From: Christian Toche [christian.toche@huawei.com]
Sent: 15 March 2009 05:05
To: 3GPP_TSG_SA_WG5@LIST.ETSI.ORG
Subject: SA5 Results at SA#43

Dear SA5 colleagues,
 
Please find below a summary of SA5 results at TSG SA#43 in Biarritz, France, March 9-12, 2009, hosted by European Friends of 3GPP.

LSs
- SP090161 LS on minimising drive tests from the joint RAN WG3-SA WG5 meeting in January 2009. This LS was provided for information (Cc SA) and was noted.

- SP090149 LS from ETSI TISPAN on maintenance of ES 282 010 by SA WG5. The MCC Specifications Manager asked whether this was really a Common IMS specification. It was noted that this would only be transferred into 3GPP if it needed to be updated. The LS was noted and this issue was then clarified off-line.

1 Rel-8 OAM&P exception request was granted until SA#44 June 2009
- SP-090047 Exception request for 3G Home NodeB OAM&P Type 1 interface definition

2 revised OAM&P WIs were approved
- SP-090148 Revised WID SOAP Solution Sets (Rel-8)
- SP-090054 Revised WID SON Self-Optimization & Self-Healing handling (Rel-9)

3 new Charging WIs were approved
- SP-090051 New WID for MMTel offline and online charging (Rel-9)
--> Editorial issues in the WID --> revised in SP-090196 and approved
- SP-090052 New WID MBMS charging in EPS (Rel-9)
- SP-090055 New WID on RTTI support in IMS charging (Rel-9)

3 new OAM&P WIs were approved
- SP-090049 New WID on EPC Performance Measurements (Rel-9)
- SP-090053 New WID on enhancement of performance measurements for E-UTRAN (Rel-9)
- SP-090050 New WID on Type 1 Interface for HNB/HeNB Revised for editorial issues in SP-090208 and approved (Rel-9)

1 new OAM&P SI was approved
- SP-090048 New SID Energy Savings Management (Rel-9)

2 Rel-8 Charging TSs for approval were approved
- SP-090058 TS 32.275 Telecommunication management; Charging management; MultiMedia Telephony (MMTel) charging
- SP-090059 TS 32.280 Telecommunication management; Charging Management: Advice of Charge (AoC) service

13 Rel-8 OAM&P TSs for information and approval were approved
- SP-090056 TS 32.111-7 Telecommunication management; Alarm Integration Reference Point (IRP): SOAP Solution Set (SS)
- SP-090760 TS 32.347 Telecommunication management; File Transfer (FT) Integration Reference Point (IRP): SOAP Solution Set (SS)

- SP-090061 TS 32.367 Telecommunication management; Entry Point (EP) Integration Reference Point (IRP): SOAP Solution Set (SS)

- SP-090063 TS 32.417 Telecommunication management; Performance Management (PM) Integration Reference Point (IRP): SOAP Solution Set (SS)

- SP-090070 TS 32.617 Telecommunication management; Bulk CM Integration Reference Point (IRP): SOAP Solution Set (SS) (Release 8)

- SP-090143 TS 32.425 Telecommunication management; Performance measurements for E-UTRAN
- SP-090067 TS 32.581 Telecommunications management; Home Node B (HNB) Operations, Administration, Maintenance and Provisioning (OAM&P); Concepts and requirements for Type 1 interface HNB to HNB Management System (HMS)

- SP-090068 TS 32.582 Telecommunications management; Home Node B (HNB) Operations, Administration, Maintenance and Provisioning (OAM&P); Information model for Type 1 interface HNB to HNB Management System (HMS)

- SP-090069 TS 32.583 Telecommunications management; Home Node B (HNB) Operations, Administration, Maintenance and Provisioning (OAM&P); Procedure flows for Type 1 interface HNB to HNB Management System (HMS)

- SP-090072 TS 32.753 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP): Common Object Request Broker Architecture (CORBA) Solution Set (SS)

- SP-090073 TS 32.755 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP): Bulk CM eXtensible Markup Language (XML) file format definition

- SP-090075 TS 32.763 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP): Common Object Request Broker Architecture (CORBA) Solution Set (SS)

- SP-090076 TS 32.765 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP): Bulk CM eXtensible Markup Language (XML) file format definition

7 Rel-8 OAM&P TSs for approval were approved
- SP-090057 TS 32.153 Integration Reference Point (IRP) technology specific templates, rules and guidelines
- SP-090062 TS 32.410 Telecommunication management; Key Performance Indicators (KPI) for UMTS and GSM
- SP-090064 TS 32.426 Telecommunication management; Performance measurements for EPC
- SP-090065 TS 32.450 Telecommunication management; Key Performance Indicators (KPI) for E-UTRAN: Definitions
- SP-090066      TS 32.451 Telecommunication management; Key Performance Indicators (KPI) for E-UTRAN: Requirements
- SP-090071      TS 32.752 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP): Information Service (IS)

- SP-090074 TS 32.762 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP): Information Service (IS)

28 Rel-8 Charging CRs for approval were approved
- SP-090043      Rel-8 CRs on EPC Charging (EPC-CH)
--> 2 CRs with the same CR number --> revised in SP-090206 and approved
- SP-090044 Rel-8 CRs on IMS Multimedia Telephony and Supplementary Services (IMSTSS)
--> One CR built on another CR, the two CRs were merged --> revised in SP-090203
--> The merged CR should have a new CR number --> revised in SP-090219 and approved
- SP-090045 Rel-8 CRs on Charging Management (CH8)

47 Rel-8 OAM&P CRs for approval were approved
- SP-090041 Rel-8 CRs on OAM&P (OAM8)
-- > Editorial issues in the CR package cover page --> revised in SP-090207 and approved
- SP-090046 Rel-8 CRs on Technical Enhancements and Improvements (TEI8)
--> Changes on changes in the CR on TS 32.511 --> revised in SP-090213 and approved

3 Rel-9 OAM&P CRs for approval were approved, 1 Rel-9 OAM&P CR for approval was withdrawn
- SP-000042 Rel-9 CRs on OAM&P (OAM9):
--> Changes on changes in all CRs --> revised in SP-090217
--> CR 5 is not based on the latest baseline and is withdrawn --> revised in SP-090220 and approved

SP-090204 RAN report to SA#43
- No particular SA5 impact

SP-090227 CT report to SA#43
- No particular SA5 impact

SA5 presentation to SA#43 is available at:
http://www.3gpp.org/ftp/tsg_sa/TSG_SA/TSGS_43/Docs/SP-090040.zip

SA#43 documents are available at:
http://www.3gpp.org/ftp/tsg_sa/TSG_SA/TSGS_43/Docs/

Thanks to Dionisio for the preparation of the SA5 report and the SA5 deliverables!
 
Best Regards,
 
Christian
SA5 chairman