Tdoc List

2019-01-25 18:20

TDoc Title Source Type For Agenda Avail Treated Decision Wdrn Replaced-by Replaces
R5‑190000 RAN5#4-5G-NR Adhoc Agenda RAN5 Chair agenda Information
1Opening of the meeting
Yes
Yes
The RAN5 Chair opened the RAN5#4 5G NR Adhoc meeting in Singapore and welcomed all delegates thanking Rohde&Schwarz for hosting.
 
The Rohde&Schwarz Test & Measurement Director welcomed all delegates to the venue and explained the meeting facilities.
 
The RAN5 Chair then reminded the delegates about the ETSI IPR policy:
- The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP Individual Members have the obligation under the IPR Policies of their respective Organizational Partners to inform their respective Organizational Partners of Essential IPRs they become aware of.
 
The members take note that they are hereby invited:
- to investigate in their company whether their company does own IPRs which are, or are likely to become Essential in respect of the work of the Technical Specification Group.
- to notify the Director-General, or the Chairman of their respective Organisational Partners, of all potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration forms (e.g. See the ETSI IPR forms http://webapp.etsi.org/Ipr/).
The RAN5 chair also explained:
“I also draw your attention to the fact that 3GPP activities are subject to antitrust and competition laws and that compliance with said laws is therefore required of any participant of this TSG/WG meeting including the Chairman and Vice Chairman. In case of question I recommend that you contact your legal counsel.
The present meeting will be conducted with strict impartiality and in the interests of 3GPP.
Furthermore, I would like to remind you that timely submission of work items in advance of TSG/WG meetings is important to allow for full and fair consideration of such matters.”
 
Then new delegates introduced themselves.
Then the RAN5 Chair presented the agenda.
noted No    
R5‑190001 Latest RAN Plenary notes – Chair (5GS Related) RAN5 Chair report Information
2.1Live Reports
Yes
Yes
noted No    
R5‑190002 Latest RAN Plenary draft Report (5GS related) RAN5 Chair report Information
2.1Live Reports
Yes
Yes
noted No    
R5‑190003 LS to RAN5 on uncertainties for OTA signalling test setup TSG WG RAN4 LS in Information
3Incoming Liaison Statements
Yes
Yes
noted No    
R5‑190004 Reply LS on simultaneous LTE and NR transmissions in EN-DC TSG WG RAN4 LS in Information
3Incoming Liaison Statements
Yes
Yes
moved to RF
noted No    
R5‑190005 LS on NR ATF to include per branch relative phase UE measurement TSG WG RAN4 LS in Action
3Incoming Liaison Statements
Yes
Yes
moved to RF
noted No    
R5‑190006 LS on Definition of test methods for Over-The-Air unwanted emissions of IMT radio equipment TSG WG RAN4 LS in Information
3Incoming Liaison Statements
Yes
Yes
noted No    
R5‑190007 LS on Measurement Grids TSG WG RAN4 LS in Information
3Incoming Liaison Statements
Yes
Yes
moved to RF
tdoc 0574 uses the way fwd from RAN4 for MU calculations
noted No    
R5‑190008 LS on the beam correspondence requirement and multi-band applicability framework for FR2 power class 3 UEs TSG WG RAN4 LS in Action
3Incoming Liaison Statements
Yes
Yes
moved to RF
RP-182879 suggests differnet proposal for beam correspondence and EIRP spherical coverage  and is not algined with way fwd in this document , also question to RAN5 about optimizing test time for testing beam correspondence needs to be revisited depending on the above understanding (KEYS and APPLE)
noted No    
R5‑190009 LS on the temperature conditions for testing some FR2 requirements TSG WG RAN4 LS in Information
3Incoming Liaison Statements
Yes
Yes
moved to RF
606 and 607 has related changes for MOP and EIS
noted No    
R5‑190010 LS on conclusion of “Study on evaluation for 2 RX exception in Rel-15 vehicle mounted UE for NR” TSG WG RAN4 LS in Information
3Incoming Liaison Statements
Yes
Yes
noted No    
R5‑190011 LS on Definition of test methods for Over-The-Air unwanted emissions of IMT radio equipment TSG RAN LS in Information
3Incoming Liaison Statements
Yes
Yes
noted No    
R5‑190012 LS on exception of 2Rx vehicle mounted UEs TSG RAN LS in Information
3Incoming Liaison Statements
Yes
Yes
noted No    
R5‑190013 LS on FR1 range TSG RAN LS in Information
3Incoming Liaison Statements
Yes
Yes
moved to RF
noted No    
R5‑190014 Updates and additions of default QoS configurations Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190713  
R5‑190015 Updates to Authentication 5GMM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190714  
R5‑190016 Updates to Configuration Update 5GMM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190017 Updates to De-registration 5GMM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190018 Updates to NAS transport 5GMM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190019 Updates to PDU session establishment 5GSM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r2 was presented on Thu.
revised No R5‑190715  
R5‑190020 Updates to PDU session modification 5GSM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190021 Updates to PDU session release 5GSM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190022 Updates to Registration 5GMM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Thu.
Editor's note can be removed.
revised No R5‑190716  
R5‑190023 Updates to Security Mode 5GMM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190717  
R5‑190024 Updates to Security Protected 5GS NAS message Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190025 Updates to Service Request 5GMM messages Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190026 Updates of MU in TS38.521-1 Annex F during RAN5#NR4 NTT DOCOMO, INC. CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
MU_FR1
dependent on tdoc 276
withdrawn Yes    
R5‑190027 Updates of TT in TS38.521-1 Annex F during RAN5#NR4 NTT DOCOMO, INC. CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
  
TT FR1
renmove UL MIMO changes it is captured in tdoc 276
Revised to: R5-190027r1.
 
  
Revised from: R5-190027.
Revised to: R5-190997.
 
 
 
revised No R5‑190997  
R5‑190028 Updates of MU in TS38.521-2 Annex F during RAN5#NR4 NTT DOCOMO, INC. CR Agreement
5.1.3.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
MU FR2
waiting on outcomes from MU discussions
withdrawn Yes    
R5‑190029 Updates of TT in TS38.521-2 Annex F during RAN5#NR4 NTT DOCOMO, INC. CR Agreement
5.1.3.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
TT FR2
needs more inputs based on MU discussions
agreed No    
R5‑190030 Updates of MU in TS38.521-3 Annex F during RAN5#NR4 NTT DOCOMO, INC. CR Agreement
5.1.4.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
withdrawn Yes    
R5‑190031 Updates of TT in TS38.521-3 Annex F during RAN5#NR4 NTT DOCOMO, INC. CR Agreement
5.1.4.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
revised No R5‑190996  
R5‑190032 Editorial cleaning up of test configuration tables in TS 38.521-1 NTT DOCOMO, INC. CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
Editorial
Revised to: R5-190032r1.
 
r1: Updates in 6.5.3.2.4.1 (co-existence) was removed to avoid overlap with R5-190334.
Revised to: R5-190825.
 
 
revised No R5‑190825  
R5‑190033 Editorial cleaning up of test configuration tables in TS 38.521-2 NTT DOCOMO, INC. CR Agreement
5.1.3.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
Editorial
Revised to: R5-190033r1.
 r1: Updates in 6.5.3.1.4 (General Spurious) was removed to avoid overlap with R5-190117
Revised to: R5-190869.
 
 
 
revised No R5‑190869  
R5‑190034 Test applicability on FR1 NSA REFSENS tests NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
check offline on the need for testing cases which do NOT have MSD impact
Revised to: R5-190034r1.
 
  
Revised from: R5-190034.
 
Change proposal to:
Proposal 1 : Send LS to RAN4 to update TS 38.101-3 based on following RAN5 perspective.
Ø LTE anchor agnostic can’t be applied to REFSENS (Inter-band within FR1) regardless of exceptional requirements (e.g. MSD, IM).
Revised to: R5-190976.
 
 
 
revised No R5‑190976  
R5‑190035 Test procedure on FR1 NSA REFSENS tests NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
No
Yes
withdrawn Yes    
R5‑190036 Editorial correction of core alignment in TS 38.521-1 NTT DOCOMO, INC. CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
Editorial
Revised to: R5-190036r1.
r1: overlap removed
Revised to: R5-190826.
 
 
 
revised No R5‑190826  
R5‑190037 Introduction of TC 7.7A.0 Minimum conformance requirements China Mobile Com. Corporation CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
 
 
  
Revised from: R5-190037.
r1: Update some Table numbers
Revised to: R5-190815.
 
 
revised No R5‑190815  
R5‑190038 Introduction of TC 7.7A.1 Spurious response for 2DL CA China Mobile Com. Corporation, Huawei CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190038r1.
 
  
Revised from: R5-190038.
r1: update the Table numbers; Add “[]” to the numbers in the “Table 7.7A.1.4.2-1: Power Window (dB) for Spurious response CA”
Revised to: R5-190816.
 
 
 
revised No R5‑190816  
R5‑190039 Introduction of TC 7.7A.2 Spurious response for 3DL CA China Mobile Com. Corporation CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190039r1.
 
  
Revised from: R5-190039.
r1: update the Table numbers;
Revised to: R5-190817.
 
 
 
revised No R5‑190817  
R5‑190040 Introduction of TC 7.7A.3 Spurious response for 4DL CA China Mobile Com. Corporation CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190040r1.
 
  
Revised from: R5-190040.
r1: update the Table numbers and the Clause number
Revised to: R5-190818.
 
 
 
revised No R5‑190818  
R5‑190041 Introduction of TC 7.9A.0 Minimum conformance requirements China Mobile Com. Corporation CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
dependent on discuss paper in R5-190615, status from RAN4, send LS to RAN4
withdrawn Yes    
R5‑190042 Introduction of TC 7.9A.1 Suprious emission for 2DL CA China Mobile Com. Corporation; R&S CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
withdrawn Yes    
R5‑190043 Introduction of TC 7.9A.2 Suprious emission for 3DL CA China Mobile Com. Corporation; R&S CR Agreement
5.1.2.2Rx Requirements (Clause 7)
No
Yes
late doc
dependent on discuss paper in R5-190615
withdrawn Yes    
R5‑190044 Introduction of TC 7.9A.3 Suprious emission for 4DL CA China Mobile Com. Corporation; R&S CR Agreement
5.1.2.2Rx Requirements (Clause 7)
No
Yes
late doc
dependent on discuss paper in R5-190615
withdrawn Yes    
R5‑190045 Updates to EN-DC test case 6.2B.2.2, UE Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC Ericsson CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
late doc
 
revised No R5‑190831  
R5‑190046 Update RRCConnectionReconfiguration message with table references Ericsson CR Agreement
6.1.9TS 36.508
Yes
Yes
withdrawn Yes    
R5‑190047 Update IE CellGroupId Ericsson CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑190048 Update IE PDCCH-ConfigCommon Ericsson, MCC TF160, Keysight Technologies CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
TF160 CR R5-190604 merged into.
r3 was presented on Thu.
revised No R5‑190718  
R5‑190049 Test procedure of FR2 ACLR NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
dependent CR in 050 more offline discussions needed
 
Added FR2 MU 3 doc tag.
FR2 MU Session:
KS: the -35dBm check is from the core requirement. The test requirement is following the core requirement.
NTT DOCOMO: this proposal doesn't conflict with core requirement.
QC: does removing this really make any difference?
NTT DOCOMO: too much relaxation.
QC: keep it and this gives flexibility for future to handle low PSD case.
Intel: don't see why to remove and add back later. keep as is.
NTT DOCOMO: this document can be noted.
 
Noted
noted No    
R5‑190050 Updates of test procedure of FR2 ACLR NTT DOCOMO, INC. CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
Based on Proposals in R5-190049
pending agreement on 49, as document 49 is just noted w/drawing
withdrawn Yes    
R5‑190051 Updates of test channel bandwidth in TS 38.508-1 NTT DOCOMO, INC. CR Agreement
7.3Other open issues from opening joint session - original A.I. retained
Yes
Yes
moved to joint on Fri.
agreed No    
R5‑190052 Multi-Band Relaxation for FR2 Power Class 3 Apple Europe Limited discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
late doc
  
LATE DOCUMENT
 
Revised to: R5-190052r1.
 
  
LATE DOCUMENT
Revised from: R5-190052.
Revised to: R5-190977.
 
 
 
revised No R5‑190977  
R5‑190053 Correction to Anritsu CR Agreement
5.1.2.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190054 update to 2Rx TDD FR1 PDSCH mapping Type A performance test case Qualcomm Incorporated pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
approved No    
R5‑190055 Update Clause 3.2 of TS 38.521-1 China Mobile Com. Corporation, Huawei CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
agreed No    
R5‑190056 TT updates among different test setups NTT DOCOMO, INC. CR Agreement
5.1.3.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
  
Revised to: R5-190056r1.
 
  
Revised from: R5-190056.
r1: Updates in 7.3.2.5 was removed to avoid overlap with R5-190118
 
MU values is based on both IFF and DFF if both are available , else it will be bsaed on MU threshold which has to be decided considering the IFF and DFF setup
Revised to: R5-190937.
 
 
 
revised No R5‑190937  
R5‑190057 MU for FR1 UL-MIMO SA TRx Tests Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
tdoc 0276 adds MU/TT in TS38.521-1 Annex
deferred to handle the TBD
Revised to: R5-190057r1.
 
  
Revised from: R5-190057.
Revised to: R5-190955.
 
 
 
revised No R5‑190955  
R5‑190058 FR1 MU for RRM timing measurements Anritsu discussion  
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
CR implemented in 0448
 
Proposal 1: ±112 Tc for FR1 Absolute timing measurement MU
Proposal 2: ±88 Tc  for FR1 Relative timing measurement MU
 
noted and proposals are endorsed
 
noted No    
R5‑190059 Impact from noise for FR2 TRx MU Anritsu discussion  
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
associated CR: 0469
 
Proposal 1) Bias of measured power due to noise is added as systematic error and accounted to total MU with  ± (?_SNR + MUother), where  ?_SNR=10 "log" 10(SNR^(-1)+1).
 
noted , proposal endorsed , implenented in tdoc 469 (other CR's 574, 570, 576, 342)
noted No    
R5‑190060 Correction to DRB identity Configuration Huawei, HiSilicon CR Agreement
4.1TS 38.508-1 (Common Clauses)
No
Yes
late doc
withdrawn Yes    
R5‑190061 Correction to SearchSpace Configuration Huawei, HiSilicon, TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
merged.
withdrawn Yes    
R5‑190062 Correction to schedulingRequestID Configuration Huawei, HiSilicon, MCC TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r2 was presented on Thu.
revised No R5‑190719  
R5‑190063 Addition of NR test case 6.1.1.2- PLMN selection of Other PLMN Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
Removed 'r1' in coversheet field.
Several comments from Rohde&Schwarz, TF160.
Redo table numbering.
Power levels shall be FFS.
r2 was presented on Thu.
 
revised No R5‑190736  
R5‑190064 Addition of NR test case 6.1.1.3-Cell reselection of ePLMN Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190737  
R5‑190065 Addition of NR test case 6.1.1.4-PLMN selection in shared network environment Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
Samsung recommended to mention the Cell PLMN4.
r2 was presented on Thu.
 
revised No R5‑190738  
R5‑190066 Addition of NR test case 6.1.1.5-PLMN selection Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
revised No R5‑190739  
R5‑190067 Addition of NR test case 6.1.2.1-Cell selection based on Qrxlevmin and Cell Reselection for Intra Frequency Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190740  
R5‑190068 Addition of NR test case 6.1.2.2-Cell selection based on Qqualmin Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1+r2? was presented on Tue.
Separate power tables FR1 and 2.
r2 was presented on Thu.
revised No R5‑190741  
R5‑190069 Addition of NR test case 6.1.2.3-Cell selection-Serving cell bar Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190742  
R5‑190070 Addition of NR test case 6.1.2.4-Cell Reselection for interband operation Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
MotorolaMobility commented about the 7s timer.
Samsung recommended not to have a verdict (P) here as it is anyway provided.
r2 was presented on Thu.
revised No R5‑190743  
R5‑190071 Addition of NR test case 6.1.2.5-Cell Reselection for interband operation using Pcompensation Between FDD and TDD Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190744  
R5‑190072 Addition of NR test case 6.1.2.9-Cell Reselection using Qhyst, Qoffset and Treselection Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190745  
R5‑190073 Addition of NR test case 6.1.2.20-Inter-frequency cell reselection according to priority Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190746  
R5‑190074 Addition of NR test case 6.1.2.21-Cell reselection,SIntra SearchQ and SnonIntraSeqrchQ Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190747  
R5‑190075 Addition of NR test case 6.1.2.22-Inter-frequency cell reselection with parameters ThreshX, HighQ, ThreshX, LowQ and ThreshServing, LowQ Huawei, HiSilicon CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190748  
R5‑190076 Correction to NR test case 7.1.1.3.7-Power Headroom Reporting Huawei, HiSilicon CR Agreement
6.1.3.3.1.2MAC
Yes
Yes
cl. Affected missing.
revised No R5‑190674  
R5‑190077 Correction to NR test case 7.1.1.6.1-Correct handling of DL assignment Semi persistent Huawei, HiSilicon CR Agreement
6.1.3.3.1.2MAC
Yes
Yes
cl. Affected missing.
revised No R5‑190675  
R5‑190078 Addition of NR test case 8.1.1.1.2-Paging Huawei, HiSilicon CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
Offline comments from TF160.
r5 was presented on Thu.
revised No R5‑190781  
R5‑190079 Correction to NR test case 8.1.1.2.1-T300 expiry Huawei, HiSilicon CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
r1 was presented on Wed.
revised No R5‑190680  
R5‑190080 Addition of NR test case 8.1.5.3.3-PWS notification Huawei, HiSilicon CR Agreement
6.1.3.4.1.5RRC Others (clause 8.1.5)
Yes
Yes
r1 was presented on Wed.
revised No R5‑190687  
R5‑190081 Correction to NR test case 8.2.3.11.1-8.2.3.11.2-ENDC measurement gap Huawei, HiSilicon CR Agreement
6.1.3.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
r1 was presented on Wed.
revised No R5‑190691  
R5‑190082 Addition of NR test case 8.1.3.1.3_ Event A4 Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r2 was presented on Wed.
Motorola Mobility wondered whether 4 Cells are needed. Anritsu recommended maybe to split the test case.
r3 was presented on Thu.
revised No R5‑190765  
R5‑190083 Addition of NR test case 8.1.3.1.4_ Event A5 Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r2 was presented on Wed.
r3 was presented on Thu.
revised No R5‑190766  
R5‑190084 Addition of NR test case 8.1.3.1.11.1_intra-band Contiguous CA Event A6 Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r3 was presented on Thu.
revised No R5‑190767  
R5‑190085 Addition of NR test case 8.1.3.1.11.2_inter-band CA Event A6 Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r1 was presented on Wed.
r2 was presented on Thu.
revised No R5‑190768  
R5‑190086 Addition of NR test case 8.1.3.1.11.3_intra-band non Contiguous CA Event A6 Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r1 was presented on Wed.
r2 was presented on Thu.
revised No R5‑190769  
R5‑190087 Addition of NR test case 8.1.3.1.12.1_ Additional intra-band Contiguous CA Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r1 was presented on Wed.
r3 was presented on Thu.
revised No R5‑190770  
R5‑190088 Addition of NR test case 8.1.3.1.12.2_ Additional inter-band CA Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r2 was presented on Thu.
revised No R5‑190771  
R5‑190089 Addition of NR test case 8.1.3.1.12.3_ Additional intra-band non Contiguous CA Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r2 was presented on Thu.
revised No R5‑190772  
R5‑190090 Correction to NR test case 9.1.5.1.1-Initial Registration Huawei, HiSilicon CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r1 was presented on Wed.
revised No R5‑190698  
R5‑190091 Addition of NR test case 9.1.1.6-Authentication failure Huawei, HiSilicon CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r1 was presented on Wed.
revised No R5‑190700  
R5‑190092 Addition of applicability for NR test case Huawei, HiSilicon CR Agreement
6.1.4TS 38.523-2
Yes
Yes
r1 was presented on Thu.
revised No R5‑190780  
R5‑190093 CR of 5G NR Capabilities Huawei, HiSilicon CR Agreement
4.2TS 38.508-2
Yes
Yes
r1 was presented on Thu.
revised No R5‑190726  
R5‑190094 Update IE BWP-Id Ericsson CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑190095 Add IE RejectWaitTime Ericsson CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑190096 Update IE ShortMAC-I Ericsson CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑190097 Update IE UE-TimersAndConstants Ericsson CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑190098 Update of TC 7.6.3_Out-of-band blocking CAICT CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190098r1.
TT analysis 0099
 
  
Revised from: R5-190098.
to check for TT analyusis needed for Power window update and check the release spec 15.4.0 matches the contents
TP analysis in 099
finalize how to include RAN4 core requirement relaxation into Test tolerance
 
r1: power window updated
Revised to: R5-190968.
 
 
 
revised No R5‑190968  
R5‑190099 Update of TT of Out-of band,NarrowbBlocking and Spurious response in Annex F CAICT CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
  
Revised to: R5-190099r1.
 
  
Revised from: R5-190099.
r1: Update value and add caculation formula
deferred to check how to include core spec relaxation into test tolerance
Revised to: R5-190965.
 
 
 
revised No R5‑190965  
R5‑190100 Introduction of TC 7.6.4 Narrow-band blocking CAICT CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190100r1.
 
  
Revised from: R5-190100.
TP analysis 0102
same comment as 0098r1
Revised to: R5-190969.
 
 
 
revised No R5‑190969  
R5‑190101 Introduction of TC 7.7 Spurious response CAICT CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190101r1.
 
  
Revised from: R5-190101.
TP analysis 0103
same comment as 0098r1
Revised to: R5-190970.
 
 
revised No R5‑190970  
R5‑190102 Test Point analysis for NR Narrow band in FR1 CAICT CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
  
Revised to: R5-190102r1.
 
  
Revised from: R5-190102.
Revised to: R5-190102r2.
 
  
Revised from: R5-190102r1.
deferred to check the core spec released version 15.4.0 matches the contents; remove the folder under zip
deferred to address how to inlcude RAN4 releaxation
Revised to: R5-190966.
 
 
 
revised No R5‑190966  
R5‑190103 Test Point analysis for NR spurious response in FR1 CAICT CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
  
Revised to: R5-190103r1.
 
  
Revised from: R5-190103.
Revised to: R5-190103r2.
 
  
Revised from: R5-190103r1.
deferred to check the core spec released version 15.4.0 matches the contents; remove the folder under zip
deferred to address how to inlcude RAN4 releaxation
Revised to: R5-190967.
 
 
 
revised No R5‑190967  
R5‑190104 FR2 TT for transmit test cases NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
FR2 TT
Revised to: R5-190104r1.
 
  
Revised from: R5-190104.
Revised to: R5-190946.
 
 
 
revised No R5‑190946  
R5‑190105 FR1 TT for UL MIMO test cases NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
FR1 TT, add the TT values into document 257 from TIM, TT Updates to the actual test case is in tdoc 276
Revised to: R5-190105r1.
 
  
Revised from: R5-190105.
 
Revised to: R5-190954.
 
 
 
revised No R5‑190954  
R5‑190106 FR1 TT for UL CA test cases NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
FR1 TT
pending 0470
Revised to: R5-190106r1.
 
  
Revised from: R5-190106.
Revised to: R5-191003.
 
 
 
revised No R5‑191003  
R5‑190107 Applicability of LTE anchor agnostic to inter-band within FR1 NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
same reason as 0034
Revised to: R5-190107r1.
 
  
Revised from: R5-190107.
Revised to: R5-190975.
 
 
 
revised No R5‑190975  
R5‑190108 Update of operating bands and channel arrangement to TS 38.521-1 China Unicom CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
  
 
3GU Spec allocation does not match AI allocation!!!
3GU allocation: 38.521-1 / AI allocation: 38.521-2
Agenda Allocation was changed: [5.1.3.3]->[5.1.2.3].
   
Revised to: R5-190108r1.
 
  
Revised from: R5-190108.
r1: Removed CA_n71 row from Table 5.2A.1-1; Minor editorial corrections
 
Revised to: R5-190827.
 
 
 
revised No R5‑190827  
R5‑190109 FR1 EN-DC Test Structure Clean Up (Rx) Anritsu CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
late doc
   
withdrawn Yes    
R5‑190110 Update of test case 6.3.4.3, Relative power tolerance in 38.521-2 Ericsson CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑190111 Updates to EN-DC test case 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC Ericsson CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
Revised to: R5-190111r1.
TP analysis 0526
r1: Test case aligned with guidelines for anchor agnostic approach test cases
Revised to: R5-190829.
 
 
 
revised No R5‑190829  
R5‑190112 Add UE capability IMS Ericsson CR Agreement
4.2TS 38.508-2
Yes
Yes
r1 was presented on Thu.
EN-DC was included later in 5GS.
revised No R5‑190727  
R5‑190113 Discussion on OBW procedure update for FR1 and FR2 Qualcomm Finland RFFE Oy discussion  
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
ask for late tdoc for cr's to -1/-2/-3 and also check if intraband contigous needs any different procedure for LTE . Also see how to optimize the test procedure
Revised to: R5-190113r1.
 
  
Revised from: R5-190113.
Revised to: R5-190963.
 
 
 
revised No R5‑190963  
R5‑190114 FR2 Spurious emissions test point analysis update Qualcomm Finland RFFE Oy discussion  
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
Revised to: R5-190114r1.
 
  
Revised from: R5-190114.
CR implemented in 0117 (TC) and 0116 (TP analysis)
Revised to: R5-190859.
 
 
 
revised No R5‑190859  
R5‑190115 Discussion on TS38.521-2 Annex K Update Qualcomm Finland RFFE Oy discussion  
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
CR implemented in 0120
noted No    
R5‑190116 Test Point analysis update for FR2 TxSpurious test case Qualcomm Finland RFFE Oy CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
  
Revised to: R5-190116r1.
 
  
Revised from: R5-190116.
 
Revised to: R5-190116r2.
 
  
Revised from: R5-190116r1.
to fix the formatting of zip file; formatting of 38.905 updates from pervious that is already presented
Revised to: R5-190957.
 
 
 
revised No R5‑190957  
R5‑190117 FR2 Spurious Emission test case updates Qualcomm Finland RFFE Oy CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
  
Based on Proposals in R5-190114
TP analysis 0116
Revised to: R5-190117r1.
 
  
Revised from: R5-190117.
update test id 1, 2 for RB allocation , also update SCS to reflect what is in r1, check with Ingo on the 3GPP style to be used for test procedure superscript , corresponding TP is in 116
Revised to: R5-190958.
 
 
 
revised No R5‑190958  
R5‑190118 FR2 Reference Sensitivity test case updates Qualcomm Finland RFFE Oy CR Agreement
5.1.3.2Rx Requirements (Clause 7)
Yes
Yes
  
depend on doc discussion 0115, CRs 0120, 0572
Revised to: R5-190118r1.
 
  
Revised from: R5-190118.
r1: update: Super-script # changed to (NOTE#)
Revised to: R5-190118r2.
 
  
Revised from: R5-190118r1.
r2 update: Undeleted the settling time in test procedure and set it to 200msec
Revised to: R5-190971.
 
 
revised No R5‑190971  
R5‑190119 Update to Annex M Qualcomm Finland RFFE Oy CR Agreement
5.1.3.3Other Clauses (i.e. Clauses 1-5, Annexes)
No
Yes
withdrawn Yes    
R5‑190120 Update to Annex K and Annex L Qualcomm Finland RFFE Oy CR Agreement
5.1.3.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
  
overlap with 0572 and 0560
Discussion paper 0115
Revised to: R5-190120r1.
 
  
Revised from: R5-190120.
Revised to: R5-191000.
 
 
 
revised No R5‑191000  
R5‑190121 Common understanding to multiband relaxation NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
MB
more offline to update the way fwd to RAn4 and RAN5
LS to RAN4 to be sent
noted No    
R5‑190122 Handling of multiband relaxation in RAN5 NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
MB
same comment as 121
LS to RAN4 to be sent
noted No    
R5‑190123 Addition of new 5GC TC 10.1.3.2 CAICT CR Agreement
6.1.3.65GS Session Management
Yes
Yes
r3 was presented on Thu.
ETSI MCC suggested to fix the formattings.
Too many FFSs.
revised No R5‑190709  
R5‑190124 Addition of 5GC test case 10.1.3.3 CAICT CR Agreement
6.1.3.65GS Session Management
Yes
Yes
withdrawn Yes    
R5‑190125 Addition of 5GC test case 10.1.3.4 CAICT CR Agreement
6.1.3.65GS Session Management
Yes
Yes
withdrawn Yes    
R5‑190126 Test approach for EN-DC TRx tests with CCs > 2 Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
Revised to: R5-190126r1.
 
  
Revised from: R5-190126.
Revised to: R5-190126r2.
 
  
Revised from: R5-190126r1.
need more time to analyze actual example from 38.101-3
Revised to: R5-190978.
 
Proposal 1 :  NR exception reqs are tested by configuring min. number of LTE CCs concerning that requirements.
Proposal 2 : LTE exception reqs are tested by configuring min. number of NR CCs concerning that requirements.
Proposal 3 : Test cases are defined with the number of CCs in the DC band combination (Option B1)  
 
 
revised No R5‑190978  
R5‑190127 TP for TS 38.522 China Mobile Com. Corporation CR Agreement
5.1.6TS 38.522
Yes
Yes
  
Revised to: R5-190127r1.
 
  
Revised from: R5-190127.
r1: The table number reference as per TS 38.508-2 and typos have been fixed.
Revised to: R5-190127r2.
 
  
Revised from: R5-190127r1.
r2: TC 6.2.2 MPR has been added. More comments as per LTE agnostic have been added for the EN-DC test cases.
Revised to: R5-190127r3.
 
  
Revised from: R5-190127r2.
check ENDC MOP test condition for DPS , and update if LTE PICS needs to be included for ENDC tests
 
r3: C07 introduced for dynamic power sharing and applied to EN-DC test case 6.2B.2.2; Condition typos of TC 6.2.1 and 6.2.2 have been fixed.
Revised to: R5-190972.
 
 
 
revised No R5‑190972  
R5‑190128 Update of test case 6.5.2.4.2, UTRA ACLR in 38.521-1 Ericsson CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
  
to check if the contents match to the official release core spec v15.4.0
Revised to: R5-190128r1.
 
  
Revised from: R5-190128.
revised to update the TT for the whole freq range
Revised to: R5-190948.
 
 
 
revised No R5‑190948  
R5‑190129 Add UE capability PDU Ericsson CR Agreement
4.2TS 38.508-2
Yes
Yes
discussion on the pics with MototrolaMobility, CATT, Qualcomm. Is not implementable. Alternative solution has to be found.
Deferred.
withdrawn Yes    
R5‑190130 Update of test case 6.3.4.3, Power Control Relative power tolerance in 38.521-1 Ericsson CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
  
Revised to: R5-190130r1.
 
  
Revised from: R5-190130.
check for contents to match released core spec , and remove [] in TT , check the test procedure for slots to be referred instead of frames
 
r1: Removed draft_38101-1 v15.4.0 as reference; Editor’s note updated
Square brackets for TT removed; Changed from sub-frame to slot in the scheduling pictures and in the test procedure; Removed frame# in FDD pictures to make them numerology independent
Revised to: R5-190949.
 
 
 
revised No R5‑190949  
R5‑190131 Update chapter 4.5 General for PDUs Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
Rohde&Schwarz remarked that IMS signalling may not be supported; problm with the security certificates. So better not perform PDU session establishment. In LTE it was not done.
Deferred.
r2 was presented on Thu.
Considered as a possible solution of handling PDU Session Est. Req. Needs further review and refinement before agreeing RAN5#82.
revised No R5‑190734  
R5‑190132 Update IE RadioBearerConfig Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190133 Update IE SDAP-Config Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
Qualcomm's R5-190178 merged into here.
r1 was presented on Thu.
revised No R5‑190720  
R5‑190134 Correcting test case 6.1.1.7 MediaTek Inc. CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
Motorola Mobility commented that the style is different from other test cases.
Samsung commented that Steps 3-20 performed on Cell 12 or 13 for 2 PLMNs is too vague.
Also, different test cases from different authors are done in a different style: this should be harmonized.
r2 was presented on Thu.
revised No R5‑190754  
R5‑190135 Discussion on defining a New WI for Rel-16 NR CA/DC band combinations CMCC, China Telecom, China Unicom, AT&T, T-Mobile USA, Sprint, Verizon, NTT DOCOMO, Orange, Dish, CAICT, Huawei, Hisilicon, MediaTek, Spreadtrum, Keysight, Anritsu, R&S, CATT, StarPoint, ZTE, vivo, SRTC, Tejet, Lenovo discussion Endorsement
4.6General Discussion Papers
Yes
Yes
r1 was presented on Mon.
revised No R5‑190618  
R5‑190136 Update Clause 2 of TS 38.521-1 China Mobile Com. Corporation CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
agreed No    
R5‑190137 Update to Test procedure to check that UE is in state 5GC RRC_IDLE on a certain cell Samsung CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190138 Update to TC 8.2.5.4.1 SCG change failure / EN-DC Samsung CR Agreement
6.1.3.4.2.5RRC Failure (clause 8.2.5)
Yes
Yes
r1 was presented on Wed.
revised No R5‑190696  
R5‑190139 Editorial update to TC 7.1.3.2.1 Samsung CR Agreement
6.1.3.3.1.4PDCP
Yes
Yes
agreed No    
R5‑190140 Update to 5G TC 9.1.5.2.1 TA registration update Samsung CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r1 was presented on Thu.
revised No R5‑190701  
R5‑190141 Introduction of TC 9.1.5.2.4 Mobility registration update / The lower layer requests NAS signalling connection recovery Samsung CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r3 was presented on Thu.
revised No R5‑190702  
R5‑190142 Update of PRD13 Samsung other Approval
4.7Others
Yes
Yes
r1 was presented on Mon.
revised No R5‑190619  
R5‑190143 Update to Test procedure to check that UE is camped on a new cell belonging to a new TA Samsung CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190144 Correction to TC 6.4A.2.1.1 Error Vector Magnitude for CA (2UL CA) China Mobile Com. Corporation CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
revised No R5‑190807  
R5‑190145 Correction to TC 6.4A.2.2 Carrier leakage for CA China Mobile Com. Corporation CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
revised No R5‑190808  
R5‑190146 Updating test case 6.1.1.8 MediaTek Inc. CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r3 was presented on Thu.
revised No R5‑190755  
R5‑190147 Correcting test case 7.1.1.3.1 MediaTek Inc. CR Agreement
6.1.3.3.1.2MAC
Yes
Yes
agreed No    
R5‑190148 Adding test case 6.2.1.1 MediaTek Inc. CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
Section heading 6.2.
revised No R5‑190756  
R5‑190149 Adding test case 6.2.1.2 MediaTek Inc. CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
reissued as R5-190613 because of wrong spec, is part-1.
withdrawn Yes    
R5‑190150 Adding test case 6.2.1.3 MediaTek Inc. CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
MotorolaMobility wondered whether the PLMN configuration could be moved to 38.508-1.
Maybe use also PLMN 3+4 instead of 13+14.
r2 was presented on Thu.
revised No R5‑190757  
R5‑190151 Adding test case 6.2.1.4 MediaTek Inc. CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190758  
R5‑190152 Adding test case 6.2.1.5 MediaTek Inc. CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
late doc
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190759  
R5‑190153 Adding test case 6.2.1.6 MediaTek Inc. CR Agreement
6.1.3.2Idle Mode (Clause 6)
No
Yes
late doc
withdrawn Yes    
R5‑190154 CR to 38.522 for event triggered reporting test cases Huawei, HiSilicon CR Agreement
5.1.6TS 38.522
No
Yes
withdrawn Yes    
R5‑190155 Addition of NR test case 6.6.1.1-reporting without gap non-DRX Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190155r1.
 
  
Revised from: R5-190155.
r1: Format of initial condition is changed; Modify the title to follow the RAN5 RRM WP; Editor’s notes are added to clarify the unfinished part
Revised to: R5-190874.
 
 
 
revised No R5‑190874  
R5‑190156 Addition of NR test case 6.6.1.2-reporting without gap DRX Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190156r1.
 
  
Revised from: R5-190156.
Revised to: R5-190875.
 
 
 
revised No R5‑190875  
R5‑190157 Addition of NR test case 6.6.1.3-with gap non DRX Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190157r1.
 
  
Revised from: R5-190157.
Revised to: R5-190876.
 
 
 
revised No R5‑190876  
R5‑190158 Addition of NR test case 6.6.1.4-with gap DRX Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190158r1.
 
  
Revised from: R5-190158.
Revised to: R5-190877.
 
 
 
revised No R5‑190877  
R5‑190159 Addition of NR test case 6.6.1.5-without gap non DRX SBI reading Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190159r1.
 
  
Revised from: R5-190159.
Revised to: R5-190878.
 
 
 
revised No R5‑190878  
R5‑190160 Addition of NR test case 6.6.1.6-with gap non DRX SBI reading Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190160r1.
 
  
Revised from: R5-190160.
Revised to: R5-190879.
 
 
 
revised No R5‑190879  
R5‑190161 CR to 38.533 annex for event triggered reorting test cases Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190161r1.
 
  
Revised from: R5-190161.
r1: Order of cell mapping is changed; Uncertainty of Noc changed from ±2 to ±1.5 dB
Revised to: R5-190880.
 
 
 
revised No R5‑190880  
R5‑190162 Addition of defualt config for event triggered test cases Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190162r1.
 
  
Revised from: R5-190162.
r1: Default value of ssbSubcarrierSpacing in table H.3.1-3 is changed to ASN.1 values.
H.3.1-6 and H.3.1-4 is modified to cover more TCs
Revised to: R5-190885.
 
 
 
revised No R5‑190885  
R5‑190163 Addition of connection diagrams for event triggered test cases Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
No
Yes
withdrawn Yes    
R5‑190164 Addition of TT analysis for event triggered test cases Huawei, HiSilicon CR Agreement
5.1.13TR 38.903 (NR MU & TT analyses)
Yes
Yes
  
Revised to: R5-190164r1.
 
  
Revised from: R5-190164.
r1: Changing Maximum allowed measurement uncertainty  AWGN absolute power, Noc from 2.0dB to 1.5 dB
Revised to: R5-190164r2.
 
  
Revised from: R5-190164r1.
r2: Change SSB_RP in spreadsheet
Revised to: R5-190164r3.
 
  
Revised from: R5-190164r2.
r3: Modify the calculation of SSB-RP power to not include AWG
Revised to: R5-190872.
 
 
 
revised No R5‑190872  
R5‑190165 Correction to RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation Qualcomm UK Ltd CR Agreement
6.1.3.3.1.3RLC
Yes
Yes
already covered in R5-190368r1.
withdrawn Yes    
R5‑190166 Correction to PDCP Test case 7.1.3.4.1 PDCP handover / Lossless handover / PDCP sequence number maintenance / PDCP status report to convey the information on missing or acknowledged PDCP SDUs at handover / In-order delivery and duplicate elimination in th Qualcomm UK Ltd CR Agreement
6.1.3.3.1.4PDCP
Yes
Yes
r1 was presented on Wed.
The TF160 manager wondered about the FFSes for EN-DC.
Remove -cou.
TF60 objected with the changes contained.
Will be changed at the next meeting.
revised No R5‑190752  
R5‑190167 Addition of 5GC TC SMS over NAS service Qualcomm UK Ltd CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r1 was presented on Thu.
revised No R5‑190704  
R5‑190168 Addition of 5GC TC - Initial registration / 5GS services / NSSAI handling Qualcomm UK Ltd CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r1 was presented on Thu.
CATT wondered about switch off. Branch 34a1?
revised No R5‑190703  
R5‑190169 Addition of 5GC TC- PDU session authentication and authorization / during the UE-requested PDU session procedure Qualcomm UK Ltd CR Agreement
6.1.3.65GS Session Management
Yes
Yes
ETSI MCC: formatting issues.
revised No R5‑190710  
R5‑190170 Addition of Idle Mode TC - Steering of UE in roaming during registration/security check successful using List Type 1 Qualcomm UK Ltd CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r2 was presented on Tue.
Editorial issues.
r3 was presented on Thu.
 
revised No R5‑190749  
R5‑190171 Addition of Idle mode TC - Cell reselection / Equivalent PLMN Qualcomm UK Ltd CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190750  
R5‑190172 Addition of Idle mode TC - PLMN selection of RPLMN, HPLMN/EHPLMN, UPLMN and OPLMN / Automatic mode Qualcomm UK Ltd CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190751  
R5‑190173 Introduction of eSIM functionality in 5G SA GCF Test cases Qualcomm UK Ltd discussion Endorsement
6.1.18Discussion Papers, Work Plan, TC lists
No
Yes
withdrawn Yes    
R5‑190174 Addition of USIM Profiles for Signaling TC Qualcomm UK Ltd CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
Editorial issues.
revised No R5‑190666  
R5‑190175 Multi PDU Session and IMS in SA Option-2 Qualcomm UK Ltd discussion Endorsement
7.2SIG group docs still requiring verdict/confirmation - original A.I. retained
Yes
Yes
action point on RAN5.
noted No    
R5‑190176 Correction to EN-DC NAS  test case 10.2.1.1 - Default EPS bearer context activation Qualcomm UK Ltd CR Agreement
6.1.3.7EN-DC Session Management
No
Yes
withdrawn Yes    
R5‑190177 Correction to SDAP Test Cases Qualcomm UK Ltd, Rohde & Schwarz CR Agreement
6.1.3.3.1.5SDAP
Yes
Yes
r1 was presented on Thu.
TF160 raised concerns. Will have to be modified at the next meeting.
revised No R5‑190753  
R5‑190178 Update SDAP Config Qualcomm UK Ltd CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
merged into R5-190123.
revised No R5‑190623  
R5‑190179 Addition of 5GC TC SMS over NAS service Qualcomm UK Ltd CR Agreement
6.1.3.55GS Mobility Management
No
Yes
withdrawn Yes    
R5‑190180 Addition of 5GC TC - Initial registration / 5GS services / NSSAI handling Qualcomm UK Ltd CR Agreement
6.1.3.55GS Mobility Management
No
Yes
withdrawn Yes    
R5‑190181 Addition of 5GC TC- PDU session authentication and authorization / during the UE-requested PDU session procedure Qualcomm UK Ltd CR Agreement
6.1.3.65GS Session Management
No
Yes
withdrawn Yes    
R5‑190182 Addition of Idle Mode TC - Steering of UE in roaming during registration/security check successful using List Type 1 Qualcomm UK Ltd CR Agreement
6.1.3.2Idle Mode (Clause 6)
No
Yes
withdrawn Yes    
R5‑190183 Addition of Idle mode TC - Cell reselection / Equivalent PLMN Qualcomm UK Ltd CR Agreement
6.1.3.2Idle Mode (Clause 6)
No
Yes
withdrawn Yes    
R5‑190184 Addition of Idle mode TC - PLMN selection of RPLMN, HPLMN/EHPLMN, UPLMN and OPLMN / Automatic mode Qualcomm UK Ltd CR Agreement
6.1.3.2Idle Mode (Clause 6)
No
Yes
withdrawn Yes    
R5‑190185 Introduction of eSIM functionality in 5G SA Test cases Qualcomm UK Ltd discussion Endorsement
6.1.18Discussion Papers, Work Plan, TC lists
Yes
Yes
Comprion reported about a default test setup modifying the profiles and the elementary fields.
Rohde&Schwarz commented it is up to the test vendors to specify what is being used, in 38.508-1.
Conclusion: Proposal 1 is accepted.
noted No    
R5‑190186 Addition of USIM Profiles for Signaling TC Qualcomm UK Ltd CR Agreement
6.1.1TS 38.508-1 (Clause 6)
No
Yes
withdrawn Yes    
R5‑190187 Multi PDU Session and IMS in SA Option-2 Qualcomm UK Ltd discussion Endorsement
6.1.18Discussion Papers, Work Plan, TC lists
No
Yes
withdrawn Yes    
R5‑190188 Correction to EN-DC NAS test case 10.2.1.1 - Default EPS bearer context activation Qualcomm UK Ltd CR Agreement
6.1.3.7EN-DC Session Management
Yes
Yes
agreed No    
R5‑190189 Correction to SDAP Test Cases Qualcomm UK Ltd CR Agreement
6.1.3.3.1.5SDAP
No
Yes
withdrawn Yes    
R5‑190190 Update SDAP Config Qualcomm UK Ltd CR Agreement
4.1TS 38.508-1 (Common Clauses)
No
Yes
withdrawn Yes    
R5‑190191 Updates to 5GS SA RRC TC - RRC / Paging for connection / Multiple paging records Qualcomm Austria RFFE GmbH CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
agreed No    
R5‑190192 Updates to 5GS SA RRC TC - RRC connection establishment / RRC Reject with wait time Qualcomm Austria RFFE GmbH CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
revised No R5‑190681  
R5‑190193 Updates to 5GS SA RRC TC - SI change / Notification of BCCH modification / Short message for SI update Qualcomm Austria RFFE GmbH CR Agreement
6.1.3.4.1.5RRC Others (clause 8.1.5)
Yes
Yes
r1 was presented on Wed.
revised No R5‑190688  
R5‑190194 Addition of 5GS SA RRC TC - RRC connection release / With priority information / T320 expiry Qualcomm Austria RFFE GmbH CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190761  
R5‑190195 Addition of 5GS SA RRC TC - RRC connection release / With priority information / T320 expiry / E-UTRA Qualcomm Austria RFFE GmbH CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190762  
R5‑190196 Addition of 5GS SA RRC TC - RRC resume / Suspend-Resume / Success Qualcomm Austria RFFE GmbH CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
Samsung commented about the test purpose.
r1 was presented on Thu.
revised No R5‑190763  
R5‑190197 Addition of 5GS SA RRC TC - RRC resume / Suspend-Resume / Reception of RRC setup Qualcomm Austria RFFE GmbH CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
withdrawn Yes    
R5‑190198 Handling of multi-layer test cases in SA Qualcomm Austria RFFE GmbH discussion Endorsement
6.1.18Discussion Papers, Work Plan, TC lists
Yes
Yes
r1 was presented on Tue.
revised No R5‑190667  
R5‑190199 Updating IEs part of SearchSpace Qualcomm Austria RFFE GmbH CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190782  
R5‑190200 Updating P-Max IE Qualcomm Austria RFFE GmbH CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
Samsung and the TF160 manager recommended to reference the condition.
r1 was presented on Fri.
revised No R5‑190784  
R5‑190201 Updating p-MaxEUTRA-r15 IE part of RRCConnectionReconfiguration Qualcomm Austria RFFE GmbH CR Agreement
4.4TS 36.508 (Common Clauses)
Yes
Yes
wrong spec on cover.
revised No R5‑190721  
R5‑190202 Adding new section for 5GS SA Multi-Layer test cases Qualcomm Austria RFFE GmbH CR Agreement
6.1.3TS 38.523-1
Yes
Yes
withdrawn Yes    
R5‑190203 Update to FR1 test case 6.5.4 Transmit intermodulation KTL CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
revised No R5‑190809  
R5‑190204 Update to FR2 test case 6.3.3.4 PRACH time mask KTL CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
  
Revised to: R5-190204r1.
 
  
Revised from: R5-190204.
update test tolerance table as core req relaxation table
 
r1: Modifying editor’s notes; Updating the test requirement table and adding the note for relaxation
 
Revised to: R5-190959.
 
 
 
revised No R5‑190959  
R5‑190205 Test Point analysis for TC 6.3.3.4 PRACH time mask in FR1 KTL CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No    
R5‑190206 Correction of default configuration of RRC IEs in 38.508-1 Huawei, HiSilicon CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190624  
R5‑190207 Addition of NR test case 8.1.3.1.5-Two event A3 RSRQ Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r2 was presented on Thu.
revised No R5‑190773  
R5‑190208 R5-19xxxx Addition of NR test case 8.1.3.1.6_Two event A5 SINR Huawei, HiSilicon CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
r2 was presented on Thu.
revised No R5‑190774  
R5‑190209 Additional of connection diagrams for event triggered test cases Huawei, HiSilicon CR Agreement
5.1.1TS 38.508-1 (Clauses 5 & 7)
Yes
Yes
moved to joint.->RF
 
Agenda Allocation was changed: [4.1]->[5.1.1].
   
Revised to: R5-190209r1.
r1: Change the title
 
Revised to: R5-190209r2.
r2: Add the front and rear Figures
 
Revised to: R5-190209r3.
r3: Change the zip file
 
connection diagram is no need as  there are TE connections with AWGN already present. This document is not needed
Revised to: R5-190873.
 
 
 
revised No R5‑190873  
R5‑190210 Adding test case 6.5B.2.1.3 to 38.905 Ericsson CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No    
R5‑190211 pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance (2x4) LG Electronics pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
  
Revised to: R5-190211r1.
 
  
Revised from: R5-190211.
Revised to: R5-190211r2.
 
  
Revised from: R5-190211r1.
Revised to: R5-190926.
 
 
 
revised No R5‑190926  
R5‑190212 pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance (4x4) LG Electronics pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
  
Revised to: R5-190212r1.
 
  
Revised from: R5-190212.
Revised to: R5-190212r2.
 
  
Revised from: R5-190212r1.
Revised to: R5-190927.
 
 
 
revised No R5‑190927  
R5‑190213 pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance with enhanced receiver type X (4x4) LG Electronics pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
  
Revised to: R5-190213r1.
 
  
Revised from: R5-190213.
Revised to: R5-190213r2.
 
  
Revised from: R5-190213r1.
Revised to: R5-190928.
 
 
 
revised No R5‑190928  
R5‑190214 Editorial: Corrected test case header level in 6.5B.2.1.3 Ericsson CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑190215 Addition of new RRC TC 8.1.1.4.3 MediaTek Inc. CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
why setting 2 different TAI?
Samsung recommended not to put in requirements which are not tested.
Deferred.
revised No R5‑190764  
R5‑190216 Addition of new RRC TC 8.1.1.4.4 MediaTek Inc. CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
Samsung commented that Step 5 is not needed.
withdrawn Yes    
R5‑190217 Addition of new 5GC TC 9.1.5.2.9 MediaTek Inc. CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r1 was presented on Thu.
revised No R5‑190705  
R5‑190218 Addition of new 5GC TC 9.1.6.1.4 MediaTek Inc. CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r1 was presented on Thu.
Add Note: Is initiated by MMI comand. Invert Stps 1 and 2.
revised No R5‑190706  
R5‑190219 Update of RAN5 5G NR phases and targets post RAN5-5G-NR Adhoc#4 Ericsson discussion Endorsement
7.5Review of Action Points and Work Plans
No
Yes
not needed. Will be reviewed at RAN5#82.
withdrawn Yes    
R5‑190220 5GS RF 38.101-x workplans vs NR band and CA/DC configuration workplan Ericsson discussion Information
4.6General Discussion Papers
Yes
Yes
noted No    
R5‑190221 Update of Annex C on calculation of test frequencies Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
No
Yes
late doc
 
withdrawn Yes    
R5‑190222 Introduction of test frequencies for NR band n50 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190625  
R5‑190223 Introduction of test frequencies for NR band n74 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190626  
R5‑190224 Correction of test frequencies for NR band n1 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
New columns can be accepted and table pasted as a whole.
revised No R5‑190627  
R5‑190225 Correction of test frequencies for NR band n2 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190628  
R5‑190226 Correction of test frequencies for NR band n3 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190629  
R5‑190227 Correction of test frequencies for NR band n5 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190630  
R5‑190228 Correction of test frequencies for NR band n7 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190631  
R5‑190229 Correction of test frequencies for NR band n8 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190632  
R5‑190230 Correction of test frequencies for NR band n12 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190633  
R5‑190231 Correction of test frequencies for NR band n20 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190634  
R5‑190232 Correction of test frequencies for NR band n25 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190635  
R5‑190233 Correction of test frequencies for NR band n28 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190636  
R5‑190234 Correction of test frequencies for NR band n34 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190637  
R5‑190235 Correction of test frequencies for NR band n38 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190638  
R5‑190236 Correction of test frequencies for NR band n39 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190639  
R5‑190237 Correction of test frequencies for NR band n40 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190640  
R5‑190238 Correction of test frequencies for NR band n41 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190641  
R5‑190239 Correction of test frequencies for NR band n51 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r2 was presented on Mon.
revised No R5‑190642  
R5‑190240 Correction of test frequencies for NR band n66 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190643  
R5‑190241 Correction of test frequencies for NR band n70 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190644  
R5‑190242 Correction of test frequencies for NR band n71 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190645  
R5‑190243 Correction of test frequencies for NR band n75 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190646  
R5‑190244 Correction of test frequencies for NR band n76 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190647  
R5‑190245 Correction of test frequencies for NR band n77 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190648  
R5‑190246 Correction of test frequencies for NR band n78 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190649  
R5‑190247 Correction of test frequencies for NR band n79 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190650  
R5‑190248 Correction of test frequencies for NR band n257 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190651  
R5‑190249 Correction of test frequencies for NR band n258 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190652  
R5‑190250 Correction of test frequencies for NR band n260 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190653  
R5‑190251 Correction of test frequencies for NR band n261 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190654  
R5‑190252 Correction of test frequencies for signalling testing in clause 6 Ericsson, ROHDE & SCHWARZ, MCC TF160, Keysight Technologies UK Ltd, Qualcomm Incorporated CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
r1 was presented on Tue.
r2 was presented on Thu.
revised No R5‑190669  
R5‑190253 Correction of DCI format 1_0 Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
revised to remove the square brackets.
revised No R5‑190655  
R5‑190254 Addition of new 5G-NR Idle Mode TC 6.1.1.6 - PLMN selection / Periodic reselection / MinimumPeriodicSearchTimer Qualcomm Incorporated CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r1 was presented on Tue.
RAN5 decided to avoid checking of user indication of correct PLMN being selected.
revised No R5‑190671  
R5‑190255 Addition of new 5G-NR Idle Mode TC 6.1.2.19 - Speed-dependent cell reselection Qualcomm Incorporated CR Agreement
6.1.3.2Idle Mode (Clause 6)
Yes
Yes
r2 was presented on Tue.
is docx
revised No R5‑190672  
R5‑190256 Update of 5G-NR test cases applicability Qualcomm Incorporated, Motorola Mobility, Samsung, Anritsu Ltd., ROHDE & SCHWARZ, Intertek, NTT DOCOMO, MediaTek Inc., Huawei, HiSilicon CR Agreement
7.2SIG group docs still requiring verdict/confirmation - original A.I. retained
Yes
Yes
late doc
agreed in the joint on Fri.
TF160 didn't have time to review.
Changes will be made on top at next meeting.
agreed No    
R5‑190257 NR TT Way Forward update Telecom Italia discussion Information
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
PCTEST: Status document for FR2 MU. No need to discuss in MU session. Will treat in TT session.
Telecom Italia: a draft revision has been uploaded for FR1 updates. waiting for FR2 MU outcome to update the paper.
 
status for FR1 is included , FR2 is pending outcome MU discussions
 
Revised to: R5-190257r1.
 
  
Revised from: R5-190257.
Revised to: R5-190940.
 
 
 
revised No R5‑190940  
R5‑190258 Changing NRf1 to use low range frequency Keysight Technologies UK Ltd, Qualcomm Incorporated CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
late doc
first agreed, then merged into R5-190252r2.
 
.
withdrawn Yes    
R5‑190259 Update to 5G-NR RRC Measurement configuration and reporting TC 8.2.3.4.1 Qualcomm Incorporated CR Agreement
6.1.3.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
late doc
r1 was presented on Wed.
revised No R5‑190692  
R5‑190260 Update RRCConnectionReconfiguration message with table references Ericsson CR Agreement
4.4TS 36.508 (Common Clauses)
Yes
Yes
wrong spec on cover.
r2 was presented on Thu.
revised No R5‑190665  
R5‑190261 Update IE CellGroupId Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190262 CR to TS 38.521-2 to add text proposal for Annex F.1 PCTEST Engineering Lab CR Agreement
5.1.3.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
  
Revised to: R5-190262r1.
 
  
Revised from: R5-190262.
r1: Modified text to clarify that the measurement uncertainty applies on a per test case basis
Revised to: R5-190806.
 
 
 
revised No R5‑190806  
R5‑190263 Updates to Annex B to add Permitted OTA Test Methods PCTEST Engineering Lab CR Agreement
4.1TS 38.508-1 (Common Clauses)
No
Yes
late doc
withdrawn Yes    
R5‑190264 WF on multiband relaxation NTT DOCOMO, INC. discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
No
Yes
LATE DOCUMENT
Late document since this document will capture agreements during the meeting.
withdrawn Yes    
R5‑190265 Review on RAN4 pending issue after RAN4#89 NTT DOCOMO, INC. discussion Discussion
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
LATE DOCUMENT
Late document since this document is based on LS from RAN4 which will be available after submission deadline. Also handle LS 0376
noted No    
R5‑190266 PICS update Motorola Mobility, CMCC, Keysight, Qualcomm CR Agreement
4.2TS 38.508-2
Yes
Yes
r1 was presented on Thu.
Overlapping with Huawei's CR.
revised No R5‑190728  
R5‑190267 Update IE BWP-Id Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190268 Add IE RejectWaitTime Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
discussion about cleaning up the table numbers and putting tables into the right sequence.
agreed No    
R5‑190269 Update IE ShortMAC-I Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
discussion about the value to be kept.
Deferred.
r1 was presented on Thu.
revised No R5‑190722  
R5‑190270 Update IE UE-TimersAndConstants Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190271 Update IE PUCCH-ConfigCommon Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190272 Update of FR1 6.2.4 Configured transmitted power Huawei, HiSilicon CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
TP analysis 0274
deferred to check the core spec released version 15.4.0 matches the contents
Confirmed
agreed No    
R5‑190273 Update of TP analysis of FR1 6.2.1 MOP Huawei, HiSilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No    
R5‑190274 Addition of TP analysis of FR1 6.2.4 Configured transmitted power Huawei, HiSilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
deferred to check the core spec released version 15.4.0 matches the contents
matching CR in 272
core spec matching
agreed No    
R5‑190275 Discussion on MU and TT for FR1 UL-MIMO test cases Huawei, HiSilicon discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
Deffered to check if MU can be merged with 0027, TT can be handled with 0105
noted No    
R5‑190276 Addition of MU and TT for NR FR1 UL-MIMO test cases Huawei, HiSilicon CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
  
dependent on 0275
Revised to: R5-190276r1.
 
  
Revised from: R5-190276.
Revised to: R5-190956.
 
 
 
revised No R5‑190956  
R5‑190277 Addition of FR2 6.2.4 Configured transmitted power Huawei, HiSilicon CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
Discussion paper: 0278
Revised to: R5-190861.
revised No R5‑190861  
R5‑190278 Discussion on necessity of testing configured transmitted power in FR2 Huawei, HiSilicon discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
CR implemented by 0277
update proposal to indicate if Pmax is not updated Configured o/p power need not be tested
Revised to: R5-190860.
revised No R5‑190860  
R5‑190279 Update of FR2 6.3.1 Minimum Output Power Huawei, HiSilicon CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
  
TP analysis 0280
needs further analysis between DFts and CP
offline still ongoing
Revised to: R5-190279r1.
 
  
Revised from: R5-190279.
r1: corrected the typo
Revised to: R5-190998.
 
 
 
revised No R5‑190998  
R5‑190280 Addition of TP analysis of FR2 6.3.1 Minimum output power Huawei, HiSilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
CR implemented in 0279
corresponding CR 279 is differed to check CP vs DFTs
Offline still on-going
agreed No    
R5‑190281 Addition of FR2 6.3.4.2 Absolute power tolerance Huawei, HiSilicon CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
TP analysis 0283
based on discussion paper 282 deferred to have more offline
method of setting tx power is still pending analysis in future meetings
Revised to: R5-190960.
revised No R5‑190960  
R5‑190282 Discussion on Absolute power tolerance testing in FR2 Huawei, HiSilicon discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
Proposal 1: It is proposed that RAN5 considers the solutions above and decide a way forward for Absolute power tolerance testing.
 
CR implemented in 0281
deferred for more offline disucssion on the impact of the antenna gain
 
more analysis needed , even in RAN4
noted No    
R5‑190283 Addition of TP analysis of FR2 6.3.4.2 Absolute power tolerance Huawei, HiSilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
CR implemented in 0281
power tolerance analysis is pending , withdrawn
withdrawn Yes    
R5‑190284 Update of FR2 6.3.3.2 General ON/OFF time mask Huawei, HiSilicon CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
  
TP analysis 0285
Revised to: R5-190284r1.
 
  
Revised from: R5-190284.
update test procedure step 3-6 to align with tdoc 117 , add editors note to capture power testing range for fr2, also chek the contents of relased core spec 15.4.0 matches
 
document not yet produce
Revised to: R5-190973.
 
 
 
revised No R5‑190973  
R5‑190285 Addition of TP analysis of FR2 6.3.3.2 General ON/OFF time mask Huawei, HiSilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
  
CR implemented in 0284
 
Revised to: R5-190285r1.
 
  
Revised from: R5-190285.
deferred to check the core spec released version 15.4.0 matches the contents
to remove the "xxxxx" and also cehck and update tp analsyis depdending on Power range discussions corresponding CR in 284
Revised to: R5-190974.
 
 
 
revised No R5‑190974  
R5‑190286 Addition of EN-DC FR1 event triggered reporting test case 4.6.1.5 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190286r1.
 
  
Revised from: R5-190286.
Revised to: R5-190881.
 
 
 
revised No R5‑190881  
R5‑190287 Addition of EN-DC FR1 event triggered reporting test case 4.6.1.6 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
revised No R5‑190882  
R5‑190288 Addition of EN-DC FR1 event triggered reporting test case 4.6.1.3 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
revised No R5‑190883  
R5‑190289 Addition of EN-DC FR1 event triggered reporting test case 4.6.1.4 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
revised No R5‑190884  
R5‑190290 Correction to temperature and voltage of Common test environments Bureau Veritas CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190291 Updated to Annex A Measurement Channels for Performance tests Bureau Veritas pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
core spec alignment
approved No    
R5‑190292 Updated to Annex B Propagation conditions for Performance tests Bureau Veritas pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
core spec alignment
approved No    
R5‑190293 General clauses updated for TS38.521-1 Bureau Veritas CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
core spec alignment
agreed No    
R5‑190294 Updated EN-DC configuration information in clause 5 Bureau Veritas CR Agreement
5.1.4.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
core spec alignment
deferred to check the core spec released version 15.4.0 matches the contents
confirmed matching
agreed No    
R5‑190295 Introduction of 5G RRM TC 4.5.3.1 Bureau Veritas pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190295r1.
 
  
Revised from: R5-190295.
Revised to: R5-190886.
 
 
 
revised No R5‑190886  
R5‑190296 Introduction of 5G RRM TC 4.5.3.2 Bureau Veritas pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190296r1.
 
  
Revised from: R5-190296.
Revised to: R5-190887.
 
 
 
revised No R5‑190887  
R5‑190297 Introduction of 5G RRM TC 4.5.3.3 Bureau Veritas pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190297r1.
 
  
Revised from: R5-190297.
Revised to: R5-190888.
 
 
 
revised No R5‑190888  
R5‑190298 Introduction of 5G RRM TC 4.6.1.1 Bureau Veritas pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190298r1.
 
  
Revised from: R5-190298.
Revised to: R5-190889.
 
 
 
revised No R5‑190889  
R5‑190299 Introduction of 5G RRM TC 4.6.1.2 Bureau Veritas pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190299r1.
 
  
Revised from: R5-190299.
Revised to: R5-190890.
 
 
 
revised No R5‑190890  
R5‑190300 Introduction of 5G RRM TC 5.5.3.1 Bureau Veritas pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190300r1.
 
  
Revised from: R5-190300.
Revised to: R5-190891.
 
 
 
revised No R5‑190891  
R5‑190301 Introduction of 5G RRM TC 6.6.3.1 Bureau Veritas pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190301r1.
 
  
Revised from: R5-190301.
Revised to: R5-190892.
 
 
 
revised No R5‑190892  
R5‑190302 Update IE ReportConfigNR Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
merged into R5-190453.
withdrawn Yes    
R5‑190303 Update CounterCheckResponse Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190304 Multiple-cell signalling test setup in FR2 ANRITSU LTD discussion Endorsement
6.1.18Discussion Papers, Work Plan, TC lists
Yes
Yes
r1 was presented on Wed.
r2 was produced.?
revised No R5‑190735  
R5‑190305 Updates to Multi-Cell SIG OTA testing for FR2 ANRITSU LTD CR Agreement
7.3Other open issues from opening joint session - original A.I. retained
Yes
Yes
r1 was presented on Fri.
Editorial issues.
revised No R5‑190790  
R5‑190306 TP_analysis_38.905_6.5.3.1_TX_SpurEmission Qualcomm Korea CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
  
Revised to: R5-190306r1.
 
  
Revised from: R5-190306.
r1: Coversheet release version changed  to Rel-15
Revised to: R5-190811.
 
 
 
revised No R5‑190811  
R5‑190307 FR1 Text update for 6.5.3.1 General spurious emission Qualcomm Korea CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
  
Revised to: R5-190307r1.
 
  
Revised from: R5-190307.
r1: Coversheet release version changed  to Rel-15
TP analysis 0306
Revised to: R5-190810.
 
 
 
revised No R5‑190810  
R5‑190308 Text update for 7.3B.3 ?RIB,c ?RIBNC for EN-DC Qualcomm Korea CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
Revised to: R5-190308r1.
Revised to: R5-190841.
 
 
 
revised No R5‑190841  
R5‑190309 FR1 Text update for 7.3C Reference sensitivity power level for SUL Qualcomm Korea CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190309r1.
 
  
Revised from: R5-190309.
r1: Coversheet release version changed  to Rel-15
Revised to: R5-190309r2.
 
  
Revised from: R5-190309r1.
update Test config to FFS and add editors note about tp analysis and also change the template of editors note
Revised to: R5-190951.
 
 
 
revised No R5‑190951  
R5‑190310 Text Update for 6.5B.3.2 Spurious Emissions for intra-band non-contiguous EN-DC Qualcomm Korea CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
Revised to: R5-190310r1.
r1: fixed 3GU issue
Revised to: R5-190832.
 
 
revised No R5‑190832  
R5‑190311 Text Update for 6.5B.3 Additional Spurious Emissions for EN-DC Qualcomm Korea CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
  
Revised to: R5-190311r1.
 
  
Revised from: R5-190311.
r1: fixed 3GU issue
Revised to: R5-190833.
 
 
revised No R5‑190833  
R5‑190312 FR1 Text update for 7.3A.2 Reference sensitivity power level for CA Qualcomm Korea CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190312r1.
 
  
Revised from: R5-190312.
Revised to: R5-190312r2.
 
  
Revised from: R5-190312r1.
requested to be deferred for more changes to be handled
Revised to: R5-190952.
 
 
 
revised No R5‑190952  
R5‑190313 FR1 Text update for 7.3.2_1 Reference sensitivity level with 4 Rx antenna ports Qualcomm Korea CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190313r1.
 
  
Revised from: R5-190313.
r1: Coversheet release version changed  to Rel-15
Revised to: R5-190819.
 
 
 
revised No R5‑190819  
R5‑190314 Text Update for 6.5B.3.3 Spurious Emissions for Inter-band EN-DC within FR1 Qualcomm Korea CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
Revised to: R5-190314r1.
r1: fixed 3GU issue
Revised to: R5-190834.
 
 
 
revised No R5‑190834  
R5‑190315 Correction to NR RRC test case 8.2.3.5.1 ANRITSU LTD CR Agreement
6.1.3.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
revised No R5‑190683  
R5‑190316 Correction to MCS Table for PUSCH Anritsu CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
is RF? Merged into xx.
withdrawn Yes    
R5‑190317 Correction to time domain PUSCH allocation parameters Anritsu CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
conflict with R5-190359.
withdrawn Yes    
R5‑190318 Addition of 5GS SA RRC TC - 8.1.2.1.1 ANRITSU LTD CR Agreement
6.1.3.4.1.2RRC Reconfiguration (clause 8.1.2)
Yes
Yes
The TF160 manager requested that TP shall be checked.
Samsung recommended to delete requirements not to be tested, like E-UTRA.
Should be aligned with the core spec, RAN2.
r1 was presented on Thu.
TF160 comments are concluded.
revised No R5‑190775  
R5‑190319 Addition of 5GS SA RRC TC - 8.1.2.1.3 ANRITSU LTD CR Agreement
6.1.3.4.1.2RRC Reconfiguration (clause 8.1.2)
Yes
Yes
r1 was presented on Wed.
r2 was presented on Thu.
revised No R5‑190776  
R5‑190320 Addition of 5GS SA RRC TC - 8.1.2.1.4 ANRITSU LTD CR Agreement
6.1.3.4.1.2RRC Reconfiguration (clause 8.1.2)
Yes
Yes
concluded to split the test cases.
r2 was presented on Thu.
revised No R5‑190777  
R5‑190321 Correction to NR test case 7.1.1.1.3-SI request Huawei, HiSilicon,TF 160 CR Agreement
6.1.3.3.1.2MAC
Yes
Yes
r2 was presented on Wed.
revised No R5‑190697  
R5‑190322 Correction to NR test case 8.1.5.3.1-ETWS Huawei, HiSilicon, TF 160 CR Agreement
6.1.3.4.1.5RRC Others (clause 8.1.5)
Yes
Yes
Qualcomm had reviewed offline.
revised No R5‑190685  
R5‑190323 Clean up of occupied bandwidth for EN-DC within FR1 Anritsu CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑190324 Update of TC 6.2B.1.1 Huawei, Hisilicon CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
late doc
  
TP analysis 0327
Revised to: R5-190324r1.
 
  
Revised from: R5-190324.
Revised to: R5-190994.
 
 
 
revised No R5‑190994  
R5‑190325 Update of TC 6.2B.1.2 Huawei, Hisilicon CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
late doc  
TP analysis 0328
no changes marked in the CR
Revised to: R5-190325r1.
 
  
Revised from: R5-190325.
Revised to: R5-190992.
 
 
 
revised No R5‑190992  
R5‑190326 Update of TC 6.2B.1.3 Huawei, Hisilicon CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
late doc
  
Discussion paper: 0605; TP analysis: 0329
Revised to: R5-190326r1.
 
  
Revised from: R5-190326.
Revised to: R5-190990.
 
 
 
revised No R5‑190990  
R5‑190327 Adding test case 6.2B.1.1 to 38.905 Huawei, Hisilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
late doc
  
Revised to: R5-190327r1.
 
  
Revised from: R5-190327.
Revised to: R5-190993.
 
 
 
revised No R5‑190993  
R5‑190328 Adding test case 6.2B.1.2 to 38.905 Huawei, Hisilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
late doc
  
Revised to: R5-190328r1.
 
  
Revised from: R5-190328.
Revised to: R5-190991.
 
 
 
revised No R5‑190991  
R5‑190329 Adding test case 6.2B.1.3 to 38.905 Huawei, Hisilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
late doc
Discussion paper: 0605; TC: 0326
Revised to: R5-190329r1.
 
  
LATE DOCUMENT
Revised from: R5-190329.
Revised to: R5-190989.
 
 
 
revised No R5‑190989  
R5‑190330 Correcton to MAC TBS test cases Motorola Mobility, MCC TF160, Mediatek CR Agreement
6.1.3.3.1.2MAC
Yes
Yes
r1 was presented on Wed.
revised No R5‑190676  
R5‑190331 Reduction of loops in MAC TBS test cases Motorola Mobility, MCC TF160 CR Agreement
6.1.3.3.1.2MAC
Yes
Yes
r1 was presented on Wed.
revised No R5‑190677  
R5‑190332 Text Update for 6.5B.3.1 Spurious Emissions for intra-band contiguous EN-DC Qualcomm Korea CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
  
Revised to: R5-190332r1.
 
  
Revised from: R5-190332.
r1: Coversheet release version changed  to Rel-15
Revised to: R5-190835.
 
 
 
revised No R5‑190835  
R5‑190333 Text Update for 7.3B.2.3 Reference sensitivity for Inter-band EN-DC within FR1 Qualcomm Korea CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
Revised to: R5-190333r1.
Revised to: R5-190842.
 
 
 
revised No R5‑190842  
R5‑190334 FR1 Text update for 6.5.3.2 Spurious emission for UE co-existence Qualcomm Korea CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
  
Revised to: R5-190334r1.
 
  
Revised from: R5-190334.
r1: Coversheet release version changed  to Rel-15
Revised to: R5-190812.
 
 
 
revised No R5‑190812  
R5‑190335 Text Update for 7.3B.2.2 Reference sensitivity for Intra-band non-contiguous EN-DC Qualcomm Korea CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
Revised to: R5-190335r1.
Revised to: R5-190843.
 
 
 
revised No R5‑190843  
R5‑190336 Text Update for 7.3B.2.1 Reference sensitivity for Intra-band Contiguous EN-DC Qualcomm Korea CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190336r1.
 
  
Revised from: R5-190336.
Revised to: R5-190844.
 
 
 
revised No R5‑190844  
R5‑190337 FR1 Text update for 7.3.2 Reference sensitivity power level Qualcomm Korea CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190337r1.
 
  
Revised from: R5-190337.
r1: Coversheet release version changed  to Rel-15
Revised to: R5-190820.
 
 
 
revised No R5‑190820  
R5‑190338 Correction to MAC TC 7.1.1.4.1.1, 7.1.1.4.2.1, 7.1.1.4.2.3, 7.1.1.4.2.4 and 7.1.1.4.2.5 MediaTek Inc. CR Agreement
6.1.3.3.1.2MAC
Yes
Yes
merged into other CR.
withdrawn Yes    
R5‑190339 Discussion on Annex G for 5G NR RRM tests Qualcomm communications-France discussion Agreement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
Revised to: R5-190339r1.
associated CR 0340
Revised to: R5-190802.
Proposal endorsed
 
 
revised No R5‑190802  
R5‑190340 Update Annex G in TS 38.533 Qualcomm communications-France pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190340r1.
 
  
Revised from: R5-190340.
Discussion paper: 0339
Revised to: R5-190803.
 
 
  
Revised from: R5-190340r1.
corrected the 3GPP formatting
 
 
revised No R5‑190803  
R5‑190341 MU value for multiple measurement antenna uncertainty Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
In this contribution we propose MU values for mechanical feed antenna positioning (switching) based on the evaluation results provided from a cable manufacturer.
 
deferred to check the value to pick based on the datasheet or other inputs from cable manufacturers
 
Multiple meausrement antenna MU is agreed to be 0.3dB and will be incorporated in teh MU CR.
 
Revised to: R5-190863.
revised No R5‑190863  
R5‑190342 CR on FR2 measurement uncertainty Anritsu CR Agreement
5.1.13TR 38.903 (NR MU & TT analyses)
No
Yes
late doc
CR to capture endorsed values in the MU budget tables.
To be merged into one TR38.903 CR 0576
withdrawn Yes    
R5‑190343 QoQZ characterization at out-of-band region Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
In this contribution we introduce our current views on factors to characterize QoQZ at out-of-band region.
 
Still needs agreement on proposals , more offline needed
 
FR2 MU Session:
KS presented the latest version of TE vendor view spreadsheet.
PCTEST: TE Vendors working offline to address the three proposals in Anritsu 343, KS 386, and R&S 567. Plan is to produce a way forward document/spreadsheet capturing the agreements.
 
0343, 0386 and 0567 will merged into a way foward discussion paper
noted No    
R5‑190344 Measurement uncertainty definition point in FR2 Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
LATE DOCUMENT
In this contribution we propose our view on the frequency point to define MU values at the outside of frequency range from 23.45 to 40.8 GHz.
 
FR2 MU session:
KS: not unheard of that we need to perform QoQZ at new frequencies.
R&S: agree with Keysight.
PCTEST: we will note this document.
 
Noted
noted No    
R5‑190345 MU contribution of “Mismatch” at FR2 in-band region Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
Proposal 1: Keep 1.3 dB as the MU value of “Mismatch” at the FR2 in-band frequency range and remove brackets from the tables.
 
FR2 MU session:
KS: we support this proposal. Any reason to keep relative measurement FFS?
Anritsu: once we reach agreement on ACLR part, we can conclude.
PCTEST: group can endorse the proposal.
Noted and proposal is endorsed
noted No    
R5‑190346 Evaluation result of amplifier stability Anritsu discussion Discussion
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
This contribution introduces an evaluation result of stability (gain characteristics) of the external amplifier unit for FR2 test system as one of factors for measurement uncertainty contribution “Amplifier uncertainties”.
 
only observation, no proposal
noted No    
R5‑190347 MU contribution of “Uncertainty of the RF power measurement equipment” (2) Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
Proposal 1: Accept to refer to values which are not warranted as measurement equipment, for example 95th %-ile values in datasheets or results from inspection data of manufactured products.
Proposal 2: Keep the currently defined MU value “Uncertainty of the RF power measurement equipment”, i.e. 2.16 dB for all in-band and out-of-band test case and remove brackets.
Revised to: R5-190347r1.
 
  
Revised from: R5-190347.
Revised to: R5-190804.
 
 
  
Revised from: R5-190347r1.
noted, proposals endorsed
 
 
revised No R5‑190804  
R5‑190348 MU contribution of “Uncertainty of network analyzer” (2) Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
Proposal 1: Define 0.4 dB as the MU value of “Uncertainty of network analyzer” at the FR2 in-band frequency range from 23.45 GHz to 44.3 GHz.
 
FR2 MU Session:
R&S: believe that we need to include sqrt(2) of VNA datasheet value.
KS: need more offline discussion.
 
Revised to: R5-190941.
revised No R5‑190941  
R5‑190349 DUT repositioning and its relations with QoQZ for OTA measurement Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
In this contribution we clarify a definition and an applicability of measurement uncertainty (MU) contribution called “DUT repositioning” from multiple use cases and also consider its relations with the quality of quiet zone (QoQZ) during the OTA measurement.
 
FR2 MU session:
KS: good overview, still discussing spurious emission domain. We need to be careful on the usage of device re-positioning vs. DUT re-positioning.
PCTEST: companies to review CR in 350 offline to determine if any text needs to be updated.
Anritsu: need to update this document to align with offline agreements.
 
review the associated CR in 350 to confirm changes between device repositioning and DUT repositioning
Revised to: R5-190939.
revised No R5‑190939  
R5‑190350 CR on definition of DUT repositioning Anritsu CR Agreement
5.1.13TR 38.903 (NR MU & TT analyses)
Yes
Yes
FR2 MU Session:
PCTEST: companies are asked to review the text based on the comments for the discusssion paper in 349.
Revised to: R5-190938.
revised No R5‑190938  
R5‑190351 Shared Risk clarification in TS 38.521-1 Telecom Italia CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
agreed No    
R5‑190352 Shared Risk clarification in TS 38.521-2 Telecom Italia CR Agreement
5.1.3.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
agreed No    
R5‑190353 Shared Risk clarification in TS 38.521-3 Telecom Italia CR Agreement
5.1.4.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
agreed No    
R5‑190354 Correction to SystemInformation MCC TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
move the value/remark up 1 cell
revised No R5‑190657  
R5‑190355 Correction to PUCCH-Config MCC TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Mon.
revised No R5‑190658  
R5‑190356 Correction to RadioBearerConfig MCC TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
Deferred. Discussion with Ericsson.
agreed No    
R5‑190357 Corrections to IEs related to transform precoding MCC TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
Conflicting with R5-190608.
withdrawn Yes    
R5‑190358 Correction to SIB3 and SIB4 MCC TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
revised No R5‑190659  
R5‑190359 Correction of PUSCH-TimeDomainResourceAllocationList MCC TF160, Ericsson, Anritsu CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
late doc
The TF160 manager recommended for this meeting to align with the Dec. 18 core specs.
Only 1 CR should deal with 1 table at a time, not multiple tables.
r1 was presented on Thu.
revised No R5‑190723  
R5‑190360 Correction of CellGroupConfig tables and logical channel identities MCC TF160, Huawei, HiSilicon, Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190361 Corrections and clarifications regarding DCI formats 0_1 and 1_1 MCC TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190724  
R5‑190362 Correction of SchedulingRequestResourceConfig MCC TF160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
withdrawn Yes    
R5‑190363 RAN5 PRD12 version 6 MCC TF160 other Approval
4.7Others
Yes
Yes
revised No R5‑190789  
R5‑190364 Corrections to the default test frequencies for signalling testing MCC TF160 CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑190365 Correction to 5GS RLC Test case 7.1.2.2.5 MCC TF160 CR Agreement
6.1.3.3.1.3RLC
Yes
Yes
agreed No    
R5‑190366 Correction to 5GS RLC Test case 7.1.2.3.8 MCC TF160 CR Agreement
6.1.3.3.1.3RLC
Yes
Yes
agreed No    
R5‑190367 Correction to 5GS RLC Test case 7.1.2.3.9 MCC TF160 CR Agreement
6.1.3.3.1.3RLC
Yes
Yes
agreed No    
R5‑190368 Correction to 5GS RLC Test case 7.1.2.3.10 MCC TF160, Qualcomm Inc. CR Agreement
6.1.3.3.1.3RLC
Yes
Yes
r1 was presented on Wed.
revised No R5‑190679  
R5‑190369 Correction to EN-DC RRC test case 8.2.2.2.1 MCC TF160 CR Agreement
6.1.3.4.2.2RRC Radio Bearer (clause 8.2.2)
Yes
Yes
revised No R5‑190690  
R5‑190370 Correction to EN-DC RRC test case 8.2.5.3.1 MCC TF160 CR Agreement
6.1.3.4.2.5RRC Failure (clause 8.2.5)
Yes
Yes
late doc
agreed No    
R5‑190371 Common aspects: Test Model updates MCC TF160 CR Agreement
6.1.5TS 38.523-3
Yes
Yes
late doc
r3 was presented on Fri.
revised No R5‑190786  
R5‑190372 EN-DC: Test Model updates MCC TF160 CR Agreement
6.1.5TS 38.523-3
Yes
Yes
late doc
r2 was presented on Fri.
revised No R5‑190787  
R5‑190373 NR/5GC: Test Model updates MCC TF160 CR Agreement
6.1.5TS 38.523-3
Yes
Yes
late doc
r1 was presented on Fri.
revised No R5‑190788  
R5‑190374 RAN5#4-5G-NR Adhoc Session Programme RAN5 Chair agenda Information
1Opening of the meeting
Yes
Yes
noted No    
R5‑190375 Resubmission of Agreed CRs to RAN5#82 RAN5 Chair other Information
7.4General Discussion Papers
Yes
Yes
for the next meeting RAN5#82 the changes on top of the present Ad hoc meeting will be highlighted.
Action point on ETSI MCC to fix the navigation pane formats in 38.523-1 and 38.523-1.
noted No    
R5‑190376 Reply LS on RAN4-RAN5 5G-NR RF pending issues ETSI LS in Information
3Incoming Liaison Statements
Yes
Yes
moved to RF
265 is a disucssion paper to address the pending RAN4 issues
noted No    
R5‑190377 Add FailureInformation Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190378 Update LocationMeasurementIndication Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
is .docx !
agreed No    
R5‑190379 Update MeasurementReport Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
is .docx !
agreed No    
R5‑190380 Update of 5GS NR RRC test case 8.2.3.6.1 and 8.2.3.8.1 ROHDE & SCHWARZ CR Agreement
6.1.3.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
r1 was presented on Wed.
revised No R5‑190693  
R5‑190381 Update to SDAP test cases 7.1.4.1 and 7.1.4.2 ROHDE & SCHWARZ CR Agreement
6.1.3.3.1.5SDAP
Yes
Yes
withdrawn Yes    
R5‑190382 Clarification for NR inter-band measurement test case configuration ROHDE & SCHWARZ CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
r1 was presented on Thu.
revised No R5‑190732  
R5‑190383 Update of 5GS NR RRC test case 8.2.1.1.1 ROHDE & SCHWARZ CR Agreement
6.1.3.4.2.1RRC UE Capability / Others (clause 8.2.1)
Yes
Yes
late doc
revised No R5‑190689  
R5‑190384 Update of 5GS NR MAC test case 7.1.1.8.1 ROHDE & SCHWARZ CR Agreement
6.1.3.3.1NR Layer 2
No
Yes
late doc
withdrawn Yes    
R5‑190385 On XPD MU Element Keysight Technologies UK Ltd discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
The XPD MU element has been defined in TR38.810 and TR38.903. This contribution is addressing a correction of the MU element definition and the MU value used by test cases referencing this MU element.
Revised to: R5-190385r1.
 
  
Revised from: R5-190385.
Revised to: R5-190864.
 
 
 
revised No R5‑190864  
R5‑190386 QoQZ Procedure for Spurious Emissions Keysight Technologies UK Ltd discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
This contribution is proposing an abbreviated procedure for spurious emissions testing for the FR2 range and beyond, i.e., up to the 2nd harmonic of the upper frequency edge of the UL operating band.
This procedure is mandatory before the test system is commissioned for certification tests and characterizes the quiet zone performance of the anechoic chamber, specifically the effect of reflections within the anechoic chamber. Additionally, it includes the effect of offsetting the directive antenna array inside a DUT from the centre of the quiet zone, i.e., the centre of rotation of the DUT and measurement antenna positioning systems.
 
FR2 MU Session:
KS presented the latest version of TE vendor view spreadsheet.
PCTEST: TE Vendors working offline to address the three proposals in Anritsu 343, KS 386, and R&S 567. Plan is to produce a way forward document/spreadsheet capturing the agreements.
Online Session:
Note all three papers. KS to request a Tdoc for WF.
 
more offline discussions needed , possible to create a new way fwd document
 
will be merged into a new discussion paper to be requested (343, 386, 567)
noted No    
R5‑190387 On MU Element for DUT Repositioning Keysight Technologies UK Ltd discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
A new MU element for DUT Repositioning has been in introduced in 38.903  during RAN5#81. This contribution is looking at a statistical analysis to provide sample values for MOP and REFSENS test cases in absence of empirical evaluations
 
noted and proposals are endorsed, CR to implement the proposal in TR38.903 merged CR
noted No    
R5‑190388 On MU Element for Positioning and pointing misalignment between the reference antenna and the measurement antenna Keysight Technologies UK Ltd discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
The MU element Positioning and pointing misalignment between the reference antenna and the measurement antenna is currently in []. This contribution is looking at a statistical analysis to provide sample values in absence of empirical evaluations
 
Revised to: R5-190805.
 
 
  
Revised from: R5-190388.
 
noted and proposal is endorsed and will be captured in TR38903 merged CR
 
 
 
revised No R5‑190805  
R5‑190389 On MU Element for Positioning Misalignment Keysight Technologies UK Ltd discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
A statistical analysis for the MUs on Positioning Misalignment and Misalignment of positioning System is presented to provide justification for the updated sample value of 0dB for MOP and REFSENS test cases.
 
Noted, proposal 2 and 3 endorsed
noted No    
R5‑190390 On QoQZ MU Impact on OBW Keysight Technologies UK Ltd discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
This contribution is presenting sample QoQZ data at the band edges of FR2_A and FR2_B with 800MHz frequency offset. This difference in QoQZ performance is then used to estimate the MU impact on the OBW test case
No impact to OBW on either approach detailed in the paper,
 
KS: No impact on OBW based on either approach. Will revise based on the Anritsu paper. The conclusions will be the same.
Anritsu: we would like to review the final doc.
 
Revised to: R5-190865.
revised No R5‑190865  
R5‑190391 On QoQZ MU Impact on ACLR Keysight Technologies UK Ltd discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
ACLR test cases focus on relative power differences at the assigned channel and the adjacent channel. When compared to absolute power measurement test cases such as MOP or SEM, ACLR test cases should only take the relative difference of QoQZ performance into account. In the simplest approximation, the relative difference could be assumed to be zero within the FR2 subranges. This contribution is presenting sample QoQZ data at the band edges of FR2_A and FR2_B with 800MHz frequency offset and shows a small relative difference
 
KS: further email discussions and offline discussions were held. One approach is overestimating and one is underestimating. The MU value would be different for ACLR. Will need to determine a final value and revise.
 
final value needs more offline discussions and incorporated in the final TDOC
 
Revised to: R5-190866.
revised No R5‑190866  
R5‑190392 Addition of 5GS NR RRC test case 8.1.5.1.1 ROHDE & SCHWARZ CR Agreement
6.1.3.4.1.5RRC Others (clause 8.1.5)
Yes
Yes
late doc
r1 was presented on Thu.
revised No R5‑190779  
R5‑190393 Updates to section 4.8.3 (test USIM parameters) ROHDE & SCHWARZ CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
late doc
agreed No    
R5‑190394 On the MU term Influence of the calibration antenna feed cable Keysight Technologies UK Ltd discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
The sample value of the Mismatch MU element has been derived by RAN4 previously. This contribution aims to remove the [0]dB sample value with a 0.1dB MU value.  
 
FR2 MU Session:
R&S: how many rotary joints were considered? Typically, there would be two so we should multiply by sqrt(2).
KS: we included one rotary joint but we are OK to revise.
PCTEST: document will be revised and updated proposal can be endorsed.
 
Revise the paper to update on offline discussions , needs to be incorporated in a final
 
Revised to: R5-190867.
revised No R5‑190867  
R5‑190395 Addition of 5GS NR RRC test case 8.1.3.1.2 ROHDE & SCHWARZ CR Agreement
6.1.3.4.1.3RRC Measurement configuration control and reporting (clause 8.1.3)
Yes
Yes
late doc
r1 was presented on Wed.
revised No R5‑190684  
R5‑190396 Update of 5GS NR RRC test case 8.1.1.3.2 ROHDE & SCHWARZ CR Agreement
6.1.3.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
late doc
agreed No    
R5‑190397 Update of test case 6.2B.3.1 UE A-MPR for Intra-band contiguous EN-DC Ericsson Limited CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
revised No R5‑190838  
R5‑190398 Update of test case 6.2B.3.4 UE A-MPR for Inter-Band EN-DC including FR2 Ericsson Limited CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
revised No R5‑190839  
R5‑190399 Update of test case 6.5B.2.1.2 UE Additional spectrum emissions mask for intra-band contiguous EN-DC Ericsson Limited CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
revised No R5‑190840  
R5‑190400 Correction of FR1 6.2.2 Maximum Power Reduction (MPR) CAICT CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑190401 Correction of FR2 6.3.2 Transmit OFF power CAICT CR Agreement
5.1.2.1Tx Requirements (Clause 6)
No
Yes
withdrawn Yes    
R5‑190402 Correction of FR2 6.3.2 Transmit OFF power CAICT CR Agreement
5.1.3.1Tx Requirements (Clause 6)
No
Yes
late doc
withdrawn Yes    
R5‑190403 Correction of FR2 7.4 Maximum input level CAICT CR Agreement
5.1.3.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190404 Introduction of FR1 7.6D.2 Inband blocking for UL-MIMO CAICT CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190821  
R5‑190405 38.521-3 Common Section updates to clarify leverage across architecture options Qualcomm communications-France CR Agreement
5.1.4.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
  
Revised to: R5-190405r1.
 
  
Revised from: R5-190405.
discussion paper: 0530
 
r1: updates some acronyms and terminology
Revised to: R5-190405r2.
 
  
Revised from: R5-190405r1.
Revised to: R5-190405r3.
 
  
Revised from: R5-190405r2.
have more offline to remove applicability sequence
Revised to: R5-190405r4.
 
  
Revised from: R5-190405r3.
Revised to: R5-190982.
 
 
 
revised No R5‑190982  
R5‑190406 Introduction of FR1 7.6D.3 Out-of-band blocking for UL-MIMO CAICT CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190822  
R5‑190407 Introduction of FR1 7.6D.4 Narrow band blocking for UL-MIMO CAICT CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190823  
R5‑190408 Introduction of FR1 7.8D.2 Wide band Intermodulation for UL-MIMO CAICT CR Agreement
5.1.2.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190824  
R5‑190409 Introduction of NSA FR1 7.6B.2.1 Inband blocking for intra-band contiguous EN-DC in FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190845  
R5‑190410 Introduction of NSA FR1 7.6B.2.2 Inband blocking for intra-band non-contiguous EN-DC in FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190846  
R5‑190411 Introduction of NSA FR1 7.6B.2.3 Inband blocking for inter-band EN-DC within FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190847  
R5‑190412 Introduction of NSA FR1 7.6B.3.1 Out-of-band blocking for intra-band contiguous EN-DC in FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190848  
R5‑190413 Introduction of NSA FR1 7.6B.3.2 Out-of-band blocking for intra-band non-contiguous EN-DC in FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190849  
R5‑190414 Introduction of NSA FR1 7.6B.3.3 Out-of-band blocking for inter-band EN-DC within FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
  
Revised to: R5-190414r1.
 
  
Revised from: R5-190414.
Revised to: R5-190850.
 
 
 
revised No R5‑190850  
R5‑190415 Introduction of NSA FR1 7.6B.4.1 Narrow band blocking for intra-band contiguous EN-DC in FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190851  
R5‑190416 Introduction of NSA FR1 7.6B.4.2 Narrow band blocking for intra-band non-contiguous EN-DC in FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190852  
R5‑190417 Introduction of NSA FR1 7.6B.4.3 Narrow band blocking for inter-band EN-DC within FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190853  
R5‑190418 Introduction of NSA FR1 7.7B.1 Spurious Response for intra-band contiguous EN-DC in FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190854  
R5‑190419 Introduction of NSA FR1 7.7B.2 Spurious Response for intra-band non-contiguous EN-DC in FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190855  
R5‑190420 Introduction of NSA FR1 7.7B.3 Spurious Response for inter-band EN-DC within FR1 CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
revised No R5‑190856  
R5‑190421 Introduction of TC 7.6B.2.1 Inband blocking for intra-band contiguous EN-DC in FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190422 Introduction of TC7.6B.2.2 Inband blocking for intra-band non-contiguous EN-DC in FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190423 Introduction of TC 7.6B.2.3 Inband blocking for inter-band EN-DC within FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190424 Introduction of TC 7.6B.3.1 Out-of-band blocking for intra-band contiguous EN-DC in FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190425 Introduction of TC 7.6B.3.2 Out-of-band blocking for intra-band non-contiguous EN-DC in FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190426 Introduction of TC 7.6B.3.3 Out-of-band blocking for inter-band EN-DC within FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190427 Introduction of TC 7.6B.4.1 Narrow band blocking for intra-band contiguous EN-DC in FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190428 Addition of NR system information combination SIB6, SIB7 Huawei, HiSilicon,TF 160 CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
coversheet issues.
revised No R5‑190660  
R5‑190429 Introduction of TC 7.6B.4.2 Narrow band blocking for intra-band non-contiguous EN-DC in FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190430 Introduction of TC 7.6B.4.3 Narrow band blocking for inter-band EN-DC within FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190431 Introduction of TC 7.7B.1 Spurious response for intra-band contiguous EN-DC in FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190432 Introduction of TC 7.7B.2 Spurious response for intra-band non-contiguous EN-DC in FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190433 Introduction of TC 7.7B.3 Spurious response for inter-band EN-DC within FR1 (2 CCs) CAICT CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190434 Introduction of EAP AKA Motorola Mobility CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
late doc
r1 was presented on Thu.
The TF160 menager remarked thar also 4.8.3.3 note shall be deleted.
revised No R5‑190733  
R5‑190435 pCR for Addition of TC 6.5.1.3 NR SA FR1 RLM OOS in DRX Qualcomm CDMA Technologies pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190435r1.
 
  
Revised from: R5-190435.
Revised to: R5-190435r2.
 
  
Revised from: R5-190435r1.
Revised to: R5-190893.
 
 
 
revised No R5‑190893  
R5‑190436 pCR for Addition of TC 6.4.3.1 NR SA FR1 TAA Accuracy Qualcomm CDMA Technologies pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190436r1.
 
  
Revised from: R5-190436.
Revised to: R5-190436r2.
 
  
Revised from: R5-190436r1.
Revised to: R5-190894.
 
 
 
revised No R5‑190894  
R5‑190437 pCR for Modification of TC 4.4.3.1 EN-DC FR1 TAA accuracy Qualcomm CDMA Technologies pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190437r1.
 
  
Revised from: R5-190437.
Revised to: R5-190437r2.
 
  
Revised from: R5-190437r1.
Revised to: R5-190895.
 
 
 
revised No R5‑190895  
R5‑190438 pCR for Addition of TC 6.5.1.1 NR SA FR1 RLM OOS Qualcomm CDMA Technologies pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190438r1.
 
  
Revised from: R5-190438.
Revised to: R5-190438r2.
 
  
Revised from: R5-190438r1.
Revised to: R5-190896.
 
 
 
revised No R5‑190896  
R5‑190439 Update of FR1 6.2D.1 MOP for MIMO Huawei, HiSilicon CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
TP analysis 0440
remove the TT table as it is added in tdoc 276
Revised to: R5-190813.
revised No R5‑190813  
R5‑190440 Addition of TP analysis of FR1 6.2D.1 MOP for MIMO Huawei, HiSilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
deferred to check the core spec released version 15.4.0 matches the contents
matches core spec release
agreed No    
R5‑190441 Update of FR1 6.2D.2 MPR for MIMO Huawei, HiSilicon CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
  
TP analysis 0442
Revised to: R5-190441r1.
 
  
Revised from: R5-190441.
add editors note for the test to be used for R&D and alos check if draft spec matches core spec released version 15.4.0 , remove TT table as it is covered in tdoc 276
tp analysis in 442
Revised to: R5-190950.
 
 
 
revised No R5‑190950  
R5‑190442 Addition of TP analysis of FR1 6.2D.2 MPR for MIMO Huawei, HiSilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
deferred to check the core spec released version 15.4.0 matches the contents
matches core spec release
agreed No    
R5‑190443 Update of 6.2D.4 Configured Output Power for MIMO Huawei, HiSilicon CR Agreement
5.1.2.1Tx Requirements (Clause 6)
Yes
Yes
TP analysis 0444
Revised to: R5-190814.
same comments as 441r1
revised No R5‑190814  
R5‑190444 Addition of TP analysis of FR1 6.2D.4 Configured transmitted power for MIMO Huawei, HiSilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
deferred to check the core spec released version 15.4.0 matches the contents
matches core spec release
agreed No    
R5‑190445 Removal of ambiguity about LTE anchor agnostic NTT DOCOMO, INC. CR Agreement
5.1.4.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
content already covered in 0405
withdrawn Yes    
R5‑190446 On the power level to derive SNR for FR2 TRx tests Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
withdrawn Yes    
R5‑190447 Clean up of occupied bandwidth for EN-DC within FR1 Anritsu CR Agreement
5.1.4.1Tx Requirements (Clause 6)
Yes
Yes
  
check the test procedure for LTE needs to be updated since this is anchor agnostic. Also discuss TP analysis to confirm if anchor agnostic holds
Revised to: R5-190447r1.
 
  
Revised from: R5-190447.
Revised to: R5-190995.
 
 
 
revised No R5‑190995  
R5‑190448 Updating FR1 MU for timing measurements Anritsu pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
Discussion paper: 0058
approved No    
R5‑190449 RRM TT analysis.xls template for NR FR1 Anritsu discussion  
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
RAN5 is asked to endorse the methods proposed the attached analysis.xls, and to use it as a template for other test cases, adapting as appropriate
 
noted , way fwd is endorsed. Pseudo CR for test cases needs to be handled as a CR to TR38.903 in Feb meeting
noted No    
R5‑190450 Update PTRS-UplinkConfig NTT DOCOMO INC. CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
merged into new Keysight doc.
withdrawn Yes    
R5‑190451 Update of NR RRC TC 8.2.3.12.1 Intertek CR Agreement
6.1.3.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
revised No R5‑190694  
R5‑190452 MU for UL-MIMO Test Cases Anritsu CR Agreement
5.1.2.3Other Clauses (i.e. Clauses 1-5, Annexes)
No
Yes
late doc
already covered by 0276
withdrawn Yes    
R5‑190453 Update ReportConfigNR and TimeToTrigger NTT DOCOMO INC., Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
R5-190302 was merged into r1.
 
revised No R5‑190661  
R5‑190454 Introducing Wide band Intermodulation for intra-band contiguous EN-DC in FR1 Anritsu CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190455 Introducing Wide band Intermodulation for intra-band non-contiguous EN-DC in FR1 Anritsu CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190456 Introducing Spurious Emissions for intra-band contiguous EN-DC in FR1 Anritsu CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190457 Introducing Spurious Emissions for intra-band non-contiguous EN-DC in FR1 Anritsu CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190458 update to 2Rx TDD FR2 PDSCH mapping Type A performance test case Qualcomm CDMA Technologies pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
similar change to 0054
approved No    
R5‑190459 Addition of new TC 8.2.3.15 NTT DOCOMO INC. CR Agreement
6.1.3.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
agreed No    
R5‑190460 SNR estimation update for FR2 priority 1 and 2 TRx TCs Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
LATE DOCUMENT
 
FR2 MU Session:
KS and Anritsu discussed the need to compare the values but clarification was needed from KS.
KS: we have a different estimate for MOP min peak EIRP and don't see the need to relax the MOP requirement. The paper is missing TRP and Spherical Coverage requirement.
Anritsu: we are working on TRP. No plan to update Spherical Coverage for this meeting.
Orange: Spherical Coverage is important.
Huawei: what does relaxation mean here? maybe it is conflicting with the Anritsu paper in R5-190059.
KS: need to relax and use reasonable MU or the systematic error will be too large.
KS: need to consider with KS paper in 601 since the MOP conclusion is different.
 
0460r1 comment, but undo after meeting discussed.
FR2 MU Session:
KS: Trying to conclude on MOP. Need to align on assumptions.
Anritsu: SNR assumptions are very different.
KS: will draft a WF on simulation assumptions to address 460 and 601.
 
Revision to include TRP SNR esitmation updates, and revise the relaxation for prio1 tests
 
related discussion in 460r1 & 601 will be merged into a way fwd paper
 
noted No    
R5‑190461 2Rx TDD FR2 PDCCH performance test case Qualcomm CDMA Technologies pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
similar change to 0054
approved No    
R5‑190462 LTE link setup details for demod test cases Qualcomm CDMA Technologies pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
revised No R5‑190929  
R5‑190463 Consideration on FR2 MU for relative power measurements Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
No
Yes
late doc
withdrawn Yes    
R5‑190464 Annex for statistical tput calculation for demod test cases Qualcomm CDMA Technologies pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
revised No R5‑190930  
R5‑190465 Update RRC TC 8.2.2.1.1 - SRB3 Establishment, Reconfiguration and Release / NR addition, modification and release / EN-DC NTT DOCOMO INC. CR Agreement
6.1.3.4.2.2RRC Radio Bearer (clause 8.2.2)
Yes
Yes
agreed No    
R5‑190466 FR1 EN-DC MU updates Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
No
Yes
late doc
withdrawn Yes    
R5‑190467 Discussion paper on section 9 and 10 of demod spec Qualcomm CDMA Technologies discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
proposal to the WP structure
deferred for replaced proposal 1 with batter wording
Revised to: R5-190467r1.
 
  
Revised from: R5-190467.
Revised to: R5-190979.
 
 
 
revised No R5‑190979  
R5‑190468 FR1 EN-DC MU updates Anritsu CR Agreement
5.1.4.3Other Clauses (i.e. Clauses 1-5, Annexes)
No
Yes
late doc
withdrawn Yes    
R5‑190469 Updating impact from noise Anritsu CR Agreement
5.1.13TR 38.903 (NR MU & TT analyses)
Yes
Yes
late doc
Discussion paper: 0059
 
KS: we likely need to set the values. Plan is to merge everything in one CR. CRs related to capturing MU outcome; KS CR in 574, R&S CR in 570. KS CR in 576, and Anritsu CR in 342.
 
merged content into Keysight CR 0576
withdrawn Yes    
R5‑190470 MU for FR1 UL CA SA TRx Tests Anritsu discussion  
5.1.15Discussion Papers, Work Plan, TC lists
No
Yes
late doc
withdrawn Yes    
R5‑190471 Offset value for coarse TRP measurement for spurious measurement Anritsu CR Agreement
5.1.13TR 38.903 (NR MU & TT analyses)
No
Yes
late doc
 
withdrawn Yes    
R5‑190472 Offset value for coarse TRP measurement for spurious measurement Anritsu discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
No
Yes
late doc
withdrawn Yes    
R5‑190473 pCR for Addition of TC 4.5.1.1 EN-DC FR1 RLM OOS Qualcomm CDMA Technologies pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised from: R5-190473.
Revised to: R5-190473r2.
 
  
Revised from: R5-190473r1.
Revised to: R5-190897.
 
 
 
revised No R5‑190897  
R5‑190474 pCR for Addition of TC 4.5.1.3 EN-DC FR1 RLM OOS in DRX Qualcomm CDMA Technologies pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190474r1.
 
  
Revised from: R5-190474.
Revised to: R5-190474r2.
 
  
Revised from: R5-190474r1.
Revised to: R5-190898.
 
 
 
revised No R5‑190898  
R5‑190475 On the minimum requirements for RRM tests ROHDE & SCHWARZ discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
associated CR 0478 to proposal 1
 
proposals are endorsed, prop2 will be updated in the draft SPEC directly by R&S
noted No    
R5‑190476 Addition of band group power offsets ROHDE & SCHWARZ pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190477 Update of the annexes ROHDE & SCHWARZ pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190478 Changes to 4.7.1.x tests ROHDE & SCHWARZ pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190479 Addition of 4.7.2.x tests ROHDE & SCHWARZ pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190480 Addition of 4.7.4.x tests ROHDE & SCHWARZ pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190481 Changes to 6.7.1.x tests ROHDE & SCHWARZ pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190482 Addition of 6.7.2.x tests ROHDE & SCHWARZ pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190483 Addition of 6.7.4.x tests ROHDE & SCHWARZ pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190484 Status RRM dependencies for Feb 2019 ROHDE & SCHWARZ discussion Information
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
For information only
noted No    
R5‑190485 Addition of new 5GC TC 10.1.2.2 CATT, TDIA CR Agreement
6.1.3.65GS Session Management
Yes
Yes
withdrawn Yes    
R5‑190486 Addition of new 5GC TC 9.1.5.1.16 CATT, TDIA CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
r2 was presented on Thu.
Discussion about manual and autmatic PLMN mode with Motorola Mobility and CATT.
revised No R5‑190707  
R5‑190487 Addition of new 5GC TC 9.1.5.1.13 CATT, TDIA CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
withdrawn Yes    
R5‑190488 Addition of new 5GC TC 9.1.5.1.15 CATT, TDIA CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
withdrawn Yes    
R5‑190489 Addition of 5GC Test case 10.1.5.1 TDIA, CATT CR Agreement
6.1.3.65GS Session Management
Yes
Yes
r1 was presented on Thu.
revised No R5‑190711  
R5‑190490 Addition of new 5GC TC 9.1.2.1 TDIA, CATT CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
agreed No    
R5‑190491 Addition of new 5GC TC 9.1.5.2.2 CATT, TDIA CR Agreement
6.1.3.55GS Mobility Management
Yes
Yes
Add NAS rules.
revised No R5‑190708  
R5‑190492 Addition of 5GC test case 10.1.3.1 CATT, TDIA, CAICT CR Agreement
6.1.3.65GS Session Management
Yes
Yes
withdrawn Yes    
R5‑190493 Addition of general test procedures for establishing PDU session CATT, TDIA CR Agreement
6.1.1TS 38.508-1 (Clause 6)
Yes
Yes
r1 was presented on Tue??
revised No R5‑190668  
R5‑190494 Title correction to MAC TC 7.1.1.7.1.1 MediaTek Inc. CR Agreement
6.1.3.3.1.2MAC
Yes
Yes
r1 was presented on Wed.
revised No R5‑190678  
R5‑190495 Correction to the presence of VRB-to-PRB_Interleaver IE in PDSCH-Config Keysight Technologies UK Ltd, Qualcomm Incorporated CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
late doc
r1 was presented on Mon.
Merged into R5-190670.
revised No R5‑190662  
R5‑190496 Addition of Test applicabilities for 5GC TCs CATT CR Agreement
6.1.4TS 38.523-2
No
Yes
late doc
withdrawn Yes    
R5‑190497 Discussion on the WP for Multi-layer Testing CATT discussion Discussion
6.1.18Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No    
R5‑190498 AddItion of 7.4B.0 Huawei, Hisilicon CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
late doc
deferred to check the core spec released version 15.4.0 matches the contents
still needs more time but agree for now can be revisited in Feb
agreed No    
R5‑190499 Update of TC 7.4B.1 Huawei, Hisilicon CR Agreement
5.1.4.2Rx Requirements (Clause 7)
Yes
Yes
late doc
  
add editors note to indicate test config is FFS pending TP also check the core spec released version 15.40 matches the contents
Revised to: R5-190499r1.
 
  
Revised from: R5-190499.
Revised to: R5-190857.
 
 
 
revised No R5‑190857  
R5‑190500 Update of TC 7.4B.2 Huawei, Hisilicon CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190501 Update of TC 7.4B.3 Huawei, Hisilicon CR Agreement
5.1.4.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190502 Adding test case 7.4B.1 to 38.905 Huawei, Hisilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
No
Yes
late doc
withdrawn Yes    
R5‑190503 Adding test case 7.4B.2 to 38.905 Huawei, Hisilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
No
Yes
late doc
withdrawn Yes    
R5‑190504 Adding test case 7.4B.3 to 38.905 Huawei, Hisilicon CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
No
Yes
late doc
withdrawn Yes    
R5‑190505 Introduction of TC 6.4D.4 Huawei, Hisilicon CR Agreement
5.1.2.1Tx Requirements (Clause 6)
No
Yes
withdrawn Yes    
R5‑190506 Update of TC 7.4D Huawei, Hisilicon CR Agreement
5.1.2.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190507 Introduction of TC 7.5D Huawei, Hisilicon CR Agreement
5.1.2.2Rx Requirements (Clause 7)
No
Yes
withdrawn Yes    
R5‑190508 Introduction of TC 6.4D.4 Huawei, Hisilicon CR Agreement
5.1.2.1Tx Requirements (Clause 6)
No
Yes
late doc
withdrawn Yes    
R5‑190509 Update of TC 7.4D Huawei, Hisilicon CR Agreement
5.1.2.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190510 Introduction of TC 7.5D Huawei, Hisilicon CR Agreement
5.1.2.2Rx Requirements (Clause 7)
No
Yes
late doc
withdrawn Yes    
R5‑190511 Addition of new RRC TC 8.1.5.3.2 Intertek CR Agreement
6.1.3.4.1.5RRC Others (clause 8.1.5)
Yes
Yes
agreed No    
R5‑190512 Addition of EN-DC FR1 radio link monitoring out-of-sync test for PSCell configured with CSI-RS-based RLM RS in non-DRX mode test case 4.5.1.5 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190513 Addition of EN-DC FR1 radio link monitoring in-sync test for PSCell configured with CSI-RS-based RLM RS in non-DRX mode test case 4.5.1.6 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190514 Addition of EN-DC FR1 radio link monitoring out-of-sync test for PSCell configured with CSI-RS-based RLM RS in DRX mode test case 4.5.1.7 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190515 Addition of EN-DC FR1 radio link monitoring in-sync test for PSCell configured with CSI-RS-based RLM RS in DRX mode test case 4.5.1.8 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190516 Addition of EN-DC FR1 interruptions at transitions between active and non-active during DRX in synchronous EN-DC test case 4.5.2.1 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190517 Addition of EN-DC FR1 interruptions at transitions between active and non-active during DRX in asynchronous EN-DC test case 4.5.2.2 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190518 Addition of EN-DC FR1 interruptions during measurements on deactivated NR SCC in synchronous EN-DC test case 4.5.2.3 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190519 Addition of EN-DC FR1 interruptions during measurements on deactivated NR SCC in asynchronous EN-DC test case 4.5.2.4 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190520 Addition of EN-DC FR1 interruptions during measurements on deactivated E-UTRAN SCC in synchronous EN-DC test case 4.5.2.5 Huawei, HiSilicon pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
approved No    
R5‑190521 Update to EN-DC FR1 transmit timing accuracy test Qualcomm communications-France pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190521r1.
 
  
Revised from: R5-190521.
Revised to: R5-190899.
 
 
 
revised No R5‑190899  
R5‑190522 Editorial update in MeasObjectNR and ReportConfigNR NTT DOCOMO INC. CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190523 pCR for TC addition of FR1 TDD 4Rx PDSCH Qualcomm CDMA Technologies pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
  
Revised to: R5-190523r1.
 
  
Revised from: R5-190523.
r1: Modified the Section/Clause numbers to align with latest WP
Revised to: R5-190931.
 
 
 
revised No R5‑190931  
R5‑190524 Addition of EN-DC FR1 RLM IS non-DRX test with SSB-based RLM RS Qualcomm communications-France pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190524r1.
 
  
Revised from: R5-190524.
Revised to: R5-190900.
 
 
 
revised No R5‑190900  
R5‑190525 Addition of EN-DC FR1 RLM IS DRX test with SSB-based RLM RS Qualcomm communications-France pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190525r1.
 
  
Revised from: R5-190525.
Revised to: R5-190901.
 
 
 
revised No R5‑190901  
R5‑190526 TP analysis for 38.521-3 MPR intra-band contiguous Ericsson CR Agreement
5.1.14TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
late doc  
Revised to: R5-190526r1.
 
  
Revised from: R5-190526.
Revised to: R5-190830.
 
 
 
revised No R5‑190830  
R5‑190527 Addition of NR SA FR1 RLM IS non-DRX test with SSB-based RLM RS Qualcomm communications-France pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190527r1.
 
  
Revised from: R5-190527.
Revised to: R5-190902.
 
 
 
revised No R5‑190902  
R5‑190528 Addition of NR SA FR1 RLM IS DRX test with SSB-based RLM RS Qualcomm communications-France pCR Approval
5.1.7TS 38.533 (pCR)
Yes
Yes
  
Revised to: R5-190528r1.
 
  
Revised from: R5-190528.
Revised to: R5-190903.
 
 
 
revised No R5‑190903  
R5‑190529 Updates to maximum output power test cases Ericsson CR Agreement
5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
  
Revised to: R5-190529r1.
 
  
Revised from: R5-190529.
remove 200ms wait time as it is not needed in step 3 and also remove the text incuded in stpe3 with 200ms. Update step5 aligned to tdoc 117
Revised to: R5-190961.
 
 
 
revised No R5‑190961  
R5‑190530 Discussion on architecture option agnostic nature of RF, RRM, Demodulation Performance tests. Qualcomm communications-France discussion Agreement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
associated CR 0405, 0539, 0546, 0548, 0550
Revised to: R5-190530r1.
 
  
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Revised from: R5-190530.
to remove 38.533 from the discussion of option4 as RRM tests have an impact. For option5 test case shall refer to LTE not NR.
Revised to: R5-190530r2.
 
  
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Revised from: R5-190530r1.
Revised to: R5-190530r3.
 
  
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Revised from: R5-190530r2.
have more offline to remove applicability sequence
Revised to: R5-190530r4.
 
  
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Revised from: R5-190530r3.
Revised to: R5-190983.
 
 
 
revised No R5‑190983  
R5‑190531 pCR for modification of FDD 2Rx FR1 PDSCH Demod Qualcomm CDMA Technologies pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
  
Revised to: R5-190531r1.
 
  
Revised from: R5-190531.
r1: Modified section numbers to align with latest WP
Revised to: R5-190932.
 
 
 
revised No R5‑190932  
R5‑190532 Discussion on MU and TT evolution Ericsson, Orange, DISH Network discussion Endorsement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
  
Revised to: R5-190532r1.
 
  
Revised from: R5-190532.
 
FR2 MU Session:
VZ: exactly same concern. Strongly don't want TE vendor to use worst case requirement.
KS: can't accept these proposals. No precendene and significant technical and commercial risk. The 38.521-2 test spec does not have the F.2 allowance.
Orange: cannot understand why MU can't be changed.
R&S: only TT was open for revision.
DISH: from a practical view, we can understand why we can see MU improving. Would appreciate more flexibility from TE vendors. Certification bodies may not be able to use these values moving forward. As MU grows, it lowers the value of certification.
PCTEST: will defer for additional offline discussion.
 
needs online time for agreement with RAn5 group on the MU evolution
 
Revised to: R5-190532r2.
 
  
Revised from: R5-190532r1.
Revised to: R5-191004.
 
 
 
revised No R5‑191004  
R5‑190533 Annex for DL and UL Signal Setup Qualcomm CDMA Technologies pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
  
Revised to: R5-190533r1.
 
  
Revised from: R5-190533
r1: reformatted the subsections for FR1 and FR2; Removed some of the not applicable wordings for FR1 and FR2
Revised to: R5-190933.
 
 
 
revised No R5‑190933  
R5‑190534 Update MobilityFromNRCommand Ericsson CR Agreement
4.1TS 38.508-1 (Common Clauses)
Yes
Yes
agreed No    
R5‑190535 Formatting updates and index correction in TS 38.521-3 Qualcomm communications-France CR Agreement
5.1.4.3Other Clauses (i.e. Clauses 1-5, Annexes)
Yes
Yes
Revised to: R5-190535r1.
r1: corrects some style errors missed earlier
Revised to: R5-190858.
 
 
 
revised No R5‑190858  
R5‑190536 Discussion on grouping of EN-DC tests with multiple NR carriers Qualcomm communications-France discussion Agreement
5.1.15Discussion Papers, Work Plan, TC lists
Yes
Yes
proposals are endorsed and implemented in updated WP
noted No    
R5‑190537 Update groupHoppingEnabledTransformPrecoding in TS 38.508-1 Keysight Technologies UK Ltd CR Agreement
4.1TS 38.508-1 (Common Clauses)
No
Yes
late doc
withdrawn Yes    
R5‑190538 pCR for modification of FDD FR1 PDCCH Demod Qualcomm CDMA Technologies pCR Approval
5.1.5TS 38.521-4 (pCR)
Yes
Yes
  
Revised to: R5-190538r1.
 
  
Revised from: R5-190538.
Revised to: R5-190934.
 
 
 
revised No R5‑190934  
R5‑190539