs further analysis from TE vendors Document will be noted
revised No R5‑201188  
    R5‑201188 Discussion on uplink power control window size Qualcomm Korea discussion Endorsement Yes
Yes
noted No   R5‑200695
    R5‑200734 Noise impact for FR2 TRx test cases Anritsu discussion Endorsement Yes
Yesr1 was produced. Offline discussion among TE vendors on delta SNR.
revised No R5‑201163  
    R5‑201163 Noise impact for FR2 TRx test cases Anritsu discussion Endorsement Yes
Yesnoted and Proposal 1&2 endorsed.
noted No   R5‑200734
    R5‑200735 Quality of Quiet Zone for spurious emission Anritsu discussion Endorsement Yes
Yesnoted and proposals are endorsed.
noted No    
    R5‑200736 Measurement uncertainty for n259 Anritsu discussion Endorsement Yes
Yesnoted no proposals endorsed
noted No    
    R5‑200737 Proposal of MU elements for FR2 spurious emission Anritsu discussion Endorsement Yes
Yesr1 was produced. Outcome of offline discussion among TE vendors on spurious emission MUs.
revised No R5‑201164  
    R5‑201164 Proposal of MU elements for FR2 spurious emission Anritsu discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200737
    R5‑200738 On FR2 ACLR MUs Anritsu discussion Endorsement Yes
Yesnoted and Proposal 5&6 endorsed
noted No    
    R5‑200739 On FR2 OBW MU Anritsu discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200741 Treatment FR2 RRM MU for different test setups Anritsu discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200745 On FR2 OFF Power MU Anritsu discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200746 On FR2 Rx Spurious MU Anritsu discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200777 Discussion Paper to clarify test config aspects for EN-DC tests with greater than two E-UTRA+NR carriers Qualcomm communications-France discussion Agreement Yes
Yesr1 was produced. r2 was produced.
revised No R5‑201199  
    R5‑201199 Discussion Paper to clarify test config aspects for EN-DC tests with greater than two E-UTRA+NR carriers Qualcomm communications-France discussion Agreement Yes
Yesnoted and proposals endorsed
noted No   R5‑200777
    R5‑200811 On RRM test cases list to start FR2 MU analysis Keysight Technologies UK Ltd discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200816 Estimate of Measurement Uncertainty for n259 ROHDE & SCHWARZ discussion Endorsement Yes
Yesnoted no proposals endorsed
noted No    
    R5‑200868 On the SNR for FR2 TRx test cases ROHDE & SCHWARZ discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200869 On the MU of FR2 OBW ROHDE & SCHWARZ discussion Endorsement Yes
Yesrelated to 200739 and 200874 no proposals endorsed
noted No    
    R5‑200873 FR2 Spurious MU: Noise Impact Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted no proposals endorsed
noted No    
    R5‑200874 On FR2 OBW MU Keysight Technologies UK Ltd discussion Endorsement Yes
Yesrelated to 200869 and 200874 noted no proposals endorsed
noted No    
    R5‑200875 FR2 Spurious MU: Network Analyzer Uncertainty Keysight Technologies UK Ltd discussion Endorsement No
Yeslate doc document not produced before meeting start
withdrawn Yes    
    R5‑200876 FR2 Spurious MU: RF power measurement MU Keysight Technologies UK Ltd discussion Endorsement Yes
Yesrelated to 200737 noted no proposals endorsed
noted No    
    R5‑200878 On FR2 Transmission OFF power MU Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced.
revised No R5‑201091  
    R5‑201091 On FR2 Transmission OFF power MU Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200878
    R5‑200879 On FR2 ACLR MU Keysight Technologies UK Ltd discussion Discussion No
Yeslate doc document not produced before meeting start
withdrawn Yes    
5.3.3 Elevation Beamforming/Full-Dimension MIMO for LTE (UID - 770062) LTE_EBF_FDMIMO-UEConTest R5‑200627 Update to CRI reporting cases for FD-MIMO Qualcomm Austria RFFE GmbH CR Agreement Yes
Yesis LTE_EBF_FDMIMO-UEConTest r1 was produced.
revised No R5‑200890  
    R5‑200890 Update to CRI reporting cases for FD-MIMO Qualcomm Austria RFFE GmbH CR Agreement Yes
Yes
agreed No   R5‑200627
    R5‑200628 Update to CQI Reporting cases with single CSI Process Qualcomm Austria RFFE GmbH CR Agreement Yes
Yesis LTE_EBF_FDMIMO-UEConTest r1 was produced.
revised No R5‑200891  
    R5‑200891 Update to CQI Reporting cases with single CSI Process Qualcomm Austria RFFE GmbH CR Agreement Yes
YesWIC fixed in 3GU.
agreed No   R5‑200628
5.3.3.1 TS 36.508                      
5.3.3.2 TS 36.521-1 R5‑200798 Update of FD-MIMO PMI test cases Ericsson CR Agreement Yes
Yes
agreed No    
5.3.3.3 TS 36.521-2                      
5.3.3.4 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.3.5 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.3.6 Discussion Papers / Work Plan / TC lists                      
5.3.4 Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest                      
5.3.4.1 TS 36.508                      
5.3.4.2 TS 36.521-1 R5‑200291 Addition of new test case 8.11.1.2.3.2, TDD PDSCH 2 Tx Antenna Port supporting wideband transmission for UE category M2 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200292 Addition of new test case 8.11.1.2.3.2_1, TDD PDSCH 2 Tx Antenna Port supporting wideband transmission for UE category M2 (CEModeB) Ericsson CR Agreement Yes
Yes
agreed No    
5.3.4.3 TS 36.521-2 R5‑200300 Adding test case 8.11.1.2.3.2 and 8.11.1.2.3.2_1 to applicability Ericsson CR Agreement Yes
Yesr1 was produced. Based on comment by R&S, C316y has been introduced in Table 4.1-1a. r2 was produced. Comment for test case 8.11.1.2.3.2 is corrected.
revised No R5‑200991  
    R5‑200991 Adding test case 8.11.1.2.3.2 and 8.11.1.2.3.2_1 to applicability Ericsson CR Agreement Yes
Yes
agreed No   R5‑200300
    R5‑200535 Applicability of RRM feMTC Test Cases Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200665 Adding missing cat M2 test cases to applicability Ericsson CR Agreement Yes
Yesr1 was produced.
revised No R5‑200994  
    R5‑200994 Adding missing cat M2 test cases to applicability Ericsson CR A