Tdoc List

2022-03-06 13:06

TDoc Title Source Type For Agenda Avail Treated Decision Wdrn Replaced-by Replaces
R5‑220000 Agenda - opening session WG Chairman agenda Information
1Opening of the meeting
Yes
YesRAN5#94-e Electronic Meeting has full decision power. Reminder for IPR declaration The RAN5 Chair drew the attention to the delegates' obligations under the 3GPP Partner Organizations’ IPR policies. Every Individual Member organization is obliged to declare to the Partner Organization or Organizations of which it is a member any IPR owned by the Individual Member or any other organization which is or is likely to become essential to the work of 3GPP. Delegates are asked to take note that they are thereby invited: • to investigate whether their organization or any other organization owns IPRs which were, or were likely to become Essential in respect of the work of 3GPP. • to notify their respective Organizational Partners of all potential IPRs, e.g., for ETSI, by means of the IPR Information Statement and the Licensing declaration forms (e.g. see the ETSI IPR forms http://webapp.etsi.org/Ipr/). Antitrust Guidance The RAN5 Chair drew the delegates' attention to the fact that 3GPP activities are subject to all applicable antitrust and competition laws and that compliance with said laws is therefore required of any participant of this TSG/WG meeting including the Chairman and Vice Chairman. In case of question it is recommended that you contact your legal counsel. The leadership shall conduct the present meeting with impartiality and in the interests of 3GPP. Furthermore, the timely submission of work items in advance of TSG/WG meetings is important to allow for full and fair consideration of such matters.” http://www.3gpp.org/about-3gpp/legal-matters/21-3gpp-calendar/1616-statement-of-antitrust-compliance
revised No R5‑221376  
R5‑220001 RAN5#94-e E-Meeting Timelines, Scope, Process WG Chairman agenda Information
1Opening of the meeting
Yes
Yes
endorsed No    
R5‑220002 RAN5 Leadership Team WG Chairman other Information
2.1Live Reports
Yes
Yes
noted No    
R5‑220003 RAN5#93-e WG Minutes ETSI Secretariat report Approval
2.1Live Reports
Yes
YesTF160 manager: R5-217790 TF160 discussion paper on Streamlining PICS for IMS emergency capabilities: the comments from the meeting_handling sheet should be added.
revised No R5‑221374  
R5‑220004 RAN5#93-e WG Action Points ETSI Secretariat report Information
2.1Live Reports
Yes
Yes
noted No    
R5‑220005 Latest RAN Plenary notes WG Chairman report Information
2.1Live Reports
Yes
Yes
noted No    
R5‑220006 Latest RAN Plenary draft Report WG Chairman report Information
2.1Live Reports
Yes
Yes
noted No    
R5‑220007 Post Plenary Active Work Item update ETSI Secretariat other Information
2.1Live Reports
Yes
Yes
noted No    
R5‑220008 RAN5 SR to RP#94-e WG Chairman report Information
2.2General Reports for information
Yes
Yes
noted No    
R5‑220009 TF160 SR to RP#94-e WG Chairman report Information
2.2General Reports for information
Yes
Yes
noted No    
R5‑220010 RAN5#94-e LS Template WG Chairman other Information
4.3RAN5 PRDs/Templates
Yes
Yes
noted No    
R5‑220011 Meeting schedule for 2022-23 WG Chairman other Information
4.4Meeting schedule for 2022
Yes
Yesthe May meeting dates changed to 9.-20.
revised No R5‑222000  
R5‑220012 WI Progress and Target Completion Date Review WG Chairman other Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220013 Review deadlines for next quarter WG Chairman other Information
7.6Confirmation of Future RAN5 Matters
Yes
Yes
noted No    
R5‑220014 Reply LS on Emergency call after Authentication Failure TSG WG CT1 LS in Information
6.2Review incoming LS (fm A.I. 3) & new subject discussion papers
Yes
Yesmoved to SIG.
noted No    
R5‑220015 Non-Support of Ciphering Algorithm GEA1 GCF SG LS in Information
3Incoming Liaison Statements
Yes
YesRAN5 actions will follow SA3 updates.
noted No    
R5‑220016 Defining test cases for E2E verification of Edge Application Server Discovery TSG WG SA2 LS in Information
3Incoming Liaison Statements
Yes
YesDeferred. Waiting for clarifications from Apple for SA2 and CT1 from Huawei. Noted in the midweek joint.
noted No    
R5‑220017 LS on Energy Efficiency as guiding principle for new solutions TSG SA LS in Information
3Incoming Liaison Statements
Yes
Yes
noted No    
R5‑220018 Response LS on duplicated measurements for SCell TSG WG RAN2 LS in Information
6.2Review incoming LS (fm A.I. 3) & new subject discussion papers
Yes
Yesmoved to SIG.
noted No    
R5‑220019 Reply LS on energy efficiency as guiding principle for new solutions TSG WG SA5 LS in Information
3Incoming Liaison Statements
Yes
Yes
noted No    
R5‑220020 dummy LS3 ETSI Secretariat LS in Information
3Incoming Liaison Statements
No
No
reserved No    
R5‑220021 dummy LS4 ETSI Secretariat LS in Information
3Incoming Liaison Statements
No
No
reserved No    
R5‑220022 SR - NR_Rel-16_CA_DC after RAN5#94-e CMCC WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220023 WP - NR_Rel-16_CA_DC after RAN5#94-e CMCC Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220024 Checklist - NR_Rel-16_CA_DC for RAN5#94-e CMCC, BV, Ericsson discussion Endorsement
4.2.15GS
Yes
Yes
noted No    
R5‑220025 SR-LTE/NR spectrum sharing in Band 34/n34 and Band 39/n39 after RAN5#94-e CMCC WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220026 WP-LTE/NR spectrum sharing in Band 34/n34 and Band 39/n39 after RAN5#94-e CMCC Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220027 SR - Rel-16 HST after RAN5#94-e CMCC WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220028 WP - Rel-16 HST after RAN5#94-e CMCC Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220029 SR - Rel-16 IiOT after RAN5#94-e CMCC WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220030 WP - Rel-16 IiOT after RAN5#94-e CMCC Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220031 SR - FS_NR_Slice_Test after RAN5#94-e CMCC WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220032 WP - FS_NR_Slice_Test after RAN5#94-e CMCC Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220033 SR - NR_Rel-17_PC1.5_n79 after RAN5#94-e CMCC WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220034 WP - NR_Rel-17_PC1.5_n79 after RAN5#94-e CMCC Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220035 SR - NR_Rel-17_PC2_n34 after RAN5#94-e CMCC WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220036 WP - NR_Rel-17_PC2_n34 after RAN5#94-e CMCC Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220037 SR - NR_Rel-17_PC2_n39 after RAN5#94-e CMCC WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220038 WP - NR_Rel-17_PC2_n39 after RAN5#94-e CMCC Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220039 Updated the related RRC information for DSS CMCC CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yeswrong WIC on cover! r1
revised No R5‑221670  
R5‑220040 Updated the Test case conditions and selection criteria for TDD DSS NR bands n38, n48, n90 CMCC CR Agreement
5.3.15.4TS 38.522
Yes
Yesr2
revised No R5‑221849  
R5‑220041 Addition of the TDD DSS NR bands n34, n39 CMCC CR Agreement
5.3.35.2TS 38.522
Yes
Yes
agreed No    
R5‑220042 Addition of PICS for frequencyShift7p5khz CMCC, Huawei, Hisilicon CR Agreement
5.3.1.2TS 38.508-2
Yes
Yesr1
revised No R5‑221673  
R5‑220043 SR - NR_SON_MDT-UEConTest after RAN5#94-e CMCC, Ericsson WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220044 WP - NR_SON_MDT-UEConTest after RAN5#94-e CMCC, Ericsson Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220045 Update of TC 7.1.3.5.6 for PDCP Duplication 3 RLC entities in NR IIoT CMCC CR Agreement
6.3.8.4TS 38.523-1
Yes
Yes
withdrawn Yes    
R5‑220046 Addition of new test case for PDCP Duplication 3 RLC entities with NR intra-band non-contiguous CA in NR IIoT CMCC CR Agreement
6.3.8.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220047 Applicability statement for new test cases for PDCP Duplication 3 RLC entities in NR IIoT CMCC CR Agreement
6.3.8.5TS 38.523-2
Yes
Yesfirst agreed, then r1
revised No R5‑222034  
R5‑220048 Update of NR CA configurations for Protocol testing with NR CA 3CC CMCC, WE Certification, DISH Network, Ericsson CR Agreement
6.3.8.1TS 38.508-1
Yes
YesEricsson: we have not explicitly specified which UL band to use for PCell for an intra-band NR CA configuration when UL CA is not configured (or if the NR CA configuration does not support UL CA). There is some exception for the CA two band configurations with SDL bands n29 and n76 where there are a specific note saying that the other band should be used as PCell. For the 3 band table there is a not that the SDL band shall not be used as Pcell (which should be obvious as SDL bands are DL only bands!). For intra-band contiguous CA we have a note stating that the first CC in the table is used as PCell if nothing else is stated in the test case. We could add a similar comment to the inter-band NR CA tables that the first listed band in the configuration not being a SDL band shall be used if nothing else is stated in the test case. See example below in Table 4.3.1.1.2.2-1. Dish network: Would it be ok to set it as “the band with lowest UL frequency is used as PCell” as I’m not sure if in e.g. TDD-FDD we would prefer FDD over TDD. So this solves the non-UL CA case, but how is the selection done when UL CA is supported? Shouldn’t that also be clarified? E///: We could add what is felt most appropriate in the note. E.g. referring as by Your suggestion to the lowest UL frequency (then we don’t need to mention SDL part) + we could include the case when an exception is needed for a specific configuration by a specific not in the table…something like. Note 2: The band with the lowest UL frequency is used as PCell if nothing else is specified for in the table or in the test case for the specific configuration. r1 TF160 reviewed.
revised No R5‑221491  
R5‑220049 Update of inter-band cell environment for Protocol testing with NR CA 3CC CMCC CR Agreement
6.3.8.1TS 38.508-1
Yes
Yescomments from TF160. r1
revised No R5‑221492  
R5‑220050 Update of cell power level for FR2 in NR Immediate MDT TC 8.1.6.2.1 CMCC CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220051 Update of cell power level for FR2 in NR Immediate MDT TC 8.1.6.2.2 CMCC CR Agreement
6.3.16.4TS 38.523-1
Yes
Yescomments from R&S and Starpoint. r1
revised No R5‑221556  
R5‑220052 Update of cell power level for FR2 in NR Immediate MDT TC 8.1.6.2.3 CMCC CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220053 Update of cell power level for FR2 in NR Immediate MDT TC 8.1.6.1.3.1 CMCC, MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220054 Update of cell power level for FR2 in NR Immediate MDT TC 8.1.6.1.3.4 CMCC, MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220055 Correction of 6.6.2.2_2 Additional Spectrum Emission Mask MediaTek Inc. CR Agreement
5.5.1.3.1Tx Requirements (Clause 6)
Yes
Yescl. aff. r1
revised No R5‑221918  
R5‑220056 Addition of Rel-16 NR Mobility Enhancement test case for Conditional PSCell change / PCell change / PSCell change / EN-DC CATT, TDIA CR Agreement
6.3.9.3TS 38.523-1
Yes
Yesr1
revised No R5‑221496  
R5‑220057 Addition of applicability for Rel-16 NR Mobility Enhancement test case CATT, TDIA CR Agreement
6.3.9.4TS 38.523-2
Yes
Yes
agreed No    
R5‑220058 Clarification on Accept-Contact header ROHDE & SCHWARZ CR Agreement
6.3.1.7TS 34.229-1
Yes
Yes
agreed No    
R5‑220059 Discussion on Alignment of test points for MPR and ACLR in TS 38.521-1 CAICT discussion Endorsement
5.3.31.4Discussion Papers, Work Plan, TC lists
Yes
Yesr2
revised No R5‑221665  
R5‑220060 Alignment of test points of ACLR with MPR CAICT CR Agreement
5.3.31.2.1Tx Requirements (Clause 6)
Yes
YesConflict with R5-220200. PC 1.5 TxD need to be defined in clause with suffix G as per the latest discussion of the WP.
withdrawn Yes    
R5‑220061 Discussion of Additional Information for 6.2.2 and 6.2.3 of 38.521-1 and 6.2B.2.3 and 6.2B.3.3 of 38.521-3 CAICT discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yesr1 proposals in R5-220061r1 can be endorsed as no more comment received.
revised No R5‑221661  
R5‑220062 Correction of Additional Information for 6.2.2, 6.2.3 and 6.5.2.4.1 of 38.521-1 and 6.2B.2.3 and 6.2B.3.3 of 38.521-3 CAICT CR Agreement
5.3.1.8TS 38.522
Yes
Yesr2
revised No R5‑221711  
R5‑220063 Correction of Test applicability of 6.2B.2.3 CAICT CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220064 Correction of test applicability of A-MPR CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221675  
R5‑220065 Correction of Test applicability of 6.2B.3.3 CAICT CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221693  
R5‑220066 Correction of 6.5B.2.3.3 to include 6.5.2.4.2 of 38.521-1 CAICT CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221694  
R5‑220067 Removal of CBW 40MHz of n25 from Table 4.3.1.0C-1 High Test Channel bandwidths for each NR band, FR1 CAICT CR Agreement
5.3.7.1TS 38.508-1
Yes
Yesfeedback from R&S and T-Mobile.
withdrawn Yes    
R5‑220068 Correction of test config table for 6.3B.3_1.1 CAICT CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220069 Correction of reference section numbers in 6.4B.2.4.5.4.1 CAICT CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220070 Correction of Editor Note and reference section numbers in 6.5B.3.4.2_1 CAICT CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220071 Addition of Test description and Test requirement for 6.3A.2.1 Transmit OFF power for 2UL CA CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220072 Correction of Table number in step 4 of 6.3A.4.2.1.4.1 CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220073 Correction of Test SCS in Table 6.2D.2.4.1-1 CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220074 Addition of missing clause titles for 6.5B, 6.5D.2_1.4 and 6.5D.2_1.4.1 CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220075 Correction of clause title styles CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220076 Correction of Test SCS in Table 7.3C.2.4.1-1 CAICT CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220077 Correction of style in Table 7.4D.4.1-1 CAICT CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220078 Correction of Test frequency in Table 7.6C.3_1.1.4.1-1 CAICT CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220079 Discussion of adding additional tolerance deltaTIB,c to test requirement of Transmitter power test cases in 38.521-1 CAICT discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
YesNoted and proposal is endorsed
noted No    
R5‑220080 Adding additional tolerance to test requirement of Transmitter power test cases CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220081 Removal of Editor note about PC1 requirements in Rel-15 and Rel-16 CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220082 Correction of table numbers in 7.6C.2_1.1 and 7.6C.3_1.1 CAICT CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220083 Introduction of new V2X test cases in 6.3E.2 CAICT CR Agreement
5.3.11.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221817  
R5‑220084 Introduction of new V2X test cases in 7.6E CAICT CR Agreement
5.3.11.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220085 Introduction of new V2X test cases in 7.7E CAICT CR Agreement
5.3.11.4.2Rx Requirements (Clause 7)
Yes
Yesfirst agreed, then r1 based on comment from Huawei.
revised No R5‑221820  
R5‑220086 Introduction of new V2X test cases in 7.8E CAICT CR Agreement
5.3.11.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220087 Introduction of new V2X test cases in 7.6E CAICT CR Agreement
5.3.11.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220088 Introduction of new V2X test cases in 7.7E CAICT CR Agreement
5.3.11.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220089 Introduction of new V2X test cases in 7.8E CAICT CR Agreement
5.3.11.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220090 Correction of clause title tyles of 4.3.1.1.1.x CAICT CR Agreement
5.3.1.1.1Test frequencies (Clause 4.3.1)
Yes
Yes
agreed No    
R5‑220091 Removal of empty lines in Table 7.3.2.3.2-1 and Table 7.3.2.5-2 CAICT CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yescover Rel-17. r1?
revised No R5‑221689  
R5‑220092 Correction of the table title style of Table 5.5A.3-1 CAICT CR Agreement
5.3.1.5.3Clauses 1-5, Annexes
Yes
Yescover Rel-17. r1?
revised No R5‑221692  
R5‑220093 Corrrection of test config tables of non-CA test cases for consistency with CA test cases on without RB allocation case CAICT CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yescover Rel-17. r1
revised No R5‑221685  
R5‑220094 Correction of test channel bandwidth for n38 CAICT CR Agreement
5.3.7.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220095 Update the FR2 cell powers of test case 11.2.1 CATT, TDIA CR Agreement
6.3.1.4.8.25G-SRVCC
Yes
Yes
agreed No    
R5‑220096 Correction to Mob_enh RRM TC 6.3.1.11 - inter-band sync DAPS HO including test tolerance China Telecommunications CR Agreement
5.3.10.4TS 38.533
Yes
Yes
agreed No    
R5‑220097 Correction to Mob_enh RRM TC 6.3.1.12 - inter-band async DAPS HO including test tolerance China Telecommunications CR Agreement
5.3.10.4TS 38.533
Yes
Yes
agreed No    
R5‑220098 Update the FR2 cell powers of test case 8.1.3.2.6 CATT, TDIA CR Agreement
6.3.1.4.4.1.3RRC Measurement Configuration Control and Reporting (clause 8.1.3)
Yes
Yes
agreed No    
R5‑220099 Update the FR2 cell powers of test case 8.1.3.2.7 CATT, TDIA CR Agreement
6.3.1.4.4.1.3RRC Measurement Configuration Control and Reporting (clause 8.1.3)
Yes
Yes
withdrawn Yes    
R5‑220100 Update the FR2 cell powers of test case 8.1.3.2.8 CATT, TDIA CR Agreement
6.3.1.4.4.1.3RRC Measurement Configuration Control and Reporting (clause 8.1.3)
Yes
Yes
agreed No    
R5‑220101 Addition of new CVX TC 12.2.1.6- Inter-carrier concurrent operation / Sidelink communication / RRC_CONNECTED / Reception TDIA, CATT CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221518  
R5‑220102 New WID on UE Conformance - Enhancement of data collection for SON and MDT in NR SA and MR-DC CMCC WID new Endorsement
4.1New Work Item proposals - for intro only
Yes
Yesr2 Added Ericsson and Dish and Ericsson.
revised No R5‑221379  
R5‑220103 Update chapter 4.5.1 General Ericsson CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
Yes
Yesr1 input from MCC TF160 to add a note for NR connected to 5GC.
revised No R5‑221419  
R5‑220104 Update RRCReconfiguration Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220105 Update IE P-Max Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220106 Addition of new test case 8.2.3.6.2 for Intra-frequency measurements Event A3 in NE-DC CMCC CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yesr1
revised No R5‑221443  
R5‑220107 Addition of new test case 8.2.3.6.2a for Inter-frequency measurements Event A3 in NE-DC CMCC CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yesr1
revised No R5‑221444  
R5‑220108 Applicability statement for new test cases for NE-DC RRC CMCC CR Agreement
6.3.1.5TS 38.523-2
Yes
Yesr1
revised No R5‑222038  
R5‑220109 Update of SA FR1 TC 4.5.3.1 and 4.5.3.3 MediaTek Inc. CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No    
R5‑220110 Update of SA FR1 TC 6.5.3.1 and 6.5.3.3 MediaTek Inc. CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No    
R5‑220111 Correction to test procedure 4.9.11 IMS Emergency call or eCall over IMS establishment in 5GC with IMS emergency registration MediaTek Inc. CR Agreement
6.3.1.1.5Other clauses, Annexes
Yes
Yesr1
revised No R5‑221424  
R5‑220112 Correction to test procedure 4.9.12 IMS Emergency call or eCall over IMS establishment in 5GC without IMS emergency registration MediaTek Inc., Anritsu CR Agreement
6.3.1.1.5Other clauses, Annexes
Yes
Yesr2
revised No R5‑221425  
R5‑220113 Editorial update of section 6.6.2 and 6.7 MediaTek Inc. CR Agreement
6.3.1.3TS 38.509
Yes
YesCR impact tick box for ME shall be set and none of the other tick boxes for UICC apps, RAN or CN shall be set for TS 38.509. r1
revised No R5‑221410  
R5‑220114 Update of date for 5GC TC 9.1.4.1 MediaTek Inc., Datang Linktester CR Agreement
6.3.1.4.5.2MM Security mode control, Identification & Generic UE configuration update (clauses 9.1.2, 9.1.3 & 9.1.4)
Yes
Yesfirst agreed, then r1 based on comments from TF160 and R&S.
revised No R5‑221451  
R5‑220115 Update of date for 5GC TC 9.2.4.1 MediaTek Inc. CR Agreement
6.4.4.65GS Non-3GPP Access Mobility Management (clause 9.2)
Yes
Yesfirst agreed, then r1 based on comments from TF160 and R&S.
revised No R5‑222013  
R5‑220116 Update of MDT TC 8.1.6.1.2.1 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221557  
R5‑220117 Update of MDT TC 8.1.6.1.2.2 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221558  
R5‑220118 Update of MDT TC 8.1.6.1.2.3 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr2
revised No R5‑221559  
R5‑220119 Update of MDT TC 8.1.6.1.2.4 MediaTek Inc., Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221560  
R5‑220120 Update of MDT TC 8.1.6.1.2.5 MediaTek Inc., Rohde & Schwarz, Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221561  
R5‑220121 Update of MDT TC 8.1.6.1.2.6 MediaTek Inc., Rohde & Schwarz, Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221562  
R5‑220122 Update of MDT TC 8.1.6.1.2.7 MediaTek Inc., ZTE Corporation, Anritsu Ltd, Keysight CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr2
revised No R5‑221563  
R5‑220123 Update of MDT TC 8.1.6.1.2.8 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221564  
R5‑220124 Update of MDT TC 8.1.6.1.2.9 MediaTek Inc., Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221565  
R5‑220125 Update of MDT TC 8.1.6.1.2.10 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr2
revised No R5‑221566  
R5‑220126 Update of MDT TC 8.1.6.1.2.11 MediaTek Inc., Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221567  
R5‑220127 Update of MDT TC 8.1.6.1.2.12 MediaTek Inc., Anritsu, Rohde & Schwarz CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221568  
R5‑220128 Update of MDT TC 8.1.6.1.2.13 MediaTek Inc., Rohde & Schwarz, Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221569  
R5‑220129 Update of date for EPC TC 9.1.5.1 MediaTek Inc. CR Agreement
6.5.3.4EPS Mobility Management
Yes
Yesr1
revised No R5‑222017  
R5‑220130 Update of date for MM NITZ TC 9.4.10 MediaTek Inc. CR Agreement
6.6.4.1TS 34.123-1
Yes
Yesr1
revised No R5‑222018  
R5‑220131 Update of date for GMM NITZ TC 12.2.1.13 and 12.2.1.15 MediaTek Inc. CR Agreement
6.6.4.1TS 34.123-1
Yes
Yesr1
revised No R5‑222019  
R5‑220132 Update of date for MM NITZ TC 26.7.6.1.1 MediaTek Inc. CR Agreement
6.6.8.1TS 51.010-1 (Signalling)
Yes
Yesr1
revised No R5‑222022  
R5‑220133 Update of date for GMM NITZ TC 44.2.9.1.1 and 44.2.9.1.3 MediaTek Inc. CR Agreement
6.6.8.1TS 51.010-1 (Signalling)
Yes
Yesr1
revised No R5‑222023  
R5‑220134 Update of GMM TC 44.2.5.2.5 MediaTek Inc. CR Agreement
6.6.8.1TS 51.010-1 (Signalling)
Yes
Yesr1
revised No R5‑222024  
R5‑220135 Update of the release for GEA1 test cases MediaTek Inc. CR Agreement
6.6.8.2TS 51.010-2 (Signalling)
Yes
Yes
agreed No    
R5‑220136 Correction to Annex F for Mob_enh RRM TCs China Telecommunications CR Agreement
5.3.10.4TS 38.533
Yes
Yes
agreed No    
R5‑220137 Update TC Frequency Error for DSS CMCC, Huawei, Hisilicon CR Agreement
5.3.35.1.1Tx Requirements (Clause 6)
Yes
Yesr1 comments/suggestions from Anritsu.
revised No R5‑221905  
R5‑220138 Update test requirements of PC2 n34 MOP for UL MIMO CMCC CR Agreement
5.3.32.2.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220139 Update test requirements of PC2 n39 MOP for UL MIMO CMCC CR Agreement
5.3.33.2.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220140 Discussion on 5G NR CADC configuration handling in RAN5 CMCC, Huawei, Hisilicon, Ericsson, China Unicom, China Telecom, Nokia, CAICT, Bureau Veritas, ZTE discussion Endorsement
4.2.15GS
Yes
Yesr1 The RAN5 Chair's advice was not to blindly follow the core requirements if there is no deployment intrest. r2 was presented in the midweek joint. Proposal 1 can be endorsed. Ericsson commented on slide 8 Prop 5 on the fallback interband configurations contiguous. Bureau Veritas and ZTE agreed with Ericsson.
revised No R5‑221397  
R5‑220141 Update TC Frequency Error for UL MIMO for DSS CMCC CR Agreement
5.3.35.1.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221906  
R5‑220142 Update TC Frequency Error for CA for DSS CMCC CR Agreement
5.3.35.1.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221907  
R5‑220143 Update IE FreqBandList Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220144 Update IE CellGroupConfig Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220145 Editorial update IE CellGroupId Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220146 Editorial update IE PDCCH-ConfigCommon Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220147 Editorial update IE SCellIndex Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220148 Editorial update IE ServCellIndex Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220149 Editorial update IE RAT-Type Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
withdrawn Yes    
R5‑220150 Update test applicabilities of UAC test cases supporting IMS voice CATT, TDIA CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
withdrawn Yes    
R5‑220151 TT analysis for Mob_enh RRM TC 6.3.1.9+6.3.1.10 China Telecommunications,huawei CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
Yes
Yesr1
revised No R5‑221647  
R5‑220152 TT analysis for Mob_enh RRM TC 6.3.1.11+6.3.1.12 China Telecommunications,Huawei CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
No
Yes
withdrawn Yes    
R5‑220153 TT analysis for Mob_enh RRM TC 6.3.1.11+6.3.1.12 China Telecommunications,Huawei CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
No
Yes
withdrawn Yes    
R5‑220154 TT analysis for Mob_enh RRM TC 6.3.1.11+6.3.1.12 China Telecommunications,Huawei CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
Yes
Yesr2
revised No R5‑221648  
R5‑220155 Update test case 7.4a Ericsson CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesoffline comments from Rohde & Schwarz. r1
revised No R5‑221470  
R5‑220156 Correction to NR-DC TC 8.2.7.2.1 TDIA, CATT CR Agreement
6.3.1.4.4.2.7RRC Resume (clause 8.2.7)
Yes
Yes
agreed No    
R5‑220157 Correction to NB-IoT test case 22.4.13 TDIA, CATT CR Agreement
6.5.3.11Others (TS 36.523-1 clauses not covered by other AIs under AI 6.5.3, e.g. eMBMS, Home (e)NB, MBMS in LTE, D2D, SC-PTM, NB-IoT, CIoT...)
Yes
Yes
agreed No    
R5‑220158 Addition of sub-clause titles for NR V2X TCs TDIA, CATT CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221519  
R5‑220159 Correction to NR TC 8.1.1.4.1 TDIA, CATT CR Agreement
6.3.1.4.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
withdrawn Yes    
R5‑220160 Add test case 7.3.2.2.4 for SA FR2 2-step PRACH China Telecommunications CR Agreement
5.3.24.4TS 38.533
Yes
Yes
agreed No    
R5‑220161 Addition of NR V2X test case 12.2.1.2 TDIA, CATT CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑222049  
R5‑220162 Addition of new test case 8.2.3.6.2b for Inter-band measurements Event A3 in NE-DC CMCC CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yesr1
revised No R5‑221445  
R5‑220163 Add 2-Step RACH test cases to Applicability spec China Telecommunications CR Agreement
5.3.24.3TS 38.522
Yes
Yes
agreed No    
R5‑220164 New WID - UE Conformance - Enhancement of Network Slicing Phase 2 CMCC, CATT WID new Endorsement
4.1New Work Item proposals - for intro only
Yes
Yesr1 AT&T asked to be added.
revised No R5‑221380  
R5‑220165 Addition of UE capability for maximum number of activated TCI states CMCC CR Agreement
5.3.16.2TS 38.508-2
Yes
Yesr1
revised No R5‑221853  
R5‑220166 Update of RRM test case applicability - Note 1 removal CMCC CR Agreement
5.3.16.4TS 38.522
Yes
Yes
agreed No    
R5‑220167 Updates to RRM HST Test Case 6.6.1.7 CMCC CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220168 Updates to RRM HST Test Case 6.6.4.5 CMCC CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220169 Correction of HST test case applicability CMCC, Anritsu CR Agreement
5.3.16.4TS 38.522
Yes
Yesfirst agreed, then r1 r2
revised No R5‑221858  
R5‑220170 Add test frequencies for R17 NR inter-band CA configurations in FR1 China Telecommunications CR Agreement
5.3.20.1TS 38.508-1
Yes
Yesr1
revised No R5‑221871  
R5‑220171 Add generic procedure for default MO voice call Ericsson CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220172 Introduction of common implementation conformance statements for NE-DC CMCC CR Agreement
6.3.1.2TS 38.508-2
Yes
Yescomments from TF160. r2
revised No R5‑221427  
R5‑220173 New WID on UE Conformance – Support of reduced capability NR devices China Unicom, Hisilicon, Ericsson, Huawei, Qualcomm WID new Approval
4.1New Work Item proposals - for intro only
Yes
Yesr1 RAN5 Chair: check WIC with RAN secretary. Completion dates are not needed to be all the same; some can be eralier. R&S suggested to include 37.571 for core POS impact as well.
revised No R5‑221381  
R5‑220174 Update test case 7.4 Ericsson CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
withdrawn Yes    
R5‑220175 Update generic procedure A.6 Ericsson CR Agreement
6.6.6.6TS 34.229-5
Yes
Yesr1
revised No R5‑222021  
R5‑220176 Update applicability for IMS emergency Ericsson CR Agreement
6.3.1.14TS 36.523-2
Yes
YesTF160 manager: wrong WiC+AI cover Rel-16! r1
revised No R5‑221408  
R5‑220177 Text Proposal on Test Procedure A.2.2.3 CMCC pCR Approval
4.5.5.1TR 38.918 (pCRs only)
Yes
Yes
approved No    
R5‑220178 Text Proposal on Test Procedure A.2.2.4 CMCC pCR Approval
4.5.5.1TR 38.918 (pCRs only)
Yes
Yes
approved No    
R5‑220179 Updates to Test Configurations CMCC pCR Approval
4.5.5.1TR 38.918 (pCRs only)
Yes
Yes
approved No    
R5‑220180 Updates to message contents in A.2.1.1 CMCC pCR Approval
4.5.5.1TR 38.918 (pCRs only)
Yes
Yes
approved No    
R5‑220181 Addition of default URSP rule to Test Procedure A.2.2.1 CMCC pCR Approval
4.5.5.1TR 38.918 (pCRs only)
Yes
Yes
approved No    
R5‑220182 Addition of default URSP rule to Test Procedure A.2.2.2 CMCC pCR Approval
4.5.5.1TR 38.918 (pCRs only)
Yes
Yes
approved No    
R5‑220183 Summary of the documents for TR 38.918 CMCC discussion Information
4.5.5.2Discussion Papers, Work Plan, TC lists
Yes
Yesr1 all pCRs for block approval.
revised No R5‑221399  
R5‑220184 Update applicability for test case G.19.1 Ericsson CR Agreement
6.6.6.2TS 34.229-2
Yes
YesTF160 manager: wrong WiC+AI r1
revised No R5‑221409  
R5‑220185 Update applicability for test case 7.4 Ericsson CR Agreement
6.3.1.8TS 34.229-2
Yes
Yes
agreed No    
R5‑220186 Editorial update of test procedure 4.9.15 MediaTek Inc. CR Agreement
6.3.1.1.5Other clauses, Annexes
Yes
Yes
agreed No    
R5‑220187 Update of SIB modification steps for Idle TC 6.1.2.9, 6.1.2.18, 6.2.3.1 and 6.2.3.3 MediaTek Inc. CR Agreement
6.3.1.4.2Idle Mode (Clause 6)
Yes
Yesr1
revised No R5‑221431  
R5‑220188 Editorial update of NR RRC TC 8.1.4.1.7.1 MediaTek Inc. CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yes
agreed No    
R5‑220189 Editorial update of NR RRC TC 8.1.4.1.8.1 MediaTek Inc. CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yes
agreed No    
R5‑220190 Update of UAC TC 11.3.1 and 11.3.1a MediaTek Inc. CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yesmerged into R5-220555r1.
withdrawn Yes    
R5‑220191 Update of MDT TC 8.1.6.1.4.7 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221570  
R5‑220192 Update of MDT TC 8.1.6.3.2.1 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesmerged into R5-221042r1.
withdrawn Yes    
R5‑220193 Update applicability of TC 9.5.2 and 9.5.6 MediaTek Inc. CR Agreement
6.6.4.2TS 34.123-2
Yes
Yesr1
revised No R5‑222020  
R5‑220194 Add applicabilities for EVS B0 and A1 Ericsson CR Agreement
6.3.1.8TS 34.229-2
Yes
Yesr1
revised No R5‑221468  
R5‑220195 Introduction of new R17 NR inter-band CA configurations in FR1 China Telecommunications CR Agreement
5.3.20.2TS 38.508-2
Yes
Yesr1
revised No R5‑221875  
R5‑220196 Update to table E.5-1 to add the cell configurations for one 2-step RACH test case China Telecommunications CR Agreement
5.3.24.4TS 38.533
Yes
Yes
agreed No    
R5‑220197 Update of R17 NR inter-band CA configurations within FR1 China Telecommunications CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
Yes
Yesr1 Will be merged into R5-220877r1.
revised No R5‑221600  
R5‑220198 Addition of test frequencies for NE-DC configurations DC_n28A_3A, DC_n28A_3C, DC_n28A_39A, DC_n28A_39C CMCC CR Agreement
5.3.20.1TS 38.508-1
Yes
Yesr1
revised No R5‑221872  
R5‑220199 Update Physical Layer Baseline Implementation Capabilities for NE-DC CMCC CR Agreement
5.3.20.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220200 Update NR ACLR test case for PC1.5 CMCC CR Agreement
5.3.31.2.1Tx Requirements (Clause 6)
Yes
Yesconflicts with R5-220405/R5-220060 (CAICT). r2 Keysight recommended to withdraw. It makes no sense to make additions relative to PC1.5 in ACLR test case 6.5.4.2.1 that will be removed from there in 1 or 2 meeting cycles into a suffix G test case.
revised No R5‑221904  
R5‑220201 Update Tx test cases for PC1.5 CA_n41C CMCC CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
No
Yes
withdrawn Yes    
R5‑220202 Update Tx test cases for PC2 CA_n41C CMCC CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
No
Yes
withdrawn Yes    
R5‑220203 Update UL CA configurations for PC2 and PC1.5 CA_n41C CMCC CR Agreement
5.3.28.3.3Clauses 1-5, Annexes
Yes
Yesr1
revised No R5‑221902  
R5‑220204 Update configuration for PC2 CA_n3A-n41A CMCC CR Agreement
5.3.28.3.3Clauses 1-5, Annexes
Yes
Yescan't open. r1
revised No R5‑221903  
R5‑220205 Addition of NR CA Physical Layer Baseline Implementation Capabilities for R16 CA_n3A-n41A CMCC CR Agreement
5.3.4.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220206 Addition of test frequencies for CA_n3A-n41A with and without UL configuration CMCC CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220207 Update operating bands and CA configurations for CA_n3A-n41A CMCC CR Agreement
5.3.4.3.3Clauses 1-5, Annexes
Yes
Yescan't open. r1
revised No R5‑221764  
R5‑220208 Update Reference sensitivity test case for CA_n3A-n41A CMCC CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yescan't open. r1
revised No R5‑221760  
R5‑220209 Update Spurious emissions for UE co-existence for CA_n3A-n41A CMCC CR Agreement
5.3.4.3.1Tx Requirements (Clause 6)
Yes
Yescan't open. r1
revised No R5‑221758  
R5‑220210 Addition of NR FR1 PC1.5 RF Baseline Implementation Capabilities for n41 CMCC CR Agreement
5.3.29.5TS 38.508-2
Yes
Yesfirst withdrawn before the meeting, then reinstated.
agreed No    
R5‑220211 Corrections to TC 22.1 ROHDE & SCHWARZ, Apple Inc CR Agreement
6.6.6.1TS 34.229-1
Yes
Yes
agreed No    
R5‑220212 Corrections to o-lines for uniqueness ROHDE & SCHWARZ, MCC TF160 CR Agreement
6.6.6.1TS 34.229-1
Yes
Yes
agreed No    
R5‑220213 Corrections for IMS5GS test cases ROHDE & SCHWARZ CR Agreement
6.3.1.8TS 34.229-2
Yes
Yes
agreed No    
R5‑220214 Corrections to A.6 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220215 Corrections to usage or non-usage of mode-set ROHDE & SCHWARZ, Apple Inc CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221471  
R5‑220216 Corrections to TC 10.1 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑222037  
R5‑220217 Corrections to TC 10.2 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr2
revised No R5‑221472  
R5‑220218 Addition of IMS5GS test case 10.7 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221473  
R5‑220219 Addition of IMS5GS TC 10.8 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221474  
R5‑220220 Corrections to TC 7.24 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220221 Corrections to TC 7.24a ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220222 Corrections to TC 7.24b ROHDE & SCHWARZ, Huawei CR Agreement
6.3.1.10TS 34.229-5
Yes
YesHuawei's R5-220646 was merged into this doc. r1
revised No R5‑221475  
R5‑220223 Corrections to TC 8.8 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
No
Yes
withdrawn Yes    
R5‑220224 Corrections to TC 8.34 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220225 Corrections to TC 8.35 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220226 Corrections to TC 8.36 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
No
Yes
withdrawn Yes    
R5‑220227 Corrections to TC 8.37 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220228 Corrections to TC 8.38 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesneeds to correct table numbering. r2
revised No R5‑221476  
R5‑220229 Corrections to TC 8.41 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220230 Corrections to TC 7.25 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220231 Corrections to TC 7.27 ROHDE & SCHWARZ, Apple Inc CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220232 Corrections to TC 7.6 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221477  
R5‑220233 Corrections to TC 8.28 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220234 Addition of IMS5GS TC 8.39 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220235 Addition of IMS5GS TC 8.39a ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220236 Corrections to TC 8.8 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr2
revised No R5‑221478  
R5‑220237 Corrections to TC 8.36 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221479  
R5‑220238 Corrections to test case titles ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220239 Voiding unused test case numbers ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221480  
R5‑220240 Corrections to 4.9.17 on IMS MO call release ROHDE & SCHWARZ CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
Yes
Yes
agreed No    
R5‑220241 Discussion paper on versioning dedicated NG.114 PICS ROHDE & SCHWARZ discussion Endorsement
6.3.1.20Discussion Papers, Work Plan, TC lists
Yes
YesR&S to continue discussion via eamil and reach consensus on highl level level principles
noted No    
R5‑220242 Updating applicability statements of Data Off test cases ROHDE & SCHWARZ CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No    
R5‑220243 Update of 5G-NR test cases applicability Qualcomm Incorporated CR Agreement
6.3.1.5TS 38.523-2
Yes
Yesr1
revised No R5‑221462  
R5‑220244 Corrections to TC 7.26 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220245 Corrections to TC 7.20 ROHDE & SCHWARZ, Huawei CR Agreement
6.3.1.10TS 34.229-5
Yes
YesHuawei's R5-220562 was merged into this doc. r1
revised No R5‑221481  
R5‑220246 Corrections to TC 7.21 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221482  
R5‑220247 Added FR2 connection diagram using modulated interferer Keysight Technologies UK Ltd CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yesr1
revised No R5‑221671  
R5‑220248 Correct TDD pattern for FR2 RF 60kHz SCS Keysight Technologies UK Ltd CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yes
agreed No    
R5‑220249 Corrected REFSENS reference in SUL Frequency error test Keysight Technologies UK Ltd CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220250 Correction of test requirements in spurious test 7.7D Keysight Technologies UK Ltd CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
Yes
Yes"Author confirmed conflicted with R5-220891 (Anritsu) and R5-221246 (T-mobile) R5-220891r1 and R5-221246r1 will be provided removing overlap with R5-220250 ‘overlap’ resolution pending Keysight: Anritsu’s paper has been withdrawn while the other from T-Mobile has been revised removing the overlap. resolved overlap"
agreed No    
R5‑220251 DL RMC correction for TDD SCS 60kHz Keysight Technologies UK Ltd CR Agreement
5.3.1.4.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑220252 Editorial correction to minimum requirements in test 6.2D.2 Keysight Technologies UK Ltd CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220253 General corrections in FR1 6.3A.3.1 ONOFF time mask CA Keysight Technologies UK Ltd CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220254 Frequency correction for NS_27 in A-MPR test Keysight Technologies UK Ltd CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220255 n71 IBNC - UL allocation correction for testing REFSENS without exceptions Keysight Technologies UK Ltd CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220256 FR2 Frequency error tests - unify requirements per polarization Keysight Technologies UK Ltd CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220257 Test limit correction in FR2 MPR test case Keysight Technologies UK Ltd CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220258 RX beam peak direction search procedure update in case of intra-band DL CA Keysight Technologies UK Ltd CR Agreement
5.3.1.5.3Clauses 1-5, Annexes
Yes
Yes"Depends on discussion paper R5-221253 discussion ongoing on R5-221253 RF close GTM:deferred for more time for agreement on the content"
agreed No    
R5‑220259 Updated reference to FR2 connection diagram in tests using modulated interferer Keysight Technologies UK Ltd CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yes"Author confirmed no overlap/conflicts R&S comment, discussion ongoing
agreed No    
R5‑220260 FR1 NSA IBC - ACLR clean up to leverage MPR test definition Keysight Technologies UK Ltd CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220261 WP - UE Conformance Test Aspects - 29 dBm UE Power Class for LTE Band 41and NR Band n41 (UID-920068) T-Mobile USA Inc. Work Plan Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220262 SR - UE Conformance Test Aspects - 29 dBm UE Power Class for LTE Band 41and NR Band n41 (UID-920068) T-Mobile USA Inc. WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220263 Revised WID - UE Conformance Test Aspects - 29 dBm UE Power Class for LTE Band 41and NR Band n41 T-Mobile USA Inc. WID revised Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
Yes
Yesis endorsed.
endorsed No    
R5‑220264 Corrections to TC 10.3 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesoverlap with R5-221037.
withdrawn Yes    
R5‑220265 Addition of test loop mode for NE-DC ROHDE & SCHWARZ CR Agreement
6.3.1.3TS 38.509
Yes
Yesr2 comments from TF160 (mainly editorial).
revised No R5‑221429  
R5‑220266 Addition of test loop mode for NE-DC ROHDE & SCHWARZ CR Agreement
6.3.1.3TS 38.509
Yes
Yescl. aff. r3 comments from TF160 (mainly editorial).
revised No R5‑221430  
R5‑220267 Add applicability for test case 11.1.1a Ericsson CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No    
R5‑220268 Add test case 11.1.1a Ericsson CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yesr1
revised No R5‑221452  
R5‑220269 Discussion on PC2 and PC1.5 CA_n41C with single UL carrier handling in RAN5 CMCC, Huawei, Hisilicon discussion Endorsement
5.3.28.6Discussion Papers, Work Plan, TC lists
Yes
Yesr1 added: PC1.5 CA_n41C Tx/Rx TCs shall not be regarded as completed before PC1.5 n41 Tx/Rx TCs to be confirmed as completed.
revised No R5‑221664  
R5‑220270 Update of R17 NR inter-band CA Tx requirements within FR1 China Telecommunications CR Agreement
5.3.20.3.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221877  
R5‑220271 Addition of test frequencies for CA_n41A-n79A with UL configuration CMCC CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220272 Update Spurious emissions for UE co-existence for CA_n41A-n79A CMCC CR Agreement
5.3.4.3.1Tx Requirements (Clause 6)
Yes
Yescan't open. r1
revised No R5‑221759  
R5‑220273 Clarifications on 5G NR connectivity options for RF FR1 CMCC CR Agreement
5.3.1.4.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑220274 Clarifications on 5G NR connectivity options for RF FR2 CMCC CR Agreement
5.3.1.5.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑220275 Clarifications on 5G NR connectivity options for RF FR1 and FR2 CMCC CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220276 Clarifications on 5G NR connectivity options for Demod CMCC CR Agreement
5.3.1.7.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No    
R5‑220277 Clarifications on 5G NR connectivity options for SIG CMCC CR Agreement
6.3.1.4.4.2.5RRC Reconfiguration / Radio Link Failure (clause 8.2.5)
Yes
Yesr1
revised No R5‑221450  
R5‑220278 Clarifications on 5G NR connectivity options for RRM CMCC CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yesno sub-AI
agreed No    
R5‑220279 Update MOP for inter-band NE-DC within FR1 CMCC CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221695  
R5‑220280 Update CA configurations for CA_n41A-n79A BCS1 CMCC CR Agreement
5.3.4.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑220281 Test Tolerance analysis for FR1 CLI-RSSI measurement with non-DRX Qualcomm Tech. Netherlands B.V CR Agreement
5.3.14.5TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑220282 Test case update for FR1 CLI-RSSI measurement with non-DRX Qualcomm Tech. Netherlands B.V CR Agreement
5.3.14.4TS 38.533
Yes
Yes
agreed No    
R5‑220283 Annexure update for test tolerance for FR1 CLI-RSSI measurement with non-DRX Qualcomm Tech. Netherlands B.V CR Agreement
5.3.14.4TS 38.533
Yes
Yes
agreed No    
R5‑220284 Update of R17 NR inter-band CA Rx requirements within FR1 China Telecommunications CR Agreement
5.3.20.3.2Rx Requirements (Clause 7)
Yes
Yesr3
revised No R5‑221878  
R5‑220285 NG.114 EPS fallback Ericsson discussion Endorsement
6.3.1.20Discussion Papers, Work Plan, TC lists
Yes
YesProposal acceped in principle, actual implementation will be subject to CR review
noted No    
R5‑220286 NG.114 SDP voice Ericsson discussion Endorsement
6.3.1.20Discussion Papers, Work Plan, TC lists
Yes
Yes"Continue discussion via email to reach consensus on way forward Generic procedure to be updated to include EVS Configuration (additional configurations) - Rapporteur Dedicated test case to cover specific confgiuration (e.g. B0)"
noted No    
R5‑220287 Correction to NR MAC test case 7.1.1.3.8.x Keysight Technologies UK, Qualcomm CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yes
agreed No    
R5‑220288 Correction to NR RRC test case 8.1.4.1.2 Keysight Technologies UK CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yesr1
revised No R5‑221440  
R5‑220289 Correction to NR MDT test case 8.1.6.1.4.6 Keysight Technologies UK, Qualcomm, Rohde & Schwarz CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220290 Correction to NR MDT test case 8.1.6.1.4.7 Keysight Technologies UK, Qualcomm CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesmerged with Mediatek CR R5-220191.
withdrawn Yes    
R5‑220291 Correction to NR-DC RRC test case 8.2.3.14.2 Keysight Technologies UK, Qualcomm CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yesr1
revised No R5‑221446  
R5‑220292 Addition of new RACS test case 9.1.9.7 Keysight Technologies UK CR Agreement
6.3.14.4TS 38.523-1
Yes
Yeslate doc r1
revised No R5‑222047  
R5‑220293 Correction to R16 eNS TC 9.1.10.6 Keysight Technologies, Qualcomm, Anritsu CR Agreement
6.3.23.4TS 38.523-1
No
Yes
withdrawn Yes    
R5‑220294 Correction to UAC test case 11.3.1a Keysight Technologies UK CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yesdeferred. r1
revised No R5‑222048  
R5‑220295 Correction to UAC test case 11.3.2 Keysight Technologies UK, Qualcomm, Huawei, Hisilicon CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yesr2
revised No R5‑221456  
R5‑220296 Correction to UAC test case 11.3.6 Keysight Technologies UK, Qualcomm CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
YesWIC cover NR_SON_MDT?? r1
revised No R5‑221457  
R5‑220297 Correction to Registration Accept message for UEs supporting RACS Keysight Technologies UK CR Agreement
6.3.14.1TS 38.508-1
No
Yes
withdrawn Yes    
R5‑220298 Correction to IMS MO speech call establishment generic procedure Keysight Technologies UK CR Agreement
6.3.1.1.3Default 5GC NAS messages and IEs (Clause 4.7)
Yes
Yesr1
revised No R5‑221423  
R5‑220299 Correction to applicability of UAC test case 11.3.2 Keysight Technologies UK CR Agreement
6.3.1.5TS 38.523-2
Yes
Yesmerged with Sporton CR R5-220949.
withdrawn Yes    
R5‑220300 Update SCG-Configuration-r12-NE-DC Ericsson CR Agreement
6.3.1.11TS 36.508
Yes
Yes
agreed No    
R5‑220301 Correction to Idle Mode SOR test case 6.3.1.5 Keysight Technologies UK CR Agreement
6.3.1.4.2Idle Mode (Clause 6)
Yes
Yesr1
revised No R5‑221432  
R5‑220302 Correction to NR SDAP test case 7.1.4.1 Keysight Technologies UK, MCC TF160 CR Agreement
6.3.1.4.3.1.5SDAP
Yes
Yesr1
revised No R5‑221435  
R5‑220303 New MCVideo TC 6.4.1 Video Pull NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221546  
R5‑220304 New MCVideo TC 6.5.1 Video Push NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221547  
R5‑220305 New MCVideo TC 6.3.1 Emergency Alert CO NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221548  
R5‑220306 WP UE Conformance Test Aspects for NR RF Requirement Enhancements for FR2 Nokia, Nokia Shanghai Bell Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220307 SR UE Conformance Test Aspects for NR RF Requirement Enhancements for FR2 Nokia, Nokia Shanghai Bell WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220308 Introduction of test frequencies for CA_n261M Nokia, Nokia Shanghai Bell, Ericsson CR Agreement
5.3.1.1.1Test frequencies (Clause 4.3.1)
Yes
Yes
agreed No    
R5‑220309 Correction of NR inter-band CA configurations for CA_n260-n261 in FR2 Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220310 Correction of FR2 standalone Enhanced Beam correspondence - EIRP RF conformance test case applicability Nokia, Nokia Shanghai Bell CR Agreement
5.3.22.5TS 38.522
Yes
Yesfirst agreed, then r1
revised No R5‑221891  
R5‑220311 Introduction of test frequencies for Rel-16 inter-band EN-DC two band combinations within FR1 Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220312 Introduction of Rel-16 inter-band EN-DC two band configurations within FR1 for physical layer baseline implementation capabilities Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220313 Introduction of Rel-16 inter-band EN-DC two band configurations within FR1 Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.3Clauses 1-5, Annexes
No
Yes
withdrawn Yes    
R5‑220314 Introduction of Output power requirements for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220315 Introduction of General Spurious emissions requirements for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220316 Introduction of Spurious emissions band UE co-existence requirements for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221767  
R5‑220317 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_8A_n20A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesr1
revised No R5‑221774  
R5‑220318 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_20A_n7A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesr1
revised No R5‑221775  
R5‑220319 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_28A_n5A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesr1
revised No R5‑221776  
R5‑220320 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_40A_n79A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesr1
revised No R5‑221777  
R5‑220321 Adding Reference sensitivity Test point analysis for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220322 Adding Reference sensitivity exceptions and MSD test points for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220323 Adding reference sensitivity requirements for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220324 Add test case 7.3.2.2.3 for NR SA FR2 2-step RACH Nokia, Nokia Shanghai Bell CR Agreement
5.3.24.4TS 38.533
Yes
Yesr1 RAN4 draft CR is endorsed as R4-2203528.
revised No R5‑221893  
R5‑220325 Correction to TC 11.3.8 UAC / Access Identity 0 / NR RRC_IDLE / Cell re-selection while T390 is running CATT CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yesr1
revised No R5‑221458  
R5‑220326 WP UE Conformance Test Aspects for 2-step RACH for NR ZTE Corporation Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220327 SR UE Conformance Test Aspects for 2-step RACH for NR ZTE Corporation WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220328 New WID on UE Conformance - LTE/NR Multi-SIM devices China Telecommunications,Vivo,CATT WID new Endorsement
4.1New Work Item proposals - for intro only
Yes
Yes
revised No R5‑221382  
R5‑220329 Update of MDT test case 8.1.6.1.2.1 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220330 Update of MDT test case 8.1.6.1.2.3 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220331 Update of MDT test case 8.1.6.1.2.4 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220332 Update of MDT test case 8.1.6.1.2.7 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesmerged into R5-220122r1.
withdrawn Yes    
R5‑220333 Update of MDT test case 8.1.6.1.2.8 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220334 Update of MDT test case 8.1.6.1.2.9 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220335 Update of MDT test case 8.1.6.1.2.12 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221571  
R5‑220336 Update of MDT test case 8.1.6.1.2.13 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221572  
R5‑220337 Addition of new feMob test case 5.1.42 ZTE, Tejet, SRTC CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221801  
R5‑220338 Addition of new feMob test case 5.1.43 ZTE, Tejet, SRTC CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221802  
R5‑220339 Addition of new feMob test case 5.1.44 ZTE, Tejet, SRTC CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221803  
R5‑220340 Addition of new feMob test case 5.1.45 ZTE, SRTC, Tejet CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221804  
R5‑220341 Addition of new feMob test case 5.1.46 ZTE, SRTC, Tejet CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221805  
R5‑220342 Addition of new feMob test case 5.1.53 ZTE, SRTC, Tejet CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221806  
R5‑220343 Addition of new feMob test case 5.1.54 ZTE, SRTC, Tejet CR Agreement
5.3.9.3TS 36.521-3
Yes
Yescorrect Table nr. r1
revised No R5‑221807  
R5‑220344 Addition of new feMob test case 5.1.55 ZTE Corporation CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221808  
R5‑220345 Addition of new feMob test case 5.1.56 ZTE Corporation CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221809  
R5‑220346 Addition of new feMob test case 5.1.57 ZTE Corporation CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221810  
R5‑220347 Addition of new feMob test case 5.1.58 ZTE Corporation CR Agreement
5.3.9.3TS 36.521-3
Yes
Yesr1
revised No R5‑221811  
R5‑220348 Add applicability of new feMob RRM test cases ZTE Corporation, Huawei, HiSilicon CR Agreement
5.3.9.2TS 36.521-2
Yes
Yesr1 R5-220825 merged into this doc.
revised No R5‑221799  
R5‑220349 Adding NR bands for UL MIMO in FR1 China Telecommunications CR Agreement
5.3.36.1.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑220350 Addition of UE co-existence requirements for band n18 to TS 38.521-1 NTT DOCOMO INC. CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
No
Yeswill come back in next meeting.
withdrawn Yes    
R5‑220351 Addition of UE co-existence requirements for band n40 to TS 38.521-1 NTT DOCOMO INC., KDDI Corporation CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yesreissued as R5-221388 because of title change
withdrawn Yes    
R5‑220352 Ongoing exchange with CT1 ROHDE & SCHWARZ discussion Discussion
6.3.1.20Discussion Papers, Work Plan, TC lists
Yes
Yes"For issue B RAN5 will wait for CT1 outcome and R&S input of possible actions needed including update of and/or late CRs Scheduled call with CT1 expert next week to clairfy things R&S to provide list of impacted test cases to TF160"
noted No    
R5‑220353 Discussion on MU and TT proposal for FR2 EVM Keysight Technologies UK Ltd discussion Discussion
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yesr2 Ericsson and Huawei: the MU/TT ratio of 1.0 in R5-220353r2 need further analysis. 2/23 FR2 MU GTM#1: R&S: Why are the values in Table 3 so large? Also applies to Anritsu paper. We have a different view on Observation 1. State of the art TE can cover 64QAM and no need to look at Near-Field systems. KS: We also see a big difference with Anritsu. The values that we are suggesting are scaled for the different BWs. Anritsu: A value between the KS and Anritsu proposals could be acceptable. R&S: We would expect the BW scaling to apply to the noise but this is taken into account separately. Is the scaling with the BW confirmed with measurements? We don't see this large of impact. E///: In both papers, we cannot fully test the highest modulation. The allowed MPR values are quite large and we could likely test if we check the UE ON Power and test coverage could be improved. We are already considering this approach for ON/OFF time mask. KS: We could also move this discussion to email to consider further. Revised to: R5-220353r1. Revised from: R5-220353. Associated CRs: R5-220354, R5-220355, R5-220356. 2/28 FR2 MU GTM#2: E///: Sent email comment to use a lower TT. This testability analysis is extremely pessimistic by summing up multiple factors. Don't see why this is any different than previous discussion on MU/TT factor. Anritsu: P2 is agreeable. For P1, we will provide MU values from Anritsu that should be closer to KS values. Will provide values by today COB. Orange: We support lower TT values. HW: This testability analysis is not extremely pessimistic as E/// commented. The factors are independent of each other. TE EVM will harm the measurement. We also have UE EVM impact. For some test points, the TE EVM impact is already above the requirement. Using ~50% of requirement is already aggressive. P3 is acceptable. KS: Agree with the comments from HW on MU factors independence. E///: Can discuss this further by email. The issue is more the assumption on UE output power across 20 slots. Moderator (AT&T): P2 can be endorsed. Further discussion will be held over email. Revised to: R5-220353r2. Revised from: R5-220353r1. Associated CRs: R5-220354, R5-220355, R5-220356. 3/1: KS: Proposal 3 seems to be able to be endorsed. E///: As commented by both Ericsson and Huawei, the MU/TT ratio of 1.0 in R5-220353r2 need further analysis, and are therefore not endorsable. Moderator (AT&T): Proposal 1 is superseded by Proposal 1 in the Anritsu paper in R5-220883r3. Proposal 3 cannot be endorsed at this time and requires additional discussion on MU/TT ratio. This document can be given a final Tdoc number and Proposal 2 can be endorsed. Revised to: R5-221625. Revised from: R5-220353r2. Noted and Proposal 2 is endorsed
revised No R5‑221625  
R5‑220354 FR2 SA EVM test case update based on MU and TT analysis Keysight Technologies UK Ltd CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221686  
R5‑220355 FR2 NSA EVM test case editor notes update Keysight Technologies UK Ltd CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221696  
R5‑220356 FR2 EVM MU definition in 38.903 Keysight Technologies UK Ltd CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yesr1
revised No R5‑221743  
R5‑220357 Introduction of reference sensitivity test point analysis for CA_n5A-n7 Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
YesWithdrawn since it was introducing IMD for 2 UL CA for CA_n5A-n7A. 2UL CA is a Rel-17 WI and the CR was for Rel-16.
withdrawn Yes    
R5‑220358 Introduction of reference sensitivity test point analysis for CA_n5A-n78A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesadded A to the title (typo). r1 w/d merged into R5-221345.
revised No R5‑221621  
R5‑220359 Introduction of reference sensitivity test point analysis for CA_n7A-n78A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesfirst agreed, then withdrawn. merged into R5-221345.
withdrawn Yes    
R5‑220360 Introduction of CA_n5A-n7A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yesr1 Withdrawn since it was introducing IMD for 2 UL CA for CA_n5A-n7A. 2UL CA is a Rel-17 WI and the CR was for Rel-16.
revised No R5‑221609  
R5‑220361 Introduction of CA_n5A-n78A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yesr1
revised No R5‑221761  
R5‑220362 Introduction of CA_n7A-n78A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220363 Update TP analysis for Rel-17 DC_2A_n77A Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220364 Update TP analysis for Rel-17 DC_5A_n77A Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220365 Update TP analysis for Rel-17 DC_13A_n77A Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220366 Update TP analysis for Rel-17 DC_66A_n77A Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220367 Correction to NAS 5GMM test case 9.1.5.1.15 Anritsu Ltd, Rohde and Schwarz CR Agreement
6.3.1.4.5.3MM Registration & De-registration (clauses 9.1.5 & 9.1.6)
Yes
Yes
agreed No    
R5‑220368 Correction to MDT test case 8.1.6.1.2.7 Anritsu Ltd, Keysight CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesmerged into R5-220122r1.
withdrawn Yes    
R5‑220369 Update general spurious emissions 6.5B.3.3.1 for 4 Rel-17 ENDC combos Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220370 Correction to MDT test case 8.1.6.1.2.9 ANRITSU LTD CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesmerged into R5-220124r1.
withdrawn Yes    
R5‑220371 Update for 6.5B.3.3.2 Spurious emission band UE co-existence for 4 Rel-17 combos Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220372 Correction of Default Configuration Parameters for Test 1 in Test Case 7.1.11 STMicroelectronics CR Agreement
5.5.1.5TS 36.521-3
Yes
Yeswas wrong Rel & ver. Offline comments from Qualcomm that the changes requested in the CR cannot be done without changing 36.133 specification. r1 w/d We would go with option 2 unless you recommend otherwise
revised No R5‑221622  
R5‑220373 Addition of Rel-16 RACS TC 9.1.9.6 ANRITSU LTD CR Agreement
6.3.14.4TS 38.523-1
Yes
Yesoffline comments from Qualcomm and MCC160. r1
revised No R5‑221536  
R5‑220374 Introduction of test frequencies for additional Rel-17 EN-DC inter-band configurations Verizon Switzerland AG, Ericsson CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220375 Update Tx TC for 4 Rel-17 combos Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.5.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221883  
R5‑220376 Addition of Rel-16 RACS TC 9.1.9.3 ANRITSU LTD CR Agreement
6.3.14.4TS 38.523-1
Yes
Yesr1
revised No R5‑221537  
R5‑220377 Introduction of reference sensitivity test point analysis for DC_1A-n7A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220378 Introduction of reference sensitivity test point analysis for DC_28A_n7A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220379 Introduction of reference sensitivity test point analysis for DC_1A_n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220380 Introduction of DC_1A-n5A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220381 Introduction of reference sensitivity test point analysis for DC_3A_n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220382 Introduction of DC_3A-n5A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220383 Introduction of reference sensitivity test point analysis for DC_7A-n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220384 Introduction of DC_7A-n5A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220385 Introduction of reference sensitivity test point analysis for DC_7A_n28A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220386 Introduction of reference sensitivity test point analysis for DC_7A_n78A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesr1
revised No R5‑221778  
R5‑220387 Introduction of DC_7A-n78A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220388 Introduction of reference sensitivity test point analysis for DC_7A_n5A-n78A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220389 Introduction of reference sensitivity test point analysis for DC_28A_n7A-n78A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220390 Introduction of DC_28A_n7A-n78A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220391 Align the terminology being used for OTA environment (Idle Mode TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.2Idle Mode (Clause 6)
Yes
Yesr1
revised No R5‑221433  
R5‑220392 Align the terminology being used for OTA environment (MAC TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yes
agreed No    
R5‑220393 Align the terminology being used for OTA environment (RRC 8.1.1.x TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yeswas wrong AI. r1
revised No R5‑221436  
R5‑220394 Align the terminology being used for OTA environment (RRC 8.1.3.x TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.1.3RRC Measurement Configuration Control and Reporting (clause 8.1.3)
Yes
Yesr1
revised No R5‑221439  
R5‑220395 Align the terminology being used for OTA environment (RRC 8.1.4.x TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yesr1
revised No R5‑221441  
R5‑220396 Align the terminology being used for OTA environment (RRC 8.2.3.x) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yesr2 comments from TF160 (mainly editorial).
revised No R5‑221447  
R5‑220397 Align the terminology being used for OTA environment (RRC 8.2.4.x) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.2.4RRC Carrier Aggregation (clause 8.2.4)
Yes
Yes
agreed No    
R5‑220398 Align the terminology being used for OTA environment (EPS Fallback TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yes
agreed No    
R5‑220399 Align the terminology being used for OTA environment (UAC TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
No
Yes
withdrawn Yes    
R5‑220400 New MCVideo TC 6.7.1 Remote Initiated Ambient Viewing CO NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221549  
R5‑220401 Additional Rel-15 parameters for MCVideo User Profile 5.5.8.7 NIST CR Agreement
6.3.15.1TS 36.579-1
Yes
Yesr1
revised No R5‑221545  
R5‑220402 Correction of 5GS IMS test case 10.9 NTT DOCOMO, INC. CR Agreement
6.3.1.10TS 34.229-5
Yes
Yescover Rel-15! r1
revised No R5‑221483  
R5‑220403 Addition of new 5GS IMS test case 11.4.12 NTT DOCOMO, INC. CR Agreement
6.3.1.4.8.4Emergency Services
Yes
Yeswas wrong AI. cover Rel-15! r1
revised No R5‑221460  
R5‑220404 Addition of applicability for emergency call eatablishment over EPS with disabling N1 mode NTT DOCOMO, INC. CR Agreement
6.3.1.5TS 38.523-2
Yes
Yeswas wrong AI. cover Rel-15! r1
revised No R5‑221463  
R5‑220405 Alignment of test points of ACLR with MPR CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
YesConflict with R5-220200. r3
revised No R5‑221676  
R5‑220406 Addition of new R15 configurations in clause 5 CAICT CR Agreement
5.3.1.5.3Clauses 1-5, Annexes
No
Yeslate doc
withdrawn Yes    
R5‑220407 Addition of new R16 CA configurations in clause 5 CAICT CR Agreement
5.3.4.4.3Clauses 1-5, Annexes
No
Yeswrong AI; late doc
withdrawn Yes    
R5‑220408 SR UE Conformance Test Aspects for NR performance requirement enhancement RAN5#94e China Telecom WI status report Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220409 WP UE Conformance Test Aspects for add support of NR DL 256QAM for FR2 RAN5#94e China Telecom Work Plan Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220410 SR UE Conformance Test Aspects for add support of NR DL 256QAM for FR2 RAN5#94e China Telecom WI status report Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220411 SR UE Conformance Aspects - Even further mobility enhancement in E-UTRAN RAN5#94e China Telecom WI status report Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220412 WP UE Conformance Aspects - Even further mobility enhancement in E-UTRAN RAN5#94e China Telecom Work Plan Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220413 SR UE Conformance SAR schemes for UE power class 2 (PC2) for NR inter-band Carrier Aggregation and supplemental uplink (SUL) configurations with 2 bands UL RAN5#94e China Telecom WI status report Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220414 WP UE Conformance SAR schemes for UE power class 2 (PC2) for NR inter-band Carrier Aggregation and supplemental uplink (SUL) configurations with 2 bands UL RAN5#94e China Telecom Work Plan Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220415 SR UE Conformance Rel-17 High power UE for NR inter-band Carrier Aggregation with 2 bands downlink and x bands uplink (x=1,2) RAN5#94e China Telecom WI status report Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220416 WP UE Conformance Rel-17 High power UE for NR inter-band Carrier Aggregation with 2 bands downlink and x bands uplink (x=1,2) RAN5#94e China Telecom Work Plan Discussion
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220417 Correction on Type I PMI test cases China Telecom CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesfirst agreed, then r1
revised No R5‑221842  
R5‑220418 Addition of FR1 CA CQI test cases applicability China Telecom CR Agreement
5.3.15.4TS 38.522
Yes
Yesfirst agreed, then r1
revised No R5‑221850  
R5‑220419 Addition of FR1 CA CQI test cases China Telecom CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesr1 comments from QC and Ericsson.
revised No R5‑221843  
R5‑220420 Addition of applicability for FR1 CA CQI test requirements China Telecom CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesr2
revised No R5‑221844  
R5‑220421 Addition of FR2 CA CQI test cases applicability China Telecom CR Agreement
5.3.15.4TS 38.522
Yes
Yesfirst agreed, then r1
revised No R5‑221851  
R5‑220422 Addition of FR2 CA CQI test cases China Telecom CR Agreement
5.3.15.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yesfirst agreed, then r1. based on comments from QC.
revised No R5‑221847  
R5‑220423 Addition of applicability for FR2 CA CQI test requirements China Telecom CR Agreement
5.3.15.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yesr2
revised No R5‑221848  
R5‑220424 Update of MOP test cases for PC2 CA_n1A-n78A with UL CA_n1A-n78A China Telecom CR Agreement
5.3.27.3.1Tx Requirements (Clause 6)
Yes
Yescover: must add +PC2! r2
revised No R5‑221896  
R5‑220425 Update of MOP test cases for PC2 CA_n3A-n78A with UL CA_n3A-n78A China Telecom CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yesfirst agreed, then r1
revised No R5‑221897  
R5‑220426 New WID on UE Conformance - NR coverage enhancements China Telecom WID new Endorsement
4.1New Work Item proposals - for intro only
Yes
YesVerizon & Dish to be added.
revised No R5‑221383  
R5‑220427 PRD-17 on Guidance to Work Item Codes (post RAN#95-e version) Bureau Veritas (Rapporteur) other Approval
7.3iWD/PRD Updates
No
No
reserved No    
R5‑220428 Update to mandate non support of GEA2 from Rel-16 Bureau Veritas CR Agreement
6.6.8.2TS 51.010-2 (Signalling)
Yes
YesTF160 manager: - the CR contains changes: - Up to Rel-16, - and also not related to the CR title, i.e. not related to GEA2. Conclusion: update the GEA2 encryption applicability to follow SA3 decision, but only update till Release 13 to comply with latest TS 51.010-2. Reissued as R5-221411 because of title change.
withdrawn Yes    
R5‑220429 Regrouping DC Configuration in clause 5 Bureau Veritas, ZTE, Apple Portugal CR Agreement
5.3.1.6.3Clauses 1-5, Annexes
Yes
Yesr1
revised No R5‑221705  
R5‑220430 Update to R15 Configuration for DC Bureau Veritas CR Agreement
5.3.1.6.3Clauses 1-5, Annexes
No
Yes
withdrawn Yes    
R5‑220431 Update to R16 Configuration for DC Bureau Veritas, Ericsson, Nokia, KDDI CR Agreement
5.3.4.5.3Clauses 1-5, Annexes
Yes
Yes"Author confirmed no overlap/conflicts Whether DC_18A-n41A_n3A could be condiered as part of jumbo CR, it's depends on Proposal 5 of R5-220140 (CMCC) R5-220140 revised to R5-221397 with all proposals enodorsed"
agreed No    
R5‑220432 Update to R17 Configuration for DC Bureau Veritas, Verizon Wireless CR Agreement
5.3.20.5.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑220433 RAN5#94-e summary of changes to RAN5 test cases with potential impact on GCF and PTCRB Ericsson report Information
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
No
reserved No    
R5‑220434 3GPP RAN5 PRD20 v1.1.0: CA status list Ericsson other Information
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
No
reserved No    
R5‑220435 WP UE Conformance Test Aspects - Rel-15 LTE CA configurations Ericsson Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220436 SR UE Conformance Test Aspects - Rel-15 LTE CA configurations Ericsson WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220437 WP UE Conformance Test Aspects - Rel-16 LTE CA configurations Ericsson Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220438 SR UE Conformance Test Aspects - Rel-16 LTE CA configurations Ericsson WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220439 WP UE Conformance Test Aspects - 5G system with NR and LTE Ericsson Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220440 SR UE Conformance Test Aspects - 5G system with NR and LTE Ericsson WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220441 5GS progress report RAN5#94-e Ericsson WI status report Information
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
No
reserved No    
R5‑220442 Update of RAN5 5G NR phases and target update RAN5#94-e Ericsson discussion Endorsement
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
No
reserved No    
R5‑220443 WP UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands Ericsson Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220444 SR UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands Ericsson WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220445 Checklist - Adding new NR band or channel bandwidth to existing bands Ericsson other Information
4.2.15GS
Yes
Yes
noted No    
R5‑220446 WP UE Conformance - Power Class 2 for EN-DC with xLTE band + yNR DL with 1LTE+1(TDD) NR UL band (x= 2, 3, 4, y=1; x=1, 2, y=2) Ericsson Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220447 SR UE Conformance - Power Class 2 for EN-DC with xLTE band + yNR DL with 1LTE+1(TDD) NR UL band (x= 2, 3, 4, y=1; x=1, 2, y=2) Ericsson WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220448 Correction of UL CA configurations for CA_25A-41A,CA_25A-25A-41A, CA_25A-41C, CA_25A-25A-41C and CA_25A-41D in Table 5.4.2A.1-2 Ericsson CR Agreement
5.3.3.2TS 36.521-1
Yes
Yes
agreed No    
R5‑220449 Update of test frequencies for protocol testing and NR inter-band CA Ericsson CR Agreement
6.3.1.1.4Test environment for SIG (Clause 6)
Yes
Yes
agreed No    
R5‑220450 MCC TF160 Status Report MCC TF160 report Approval
2.1Live Reports
Yes
Yes
revised No R5‑221378  
R5‑220451 RAN5 PRD12 version 6.8 MCC TF160 other Approval
4.3RAN5 PRDs/Templates
Yes
Yes
approved No    
R5‑220452 Correction to RF E-UTRA RRC_CONNECTED procedure MCC TF160, Anritsu CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
Yes
YesKeysight UK/TF160: 36.300 cl. 13.1 and 23.401 cl. 4.7.2 specify: When a data radio bearer exists, there is a one-to-one mapping between this data radio bearer and the EPS bearer. This means that a new dedicated EPS bearer shall be linked to the SCG DRB, as this cannot be linked to the same EPS bearer identity as the MCG. You can have an MCG bearer terminated in the SN i.e. you can have just one DRB, which is configured on the NR cell, but if you want 2 DRBs, for an MCG and an SCG, then you will need a default bearer and a dedicated bearer. R&S: is OK with the contents of R5-220452 and we do not see the need for the changes proposed by Keysight. Keysight Spain: As we commented below, our proposal is to reduce RF EUTRA RRC_CONNECTED state as much as possible considering RF testing does not care about DRB configuration. There is not any RF, RRM or Demod (except Demod SDR test case) where DRB is exercised. Hence, considering this context, the proposal is to not activate a dedicated EPS bearer during RF E-UTRA RRC_CONNECTED state for all RF, RRM and Demod test cases as it is not needed, saving unnecessary NSA message transaction for all NSA preambles, in all RF, RRM and Demod test cases. Of course, for doing that, only one DRB would be stablished at the end of RF E-UTRA CONNECTED state. In that case only SCG DRB would be stablished and MCG DRB would be release during RF E-UTRA RRC_CONNECTED state. Translating this proposal into RF E-UTRA RRC_CONNECTED stated, step 12 would consider: - MCG DRB release - And, SCG DRB addition - Linking SCG DRB to default EPS bearer - Hence, no need to send ACTIVATE DEDICATED EPS BEARER Then, RF E-UTRA RRC_CONNECTED would finalize in step 13 as step 12 would not send ACTIVATE DEDICATED EPSA BEARER REQUEST
agreed No    
R5‑220453 Deletion of Editor's Note below clause 7.1.2 MCC TF160 CR Agreement
6.3.1.4.3.1.3RLC
Yes
Yes
agreed No    
R5‑220454 Correction to 5GC test case 9.1.1.3 MCC TF160 CR Agreement
6.3.1.4.5.1MM Primary authentication and key agreement (clause 9.1.1)
Yes
Yes
agreed No    
R5‑220455 5G Rel-15: Test Models updates MCC TF160 CR Agreement
6.3.1.6TS 38.523-3
Yes
Yesr2
revised No R5‑221467  
R5‑220456 5G V2X: Test Model updates MCC TF160 CR Agreement
6.3.10.6TS 38.523-3
Yes
Yescover Rel-16! r1
revised No R5‑221529  
R5‑220457 5G V2X: GNSS Test Model updates for NR sidelink MCC TF160 CR Agreement
6.3.10.9TS 37.571-4
Yes
Yeswrong AI! Spec doesn't exist in WID! Huawei: must update the WID to add TS 37.571-4.
agreed No    
R5‑220458 Addition of NR/WLAN Inter-RAT test model MCC TF160 CR Agreement
6.3.16.6TS 38.523-3
Yes
YesRel -17. r1
revised No R5‑221403  
R5‑220459 Reference dedicated EPS bearer contexts for MCVideo and MCData MCC TF160 CR Agreement
6.5.1Routine Maintenance for TS 36.508
Yes
Yesr1
revised No R5‑222015  
R5‑220460 Routine maintenance for TS 36.523-3 MCC TF160 CR Agreement
6.5.5Routine Maintenance for TS 36.523-3
No
Yeslate doc
withdrawn Yes    
R5‑220461 Correction of clause 2 - References MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220462 Correction of clause 5.4 - Generic test procedures for UE operation over E-UTRA/EPC MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220463 Correction of clause 5.5.11 - Default MCVideo Transmission Control Messages and other Information Elements MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220464 Correction of clause 5.5.12 - MSRP Messages for MCData MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220465 Correction of clause 5.5.2.16 - SIP 1xx MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220466 Correction of clause 5.5.2.17 - SIP 2xx MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220467 Correction of clause 5.5.2.5 - SIP INVITE MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220468 Correction of clause 5.5.2.7 - SIP MESSAGE MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220469 Correction of clause 5.5.2-11 - SIP PUBLISH MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220470 Correction of clause 5.5.2-8 - SIP NOTIFY MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220471 Correction of clause 5.5.3.1 - SDP Message MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yesr1
revised No R5‑222026  
R5‑220472 Correction of clause 5.5.3.10 - MCData Protected Payload Message MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220473 Correction of clause 5.5.3.6 - SIMPLE-FILTER MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yesr1
revised No R5‑222027  
R5‑220474 Correction of clause 5.5.3.8 - MCData Data signalling messages MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220475 Correction of clause 5.5.4 - Default HTTP message and other information elements MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220476 Correction of clause 5.5.6 - Default MCPTT media plane control messages and other information elements MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220477 Correction of clause 5.5.7 - Default MCX group management messages and other information elements MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220478 Correction of clause 5.5.8 - Default MCS configuration management messages and other information elements MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220479 Correction of clause 5.5.9.1 - CSK download by the SS MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220480 Removal of clause 5.5.3.13 MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No    
R5‑220481 Restructuring of clause 5.3 - Generic test procedures for UE MCS operation MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yesr1
revised No R5‑222028  
R5‑220482 Correction of MCPTT Test Case 5.2 MCC TF160 CR Agreement
6.6.9.2TS 36.579-2
Yes
Yes
agreed No    
R5‑220483 Correction of MCPTT Test Case 5.3 MCC TF160, NIST, UPV/EHU, Nemergent Solutions CR Agreement
6.6.9.2TS 36.579-2
Yes
Yesr1
revised No R5‑222029  
R5‑220484 Correction of MCPTT Test Case 5.5 MCC TF160 CR Agreement
6.6.9.2TS 36.579-2
Yes
Yes
agreed No    
R5‑220485 Correction of Test Cases in clause 6 MCC TF160, , UPV/EHU, Nemergent Solutions CR Agreement
6.6.9.2TS 36.579-2
Yes
Yesr2
revised No R5‑222030  
R5‑220486 MCPTT condition clarification MCC TF160 CR Agreement
6.6.9.2TS 36.579-2
Yes
Yes
agreed No    
R5‑220487 Addition of PICS MCC TF160 CR Agreement
6.6.9.4TS 36.579-4
Yes
Yesrmv to Annex A.4! r1
revised No R5‑222031  
R5‑220488 Routine maintenance for TS 36.579-5 MCC TF160 CR Agreement
6.6.9.5TS 36.579-5
Yes
Yes
agreed No    
R5‑220489 Correction of MCVideo Test Case 5.1 MCC TF160 CR Agreement
6.6.9.6TS 36.579-6
Yes
Yes
agreed No    
R5‑220490 Correction of MCVideo Test Case 5.2 MCC TF160 CR Agreement
6.6.9.6TS 36.579-6
Yes
Yes
agreed No    
R5‑220491 Correction of MCVideo Test Case 5.3 MCC TF160 CR Agreement
6.6.9.6TS 36.579-6
Yes
Yes
agreed No    
R5‑220492 Correction of MCVideo Test Case 5.4 MCC TF160 CR Agreement
6.6.9.6TS 36.579-6
Yes
Yes
agreed No    
R5‑220493 MCVideo condition clarification MCC TF160 CR Agreement
6.6.9.6TS 36.579-6
Yes
Yes
agreed No    
R5‑220494 Addition of test files to annex A MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yescover title! r1
revised No R5‑221404  
R5‑220495 Correction of clause 2 - References MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No    
R5‑220496 Correction of clause 6.1 - Short Data Service MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No    
R5‑220497 Correction of clause 6.2 - File Distribution Test Cases MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No    
R5‑220498 Correction of clause 6.3 - Enhanced Status Test Cases MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No    
R5‑220499 Correction of MCData Test Case 5.2 MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No    
R5‑220500 Correction of MCData Test Case 5.3 MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No    
R5‑220501 Correction of MCData Test Case 5.4 MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No    
R5‑220502 MCData condition clarification MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No    
R5‑220503 Update of protocol testing applicability for inter-band FR1 EN-DC configurations with NR CA non-contiguous Ericsson CR Agreement
5.3.20.1TS 38.508-1
Yes
Yesresolves conflict with Huawei CR in R5-220974.
withdrawn Yes    
R5‑220504 Correction to NR RRC test case 8.1.5.2.2 Keysight Technologies UK CR Agreement
6.3.1.4.4.2.5RRC Reconfiguration / Radio Link Failure (clause 8.2.5)
No
Yes
withdrawn Yes    
R5‑220505 Remove test case 8.1.6.1.3.6 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yescl. aff. r2 RAN5 is aware of known open issues in TS 38.523-1 TC 8.1.6.1.3.6 which will be addressed in RAN5#95-e meeting.
revised No R5‑221412  
R5‑220506 Correction to SON-MDT test case 8.1.6.1.4.2 Anritsu Ltd, Qualcomm, Keysight CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221573  
R5‑220507 Update to test case 8.1.6.1.3.7 MediaTek Inc., Rohde & Schwarz, Qualcomm, Keysight Technologies UK, Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221574  
R5‑220508 Update of protocol testing applicability for 3CC inter-band NR DC configurations Ericsson CR Agreement
5.3.20.1TS 38.508-1
Yes
Yesr1
revised No R5‑221873  
R5‑220509 WP for HPUE_PC1_5_n77_n78-UEConTest for RAN5#94-e Verizon Switzerland AG Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220510 SR for HPUE_PC1_5_n77_n78-UEConTest for RAN5#94-e Verizon Switzerland AG WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220511 New MCVideo TC 6.7.2 Remote Initiated Ambient Viewing CT NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221550  
R5‑220512 New MCVideo TC Selected Group Change of Targeted User CO NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221551  
R5‑220513 Updates to A.7.1.1.1 and A.9.1.1.1 test points Qualcomm communications-France CR Agreement
5.3.6.1TR 37.901-5
Yes
Yes
agreed No    
R5‑220514 Updates to A.7.1.2.1 and A.9.1.2.1 Qualcomm communications-France CR Agreement
5.3.6.1TR 37.901-5
Yes
Yes
agreed No    
R5‑220515 Updates to A.10 and Annex.11 for Downlink Throughput tests with Variable Reference Channel Qualcomm communications-France CR Agreement
5.3.6.1TR 37.901-5
Yes
Yesfilename! () r1
revised No R5‑221784  
R5‑220516 Updates to Conclusion Qualcomm communications-France CR Agreement
5.3.6.1TR 37.901-5
Yes
Yescl. aff. r2
revised No R5‑221785  
R5‑220517 Updates to Annex.B Qualcomm communications-France CR Agreement
5.3.6.1TR 37.901-5
Yes
Yescl. aff. r2
revised No R5‑221786  
R5‑220518 Addition of test cases for UE Rx-Tx time difference measurement period CATT CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑220519 Addition of UE Rx-Tx time difference measurement test uncertainties and test parameter relaxations CATT CR Agreement
5.3.21.3TS 37.571-1
Yes
Yesr1
revised No R5‑221887  
R5‑220520 Addition of test applicabilities for NR UE Rx-Tx time difference measurement test cases CATT CR Agreement
5.3.21.4TS 37.571-3
Yes
YesCR# r1
revised No R5‑221888  
R5‑220521 Addition of test applicabilities for PosSIB broadcasting test case CATT CR Agreement
6.3.20.5TS 37.571-3
Yes
Yesr1
revised No R5‑221594  
R5‑220522 Addition of TC 9.4.1 PosSIB broadcasting followed by location information transfer CATT CR Agreement
6.3.20.4TS 37.571-2
Yes
Yesr1
revised No R5‑221592  
R5‑220523 Correction of the assistance data elements for NR positioning support CATT CR Agreement
6.3.20.4TS 37.571-2
Yes
Yesr2
revised No R5‑221593  
R5‑220524 Addition of positioning system information blocks associated parameters CATT CR Agreement
6.3.20.1TS 38.508-1
Yes
YesRel-16 cover! r2
revised No R5‑221591  
R5‑220525 Correction to TC 7.1.1.12.3 DRX adaptation / UE wakeup indication CATT CR Agreement
6.3.12.4TS 38.523-1
Yes
Yesfirst agreed, then r1. r2
revised No R5‑221530  
R5‑220526 Work plan: UE Conformance Test Aspects for NR Positioning Support CATT Work Plan Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220527 SR UE Conformance Test Aspects - NR Positioning Support CATT WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220528 Work plan: UE Conformance Test Aspects – UE power saving in NR CATT Work Plan Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220529 SR UE Conformance Test Aspects - UE power saving in NR CATT WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220530 Update of NR5G NPN TC 6.5.2.1 MediaTek Inc. CR Agreement
6.3.13.3TS 38.523-1
Yes
Yesr2
revised No R5‑221531  
R5‑220531 Update of NR5G NPN TC 6.5.2.2 MediaTek Inc. CR Agreement
6.3.13.3TS 38.523-1
Yes
Yes
agreed No    
R5‑220532 Update of NR5G NPN TC 6.5.2.4 MediaTek Inc. CR Agreement
6.3.13.3TS 38.523-1
Yes
Yes
agreed No    
R5‑220533 Editorial correction to UE declaration of Bandwidth Class and BCS information Bureau Veritas CR Agreement
5.3.4.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220534 Update test applicability to allow for support of limited GNSS combinations for 5G tests Bureau Veritas, Spirent Communications CR Agreement
5.3.1.12TS 37.571-1
Yes
Yes
agreed No    
R5‑220535 Update test applicability to allow for support of limited GNSS combinations Bureau Veritas, Spirent Communications CR Agreement
5.6.9TS 37.571-1
Yes
Yes
agreed No    
R5‑220536 Correction to Applicability and Additional information for EN-DC TC and RRM TC TTA, SGS Wireless CR Agreement
5.3.1.8TS 38.522
Yes
Yesr1
revised No R5‑221712  
R5‑220537 Correction on test procedure and initial condition for power tolerance test cases TTA CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220538 Correction on test requirements for TC 6.5B.3.3.2 TTA CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220539 Addition of 6.4E.1 Frequency error for V2X TTA CR Agreement
5.3.11.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220540 Addition of 6.4E.2.1 Error Vector Magnitude for V2X TTA CR Agreement
5.3.11.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220541 Introduction of test frequencies for n25 adding CBWs 25MHz, 30MHz, 40MHz Ericsson, Rohde & Schwarz CR Agreement
5.3.7.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220542 Correction to cl 4.5.3 RRC_INACTIVE generic procedure Huawei, Hisilicon CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
Yes
Yesdeferred. r1
revised No R5‑222039  
R5‑220543 Correction to NR TC 6.4.1.1-PLMN Selection-Higher priority PLMN Huawei, Hisilicon CR Agreement
6.3.1.4.2Idle Mode (Clause 6)
Yes
Yes
agreed No    
R5‑220544 Correction to NR TC 7.1.1.5.3-Short Cycle DRX Huawei, Hisilicon CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yes
agreed No    
R5‑220545 Correction to NR SA TC 8.1.1.3.7-RRC release Huawei, Hisilicon CR Agreement
6.3.1.4.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
agreed No    
R5‑220546 Correction to NR TC 8.1.2.1.1-RRC Reconfiguration Huawei, Hisilicon CR Agreement
6.3.1.4.4.1.2RRC Reconfiguration (clause 8.1.2)
Yes
Yesr1
revised No R5‑221438  
R5‑220547 Correction to NR SA TC 8.1.4.1.7.x-SCell release Huawei, Hisilicon CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yesr1
revised No R5‑221442  
R5‑220548 Correction to NR SA TC 8.2.2.2.1-Split SRB Huawei, Hisilicon CR Agreement
6.3.1.4.4.2.2RRC Radio Bearer (clause 8.2.2)
Yes
Yes
agreed No    
R5‑220549 Correction to NR TC 9.1.4.1-Generic UE configuration update Huawei, Hisilicon CR Agreement
6.3.1.4.5.2MM Security mode control, Identification & Generic UE configuration update (clauses 9.1.2, 9.1.3 & 9.1.4)
Yes
Yes
agreed No    
R5‑220550 Correction to NR TC 10.1.1.1-PDU session authentication and authorization Huawei, Hisilicon CR Agreement
6.3.1.4.6.1SM PDU session authentication and authorization (clause 10.1.1)
Yes
Yes
agreed No    
R5‑220551 Correction to NR TC 10.1.1.2-After the UE-requested PDU session procedure Huawei, Hisilicon CR Agreement
6.3.1.4.6.1SM PDU session authentication and authorization (clause 10.1.1)
Yes
Yes
agreed No    
R5‑220552 Correction to ENDC TC 10.2.2.1-EPS bearer resource allocation Huawei, Hisilicon CR Agreement
6.3.1.4.7EN-DC Session Management
Yes
Yes
agreed No    
R5‑220553 Correction to NR TC 11.1.5-EPS Fallback from NR Connected without N26 Huawei, Hisilicon, CATT, Datang Linktester CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yesr3
revised No R5‑221453  
R5‑220554 Correction to NR TC 11.1.6-EPS Fallback from NR Idle without N26 Huawei, Hisilicon, CATT, Datang Linktester CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yesfirst agreed. then r1 r2
revised No R5‑221454  
R5‑220555 Correction to NR TC 11.3.1-UAC for MO Speech Call and SMSoIP Huawei, Hisilicon, CATT, Datang Linktester, MediaTek Inc. CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yesr2
revised No R5‑221459  
R5‑220556 Correction to NR TC 11.3.2-UAC for Emergency Call Huawei, Hisilicon CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yessame changes (fixing the PICS ) as Qualcomm CR R5-220848.
withdrawn Yes    
R5‑220557 Correction to NR TC 11.3.5-UAC New cell not in the country of its HPLMN Huawei, Hisilicon, CATT, Datang Linktester CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yes
agreed No    
R5‑220558 Correction to NR TC 11.3.6-UAC for Access Identity 2 Huawei, Hisilicon CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yesstill needed further discussion. deferred. TDIA: If the time cell selection takes is uncertain, It's hard to say exactly why UE did not send RRCSetupRequest in 20s or 120s, is it because of cell selection or Barring? We think it makes TP1 not testable. Could we change TP1 using Access Category 7(checking MO-data) instead of Access Category 3(checking MO-sig, mobility registration), and corresponding steps? r1
revised No R5‑222036  
R5‑220559 Correction to NR TC 11.3.9-UAC for ODAC Huawei, Hisilicon CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yes
agreed No    
R5‑220560 Correction to NR TC 11.4.1-emergency call and authentication failure Huawei, Hisilicon CR Agreement
6.3.1.4.8.4Emergency Services
Yes
Yes
agreed No    
R5‑220561 Correction to NR TC 11.4.10-N26 not supported - N1 to S1 transfer of an existing emergency PDU session Huawei, Hisilicon CR Agreement
6.3.1.4.8.4Emergency Services
Yes
Yesdeferred. r1
revised Yes R5‑221417  
R5‑220562 Correction to NR IMS TC 7.20-MTSI MO Voice Call to add video and remove video with preconditions Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesmerged into R&S's R5-220245.
withdrawn Yes    
R5‑220563 Correction to NR IMS TC 7.21-MTSI MT Voice Call to add video and remove video without preconditions Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221484  
R5‑220564 Correction to NR IMS TC 7.23-MTSI MT Voice Call to add video and remove video without preconditions Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221485  
R5‑220565 Correction to NR IMS TC 7.4-MTSI MO Voice Call with preconditions Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220566 Correction to NR IMS TC 8.40-User initiated USSI Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1
revised No R5‑221486  
R5‑220567 Addition of default AT command and information element for NR SL test Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220568 Correction to generic test procedures for NR SL MIMO tests Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221499  
R5‑220569 Correction to test procedures for establishing unicast link Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220570 Addition of test procedures for releasing unicast link Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221500  
R5‑220571 Addition of test procedures for data exchanging on unicast link Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221501  
R5‑220572 Correction to PC5 RRC message MasterInformationBlockSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221502  
R5‑220573 Correction to PC5 RRC message MeasurementReportSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221503  
R5‑220574 Correction to PC5 RRC message RRCReconfigurationSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr2
revised No R5‑221504  
R5‑220575 Correction to PC5 RRC message RRCReconfigurationCompleteSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221505  
R5‑220576 Correction to PC5 RRC message RRCReconfigurationFailureSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221506  
R5‑220577 Correction to PC5 RRC message UECapabilityEnquirySidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221507  
R5‑220578 Correction to PC5 RRC message UECapabilityInformationSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221508  
R5‑220579 Correction to SIB12 Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220580 Correction to IE SL-BWP-Config and SL-BWP-ConfigCommon Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes-Pool removed in 3GU!
agreed No    
R5‑220581 Correction to SL-PreconfigurationNR Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesmerged into R5-220789.
withdrawn Yes    
R5‑220582 Correction to IE SL-ResourcePool Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220583 Correction to V2X message DIRECT LINK ESTABLISHMENT REQUEST Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221509  
R5‑220584 Correction to V2X message DIRECT LINK ESTABLISHMENT ACCEPT Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221510  
R5‑220585 Correction to V2X message DIRECT LINK RELEASE REQUEST Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221511  
R5‑220586 Correction to V2X message DIRECT LINK RELEASE ACCEPT Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221512  
R5‑220587 Correction to V2X message DIRECT LINK KEEPALIVE REQUEST Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221513  
R5‑220588 Correction to V2X message DIRECT LINK SECURITY MODE COMMAND Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221514  
R5‑220589 Correction to V2X message DIRECT LINK SECURITY MODE COMPLETE Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yesr1
revised No R5‑221515  
R5‑220590 Correction to V2X service identifier to PC5 RAT and Tx profiles mapping rule Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220591 Correction to V2X frequencies Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220592 Correction to test loop procedures for SL test Huawei, Hisilicon CR Agreement
6.3.10.3TS 38.509
Yes
Yesr2
revised No R5‑221516  
R5‑220593 Correction to test protocol messages for SL test Huawei, Hisilicon CR Agreement
6.3.10.3TS 38.509
Yes
Yesr2
revised No R5‑221517  
R5‑220594 Addition of V2X TC 13.2.1-Conflict Layer 2 ID Huawei, Hisilicon CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221520  
R5‑220595 Addition of V2X TC 13.2.2-Security Mode Huawei, Hisilicon CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221521  
R5‑220596 Addition of V2X TC 13.2.6-Link keep alive Huawei, Hisilicon CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221522  
R5‑220597 Addition of NR V2X TC applicability Huawei, Hisilicon CR Agreement
6.3.10.5TS 38.523-2
Yes
Yesr1
revised No R5‑221527  
R5‑220598 Discussion on NR V2X PC5 unicast test Huawei, Hisilicon discussion Endorsement
6.3.10.8Discussion Papers, Work Plan, TC lists
Yes
YesHuawei: the change of TS 24.587 cl 6.1.2.7.3, i.e change from to , is not clear. Our understanding for NR V2X core spec is: Null algorithm -> not ciphered -> msg not protected -> security is not activated. This is not the same as TS 24.501, where Null algorithm -> ciphered -> msg protected -> Not clearly say whether security is activated or not, but our understanding goes to security is activated. Not sure why NR V2X with Null algorithm does not go with the same way as the original NAS spec TS 24.501? Consider proposals again in SIG Session 2, interested companies are asked to check with their SA3, CT1 and RAN2 colleagues and convey position on the proposals Meeting agreed to send LS to SA3/CT1/RAN2. Huawei to draft the LS.
noted No    
R5‑220599 SR of Rel-16 NR V2X WI after RAN5 94e Huawei, Hisilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220600 WP of Rel-16 NR V2X WI after RAN5 94e Huawei, Hisilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220601 Correction to NR TC 7.1.3.4.3-PDCP DAPS HO Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yesreissued as R5-221375 because of title change.
withdrawn Yes    
R5‑220602 Correction to NR TC 8.1.4.3.1-RRC DAPS HO Success Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yesdeferred. r1
revised No R5‑222040  
R5‑220603 Correction to NR TC 8.1.4.3.2-RRC DAPS HO Failure Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yesr1
revised No R5‑222041  
R5‑220604 Correction to NR TC 8.1.4.3.4-RRC DAPS HO Success Inter-frequency Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yesr1
revised No R5‑221497  
R5‑220605 Correction to NR TC 8.1.4.4.4-Conditional handover and legacy handover Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yesdeferred. r1
revised No R5‑222042  
R5‑220606 Correction to NR TC 8.2.3.18.1-Conditional PSCell change Success Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yesr1
revised No R5‑221498  
R5‑220607 Correction to applicability for NR MobEnh Huawei, Hisilicon CR Agreement
6.3.9.4TS 38.523-2
Yes
Yesr1?
agreed No    
R5‑220608 SR of Rel-16 NR Mobility Enhancement WI after RAN5 94e Huawei, Hisilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220609 WP of Rel-16 NR Mobility Enhancement WI after RAN5 94e Huawei, Hisilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220610 Addtion of LTE TC 8.2.4.31.4-Conditional handover Huawei, Hisilicon CR Agreement
6.3.7.2TS 36.523-1
Yes
Yesr1
revised No R5‑221490  
R5‑220611 Correction to applicability for LTE feMob Huawei, Hisilicon CR Agreement
6.3.7.3TS 36.523-2
Yes
Yes
agreed No    
R5‑220612 Correction to NR MDT TC 8.1.6.1.4.3-Intra NR_Connection Establishment Failure_Reporting at intra-NR handover Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220613 Correction to NR MDT TC 8.1.6.1.4.4-Intra NR_Connection Establishment Failure_RRC connection re-establishment Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑220614 Correction to NR MDT TC 8.1.6.1.4.7-Intra NR_Connection Establishment Failure_ Inter-frequency measurements Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesmerged into CR R5-220191.
withdrawn Yes    
R5‑220615 Correction to NR MDT TC 8.1.6.3.1.3-Inter System_Immediate MDT_Sensor Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221575  
R5‑220616 Correction to NR MDT TC 8.1.6.3.2.1-Inter System_Logged_Bluetooth Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesbe merged into R5-221042.
withdrawn Yes    
R5‑220617 Correction to NR MDT TC 8.1.6.3.2.3-Inter System_Logged_Sensor Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221576  
R5‑220618 Correction to NR MDT TC 8.1.6.3.3.3-Inter System_RLF_Sensor Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221577  
R5‑220619 Correction to NR MDT TC 8.1.6.3.4.3-Inter System_Connection Establishment Failure_Sensor Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221578  
R5‑220620 Correction to default AT command and information element Huawei, Hisilicon CR Agreement
6.5.1Routine Maintenance for TS 36.508
Yes
Yes
agreed No    
R5‑220621 Correction to NR SRVCC TC 8.1.3.2.8-Inter RAT Huawei, Hisilicon CR Agreement
6.4.4.11.25G-SRVCC
Yes
YesTF160 manager: should be: TEI16_Test, SRVCC_NR_to_UMTS-UEConTest! r1
revised No R5‑222014  
R5‑220622 New WID on UE Conformance - NR Multicast and Broadcast Services including CT and SA aspects Huawei, Hisilicon WID new Approval
4.1New Work Item proposals - for intro only
Yes
YesAT&T asked to be added.
revised No R5‑221384  
R5‑220623 Revised WID on UE conformance test aspects for 5G V2X with NR sidelink Huawei, Hisilicon WID revised Agreement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
Yes
Yesis endorsed.
endorsed No    
R5‑220624 Revised WID on UE conformance test aspects for NR mobility enhancements Huawei, Hisilicon WID revised Agreement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
Yes
Yesis endorsed.
endorsed No    
R5‑220625 TS 36.523-1 Tracker status before RAN5-94e Huawei, Hisilicon other Information
6.4.7Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No    
R5‑220626 TS 38.523-1 Tracker status before RAN5-94e Huawei, Hisilicon other Information
6.5.6Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No    
R5‑220627 TS 36.523-1 Tracker status after RAN5-94e Huawei, Hisilicon other Information
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
No
reserved No    
R5‑220628 TS 38.523-1 Tracker status after RAN5-94e Huawei, Hisilicon other Information
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
No
reserved No    
R5‑220629 Correction to demod TC 5.2.2.1.4_1 Huawei, Hisilicon CR Agreement
5.3.1.7.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No    
R5‑220630 Correction to demod TC 5.2.3.2.1_1 Huawei, Hisilicon CR Agreement
5.3.1.7.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No    
R5‑220631 Correction to demod TC 9.4B.1.1 Huawei, Hisilicon CR Agreement
5.3.1.7.3Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10)
Yes
Yesmerge the changes on R5-221166. w/d? "Author confirmed conflicted with R5-221166 (QC), will discuss and merge ‘overlap’ resolution pending HW: likely that we will withdraw R5-220631 and merge the changes on R5-221166. But since the discussion may not be finished before end of this week, so please mark R5-220631 as deferred. Discussion between R5-221166 and R5-220631(HW) is ongoing withdrawn by 4 March RF MH if no contrary comments rxvd by 4 march 16:00 UTC"
withdrawn Yes    
R5‑220632 Introduction_of_test_frequencies_for_new_EN-DC_comb_within_FR1 KDDI Corporation CR Agreement
6.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220633 Introduction_of_UE_capabilities_for_new_EN-DC_comb_within_FR1 KDDI Corporation CR Agreement
6.3.4.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220634 Updates to HST test case 5.2.3.1.9_1 CMCC CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yes
agreed No    
R5‑220635 Updates to HST test case 5.2.3.1.10_1 CMCC CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yes
agreed No    
R5‑220636 Addition of HST test case 5.2.3.1.9_1 to annex F CMCC CR Agreement
5.3.16.3.2Clauses 1-4, Annexes
Yes
Yesr1
revised No R5‑221856  
R5‑220637 Addition of HST test case 5.2.3.1.10_1 to annex F CMCC CR Agreement
5.3.16.3.2Clauses 1-4, Annexes
Yes
Yesr1
revised No R5‑221857  
R5‑220638 Addition of fading profile power uncertainty for 4Tx, FR1 Ericsson CR Agreement
5.3.1.7.4Clauses 1-4, Annexes
Yes
Yes
agreed No    
R5‑220639 Editorial, correction of clause numbering in test case 6.5D.2.4.1 Ericsson CR Agreement
5.3.12.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220640 Correction to NR-DC testcase 7.1.1.11.1 ROHDE & SCHWARZ, Keysight, Qualcomm CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yesr1
revised No R5‑221434  
R5‑220641 Correction to NR PDCP test case 7.1.3.5.2 MCC TF160 CR Agreement
6.3.1.4.3.1.4PDCP
Yes
Yes
agreed No    
R5‑220642 Addition of test case, 6.5D.2_1.4.1, NR ACLR for UL MIMO (Rel-16 onward) Ericsson CR Agreement
5.3.12.3.1Tx Requirements (Clause 6)
Yes
Yesr1 w/d new test case may not be needed.
revised No R5‑221616  
R5‑220643 Introduction of test frequencies for n2 adding CBWs 25MHz, 30MHz, 40MHz Ericsson CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220644 Correction to NR5GC testcase 11.1.7 ROHDE & SCHWARZ, Qualcomm CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yesno comments received.
agreed No    
R5‑220645 Addition of TP analysis for test case 6.5D.2_1.4 in 38.905 Ericsson CR Agreement
5.3.12.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesfirst agreed, then withdrawn. new test case may not be needed.
withdrawn Yes    
R5‑220646 Correction to NR IMS TC 7.24b-MTSI MO Voice Call Forking Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesmerged into R&S's R5-220222.
withdrawn Yes    
R5‑220647 Correction to NR IMS generic procedure A.4.1-MTSI MO Voice Call with preconditions Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220648 Correction to NR MAC testcase 7.1.1.3.3 ROHDE & SCHWARZ CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yesno comments received.
agreed No    
R5‑220649 Correction to NR test case 8.1.1.4.1 ROHDE & SCHWARZ, TDIA, CATT, Spreadtrum CR Agreement
6.3.1.4.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yesr2
revised No R5‑221437  
R5‑220650 Correction to NR V2X TC 13.1.1-policy provisioning Huawei, Hisilicon CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221523  
R5‑220651 Editorial correction for test case title in Annex F CMCC CR Agreement
5.3.16.3.2Clauses 1-4, Annexes
Yes
Yes
agreed No    
R5‑220652 Correction to RRCReconfiguration message with condition REEST ROHDE & SCHWARZ, MediaTek, Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yesr2
revised No R5‑221420  
R5‑220653 Addition of test frequencies for CA_n41C-n79A with and without UL configuration CMCC CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220654 Update NE-DC configurations for DC_n28A_3A, DC_n28A_3C, DC_n28A_39A, DC_n28A_39C CMCC CR Agreement
5.3.20.5.3Clauses 1-5, Annexes
Yes
Yesr1
revised No R5‑221886  
R5‑220655 Adding RIB,c for Inter-band NE-DC CMCC CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220656 Clarification on clause number of NE-DC for Tx test cases CMCC CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yescan't open. r1
revised No R5‑221697  
R5‑220657 Clarification on clause number of NE-DC for Rx test cases CMCC CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yescan't open. r1
revised No R5‑221703  
R5‑220658 Update superscripts of power class for inter-band CA CMCC CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yescannot open. Wrong WIC? r1
revised No R5‑221898  
R5‑220659 Update MOP for 2 bands DL and 1 band UL CA CMCC CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yescannot open. Wrong WIC? r2
revised No R5‑221899  
R5‑220660 draft TR 38.918 v0.4.0 CMCC draft TR Approval
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
No
reserved No    
R5‑220661 PRD21 v1.0.0 on NR bands and 5G NR CADC configuration handling in RAN5 CMCC other Approval
7.3iWD/PRD Updates
No
No
reserved No    
R5‑220662 Correction to NR testcases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.2.4RRC Carrier Aggregation (clause 8.2.4)
Yes
Yesr1
revised No R5‑221449  
R5‑220663 Update of HST Demod test case applicability - Note 1 removal CMCC CR Agreement
5.3.16.4TS 38.522
Yes
Yes
agreed No    
R5‑220664 Editorial change for the position of clause 5.2.3.1.9 and 5.2.3.1.10 CMCC CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yes
agreed No    
R5‑220665 Correction Ref. of Table A.18b/10 SGS Wireless CR Agreement
6.6.4.2TS 34.123-2
Yes
Yes
agreed No    
R5‑220666 Correction typo for Table A.4.3.2B.2.3.1-3a and Table A.4.3.8-1 SGS Wireless CR Agreement
5.3.1.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220667 Correction the condition of 38.533 RRM TC6.7.7.1 SGS Wireless CR Agreement
5.3.1.8TS 38.522
Yes
Yesmerged into R5-220536.
withdrawn Yes    
R5‑220668 Correction the condition of 38.523-1 TC11.3.2 and TC11.3.8 and Test case Selection Expression of C61 SGS Wireless CR Agreement
6.3.1.5TS 38.523-2
Yes
Yesr2
revised No R5‑221464  
R5‑220669 Correction to MDT test case 8.1.6.1.3.3 MediaTek Inc., Rohde & Schwarz CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221579  
R5‑220670 Correction to the BWP-DownlinkDedicated. ROHDE & SCHWARZ CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
No
Yes
withdrawn Yes    
R5‑220671 Correction to NR test case 7.1.1.9.1 ROHDE & SCHWARZ CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yesdeferred. r2
revised No R5‑222044  
R5‑220672 Addition of test case 5.2.3.2.10_1, 4Rx TDD FR1 HST DPS performance - 2x4 MIMO with baseline receiver for both SA and NSA Ericsson CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yeswas R17 in 3GU. r1
revised No R5‑221854  
R5‑220673 Correcting applicability of HST test cases in 38.522 Ericsson CR Agreement
5.3.16.4TS 38.522
Yes
Yes
agreed No    
R5‑220674 Removing editors note in CA test cases DEKRA CR Agreement
5.3.2.2TS 36.521-1
Yes
Yesr1
revised No R5‑221754  
R5‑220675 Addition of new test case in Annex F.1.5 and Annex F.3.5 DEKRA CR Agreement
5.3.2.2TS 36.521-1
Yes
Yes
agreed No    
R5‑220676 Removing editors note in CA test cases DEKRA CR Agreement
5.3.2.4TS 36.521-3
Yes
Yesr1
revised No R5‑221755  
R5‑220677 Addition of new test case in Annex F.1.2 and Annex F.3.2 DEKRA CR Agreement
5.3.2.4TS 36.521-3
Yes
Yesr1
revised No R5‑221756  
R5‑220678 Correcting applicability part of HST test cases in 38.521-4 Ericsson CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yes
agreed No    
R5‑220679 Correction to NR5GC testcase 6.5.2.1 ROHDE & SCHWARZ CR Agreement
6.3.13.3TS 38.523-1
Yes
Yesmerged into R5-220530r1.
withdrawn Yes    
R5‑220680 Adding new HST test cases to 38.522 Ericsson CR Agreement
5.3.16.4TS 38.522
Yes
Yesreissued as R5-221371 because of wrong spec.
withdrawn Yes    
R5‑220681 Correction to NR5GC testcase 6.5.1.3 ROHDE & SCHWARZ, Qualcomm CR Agreement
6.3.13.3TS 38.523-1
Yes
Yesfirst agreed, then r1
revised No R5‑221532  
R5‑220682 Correction to NR5GC testcase 6.5.1.2 ROHDE & SCHWARZ CR Agreement
6.3.13.3TS 38.523-1
Yes
Yes
agreed No    
R5‑220683 Correction to NR5GC testcase 6.5.1.1 ROHDE & SCHWARZ, Qualcomm CR Agreement
6.3.13.3TS 38.523-1
Yes
Yesfirst agreed, then r1 After discussions with Qualcomm, the TP text is reverted to original text, and included Qualcomm as co-source.
revised No R5‑221533  
R5‑220684 Addition of new RMCs to Annex Ericsson CR Agreement
5.3.15.3.4Clauses 1-4, Annexes
Yes
Yes
agreed No    
R5‑220685 Addition of test case 5.2.3.2.4_1, 4Rx TDD FR1 PDSCH Mapping Type A and LTE-NR coexistence performance - 4x4 MIMO with baseline receiver for both SA and NSA Ericsson CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesr1
revised No R5‑221845  
R5‑220686 Correcting test applicability for EN-DC, rel-16 to rel-15 Ericsson CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No    
R5‑220687 Correction to default RRC IEs for RRM Huawei,Hisilicon CR Agreement
5.3.1.1.3Test environment for RRM (Clause 7)
Yes
Yesr2
revised No R5‑221669  
R5‑220688 Correction to FR1 EN-DC RRM TCs - interruption SCC Huawei,Hisilicon CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yesr1
revised No R5‑221713  
R5‑220689 Correction to FR1 EN-DC RRM TCs - SCell activation Huawei,Hisilicon CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes"RAN4 dependent draftCR R4-2204844 (Endorsed) Author confirmed no overlap/conflicts RAN4 verdict pending"
agreed No    
R5‑220690 Correction to FR2 EN-DC RRM TCs - RLM Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr1
revised No R5‑221715  
R5‑220691 Correction to FR2 EN-DC RRM TC 5.5.5.1 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr3
revised No R5‑221716  
R5‑220692 Correction to FR2 EN-DC RRM TC 5.5.5.2 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr3
revised No R5‑221717  
R5‑220693 Correction to FR2 EN-DC RRM TC 5.5.5.3 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr3
revised No R5‑221718  
R5‑220694 Correction to FR2 EN-DC RRM TC 5.5.5.4 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr3
revised No R5‑221719  
R5‑220695 Correction to FR2 EN-DC RRM TC 5.5.5.5 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr3
revised No R5‑221720  
R5‑220696 Correction to FR2 EN-DC RRM TC 5.6.1.1 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr1
revised No R5‑221721  
R5‑220697 Correction to FR2 EN-DC RRM TC 5.6.1.2 Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑220698 Correction to FR2 EN-DC RRM TC 5.6.1.3 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr1
revised No R5‑221722  
R5‑220699 Correction to FR2 EN-DC RRM TC 5.6.1.4 Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑220700 Correction to FR1 NR SA RRM TCs - low priority reselection Huawei,Hisilicon CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑220701 Correction to FR1 NR SA RRM TC 6.5.2.1 - interruption SCC Huawei,Hisilicon CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No    
R5‑220702 Correction to FR1 NR SA RRM TCs - SCell activation Huawei,Hisilicon CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes"RAN4 dependent draftCR R4-2204844 (Endorsed) Author confirmed no overlap/conflicts RAN4 verdict pending"
agreed No    
R5‑220703 Correction to FR2 NR SA RRM TCs - RLM Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
YesThis CR is RAN4 dependent. And during RAN4 1st round discussion it was agreed that all corresponding changes shall be reversed. So R5-220703 is no longer needed.
withdrawn Yes    
R5‑220704 Correction to FR2 NR SA RRM TC 7.5.5.1 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr3
revised No R5‑221727  
R5‑220705 Correction to FR2 NR SA RRM TC 7.5.5.2 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr3
revised No R5‑221728  
R5‑220706 Correction to FR2 NR SA RRM TC 7.5.5.3 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr3
revised No R5‑221729  
R5‑220707 Correction to FR2 NR SA RRM TC 7.5.5.4 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr3
revised No R5‑221730  
R5‑220708 Correction to FR2 NR SA RRM TC 7.5.5.5 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr3
revised No R5‑221731  
R5‑220709 Correction to FR2 NR SA RRM TC 7.6.1.1 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr1
revised No R5‑221732  
R5‑220710 Correction to FR2 NR SA RRM TC 7.6.1.2 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr1
revised No R5‑221637  
R5‑220711 Correction to FR2 NR SA RRM TC 7.6.1.3 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr1
revised No R5‑221733  
R5‑220712 Correction to FR2 NR SA RRM TC 7.6.1.4 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yesr1
revised No R5‑221638  
R5‑220713 Correction to Annex F for FR2 SSB based BFD TCs Huawei,Hisilicon CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yesr1
revised No R5‑221736  
R5‑220714 Correction to Annex F for FR2 SSB based intra-freq measurement TCs Huawei,Hisilicon CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yesr1
revised No R5‑221737  
R5‑220715 Correction to default configuration in Annex H Huawei,Hisilicon CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yesr3
revised No R5‑221738  
R5‑220716 TT analysis for FR2 SSB based BFD TCs Huawei,Hisilicon CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yesr2
revised No R5‑221744  
R5‑220717 TT analysis for FR2 SSB intra-freq measurement without DRX TCs Huawei,Hisilicon CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yesr2
revised No R5‑221745  
R5‑220718 TT analysis for FR2 SSB intra-freq measurement with DRX TCs Huawei,Hisilicon CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑220719 Correction to Mob_enh RRM TC 7.3.1.4 with TT Huawei,Hisilicon CR Agreement
5.3.10.4TS 38.533
Yes
Yesr4
revised No R5‑221645  
R5‑220720 Correction to Mob_enh RRM TC 7.3.1.5 with TT Huawei,Hisilicon CR Agreement
5.3.10.4TS 38.533
Yes
Yesr4
revised No R5‑221646  
R5‑220721 Correction to Mob_enh RRM TC 7.3.3.1 with TT Huawei,Hisilicon CR Agreement
5.3.10.4TS 38.533
Yes
Yesr1
revised No R5‑221812  
R5‑220722 Correction to Annex F for Mob_enh RRM TCs Huawei,Hisilicon CR Agreement
5.3.10.4TS 38.533
Yes
Yescover 5GS! r1
revised No R5‑221813  
R5‑220723 TT analysis for Mob_enh RRM TCs 7.3.1.4 and 7.3.1.5 Huawei,Hisilicon CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
Yes
Yescover 5GS! r1
revised No R5‑221649  
R5‑220724 TT analysis for Mob_enh RRM TCs 7.3.3.1 Huawei,Hisilicon CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
Yes
Yescover 5GS! r1
revised No R5‑221814  
R5‑220725 Addition of default configuration for NR SL RRM test Huawei,Hisilicon CR Agreement
5.3.11.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220726 Addition of band group for NR SL RRM test Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220727 Addition of minimum requirements for NR SL UE Tx timing TCs Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220728 Addition of NR SL RRM TC 9.1.1.1 - Tx Timing GNSS Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes"RAN4 dependent draftCR R4-2204852 revised to R4-2207092 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220729 Addition of NR SL RRM TC 9.1.1.2 - Tx Timing SyncRef UE Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes"RAN4 dependent draftCR R4-2204852 revised to R4-2207092 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220730 Addition of NR SL RRM TC 9.1.1.3 - Tx Timing NR Cell Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes"RAN4 dependent draftCR R4-2204852 revised to R4-2207092 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220731 Addition of minimum requirements for NR SL S-SSB Tx TCs Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220732 Addition of NR SL RRM TC 9.1.2.1 - SLSS Tx NR Cell Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yesr1
revised No R5‑221821  
R5‑220733 Addition of NR SL RRM TC 9.1.2.2 - SLSS Tx SyncRef UE Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yesr1
revised No R5‑221822  
R5‑220734 Addition of minimum requirements for NR SL SyncRef reselection TCs Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220735 Addition of NR SL RRM TC 9.1.3.1 - SyncRef reselection GNSS Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yesr1
revised No R5‑221823  
R5‑220736 Addition of NR SL RRM TC 9.1.3.2 - SyncRef reselection Cell Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yesr1
revised No R5‑221824  
R5‑220737 Addition of minimum requirements for NR SL L1 SL-RSRP TCs Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220738 Addition of NR SL RRM TC 9.1.4.1 - Resource sensing Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes"RAN4 dependent draftCR R4-2204852 revised to R4-2207092 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220739 Addition of NR SL RRM TC 9.1.4.2 - Resource pre-emption Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yesr1
revised No R5‑221825  
R5‑220740 Addition of NR SL RRM TC 9.1.4.3 - Resource re-evaluation Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yesr1
revised No R5‑221826  
R5‑220741 Addition of minimum requirements for NR SL Congestion control TCs Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220742 Addition of NR SL RRM TC 9.1.5.1 - SL-RSSI con-current Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes"RAN4 dependent draftCR R4-2204852 revised to R4-2207092 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220743 Addition of NR SL RRM TC 9.1.5.2 - SL-RSSI PC5 only Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yesr1
revised No R5‑221827  
R5‑220744 Addition of minimum requirements for NR SL interruption TCs Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220745 Addition of NR SL RRM TC 9.1.6.1 - WAN interruption Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes"RAN4 dependent draftCR R4-2204852 revised to R4-2207092 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220746 Addition of RMC for NR SL RRM test in Annex A Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yesr1
revised No R5‑221828  
R5‑220747 Addition of side conditions for NR SL RRM test in Annex B Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220748 Correction to Annex E for NR SL RRM TCs Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220749 Correction to Annex G for NR SL RRM TCs Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No    
R5‑220750 Correction to PICS for PS TCs Huawei,Hisilicon CR Agreement
5.3.13.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220751 Correction to PS Demod TC 5.3.2.1.3 Huawei,Hisilicon CR Agreement
5.3.13.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes"RAN4 dependent draftCR R4-2205744 revised to R4-2207260 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220752 Updating on additional UE co-ex requirements for 2 Band UL CA NTT DOCOMO INC. CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220753 Updating on n74 co-existence for TS 38.521-1 NTT DOCOMO INC. CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220754 Updating on 6.5B.3.3.2 Spurious emission for UE co-existence for inter-band within FR1 including n1 NTT DOCOMO INC. CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220755 Addition of Test Point analysis for FR1 Spurious emission for UE co-existence for DC_19_n1 NTT DOCOMO INC. CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No    
R5‑220756 Addition of Test Point analysis for FR1 Spurious emission for UE co-existence for DC_21_n1 NTT DOCOMO INC. CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No    
R5‑220757 Addition of new performance enhancement test case in 38.522 Ericsson CR Agreement
5.3.15.4TS 38.522
Yes
Yes
agreed No    
R5‑220758 Introduction of CA_n5A-n7A and CA_n7A_n78A maximum output power test requirements Ericsson CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yesr1
revised No R5‑221762  
R5‑220759 Introduction of maximum output power test requirements for DC_1A_n5A, DC_1A_n7A, DC_3A_n5A, DC_7A_n5A and DC_28A_n7A Ericsson CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220760 Introduction of test frequencies for n5 adding CBW 25MHz Ericsson CR Agreement
5.3.19.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220761 Editorial corrections for NR CA configuration CA_n48B Ericsson CR Agreement
5.3.19.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220762 Addition of connection diagram for 16Tx, 2Rx Ericsson CR Agreement
5.3.15.1TS 38.508-1
Yes
Yes
withdrawn Yes    
R5‑220763 Corrections to TC 10.9 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No    
R5‑220764 Updating test case 6.3.2.2.3, 2Rx TDD FR1 Single PMI with 16Tx Type1 - SinglePanel codebook for both SA and NSA Ericsson CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No    
R5‑220765 Core spec alignment for FR2 test case 6.3.4.3, Relative power tolerance Ericsson CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yeslate doc r1 The dependent RAN4 draft CR, R4-2204599, was not pursued.
revised No R5‑221929  
R5‑220766 Update Tx test cases for DC_n28A_3A, DC_n28A_3C, DC_n28A_39A, DC_n28A_39C CMCC CR Agreement
5.3.20.5.1Tx Requirements (Clause 6)
Yes
Yeslate doc
agreed No    
R5‑220767 PRD21 v0.1.0 on NR bands and 5G NR CADC configuration handling in RAN5 CMCC other Approval
4.3RAN5 PRDs/Templates
Yes
Yesr1
revised No R5‑221398  
R5‑220768 Correction to test procedure for adding video to speech call in 5GC ROHDE & SCHWARZ CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
No
Yes
withdrawn Yes    
R5‑220769 Correction to RACS test case 9.1.9.5 Keysight Technologies UK, Anritsu CR Agreement
6.3.14.4TS 38.523-1
Yes
Yesr1
revised No R5‑221538  
R5‑220770 Corrections of Tx TCs having impact on ETSI EN 301 908-25 China Unicom CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221677  
R5‑220771 Introduction of test frequencies for CA_n66(2A) BCS1 and BCS2 Ericsson CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220772 WP on ENDC_UE_PC2_R17_NR_TDD-UEConTest for RAN5#94e China Unicom Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220773 SR on ENDC_UE_PC2_R17_NR_TDD-UEConTest for RAN5#94e China Unicom WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220774 Corrections to test procedures 4.9.26 and 4.9.27 MCC TF160, ROHDE & SCHWARZ CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
Yes
Yes
agreed No    
R5‑220775 Update of MOP TC for PC2 ENDC configurations China Unicom CR Agreement
5.3.23.3.1Tx Requirements (Clause 6)
Yes
Yesfirst agreed, then r1 upon E///'s comments.
revised No R5‑221892  
R5‑220776 Update of PC2 DC_8A-n78A Baseline Implementation Capabilities China Unicom CR Agreement
5.3.23.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220777 General updates of clause 5 for R16 new CBW configurations China Unicom, ROHDE & SCHWARZ, Huawei, Hisilicon CR Agreement
5.3.7.3.3Clauses 1-5, Annexes
Yes
Yesconflict with and Apple CR R5-221361. r1
revised No R5‑221791  
R5‑220778 Correction of 4.1.1 on removal of lower humidity limit in NR test environment Samsung R&D Institute UK, ZTE Corporation CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yescover TEI16! revision marks! r4
revised No R5‑221672  
R5‑220779 Update of test frequencies for n66 and asymmetric channel bandwidth combination set 1 Ericsson CR Agreement
5.3.7.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220780 Discussion on statistical testing Huawei, HiSilicon discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yesr2 "Revised from: R5-220780. Associated CR R5-220781 RF session#2: KS: is there a need for revalidating the tests? Given the test time is changing (decreasing) Revalidations needs to be considered post RAN5 spec agreement with revalidation org Option1 vs Option2 to be considered in offline discussions document is deferred Revised to: R5-220780r2." "Revised from: R5-220780r1. HW: dedicated email thread is created for discussion RF close GTM: Noted proposals endorsed implemented in 781r2 Revised to: R5-221639.
revised No R5‑221639  
R5‑220781 Update to statistical testing Huawei, HiSilicon CR Agreement
5.3.1.4.3Clauses 1-5, Annexes
Yes
Yesr2
revised No R5‑221683  
R5‑220782 Addition of summary table for MU factors Huawei, HiSilicon CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yesr1 Keysight Spain: Regarding table B.2.2.27-1, we think that, instead of listing companies SNR values, it would be worthy to show the SNR chosen for the given impact of noise and relaxation. Please notice that some revisions could have been done internally before the final agreement when other TE vendor made the final proposal, hence not being documented in any RAN5 Tdoc. It also seems you have not carried out the second change described in the cover page in the network analyzer? Huawei: we didn’t always agree on SNR. Sometime we just agreed on the noise impact value based on companies’ input. Maybe I can try to calculate the SNR value based on existing noise impact value in next version. For example maybe for below OFF power (TRP), I could update the SNR for FR2a to -24.4dB, and SNR for FR2a to <-25dB. r2 Keysight Spain: we think the approach you mentioned should be acceptable (including the cases where relaxation has been used).
revised No R5‑221746  
R5‑220783 Draft ITU-R document for IMT-2020 Huawei, HiSilicon discussion Discussion
4.2.2All other topics
Yes
YesSkeleton for TS 38.521-3 to be reviewed and comments passed on to Huawei
noted No    
R5‑220784 Update to NR V2X test cases with non-concurrent operation Huawei, HiSilicon CR Agreement
5.3.11.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221818  
R5‑220785 Addition of 6.2E.2.2 MPR for concurrent opration Huawei, HiSilicon CR Agreement
5.3.11.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221819  
R5‑220786 TP analysis for 6.2E.2.2 MPR for concurrent opration Huawei, HiSilicon CR Agreement
5.3.11.11TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
YesR5-xx r1
revised No R5‑221829  
R5‑220787 Update to test applicability for V2X test cases Huawei, HiSilicon CR Agreement
5.3.11.7TS 38.522
Yes
Yes
agreed No    
R5‑220788 Addition of V2X connection diagram Huawei, HiSilicon CR Agreement
5.3.11.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220789 Update to NR sidelink preconfiguration Huawei, HiSilicon CR Agreement
5.3.11.1TS 38.508-1
Yes
YesTF160 offline comment. r2
revised No R5‑221815  
R5‑220790 Update to GNSS configuration for NR sidelink Huawei, HiSilicon CR Agreement
5.3.11.1TS 38.508-1
Yes
Yesr1
revised No R5‑221816  
R5‑220791 Update to 6.2D.1 for ULFPTx Huawei, HiSilicon CR Agreement
5.3.12.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220792 Update to 6.2D.2 for ULFPTx Huawei, HiSilicon CR Agreement
5.3.12.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220793 Update to 6.2D.4 for ULFPTx Huawei, HiSilicon CR Agreement
5.3.12.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220794 TP analysis for 6.2D.1 for ULFPTx Huawei, HiSilicon CR Agreement
5.3.12.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑220795 TP analysis for 6.2D.2 for ULFPTx Huawei, HiSilicon CR Agreement
5.3.12.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesr1
revised No R5‑221841  
R5‑220796 Update to eMIMO demod test cases Huawei, HiSilicon CR Agreement
5.3.12.6.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No    
R5‑220797 Addition of connection diagram for 16Tx Huawei, HiSilicon CR Agreement
5.3.12.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220798 Update to 5.5.5.0 FR2 BFD minimum requirements Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220799 Addition of 5.5.5.6 FR2 SCell BFD in non-DRX for NSA Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221833  
R5‑220800 Addition of 5.5.5.7 FR2 SCell BFD in DRX for NSA Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221834  
R5‑220801 Update to 7.5.5.0 FR2 BFD minimum requirements Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220802 Addition of 7.5.5.6 FR2 SCell BFD in non-DRX for SA Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221835  
R5‑220803 Addition of 7.5.5.7 FR2 SCell BFD in DRX for SA Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221836  
R5‑220804 Update to Annex E for eMIMO test cases Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220805 Update to Annex F for eMIMO test cases Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yesr2
revised No R5‑221837  
R5‑220806 Update to Annex H for eMIMO test cases Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221838  
R5‑220807 Addition of TT analysis for FR2 BFR test cases Huawei, HiSilicon CR Agreement
5.3.12.9TR 38.903 (NR MU & TT analyses)
Yes
Yesr1
revised No R5‑221840  
R5‑220808 Update to MAC-CellGroupConfig Huawei, HiSilicon CR Agreement
5.3.12.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220809 Addition of default DCI_1_2 for URLLC Huawei, HiSilicon CR Agreement
6.3.17.1TS 38.508-1
Yes
Yesfirst agreed, then r1
revised No R5‑221584  
R5‑220810 Addition of message exception to 7.1.1.4.1.5 Huawei, HiSilicon CR Agreement
6.3.17.3TS 38.523-1
Yes
Yeschanges are included in R5-221087.
withdrawn Yes    
R5‑220811 Discussion on minimum test time for 1% residual BLER Huawei, HiSilicon discussion Discussion
5.3.18.6Discussion Papers, Work Plan, TC lists
Yes
Yesr2 Noted without anything endorsed.
revised No R5‑221663  
R5‑220812 Addition of minimum test time for 1% residual BLER Huawei, HiSilicon CR Agreement
5.3.18.3.4Clauses 1-4, Annexes
Yes
Yescl. aff. r3
revised No R5‑221867  
R5‑220813 Update to 5.2.x.y.5 PDSCH with 1e-5 BLER Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesfirst agreed, then r1
revised No R5‑221860  
R5‑220814 Update to 5.2.x.y.6 PDSCH with repetitions over multiple slots Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesfirst agreed, then r1
revised No R5‑221861  
R5‑220815 Update to 5.2.x.y.7 PDSCH mapping type B Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
withdrawn Yes    
R5‑220816 Update to 5.2.2.y.8 PDSCH pre-emption Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes2.x r2
revised No R5‑221862  
R5‑220817 Addition of 5.2.3.1.8 PDSCH pre-emption 4Rx FDD Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesr2
revised No R5‑221863  
R5‑220818 Addition of 5.2.3.2.8 PDSCH pre-emption 4Rx TDD Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesr2
revised No R5‑221864  
R5‑220819 Update to Annex F for URLLC test cases Huawei, HiSilicon CR Agreement
5.3.18.3.4Clauses 1-4, Annexes
Yes
Yesr2
revised No R5‑221868  
R5‑220820 Adding testability description of 7.2.2.2.2 and 7.2.2.2.3 Huawei, HiSilicon CR Agreement
5.3.18.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yes
agreed No    
R5‑220821 Addition of 7.2.2.2.2 FR2 PDSCH repetition Huawei, HiSilicon CR Agreement
5.3.18.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yesr1
revised No R5‑221865  
R5‑220822 Addition of 7.2.2.2.3 FR2 PDSCH mapping Type B Huawei, HiSilicon CR Agreement
5.3.18.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
YesR5-xx r2
revised No R5‑221866  
R5‑220823 Update to test applicability for URLLC test cases Huawei, HiSilicon CR Agreement
5.3.18.4TS 38.522
Yes
Yes
agreed No    
R5‑220824 Addition of 5.1.41 inter-frequency DAPS handover Huawei, HiSilicon CR Agreement
5.3.9.3TS 36.521-3
Yes
Yeswas wrong AI. The RAN4 CR R4-2205324 is revised to R4-2206834 and endorsed.
agreed No    
R5‑220825 Addition of test applicability of DAPS handover test cases Huawei, HiSilicon CR Agreement
5.3.9.2TS 36.521-2
Yes
Yeswas wrong AI. w/d. Changes merged into R5-220348.
withdrawn Yes    
R5‑220826 Update to GNSS configuration for E-UTRA V2X Huawei, HiSilicon CR Agreement
5.5.1.1TS 36.508
Yes
Yesr1
revised No R5‑221914  
R5‑220827 Update to GNSS configuration for LTE aerial testing Huawei, HiSilicon CR Agreement
5.5.1.1TS 36.508
Yes
Yesr1
revised No R5‑221915  
R5‑220828 WP - Enhancements on MIMO for NR Huawei, HiSilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220829 SR - Enhancements on MIMO for NR Huawei, HiSilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220830 WP - NR URLLC Huawei, HiSilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220831 SR - NR URLLC Huawei, HiSilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220832 TP to TR 38.834 for Annex B MU tables MVG Industries, Rohde & Schwarz discussion Endorsement
5.3.39.1Measurement Uncertainty (MU) assessment proposals for TR 38.834, Discussion Papers, Work Plan
Yes
Yesr1: - Additional wording to reflect the values in tables are “preliminary examples” and the finalization of MU estimation is expected with the work on the RAN5 test specification. - Clarification on the table titles to refer to the FR1 bands currently defined in TR 38.834. - Update of QoQZ terms to align with changes in R5-221175r2. r2: - Clarification on the distribution of QoQZ terms. - “Gaussian” replaced by “Actual” - Typo correction R&S: Regarding the RAN4 pCR to TR38.834, yes we have a reserved tdoc at RAN4#102-e to capture the endorsed content from RAN5. It’s R4-2205826 TP to TR 38.834 on contents for Annex B.
revised No R5‑221623  
R5‑220833 WP UE Conformance Test Aspects - Rel-16 Private Network Support for NG-RAN Qualcomm CDMA Technologies Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220834 SR UE Conformance Test Aspects - Rel-16 Private Network Support for NG-RAN Qualcomm CDMA Technologies WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220835 WP UE Conformance Test Aspects - Rel-16 Optimisations on UE radio capability signalling – NR/E-UTRA Qualcomm CDMA Technologies Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220836 SR UE Conformance Test Aspects - Rel-16 Optimisations on UE radio capability signalling – NR/E-UTRA Qualcomm CDMA Technologies WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220837 Discussion paper for Rel-15 NR Tests Applicability on SNPN Only UE Qualcomm CDMA Technologies discussion Discussion
6.3.13.6Discussion Papers, Work Plan, TC lists
Yes
Yes"LATE DOCUMENT Continue to do scoping Proposal 2 seems acceptable Send LS to GCF, PTCRB seeking feedback on certification needs/expectation for SNPN "
noted No    
R5‑220838 Revised WID - UE Conformance Test Aspects - Rel-16 Optimisations on UE radio capability signalling – NR/E-UTRA Qualcomm CDMA Technologies WID revised Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
Yes
Norapporteur change
available No    
R5‑220839 Correction to NR-DC RRC test case 8.2.3.11.3 Qualcomm CDMA Technologies CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yesr1
revised No R5‑221448  
R5‑220840 Correction to R16 eNS TC 9.1.10.6 Qualcomm CDMA Technologies, Keysight Technologies UK, Anritsu Ltd CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
YesTF160 manager: should be: TEI16_Test, eNS-UEConTest! r1
revised No R5‑222007  
R5‑220841 Correction to R16 eNS TC 9.1.10.3 Qualcomm CDMA Technologies, Anritsu Ltd, Ericsson CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
YesTF160 manager: should be: TEI16_Test, eNS-UEConTest! r2
revised No R5‑222008  
R5‑220842 Correction to R16 eNS TC 9.1.10.1 Qualcomm CDMA Technologies, Keysight Technologies UK, Anritsu Ltd CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
YesTF160 manager: should be: TEI16_Test, eNS-UEConTest! r1
revised No R5‑222009  
R5‑220843 Correction to NR MDT test case 8.1.6.1.3.4 Qualcomm CDMA Technologies, Anritsu Ltd CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221580  
R5‑220844 Correction to NR MDT test case 8.1.6.1.3.7 Qualcomm CDMA Technologies, Anritsu Ltd, Keysight Technologies UK CR Agreement
6.3.16.4TS 38.523-1
Yes
Yescover shall add +NR! merged changes with Mediatek in revised R5-220507.
withdrawn Yes    
R5‑220845 Correction to NR MDT test case 8.1.6.1.4.8 Qualcomm CDMA Technologies CR Agreement
6.3.16.4TS 38.523-1
No
Yeslate doc
withdrawn Yes    
R5‑220846 Editorial Updates to Clause. 4.4.3.1.2 for System information combination Qualcomm CDMA Technologies CR Agreement
6.3.13.1TS 38.508-1
No
Yeslate doc
withdrawn Yes    
R5‑220847 Addition of test frequency n53 in Table 6.2.3.1-4 Qualcomm CDMA Technologies CR Agreement
6.3.1.1.4Test environment for SIG (Clause 6)
Yes
Yeslate doc TF160 requested deferral. ->solved.
agreed No    
R5‑220848 Correction to NR test case 11.3.2 Qualcomm CDMA Technologies CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yesthe PICS update is being handled in Keysight CR R5-220295.
withdrawn Yes    
R5‑220849 Editorial Updates to Clause 8.2 Qualcomm CDMA Technologies CR Agreement
6.3.1.4.4.2.1RRC UE Capability / Others (clause 8.2.1)
Yes
Yes
agreed No    
R5‑220850 Addition of new RACS PICS Qualcomm CDMA Technologies CR Agreement
6.3.14.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220851 Updates to Table 4.7.3-6 for "without N26 Interface" Qualcomm CDMA Technologies CR Agreement
6.3.1.11TS 36.508
No
Yeslate doc
withdrawn Yes    
R5‑220852 Correction to IMS5GS test cases 7.21 Qualcomm CDMA Technologies CR Agreement
6.3.1.10TS 34.229-5
Yes
Yeslate doc
withdrawn Yes    
R5‑220853 Correction of 4.1.1 on lower humidity limit in temperature test environment Samsung R&D Institute UK, ZTE Corporation CR Agreement
5.5.1.1TS 36.508
Yes
Yesinverted TEI16 and _RF in 3GU. BV: put TEI8_Test! r3
revised No R5‑221916  
R5‑220854 New MCVideo TC Selected Group Change of Targeted User CT NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221552  
R5‑220855 New MCVideo TC Conference Event Package NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221553  
R5‑220856 FR1/E-UTRA/UTRA OTA environment limitation ROHDE & SCHWARZ discussion Decision
6.3.1.20Discussion Papers, Work Plan, TC lists
Yes
Yes"Continue discussion via email to reach consnesus on way forward Proposal 2 not accepted Weighing up on Proposals1 &3 Proposal 1 to be pursued for one more meeting cycle before RAN5 conclude Action points to remain till RAN5#95-e"
noted No    
R5‑220857 New MCVideo TC 6.3.2 Emergency Alert CT NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221554  
R5‑220858 SR UE Conformance Test Aspects - Enhancements for Mission Critical Services MCPTT, MCData and MCVideo NIST WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220859 WP UE Conformance Test Aspects - Enhancements for Mission Critical Services MCPTT, MCData and MCVideo NIST Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220860 Introducing Rel-17 2 band CA configurations for n24 and n41 to clause 4.3.1 Ligado Networks CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220861 Introducing Rel-17 2 band CA configurations for n24 and n48 to clause 4.3.1 Ligado Networks CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220862 Introducing Rel-17 2 band CA configurations for n24 and n77 to clause 4.3.1 Ligado Networks CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220863 WP UE Conformance Test Aspects- SRVCC_NR_to_UMTS China Unicom Work Plan  
7.4.3Work Plan updates of recently closed work items
No
No
reserved No    
R5‑220864 Introducing Rel-17 2 band CA configurations for n24 and n41 to clause A.4.3.2A.4.1 Ligado Networks CR Agreement
5.3.20.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220865 Introducing Rel-17 2 band CA configurations for n24 and n48 to clause A.4.3.2A.4.1 Ligado Networks CR Agreement
5.3.20.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220866 Introducing Rel-17 2 band CA configurations for n24 and n77 to clause A.4.3.2A.4.1 Ligado Networks CR Agreement
5.3.20.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220867 Introducing Rel-17 2 band CA configurations for n24 and n41 to clause 5 Ligado Networks CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
Yes
Yesmerged in R5-220877r1.
withdrawn Yes    
R5‑220868 Introducing Rel-17 2 band CA configurations for n24 and n48 to clause 5 Ligado Networks CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
Yes
Yesmerged in R5-220877r1.
withdrawn Yes    
R5‑220869 Introducing Rel-17 2 band CA configurations for n24 and n77 to clause 5 Ligado Networks CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
Yes
Yesmerged in R5-220877r1.
withdrawn Yes    
R5‑220870 Updating MOP and Configured Tx Power TCs for CA_n24A-n41A Ligado Networks CR Agreement
5.3.20.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220871 Updating MOP and Configured Tx Power TCs for CA_n24A-n48A Ligado Networks CR Agreement
5.3.20.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220872 Updating MOP and Configured Tx Power TCs for CA_n24A-n77A Ligado Networks CR Agreement
5.3.20.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220873 Updating reference sensitvity test requirement for CA combination of n24 and n41 Ligado Networks CR Agreement
5.3.20.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220874 Updating Delta_RIB_c and reference sensitvity test requirement for CA combination of n24 and n48 Ligado Networks CR Agreement
5.3.20.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220875 Updating Delta_RIB_c and reference sensitvity test requirement for CA combination of n24 and n77 Ligado Networks CR Agreement
5.3.20.3.2Rx Requirements (Clause 7)
Yes
Yesr1
revised No R5‑221879  
R5‑220876 General updates of clause 5 for R16 CADC configurations China Unicom, Ericsson CR Agreement
5.3.4.3.3Clauses 1-5, Annexes
Yes
Yesr1
revised No R5‑221765  
R5‑220877 General updates of clause 5 for R17 CADC configurations China Unicom, WE Certification, Dish Network, China Telecommunications, Ligado Networks CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
Yes
Yesr1
revised No R5‑221881  
R5‑220878 General updates of clause 5 for R17 new CBW configurations China Unicom, Huawei, Hisilicon CR Agreement
5.3.19.3.3Clauses 1-5, Annexes
Yes
Yesmerged into R5-220777r1.
withdrawn Yes    
R5‑220879 Correction to NR SA FR1 cell re-selection for UE configured with highSpeedMeasFlag-r16 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
YesNone of the CR impact tick boxes for UICC apps, ME, RAN or CN shall be set for TS 38.533. r1
revised No R5‑221655  
R5‑220880 Add Test Tolerance analyses for NR SA FR1 cell re-selection for UE configured with highSpeedMeasFlag-r16 Test cases Anritsu CR Agreement
5.3.16.7TR 38.903 (NR MU & TT analyses)
Yes
YesNone of the CR impact tick boxes for UICC apps, ME, RAN or CN shall be set for TS 38.533. r1
revised No R5‑221656  
R5‑220881 Correction to HST Demod TC 5.2.2.1.9_1 - HST-SFN Huawei,Hisilicon CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yesfully covered by R5-221169.
withdrawn Yes    
R5‑220882 Common assumption for FR2 enhanced test methods Anritsu discussion Endorsement
5.3.40.1Discussion Papers, Work Plan to track adoption of the TR 38.884 outcomes into RAN5 test specifications
Yes
Yes-> 5.3.40.1, FR2_enhTestMethods? 2/23 FR2 MU GTM#1: KS: Too early to agree/endorse the proposals due to the overlap with the testability improvement WI work plan development. These proposals are more about applicability than FR MU. Apple: P2 is very generic statement on ETC. RAN5 has already determined feasibility for ETC. May not have to be discussed separately. P4 needs to wait for RAN4 conclusions. Need to keep FR2-1 and FR2-2 separate. E///: On P3, we have PC5 coming and will need to be handled as part of the testability enhancements as well. KS: On PC5, we also haven't done anything for PC2 and PC4 either. Needs more time for antenna assumptions. Focus on PC3 and PC1 as RAN5 has been doing. Moderator (AT&T): Clear the FR2 MU flag and change the agenda item to 5.3.40.1 to discuss in the testing enhancements WI. Document noted. No proposals endorsed.
noted No    
R5‑220883 MU and TT proposal for FR2 EVM Anritsu discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yesr1 improved MU values from Anritsu in R5-220883r1. Comparing values in R5-215476 (R&S), R5-220353r1 (Keysight) and R5-220883r1 (Anritsu), I think the following values are acceptable for all TEVs. r3 2/23 FR2 MU GTM#1: Moderator (AT&T): GTM comments related to this paper are captured generically under the discussion for R5-220353. Revised to: R5-220883r1. 2/28 FR2 MU GTM#2: Moderator (AT&T): Anritsu will capture their updated MU values in a revision. Revised from: R5-220883. Revised to: R5-220883r2. Revised from: R5-220883r1. Revised to: R5-220883r3. Revised from: R5-220883r2. 3/1: KS: Proposal 1 seems to be able to be endorsed. Moderator (AT&T): This document can be given a final Tdoc number and Proposal 1 can be endorsed. Revised to: R5-221626. Revised from: R5-220883r3. Noted and Proposal 1 is endorsed
revised No R5‑221626  
R5‑220884 Discussion on the dynamic range issue for FR2 ON OFF time mask Anritsu discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
YesR&S: to Anritsu: Thank you very much for the summary of the two papers. We share your view that all Proposals of both papers except the Proposals 3 can be endorsed. Can you confirm that you share the same intention of TT as expressed in R5-221270r1 paper? To E///: Our intention is to reuse the same formula as for minimum output power. Due to the required relaxation, this will result in TT=0dB for all channel bandwidths and frequency ranges. I have updated this aspect in R5-221270r1 r1. To Keysight Spain: Our analysis covers PC3 and PC1. Regarding the risk to fail the test: Risk of misjudgment is not higher due to ON power dependent relaxation, since due to higher ON power also the power of the transient leaking in the OFF region is higher which results in same detection efficiency, i.e., the SNR for the leaking power stays constant. Keysight Spain: if the proposals in these 2 documents are endorsed, different PC3 devices will be tested against different test requirements, where relaxations are higher for those devices with higher risk to fail this test. Would this be fair? r1 Anritsu assumes only PC3 for now. Corrected the comparison table which clarifies PC3. Regarding TT, we agree with the new Proposal 6 and Eq.(1). It seems to introduce the same approach endorsed in R5-215826. We will revise the TT table in R5-220885 (CR for 38.521-2) as below. Regarding power class, I would like to consider PC1 as well when considering the relaxation value of R5-221270r1. R&S: Correct, it is the same approach. In the CRs of RAN5#92-e R has been subtracted from the formula of the discussion paper in order to specify R and TT separately. Regarding the table in the Annex F, it seems to be confusing to refer to 6.3.1 since there a different table for the relaxation values is referred to and also the ?SNR_mr values do not match:… Thus, I suggest to reuse the formula with some explanation: TT = max(R, ?SNRmr + 0.65 x (MTSUIFF – 1.0)) -R R: Relaxation needed to limit influence of TE noise to 1 dB (specified in clause 6.3.3.2.5) ?SNRmr: Systematic offset due to noise when measuring at minimum requirement level (-30 dBm) TT = 0, since R > ?SNRmr + 0.65 x (MTSUIFF – 1.0) RF AP#89e.24, associated CR R5-220885, R5-220886 2/22: Offline discussions are occurring. Revised to: R5-220884r1. Revised from: R5-220884. RF AP#89e.24, associated CR R5-220885, R5-220886 2/23 FR2 MU GTM#1: Moderator (AT&T): Given the similarity in proposals, this paper can be given a final Tdoc and noted as the R&S paper in R5-221270r1 will be used as baseline for further discussion. Revised to: R5-221610. Revised from: R5-220884r1. RF AP#89e.24, associated CR R5-220885, R5-220886 document noted
revised No R5‑221610  
R5‑220885 Correction of general ON OFF time mask Anritsu CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221687  
R5‑220886 Correction of ON OFF time mask for inter-band EN-DC including FR2 Anritsu CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221699  
R5‑220887 Introduction of DL MU for FR2 absolute power tolerance Anritsu discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yesr1 Anritsu: Regarding Proposal 2, we are OK to reconsider TT equation. Could you please let me know ideas. R&S: We agree with P1 and P2. For P3, the SNR is 5dB below the measured level. We have usually avoided this high of a noise level. This is setting a new requirement for noise floor. We need to check if this has an impact to impact of noise. Anritsu: For the concern from R&S, upper limit will be correctly measured even in red cells, so I think we can consider to withdraw Proposal 3 and skip red cells for lower limit. Huawei: we have concern regarding P2 because TT=0 only happens when there is a large R at the same time. This is true for minimum output power, but for absolute power tolerance, we are not always measuring at -13dBm. The target power level for absolute power tolerance ranges from 6dBm to 21dBm, for which I believe no relaxation is needed. Another point that needs further consideration is, the minimum output power is a single-side measurement with MU around 5dB. UE could optimize it’s performance to compliment the impact of MU. However, the absolute power tolerance is a double-sided measurement with MU around 8dB according to R5-220887. The minimum requirement itself is just +/-12dB for Pmax = P > Pint. In this case, if the UE’s transmit power is adjusted by a value >4dB, the measurement uncertainty 8dB might bring the final result to >12dB, which means the UE is failed. This is limiting the UE’s allowed tolerance to only 1/3 of the minimum requirement which I think is too strict. Based on above, we would propose to set a TT=0.9*MU for absolute power tolerance. 1. The absolute power tolerance requirements includes the impact of both DL link and UL link, therefore is difficult for UE to achieve large performance improvement. The TT values proposed in RR-220887 is derived by equation considering the DL and UL impact. 2. The absolute power tolerance requirements are double-sided, therefore UE can’t simply improve the performance towards a single direction, and is just stuck in the middle. Huawei to Orange: As we discussed before, when TT=MU, a borderline UE is expected to pass the test case with acceptable impact from uncertainty. When TT =0.7*MU for REFSENS, UE has to improve the performance by 0.3*MU to pass the test case. For absolute power tolerance, it’s more difficult for UE to adjust its performance as it needs to ensure the accuracy in both side. So I propose a value higher than the ratio for REFSENS. Regarding your comment ‘The TT values proposed in RR-220887 is derived by equation considering the DL and UL impact.’, I would say the equation is not using the correct UL TT as I stated in previous email. Associated CR R5-220888 2/23 FR2 MU GTM#1: R&S: We agree with P1 and P2. For P3, the SNR is 5dB below the measured level. We have usually avoided this high of a noise level. This is setting a new requirement for noise floor. We need to check if this has an impact to impact of noise. E///: P1 looks reasonable. This could affect our selection of test points and may have to revisit those. Huawei: May need more time to consider P2. TT values in some cases are quite small when compared to MU value. Moderator (AT&T): P1 can be endorsed at this time. Companies to further check on P2 and P3. 2/24: Moderator (AT&T): P3 will no longer be considered based on proponent feedback. P2 is still under discussion. Revised to: R5-220887r1. 2/28 FR2 MU GTM#2: E///: We will need to revisit the test points if MU and TT increase. Worried about the higher MU/TT ratio and what the impact on the output power will be. Orange: Don't agree with the MU/TT factor of 0.9. HW: Agree with Orange since the MU value is now too large and we need to further discuss testability for this test case. KS: Following same approach with FR1 on MU. Agree with the values proposed by Anritsu. R&S: Share the same view with Anritsu and KS. E///: Maybe we can have an Action Point to check the testability of this test case. Moderator (AT&T): Do we need an editor's note for the test case to make this clear? Anritsu: Do we need to send this test case back to incomplete based on the need for further analysis? Moderator (AT&T): We can continue discussion on the CR and decide on need for an Action Point later in the week. P1 can be endorsed. HW: P2 is calculating TT based on minimum power. Not appropriate for this test case. Moderator (AT&T): Modify P2 to use MU value directly and modify CR accordingly. With this update P2 should be able to be endorsed. Will check the revision before conclusion. Revised from: R5-220887. Associated CR R5-220888 3/1: Moderator (AT&T): The test points need to be revisited based on the update. The information in the revision concerning the testability is not confirmed. The effort to revisit the test points can be considered in the CR. With the r1, the paper can be given a final Tdoc and noted. Proposal 1 and Proposal 2 can be endorsed. Revised to: R5-221627. Revised from: R5-220887r1. Noted and Proposal 1 and 2 are endorsed
revised No R5‑221627  
R5‑220888 Correction to FR2 absolute power tolerance MU and TT Anritsu CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yesr4 As a result of further MU discussion, expected measured power at test point 1 is corrected again.
revised No R5‑221688  
R5‑220889 Discussion on test procedure for SCell drop issue Anritsu discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
YesModerator (Apple) discussion ongoing Moderator (Apple): Document can be noted (no proposals endorsed) document Noted"
noted No    
R5‑220890 Correction to test channel bandwidth for n38 Anritsu CR Agreement
5.3.7.1TS 38.508-1
Yes
Yes
withdrawn Yes    
R5‑220891 Correction to Rx test cases for n38 new CBW 25MHz and 30MHz Anritsu CR Agreement
5.3.7.3.2Rx Requirements (Clause 7)
Yes
Yes
withdrawn Yes    
R5‑220892 Correction to note of general spurious emissions Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221678  
R5‑220893 Correction to test procedure of SRS time mask Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220894 Definition of MTSU and TT for Intra-band EN-DC additional spurious emissions test cases Anritsu, DOCOMO Communications Lab. CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221700  
R5‑220895 Correction to test procedure of FR1 EN-DC Spurious test for EN-DC only capable UE Anritsu CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221701  
R5‑220896 Definition of MTSU for 7.6B.3.3_1.1 Anritsu CR Agreement
5.3.1.6.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑220897 Correction to test requirement of DC_xxA_n41A in 6.5B.3.3.1 Anritsu CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221768  
R5‑220898 Correction to test requirement of 6.2.4 Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yesfirst agreed, then r1. This revision removes test requirements at test ID 3 for bands other than n40, n41, n77, n78, n79 from Table 6.2.4.5-1 and 6.2.4.5-1b based on E///'s comment.
revised No R5‑221679  
R5‑220899 Correction to test requirement of NS_27 in 6.2.3 Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220900 Correction to test requirement of NS_47 in 6.2.3 Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220901 Correction to measurement timing for inter-band CA with FDD and TDD Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221680  
R5‑220902 Correction to measurement timing for EN-DC combination with FDD and TDD Anritsu CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220903 Correction to test frequency range for n14 Anritsu CR Agreement
5.3.1.1.1Test frequencies (Clause 4.3.1)
Yes
Yesr1
revised No R5‑221667  
R5‑220904 Correction to test frequency of EN-DC 28_n51 in 7.3B.2.3 Anritsu CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220905 Correction to test CBW for Non-SUL carrier in 6.4C.2.2 Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220906 Correction to test requirement of 6.5C.3.2 Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220907 Editorial correction to SUL test cases Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221681  
R5‑220908 Correction to test procedure of 6.4A.1.1 Anritsu CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220909 Correction to Annex H.1.2 Anritsu CR Agreement
5.3.1.7.4Clauses 1-4, Annexes
Yes
Yesr1
revised No R5‑221710  
R5‑220910 Correction to TRS Configuration of 6.3.2.1.3 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes"RAN4 dependent draftCR R4-2203572 merged into R4-2206805 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220911 Correction to test procedure of 6.1.1.2 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No    
R5‑220912 Correction to reference of test frequency in 6.3.1.x NR only test cases Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No    
R5‑220913 Correction to test procedure of SFTD measurement accuracy Anritsu CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yesr3
revised No R5‑221923  
R5‑220914 Correction to RMC for PUCCH format 1 test cases Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220915 Correction to connection diagram and test configuration for Tx SUL test cases Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220916 Addition of PRB-Id setting for RRM test cases Anritsu CR Agreement
5.3.1.1.3Test environment for RRM (Clause 7)
Yes
Yes
agreed No    
R5‑220917 Correction to test frequencies for performance test cases Anritsu CR Agreement
5.3.1.7.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesr1 R&S: We concur that in current specification the test frequencies do not match with the RAN4 minimum requirements with respect to offsetToCarrier. However, we have the concern that the addition of “adjusted such that offsetToCarrier is equal to 0, as defined in Table 5.2-1.” in the Initial Conditions is not working properly, since many values in the test frequency tables are derived based on offsetToCarrier. For example, point A, absoluteFrequencyPointA, offsetToPointA (SIB), etc., all depend on offsetToCarrier. Changing only offsetToCarrier will result in inconsistent test frequency configuration. Therefore, new test frequency tables have to be introduced for Demod in TS 38.508-1 clause 5.2.2. There is already a table for band n71 present and for other bands analog tables are required. Ericsson: we agree with R&S that if the current test frequencies in clause 4.3.1 is not fulfilling what is required by 38.521-4 test cases then should alternative test frequencies be defined in clause 5.2.2 in 38.508-1 such that all test case implementations use the same configurations. The alternative would be to shift all Mid-range test frequencies in clause 43.1 to use OffsetToCarrier=0. For Low and High the priority is to get the carrier Low and High edge as close as possible to the band edges, but for Mid I assume it doesn’t matter if the frequency is not exact at the band’s bandwidth center. But that is probably not preferred due to the wide use of the Mid test frequencies in test case implementations today. When It was discussed last time I thought it was only for band 71 there was an issue and thus alternative test frequencies were defined to fit the full CBW in CORESET0. Is there a problem for more bands or is it “only” because the offsetToCarrier value is defined as <>0?
revised No R5‑221615  
R5‑220918 Correction to SRS configuration condition for FR1 timing test cases Anritsu CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No    
R5‑220919 Correction to transmission slot in SRS time mask test case Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220920 Correction to DRX setting of 8.4.2.9 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220921 Correction to message exception for handover test cases Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No    
R5‑220922 Correction to DRX setting of 4.6.4.5 and 6.6.4.5 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yesr1
revised No R5‑221859  
R5‑220923 Correction to BWP switch delay test cases Anritsu CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No    
R5‑220924 Correction to message exception for 4.7.5.1 Anritsu CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No    
R5‑220925 Correction to radioLinkMonitoringConfig for Scell Anritsu CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yesavoid overlap with R5-221178.
withdrawn Yes    
R5‑220926 Correction to message exception for 8.4.2.x with SSB index detection Anritsu CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yesr1
revised No R5‑221734  
R5‑220927 Correction to 6.3.2.3.1 NR SA FR1 RRC connection release with redirection Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes"RAN4 dependent draftCR R4-2203572 merged into R4-2206805 (Endorsed) Author confirmed no overlap/conflicts RAN4 verdict pending"
agreed No    
R5‑220928 Correction to NR-EUTRA and EUTRA-NR reselection with high speed Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220929 Correction to message exception for 8.5.1.1 Anritsu CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No    
R5‑220930 Correction to ssb-ResourceList for 5.3.2.2.2 Anritsu CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑220931 Correction to SMTC configuration in 6.1.1.7 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220932 Correction to active BWP ID and TRS configuration in 6.5.6.1.1 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yesr1
revised No R5‑221925  
R5‑220933 Correction to T HARQ setting for 6.5.3.1 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes"RAN4 dependent draftCR R4-2203572 merged into R4-2206805 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220934 Correction to CSI-RS offset for 6.5.3.1 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yesr1
revised No R5‑221926  
R5‑220935 Correction to CSI report offset for 6.5.3.1 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yesr1
revised No R5‑221927  
R5‑220936 Editorial correction to 5.3.3.1.3 and 5.3.3.2.3 Anritsu CR Agreement
5.3.13.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No    
R5‑220937 Correction to BWP configuration for 4.5.6.1.2 Anritsu CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yesr1
revised No R5‑221924  
R5‑220938 Correction to DRX setting of 6.6.1.7 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220939 Correction to message exception of 4.6.1.7 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220940 Correction to test procedure for 8.2.1.2 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220941 Correction to SIB1 message exceptions of 4.6.1.7 and 4.6.4.5 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No    
R5‑220942 Addition of new test case 7.7.6.1 NR SA FR2 CSI-RS based CMR and no dedicated IMR configured and CSI-RS resource set with repetition off L1-SINR measurement accuracy Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220943 Addition of new test case 7.7.6.2 NR SA FR2 SSB based CMR and dedicated IMR L1-SINR measurement accuracy Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220944 Addition of new test case 7.7.6.3 NR SA FR2 CSI-RS based CMR and dedicated IMR L1-SINR measurement accuracy Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220945 Completion 4.5.5.5 including TT anaysis results Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221650  
R5‑220946 Completion 4.5.5.6 including TT anaysis results Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yesr2
revised No R5‑221651  
R5‑220947 Addition of cell configuration MU and TT for Enhancement on MIMO Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221652  
R5‑220948 Addition of test applicability for UE Enhancements on MIMO Sporton CR Agreement
5.3.12.7TS 38.522
Yes
Yesr1
revised No R5‑221831  
R5‑220949 Correct of conditions for Uplink Data Transfer and Unified Access Control Sporton, Keysight, CATT, TDIA, SGS Wireless CR Agreement
6.3.1.5TS 38.523-2
Yes
Yesr2
revised No R5‑221465  
R5‑220950 Addition of several NR CA combinations to FR1 inter-band configurations table WE Certification Oy, DISH Network CR Agreement
5.3.20.1TS 38.508-1
Yes
Yesr1
revised No R5‑221874  
R5‑220951 Correction of General Spurious emissions requirements for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221769  
R5‑220952 Addition of applicability tables of several NR CA combinations to FR1 inter-band configurations WE Certification Oy, DISH Network CR Agreement
5.3.20.2TS 38.508-2
Yes
Yesfirst agreed, then r1
revised No R5‑221876  
R5‑220953 Addition of several CA combinations to Reference Sensitivity test case WE Certification Oy, DISH Network CR Agreement
5.3.20.3.2Rx Requirements (Clause 7)
Yes
Yesr1
revised No R5‑221880  
R5‑220954 Test point analysis for reference sensitivity for several CA combinations WE Certification Oy, DISH Network CR Agreement
5.3.20.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesafter discussion with Ericsson.
withdrawn Yes    
R5‑220955 Updates to IE UE Route Selection Policy Rules CMCC CR Agreement
6.3.1.1.5Other clauses, Annexes
Yes
Yes
agreed No    
R5‑220956 Updates to IE Route Selection Descriptors CMCC CR Agreement
6.3.1.1.5Other clauses, Annexes
Yes
Yesr1
revised No R5‑221426  
R5‑220957 WP UE Conformance Test Aspects - Support of eCall over IMS for NR Qualcomm Incorporated Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220958 SR UE Conformance Test Aspects - Support of eCall over IMS for NR Qualcomm Incorporated WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220959 Update to Annex A.1.1 Qualcomm Incorporated CR Agreement
6.6.6.1TS 34.229-1
Yes
Yes
withdrawn Yes    
R5‑220960 Addition of test frequency for DC_7C_n78A Huawei, HiSilicon CR Agreement
5.3.37.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220961 Addition of common uplink configuration for E-UTRA intra-band contiguous CA Huawei, HiSilicon CR Agreement
5.3.37.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220962 Addition of new test case 6.2B.1.3_1 for Maximum Output Power for inter-band EN-DC with 3 uplink Huawei, HiSilicon CR Agreement
5.3.37.3.1Tx Requirements (Clause 6)
Yes
YesEricsson’s comment. r2
revised No R5‑221908  
R5‑220963 Addition of new test case 6.2B.4.1.3_1 for Configured Output Power for inter-band EN-DC with 3 uplink Huawei, HiSilicon CR Agreement
5.3.37.3.1Tx Requirements (Clause 6)
Yes
YesEricsson’s comment. r2
revised No R5‑221909  
R5‑220964 Addition of annex F for test cases for EN-DC configurations with 3 uplink Huawei, HiSilicon CR Agreement
5.3.37.3.3Clauses 1-5, Annexes
Yes
Yesr1
revised No R5‑221910  
R5‑220965 Addition of applicability for test cases for EN-DC with 3 uplink Huawei, HiSilicon CR Agreement
5.3.37.4TS 38.522
Yes
Yes
agreed No    
R5‑220966 Discussion on test cases about EN-DC with 3UL (2CC LTE, 1CC NR) Huawei, HiSilicon discussion Discussion
5.3.37.6Discussion Papers, Work Plan, TC lists
Yes
YesNoted. Proposal 1/1a is implemented in CRs R5-221908/1910/0965/0967 Proposal 2/2a is implemented in CRs R5-221909/1910/0965/0968 Proposal 3 is endorsed. Proposal 4 is more like a work assumption.
noted No    
R5‑220967 Update of 6.2B.1.3 Maximum Output Power for Inter-Band EN-DC Huawei, HiSilicon CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220968 Update of 6.2B.4.1.3 Configured Output Power for Inter-Band EN-DC Huawei, HiSilicon CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑220969 WP - Common RF requirement configured output power for EN-DC with 3 uplink CC and 2 different bands (2CC LTE, 1CC NR FR1) Huawei, HiSilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220970 SR - Common RF requirement configured output power for EN-DC with 3 uplink CC and 2 different bands (2CC LTE, 1CC NR FR1) Huawei, HiSilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑220971 Update to A.2.1 for eCall over IMS Qualcomm Incorporated CR Agreement
6.6.6.1TS 34.229-1
Yes
Yes
agreed No    
R5‑220972 Addition of test frequencies for Rel-16 EN-DC configurations Huawei, Hisilicon, Orange CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220973 Addition of physical baseline implementation capabilities for Rel-16 EN-DC configurations Huawei, Hisilicon, Orange CR Agreement
5.3.4.2TS 38.508-2
Yes
Yes
agreed No    
R5‑220974 Correction to applicability for protocol testing for inter-band EN-DC configurations Huawei, HiSilicon, China Unicom CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No    
R5‑220975 Addition of transmit power configuration for EN-DC reference sensitivity Huawei, Hisilicon CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yesr2 The RAN4 dependent CR was endorsed.
revised No R5‑221931  
R5‑220976 Correction to reference sensitivity for intra-band contiguous EN-DC Huawei, Hisilicon CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220977 Correction to Maximum Input Level for intra-band contiguous EN-DC Huawei, Hisilicon CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220978 Correction to Adjacent Channel Selectivity for intra-band contiguous EN-DC Huawei, Hisilicon CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220979 Update of Adjacent Channel Selectivity for intra-band non-contiguous EN-DC Huawei, Hisilicon CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑220980 Correction to out-of-band blocking for intra-band contiguous EN-DC Huawei, Hisilicon CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes"RAN4 dependent draftCR R4-2205304 (Endorsed) RAN4 verdict pending"
agreed No    
R5‑220981 Update of Annex F for Adjacent Channel Selectivity for intra-band EN-DC Huawei, Hisilicon CR Agreement
5.3.1.6.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑220982 Update of test point analysis for Adjacent Channel Selectivity for EN-DC within FR1 Huawei, Hisilicon CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No    
R5‑220983 Update to applicability of test case 6.4 Qualcomm Incorporated CR Agreement
6.3.1.8TS 34.229-2
Yes
YesQualcomm: we didn’t receive any preference on having optional TP vs split test case during offline discussion. So, I proceeded further with optional TP for 34.229-5 test case 6.4. replacement Tdoc R5-221400.
withdrawn Yes    
R5‑220984 Update to applicability of NR EIEI test cases Qualcomm Incorporated CR Agreement
6.3.22.7TS 34.229-2
Yes
Yesfirst agreed, then r1
revised No R5‑222045  
R5‑220985 Addition of new IMS over 5GS TC 11.5 eCall over IMS / Automatic initiation / MSD transfer and 200 OK with ACK / SIP INFO request for MSD Update / Success / 5GS Qualcomm Incorporated CR Agreement
6.3.22.9TS 34.229-5
Yes
Yesr1
revised No R5‑221597  
R5‑220986 Update of 4.6.7.1 EN-DC FR1 CSI-RS based CMR and no dedicated IMR L1-SINR measurement in non-DRX Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220987 Update of 4.6.7.2 EN-DC FR1 SSB based CMR and dedicated IMR L1-SINR measurement in DRX Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221653  
R5‑220988 Update of 4.6.7.3 EN-DC FR1 CSI-RS based CMR and dedicated IMR L1-SINR measurement in DRX Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220989 Update of 6.6.8.1 NR SA FR1 CSI-RS based CMR and no dedicated IMR L1-SINR measurement in DRX Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220990 Update of 6.6.8.2 NR SA FR1 SSB based CMR and dedicated IMR L1-SINR measurement in non-DRX Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yesr1
revised No R5‑221654  
R5‑220991 Update of 6.6.8.3 NR SA FR1 CSI-RS based CMR and dedicated IMR L1-SINR measurement in non-DRX Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220992 Update of Annex for EN-DC FR1 L1-SINR measurement test cases Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220993 Update of Annex for NR SA FR1 L1-SINR measurement test cases Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑220994 Addition of test tolerance analysis for 4.6.7.1 and 6.6.8.1 EN-DC and NR SA CSI-RS based L1-SINR measurement Huawei, HiSilicon CR Agreement
5.3.12.9TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑220995 Addition of test tolerance analysis for 4.6.7.2 EN-DC SSB based L1-SINR measurement Huawei, HiSilicon CR Agreement
5.3.12.9TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑220996 Addition of test tolerance analysis for 4.6.7.3 EN-DC CSI-RS based L1-SINR measurement Huawei, HiSilicon CR Agreement
5.3.12.9TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑220997 Addition of test tolerance analysis for 6.6.8.2 NR SA SSB based L1-SINR measurement Huawei, HiSilicon CR Agreement
5.3.12.9TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑220998 Addition of test tolerance analysis for 6.6.8.3 NR SA CSI-RS based L1-SINR measurement Huawei, HiSilicon CR Agreement
5.3.12.9TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑220999 Addition of physical implementation capability for L1-SINR measurement Huawei, HiSilicon, Sporton CR Agreement
5.3.12.2TS 38.508-2
Yes
Yesr1
revised No R5‑221830  
R5‑221000 Addition of test applicability for L1-SINR measurement cases Huawei, HiSilicon CR Agreement
5.3.12.7TS 38.522
Yes
Yesr1
revised No R5‑221832  
R5‑221001 Correction to Annex H.3.6A RRC messages for L1-SINR measurement Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No    
R5‑221002 Update of RRM Test Cases for UE Enhancements on MIMO Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yesr2
revised No R5‑221839  
R5‑221003 Addition of new IMS over 5GS TC 11.6 eCall over IMS / Automatic initiation / MSD transfer and 200 OK with ACK / SIP INFO request for unsupported MSD / UE indicates unsuccessful in SIP INFO / 5GS Qualcomm Incorporated CR Agreement
6.3.22.9TS 34.229-5
Yes
Yesr1
revised No R5‑221598  
R5‑221004 Correction to applicability of FR2 intra-frequency measurement without DRX and BFD TCs Huawei,Hisilicon CR Agreement
5.3.1.8TS 38.522
Yes
Yes
agreed No    
R5‑221005 Addition of PICs for FR2 CSI-RS based RLM Huawei,Hisilicon CR Agreement
5.3.1.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221006 UE capabilities for completed NR CA configurations CA_n5A-n7A, CA_n5A-n78A and CA_n7A-n78A Ericsson CR Agreement
5.3.7.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221007 Addition of new IMS over 5GS TC 11.7 eCall only mode / Manual initiation / Emergency registration / Abnormal case / IM CN sends a 486 (Busy Here) / UE performs eCall in CS domain / UTRAN or GERAN / 5GS Qualcomm Incorporated CR Agreement
6.3.22.9TS 34.229-5
Yes
Yesr1 As discussed in yesterday’s SIG session, ok to withdraw.
revised No R5‑221599  
R5‑221008 Editorial corrections for EditHelp comments s1 to s3 ROHDE & SCHWARZ CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No    
R5‑221009 Editorial corrections for EditHelp comments s4 ROHDE & SCHWARZ CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No    
R5‑221010 Editorial corrections to revert headers to h6 for s4 ROHDE & SCHWARZ CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No    
R5‑221011 Editorial corrections for EditHelp comments s5 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221012 Editorial corrections to revert headers to h6 for s5 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221013 Editorial corrections for EditHelp comments s6.1 to s6.3 ROHDE & SCHWARZ CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No    
R5‑221014 Editorial corrections for EditHelp comments s6.4 to s6.5 ROHDE & SCHWARZ CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No    
R5‑221015 Editorial corrections for EditHelp comments s7 ROHDE & SCHWARZ CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No    
R5‑221016 Editorial corrections for EditHelp comments s8 ROHDE & SCHWARZ CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No    
R5‑221017 Editorial corrections to revert headers to h6 for s8 ROHDE & SCHWARZ CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No    
R5‑221018 Editorial corrections for EditHelp comments Annexes ROHDE & SCHWARZ CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No    
R5‑221019 New section for NE-DC RRM test cases ROHDE & SCHWARZ CR Agreement
5.3.1.9.2NE-DC with all NR cells in FR1 (Clause 4A)
Yes
Yes"Discussing to revise R5-221366 (Apple) and remove the overlap R5-221366r1 to resolve the overlap/conflicts"
agreed No    
R5‑221020 Minimum requirements for EN-DC FR1 L1-RSRP test cases ROHDE & SCHWARZ CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No    
R5‑221021 Minimum requirements for EN-DC FR2 L1-RSRP test cases ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221022 New test case 5.7.4.1 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
YesCR# r1
revised No R5‑221723  
R5‑221023 New test case 5.7.4.2 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yesr1
revised No R5‑221724  
R5‑221024 Correct message contents reference iRAT ROHDE & SCHWARZ CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No    
R5‑221025 Add auxiliary band for n39 ROHDE & SCHWARZ CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No    
R5‑221026 Corrections to 5.7.x.x ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221027 Corrections to 8.4.2.4 ROHDE & SCHWARZ CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No    
R5‑221028 Corrections to 8.2.1.1 ROHDE & SCHWARZ CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No    
R5‑221029 Corrections to 8.5.2.2.1 ROHDE & SCHWARZ CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No    
R5‑221030 Corrections to 6.7.x.x ROHDE & SCHWARZ CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yesr1 draftCR R4-2203599 has been endorsed.
revised No R5‑221726  
R5‑221031 Correction reportAmount for B2 report ROHDE & SCHWARZ CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No    
R5‑221032 Updates to CSI-ReportConfig for FR2 ROHDE & SCHWARZ CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yesr1
revised No R5‑221739  
R5‑221033 Corrections to message contents for 8.4.2.3 and 8.4.2.4 ROHDE & SCHWARZ CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No    
R5‑221034 Update report config for iRAT test cases ROHDE & SCHWARZ CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yesr1
revised No R5‑221740  
R5‑221035 Text Proposal to update 5.4.2 and 5.4.3 ROHDE & SCHWARZ pCR Agreement
4.5.5.1TR 38.918 (pCRs only)
Yes
Yes
approved No    
R5‑221036 Addition of new IMS over 5GS TC 11.8 eCall only mode / Automatic initiation / Emergency registration / Abnormal case / IM CN sends a 600 (Busy Everywhere) / UE performs eCall in CS domain / UTRAN or GERAN / 5GS Qualcomm Incorporated CR Agreement
6.3.22.9TS 34.229-5
Yes
Yesr2 As discussed in yesterday’s SIG session, ok to withdraw.
revised No R5‑222001  
R5‑221037 Corrections to TC 10.3 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr2
revised No R5‑221487  
R5‑221038 Addition of new PIXIT parameter for NR EIEI Qualcomm Incorporated CR Agreement
6.3.22.5TS 38.523-3
Yes
Yesr1
revised No R5‑221596  
R5‑221039 Discussion on handling TxD test cases Huawei, HiSilicon discussion Discussion
5.3.38.6Discussion Papers, Work Plan, TC lists
Yes
Yesr2 Proposal 1 and Proposal 2 can be endorsed. Now the disagreement is about how to introduce TxD case and move PC 1.5 cases to clause G at the same meeting in case PC1.5 re-arrangement is urgent for companies. Based on the outcome of offline discussion, R5-221039r2 listed the two possible solutions to discuss this problem. r3 The WP needs to be stable before discussing the WIs. Proposals 1-3 are endorsed. Noted.
revised No R5‑221666  
R5‑221040 Applicability updates for NR EIEI test cases Qualcomm Incorporated CR Agreement
6.3.22.4TS 38.523-2
Yes
Yes
agreed No    
R5‑221041 Updates to Inter-System MDT test cases 8.1.6.3.1.x MCC TF160 CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No    
R5‑221042 Updates to Inter-System MDT test cases 8.1.6.3.2.x MCC TF160, MediaTek Inc., Huawei, HiSilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr2
revised No R5‑221581  
R5‑221043 Updates to Inter-System MDT test cases 8.1.6.3.3.x MCC TF160, MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221582  
R5‑221044 Updates to Inter-System MDT test cases 8.1.6.3.4.x MCC TF160, MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1
revised No R5‑221583  
R5‑221045 Updates to titles of Inter-System MDT sensor test cases MCC TF160 CR Agreement
6.3.16.5TS 38.523-2
Yes
Yes
agreed No    
R5‑221046 Addition of 6.5.2.3 on new CBW to A-SEM for NS_04 ZTE Corporation CR Agreement
5.3.7.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221047 Addition of A.4.3.2B.2.3.7 for DC_3A-42D_n257A and DC_3A-42E_n257A ZTE Corporation CR Agreement
5.3.1.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221048 Correction of 4.0 for tested DC configuration selection criteria ZTE Corporation CR Agreement
5.3.1.8TS 38.522
Yes
Yes
agreed No    
R5‑221049 Correction of 4.3.1.1.5.48 for test frequencies of CA_n48_2A ZTE Corporation CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes() ! r1
revised No R5‑221757  
R5‑221050 Correction of 4.3.1.2.4.4.2 for test frequencies for CA_n260_A-I ZTE Corporation CR Agreement
5.3.1.1.1Test frequencies (Clause 4.3.1)
Yes
Yes()! r1
revised No R5‑221668  
R5‑221051 Correction of 6.2A.1 for UE maximum output power for CA ZTE Corporation CR Agreement
5.3.4.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221052 Correction of 6.2A.2 on UE MPR for CA ZTE Corporation CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221053 Correction of 6.2B.1.1 for intra-band contiguous EN-DC maximum output power ZTE Corporation CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221054 Correction of A.4.3.2B.2 for intra-band contiguous and non-contiguous EN-DC ZTE Corporation CR Agreement
5.3.1.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221055 Correction of A.4.3.2B.2.3.4 for supported inter-band EN-DC configurations within FR1 ZTE Corporation CR Agreement
5.3.1.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221056 Removal of supported BCS for inter-band EN-DC configurations including FR1 and FR2 ZTE Corporation CR Agreement
5.3.4.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221057 Removal of supported BCS for inter-band EN-DC configurations including FR2 ZTE Corporation CR Agreement
5.3.4.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221058 Removal of supported BCS for inter-band EN-DC configurations within FR1 ZTE Corporation CR Agreement
5.3.4.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221059 Update of 3.2 and 3.3 on symbols and abbreviations ZTE Corporation CR Agreement
5.3.1.6.3Clauses 1-5, Annexes
Yes
Yesr1
revised No R5‑221706  
R5‑221060 Update of 6.2A.1 for UE maximum output power ZTE Corporation CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221061 Update of 6.2.3 for UE maximum output power with additional requirements ZTE Corporation CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221062 Update of 6.2A.2 for UE maximum output power reduction for CA ZTE Corporation CR Agreement
5.3.4.4.1Tx Requirements (Clause 6)
Yes
Yescomments from Anritsu. r1
revised No R5‑221766  
R5‑221063 Update of 6.2A.4 for configured transmitted power for CA ZTE Corporation CR Agreement
5.3.4.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221064 Update of A.4.3.9 for Additional capabilities for UE declared capability ZTE Corporation CR Agreement
5.3.1.2TS 38.508-2
Yes
Yesfirst agreed, then r1 based on Ericsson's comments. Keysight Spain: should WIC be Rel-17 band combo instead?
revised No R5‑221674  
R5‑221065 Discussion on the naming of meeting handling ZTE Corporation discussion Approval
4.2.2All other topics
Yes
Yes
withdrawn Yes    
R5‑221066 Discussion on the lower humidity limit in temperature test environment ZTE Corporation, Samsung R&D Institute UK discussion Approval
5.3.1.1.4Other clauses, Annexes
Yes
Yesrelated LS out 221604 is approved.
noted No    
R5‑221067 Updates to LTE audit TC 8.5.4.1 MCC TF160 CR Agreement
6.5.3.3.1RRC Part 1 (clauses 8.1 and 8.5)
Yes
Yesr1
revised No R5‑221405  
R5‑221068 Addition of new NR EIEI test case 11.5.5 Qualcomm Incorporated CR Agreement
6.3.22.3TS 38.523-1
Yes
Yesr1
revised No R5‑221595  
R5‑221069 Correction to test case name of TC 9.1.10.3 and TC 9.1.10.4 Tejet CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
YesTF160 manager: wrong WIC. cl. aff. r1
revised No R5‑222010  
R5‑221070 USIM configurations for NR EIEI test cases Qualcomm Incorporated CR Agreement
6.3.22.1TS 38.508-1
Yes
Yes
agreed No    
R5‑221071 WP - Transparent Tx Diversity (TxD) for NR Huawei, HiSilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221072 SR - Transparent Tx Diversity (TxD) for NR Huawei, HiSilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221073 Update to EIEI test case 11.3.2 Qualcomm Incorporated CR Agreement
6.5.3.6General Tests
Yes
Yes
agreed No    
R5‑221074 Update to EIEI test case 11.3.6 Qualcomm Incorporated CR Agreement
6.5.3.6General Tests
Yes
Yes
agreed No    
R5‑221075 Addition of applicability for RACS test cases Qualcomm Incorporated CR Agreement
6.3.14.10TS 36.523-2
Yes
Yes
agreed No    
R5‑221076 Addition of new RACS test case 9.2.5.1 Qualcomm Incorporated CR Agreement
6.3.14.9TS 36.523-1
Yes
Yes
agreed No    
R5‑221077 Update of MDT TC 8.1.6.3.3.1 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1 merged into R5-221043r1.
revised No R5‑221395  
R5‑221078 Update of MDT TC 8.1.6.3.4.1 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yesr1 merged into R5-221044.
revised No R5‑221396  
R5‑221079 Addition of new RACS test case 9.2.5.2 Qualcomm Incorporated CR Agreement
6.3.14.9TS 36.523-1
Yes
Yesr2
revised No R5‑221543  
R5‑221080 Update of TC 7.1.3.5.6 for PDCP Duplication 3 RLC entities in NR IIoT CMCC, MCC TF160 CR Agreement
6.3.8.4TS 38.523-1
Yes
Yesr1
revised No R5‑221494  
R5‑221081 Addition of new RACS test case 9.2.5.3 Qualcomm Incorporated CR Agreement
6.3.14.9TS 36.523-1
Yes
Yes
agreed No    
R5‑221082 Correction of MCPTT Test Case 6.2.2 UPV/EHU, Nemergent Solutions CR Agreement
6.6.9.2TS 36.579-2
Yes
YesCR will be merged into TF160’s R5-220485.
withdrawn Yes    
R5‑221083 Correction of MCPTT Test Case 6.1.1.17 UPV/EHU, Nemergent Solutions CR Agreement
6.6.9.2TS 36.579-2
Yes
Yes
withdrawn Yes    
R5‑221084 RACS updates to default message content of Attach and TAU accept messages Qualcomm Incorporated CR Agreement
6.3.14.7TS 36.508
Yes
Yes
agreed No    
R5‑221085 Addition of predefined UE capability message container for test function Set UL Message Qualcomm Incorporated CR Agreement
6.3.14.8TS 36.509
Yes
YesCR impact tick box for ME shall be set and none of the other tick boxes for UICC apps, RAN or CN shall be set for TS 36.509. r2
revised No R5‑221542  
R5‑221086 Update of network requested CA band combination test cases 8.5.4.2 and 8.5.4.3 Qualcomm Incorporated CR Agreement
6.3.14.9TS 36.523-1
Yes
Yesr1
revised No R5‑221544  
R5‑221087 Correction to NR URLLC MAC Test Case 7.1.1.4.1.5 Lenovo, Motorola Mobility, Huawei, HiSilicon, MCC TF160 CR Agreement
6.3.17.3TS 38.523-1
Yes
Yesr1
revised No R5‑221586  
R5‑221088 Addition of new NR URLLC MAC Test Case for DL Grant Prioritisation Lenovo, Motorola Mobility CR Agreement
6.3.17.3TS 38.523-1
Yes
Yesr1
revised No R5‑221587  
R5‑221089 Addition of new NR URLLC MAC Test Case for UL Data prioritisation Lenovo, Motorola Mobility CR Agreement
6.3.17.3TS 38.523-1
Yes
Yesr1
revised No R5‑221588  
R5‑221090 Addition of new NR URLLC MAC Test Case applicabilities Lenovo, Motorola Mobility CR Agreement
6.3.17.4TS 38.523-2
Yes
Yesr1
revised No R5‑221590  
R5‑221091 Addition of new PICS for URLLC Lenovo, Motorola Mobility CR Agreement
6.3.17.2TS 38.508-2
Yes
Yescover Rel-16. r2
revised No R5‑221585  
R5‑221092 Correction to NR URLLC MAC Test Case 7.1.1.4.2.6 Lenovo, Motorola Mobility, MCC TF160 CR Agreement
6.3.17.3TS 38.523-1
No
Yes
withdrawn Yes    
R5‑221093 Correction to Rel16 eNS EPS Mobility Management test case Lenovo, Motorola Mobility, MCC TF160 CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yeswas wrong AI. r1
revised No R5‑222011  
R5‑221094 Introduce and update PICS Lenovo, Motorola Mobility, Qualcomm, Rhode & Schwarz CR Agreement
6.3.1.2TS 38.508-2
Yes
Yesr3
revised No R5‑221428  
R5‑221095 Addition of new SNPN test case for EAP based primary authentication and key agreement Lenovo, Motorola Mobility CR Agreement
6.3.13.3TS 38.523-1
Yes
Yesr1
revised No R5‑221534  
R5‑221096 Addition of applicability for new SNPN test cases Lenovo, Motorola Mobility CR Agreement
6.3.13.4TS 38.523-2
Yes
Yesr1
revised No R5‑221535  
R5‑221097 Addition of new NR V2X PC5 RRC reconfiguration failure / Initiating UE side Lenovo, Motorola Mobility CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221524  
R5‑221098 Addition of new NR V2X PC5 RRC reconfiguration failure / Peer UE side test case Lenovo, Motorola Mobility CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221525  
R5‑221099 Addition of new NR V2X Sidelink radio link failure / Transmission side test case Lenovo, Motorola Mobility CR Agreement
6.3.10.4TS 38.523-1
Yes
Yesr1
revised No R5‑221526  
R5‑221100 Addition of applicability for new V2X test cases Lenovo, Motorola Mobility CR Agreement
6.3.10.5TS 38.523-2
Yes
YesCR# r2
revised No R5‑221528  
R5‑221101 Misc. updates to MC client test cases MCC TF160 CR Agreement
6.6.9.4TS 36.579-4
Yes
Yes
agreed No    
R5‑221102 Applicability updates for NR RACS test cases Qualcomm Incorporated, Keysight, Anritsu CR Agreement
6.3.14.5TS 38.523-2
Yes
Yesr1
revised No R5‑221541  
R5‑221103 Addition of new RACS test case 9.1.9.4 Qualcomm Incorporated CR Agreement
6.3.14.4TS 38.523-1
Yes
Yesr1
revised No R5‑221539  
R5‑221104 Addition of new USIM configuration for RACS test case Qualcomm Incorporated CR Agreement
6.3.14.1TS 38.508-1
Yes
Yes
agreed No    
R5‑221105 Correction to NR testcase 8.1.5.2.2 ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.1.5RRC Others (clause 8.1.5)
Yes
Yes
agreed No    
R5‑221106 Correcting test applicabilities for MIMO test cases Huawei, Hisilicon CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221107 Correcting to NR test case 6.2A.1 MOP for CA Huawei, Hisilicon CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221108 Updating message contents for REFSENS for 2DL CA exceptions testing Huawei, Hisilicon CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
Yes
YesTdoc# r1 The RAN4 dependent CR was endorsed.
revised No R5‑221930  
R5‑221109 Updating test case 6.2.3 AMPR for NS_03 and NS_03U Huawei, Hisilicon CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221110 Correction to PDCCH DCI format for FR2 test cases Huawei, Hisilicon CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yesr1
revised No R5‑221690  
R5‑221111 Editorial correction to titles of FR2 test cases Huawei, Hisilicon CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑221112 Update to test applicability to FR2 test cases Huawei, Hisilicon CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221113 Updating General Spurious testing for CA_n41A-n79A Huawei, Hisilicon CR Agreement
5.3.4.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221114 Updating A-MPR for CA testing for CA_n41A-n79A Huawei, Hisilicon CR Agreement
5.3.4.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221115 Updating TP analysis for FR1 AMPR for CA_n41A-n79A testing Huawei, Hisilicon CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑221116 Updating minimum requirements for test case 6.2.3 AMPR Huawei, Hisilicon CR Agreement
5.3.7.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221117 Updating test case Additional spurious emissions for NS_46 Huawei, Hisilicon, Bureau Veritas CR Agreement
5.3.7.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221118 Updating test case AMPR for MIMO Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221794  
R5‑221119 Updating UTRA ACLR for UL MIMO Rel-16 onward for NS_100 Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221120 Updating Additional spurious emissions for UL MIMO Rel-16 onward for several bands Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221121 Updating 6.1A for intra-band contiguous CA Outer1 RB allocation Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221122 Updating test case 6.2A.2 MPR for intra-band non-contiguous CA Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
YesAuthor confirmed no overlap/conflicts CAICT: conflicts with discussion paper R5-220059 proposal and CR R5-220405; More test poit mismatch between MPR and ACLR"
agreed No    
R5‑221123 Updating TP analysis for FR1 MPR for intra-band CA test case Huawei, Hisilicon CR Agreement
5.3.8.8TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑221124 Updating Absolute power tolerance for intra-band non-contiguous CA Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yescl. aff. r1
revised No R5‑221795  
R5‑221125 Updating TP analysis for FR1 Absolute power tolerance CA test case Huawei, Hisilicon CR Agreement
5.3.8.8TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑221126 Updating FR1 ACLR for intra-band CA test case Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221796  
R5‑221127 Updating TP analysis for FR1 ACLR for intra-band CA test case Huawei, Hisilicon CR Agreement
5.3.8.8TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesdeferred.
agreed No    
R5‑221128 Updating FR1 Spectrum emission mask for intra-band CA test case Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221129 Updating TP analysis for FR1 SEM for intra-band CA test case Huawei, Hisilicon CR Agreement
5.3.8.8TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑221130 Updating Relative power control tolerance testing for intra-band CA Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221131 Updating clause 5.2C for R17 SUL configurations Huawei, Hisilicon CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
Yes
Yesr1
revised No R5‑221882  
R5‑221132 Updating channel bandwidths for NR band n97 Huawei, Hisilicon CR Agreement
5.3.19.1TS 38.508-1
Yes
Yes
agreed No    
R5‑221133 Updating test frequencies for NR band n97 Huawei, Hisilicon CR Agreement
5.3.19.1TS 38.508-1
Yes
Yes
agreed No    
R5‑221134 Updating test frequencies for NR band n1 Huawei, Hisilicon CR Agreement
5.3.19.1TS 38.508-1
Yes
Yesoffline comments from Ericsson and Anritsu. r1
revised No R5‑221869  
R5‑221135 Discussion on Additional RF requirements for NS_03U, NS_05U and NS_43U Huawei, Hisilicon discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No    
R5‑221136 Revised WID on UE Conformance - Additional NR bands for UL-MIMO in Rel-17 Huawei, Hisilicon WID revised Approval
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
Yes
Yesis endorsed.
endorsed No    
R5‑221137 New WID on UE Conformance - Introduction of FR2 FWA UE with maximum TRP of 23dBm for band n257 and n258 Huawei, Hisilicon WID new Approval
4.1New Work Item proposals - for intro only
Yes
Yes
revised No R5‑221385  
R5‑221138 WP of New Rel-17 NR licensed bands and extension of existing NR bands Huawei, Hisilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221139 SR of New Rel-17 NR licensed bands and extension of existing NR bands Huawei, Hisilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221140 WP of Rel-17 NR CA and DC; and NR and LTE DC Configurations Huawei, Hisilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221141 SR of Rel-17 NR CA and DC; and NR and LTE DC Configurations Huawei, Hisilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221142 WP of Additional NR bands for UL-MIMO in Rel-17 Huawei, Hisilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221143 SR of Additional NR bands for UL-MIMO in Rel-17 Huawei, Hisilicon WI status report Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221144 Update to maximum output power for UL CA Band combo 2A-46A Qualcomm Tech. Netherlands B.V CR Agreement
5.5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221145 WP UE Conformance Test Aspects - NR performance requirement enhancement Qualcomm CDMA Technologies Work Plan Approval
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221146 WP UE Conformance Test Aspects - Rel -16 for CLI handling for NR Qualcomm CDMA Technologies Work Plan Approval
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221147 SR UE Conformance Test Aspects - Rel -16 for CLI handling for NR Qualcomm CDMA Technologies WI status report Approval
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221148 WP - 5G NR User Equipment (UE) Application Layer Data Throughput Performance Qualcomm CDMA Technologies Work Plan Approval
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221149 SR - 5G NR User Equipment (UE) Application Layer Data Throughput Performance Qualcomm CDMA Technologies WI status report Approval
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221150 WP - UE Conformance Test Aspects for NR-based Access to Unlicensed Spectrum Qualcomm CDMA Technologies Work Plan Approval
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221151 SR - UE Conformance Test Aspects for NR-based Access to Unlicensed Spectrum Qualcomm CDMA Technologies WI status report Approval
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221152 Applicability of NR perf enh WI test cases Qualcomm CDMA Technologies CR Agreement
5.3.15.4TS 38.522
Yes
YesRequested to defer the verdict to include applicability from other companies contributing to the NR perf enh WI in this meeting. r1
revised No R5‑221852  
R5‑221153 Update to FR1 CA normal PDSCH test cases Qualcomm CDMA Technologies CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
YesRAN4 draftCR is now agreed.
agreed No    
R5‑221154 Update to FR1 CA power imbalance test cases Qualcomm CDMA Technologies CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No    
R5‑221155 Update to FR2 CA normal PDSCH test cases Qualcomm CDMA Technologies CR Agreement
5.3.15.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
YesRAN4 draftCR is now agreed.
agreed No    
R5‑221156 Introduction of FR1 CA SDR test case Qualcomm CDMA Technologies CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesr1
revised No R5‑221846  
R5‑221157 Introduction of FR1 CA CQI reporting test case Qualcomm CDMA Technologies CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yeschanges are contained in R5-220419.
withdrawn Yes    
R5‑221158 Update to RRM test case with CDRX Qualcomm CDMA Technologies CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes3GU??
revised No R5‑221725  
R5‑221159 Update of predicted SNR upper bound for noise free SDR scenarios Qualcomm CDMA Technologies CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yeswas wrong ver in 3GU + cover! r3
revised No R5‑221747  
R5‑221160 Editorial update to PBCH demod requirements section Qualcomm CDMA Technologies CR Agreement
5.3.1.7.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yesr1
revised No R5‑221707  
R5‑221161 Test procedure update to L2NR Cell reselection test case Qualcomm CDMA Technologies CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yescl. aff. r1
revised No R5‑221735  
R5‑221162 Update to FR1 SA Scell activation and deactivation test case Qualcomm CDMA Technologies CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yesr1 RAN4 verdict and 'overlap' resolution pending ‘overlap’ resolution pending QC: No overlap with R5-220689, R5-220109. r1 uploaded to update Figure 4.5.3.1.5-1 and Figure 6.5.3.1.5-1 as per the proposals in this CR after receving an editable version of the figure from the original contributing company QC 3/3: RAN4 draftCR was not pursued in this meeting..The content was agreed, but due to an unusual procedural problem, CR was not pursued in this meeting. In light of that, we would like to withdraw R5-221162 and resubmit in next meeting
revised No R5‑221928  
R5‑221163 Update to testability of test requirements due to achievable SNR improvements Qualcomm CDMA Technologies CR Agreement
5.3.1.7.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
YesR&S: In R5-221163r1 Table 8.1.1_1-1 is updated. However, content of associated Table D.3.2.2-2 in TR 38.903 CR R5-2211593r3 is not changed and it is not associated to the discussion paper neither. Content of this table is for AWGN condition without fading and affects only TC 8.2.2.2.1.1 for which already all test points are applicable. Therefore, we kindly request to remove the changes to Table 8.1.1_1-1 from CR R5-221163. r1
revised No R5‑221708  
R5‑221164 Discussion on fading crest factor Qualcomm CDMA Technologies discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yeslate doc r1 Keysight Spain: - Is the intention that proposal 4 replaces proposal 1 and proposal 5 replaces proposal 2? - Now that 28 GHz and 39 GHz testability is covered, will the LS be sent? With the new proposal 4 and 5 we are not only removing the additional fading back-off but, even reducing the widely used assumption of 13 dB for signal PAPR. [QC]: yes, over a year back, we started with signal PAPR of 13 dB and additional 10 dB backoff due to fading. Based on the faded signal simulation results we have revised these assumptions starting with a total backoff of ~18 dB (corresponding to worst case PAPR obtained from joint distribution of faded signal) . Now that we have link level simulation results for the different test scenarios defined in the 38.521-4 spec for different faded signal clipping probabilities, we see no tput degradation for 1e-4/1e-3 signal clipping depending on 64QAM or 256QAM. Are we willing to go beyond signal PAPR assumptions? >>[QC]: yes. that’s what simulation results from 2 companies suggest. As we have seen in previous discussions, in the end instead of looking at signal PAPR and PAPR due to fading separately, it is better to look at the joint probability of the faded signal. Would like to hear your and other company comments if you see a concern in revising these PAPR assumptions. Do we need to inform RAN4 about it? [QC]: As we discussed in the GTM, consensus seems to be that we don’t need to inform RAN4 about it. Although Ran4 provided the initial MU analysis, it was Ran5 that took up the MU/TT analysis • Is the intention that proposal 4 replaces proposal 1 and proposal 5 replaces proposal 2? [QC]: correct • Now that 28 GHz and 39 GHz testability is covered, will the LS be sent? [QC]: Consensus in the GTM session seems to be that LS is not needed. Would like to hear feedback in favor of sending LS to RAN4. r2 3/1: R&S: Proposal 4 is acceptable based on our analysis. Moderator (AT&T): r2 produced after the discussion paper deadline. Only Proposal 4 can be considered based on previous feedback from Anritsu on Proposal 5 (256QAM) and since Proposal 4 was not modified in the r2. The CR can take the outcome of Proposal 4 into consideration. The paper can be given a final Tdoc number and noted. Proposal 4 can be endorsed. LATE DOCUMENT RF AP#89e.23 2/23 FR2 MU GTM#1: E///: This is not performing any link level evaluation and the values are only being measured. Good to hear that additional simulations are in progress. RAN4 SI scope does not include this aspect so this question would not need to be added to the LS. Anritsu: Only can accept 64QAM at this time. Need more time to check 256QAM by looking at actual device impact. QC: May be able to extend the RAN SI scope to Demod. Would like Anritsu to clarify the comment on 256QAM. Moderator (AT&T): Is it acceptable to send an LS to RAN4? E///: Defer RAN4 LS until further discussion at this meeting. Revised to: R5-221164r1. LATE DOCUMENT Revised from: R5-221164. RF AP#89e.23 2/28 FR2 MU GTM#2: KS: The new P4 will replace the previous P1 and the new P5 will replace the previous P2, correct? With the new P4 and P5, we are going beyond the signal PAPR backoff by almost 2dBs. Should we inform RAN4 about this since RAN4 was assuming 13dB PAPR. QC: Need to fix typo on current working assumption for 64QAM Demod. It should be 17.71dB. To KS, P1 and P2 are superceded by P4 and P5. Yes, we are going beyond the signal clipping margin. Are you requesting the LS to RAN4 to be sent as an FYI? R&S: For P5, the proposal is different from the Observation. Why is 12.62 selected instead of 15.36 since the proposal was to use the worst case value for Demod and CSI? Need to recheck the values for n259. QC: The signal power doesn't change. Need to check if the testability table used 15.36 or not. Update P5 to align with worst case. Anritsu: We can only accept 64QAM at this time. We need to check experimental results align with simulation results. E///: Thanks for the link-level simulation results. We have 2 companies coming to similar conclusions. We don't think that an LS to RAN4 is required. We should check if we have responded to their LS on n262. For 256QAM, maybe we need one value for Demod and one for CSI to improve the Demod testability. RAN4 TR expects n262 to be 3.5dB worse than what we have today. QC: Need to check the one CSI test point but we can consider using separate values for Demod and CSI. We agree that RAN4 will not consider the RAN5 values. It would be good to inform RAN4 on n262. Moderator (AT&T): QC will modify P5 to reflect the comments above and split P6 such that 64QAM and 256QAM are handled separately. P4 may be able to be endorsed but R&S needs time to check the values for n259. Revised to: R5-221164r2. LATE DOCUMENT Revised from: R5-221164r1. 3/1: R&S: Proposal 4 is acceptable based on our analysis. Moderator (AT&T): r2 produced after the discussion paper deadline. Only Proposal 4 can be considered based on previous feedback from Anritsu on Proposal 5 (256QAM) and since Proposal 4 was not modified in the r2. The CR can take the outcome of Proposal 4 into consideration. The paper can be given a final Tdoc number and noted. Proposal 4 can be endorsed. Revised to: R5-221628. LATE DOCUMENT r3 Revised from: R5-221164r2. Noted and Proposal 4 is endorsed
revised No R5‑221628  
R5‑221165 Update to NZP CSI-RS power control offset IE for Demod scenarios Qualcomm CDMA Technologies CR Agreement
5.3.1.1.2Test environment for RF (Clauses 5)
Yes
Yesdeferred. Some more checks needed. Based on further checks it was determined the proposed change is not needed
withdrawn Yes    
R5‑221166 FR1 NSA SDR message contents update Qualcomm CDMA Technologies CR Agreement
5.3.1.7.3Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10)
Yes
Yesr1 resolve overlaps with Huawei CR R5-220631. More discussion with Huawei on the NSA SDR message contents. r2
revised No R5‑221709  
R5‑221167 Update to Ciphering algo IE for FR1 NSA SDR Qualcomm CDMA Technologies CR Agreement
5.3.1.1.2Test environment for RF (Clauses 5)
Yes
Yes
agreed No    
R5‑221168 Discussion on minimum test time for HST Demod scenarios Qualcomm CDMA Technologies discussion Endorsement
5.3.16.8Discussion Papers, Work Plan, TC lists
Yes
Yeslate doc RF session#2 : CR in R5-221169 , Add Doc Tag HSt_Strat E// requesting more time to check. Huawei: can we consisder abs tput for Tput vs SNR convergence CMCC: update Annex G with the test time analyzed in this paper. No other concerns , document can noted and proposals endorsed by end of first week if no further changes needed. Qualcomm: would like to defer this document since I plan to revise my paper by end of this week with more simulation data r1
revised No R5‑221662  
R5‑221169 Update to HST Demod test cases Qualcomm CDMA Technologies CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yesdeferred. r1
revised No R5‑221855  
R5‑221170 Addition of 6.2B.2.3a MPR for inter-band NE-DC within FR1 CMCC CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221171 Addition of 6.4B.2.3a.4 EVM Equalizer Flatness for inter-band NE-DC within FR1 CMCC CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221172 Addition of 6.2B.4.2.3a TIB,c for Inter-band NE-DC within FR1 CMCC CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221173 Update Rx test cases for DC_n28A_3A, DC_n28A_3C, DC_n28A_39A, DC_n28A_39C CMCC CR Agreement
5.3.20.5.2Rx Requirements (Clause 7)
No
Yeslate doc
withdrawn Yes    
R5‑221174 Correction to NR URLLC MAC Test Case 7.1.1.4.2.6 Lenovo, Motorola Mobility CR Agreement
6.3.17.3TS 38.523-1
Yes
Yesr1
revised No R5‑221589  
R5‑221175 TP to TR 38.834 on MU General section and descriptions ROHDE & SCHWARZ, MVG Industries discussion Endorsement
5.3.39.1Measurement Uncertainty (MU) assessment proposals for TR 38.834, Discussion Papers, Work Plan
Yes
Yesr1 and r2: - Quality of the Quiet Zone definition (B.2.8) updated, including additional changes in r2 to improve wording and QoQZ for Stage 1. - Clarification on the uncertainty for relevant equipment (B.2.4, B.2.5, B.2.15 and B.2.16) to include the usage of datasheet, and alternatively calibration report in case of the calibration antenna. r3: - Clarification on the distribution of QoQZ term for Stage 1. - “Gaussian” replaced by “Actual”
revised No R5‑221624  
R5‑221176 Introduction of test frequencies for NR CA configurations CA_n5A-n7A, CA_n5A-n78A and CA_n7A-n78A Ericsson CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑221177 Update to Inter Band UL CA Band combo 2A-46A Qualcomm Tech. Netherlands B.V CR Agreement
5.5.1.4TS 36.521-2
Yes
Yes
agreed No    
R5‑221178 Correction to the BWP-DownlinkDedicated MediaTek Inc., Rohde & Schwarz, Anritsu CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yesr1
revised No R5‑221421  
R5‑221179 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_1A_n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
YesNone of the CR impact tick boxes for UICC apps, ME, RAN or CN shall be set for TS 38.905. r1
revised No R5‑221779  
R5‑221180 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_1A_n7A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yessee R5-221179. r1
revised No R5‑221780  
R5‑221181 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_3A_n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yessee R5-221179. r1
revised No R5‑221781  
R5‑221182 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_7A_n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yessee R5-221179. r1
revised No R5‑221782  
R5‑221183 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_28A_n7A Ericsson, Qualcomm CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yessee R5-221179. r1
revised No R5‑221783  
R5‑221184 Introduction of DC_1A_n5A, DC_1A_n7A, DC_3A_n5A, DC_7A_n5A, DC_28A_n7A to general spurious emission test case Ericsson CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
YesNone of the CR impact tick boxes for UICC apps, ME, RAN or CN shall be set for TS 38.521-3. r1
revised No R5‑221770  
R5‑221185 Introduction of DC_1A_n5A, DC_1A_n7A, DC_3A_n5A, DC_7A_n5A, DC_28A_n7A to UE co-existence spurious emission test case Ericsson CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
YesNone of the CR impact tick boxes for UICC apps, ME, RAN or CN shall be set for TS 38.521-3. r1
revised No R5‑221771  
R5‑221186 Introduction of test frequencies for DC_1A_n5A, DC_1A_n7A, DC_3A_n5A, DC_7A_n5A, DC_28A_n7A Ericsson CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No    
R5‑221187 Correct message content for RLM-SSB Based FR2 5.5.1.1 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221188 Correct message content for RLM-SSB Based FR2 5.5.1.2 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221189 Correct message content for RLM-SSB Based FR2 5.5.1.3 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221190 Correct message content for RLM-SSB Based FR2 5.5.1.4 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221191 Correct message content for FR2 interruption ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No    
R5‑221192 Update on RRM issue #8 ROHDE & SCHWARZ discussion Information
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No    
R5‑221193 Update of test points analysis per CA configuration Table China Unicom CR Agreement
5.3.20.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yesfirst agreed, then merged into R5-221345r1.
withdrawn Yes    
R5‑221194 WP UE Conformance Test Aspects - LTE-NR & NR-NR Dual Connectivity and NR CA enhancements Nokia, Nokia Shanghai Bell Work Plan  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221195 Update to test cases 11.1.1, 11.1.3, 11.1.4, 11.1.8 and 11.1.9 MediaTek Inc. CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yesr1 no overlap.
revised No R5‑221455  
R5‑221196 SR UE Conformance Test Aspects - LTE-NR & NR-NR Dual Connectivity and NR CA enhancements Nokia, Nokia Shanghai Bell WI status report  
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221197 New testcase for Idle/Inactive measurements on NR cells in RRC_INACTIVE state with configuration through SIB11 Nokia, Nokia Shanghai Bell CR Agreement
6.3.24.3TS 38.523-1
Yes
Yesr2
revised No R5‑222003  
R5‑221198 Addition of CBW 70MHz into TC 6.5D China Unicom CR Agreement
5.3.7.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221199 New testcase for Idle/Inactive measurements on E-UTRA cells in RRC_INACTIVE state with configuration through SIB11 Nokia, Nokia Shanghai Bell CR Agreement
6.3.24.3TS 38.523-1
Yes
Yescl. aff. r2
revised No R5‑222004  
R5‑221200 Addition of CBW 70MHz into Rx TCs China Unicom CR Agreement
5.3.7.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑221201 Update for the signal conditions for FR2 test cases ROHDE & SCHWARZ CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑221202 New NR RSTD test case 14.2.1 ROHDE & SCHWARZ CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑221203 New NR RSTD test case 14.2.2 ROHDE & SCHWARZ CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑221204 New NR RSTD test case 14.3.1 ROHDE & SCHWARZ CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑221205 New NR RSTD test case 14.3.2 ROHDE & SCHWARZ CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑221206 New NR PRS-RSRP test case 16.2.1 ROHDE & SCHWARZ CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑221207 New NR PRS-RSRP test case 16.2.2 ROHDE & SCHWARZ CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑221208 New NR PRS-RSRP test case 16.3.1 ROHDE & SCHWARZ CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No    
R5‑221209 Updating MPR minimum requirement for NR band n97 Huawei, Hisilicon CR Agreement
5.3.19.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221210 Update MOP for Intra-band contiguous CA CMCC, CT CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221900  
R5‑221211 Update MOP for Intra-band non-contiguous CA CMCC, CT CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221901  
R5‑221212 Addition of new CADC MPR TC 6.2B.2.4_1.1 Intertek CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yesr1 comments from R&S.
revised No R5‑221772  
R5‑221213 Addition of applicability for CADC MPR TC 6.2B.2.4_1.1 Intertek CR Agreement
5.3.4.7TS 38.522
Yes
Yes
agreed No    
R5‑221214 Update IE RadioBearerConfig Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yesmerged in R5-220652r2. During review of those changes, TF160 has identified an issue within Table 4.6.3-132: RadioBearerConfig, for condition DRBn. The condition DRBn is used for NR-DC and NE-DC and other cases of PDU session establishment. In case of NR-DC and NE-DC, the field defaultDRB shall be set to non default DRB (false), because we modify the PDU session to add an additional DRB, only one DRB can be set to default DRB in a PDU session (as per TS 38.331). When the condition DRBn is used in other context, the DRB should be set to true (default DRB). E.g. Table 4.5A.2.2.3-2: RRCReconfiguration … etc. So the conditions should be adapted for the 2 cases. Unfortunately it is too late at this RAN5#94-e meeting to resolve the identified issues, so we propose that a RAN5 SIG Action Point is raised to document and track this issue.
withdrawn Yes    
R5‑221215 On the LS response to ITU-R on Generic unwanted emission (IMT-2020) Ericsson discussion Endorsement
4.2.2All other topics
Yes
Yeslate doc all 3 proposals are endorsed. RAN will be informed vi the RAN5 Chair report, rather than sending an LS. Thanks to Huawei, Apple, Orange.
noted No    
R5‑221216 Editorial update for IMS emergency service applicability Ericsson CR Agreement
6.6.6.2TS 34.229-2
Yes
YesTF160 manager: Wrong WIC and AI. E///: use TEI9_test and AI 6.6.6.2 r2
revised No R5‑221407  
R5‑221217 Update for IMS emergency service applicability Ericsson CR Agreement
6.3.1.8TS 34.229-2
Yes
Yesr3
revised No R5‑221469  
R5‑221218 Updates to IMS security applicabilities Ericsson CR Agreement
6.3.1.8TS 34.229-2
Yes
Yes
agreed No    
R5‑221219 Update of XCAP test case Preambles Ericsson CR Agreement
6.3.1.10TS 34.229-5
Yes
Yesr1 not yet agreed
revised No R5‑221488  
R5‑221220 Updates to test case 7.1.4.42 Ericsson CR Agreement
6.5.3.2.1MAC
Yes
Yesr1
revised No R5‑222016  
R5‑221221 Updates to test case 8.5.4.1 Ericsson CR Agreement
6.5.3.3.1RRC Part 1 (clauses 8.1 and 8.5)
Yes
Yes
agreed No    
R5‑221222 NE-DC support for UECapabilityEnquiry and UECapabilityInformation messages Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yesr2
revised No R5‑221422  
R5‑221223 Update to test case 11.6.1 Ericsson CR Agreement
6.3.1.4.8.53GPP PS Data Off
Yes
Yesr1
revised No R5‑221461  
R5‑221224 Update Connectivity NR to NR/5GC in clause 6 Ericsson CR Agreement
6.3.1.4.2Idle Mode (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑221225 Update Connectivity NR to NR/5GC in clause 7 MAC Ericsson CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yes
withdrawn Yes    
R5‑221226 Update Connectivity NR to NR/5GC in clause 7 PDCP Ericsson CR Agreement
6.3.1.4.3.1.4PDCP
Yes
Yes
withdrawn Yes    
R5‑221227 Update Connectivity NR to NR/5GC in clause 7 RLC Ericsson CR Agreement
6.3.1.4.3.1.3RLC
Yes
Yes
withdrawn Yes    
R5‑221228 Update Connectivity NR to NR/5GC in clause 8.1.3 Ericsson CR Agreement
6.3.1.4.4.1.3RRC Measurement Configuration Control and Reporting (clause 8.1.3)
Yes
Yes
withdrawn Yes    
R5‑221229 Update Connectivity NR to NR/5GC in clause 8.2.3 Ericsson CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
withdrawn Yes    
R5‑221230 Update Connectivity NR to NR/5GC in clause 8.1.5 Ericsson CR Agreement
6.3.1.4.4.1.5RRC Others (clause 8.1.5)
Yes
Yes
withdrawn Yes    
R5‑221231 Update Connectivity NR to NR/5GC in clause 8.2.6 Ericsson CR Agreement
6.3.1.4.4.2.6RRC Others (clause 8.2.6)
Yes
Yes
withdrawn Yes    
R5‑221232 Update Connectivity NR to NR/5GC in clause 8.2.2 Ericsson CR Agreement
6.3.1.4.4.2.2RRC Radio Bearer (clause 8.2.2)
Yes
Yes
withdrawn Yes    
R5‑221233 Update Connectivity NR to NR/5GC in clause 9.1.5 Ericsson CR Agreement
6.3.1.4.5.3MM Registration & De-registration (clauses 9.1.5 & 9.1.6)
Yes
Yes
withdrawn Yes    
R5‑221234 Update Connectivity NR to NR/5GC in clause 9.3.1 Ericsson CR Agreement
6.3.1.4.5.6Inter-system Mobility (clause 9.3)
Yes
Yes
withdrawn Yes    
R5‑221235 Update Connectivity NR to NR/5GC in clause 11.1 Ericsson CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yes
withdrawn Yes    
R5‑221236 Update Connectivity NR to NR/5GC in clause 11.3 Ericsson CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yes
withdrawn Yes    
R5‑221237 Update Connectivity NR to NR/5GC in clause 11.4 Ericsson CR Agreement
6.3.1.4.8.4Emergency Services
Yes
Yes
withdrawn Yes    
R5‑221238 Adition of new test case 11.6.3 Data Off / SMSoIP Ericsson CR Agreement
6.3.1.4.8.53GPP PS Data Off
Yes
Yes
agreed No    
R5‑221239 Updates to test case 9.1.10.3 Ericsson CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yesmerged into Qualcomm CR R5-220841r1.
withdrawn Yes    
R5‑221240 Updates to test case 9.1.10.4 Ericsson CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yesr1
revised No R5‑222012  
R5‑221241 Addition of applicability for new test case 11.6.3 Ericsson CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No    
R5‑221242 Updates to emergency applicabilities and conditions Ericsson CR Agreement
6.3.1.5TS 38.523-2
Yes
Yesr3
revised No R5‑221466  
R5‑221243 Update IE RadioBearerConfig Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yesreissued as R5-221413 because of title change.
withdrawn Yes    
R5‑221244 Addition of CA_n1A-n3A into TC 6.2A China Unicom CR Agreement
5.3.4.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221245 New channel bandwidth for n25. UL-MIMO. T-Mobile USA Inc., ROHDE & SCHWARZ CR Agreement
5.3.7.3.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221788  
R5‑221246 New channel bandwidth for n25. refsens and UL-MIMO T-Mobile USA Inc., ROHDE & SCHWARZ CR Agreement
5.3.7.3.2Rx Requirements (Clause 7)
Yes
Yesr3 Further applicable WIC: “NR_lic_bands_BW_R17-UEConTest” to allow 45MHz CBW.
revised No R5‑221790  
R5‑221247 WP UE Conformance Test Aspects – Rel14 Enhanced Full Dimension MIMO for LTE Ericsson Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
Yes
No
available No    
R5‑221248 SR UE Conformance Test Aspects – Rel14 Enhanced Full Dimension MIMO for LTE Ericsson WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221249 Discussion on acceptable clipping and testable SNR for FR2 demod Ericsson discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yesr1. 2/28 FR2 MU GTM#2: Moderator (AT&T): Ericsson agreed to use QC paper in R5-221164 as baseline. This paper can be given a final Tdoc number and noted. RF AP#89e.23 Revised to: R5-221249r1. Revised from: R5-221249. RF AP#89e.23 2/23 FR2 MU GTM#1: Anritsu: Only can accept 64QAM at this time. Need more time to check 256QAM. QC: Can E/// clarify if the proposals include CQI? E///: Our proposals are only considering Demod and not CQI at this point. Don't see the need to stop and wait for CQI outcome. Revised to: R5-221249r2. Revised from: R5-221249r1. RF AP#89e.23 2/28 FR2 MU GTM#2: Moderator (AT&T): Ericsson agreed to use QC paper in R5-221164 as baseline. This paper can be given a final Tdoc number and noted. Revised to: R5-221614. Revised from: R5-221249r2. document noted
revised No R5‑221614  
R5‑221250 Solutions for preventing SCell drop in RAN5 FR2 UL CA test cases Ericsson discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
YesModerator (Apple) discussion ongoing Moderator (Apple): Document can be noted (no proposals endorsed) document Noted"
noted No    
R5‑221251 Introduction of NR-U OFF power test case Ericsson CR Agreement
5.3.25.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221894  
R5‑221252 Introduction of NR-U General ON/OFF time mask test case Ericsson CR Agreement
5.3.25.4.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221895  
R5‑221253 Discussion on Beam Peak Search procedure in case of intra-band DL CA Keysight Technologies UK Ltd discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yesr1 Proposal endorsed.
revised No R5‑221643  
R5‑221254 Update 4.5.7.1 test procedure Keysight Technologies UK Ltd CR Agreement
5.3.1.9.2NE-DC with all NR cells in FR1 (Clause 4A)
Yes
Yes
agreed No    
R5‑221255 Update K1 value for RRM TDD FR1 30kHz RMC Keysight Technologies UK Ltd CR Agreement
5.3.1.1.3Test environment for RRM (Clause 7)
Yes
Yes
agreed No    
R5‑221256 Update number of HARQ processes for FDD Keysight Technologies UK Ltd CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No    
R5‑221257 Update on number of measurement reports in 6.3.1.4 Keysight Technologies UK Ltd CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
withdrawn Yes    
R5‑221258 Modification of testcase 7.1.3.5.7 Ethernet header compression and decompression / Correct functionality of ethernet header compression and decompression Nokia, Nokia Shanghai Bell CR Agreement
6.3.8.4TS 38.523-1
Yes
Yesver r2
revised No R5‑221495  
R5‑221259 Update of R17 new CBW 45M into refsense TC China Unicom, T-Mobile USA Inc., ROHDE & SCHWARZ, Anritsu CR Agreement
5.3.19.3.2Rx Requirements (Clause 7)
Yes
Yesr1 The test requirement and minimum conformance requirement of R5-220891 and R5-221246 is merged into here. r2
revised No R5‑221870  
R5‑221260 On NF Methodologies for Low UL/High DL Power Test Cases Keysight Technologies UK Ltd discussion Approval
5.3.40.1Discussion Papers, Work Plan to track adoption of the TR 38.884 outcomes into RAN5 test specifications
Yes
YesAnritsu: For Proposal 1, we believe that it is difficult to achieve the 14dB improvement by the actual future TE for the reasons in the next paragraph. We think that it is the maximum improvement value that can be theoretically possible with NF and is given as just a reference. Is our understanding correct? Proposal 1: RAN5 to determine whether the ~14dB improvement in relaxations is sufficient before integrating and further researching the new NF methodologies in test specifications and technical reports. Keysight USA: Depending on methodology, we can see up to ~14dB improvement due to the reduced path losses (assuming the 30cm QZ). As I outlined in the contribution, there could be additional improvements due to simplified switching and signal condition… Anritsu: When we try to achieve 14 dB improvement by the actual TE, we assume the following concerns. - We discussed expanding the QZ size to 40cm. The range length 22cm which is used for the path loss calculation of NF is almost equal to the radius of the 40cm QZ. We are afraid that the antenna will interfere with DUT holder or positioner. Keysight USA: For larger QZs, the NF probe measurement distance would have to be adjusted, this is correct . Please keep in mind that when we started this work in RAN4, the larger QZs did not exist and we currently still have not completed the MU work and thus the required relaxations for 40cm and 55cm QZs Anritsu: - As I mentioned in R5-220882, we need to consider ETC enclosure too. Considering the interference between antenna and ETC enclosure as well as DUT holder and positioner, the actual achievable range length will be much larger than 22cm. Keysight USA: I don’t believe ETC is applicable for the test cases with the large relaxations and in order to maximize the reduction of relaxations (as requested by industry), I believe we might need to consider the removal of the ETC enclosure (which you stated as not realistic in your contribution). ETC environment: It is not realistic to add or remove ETC enclosure for each TCs, so it is necessary to consider ETC environment even in TCs which do not need ETC testing. Proposal 2 : Adopt ETC environment for the common assumption of FR2 enhanced test methods. R&S: We share some of the concerns raised by Anritsu in the sense that the ~14dB improvement is only considering FSPL improvement under very concrete conditions, i.e. 30cm QZ, no ETC, comparison between 1m range/focal length to a 22cm… Therefore we think it is unlikely to reach that much improvement while allowing a reasonable freedom of test system implementation. Thus, we don’t think the ~14dB can be used as a plain number for the group to decide on. In addition, we have another comment regarding Proposal 1. Following what it’s presented in clause 5.1.6 of TR 38.884, there must be first an assessment on the improvements to IFF before deciding on NF methods: For a given test case, NF based solutions should only be considered if the improvement for current methods is not enough to remove the relaxations determined by RAN5. Therefore, even if we tune the expected improvement for NF methods, we cannot resolve on Proposal 1 before analyzing the improvements to IFF. r1 revised Proposal 1 in the absence of an estimate for the combined/total relaxation improvement. It now reads: Proposal 1: RAN5 to determine whether the new NF methodologies should be considered if the relaxations cannot be completely be eliminated This change also addresses Anritsu’s request to double check the FSPL value (which came directly from RAN4 and was documented there). Conclusion: Proposals 1 and 2 are endorsed. (There has been a request from proponent to create corresponding Action Points).
revised No R5‑221640  
R5‑221261 Update of mid test channel bandwidth for band n25 ROHDE & SCHWARZ, T-Mobile USA Inc. CR Agreement
5.3.7.1TS 38.508-1
Yes
Yesr2
revised No R5‑221787  
R5‑221262 Addition of CBHWs 25 MHz, 30 MHz, 40 MHz for n25 ROHDE & SCHWARZ, T-Mobile USA Inc. CR Agreement
5.3.7.3.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221789  
R5‑221263 Correction to FR1 UL RMCs ROHDE & SCHWARZ, T-Mobile USA Inc. CR Agreement
5.3.1.4.3Clauses 1-5, Annexes
Yes
Yesr1 RAN4 draft CR has been agreed.
revised No R5‑221684  
R5‑221264 Correction of csi-ResourceConfigId ROHDE & SCHWARZ CR Agreement
5.3.1.1.2Test environment for RF (Clauses 5)
Yes
Yes
agreed No    
R5‑221265 Correction of DMRS-DownlinkConfig ROHDE & SCHWARZ CR Agreement
5.3.1.1.2Test environment for RF (Clauses 5)
Yes
Yes
agreed No    
R5‑221266 Correction of in-band emissions test cases ROHDE & SCHWARZ CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes"Author confirmed resolution of overlap with R5-220770 is ongoing Overlap resolving by revising R5-220770 (ChinaUnicom) "
agreed No    
R5‑221267 Correction of SRS time mask test case ROHDE & SCHWARZ CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221268 Update of E-UTRA configuration ROHDE & SCHWARZ CR Agreement
5.3.1.6.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑221269 Correction of ON OFF time mask test cases for FR2 ROHDE & SCHWARZ CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221270 On FR2 ON/OFF Time Mask ROHDE & SCHWARZ discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yesr1 received comments. It has been clarified that Proposal 3 is applicable to PC3 and PC1. Proposal 6 has been reworded and TT derivation clarified. Anritsu: Proposal 3 is acceptable RF AP#89e.24 2/22: Offline discussions are occurring. Revised to: R5-221270r1. Revised from: R5-221270. RF AP#89e.24 2/23 FR2 MU GTM#1: Moderator (AT&T): Given the similarities in the proposals with R5-220884, can we take this paper as the baseline for further discussion? No objections were raised. Anritsu: Need more time to assess the new P6 and to check relaxation values for P3. Moderator (AT&T): P1, P2, P4, and P5 can be endorsed. Will come back to P3 and P6. 2/25: Moderator (AT&T): P3 and P6 can now be endorsed based on feedback from Anritsu. Anritsu capture ON/OFF Time Mask outcome to reuse the MU of the MOP test case for the ON power measurement. This paper can be given a final Tdoc number and noted with all of the proposals endorsed. Revised to: R5-221612. 2/28 FR2 MU GTM#2: Moderator (AT&T): The 38.903 content will be captured in the HW CR in R5-220782 as opposed to requiring a late Tdoc. Revised from: R5-221270r1. Noted and all of the proposals are endorsed
revised No R5‑221612  
R5‑221271 Correction of maximum output power for CA test case ROHDE & SCHWARZ CR Agreement
5.5.1.3.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221919  
R5‑221272 Correction of NB-IoT test frequency for band 85 ROHDE & SCHWARZ CR Agreement
5.5.1.1TS 36.508
Yes
Yesspec! r1
revised No R5‑221917  
R5‑221273 Modification of common test environment for EHC testing Nokia, Nokia Shanghai Bell CR Agreement
6.3.8.1TS 38.508-1
Yes
Yesver r1 wrong Rel+ver! r2
revised No R5‑221493  
R5‑221274 Applicability clauses for Idle Inactive measurement test cases Nokia, Nokia Shanghai Bell CR Agreement
6.3.23.5TS 38.523-2
Yes
Yescl. aff. r3
revised No R5‑222002  
R5‑221275 Beam correspondence Measurement Uncertainties and test tolerances derivation Keysight technologies UK Ltd discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes2/23 FR2 MU GTM#1: Moderator (AT&T): Companies are encouraged to review the corresponding CRs prior to the end of the week. If no updates are required, the CRs will be recommended to be provisionally agreed. This paper can be noted and the proposals can be endorsed. Noted and proposals are endorsed
noted No    
R5‑221276 38.521-2 Beam correspondence Measurement Uncertainties and test tolerances Keysight technologies UK Ltd CR Agreement
5.3.1.5.3Clauses 1-5, Annexes
Yes
Yesr1 r2 done after the agreement -> not allowed, but nevertheless changes introduced in the final doc.
revised No R5‑221611  
R5‑221277 38.903 Beam correspondence Measurement Uncertainties Keysight technologies UK Ltd CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes2/23 FR2 MU GTM#1: Moderator (AT&T): Companies are encouraged to review the CR for content based on the endorsement of the proposals in R5-221275 by the end of the week. Could be agreed. 2/25: Moderator (AT&T): There have been no further comments on the CR. This document can be provisionally agreed. r1
revised No R5‑221629  
R5‑221278 Discussion on LTE_NR_B41_Bn41_PC29dBm-UEConTest Work plan review to include dependencies with NR_RF_TxD-UEConTest work plan Keysight technologies UK Ltd discussion Endorsement
5.3.29.4Discussion Papers, Work Plan, TC lists
Yes
Yesr1
revised No R5‑221605  
R5‑221279 Discussion on HPUE_PC1_5_n77_n78-UEConTest Work plan review to include dependencies with NR_RF_TxD-UEConTest work plan Keysight technologies UK Ltd discussion Endorsement
5.3.34.4Discussion Papers, Work Plan, TC lists
Yes
Yesr1
revised No R5‑221607  
R5‑221280 Discussion on NR_UE_PC1_5_n79-UEConTest Work plan review to include dependencies with NR_RF_TxD-UEConTest work plan Keysight technologies UK Ltd discussion Endorsement
5.3.31.4Discussion Papers, Work Plan, TC lists
Yes
Yesr1
revised No R5‑221606  
R5‑221281 Discussion on Transparent Tx diversity work plan Keysight technologies UK Ltd discussion Endorsement
5.3.38.6Discussion Papers, Work Plan, TC lists
Yes
Yesr2
revised No R5‑221608  
R5‑221282 New testcase for Idle/Inactive measurements on NR cells in RRC_INACTIVE state with configuration through RRCRelease Nokia, Nokia Shanghai Bell CR Agreement
6.3.24.3TS 38.523-1
Yes
Yesr2
revised No R5‑222005  
R5‑221283 New testcase for Idle/Inactive measurements on E-UTRA cells in RRC_INACTIVE state with configuration through RRCRelease Nokia, Nokia Shanghai Bell CR Agreement
6.3.24.3TS 38.523-1
Yes
Yes<> r3
revised No R5‑222006  
R5‑221284 FR2 RRM test cases: Known Issue List Ericsson discussion Information
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No    
R5‑221285 FR2 RRM test cases: Known Issue List - after RAN5_94e Ericsson discussion Information
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes• Issue #10(new) has been assigned to Anritsu. • One issue have been resolved during RAN5#94e: o Issue#8, R&S • 4 issues remain open.
noted No    
R5‑221286 Test Tolerance analysis for E-UTRA - NR FR1 Cell reselection tests for HST Ericsson CR Agreement
5.3.16.7TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑221287 Test Tolerance analysis for inter-frequency RRC re-establishment test case Ericsson CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes"Test tolerance analysis. RAN4 dependent draftCR R4-2205073 (Endorsed) 2/24 Moderator (E///): good to go after RAN4 dependency is cleared pending RRM TT facilitator update on the RAN5 analysis of the CR 2/25 Moderator (E///): good to go"
agreed No    
R5‑221288 Test Tolerance analysis for inter-frequency RRC re-establishment test case Ericsson CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yesr1
revised No R5‑221644  
R5‑221289 Correction of RRM re-establishment test case 7.3.2.1.1 including Test Tolerance Ericsson CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No    
R5‑221290 Correction of RRM re-establishment test case 7.3.2.1.2 including Test Tolerance Ericsson CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes"Test case correction with Test Tolerance. RAN4 dependent draftCR R4-2205073(Endorsed) 2/25 Moderator (E///): some work needed or revision expected 2/28 Moderator (E///): good to go"
agreed No    
R5‑221291 Test Tolerance addition in Annex F for RRM FR2 re-establishment test cases Ericsson CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes"TT addition to Annex F, RAN4 dependent draftCR R4-2205073 (Endorsed) Author confirmed no overlap/conflicts 2/25 Moderator (E///): some work needed or revision expected 2/28 Moderator (E///): good to go"
agreed No    
R5‑221292 Addition of Setup Diagram for RRM multicell 2x2 test cases Ericsson CR Agreement
5.3.8.1TS 38.508-1
Yes
Yes
agreed No    
R5‑221293 Addition of Condition for FR1 DL Interruptions test cases applicability Ericsson CR Agreement
5.3.8.2TS 38.508-2
Yes
Yesr1
revised No R5‑221793  
R5‑221294 Addition of FR1 DL Interruptions test cases applicability Ericsson CR Agreement
5.3.8.5TS 38.522
Yes
Yesr1
revised No R5‑221797  
R5‑221295 Correction of RRM test cases applicability - Note 1 removal Ericsson CR Agreement
5.3.1.8TS 38.522
Yes
Yes
agreed No    
R5‑221296 Addition of Idle Mode CA/DC Measurements test cases applicability Ericsson CR Agreement
5.3.26.3TS 38.522
Yes
Yes
agreed No    
R5‑221297 Addition of Minimum conformance requirements for DL interruptions at switching between two uplink carriers Ericsson CR Agreement
5.3.8.6TS 38.533
Yes
Yes
agreed No    
R5‑221298 Addition of UL switching test case 6.5.7.1 Ericsson CR Agreement
5.3.8.6TS 38.533
Yes
Yes
agreed No    
R5‑221299 Addition of UL switching test case 6.5.7.2 Ericsson CR Agreement
5.3.8.6TS 38.533
Yes
Yesr1
revised No R5‑221798  
R5‑221300 Cell configuration mapping for UL switching test cases Ericsson CR Agreement
5.3.8.6TS 38.533
Yes
Yes
agreed No    
R5‑221301 Addition of Idle mode CA/DC measurement test case 6.6.9.1 Ericsson CR Agreement
5.3.26.4TS 38.533
Yes
Yes
agreed No    
R5‑221302 Addition of Idle Mode measurements of inter-RAT CA candidate cells for early reporting test case 6.6.15.1 Ericsson CR Agreement
5.3.26.4TS 38.533
Yes
Yes
agreed No    
R5‑221303 Correction of clause 3 Ericsson CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yesr1
revised No R5‑221741  
R5‑221304 Correction of clause 3 Ericsson CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No    
R5‑221305 Addition of Intra frequency conditional handover Test Case 5.1.47 Ericsson CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No    
R5‑221306 Addition of Intra frequency conditional handover Test Case 5.1.48 Ericsson CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No    
R5‑221307 Addition of Inter frequency conditional handover Test Case 5.1.49 Ericsson CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No    
R5‑221308 Addition of Inter frequency conditional handover Test Case 5.1.50 Ericsson CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No    
R5‑221309 Addition of Inter frequency conditional handover Test Case 5.1.51 Ericsson CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No    
R5‑221310 Addition of Inter frequency conditional handover Test Case 5.1.52 Ericsson CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No    
R5‑221311 Addition of cell configuration mapping for conditional handover test cases in Annex E Ericsson CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No    
R5‑221312 Addition conditional handover test cases applicability Ericsson CR Agreement
5.3.9.2TS 36.521-2
Yes
Yesr1
revised No R5‑221800  
R5‑221313 TP analysis for ref sensitivity for DC_2A_n78A Qualcomm Korea CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No    
R5‑221314 Update_TP_analysis for EVM Qualcomm Korea, ROHDE & SCHWARZ CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yesrev 1! r1
revised No R5‑221750  
R5‑221315 Editorial correction for 6.5B.3.3 Spurious emission Qualcomm Korea CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221702  
R5‑221316 Update Rx Requirements for 4 Rel-17 ENDC combos Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.5.2Rx Requirements (Clause 7)
Yes
Yesr2
revised No R5‑221884  
R5‑221317 Update for 6.5B.4.2 Additional Spurious Emissions for Intra-band non-contiguous EN-DC Qualcomm Korea CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221318 Discussion on handling ETC for FR2 UE RF test scenarios Apple Hungary Kft. discussion Discussion
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No    
R5‑221319 Discussion on applicability of FR2 single carrier Tx beam peak for UL MIMO Tx test cases Qualcomm Finland RFFE Oy discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
YesNoted and endorsed P1, P2->Option 1 and P3.
noted No    
R5‑221320 TP analysis for ref sensitivity for 4 Rel-17 ENDC combos Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑221321 Update for reference sensitivity for EN_DC_r15 Qualcomm Korea CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑221322 Update for 6.5C.3.3 Additional spurious emissions for SUL Qualcomm Korea CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221323 Editorial correction to clause 6.5.3.2 and 6.5.3.3 Qualcomm Korea CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221682  
R5‑221324 Test Point analysis for FR2 Tx spur emission UL MIMO tests Qualcomm Finland RFFE Oy CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yesr1 incorporating offline feedback from Ericsson and R&S.
revised No R5‑221751  
R5‑221325 Editorial Update for 6.2B.4.2.3.1 Qualcomm Korea CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221326 Update for 7.3B.2.0 Min Requirements of Ref sensitivity for EN-DC Qualcomm Korea CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yesr1
revised No R5‑221773  
R5‑221327 TP analysis for ref sensitivity for DC_2A_n66A Qualcomm Korea CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No    
R5‑221328 Removing TP analysis editor note for FR2 Tx spur emission UL MIMO test case Qualcomm Finland RFFE Oy CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
No
Yes
withdrawn Yes    
R5‑221329 Update Ref sense for r16 DC combos Qualcomm Korea CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑221330 Introduction of UE capabilities for Rel-17 EN-DC configurations Verizon Switzerland AG, Ericsson, Qualcomm CR Agreement
5.3.20.2TS 38.508-2
Yes
Yes
agreed No    
R5‑221331 Update for 7.3B.2 Qualcomm Korea CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yesr1
revised No R5‑221704  
R5‑221332 ETC for FR2 RF CA Apple Hungary Kft. CR Agreement
5.3.7.4.1Tx Requirements (Clause 6)
Yes
Yesr2
revised No R5‑221792  
R5‑221333 New EVM test case applicability Qualcomm Korea, ROHDE & SCHWARZ CR Agreement
5.4.4TS 38.522
Yes
Yesr2
revised No R5‑221913  
R5‑221334 Removing TP analysis editor note for FR2 Tx spur emission UL MIMO test case Qualcomm Finland RFFE Oy CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
YesDependent 38.905 TP analysis tdoc is R5-221324. R&S comment to TP analysis
agreed No    
R5‑221335 Add_UE capability enhancedUL-TransientPeriod Qualcomm Korea, ROHDE & SCHWARZ CR Agreement
5.4.1TS 38.508-2
Yes
Yesr2
revised No R5‑221911  
R5‑221336 Update for 6.4.2.1a EVM including symbols with transient period Qualcomm Korea, ROHDE & SCHWARZ CR Agreement
5.4.2TS 38.521-1
Yes
Yesr3
revised No R5‑221912  
R5‑221337 Addition of PC2 ENDC 4 combos into 38.521-3 TC7.3B.2 Verizon Switzerland AG, Ericsson CR Agreement
5.3.23.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑221338 Update to Clause 7.6 Blocking Characteristics Apple Hungary Kft. CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑221339 A-MPR updates for n77 Verizon Switzerland AG, Nokia CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yeswas wrong AI.
agreed No    
R5‑221340 Update to Clause 7.5 Adjacent channel selectivity Apple Hungary Kft. CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yesr1
revised No R5‑221691  
R5‑221341 Update to Intra-band non-contiguous CA Apple Hungary Kft. CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑221342 Revised WID on UE Conformance Test Aspects – LTE-NR & NR-NR Dual Connectivity and NR CA enhancements Nokia, Nokia Shanghai Bell WID revised Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
Yes
Yesr1
revised No R5‑222033  
R5‑221343 New MCVideo TC MBMS NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yesr1
revised No R5‑221555  
R5‑221344 Addition of reference sensitivity checklist for CA reference sensitivity test point analysis Ericsson CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yesr1
revised No R5‑221752  
R5‑221345 Modification of test point analysis clause for FR1 NR CA Ericsson, WE Certification Oy, DISH Network, China Unicom CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yesr3
revised No R5‑221753  
R5‑221346 Avoiding Scell Drop in FR2 RF UL-CA tests Apple Portugal discussion Agreement
4.5.1RF group docs for WG review/verdict - original A.I. retained
Yes
Yesr1 Option 2 seems to be the way forward. - An updated draft of the Discussion Paper (Draftv3_R5-221346r2_FR2_PCC-Prio_Discussion.docx ) containing the way forward proposals is uploaded to Drafts folder. Proposal 1 aligns with the general agreement today to proceed with Option2 and Proposal 2 incorporates the proposed LS to RAN4 idea. - A draft LS to RAN4 on FR2 ULCA SCell Drop.docx” is uploaded. r3 Proposals are endorsed.
revised No R5‑221630  
R5‑221347 CR to implement test function approach to avoid Scell Drop in FR2 UL-CA Apple Portugal CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yesr1 will produce a draftCR.
revised No R5‑221658  
R5‑221348 Addition of new test function to limit Pcell power Apple Portugal CR Agreement
5.3.1.3TS 38.509
Yes
YesCR impact tick box for ME shall be set and none of the other tick boxes for UICC apps, RAN or CN shall be set for TS 38.509. TF160 manager: - WIC is Rel-15 5GS_NR_LTE-UEConTest, but your CR is on Rel-16 spec. You also need a Rel-15 CR. - ME shall be ticked. - Clauses affected says “5,6” but you add a new clause 5.8??? - The text in clause 5.8.1 is worded like a discussion document proposal, but here we have a Change Request to a Technical Specification. - There is no UE requirement (no ‘shall’) whatsoever in your CR. It is not specified what the UE shall do (and possibly not do) upon reception of the DL message. - Wrong format of the figure. - What is this f,Pcell on the left of the figure??? - No figure title. - Only a general section 5.8.1, no section 5.8.2??? - New message definitions to be added under clause 6. r2 will produce a draftCR.
revised No R5‑221659  
R5‑221349 Add new messages and procedure for test function to limit Pcell Power Apple Portugal CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yeslate doc (0:49) offline comment by R&S. r1 will produce a draftCR.
revised No R5‑221660  
R5‑221350 MSD test configurations modification for US inter-band CA combinations with n77 Apple Portugal CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yescorrects typo in band configuration nomenclature as pointed out by CMRI. r3
revised No R5‑221763  
R5‑221351 MSD test configurations modification for US inter-band EN-DC combinations with n77 Apple Portugal CR Agreement
5.3.20.5.2Rx Requirements (Clause 7)
Yes
Yesr1 WIC changed from CADC R16 to R17.
revised No R5‑221885  
R5‑221352 FR2 Enhanced Beam Correspondence test updates Apple Portugal CR Agreement
5.3.22.3.1Tx Requirements (Clause 6)
Yes
Yeslate doc (1:16) first agreed, then r1. re-opening is to incorporate a recent comment/discussion with Ericsson to remove references to Spherical Coverage in the added text until the Rel16 BC test case structure is further discussed.
revised No R5‑221889  
R5‑221353 Minimum Conformance Requirements updates to enhanced beam correspondence Apple Portugal CR Agreement
5.3.22.3.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221890  
R5‑221354 Update reference to intra-band non-contiguous UL-CA FR2 RF tests in Annex Apple Portugal CR Agreement
5.3.22.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221355 Editorial correction in intra-band non-contiguous configurations table Apple Portugal CR Agreement
5.3.22.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑221356 Add correct test case structure to Beam Correspondence CA test case Apple Portugal CR Agreement
5.3.22.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221357 Introduce EIS test cases to incorporate Rel.16 inter-band CA Apple Portugal CR Agreement
5.3.22.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No    
R5‑221358 CR on SRS IL for TxD Apple Portugal CR Agreement
5.3.38.3.1Tx Requirements (Clause 6)
Yes
YesAuthor requested to withdraw to wait for RAN5 agreement before introducing the change in RAN5
withdrawn Yes    
R5‑221359 Discussion on Internal Work Plan Structure for FR2 Enhanced Test Methods Apple Portugal discussion Agreement
5.3.40.1Discussion Papers, Work Plan to track adoption of the TR 38.884 outcomes into RAN5 test specifications
Yes
Yesr1 offline feedback received from Keysight Spain, R&S and Ericsson. Keysight: In section 2.2.2.4.2 you have added the following statement: - Specify a grace period where the legacy method and the dual-polarization receiver can be used for conformance testing. After the grace period switch to the dual polarization method. Is it not assuming that the applicability of such enhanced test method will be from Rel-15 onwards? As far as I know such discussion as not taken place yet. r2 feedback received from Keysight and R&S. Keysight Spain: we don’t agree yet with the statement: - RAN5 to discuss the timeline aspects for enabling the dual receiver, while factoring in the applicability guidelines in clause 4 of TR38.884 e.g., by introducing a grace period for using both legacy and new method at the same time to allow TEV to implement and validate the test method. Whether a grace period will be defined or not will depend on the discussions. Our proposal is to keep such statement as: - RAN5 to discuss the timeline aspects for enabling the dual receiver, while factoring in the applicability guidelines in clause 4 of TR38.884 r3 R&S: We are fine the updated proposal P1 & P2 and with the creation of associated action points. Conclusion: Proposals 1,2,3,4,5,6,7 are endorsed.
revised No R5‑221641  
R5‑221360 Draft internal Work Plan for FR2 Enhanced Test Methods Apple Portugal Work Plan Approval
5.3.40.1Discussion Papers, Work Plan to track adoption of the TR 38.884 outcomes into RAN5 test specifications
Yes
Yesr1 offline feedback received from Keysight Spain, R&S and Ericsson. r2 - RAN5 WP uploaded with a minor update to row39 to add a comment to track the Single LInk Polarization method as suggested by Chunying/Huawei. No additional comments/concerns and seems it can be agreed. Associated Work Plan is agreed. Noted.
revised No R5‑221642  
R5‑221361 Editorial update within channel raster section Apple Portugal CR Agreement
5.3.1.4.3Clauses 1-5, Annexes
Yes
Yes
agreed No    
R5‑221362 Update to Rel.16 EN-DC FR2 Band Combination Tables Apple Portugal CR Agreement
5.3.4.5.3Clauses 1-5, Annexes
Yes
Yeslate doc (1:47) merged with R5-220429.
withdrawn Yes    
R5‑221363 38.522 applicability updates for Rel.16 FR2 RF enhancements Apple Portugal CR Agreement
5.3.22.5TS 38.522
Yes
Yesfirst agreed, then withdrawn. . Request to withdraw based on Ericsson suggestion to keep current applicability logic and defer this change to next meeting until updates to test case structure are discussed.
withdrawn Yes    
R5‑221364 Correction of RB allocation in LTE MPR CA test case Apple Portugal CR Agreement
5.5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No    
R5‑221365 Introduction of AMPR modification in n30 Apple Portugal CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
withdrawn Yes    
R5‑221366 Introduce Test case for LTE PSCell addition and release in NE-DC Apple Portugal CR Agreement
5.3.1.9.2NE-DC with all NR cells in FR1 (Clause 4A)
Yes
Yesfeedback from R&S. r1
revised No R5‑221714  
R5‑221367 Addition of NR SA CGI test for inter-RAT E-UTRA cell using autonomous gaps Apple Portugal CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
YesAs pointed out by R&S and Huawei the test has to be introduced as part of future Rel16 RRM enhancements WID.
withdrawn Yes    
R5‑221368 Correction to NR RRC test case 8.1.5.2.2 Keysight Technologies UK CR Agreement
6.3.1.4.4.1.5RRC Others (clause 8.1.5)
Yes
Yes
agreed No    
R5‑221369 Update to PUCCH resource counfiguration for Scell CSI Qualcomm CDMA Technologies CR Agreement
5.3.1.1.3Test environment for RRM (Clause 7)
Yes
Yes
agreed No    
R5‑221370 Update to PDSCH reference measurement channels for RRM test cases with DRX config Qualcomm CDMA Technologies CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
YesQC 3/3: RAN4 draftCR is now endorsed. The RAN5 CR can be agreed
agreed No    
R5‑221371 Adding new HST test cases Ericsson CR Agreement
5.3.16.4TS 38.522
Yes
Yes
agreed No    
R5‑221372 WP - RF requirements for NR frequency range 1 (FR1) Huawei, HiSilicon Work Plan Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221373 SR - RF requirements for NR frequency range 1 (FR1) Huawei, HiSilicon WI status report Information
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
No
No
reserved No    
R5‑221374 RAN5#93-e WG Minutes ETSI Secretariat report Approval
4.5.1RF group docs for WG review/verdict - original A.I. retained
Yes
Yes
approved No   R5‑220003
R5‑221375 Correction to NR TCs 7.1.3.4.3 and TC 7.1.3.4.4 - PDCP DAPS HO Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yesdeferred. r1
revised No R5‑222043  
R5‑221376 Agenda - opening session WG Chairman agenda Information
1Opening of the meeting
Yes
Yessub AIs added: 5.3.29.5 TS 38.508-2 6.3.10.9 TS 37.571-4
revised No R5‑221415 R5‑220000
R5‑221377 Addition of Test frequencies for NE-DC band configurations for signalling testing CMCC CR Agreement
6.3.1.1.4Test environment for SIG (Clause 6)
Yes
Yeslate doc
agreed No    
R5‑221378 MCC TF160 Status Report MCC TF160 report Approval
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
Yes
Yes
approved No   R5‑220450
R5‑221379 New WID on UE Conformance - Enhancement of data collection for SON and MDT in NR SA and MR-DC CMCC WID new Endorsement
7.4.1Final version of Work Item Proposals
Yes
Yesis endorsed.
endorsed No   R5‑220102
R5‑221380 New WID - UE Conformance - Enhancement of Network Slicing Phase 2 CMCC, CATT WID new Endorsement
7.4.1Final version of Work Item Proposals
Yes
Yesis endorsed.
endorsed No   R5‑220164
R5‑221381 New WID on UE Conformance – Support of reduced capability NR devices China Unicom, Hisilicon, Ericsson, Huawei, Qualcomm WID new Approval
7.4.1Final version of Work Item Proposals
Yes
Yesis endorsed.
endorsed No   R5‑220173
R5‑221382 New WID on UE Conformance - LTE/NR Multi-SIM devices China Telecommunications,Vivo,CATT WID new Endorsement
7.4.1Final version of Work Item Proposals
Yes
Yesis endorsed.
endorsed No   R5‑220328
R5‑221383 New WID on UE Conformance - NR coverage enhancements China Telecom WID new Endorsement
7.4.1Final version of Work Item Proposals
Yes
Yesis endorsed.
endorsed No   R5‑220426
R5‑221384 New WID on UE Conformance - NR Multicast and Broadcast Services including CT and SA aspects Huawei, Hisilicon WID new Approval
7.4.1Final version of Work Item Proposals
Yes
Yesis endorsed.
endorsed No   R5‑220622
R5‑221385 New WID on UE Conformance - Introduction of FR2 FWA UE with maximum TRP of 23dBm for band n257 and n258 Huawei, Hisilicon WID new Approval
7.4.1Final version of Work Item Proposals
Yes
Yesis endorsed.
endorsed No   R5‑221137
R5‑221386 Editorial update of section 6.7 in Rel-15 MediaTek Inc. CR Agreement
6.3.1.3TS 38.509
Yes
Yeslate doc
agreed No    
R5‑221387 Corrections to A.9 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yeslate doc r1
revised No R5‑221489  
R5‑221388 Addition of UE co-existence requirements for band n18 NTT DOCOMO INC., KDDI Corporation CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
No
Yesdid not re-instate the withdrawn R5-220350 instead.
withdrawn Yes    
R5‑221389 Correction to SIG test frequencies for intra-band non-contiguous CA Huawei,Hisilicon, Starpoint CR Agreement
6.3.1.1.4Test environment for SIG (Clause 6)
Yes
Yeslate doc
agreed No    
R5‑221390 Update of NR Immediate MDT TC 8.1.6.2.3 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
No
Yeslate doc was wrongly uploaded. replaced by R5-221393.
withdrawn Yes    
R5‑221391 Correction to NR RRC test cases 8.2.1.1.1 and 8.2.1.1.2 Keysight Technologies UK CR Agreement
6.3.1.4.4.2.1RRC UE Capability / Others (clause 8.2.1)
Yes
Yeslate doc
agreed No    
R5‑221392 Correction to the NR5GC testcases 8.1.4.1.9.1, 8.1.4.1.9.2 and 8.1.4.1.9.3 Rohde&Schwarz CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yeslate doc
agreed No    
R5‑221393 Update of NR Immediate MDT TC 8.1.6.2.3 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
YesKeysight UK/TF160: • If step 8b1 onwards of generic procedure 4.9.7 are performed then steps 5A-5C will not be needed as the the UE will already have SRB2 and at least one DRB configured • The 2nd reason for change seems to be wrong - there will be PDU sessions carried over from E-UTRA as this is a HO. • Steps 5-6 of 4.5.4.2-3 aren't needed as these are included in the HO • The specific message contents for this HO hard-codes on DRB1 is included in the HO. This is does not take into account the multiple PDU sessions that may have been created in NR and transferred to E-UTRA. This contradicts the DRB(s) referred to in step 12C. ->more discussion is required for fixing this test case.
withdrawn Yes    
R5‑221394 Correction to NR5GC testcase 8.1.5.9.1 Rohde&Schwarz CR Agreement
6.3.14.4TS 38.523-1
Yes
Yeslate doc r1
revised No R5‑221540  
R5‑221395 Update of MDT TC 8.1.6.3.3.1 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
withdrawn Yes   R5‑221077
R5‑221396 Update of MDT TC 8.1.6.3.4.1 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
withdrawn Yes   R5‑221078
R5‑221397 Discussion on 5G NR CADC configuration handling in RAN5 CMCC, Huawei, Hisilicon, Ericsson, China Unicom, China Telecom, Nokia, CAICT, Bureau Veritas, ZTE discussion Endorsement
7.2.3Other open issues from joint sessions - original A.I. retained
Yes
YesAll proposals are endorsed.
noted No   R5‑220140
R5‑221398 PRD21 v0.1.0 on NR bands and 5G NR CADC configuration handling in RAN5 CMCC other Approval
7.2.3Other open issues from joint sessions - original A.I. retained
Yes
Yes
noted No   R5‑220767
R5‑221399 Summary of the documents for TR 38.918 CMCC discussion Information
4.5.5.2Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑220183
R5‑221400 Update to test case 6.4 Qualcomm Incorporated CR Agreement
6.3.1.10TS 34.229-5
Yes
Yeslate doc r1
revised No R5‑222046  
R5‑221401 Addition of EHC function to the test loop mode A Nokia, Nokia Shanghai Bell CR Agreement
6.3.8.3TS 38.509
Yes
Yeslate doc
agreed No    
R5‑221402 Correction to generic procedure 4.9.7 Huawei,Hisilicon CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
Yes
Yeslate doc needs more careful consideration and can be handled in next meeting.
withdrawn Yes    
R5‑221403 Addition of NR/WLAN Inter-RAT test model MCC TF160 CR Agreement
6.3.16.6TS 38.523-3
Yes
Yes
agreed No   R5‑220458
R5‑221404 Addition of test files to annex A MCC TF160 CR Agreement
6.6.9.7TS 36.579-7
Yes
Yes
agreed No   R5‑220494
R5‑221405 Updates to LTE audit TC 8.5.4.1 MCC TF160 CR Agreement
6.5.3.3.1RRC Part 1 (clauses 8.1 and 8.5)
Yes
Yes
agreed No   R5‑221067
R5‑221406 Correction to NR TC 11.1.2-EPS Fallback with redirection without N26 Huawei,Hisilicon CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yeslate doc
agreed No    
R5‑221407 Editorial update for IMS emergency service applicability Ericsson CR Agreement
6.6.6.2TS 34.229-2
Yes
Yes
withdrawn Yes   R5‑221216
R5‑221408 Update applicability for IMS emergency Ericsson CR Agreement
6.3.1.14TS 36.523-2
Yes
Yes
withdrawn Yes   R5‑220176
R5‑221409 Update applicability for test case G.19.1 Ericsson CR Agreement
6.6.6.2TS 34.229-2
Yes
Yes
withdrawn Yes   R5‑220184
R5‑221410 Editorial update of section 6.6.2 and 6.7 MediaTek Inc. CR Agreement
6.3.1.3TS 38.509
Yes
Yes
agreed No   R5‑220113
R5‑221411 Update to GEA2 Encryption applicability Bureau Veritas CR Agreement
6.6.8.2TS 51.010-2 (Signalling)
Yes
Yesr1
revised No R5‑222025  
R5‑221412 Remove test case 8.1.6.1.3.6 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
withdrawn Yes   R5‑220505
R5‑221413 Update IE SDAP-Config Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
agreed No    
R5‑221414 Critical prose CRs list for protocol test cases at RAN5#94-e TSG WG RAN5 LS out Approval
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
Yesfor email approval
for email approval No    
R5‑221415 Agenda - opening session WG Chairman agenda Information
1Opening of the meeting
Yes
Yessub AI added: 6.6.6.6 TS 34.229-5 late i/c LS R1-2202769 will be handled at the next meeting RAN5#95-e.
approved No   R5‑221376
R5‑221416 LS on V2X PC5 link for unicast communication with null security algorithm TSG WG RAN5 LS out Approval
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
Yes
Yes
revised No R5‑222035  
R5‑221417 Correction to NR TC 11.4.10-N26 not supported - N1 to S1 transfer of an existing emergency PDU session Huawei, Hisilicon CR Agreement
6.3.1.4.8.4Emergency Services
Yes
Novoided test case-> reissued as R5-221418 because of title change.
withdrawn Yes   R5‑220561
R5‑221418 Removal of test case 11.4.10 - N26 not supported - N1 to S1 transfer of an existing emergency PDU session Huawei, Hisilicon CR Agreement
6.3.1.4.8.4Emergency Services
Yes
Yes
agreed No    
R5‑221419 Update chapter 4.5.1 General Ericsson CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
Yes
Yes
agreed No   R5‑220103
R5‑221420 Correction to RRCReconfiguration message with condition REEST ROHDE & SCHWARZ, MediaTek, Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
agreed No   R5‑220652
R5‑221421 Correction to the BWP-DownlinkDedicated MediaTek Inc., Rohde & Schwarz, Anritsu CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
agreed No   R5‑221178
R5‑221422 NE-DC support for UECapabilityEnquiry and UECapabilityInformation messages Ericsson CR Agreement
6.3.1.1.2Default NG-RAN RRC messages and IEs (Clause 4.6)
Yes
Yes
agreed No   R5‑221222
R5‑221423 Correction to IMS MO speech call establishment generic procedure Keysight Technologies UK CR Agreement
6.3.1.1.3Default 5GC NAS messages and IEs (Clause 4.7)
Yes
Yes
agreed No   R5‑220298
R5‑221424 Correction to test procedure 4.9.11 IMS Emergency call or eCall over IMS establishment in 5GC with IMS emergency registration MediaTek Inc. CR Agreement
6.3.1.1.5Other clauses, Annexes
Yes
Yes
agreed No   R5‑220111
R5‑221425 Correction to test procedure 4.9.12 IMS Emergency call or eCall over IMS establishment in 5GC without IMS emergency registration MediaTek Inc., Anritsu CR Agreement
6.3.1.1.5Other clauses, Annexes
Yes
Yes
agreed No   R5‑220112
R5‑221426 Updates to IE Route Selection Descriptors CMCC CR Agreement
6.3.1.1.5Other clauses, Annexes
Yes
Yes
agreed No   R5‑220956
R5‑221427 Introduction of common implementation conformance statements for NE-DC CMCC CR Agreement
6.3.1.2TS 38.508-2
Yes
Yes
agreed No   R5‑220172
R5‑221428 Introduce and update PICS Lenovo, Motorola Mobility, Qualcomm, Rhode & Schwarz CR Agreement
6.3.1.2TS 38.508-2
Yes
Yes
agreed No   R5‑221094
R5‑221429 Addition of test loop mode for NE-DC ROHDE & SCHWARZ CR Agreement
6.3.1.3TS 38.509
Yes
Yes
agreed No   R5‑220265
R5‑221430 Addition of test loop mode for NE-DC ROHDE & SCHWARZ CR Agreement
6.3.1.3TS 38.509
Yes
Yes
agreed No   R5‑220266
R5‑221431 Update of SIB modification steps for Idle TC 6.1.2.9, 6.1.2.18, 6.2.3.1 and 6.2.3.3 MediaTek Inc. CR Agreement
6.3.1.4.2Idle Mode (Clause 6)
Yes
Yes
agreed No   R5‑220187
R5‑221432 Correction to Idle Mode SOR test case 6.3.1.5 Keysight Technologies UK CR Agreement
6.3.1.4.2Idle Mode (Clause 6)
Yes
Yes
agreed No   R5‑220301
R5‑221433 Align the terminology being used for OTA environment (Idle Mode TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.2Idle Mode (Clause 6)
Yes
Yes
agreed No   R5‑220391
R5‑221434 Correction to NR-DC testcase 7.1.1.11.1 ROHDE & SCHWARZ, Keysight, Qualcomm CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yes
agreed No   R5‑220640
R5‑221435 Correction to NR SDAP test case 7.1.4.1 Keysight Technologies UK, MCC TF160 CR Agreement
6.3.1.4.3.1.5SDAP
Yes
Yes
agreed No   R5‑220302
R5‑221436 Align the terminology being used for OTA environment (RRC 8.1.1.x TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
agreed No   R5‑220393
R5‑221437 Correction to NR test case 8.1.1.4.1 ROHDE & SCHWARZ, TDIA, CATT, Spreadtrum CR Agreement
6.3.1.4.4.1.1RRC Connection Management Procedures (clause 8.1.1)
Yes
Yes
agreed No   R5‑220649
R5‑221438 Correction to NR TC 8.1.2.1.1-RRC Reconfiguration Huawei, Hisilicon CR Agreement
6.3.1.4.4.1.2RRC Reconfiguration (clause 8.1.2)
Yes
Yes
agreed No   R5‑220546
R5‑221439 Align the terminology being used for OTA environment (RRC 8.1.3.x TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.1.3RRC Measurement Configuration Control and Reporting (clause 8.1.3)
Yes
Yes
agreed No   R5‑220394
R5‑221440 Correction to NR RRC test case 8.1.4.1.2 Keysight Technologies UK CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yes
agreed No   R5‑220288
R5‑221441 Align the terminology being used for OTA environment (RRC 8.1.4.x TCs) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yes
agreed No   R5‑220395
R5‑221442 Correction to NR SA TC 8.1.4.1.7.x-SCell release Huawei, Hisilicon CR Agreement
6.3.1.4.4.1.4RRC Handover (clause 8.1.4)
Yes
Yes
agreed No   R5‑220547
R5‑221443 Addition of new test case 8.2.3.6.2 for Intra-frequency measurements Event A3 in NE-DC CMCC CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
agreed No   R5‑220106
R5‑221444 Addition of new test case 8.2.3.6.2a for Inter-frequency measurements Event A3 in NE-DC CMCC CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
agreed No   R5‑220107
R5‑221445 Addition of new test case 8.2.3.6.2b for Inter-band measurements Event A3 in NE-DC CMCC CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
agreed No   R5‑220162
R5‑221446 Correction to NR-DC RRC test case 8.2.3.14.2 Keysight Technologies UK, Qualcomm CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
agreed No   R5‑220291
R5‑221447 Align the terminology being used for OTA environment (RRC 8.2.3.x) ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
agreed No   R5‑220396
R5‑221448 Correction to NR-DC RRC test case 8.2.3.11.3 Qualcomm CDMA Technologies CR Agreement
6.3.1.4.4.2.3RRC Measurement / Handovers (clause 8.2.3)
Yes
Yes
agreed No   R5‑220839
R5‑221449 Correction to NR testcases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 ROHDE & SCHWARZ CR Agreement
6.3.1.4.4.2.4RRC Carrier Aggregation (clause 8.2.4)
Yes
Yes
agreed No   R5‑220662
R5‑221450 Clarifications on 5G NR connectivity options for SIG CMCC CR Agreement
6.3.1.4.4.2.5RRC Reconfiguration / Radio Link Failure (clause 8.2.5)
Yes
Yes
agreed No   R5‑220277
R5‑221451 Update of date for 5GC TC 9.1.4.1 MediaTek Inc., Datang Linktester CR Agreement
6.3.1.4.5.2MM Security mode control, Identification & Generic UE configuration update (clauses 9.1.2, 9.1.3 & 9.1.4)
Yes
Yes
agreed No   R5‑220114
R5‑221452 Add test case 11.1.1a Ericsson CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yes
agreed No   R5‑220268
R5‑221453 Correction to NR TC 11.1.5-EPS Fallback from NR Connected without N26 Huawei, Hisilicon, CATT, Datang Linktester CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yes
agreed No   R5‑220553
R5‑221454 Correction to NR TC 11.1.6-EPS Fallback from NR Idle without N26 Huawei, Hisilicon, CATT, Datang Linktester CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yes
agreed No   R5‑220554
R5‑221455 Update to test cases 11.1.1, 11.1.3, 11.1.4, 11.1.8 and 11.1.9 MediaTek Inc. CR Agreement
6.3.1.4.8.1EPS Fallback
Yes
Yes
agreed No   R5‑221195
R5‑221456 Correction to UAC test case 11.3.2 Keysight Technologies UK CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yes
agreed No   R5‑220295
R5‑221457 Correction to UAC test case 11.3.6 Keysight Technologies UK, Qualcomm CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yes
agreed No   R5‑220296
R5‑221458 Correction to TC 11.3.8 UAC / Access Identity 0 / NR RRC_IDLE / Cell re-selection while T390 is running CATT CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yes
withdrawn Yes   R5‑220325
R5‑221459 Correction to NR TC 11.3.1-UAC for MO Speech Call and SMSoIP Huawei, Hisilicon, CATT, Datang Linktester, MediaTek Inc. CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yes
agreed No   R5‑220555
R5‑221460 Addition of new 5GS IMS test case 11.4.12 NTT DOCOMO, INC. CR Agreement
6.3.1.4.8.4Emergency Services
Yes
Yes
agreed No   R5‑220403
R5‑221461 Update to test case 11.6.1 Ericsson CR Agreement
6.3.1.4.8.53GPP PS Data Off
Yes
Yes
agreed No   R5‑221223
R5‑221462 Update of 5G-NR test cases applicability Qualcomm Incorporated CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No   R5‑220243
R5‑221463 Addition of applicability for emergency call eatablishment over EPS with disabling N1 mode NTT DOCOMO, INC. CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No   R5‑220404
R5‑221464 Correction the condition of 38.523-1 TC11.3.2 and TC11.3.8 and Test case Selection Expression of C61 SGS Wireless CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No   R5‑220668
R5‑221465 Correct of conditions for Uplink Data Transfer and Unified Access Control Sporton, Keysight, CATT, TDIA, SGS Wireless CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No   R5‑220949
R5‑221466 Updates to emergency applicabilities and conditions Ericsson CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No   R5‑221242
R5‑221467 5G Rel-15: Test Models updates MCC TF160 CR Agreement
6.3.1.6TS 38.523-3
Yes
Yes
agreed No   R5‑220455
R5‑221468 Add applicabilities for EVS B0 and A1 Ericsson CR Agreement
6.3.1.8TS 34.229-2
Yes
Yes
agreed No   R5‑220194
R5‑221469 Update for IMS emergency service applicability Ericsson CR Agreement
6.3.1.8TS 34.229-2
Yes
Yes
agreed No   R5‑221217
R5‑221470 Update test case 7.4a Ericsson CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220155
R5‑221471 Corrections to usage or non-usage of mode-set ROHDE & SCHWARZ, Apple Inc CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220215
R5‑221472 Corrections to TC 10.2 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220217
R5‑221473 Addition of IMS5GS test case 10.7 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220218
R5‑221474 Addition of IMS5GS TC 10.8 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220219
R5‑221475 Corrections to TC 7.24b ROHDE & SCHWARZ, Huawei CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220222
R5‑221476 Corrections to TC 8.38 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220228
R5‑221477 Corrections to TC 7.6 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220232
R5‑221478 Corrections to TC 8.8 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220236
R5‑221479 Corrections to TC 8.36 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220237
R5‑221480 Voiding unused test case numbers ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220239
R5‑221481 Corrections to TC 7.20 ROHDE & SCHWARZ, Huawei CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220245
R5‑221482 Corrections to TC 7.21 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220246
R5‑221483 Correction of 5GS IMS test case 10.9 NTT DOCOMO, INC. CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220402
R5‑221484 Correction to NR IMS TC 7.21-MTSI MT Voice Call to add video and remove video without preconditions Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220563
R5‑221485 Correction to NR IMS TC 7.23-MTSI MT Voice Call to add video and remove video without preconditions Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220564
R5‑221486 Correction to NR IMS TC 8.40-User initiated USSI Huawei, Hisilicon CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220566
R5‑221487 Corrections to TC 10.3 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑221037
R5‑221488 Update of XCAP test case Preambles Ericsson CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑221219
R5‑221489 Corrections to A.9 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑221387
R5‑221490 Addtion of LTE TC 8.2.4.31.4-Conditional handover Huawei, Hisilicon CR Agreement
6.3.7.2TS 36.523-1
Yes
Yes
agreed No   R5‑220610
R5‑221491 Update of NR CA configurations for Protocol testing with NR CA 3CC CMCC, WE Certification, DISH Network, Ericsson CR Agreement
6.3.8.1TS 38.508-1
Yes
Yes
agreed No   R5‑220048
R5‑221492 Update of inter-band cell environment for Protocol testing with NR CA 3CC CMCC CR Agreement
6.3.8.1TS 38.508-1
Yes
Yes
agreed No   R5‑220049
R5‑221493 Modification of common test environment for EHC testing Nokia, Nokia Shanghai Bell CR Agreement
6.3.8.1TS 38.508-1
Yes
Yes
agreed No   R5‑221273
R5‑221494 Update of TC 7.1.3.5.6 for PDCP Duplication 3 RLC entities in NR IIoT CMCC, MCC TF160 CR Agreement
6.3.8.4TS 38.523-1
Yes
Yes
agreed No   R5‑221080
R5‑221495 Modification of testcase 7.1.3.5.7 Ethernet header compression and decompression / Correct functionality of ethernet header compression and decompression Nokia, Nokia Shanghai Bell CR Agreement
6.3.8.4TS 38.523-1
Yes
Yes
agreed No   R5‑221258
R5‑221496 Addition of Rel-16 NR Mobility Enhancement test case for Conditional PSCell change / PCell change / PSCell change / EN-DC CATT, TDIA CR Agreement
6.3.9.3TS 38.523-1
Yes
Yes
agreed No   R5‑220056
R5‑221497 Correction to NR TC 8.1.4.3.4-RRC DAPS HO Success Inter-frequency Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yes
agreed No   R5‑220604
R5‑221498 Correction to NR TC 8.2.3.18.1-Conditional PSCell change Success Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yes
agreed No   R5‑220606
R5‑221499 Correction to generic test procedures for NR SL MIMO tests Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220568
R5‑221500 Addition of test procedures for releasing unicast link Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220570
R5‑221501 Addition of test procedures for data exchanging on unicast link Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220571
R5‑221502 Correction to PC5 RRC message MasterInformationBlockSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220572
R5‑221503 Correction to PC5 RRC message MeasurementReportSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220573
R5‑221504 Correction to PC5 RRC message RRCReconfigurationSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220574
R5‑221505 Correction to PC5 RRC message RRCReconfigurationCompleteSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220575
R5‑221506 Correction to PC5 RRC message RRCReconfigurationFailureSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220576
R5‑221507 Correction to PC5 RRC message UECapabilityEnquirySidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220577
R5‑221508 Correction to PC5 RRC message UECapabilityInformationSidelink Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220578
R5‑221509 Correction to V2X message DIRECT LINK ESTABLISHMENT REQUEST Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220583
R5‑221510 Correction to V2X message DIRECT LINK ESTABLISHMENT ACCEPT Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220584
R5‑221511 Correction to V2X message DIRECT LINK RELEASE REQUEST Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220585
R5‑221512 Correction to V2X message DIRECT LINK RELEASE ACCEPT Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220586
R5‑221513 Correction to V2X message DIRECT LINK KEEPALIVE REQUEST Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220587
R5‑221514 Correction to V2X message DIRECT LINK SECURITY MODE COMMAND Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220588
R5‑221515 Correction to V2X message DIRECT LINK SECURITY MODE COMPLETE Huawei, Hisilicon CR Agreement
6.3.10.1TS 38.508-1
Yes
Yes
agreed No   R5‑220589
R5‑221516 Correction to test loop procedures for SL test Huawei, Hisilicon CR Agreement
6.3.10.3TS 38.509
Yes
Yes
agreed No   R5‑220592
R5‑221517 Correction to test protocol messages for SL test Huawei, Hisilicon CR Agreement
6.3.10.3TS 38.509
Yes
Yes
agreed No   R5‑220593
R5‑221518 Addition of new CVX TC 12.2.1.6- Inter-carrier concurrent operation / Sidelink communication / RRC_CONNECTED / Reception TDIA, CATT CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑220101
R5‑221519 Addition of sub-clause titles for NR V2X TCs TDIA, CATT CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑220158
R5‑221520 Addition of V2X TC 13.2.1-Conflict Layer 2 ID Huawei, Hisilicon CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑220594
R5‑221521 Addition of V2X TC 13.2.2-Security Mode Huawei, Hisilicon CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑220595
R5‑221522 Addition of V2X TC 13.2.6-Link keep alive Huawei, Hisilicon CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑220596
R5‑221523 Correction to NR V2X TC 13.1.1-policy provisioning Huawei, Hisilicon CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑220650
R5‑221524 Addition of new NR V2X PC5 RRC reconfiguration failure / Initiating UE side Lenovo, Motorola Mobility CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑221097
R5‑221525 Addition of new NR V2X PC5 RRC reconfiguration failure / Peer UE side test case Lenovo, Motorola Mobility CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑221098
R5‑221526 Addition of new NR V2X Sidelink radio link failure / Transmission side test case Lenovo, Motorola Mobility CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑221099
R5‑221527 Addition of NR V2X TC applicability Huawei, Hisilicon CR Agreement
6.3.10.5TS 38.523-2
Yes
Yes
agreed No   R5‑220597
R5‑221528 Addition of applicability for new V2X test cases Lenovo, Motorola Mobility CR Agreement
6.3.10.5TS 38.523-2
Yes
Yes
agreed No   R5‑221100
R5‑221529 5G V2X: Test Model updates MCC TF160 CR Agreement
6.3.10.6TS 38.523-3
Yes
Yes
agreed No   R5‑220456
R5‑221530 Correction to TC 7.1.1.12.3 DRX adaptation / UE wakeup indication CATT CR Agreement
6.3.12.4TS 38.523-1
Yes
Yes
agreed No   R5‑220525
R5‑221531 Update of NR5G NPN TC 6.5.2.1 MediaTek Inc. CR Agreement
6.3.13.3TS 38.523-1
Yes
Yes
agreed No   R5‑220530
R5‑221532 Correction to NR5GC testcase 6.5.1.3 ROHDE & SCHWARZ, Qualcomm CR Agreement
6.3.13.3TS 38.523-1
Yes
Yes
agreed No   R5‑220681
R5‑221533 Correction to NR5GC testcase 6.5.1.1 ROHDE & SCHWARZ, Qualcomm CR Agreement
6.3.13.3TS 38.523-1
Yes
Yes
agreed No   R5‑220683
R5‑221534 Addition of new SNPN test case for EAP based primary authentication and key agreement Lenovo, Motorola Mobility CR Agreement
6.3.13.3TS 38.523-1
Yes
Yes
agreed No   R5‑221095
R5‑221535 Addition of applicability for new SNPN test cases Lenovo, Motorola Mobility CR Agreement
6.3.13.4TS 38.523-2
Yes
Yes
agreed No   R5‑221096
R5‑221536 Addition of Rel-16 RACS TC 9.1.9.6 ANRITSU LTD CR Agreement
6.3.14.4TS 38.523-1
Yes
Yes
agreed No   R5‑220373
R5‑221537 Addition of Rel-16 RACS TC 9.1.9.3 ANRITSU LTD CR Agreement
6.3.14.4TS 38.523-1
Yes
Yes
agreed No   R5‑220376
R5‑221538 Correction to RACS test case 9.1.9.5 Keysight Technologies UK, Anritsu CR Agreement
6.3.14.4TS 38.523-1
Yes
Yes
agreed No   R5‑220769
R5‑221539 Addition of new RACS test case 9.1.9.4 Qualcomm Incorporated CR Agreement
6.3.14.4TS 38.523-1
Yes
Yes
agreed No   R5‑221103
R5‑221540 Correction to NR5GC testcase 8.1.5.9.1 Rohde&Schwarz CR Agreement
6.3.14.4TS 38.523-1
Yes
Yes
agreed No   R5‑221394
R5‑221541 Applicability updates for NR RACS test cases Qualcomm Incorporated, Keysight, Anritsu CR Agreement
6.3.14.5TS 38.523-2
Yes
Yes
agreed No   R5‑221102
R5‑221542 Addition of predefined UE capability message container for test function Set UL Message Qualcomm Incorporated CR Agreement
6.3.14.8TS 36.509
Yes
Yes
agreed No   R5‑221085
R5‑221543 Addition of new RACS test case 9.2.5.2 Qualcomm Incorporated CR Agreement
6.3.14.9TS 36.523-1
Yes
Yes
agreed No   R5‑221079
R5‑221544 Update of network requested CA band combination test cases 8.5.4.2 and 8.5.4.3 Qualcomm Incorporated CR Agreement
6.3.14.9TS 36.523-1
Yes
Yes
agreed No   R5‑221086
R5‑221545 Additional Rel-15 parameters for MCVideo User Profile 5.5.8.7 NIST CR Agreement
6.3.15.1TS 36.579-1
Yes
Yes
agreed No   R5‑220401
R5‑221546 New MCVideo TC 6.4.1 Video Pull NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220303
R5‑221547 New MCVideo TC 6.5.1 Video Push NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220304
R5‑221548 New MCVideo TC 6.3.1 Emergency Alert CO NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220305
R5‑221549 New MCVideo TC 6.7.1 Remote Initiated Ambient Viewing CO NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220400
R5‑221550 New MCVideo TC 6.7.2 Remote Initiated Ambient Viewing CT NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220511
R5‑221551 New MCVideo TC Selected Group Change of Targeted User CO NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220512
R5‑221552 New MCVideo TC Selected Group Change of Targeted User CT NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220854
R5‑221553 New MCVideo TC Conference Event Package NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220855
R5‑221554 New MCVideo TC 6.3.2 Emergency Alert CT NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑220857
R5‑221555 New MCVideo TC MBMS NIST CR Agreement
6.3.15.6TS 36.579-6
Yes
Yes
agreed No   R5‑221343
R5‑221556 Update of cell power level for FR2 in NR Immediate MDT TC 8.1.6.2.2 CMCC CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220051
R5‑221557 Update of MDT TC 8.1.6.1.2.1 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220116
R5‑221558 Update of MDT TC 8.1.6.1.2.2 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220117
R5‑221559 Update of MDT TC 8.1.6.1.2.3 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220118
R5‑221560 Update of MDT TC 8.1.6.1.2.4 MediaTek Inc., Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220119
R5‑221561 Update of MDT TC 8.1.6.1.2.5 MediaTek Inc., Rohde & Schwarz, Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220120
R5‑221562 Update of MDT TC 8.1.6.1.2.6 MediaTek Inc., Rohde & Schwarz, Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220121
R5‑221563 Update of MDT TC 8.1.6.1.2.7 MediaTek Inc., ZTE Corporation, Anritsu Ltd, Keysight CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220122
R5‑221564 Update of MDT TC 8.1.6.1.2.8 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220123
R5‑221565 Update of MDT TC 8.1.6.1.2.9 MediaTek Inc., Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220124
R5‑221566 Update of MDT TC 8.1.6.1.2.10 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220125
R5‑221567 Update of MDT TC 8.1.6.1.2.11 MediaTek Inc., Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220126
R5‑221568 Update of MDT TC 8.1.6.1.2.12 MediaTek Inc., Anritsu, Rohde & Schwarz CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220127
R5‑221569 Update of MDT TC 8.1.6.1.2.13 MediaTek Inc., Rohde & Schwarz, Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220128
R5‑221570 Update of MDT TC 8.1.6.1.4.7 MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220191
R5‑221571 Update of MDT test case 8.1.6.1.2.12 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220335
R5‑221572 Update of MDT test case 8.1.6.1.2.13 ZTE Corporation CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220336
R5‑221573 Correction to SON-MDT test case 8.1.6.1.4.2 Anritsu Ltd, Qualcomm, Keysight CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220506
R5‑221574 Update to test case 8.1.6.1.3.7 MediaTek Inc., Rohde & Schwarz, Qualcomm, Keysight Technologies UK, Anritsu CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220507
R5‑221575 Correction to NR MDT TC 8.1.6.3.1.3-Inter System_Immediate MDT_Sensor Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220615
R5‑221576 Correction to NR MDT TC 8.1.6.3.2.3-Inter System_Logged_Sensor Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220617
R5‑221577 Correction to NR MDT TC 8.1.6.3.3.3-Inter System_RLF_Sensor Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220618
R5‑221578 Correction to NR MDT TC 8.1.6.3.4.3-Inter System_Connection Establishment Failure_Sensor Huawei, Hisilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220619
R5‑221579 Correction to MDT test case 8.1.6.1.3.3 MediaTek Inc., Rohde & Schwarz CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220669
R5‑221580 Correction to NR MDT test case 8.1.6.1.3.4 Qualcomm CDMA Technologies, Anritsu Ltd CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑220843
R5‑221581 Updates to Inter-System MDT test cases 8.1.6.3.2.x MCC TF160, MediaTek Inc., Huawei, HiSilicon CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑221042
R5‑221582 Updates to Inter-System MDT test cases 8.1.6.3.3.x MCC TF160, MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑221043
R5‑221583 Updates to Inter-System MDT test cases 8.1.6.3.4.x MCC TF160, MediaTek Inc. CR Agreement
6.3.16.4TS 38.523-1
Yes
Yes
agreed No   R5‑221044
R5‑221584 Addition of default DCI_1_2 for URLLC Huawei, HiSilicon CR Agreement
6.3.17.1TS 38.508-1
Yes
Yes
agreed No   R5‑220809
R5‑221585 Addition of new PICS for URLLC Lenovo, Motorola Mobility CR Agreement
6.3.17.2TS 38.508-2
Yes
Yes
agreed No   R5‑221091
R5‑221586 Correction to NR URLLC MAC Test Case 7.1.1.4.1.5 Lenovo, Motorola Mobility, Huawei, HiSilicon, MCC TF160 CR Agreement
6.3.17.3TS 38.523-1
Yes
Yes
agreed No   R5‑221087
R5‑221587 Addition of new NR URLLC MAC Test Case for DL Grant Prioritisation Lenovo, Motorola Mobility CR Agreement
6.3.17.3TS 38.523-1
Yes
Yes
agreed No   R5‑221088
R5‑221588 Addition of new NR URLLC MAC Test Case for UL Data prioritisation Lenovo, Motorola Mobility CR Agreement
6.3.17.3TS 38.523-1
Yes
Yes
agreed No   R5‑221089
R5‑221589 Correction to NR URLLC MAC Test Case 7.1.1.4.2.6 Lenovo, Motorola Mobility CR Agreement
6.3.17.3TS 38.523-1
Yes
Yes
agreed No   R5‑221174
R5‑221590 Addition of new NR URLLC MAC Test Case applicabilities Lenovo, Motorola Mobility CR Agreement
6.3.17.4TS 38.523-2
Yes
Yes
agreed No   R5‑221090
R5‑221591 Addition of positioning system information blocks associated parameters CATT CR Agreement
6.3.20.1TS 38.508-1
Yes
Yes
agreed No   R5‑220524
R5‑221592 Addition of TC 9.4.1 PosSIB broadcasting followed by location information transfer CATT CR Agreement
6.3.20.4TS 37.571-2
Yes
Yes
agreed No   R5‑220522
R5‑221593 Correction of the assistance data elements for NR positioning support CATT CR Agreement
6.3.20.4TS 37.571-2
Yes
Yes
agreed No   R5‑220523
R5‑221594 Addition of test applicabilities for PosSIB broadcasting test case CATT CR Agreement
6.3.20.5TS 37.571-3
Yes
Yes
agreed No   R5‑220521
R5‑221595 Addition of new NR EIEI test case 11.5.5 Qualcomm Incorporated CR Agreement
6.3.22.3TS 38.523-1
Yes
Yes
agreed No   R5‑221068
R5‑221596 Addition of new PIXIT parameter for NR EIEI Qualcomm Incorporated CR Agreement
6.3.22.5TS 38.523-3
Yes
Yes
agreed No   R5‑221038
R5‑221597 Addition of new IMS over 5GS TC 11.5 eCall over IMS / Automatic initiation / MSD transfer and 200 OK with ACK / SIP INFO request for MSD Update / Success / 5GS Qualcomm Incorporated CR Agreement
6.3.22.9TS 34.229-5
Yes
Yes
agreed No   R5‑220985
R5‑221598 Addition of new IMS over 5GS TC 11.6 eCall over IMS / Automatic initiation / MSD transfer and 200 OK with ACK / SIP INFO request for unsupported MSD / UE indicates unsuccessful in SIP INFO / 5GS Qualcomm Incorporated CR Agreement
6.3.22.9TS 34.229-5
Yes
Yes
agreed No   R5‑221003
R5‑221599 Addition of new IMS over 5GS TC 11.7 eCall only mode / Manual initiation / Emergency registration / Abnormal case / IM CN sends a 486 (Busy Here) / UE performs eCall in CS domain / UTRAN or GERAN / 5GS Qualcomm Incorporated CR Agreement
6.3.22.9TS 34.229-5
Yes
Yes
withdrawn Yes   R5‑221007
R5‑221600 Update of R17 NR inter-band CA configurations within FR1 China Telecommunications CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
No
Yes
withdrawn Yes   R5‑220197
R5‑221601 Correction to test frequencies for intra-band contiguous CA Huawei,Hisilicon CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yeslate doc r1
revised No R5‑221742  
R5‑221602 Correction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_8A_n3A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yeslate doc
agreed No    
R5‑221603 Correction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_20A_n3A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yeslate doc
agreed No    
R5‑221604 LS on lower humidity limit in normal temperature test environment TSG WG RAN5 LS out Approval
5.7Outgoing liaison statements for provisional approval
Yes
Yes(sent)
approved No    
R5‑221605 Discussion on LTE_NR_B41_Bn41_PC29dBm-UEConTest Work plan review to include dependencies with NR_RF_TxD-UEConTest work plan Keysight technologies UK Ltd discussion Endorsement
5.3.29.4Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑221278
R5‑221606 Discussion on NR_UE_PC1_5_n79-UEConTest Work plan review to include dependencies with NR_RF_TxD-UEConTest work plan Keysight technologies UK Ltd discussion Endorsement
5.3.31.4Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑221280
R5‑221607 Discussion on HPUE_PC1_5_n77_n78-UEConTest Work plan review to include dependencies with NR_RF_TxD-UEConTest work plan Keysight technologies UK Ltd discussion Endorsement
5.3.34.4Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑221279
R5‑221608 Discussion on Transparent Tx diversity work plan Keysight technologies UK Ltd discussion Endorsement
5.3.38.6Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑221281
R5‑221609 Introduction of CA_n5A-n7A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yes
withdrawn Yes   R5‑220360
R5‑221610 Discussion on the dynamic range issue for FR2 ON OFF time mask Anritsu discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑220884
R5‑221611 38.521-2 Beam correspondence Measurement Uncertainties and test tolerances Keysight technologies UK Ltd CR Agreement
5.3.1.5.3Clauses 1-5, Annexes
Yes
Yes
revised No R5‑221657 R5‑221276
R5‑221612 On FR2 ON/OFF Time Mask ROHDE & SCHWARZ discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑221270
R5‑221613 LS on Additional RF requirements for NS_03U, NS_05U and NS_43U TSG WG RAN5 LS out Approval
5.7Outgoing liaison statements for provisional approval
Yes
Yes(sent)
approved No    
R5‑221614 Discussion on acceptable clipping and testable SNR for FR2 demod Ericsson discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑221249
R5‑221615 Correction to test frequencies for performance test cases Anritsu CR Agreement
5.3.1.7.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
withdrawn Yes   R5‑220917
R5‑221616 Addition of test case, 6.5D.2_1.4.1, NR ACLR for UL MIMO (Rel-16 onward) Ericsson CR Agreement
5.3.12.3.1Tx Requirements (Clause 6)
Yes
Yes
withdrawn Yes   R5‑220642
R5‑221617 LS on SCell Dropping in FR2 RF UL-CA tests TSG WG RAN5 LS out Approval
5.7Outgoing liaison statements for provisional approval
Yes
Yesdeferred. email approved on last day Fri. (sent)
approved No    
R5‑221618 Implement test function approach to avoid Scell Drop in FR2 UL-CA Apple Portugal draftCR Endorsement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yesr1
revised No R5‑221922  
R5‑221619 Addition of new test function to limit Pcell power Apple Portugal draftCR Endorsement
5.3.1.3TS 38.509
Yes
Yesr2
revised No R5‑221921  
R5‑221620 Add new messages and procedure for test function to limit Pcell Power Apple Portugal draftCR Endorsement
5.3.1.1.4Other clauses, Annexes
Yes
Yesr2
revised No R5‑221920  
R5‑221621 Introduction of reference sensitivity test point analysis for CA_n5A-n78A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
withdrawn Yes   R5‑220358
R5‑221622 Correction of Default Configuration Parameters for Test 1 in Test Case 7.1.11 STMicroelectronics CR Agreement
5.5.1.5TS 36.521-3
Yes
Yes
withdrawn Yes   R5‑220372
R5‑221623 TP to TR 38.834 for Annex B MU tables MVG Industries, Rohde & Schwarz discussion Endorsement
5.3.39.1Measurement Uncertainty (MU) assessment proposals for TR 38.834, Discussion Papers, Work Plan
Yes
YesRF AP#93e.21 closed R&S: final uploaded as well as the corresponding contribution to RAN4#102-e in R4-2205826.zip"
noted No   R5‑220832
R5‑221624 TP to TR 38.834 on MU General section and descriptions ROHDE & SCHWARZ, MVG Industries discussion Endorsement
5.3.39.1Measurement Uncertainty (MU) assessment proposals for TR 38.834, Discussion Papers, Work Plan
Yes
YesRF AP#93e.21 closed R&S: final uploaded as well as the corresponding contribution to RAN4#102-e in R4-2205826.zip"
noted No   R5‑221175
R5‑221625 Discussion on MU and TT proposal for FR2 EVM Keysight Technologies UK Ltd discussion Discussion
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑220353
R5‑221626 MU and TT proposal for FR2 EVM Anritsu discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑220883
R5‑221627 Introduction of DL MU for FR2 absolute power tolerance Anritsu discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑220887
R5‑221628 Discussion on fading crest factor Qualcomm CDMA Technologies discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑221164
R5‑221629 38.903 Beam correspondence Measurement Uncertainties Keysight technologies UK Ltd CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No   R5‑221277
R5‑221630 Avoiding Scell Drop in FR2 RF UL-CA tests Apple Portugal discussion Agreement
4.5.1RF group docs for WG review/verdict - original A.I. retained
Yes
Yes
noted No   R5‑221346
R5‑221631 Update of spurious emission TP analysis for DC_3A_n41A Anritsu CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yeslate doc
agreed No    
R5‑221632 Update of spurious emission TP analysis for DC_8A_n41A Anritsu CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yeslate doc
agreed No    
R5‑221633 Update of spurious emission TP analysis for DC_25A_n41A Anritsu CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yeslate doc
agreed No    
R5‑221634 Update of spurious emission TP analysis for DC_26A_n41A Anritsu CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yeslate doc
agreed No    
R5‑221635 Update of spurious emission TP analysis for DC_39A_n41A Anritsu CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yeslate doc
agreed No    
R5‑221636 Update of spurious emission TP analysis for DC_40A_n41A Anritsu CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yeslate doc
agreed No    
R5‑221637 Correction to FR2 NR SA RRM TC 7.6.1.2 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220710
R5‑221638 Correction to FR2 NR SA RRM TC 7.6.1.4 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220712
R5‑221639 Discussion on statistical testing Huawei, HiSilicon discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
YesNoted and proposals endorsed and implemented in R5-220781r2
noted No   R5‑220780
R5‑221640 On NF Methodologies for Low UL/High DL Power Test Cases Keysight Technologies UK Ltd discussion Approval
5.3.40.1Discussion Papers, Work Plan to track adoption of the TR 38.884 outcomes into RAN5 test specifications
Yes
Yes
noted No   R5‑221260
R5‑221641 Discussion on Internal Work Plan Structure for FR2 Enhanced Test Methods Apple Portugal discussion Agreement
5.3.40.1Discussion Papers, Work Plan to track adoption of the TR 38.884 outcomes into RAN5 test specifications
Yes
YesNoted and Proposal 1 to 7 endorsed
noted No   R5‑221359
R5‑221642 Draft internal Work Plan for FR2 Enhanced Test Methods Apple Portugal Work Plan Approval
5.3.40.1Discussion Papers, Work Plan to track adoption of the TR 38.884 outcomes into RAN5 test specifications
Yes
Yes
noted No   R5‑221360
R5‑221643 Discussion on Beam Peak Search procedure in case of intra-band DL CA Keysight Technologies UK Ltd discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
YesNoted and Proposal1&2 are implemented in CR R5-220258.
noted No   R5‑221253
R5‑221644 Test Tolerance analysis for inter-frequency RRC re-establishment test case Ericsson CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No   R5‑221288
R5‑221645 Correction to Mob_enh RRM TC 7.3.1.4 with TT Huawei,Hisilicon CR Agreement
5.3.10.4TS 38.533
Yes
Yes
agreed No   R5‑220719
R5‑221646 Correction to Mob_enh RRM TC 7.3.1.5 with TT Huawei,Hisilicon CR Agreement
5.3.10.4TS 38.533
Yes
Yes
agreed No   R5‑220720
R5‑221647 TT analysis for Mob_enh RRM TC 6.3.1.9+6.3.1.10 China Telecommunications,huawei CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220151
R5‑221648 TT analysis for Mob_enh RRM TC 6.3.1.11+6.3.1.12 China Telecommunications,Huawei CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220154
R5‑221649 TT analysis for Mob_enh RRM TCs 7.3.1.4 and 7.3.1.5 Huawei,Hisilicon CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220723
R5‑221650 Completion 4.5.5.5 including TT anaysis results Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220945
R5‑221651 Completion 4.5.5.6 including TT anaysis results Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220946
R5‑221652 Addition of cell configuration MU and TT for Enhancement on MIMO Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220947
R5‑221653 Update of 4.6.7.2 EN-DC FR1 SSB based CMR and dedicated IMR L1-SINR measurement in DRX Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220987
R5‑221654 Update of 6.6.8.2 NR SA FR1 SSB based CMR and dedicated IMR L1-SINR measurement in non-DRX Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220990
R5‑221655 Correction to NR SA FR1 cell re-selection for UE configured with highSpeedMeasFlag-r16 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No   R5‑220879
R5‑221656 Add Test Tolerance analyses for NR SA FR1 cell re-selection for UE configured with highSpeedMeasFlag-r16 Test cases Anritsu CR Agreement
5.3.16.7TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220880
R5‑221657 38.521-2 Beam correspondence Measurement Uncertainties and test tolerances Keysight technologies UK Ltd CR Agreement
5.3.1.5.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑221611
R5‑221658 CR to implement test function approach to avoid Scell Drop in FR2 UL-CA Apple Portugal CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
withdrawn Yes   R5‑221347
R5‑221659 Addition of new test function to limit Pcell power Apple Portugal CR Agreement
5.3.1.3TS 38.509
Yes
Yes
withdrawn Yes   R5‑221348
R5‑221660 Add new messages and procedure for test function to limit Pcell Power Apple Portugal CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yes
withdrawn Yes   R5‑221349
R5‑221661 Discussion of Additional Information for 6.2.2 and 6.2.3 of 38.521-1 and 6.2B.2.3 and 6.2B.3.3 of 38.521-3 CAICT discussion Endorsement
5.3.1.17Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑220061
R5‑221662 Discussion on minimum test time for HST Demod scenarios Qualcomm CDMA Technologies discussion Endorsement
5.3.16.8Discussion Papers, Work Plan, TC lists
Yes
Yes
noted No   R5‑221168
R5‑221663 Discussion on minimum test time for 1% residual BLER Huawei, HiSilicon discussion Discussion
5.3.18.6Discussion Papers, Work Plan, TC lists
Yes
Yes
agreed No   R5‑220811
R5‑221664 Discussion on PC2 and PC1.5 CA_n41C with single UL carrier handling in RAN5 CMCC, Huawei, Hisilicon discussion Endorsement
5.3.28.6Discussion Papers, Work Plan, TC lists
Yes
YesNoted and Proposal 1 is implemented in R5-220203r1, prop2/3 are working assumptions to be considered by contributors."
noted No   R5‑220269
R5‑221665 Discussion on Alignment of test points for MPR and ACLR in TS 38.521-1 CAICT discussion Endorsement
5.3.31.4Discussion Papers, Work Plan, TC lists
Yes
YesNoted and proposal implemented in R5-220405r3, R5-220784r1 and R5-221126r1.
noted No   R5‑220059
R5‑221666 Discussion on handling TxD test cases Huawei, HiSilicon discussion Discussion
5.3.38.6Discussion Papers, Work Plan, TC lists
Yes
YesNoted and prop1 endorsed; prop2/3 working assumptions to be considered by contributors.
noted No   R5‑221039
R5‑221667 Correction to test frequency range for n14 Anritsu CR Agreement
5.3.1.1.1Test frequencies (Clause 4.3.1)
Yes
Yes
agreed No   R5‑220903
R5‑221668 Correction of 4.3.1.2.4.4.2 for test frequencies for CA_n260_A-I ZTE Corporation CR Agreement
5.3.1.1.1Test frequencies (Clause 4.3.1)
Yes
Yes
agreed No   R5‑221050
R5‑221669 Correction to default RRC IEs for RRM Huawei,Hisilicon CR Agreement
5.3.1.1.3Test environment for RRM (Clause 7)
Yes
Yes
agreed No   R5‑220687
R5‑221670 Updated the related RRC information for DSS CMCC CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yes
agreed No   R5‑220039
R5‑221671 Added FR2 connection diagram using modulated interferer Keysight Technologies UK Ltd CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yes
agreed No   R5‑220247
R5‑221672 Correction of 4.1.1 on removal of lower humidity limit in NR test environment Samsung R&D Institute UK, ZTE Corporation CR Agreement
5.3.1.1.4Other clauses, Annexes
Yes
Yes
agreed No   R5‑220778
R5‑221673 Addition of PICS for frequencyShift7p5khz CMCC, Huawei, Hisilicon CR Agreement
5.3.1.2TS 38.508-2
Yes
Yes
agreed No   R5‑220042
R5‑221674 Update of A.4.3.9 for Additional capabilities for UE declared capability ZTE Corporation CR Agreement
5.3.1.2TS 38.508-2
Yes
Yes
agreed No   R5‑221064
R5‑221675 Correction of test applicability of A-MPR CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220064
R5‑221676 Alignment of test points of ACLR with MPR CAICT CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220405
R5‑221677 Corrections of Tx TCs having impact on ETSI EN 301 908-25 China Unicom CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220770
R5‑221678 Correction to note of general spurious emissions Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220892
R5‑221679 Correction to test requirement of 6.2.4 Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220898
R5‑221680 Correction to measurement timing for inter-band CA with FDD and TDD Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220901
R5‑221681 Editorial correction to SUL test cases Anritsu CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220907
R5‑221682 Editorial correction to clause 6.5.3.2 and 6.5.3.3 Qualcomm Korea CR Agreement
5.3.1.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221323
R5‑221683 Update to statistical testing Huawei, HiSilicon CR Agreement
5.3.1.4.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220781
R5‑221684 Correction to FR1 UL RMCs ROHDE & SCHWARZ, T-Mobile USA Inc. CR Agreement
5.3.1.4.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑221263
R5‑221685 Corrrection of test config tables of non-CA test cases for consistency with CA test cases on without RB allocation case CAICT CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220093
R5‑221686 FR2 SA EVM test case update based on MU and TT analysis Keysight Technologies UK Ltd CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220354
R5‑221687 Correction of general ON OFF time mask Anritsu CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220885
R5‑221688 Correction to FR2 absolute power tolerance MU and TT Anritsu CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220888
R5‑221689 Removal of empty lines in Table 7.3.2.3.2-1 and Table 7.3.2.5-2 CAICT CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220091
R5‑221690 Correction to PDCCH DCI format for FR2 test cases Huawei, Hisilicon CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221110
R5‑221691 Update to Clause 7.5 Adjacent channel selectivity Apple Hungary Kft. CR Agreement
5.3.1.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221340
R5‑221692 Correction of the table title style of Table 5.5A.3-1 CAICT CR Agreement
5.3.1.5.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220092
R5‑221693 Correction of Test applicability of 6.2B.3.3 CAICT CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220065
R5‑221694 Correction of 6.5B.2.3.3 to include 6.5.2.4.2 of 38.521-1 CAICT CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220066
R5‑221695 Update MOP for inter-band NE-DC within FR1 CMCC CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220279
R5‑221696 FR2 NSA EVM test case editor notes update Keysight Technologies UK Ltd CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220355
R5‑221697 Clarification on clause number of NE-DC for Tx test cases CMCC CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220656
R5‑221699 Correction of ON OFF time mask for inter-band EN-DC including FR2 Anritsu CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220886
R5‑221700 Definition of MTSU and TT for Intra-band EN-DC additional spurious emissions test cases Anritsu, DOCOMO Communications Lab. CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220894
R5‑221701 Correction to test procedure of FR1 EN-DC Spurious test for EN-DC only capable UE Anritsu CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220895
R5‑221702 Editorial correction for 6.5B.3.3 Spurious emission Qualcomm Korea CR Agreement
5.3.1.6.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221315
R5‑221703 Clarification on clause number of NE-DC for Rx test cases CMCC CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220657
R5‑221704 Update for 7.3B.2 Qualcomm Korea CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221331
R5‑221705 Regrouping DC Configuration in clause 5 Bureau Veritas, ZTE, Apple Portugal CR Agreement
5.3.1.6.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220429
R5‑221706 Update of 3.2 and 3.3 on symbols and abbreviations ZTE Corporation CR Agreement
5.3.1.6.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑221059
R5‑221707 Editorial update to PBCH demod requirements section Qualcomm CDMA Technologies CR Agreement
5.3.1.7.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑221160
R5‑221708 Update to testability of test requirements due to achievable SNR improvements Qualcomm CDMA Technologies CR Agreement
5.3.1.7.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yes
agreed No   R5‑221163
R5‑221709 FR1 NSA SDR message contents update Qualcomm CDMA Technologies CR Agreement
5.3.1.7.3Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10)
Yes
Yes
agreed No   R5‑221166
R5‑221710 Correction to Annex H.1.2 Anritsu CR Agreement
5.3.1.7.4Clauses 1-4, Annexes
Yes
Yes
agreed No   R5‑220909
R5‑221711 Correction of Additional Information for 6.2.2, 6.2.3 and 6.5.2.4.1 of 38.521-1 and 6.2B.2.3 and 6.2B.3.3 of 38.521-3 CAICT CR Agreement
5.3.1.8TS 38.522
Yes
Yes
agreed No   R5‑220062
R5‑221712 Correction to Applicability and Additional information for EN-DC TC and RRM TC TTA, SGS Wireless CR Agreement
5.3.1.8TS 38.522
Yes
Yes
agreed No   R5‑220536
R5‑221713 Correction to FR1 EN-DC RRM TCs - interruption SCC Huawei,Hisilicon CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No   R5‑220688
R5‑221714 Introduce Test case for LTE PSCell addition and release in NE-DC Apple Portugal CR Agreement
5.3.1.9.2NE-DC with all NR cells in FR1 (Clause 4A)
Yes
Yes
agreed No   R5‑221366
R5‑221715 Correction to FR2 EN-DC RRM TCs - RLM Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑220690
R5‑221716 Correction to FR2 EN-DC RRM TC 5.5.5.1 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑220691
R5‑221717 Correction to FR2 EN-DC RRM TC 5.5.5.2 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑220692
R5‑221718 Correction to FR2 EN-DC RRM TC 5.5.5.3 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑220693
R5‑221719 Correction to FR2 EN-DC RRM TC 5.5.5.4 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑220694
R5‑221720 Correction to FR2 EN-DC RRM TC 5.5.5.5 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑220695
R5‑221721 Correction to FR2 EN-DC RRM TC 5.6.1.1 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑220696
R5‑221722 Correction to FR2 EN-DC RRM TC 5.6.1.3 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑220698
R5‑221723 New test case 5.7.4.1 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑221022
R5‑221724 New test case 5.7.4.2 ROHDE & SCHWARZ CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑221023
R5‑221725 Update to RRM test case with CDRX Qualcomm CDMA Technologies CR Agreement
5.3.1.9.3EN-DC with at least 1 NR Cell in FR2 (Clause5)
Yes
Yes
agreed No   R5‑221158
R5‑221726 Corrections to 6.7.x.x ROHDE & SCHWARZ CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No   R5‑221030
R5‑221727 Correction to FR2 NR SA RRM TC 7.5.5.1 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220704
R5‑221728 Correction to FR2 NR SA RRM TC 7.5.5.2 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220705
R5‑221729 Correction to FR2 NR SA RRM TC 7.5.5.3 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220706
R5‑221730 Correction to FR2 NR SA RRM TC 7.5.5.4 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220707
R5‑221731 Correction to FR2 NR SA RRM TC 7.5.5.5 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220708
R5‑221732 Correction to FR2 NR SA RRM TC 7.6.1.1 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220709
R5‑221733 Correction to FR2 NR SA RRM TC 7.6.1.3 with TT Huawei,Hisilicon CR Agreement
5.3.1.9.5NR standalone with at least one NR cell in FR2 (Clause7)
Yes
Yes
agreed No   R5‑220711
R5‑221734 Correction to message exception for 8.4.2.x with SSB index detection Anritsu CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No   R5‑220926
R5‑221735 Test procedure update to L2NR Cell reselection test case Qualcomm CDMA Technologies CR Agreement
5.3.1.9.6E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)
Yes
Yes
agreed No   R5‑221161
R5‑221736 Correction to Annex F for FR2 SSB based BFD TCs Huawei,Hisilicon CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No   R5‑220713
R5‑221737 Correction to Annex F for FR2 SSB based intra-freq measurement TCs Huawei,Hisilicon CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No   R5‑220714
R5‑221738 Correction to default configuration in Annex H Huawei,Hisilicon CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No   R5‑220715
R5‑221739 Updates to CSI-ReportConfig for FR2 ROHDE & SCHWARZ CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No   R5‑221032
R5‑221740 Update report config for iRAT test cases ROHDE & SCHWARZ CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No   R5‑221034
R5‑221741 Correction of clause 3 Ericsson CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No   R5‑221303
R5‑221742 Correction to test frequencies for intra-band contiguous CA Huawei,Hisilicon CR Agreement
5.3.1.9.7Clauses 1-3, Annexes
Yes
Yes
agreed No   R5‑221601
R5‑221743 FR2 EVM MU definition in 38.903 Keysight Technologies UK Ltd CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220356
R5‑221744 TT analysis for FR2 SSB based BFD TCs Huawei,Hisilicon CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220716
R5‑221745 TT analysis for FR2 SSB intra-freq measurement without DRX TCs Huawei,Hisilicon CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220717
R5‑221746 Addition of summary table for MU factors Huawei, HiSilicon CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220782
R5‑221747 Update of predicted SNR upper bound for noise free SDR scenarios Qualcomm CDMA Technologies CR Agreement
5.3.1.15TR 38.903 ((NR MU & TT analyses)
Yes
Yes
agreed No   R5‑221159
R5‑221750 Update_TP_analysis for EVM Qualcomm Korea, ROHDE & SCHWARZ CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No   R5‑221314
R5‑221751 Test Point analysis for FR2 Tx spur emission UL MIMO tests Qualcomm Finland RFFE Oy CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No   R5‑221324
R5‑221752 Addition of reference sensitivity checklist for CA reference sensitivity test point analysis Ericsson CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No   R5‑221344
R5‑221753 Modification of test point analysis clause for FR1 NR CA Ericsson, WE Certification Oy, DISH Network, China Unicom CR Agreement
5.3.1.16TR 38.905 (NR Test Points Radio Transmission and Reception )
Yes
Yes
agreed No   R5‑221345
R5‑221754 Removing editors note in CA test cases DEKRA CR Agreement
5.3.2.2TS 36.521-1
Yes
Yes
agreed No   R5‑220674
R5‑221755 Removing editors note in CA test cases DEKRA CR Agreement
5.3.2.4TS 36.521-3
Yes
Yes
agreed No   R5‑220676
R5‑221756 Addition of new test case in Annex F.1.2 and Annex F.3.2 DEKRA CR Agreement
5.3.2.4TS 36.521-3
Yes
Yes
agreed No   R5‑220677
R5‑221757 Correction of 4.3.1.1.5.48 for test frequencies of CA_n48_2A ZTE Corporation CR Agreement
5.3.4.1TS 38.508-1
Yes
Yes
agreed No   R5‑221049
R5‑221758 Update Spurious emissions for UE co-existence for CA_n3A-n41A CMCC CR Agreement
5.3.4.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220209
R5‑221759 Update Spurious emissions for UE co-existence for CA_n41A-n79A CMCC CR Agreement
5.3.4.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220272
R5‑221760 Update Reference sensitivity test case for CA_n3A-n41A CMCC CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220208
R5‑221761 Introduction of CA_n5A-n78A reference sensitivity test requirements Ericsson CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220361
R5‑221762 Introduction of CA_n5A-n7A and CA_n7A_n78A maximum output power test requirements Ericsson CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220758
R5‑221763 MSD test configurations modification for US inter-band CA combinations with n77 Apple Portugal CR Agreement
5.3.4.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221350
R5‑221764 Update operating bands and CA configurations for CA_n3A-n41A CMCC CR Agreement
5.3.4.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220207
R5‑221765 General updates of clause 5 for R16 CADC configurations China Unicom, Ericsson CR Agreement
5.3.4.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220876
R5‑221766 Update of 6.2A.2 for UE maximum output power reduction for CA ZTE Corporation CR Agreement
5.3.4.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221062
R5‑221767 Introduction of Spurious emissions band UE co-existence requirements for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220316
R5‑221768 Correction to test requirement of DC_xxA_n41A in 6.5B.3.3.1 Anritsu CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220897
R5‑221769 Correction of General Spurious emissions requirements for Rel-16 inter-band EN-DC FR1 two band combinations Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220951
R5‑221770 Introduction of DC_1A_n5A, DC_1A_n7A, DC_3A_n5A, DC_7A_n5A, DC_28A_n7A to general spurious emission test case Ericsson CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221184
R5‑221771 Introduction of DC_1A_n5A, DC_1A_n7A, DC_3A_n5A, DC_7A_n5A, DC_28A_n7A to UE co-existence spurious emission test case Ericsson CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221185
R5‑221772 Addition of new CADC MPR TC 6.2B.2.4_1.1 Intertek CR Agreement
5.3.4.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221212
R5‑221773 Update for 7.3B.2.0 Min Requirements of Ref sensitivity for EN-DC Qualcomm Korea CR Agreement
5.3.4.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221326
R5‑221774 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_8A_n20A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑220317
R5‑221775 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_20A_n7A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑220318
R5‑221776 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_28A_n5A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑220319
R5‑221777 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_40A_n79A Nokia, Nokia Shanghai Bell CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑220320
R5‑221778 Introduction of reference sensitivity test point analysis for DC_7A_n78A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑220386
R5‑221779 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_1A_n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑221179
R5‑221780 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_1A_n7A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑221180
R5‑221781 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_3A_n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑221181
R5‑221782 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_7A_n5A Ericsson CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑221182
R5‑221783 Introduction of spurious emission TP analysis for Rel-16 EN-DC configuration DC_28A_n7A Ericsson, Qualcomm CR Agreement
5.3.4.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑221183
R5‑221784 Updates to A.10 and Annex.11 for Downlink Throughput tests with Variable Reference Channel Qualcomm communications-France CR Agreement
5.3.6.1TR 37.901-5
Yes
Yes
agreed No   R5‑220515
R5‑221785 Updates to Conclusion Qualcomm communications-France CR Agreement
5.3.6.1TR 37.901-5
Yes
Yes
agreed No   R5‑220516
R5‑221786 Updates to Annex.B Qualcomm communications-France CR Agreement
5.3.6.1TR 37.901-5
Yes
Yes
agreed No   R5‑220517
R5‑221787 Update of mid test channel bandwidth for band n25 ROHDE & SCHWARZ, T-Mobile USA Inc. CR Agreement
5.3.7.1TS 38.508-1
Yes
Yes
agreed No   R5‑221261
R5‑221788 New channel bandwidth for n25. UL-MIMO. T-Mobile USA Inc., ROHDE & SCHWARZ CR Agreement
5.3.7.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221245
R5‑221789 Addition of CBHWs 25 MHz, 30 MHz, 40 MHz for n25 ROHDE & SCHWARZ, T-Mobile USA Inc. CR Agreement
5.3.7.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221262
R5‑221790 New channel bandwidth for n25. refsens and UL-MIMO T-Mobile USA Inc., ROHDE & SCHWARZ CR Agreement
5.3.7.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221246
R5‑221791 General updates of clause 5 for R16 new CBW configurations China Unicom, ROHDE & SCHWARZ, Huawei, Hisilicon CR Agreement
5.3.7.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220777
R5‑221792 ETC for FR2 RF CA Apple Hungary Kft. CR Agreement
5.3.7.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221332
R5‑221793 Addition of Condition for FR1 DL Interruptions test cases applicability Ericsson CR Agreement
5.3.8.2TS 38.508-2
Yes
Yes
agreed No   R5‑221293
R5‑221794 Updating test case AMPR for MIMO Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221118
R5‑221795 Updating Absolute power tolerance for intra-band non-contiguous CA Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221124
R5‑221796 Updating FR1 ACLR for intra-band CA test case Huawei, Hisilicon CR Agreement
5.3.8.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221126
R5‑221797 Addition of FR1 DL Interruptions test cases applicability Ericsson CR Agreement
5.3.8.5TS 38.522
Yes
Yes
agreed No   R5‑221294
R5‑221798 Addition of UL switching test case 6.5.7.2 Ericsson CR Agreement
5.3.8.6TS 38.533
Yes
Yes
agreed No   R5‑221299
R5‑221799 Add applicability of new feMob RRM test cases ZTE Corporation, Huawei, HiSilicon CR Agreement
5.3.9.2TS 36.521-2
Yes
Yes
agreed No   R5‑220348
R5‑221800 Addition conditional handover test cases applicability Ericsson CR Agreement
5.3.9.2TS 36.521-2
Yes
Yes
agreed No   R5‑221312
R5‑221801 Addition of new feMob test case 5.1.42 ZTE, Tejet, SRTC CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220337
R5‑221802 Addition of new feMob test case 5.1.43 ZTE, Tejet, SRTC CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220338
R5‑221803 Addition of new feMob test case 5.1.44 ZTE, Tejet, SRTC CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220339
R5‑221804 Addition of new feMob test case 5.1.45 ZTE, SRTC, Tejet CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220340
R5‑221805 Addition of new feMob test case 5.1.46 ZTE, SRTC, Tejet CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220341
R5‑221806 Addition of new feMob test case 5.1.53 ZTE, SRTC, Tejet CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220342
R5‑221807 Addition of new feMob test case 5.1.54 ZTE, SRTC, Tejet CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220343
R5‑221808 Addition of new feMob test case 5.1.55 ZTE Corporation CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220344
R5‑221809 Addition of new feMob test case 5.1.56 ZTE Corporation CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220345
R5‑221810 Addition of new feMob test case 5.1.57 ZTE Corporation CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220346
R5‑221811 Addition of new feMob test case 5.1.58 ZTE Corporation CR Agreement
5.3.9.3TS 36.521-3
Yes
Yes
agreed No   R5‑220347
R5‑221812 Correction to Mob_enh RRM TC 7.3.3.1 with TT Huawei,Hisilicon CR Agreement
5.3.10.4TS 38.533
Yes
Yes
agreed No   R5‑220721
R5‑221813 Correction to Annex F for Mob_enh RRM TCs Huawei,Hisilicon CR Agreement
5.3.10.4TS 38.533
Yes
Yes
agreed No   R5‑220722
R5‑221814 TT analysis for Mob_enh RRM TCs 7.3.3.1 Huawei,Hisilicon CR Agreement
5.3.10.5TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220724
R5‑221815 Update to NR sidelink preconfiguration Huawei, HiSilicon CR Agreement
5.3.11.1TS 38.508-1
Yes
Yes
agreed No   R5‑220789
R5‑221816 Update to GNSS configuration for NR sidelink Huawei, HiSilicon CR Agreement
5.3.11.1TS 38.508-1
Yes
Yes
agreed No   R5‑220790
R5‑221817 Introduction of new V2X test cases in 6.3E.2 CAICT CR Agreement
5.3.11.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220083
R5‑221818 Update to NR V2X test cases with non-concurrent operation Huawei, HiSilicon CR Agreement
5.3.11.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220784
R5‑221819 Addition of 6.2E.2.2 MPR for concurrent opration Huawei, HiSilicon CR Agreement
5.3.11.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220785
R5‑221820 Introduction of new V2X test cases in 7.7E CAICT CR Agreement
5.3.11.4.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220085
R5‑221821 Addition of NR SL RRM TC 9.1.2.1 - SLSS Tx NR Cell Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No   R5‑220732
R5‑221822 Addition of NR SL RRM TC 9.1.2.2 - SLSS Tx SyncRef UE Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No   R5‑220733
R5‑221823 Addition of NR SL RRM TC 9.1.3.1 - SyncRef reselection GNSS Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No   R5‑220735
R5‑221824 Addition of NR SL RRM TC 9.1.3.2 - SyncRef reselection Cell Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No   R5‑220736
R5‑221825 Addition of NR SL RRM TC 9.1.4.2 - Resource pre-emption Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No   R5‑220739
R5‑221826 Addition of NR SL RRM TC 9.1.4.3 - Resource re-evaluation Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No   R5‑220740
R5‑221827 Addition of NR SL RRM TC 9.1.5.2 - SL-RSSI PC5 only Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No   R5‑220743
R5‑221828 Addition of RMC for NR SL RRM test in Annex A Huawei,Hisilicon CR Agreement
5.3.11.8TS 38.533
Yes
Yes
agreed No   R5‑220746
R5‑221829 TP analysis for 6.2E.2.2 MPR for concurrent opration Huawei, HiSilicon CR Agreement
5.3.11.11TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑220786
R5‑221830 Addition of physical implementation capability for L1-SINR measurement Huawei, HiSilicon, Sporton CR Agreement
5.3.12.2TS 38.508-2
Yes
Yes
agreed No   R5‑220999
R5‑221831 Addition of test applicability for UE Enhancements on MIMO Sporton CR Agreement
5.3.12.7TS 38.522
Yes
Yes
agreed No   R5‑220948
R5‑221832 Addition of test applicability for L1-SINR measurement cases Huawei, HiSilicon CR Agreement
5.3.12.7TS 38.522
Yes
Yes
agreed No   R5‑221000
R5‑221833 Addition of 5.5.5.6 FR2 SCell BFD in non-DRX for NSA Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220799
R5‑221834 Addition of 5.5.5.7 FR2 SCell BFD in DRX for NSA Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220800
R5‑221835 Addition of 7.5.5.6 FR2 SCell BFD in non-DRX for SA Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220802
R5‑221836 Addition of 7.5.5.7 FR2 SCell BFD in DRX for SA Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220803
R5‑221837 Update to Annex F for eMIMO test cases Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220805
R5‑221838 Update to Annex H for eMIMO test cases Huawei, HiSilicon CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑220806
R5‑221839 Update of RRM Test Cases for UE Enhancements on MIMO Sporton CR Agreement
5.3.12.8TS 38.533
Yes
Yes
agreed No   R5‑221002
R5‑221840 Addition of TT analysis for FR2 BFR test cases Huawei, HiSilicon CR Agreement
5.3.12.9TR 38.903 (NR MU & TT analyses)
Yes
Yes
agreed No   R5‑220807
R5‑221841 TP analysis for 6.2D.2 for ULFPTx Huawei, HiSilicon CR Agreement
5.3.12.10TR 38.905 (NR Test Points Radio Transmission and Reception)
Yes
Yes
agreed No   R5‑220795
R5‑221842 Correction on Type I PMI test cases China Telecom CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220417
R5‑221843 Addition of FR1 CA CQI test cases China Telecom CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220419
R5‑221844 Addition of applicability for FR1 CA CQI test requirements China Telecom CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220420
R5‑221845 Addition of test case 5.2.3.2.4_1, 4Rx TDD FR1 PDSCH Mapping Type A and LTE-NR coexistence performance - 4x4 MIMO with baseline receiver for both SA and NSA Ericsson CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220685
R5‑221846 Introduction of FR1 CA SDR test case Qualcomm CDMA Technologies CR Agreement
5.3.15.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑221156
R5‑221847 Addition of FR2 CA CQI test cases China Telecom CR Agreement
5.3.15.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yes
agreed No   R5‑220422
R5‑221848 Addition of applicability for FR2 CA CQI test requirements China Telecom CR Agreement
5.3.15.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yes
agreed No   R5‑220423
R5‑221849 Updated the Test case conditions and selection criteria for TDD DSS NR bands n38, n48, n90 CMCC CR Agreement
5.3.15.4TS 38.522
Yes
Yes
agreed No   R5‑220040
R5‑221850 Addition of FR1 CA CQI test cases applicability China Telecom CR Agreement
5.3.15.4TS 38.522
Yes
Yes
agreed No   R5‑220418
R5‑221851 Addition of FR2 CA CQI test cases applicability China Telecom CR Agreement
5.3.15.4TS 38.522
Yes
Yes
agreed No   R5‑220421
R5‑221852 Applicability of NR perf enh WI test cases Qualcomm CDMA Technologies CR Agreement
5.3.15.4TS 38.522
Yes
Yes
agreed No   R5‑221152
R5‑221853 Addition of UE capability for maximum number of activated TCI states CMCC CR Agreement
5.3.16.2TS 38.508-2
Yes
Yes
agreed No   R5‑220165
R5‑221854 Addition of test case 5.2.3.2.10_1, 4Rx TDD FR1 HST DPS performance - 2x4 MIMO with baseline receiver for both SA and NSA Ericsson CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yes
agreed No   R5‑220672
R5‑221855 Update to HST Demod test cases Qualcomm CDMA Technologies CR Agreement
5.3.16.3.1Conducted Demod Performance and CSI Reporting Requirements (Clause 5)
Yes
Yes
agreed No   R5‑221169
R5‑221856 Addition of HST test case 5.2.3.1.9_1 to annex F CMCC CR Agreement
5.3.16.3.2Clauses 1-4, Annexes
Yes
Yes
agreed No   R5‑220636
R5‑221857 Addition of HST test case 5.2.3.1.10_1 to annex F CMCC CR Agreement
5.3.16.3.2Clauses 1-4, Annexes
Yes
Yes
agreed No   R5‑220637
R5‑221858 Correction of HST test case applicability CMCC, Anritsu CR Agreement
5.3.16.4TS 38.522
Yes
Yes
agreed No   R5‑220169
R5‑221859 Correction to DRX setting of 4.6.4.5 and 6.6.4.5 Anritsu CR Agreement
5.3.16.5TS 38.533
Yes
Yes
agreed No   R5‑220922
R5‑221860 Update to 5.2.x.y.5 PDSCH with 1e-5 BLER Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220813
R5‑221861 Update to 5.2.x.y.6 PDSCH with repetitions over multiple slots Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220814
R5‑221862 Update to 5.2.2.y.8 PDSCH pre-emption Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220816
R5‑221863 Addition of 5.2.3.1.8 PDSCH pre-emption 4Rx FDD Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220817
R5‑221864 Addition of 5.2.3.2.8 PDSCH pre-emption 4Rx TDD Huawei, HiSilicon CR Agreement
5.3.18.3.1Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)
Yes
Yes
agreed No   R5‑220818
R5‑221865 Addition of 7.2.2.2.2 FR2 PDSCH repetition Huawei, HiSilicon CR Agreement
5.3.18.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yes
agreed No   R5‑220821
R5‑221866 Addition of 7.2.2.2.3 FR2 PDSCH mapping Type B Huawei, HiSilicon CR Agreement
5.3.18.3.2Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)
Yes
Yes
agreed No   R5‑220822
R5‑221867 Addition of minimum test time for 1% residual BLER Huawei, HiSilicon CR Agreement
5.3.18.3.4Clauses 1-4, Annexes
Yes
Yes
agreed No   R5‑220812
R5‑221868 Update to Annex F for URLLC test cases Huawei, HiSilicon CR Agreement
5.3.18.3.4Clauses 1-4, Annexes
Yes
Yes
agreed No   R5‑220819
R5‑221869 Updating test frequencies for NR band n1 Huawei, Hisilicon CR Agreement
5.3.19.1TS 38.508-1
Yes
Yes
agreed No   R5‑221134
R5‑221870 Update of R17 new CBW 45M into refsense TC China Unicom, T-Mobile USA Inc., ROHDE & SCHWARZ, Anritsu CR Agreement
5.3.19.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221259
R5‑221871 Add test frequencies for R17 NR inter-band CA configurations in FR1 China Telecommunications CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No   R5‑220170
R5‑221872 Addition of test frequencies for NE-DC configurations DC_n28A_3A, DC_n28A_3C, DC_n28A_39A, DC_n28A_39C CMCC CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No   R5‑220198
R5‑221873 Update of protocol testing applicability for 3CC inter-band NR DC configurations Ericsson CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No   R5‑220508
R5‑221874 Addition of several NR CA combinations to FR1 inter-band configurations table WE Certification Oy, DISH Network CR Agreement
5.3.20.1TS 38.508-1
Yes
Yes
agreed No   R5‑220950
R5‑221875 Introduction of new R17 NR inter-band CA configurations in FR1 China Telecommunications CR Agreement
5.3.20.2TS 38.508-2
Yes
Yes
agreed No   R5‑220195
R5‑221876 Addition of applicability tables of several NR CA combinations to FR1 inter-band configurations WE Certification Oy, DISH Network CR Agreement
5.3.20.2TS 38.508-2
Yes
Yes
agreed No   R5‑220952
R5‑221877 Update of R17 NR inter-band CA Tx requirements within FR1 China Telecommunications CR Agreement
5.3.20.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220270
R5‑221878 Update of R17 NR inter-band CA Rx requirements within FR1 China Telecommunications CR Agreement
5.3.20.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220284
R5‑221879 Updating Delta_RIB_c and reference sensitvity test requirement for CA combination of n24 and n77 Ligado Networks CR Agreement
5.3.20.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220875
R5‑221880 Addition of several CA combinations to Reference Sensitivity test case WE Certification Oy, DISH Network CR Agreement
5.3.20.3.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑220953
R5‑221881 General updates of clause 5 for R17 CADC configurations China Unicom, WE Certification, Dish Network, China Telecommunications, Ligado Networks CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220877
R5‑221882 Updating clause 5.2C for R17 SUL configurations Huawei, Hisilicon CR Agreement
5.3.20.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑221131
R5‑221883 Update Tx TC for 4 Rel-17 combos Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.5.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220375
R5‑221884 Update Rx Requirements for 4 Rel-17 ENDC combos Verizon Switzerland AG, Qualcomm, Ericsson CR Agreement
5.3.20.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221316
R5‑221885 MSD test configurations modification for US inter-band EN-DC combinations with n77 Apple Portugal CR Agreement
5.3.20.5.2Rx Requirements (Clause 7)
Yes
Yes
agreed No   R5‑221351
R5‑221886 Update NE-DC configurations for DC_n28A_3A, DC_n28A_3C, DC_n28A_39A, DC_n28A_39C CMCC CR Agreement
5.3.20.5.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220654
R5‑221887 Addition of UE Rx-Tx time difference measurement test uncertainties and test parameter relaxations CATT CR Agreement
5.3.21.3TS 37.571-1
Yes
Yes
agreed No   R5‑220519
R5‑221888 Addition of test applicabilities for NR UE Rx-Tx time difference measurement test cases CATT CR Agreement
5.3.21.4TS 37.571-3
Yes
Yes
agreed No   R5‑220520
R5‑221889 FR2 Enhanced Beam Correspondence test updates Apple Portugal CR Agreement
5.3.22.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221352
R5‑221890 Minimum Conformance Requirements updates to enhanced beam correspondence Apple Portugal CR Agreement
5.3.22.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221353
R5‑221891 Correction of FR2 standalone Enhanced Beam correspondence - EIRP RF conformance test case applicability Nokia, Nokia Shanghai Bell CR Agreement
5.3.22.5TS 38.522
Yes
Yes
agreed No   R5‑220310
R5‑221892 Update of MOP TC for PC2 ENDC configurations China Unicom CR Agreement
5.3.23.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220775
R5‑221893 Add test case 7.3.2.2.3 for NR SA FR2 2-step RACH Nokia, Nokia Shanghai Bell CR Agreement
5.3.24.4TS 38.533
Yes
Yes
agreed No   R5‑220324
R5‑221894 Introduction of NR-U OFF power test case Ericsson CR Agreement
5.3.25.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221251
R5‑221895 Introduction of NR-U General ON/OFF time mask test case Ericsson CR Agreement
5.3.25.4.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221252
R5‑221896 Update of MOP test cases for PC2 CA_n1A-n78A with UL CA_n1A-n78A China Telecom CR Agreement
5.3.27.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220424
R5‑221897 Update of MOP test cases for PC2 CA_n3A-n78A with UL CA_n3A-n78A China Telecom CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220425
R5‑221898 Update superscripts of power class for inter-band CA CMCC CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220658
R5‑221899 Update MOP for 2 bands DL and 1 band UL CA CMCC CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220659
R5‑221900 Update MOP for Intra-band contiguous CA CMCC, CT CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221210
R5‑221901 Update MOP for Intra-band non-contiguous CA CMCC, CT CR Agreement
5.3.28.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221211
R5‑221902 Update UL CA configurations for PC2 and PC1.5 CA_n41C CMCC CR Agreement
5.3.28.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220203
R5‑221903 Update configuration for PC2 CA_n3A-n41A CMCC CR Agreement
5.3.28.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220204
R5‑221904 Update NR ACLR test case for PC1.5 CMCC CR Agreement
5.3.31.2.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220200
R5‑221905 Update TC Frequency Error for DSS CMCC, Huawei, Hisilicon CR Agreement
5.3.35.1.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220137
R5‑221906 Update TC Frequency Error for UL MIMO for DSS CMCC CR Agreement
5.3.35.1.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220141
R5‑221907 Update TC Frequency Error for CA for DSS CMCC CR Agreement
5.3.35.1.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220142
R5‑221908 Addition of new test case 6.2B.1.3_1 for Maximum Output Power for inter-band EN-DC with 3 uplink Huawei, HiSilicon CR Agreement
5.3.37.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220962
R5‑221909 Addition of new test case 6.2B.4.1.3_1 for Configured Output Power for inter-band EN-DC with 3 uplink Huawei, HiSilicon CR Agreement
5.3.37.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220963
R5‑221910 Addition of annex F for test cases for EN-DC configurations with 3 uplink Huawei, HiSilicon CR Agreement
5.3.37.3.3Clauses 1-5, Annexes
Yes
Yes
agreed No   R5‑220964
R5‑221911 Add_UE capability enhancedUL-TransientPeriod Qualcomm Korea, ROHDE & SCHWARZ CR Agreement
5.4.1TS 38.508-2
Yes
Yes
agreed No   R5‑221335
R5‑221912 Update for 6.4.2.1a EVM including symbols with transient period Qualcomm Korea, ROHDE & SCHWARZ CR Agreement
5.4.2TS 38.521-1
Yes
Yes
agreed No   R5‑221336
R5‑221913 New EVM test case applicability Qualcomm Korea, ROHDE & SCHWARZ CR Agreement
5.4.4TS 38.522
Yes
Yes
agreed No   R5‑221333
R5‑221914 Update to GNSS configuration for E-UTRA V2X Huawei, HiSilicon CR Agreement
5.5.1.1TS 36.508
Yes
Yes
agreed No   R5‑220826
R5‑221915 Update to GNSS configuration for LTE aerial testing Huawei, HiSilicon CR Agreement
5.5.1.1TS 36.508
Yes
Yes
agreed No   R5‑220827
R5‑221916 Correction of 4.1.1 on lower humidity limit in temperature test environment Samsung R&D Institute UK, ZTE Corporation CR Agreement
5.5.1.1TS 36.508
Yes
Yes
agreed No   R5‑220853
R5‑221917 Correction of NB-IoT test frequency for band 85 ROHDE & SCHWARZ CR Agreement
5.5.1.1TS 36.508
Yes
Yes
agreed No   R5‑221272
R5‑221918 Correction of 6.6.2.2_2 Additional Spectrum Emission Mask MediaTek Inc. CR Agreement
5.5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑220055
R5‑221919 Correction of maximum output power for CA test case ROHDE & SCHWARZ CR Agreement
5.5.1.3.1Tx Requirements (Clause 6)
Yes
Yes
agreed No   R5‑221271
R5‑221920 Add new messages and procedure for test function to limit Pcell Power Apple Portugal draftCR Endorsement
5.3.1.1.4Other clauses, Annexes
Yes
Yes
endorsed No   R5‑221620
R5‑221921 Addition of new test function to limit Pcell power Apple Portugal draftCR Endorsement
5.3.1.3TS 38.509
Yes
Yes
endorsed No   R5‑221619
R5‑221922 Implement test function approach to avoid Scell Drop in FR2 UL-CA Apple Portugal draftCR Endorsement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
endorsed No   R5‑221618
R5‑221923 Correction to test procedure of SFTD measurement accuracy Anritsu CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No   R5‑220913
R5‑221924 Correction to BWP configuration for 4.5.6.1.2 Anritsu CR Agreement
5.3.1.9.1EN-DC with all NR cells in FR1 (Clause 4)
Yes
Yes
agreed No   R5‑220937
R5‑221925 Correction to active BWP ID and TRS configuration in 6.5.6.1.1 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No   R5‑220932
R5‑221926 Correction to CSI-RS offset for 6.5.3.1 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No   R5‑220934
R5‑221927 Correction to CSI report offset for 6.5.3.1 Anritsu CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
agreed No   R5‑220935
R5‑221928 Update to FR1 SA Scell activation and deactivation test case Qualcomm CDMA Technologies CR Agreement
5.3.1.9.4NR Standalone in FR1 (Clause 6)
Yes
Yes
withdrawn Yes   R5‑221162
R5‑221929 Core spec alignment for FR2 test case 6.3.4.3, Relative power tolerance Ericsson CR Agreement
5.3.1.5.1Tx Requirements (Clause 6)
Yes
Yes
withdrawn Yes   R5‑220765
R5‑221930 Updating message contents for REFSENS for 2DL CA exceptions testing Huawei, Hisilicon CR Agreement
5.3.1.4.2Rx Requirements (Clause 7)
No
Yes
agreed No   R5‑221108
R5‑221931 Addition of transmit power configuration for EN-DC reference sensitivity Huawei, Hisilicon CR Agreement
5.3.1.6.2Rx Requirements (Clause 7)
No
Yes
agreed No   R5‑220975
R5‑222000 Meeting schedule for 2022-23 WG Chairman other Information
4.4Meeting schedule for 2022
Yes
Yes
noted No   R5‑220011
R5‑222001 Addition of new IMS over 5GS TC 11.8 eCall only mode / Automatic initiation / Emergency registration / Abnormal case / IM CN sends a 600 (Busy Everywhere) / UE performs eCall in CS domain / UTRAN or GERAN / 5GS Qualcomm Incorporated CR Agreement
6.3.22.9TS 34.229-5
Yes
Yes
withdrawn Yes   R5‑221036
R5‑222002 Applicability clauses for Idle Inactive measurement test cases Nokia, Nokia Shanghai Bell CR Agreement
6.3.23.5TS 38.523-2
Yes
Yes
agreed No   R5‑221274
R5‑222003 New testcase for Idle/Inactive measurements on NR cells in RRC_INACTIVE state with configuration through SIB11 Nokia, Nokia Shanghai Bell CR Agreement
6.3.24.3TS 38.523-1
Yes
Yes
agreed No   R5‑221197
R5‑222004 New testcase for Idle/Inactive measurements on E-UTRA cells in RRC_INACTIVE state with configuration through SIB11 Nokia, Nokia Shanghai Bell CR Agreement
6.3.24.3TS 38.523-1
Yes
Yes
agreed No   R5‑221199
R5‑222005 New testcase for Idle/Inactive measurements on NR cells in RRC_INACTIVE state with configuration through RRCRelease Nokia, Nokia Shanghai Bell CR Agreement
6.3.24.3TS 38.523-1
Yes
Yes
agreed No   R5‑221282
R5‑222006 New testcase for Idle/Inactive measurements on E-UTRA cells in RRC_INACTIVE state with configuration through RRCRelease Nokia, Nokia Shanghai Bell CR Agreement
6.3.24.3TS 38.523-1
Yes
Yes
agreed No   R5‑221283
R5‑222007 Correction to R16 eNS TC 9.1.10.6 Qualcomm CDMA Technologies, Keysight Technologies UK, Anritsu Ltd CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yes
agreed No   R5‑220840
R5‑222008 Correction to R16 eNS TC 9.1.10.3 Qualcomm CDMA Technologies, Anritsu Ltd, Ericsson CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yes
agreed No   R5‑220841
R5‑222009 Correction to R16 eNS TC 9.1.10.1 Qualcomm CDMA Technologies, Keysight Technologies UK, Anritsu Ltd CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yes
agreed No   R5‑220842
R5‑222010 Correction to test case name of TC 9.1.10.3 and TC 9.1.10.4 Tejet CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yes
agreed No   R5‑221069
R5‑222011 Correction to Rel16 eNS EPS Mobility Management test case Lenovo, Motorola Mobility, MCC TF160 CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yes
agreed No   R5‑221093
R5‑222012 Updates to test case 9.1.10.4 Ericsson CR Agreement
6.4.4.5.6MM Network slice-specific authentication and authorization (clause 9.1.10)
Yes
Yes
agreed No   R5‑221240
R5‑222013 Update of date for 5GC TC 9.2.4.1 MediaTek Inc. CR Agreement
6.4.4.65GS Non-3GPP Access Mobility Management (clause 9.2)
Yes
Yes
agreed No   R5‑220115
R5‑222014 Correction to NR SRVCC TC 8.1.3.2.8-Inter RAT Huawei, Hisilicon CR Agreement
6.4.4.11.25G-SRVCC
Yes
Yes
agreed No   R5‑220621
R5‑222015 Reference dedicated EPS bearer contexts for MCVideo and MCData MCC TF160 CR Agreement
6.5.1Routine Maintenance for TS 36.508
Yes
Yes
agreed No   R5‑220459
R5‑222016 Updates to test case 7.1.4.42 Ericsson CR Agreement
6.5.3.2.1MAC
Yes
Yes
agreed No   R5‑221220
R5‑222017 Update of date for EPC TC 9.1.5.1 MediaTek Inc. CR Agreement
6.5.3.4EPS Mobility Management
Yes
Yes
agreed No   R5‑220129
R5‑222018 Update of date for MM NITZ TC 9.4.10 MediaTek Inc. CR Agreement
6.6.4.1TS 34.123-1
Yes
Yes
agreed No   R5‑220130
R5‑222019 Update of date for GMM NITZ TC 12.2.1.13 and 12.2.1.15 MediaTek Inc. CR Agreement
6.6.4.1TS 34.123-1
Yes
Yes
agreed No   R5‑220131
R5‑222020 Update applicability of TC 9.5.2 and 9.5.6 MediaTek Inc. CR Agreement
6.6.4.2TS 34.123-2
Yes
Yes
agreed No   R5‑220193
R5‑222021 Update generic procedure A.6 Ericsson CR Agreement
6.6.6.6TS 34.229-5
Yes
Yes
agreed No   R5‑220175
R5‑222022 Update of date for MM NITZ TC 26.7.6.1.1 MediaTek Inc. CR Agreement
6.6.8.1TS 51.010-1 (Signalling)
Yes
Yes
agreed No   R5‑220132
R5‑222023 Update of date for GMM NITZ TC 44.2.9.1.1 and 44.2.9.1.3 MediaTek Inc. CR Agreement
6.6.8.1TS 51.010-1 (Signalling)
Yes
Yes
agreed No   R5‑220133
R5‑222024 Update of GMM TC 44.2.5.2.5 MediaTek Inc. CR Agreement
6.6.8.1TS 51.010-1 (Signalling)
Yes
Yes
agreed No   R5‑220134
R5‑222025 Update to GEA2 Encryption applicability Bureau Veritas CR Agreement
6.6.8.2TS 51.010-2 (Signalling)
Yes
Yes
agreed No   R5‑221411
R5‑222026 Correction of clause 5.5.3.1 - SDP Message MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No   R5‑220471
R5‑222027 Correction of clause 5.5.3.6 - SIMPLE-FILTER MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No   R5‑220473
R5‑222028 Restructuring of clause 5.3 - Generic test procedures for UE MCS operation MCC TF160 CR Agreement
6.6.9.1TS 36.579-1
Yes
Yes
agreed No   R5‑220481
R5‑222029 Correction of MCPTT Test Case 5.3 MCC TF160, NIST, UPV/EHU, Nemergent Solutions CR Agreement
6.6.9.2TS 36.579-2
Yes
YesUnresolved issues have been identified late and there is no time any more to fix them at this meeting.
withdrawn Yes   R5‑220483
R5‑222030 Correction of Test Cases in clause 6 MCC TF160, , UPV/EHU, Nemergent Solutions CR Agreement
6.6.9.2TS 36.579-2
Yes
Yes
agreed No   R5‑220485
R5‑222031 Addition of PICS MCC TF160 CR Agreement
6.6.9.4TS 36.579-4
Yes
Yes
agreed No   R5‑220487
R5‑222032 3GPP RAN5 work on Overall UE Certification for 3GPP Rel-16 SNPN and other verticals UE TSG WG RAN5 LS out Approval
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
Yesfor email approval
for email approval No    
R5‑222033 Revised WID on UE Conformance Test Aspects – LTE-NR & NR-NR Dual Connectivity and NR CA enhancements Nokia, Nokia Shanghai Bell WID revised Endorsement
7.4.2Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid)
Yes
Yesis endorsed.
endorsed No   R5‑221342
R5‑222034 Applicability statement for new test cases for PDCP Duplication 3 RLC entities in NR IIoT CMCC CR Agreement
6.3.8.5TS 38.523-2
Yes
Yes
agreed No   R5‑220047
R5‑222035 LS on V2X PC5 link for unicast communication with null security algorithm TSG WG RAN5 LS out Approval
7.5Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.)
No
Yes
approved No   R5‑221416
R5‑222036 Correction to NR TC 11.3.6-UAC for Access Identity 2 Huawei, Hisilicon CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yeswithdrawn. Could not reach agreement with TF160.
withdrawn Yes   R5‑220558
R5‑222037 Corrections to TC 10.1 ROHDE & SCHWARZ CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑220216
R5‑222038 Applicability statement for new test cases for NE-DC RRC CMCC CR Agreement
6.3.1.5TS 38.523-2
Yes
Yes
agreed No   R5‑220108
R5‑222039 Correction to cl 4.5.3 RRC_INACTIVE generic procedure Huawei, Hisilicon CR Agreement
6.3.1.1.1Generic Procedures and Test Procedures (Clauses 4.5, 4.5A & 4.9)
Yes
Yes
agreed No   R5‑220542
R5‑222040 Correction to NR TC 8.1.4.3.1-RRC DAPS HO Success Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yes
agreed No   R5‑220602
R5‑222041 Correction to NR TC 8.1.4.3.2-RRC DAPS HO Failure Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yes
agreed No   R5‑220603
R5‑222042 Correction to NR TC 8.1.4.4.4-Conditional handover and legacy handover Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yes
agreed No   R5‑220605
R5‑222043 Correction to NR TCs 7.1.3.4.3 and TC 7.1.3.4.4 - PDCP DAPS HO Huawei, Hisilicon CR Agreement
6.3.9.3TS 38.523-1
Yes
Yes
agreed No   R5‑221375
R5‑222044 Correction to NR test case 7.1.1.9.1 ROHDE & SCHWARZ CR Agreement
6.3.1.4.3.1.2MAC
Yes
Yes
agreed No   R5‑220671
R5‑222045 Update to applicability of NR EIEI test cases Qualcomm Incorporated CR Agreement
6.3.22.7TS 34.229-2
Yes
Yes
agreed No   R5‑220984
R5‑222046 Update to test case 6.4 Qualcomm Incorporated CR Agreement
6.3.1.10TS 34.229-5
Yes
Yes
agreed No   R5‑221400
R5‑222047 Addition of new RACS test case 9.1.9.7 Keysight Technologies UK CR Agreement
6.3.14.4TS 38.523-1
Yes
Yes
agreed No   R5‑220292
R5‑222048 Correction to UAC test case 11.3.1a Keysight Technologies UK CR Agreement
6.3.1.4.8.3Unified Access Control (UAC)
Yes
Yes
agreed No   R5‑220294
R5‑222049 Addition of NR V2X test case 12.2.1.2 TDIA, CATT CR Agreement
6.3.10.4TS 38.523-1
Yes
Yes
agreed No   R5‑220161