Last Allocated Document: SP-140395

Temporary Documents List - Ordered by Agenda Item

Colour Key:
Agenda Item, Agenda Title
No Conclusion
Conclusion Reached
Document Revised
Document Withdrawn
Document Not Handled

To use hyperlinks, this file must be placed above Folder 'Docs'

Created: 2014-06-17 17:41     START OF LIST

Agenda TD LongTitle Source Summary Doc_Type Doc_For Decision Rev_By Rev_Of LS_Source_file Comment
1 - Opening of the Meeting - - - - - - - - -
2 - Approval of Agenda - - - - - - - - -
2 SP-140174 Draft agenda for TSG SA meeting #64 TSG SA Chairman Draft agenda for TSG SA meeting #64 Agenda Approval Approved This Agenda was approved
3 - IPR Reminder - - - - - - - - -
4 - Reports from Previous Meetings - - - - - - - - -
4.1 - Report from TSG SA#63 - - - - - - - - -
4.1 SP-140175 Draft Report of TSG SA meeting #63 TSG SA Secretary Draft Report of TSG SA meeting #63 containing revision marks of changes on the distributed draft. Report Approval Approved This Report was approved
4.2 - Reports from TSG SA ad-hoc meetings and workshops - - - - - - - - -
5 - Items for early consideration - - - - - - - - -
5 SP-140187 LS from SA WG2: Maintenance of I-WLAN specification SA WG2 Following the TSG SA request to avoid I-WLAN considerations in Rel-12 WLAN related work and to stop the functional modifications of I-WLAN, SA WG2 has studied the existing specifications in its own area. From S [...]. LS In Action Noted S2-142202 This was reviewed and noted.
5 SP-140189 LS from SA WG3: Reply to LS on Maintenance of I-WLAN Solution SA WG3 There has been some discussion in various 3GPP groups about how to best resolve conflicts between ongoing WLAN work in 3GPP and the existing I-WLAN specifications. SA stated that they would provide further guid [...]. LS In Information Noted S3-140920 This was reviewed and noted.
5 SP-140193 LS from SA WG5: Reply LS on Maintenance of I-WLAN Solution SA WG5 SA WG5 has reviewed the LS from TSG SA informing about the decision that ongoing WLAN related work in Rel-12 shall not take I-WLAN into account and that functional modifications of I-WLAN shall be stopped from [...]. LS In Information Noted S5-143431 This was reviewed and noted.
5 SP-140365 LS from TSG CT: Reply LS on Maintenance of I-WLAN Solution TSG CT TSG CT#64 thanks SA WG2 and SA on LSs on I-WLAN maintenance in CP140345 and CP-140349. TSG CT#64 has discussed the topic and agrees with CT WG1 and SA WG2 in their decision to stop the maintenance of I-WLAN fun [...]. LS In Action Noted CP-140457 This was reviewed and noted.
5 SP-140183 LS from CT WG6: Reply to LS on Maintenance of I-WLAN Solution (SP-140089 /C6-140255) CT WG6 CT WG6 would like to inform TSG SA that the current CT WG6 specifications include the I-WLAN access configuration parameters stored in the USIM. From the USIM perspective it can be noted that even though the I- [...]. LS In Action Noted C6-140294 Response to SP-140089. This was covered by the TSG CT LS in SP-140365 and was noted.
5 SP-140347 Maintenance of I-WLAN specifications Broadcom Corporation Identification of possible alternatives to stop maintaining I-WLAN specifications OTHER Decision Revised SP-140372 Related to 23.402 CR1275R2 in SP-140269. Revised in SP-140372
5 SP-140372 Maintenance of I-WLAN specifications Broadcom Corporation Identification of possible alternatives to stop maintaining I-WLAN specifications OTHER Decision Noted SP-140347 Related to 23.402 CR1275R2 in SP-140269. This was reviewed and noted.
5 SP-140361 Way forward related to SA WG2 CR S2-142163 in package SP-140269 and LS S2-142202 = SP-140187 Gemalto - Discussion Presentation Noted Related to 23.402 CR1275R2 CR in SP-140269. This was reviewed and noted.
5 SP-140376 1 CR to 23.402 (Rel-12: TEI12) SA WG2 23.402 CR1275R2. Summary of change: Scope is clarified to say the intention to replace I-WLAN with the new WLAN IWK. It is clarified that it is UE responsibility to use either WLAN IWK and I-WLAN, but not both [...]. CR Pack Approval Approved with 1 Objection SP-140269 One objection was raised against 23.402 CR1275R2 by Gemalto. This was left for further off-line discussion. This CR Pack was approved with an objection from Gemalto
5 SP-140379 Reply LS on Maintenance of I-WLAN Solution TSG SA To: TSG CT, SA WG1, SA WG2, SA WG3, SA WG5, CT WG1, CT WG4, CT WG6 LS OUT Approval Revised SP-140389 This required further off-line discussion and was revised in SP-140389
5 SP-140389 Reply LS on Maintenance of I-WLAN Solution TSG SA To: SA WG1, SA WG2, SA WG3, SA WG5, CT WG1, CT WG4, CT WG6 CC: TSG CT LS OUT Approval SP-140379
5 SP-140375 Study on use of commercial mobile networks and equipment for mission-critical high-speed broadband communications in specific sectors TCCA - OTHER Presentation Noted This presentation was noted.
5 SP-140220 Critical Communications Work Items TCCA TETRA has over 190 critical communications-specific features and functions. Many will need to be replicated on an LTE platform. 3GPP, ETSI & OMA working together in partnership will allow the substantial body o [...]. Slides Presentation Noted This presentation was noted.
5 SP-140179 LS to TSG SA, SA WG1 and SA WG2 on MCPTT requirements OMA COM 1 Overview The OMA COM was pleased to receive the TD SP-130727 (December 2013), LS on Mission Critical Push To Talk over LTE (MCPTT), document from TSG SA and SA WG1. This liaison stated 'TSG SA understands tha [...]. LS In Information Noted OMA-LS_1003 This LS was reviewed and noted.
5 SP-140185 LS from SA WG1: LS on MCPTT Requirements SA WG1 SA WG1 would like to thank OMA for providing visibility of their requirements. SA WG1 would be interested in having feedback from OMA on the following: - As part of the ongoing work in OMA is there a plan fo [...]. LS In Information Noted S1-141590 This LS was reviewed and noted.
5 SP-140366 LS from OMA COM: Response to S1-141590 LS on MCPTT Requirements OMA COM The OMA COM was pleased to receive LS S1-141590 on MCPTT Requirements (May 2014) from TSG SA WG1. This liaison response answers the two questions from LS S1-141590. SA WG1 would be interested in having feedback [...]. LS In Action Noted OMA-LS_1007-COM This LS was reviewed and noted.
5 SP-140367 LS from OMA COM: LS to TCCE on PCPS OMA COM The OMA COM was pleased to receive the 'substantive reply to Liaison Statement: information on a work item on Push to Communicate for Public Safety [1] has been approved' from ETSI TC TCCE. OMA COM would like t [...]. LS In Information Noted OMA-LS_1008-COM This LS was reviewed and noted.
5 SP-140196 MCPTT Work Considerations in SA WG2 SA WG2 Chairman Plenary discussion and planning would benefit the soon-to-start MCPTT work item as it has an extensive list of requirements, builds upon other Rel-13 features that have RAN dependencies, and there is concurrent [...]. Discussion Discussion Noted This contribution was noted.
5 SP-140370 Way forward and proposed division of work for MCPTT Motorola Solutions Explains the desirability for 3GPP to share MCPTT work with OMA and ETSI and proposes concretely what work to be shared and what the immediate next steps should be. OTHER Action Noted This contribution was noted.
5 SP-140348 MCPTT standardization U.S. Dept of Commerce Describes Push to talk (PTT) standardization effort within 3GPP and concept to split the work amongst other standards development organizations OTHER Discussion Noted An LS was drafted in SP-140380 and this contribution was noted
5 SP-140380 LS on MCPTT Work TSG SA To: SA WG2 LS OUT Approval Revised SP-140390 This was further discussed off-line and revised in TD SP 140390
5 SP-140390 LS on MCPTT Work TSG SA To: SA WG2 LS OUT Approval SP-140380
5 SP-140352 Virtualisation discussion paper Cisco, Qualcomm, NEC At the March 2014 TSG SA Plenary meeting in Fukuoka, Japan, there was a session dedicated to discussing what work should be carried out in 3GPP to look at how the 3GPP architecture might be impacted as a result [...]. OTHER Discussion Noted This presentation was noted.
5 SP-140356 Initiate study of NFV-SDN in 3GPP China Mobile, CATR, Deutsche Telekom, KDDI, Telefónica, ZTE This contribution suggest 3GPP to initiate the NFV/SDN work from now, presented the principle, motivation and the way to organize among different groups. OTHER Approval Revised SP-140371
5 SP-140371 Initiate study of NFV-SDN in 3GPP China Mobile, CATR, Deutsche Telekom, KDDI, Telefónica, ZTE This contribution suggest 3GPP to initiate the NFV/SDN work from now, presented the principle, motivation and the way to organize among different groups. OTHER Approval Noted SP-140356 This presentation was noted.
5 SP-140351 NFV: 'KDDI's view on 3GPP activities' KDDI Summary: - Core network enhancements based on NFV framework has to be achieved in Rel.14 as a near-term goal - SA WG5 scope: achieve reliable automatic provisioning and dynamic configuration change - SA WG2 sco [...]. OTHER Discussion Noted This presentation was noted.
5 SP-140295 Forecast Requirements in SA WG1 Virtualized and Soften Mobile Operators Networks China Telecom, CATR Motivation on China Telecom in SA WG1 works: Mobile operators all over the world faces the same problems as China Telecom that the rapid growth of mobile Internet traffic, the core network(CN) capacity needs ex [...]. Slides Presentation Noted This presentation was noted.
5.1 - Challenges to working agreements - - - - - - - - -
6 - General Incoming Liaisons - - - - - - - - -
6 SP-140176 Letter to ITU on LS on Architecture and Topology of IMT Networks TSG CT Actions: By the indicated deadline, TSG CT had no comments to the attached feedback to ITU-R WP 5D as received from TSG RAN in RP-140589. TSG SA is asked to review the document as agreed by CT and provide the S [...]. LS In Approval Forwarded to PCG CP-140226 For e-mail approval. This was approved by e-mail before the meeting and forwarded to the PCG.
6 SP-140177 LS to PCG: Letter to ITU on LS on Architecture and Topology of IMT Networks TSG SA To: PCG. Attachment: Input to ITU WP5D on Architecture of UTRA and EUTRA LS OUT Approval Withdrawn For e-mail approval WITHDRAWN
6 SP-140181 LS from GSMA: Publication of GSMA HD Voice Logo Technical Annex F for Mobile Networks and Terminals for the usage of the ‘HD voice’ logo with LTE GSMA The GSMA Inter-Working, Roaming Expert Group (IREG) and Terminal Steering Group (TSG) wishes to announce that the GSMA has published Annex F listing Minimum Network and Terminal Requirements for the usage of th [...]. LS In Information Noted TSGVLR_189 This incoming LS was noted
6 SP-140182 LS from WBA: WBA Carrier Wi-Fi Liaison Statement WBA The WBA Carrier Wi-Fi project team would like to announce the publication of its Carrier Wi-Fi (CWLAN) Guidelines. LS In Information Forwarded to SA WG2 WBA-LiasionStatement_on_Carrier_WiFi_to_3GPP_SA This was forwarded to SA WG2 for consideration.
6 SP-140180 LS on invitation to participate to JCA-IoT meetings, request to update contact points and IoT Standards Roadmap JCA-IoT The Joint Coordination Activity on Internet of Things (JCA-IoT) is maintaining contact points from various SDOs, Forums and Consortia, which are participating in the JCA-IoT. These contact points help to coordi [...]. LS OUT Information Postponed JCA-IoT - LS 20 This LS was postponed to TSG SA meeting #66.
6 SP-140192 LS from SA WG5: LS on co-ordination of response LS to ITU JCA-SDN SA WG5 SA WG5 has received an LS from ITU JCA-SDN which asks SA WG5 and SA WG2 to provide information regarding ongoing activities related to SDN (Software Defined Networking) or NFV (Network Function Virtualisation). [...]. LS In Action S5-143430 This was reviewed and a response from TSG SA to ITU was drafted in SP-140382.
6 SP-140186 LS from SA WG2: LS on co-ordination of response LS to ITU JCA-SDN SA WG2 SA WG2 has received an LS from ITU JCA-SDN which asks SA WG2 and SA WG5 to provide information regarding ongoing activities related to SDN (Software Defined Networking) or NFV (Network Function Virtualisation). [...]. LS In Action S2-141481 This was reviewed and a response from TSG SA to ITU was drafted in SP-140382.
6 SP-140382 Reply LS on SDN standardization activity map TSG SA To: ITU JCA-SDN CC: SA WG5, SA WG2. Attachment: SP-140323 LS OUT Approval
7 - Reports from SA Working Groups and other TSGs - - - - - - - - -
7.1 - SA WG1 Report and Questions for Advice - - - - - - - - -
7.1 SP-140221 SA WG1 Report to TSG SA#64 SA WG1 Chairman Chairman's report of SA WG1 activities Report Presentation Noted The SA WG1 Chairman was thanked for this report, which was noted.
7.1 SP-140357 Proposal for Rel-13 Stage 1 freeze SA WG1 Chairman Proposal for handling Rel-13 stage 1 freeze and start of Rel-14 Stage 1 work. OTHER Approval Endorsed proposals Proposal #1 was endorsed by TSG SA. Proposal #2 was endorsed, with the addition to allow work on ongoing Study items in Q4 2014.
7.2 - SA WG2 Report and Questions for Advice - - - - - - - - -
7.2 SP-140195 SA WG2 chairman's report to TSG SA#64 SA WG2 Chairman Chairman's report of SA WG2 activities Report Presentation Noted The SA WG2 Chairman was thanked for this report, which was noted.
7.2 SP-140197 Release 13 Time Management SA WG2 Chairman TSG SA is asked to decide how to allocate SA WG2 time resources during the Release 13 time frame Discussion Action Revised SP-140384
7.2 SP-140384 Release 13 Time Management SA WG2 Chairman TSG SA is asked to decide how to allocate SA WG2 time resources during the Release 13 time frame Discussion Action Revised SP-140392 SP-140197 Further update suggestions were provided and this was revised again off-line in SP-140392
7.2 SP-140392 Release 13 Time Management SA WG2 Chairman TSG SA is asked to decide how to allocate SA WG2 time resources during the Release 13 time frame Discussion Action SP-140384
7.3 - SA WG3 Report and Questions for Advice - - - - - - - - -
7.3 SP-140298 SA WG3 Status Report SA WG3 Chairman Chairman's report of SA WG3 activities Report Presentation Noted The SA WG3 Chairman was thanked for this report, which was noted.
7.4 - SA WG4 Report and Questions for Advice - - - - - - - - -
7.4 SP-140202 SA WG4 Status Report at TSG SA#64 SA WG4 Chairman Chairman's report of SA WG4 activities Report Presentation Noted The SA WG4 Chairman was thanked for this report, which was noted.
7.5 - SA WG5 Report and Questions for Advice - - - - - - - - -
7.5 SP-140320 SA WG5 Status Report SA WG5 Chairman Chairman's report of SA WG5 activities. Report Presentation Noted The SA WG5 Chairman was thanked for this report, which was noted.
7.6 - TSG RAN report and Questions for Advice - - - - - - - - -
7.6 SP-140373 TSG RAN Status Report to TSG SA#64 TSG RAN Chairman TSG RAN Status Report to TSG SA#64 Report Presentation Noted This Report was noted
7.6 SP-140374 Draft report of TSG RAN meeting #64 TSG RAN Secretary Draft report of TSG RAN meeting #64 Report Information Noted This Report was noted
7.6 SP-140391 Chairman Summary of workshop on LTE in unlicensed spectrum TSG RAN Chairman - Report Information
7.7 - TSG CT report and Questions for Advice - - - - - - - - -
7.7 SP-140362 Status report of TSG CT#64 TSG CT Chairman TSG CT Status Report to TSG SA#64 Report Presentation Revised SP-140378
7.7 SP-140378 Status report of TSG CT#64 TSG CT Chairman TSG CT Status Report to TSG SA#64 Report Presentation Noted SP-140362 The TSG CT Chairman was thanked for this report, which was noted.
7.7 SP-140363 Draft meeting report of TSG CT#64 MCC Draft report of TSG CT meeting #64 Report Information Noted This was provided for information and was noted.
7.7 SP-140364 IETF Status report TSG CT Chairman IETF dependencies Status report Report Presentation Noted The TSG CT Chairman was thanked for this report, which was noted.
7.8 - TSG GERAN report and Questions for Advice - - - - - - - - -
7.8 SP-140355 TSG GERAN Status Report to TSG SA#64 TSG GERAN Chairman TSG GERAN Status Report to TSG SA#64 Report Presentation Noted The TSG GERAN Secretary and TSG GERAN Chairman were thanked for this report, which was noted.
7.8 SP-140350 LS from TSG GERAN: LS on Study Item for Low Throughput Internet of Things TSG GERAN TSG GERAN would like to inform the addressed groups that they have agreed the attached Study Item 'Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things' at GERAN#62. As the wor [...]. LS In Information Noted GP-140429 This LS was noted.
8 - Documents related to Rel-8 or Earlier Features - - - - - - - - -
8.1 - Rel-4 CRs - - - - - - - - -
8.2 - Rel-5 CRs - - - - - - - - -
8.3 - Rel-6 CRs - - - - - - - - -
8.4 - Rel-7 CRs - - - - - - - - -
8.5 - Rel-8 CRs - - - - - - - - -
8.5 SP-140222 Stage 1 CRs on Removal of CDIVN service SA WG1 22.173 CR0094; 22.173 CR0095; 22.173 CR0096; 22.173 CR0097; 22.173 CR0098 CR Pack Approval Approved This CR Pack was approved
8.5 SP-140334 Rel-8 CRs on Charging Management (CH8) SA WG5 32.251 CR0366R1; 32.251 CR0367R1; 32.251 CR0368R1; 32.251 CR0369R1; 32.251 CR0370R1; 32.298 CR0446R1; 32.298 CR0447R1; 32.298 CR0448R1; 32.298 CR0449R1; 32.298 CR0450R1 CR Pack Approval Approved This CR Pack was approved
9 - Rel-9 CRs - - - - - - - - -
9 SP-140247 3 CRs to 23.167 (Rel-9, Rel-10, Rel-11: IMS_EMER_GPRS_EPS) SA WG2 23.167 CR0262R3; 23.167 CR0263R3; 23.167 CR0264R3 CR Pack Approval Approved This CR Pack was approved
9 SP-140248 4 CRs to 23.402 (Rel-9, Rel-10, Rel-11, Rel-12: TEI9) SA WG2 23.402 CR1244R2; 23.402 CR1245R1; 23.402 CR1246R1; 23.402 CR1247R1 CR Pack Approval Approved This CR Pack was approved
9 SP-140203 CRs to TS 26.346 on 'PSS and MBMS extensions (PMA-MBS_Ext)' (Release 9 to Release 12) - pack 1 SA WG4 26.346 CR0366; 26.346 CR0367; 26.346 CR0368; 26.346 CR0369; 26.346 CR0370; 26.346 CR0371; 26.346 CR0372; 26.346 CR0373; 26.346 CR0376R2; 26.346 CR0377R2; 26.346 CR0378R2; 26.346 CR0379R2 CR Pack Approval Approved This CR Pack was approved
9 SP-140204 CRs to TS 26.346 on 'PSS and MBMS extensions (PMA-MBS_Ext)' (Release 9 to Release 12) - pack 2 SA WG4 26.346 CR0389R2; 26.346 CR0390R2; 26.346 CR0391R2; 26.346 CR0392R2; 26.346 CR0393; 26.346 CR0394; 26.346 CR0395; 26.346 CR0396; 26.346 CR0397R1; 26.346 CR0398R1; 26.346 CR0399R1; 26.346 CR0400R1; 26.346 CR0403R [...]. CR Pack Approval Approved This CR Pack was approved
9 SP-140311 Release 9 CRs on 128 bit encryption for GSM and GPRS (A5/4-GEA4) SA WG3 43.020 CR0031R2; 43.020 CR0032R2; 43.020 CR0033R3; 43.020 CR0034R2 CR Pack Approval Approved This CR Pack was approved
9 SP-140330 Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) SA WG5 32.423 CR0078R2; 32.765 CR0021 CR Pack Approval Approved This CR Pack was approved
10 - Rel-10 CRs - - - - - - - - -
10 SP-140249 6 CRs to 23.237, 23.292 (Rel-10, Rel-11, Rel-12: SAES, TEI10) SA WG2 23.237 CR0470R1; 23.237 CR0471; 23.237 CR0472; 23.292 CR0209R2; 23.292 CR0210R1; 23.292 CR0211R1 CR Pack Approval Approved This CR Pack was approved
10 SP-140250 3 CRs to 23.272 (Rel-10, Rel-11, Rel-12: eMPS) SA WG2 23.272 CR0923R3; 23.272 CR0924R3; 23.272 CR0925R3 CR Pack Approval Approved This CR Pack was approved
10 SP-140251 12 CRs to 23.002, 23.060, 23.221, 23.272, 23.401 (Rel-10, Rel-11, Rel-12: TEI10) SA WG2 23.002 CR0274R1; 23.060 CR1843; 23.060 CR1844; 23.060 CR1845; 23.221 CR0158R3; 23.221 CR0159R3; 23.272 CR0928R1; 23.272 CR0929R1; 23.272 CR0930R1; 23.401 CR2661R1; 23.401 CR2662R1; 23.401 CR2663R1 CR Pack Approval Approved This CR Pack was approved
10 SP-140252 6 CRs to 23.237, 23.272 (Rel-10, Rel-11, Rel-12: TEI10) SA WG2 23.237 CR0476R1; 23.237 CR0477R1; 23.237 CR0478R1; 23.272 CR0933R2; 23.272 CR0934R1; 23.272 CR0935R1 CR Pack Approval Approved This CR Pack was approved
10 SP-140205 CRs to TS 26.247 on 'HTTP-based Streaming and Download Services (HTTP_SDS)' (Release 10 to Release 12) SA WG4 26.247 CR0056R2; 26.247 CR0057R2; 26.247 CR0058R2; 26.247 CR0059R2; 26.247 CR0060R2; 26.247 CR0061R2 CR Pack Approval Approved This CR Pack was approved
10 SP-140331 Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) SA WG5 32.766 CR0063R1; 32.766 CR0064 CR Pack Approval Approved This CR Pack was approved
11 - Rel-11 CRs - - - - - - - - -
11 SP-140253 2 CRs to 23.203 (Rel-11, Rel-12: BBAI) SA WG2 23.203 CR0887R2; 23.203 CR0888R2 CR Pack Approval Approved This CR Pack was approved
11 SP-140254 2 CRs to 23.203 (Rel-11, Rel-12: SAPP) SA WG2 23.203 CR0879R2; 23.203 CR0880R2 CR Pack Approval Approved This CR Pack was approved
11 SP-140255 6 CRs to 23.216, 23.271, 23.401 (Rel-11, Rel-12: TEI11) SA WG2 23.216 CR0324; 23.216 CR0325; 23.271 CR0402R2; 23.271 CR0403R2; 23.401 CR2653R1; 23.401 CR2654R1 CR Pack Approval Approved This CR Pack was approved
11 SP-140256 10 CRs to 23.060, 23.272, 23.401 (Rel-11, Rel-12: TEI11, SAES) SA WG2 23.060 CR1865R2; 23.060 CR1866R2; 23.060 CR1846R2; 23.060 CR1847R2; 23.272 CR0926R1; 23.272 CR0927R1; 23.401 CR2688R2; 23.401 CR2689R2; 23.401 CR2659R3; 23.401 CR2660R3 CR Pack Approval Approved This CR Pack was approved
11 SP-140257 9 CRs to 23.060, 23.203, 23.401 (Rel-11, Rel-12: CNO_ULI) SA WG2 23.060 CR1869R3; 23.060 CR1863R1; 23.060 CR1862R5; 23.060 CR1858R2; 23.203 CR0884R4; 23.203 CR0882R2; 23.401 CR2696R3; 23.401 CR2681R1; 23.401 CR2679R5 CR Pack Approval Approved except 23.203 CR0884R4 Proposed revision of 23.203 CR0884R4 in SP-140354. All other CRs in this pack were approved.
11 SP-140354 23.203 CR0884R5: Correction of ULI reporting only when the UE is in 'CONNECTED' state Ericsson 23.203 CR0884R5. Editorial changes from the SA WG2 agreed CR are to include Annex A.1 CR Pack Approval Approved Update of 23.203 CR0884R4 from SP-140257 This CR Pack was approved
11 SP-140206 CRs to TS 26.346 on Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)' (Release 11 and Release 12) SA WG4 26.346 CR0381R2; 26.346 CR0382R2; 26.346 CR0384R2; 26.346 CR0385R1; 26.346 CR0412; 26.346 CR0413 CR Pack Approval Approved This CR Pack was approved
11 SP-140207 CR to TS 26.234 on 'Missing IANA Registration Information on 3GPP-framepackingtype SDP Attribute (M3DV)' (Release 11 and Release 12) SA WG4 26.234 CR0219R1; 26.234 CR0220R1 CR Pack Approval Approved This CR Pack was approved
11 SP-140319 Release 11 CRs on Lawful Interception (LI11) SA WG3 33.107 CR0144; 33.107 CR0146 CR Pack Approval Approved This CR Pack was approved
11 SP-140332 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) Batch 1 SA WG5 28.622 CR0001; 28.623 CR0003R1; 28.625 CR0001; 28.626 CR0001; 28.629 CR0004; 28.633 CR0001; 28.652 CR0003R2; 28.652 CR0004R1; 28.653 CR0003R1; 28.655 CR0001R1; 28.656 CR0001; 28.656 CR0002R1; 28.659 CR0006; 28. [...]. CR Pack Approval Approved This CR Pack was approved
11 SP-140358 Rel-11 CRs on OAM Maintenance and small Enhancements  (OAM11) Batch 2 SA WG5 28.621 CR0001; 28.622 CR0002; 28.623 CR0004; 28.624 CR0001; 28.625 CR0002; 28.626 CR0002; 28.627 CR0001; 28.628 CR0007; 28.629 CR0005; 28.631 CR0001; 28.632 CR0001; 28.633 CR0002; 28.651 CR0001; 28.709 CR0002; [...]. CR Pack Approval Approved This CR Pack was approved
11 SP-140359 Rel-11 CRs on OAM Maintenance and small Enhancements  (OAM11) Batch 3 SA WG5 28.652 CR0005; 28.653 CR0005; 28.654 CR0001; 28.655 CR0002; 28.656 CR0003; 28.657 CR0002; 28.658 CR0008; 28.659 CR0008; 28.661 CR0002; 28.662 CR0002; 28.663 CR0003; 28.751 CR0001; 28.752 CR0001; 28.753 CR0002; [...]. CR Pack Approval Approved This CR Pack was approved
11 SP-140360 Rel-11 CRs on OAM Maintenance and small Enhancements  (OAM11) Batch 4 SA WG5 28.671 CR0001; 28.672 CR0001; 28.673 CR0002; 28.674 CR0001; 28.675 CR0001; 28.676 CR0002; 28.701 CR0001; 28.702 CR0003; 28.703 CR0003; 28.704 CR0001; 28.705 CR0002; 28.706 CR0002; 28.707 CR0001; 28.708 CR0001 [...]. CR Pack Approval Approved This CR Pack was approved
11 SP-140335 Rel-11 CRs on Charging Management (CH11) SA WG5 32.299 CR0588; 32.299 CR0589 CR Pack Approval Approved This CR Pack was approved
11 SP-140343 Rel-11 CRs on Transit Inter Operator Identifier for IMS Interconnection Charging in multi operator environment (IOI_IMS_CH) SA WG5 32.240 CR0374R1; 32.240 CR0375R1; 32.260 CR0255R1; 32.260 CR0256R1; 32.298 CR0455R1; 32.298 CR0456R1; 32.299 CR0594R1; 32.299 CR0595R1 CR Pack Approval Approved This CR Pack was approved
11 SP-140344 Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) SA WG5 32.422 CR0263R1; 32.422 CR0264R1; 32.422 CR0265R1; 32.422 CR0266R1; 32.422 CR0268; 32.422 CR0269; 32.422 CR0270; 32.423 CR0083 CR Pack Approval Approved This CR Pack was approved
11 SP-140346 Rel-11 CRs on Unification of Charging session from SIP AS and SRVCC functions in IMS (UCHIMS_AS-SRVCC) SA WG5 32.260 CR0245R3; 32.260 CR0246R3; 32.260 CR0247R4; 32.260 CR0248R4; 32.260 CR0251R1; 32.260 CR0252R1; 32.260 CR0253R1; 32.260 CR0254R1; 32.260 CR0264R1; 32.260 CR0265R1; 32.298 CR0453R1; 32.298 CR0454R1; 32.299 [...]. CR Pack Approval Approved This CR Pack was approved
12 - Documents Related to Rel-12 Features - - - - - - - - -
12.1 - (SEQ_FA) - Sequential Flexible Alerting - - - - - - - - -
12.2 - (IMS_WebRTC) - Web Real Time Communication (WebRTC) Access to IMS - - - - - - - - -
12.2 SP-140223 Stage 1 CRs on TEI12 for Alignment with Stage 2/3 on IMS_WebRTC SA WG1 22.228 CR0200R1; 22.228 CR0201R1 CR Pack Approval Approved This CR Pack was approved
12.2 SP-140225 Stage 1 CR on corrections on IMS_WebRTC SA WG1 22.228 CR0203R2 CR Pack Approval Approved This CR Pack was approved
12.2 SP-140261 9 CRs to 23.228 (Rel-12: IMS_WebRTC) SA WG2 23.228 CR1081R2; 23.228 CR1079R2; 23.228 CR1075R2; 23.228 CR1072R2; 23.228 CR1070R2; 23.228 CR1069R1; 23.228 CR1068R4; 23.228 CR1066R1; 23.228 CR1065R1 CR Pack Approval Approved This CR Pack was approved
12.2 SP-140308 TR 33.871 (Web Real Time Communication (WebRTC) Access to IMS) SA WG3 Abstract of document: TR 33.871 contains a study on security for WebRTC access to IMS, based on the architecture and stage 2 procedures defined in Annex U of TS 23.228. The document is addressing: - WebRTC IMS [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG3
12.2 SP-140312 Release 12 CRs on Web Real Time Communication (WebRTC) Access to IMS SA WG3 33.203 CR0208R1; 33.203 CR0209R1; 33.203 CR0211R1; 33.203 CR0212R2; 33.203 CR0213R1; 33.328 CR0060R1 CR Pack Approval Approved This CR Pack was approved
12.2 SP-140286 Updated WID: Enhancements to WEBRTC interoperability {eWebRTCi} SA WG2 Objective: SA WG1 objectives: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases origina [...]. WID Approval Approved This updated WID was approved.
12.3 - (LangInfo) - Language and Modality Information for communications - - - - - - - - -
12.4 - (EVS_codec) - Codec for Enhanced Voice Services - - - - - - - - -
12.4 SP-140208 TS 26.441 EVS Codec General Overview (EVS_codec) (Release 12), v. 1.0.0 SA WG4 Abstract of document: The present document is an introduction to the audio processing parts of the Enhanced Voice Services employing the Enhanced Voice Services coder. A general overview of the audio processing [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG4
12.4 SP-140209 CR to TS 26.114 on 'Correction on Missing Reference in CVO Specification (CVO)' (Release 12) SA WG4 26.114 CR0280 CR Pack Approval Approved This CR Pack was approved
12.5 - (IMS_TELEP) - IMS-based Telepresence - - - - - - - - -
12.6 - (SMURFs) - Service and Media Reachability for Users over Restrictive Firewalls - - - - - - - - -
12.7 - (MOSAP) - Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers - - - - - - - - -
12.8 - (IPXSNAT) - IPXS for national interconnect - - - - - - - - -
12.9 - (INIPUI) - IMS Network-Independent Public User Identities (including FS_INIPUI) - - - - - - - - -
12.10 - (ECTB) - ECT Blind service interactions - - - - - - - - -
12.11 - (PMOC) - Prevention of mobile-originating signalling and/or data traffic of UE in connected mode - - - - - - - - -
12.12 - (ESID) - Emergency Session Identification - - - - - - - - -
12.13 - (IMS_Corp2) - Transfer of ETSI business trunking specifications - - - - - - - - -
12.13 SP-140226 TS 22.519 v.1.0.0 on Transfer of ETSI business trunking specifications (IMS_Corp2) SA WG1 Abstract of document: This document is the result of transferring the technical contents of ETSI TS 181 019 to a 3GPP TS for ongoing maintenance. A 3GPP version of the defined business trunking document has bee [...]. TS Information Noted This TS was noted. Companies are invited to review thisTS and send comments to SA WG1
12.14 - (ProSe and FS_ProSe) - Proximity based Services (including FS phase) - - - - - - - - -
12.14 SP-140194 LS from SA WG3-LI: Reply LS on ProSe Lawful Interception SA WG3-LI SA WG3-LI thanks RAN for the LS RP-132107. SA WG3-LI would like to provide to the following answers to the question from RAN, together with questions for SA WG3 and SA WG5, and additional general information [...]. LS In Information Noted SA3LI14_077r2 This LS was reviewed and noted.
12.14 SP-140191 LS from SA WG5: Reply LS on ProSe Lawful Interception SA WG5 SA WG5 thanks SA WG3-LI for the LS SA WG3LI14_077r2. SA WG5 was requested to provide an answer to the following question: Question to SA WG5: Regarding one-to-many ProSe Direct Communication, would SA WG5 pr [...]. LS In Information Noted S5-143384 This LS was reviewed and noted.
12.14 SP-140266 18 CRs to 23.303 (Rel-12: ProSe) SA WG2 23.303 CR0087R1; 23.303 CR0086R2; 23.303 CR0085R2; 23.303 CR0077R1; 23.303 CR0076R2; 23.303 CR0074R1; 23.303 CR0073R3; 23.303 CR0068R3; 23.303 CR0066R1; 23.303 CR0058R2; 23.303 CR0057R4; 23.303 CR0056R2; 23.303 [...]. CR Pack Approval Approved except 23.303 CR0057R4 and 23.303 CR0045R2 23.303 CR0057R4 and 23.303 CR0045R2 merged in SP-140297. All other CRs in this pack were approved.
12.14 SP-140297 Merger of CRs S2-142274 (23.303 CR0057R4) and S2-141927 (23.303 CR0045R2) to resolve figure update clash Apple Inc., Intel, Ericsson 23.303 CR0057R5 CR Pack Approval Approved Merges 2 CRs from SP-140266. This CR was approved.
12.14 SP-140267 17 CRs to 23.303 (Rel-12: ProSe) SA WG2 23.303 CR0034R1; 23.303 CR0030R2; 23.303 CR0025R5; 23.303 CR0024R1; 23.303 CR0023R5; 23.303 CR0021R1; 23.303 CR0020; 23.303 CR0019R2; 23.303 CR0018R7; 23.303 CR0016R5; 23.303 CR0012R1; 23.303 CR0010R4; 23.303 C [...]. CR Pack Approval Approved This CR Pack was approved
12.14 SP-140300 Revised WID: Proximity-based Services (ProSe) SA WG3 Objective: The SA WG1 objective is to specify service requirements for: - ProSe Discovery over E-UTRA; o within network coverage and o outside network coverage, only for Public Safety Discovery within network c [...]. WID Approval Approved This updated WID was approved.
12.14 SP-140309 TR 33.833 (Security for Proximity-based Services) SA WG3 Abstract of document: This document contains the various proposals that were studied while developing normative security solutions for Rel-12 Proximity-based Services (ProSe). It also contains in its Annexes, k [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG3
12.14 SP-140307 TS 33.303 (Security for Proximity-based Services) SA WG3 Abstract of document: This document contains the normative specification TS 33.303 on Security for Proximity-based Services including: 1) security for direct discovery, 2) EPC-level discovery and 3) one-to-m [...]. TS Approval Approved This TS was approved and placed under Change control
12.14 SP-140315 Release 12 CR on Proximity based Services (ProSe) SA WG3 33.220 CR0180R1 CR Pack Approval Approved This CR Pack was approved
12.15 - (GCSE_LTE) - Group Communication System Enablers for LTE - - - - - - - - -
12.15 SP-140178 LIAISON STATEMENT TO 3GPP ON he technologies for Group Communications CCSA CCSA/TC5/WG9 has just finished the study work of TD-LTE Trunking system. The current group communication standardization in 3GPP is related to the ongoing activities in CCSA/TC5/WG9. To provide 3GPP with more i [...]. LS In Information Noted CCSA LS to 3GPP This incoming LS was noted
12.15 SP-140259 16 CRs to 23.002, 23.468, 23.768 (Rel-12: GCSE_LTE) SA WG2 23.002 CR0273R2; 23.468 CR0039R1; 23.468 CR0038R1; 23.468 CR0037R2; 23.468 CR0035R1; 23.468 CR0032R1; 23.468 CR0021R2; 23.468 CR0019R2; 23.468 CR0018R2; 23.468 CR0017R1; 23.468 CR0016R1; 23.468 CR0010R2; 23.468 [...]. CR Pack Approval Approved This CR Pack was approved
12.15 SP-140260 1 CR to 23.246 (Rel-12: GCSE_LTE) SA WG2 23.246 CR0281R1 CR Pack Approval Noted Proposed revision in SP-140369. This was noted as it was replaced by the CR in SP-140387.
12.15 SP-140369 Source for MBMS traffic when GCSE is used Motorola Solutions 23.246 CR0281R2. Replacement for SA WG2 agreed CR # 281 R1 against 23.246 in SP-140260, with corrected Cover page CR Pack Approval Revised SP-140387
12.15 SP-140387 Source for MBMS traffic when GCSE is used Motorola Solutions 23.246 CR0283 CR Pack Approval Approved SP-140369 This CR Pack was approved
12.15 SP-140306 TR 33.888 (Security for Group Communication System Enablers for LTE (Stage 2) SA WG3 Abstract of document: TR 33.888 contains the result of the study on Security issues to support Group Communication System Enablers for LTE. TR 33.888 includes: - a general introduction and overview of GCSE secu [...]. TR Approval Approved This TR was approved and placed under Change control
12.15 SP-140313 Release 12 CRs on Group Communication System Enablers for LTE (GCSE) SA WG3 33.246 CR0172R1; 33.246 CR0173R1; 33.246 CR0174R1; 33.246 CR0176R1; 33.246 CR0177R1 CR Pack Approval Approved This CR Pack was approved
12.16 - (IMSSat) - IMS access via Digital Video Broadcast - Return Channel via Satellite - - - - - - - - -
12.17 - (IMS_RegCon) - IMS Registration Control - - - - - - - - -
12.18 - (SIPTO_SC, LIMONET) - SIPTO Service Continuity, LIPA Mobility and SIPTO at the Local Network - - - - - - - - -
12.19 - (OPIIS) - Operator Policies for IP Interface Selection - - - - - - - - -
12.20 - (P4C) - Policy and Charging Control for supporting fixed broadband access networks (including all building blocks in all WGs) - - - - - - - - -
12.20 SP-140265 2 CRs to 23.203 (Rel-12: P4C-F) SA WG2 23.203 CR0889R2; 23.203 CR0878R2 CR Pack Approval Approved This CR Pack was approved
12.20 SP-140340 Rel-12 CR on Traffic Detection Function (TDF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (Stage 2/3)(P4C-F-CH_T) SA WG5 32.251 CR0361R1 CR Pack Approval Approved This CR Pack was approved
12.20 SP-140341 Rel-12 CRs on Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_P) SA WG5 32.251 CR0362R1; 32.251 CR0363R1; 32.251 CR0364R1; 32.251 CR0377; 32.298 CR0445R1; 32.299 CR0584; 32.251 CR0376R1 CR Pack Approval Approved This CR Pack was approved
12.21 - (SMSMI) - SMS submit and delivery without MSISDN in IMS - - - - - - - - -
12.22 - (MTCe) - Machine-Type and other mobile data applications Communications Enhancements - - - - - - - - -
12.22 SP-140224 Stage 1 CR on TEI12 for Alignment with Stage 2/3 on MTCe (MTCe-SRM) SA WG1 22.368 CR0153R1 CR Pack Approval Approved This CR Pack was approved
12.22 SP-140263 7 CRs to 23.060, 23.401, 23.682 (Rel-12: MTCe-UEPCOP, MTCe-SDDTE) SA WG2 23.060 CR1864R2; 23.401 CR2683R2; 23.401 CR2680R1; 23.401 CR2684R9; 23.682 CR0086R1; 23.682 CR0085R1; 23.682 CR0084 CR Pack Approval Approved There was an objection raised by Ericsson and NSN to 23.401 CR2684R9 This CR Pack was approved
12.22 SP-140318 Release 12 CRs on Machine-Type and other mobile data applications Communications Enhancements (MTCe) SA WG3 33.187 CR0001R1; 33.868 CR0001R1 CR Pack Approval Approved This CR Pack was approved
12.22 SP-140289 Standardization of Machine-type Communications MCC Work Plan Manager The main focus of the present document is on the M2M Communications work items in 3GPP and ETSI. OTHER Information Noted This contribution was noted
12.23 - (WLAN_NS) - WLAN Network Selection for 3GPP Terminals - - - - - - - - -
12.23 SP-140271 3 CRs to 23.402 (Rel-12: WLAN_NS) SA WG2 23.402 CR1284R1; 23.402 CR1270R2; 23.402 CR1259R1 CR Pack Approval Approved This CR Pack was approved
12.24 - (LTE_HRPD_SON) - LTE-HRPD (High Rate Packet Data in 3GPP2) inter-RAT SON - - - - - - - - -
12.25 - (CNO_ULI) - User Location Information reporting improvements - - - - - - - - -
12.26 - (eSAMOG and FS_SAMOG) - S2a Mobility Based on Trusted WLAN access to EPC (including FS) - - - - - - - - -
12.26 SP-140190 LS from SA WG3: Reply LS on WLCP security aspects SA WG3 SA WG3 thanks SA WG2 for their LS S2-140550. SA WG3 would like to provide to the following consensus made in SA WG3 meeting: - WLCP security is within 3GPP scope. - SA WG3 identifies there are some security thr [...]. LS In Information Noted S3-141011 This incoming LS was noted
12.26 SP-140258 3 CRs to 23.402 (Rel-12: eSaMOG) SA WG2 23.402 CR1280R1; 23.402 CR1254R1; 23.402 CR1253R1 CR Pack Approval Approved This CR Pack was approved
12.27 - (WORM and FS_WORM) - optimized offloading to WLAN in 3GPP RAT mobility (including FS) - - - - - - - - -
12.27 SP-140272 2 CRs to 23.060, 23.401 (Rel-12: WORM) SA WG2 23.060 CR1848R1; 23.401 CR2656R1 CR Pack Approval Approved This CR Pack was approved
12.28 - (UTRA_LTE_WLAN_interw) - SA2 aspects of WLAN/3GPP Radio Interworking - - - - - - - - -
12.29 - (NETLOC_TWAN) - Network Provided Location Information for IMS (TWAN case) - - - - - - - - -
12.29 SP-140264 3 CRs to 23.402 (Rel-12: NETLOC_TWAN) SA WG2 23.402 CR1248R1; 23.402 CR1257R1; 23.402 CR1269R2 CR Pack Approval Approved This CR Pack was approved
12.30 - (UMONC and FS_UMONC) - Usage Monitoring Control PCC Enhancement (including FS) - - - - - - - - -
12.30 SP-140284 New WID: Usage Monitoring Control PCC Enhancement {FS_eUMONC} SA WG2 Objective: The objective of this study item is to conclude the above three issues according to the following descending priorities: 1st priority: 1. Service/Application Monitored in more than one monitoring gro [...]. WID Approval Revised SP-140388
12.30 SP-140388 New WID: Usage Monitoring Control PCC Enhancement {FS_eUMONC} SA WG2 Objective: The objective of this study item is to conclude the above three issues according to the following descending priorities: 1st priority: 1. Service/Application Monitored in more than one monitoring gro [...]. WID Approval SP-140284
12.31 - (ABC and FS_ABC) - Application Based Charging (including FS) - - - - - - - - -
12.31 SP-140337 Rel-12 CRs on Charging for Application Based Charging (ABC) SA WG5 32.251 CR0360R2; 32.251 CR0373R1; 32.298 CR0443R1; 32.298 CR0444R2; 32.299 CR0583R1 CR Pack Approval Approved This CR Pack was approved
12.32 - (BusTI) - IMS Business Trunking for IP-PBX in Static Mode of Operation - - - - - - - - -
12.33 - (PWS_Sec) - Public Warning System Security - - - - - - - - -
12.33 SP-140299 Revised WID: Security Aspects of Public Warning System (PWS_SEC ) SA WG3 Objective: The objectives of this work item are: - To review, and update as required, the security requirements for PWS. This should include review of security requirements relating to handling of roaming users [...]. WID Approval Approved This WID was approved
12.34 - (eMEDIASEC) - IMS media plane security extensions (including FS_eMEDIASEC) - - - - - - - - -
12.35 - (SSO_int and FS_SSO-int) - Service requirements for integration of Single Sign-On (SSO) frameworks with 3GPP networks (including FS phase) - - - - - - - - -
12.36 - (Web_GBA) - Security enhancements for usage of GBA from the browser - - - - - - - - -
12.37 - (SECAS) - Security Assurance Specification for 3GPP Network Products - - - - - - - - -
12.38 - (STAS) - Specification of the TUAK algorithm set - - - - - - - - -
12.38 SP-140316 Release 12 CRs on Specification of the TUAK Algorithm Set (STAS) SA WG3 35.231 CR0001R2; 35.232 CR0001R2; 35.233 CR0001R2 CR Pack Approval Approved This CR Pack was approved
12.39 - (TURAN) - Tunneling of UE Services over Restrictive Access Networks - - - - - - - - -
12.40 - (CVO) - Co-ordination of Video Orientation - - - - - - - - -
12.41 - (HEVC) - High Efficiency Video Coding - - - - - - - - -
12.41 SP-140210 TR 26.906 Evaluation of HEVC for 3GPP Services (HEVC) (Release 12), v. 2.0.0 SA WG4 Abstract of document: This document contains the Technical Report (TR) for evaluation of High Efficiency Video Coding (HEVC), i.e. ITU-T Recommendation H.265 | ISO/IEC IS 23008-2, over the 3GPP services. The TR [...]. TR Approval Approved This TR was approved and placed under Change control
12.41 SP-140211 CR to TS 26.114 on 'SDP examples and QoS examples for H.265 (HEVC)' (Release 12) SA WG4 26.114 CR0278R5 CR Pack Approval Approved This CR Pack was approved
12.42 - (IMS_SDE) - IMS-based Streaming and Download Delivery Enhancements - - - - - - - - -
12.43 - (M3DV_Ext) - Mobile stereoscopic 3D services extensions - - - - - - - - -
12.44 - (ART_LTE) - Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - - - - - - - - -
12.45 - (MI) - MBMS Improvements - - - - - - - - -
12.45 SP-140212 Revised WID on 'Enhanced MBMS Operation' (MI-EMO) SA WG4 Objective: The objectives of this work item are to standardise the following aspects of MBMS operation: - Improve MBMS OTA efficiency (e.g. by object bundling, reduction of FLUTE overhead, etc.) - Improve MBMS [...]. WID Approval Approved This WID was approved
12.45 SP-140213 CRs to TS 26.346 on 'Enhanced MBMS Operation (MI-EMO)' (Release 12) SA WG4 26.346 CR0374; 26.346 CR0388R1; 26.346 CR0401R1; 26.346 CR0414 CR Pack Approval Approved This CR Pack was approved
12.45 SP-140214 CR to TS 26.346 on 'Proxy server-based MooD (MI-MooD)' (Release 12) SA WG4 26.346 CR0347R6 CR Pack Approval Approved This CR Pack was approved
12.46 - (E2EMTSI) - End-to-end MTSI extensions - - - - - - - - -
12.46 SP-140215 CR to TS 26.114 on 'Fixed-mobile interworking (E2EMTSI-S4)' (Release 12) SA WG4 26.114 CR0279R1 CR Pack Approval Approved This CR Pack was approved
12.47 - (VCEIMP) - Video Coding Enhancements in IMS Messaging and Presence - - - - - - - - -
12.48 - (LI12) - Lawful Interception in Rel-12 - - - - - - - - -
12.48 SP-140184 LS from SA WG1: Reply LS on MTC Device Identification for LI SA WG1 SA WG1 thanks SA WG3-LI for their LS on MTC Device Identification for LI. SA WG1 affirms the requirement that MTC devices be uniquely identified. Quoting from TS 22.368 clause 7.1.4: 7.1.4 Identifiers The [...]. LS In Information Noted S1-141384 This incoming LS was noted
12.48 SP-140310 Release 12 CRs on Lawful Interception (LI12) SA WG3 33.107 CR0142; 33.107 CR0143; 33.107 CR0145; 33.107 CR0147; 33.107 CR0148; 33.107 CR0149; 33.108 CR0223; 33.108 CR0224; 33.108 CR0225; 33.108 CR0226; 33.108 CR0227 CR Pack Approval Approved This CR Pack was approved
12.49 - (CH12) - Charging Management Rel-12 (including all building blocks and work tasks) - - - - - - - - -
12.49 SP-140327 TS 32.276 'Telecommunication management; Charging management; Voice call service charging' SA WG5 Abstract of document: TS 32.276 specifies the online charging description for Voice Call Service Charging from a Proxy Function. This charging description includes the online charging architecture and scenarios [...]. TS Approval Approved This TS was approved and placed under Change control
12.49 SP-140328 TS 32.293 'Telecommunication management; Charging management; Proxy function' SA WG5 Abstract of document: TS 32.293 specifies the architecture and functions of the Proxy Function. This charging description only defines the interworking between CAMEL and Diameter for Voice Call Service charging [...]. TS Approval Approved This TS was approved and placed under Change control
12.49 SP-140336 Rel-12 CRs on Charging Management (CH12) SA WG5 32.251 CR0372R1; 32.275 CR0052R1; 32.298 CR0451; 32.299 CR0582R1; 32.299 CR0585R1 CR Pack Approval Approved This CR Pack was approved
12.49 SP-140338 Rel-12 CRs on Charging for IMS centralized service (ICS) control (Stage 2/3) (CHICS) SA WG5 32.250 CR0039R1 CR Pack Approval Approved This CR Pack was approved
12.49 SP-140339 Rel-12 CRs on Charging per IP - Connectivity Access Network (IP-CAN) Session (Stage 2/3) (CHIPS) SA WG5 32.251 CR0365R1; 32.251 CR0374; 32.298 CR0452R1; 32.299 CR0587R1 CR Pack Approval Approved This CR Pack was approved
12.49 SP-140342 Rel-12 CRs on Charging using an Alternative Roaming Provider (Stage 2/3) (CHARP) SA WG5 32.299 CR0586R2 CR Pack Approval Approved This CR Pack was approved
12.50 - (OAM12) - OAM&P Rel-12 (including all building blocks and work tasks) - - - - - - - - -
12.50 SP-140321 Revised WID Compliance to NGMN NGCOR Requirements SA WG5 Objective: The objectives of this WI are: - Record the detailed gap analysis already performed by SA WG5 - Identify for each requirement the work already done by SA WG5 - Discuss and agree on the work remaining [...]. WID Approval Approved This WID was approved
12.50 SP-140322 Revised WID Converged Model Alignment (Phase 2) SA WG5 Objective: The 3GPP WI Model Alignment (Phase 2) should address: 1. Considering NGCOR phase 1 requirements & developing topic related standards solutions Identify relevant NGCOR phase 1 requirements for Model A [...]. WID Approval Approved This WID was approved
12.50 SP-140329 TR 32.838 'Study on Compliance of 3GPP OAM specifications to the NGMN Top OPE Recommendations' SA WG5 Abstract of document: TR 32.838 provides a compliance statement of SA WG5 specifications against NGMN Top OPE Recommendations. For each Top OPE Recommendation, the SA WG5 solution is described when it exists. O [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG5
12.50 SP-140333 Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) SA WG5 28.606 CR0001; 28.616 CR0001; 32.593 CR0010R1 CR Pack Approval Approved This CR Pack was approved
12.50 SP-140345 Rel-12 CRs on Radio Planning Tool (RPT) interface (OAM-RPTi) SA WG5 32.101 CR0055R2 CR Pack Approval Approved This CR Pack was approved
12.50 SP-140349 Revised WID for Study on Compliance of SA WG5 specifications to the NGMN Next Generation Converged Operations Requirements (NGCOR) SA WG5 Objective: The objectives of this Study are: - Record the detailed gap analysis already performed by SA WG5; - Identify for each requirement the work already done by SA WG5 ; - Discuss and agree on the work rem [...]. WID Approval Approved This WID was approved
12.51 - (SEC12) - Small Security Enhancements for Rel-12 - - - - - - - - -
12.51 SP-140317 Release 12 CRs on Small Security Enhancements for Rel-12 (SEC12) SA WG3 33.102 CR0274R1; 33.310 CR0071R1; 33.310 CR0072R1; 33.310 CR0073R2 CR Pack Approval Revised SP-140381
12.51 SP-140381 Release 12 CRs on Small Security Enhancements for Rel-12 (SEC12) SA WG3 33.102 CR0264R2; 33.310 CR0071R1; 33.310 CR0072R1; 33.310 CR0073R2 CR Pack Approval Approved SP-140317 This CR Pack was approved
12.52 - (TEI12) - TEI Rel-12 - - - - - - - - -
12.52 SP-140268 1 CR to 23.402 (Rel-12: GOCMe, TEI12) SA WG2 23.402 CR1282R1 CR Pack Approval Approved This CR Pack was approved
12.52 SP-140269 16 CRs to 23.060, 23.221, 23.246, 23.251, 23.272, 23.401, 23.402 (Rel-12: TEI12) SA WG2 23.060 CR1853R2; 23.060 CR1868R3; 23.221 CR0157R2; 23.246 CR0279R2; 23.251 CR0100R3; 23.272 CR0931R1; 23.272 CR0932; 23.401 CR2655R2; 23.401 CR2658R3; 23.401 CR2672; 23.401 CR2693R3; 23.401 CR2694R5; 23.401 CR2 [...]. CR Pack Approval Revised SP-140376 23.402 CR1275R2 revised in SP-140376. Other CRs revised in SP-140377
12.52 SP-140377 15 CRs to 23.060, 23.221, 23.246, 23.251, 23.272, 23.401, 23.402 (Rel-12: TEI12) SA WG2 23.060 CR1853R2; 23.060 CR1868R3; 23.221 CR0157R2; 23.246 CR0279R2; 23.251 CR0100R3; 23.272 CR0931R1; 23.272 CR0932; 23.401 CR2655R2; 23.401 CR2658R3; 23.401 CR2672; 23.401 CR2693R3; 23.401 CR2694R5; 23.401 CR2 [...]. CR Pack Approval Approved SP-140269 This CR Pack was approved
12.52 SP-140216 CRs to TS 26.114, TS 26.132 and TS 26.346 on 'Technical Enhancements and Improvements for Release 12 (TEI12)' (Release 12) SA WG4 26.114 CR0277R1; 26.114 CR0282R1; 26.132 CR0069R2; 26.346 CR0375R2 CR Pack Approval Approved This CR Pack was approved
12.53 - Any other Release 12 documents - - - - - - - - -
12.53 SP-140262 3 CRs to 23.251, 23.401 (Rel-12: LTE_SC_enh_dualC-core) SA WG2 23.251 CR0099R2 CR Pack Approval Approved This CR Pack was approved
12.53 SP-140270 3 CRs to 23.060, 23.401, 23.402 (Rel-12: UTRA_LTE_WLAN_interw-SA WG2) SA WG2 23.060 CR1867R2; 23.401 CR2697R4; 23.402 CR1279R3 CR Pack Approval Approved This CR Pack was approved
12.53 SP-140314 Release 12 CRs for Dual connectivity for LTE Core Part (LTE_SC_enh_dualC-Core) SA WG3 33.401 CR0525R1 CR Pack Approval Approved This CR Pack was approved
13 - Documents Related to Rel-13 and later Features - - - - - - - - -
13.1 - (SEES) - Service Exposure and Enablement Support - - - - - - - - -
13.1 SP-140188 LS from SA WG2: Reply to OMA LS on SEES work item SA WG2 SA WG2 thanks OMA Architecture Working Group for their information on the mission and activities and the cooperation with 3GPP received in S2-140865. SA WG2 has agreed and submitted for approval to SA Plenary [...]. LS In Information Noted S2-142221 This incoming LS was noted
13.1 SP-140229 TR 22.853 v.2.0.0 on Study Service Exposure and Enablement Support (SEES) SA WG1 Abstract of document: TR 22.853 contains use cases and identifies potential requirements for network information and functionality that the 3GPP network could exposed to 3rd party applications. The goal is to a [...]. TR Approval Approved This TR was approved and placed under Change control
13.2 - (RSE and FS_RSE) - RAN Sharing Enhancements - - - - - - - - -
13.3 - (SRMMTC) - Service Requirements Maintenance for Machine-Type Communications - - - - - - - - -
13.4 - (MCPTT) - Mission Critical Push-to-Talk over LTE - - - - - - - - -
13.4 SP-140276 SA WG2 Update to WID on Mission Critical Push to Talk over LTE (MCPTT) SA WG2 Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. WID Approval
13.5 - (eWebRTCi) - Enhancements to WebRTC interoperability - - - - - - - - -
13.5 SP-140230 Stage 1 CR on Enhancements to WebRTC interoperability (eWebRTCi) SA WG1 22.228 CR0197R2; 22.228 CR0198R2 CR Pack Approval Approved This CR Pack was approved
13.6 - (IOPS and FS_IOPS) - Isolated E-UTRAN Operation for Public Safety (including FS phase) - - - - - - - - -
13.6 SP-140232 Updated WID on Isolated E-UTRAN Operation for Public Safety (IOPS) SA WG1 Objective: The SA WG1 objective is to specify service requirements to go into a new TS for: - Initiation of an Isolated E-UTRAN for Public Safety use. o Management of a lost backhaul by an eNB. o Detection and [...]. WID Approval Approved This WID was approved
13.6 SP-140239 TR 22.897 v.2.0.0 on Isolated E-UTRAN Operation for Public Safety (FS_IOPS) SA WG1 Abstract of document: TR 22.897 addresses service requirements of Isolated E-UTRAN Operation (IOPS). It is presented to SA#64 plenary for approval because SA 1 considers that it is 100% completed. In mission c [...]. TR Approval Approved This TR was approved and placed under Change control
13.6 SP-140231 Stage 1 CR on Isolated E-UTRAN Operation for Public Safety (IOPS) SA WG1 22.278 CR0202R1; 22.278 CR0203R1; 22.278 CR0204R2; 22.278 CR0205R1; 22.278 CR0206R2 CR Pack Approval Noted A new TS will be provided to TSG SA#65 to include the content of these CRs. This CR Pack was noted
13.7 - (UPCON) - UserPlane Congestion Management - - - - - - - - -
13.8 - (CSPS_coord) - Improvements to CS/PS coordination in UTRAN/GERAN Shared Networks - - - - - - - - -
13.8 SP-140275 TR 23.704 version 1.0.0: Study on CS/PS Coordination in shared network; Stage 2 SA WG2 Abstract of document: TR 23.704 contains the Stage-2 study and evaluation of possible solutions for CS/PS coordination issues i.e. scenarios when CS/PS coordination failure result in a UE ending up registered t [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG2
13.9 - (LI13) - Lawful Interception in Rel-13 - - - - - - - - -
13.10 - (CH13) - Charging Management Rel-13 (including all building blocks and work tasks) - - - - - - - - -
13.11 - (OAM13) - OAM&P Rel-13 (including all building blocks and work tasks) - - - - - - - - -
13.12 - (SEC13) - Small Security Enhancements for Rel-13 - - - - - - - - -
13.13 - (TEI13) - TEI Rel-13 - - - - - - - - -
13.13 SP-140274 2 CRs to 23.221, 23.292 (Rel-13: TEI13) SA WG2 23.221 CR0163R2; 23.292 CR0213R2 CR Pack Approval Approved This CR Pack was approved
13.14 - Any other Release 13 documents - - - - - - - - -
13.14 SP-140273 1 CR to 23.203 (Rel-13: DRuMS) SA WG2 23.203 CR0885R5 CR Pack Approval Noted SP-140383 Proposed revision in SP-140383 This CR Pack was noted
13.14 SP-140383 1 CR to 23.203 (Rel-13: DRuMS) - revision of 23.203 CR0885R5 Ericsson, Huawei 23.203 CR0885R6 CR Pack Approval Approved SP-140273 This CR Pack was approved
14 - Documents related to current Study Items - - - - - - - - -
14.1 - (FS_MAPN) - Study on Need for multiple APNs - - - - - - - - -
14.2 - (FS_CSIPTO) - Study on Co-ordinated P-GW change for SIPTO - - - - - - - - -
14.2 SP-140240 TR 22.828 v.2.0.0 on Co-ordinated P-GW change for SIPTO (FS_CSIPTO) SA WG1 Abstract of document: This document is the feasibility study for Co-ordinated PGW Change for Selected IP Offload (CSIPTO), with use cases and potential requirements. This TR considers use cases and identifies p [...]. TR Approval Approved This TR was approved and placed under Change control
14.3 - (FS_eICBD) - Study on Enhancements for infrastructure based data communication between devices - - - - - - - - -
14.3 SP-140241 TR 22.807 v.1.0.0 on Enhancements for infrastructure based data communication between devices (FS_eICBD) SA WG1 Abstract of document: The TR contains use cases with potential requirements for the infrastructure based communication between devices. The goal behind the eICBD study of which this TR is the result is to enab [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG1
14.4 - (FS_FMSS) - Flexible Mobile Service Steering - - - - - - - - -
14.4 SP-140242 TR 22.808 v.1.0.0 on Flexible Mobile Service Steering (FS_FMSS) SA WG1 Abstract of document: TR 22.808 contains use cases and identifies potential requirements for defining traffic steering policies. The goal is to allow 3GPP Network to define and modify traffic steering policies [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG1
14.5 - (FS_MBSP) - Multimedia Broadcast Supplement for PWS - - - - - - - - -
14.6 - (FS_ECIP) - Enhanced Calling Information Presentation - - - - - - - - -
14.6 SP-140243 TR 22.810 v.1.0.0 on Enhanced Calling Information Presentation (FS_ECIP) SA WG1 Abstract of document: TR 22.810 contains use cases and identifies potential requirements for enhanced call information presentation. Changes since last presentation to SA Meeting: First presentation Outstanding [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG1
14.7 - (FS_GUSH) - RAN Sharing Enhancements on GERAN and UTRAN - - - - - - - - -
14.7 SP-140244 Stage 1 CRs on RAN Sharing Enhancements on GERAN and UTRAN (GUSH) SA WG1 22.852 CR0001R1; 22.852 CR0002R1; 22.852 CR0003R1; 22.852 CR0004R1; 22.852 CR0005R1; 22.852 CR0006R1; 22.852 CR0007R1; 22.852 CR0008R2; 22.852 CR0009R2; 22.852 CR0010R1; 22.852 CR0011R2; 22.852 CR0012R2 [...]. CR Pack Approval 22.852 CR0009R2 noted. Other CRs approved 22.852 CR0009R2 was noted. Other CRs approved
14.8 - (FS_UC_SPOOF) - Service aspects for dealing with User Control over spoofed calls - - - - - - - - -
14.9 - (FS_CNO) - Study on Core Network Overload solutions - - - - - - - - -
14.10 - (FS_SEEE) - Study on System Enhancements for Energy Efficiency - - - - - - - - -
14.11 - (FS_Fire) - Study on Firewall Traversal - - - - - - - - -
14.12 - (FS_SPOOF) - Study on Security on spoofed call detection and prevention - - - - - - - - -
14.13 - (FS_ACDC) - Application specific Congestion control for Data Communication - - - - - - - - -
14.13 SP-140238 TR 22.806 v.2.0.0 on Study on Application specific Congestion control for Data Communication (FS_ACDC) SA WG1 Abstract of document: This document provides the feasibility study for Application specific Congestion control for Data Communication (FS_ACDC). FS_ACDC investigates use cases and potential requirements to allo [...]. TR Approval Approved This TR was approved and placed under Change control
14.14 - (FS_SECAM) - Security Assurance Methodology for 3GPP Network Elements - - - - - - - - -
14.15 - (FS_SPI) - Study on Subscriber Privacy Impact in 3GPP - - - - - - - - -
14.16 - (FS_IS_DASH) - Study on Improved Support for Dynamic Adaptive Streaming over HTTP - - - - - - - - -
14.17 - (FS_SEATS) - Study on Enhanced Acoustic Test Specifications - - - - - - - - -
14.18 - (FS_HTML5) - Study on HTML5 for a New Presentation Layer in 3GPP Services - - - - - - - - -
14.18 SP-140217 TR 26.907 HTML5 for a new Presentation Layer in 3GPP Services (FS_HTML5) (Release 12), v. 1.0.0 SA WG4 Abstract of document: The Technical Report on HTML5 for a new Presentation Layer in 3GPP Services, V0.4.1 studies the introduction of HTML5 as the scene description format for 3GPP services based on the Study I [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG4
14.19 - (FS_OAM_HetNet) - Study on management of Heterogeneous Networks - - - - - - - - -
14.19 SP-140326 TR 32.835 'Study on management of Heterogeneous Networks' SA WG5 Abstract of document: This document investigates and makes recommendations on how management information can be selected by the manager over Itf-N for heterogeneous networks nodes that are owned, deployed and m [...]. TR Approval Approved This TR was approved and placed under Change control
14.20 - (FS_ D-SON-OAM) - Study on Enhancements of OAM aspects of Distributed MLB SON function - - - - - - - - -
14.21 - (FS_OAM_AP_Itf-N) - Study on Application and Partitioning of Itf-N - - - - - - - - -
14.22 - (FS_SON-NM-CCO) - Study on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization - - - - - - - - -
14.23 - (FS_REVOLTE_IMS_CH) - Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks - - - - - - - - -
15 - Proposed New WIDs (not part of an existing feature) - - - - - - - - -
15 SP-140283 New WID: Extended Proximity-based Services {ProSe_Ext} SA WG2 Objective: The SA WG2 objectives are as follows: 1. As part of the TR phase a. Study architecture enhancements in order to support: i. Restricted ProSe Direct Discovery for non-Public Safety use; ii. ProSe Dire [...]. WID Approval Noted Proposed update in SP-140296 This WID was noted
15 SP-140296 Editorial update of ProSe phase 2 WID Qualcomm Incorporated (rapporteur) This contribution proposes some editorial changes to the SA WG2 approved ProSe WID for Rel-13 (S2-142228/SP-140283). WID Approval Revised SP-140385 Update to SP-140283
15 SP-140385 Editorial update of ProSe phase 2 WID Qualcomm Incorporated (rapporteur) This contribution proposes some editorial changes to the SA WG2 approved ProSe WID for Rel-13 (S2-142228/SP-140283). WID Approval SP-140296
15 SP-140227 New WID on Proximity-based Services Maintenance (ProSeM) SA WG1 Objective: To support stage 2/3 development during Release 13. To support end-of-release 12 maintenance to review and ensure that Release 13 TS 22.278 and TS 22.115 contain all agreed ProSe Stage 1 requirements [...]. WID Approval Noted Proposed update in SP-140353 This WID was noted
15 SP-140353 Editorial update of SA WG1 ProSe phase 2 WID Qualcomm Incorporated (rapporteur) This contribution proposes some editorial changes to the SA WG1 approved ProSe WID for Rel-13 (S1-141569 / SP-140227). WID Approval Revised SP-140386 Update to SP-140227
15 SP-140386 Editorial update of SA WG1 ProSe phase 2 WID Qualcomm Incorporated (rapporteur) This contribution proposes some editorial changes to the SA WG1 approved ProSe WID for Rel-13 (S1-141569 / SP-140227). WID Approval SP-140353
15 SP-140228 New WID on Service Requirements Maintenance for Group Communication System Enablers for LTE (SRM_GCSE_LTE) SA WG1 Objective: This is a maintenance work item to support and, if needed, provide necessary clarifications for the introduction of requirements not implemented in Rel-12. No new functions will be introduced by thi [...]. WID Approval Approved This WID was approved
15 SP-140234 New WID on Application specific Congestion control for Data Communication (ACDC) SA WG1 Objective: The objective is to specify service requirements for system that shall be able to allow/prohibit communication initiation of particular applications defined by operator, subject to regional regulatio [...]. WID Approval Approved This WID was approved
15 SP-140233 Stage 1 CR on Application specific Congestion control for Data Communication (ACDC) SA WG1 22.011 CR0203R2 CR Pack Approval Approved This CR Pack was approved
15 SP-140235 New WID on Co-ordinated P-GW change for SIPTO (CSIPTO) SA WG1 Objective: The SA WG1 objective is to define system requirements for coordinated selective IP traffic offload that minimises service disruption by taking into account UE's knowledge of the IP flow characteristi [...]. WID Approval Approved This WID was approved
15 SP-140237 New WID on Voice over E-UTRAN Paging Policy Differentiation (VoE-UTRAN_PPD) SA WG1 Objective: The objective of this work item is to specify service requirements to allow a more aggressive paging policy for voice over E-UTRAN termination attempts than for non-voice over E-UTRAN termination att [...]. WID Approval Noted SA WG2 Update in SP-140287 This WID was noted
15 SP-140287 New WID: voice over E-UTRAN Paging Policy Differentiation {voE-UTRAN_PPD} SA WG2 Objective: SA WG1 Objective The objective of this work item is to specify service requirements to allow a more aggressive paging policy for voice over E-UTRAN termination attempts than for non-voice over E-UTRA [...]. WID Approval Revised SP-140394 Update to SA WG1 WID in SP-140137
15 SP-140394 New WID: voice over E-UTRAN Paging Policy Differentiation {voE-UTRAN_PPD} SA WG2 Objective: SA WG1 Objective The objective of this work item is to specify service requirements to allow a more aggressive paging policy for voice over E-UTRAN termination attempts than for non-voice over E-UTRA [...]. WID Approval Approved SP-140287 This WID was approved
15 SP-140236 Stage 1 CRs on Voice over E-UTRAN Paging Policy Differentiation (VoE-UTRAN_PPD) SA WG1 22.228 CR0199R2; 22.278 CR0201R2 CR Pack Approval Approved This CR Pack was approved
15 SP-140277 New WID: Double Resource Reuse for Multiple Media Sessions {DRuMS} SA WG2 Objective: To optimize the PS access resources so that two or more parallel sessions for a user can share resources reserved per media type given that only one media stream per media type will be used at one ti [...]. WID Approval Noted Updated proposal in SP-140393 This WID was noted
15 SP-140393 New WID: Double Resource Reuse for Multiple Media Sessions {DRuMS} SA WG2 Chairman Objective: To optimize the PS access resources so that two or more parallel sessions for a user can share resources reserved per media type given that only one media stream per media type will be used at one ti [...]. WID Approval Approved SP-140277 This WID was approved
15 SP-140278 New WID: Dedicated Core Networks {Decor} SA WG2 Objective: The objective of this work item is to enable the deployment of dedicated core networks where each dedicated core network is dedicated to UEs sharing the same characteristics. The specific dedicated c [...]. WID Approval Revised SP-140395
15 SP-140395 New WID: Dedicated Core Networks {Decor} SA WG2 Objective: The objective of this work item is to enable the deployment of dedicated core networks where each dedicated core network is dedicated to UEs sharing the same characteristics. The specific dedicated c [...]. WID Approval Approved SP-140278 This WID was approved
15 SP-140279 New WID: IP Flow Mobility support for S2a and S2b Interfaces (NB-IFOM) {NBIFOM} SA WG2 Objective: The objective of this work item is to define the IFOM functionality for PMIP and GTP-based S2a and S2b over WLAN. The scope of the work is based on the use-cases and service requirements defined in T [...]. WID Approval Approved This WID was approved
15 SP-140280 New WID: Architecture Enhancements for Service Capability Exposure {AESE} SA WG2 Objective: Objective of this work item is to define stage 2 architecture enhancements wherein 3GPP system provided service capabilities are exposed to application providers, e.g. via OMA-API(s). As part of thi [...]. WID Approval Noted This WID was noted
15 SP-140301 New WID: Architecture Enhancements for Service Capability Exposure (AESE) SA WG3 Objective: Objective of this work item is to define stage 2 architecture enhancements wherein 3GPP system provided service capabilities are exposed to application providers, e.g. via OMA-API(s). As part of this [...]. WID Approval Approved This WID was approved
15 SP-140281 New WID: Monitoring Enhancements {MONTE} SA WG2 Objective: Objective of this work item is to study and provide stage-2 specification for the following items - - Monitoring as per the service requirements defined in the clause 7.2.8 of TS 22.368 This work ite [...]. WID Approval Noted This WID was noted
15 SP-140302 New WID: Monitoring Enhancements (MONTE) SA WG3 Objective: Objective of this work item is to study and provide stage-2 specification for the following items - - Monitoring as per the service requirements defined in the clause 7.2.8 of TS 22.368 This work ite [...]. WID Approval Approved This WID was approved
15 SP-140282 New WID: Group based Enhancements {GROUPE} SA WG2 Objective: The objectives of this work item are to study the concept of groups and to study and specify solutions to: - Fulfil the general group based requirements (22.368 clause 7.2.14.1) - Fulfil the group ba [...]. WID Approval Noted This WID was noted
15 SP-140305 New WID: Group based Enhancements (GROUPE) SA WG3 Objective: The objectives of this work item are to study the concept of groups and to study and specify solutions to: - Fulfil the general group based requirements (22.368 clause 7.2.14.1) - Fulfil the group ba [...]. WID Approval Approved This WID was approved
15 SP-140285 New WID: Enhanced CSFB {eCSFB} SA WG2 Objective: Investigate and describe how the CSFB procedures can be enhanced or improved for shortening CSFB call setup time (e.g., by reusing existing operations, it may be possible to enhance CSFB call setup d [...]. WID Approval Approved This WID was approved
15 SP-140303 New WID: Study on Lawful Interception Service Evolution SA WG3 Objective The objective of this study is to look at LI service requirements and identify the important aspects that a new, parallel evolved LI service will need to address based on the emerging trends of 3GPP n [...]. WID Approval
15 SP-140304 New WID: Lawful Interception Rel-13 SA WG3 Objective: The objective of this work item is to enhance the 3GPP LI service to accommodate Release 13 service enhancements and extensions. Enhancements to specifications TS 33.106, TS 33.107 and TS 33.108 will [...]. WID Approval
15 SP-140218 New Work Item Description on 'Video Telephony Robustness Improvements' (VTRI) SA WG4 Objective: Specify additional requirements and guidelines for video telephony robustness in order to improve the performance of the service for PLI, Generic NACK, and FIR messages while staying within the overa [...]. New WID Approval
15 SP-140219 New Work Item Description on Video Enhancements by Region-of-Interest Information Signalling' (ROI) SA WG4 Objective: The objective of this work is to standardize the signalling of region-of-interest (ROI) information and associated capability negotiation mechanisms for MTSI in TS 26.114. More specifically, standard [...]. New WID Approval
15 SP-140324 New WID Inter-PLMN PS domain online charging SA WG5 Objective: Objective of this Work item is to study and specify Gy Reference Point 'service data flows based online charging' for inter-PLMN situations. In particular, the following configurations will be addres [...]. WID Approval
15 SP-140325 New WID Charging Aspects of Proximity-based Services SA WG5 Objective: The objective of this work item is to develop specifications on the charging aspects for ProSe services, in accordance to starge 1 and stage 2 requirements. Specifically, the areas of work for SA WG5 [...]. WID Approval
16 - Proposed New Study Items (SIDs) - - - - - - - - -
16 SP-140245 New WID on Study on Enhancements to User Location Reporting Support (FS_eULRS) SA WG1 Objective: This study aims to provide details about the possible scenarios and use cases where there is a need of enhanced user location reporting. This study also aims to identify potential new requirements to [...]. WID Approval
16 SP-140246 New WID on Study on Control of Applications when Third party Servers encounter difficulties (FS_CATS) SA WG1 Objective: The objective of this study is to identify potential requirements that will enable the 3GPP network to detect or receive an indication from a third party server of its congestion status or failure st [...]. WID Approval
16 SP-140323 New WID Study on Network Management of Virtualized Networks SA WG5 Objective The objectives of this study are: For Objective Set 1: - Study the use cases and concepts for the network management of Virtualized Networks, which are applicable to SA WG5, taking into account the re [...]. WID Approval
17 - Project Management - - - - - - - - -
17.1 - Review of the work plan - - - - - - - - -
17.1 SP-140288 3GPP Work Plan review at Plenary #64 MCC Work Plan Manager Presentation of the 3GPP Work Plan review at Plenary #64 WORK PLAN Presentation
17.1 SP-140290 3GPP Public Safety (individual to/from authority) communications MCC Work Plan Manager The present document collects 3GPP work items for supporting Public Safety (individual-to-authority/authority-to-individual) communication, including eCall, PWS, ETWS, etc., so that police/fire-fighters/paramed [...]. OTHER Information
17.1 SP-140291 LTE for Public Safety (authority-to-authority) communications MCC Work Plan Manager The present document collects 3GPP work items to enhance LTE for supporting Public Safety (authority-to-authority) communications, so that police/fire-fighters/paramedics/ambulance and other services can use LT [...]. OTHER Information
17.1 SP-140292 WLAN interworking with a 3GPP system (I-WLAN) MCC Work Plan Manager The main focus of the present document is on the WLAN interworking with a 3GPP system (I-WLAN). OTHER Information
17.1 SP-140293 3GPP Rel-12_description MCC Work Plan Manager The present document contains a high-level description of the 3GPP Release 12 Features. Its latest version is available at: http://www.3gpp.org/ftp/Information/WORK_PLAN/Description_Releases/ OTHER Information
17.1 SP-140294 3GPP Rel-13_description MCC Work Plan Manager The present document contains a high-level description of the 3GPP Release 13 Features. Its latest version is available at: http://www.3gpp.org/ftp/Information/WORK_PLAN/Description_Releases/ OTHER Information
17.2 - Release contents and planning discussions - - - - - - - - -
17.3 - Specification Status - - - - - - - - -
17.3 SP-140199 Promotion of SIM specs with a view to closing early Releases MCC Specifications Manager Promotion of SIM specs with a view to closing early Releases Discussion Approval
17.3 SP-140200 CRs to Spec lists MCC Specifications Manager - CR Pack Approval
18 - Project Support - - - - - - - - -
18.1 - Improvements to working methods - - - - - - - - -
18.1 SP-140201 Underlining in 3GPP Specs [CR to 21.801] MCC Specifications Manager - CR Pack Approval
18.2 - MCC Status Report - - - - - - - - -
18.2 SP-140198 MCC status report Director of MCC Report of MCC activities Report Presentation
19 - Future meeting schedule - - - - - - - - -
19 SP-140368 Survey results on single-week TSG TSG SA Chairman - OTHER Information

Created: 2014-06-17 17:41     END OF LIST

Last Allocated Document: SP-140395