Tdoc List
2019-01-25 18:20
Agenda | Topic | TDoc | Title | Source | Type | For | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Opening of the meeting | R5‑190000 | RAN5#4-5G-NR Adhoc Agenda | RAN5 Chair | agenda | Information | Yes |
Yes
The RAN5 Chair opened the RAN5#4 5G NR Adhoc meeting in Singapore and welcomed all delegates thanking Rohde&Schwarz for hosting.
The Rohde&Schwarz Test & Measurement Director welcomed all delegates to the venue and explained the meeting facilities.
The RAN5 Chair then reminded the delegates about the ETSI IPR policy:
- The attention of the members of this Technical Specification Group is drawn to the fact that 3GPP Individual Members have the obligation under the IPR Policies of their respective Organizational Partners to inform their respective Organizational Partners of Essential IPRs they become aware of.
The members take note that they are hereby invited:
- to investigate in their company whether their company does own IPRs which are, or are likely to become Essential in respect of the work of the Technical Specification Group.
- to notify the Director-General, or the Chairman of their respective Organisational Partners, of all potential IPRs that their company may own, by means of the IPR Statement and the Licensing declaration forms (e.g. See the ETSI IPR forms http://webapp.etsi.org/Ipr/).
The RAN5 chair also explained:
“I also draw your attention to the fact that 3GPP activities are subject to antitrust and competition laws and that compliance with said laws is therefore required of any participant of this TSG/WG meeting including the Chairman and Vice Chairman. In case of question I recommend that you contact your legal counsel.
The present meeting will be conducted with strict impartiality and in the interests of 3GPP.
Furthermore, I would like to remind you that timely submission of work items in advance of TSG/WG meetings is important to allow for full and fair consideration of such matters.”
Then new delegates introduced themselves.
Then the RAN5 Chair presented the agenda. | noted | No | ||
R5‑190374 | RAN5#4-5G-NR Adhoc Session Programme | RAN5 Chair | agenda | Information | Yes |
Yes
| noted | No | ||||
2 | Reports |   | ||||||||||
2.1 | Live Reports | R5‑190001 | Latest RAN Plenary notes – Chair (5GS Related) | RAN5 Chair | report | Information | Yes |
Yes
| noted | No | ||
R5‑190002 | Latest RAN Plenary draft Report (5GS related) | RAN5 Chair | report | Information | Yes |
Yes
| noted | No | ||||
3 | Incoming Liaison Statements | R5‑190003 | LS to RAN5 on uncertainties for OTA signalling test setup | TSG WG RAN4 | LS in | Information | Yes |
Yes
| noted | No | ||
R5‑190004 | Reply LS on simultaneous LTE and NR transmissions in EN-DC | TSG WG RAN4 | LS in | Information | Yes |
Yes
moved to RF | noted | No | ||||
R5‑190005 | LS on NR ATF to include per branch relative phase UE measurement | TSG WG RAN4 | LS in | Action | Yes |
Yes
moved to RF | noted | No | ||||
R5‑190006 | LS on Definition of test methods for Over-The-Air unwanted emissions of IMT radio equipment | TSG WG RAN4 | LS in | Information | Yes |
Yes
| noted | No | ||||
R5‑190007 | LS on Measurement Grids | TSG WG RAN4 | LS in | Information | Yes |
Yes
moved to RF
tdoc 0574 uses the way fwd from RAN4 for MU calculations | noted | No | ||||
R5‑190008 | LS on the beam correspondence requirement and multi-band applicability framework for FR2 power class 3 UEs | TSG WG RAN4 | LS in | Action | Yes |
Yes
moved to RF
RP-182879 suggests differnet proposal for beam correspondence and EIRP spherical coverage and is not algined with way fwd in this document , also question to RAN5 about optimizing test time for testing beam correspondence needs to be revisited depending on the above understanding (KEYS and APPLE) | noted | No | ||||
R5‑190009 | LS on the temperature conditions for testing some FR2 requirements | TSG WG RAN4 | LS in | Information | Yes |
Yes
moved to RF
606 and 607 has related changes for MOP and EIS | noted | No | ||||
R5‑190010 | LS on conclusion of “Study on evaluation for 2 RX exception in Rel-15 vehicle mounted UE for NR” | TSG WG RAN4 | LS in | Information | Yes |
Yes
| noted | No | ||||
R5‑190011 | LS on Definition of test methods for Over-The-Air unwanted emissions of IMT radio equipment | TSG RAN | LS in | Information | Yes |
Yes
| noted | No | ||||
R5‑190012 | LS on exception of 2Rx vehicle mounted UEs | TSG RAN | LS in | Information | Yes |
Yes
| noted | No | ||||
R5‑190013 | LS on FR1 range | TSG RAN | LS in | Information | Yes |
Yes
moved to RF | noted | No | ||||
R5‑190376 | Reply LS on RAN4-RAN5 5G-NR RF pending issues | ETSI | LS in | Information | Yes |
Yes
moved to RF
265 is a disucssion paper to address the pending RAN4 issues | noted | No | ||||
R5‑190616 | LS on finalisation of “2 Rx exception for RX vehicle mounted UE” Study | TSG RAN | LS in | Information | Yes |
Yes
RAN4 needed to identify the type of UE. | noted | No | ||||
4 | RAN5 General Issues |   | ||||||||||
4.1 | TS 38.508-1 (Common Clauses) | R5‑190014 | Updates and additions of default QoS configurations | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190713 | |
R5‑190713 | Updates and additions of default QoS configurations | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190014 | |||
R5‑190015 | Updates to Authentication 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190714 | |||
R5‑190714 | Updates to Authentication 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190015 | |||
R5‑190016 | Updates to Configuration Update 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190017 | Updates to De-registration 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190018 | Updates to NAS transport 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190019 | Updates to PDU session establishment 5GSM messages | Ericsson | CR | Agreement | Yes |
Yes
r2 was presented on Thu. | revised | No | R5‑190715 | |||
R5‑190715 | Updates to PDU session establishment 5GSM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190019 | |||
R5‑190020 | Updates to PDU session modification 5GSM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190021 | Updates to PDU session release 5GSM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190022 | Updates to Registration 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Thu.
Editor's note can be removed. | revised | No | R5‑190716 | |||
R5‑190716 | Updates to Registration 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190022 | |||
R5‑190023 | Updates to Security Mode 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190717 | |||
R5‑190717 | Updates to Security Mode 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190023 | |||
R5‑190024 | Updates to Security Protected 5GS NAS message | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190025 | Updates to Service Request 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190048 | Update IE PDCCH-ConfigCommon | Ericsson, MCC TF160, Keysight Technologies | CR | Agreement | Yes |
Yes
TF160 CR R5-190604 merged into.
r3 was presented on Thu. | revised | No | R5‑190718 | |||
R5‑190718 | Update IE PDCCH-ConfigCommon | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190048 | |||
R5‑190060 | Correction to DRB identity Configuration | Huawei, HiSilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190061 | Correction to SearchSpace Configuration | Huawei, HiSilicon, TF160 | CR | Agreement | Yes |
Yes
merged. | withdrawn | Yes | ||||
R5‑190062 | Correction to schedulingRequestID Configuration | Huawei, HiSilicon, MCC TF160 | CR | Agreement | Yes |
Yes
r2 was presented on Thu. | revised | No | R5‑190719 | |||
R5‑190719 | Correction to schedulingRequestID Configuration | Huawei, HiSilicon, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190062 | |||
R5‑190131 | Update chapter 4.5 General for PDUs | Ericsson | CR | Agreement | Yes |
Yes
Rohde&Schwarz remarked that IMS signalling may not be supported; problm with the security certificates. So better not perform PDU session establishment. In LTE it was not done.
Deferred.
r2 was presented on Thu.
Considered as a possible solution of handling PDU Session Est. Req. Needs further review and refinement before agreeing RAN5#82. | revised | No | R5‑190734 | |||
R5‑190734 | Update chapter 4.5 General for PDUs | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑190131 | |||
R5‑190132 | Update IE RadioBearerConfig | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190133 | Update IE SDAP-Config | Ericsson | CR | Agreement | Yes |
Yes
Qualcomm's R5-190178 merged into here.
r1 was presented on Thu. | revised | No | R5‑190720 | |||
R5‑190720 | Update IE SDAP-Config | Ericsson, Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190133 | |||
R5‑190137 | Update to Test procedure to check that UE is in state 5GC RRC_IDLE on a certain cell | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190143 | Update to Test procedure to check that UE is camped on a new cell belonging to a new TA | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190178 | Update SDAP Config | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Mon.
merged into R5-190123. | revised | No | R5‑190623 | |||
R5‑190623 | Update SDAP Config | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑190178 | |||
R5‑190190 | Update SDAP Config | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190199 | Updating IEs part of SearchSpace | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190782 | |||
R5‑190200 | Updating P-Max IE | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
Samsung and the TF160 manager recommended to reference the condition.
r1 was presented on Fri. | revised | No | R5‑190784 | |||
R5‑190784 | Updating P-Max IE | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190200 | |||
R5‑190206 | Correction of default configuration of RRC IEs in 38.508-1 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190624 | |||
R5‑190624 | Correction of default configuration of RRC IEs in 38.508-1 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190206 | |||
R5‑190221 | Update of Annex C on calculation of test frequencies | Ericsson | CR | Agreement | No |
Yes
late doc
| withdrawn | Yes | ||||
R5‑190222 | Introduction of test frequencies for NR band n50 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190625 | |||
R5‑190625 | Introduction of test frequencies for NR band n50 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190222 | |||
R5‑190223 | Introduction of test frequencies for NR band n74 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190626 | |||
R5‑190626 | Introduction of test frequencies for NR band n74 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190223 | |||
R5‑190224 | Correction of test frequencies for NR band n1 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon.
New columns can be accepted and table pasted as a whole. | revised | No | R5‑190627 | |||
R5‑190627 | Correction of test frequencies for NR band n1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190224 | |||
R5‑190225 | Correction of test frequencies for NR band n2 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190628 | |||
R5‑190628 | Correction of test frequencies for NR band n2 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190225 | |||
R5‑190226 | Correction of test frequencies for NR band n3 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190629 | |||
R5‑190629 | Correction of test frequencies for NR band n3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190226 | |||
R5‑190227 | Correction of test frequencies for NR band n5 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190630 | |||
R5‑190630 | Correction of test frequencies for NR band n5 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190227 | |||
R5‑190228 | Correction of test frequencies for NR band n7 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190631 | |||
R5‑190631 | Correction of test frequencies for NR band n7 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190228 | |||
R5‑190229 | Correction of test frequencies for NR band n8 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190632 | |||
R5‑190632 | Correction of test frequencies for NR band n8 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190229 | |||
R5‑190230 | Correction of test frequencies for NR band n12 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190633 | |||
R5‑190633 | Correction of test frequencies for NR band n12 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190230 | |||
R5‑190231 | Correction of test frequencies for NR band n20 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190634 | |||
R5‑190634 | Correction of test frequencies for NR band n20 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190231 | |||
R5‑190232 | Correction of test frequencies for NR band n25 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190635 | |||
R5‑190635 | Correction of test frequencies for NR band n25 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190232 | |||
R5‑190233 | Correction of test frequencies for NR band n28 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190636 | |||
R5‑190636 | Correction of test frequencies for NR band n28 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190233 | |||
R5‑190234 | Correction of test frequencies for NR band n34 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190637 | |||
R5‑190637 | Correction of test frequencies for NR band n34 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190234 | |||
R5‑190235 | Correction of test frequencies for NR band n38 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190638 | |||
R5‑190638 | Correction of test frequencies for NR band n38 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190235 | |||
R5‑190236 | Correction of test frequencies for NR band n39 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190639 | |||
R5‑190639 | Correction of test frequencies for NR band n39 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190236 | |||
R5‑190237 | Correction of test frequencies for NR band n40 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190640 | |||
R5‑190640 | Correction of test frequencies for NR band n40 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190237 | |||
R5‑190238 | Correction of test frequencies for NR band n41 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190641 | |||
R5‑190641 | Correction of test frequencies for NR band n41 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190238 | |||
R5‑190239 | Correction of test frequencies for NR band n51 | Ericsson | CR | Agreement | Yes |
Yes
r2 was presented on Mon. | revised | No | R5‑190642 | |||
R5‑190642 | Correction of test frequencies for NR band n51 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190239 | |||
R5‑190240 | Correction of test frequencies for NR band n66 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190643 | |||
R5‑190643 | Correction of test frequencies for NR band n66 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190240 | |||
R5‑190241 | Correction of test frequencies for NR band n70 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190644 | |||
R5‑190644 | Correction of test frequencies for NR band n70 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190241 | |||
R5‑190242 | Correction of test frequencies for NR band n71 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190645 | |||
R5‑190645 | Correction of test frequencies for NR band n71 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190242 | |||
R5‑190243 | Correction of test frequencies for NR band n75 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190646 | |||
R5‑190646 | Correction of test frequencies for NR band n75 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190243 | |||
R5‑190244 | Correction of test frequencies for NR band n76 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190647 | |||
R5‑190647 | Correction of test frequencies for NR band n76 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190244 | |||
R5‑190245 | Correction of test frequencies for NR band n77 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190648 | |||
R5‑190648 | Correction of test frequencies for NR band n77 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190245 | |||
R5‑190246 | Correction of test frequencies for NR band n78 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190649 | |||
R5‑190649 | Correction of test frequencies for NR band n78 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190246 | |||
R5‑190247 | Correction of test frequencies for NR band n79 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190650 | |||
R5‑190650 | Correction of test frequencies for NR band n79 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190247 | |||
R5‑190248 | Correction of test frequencies for NR band n257 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190651 | |||
R5‑190651 | Correction of test frequencies for NR band n257 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190248 | |||
R5‑190249 | Correction of test frequencies for NR band n258 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190652 | |||
R5‑190652 | Correction of test frequencies for NR band n258 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190249 | |||
R5‑190250 | Correction of test frequencies for NR band n260 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190653 | |||
R5‑190653 | Correction of test frequencies for NR band n260 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190250 | |||
R5‑190251 | Correction of test frequencies for NR band n261 | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190654 | |||
R5‑190654 | Correction of test frequencies for NR band n261 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190251 | |||
R5‑190253 | Correction of DCI format 1_0 | Ericsson | CR | Agreement | Yes |
Yes
revised to remove the square brackets. | revised | No | R5‑190655 | |||
R5‑190655 | Correction of DCI format 1_0 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190253 | |||
R5‑190261 | Update IE CellGroupId | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190263 | Updates to Annex B to add Permitted OTA Test Methods | PCTEST Engineering Lab | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190267 | Update IE BWP-Id | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190268 | Add IE RejectWaitTime | Ericsson | CR | Agreement | Yes |
Yes
discussion about cleaning up the table numbers and putting tables into the right sequence. | agreed | No | ||||
R5‑190269 | Update IE ShortMAC-I | Ericsson | CR | Agreement | Yes |
Yes
discussion about the value to be kept.
Deferred.
r1 was presented on Thu. | revised | No | R5‑190722 | |||
R5‑190722 | Update IE ShortMAC-I | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190269 | |||
R5‑190270 | Update IE UE-TimersAndConstants | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190271 | Update IE PUCCH-ConfigCommon | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190290 | Correction to temperature and voltage of Common test environments | Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190302 | Update IE ReportConfigNR | Ericsson | CR | Agreement | Yes |
Yes
merged into R5-190453. | withdrawn | Yes | ||||
R5‑190303 | Update CounterCheckResponse | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190316 | Correction to MCS Table for PUSCH | Anritsu | CR | Agreement | Yes |
Yes
is RF? Merged into xx. | withdrawn | Yes | ||||
R5‑190317 | Correction to time domain PUSCH allocation parameters | Anritsu | CR | Agreement | Yes |
Yes
conflict with R5-190359. | withdrawn | Yes | ||||
R5‑190354 | Correction to SystemInformation | MCC TF160 | CR | Agreement | Yes |
Yes
move the value/remark up 1 cell | revised | No | R5‑190657 | |||
R5‑190657 | Correction to SystemInformation | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190354 | |||
R5‑190355 | Correction to PUCCH-Config | MCC TF160 | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190658 | |||
R5‑190658 | Correction to PUCCH-Config | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190355 | |||
R5‑190356 | Correction to RadioBearerConfig | MCC TF160 | CR | Agreement | Yes |
Yes
Deferred. Discussion with Ericsson. | agreed | No | ||||
R5‑190357 | Corrections to IEs related to transform precoding | MCC TF160 | CR | Agreement | Yes |
Yes
Conflicting with R5-190608. | withdrawn | Yes | ||||
R5‑190358 | Correction to SIB3 and SIB4 | MCC TF160 | CR | Agreement | Yes |
Yes
| revised | No | R5‑190659 | |||
R5‑190659 | Correction to SIB3 and SIB4 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190358 | |||
R5‑190359 | Correction of PUSCH-TimeDomainResourceAllocationList | MCC TF160, Ericsson, Anritsu | CR | Agreement | Yes |
Yes
late doc
The TF160 manager recommended for this meeting to align with the Dec. 18 core specs.
Only 1 CR should deal with 1 table at a time, not multiple tables.
r1 was presented on Thu. | revised | No | R5‑190723 | |||
R5‑190360 | Correction of CellGroupConfig tables and logical channel identities | MCC TF160, Huawei, HiSilicon, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190361 | Corrections and clarifications regarding DCI formats 0_1 and 1_1 | MCC TF160 | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190724 | |||
R5‑190362 | Correction of SchedulingRequestResourceConfig | MCC TF160 | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190377 | Add FailureInformation | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190378 | Update LocationMeasurementIndication | Ericsson | CR | Agreement | Yes |
Yes
is .docx ! | agreed | No | ||||
R5‑190379 | Update MeasurementReport | Ericsson | CR | Agreement | Yes |
Yes
is .docx ! | agreed | No | ||||
R5‑190393 | Updates to section 4.8.3 (test USIM parameters) | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
R5‑190428 | Addition of NR system information combination SIB6, SIB7 | Huawei, HiSilicon,TF 160 | CR | Agreement | Yes |
Yes
coversheet issues. | revised | No | R5‑190660 | |||
R5‑190660 | Addition of NR system information combination SIB6, SIB7 | Huawei, HiSilicon,TF 160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190428 | |||
R5‑190450 | Update PTRS-UplinkConfig | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
merged into new Keysight doc. | withdrawn | Yes | ||||
R5‑190453 | Update ReportConfigNR and TimeToTrigger | NTT DOCOMO INC., Ericsson | CR | Agreement | Yes |
Yes
R5-190302 was merged into r1.
| revised | No | R5‑190661 | |||
R5‑190661 | Update ReportConfigNR and TimeToTrigger | NTT DOCOMO INC., Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190453 | |||
R5‑190495 | Correction to the presence of VRB-to-PRB_Interleaver IE in PDSCH-Config | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Mon.
Merged into R5-190670. | revised | No | R5‑190662 | |||
R5‑190662 | Correction to the presence of VRB-to-PRB_Interleaver IE in PDSCH-Config | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑190495 | |||
R5‑190522 | Editorial update in MeasObjectNR and ReportConfigNR | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190534 | Update MobilityFromNRCommand | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190537 | Update groupHoppingEnabledTransformPrecoding in TS 38.508-1 | Keysight Technologies UK Ltd | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190540 | Update searchSpaceSIB1 in TS 38.508-1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
overlapping with R5-190048. Following Ericsson. | withdrawn | Yes | ||||
R5‑190547 | Update Paging | Ericsson | CR | Agreement | Yes |
Yes
r2 was produced. | revised | No | R5‑190725 | |||
R5‑190725 | Update Paging | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190547 | |||
R5‑190549 | Update AS security Algorithm for RF testing | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190556 | Update RRCSetupComplete | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190573 | Update SecurityModeComplete | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190575 | Update SecurityModeFailure | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190577 | Update IE RRCRelease | Intertek | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190578 | Update UEAssistanceInformation | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190579 | Update UECapabilityInformation | Ericsson | CR | Agreement | Yes |
Yes
is .docx | agreed | No | ||||
R5‑190580 | Update ULInformationTransfer | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190604 | Correction of pagingSearchSpace in PDCCH-ConfigCommon | MCC TF160 | CR | Agreement | Yes |
Yes
merged into R5-190048. | withdrawn | Yes | ||||
R5‑190608 | Correction to UL waveform condition to make it configurable | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc
The TF160 manager preferred not to introduce a new pixit.
Discussion with Ericsson about the defaults.
The RF Vice Chair commented that this has impact on RF. | withdrawn | Yes | ||||
R5‑190611 | Corrections to UE capability checking for EN-DC | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc
moved to SIG.
r1 was presentted on Mon.
The TF160 manager commented that even if elements are not chacked, it may fail conformant UEs because it has to include everything until the end of the tree. | revised | No | R5‑190663 | |||
R5‑190663 | Corrections to UE capability checking for EN-DC | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑190611 | |||
R5‑190612 | Correction to Searchspace configuration in Table 4.6.3-123 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
late doc
TF160 needed more time to review.
moved to SIG. | withdrawn | Yes | ||||
R5‑190622 | Additions and updates to UE capability Information Elements | Ericsson, Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Fri. | revised | No | R5‑190783 | |||
R5‑190783 | Additions and updates to UE capability Information Elements | Ericsson, Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190622 | |||
R5‑190695 | Update IE QuantityConfig and CSI-ReportConfig | Ericsson | CR | discussion | Yes |
Yeslate doc
| agreed | No | ||||
R5‑190712 | Correction to UL configuration | Keysight Technologies UK Ltd, Qualcomm Incorporated, MCC TF160, Anritsu, NTT DOCOMO, INC. | CR | discussion | Yes |
Yes
late doc
agreed in SIG. | revised | No | R5‑190791 | |||
4.2 | TS 38.508-2 | R5‑190093 | CR of 5G NR Capabilities | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190726 | |
R5‑190726 | CR of 5G NR Capabilities | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
merged into R5-190728. | withdrawn | Yes | R5‑190093 | |||
R5‑190112 | Add UE capability IMS | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Thu.
EN-DC was included later in 5GS. | revised | No | R5‑190727 | |||
R5‑190727 | Add UE capability IMS | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190112 | |||
R5‑190129 | Add UE capability PDU | Ericsson | CR | Agreement | Yes |
Yes
discussion on the pics with MototrolaMobility, CATT, Qualcomm. Is not implementable. Alternative solution has to be found.
Deferred. | withdrawn | Yes | ||||
R5‑190266 | PICS update | Motorola Mobility, CMCC, Keysight, Qualcomm | CR | Agreement | Yes |
Yes
r1 was presented on Thu.
Overlapping with Huawei's CR. | revised | No | R5‑190728 | |||
R5‑190728 | PICS update | Motorola Mobility, CMCC, Keysight, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190266 | |||
4.3 | TS 38.509 | R5‑190571 | Resolving FFS's | MCC TF160 | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190664 | |
R5‑190664 | Resolving FFS's | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190571 | |||
4.4 | TS 36.508 (Common Clauses) | R5‑190201 | Updating p-MaxEUTRA-r15 IE part of RRCConnectionReconfiguration | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
wrong spec on cover. | revised | No | R5‑190721 | |
R5‑190721 | Updating p-MaxEUTRA-r15 IE part of RRCConnectionReconfiguration | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190201 | |||
R5‑190260 | Update RRCConnectionReconfiguration message with table references | Ericsson | CR | Agreement | Yes |
Yes
wrong spec on cover.
r2 was presented on Thu. | revised | No | R5‑190665 | |||
R5‑190665 | Update RRCConnectionReconfiguration message with table references | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190260 | |||
4.5 | TS 36.509 |   | ||||||||||
4.6 | General Discussion Papers | R5‑190135 | Discussion on defining a New WI for Rel-16 NR CA/DC band combinations | CMCC, China Telecom, China Unicom, AT&T, T-Mobile USA, Sprint, Verizon, NTT DOCOMO, Orange, Dish, CAICT, Huawei, Hisilicon, MediaTek, Spreadtrum, Keysight, Anritsu, R&S, CATT, StarPoint, ZTE, vivo, SRTC, Tejet, Lenovo | discussion | Endorsement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190618 | |
R5‑190618 | Discussion on defining a New WI for Rel-16 NR CA/DC band combinations | CMCC, China Telecom, China Unicom, AT&T, T-Mobile USA, Sprint, Verizon, NTT DOCOMO, Orange, Dish, CAICT, Huawei, Hisilicon, MediaTek, Spreadtrum, Keysight, Anritsu, R&S, CATT, StarPoint, ZTE, vivo, SRTC, Tejet, Lenovo | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑190135 | |||
R5‑190220 | 5GS RF 38.101-x workplans vs NR band and CA/DC configuration workplan | Ericsson | discussion | Information | Yes |
Yes
| noted | No | ||||
R5‑190617 | Way Forward for Rel-16 NR CA/DC Band Combinations WI | CMCC | discussion | discussion | Yes |
Yes
a draft was presented on Mon.
Dish commented that RAN4 will probably not be ready.
The RAN5 Vice Chair commented about the RAN4 timings.
Ericsson reported that for many Rel-16 band combinations there is not rapporteur yet.
The way forward was endorsed. | endorsed | No | ||||
4.7 | Others | R5‑190142 | Update of PRD13 | Samsung | other | Approval | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑190619 | |
R5‑190619 | Update of PRD13 | Samsung | other | Approval | Yes |
Yes
| approved | No | R5‑190142 | |||
R5‑190363 | RAN5 PRD12 version 6 | MCC TF160 | other | Approval | Yes |
Yes
| revised | No | R5‑190789 | |||
R5‑190789 | RAN5 PRD12 version 6 | MCC TF160 | other | Approval | Yes |
Yes
| approved | No | R5‑190363 | |||
5 | RF Functional Area |   | ||||||||||
5.1 | 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest |   | ||||||||||
5.1.1 | TS 38.508-1 (Clauses 5 & 7) | R5‑190209 | Additional of connection diagrams for event triggered test cases | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
moved to joint.->RF
Agenda Allocation was changed: [4.1]->[5.1.1].
Revised to: R5-190209r1.
r1: Change the title
Revised to: R5-190209r2.
r2: Add the front and rear Figures
Revised to: R5-190209r3.
r3: Change the zip file
connection diagram is no need as there are TE connections with AWGN already present. This document is not needed
Revised to: R5-190873.
| revised | No | R5‑190873 | |
R5‑190873 | Additional of connection diagrams for event triggered test cases | Huawei, HiSilicon | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑190209 | |||
R5‑190800 | Correction of test frequencies for EN-DC configuration DC_(n)41 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑190836 | |||
R5‑190836 | Correction of test frequencies for EN-DC configuration DC_(n)41 | Ericsson | CR | Agreement | Yes |
Yes
LATE DOCUMENT
Revised from: R5-190800.
make the changes to BW instead of number of RB's | agreed | No | R5‑190800 | |||
R5‑190801 | Correction of test frequencies for EN-DC configuration DC_(n)71 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑190837 | |||
R5‑190837 | Correction of test frequencies for EN-DC configuration DC_(n)71 | Ericsson | CR | Agreement | Yes |
Yes
LATE DOCUMENT
Revised from: R5-190801.
make the changes to BW instead of number of RB's | agreed | No | R5‑190801 | |||
5.1.2 | TS 38.521-1 |   | ||||||||||
5.1.2.1 | Tx Requirements (Clause 6) | R5‑190128 | Update of test case 6.5.2.4.2, UTRA ACLR in 38.521-1 | Ericsson | CR | Agreement | Yes |
Yes
to check if the contents match to the official release core spec v15.4.0
Revised to: R5-190128r1.
Revised from: R5-190128.
revised to update the TT for the whole freq range
Revised to: R5-190948.
| revised | No | R5‑190948 | |
R5‑190948 | Update of test case 6.5.2.4.2, UTRA ACLR in 38.521-1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190128 | |||
R5‑190130 | Update of test case 6.3.4.3, Power Control Relative power tolerance in 38.521-1 | Ericsson | CR | Agreement | Yes |
Yes
Revised to: R5-190130r1.
Revised from: R5-190130.
check for contents to match released core spec , and remove [] in TT , check the test procedure for slots to be referred instead of frames
r1: Removed draft_38101-1 v15.4.0 as reference; Editor’s note updated
Square brackets for TT removed; Changed from sub-frame to slot in the scheduling pictures and in the test procedure; Removed frame# in FDD pictures to make them numerology independent
Revised to: R5-190949.
| revised | No | R5‑190949 | |||
R5‑190949 | Update of test case 6.3.4.3, Power Control Relative power tolerance in 38.521-1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190130 | |||
R5‑190144 | Correction to TC 6.4A.2.1.1 Error Vector Magnitude for CA (2UL CA) | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
| revised | No | R5‑190807 | |||
R5‑190807 | Correction to TC 6.4A.2.1.1 Error Vector Magnitude for CA (2UL CA) | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised from: R5-190144.
add TT table separate and add editors note for Interband FFS and MU update in ANNEX F is FFS | agreed | No | R5‑190144 | |||
R5‑190145 | Correction to TC 6.4A.2.2 Carrier leakage for CA | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
| revised | No | R5‑190808 | |||
R5‑190808 | Correction to TC 6.4A.2.2 Carrier leakage for CA | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised from: R5-190145.
add TT table separate and add editors note for Interband FFS and MU update in ANNEX F is FFS | agreed | No | R5‑190145 | |||
R5‑190203 | Update to FR1 test case 6.5.4 Transmit intermodulation | KTL | CR | Agreement | Yes |
Yes
| revised | No | R5‑190809 | |||
R5‑190809 | Update to FR1 test case 6.5.4 Transmit intermodulation | KTL | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190203 | |||
R5‑190272 | Update of FR1 6.2.4 Configured transmitted power | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
TP analysis 0274
deferred to check the core spec released version 15.4.0 matches the contents
Confirmed | agreed | No | ||||
R5‑190307 | FR1 Text update for 6.5.3.1 General spurious emission | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190307r1.
Revised from: R5-190307.
r1: Coversheet release version changed to Rel-15
TP analysis 0306
Revised to: R5-190810.
| revised | No | R5‑190810 | |||
R5‑190810 | FR1 Text update for 6.5.3.1 General spurious emission | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190307 | |||
R5‑190334 | FR1 Text update for 6.5.3.2 Spurious emission for UE co-existence | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190334r1.
Revised from: R5-190334.
r1: Coversheet release version changed to Rel-15
Revised to: R5-190812.
| revised | No | R5‑190812 | |||
R5‑190812 | FR1 Text update for 6.5.3.2 Spurious emission for UE co-existence | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised from: R5-190334r1.
update Lowest supported SCS to Lowest. Defintion of lowest is in general section 6.1 | agreed | No | R5‑190334 | |||
R5‑190400 | Correction of FR1 6.2.2 Maximum Power Reduction (MPR) | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190401 | Correction of FR2 6.3.2 Transmit OFF power | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190439 | Update of FR1 6.2D.1 MOP for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
TP analysis 0440
remove the TT table as it is added in tdoc 276
Revised to: R5-190813. | revised | No | R5‑190813 | |||
R5‑190813 | Update of FR1 6.2D.1 MOP for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190439 | |||
R5‑190441 | Update of FR1 6.2D.2 MPR for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
TP analysis 0442
Revised to: R5-190441r1.
Revised from: R5-190441.
add editors note for the test to be used for R&D and alos check if draft spec matches core spec released version 15.4.0 , remove TT table as it is covered in tdoc 276
tp analysis in 442
Revised to: R5-190950.
| revised | No | R5‑190950 | |||
R5‑190950 | Update of FR1 6.2D.2 MPR for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
Revised from: R5-190441r1.
remove the refeerence to ACLR since ACLR test is still not defined | agreed | No | R5‑190441 | |||
R5‑190443 | Update of 6.2D.4 Configured Output Power for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
TP analysis 0444
Revised to: R5-190814.
same comments as 441r1 | revised | No | R5‑190814 | |||
R5‑190814 | Update of 6.2D.4 Configured Output Power for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
Revised from: R5-190443.
deferred to check the core spec 15.4.0 matches the contents
contents are matching latest released core spec | agreed | No | R5‑190443 | |||
R5‑190505 | Introduction of TC 6.4D.4 | Huawei, Hisilicon | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190508 | Introduction of TC 6.4D.4 | Huawei, Hisilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190551 | Editorial change in 6.5.2.1 general section | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
Moved content of 6.5.2 into general section 6.5.2.1 | agreed | No | ||||
R5‑190555 | Update transmit modulation quality test cases | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
late doc
content already covered in 0563 | withdrawn | Yes | ||||
R5‑190559 | Update frequency error test case | Keysight Technologies UK Ltd | CR | Agreement | No |
Yes
late doc
content already covered in 0563 | withdrawn | Yes | ||||
R5‑190563 | Update of transmit signal quality test cases for FR1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
LATE DOCUMENT
deferred to check the core spec released version 15.4.0 matches the contents
new request to add DL allocation is missing to force PUCCH txion , add editors note to capture it
Revised to: R5-190947. | revised | No | R5‑190947 | |||
R5‑190947 | Update of transmit signal quality test cases for FR1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190563 | |||
R5‑190925 | Correction of errors in Table 6.1-1 of 38.521-1 | Qualcomm Korea | CR | Agreement | Yes |
Yes
late doc
LATE DOCUMENT
Corrected Inner_full RB configuration for several Ch BW/SCS combinations listed in Table 6.1-1 of TS 38.521-1
Defer for Huawei and CAICT to have more time offline to check the content change
Revised to: R5-190925r1.
LATE DOCUMENT
Revised from: R5-190925.
r1: Undo the changes; Adding a note to capture the backgroud of selection of RB allocation.
Revised to: R5-190981.
| revised | No | R5‑190981 | |||
R5‑190981 | Correction of errors in Table 6.1-1 of 38.521-1 | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190925 | |||
R5‑190943 | OBW test procedure update for 38.521-1 | Qualcomm Inc | CR | Agreement | Yes |
Yes
late doc
LATE DOCUMENT
Discussion paper 0113
Revised to: R5-190943r1.
LATE DOCUMENT
Revised from: R5-190943.
change the test procedure to have conducted mode procedure rather than raditated
Revised to: R5-190964.
| revised | No | R5‑190964 | |||
R5‑190964 | OBW test procedure update for 38.521-1 | Qualcomm Inc | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190943 | |||
5.1.2.2 | Rx Requirements (Clause 7) | R5‑190037 | Introduction of TC 7.7A.0 Minimum conformance requirements | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised from: R5-190037.
r1: Update some Table numbers
Revised to: R5-190815.
| revised | No | R5‑190815 | |
R5‑190815 | Introduction of TC 7.7A.0 Minimum conformance requirements | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised from: R5-190037r1.
deferred to check the core spec released version 15.4.0 matches the contents | agreed | No | R5‑190037 | |||
R5‑190038 | Introduction of TC 7.7A.1 Spurious response for 2DL CA | China Mobile Com. Corporation, Huawei | CR | Agreement | Yes |
Yes
Revised to: R5-190038r1.
Revised from: R5-190038.
r1: update the Table numbers; Add “[]” to the numbers in the “Table 7.7A.1.4.2-1: Power Window (dB) for Spurious response CA”
Revised to: R5-190816.
| revised | No | R5‑190816 | |||
R5‑190816 | Introduction of TC 7.7A.1 Spurious response for 2DL CA | China Mobile Com. Corporation, Huawei | CR | Agreement | Yes |
Yes
Revised from: R5-190038r1.
deferred to check the core spec released version 15.4.0 matches the contents and ediotrs note has been updated | agreed | No | R5‑190038 | |||
R5‑190039 | Introduction of TC 7.7A.2 Spurious response for 3DL CA | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised to: R5-190039r1.
Revised from: R5-190039.
r1: update the Table numbers;
Revised to: R5-190817.
| revised | No | R5‑190817 | |||
R5‑190817 | Introduction of TC 7.7A.2 Spurious response for 3DL CA | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised from: R5-190039r1.
deferred to check the core spec released version 15.4.0 matches the contents, editors note is updated also | agreed | No | R5‑190039 | |||
R5‑190040 | Introduction of TC 7.7A.3 Spurious response for 4DL CA | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised to: R5-190040r1.
Revised from: R5-190040.
r1: update the Table numbers and the Clause number
Revised to: R5-190818.
| revised | No | R5‑190818 | |||
R5‑190818 | Introduction of TC 7.7A.3 Spurious response for 4DL CA | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised from: R5-190040r1.
deferred to check the core spec released version 15.4.0 matches the contents, and editors note is also updates | agreed | No | R5‑190040 | |||
R5‑190041 | Introduction of TC 7.9A.0 Minimum conformance requirements | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
dependent on discuss paper in R5-190615, status from RAN4, send LS to RAN4 | withdrawn | Yes | ||||
R5‑190042 | Introduction of TC 7.9A.1 Suprious emission for 2DL CA | China Mobile Com. Corporation; R&S | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190043 | Introduction of TC 7.9A.2 Suprious emission for 3DL CA | China Mobile Com. Corporation; R&S | CR | Agreement | No |
Yes
late doc
dependent on discuss paper in R5-190615 | withdrawn | Yes | ||||
R5‑190044 | Introduction of TC 7.9A.3 Suprious emission for 4DL CA | China Mobile Com. Corporation; R&S | CR | Agreement | No |
Yes
late doc
dependent on discuss paper in R5-190615 | withdrawn | Yes | ||||
R5‑190053 | Correction to | Anritsu | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190098 | Update of TC 7.6.3_Out-of-band blocking | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-190098r1.
TT analysis 0099
Revised from: R5-190098.
to check for TT analyusis needed for Power window update and check the release spec 15.4.0 matches the contents
TP analysis in 099
finalize how to include RAN4 core requirement relaxation into Test tolerance
r1: power window updated
Revised to: R5-190968.
| revised | No | R5‑190968 | |||
R5‑190968 | Update of TC 7.6.3_Out-of-band blocking | CAICT | CR | Agreement | Yes |
Yes
Revised from: R5-190098r1.
add power relaxation as a note in the new table | agreed | No | R5‑190098 | |||
R5‑190100 | Introduction of TC 7.6.4 Narrow-band blocking | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-190100r1.
Revised from: R5-190100.
TP analysis 0102
same comment as 0098r1
Revised to: R5-190969.
| revised | No | R5‑190969 | |||
R5‑190969 | Introduction of TC 7.6.4 Narrow-band blocking | CAICT | CR | Agreement | Yes |
Yes
Revised from: R5-190100r1.
same change as 0968 | agreed | No | R5‑190100 | |||
R5‑190101 | Introduction of TC 7.7 Spurious response | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-190101r1.
Revised from: R5-190101.
TP analysis 0103
same comment as 0098r1
Revised to: R5-190970.
| revised | No | R5‑190970 | |||
R5‑190970 | Introduction of TC 7.7 Spurious response | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190101 | |||
R5‑190309 | FR1 Text update for 7.3C Reference sensitivity power level for SUL | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190309r1.
Revised from: R5-190309.
r1: Coversheet release version changed to Rel-15
Revised to: R5-190309r2.
Revised from: R5-190309r1.
update Test config to FFS and add editors note about tp analysis and also change the template of editors note
Revised to: R5-190951.
| revised | No | R5‑190951 | |||
R5‑190951 | FR1 Text update for 7.3C Reference sensitivity power level for SUL | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190309 | |||
R5‑190312 | FR1 Text update for 7.3A.2 Reference sensitivity power level for CA | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190312r1.
Revised from: R5-190312.
Revised to: R5-190312r2.
Revised from: R5-190312r1.
requested to be deferred for more changes to be handled
Revised to: R5-190952.
| revised | No | R5‑190952 | |||
R5‑190952 | FR1 Text update for 7.3A.2 Reference sensitivity power level for CA | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190312 | |||
R5‑190313 | FR1 Text update for 7.3.2_1 Reference sensitivity level with 4 Rx antenna ports | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190313r1.
Revised from: R5-190313.
r1: Coversheet release version changed to Rel-15
Revised to: R5-190819.
| revised | No | R5‑190819 | |||
R5‑190819 | FR1 Text update for 7.3.2_1 Reference sensitivity level with 4 Rx antenna ports | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised from: R5-190313r1.
corrected the table ID which overlap with 0337 | agreed | No | R5‑190313 | |||
R5‑190337 | FR1 Text update for 7.3.2 Reference sensitivity power level | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190337r1.
Revised from: R5-190337.
r1: Coversheet release version changed to Rel-15
Revised to: R5-190820.
| revised | No | R5‑190820 | |||
R5‑190820 | FR1 Text update for 7.3.2 Reference sensitivity power level | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190337 | |||
R5‑190404 | Introduction of FR1 7.6D.2 Inband blocking for UL-MIMO | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190821 | |||
R5‑190821 | Introduction of FR1 7.6D.2 Inband blocking for UL-MIMO | CAICT | CR | Agreement | Yes |
Yes
Revised from: R5-190404.
update the editors note template | agreed | No | R5‑190404 | |||
R5‑190406 | Introduction of FR1 7.6D.3 Out-of-band blocking for UL-MIMO | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190822 | |||
R5‑190822 | Introduction of FR1 7.6D.3 Out-of-band blocking for UL-MIMO | CAICT | CR | Agreement | Yes |
Yes
Revised from: R5-190406.
same changes as 0821 | agreed | No | R5‑190406 | |||
R5‑190407 | Introduction of FR1 7.6D.4 Narrow band blocking for UL-MIMO | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190823 | |||
R5‑190823 | Introduction of FR1 7.6D.4 Narrow band blocking for UL-MIMO | CAICT | CR | Agreement | Yes |
Yes
Revised from: R5-190407.
same changes as 0821 | agreed | No | R5‑190407 | |||
R5‑190408 | Introduction of FR1 7.8D.2 Wide band Intermodulation for UL-MIMO | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190824 | |||
R5‑190824 | Introduction of FR1 7.8D.2 Wide band Intermodulation for UL-MIMO | CAICT | CR | Agreement | Yes |
Yes
Revised from: R5-190408.
same changes as 0821 | agreed | No | R5‑190408 | |||
R5‑190506 | Update of TC 7.4D | Huawei, Hisilicon | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190507 | Introduction of TC 7.5D | Huawei, Hisilicon | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190509 | Update of TC 7.4D | Huawei, Hisilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190510 | Introduction of TC 7.5D | Huawei, Hisilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190554 | Update ACS and Inband Blocking test cases in TS38.521-1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
Revised to: R5-190554r1.
Revised from: R5-190554.
to update the editor's note typo; discuss the test tolerance for power window; note 3 FFS replacing […]
pending decision on how to include RAN4 relaxation as in 98r1/99r1
Revised to: R5-190953.
| revised | No | R5‑190953 | |||
R5‑190953 | Update ACS and Inband Blocking test cases in TS38.521-1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
Revised from: R5-190554r1.
Include decision on how to include RAN4 relaxation as in 98r1/99r1 | agreed | No | R5‑190554 | |||
5.1.2.3 | Other Clauses (i.e. Clauses 1-5, Annexes) | R5‑190026 | Updates of MU in TS38.521-1 Annex F during RAN5#NR4 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
MU_FR1
dependent on tdoc 276 | withdrawn | Yes | ||
R5‑190027 | Updates of TT in TS38.521-1 Annex F during RAN5#NR4 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
TT FR1
renmove UL MIMO changes it is captured in tdoc 276
Revised to: R5-190027r1.
Revised from: R5-190027.
Revised to: R5-190997.
| revised | No | R5‑190997 | |||
R5‑190997 | Updates of TT in TS38.521-1 Annex F during RAN5#NR4 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190027 | |||
R5‑190032 | Editorial cleaning up of test configuration tables in TS 38.521-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Editorial
Revised to: R5-190032r1.
r1: Updates in 6.5.3.2.4.1 (co-existence) was removed to avoid overlap with R5-190334.
Revised to: R5-190825.
| revised | No | R5‑190825 | |||
R5‑190825 | Editorial cleaning up of test configuration tables in TS 38.521-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Revised from: R5-190032r1.
updated word format from *.docx to *.doc | agreed | No | R5‑190032 | |||
R5‑190036 | Editorial correction of core alignment in TS 38.521-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Editorial
Revised to: R5-190036r1.
r1: overlap removed
Revised to: R5-190826.
| revised | No | R5‑190826 | |||
R5‑190826 | Editorial correction of core alignment in TS 38.521-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190036 | |||
R5‑190055 | Update Clause 3.2 of TS 38.521-1 | China Mobile Com. Corporation, Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190099 | Update of TT of Out-of band,NarrowbBlocking and Spurious response in Annex F | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-190099r1.
Revised from: R5-190099.
r1: Update value and add caculation formula
deferred to check how to include core spec relaxation into test tolerance
Revised to: R5-190965.
| revised | No | R5‑190965 | |||
R5‑190965 | Update of TT of Out-of band,NarrowbBlocking and Spurious response in Annex F | CAICT | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑190099 | |||
R5‑190108 | Update of operating bands and channel arrangement to TS 38.521-1 | China Unicom | CR | Agreement | Yes |
Yes
3GU Spec allocation does not match AI allocation!!!
3GU allocation: 38.521-1 / AI allocation: 38.521-2
Agenda Allocation was changed: [5.1.3.3]->[5.1.2.3].
Revised to: R5-190108r1.
Revised from: R5-190108.
r1: Removed CA_n71 row from Table 5.2A.1-1; Minor editorial corrections
Revised to: R5-190827.
| revised | No | R5‑190827 | |||
R5‑190827 | Update of operating bands and channel arrangement to TS 38.521-1 | China Unicom | CR | Agreement | Yes |
Yes
Revised from: R5-190108r1.
deferred to check the core spec released version 15.4.0 matches the contents
core spec matches released version | agreed | No | R5‑190108 | |||
R5‑190136 | Update Clause 2 of TS 38.521-1 | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190276 | Addition of MU and TT for NR FR1 UL-MIMO test cases | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
dependent on 0275
Revised to: R5-190276r1.
Revised from: R5-190276.
Revised to: R5-190956.
| revised | No | R5‑190956 | |||
R5‑190956 | Addition of MU and TT for NR FR1 UL-MIMO test cases | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190276 | |||
R5‑190293 | General clauses updated for TS38.521-1 | Bureau Veritas | CR | Agreement | Yes |
Yes
core spec alignment | agreed | No | ||||
R5‑190351 | Shared Risk clarification in TS 38.521-1 | Telecom Italia | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190452 | MU for UL-MIMO Test Cases | Anritsu | CR | Agreement | No |
Yes
late doc
already covered by 0276 | withdrawn | Yes | ||||
R5‑190539 | 38.521-1 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | CR | Agreement | Yes |
Yes
Revised to: R5-190539r1.
Revised from: R5-190539.
discussion paper: 0530
Revised to: R5-190539r2.
Revised from: R5-190539r1.
depends on 0530 discussion
have more offline to remove applicability sequence
Revised to: R5-190539r3.
Revised from: R5-190539r2.
Revised to: R5-190984.
| revised | No | R5‑190984 | |||
R5‑190984 | 38.521-1 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190539 | |||
R5‑190561 | Update of Global In-channel Tx Test Annex for FR1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
late doc
Revised to: R5-190561r1.
r1: removed unintended changes of the window length in Table E.6.7-2
Revised to: R5-190828.
| revised | No | R5‑190828 | |||
R5‑190828 | Update of Global In-channel Tx Test Annex for FR1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190561 | |||
5.1.3 | TS 38.521-2 |   | ||||||||||
5.1.3.1 | Tx Requirements (Clause 6) | R5‑190050 | Updates of test procedure of FR2 ACLR | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Based on Proposals in R5-190049
pending agreement on 49, as document 49 is just noted w/drawing | withdrawn | Yes | ||
R5‑190110 | Update of test case 6.3.4.3, Relative power tolerance in 38.521-2 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190117 | FR2 Spurious Emission test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
Based on Proposals in R5-190114
TP analysis 0116
Revised to: R5-190117r1.
Revised from: R5-190117.
update test id 1, 2 for RB allocation , also update SCS to reflect what is in r1, check with Ingo on the 3GPP style to be used for test procedure superscript , corresponding TP is in 116
Revised to: R5-190958.
| revised | No | R5‑190958 | |||
R5‑190958 | FR2 Spurious Emission test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190117 | |||
R5‑190204 | Update to FR2 test case 6.3.3.4 PRACH time mask | KTL | CR | Agreement | Yes |
Yes
Revised to: R5-190204r1.
Revised from: R5-190204.
update test tolerance table as core req relaxation table
r1: Modifying editor’s notes; Updating the test requirement table and adding the note for relaxation
Revised to: R5-190959.
| revised | No | R5‑190959 | |||
R5‑190959 | Update to FR2 test case 6.3.3.4 PRACH time mask | KTL | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190204 | |||
R5‑190277 | Addition of FR2 6.2.4 Configured transmitted power | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
Discussion paper: 0278
Revised to: R5-190861. | revised | No | R5‑190861 | |||
R5‑190861 | Addition of FR2 6.2.4 Configured transmitted power | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
Revised from: R5-190277.
make the change to test applicability to indicate the test is covered if both MOP and MPR is tested, also add this test in test applicability spec 38.522 with condition. | agreed | No | R5‑190277 | |||
R5‑190279 | Update of FR2 6.3.1 Minimum Output Power | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
TP analysis 0280
needs further analysis between DFts and CP
offline still ongoing
Revised to: R5-190279r1.
Revised from: R5-190279.
r1: corrected the typo
Revised to: R5-190998.
| revised | No | R5‑190998 | |||
R5‑190998 | Update of FR2 6.3.1 Minimum Output Power | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190279 | |||
R5‑190281 | Addition of FR2 6.3.4.2 Absolute power tolerance | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
TP analysis 0283
based on discussion paper 282 deferred to have more offline
method of setting tx power is still pending analysis in future meetings
Revised to: R5-190960. | revised | No | R5‑190960 | |||
R5‑190960 | Addition of FR2 6.3.4.2 Absolute power tolerance | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
Revised from: R5-190281.
add editors note to indicate tp analysis is pending due to tx power setting open item | agreed | No | R5‑190281 | |||
R5‑190284 | Update of FR2 6.3.3.2 General ON/OFF time mask | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
TP analysis 0285
Revised to: R5-190284r1.
Revised from: R5-190284.
update test procedure step 3-6 to align with tdoc 117 , add editors note to capture power testing range for fr2, also chek the contents of relased core spec 15.4.0 matches
document not yet produce
Revised to: R5-190973.
| revised | No | R5‑190973 | |||
R5‑190973 | Update of FR2 6.3.3.2 General ON/OFF time mask | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
Revised from: R5-190284r1.
add editor's note for TP analysis pending | agreed | No | R5‑190284 | |||
R5‑190402 | Correction of FR2 6.3.2 Transmit OFF power | CAICT | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190529 | Updates to maximum output power test cases | Ericsson | CR | Agreement | Yes |
Yes
Revised to: R5-190529r1.
Revised from: R5-190529.
remove 200ms wait time as it is not needed in step 3 and also remove the text incuded in stpe3 with 200ms. Update step5 aligned to tdoc 117
Revised to: R5-190961.
| revised | No | R5‑190961 | |||
R5‑190961 | Updates to maximum output power test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190529 | |||
R5‑190564 | Update of transmit signal quality test cases for FR2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
late doc
LATE DOCUMENT
Revised to: R5-190564r1.
LATE DOCUMENT
Revised from: R5-190564.
update step4 and 5 in freq error to account for Annex K as per tdoc 117, update step1.3-1.8 to account for Annex K as per tdoc 117
r1: Test procedures have been updated to include Annex K updates.
Revised to: R5-190999.
| revised | No | R5‑190999 | |||
R5‑190999 | Update of transmit signal quality test cases for FR2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190564 | |||
R5‑190606 | Correction to FR2 EIRP test configurations | Dish Network | CR | Agreement | Yes |
Yes
late doc
Revised to: R5-190606r1.
Revised from: R5-190606.
update spherical coverage test section 6.2.1.2 to indicate nominal conditions, and EIRP indicate extermene conditions with editors note on test procedure and equipoment readiness is FFS, TRP is for nominal conditions
Revised to: R5-190962.
| revised | No | R5‑190962 | |||
R5‑190962 | Correction to FR2 EIRP test configurations | Dish Network | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190606 | |||
R5‑190944 | OBW test procedure update for 38.521-2 | Qualcomm Inc | CR | Agreement | Yes |
Yes
late doc
Discussion paper 0113 | agreed | No | ||||
5.1.3.2 | Rx Requirements (Clause 7) | R5‑190118 | FR2 Reference Sensitivity test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
depend on doc discussion 0115, CRs 0120, 0572
Revised to: R5-190118r1.
Revised from: R5-190118.
r1: update: Super-script # changed to (NOTE#)
Revised to: R5-190118r2.
Revised from: R5-190118r1.
r2 update: Undeleted the settling time in test procedure and set it to 200msec
Revised to: R5-190971.
| revised | No | R5‑190971 | |
R5‑190971 | FR2 Reference Sensitivity test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190118 | |||
R5‑190403 | Correction of FR2 7.4 Maximum input level | CAICT | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190607 | Correction to FR2 EIS test configurations | Dish Network | CR | Agreement | Yes |
Yes
late doc | revised | No | R5‑190870 | |||
R5‑190870 | Correction to FR2 EIS test configurations | Dish Network | CR | Agreement | Yes |
Yes
Revised from: R5-190607.
update coversheet and add editors note on test procedure and test equipment updates needed for exterme condition | agreed | No | R5‑190607 | |||
5.1.3.3 | Other Clauses (i.e. Clauses 1-5, Annexes) | R5‑190028 | Updates of MU in TS38.521-2 Annex F during RAN5#NR4 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
MU FR2
waiting on outcomes from MU discussions | withdrawn | Yes | ||
R5‑190029 | Updates of TT in TS38.521-2 Annex F during RAN5#NR4 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
TT FR2
needs more inputs based on MU discussions | agreed | No | ||||
R5‑190033 | Editorial cleaning up of test configuration tables in TS 38.521-2 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Editorial
Revised to: R5-190033r1.
r1: Updates in 6.5.3.1.4 (General Spurious) was removed to avoid overlap with R5-190117
Revised to: R5-190869.
| revised | No | R5‑190869 | |||
R5‑190869 | Editorial cleaning up of test configuration tables in TS 38.521-2 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190033 | |||
R5‑190056 | TT updates among different test setups | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Revised to: R5-190056r1.
Revised from: R5-190056.
r1: Updates in 7.3.2.5 was removed to avoid overlap with R5-190118
MU values is based on both IFF and DFF if both are available , else it will be bsaed on MU threshold which has to be decided considering the IFF and DFF setup
Revised to: R5-190937.
| revised | No | R5‑190937 | |||
R5‑190937 | TT updates among different test setups | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Revised from: R5-190056r1.
plan for the future meeting clarification | withdrawn | Yes | R5‑190056 | |||
R5‑190119 | Update to Annex M | Qualcomm Finland RFFE Oy | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190120 | Update to Annex K and Annex L | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
overlap with 0572 and 0560
Discussion paper 0115
Revised to: R5-190120r1.
Revised from: R5-190120.
Revised to: R5-191000.
| revised | No | R5‑191000 | |||
R5‑191000 | Update to Annex K and Annex L | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190120 | |||
R5‑190262 | CR to TS 38.521-2 to add text proposal for Annex F.1 | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes
Revised to: R5-190262r1.
Revised from: R5-190262.
r1: Modified text to clarify that the measurement uncertainty applies on a per test case basis
Revised to: R5-190806.
| revised | No | R5‑190806 | |||
R5‑190806 | CR to TS 38.521-2 to add text proposal for Annex F.1 | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190262 | |||
R5‑190352 | Shared Risk clarification in TS 38.521-2 | Telecom Italia | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190546 | 38.521-2 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | CR | Agreement | Yes |
Yes
Revised to: R5-190546r1.
Revised from: R5-190546.
Discussion paper: 0530
Revised to: R5-190546r2.
Revised from: R5-190546r1.
depends on 530 discussion paper
more discussion to remove opitonality sequence
Revised to: R5-190546r3.
Revised from: R5-190546r2.
Revised to: R5-190985.
| revised | No | R5‑190985 | |||
R5‑190985 | 38.521-2 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190546 | |||
R5‑190557 | Editorial correction of core alignment in TS 38.521-2 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190560 | Update TRP measurement procedure Annex in TS38.521-2 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
overlap with 0120
Revised to: R5-190560r1.
Revised from: R5-190560.
r1: remove Annex L due to overlapping with R5-190120
Revised to: R5-191002.
| revised | No | R5‑191002 | |||
R5‑191002 | Update TRP measurement procedure Annex in TS38.521-2 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
Revised from: R5-190560r1.
updated coversheet to remove Annex L changes from clause affected | agreed | No | R5‑190560 | |||
R5‑190562 | Update of Global In-channel Tx Test Annex for FR2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| revised | No | R5‑190871 | |||
R5‑190871 | Update of Global In-channel Tx Test Annex for FR2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190562 | |||
R5‑190572 | Update Annex K and Annex M in TS38.521-2 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
overlap with 0120
Revised to: R5-190572r1.
Revised from: R5-190572.
r1: remove Annex K due to overlapping with R5-190120
Revised to: R5-191001.
| revised | No | R5‑191001 | |||
R5‑191001 | Update Annex K and Annex M in TS38.521-2 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
Revised from: R5-190572r1.
updated coversheet to remove Annex K changes from clause affected | agreed | No | R5‑190572 | |||
5.1.4 | TS 38.521-3 |   | ||||||||||
5.1.4.1 | Tx Requirements (Clause 6) | R5‑190045 | Updates to EN-DC test case 6.2B.2.2, UE Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC | Ericsson | CR | Agreement | Yes |
Yes
late doc
| revised | No | R5‑190831 | |
R5‑190831 | Updates to EN-DC test case 6.2B.2.2, UE Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC | Ericsson | CR | Agreement | Yes |
Yes
LATE DOCUMENT
Revised from: R5-190045.
changes to the editor's note with proper wording | agreed | No | R5‑190045 | |||
R5‑190111 | Updates to EN-DC test case 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC | Ericsson | CR | Agreement | Yes |
Yes
Revised to: R5-190111r1.
TP analysis 0526
r1: Test case aligned with guidelines for anchor agnostic approach test cases
Revised to: R5-190829.
| revised | No | R5‑190829 | |||
R5‑190829 | Updates to EN-DC test case 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC | Ericsson | CR | Agreement | Yes |
Yes
Revised from: R5-190111r1.
change the test procedure step numbers
corresponding TP in 526 | agreed | No | R5‑190111 | |||
R5‑190214 | Editorial: Corrected test case header level in 6.5B.2.1.3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190310 | Text Update for 6.5B.3.2 Spurious Emissions for intra-band non-contiguous EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190310r1.
r1: fixed 3GU issue
Revised to: R5-190832.
| revised | No | R5‑190832 | |||
R5‑190832 | Text Update for 6.5B.3.2 Spurious Emissions for intra-band non-contiguous EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised from: R5-190310r1.
update anchor agnostic statement in the min req section and also add the LTE config in the general section | agreed | No | R5‑190310 | |||
R5‑190311 | Text Update for 6.5B.3 Additional Spurious Emissions for EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190311r1.
Revised from: R5-190311.
r1: fixed 3GU issue
Revised to: R5-190833.
| revised | No | R5‑190833 | |||
R5‑190833 | Text Update for 6.5B.3 Additional Spurious Emissions for EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised from: R5-190311r1.
same comments as 832 , and also remove test proc step6 after checking 38.508-1 4.3.1 clause which has the same info | agreed | No | R5‑190311 | |||
R5‑190314 | Text Update for 6.5B.3.3 Spurious Emissions for Inter-band EN-DC within FR1 | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190314r1.
r1: fixed 3GU issue
Revised to: R5-190834.
| revised | No | R5‑190834 | |||
R5‑190834 | Text Update for 6.5B.3.3 Spurious Emissions for Inter-band EN-DC within FR1 | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised from: R5-190314r1.
same comments as 832 | agreed | No | R5‑190314 | |||
R5‑190323 | Clean up of occupied bandwidth for EN-DC within FR1 | Anritsu | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190324 | Update of TC 6.2B.1.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
late doc
TP analysis 0327
Revised to: R5-190324r1.
Revised from: R5-190324.
Revised to: R5-190994.
| revised | No | R5‑190994 | |||
R5‑190994 | Update of TC 6.2B.1.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190324 | |||
R5‑190325 | Update of TC 6.2B.1.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
late doc
TP analysis 0328
no changes marked in the CR
Revised to: R5-190325r1.
Revised from: R5-190325.
Revised to: R5-190992.
| revised | No | R5‑190992 | |||
R5‑190992 | Update of TC 6.2B.1.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190325 | |||
R5‑190326 | Update of TC 6.2B.1.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
late doc
Discussion paper: 0605; TP analysis: 0329
Revised to: R5-190326r1.
Revised from: R5-190326.
Revised to: R5-190990.
| revised | No | R5‑190990 | |||
R5‑190990 | Update of TC 6.2B.1.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190326 | |||
R5‑190332 | Text Update for 6.5B.3.1 Spurious Emissions for intra-band contiguous EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190332r1.
Revised from: R5-190332.
r1: Coversheet release version changed to Rel-15
Revised to: R5-190835.
| revised | No | R5‑190835 | |||
R5‑190835 | Text Update for 6.5B.3.1 Spurious Emissions for intra-band contiguous EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190332 | |||
R5‑190397 | Update of test case 6.2B.3.1 UE A-MPR for Intra-band contiguous EN-DC | Ericsson Limited | CR | Agreement | Yes |
Yes
| revised | No | R5‑190838 | |||
R5‑190838 | Update of test case 6.2B.3.1 UE A-MPR for Intra-band contiguous EN-DC | Ericsson Limited | CR | Agreement | Yes |
Yes
Revised from: R5-190397.
update editors note on the test procedure for DPS and SPS is FFS | agreed | No | R5‑190397 | |||
R5‑190398 | Update of test case 6.2B.3.4 UE A-MPR for Inter-Band EN-DC including FR2 | Ericsson Limited | CR | Agreement | Yes |
Yes
| revised | No | R5‑190839 | |||
R5‑190839 | Update of test case 6.2B.3.4 UE A-MPR for Inter-Band EN-DC including FR2 | Ericsson Limited | CR | Agreement | Yes |
Yes
Revised from: R5-190398.
remove editors note for assumption of 38.101-2 req applies | agreed | No | R5‑190398 | |||
R5‑190399 | Update of test case 6.5B.2.1.2 UE Additional spectrum emissions mask for intra-band contiguous EN-DC | Ericsson Limited | CR | Agreement | Yes |
Yes
| revised | No | R5‑190840 | |||
R5‑190840 | Update of test case 6.5B.2.1.2 UE Additional spectrum emissions mask for intra-band contiguous EN-DC | Ericsson Limited | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190399 | |||
R5‑190447 | Clean up of occupied bandwidth for EN-DC within FR1 | Anritsu | CR | Agreement | Yes |
Yes
check the test procedure for LTE needs to be updated since this is anchor agnostic. Also discuss TP analysis to confirm if anchor agnostic holds
Revised to: R5-190447r1.
Revised from: R5-190447.
Revised to: R5-190995.
| revised | No | R5‑190995 | |||
R5‑190995 | Clean up of occupied bandwidth for EN-DC within FR1 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190447 | |||
R5‑190565 | Addition of transmit modulation quality test cases for inter-band EN-DC including FR2 | ROHDE & SCHWARZ | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190945 | OBW test procedure update for 38.521-3 | Qualcomm Inc | CR | Agreement | No |
Yes
late doc
need more time , dependent on discussion paper 113
wdrawn since the test points to -1 and -2 specs | withdrawn | Yes | ||||
5.1.4.2 | Rx Requirements (Clause 7) | R5‑190109 | FR1 EN-DC Test Structure Clean Up (Rx) | Anritsu | CR | Agreement | No |
Yes
late doc
| withdrawn | Yes | ||
R5‑190308 | Text update for 7.3B.3 ?RIB,c ?RIBNC for EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190308r1.
Revised to: R5-190841.
| revised | No | R5‑190841 | |||
R5‑190841 | Text update for 7.3B.3 ?RIB,c ?RIBNC for EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190308 | |||
R5‑190333 | Text Update for 7.3B.2.3 Reference sensitivity for Inter-band EN-DC within FR1 | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190333r1.
Revised to: R5-190842.
| revised | No | R5‑190842 | |||
R5‑190842 | Text Update for 7.3B.2.3 Reference sensitivity for Inter-band EN-DC within FR1 | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190333 | |||
R5‑190335 | Text Update for 7.3B.2.2 Reference sensitivity for Intra-band non-contiguous EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190335r1.
Revised to: R5-190843.
| revised | No | R5‑190843 | |||
R5‑190843 | Text Update for 7.3B.2.2 Reference sensitivity for Intra-band non-contiguous EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised from: R5-190335r1.
same changes as 833 regarding step6 of test proc and also remove LTE config steps in test proc | agreed | No | R5‑190335 | |||
R5‑190336 | Text Update for 7.3B.2.1 Reference sensitivity for Intra-band Contiguous EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190336r1.
Revised from: R5-190336.
Revised to: R5-190844.
| revised | No | R5‑190844 | |||
R5‑190844 | Text Update for 7.3B.2.1 Reference sensitivity for Intra-band Contiguous EN-DC | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190336 | |||
R5‑190409 | Introduction of NSA FR1 7.6B.2.1 Inband blocking for intra-band contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190845 | |||
R5‑190845 | Introduction of NSA FR1 7.6B.2.1 Inband blocking for intra-band contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190409 | |||
R5‑190410 | Introduction of NSA FR1 7.6B.2.2 Inband blocking for intra-band non-contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190846 | |||
R5‑190846 | Introduction of NSA FR1 7.6B.2.2 Inband blocking for intra-band non-contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190410 | |||
R5‑190411 | Introduction of NSA FR1 7.6B.2.3 Inband blocking for inter-band EN-DC within FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190847 | |||
R5‑190847 | Introduction of NSA FR1 7.6B.2.3 Inband blocking for inter-band EN-DC within FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190411 | |||
R5‑190412 | Introduction of NSA FR1 7.6B.3.1 Out-of-band blocking for intra-band contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190848 | |||
R5‑190848 | Introduction of NSA FR1 7.6B.3.1 Out-of-band blocking for intra-band contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190412 | |||
R5‑190413 | Introduction of NSA FR1 7.6B.3.2 Out-of-band blocking for intra-band non-contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190849 | |||
R5‑190849 | Introduction of NSA FR1 7.6B.3.2 Out-of-band blocking for intra-band non-contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190413 | |||
R5‑190414 | Introduction of NSA FR1 7.6B.3.3 Out-of-band blocking for inter-band EN-DC within FR1 | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-190414r1.
Revised from: R5-190414.
Revised to: R5-190850.
| revised | No | R5‑190850 | |||
R5‑190850 | Introduction of NSA FR1 7.6B.3.3 Out-of-band blocking for inter-band EN-DC within FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190414 | |||
R5‑190415 | Introduction of NSA FR1 7.6B.4.1 Narrow band blocking for intra-band contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190851 | |||
R5‑190851 | Introduction of NSA FR1 7.6B.4.1 Narrow band blocking for intra-band contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190415 | |||
R5‑190416 | Introduction of NSA FR1 7.6B.4.2 Narrow band blocking for intra-band non-contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190852 | |||
R5‑190852 | Introduction of NSA FR1 7.6B.4.2 Narrow band blocking for intra-band non-contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190416 | |||
R5‑190417 | Introduction of NSA FR1 7.6B.4.3 Narrow band blocking for inter-band EN-DC within FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190853 | |||
R5‑190853 | Introduction of NSA FR1 7.6B.4.3 Narrow band blocking for inter-band EN-DC within FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190417 | |||
R5‑190418 | Introduction of NSA FR1 7.7B.1 Spurious Response for intra-band contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190854 | |||
R5‑190854 | Introduction of NSA FR1 7.7B.1 Spurious Response for intra-band contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190418 | |||
R5‑190419 | Introduction of NSA FR1 7.7B.2 Spurious Response for intra-band non-contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190855 | |||
R5‑190855 | Introduction of NSA FR1 7.7B.2 Spurious Response for intra-band non-contiguous EN-DC in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190419 | |||
R5‑190420 | Introduction of NSA FR1 7.7B.3 Spurious Response for inter-band EN-DC within FR1 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑190856 | |||
R5‑190856 | Introduction of NSA FR1 7.7B.3 Spurious Response for inter-band EN-DC within FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190420 | |||
R5‑190421 | Introduction of TC 7.6B.2.1 Inband blocking for intra-band contiguous EN-DC in FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190422 | Introduction of TC7.6B.2.2 Inband blocking for intra-band non-contiguous EN-DC in FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190423 | Introduction of TC 7.6B.2.3 Inband blocking for inter-band EN-DC within FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190424 | Introduction of TC 7.6B.3.1 Out-of-band blocking for intra-band contiguous EN-DC in FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190425 | Introduction of TC 7.6B.3.2 Out-of-band blocking for intra-band non-contiguous EN-DC in FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190426 | Introduction of TC 7.6B.3.3 Out-of-band blocking for inter-band EN-DC within FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190427 | Introduction of TC 7.6B.4.1 Narrow band blocking for intra-band contiguous EN-DC in FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190429 | Introduction of TC 7.6B.4.2 Narrow band blocking for intra-band non-contiguous EN-DC in FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190430 | Introduction of TC 7.6B.4.3 Narrow band blocking for inter-band EN-DC within FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190431 | Introduction of TC 7.7B.1 Spurious response for intra-band contiguous EN-DC in FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190432 | Introduction of TC 7.7B.2 Spurious response for intra-band non-contiguous EN-DC in FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190433 | Introduction of TC 7.7B.3 Spurious response for inter-band EN-DC within FR1 (2 CCs) | CAICT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190454 | Introducing Wide band Intermodulation for intra-band contiguous EN-DC in FR1 | Anritsu | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190455 | Introducing Wide band Intermodulation for intra-band non-contiguous EN-DC in FR1 | Anritsu | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190456 | Introducing Spurious Emissions for intra-band contiguous EN-DC in FR1 | Anritsu | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190457 | Introducing Spurious Emissions for intra-band non-contiguous EN-DC in FR1 | Anritsu | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190498 | AddItion of 7.4B.0 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
late doc
deferred to check the core spec released version 15.4.0 matches the contents
still needs more time but agree for now can be revisited in Feb | agreed | No | ||||
R5‑190499 | Update of TC 7.4B.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
late doc
add editors note to indicate test config is FFS pending TP also check the core spec released version 15.40 matches the contents
Revised to: R5-190499r1.
Revised from: R5-190499.
Revised to: R5-190857.
| revised | No | R5‑190857 | |||
R5‑190857 | Update of TC 7.4B.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190499 | |||
R5‑190500 | Update of TC 7.4B.2 | Huawei, Hisilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190501 | Update of TC 7.4B.3 | Huawei, Hisilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
5.1.4.3 | Other Clauses (i.e. Clauses 1-5, Annexes) | R5‑190030 | Updates of MU in TS38.521-3 Annex F during RAN5#NR4 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑190031 | Updates of TT in TS38.521-3 Annex F during RAN5#NR4 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| revised | No | R5‑190996 | |||
R5‑190996 | Updates of TT in TS38.521-3 Annex F during RAN5#NR4 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Revised from: R5-190031.
removed editor's note to avoid conflicted with 0326 | agreed | No | R5‑190031 | |||
R5‑190294 | Updated EN-DC configuration information in clause 5 | Bureau Veritas | CR | Agreement | Yes |
Yes
core spec alignment
deferred to check the core spec released version 15.4.0 matches the contents
confirmed matching | agreed | No | ||||
R5‑190353 | Shared Risk clarification in TS 38.521-3 | Telecom Italia | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190405 | 38.521-3 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | CR | Agreement | Yes |
Yes
Revised to: R5-190405r1.
Revised from: R5-190405.
discussion paper: 0530
r1: updates some acronyms and terminology
Revised to: R5-190405r2.
Revised from: R5-190405r1.
Revised to: R5-190405r3.
Revised from: R5-190405r2.
have more offline to remove applicability sequence
Revised to: R5-190405r4.
Revised from: R5-190405r3.
Revised to: R5-190982.
| revised | No | R5‑190982 | |||
R5‑190982 | 38.521-3 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190405 | |||
R5‑190445 | Removal of ambiguity about LTE anchor agnostic | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
content already covered in 0405 | withdrawn | Yes | ||||
R5‑190468 | FR1 EN-DC MU updates | Anritsu | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190535 | Formatting updates and index correction in TS 38.521-3 | Qualcomm communications-France | CR | Agreement | Yes |
Yes
Revised to: R5-190535r1.
r1: corrects some style errors missed earlier
Revised to: R5-190858.
| revised | No | R5‑190858 | |||
R5‑190858 | Formatting updates and index correction in TS 38.521-3 | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190535 | |||
5.1.5 | TS 38.521-4 (pCR) | R5‑190054 | update to 2Rx TDD FR1 PDSCH mapping Type A performance test case | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
| approved | No | ||
R5‑190211 | pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance (2x4) | LG Electronics | pCR | Approval | Yes |
Yes
Revised to: R5-190211r1.
Revised from: R5-190211.
Revised to: R5-190211r2.
Revised from: R5-190211r1.
Revised to: R5-190926.
| revised | No | R5‑190926 | |||
R5‑190926 | pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance (2x4) | LG Electronics | pCR | Approval | Yes |
Yes
| agreed | No | R5‑190211 | |||
R5‑190212 | pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance (4x4) | LG Electronics | pCR | Approval | Yes |
Yes
Revised to: R5-190212r1.
Revised from: R5-190212.
Revised to: R5-190212r2.
Revised from: R5-190212r1.
Revised to: R5-190927.
| revised | No | R5‑190927 | |||
R5‑190927 | pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance (4x4) | LG Electronics | pCR | Approval | Yes |
Yes
| approved | No | R5‑190212 | |||
R5‑190213 | pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance with enhanced receiver type X (4x4) | LG Electronics | pCR | Approval | Yes |
Yes
Revised to: R5-190213r1.
Revised from: R5-190213.
Revised to: R5-190213r2.
Revised from: R5-190213r1.
Revised to: R5-190928.
| revised | No | R5‑190928 | |||
R5‑190928 | pCR for new TC addition for FR1 4Rx FDD PDSCH Demodulation performance with enhanced receiver type X (4x4) | LG Electronics | pCR | Approval | Yes |
Yes
Revised from: R5-190213r2.
same comment as 0926 | approved | No | R5‑190213 | |||
R5‑190291 | Updated to Annex A Measurement Channels for Performance tests | Bureau Veritas | pCR | Approval | Yes |
Yes
core spec alignment | approved | No | ||||
R5‑190292 | Updated to Annex B Propagation conditions for Performance tests | Bureau Veritas | pCR | Approval | Yes |
Yes
core spec alignment | approved | No | ||||
R5‑190458 | update to 2Rx TDD FR2 PDSCH mapping Type A performance test case | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
similar change to 0054 | approved | No | ||||
R5‑190461 | 2Rx TDD FR2 PDCCH performance test case | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
similar change to 0054 | approved | No | ||||
R5‑190462 | LTE link setup details for demod test cases | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| revised | No | R5‑190929 | |||
R5‑190929 | LTE link setup details for demod test cases | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised from: R5-190462.
change table numbers, remove cross carrier scheduling form TDD, add QPSK modulation RMC refernce for 5Mhz, 20Mhz BW's | approved | No | R5‑190462 | |||
R5‑190464 | Annex for statistical tput calculation for demod test cases | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| revised | No | R5‑190930 | |||
R5‑190930 | Annex for statistical tput calculation for demod test cases | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised from: R5-190464.
add editors note to indicate FR2 considerations for min test time needs to be included, update the document with revision mark | approved | No | R5‑190464 | |||
R5‑190523 | pCR for TC addition of FR1 TDD 4Rx PDSCH | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190523r1.
Revised from: R5-190523.
r1: Modified the Section/Clause numbers to align with latest WP
Revised to: R5-190931.
| revised | No | R5‑190931 | |||
R5‑190931 | pCR for TC addition of FR1 TDD 4Rx PDSCH | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| agreed | No | R5‑190523 | |||
R5‑190531 | pCR for modification of FDD 2Rx FR1 PDSCH Demod | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190531r1.
Revised from: R5-190531.
r1: Modified section numbers to align with latest WP
Revised to: R5-190932.
| revised | No | R5‑190932 | |||
R5‑190932 | pCR for modification of FDD 2Rx FR1 PDSCH Demod | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| approved | No | R5‑190531 | |||
R5‑190533 | Annex for DL and UL Signal Setup | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190533r1.
Revised from: R5-190533
r1: reformatted the subsections for FR1 and FR2; Removed some of the not applicable wordings for FR1 and FR2
Revised to: R5-190933.
| revised | No | R5‑190933 | |||
R5‑190933 | Annex for DL and UL Signal Setup | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| approved | No | R5‑190533 | |||
R5‑190538 | pCR for modification of FDD FR1 PDCCH Demod | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190538r1.
Revised from: R5-190538.
Revised to: R5-190934.
| revised | No | R5‑190934 | |||
R5‑190934 | pCR for modification of FDD FR1 PDCCH Demod | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| approved | No | R5‑190538 | |||
R5‑190541 | PDSCH and PDCCH Config before measurement | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| revised | No | R5‑190935 | |||
R5‑190935 | PDSCH and PDCCH Config before measurement | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised from: R5-190541.
add revision mark, update reference to 38.508-1 and list exception, update coversheet to indicate clause Annex C. | approved | No | R5‑190541 | |||
R5‑190550 | 38.521-4 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | pCR | Approval | Yes |
Yes
Revised to: R5-190550r1.
Revised from: R5-190550.
Discussion paper: 0530
Revised to: R5-190550r2.
Revised from: R5-190550r1.
Revised to: R5-190550r3.
Revised from: R5-190550r2.
more discussion to remove opitonality sequence
Revised to: R5-190550r4.
Revised from: R5-190550r3.
Revised to: R5-190986.
| revised | No | R5‑190986 | |||
R5‑190986 | 38.521-4 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | R5‑190550 | |||
R5‑190552 | Addition of 2Rx TDD FR1 Single PMI tests for both SA and NSA | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190553 | Addition of 2Rx TDD FR1 RI reporting for both SA and NSA | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | ||||
5.1.6 | TS 38.522 | R5‑190127 | TP for TS 38.522 | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
Revised to: R5-190127r1.
Revised from: R5-190127.
r1: The table number reference as per TS 38.508-2 and typos have been fixed.
Revised to: R5-190127r2.
Revised from: R5-190127r1.
r2: TC 6.2.2 MPR has been added. More comments as per LTE agnostic have been added for the EN-DC test cases.
Revised to: R5-190127r3.
Revised from: R5-190127r2.
check ENDC MOP test condition for DPS , and update if LTE PICS needs to be included for ENDC tests
r3: C07 introduced for dynamic power sharing and applied to EN-DC test case 6.2B.2.2; Condition typos of TC 6.2.1 and 6.2.2 have been fixed.
Revised to: R5-190972.
| revised | No | R5‑190972 | |
R5‑190972 | TP for TS 38.522 | China Mobile Com. Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190127 | |||
R5‑190154 | CR to 38.522 for event triggered reporting test cases | Huawei, HiSilicon | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
5.1.7 | TS 38.533 (pCR) | R5‑190155 | Addition of NR test case 6.6.1.1-reporting without gap non-DRX | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190155r1.
Revised from: R5-190155.
r1: Format of initial condition is changed; Modify the title to follow the RAN5 RRM WP; Editor’s notes are added to clarify the unfinished part
Revised to: R5-190874.
| revised | No | R5‑190874 | |
R5‑190874 | Addition of NR test case 6.6.1.1-reporting without gap non-DRX | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised from: R5-190155r1.
updated editor's note to indicate connection diagram is FFS for 2 cells; updated coversheet to remove 38.508-1 reference; updated the test environment to NC only | approved | No | R5‑190155 | |||
R5‑190156 | Addition of NR test case 6.6.1.2-reporting without gap DRX | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190156r1.
Revised from: R5-190156.
Revised to: R5-190875.
| revised | No | R5‑190875 | |||
R5‑190875 | Addition of NR test case 6.6.1.2-reporting without gap DRX | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190156 | |||
R5‑190157 | Addition of NR test case 6.6.1.3-with gap non DRX | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190157r1.
Revised from: R5-190157.
Revised to: R5-190876.
| revised | No | R5‑190876 | |||
R5‑190876 | Addition of NR test case 6.6.1.3-with gap non DRX | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190157 | |||
R5‑190158 | Addition of NR test case 6.6.1.4-with gap DRX | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190158r1.
Revised from: R5-190158.
Revised to: R5-190877.
| revised | No | R5‑190877 | |||
R5‑190877 | Addition of NR test case 6.6.1.4-with gap DRX | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190158 | |||
R5‑190159 | Addition of NR test case 6.6.1.5-without gap non DRX SBI reading | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190159r1.
Revised from: R5-190159.
Revised to: R5-190878.
| revised | No | R5‑190878 | |||
R5‑190878 | Addition of NR test case 6.6.1.5-without gap non DRX SBI reading | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190159 | |||
R5‑190160 | Addition of NR test case 6.6.1.6-with gap non DRX SBI reading | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190160r1.
Revised from: R5-190160.
Revised to: R5-190879.
| revised | No | R5‑190879 | |||
R5‑190879 | Addition of NR test case 6.6.1.6-with gap non DRX SBI reading | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190160 | |||
R5‑190161 | CR to 38.533 annex for event triggered reorting test cases | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190161r1.
Revised from: R5-190161.
r1: Order of cell mapping is changed; Uncertainty of Noc changed from ±2 to ±1.5 dB
Revised to: R5-190880.
| revised | No | R5‑190880 | |||
R5‑190880 | CR to 38.533 annex for event triggered reorting test cases | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190161 | |||
R5‑190162 | Addition of defualt config for event triggered test cases | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190162r1.
Revised from: R5-190162.
r1: Default value of ssbSubcarrierSpacing in table H.3.1-3 is changed to ASN.1 values.
H.3.1-6 and H.3.1-4 is modified to cover more TCs
Revised to: R5-190885.
| revised | No | R5‑190885 | |||
R5‑190885 | Addition of defualt config for event triggered test cases | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190162 | |||
R5‑190163 | Addition of connection diagrams for event triggered test cases | Huawei, HiSilicon | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑190286 | Addition of EN-DC FR1 event triggered reporting test case 4.6.1.5 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190286r1.
Revised from: R5-190286.
Revised to: R5-190881.
| revised | No | R5‑190881 | |||
R5‑190881 | Addition of EN-DC FR1 event triggered reporting test case 4.6.1.5 | Huawei, HiSilicon | pCR | Approval | No |
Yes
| approved | No | R5‑190286 | |||
R5‑190287 | Addition of EN-DC FR1 event triggered reporting test case 4.6.1.6 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| revised | No | R5‑190882 | |||
R5‑190882 | Addition of EN-DC FR1 event triggered reporting test case 4.6.1.6 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190287 | |||
R5‑190288 | Addition of EN-DC FR1 event triggered reporting test case 4.6.1.3 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| revised | No | R5‑190883 | |||
R5‑190883 | Addition of EN-DC FR1 event triggered reporting test case 4.6.1.3 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190288 | |||
R5‑190289 | Addition of EN-DC FR1 event triggered reporting test case 4.6.1.4 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| revised | No | R5‑190884 | |||
R5‑190884 | Addition of EN-DC FR1 event triggered reporting test case 4.6.1.4 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190289 | |||
R5‑190295 | Introduction of 5G RRM TC 4.5.3.1 | Bureau Veritas | pCR | Approval | Yes |
Yes
Revised to: R5-190295r1.
Revised from: R5-190295.
Revised to: R5-190886.
| revised | No | R5‑190886 | |||
R5‑190886 | Introduction of 5G RRM TC 4.5.3.1 | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑190295 | |||
R5‑190296 | Introduction of 5G RRM TC 4.5.3.2 | Bureau Veritas | pCR | Approval | Yes |
Yes
Revised to: R5-190296r1.
Revised from: R5-190296.
Revised to: R5-190887.
| revised | No | R5‑190887 | |||
R5‑190887 | Introduction of 5G RRM TC 4.5.3.2 | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑190296 | |||
R5‑190297 | Introduction of 5G RRM TC 4.5.3.3 | Bureau Veritas | pCR | Approval | Yes |
Yes
Revised to: R5-190297r1.
Revised from: R5-190297.
Revised to: R5-190888.
| revised | No | R5‑190888 | |||
R5‑190888 | Introduction of 5G RRM TC 4.5.3.3 | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑190297 | |||
R5‑190298 | Introduction of 5G RRM TC 4.6.1.1 | Bureau Veritas | pCR | Approval | Yes |
Yes
Revised to: R5-190298r1.
Revised from: R5-190298.
Revised to: R5-190889.
| revised | No | R5‑190889 | |||
R5‑190889 | Introduction of 5G RRM TC 4.6.1.1 | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑190298 | |||
R5‑190299 | Introduction of 5G RRM TC 4.6.1.2 | Bureau Veritas | pCR | Approval | Yes |
Yes
Revised to: R5-190299r1.
Revised from: R5-190299.
Revised to: R5-190890.
| revised | No | R5‑190890 | |||
R5‑190890 | Introduction of 5G RRM TC 4.6.1.2 | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑190299 | |||
R5‑190300 | Introduction of 5G RRM TC 5.5.3.1 | Bureau Veritas | pCR | Approval | Yes |
Yes
Revised to: R5-190300r1.
Revised from: R5-190300.
Revised to: R5-190891.
| revised | No | R5‑190891 | |||
R5‑190891 | Introduction of 5G RRM TC 5.5.3.1 | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑190300 | |||
R5‑190301 | Introduction of 5G RRM TC 6.6.3.1 | Bureau Veritas | pCR | Approval | Yes |
Yes
Revised to: R5-190301r1.
Revised from: R5-190301.
Revised to: R5-190892.
| revised | No | R5‑190892 | |||
R5‑190892 | Introduction of 5G RRM TC 6.6.3.1 | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑190301 | |||
R5‑190340 | Update Annex G in TS 38.533 | Qualcomm communications-France | pCR | Approval | Yes |
Yes
Revised to: R5-190340r1.
Revised from: R5-190340.
Discussion paper: 0339
Revised to: R5-190803.
Revised from: R5-190340r1.
corrected the 3GPP formatting
| revised | No | R5‑190803 | |||
R5‑190803 | Update Annex G in TS 38.533 | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | R5‑190340 | |||
R5‑190435 | pCR for Addition of TC 6.5.1.3 NR SA FR1 RLM OOS in DRX | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190435r1.
Revised from: R5-190435.
Revised to: R5-190435r2.
Revised from: R5-190435r1.
Revised to: R5-190893.
| revised | No | R5‑190893 | |||
R5‑190893 | pCR for Addition of TC 6.5.1.3 NR SA FR1 RLM OOS in DRX | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| approved | No | R5‑190435 | |||
R5‑190436 | pCR for Addition of TC 6.4.3.1 NR SA FR1 TAA Accuracy | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190436r1.
Revised from: R5-190436.
Revised to: R5-190436r2.
Revised from: R5-190436r1.
Revised to: R5-190894.
| revised | No | R5‑190894 | |||
R5‑190894 | pCR for Addition of TC 6.4.3.1 NR SA FR1 TAA Accuracy | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| agreed | No | R5‑190436 | |||
R5‑190437 | pCR for Modification of TC 4.4.3.1 EN-DC FR1 TAA accuracy | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190437r1.
Revised from: R5-190437.
Revised to: R5-190437r2.
Revised from: R5-190437r1.
Revised to: R5-190895.
| revised | No | R5‑190895 | |||
R5‑190895 | pCR for Modification of TC 4.4.3.1 EN-DC FR1 TAA accuracy | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| approved | No | R5‑190437 | |||
R5‑190438 | pCR for Addition of TC 6.5.1.1 NR SA FR1 RLM OOS | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190438r1.
Revised from: R5-190438.
Revised to: R5-190438r2.
Revised from: R5-190438r1.
Revised to: R5-190896.
| revised | No | R5‑190896 | |||
R5‑190896 | pCR for Addition of TC 6.5.1.1 NR SA FR1 RLM OOS | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| approved | No | R5‑190438 | |||
R5‑190448 | Updating FR1 MU for timing measurements | Anritsu | pCR | Approval | Yes |
Yes
Discussion paper: 0058 | approved | No | ||||
R5‑190473 | pCR for Addition of TC 4.5.1.1 EN-DC FR1 RLM OOS | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised from: R5-190473.
Revised to: R5-190473r2.
Revised from: R5-190473r1.
Revised to: R5-190897.
| revised | No | R5‑190897 | |||
R5‑190897 | pCR for Addition of TC 4.5.1.1 EN-DC FR1 RLM OOS | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| approved | No | R5‑190473 | |||
R5‑190474 | pCR for Addition of TC 4.5.1.3 EN-DC FR1 RLM OOS in DRX | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
Revised to: R5-190474r1.
Revised from: R5-190474.
Revised to: R5-190474r2.
Revised from: R5-190474r1.
Revised to: R5-190898.
| revised | No | R5‑190898 | |||
R5‑190898 | pCR for Addition of TC 4.5.1.3 EN-DC FR1 RLM OOS in DRX | Qualcomm CDMA Technologies | pCR | Approval | Yes |
Yes
| approved | No | R5‑190474 | |||
R5‑190476 | Addition of band group power offsets | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190477 | Update of the annexes | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190478 | Changes to 4.7.1.x tests | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190479 | Addition of 4.7.2.x tests | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190480 | Addition of 4.7.4.x tests | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190481 | Changes to 6.7.1.x tests | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190482 | Addition of 6.7.2.x tests | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190483 | Addition of 6.7.4.x tests | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190512 | Addition of EN-DC FR1 radio link monitoring out-of-sync test for PSCell configured with CSI-RS-based RLM RS in non-DRX mode test case 4.5.1.5 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190513 | Addition of EN-DC FR1 radio link monitoring in-sync test for PSCell configured with CSI-RS-based RLM RS in non-DRX mode test case 4.5.1.6 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190514 | Addition of EN-DC FR1 radio link monitoring out-of-sync test for PSCell configured with CSI-RS-based RLM RS in DRX mode test case 4.5.1.7 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190515 | Addition of EN-DC FR1 radio link monitoring in-sync test for PSCell configured with CSI-RS-based RLM RS in DRX mode test case 4.5.1.8 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190516 | Addition of EN-DC FR1 interruptions at transitions between active and non-active during DRX in synchronous EN-DC test case 4.5.2.1 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190517 | Addition of EN-DC FR1 interruptions at transitions between active and non-active during DRX in asynchronous EN-DC test case 4.5.2.2 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190518 | Addition of EN-DC FR1 interruptions during measurements on deactivated NR SCC in synchronous EN-DC test case 4.5.2.3 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190519 | Addition of EN-DC FR1 interruptions during measurements on deactivated NR SCC in asynchronous EN-DC test case 4.5.2.4 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190520 | Addition of EN-DC FR1 interruptions during measurements on deactivated E-UTRAN SCC in synchronous EN-DC test case 4.5.2.5 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑190521 | Update to EN-DC FR1 transmit timing accuracy test | Qualcomm communications-France | pCR | Approval | Yes |
Yes
Revised to: R5-190521r1.
Revised from: R5-190521.
Revised to: R5-190899.
| revised | No | R5‑190899 | |||
R5‑190899 | Update to EN-DC FR1 transmit timing accuracy test | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | R5‑190521 | |||
R5‑190524 | Addition of EN-DC FR1 RLM IS non-DRX test with SSB-based RLM RS | Qualcomm communications-France | pCR | Approval | Yes |
Yes
Revised to: R5-190524r1.
Revised from: R5-190524.
Revised to: R5-190900.
| revised | No | R5‑190900 | |||
R5‑190900 | Addition of EN-DC FR1 RLM IS non-DRX test with SSB-based RLM RS | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | R5‑190524 | |||
R5‑190525 | Addition of EN-DC FR1 RLM IS DRX test with SSB-based RLM RS | Qualcomm communications-France | pCR | Approval | Yes |
Yes
Revised to: R5-190525r1.
Revised from: R5-190525.
Revised to: R5-190901.
| revised | No | R5‑190901 | |||
R5‑190901 | Addition of EN-DC FR1 RLM IS DRX test with SSB-based RLM RS | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | R5‑190525 | |||
R5‑190527 | Addition of NR SA FR1 RLM IS non-DRX test with SSB-based RLM RS | Qualcomm communications-France | pCR | Approval | Yes |
Yes
Revised to: R5-190527r1.
Revised from: R5-190527.
Revised to: R5-190902.
| revised | No | R5‑190902 | |||
R5‑190902 | Addition of NR SA FR1 RLM IS non-DRX test with SSB-based RLM RS | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | R5‑190527 | |||
R5‑190528 | Addition of NR SA FR1 RLM IS DRX test with SSB-based RLM RS | Qualcomm communications-France | pCR | Approval | Yes |
Yes
Revised to: R5-190528r1.
Revised from: R5-190528.
Revised to: R5-190903.
| revised | No | R5‑190903 | |||
R5‑190903 | Addition of NR SA FR1 RLM IS DRX test with SSB-based RLM RS | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | R5‑190528 | |||
R5‑190542 | Correction of RRM 5G Test Cases 4.6.2 - EN-DC FR1-FR1 Inter-frequency measurements | Ericsson | pCR | Approval | Yes |
Yes
late doc
Revised to: R5-190542r1.
Revised from: R5-190542.
Revised to: R5-190904.
| revised | No | R5‑190904 | |||
R5‑190904 | Correction of RRM 5G Test Cases 4.6.2 - EN-DC FR1-FR1 Inter-frequency measurements | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | R5‑190542 | |||
R5‑190543 | Correction of RRM 5G Test Cases 5.6.2 - EN-DC FR2-FR2 Inter-frequency measurements | Ericsson | pCR | Approval | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190544 | Correction of RRM 5G Test Cases 6.6.2 - NR SA FR1-FR1 Inter-frequency measurements | Ericsson | pCR | Approval | Yes |
Yes
late doc
Revised to: R5-190544r1.
Revised from: R5-190544.
Revised to: R5-190905.
| revised | No | R5‑190905 | |||
R5‑190905 | Correction of RRM 5G Test Cases 6.6.2 - NR SA FR1-FR1 Inter-frequency measurements | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | R5‑190544 | |||
R5‑190545 | Correction of RRM 5G Test Cases 7.6.2 - NR SA FR2-FR2 Inter-frequency measurements | Ericsson | pCR | Approval | Yes |
Yes
late doc
Revised to: R5-190545r1.
Revised from: R5-190545.
Revised to: R5-190906.
| revised | No | R5‑190906 | |||
R5‑190906 | Correction of RRM 5G Test Cases 7.6.2 - NR SA FR2-FR2 Inter-frequency measurements | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | R5‑190545 | |||
R5‑190548 | 38.533 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | pCR | Approval | Yes |
Yes
Revised to: R5-190548r1.
Revised from: R5-190548.
Discussion paper: 0530
Revised to: R5-190548r2.
Revised from: R5-190548r1.
Revised to: R5-190548r3.
Revised from: R5-190548r2.
more discussion to remove opitonality sequence
Revised to: R5-190548r4.
Revised from: R5-190548r3.
Revised to: R5-190987.
| revised | No | R5‑190987 | |||
R5‑190987 | 38.533 Common Section updates to clarify leverage across architecture options | Qualcomm communications-France | pCR | Approval | Yes |
Yes
| approved | No | R5‑190548 | |||
R5‑190582 | Annex F correction | ROHDE & SCHWARZ, ANRITSU | pCR | Approval | Yes |
Yes
The AWGN absolute power MU has been changed to +-1.5dB | approved | No | ||||
R5‑190583 | Addition of RRM Test Cases 4.5.2.6: EN-DC FR1 interruptions during measurements on deactivated E-UTRAN SCC in asynchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190583r1.
Revised from: R5-190583.
Revised to: R5-190907.
| revised | No | R5‑190907 | |||
R5‑190907 | Addition of RRM Test Cases 4.5.2.6: EN-DC FR1 interruptions during measurements on deactivated E-UTRAN SCC in asynchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190583 | |||
R5‑190584 | Addition of RRM Test Cases 5.5.2.1: EN-DC FR2 interruptions at transitions between active and non-active during DRX in synchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190584r1.
Revised from: R5-190584.
Revised to: R5-190908.
| revised | No | R5‑190908 | |||
R5‑190908 | Addition of RRM Test Cases 5.5.2.1: EN-DC FR2 interruptions at transitions between active and non-active during DRX in synchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190584 | |||
R5‑190585 | Addition of RRM Test Cases 5.5.2.2: EN-DC FR2 interruptions at transitions between active and non-active during DRX in asynchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190585r1.
Revised from: R5-190585.
Revised to: R5-190909.
| revised | No | R5‑190909 | |||
R5‑190909 | Addition of RRM Test Cases 5.5.2.2: EN-DC FR2 interruptions at transitions between active and non-active during DRX in asynchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190585 | |||
R5‑190586 | Addition of RRM Test Cases 5.5.2.3: EN-DC FR2 interruptions during measurements on deactivated NR SCC in synchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190586r1.
Revised from: R5-190586.
Revised to: R5-190910.
| revised | No | R5‑190910 | |||
R5‑190910 | Addition of RRM Test Cases 5.5.2.3: EN-DC FR2 interruptions during measurements on deactivated NR SCC in synchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190586 | |||
R5‑190587 | Addition of RRM Test Cases 5.5.2.4: EN-DC FR2 interruptions during measurements on deactivated NR SCC in asynchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190587r1.
Revised from: R5-190587.
Revised to: R5-190911.
| revised | No | R5‑190911 | |||
R5‑190911 | Addition of RRM Test Cases 5.5.2.4: EN-DC FR2 interruptions during measurements on deactivated NR SCC in asynchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190587 | |||
R5‑190588 | Addition of RRM Test Cases 5.5.2.5: EN-DC FR2 interruptions during measurements on deactivated E-UTRAN SCC in synchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190588r1.
Revised from: R5-190588.
Revised to: R5-190912.
| revised | No | R5‑190912 | |||
R5‑190912 | Addition of RRM Test Cases 5.5.2.5: EN-DC FR2 interruptions during measurements on deactivated E-UTRAN SCC in synchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190588 | |||
R5‑190589 | Addition of RRM Test Cases 5.5.2.6: EN-DC FR2 interruptions during measurements on deactivated E-UTRAN SCC in asynchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190589r1.
Revised from: R5-190589.
Revised to: R5-190913.
| revised | No | R5‑190913 | |||
R5‑190913 | Addition of RRM Test Cases 5.5.2.6: EN-DC FR2 interruptions during measurements on deactivated E-UTRAN SCC in asynchronous EN-DC | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| agreed | No | R5‑190589 | |||
R5‑190590 | Addition of RRM Test Cases 6.1.1.1: NR SA FR1 cell re-selection | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190590r1.
Revised from: R5-190590.
Revised to: R5-190914.
| revised | No | R5‑190914 | |||
R5‑190914 | Addition of RRM Test Cases 6.1.1.1: NR SA FR1 cell re-selection | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| agreed | No | R5‑190590 | |||
R5‑190591 | Addition of RRM Test Cases 6.1.1.2: NR SA FR1-FR1 cell re-selection | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190591r1.
Revised from: R5-190591.
Revised to: R5-190915.
| revised | No | R5‑190915 | |||
R5‑190915 | Addition of RRM Test Cases 6.1.1.2: NR SA FR1-FR1 cell re-selection | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190591 | |||
R5‑190592 | Addition of cell re-selection to higher priority E-UTRAN test case 6.1.2.1 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190592r1.
Revised from: R5-190592.
Revised to: R5-190916.
| revised | No | R5‑190916 | |||
R5‑190916 | Addition of cell re-selection to higher priority E-UTRAN test case 6.1.2.1 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190592 | |||
R5‑190593 | Addition of cell re-selection to lower priority E-UTRAN test case 6.1.2.2 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190593r1.
Revised from: R5-190593.
needs an editor note for test procedure change to update cell1/2 due to power levels
Revised to: R5-190917.
Revised to: R5-190917.
| revised | No | R5‑190917 | |||
R5‑190917 | Addition of cell re-selection to lower priority E-UTRAN test case 6.1.2.2 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190593 | |||
R5‑190594 | Addition of SA NR to E-UTRAN handover test case 6.3.1.4 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190594r1.
Revised from: R5-190594.
Revised to: R5-190918.
| revised | No | R5‑190918 | |||
R5‑190918 | Addition of SA NR to E-UTRAN handover test case 6.3.1.4 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| agreed | No | R5‑190594 | |||
R5‑190595 | Addition of SA NR to E-UTRAN handover test case 6.3.1.5 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190595r1.
Revised from: R5-190595.
Revised to: R5-190919.
| revised | No | R5‑190919 | |||
R5‑190919 | Addition of SA NR to E-UTRAN handover test case 6.3.1.5 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190595 | |||
R5‑190596 | Addition of NR SA FR1 UE UL carrier RRC reconfiguration delay test case 6.5.4.1 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190596r1.
Revised from: R5-190596.
Revised to: R5-190920.
| revised | No | R5‑190920 | |||
R5‑190920 | Addition of NR SA FR1 UE UL carrier RRC reconfiguration delay test case 6.5.4.1 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190596 | |||
R5‑190597 | Addition of NR SA FR1 CSI-RS based RLM out-of-sync non-DRX test case 6.5.1.5 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190597r1.
Revised from: R5-190597.
Revised to: R5-190921.
| revised | No | R5‑190921 | |||
R5‑190921 | Addition of NR SA FR1 CSI-RS based RLM out-of-sync non-DRX test case 6.5.1.5 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190597 | |||
R5‑190598 | Addition of NR SA FR1 CSI-RS based RLM in-sync non-DRX test case 6.5.1.6 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190598r1.
Revised from: R5-190598.
Revised to: R5-190922.
| revised | No | R5‑190922 | |||
R5‑190922 | Addition of NR SA FR1 CSI-RS based RLM in-sync non-DRX test case 6.5.1.6 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| agreed | No | R5‑190598 | |||
R5‑190599 | Addition of NR SA FR1 CSI-RS based RLM out-of-sync in DRX test case 6.5.1.7 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190599r1.
Revised from: R5-190599.
Revised to: R5-190923.
| revised | No | R5‑190923 | |||
R5‑190923 | Addition of NR SA FR1 CSI-RS based RLM out-of-sync in DRX test case 6.5.1.7 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| agreed | No | R5‑190599 | |||
R5‑190600 | Addition of NR SA FR1 CSI-RS based RLM in-sync in DRX test case 6.5.1.8 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-190600r1.
Revised from: R5-190600.
Revised to: R5-190924.
| revised | No | R5‑190924 | |||
R5‑190924 | Addition of NR SA FR1 CSI-RS based RLM in-sync in DRX test case 6.5.1.8 | Huawei, HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑190600 | |||
5.1.8 | TS 36.508 |   | ||||||||||
5.1.9 | TS 36.521-3 |   | ||||||||||
5.1.10 | TS 37.571-1 |   | ||||||||||
5.1.11 | TS 37.571-3 |   | ||||||||||
5.1.12 | TS 37.571-5 |   | ||||||||||
5.1.13 | TR 38.903 (NR MU & TT analyses) | R5‑190164 | Addition of TT analysis for event triggered test cases | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
Revised to: R5-190164r1.
Revised from: R5-190164.
r1: Changing Maximum allowed measurement uncertainty AWGN absolute power, Noc from 2.0dB to 1.5 dB
Revised to: R5-190164r2.
Revised from: R5-190164r1.
r2: Change SSB_RP in spreadsheet
Revised to: R5-190164r3.
Revised from: R5-190164r2.
r3: Modify the calculation of SSB-RP power to not include AWG
Revised to: R5-190872.
| revised | No | R5‑190872 | |
R5‑190872 | Addition of TT analysis for event triggered test cases | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190164 | |||
R5‑190342 | CR on FR2 measurement uncertainty | Anritsu | CR | Agreement | No |
Yes
late doc
CR to capture endorsed values in the MU budget tables.
To be merged into one TR38.903 CR 0576 | withdrawn | Yes | ||||
R5‑190350 | CR on definition of DUT repositioning | Anritsu | CR | Agreement | Yes |
Yes
FR2 MU Session:
PCTEST: companies are asked to review the text based on the comments for the discusssion paper in 349.
Revised to: R5-190938. | revised | No | R5‑190938 | |||
R5‑190938 | CR on definition of DUT repositioning | Anritsu | CR | Agreement | Yes |
Yes
Revised from: R5-190350.
to be check the final updated based on offline | withdrawn | Yes | R5‑190350 | |||
R5‑190469 | Updating impact from noise | Anritsu | CR | Agreement | Yes |
Yes
late doc
Discussion paper: 0059
KS: we likely need to set the values. Plan is to merge everything in one CR. CRs related to capturing MU outcome; KS CR in 574, R&S CR in 570. KS CR in 576, and Anritsu CR in 342.
merged content into Keysight CR 0576 | withdrawn | Yes | ||||
R5‑190471 | Offset value for coarse TRP measurement for spurious measurement | Anritsu | CR | Agreement | No |
Yes
late doc
| withdrawn | Yes | ||||
R5‑190570 | Update of MU budget to TR 38.903 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
content merged into Keysight CR 0576 | withdrawn | Yes | ||||
R5‑190574 | Update MU tables with beam peak search uncertainty | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
content merged into Keysight CR 0576 | withdrawn | Yes | ||||
5.1.14 | TR 38.905 (NR Test Points Radio Transmission and Reception ) | R5‑190102 | Test Point analysis for NR Narrow band in FR1 | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-190102r1.
Revised from: R5-190102.
Revised to: R5-190102r2.
Revised from: R5-190102r1.
deferred to check the core spec released version 15.4.0 matches the contents; remove the folder under zip
deferred to address how to inlcude RAN4 releaxation
Revised to: R5-190966.
| revised | No | R5‑190966 | |
R5‑190966 | Test Point analysis for NR Narrow band in FR1 | CAICT | CR | Agreement | Yes |
Yes
Revised from: R5-190102r2.
no need for power consideration in the TP anslysis since it is only for Tx power, measurement is for Rx. | agreed | No | R5‑190102 | |||
R5‑190103 | Test Point analysis for NR spurious response in FR1 | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-190103r1.
Revised from: R5-190103.
Revised to: R5-190103r2.
Revised from: R5-190103r1.
deferred to check the core spec released version 15.4.0 matches the contents; remove the folder under zip
deferred to address how to inlcude RAN4 releaxation
Revised to: R5-190967.
| revised | No | R5‑190967 | |||
R5‑190967 | Test Point analysis for NR spurious response in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190103 | |||
R5‑190116 | Test Point analysis update for FR2 TxSpurious test case | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
Revised to: R5-190116r1.
Revised from: R5-190116.
Revised to: R5-190116r2.
Revised from: R5-190116r1.
to fix the formatting of zip file; formatting of 38.905 updates from pervious that is already presented
Revised to: R5-190957.
| revised | No | R5‑190957 | |||
R5‑190957 | Test Point analysis update for FR2 TxSpurious test case | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190116 | |||
R5‑190205 | Test Point analysis for TC 6.3.3.4 PRACH time mask in FR1 | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190210 | Adding test case 6.5B.2.1.3 to 38.905 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190273 | Update of TP analysis of FR1 6.2.1 MOP | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190274 | Addition of TP analysis of FR1 6.2.4 Configured transmitted power | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
deferred to check the core spec released version 15.4.0 matches the contents
matching CR in 272
core spec matching | agreed | No | ||||
R5‑190280 | Addition of TP analysis of FR2 6.3.1 Minimum output power | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
CR implemented in 0279
corresponding CR 279 is differed to check CP vs DFTs
Offline still on-going | agreed | No | ||||
R5‑190283 | Addition of TP analysis of FR2 6.3.4.2 Absolute power tolerance | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
CR implemented in 0281
power tolerance analysis is pending , withdrawn | withdrawn | Yes | ||||
R5‑190285 | Addition of TP analysis of FR2 6.3.3.2 General ON/OFF time mask | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
CR implemented in 0284
Revised to: R5-190285r1.
Revised from: R5-190285.
deferred to check the core spec released version 15.4.0 matches the contents
to remove the "xxxxx" and also cehck and update tp analsyis depdending on Power range discussions corresponding CR in 284
Revised to: R5-190974.
| revised | No | R5‑190974 | |||
R5‑190974 | Addition of TP analysis of FR2 6.3.3.2 General ON/OFF time mask | Huawei, HiSilicon | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑190285 | |||
R5‑190306 | TP_analysis_38.905_6.5.3.1_TX_SpurEmission | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised to: R5-190306r1.
Revised from: R5-190306.
r1: Coversheet release version changed to Rel-15
Revised to: R5-190811.
| revised | No | R5‑190811 | |||
R5‑190811 | TP_analysis_38.905_6.5.3.1_TX_SpurEmission | Qualcomm Korea | CR | Agreement | Yes |
Yes
Revised from: R5-190306r1.
remove the folder in the zip file in the final version | agreed | No | R5‑190306 | |||
R5‑190327 | Adding test case 6.2B.1.1 to 38.905 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
late doc
Revised to: R5-190327r1.
Revised from: R5-190327.
Revised to: R5-190993.
| revised | No | R5‑190993 | |||
R5‑190993 | Adding test case 6.2B.1.1 to 38.905 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190327 | |||
R5‑190328 | Adding test case 6.2B.1.2 to 38.905 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
late doc
Revised to: R5-190328r1.
Revised from: R5-190328.
Revised to: R5-190991.
| revised | No | R5‑190991 | |||
R5‑190991 | Adding test case 6.2B.1.2 to 38.905 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190328 | |||
R5‑190329 | Adding test case 6.2B.1.3 to 38.905 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
late doc
Discussion paper: 0605; TC: 0326
Revised to: R5-190329r1.
LATE DOCUMENT
Revised from: R5-190329.
Revised to: R5-190989.
| revised | No | R5‑190989 | |||
R5‑190989 | Adding test case 6.2B.1.3 to 38.905 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190329 | |||
R5‑190440 | Addition of TP analysis of FR1 6.2D.1 MOP for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
deferred to check the core spec released version 15.4.0 matches the contents
matches core spec release | agreed | No | ||||
R5‑190442 | Addition of TP analysis of FR1 6.2D.2 MPR for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
deferred to check the core spec released version 15.4.0 matches the contents
matches core spec release | agreed | No | ||||
R5‑190444 | Addition of TP analysis of FR1 6.2D.4 Configured transmitted power for MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
deferred to check the core spec released version 15.4.0 matches the contents
matches core spec release | agreed | No | ||||
R5‑190502 | Adding test case 7.4B.1 to 38.905 | Huawei, Hisilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190503 | Adding test case 7.4B.2 to 38.905 | Huawei, Hisilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190504 | Adding test case 7.4B.3 to 38.905 | Huawei, Hisilicon | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190526 | TP analysis for 38.521-3 MPR intra-band contiguous | Ericsson | CR | Agreement | Yes |
Yes
late doc
Revised to: R5-190526r1.
Revised from: R5-190526.
Revised to: R5-190830.
| revised | No | R5‑190830 | |||
R5‑190830 | TP analysis for 38.521-3 MPR intra-band contiguous | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190526 | |||
5.1.15 | Discussion Papers, Work Plan, TC lists | R5‑190034 | Test applicability on FR1 NSA REFSENS tests | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
check offline on the need for testing cases which do NOT have MSD impact
Revised to: R5-190034r1.
Revised from: R5-190034.
Change proposal to:
Proposal 1 : Send LS to RAN4 to update TS 38.101-3 based on following RAN5 perspective.
Ř LTE anchor agnostic can’t be applied to REFSENS (Inter-band within FR1) regardless of exceptional requirements (e.g. MSD, IM).
Revised to: R5-190976.
| revised | No | R5‑190976 | |
R5‑190976 | Test applicability on FR1 NSA REFSENS tests | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
Revised from: R5-190034r1.
noted , LS to be sent to RAN4 | noted | No | R5‑190034 | |||
R5‑190035 | Test procedure on FR1 NSA REFSENS tests | NTT DOCOMO, INC. | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
R5‑190049 | Test procedure of FR2 ACLR | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
dependent CR in 050 more offline discussions needed
Added FR2 MU 3 doc tag.
FR2 MU Session:
KS: the -35dBm check is from the core requirement. The test requirement is following the core requirement.
NTT DOCOMO: this proposal doesn't conflict with core requirement.
QC: does removing this really make any difference?
NTT DOCOMO: too much relaxation.
QC: keep it and this gives flexibility for future to handle low PSD case.
Intel: don't see why to remove and add back later. keep as is.
NTT DOCOMO: this document can be noted.
Noted | noted | No | ||||
R5‑190052 | Multi-Band Relaxation for FR2 Power Class 3 | Apple Europe Limited | discussion | Endorsement | Yes |
Yes
late doc
LATE DOCUMENT
Revised to: R5-190052r1.
LATE DOCUMENT
Revised from: R5-190052.
Revised to: R5-190977.
| revised | No | R5‑190977 | |||
R5‑190977 | Multi-Band Relaxation for FR2 Power Class 3 | Apple Europe Limited | discussion | Endorsement | Yes |
Yes
LATE DOCUMENT
Revised from: R5-190052r1.
LS to RAN4 to be sent | noted | No | R5‑190052 | |||
R5‑190057 | MU for FR1 UL-MIMO SA TRx Tests | Anritsu | discussion | Endorsement | Yes |
Yes
tdoc 0276 adds MU/TT in TS38.521-1 Annex
deferred to handle the TBD
Revised to: R5-190057r1.
Revised from: R5-190057.
Revised to: R5-190955.
| revised | No | R5‑190955 | |||
R5‑190955 | MU for FR1 UL-MIMO SA TRx Tests | Anritsu | discussion | Endorsement | Yes |
Yes
Revised from: R5-190057r1.
noted and proposals are endorsed | noted | No | R5‑190057 | |||
R5‑190058 | FR1 MU for RRM timing measurements | Anritsu | discussion | Yes |
Yes
CR implemented in 0448
Proposal 1: ±112 Tc for FR1 Absolute timing measurement MU
Proposal 2: ±88 Tc for FR1 Relative timing measurement MU
noted and proposals are endorsed
| noted | No | |||||
R5‑190059 | Impact from noise for FR2 TRx MU | Anritsu | discussion | Yes |
Yes
associated CR: 0469
Proposal 1) Bias of measured power due to noise is added as systematic error and accounted to total MU with ± (?_SNR + MUother), where ?_SNR=10 "log" 10(SNR^(-1)+1).
noted , proposal endorsed , implenented in tdoc 469 (other CR's 574, 570, 576, 342) | noted | No | |||||
R5‑190104 | FR2 TT for transmit test cases | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
FR2 TT
Revised to: R5-190104r1.
Revised from: R5-190104.
Revised to: R5-190946.
| revised | No | R5‑190946 | |||
R5‑190946 | FR2 TT for transmit test cases | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
Revised from: R5-190104r1.
remove Tconfigure o/p power is covered in MPR , also MPR and AMPR needs more analysis for determining whether it is low PSD, will be revisited in future meeting. Obs 3 and prop1 needs to be changed. Prop1 is endorsed pending technical analysis | noted | No | R5‑190104 | |||
R5‑190105 | FR1 TT for UL MIMO test cases | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
FR1 TT, add the TT values into document 257 from TIM, TT Updates to the actual test case is in tdoc 276
Revised to: R5-190105r1.
Revised from: R5-190105.
Revised to: R5-190954.
| revised | No | R5‑190954 | |||
R5‑190954 | FR1 TT for UL MIMO test cases | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
Revised from: R5-190105r1.
Noted and proposal is endorsed | noted | No | R5‑190105 | |||
R5‑190106 | FR1 TT for UL CA test cases | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
FR1 TT
pending 0470
Revised to: R5-190106r1.
Revised from: R5-190106.
Revised to: R5-191003.
| revised | No | R5‑191003 | |||
R5‑191003 | FR1 TT for UL CA test cases | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
Revised from: R5-190106r1.
Noted and 2 proposals are endorsed | noted | No | R5‑190106 | |||
R5‑190107 | Applicability of LTE anchor agnostic to inter-band within FR1 | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
same reason as 0034
Revised to: R5-190107r1.
Revised from: R5-190107.
Revised to: R5-190975.
| revised | No | R5‑190975 | |||
R5‑190975 | Applicability of LTE anchor agnostic to inter-band within FR1 | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
Revised from: R5-190107r1.
noted LS to be sent to RAN4 | noted | No | R5‑190107 | |||
R5‑190113 | Discussion on OBW procedure update for FR1 and FR2 | Qualcomm Finland RFFE Oy | discussion | Yes |
Yes
ask for late tdoc for cr's to -1/-2/-3 and also check if intraband contigous needs any different procedure for LTE . Also see how to optimize the test procedure
Revised to: R5-190113r1.
Revised from: R5-190113.
Revised to: R5-190963.
| revised | No | R5‑190963 | ||||
R5‑190963 | Discussion on OBW procedure update for FR1 and FR2 | Qualcomm Finland RFFE Oy | discussion | - | Yes |
Yes
Revised from: R5-190113r1.
Noted and proposals are endorsed
CR implemented in 0943 (38.521-1) and 0944 (38.521-2) | noted | No | R5‑190113 | |||
R5‑190114 | FR2 Spurious emissions test point analysis update | Qualcomm Finland RFFE Oy | discussion | Yes |
Yes
Revised to: R5-190114r1.
Revised from: R5-190114.
CR implemented in 0117 (TC) and 0116 (TP analysis)
Revised to: R5-190859.
| revised | No | R5‑190859 | ||||
R5‑190859 | FR2 Spurious emissions test point analysis update | Qualcomm Finland RFFE Oy | discussion | - | Yes |
Yes
| noted | No | R5‑190114 | |||
R5‑190115 | Discussion on TS38.521-2 Annex K Update | Qualcomm Finland RFFE Oy | discussion | Yes |
Yes
CR implemented in 0120 | noted | No | |||||
R5‑190121 | Common understanding to multiband relaxation | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
MB
more offline to update the way fwd to RAn4 and RAN5
LS to RAN4 to be sent | noted | No | ||||
R5‑190122 | Handling of multiband relaxation in RAN5 | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
MB
same comment as 121
LS to RAN4 to be sent | noted | No | ||||
R5‑190126 | Test approach for EN-DC TRx tests with CCs > 2 | Anritsu | discussion | Endorsement | Yes |
Yes
Revised to: R5-190126r1.
Revised from: R5-190126.
Revised to: R5-190126r2.
Revised from: R5-190126r1.
need more time to analyze actual example from 38.101-3
Revised to: R5-190978.
Proposal 1 : NR exception reqs are tested by configuring min. number of LTE CCs concerning that requirements.
Proposal 2 : LTE exception reqs are tested by configuring min. number of NR CCs concerning that requirements.
Proposal 3 : Test cases are defined with the number of CCs in the DC band combination (Option B1)
| revised | No | R5‑190978 | |||
R5‑190978 | Test approach for EN-DC TRx tests with CCs > 2 | Anritsu | discussion | Endorsement | Yes |
Yes
Revised from: R5-190126r2.
Noted and proposals are endorsed | noted | No | R5‑190126 | |||
R5‑190257 | NR TT Way Forward update | Telecom Italia | discussion | Information | Yes |
Yes
PCTEST: Status document for FR2 MU. No need to discuss in MU session. Will treat in TT session.
Telecom Italia: a draft revision has been uploaded for FR1 updates. waiting for FR2 MU outcome to update the paper.
status for FR1 is included , FR2 is pending outcome MU discussions
Revised to: R5-190257r1.
Revised from: R5-190257.
Revised to: R5-190940.
| revised | No | R5‑190940 | |||
R5‑190940 | NR TT Way Forward update | Telecom Italia | discussion | Information | Yes |
Yes
Revised from: R5-190257r1.
noted and FR1 TT values are endorsed | noted | No | R5‑190257 | |||
R5‑190264 | WF on multiband relaxation | NTT DOCOMO, INC. | discussion | Endorsement | No |
Yes
LATE DOCUMENT
Late document since this document will capture agreements during the meeting. | withdrawn | Yes | ||||
R5‑190265 | Review on RAN4 pending issue after RAN4#89 | NTT DOCOMO, INC. | discussion | Discussion | Yes |
Yes
LATE DOCUMENT
Late document since this document is based on LS from RAN4 which will be available after submission deadline. Also handle LS 0376 | noted | No | ||||
R5‑190275 | Discussion on MU and TT for FR1 UL-MIMO test cases | Huawei, HiSilicon | discussion | Endorsement | Yes |
Yes
Deffered to check if MU can be merged with 0027, TT can be handled with 0105 | noted | No | ||||
R5‑190278 | Discussion on necessity of testing configured transmitted power in FR2 | Huawei, HiSilicon | discussion | Endorsement | Yes |
Yes
CR implemented by 0277
update proposal to indicate if Pmax is not updated Configured o/p power need not be tested
Revised to: R5-190860. | revised | No | R5‑190860 | |||
R5‑190860 | Discussion on necessity of testing configured transmitted power in FR2 | Huawei, HiSilicon | discussion | Endorsement | Yes |
Yes
Revised from: R5-190278.
noted and proposal is endorsed | noted | No | R5‑190278 | |||
R5‑190282 | Discussion on Absolute power tolerance testing in FR2 | Huawei, HiSilicon | discussion | Endorsement | Yes |
Yes
Proposal 1: It is proposed that RAN5 considers the solutions above and decide a way forward for Absolute power tolerance testing.
CR implemented in 0281
deferred for more offline disucssion on the impact of the antenna gain
more analysis needed , even in RAN4 | noted | No | ||||
R5‑190339 | Discussion on Annex G for 5G NR RRM tests | Qualcomm communications-France | discussion | Agreement | Yes |
Yes
Revised to: R5-190339r1.
associated CR 0340
Revised to: R5-190802.
Proposal endorsed
| revised | No | R5‑190802 | |||
R5‑190802 | Discussion on Annex G for 5G NR RRM tests | Qualcomm communications-France | discussion | Agreement | Yes |
Yes
| noted | No | R5‑190339 | |||
R5‑190341 | MU value for multiple measurement antenna uncertainty | Anritsu | discussion | Endorsement | Yes |
Yes
In this contribution we propose MU values for mechanical feed antenna positioning (switching) based on the evaluation results provided from a cable manufacturer.
deferred to check the value to pick based on the datasheet or other inputs from cable manufacturers
Multiple meausrement antenna MU is agreed to be 0.3dB and will be incorporated in teh MU CR.
Revised to: R5-190863. | revised | No | R5‑190863 | |||
R5‑190863 | MU value for multiple measurement antenna uncertainty | Anritsu | discussion | Endorsement | Yes |
Yes
Revised from: R5-190341.
Proposal 1: Define 0.5 dB as MU value of “Multiple antenna measurement uncertainty” in the case of mechanical feed antenna positioning.
noted and proposal is endorsed with 0.3dB multiple measurement antenna | noted | No | R5‑190341 | |||
R5‑190343 | QoQZ characterization at out-of-band region | Anritsu | discussion | Endorsement | Yes |
Yes
In this contribution we introduce our current views on factors to characterize QoQZ at out-of-band region.
Still needs agreement on proposals , more offline needed
FR2 MU Session:
KS presented the latest version of TE vendor view spreadsheet.
PCTEST: TE Vendors working offline to address the three proposals in Anritsu 343, KS 386, and R&S 567. Plan is to produce a way forward document/spreadsheet capturing the agreements.
0343, 0386 and 0567 will merged into a way foward discussion paper | noted | No | ||||
R5‑190344 | Measurement uncertainty definition point in FR2 | Anritsu | discussion | Endorsement | Yes |
Yes
LATE DOCUMENT
In this contribution we propose our view on the frequency point to define MU values at the outside of frequency range from 23.45 to 40.8 GHz.
FR2 MU session:
KS: not unheard of that we need to perform QoQZ at new frequencies.
R&S: agree with Keysight.
PCTEST: we will note this document.
Noted | noted | No | ||||
R5‑190345 | MU contribution of “Mismatch” at FR2 in-band region | Anritsu | discussion | Endorsement | Yes |
Yes
Proposal 1: Keep 1.3 dB as the MU value of “Mismatch” at the FR2 in-band frequency range and remove brackets from the tables.
FR2 MU session:
KS: we support this proposal. Any reason to keep relative measurement FFS?
Anritsu: once we reach agreement on ACLR part, we can conclude.
PCTEST: group can endorse the proposal.
Noted and proposal is endorsed | noted | No | ||||
R5‑190346 | Evaluation result of amplifier stability | Anritsu | discussion | Discussion | Yes |
Yes
This contribution introduces an evaluation result of stability (gain characteristics) of the external amplifier unit for FR2 test system as one of factors for measurement uncertainty contribution “Amplifier uncertainties”.
only observation, no proposal | noted | No | ||||
R5‑190347 | MU contribution of “Uncertainty of the RF power measurement equipment” (2) | Anritsu | discussion | Endorsement | Yes |
Yes
Proposal 1: Accept to refer to values which are not warranted as measurement equipment, for example 95th %-ile values in datasheets or results from inspection data of manufactured products.
Proposal 2: Keep the currently defined MU value “Uncertainty of the RF power measurement equipment”, i.e. 2.16 dB for all in-band and out-of-band test case and remove brackets.
Revised to: R5-190347r1.
Revised from: R5-190347.
Revised to: R5-190804.
Revised from: R5-190347r1.
noted, proposals endorsed
| revised | No | R5‑190804 | |||
R5‑190804 | MU contribution of “Uncertainty of the RF power measurement equipment” (2) | Anritsu | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑190347 | |||
R5‑190348 | MU contribution of “Uncertainty of network analyzer” (2) | Anritsu | discussion | Endorsement | Yes |
Yes
Proposal 1: Define 0.4 dB as the MU value of “Uncertainty of network analyzer” at the FR2 in-band frequency range from 23.45 GHz to 44.3 GHz.
FR2 MU Session:
R&S: believe that we need to include sqrt(2) of VNA datasheet value.
KS: need more offline discussion.
Revised to: R5-190941. | revised | No | R5‑190941 | |||
R5‑190941 | MU contribution of “Uncertainty of network analyzer” (2) | Anritsu | discussion | Endorsement | Yes |
Yes
Revised from: R5-190348.
deferred to capture the offline discussion on the proposal1
Noted and 2 proposal are endorsed | noted | No | R5‑190348 | |||
R5‑190349 | DUT repositioning and its relations with QoQZ for OTA measurement | Anritsu | discussion | Endorsement | Yes |
Yes
In this contribution we clarify a definition and an applicability of measurement uncertainty (MU) contribution called “DUT repositioning” from multiple use cases and also consider its relations with the quality of quiet zone (QoQZ) during the OTA measurement.
FR2 MU session:
KS: good overview, still discussing spurious emission domain. We need to be careful on the usage of device re-positioning vs. DUT re-positioning.
PCTEST: companies to review CR in 350 offline to determine if any text needs to be updated.
Anritsu: need to update this document to align with offline agreements.
review the associated CR in 350 to confirm changes between device repositioning and DUT repositioning
Revised to: R5-190939. | revised | No | R5‑190939 | |||
R5‑190939 | DUT repositioning and its relations with QoQZ for OTA measurement | Anritsu | discussion | Endorsement | Yes |
Yes
Revised from: R5-190349.
incorported the changes based on offline discussion to the final proposal | noted | No | R5‑190349 | |||
R5‑190385 | On XPD MU Element | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
The XPD MU element has been defined in TR38.810 and TR38.903. This contribution is addressing a correction of the MU element definition and the MU value used by test cases referencing this MU element.
Revised to: R5-190385r1.
Revised from: R5-190385.
Revised to: R5-190864.
| revised | No | R5‑190864 | |||
R5‑190864 | On XPD MU Element | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
Revised from: R5-190385r1.
Proposal 1: Change the MU value in [2] from [0.48] dB [3] to 0.01 dB for an XPD of -25 dB.
Proposal 2: Set the MU element of the XPD of the measurement probe to 0dB for a calibration approach based on calibrating all signal paths
Proposal 3: Replace the derivation of the MU element of the XPD in 38.903 with the derivation outlined in this contribution
noted and 3 proposals are endorsed | noted | No | R5‑190385 | |||
R5‑190386 | QoQZ Procedure for Spurious Emissions | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
This contribution is proposing an abbreviated procedure for spurious emissions testing for the FR2 range and beyond, i.e., up to the 2nd harmonic of the upper frequency edge of the UL operating band.
This procedure is mandatory before the test system is commissioned for certification tests and characterizes the quiet zone performance of the anechoic chamber, specifically the effect of reflections within the anechoic chamber. Additionally, it includes the effect of offsetting the directive antenna array inside a DUT from the centre of the quiet zone, i.e., the centre of rotation of the DUT and measurement antenna positioning systems.
FR2 MU Session:
KS presented the latest version of TE vendor view spreadsheet.
PCTEST: TE Vendors working offline to address the three proposals in Anritsu 343, KS 386, and R&S 567. Plan is to produce a way forward document/spreadsheet capturing the agreements.
Online Session:
Note all three papers. KS to request a Tdoc for WF.
more offline discussions needed , possible to create a new way fwd document
will be merged into a new discussion paper to be requested (343, 386, 567) | noted | No | ||||
R5‑190387 | On MU Element for DUT Repositioning | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
A new MU element for DUT Repositioning has been in introduced in 38.903 during RAN5#81. This contribution is looking at a statistical analysis to provide sample values for MOP and REFSENS test cases in absence of empirical evaluations
noted and proposals are endorsed, CR to implement the proposal in TR38.903 merged CR | noted | No | ||||
R5‑190388 | On MU Element for Positioning and pointing misalignment between the reference antenna and the measurement antenna | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
The MU element Positioning and pointing misalignment between the reference antenna and the measurement antenna is currently in []. This contribution is looking at a statistical analysis to provide sample values in absence of empirical evaluations
Revised to: R5-190805.
Revised from: R5-190388.
noted and proposal is endorsed and will be captured in TR38903 merged CR
| revised | No | R5‑190805 | |||
R5‑190805 | On MU Element for Positioning and pointing misalignment between the reference antenna and the measurement antenna | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑190388 | |||
R5‑190389 | On MU Element for Positioning Misalignment | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
A statistical analysis for the MUs on Positioning Misalignment and Misalignment of positioning System is presented to provide justification for the updated sample value of 0dB for MOP and REFSENS test cases.
Noted, proposal 2 and 3 endorsed | noted | No | ||||
R5‑190390 | On QoQZ MU Impact on OBW | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
This contribution is presenting sample QoQZ data at the band edges of FR2_A and FR2_B with 800MHz frequency offset. This difference in QoQZ performance is then used to estimate the MU impact on the OBW test case
No impact to OBW on either approach detailed in the paper,
KS: No impact on OBW based on either approach. Will revise based on the Anritsu paper. The conclusions will be the same.
Anritsu: we would like to review the final doc.
Revised to: R5-190865. | revised | No | R5‑190865 | |||
R5‑190865 | On QoQZ MU Impact on OBW | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes
Revised from: R5-190390.
offline agreements on OBW needs to be incoporated , verdict to be issued after the offline check on the document | withdrawn | Yes | R5‑190390 | |||
R5‑190391 | On QoQZ MU Impact on ACLR | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
ACLR test cases focus on relative power differences at the assigned channel and the adjacent channel. When compared to absolute power measurement test cases such as MOP or SEM, ACLR test cases should only take the relative difference of QoQZ performance into account. In the simplest approximation, the relative difference could be assumed to be zero within the FR2 subranges. This contribution is presenting sample QoQZ data at the band edges of FR2_A and FR2_B with 800MHz frequency offset and shows a small relative difference
KS: further email discussions and offline discussions were held. One approach is overestimating and one is underestimating. The MU value would be different for ACLR. Will need to determine a final value and revise.
final value needs more offline discussions and incorporated in the final TDOC
Revised to: R5-190866. | revised | No | R5‑190866 | |||
R5‑190866 | On QoQZ MU Impact on ACLR | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes
Revised from: R5-190391.
verdict to be issued after offline check on the draft | withdrawn | Yes | R5‑190391 | |||
R5‑190394 | On the MU term Influence of the calibration antenna feed cable | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
The sample value of the Mismatch MU element has been derived by RAN4 previously. This contribution aims to remove the [0]dB sample value with a 0.1dB MU value.
FR2 MU Session:
R&S: how many rotary joints were considered? Typically, there would be two so we should multiply by sqrt(2).
KS: we included one rotary joint but we are OK to revise.
PCTEST: document will be revised and updated proposal can be endorsed.
Revise the paper to update on offline discussions , needs to be incorporated in a final
Revised to: R5-190867. | revised | No | R5‑190867 | |||
R5‑190867 | On the MU term Influence of the calibration antenna feed cable | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
Revised from: R5-190394.
Noted and proposal is endorsed | noted | No | R5‑190394 | |||
R5‑190446 | On the power level to derive SNR for FR2 TRx tests | Anritsu | discussion | Endorsement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190449 | RRM TT analysis.xls template for NR FR1 | Anritsu | discussion | Yes |
Yes
RAN5 is asked to endorse the methods proposed the attached analysis.xls, and to use it as a template for other test cases, adapting as appropriate
noted , way fwd is endorsed. Pseudo CR for test cases needs to be handled as a CR to TR38.903 in Feb meeting | noted | No | |||||
R5‑190460 | SNR estimation update for FR2 priority 1 and 2 TRx TCs | Anritsu | discussion | Endorsement | Yes |
Yes
LATE DOCUMENT
FR2 MU Session:
KS and Anritsu discussed the need to compare the values but clarification was needed from KS.
KS: we have a different estimate for MOP min peak EIRP and don't see the need to relax the MOP requirement. The paper is missing TRP and Spherical Coverage requirement.
Anritsu: we are working on TRP. No plan to update Spherical Coverage for this meeting.
Orange: Spherical Coverage is important.
Huawei: what does relaxation mean here? maybe it is conflicting with the Anritsu paper in R5-190059.
KS: need to relax and use reasonable MU or the systematic error will be too large.
KS: need to consider with KS paper in 601 since the MOP conclusion is different.
0460r1 comment, but undo after meeting discussed.
FR2 MU Session:
KS: Trying to conclude on MOP. Need to align on assumptions.
Anritsu: SNR assumptions are very different.
KS: will draft a WF on simulation assumptions to address 460 and 601.
Revision to include TRP SNR esitmation updates, and revise the relaxation for prio1 tests
related discussion in 460r1 & 601 will be merged into a way fwd paper
| noted | No | ||||
R5‑190463 | Consideration on FR2 MU for relative power measurements | Anritsu | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190466 | FR1 EN-DC MU updates | Anritsu | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190467 | Discussion paper on section 9 and 10 of demod spec | Qualcomm CDMA Technologies | discussion | Endorsement | Yes |
Yes
proposal to the WP structure
deferred for replaced proposal 1 with batter wording
Revised to: R5-190467r1.
Revised from: R5-190467.
Revised to: R5-190979.
| revised | No | R5‑190979 | |||
R5‑190979 | Discussion paper on section 9 and 10 of demod spec | Qualcomm CDMA Technologies | discussion | Endorsement | Yes |
Yes
Revised from: R5-190467r1.
Noted and proposal is endorsed | noted | No | R5‑190467 | |||
R5‑190470 | MU for FR1 UL CA SA TRx Tests | Anritsu | discussion | No |
Yes
late doc | withdrawn | Yes | |||||
R5‑190472 | Offset value for coarse TRP measurement for spurious measurement | Anritsu | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190475 | On the minimum requirements for RRM tests | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
associated CR 0478 to proposal 1
proposals are endorsed, prop2 will be updated in the draft SPEC directly by R&S | noted | No | ||||
R5‑190484 | Status RRM dependencies for Feb 2019 | ROHDE & SCHWARZ | discussion | Information | Yes |
Yes
For information only | noted | No | ||||
R5‑190530 | Discussion on architecture option agnostic nature of RF, RRM, Demodulation Performance tests. | Qualcomm communications-France | discussion | Agreement | Yes |
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
associated CR 0405, 0539, 0546, 0548, 0550
Revised to: R5-190530r1.
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Revised from: R5-190530.
to remove 38.533 from the discussion of option4 as RRM tests have an impact. For option5 test case shall refer to LTE not NR.
Revised to: R5-190530r2.
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Revised from: R5-190530r1.
Revised to: R5-190530r3.
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Revised from: R5-190530r2.
have more offline to remove applicability sequence
Revised to: R5-190530r4.
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Revised from: R5-190530r3.
Revised to: R5-190983.
| revised | No | R5‑190983 | |||
R5‑190532 | Discussion on MU and TT evolution | Ericsson, Orange, DISH Network | discussion | Endorsement | Yes |
Yes
Revised to: R5-190532r1.
Revised from: R5-190532.
FR2 MU Session:
VZ: exactly same concern. Strongly don't want TE vendor to use worst case requirement.
KS: can't accept these proposals. No precendene and significant technical and commercial risk. The 38.521-2 test spec does not have the F.2 allowance.
Orange: cannot understand why MU can't be changed.
R&S: only TT was open for revision.
DISH: from a practical view, we can understand why we can see MU improving. Would appreciate more flexibility from TE vendors. Certification bodies may not be able to use these values moving forward. As MU grows, it lowers the value of certification.
PCTEST: will defer for additional offline discussion.
needs online time for agreement with RAn5 group on the MU evolution
Revised to: R5-190532r2.
Revised from: R5-190532r1.
Revised to: R5-191004.
| revised | No | R5‑191004 | |||
R5‑191004 | Discussion on MU and TT evolution | Ericsson, Orange, DISH Network | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑190532 | |||
R5‑190536 | Discussion on grouping of EN-DC tests with multiple NR carriers | Qualcomm communications-France | discussion | Agreement | Yes |
Yes
proposals are endorsed and implemented in updated WP | noted | No | ||||
R5‑190558 | Handling on FR2 configured output power | NTT DOCOMO, INC. | discussion | Discussion | Yes |
Yes
Same content as discussed in 0277 (CR) and 0278 (discussion)
For information only | noted | No | ||||
R5‑190566 | Discussion on measurement uncertainty in FR2 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Agenda Allocation was changed: [5.1.12]->[5.1.15].
Same as prop2 of 389 noted and endorsed | noted | No | ||||
R5‑190567 | Discussion on QoQZ for spurious emissions | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Agenda Allocation was changed: [5.1.13]->[5.1.15].
FR2 MU Session:
KS presented the latest version of TE vendor view spreadsheet.
PCTEST: TE Vendors working offline to address the three proposals in Anritsu 343, KS 386, and R&S 567. Plan is to produce a way forward document/spreadsheet capturing the agreements.
Plan to include in the merged way fwd ( 343, 386)
will be merged into a new discussion paper to be requested (343, 386, 567) | noted | No | ||||
R5‑190568 | Discussion on mismatch uncertainty | ROHDE & SCHWARZ | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190569 | Discussion on ACLR MU | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
FR2 MU Session:
R&S: received offline feedback from MVG and Anritsu which is not incorporated yet.
KS: good start. similar to QoQZ impact for ACLR in our paper. QoQZ treatment for calibration stage should be similar to DUT measurement stage.
Anritsu: is this only for IFF?
R&S: yes.
PCTEST: document will be revised.
to be revised based on offline feedback
Revised to: R5-190868. | revised | No | R5‑190868 | |||
R5‑190868 | Discussion on ACLR MU | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Revised from: R5-190569.
to incorporate the offline agreement
Noted and proposal is endorsed | noted | No | R5‑190569 | |||
R5‑190581 | Comparison of OTA measurements with and without USB | ROHDE & SCHWARZ | discussion | Information | Yes |
Yes
Revised to: R5-190581r1.
Revised from: R5-190581.
Revised to: R5-190862.
| revised | No | R5‑190862 | |||
R5‑190862 | Comparison of OTA measurements with and without USB | ROHDE & SCHWARZ | discussion | Information | Yes |
Yes
Revised from: R5-190581r1.
For Information only | noted | No | R5‑190581 | |||
R5‑190601 | On relaxation of test requirements for Low and High PSD test cases | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
LATE DOCUMENT
This contribution is providing conclusions based on system level analyses whether test requirements should be relaxed for various low and high PSD test cases or whether tests cases are testable.
FR2 MU Session:
Anritsu: further offline discussions are necessary. are the numbers based on real equipment or listed as test equipment requirements only?
Online Session:
KS: need to consider with Anritsu paper in 460 since the MOP conclusion is different.
KS: will draft a WF on simulation assumptions to address 460 and 601.
Related document 460 . Conflicting proposals between 460 and 601 for MOP, MOP conflict needs to be resolved as it is prio1 test case.
related discussion in 460r1 & 601 wull be merged into a way fwd paper , new way fwd late tdoc to be requested | noted | No | ||||
R5‑190602 | On RF power measurement equipment MU | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes
LATE DOCUMENT
The sample value of the RF power measurement equipment MU element for MOP has been derived by RAN4 by comparing various SA datasheets. This contribution is revisiting this MU element based on preliminary gNB Power Measurement MUs.
FR2 MU Session:
PCTEST: This document can be withdrawn. | withdrawn | Yes | ||||
R5‑190603 | On gNB uncertainty on absolute level MU | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes
LATE DOCUMENT
This contribution is revisiting gNB MU element for EIS measurements based on preliminary gNB measurements.
FR2 MU Session:
PCTEST: This document can be withdrawn. | withdrawn | Yes | ||||
R5‑190605 | Discussion on impact of UL Power control mechanisms on EN-DC MOP test | Huawei, Hisilicon | discussion | Endorsement | Yes |
Yes
associated CR # 0326, 0329 (TP)
Revised to: R5-190605r1.
Revised from: R5-190605.
Revised to: R5-190988.
| revised | No | R5‑190988 | |||
R5‑190988 | Discussion on impact of UL Power control mechanisms on EN-DC MOP test | Huawei, Hisilicon | discussion | Endorsement | Yes |
Yes
Revised from: R5-190605r1.
Noted and proposal 1, 2 are endorsed | noted | No | R5‑190605 | |||
R5‑190615 | Discussion on the structure of Clause 7.9A in TS 38.521-1 | China Mobile Com. Corporation, ROHDE & SCHWARZ, Huawei | discussion | discussion | Yes |
Yes
LATE DOCUMENT
associated CR 0043, 0044
Document noted , Prop1 to send LS to RAN4 is endorsed with changes to the content of clarifications needed from RAN4. Prop2 is noted. | noted | No | ||||
R5‑190942 | Way Forward on QoQZ Procedure for Spurious Emissions | Keysight Technologies UK Ltd, Rohde&Schwarz, Anritsu | discussion | discussion | Yes |
Yes
late doc
pending more offline
Noted and WF is endorsed | noted | No | ||||
R5‑190980 | Way Forward on SNR estimation assumptions | Anritsu, Keysight Technologies, R&S | discussion | discussion | Yes |
Yes
LATE DOCUMENT
noted, way fwd is endorsed, consider adding rx spur into the list of tests if not we can discuss again tomm | noted | No | ||||
6 | Signalling Protocol Functional Area |   | ||||||||||
6.1 | 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest |   | ||||||||||
6.1.1 | TS 38.508-1 (Clause 6) | R5‑190047 | Update IE CellGroupId | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑190094 | Update IE BWP-Id | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190095 | Add IE RejectWaitTime | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190096 | Update IE ShortMAC-I | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190097 | Update IE UE-TimersAndConstants | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190174 | Addition of USIM Profiles for Signaling TC | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu.
Editorial issues. | revised | No | R5‑190666 | |||
R5‑190666 | Addition of USIM Profiles for Signaling TC | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190174 | |||
R5‑190186 | Addition of USIM Profiles for Signaling TC | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190252 | Correction of test frequencies for signalling testing in clause 6 | Ericsson, ROHDE & SCHWARZ, MCC TF160, Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190669 | |||
R5‑190669 | Correction of test frequencies for signalling testing in clause 6 | Ericsson, ROHDE & SCHWARZ, MCC TF160, Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190252 | |||
R5‑190258 | Changing NRf1 to use low range frequency | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc
first agreed, then merged into R5-190252r2.
. | withdrawn | Yes | ||||
R5‑190364 | Corrections to the default test frequencies for signalling testing | MCC TF160 | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190382 | Clarification for NR inter-band measurement test case configuration | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190732 | |||
R5‑190732 | Clarification for NR inter-band measurement test case configuration | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190382 | |||
R5‑190434 | Introduction of EAP AKA | Motorola Mobility | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Thu.
The TF160 menager remarked thar also 4.8.3.3 note shall be deleted. | revised | No | R5‑190733 | |||
R5‑190733 | Introduction of EAP AKA | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190434 | |||
R5‑190493 | Addition of general test procedures for establishing PDU session | CATT, TDIA | CR | Agreement | Yes |
Yes
r1 was presented on Tue?? | revised | No | R5‑190668 | |||
R5‑190668 | Addition of general test procedures for establishing PDU session | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑190493 | |||
R5‑190610 | Correction to default value of resourceAllocation IE in PDSCH-Config | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
late doc
NTT DOCOMO needed more time to check.
Moved to SIG.
Merged into R5-190670. | withdrawn | Yes | ||||
6.1.2 | TS 38.509 |   | ||||||||||
6.1.3 | TS 38.523-1 | R5‑190202 | Adding new section for 5GS SA Multi-Layer test cases | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
6.1.3.1 | Clauses 1 - 5 |   | ||||||||||
6.1.3.2 | Idle Mode (Clause 6) | R5‑190063 | Addition of NR test case 6.1.1.2- PLMN selection of Other PLMN | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Removed 'r1' in coversheet field.
Several comments from Rohde&Schwarz, TF160.
Redo table numbering.
Power levels shall be FFS.
r2 was presented on Thu.
| revised | No | R5‑190736 | |
R5‑190736 | Addition of NR test case 6.1.1.2- PLMN selection of Other PLMN | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190063 | |||
R5‑190064 | Addition of NR test case 6.1.1.3-Cell reselection of ePLMN | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190737 | |||
R5‑190737 | Addition of NR test case 6.1.1.3-Cell reselection of ePLMN | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190064 | |||
R5‑190065 | Addition of NR test case 6.1.1.4-PLMN selection in shared network environment | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Samsung recommended to mention the Cell PLMN4.
r2 was presented on Thu.
| revised | No | R5‑190738 | |||
R5‑190738 | Addition of NR test case 6.1.1.4-PLMN selection in shared network environment | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190065 | |||
R5‑190066 | Addition of NR test case 6.1.1.5-PLMN selection | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑190739 | |||
R5‑190739 | Addition of NR test case 6.1.1.5-PLMN selection | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190066 | |||
R5‑190067 | Addition of NR test case 6.1.2.1-Cell selection based on Qrxlevmin and Cell Reselection for Intra Frequency | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190740 | |||
R5‑190740 | Addition of NR test case 6.1.2.1-Cell selection based on Qrxlevmin and Cell Reselection for Intra Frequency | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190067 | |||
R5‑190068 | Addition of NR test case 6.1.2.2-Cell selection based on Qqualmin | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1+r2? was presented on Tue.
Separate power tables FR1 and 2.
r2 was presented on Thu. | revised | No | R5‑190741 | |||
R5‑190741 | Addition of NR test case 6.1.2.2-Cell selection based on Qqualmin | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190068 | |||
R5‑190069 | Addition of NR test case 6.1.2.3-Cell selection-Serving cell bar | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190742 | |||
R5‑190742 | Addition of NR test case 6.1.2.3-Cell selection-Serving cell bar | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190069 | |||
R5‑190070 | Addition of NR test case 6.1.2.4-Cell Reselection for interband operation | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
MotorolaMobility commented about the 7s timer.
Samsung recommended not to have a verdict (P) here as it is anyway provided.
r2 was presented on Thu. | revised | No | R5‑190743 | |||
R5‑190743 | Addition of NR test case 6.1.2.4-Cell Reselection for interband operation | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190070 | |||
R5‑190071 | Addition of NR test case 6.1.2.5-Cell Reselection for interband operation using Pcompensation Between FDD and TDD | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190744 | |||
R5‑190744 | Addition of NR test case 6.1.2.5-Cell Reselection for interband operation using Pcompensation Between FDD and TDD | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190071 | |||
R5‑190072 | Addition of NR test case 6.1.2.9-Cell Reselection using Qhyst, Qoffset and Treselection | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190745 | |||
R5‑190745 | Addition of NR test case 6.1.2.9-Cell Reselection using Qhyst, Qoffset and Treselection | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190072 | |||
R5‑190073 | Addition of NR test case 6.1.2.20-Inter-frequency cell reselection according to priority | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190746 | |||
R5‑190746 | Addition of NR test case 6.1.2.20-Inter-frequency cell reselection according to priority | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190073 | |||
R5‑190074 | Addition of NR test case 6.1.2.21-Cell reselection,SIntra SearchQ and SnonIntraSeqrchQ | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190747 | |||
R5‑190747 | Addition of NR test case 6.1.2.21-Cell reselection,SIntra SearchQ and SnonIntraSeqrchQ | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190074 | |||
R5‑190075 | Addition of NR test case 6.1.2.22-Inter-frequency cell reselection with parameters ThreshX, HighQ, ThreshX, LowQ and ThreshServing, LowQ | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190748 | |||
R5‑190748 | Addition of NR test case 6.1.2.22-Inter-frequency cell reselection with parameters ThreshX, HighQ, ThreshX, LowQ and ThreshServing, LowQ | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190075 | |||
R5‑190134 | Correcting test case 6.1.1.7 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Motorola Mobility commented that the style is different from other test cases.
Samsung commented that Steps 3-20 performed on Cell 12 or 13 for 2 PLMNs is too vague.
Also, different test cases from different authors are done in a different style: this should be harmonized.
r2 was presented on Thu. | revised | No | R5‑190754 | |||
R5‑190754 | Correcting test case 6.1.1.7 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190134 | |||
R5‑190146 | Updating test case 6.1.1.8 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r3 was presented on Thu. | revised | No | R5‑190755 | |||
R5‑190755 | Updating test case 6.1.1.8 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190146 | |||
R5‑190148 | Adding test case 6.2.1.1 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu.
Section heading 6.2. | revised | No | R5‑190756 | |||
R5‑190756 | Adding test case 6.2.1.1 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190148 | |||
R5‑190149 | Adding test case 6.2.1.2 | MediaTek Inc. | CR | Agreement | Yes |
Yes
reissued as R5-190613 because of wrong spec, is part-1. | withdrawn | Yes | ||||
R5‑190613 | Adding test case 6.2.1.2 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Fri.? | revised | No | R5‑190760 | |||
R5‑190150 | Adding test case 6.2.1.3 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
MotorolaMobility wondered whether the PLMN configuration could be moved to 38.508-1.
Maybe use also PLMN 3+4 instead of 13+14.
r2 was presented on Thu. | revised | No | R5‑190757 | |||
R5‑190757 | Adding test case 6.2.1.3 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190150 | |||
R5‑190151 | Adding test case 6.2.1.4 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190758 | |||
R5‑190758 | Adding test case 6.2.1.4 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190151 | |||
R5‑190152 | Adding test case 6.2.1.5 | MediaTek Inc. | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190759 | |||
R5‑190759 | Adding test case 6.2.1.5 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190152 | |||
R5‑190153 | Adding test case 6.2.1.6 | MediaTek Inc. | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑190170 | Addition of Idle Mode TC - Steering of UE in roaming during registration/security check successful using List Type 1 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
r2 was presented on Tue.
Editorial issues.
r3 was presented on Thu.
| revised | No | R5‑190749 | |||
R5‑190749 | Addition of Idle Mode TC - Steering of UE in roaming during registration/security check successful using List Type 1 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190170 | |||
R5‑190171 | Addition of Idle mode TC - Cell reselection / Equivalent PLMN | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 was presented on Thu. | revised | No | R5‑190750 | |||
R5‑190750 | Addition of Idle mode TC - Cell reselection / Equivalent PLMN | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190171 | |||
R5‑190172 | Addition of Idle mode TC - PLMN selection of RPLMN, HPLMN/EHPLMN, UPLMN and OPLMN / Automatic mode | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190751 | |||
R5‑190751 | Addition of Idle mode TC - PLMN selection of RPLMN, HPLMN/EHPLMN, UPLMN and OPLMN / Automatic mode | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190172 | |||
R5‑190182 | Addition of Idle Mode TC - Steering of UE in roaming during registration/security check successful using List Type 1 | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190183 | Addition of Idle mode TC - Cell reselection / Equivalent PLMN | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190184 | Addition of Idle mode TC - PLMN selection of RPLMN, HPLMN/EHPLMN, UPLMN and OPLMN / Automatic mode | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190254 | Addition of new 5G-NR Idle Mode TC 6.1.1.6 - PLMN selection / Periodic reselection / MinimumPeriodicSearchTimer | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
RAN5 decided to avoid checking of user indication of correct PLMN being selected. | revised | No | R5‑190671 | |||
R5‑190671 | Addition of new 5G-NR Idle Mode TC 6.1.1.6 - PLMN selection / Periodic reselection / MinimumPeriodicSearchTimer | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190254 | |||
R5‑190255 | Addition of new 5G-NR Idle Mode TC 6.1.2.19 - Speed-dependent cell reselection | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r2 was presented on Tue.
is docx | revised | No | R5‑190672 | |||
R5‑190672 | Addition of new 5G-NR Idle Mode TC 6.1.2.19 - Speed-dependent cell reselection | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised from: R5-190255r2.
Update specific message contents to Dec 18 core spec
Motorola Mobility - TC should cover medium mobility scenario. Current definition of same values for high & medium mobility parameters may pass a non-conformant UE | agreed | No | R5‑190255 | |||
6.1.3.3 | Layer 2 |   | ||||||||||
6.1.3.3.1 | NR Layer 2 | R5‑190384 | Update of 5GS NR MAC test case 7.1.1.8.1 | ROHDE & SCHWARZ | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||
6.1.3.3.1.1 | Common Test Case Specific Values for Layer 2 (Clause 7.1.0) |   | ||||||||||
6.1.3.3.1.2 | MAC | R5‑190076 | Correction to NR test case 7.1.1.3.7-Power Headroom Reporting | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
cl. Affected missing. | revised | No | R5‑190674 | |
R5‑190674 | Correction to NR test case 7.1.1.3.7-Power Headroom Reporting | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190076 | |||
R5‑190077 | Correction to NR test case 7.1.1.6.1-Correct handling of DL assignment Semi persistent | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
cl. Affected missing. | revised | No | R5‑190675 | |||
R5‑190675 | Correction to NR test case 7.1.1.6.1-Correct handling of DL assignment Semi persistent | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190077 | |||
R5‑190147 | Correcting test case 7.1.1.3.1 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190321 | Correction to NR test case 7.1.1.1.3-SI request | Huawei, HiSilicon,TF 160 | CR | Agreement | Yes |
Yes
r2 was presented on Wed. | revised | No | R5‑190697 | |||
R5‑190697 | Correction to NR test case 7.1.1.1.3-SI request | Huawei, HiSilicon,TF 160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190321 | |||
R5‑190330 | Correcton to MAC TBS test cases | Motorola Mobility, MCC TF160, Mediatek | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190676 | |||
R5‑190676 | Correcton to MAC TBS test cases | Motorola Mobility, MCC TF160, Mediatek | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190330 | |||
R5‑190331 | Reduction of loops in MAC TBS test cases | Motorola Mobility, MCC TF160 | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190677 | |||
R5‑190677 | Reduction of loops in MAC TBS test cases | Motorola Mobility, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190331 | |||
R5‑190338 | Correction to MAC TC 7.1.1.4.1.1, 7.1.1.4.2.1, 7.1.1.4.2.3, 7.1.1.4.2.4 and 7.1.1.4.2.5 | MediaTek Inc. | CR | Agreement | Yes |
Yes
merged into other CR. | withdrawn | Yes | ||||
R5‑190494 | Title correction to MAC TC 7.1.1.7.1.1 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190678 | |||
R5‑190678 | Title correction to MAC TC 7.1.1.7.1.1 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190494 | |||
6.1.3.3.1.3 | RLC | R5‑190165 | Correction to RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
already covered in R5-190368r1. | withdrawn | Yes | ||
R5‑190365 | Correction to 5GS RLC Test case 7.1.2.2.5 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190366 | Correction to 5GS RLC Test case 7.1.2.3.8 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190367 | Correction to 5GS RLC Test case 7.1.2.3.9 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190368 | Correction to 5GS RLC Test case 7.1.2.3.10 | MCC TF160, Qualcomm Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190679 | |||
R5‑190679 | Correction to 5GS RLC Test case 7.1.2.3.10 | MCC TF160, Qualcomm Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190368 | |||
6.1.3.3.1.4 | PDCP | R5‑190139 | Editorial update to TC 7.1.3.2.1 | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑190166 | Correction to PDCP Test case 7.1.3.4.1 PDCP handover / Lossless handover / PDCP sequence number maintenance / PDCP status report to convey the information on missing or acknowledged PDCP SDUs at handover / In-order delivery and duplicate elimination in th | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Wed.
The TF160 manager wondered about the FFSes for EN-DC.
Remove -cou.
TF60 objected with the changes contained.
Will be changed at the next meeting. | revised | No | R5‑190752 | |||
R5‑190752 | Correction to PDCP Test case 7.1.3.4.1 PDCP handover / Lossless handover / PDCP sequence number maintenance / PDCP status report to convey the information on missing or acknowledged PDCP SDUs at handover / In-order delivery and duplicate elimination in th | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190166 | |||
6.1.3.3.1.5 | SDAP | R5‑190177 | Correction to SDAP Test Cases | Qualcomm UK Ltd, Rohde & Schwarz | CR | Agreement | Yes |
Yes
r1 was presented on Thu.
TF160 raised concerns. Will have to be modified at the next meeting. | revised | No | R5‑190753 | |
R5‑190753 | Correction to SDAP Test Cases | Qualcomm UK Ltd, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190177 | |||
R5‑190189 | Correction to SDAP Test Cases | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190381 | Update to SDAP test cases 7.1.4.1 and 7.1.4.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
6.1.3.4 | RRC |   | ||||||||||
6.1.3.4.1 | NR RRC |   | ||||||||||
6.1.3.4.1.1 | RRC Connection Management Procedures (clause 8.1.1) | R5‑190078 | Addition of NR test case 8.1.1.1.2-Paging | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
Offline comments from TF160.
r5 was presented on Thu. | revised | No | R5‑190781 | |
R5‑190781 | Addition of NR test case 8.1.1.1.2-Paging | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190078 | |||
R5‑190079 | Correction to NR test case 8.1.1.2.1-T300 expiry | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190680 | |||
R5‑190680 | Correction to NR test case 8.1.1.2.1-T300 expiry | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190079 | |||
R5‑190191 | Updates to 5GS SA RRC TC - RRC / Paging for connection / Multiple paging records | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190192 | Updates to 5GS SA RRC TC - RRC connection establishment / RRC Reject with wait time | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| revised | No | R5‑190681 | |||
R5‑190681 | Updates to 5GS SA RRC TC - RRC connection establishment / RRC Reject with wait time | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190192 | |||
R5‑190194 | Addition of 5GS SA RRC TC - RRC connection release / With priority information / T320 expiry | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190761 | |||
R5‑190761 | Addition of 5GS SA RRC TC - RRC connection release / With priority information / T320 expiry | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190194 | |||
R5‑190195 | Addition of 5GS SA RRC TC - RRC connection release / With priority information / T320 expiry / E-UTRA | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190762 | |||
R5‑190762 | Addition of 5GS SA RRC TC - RRC connection release / With priority information / T320 expiry / E-UTRA | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190195 | |||
R5‑190196 | Addition of 5GS SA RRC TC - RRC resume / Suspend-Resume / Success | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
Samsung commented about the test purpose.
r1 was presented on Thu. | revised | No | R5‑190763 | |||
R5‑190763 | Addition of 5GS SA RRC TC - RRC resume / Suspend-Resume / Success | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190196 | |||
R5‑190197 | Addition of 5GS SA RRC TC - RRC resume / Suspend-Resume / Reception of RRC setup | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190215 | Addition of new RRC TC 8.1.1.4.3 | MediaTek Inc. | CR | Agreement | Yes |
Yes
why setting 2 different TAI?
Samsung recommended not to put in requirements which are not tested.
Deferred. | revised | No | R5‑190764 | |||
R5‑190764 | Addition of new RRC TC 8.1.1.4.3 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190215 | |||
R5‑190216 | Addition of new RRC TC 8.1.1.4.4 | MediaTek Inc. | CR | Agreement | Yes |
Yes
Samsung commented that Step 5 is not needed. | withdrawn | Yes | ||||
R5‑190396 | Update of 5GS NR RRC test case 8.1.1.3.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
6.1.3.4.1.2 | RRC Reconfiguration (clause 8.1.2) | R5‑190318 | Addition of 5GS SA RRC TC - 8.1.2.1.1 | ANRITSU LTD | CR | Agreement | Yes |
Yes
The TF160 manager requested that TP shall be checked.
Samsung recommended to delete requirements not to be tested, like E-UTRA.
Should be aligned with the core spec, RAN2.
r1 was presented on Thu.
TF160 comments are concluded. | revised | No | R5‑190775 | |
R5‑190775 | Addition of 5GS SA RRC TC - 8.1.2.1.1 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190318 | |||
R5‑190319 | Addition of 5GS SA RRC TC - 8.1.2.1.3 | ANRITSU LTD | CR | Agreement | Yes |
Yes
r1 was presented on Wed.
r2 was presented on Thu. | revised | No | R5‑190776 | |||
R5‑190776 | Addition of 5GS SA RRC TC - 8.1.2.1.3 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190319 | |||
R5‑190320 | Addition of 5GS SA RRC TC - 8.1.2.1.4 | ANRITSU LTD | CR | Agreement | Yes |
Yes
concluded to split the test cases.
r2 was presented on Thu. | revised | No | R5‑190777 | |||
R5‑190777 | Addition of 5GS SA RRC TC - 8.1.2.1.4 | ANRITSU LTD | CR | Agreement | Yes |
Yes
replaced by R5-190778 because of title change | withdrawn | Yes | R5‑190320 | |||
R5‑190778 | Addition of 5GS SA RRC TC - 8.1.5.3.4 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.1.3.4.1.3 | RRC Measurement configuration control and reporting (clause 8.1.3) | R5‑190082 | Addition of NR test case 8.1.3.1.3_ Event A4 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r2 was presented on Wed.
Motorola Mobility wondered whether 4 Cells are needed. Anritsu recommended maybe to split the test case.
r3 was presented on Thu. | revised | No | R5‑190765 | |
R5‑190765 | Addition of NR test case 8.1.3.1.3_ Event A4 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190082 | |||
R5‑190083 | Addition of NR test case 8.1.3.1.4_ Event A5 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r2 was presented on Wed.
r3 was presented on Thu. | revised | No | R5‑190766 | |||
R5‑190766 | Addition of NR test case 8.1.3.1.4_ Event A5 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190083 | |||
R5‑190084 | Addition of NR test case 8.1.3.1.11.1_intra-band Contiguous CA Event A6 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r3 was presented on Thu. | revised | No | R5‑190767 | |||
R5‑190767 | Addition of NR test case 8.1.3.1.11.1_intra-band Contiguous CA Event A6 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190084 | |||
R5‑190085 | Addition of NR test case 8.1.3.1.11.2_inter-band CA Event A6 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Wed.
r2 was presented on Thu. | revised | No | R5‑190768 | |||
R5‑190768 | Addition of NR test case 8.1.3.1.11.2_inter-band CA Event A6 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190085 | |||
R5‑190086 | Addition of NR test case 8.1.3.1.11.3_intra-band non Contiguous CA Event A6 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Wed.
r2 was presented on Thu. | revised | No | R5‑190769 | |||
R5‑190769 | Addition of NR test case 8.1.3.1.11.3_intra-band non Contiguous CA Event A6 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190086 | |||
R5‑190087 | Addition of NR test case 8.1.3.1.12.1_ Additional intra-band Contiguous CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Wed.
r3 was presented on Thu. | revised | No | R5‑190770 | |||
R5‑190770 | Addition of NR test case 8.1.3.1.12.1_ Additional intra-band Contiguous CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190087 | |||
R5‑190088 | Addition of NR test case 8.1.3.1.12.2_ Additional inter-band CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r2 was presented on Thu. | revised | No | R5‑190771 | |||
R5‑190771 | Addition of NR test case 8.1.3.1.12.2_ Additional inter-band CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190088 | |||
R5‑190089 | Addition of NR test case 8.1.3.1.12.3_ Additional intra-band non Contiguous CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r2 was presented on Thu. | revised | No | R5‑190772 | |||
R5‑190772 | Addition of NR test case 8.1.3.1.12.3_ Additional intra-band non Contiguous CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190089 | |||
R5‑190207 | Addition of NR test case 8.1.3.1.5-Two event A3 RSRQ | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r2 was presented on Thu. | revised | No | R5‑190773 | |||
R5‑190773 | Addition of NR test case 8.1.3.1.5-Two event A3 RSRQ | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190207 | |||
R5‑190208 | R5-19xxxx Addition of NR test case 8.1.3.1.6_Two event A5 SINR | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r2 was presented on Thu. | revised | No | R5‑190774 | |||
R5‑190774 | R5-19xxxx Addition of NR test case 8.1.3.1.6_Two event A5 SINR | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190208 | |||
R5‑190395 | Addition of 5GS NR RRC test case 8.1.3.1.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Wed. | revised | No | R5‑190684 | |||
R5‑190684 | Addition of 5GS NR RRC test case 8.1.3.1.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190395 | |||
6.1.3.4.1.4 | RRC Handover (clause 8.1.4) |   | ||||||||||
6.1.3.4.1.5 | RRC Others (clause 8.1.5) | R5‑190080 | Addition of NR test case 8.1.5.3.3-PWS notification | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190687 | |
R5‑190687 | Addition of NR test case 8.1.5.3.3-PWS notification | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190080 | |||
R5‑190193 | Updates to 5GS SA RRC TC - SI change / Notification of BCCH modification / Short message for SI update | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190688 | |||
R5‑190688 | Updates to 5GS SA RRC TC - SI change / Notification of BCCH modification / Short message for SI update | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190193 | |||
R5‑190322 | Correction to NR test case 8.1.5.3.1-ETWS | Huawei, HiSilicon, TF 160 | CR | Agreement | Yes |
Yes
Qualcomm had reviewed offline. | revised | No | R5‑190685 | |||
R5‑190685 | Correction to NR test case 8.1.5.3.1-ETWS | Huawei, HiSilicon, TF 160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190322 | |||
R5‑190392 | Addition of 5GS NR RRC test case 8.1.5.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Thu. | revised | No | R5‑190779 | |||
R5‑190779 | Addition of 5GS NR RRC test case 8.1.5.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190392 | |||
R5‑190511 | Addition of new RRC TC 8.1.5.3.2 | Intertek | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.1.3.4.2 | MR-DC RRC |   | ||||||||||
6.1.3.4.2.1 | RRC UE Capability / Others (clause 8.2.1) | R5‑190383 | Update of 5GS NR RRC test case 8.2.1.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
late doc | revised | No | R5‑190689 | |
R5‑190689 | Update of 5GS NR RRC test case 8.2.1.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190383 | |||
6.1.3.4.2.2 | RRC Radio Bearer (clause 8.2.2) | R5‑190369 | Correction to EN-DC RRC test case 8.2.2.2.1 | MCC TF160 | CR | Agreement | Yes |
Yes
| revised | No | R5‑190690 | |
R5‑190690 | Correction to EN-DC RRC test case 8.2.2.2.1 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190369 | |||
R5‑190465 | Update RRC TC 8.2.2.1.1 - SRB3 Establishment, Reconfiguration and Release / NR addition, modification and release / EN-DC | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.1.3.4.2.3 | RRC Measurement / Handovers (clause 8.2.3) | R5‑190081 | Correction to NR test case 8.2.3.11.1-8.2.3.11.2-ENDC measurement gap | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190691 | |
R5‑190691 | Correction to NR test case 8.2.3.11.1-8.2.3.11.2-ENDC measurement gap | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190081 | |||
R5‑190259 | Update to 5G-NR RRC Measurement configuration and reporting TC 8.2.3.4.1 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Wed. | revised | No | R5‑190692 | |||
R5‑190692 | Update to 5G-NR RRC Measurement configuration and reporting TC 8.2.3.4.1 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190259 | |||
R5‑190315 | Correction to NR RRC test case 8.2.3.5.1 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| revised | No | R5‑190683 | |||
R5‑190683 | Correction to NR RRC test case 8.2.3.5.1 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190315 | |||
R5‑190380 | Update of 5GS NR RRC test case 8.2.3.6.1 and 8.2.3.8.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190693 | |||
R5‑190693 | Update of 5GS NR RRC test case 8.2.3.6.1 and 8.2.3.8.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190380 | |||
R5‑190451 | Update of NR RRC TC 8.2.3.12.1 | Intertek | CR | Agreement | Yes |
Yes
| revised | No | R5‑190694 | |||
R5‑190694 | Update of NR RRC TC 8.2.3.12.1 | Intertek | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190451 | |||
R5‑190459 | Addition of new TC 8.2.3.15 | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190620 | Update to EN-DC test case 8.2.3.7.1 | MCC TF160, Tech Mahindra Limited | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
R5‑190621 | Update to 5G-NR RRC Measurement configuration and reporting TC 8.2.3.3.1 | Qualcomm Incorporated | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
R5‑190656 | Correction to NR RRC test case 8.2.3.14.1 | Keysight Technologies UK Ltd, MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| revised | No | R5‑190699 | |||
R5‑190699 | Correction to NR RRC test case 8.2.3.14.1 | Keysight Technologies UK Ltd, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190656 | |||
R5‑190673 | Correction to NR RRC test case 8.2.3.1.1 | Anritsu Ltd | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
6.1.3.4.2.4 | RRC Carrier Aggregation (clause 8.2.4) |   | ||||||||||
6.1.3.4.2.5 | RRC Failure (clause 8.2.5) | R5‑190138 | Update to TC 8.2.5.4.1 SCG change failure / EN-DC | Samsung | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190696 | |
R5‑190696 | Update to TC 8.2.5.4.1 SCG change failure / EN-DC | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190138 | |||
R5‑190370 | Correction to EN-DC RRC test case 8.2.5.3.1 | MCC TF160 | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
6.1.3.5 | 5GS Mobility Management | R5‑190090 | Correction to NR test case 9.1.5.1.1-Initial Registration | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190698 | |
R5‑190698 | Correction to NR test case 9.1.5.1.1-Initial Registration | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190090 | |||
R5‑190091 | Addition of NR test case 9.1.1.6-Authentication failure | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑190700 | |||
R5‑190700 | Addition of NR test case 9.1.1.6-Authentication failure | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑190091 | |||
R5‑190140 | Update to 5G TC 9.1.5.2.1 TA registration update | Samsung | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190701 | |||
R5‑190701 | Update to 5G TC 9.1.5.2.1 TA registration update | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190140 | |||
R5‑190141 | Introduction of TC 9.1.5.2.4 Mobility registration update / The lower layer requests NAS signalling connection recovery | Samsung | CR | Agreement | Yes |
Yes
r3 was presented on Thu. | revised | No | R5‑190702 | |||
R5‑190702 | Introduction of TC 9.1.5.2.4 Mobility registration update / The lower layer requests NAS signalling connection recovery | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190141 | |||
R5‑190167 | Addition of 5GC TC SMS over NAS service | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190704 | |||
R5‑190704 | Addition of 5GC TC SMS over NAS service | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190167 | |||
R5‑190168 | Addition of 5GC TC - Initial registration / 5GS services / NSSAI handling | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Thu.
CATT wondered about switch off. Branch 34a1? | revised | No | R5‑190703 | |||
R5‑190703 | Addition of 5GC TC - Initial registration / 5GS services / NSSAI handling | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
will be resubmitted incl. changes to the next meeting. | agreed | No | R5‑190168 | |||
R5‑190179 | Addition of 5GC TC SMS over NAS service | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190180 | Addition of 5GC TC - Initial registration / 5GS services / NSSAI handling | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190217 | Addition of new 5GC TC 9.1.5.2.9 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190705 | |||
R5‑190705 | Addition of new 5GC TC 9.1.5.2.9 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190217 | |||
R5‑190218 | Addition of new 5GC TC 9.1.6.1.4 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Thu.
Add Note: Is initiated by MMI comand. Invert Stps 1 and 2. | revised | No | R5‑190706 | |||
R5‑190706 | Addition of new 5GC TC 9.1.6.1.4 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190218 | |||
R5‑190486 | Addition of new 5GC TC 9.1.5.1.16 | CATT, TDIA | CR | Agreement | Yes |
Yes
r2 was presented on Thu.
Discussion about manual and autmatic PLMN mode with Motorola Mobility and CATT. | revised | No | R5‑190707 | |||
R5‑190707 | Addition of new 5GC TC 9.1.5.1.16 | CATT, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190486 | |||
R5‑190487 | Addition of new 5GC TC 9.1.5.1.13 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190488 | Addition of new 5GC TC 9.1.5.1.15 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190490 | Addition of new 5GC TC 9.1.2.1 | TDIA, CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑190491 | Addition of new 5GC TC 9.1.5.2.2 | CATT, TDIA | CR | Agreement | Yes |
Yes
Add NAS rules. | revised | No | R5‑190708 | |||
R5‑190708 | Addition of new 5GC TC 9.1.5.2.2 | CATT, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190491 | |||
6.1.3.6 | 5GS Session Management | R5‑190123 | Addition of new 5GC TC 10.1.3.2 | CAICT | CR | Agreement | Yes |
Yes
r3 was presented on Thu.
ETSI MCC suggested to fix the formattings.
Too many FFSs. | revised | No | R5‑190709 | |
R5‑190709 | Addition of new 5GC TC 10.1.3.2 | CAICT | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑190123 | |||
R5‑190124 | Addition of 5GC test case 10.1.3.3 | CAICT | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190125 | Addition of 5GC test case 10.1.3.4 | CAICT | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190169 | Addition of 5GC TC- PDU session authentication and authorization / during the UE-requested PDU session procedure | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
ETSI MCC: formatting issues. | revised | No | R5‑190710 | |||
R5‑190710 | Addition of 5GC TC- PDU session authentication and authorization / during the UE-requested PDU session procedure | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190169 | |||
R5‑190181 | Addition of 5GC TC- PDU session authentication and authorization / during the UE-requested PDU session procedure | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑190485 | Addition of new 5GC TC 10.1.2.2 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑190489 | Addition of 5GC Test case 10.1.5.1 | TDIA, CATT | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190711 | |||
R5‑190711 | Addition of 5GC Test case 10.1.5.1 | TDIA, CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190489 | |||
R5‑190492 | Addition of 5GC test case 10.1.3.1 | CATT, TDIA, CAICT | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
6.1.3.7 | EN-DC Session Management | R5‑190176 | Correction to EN-DC NAS test case 10.2.1.1 - Default EPS bearer context activation | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
R5‑190188 | Correction to EN-DC NAS test case 10.2.1.1 - Default EPS bearer context activation | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.1.4 | TS 38.523-2 | R5‑190092 | Addition of applicability for NR test case | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑190780 | |
R5‑190780 | Addition of applicability for NR test case | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑190092 | |||
R5‑190496 | Addition of Test applicabilities for 5GC TCs | CATT | CR | Agreement | No |
Yes
late doc | withdrawn | Yes | ||||
6.1.5 | TS 38.523-3 | R5‑190371 | Common aspects: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
late doc
r3 was presented on Fri. | revised | No | R5‑190786 | |
R5‑190786 | Common aspects: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190371 | |||
R5‑190372 | EN-DC: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
late doc
r2 was presented on Fri. | revised | No | R5‑190787 | |||
R5‑190787 | EN-DC: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190372 | |||
R5‑190373 | NR/5GC: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Fri. | revised | No | R5‑190788 | |||
R5‑190788 | NR/5GC: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190373 | |||
R5‑190609 | Introduction of pixit to make UL waveform configurable | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc | withdrawn | Yes | ||||
6.1.6 | TS 34.229-1 |   | ||||||||||
6.1.7 | TS 34.229-2 |   | ||||||||||
6.1.8 | TS 34.229-3 |   | ||||||||||
6.1.9 | TS 36.508 | R5‑190046 | Update RRCConnectionReconfiguration message with table references | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
6.1.10 | TS 36.509 |   | ||||||||||
6.1.11 | TS 36.523-1 |   | ||||||||||
6.1.12 | TS 36.523-2 |   | ||||||||||
6.1.13 | TS 36.523-3 |   | ||||||||||
6.1.14 | TS 37.571-2 |   | ||||||||||
6.1.15 | TS 37.571-3 |   | ||||||||||
6.1.16 | TS 37.571-4 |   | ||||||||||
6.1.17 | TS 37.571-5 |   | ||||||||||
6.1.18 | Discussion Papers, Work Plan, TC lists | R5‑190173 | Introduction of eSIM functionality in 5G SA GCF Test cases | Qualcomm UK Ltd | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||
R5‑190185 | Introduction of eSIM functionality in 5G SA Test cases | Qualcomm UK Ltd | discussion | Endorsement | Yes |
Yes
Comprion reported about a default test setup modifying the profiles and the elementary fields.
Rohde&Schwarz commented it is up to the test vendors to specify what is being used, in 38.508-1.
Conclusion: Proposal 1 is accepted. | noted | No | ||||
R5‑190187 | Multi PDU Session and IMS in SA Option-2 | Qualcomm UK Ltd | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
R5‑190198 | Handling of multi-layer test cases in SA | Qualcomm Austria RFFE GmbH | discussion | Endorsement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑190667 | |||
R5‑190667 | Handling of multi-layer test cases in SA | Qualcomm Austria RFFE GmbH | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑190198 | |||
R5‑190304 | Multiple-cell signalling test setup in FR2 | ANRITSU LTD | discussion | Endorsement | Yes |
Yes
r1 was presented on Wed.
r2 was produced.? | revised | No | R5‑190735 | |||
R5‑190497 | Discussion on the WP for Multi-layer Testing | CATT | discussion | Discussion | Yes |
Yes
| noted | No | ||||
7 | Closing Session |   | ||||||||||
7.1 | RF group docs still requiring verdict/confirmation - original A.I. retained | R5‑190983 | Discussion on architecture option agnostic nature of RF, RRM, Demodulation Performance tests. | Qualcomm communications-France | discussion | Agreement | Yes |
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-190530r4.
Noted and proposal is endorsed (move to SIG for information A.I. 7.1)
| noted | No | R5‑190530 | |
R5‑190576 | CR to TR38.903 to update MU tables and element descriptions | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
LATE DOCUMENT
to be merged into ONE TR38,903 CR, Moved to 7.1 to give more time to implement the way fwd and MU agreements
Merged R5-190469 and R5-190570
provide a mapping of 31 MU elements to the dependent assumptions and if any of the MU elements are interdepeddent in future meetings to better understand the MU value
Revised to: R5-191005. | revised | No | R5‑191005 | |||
R5‑191005 | CR to TR38.903 to update MU tables and element descriptions | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190576 | |||
R5‑190614 | WF of test tolerances and measurement uncertainty for User Equipment (UE) conformance test | Verizon, Qualcomm | discussion | Endorsement | Yes |
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
LATE DOCUMENT
FR2 MU Session:
KS: How are device characteristics part of test equipment? MU being slashed is the wrong direction. Don't know how MU can be improved by further calibration.
Anritsu: what was the derivation for these MU results?
MVG: values proposed are barely above LTE values.
Telecom Italia: it is our understanding that spherical coverage MU is not defined yet. Adjusting TT would be a better way forward.
VZ: Do not agree with comment from KS on Tx characteristics.
PCTEST: will require further offline discussion.
Revised to: R5-190614r1.
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.1].
Conclusion changes to one of the replicas will be replicated to the other.
LATE DOCUMENT
Revised from: R5-190614.
Revised to incoporate MU evolution way fwd needs more RAn5 group view to decide on the way fwd
KS: do you want to drop MU because of TT? Any MU reduction would need to be accompanied by specific proposals.
VZ: the data that TE vendors are using are the worst case results.
Apple: too early to tighten MU now since we haven't seen commercial chambers yet. We have to respect the work that TE vendors have done for the last year and a half. Scaling the MU now may not be the right way.
Orange: we agree that the proposal is not to change the value now but agree on a timeline to improve the value.
AT&T: similar to the TT approach, we can have a goal.
Intel: we think that there needs to be a way to deal with improved MU.
DISH: the main idea is not to lock down the MU at this point. RAN5 needs to agree that the MU can be updated.
PCTEST: the MU tables in 38.903 are examples. the MU threshold is in most cases chosen to be a balanced decision based on different implementations and do not necessarily match the MU example tables. Today, there are OTA MU threshold values that are lower than the example tables.
r2 was presented on Fri in the joint.
Keysight suggested to move it to Rel-16 and further.
Apple suggested to move the decision should be moved to the next meeting.
MVG commented about the proposed values.
| revised | No | R5‑190793 | |||
R5‑190793 | WF of test tolerances and measurement uncertainty for User Equipment (UE) conformance test | Verizon, Qualcomm | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑190614 | |||
7.2 | SIG group docs still requiring verdict/confirmation - original A.I. retained | R5‑190760 | Adding test case 6.2.1.2 | MediaTek Inc. | CR | Agreement | Yes |
Yes
rev on coversheet | revised | No | R5‑190785 | R5‑190613 |
R5‑190785 | Adding test case 6.2.1.2 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190760 | |||
R5‑190175 | Multi PDU Session and IMS in SA Option-2 | Qualcomm UK Ltd | discussion | Endorsement | Yes |
Yes
action point on RAN5. | noted | No | ||||
R5‑190782 | Updating IEs part of SearchSpace | Qualcomm Austria RFFE GmbH, Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190199 | |||
R5‑190256 | Update of 5G-NR test cases applicability | Qualcomm Incorporated, Motorola Mobility, Samsung, Anritsu Ltd., ROHDE & SCHWARZ, Intertek, NTT DOCOMO, MediaTek Inc., Huawei, HiSilicon | CR | Agreement | Yes |
Yes
late doc
agreed in the joint on Fri.
TF160 didn't have time to review.
Changes will be made on top at next meeting. | agreed | No | ||||
R5‑190670 | Correction to default value of IE’s in PDSCH-Config in Table 4.6.3-75 | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc
Agreed in SIG.
Seen again in the joint on Fri. | agreed | No | ||||
R5‑190791 | Correction to UL configuration | Keysight Technologies UK Ltd, Qualcomm Incorporated, MCC TF160, Anritsu, NTT DOCOMO, INC. | CR | discussion | Yes |
Yes
| agreed | No | R5‑190712 | |||
7.3 | Other open issues from opening joint session - original A.I. retained | R5‑190051 | Updates of test channel bandwidth in TS 38.508-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
moved to joint on Fri. | agreed | No | ||
R5‑190735 | Multiple-cell signalling test setup in FR2 | ANRITSU LTD | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑190304 | |||
R5‑190305 | Updates to Multi-Cell SIG OTA testing for FR2 | ANRITSU LTD | CR | Agreement | Yes |
Yes
r1 was presented on Fri.
Editorial issues. | revised | No | R5‑190790 | |||
R5‑190790 | Updates to Multi-Cell SIG OTA testing for FR2 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190305 | |||
R5‑190723 | Correction of PUSCH-TimeDomainResourceAllocationList | MCC TF160, Ericsson, Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190359 | |||
R5‑190724 | Corrections and clarifications regarding DCI formats 0_1 and 1_1 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑190361 | |||
7.4 | General Discussion Papers | R5‑190375 | Resubmission of Agreed CRs to RAN5#82 | RAN5 Chair | other | Information | Yes |
Yes
for the next meeting RAN5#82 the changes on top of the present Ad hoc meeting will be highlighted.
Action point on ETSI MCC to fix the navigation pane formats in 38.523-1 and 38.523-1. | noted | No | ||
7.5 | Review of Action Points and Work Plans | R5‑190219 | Update of RAN5 5G NR phases and targets post RAN5-5G-NR Adhoc#4 | Ericsson | discussion | Endorsement | No |
Yes
not needed. Will be reviewed at RAN5#82. | withdrawn | Yes | ||
7.6 | Outgoing LS (Post meeting approval on RAN5 reflector) | R5‑190936 | Clarifications on the requirements of 7.9A Spurious emissions for CA | TSG WG RAN5 | LS out | discussion | Yes |
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.6].
Conclusion changes to one of the replicas will be replicated to the other.
To: RAN4
draft reviewed some changes to non contigous TBD Action, changes to Interband SDL action, document 615 needs a verdict after LS is treated
RF review and approved
| approved | No | ||
R5‑190729 | LS on Multi-band relaxation | TSG WG RAN5 | LS out | Approval | Yes |
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.6].
Conclusion changes to one of the replicas will be replicated to the other.
To: RAN4
RF review and approved | approved | No | ||||
R5‑190730 | LS on applicability of LTE anchor agnostic to specific RF test cases | TSG WG RAN5 | LS out | Approval | Yes |
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.6].
Conclusion changes to one of the replicas will be replicated to the other.
To: RAN4
RF review and approved | approved | No | ||||
R5‑190731 | LS on RAN4-RAN5 5G-NR RF pending issues after RAN5#4-5G-NR Adhoc | TSG WG RAN5 | LS out | Approval | Yes |
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.1.15]-[7.6].
Conclusion changes to one of the replicas will be replicated to the other.
To: RAN4
RF review and approved | approved | No | ||||
R5‑190792 | Critical prose CRs list for 5G Protocol Test Cases at RAN5#4-5G-NR Adhoc | TSG WG RAN5 | LS out | Approval | No |
No1st Feb.
| for email approval | No | ||||
7.7 | Draft Meeting Minutes RAN5#4-5G-NR Adhoc (Sec) |   | ||||||||||
7.8 | Summary of RAN5 Agreed CRs input into RAN5#82 (Sec) |   | ||||||||||
7.9 | New draft version of 5G-NR Technical Specifications – TS 38.521-4 & TS 38.533 implementing approved pCRs (Post meeting approval on RAN5 reflector) | R5‑190682 | TS 38.533 v0.2.0 | Rohde&Schwarz | draft TS | Approval | No |
Yes
29th Jan availability deadline
5th Feb Approval | for email approval | No | ||
R5‑190686 | TS 38.521-4 v0.3.0 | Qualcomm | draft TS | Approval | No |
Yes
29th Jan availability deadline
5th Feb Approval | for email approval | No | ||||
7.10 | AOB |   |