Document List for 3GPPRAN2-Ad Hoc on LTE RRC
List generated on : 2007-12-14 at 14:23:38 (GMT +01:00)

DOCUMENT: Agenda for LTE RRC ad-hoc
Doc.Name R2-075510 Allocations: Content Type:
File Name: R2-075510.zip
Source: WG Chairman
The file is uploaded
 
DOCUMENT: MIB Information Elements
Doc.Name R2-075511 Allocations: Content Type:
File Name: R2-075511.zip
Source: Ericsson, Qualcomm Europe
The file is uploaded
 
DOCUMENT: Need for RRC Connection Setup Complete and RRC Connection Re
ject
Doc.Name R2-075512 Allocations: Content Type:
File Name: R2-075512.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: Contents for RRC Connection Request, Set-up and Set-up compl
ete/Reject
Doc.Name R2-075513 Allocations: Content Type:
File Name: R2-075513.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: E-UTRAN RRC Error Handling
Doc.Name R2-075514 Allocations: Content Type:
File Name: R2-075514.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: UE Capability Transfer
Doc.Name R2-075515 Allocations: Content Type:
File Name: R2-075515.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: E-UTRA RRC message extensibility in ASN.1
Doc.Name R2-075516 Allocations: Content Type:
File Name: R2-075516.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: Start of AS security
Doc.Name R2-075517 Allocations: Content Type:
File Name: R2-075517.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: Configurable parameters in MAC
Doc.Name R2-075518 Allocations: Content Type:
File Name: R2-075518.zip
Source: MAC Rapporteurs (Ericsson, Qualcomm)
The file is uploaded
 
DOCUMENT: Configurable physical layer parameters
Doc.Name R2-075519 Allocations: Content Type:
File Name: R2-075519.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: Idle Mode Parameters for 36.331
Doc.Name R2-075520 Allocations: Content Type:
File Name: R2-075520.zip
Source: Nokia Corporation
The file is uploaded
 
DOCUMENT: System Information Scheduling - Clarifications
Doc.Name R2-075521 Allocations: Content Type:
File Name: R2-075521.zip
Source: Nokia Siemens Networks
The file is uploaded
 
DOCUMENT: NW based scaling of mobility measurement parameters
Doc.Name R2-075522 Allocations: Content Type:
File Name: R2-075522.zip
Source: Nokia Siemens Networks
The file is uploaded
 
DOCUMENT: Measurement configuration and reporting for E-UTRAN
Doc.Name R2-075523 Allocations: Content Type:
File Name: R2-075523.zip
Source: Nokia Siemens Networks
The file is uploaded
 
DOCUMENT: E-UTRA RRC confirmation & failure messages
Doc.Name R2-075524 Allocations: Content Type:
File Name: R2-075524.zip
Source: Samsung
The file is uploaded
 
DOCUMENT: Additional RRC messages
Doc.Name R2-075525 Allocations: Content Type:
File Name: R2-075525.zip
Source: Samsung
The file is uploaded
 
DOCUMENT: Specification of invalid network configurations cases
Doc.Name R2-075526 Allocations: Content Type:
File Name: R2-075526.zip
Source: Samsung
The file is uploaded
 
DOCUMENT: Structure of the procedural specification
Doc.Name R2-075527 Allocations: Content Type:
File Name: R2-075527.zip
Source: Samsung, Motorola
The file is uploaded
 
DOCUMENT: E-UTRA RRC ASN.1 initial draft & need for tabular
Doc.Name R2-075528 Allocations: Content Type:
File Name: R2-075528.zip
Source: Samsung
The file is uploaded
 
DOCUMENT: E-UTRA RRC Measurement information structure
Doc.Name R2-075529 Allocations: Content Type:
File Name: R2-075529.zip
Source: Samsung
The file is uploaded
 
DOCUMENT: E-UTRA RRC TP on information between network nodes
Doc.Name R2-075530 Allocations: Content Type:
File Name: R2-075530.zip
Source: Samsung
The file is uploaded
 
DOCUMENT: E-UTRA RRC TP on missing high level procedures
Doc.Name R2-075531 Allocations: Content Type:
File Name: R2-075531.zip
Source: Samsung
The file is uploaded
 
DOCUMENT: Scheduling of Msg5
Doc.Name R2-075532 Allocations: Content Type:
File Name: R2-075532.zip
Source: CATT
The file is uploaded
 
DOCUMENT: UE Capability Transfer
Doc.Name R2-075533 Allocations: Content Type:
File Name: R2-075533.zip
Source: CATT
The file is uploaded
 
DOCUMENT: PDCP parameters
Doc.Name R2-075534 Allocations: Content Type:
File Name: R2-075534.zip
Source: LG Electronics Inc.
The file is uploaded
 
DOCUMENT: Update of System Information
Doc.Name R2-075535 Allocations: Content Type:
File Name: R2-075535.zip
Source: Infineon
The file is uploaded
 
DOCUMENT: Review of the structure of the procedural specification
Doc.Name R2-075536 Allocations: Content Type:
File Name: R2-075536.zip
Source: Infineon
The file is uploaded
 
DOCUMENT: SMC and measurements
Doc.Name R2-075537 Allocations: Content Type:
File Name: R2-075537.zip
Source: Alcatel-Lucent
The file is uploaded
 
DOCUMENT: Tracking Area Code as NAS or AS IE in SIB
Doc.Name R2-075538 Allocations: Content Type:
File Name: R2-075538.zip
Source: Alcatel-Lucent
The file is uploaded
 
DOCUMENT: Capturing of ASN.1 coding standards
Doc.Name R2-075539 Allocations: Content Type:
File Name: R2-075539.zip
Source: Qualcomm Europe
The file is uploaded
 
DOCUMENT: Security and bearer setup procedures
Doc.Name R2-075540 Allocations: Content Type:
File Name: R2-075540.zip
Source: Qualcomm Europe
The file is uploaded
 
DOCUMENT: Handover failure procedure
Doc.Name R2-075541 Allocations: Content Type:
File Name: R2-075541.zip
Source: Qualcomm Europe
The file is uploaded
 
DOCUMENT: Definition of Scheduling Unit (SU)
Doc.Name R2-075542 Allocations: Content Type:
File Name: R2-075542.zip
Source: Qualcomm Europe
The file is uploaded
 
DOCUMENT: Error handling related to network mis-operations
Doc.Name R2-075543 Allocations: Content Type:
File Name: R2-075543.zip
Source: Qualcomm Europe
The file is uploaded
 
DOCUMENT: Change of UE capability
Doc.Name R2-075544 Allocations: Content Type:
File Name: R2-075544.zip
Source: Qualcomm Europe
The file is uploaded
 
DOCUMENT: Essential Measurement Control Functionality
Doc.Name R2-075545 Allocations: Content Type:
File Name: R2-075545.zip
Source: Panasonic
The file is uploaded
 
DOCUMENT: Gap Parameters Signaling Scheme
Doc.Name R2-075546 Allocations: Content Type:
File Name: R2-075546.zip
Source: Panasonic
The file is uploaded
 
DOCUMENT: Signaling Aspect for Measurement Gap
Doc.Name R2-075547 Allocations: Content Type:
File Name: R2-075547.zip
Source: Panasonic
The file is uploaded
 
DOCUMENT: System information issues
Doc.Name R2-075548 Allocations: Content Type:
File Name: R2-075548.zip
Source: Panasonic
The file is uploaded
 
DOCUMENT: Cell Reselection and evaluation during RRC Connection proced
ure
Doc.Name R2-075549 Allocations: Content Type:
File Name: R2-075549.zip
Source: Panasonic
The file is uploaded
 
DOCUMENT: Retransmission aspect of RACH procedure
Doc.Name R2-075550 Allocations: Content Type:
File Name: R2-075550.zip
Source: Panasonic
The file is uploaded
 
DOCUMENT: Measurement Gap Configuration
Doc.Name R2-075551 Allocations: Content Type:
File Name: R2-075551.zip
Source: Nokia Corporation, Nokia Siemens Networks
The file is uploaded
 
DOCUMENT: Radio Link Failure Recovery signalling
Doc.Name R2-075552 Allocations: Content Type:
File Name: R2-075552.zip
Source: Nortel
The file is uploaded
 
DOCUMENT: Optimised GSM NCL for SIB4
Doc.Name R2-075553 Allocations: Content Type:
File Name: R2-075553.zip
Source: Vodafone
The file is uploaded
 
DOCUMENT: Structure of information for measurements in RRC_CONNECTED
Doc.Name R2-075554 Allocations: Content Type:
File Name: R2-075554.zip
Source: Motorola
The file is uploaded
 
DOCUMENT: Description of error cases in 36.331
Doc.Name R2-075555 Allocations: Content Type:
File Name: R2-075555.zip
Source: Motorola
The file is uploaded
 
DOCUMENT: Structure of RRC Procedural Description
Doc.Name R2-075556 Allocations: Content Type:
File Name: R2-075556.zip
Source: Motorola
The file is uploaded
 
DOCUMENT: RRC release and SMC messages vs. RCR message
Doc.Name R2-075557 Allocations: Content Type:
File Name: R2-075557.zip
Source: Nokia Corporation, Nokia Siemens Networks
Abstract: This document addresses FFSs in section 6.2 of 36.331, on the use of specific me
ssages for Security Mode Command and RRC Connection Release vs. use of RRC Conne
ction Reconfiguration message
The file is uploaded
 
DOCUMENT: Concatenation of Scheduling Units and SIB mapping
Doc.Name R2-075558 Allocations: Content Type:
File Name: R2-075558.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: Transmission of dynamic system information
Doc.Name R2-075559 Allocations: Content Type:
File Name: R2-075559.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: Structure of measurements
Doc.Name R2-075560 Allocations: Content Type:
File Name: R2-075560.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: RRC connection control messages
Doc.Name R2-075561 Allocations: Content Type:
File Name: R2-075561.zip
Source: NEC
The file is uploaded
 
DOCUMENT: Handling of error cases in LTE RRC
Doc.Name R2-075562 Allocations: Content Type:
File Name: R2-075562.zip
Source: NEC
The file is uploaded
 
DOCUMENT: Structure of LTE RRC procedure specification
Doc.Name R2-075563 Allocations: Content Type:
File Name: R2-075563.zip
Source: NEC
The file is uploaded
 
DOCUMENT: Tabular and ASN.1 structure for LTE RRC specification
Doc.Name R2-075564 Allocations: Content Type:
File Name: R2-075564.zip
Source: NEC
The file is uploaded
 
DOCUMENT: E-UTRAN, UTRAN & GERAN UE Radio Access Capabilities transfer
Doc.Name R2-075565 Allocations: Content Type:
File Name: R2-075565.zip
Source: NEC
The file is uploaded
 
DOCUMENT: SU-1 Content
Doc.Name R2-075566 Allocations: Content Type:
File Name: R2-075566.zip
Source: Ericsson
The file is not uploaded
 
DOCUMENT: Structure of the E-UTRA RRC message specification
Doc.Name R2-075567 Allocations: Content Type:
File Name: R2-075567.zip
Source: Ericsson
The file is uploaded
 
DOCUMENT: Activation for Key Change in LTE_ACTIVE State
Doc.Name R2-075568 Allocations: Content Type:
File Name: R2-075568.zip
Source: HUAWEI
The file is uploaded
 
DOCUMENT: mapping between SIBs and SUs in system information
Doc.Name R2-075569 Allocations: Content Type:
File Name: R2-075569.zip
Source: HUAWEI
The file is uploaded
 
DOCUMENT: Measurement rules, objects and mapping
Doc.Name R2-075570 Allocations: Content Type:
File Name: R2-075570.zip
Source: NTT DoCoMo
The file is uploaded
 
DOCUMENT: Inter-F/R measurements during DRX and signallings to assist
gap activation/de-activation
Doc.Name R2-075571 Allocations: Content Type:
File Name: R2-075571.zip
Source: NTT DoCoMo
The file is uploaded
 
DOCUMENT: RLC parameters to be configured by RRC
Doc.Name R2-075572 Allocations: Content Type:
File Name: R2-075572.zip
Source: NTT DoCoMo
The file is uploaded
 
DOCUMENT: Updated skeleton minutes
Doc.Name R2-075573 Allocations: Content Type:
File Name: R2-075573.zip
Source: WG Chairman
The file is uploaded
 
DOCUMENT: Tool is now re-opened (Claude)
Doc.Name R2-075574 Allocations: Content Type:
File Name: R2-075574.zip
Source: ETSI Secretariat
The file is not uploaded
 
DOCUMENT: New version of R2-075520
Doc.Name R2-075575 Allocations: Content Type:
File Name: R2-075575.zip
Source: Nokia Corporation
The file is uploaded
 
DOCUMENT: Update of R2-075575 - Idle Mode Parameters
Doc.Name R2-075576 Allocations: Content Type:
File Name: R2-075576.zip
Source: Nokia Corporation
The file is uploaded
 
67 Numbers Reserved... (0 Withdrawn)
With 0 Revisions   And   0 Addenda
Last Reservation/Withdrawal On '2007-12-14 at 15:06:09 (GMT +01:00)'

65 Files Uploaded (with Correct Filename)
Last Upload On '2007-12-14 at 14:23:37 (GMT +01:00)'