Tdoc List

2017-01-27 13:27

TDoc Title Source Type For Agenda Avail Treated Decision Wdrn Replaced-by Replaces
s3i170001 Last meeting report (SA3LI#63) ETSI report Decision
4Last meeting report SA3 LI#63 San Antonio, USA
No
Yes
approved No    
s3i170002 Meeting Agenda (SA3LI#64) ETSI agenda Decision
3Approval of agenda
No
Yes
approved No    
s3i170003 LS IN on I-WLAN handling and specification withdrawal SA3 LS in Information
6Generic Incoming liaisons
No
Yes
noted No    
s3i170004 LS IN on IP delivery for CS traffic ETSI TC LI LS in Discussion
6Generic Incoming liaisons
No
NoThe content of the document is understood. At the same time it was highlighted the need to undertake a study to make sure that by moving to IP we do not leave out aspects which were looked after in a circuit switched environment. A proper and careful approach needs to be taken, and a discussion paper would help.
noted No    
s3i170005 Discussion – LI Solution Architecture for CUPS Nokia Corporation discussion Agreement
8.2Release 14 33.107v14.0.0
No
YesDocument discussed thoroughly. It was agreed to provide for split CC-X3 interworking function. The principle of the document was considered very sensible, and will be used as basis for future work through CRs.
noted No    
s3i170006 Stage 2 description for CUPS LI Nokia Corporation CR Approval
8.2Release 14 33.107v14.0.0
No
YesRevised for some corrections and changes. It was agreed to send an LS to CT4.
revised No s3i170047  
s3i170007 Proposed Reply LS to SA2 on Conclusion on lawful interception in split EPC architecture Nokia Corporation LS out Decision
12Outgoing Liaisons
No
YesRevised following the discussions on document s3i170027.
revised No s3i170041  
s3i170008 IP based Handover Interface for CS Intercepts - Discussion Nokia Corporation discussion  
10.5IP delivery of CS traffic
No
YesDocument revised following thorough discussion on the scenarios shown.
revised No s3i170055  
s3i170009 Possible simplification of S8HR LI architecture Nokia Corporation discussion  
10.1S8HR, VoLTE & Roaming (inc TR 33.827 v14.0.0)
No
NoDocument discussed thoroughly. It was agreed to opt for simplifications 1 (only user plane packets on Xia reference point) and 2 (elimination of LPCF and Xic). CR(s) will be produced accordingly for the next meeting (SA3LI#65), noting that completing S8HR is urgent.
noted No    
s3i170010 Phase 2 of LALS development - Stage 2 description Rogers Communications Canada CR Approval
8.2Release 14 33.107v14.0.0
No
YesRevise for some correction, in particular on the Local Access Location Service clause and other minor issues.
revised No s3i170050  
s3i170011 National requirements related to SDP info in HI3 Ministère Economie Indu. Numer CR Decision
7.2Release 14 33.106v13.4.0
No
YesRevised for some corrections.
revised No s3i170030  
s3i170012 Phase 2 of the LALS development - Stage 3 description Rogers Communications Canada CR Approval
9.2Release 14 33.108 v13.4.0
No
YesRevised for some corrections. Among minor others, it was necessary to make sure the code is updated to reflect the first Rel 14 publication of the spec.
revised No s3i170051  
s3i170013 Liaison Report: PTSC LAES Nokia Corporation report  
5.7ATIS PTSC LAES
No
YesThe content was discussed and the points were noted.
noted No    
s3i170014 Start of intercept on active session Nokia Corporation discussion Discussion
10.8Other
No
YesThis useful discussion document was analyzed. It highlighted that the related LI requirements will possibly need updated through CRs both in SA3LI and TC LI. It was agreed that there are three ways to proceed, the first two strictly related: 1a) we update DF2; 1b) we update DF2 and ICE (the DF2 is in charge); 2) we update the ICE (the ICE is in charge). A short informative Annex would be a good solution.
noted No    
s3i170015 Location information for ProSe UE-to-NW Relay Ericsson LM CR  
8.1Release 13 33.107 v13.5.0 and Earlier
No
YesRevised for some updates following a discussion.
revised No s3i170037  
s3i170016 Location information for ProSe UE-to-NW Relay Ericsson LM CR  
8.2Release 14 33.107v14.0.0
No
YesRevised for some updates following a discussion on related s3i170015.
revised No s3i170038  
s3i170017 Location information for ProSe UE-to-NW Relay Ericsson LM CR  
9.1Release 13 33.108 v13.4.0 and Earlier
No
NoRevised for some updates following a discussion on related s3i170015.
revised No    
s3i170018 Key Issue 7.1 of FS NSA (SA3) related privacy vs LI on Next Generation Core Ministère Economie Indu. Numer discussion Discussion
10.25G
No
YesThere are a number of HPLMN and VPLMN issues to resolve. Requirements in 33.106 require clarification rather than wholesale changes for 5G.
noted No    
s3i170019 Defining the Forwarding Function for CUPS. OTD discussion  
10.8Other
No
YesThis contribuition is strictly related to s3i170005. It was agreed that s3i170005 will be the base for future work through CRs.
noted No    
s3i170020 Subscriber Repository based LI triggering OTD discussion Discussion
10.25G
No
YesRevised for some corrections.
revised No s3i170032  
s3i170021 SDP info at DF3 THALES CR Approval
8.1Release 13 33.107 v13.5.0 and Earlier
No
YesRevised for some corrections.
revised No s3i170040  
s3i170022 Start of intercept on active session Ericsson LM discussion  
8.2Release 14 33.107v14.0.0
No
YesIt was agreed that the option to implement the start of interception in case of multiple LEAs in the IMS ICEs (rather than in the DF2) shall be kept.
noted No    
s3i170023 Summary report of ETSI TC LI PIDS other Information
5.3ETSI TC LI
No
Yes
noted No    
s3i170024 Separate Delivery of MMS OTD CR  
8.2Release 14 33.107v14.0.0
No
YesRevised for some corrections.
revised No s3i170048  
s3i170025 Separate Delivery of MMS - Handover Details OTD CR  
9.2Release 14 33.108 v13.4.0
No
YesRevised for some corrections.
revised No s3i170031  
s3i170026 TPKT Enhancements for EPS OTD CR  
9.2Release 14 33.108 v13.4.0
No
YesRevised to correct the cover page and the proposed text.
revised No s3i170052  
s3i170027 Discussion of Third-party UP in CUPS Huawei Tech.(UK) Co., Ltd discussion Discussion
10Continued Discussion and New Business
No
YesOn the basis of the discussion, it was agreed to revise the related LS s3i170007 for SA2 into s3i170041.
noted No    
s3i170028 LS in on SA2 involvement for the light connection 3GPP SA2 LS in Action
6Generic Incoming liaisons
No
Yes
replied to No    
s3i170029 WTSC LI summary report AT&T GNS Belgium SPRL report Information
5.6WTSC-LI
No
YesThe report content was discussed. As highlighted by WTSC-LI discussions on S8HR, SA3LI need to urgently make progress on S8HR 5G V2X and other 3GPP topics. In order to achieve this SA3LI agreed that a TR will be used to undertake studies on future SA3LI topics allowing both SA3LI and wider 3GPP groups to progress their subsequent normative work. Greg agreed to draft a SID. It was noted that both TC LI and WTSC-LI should have an active stake in this new TR
noted No    
s3i170030 National requirements related to SDP info in HI3 Ministère Economie Indu. Numer CR Decision
7.2Release 14 33.106v13.4.0
No
No
agreed No   s3i170011
s3i170031 Separate Delivery of MMS - Handover Details OTD CR -
9.2Release 14 33.108 v13.4.0
No
YesRevised for several corrections and deletion of some of the proposed parts.
revised No s3i170049 s3i170025
s3i170032 Subscriber Repository based LI triggering OTD discussion Discussion
10.25G
No
YesRevised for some corrections.
revised No s3i170036 s3i170020
s3i170033 LS IN on Conclusion on lawful interception in split EPC architecture 3GPP SA2 LS in Discussion
6Generic Incoming liaisons
No
No
noted No    
s3i170034 LS IN on Completion LI study on S8HR GSMA LS in Action
6Generic Incoming liaisons
No
YesThe scenario described by GSMA will be taken into account and supported for Rel 14. The raleted features will be enhanced. We plan to send an LS to GSMA after SA3LI#65 in April. In the meantime a reply email will be sent to express that we will take the indications into account.
noted No    
s3i170035 Reply to: LS in on SA2 involvement for the light connection current meeting LS out approval
6Generic Incoming liaisons
No
No
agreed No    
s3i170036 Subscriber Repository based LI triggering OTD discussion Discussion
10.25G
No
YesRevised for some corrections.
revised No   s3i170032
s3i170037 Location information for ProSe UE-to-NW Relay Ericsson LM CR -
8.1Release 13 33.107 v13.5.0 and Earlier
No
YesRevised for a change in a sentence.
revised No s3i170057 s3i170015
s3i170038 Location information for ProSe UE-to-NW Relay Ericsson LM CR -
8.2Release 14 33.107v14.0.0
No
YesRevised for a change in a sentence.
agreed No   s3i170016
s3i170039 Location information for ProSe UE-to-NW Relay Ericsson LM CR -
9.1Release 13 33.108 v13.4.0 and Earlier
No
No
agreed No   s3i170017
s3i170040 SDP info at DF3 THALES CR Approval
8.1Release 13 33.107 v13.5.0 and Earlier
No
No
agreed No   s3i170021
s3i170041 Proposed Reply LS to SA2 on Conclusion on lawful interception in split EPC architecture Nokia Corporation LS out Decision
12Outgoing Liaisons
No
NoIt was decided to request SA2 to take note of LI architecture with CUPS and to CT4 to proceed with the stage 3 work to enhance the Sxa’ and Sxb’ to support the LI functionalities as defined in the CR. LS agreed with doc S3i170047 attached.
agreed No   s3i170007
s3i170042 Subscriber Repository based LI triggering OTD discussion Discussion
10.25G
No
YesDocument discussed, it highlights significant challenges of performing LI in a multi-slice 5G environment. Multi-network deployment scenarios are particularly difficult to deal with. Meeting discussed whether there is an overlap of requirements with SA5 in terms of billing indentity availability in some scenario. It was agreed to send an LS to SA5.
noted No   s3i170036
s3i170043 Storing of the long-term identities used in the VPLMN OTD LS out Decision
12Outgoing Liaisons
No
NoLS to SA5 because SA3LI considered that similar requirement potentially exist for billing reasons, and there is a need to inform each other groups' existing requirement, and coordinate future actions.
agreed No    
s3i170044 Revised Release 14 WID Sprint WID revised discussion
10.3WID
No
NoDocument agreed with updated features and supporting organisations.
agreed No    
s3i170045 New Release 15 WID Sprint WID new discussion
10.3WID
No
NoDocument agreed with justification to include 5G core network and NR, and support for S1 relocation by the LI service for S8HR, and specified objectives. Supporting organisations agreed. It was agreed that the rapporteurs of the future 3 Rel-15 TSs will be: TS 33.126 Koen Jaspers TS 33.127 Koen Jaspers (but delegates are encouraged to share the workload) TS 33.128 Nagaraja Rao
agreed No    
s3i170046 New Study Item: Study on 5G Lawful Interception Service - Phase 1 Sprint SID new discussion
10.3WID
No
NoDocument shown, justifications and objective agreed. This study will produce an internal TR which will take the output (both studies and normative specifications) on 5G from other 3GPP groups as well as issues which arise out of regulatory LI requirements Rapporteur: Gerry McQuaid. Supporting organisations agreed.
agreed No    
s3i170047 Stage 2 description for CUPS LI Nokia Corporation CR Approval
8.2Release 14 33.107v14.0.0
No
NoI
agreed No   s3i170006
s3i170048 Separate Delivery of MMS OTD CR -
8.2Release 14 33.107v14.0.0
No
Yes
agreed No   s3i170024
s3i170049 Separate Delivery of MMS - Handover Details OTD CR -
9.2Release 14 33.108 v13.4.0
No
YesRevised to update the cover sheet.
revised No s3i170059 s3i170031
s3i170050 Phase 2 of LALS development - Stage 2 description Rogers Communications Canada CR Approval
8.2Release 14 33.107v14.0.0
No
No
agreed No   s3i170010
s3i170051 Phase 2 of the LALS development - Stage 3 description Rogers Communications Canada CR Approval
9.2Release 14 33.108 v13.4.0
No
No
agreed No   s3i170012
s3i170052 TPKT Enhancements for EPS OTD CR -
9.2Release 14 33.108 v13.4.0
No
Yes
agreed No   s3i170026
s3i170053 Reconfirming LI requirements NTAC CR discussion
1Opening and Welcome
No
No
agreed No    
s3i170054 LS on LI requirements reconfirmed, including 5G and CIoT PIDS LS out Decision
1Opening and Welcome
No
No
agreed No    
s3i170055 IP based Handover Interface for CS Intercepts - Discussion Nokia Corporation discussion -
10.5IP delivery of CS traffic
No
NoPresentation discussed. It was agreed that there is a need to mandate a specific scenario in 33.107 and 33.108. However there was a desire to modify the approach to align with that used in ETSI TS 102 232-6. Among the scenarios discussed, the single stream option is the closest to the TC LI approach, which is desirable, however it might have a hgher impact on implementation. It was agreed that TC LI will discuss this document during the following week's TC LI#44 meeting, and feedback to SA3LI via an LS, on which basis, CRs will be generated for 33.107 and 33.108.
reserved No   s3i170008
s3i170056 SDP info at DF3 THALES CR Decision
1Opening and Welcome
No
No
agreed No    
s3i170057 Location information for ProSe UE-to-NW Relay Ericsson LM CR -
8.1Release 13 33.107 v13.5.0 and Earlier
No
No
agreed No   s3i170037
s3i170058 Location information for ProSe UE-to-NW Relay Ericsson LM CR -
8.2Release 14 33.107v14.0.0
No
No
agreed No   s3i170038
s3i170059 Separate Delivery of MMS - Handover Details OTD CR -
9.2Release 14 33.108 v13.4.0
No
No
agreed No   s3i170049