DOCUMENT:
|
Agenda for LTE RRC ad-hoc
|
Doc.Name
|
R2-075510
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075510.zip
|
|
|
Source:
|
WG Chairman
|
The file is uploaded
|
|
DOCUMENT:
|
MIB Information Elements
|
Doc.Name
|
R2-075511
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075511.zip
|
|
|
Source:
|
Ericsson, Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Need for RRC Connection Setup Complete and RRC Connection Re ject
|
Doc.Name
|
R2-075512
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075512.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Contents for RRC Connection Request, Set-up and Set-up compl ete/Reject
|
Doc.Name
|
R2-075513
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075513.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRAN RRC Error Handling
|
Doc.Name
|
R2-075514
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075514.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
UE Capability Transfer
|
Doc.Name
|
R2-075515
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075515.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRA RRC message extensibility in ASN.1
|
Doc.Name
|
R2-075516
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075516.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Start of AS security
|
Doc.Name
|
R2-075517
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075517.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Configurable parameters in MAC
|
Doc.Name
|
R2-075518
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075518.zip
|
|
|
Source:
|
MAC Rapporteurs (Ericsson, Qualcomm)
|
The file is uploaded
|
|
DOCUMENT:
|
Configurable physical layer parameters
|
Doc.Name
|
R2-075519
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075519.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Idle Mode Parameters for 36.331
|
Doc.Name
|
R2-075520
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075520.zip
|
|
|
Source:
|
Nokia Corporation
|
The file is uploaded
|
|
DOCUMENT:
|
System Information Scheduling - Clarifications
|
Doc.Name
|
R2-075521
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075521.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
NW based scaling of mobility measurement parameters
|
Doc.Name
|
R2-075522
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075522.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Measurement configuration and reporting for E-UTRAN
|
Doc.Name
|
R2-075523
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075523.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRA RRC confirmation & failure messages
|
Doc.Name
|
R2-075524
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075524.zip
|
|
|
Source:
|
Samsung
|
The file is uploaded
|
|
DOCUMENT:
|
Additional RRC messages
|
Doc.Name
|
R2-075525
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075525.zip
|
|
|
Source:
|
Samsung
|
The file is uploaded
|
|
DOCUMENT:
|
Specification of invalid network configurations cases
|
Doc.Name
|
R2-075526
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075526.zip
|
|
|
Source:
|
Samsung
|
The file is uploaded
|
|
DOCUMENT:
|
Structure of the procedural specification
|
Doc.Name
|
R2-075527
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075527.zip
|
|
|
Source:
|
Samsung, Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRA RRC ASN.1 initial draft & need for tabular
|
Doc.Name
|
R2-075528
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075528.zip
|
|
|
Source:
|
Samsung
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRA RRC Measurement information structure
|
Doc.Name
|
R2-075529
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075529.zip
|
|
|
Source:
|
Samsung
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRA RRC TP on information between network nodes
|
Doc.Name
|
R2-075530
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075530.zip
|
|
|
Source:
|
Samsung
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRA RRC TP on missing high level procedures
|
Doc.Name
|
R2-075531
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075531.zip
|
|
|
Source:
|
Samsung
|
The file is uploaded
|
|
DOCUMENT:
|
Scheduling of Msg5
|
Doc.Name
|
R2-075532
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075532.zip
|
|
|
Source:
|
CATT
|
The file is uploaded
|
|
DOCUMENT:
|
UE Capability Transfer
|
Doc.Name
|
R2-075533
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075533.zip
|
|
|
Source:
|
CATT
|
The file is uploaded
|
|
DOCUMENT:
|
PDCP parameters
|
Doc.Name
|
R2-075534
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075534.zip
|
|
|
Source:
|
LG Electronics Inc.
|
The file is uploaded
|
|
DOCUMENT:
|
Update of System Information
|
Doc.Name
|
R2-075535
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075535.zip
|
|
|
Source:
|
Infineon
|
The file is uploaded
|
|
DOCUMENT:
|
Review of the structure of the procedural specification
|
Doc.Name
|
R2-075536
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075536.zip
|
|
|
Source:
|
Infineon
|
The file is uploaded
|
|
DOCUMENT:
|
SMC and measurements
|
Doc.Name
|
R2-075537
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075537.zip
|
|
|
Source:
|
Alcatel-Lucent
|
The file is uploaded
|
|
DOCUMENT:
|
Tracking Area Code as NAS or AS IE in SIB
|
Doc.Name
|
R2-075538
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075538.zip
|
|
|
Source:
|
Alcatel-Lucent
|
The file is uploaded
|
|
DOCUMENT:
|
Capturing of ASN.1 coding standards
|
Doc.Name
|
R2-075539
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075539.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Security and bearer setup procedures
|
Doc.Name
|
R2-075540
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075540.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Handover failure procedure
|
Doc.Name
|
R2-075541
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075541.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Definition of Scheduling Unit (SU)
|
Doc.Name
|
R2-075542
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075542.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Error handling related to network mis-operations
|
Doc.Name
|
R2-075543
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075543.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Change of UE capability
|
Doc.Name
|
R2-075544
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075544.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Essential Measurement Control Functionality
|
Doc.Name
|
R2-075545
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075545.zip
|
|
|
Source:
|
Panasonic
|
The file is uploaded
|
|
DOCUMENT:
|
Gap Parameters Signaling Scheme
|
Doc.Name
|
R2-075546
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075546.zip
|
|
|
Source:
|
Panasonic
|
The file is uploaded
|
|
DOCUMENT:
|
Signaling Aspect for Measurement Gap
|
Doc.Name
|
R2-075547
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075547.zip
|
|
|
Source:
|
Panasonic
|
The file is uploaded
|
|
DOCUMENT:
|
System information issues
|
Doc.Name
|
R2-075548
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075548.zip
|
|
|
Source:
|
Panasonic
|
The file is uploaded
|
|
DOCUMENT:
|
Cell Reselection and evaluation during RRC Connection proced ure
|
Doc.Name
|
R2-075549
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075549.zip
|
|
|
Source:
|
Panasonic
|
The file is uploaded
|
|
DOCUMENT:
|
Retransmission aspect of RACH procedure
|
Doc.Name
|
R2-075550
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075550.zip
|
|
|
Source:
|
Panasonic
|
The file is uploaded
|
|
DOCUMENT:
|
Measurement Gap Configuration
|
Doc.Name
|
R2-075551
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075551.zip
|
|
|
Source:
|
Nokia Corporation, Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Radio Link Failure Recovery signalling
|
Doc.Name
|
R2-075552
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075552.zip
|
|
|
Source:
|
Nortel
|
The file is uploaded
|
|
DOCUMENT:
|
Optimised GSM NCL for SIB4
|
Doc.Name
|
R2-075553
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075553.zip
|
|
|
Source:
|
Vodafone
|
The file is uploaded
|
|
DOCUMENT:
|
Structure of information for measurements in RRC_CONNECTED
|
Doc.Name
|
R2-075554
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075554.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
Description of error cases in 36.331
|
Doc.Name
|
R2-075555
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075555.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
Structure of RRC Procedural Description
|
Doc.Name
|
R2-075556
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075556.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
RRC release and SMC messages vs. RCR message
|
Doc.Name
|
R2-075557
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075557.zip
|
|
|
Source:
|
Nokia Corporation, Nokia Siemens Networks
|
Abstract:
|
This document addresses FFSs in section 6.2 of 36.331, on the use of specific me ssages for Security Mode Command and RRC Connection Release vs. use of RRC Conne ction Reconfiguration message
|
The file is uploaded
|
|
DOCUMENT:
|
Concatenation of Scheduling Units and SIB mapping
|
Doc.Name
|
R2-075558
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075558.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Transmission of dynamic system information
|
Doc.Name
|
R2-075559
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075559.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Structure of measurements
|
Doc.Name
|
R2-075560
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075560.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
RRC connection control messages
|
Doc.Name
|
R2-075561
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075561.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Handling of error cases in LTE RRC
|
Doc.Name
|
R2-075562
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075562.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Structure of LTE RRC procedure specification
|
Doc.Name
|
R2-075563
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075563.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Tabular and ASN.1 structure for LTE RRC specification
|
Doc.Name
|
R2-075564
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075564.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRAN, UTRAN & GERAN UE Radio Access Capabilities transfer
|
Doc.Name
|
R2-075565
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075565.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
SU-1 Content
|
Doc.Name
|
R2-075566
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075566.zip
|
|
|
Source:
|
Ericsson
|
The file is not uploaded
|
|
DOCUMENT:
|
Structure of the E-UTRA RRC message specification
|
Doc.Name
|
R2-075567
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075567.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Activation for Key Change in LTE_ACTIVE State
|
Doc.Name
|
R2-075568
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075568.zip
|
|
|
Source:
|
HUAWEI
|
The file is uploaded
|
|
DOCUMENT:
|
mapping between SIBs and SUs in system information
|
Doc.Name
|
R2-075569
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075569.zip
|
|
|
Source:
|
HUAWEI
|
The file is uploaded
|
|
DOCUMENT:
|
Measurement rules, objects and mapping
|
Doc.Name
|
R2-075570
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075570.zip
|
|
|
Source:
|
NTT DoCoMo
|
The file is uploaded
|
|
DOCUMENT:
|
Inter-F/R measurements during DRX and signallings to assist gap activation/de-activation
|
Doc.Name
|
R2-075571
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075571.zip
|
|
|
Source:
|
NTT DoCoMo
|
The file is uploaded
|
|
DOCUMENT:
|
RLC parameters to be configured by RRC
|
Doc.Name
|
R2-075572
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075572.zip
|
|
|
Source:
|
NTT DoCoMo
|
The file is uploaded
|
|
DOCUMENT:
|
Updated skeleton minutes
|
Doc.Name
|
R2-075573
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075573.zip
|
|
|
Source:
|
WG Chairman
|
The file is uploaded
|
|
DOCUMENT:
|
Tool is now re-opened (Claude)
|
Doc.Name
|
R2-075574
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075574.zip
|
|
|
Source:
|
ETSI Secretariat
|
The file is not uploaded
|
|
DOCUMENT:
|
New version of R2-075520
|
Doc.Name
|
R2-075575
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075575.zip
|
|
|
Source:
|
Nokia Corporation
|
The file is uploaded
|
|
DOCUMENT:
|
Update of R2-075575 - Idle Mode Parameters
|
Doc.Name
|
R2-075576
|
Allocations:
|
Content Type:
|
File Name:
|
R2-075576.zip
|
|
|
Source:
|
Nokia Corporation
|
The file is uploaded
|
|