Tdoc List

2020-06-10 08:53

Agenda Topic TDoc Title Source Type For Avail Treated Decision Wdrn Replaced-by Replaces
1 Opening of the meeting R5‑201300 Agenda - opening session WG Chairman agenda Information Yes
YesRAN5#87 Electronic Meeting has full decision power. Review of the IPR obligations, Antitrust and US EAR regulations - please refer to the ‘Reminder for IPR Declaration’ (page 15); ‘Antitrust Guidance’ (page 15) and ‘Statement on US EAR’ (page 16) in R5-201300.
approved No    
    R5‑201301 RAN5#87 E-Meeting Timelines, Scope, Process WG Chairman agenda Information Yes
Yes
revised No R5‑202512  
    R5‑202512 RAN5#87 E-Meeting Timelines, Scope, Process WG Chairman agenda Information Yes
Yesis endorsed.
endorsed No   R5‑201301
2 Reports                      
2.1 Live Reports R5‑201302 RAN5 Leadership Team WG Chairman other Information Yes
Yes
noted No    
    R5‑201303 RAN5#86-e WG Minutes ETSI Secretariat report Approval Yes
Yes
approved No    
    R5‑201304 RAN5#86-e WG Action Points ETSI Secretariat report Information Yes
Yes
noted No    
    R5‑201305 Latest RAN Plenary notes WG Chairman report Information Yes
Yes
noted No    
    R5‑201306 Latest RAN Plenary draft Report WG Chairman report Information Yes
Yes
noted No    
    R5‑201307 Post Plenary Active Work Item update ETSI Secretariat other Information Yes
Yes
noted No    
    R5‑201568 MCC TF160 Status Report MCC TF160 report Approval Yes
Yesto be revised
revised No R5‑202521  
2.2 General Reports for information R5‑201308 RAN5 SR to RP#87-e WG Chairman report Information Yes
Yes
noted No    
    R5‑201309 TF160 SR to RP#87-e WG Chairman report Information Yes
Yes
noted No    
    R5‑201549 GCF 3GPP TCL after GCF CAG#62 Ericsson report Information Yes
Yes
noted No    
    R5‑201551 3GPP RAN5 CA status list (pre-RAN5#87-e meeting) Ericsson other Information Yes
Yes
noted No    
3 Incoming Liaison Statements R5‑201315 Reply LS on support for eCall over NR TSG SA LS in Action Yes
YesQualcomm clarified work to be done in CT1 and RAN2 under TEI16, RAN5 will wait for this to conclude
noted No    
    R5‑201316 LS on publication of TS.51 V1.0 GSMA TSG IoTOTA LS in Action Yes
Yes
noted No    
    R5‑201319 Reply LS on support for eCall over NR TSG WG SA2 LS in Information Yes
Yes
noted No    
    R5‑201594 LS Announcing the publication of GSMA TS.48 Generic eUICC Test Profile for Device Testing version 2.0 GSMA TSG eSIMTP LS in Information Yes
Yes
noted No    
4 RAN5 General Issues R5‑201380 Addition of new NR TC 11.3.9-UAC Operator Defined Access Category Huawei, Hisilicon CR Agreement Yes
Yesr2
revised No R5‑202669  
    R5‑202669 Addition of new NR TC 11.3.9-UAC Operator Defined Access Category Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑201380
4.1 New Work Item proposals - for intro only R5‑201474 New WID on UE conformance test aspects for NR mobility enhancements Huawei, Hisilicon, China Telecom WID new Approval Yes
Yes
revised No R5‑202513  
    R5‑202513 New WID on UE conformance test aspects for NR mobility enhancements Huawei, Hisilicon, China Telecom WID new Approval Yes
YesR&S asked to be added. WI is endorsed.
endorsed No   R5‑201474
    R5‑201475 New WID on UE conformance test aspects for 5G V2X with NR sidelink Huawei, Hisilicon WID new Approval Yes
Yes
revised No R5‑202514  
    R5‑202514 New WID on UE conformance test aspects for 5G V2X with NR sidelink Huawei, Hisilicon WID new Approval Yes
YesR&S asked to be added. WI is endorsed.
endorsed No   R5‑201475
    R5‑201630 New WID – Optimisations on UE radio capability signalling - NR/E-UTRA Aspects Qualcomm CDMA Technologies WID new Approval Yes
Yes
revised No R5‑202515  
    R5‑202515 New WID – Optimisations on UE radio capability signalling - NR/E-UTRA Aspects Qualcomm CDMA Technologies WID new Approval Yes
Yesis endorsed.
endorsed No   R5‑201630
    R5‑201631 New WID - Private Network Support for NG-RAN Qualcomm CDMA Technologies WID new Approval Yes
Yes
revised No R5‑202516  
    R5‑202516 New WID - Private Network Support for NG-RAN Qualcomm CDMA Technologies WID new Approval Yes
Yesis endorsed.
endorsed No   R5‑201631
    R5‑201720 New WID - UE Conformance Aspects – Even further mobility enhancement in E-UTRAN China Telecom WID new Endorsement Yes
Yes
revised No R5‑202517  
    R5‑202517 New WID - UE Conformance Aspects – Even further mobility enhancement in E-UTRAN China Telecom WID new Endorsement Yes
Yesis endorsed.
endorsed No   R5‑201720
    R5‑201863 New WI proposal for Rel-16 Enhancements on MIMO for NR(NR_eMIMO) Huawei, HiSilicon, Samsung WID new Endorsement Yes
Yes
revised No R5‑202518  
    R5‑202518 New WI proposal for Rel-16 Enhancements on MIMO for NR(NR_eMIMO) Huawei, HiSilicon, Samsung WID new Endorsement Yes
Yesis endorsed.
endorsed No   R5‑201863
    R5‑201918 New WID - UE Conformance Aspects - Support of NR Industrial Internet of Things (IoT) CMCC, Nokia WID new Approval Yes
Yes
revised No R5‑202519  
    R5‑202519 New WID - UE Conformance Aspects - Support of NR Industrial Internet of Things (IoT) CMCC, Nokia WID new Approval Yes
Yesis endorsed. R&S asked to be added.
endorsed No   R5‑201918
    R5‑202164 New WID - UE Conformance Aspects - UE Power Saving in NR CATT WID new Endorsement Yes
Yes
revised No R5‑202520  
    R5‑202520 New WID - UE Conformance Aspects - UE Power Saving in NR CATT WID new Endorsement Yes
Yesis endorsed.
endorsed No   R5‑202164
4.2 General Discussion Papers                      
4.2.1 5GS R5‑201569 Feature priority inputs for the RAN5 5GS work plan MCC TF160 discussion Information Yes
YesOrange was wondering whether there is there any spec which is doing the work which we're doing here. Ericsson: there is only RAN4 with the base stations.
noted No    
    R5‑201706 Proposing new test cases for small TEI-16 WIs - inter-RAT HO from NR to EN-DC China Telecommunications, China Unicom, Vodafone, China Mobile, NTT Docomo discussion Endorsement Yes
Yesproposal was accepted to add the test cases.
noted No    
    R5‑201955 Check List for adding new NR bands and for new channel bandwidth to existing NR bands Ericsson other Endorsement Yes
Yes
revised No R5‑202536  
    R5‑202536 Check List for adding new NR bands and for new channel bandwidth to existing NR bands Ericsson other Endorsement Yes
Yes
noted No   R5‑201955
    R5‑202169 Proposing new test cases for small TEI-16 WIs - voice fallback indication CATT discussion Endorsement Yes
YesMotorola Mobility commented it shall be TS 38.331. Proposal is noted and endorsed.
noted No    
4.2.2 All other topics R5‑202023 Issues with BeiDou GNSS scenarios Spirent Communications discussion Discussion Yes
Yesin the next meeting the BeiDou scenarios need fixing. Offline email thread with Rohde&Schwarz, CATT et al. Affects SIG+RF. Deferred. r1
revised No R5‑202553  
4.3 RAN5 PRDs/Templates R5‑201311 RAN5#87-e LS Template WG Chairman other Information Yes
Yes
noted No    
4.4 Meeting schedule for 2020-21 R5‑201312 Meeting schedule for 2020 WG Chairman other Information Yes
Yes
noted No    
4.5 Tdocs for mid-week joint session                      
4.5.1 RF group docs for WG review/verdict - original A.I. retained                      
4.5.2 Sig group docs for WG review/verdict - original A.I. retained                      
4.5.3 Other open issues from joint sessions - original A.I. retained                      
4.5.4 UE Application Layer Data Throughput Performance TEI11_Test / TEI15_Test (TR 37.901)                      
4.5.5 GCF Test Optimisation                      
4.5.6 5GS                      
4.5.7 Other                      
5 RF Functional Area                      
5.1 Review action points (fm A.I. 2.1)                      
5.2 Review incoming LS (fm A.I. 3) & new subject discussion papers R5‑201310 LS to RAN5 on NR DL RMC configuration for UE ACS tests TSG WG RAN4 LS in Information Yes
YesMoved to RF. No CR's addressing the actions in RAn5#87e . LS author company (MTK ) , FR1 and FR2 ACS clause 7.5x test case author(s) (KEYS, Huawei, China Telecom, CMCC), to take this up in future RAN5 meetings to address the action to RAN5
noted No    
    R5‑201317 Over-the-Air Radiated Performance Testing for 5G mm-Wave (FR2) UserEquipment CTIA Certification Program Working Group - 5G Millimeter Wave Sub-Working Group LS in Information Yes
Yesmoved to RF. Presented by Keysight USA. Associated tdoc R5-202434(disc paper), R5-202435(CR), R5-202374(disc paper), R5-201846(CR), R5-201924(CR), R5-201853(CR), R5-201923(CR) response LS will be decided during the RAN5#87e RF sessions
noted No    
    R5‑201318 LS on requirement in Power Class 2 for UL MIMO Test cases GCF CAG LS in Action Yes
Yesmoved to RF. Presented by Qualcomm. Related discussion R5-202434. Related CR R5-20435.
noted No    
    R5‑202505 Reply LS from CTIA CCLLC OTA WG to the GCF SG Concerning Antenna Performance Assessments CTIA Certification Program Working Group LS in Information Yes
Yesmoved to RF. Presented by AT&T.
noted No    
5.3 Open Work Items                      
5.3.1 Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest                      
5.3.1.1 TS 36.508                      
5.3.1.2 TS 36.521-1 R5‑201481 Addition of CA_48C and CA_48D to 36.521-1 Table 7.6.2A.5.5-2 C Spire Wireless CR Agreement Yes
Yesno cl. aff. r1
revised No R5‑202705  
    R5‑202705 Addition of CA_48C and CA_48D to 36.521-1 Table 7.6.2A.5.5-2 C Spire Wireless CR Agreement Yes
Yes
agreed No   R5‑201481
    R5‑201694 Update REFSENS of some CA combinations in 7.3A.5 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.1.3 TS 36.521-2 R5‑201696 Addition of Rel-14 capabilities of multiple CA in 36.521-2 Huawei, HiSilicon CR Agreement Yes
YesRel14 r1
revised No R5‑202818  
    R5‑202818 Addition of Rel-14 capabilities of multiple CA in 36.521-2 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201696
5.3.1.4 TS 36.521-3                      
5.3.1.5 TS 37.571-1                      
5.3.1.6 TS 37.571-3                      
5.3.1.7 TS 37.571-5                      
5.3.1.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.1.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.1.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) R5‑201724 Addition of TP analysis for CA_1A-7A-7A to 36.905 Huawei, HiSilicon CR Agreement Yes
YesRel14 r1
revised No R5‑202706  
    R5‑202706 Addition of TP analysis for CA_1A-7A-7A to 36.905 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201724
    R5‑201725 Addition of TP analysis for CA_1A-7A-28A BW set2 to 36.905 Huawei, HiSilicon CR Agreement Yes
YesRel14 r1
revised No R5‑202707  
    R5‑202707 Addition of TP analysis for CA_1A-7A-28A BW set2 to 36.905 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201725
    R5‑201726 Addition of TP analysis for CA_3C-20A to 36.905 Huawei, HiSilicon CR Agreement Yes
YesRel14 r1
revised No R5‑202819  
    R5‑202819 Addition of TP analysis for CA_3C-20A to 36.905 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201726
5.3.1.11 Discussion Papers / Work Plan / TC lists                      
5.3.2 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest                      
5.3.2.1 TS 38.508-1 R5‑201337 Correction to Table 7.3.1-7 NZP-CSI-RS-Resource for TRS Huawei, Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201595 TRS - PowerControlOffset correction for UE RF testing Keysight Technologies UK Ltd CR Agreement Yes
Yes16.3.0 r1
revised No R5‑202708  
    R5‑202708 TRS - PowerControlOffset correction for UE RF testing Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑201595
    R5‑201604 Clarifications on the QoQZ validation procedure for RRM ROHDE & SCHWARZ CR Agreement Yes
Yesr1
revised No R5‑202703  
    R5‑202703 Clarifications on the QoQZ validation procedure for RRM ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑201604
    R5‑201627 Correction to PDCCH-ConfigCommon Table 4.6.3-96 for IE searchSpaceOtherSystemInformation Qualcomm Finland RFFE Oy CR Agreement Yes
Yesoverlapping with R5-201571.
withdrawn Yes    
    R5‑201731 Addition of NR SUL connection diagram in A.3.1.4 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201844 Updating DCI related messages Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202878  
    R5‑202878 Updating DCI related messages Huawei, HiSilicon CR Agreement Yes
Yes
revised No R5‑202962 R5‑201844
    R5‑202962 Updating DCI related messages Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑202878
    R5‑202084 Addition of Quiet Zone size above 30cm to TS 38.508-1 ROHDE & SCHWARZ CR Agreement Yes
Yes
not pursued No    
    R5‑202123 CR to 38.508-1 to clarify the test zone/quiet zone Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑202160 Addition of BW to Table 4.6.3-33 Qualcomm Finland RFFE Oy CR Agreement Yes
Yesr1
revised No R5‑202879  
    R5‑202879 Addition of BW to Table 4.6.3-33 Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202160
    R5‑202203 Clarification of disabling Tx diversity for FR2 UE Huawei, HiSilicon CR Agreement Yes
Yes16.3.0 r4
revised No R5‑202880  
    R5‑202880 Clarification of disabling Tx diversity for FR2 UE Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑202203
    R5‑202210 Corrections on test frequencies for inter-band EN-DC configurations within FR1 for five bands in 38.508-1 ZTE Corporation CR Agreement Yes
Yes
agreed No    
    R5‑202239 Addition of PUCCH-ResourceId for CQI reporting test case Qualcomm Wireless GmbH CR Agreement No
Yeslate doc contents are captured in doc 2243.
withdrawn Yes    
    R5‑202241 Restructuring 38.508-1 message contents for Demod and CSI reporting test cases Qualcomm Wireless GmbH CR Agreement Yes
Yesr3
revised No R5‑202881  
    R5‑202881 Restructuring 38.508-1 message contents for Demod and CSI reporting test cases Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No   R5‑202241
    R5‑202243 Update of PUCCH-ResourceId for Demod test cases Qualcomm Wireless GmbH CR Agreement Yes
Yesr2
revised No R5‑202882  
    R5‑202882 Update of PUCCH-ResourceId for Demod test cases Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No   R5‑202243
    R5‑202244 Correction to nrofRBs under TRS CSI-FrequencyOccupation for Demod test cases with 10 MHz CBW Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No    
    R5‑202246 Update to default value of PDSCH-to-HARQ_feedback timing indicator (k1) Qualcomm Wireless GmbH CR Agreement Yes
Yeslate doc r2 pending RAN4 verdict of R4-2007279 (agreed).
revised No R5‑202967  
    R5‑202967 Update to default value of PDSCH-to-HARQ_feedback timing indicator (k1) Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No   R5‑202246
    R5‑202255 Configuration of p-ZP-CSI-RS-ResourceSet for PDSCH Demod test cases Qualcomm Wireless GmbH CR Agreement Yes
Yesr2
revised No R5‑202883  
    R5‑202883 Configuration of p-ZP-CSI-RS-ResourceSet for PDSCH Demod test cases Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No   R5‑202255
    R5‑202284 Correction to configuration bwp-id parameter in TCI-State IE Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202285 Correction to PRB-Id for secondHopPRB Anritsu CR Agreement Yes
Yesr1
revised No R5‑202820  
    R5‑202820 Correction to PRB-Id for secondHopPRB Anritsu CR Agreement Yes
Yes
agreed No   R5‑202285
    R5‑202409 Update PDCCH-ControlResourceSet for RRM testing Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑202410 Addition Physical Layer Parameter section for RRM testing Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑202449 Correction of test frequencies for DC n71AA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202451 Correction of test frequencies for Band n79 ROHDE & SCHWARZ CR Agreement Yes
Yesconflict with E\\ CR R5-201984.
withdrawn Yes    
5.3.2.2 TS 38.508-2 R5‑202108 Updates on UE capability for Rel-15 NR CA configuration NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No    
    R5‑202224 Update ICS proforma tables for UE implementation types in A.4.1 of 38.508-2 ZTE Corporation CR Agreement Yes
Yesr1
revised No R5‑202709  
    R5‑202709 Update ICS proforma tables for UE implementation types in A.4.1 of 38.508-2 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑202224
    R5‑202226 Update NR intra-band contiguous CA implementation capabilities in 38.508-2 ZTE Corporation CR Agreement Yes
Yes
agreed No    
    R5‑202228 Update RF baseline implementation capabilities in 38.508-2 ZTE Corporation CR Agreement Yes
Yes
agreed No    
    R5‑202286 Introducing new condition on UE reported parameter in txDirectCurrentLocation Anritsu CR Agreement Yes
Yes"Associated discussion R5-202417 Author confirmed no overlap Depends on the outcome of discussion 2417 during the meeting, may not needed RAN5 RF decided to use option2 prop1 of 2417 hence this can be w/drawn"
withdrawn Yes    
    R5‑202446 Addition of EN-DC configurations DC_41C_n41A and DC_41D_n41A ROHDE & SCHWARZ CR Agreement Yes
Yeslate doc
agreed No    
5.3.2.3 TS 38.509 R5‑202118 CR to 38.509 to clarify UBF for Intra-Band Carrier Aggregation Keysight Technologies UK Ltd CR Agreement Yes
YesR5-xx r1
revised No R5‑202884  
    R5‑202884 CR to 38.509 to clarify UBF for Intra-Band Carrier Aggregation Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑202118
5.3.2.4 TS 38.521-1                      
5.3.2.4.1 Tx Requirements (Clause 6) R5‑201598 Correction of lower limit for test ID 55 in test 6.2.3 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑201599 Correction on how to modify P-Max in test 6.2.4 and 6.2D.4 Keysight Technologies UK Ltd CR Agreement Yes
Yesnot strictly needed.
withdrawn Yes    
    R5‑201732 Update of Test requirement of NS_100 in NR test case 6.2.3 A-MPR Huawei,Hisilicon CR Agreement Yes
YesRAN4 may submit a CR to clarify this in next meeting.
withdrawn Yes    
    R5‑201733 Update of NR test case 6.2A.3 AMPR for CA Huawei,Hisilicon CR Agreement Yes
Yesr2
revised No R5‑202710  
    R5‑202710 Update of NR test case 6.2A.3 AMPR for CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑201733
    R5‑201734 Addition of NR test case 6.3C.1 Minimum output power for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201735 Addition of NR test case 6.3C.2 Transmit OFF power for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201736 Addition of NR test case 6.3C.3 Transmit ON/OFF time mask for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201737 Addition of NR test case 6.3C.4.1-Absolute power tolerance for SUL Huawei,Hisilicon CR Agreement Yes
Yesr2
revised No R5‑202711  
    R5‑202711 Addition of NR test case 6.3C.4.1-Absolute power tolerance for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑201737
    R5‑201738 Addition of NR test case 6.3C.4.2 Power Control Relative power tolerance for SUL Huawei,Hisilicon CR Agreement Yes
Yesr2
revised No R5‑202712  
    R5‑202712 Addition of NR test case 6.3C.4.2 Power Control Relative power tolerance for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑201738
    R5‑201739 Addition of NR test case 6.3C.4.3 Aggregate power tolerance for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201740 Update of NR test case 6.5.2.4 ACLR Huawei,Hisilicon CR Agreement Yes
Yesr1
revised No R5‑202713  
    R5‑202713 Update of NR test case 6.5.2.4 ACLR Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑201740
    R5‑201741 Update of NR test case 6.5C.3.3-Additional spurious emissions for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201763 Aligning A-MPR clause with TS 38.101-1 Rel-15 Ericsson CR Agreement Yes
Yesr1
revised No R5‑202886  
    R5‑202886 Aligning A-MPR clause with TS 38.101-1 Rel-15 Ericsson CR Agreement Yes
Yes
agreed No   R5‑201763
    R5‑201766 Update of test case 6.2.3 UE A_MPR, NS_40 Ericsson CR Agreement Yes
Yesr2
revised No R5‑202821  
    R5‑202821 Update of test case 6.2.3 UE A_MPR, NS_40 Ericsson CR Agreement Yes
Yes
agreed No   R5‑201766
    R5‑201768 Update of test case 6.2.3 UE A_MPR, NS_41 Ericsson CR Agreement Yes
Yesr3
revised No R5‑202822  
    R5‑202822 Update of test case 6.2.3 UE A_MPR, NS_41 Ericsson CR Agreement Yes
Yes
agreed No   R5‑201768
    R5‑201770 Update of test case 6.2.3 UE A_MPR, NS_42 Ericsson CR Agreement Yes
Yesr2
revised No R5‑202714  
    R5‑202714 Update of test case 6.2.3 UE A_MPR, NS_42 Ericsson CR Agreement Yes
Yes
agreed No   R5‑201770
    R5‑201833 Update of Refsense requirements for n79 Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
    R5‑201845 Editorial correction of 6.2.1 test requirements Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201846 Updating 6.2.1 to add test method for UEs with 2 Tx antennas Huawei, HiSilicon CR Agreement Yes
YesOPPO agreed with Huawei that single port cannot be included in the UL MIMO case. The codebook using in UL MIMO case is applied for 2-layer UL MIMO transmission which is impossible to use with only one antenna port. Better capture this requirement in 6.2.1. Qualcomm: this CR is addressing Transmit Diversity: We agreeo that measurements are per port, but when you use two connectors mapped to one port and sum powers => Transmit diversity (TxD), for which there are no RAN 4 requirements. So the request is to please allow RAN 4 to figure out Transmit diversity requirements, and it could be discussed and support your TxD proposals for 38.521-1 -> 6.2.1. Otherwise it will generate confusion, especially if RAN 4 eventually agrees on something else after we prematurely forced something in RAN 5 spec. Therefore requesting to withdraw the CR.
not pursued No    
    R5‑201847 Updating 6.3.4.3 alternating sub-test Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201935 Updates to test case 6.2.2 UE maximum output power reduction Ericsson CR Agreement Yes
YesBased on offline discussions this CR is not agreeable.
withdrawn Yes    
    R5‑201936 Updates to test case 6.5.2.4.1, NR ACLR Ericsson CR Agreement Yes
Yesr3
revised No R5‑202940  
    R5‑202940 Updates to test case 6.5.2.4.1, NR ACLR Ericsson CR Agreement Yes
Yes
agreed No   R5‑201936
    R5‑201937 Updates to test case 6.5.2.2, Spectrum Emission Mask Ericsson CR Agreement Yes
Yesr2
revised No R5‑202765  
    R5‑202765 Updates to test case 6.5.2.2, Spectrum Emission Mask Ericsson CR Agreement Yes
Yes
agreed No   R5‑201937
    R5‑202110 NS_05 corrections related to n65 Dish Network CR Agreement Yes
Yesr1
revised No R5‑202887  
    R5‑202887 NS_05 corrections related to n65 Dish Network CR Agreement Yes
Yes
agreed No   R5‑202110
    R5‑202172 correction 6.5.3.1.3 general spurious emission limits T-Mobile USA Inc. CR Agreement Yes
YesR5 Content is included in R5-202431.
withdrawn Yes    
    R5‑202188 Corrections on network signalling value abbreviation in 38.521-1 ZTE Corporation CR Agreement Yes
Yesr1
revised No R5‑202888  
    R5‑202888 Corrections on network signalling value abbreviation in 38.521-1 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑202188
    R5‑202206 Corrections on NS signalling label for band n39 in 38.521-1 ZTE Corporation, Ericsson, Qualcomm, China Unicom, Bureau Veritas, Huawei, Hisilicon CR Agreement Yes
Yesr3
revised No R5‑202889  
    R5‑202889 Corrections on NS signalling label for band n39 in 38.521-1 ZTE Corporation, Ericsson, Qualcomm, China Unicom, Bureau Veritas, Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑202206
    R5‑202211 Correct power window size to 6.4.2.2 Guangdong OPPO Mobile Telecom. CR Agreement Yes
Yesmerged into R5-202420.
withdrawn Yes    
    R5‑202217 Corrections on transmitter power for CA in 38.521-1 ZTE Corporation CR Agreement Yes
Yes
agreed No    
    R5‑202287 Correction on txDirectCurrentLocation in FR1 SA tests Anritsu CR Agreement Yes
Yesr1
revised No R5‑202890  
    R5‑202890 Correction on txDirectCurrentLocation in FR1 SA tests Anritsu CR Agreement Yes
Yes
agreed No   R5‑202287
    R5‑202420 Update Uplink power control window size for SA TX TCs QUALCOMM Europe Inc. - Italy, OPPO CR Agreement Yes
Yesr1 Merge changes in R5-202211.
revised No R5‑202715  
    R5‑202715 Update Uplink power control window size for SA TX TCs QUALCOMM Europe Inc. - Italy, OPPO CR Agreement Yes
Yes
agreed No   R5‑202420
    R5‑202427 Update for 6.5.3.3 Additional spurious emissions QUALCOMM Europe Inc. - Italy CR Agreement Yes
Yesr4
revised No R5‑202823  
    R5‑202823 Update for 6.5.3.3 Additional spurious emissions QUALCOMM Europe Inc. - Italy CR Agreement Yes
Yes
agreed No   R5‑202427
    R5‑202431 Update for 6.5.3.1 General spurious emissions QUALCOMM Europe Inc. - Italy, T-Mobile USA CR Agreement Yes
Yesr1
revised No R5‑202716  
    R5‑202716 Update for 6.5.3.1 General spurious emissions QUALCOMM Europe Inc. - Italy, T-Mobile USA CR Agreement Yes
Yes
agreed No   R5‑202431
    R5‑202435 Updated MOP UL MIMO test case to include steps for per port testing QUALCOMM JAPAN LLC. CR Agreement Yes
YesQualcomm: we address UL MIMO & SISO Power class consistency: Huawei's points w.r.t to QC's newly added step 4 in this CR are valid. Perhaps we need some corrections. Two other options are possible. r2
revised No R5‑202891  
    R5‑202891 Updated MOP UL MIMO test case to include steps for per port testing QUALCOMM JAPAN LLC. CR Agreement Yes
Yes
agreed No   R5‑202435
5.3.2.4.2 Rx Requirements (Clause 7) R5‑201597 Correction of 4RX Reference requirement for n77 high range in 7.3.2 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑201742 Update test description of NR test case 7.6.3-Out-of-band blocking Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201743 Addition of NR test case 7.6C.2-Inband Blocking for SUL Huawei,Hisilicon CR Agreement Yes
Yesr1
revised No R5‑202717  
    R5‑202717 Addition of NR test case 7.6C.2-Inband Blocking for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑201743
    R5‑201744 Addition of NR test case 7.6C.3 Out-of-band blocking for SUL Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201841 Skipping 2Rx testing on bands where UE support 4Rx for SA test cases Huawei, HiSilicon, CAICT, OPPO, Samsung, Bureau Veritas CR Agreement Yes
YesDish did not agree to this interpretation, 2Rx antenna port testing is required, and furthermore, this is a RAN4 required change. r3
revised No R5‑202941  
    R5‑202941 Skipping 2Rx testing on bands where UE support 4Rx for SA test cases Huawei, HiSilicon, CAICT, OPPO, Samsung, Bureau Veritas CR Agreement Yes
Yes
agreed No   R5‑201841
    R5‑201848 Updating REFSENS to add several R15 CA configurations Huawei, HiSilicon CR Agreement Yes
Yesr1 to be withdrawn and merged into 2377r1.
revised No R5‑202875  
    R5‑202875 Updating REFSENS to add several R15 CA configurations Huawei, HiSilicon CR Agreement Yes
Yes
withdrawn Yes   R5‑201848
    R5‑202109 Correction to n70 asymmetric test points in Rx tests Dish Network CR Agreement Yes
Yes
agreed No    
    R5‑202377 Re-organization of CA refsens test cases Ericsson, WE Certification, DISH CR Agreement Yes
Yesr1
revised No R5‑202942  
    R5‑202942 Re-organization of CA refsens test cases Ericsson, WE Certification, DISH CR Agreement Yes
Yes
agreed No   R5‑202377
    R5‑202380 Update of UL configuration in REFSENS Huawei, HiSilicon, Guangdong OPPO Mobile Telecom CR Agreement Yes
Yesr1 revision includes changes in R5-202426. r2
revised No R5‑202718  
    R5‑202718 Update of UL configuration in REFSENS Huawei, HiSilicon, Guangdong OPPO Mobile Telecom CR Agreement Yes
Yes
agreed No   R5‑202380
    R5‑202394 Diversity Characteristics requirements alignment Samsung R&D Institute UK CR Agreement Yes
Yesr1
revised No R5‑202719  
    R5‑202719 Diversity Characteristics requirements alignment Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑202394
    R5‑202426 Update for 7.3.2 Ref sensitivity power level QUALCOMM Europe Inc. - Italy CR Agreement Yes
Yesmerged into Huawei's R5-202380.
withdrawn Yes    
5.3.2.4.3 Clauses 1-5 / Annexes R5‑201452 Updates of MU and TT in TS 38.521_1 NTT DOCOMO INC. CR Agreement No
Yes
withdrawn Yes    
    R5‑201455 Updates of MU and TT in TS 38.521-1 NTT DOCOMO INC. CR Agreement Yes
YesThere is no agreement for -1 MU and TT during this meeting except for Huawei’s papers (0392_Dp, 0393_CR).
withdrawn Yes    
    R5‑201596 Correction and clarifications of default DL physical channels power in annex C Keysight Technologies UK Ltd CR Agreement Yes
Yesr2
revised No R5‑202892  
    R5‑202892 Correction and clarifications of default DL physical channels power in annex C Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑201596
    R5‑201745 Update of Annex F.3.2 and F.3.3 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201801 Update of clause 5 to TS 38.521-1 in R15 China Unicom CR Agreement Yes
Yesr1
agreed No    
    R5‑201834 Correction of FR1 PUCCH EVM definition Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
    R5‑202405 Receiver characteristics testing update to 38.521-1 Samsung R&D Institute UK CR Agreement Yes
Yes
revised No R5‑202807  
    R5‑202807 Receiver characteristics testing update to 38.521-1 Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑202405
    R5‑202422 Update F.1.2 with Relative Uplink power measurement uncertainty as 6.3.4.3 QUALCOMM Europe Inc. - Italy CR Agreement Yes
Yes
agreed No    
    R5‑202503 CR on EVM Window Centre Timing Definition in FR1 Skyworks Solutions Inc. CR Agreement Yes
Yeslate doc
agreed No    
5.3.2.5 TS 38.521-2 R5‑202119 CR to 38.521-2 to correct Clenshaw-Curtis Weights at the Poles for CDF/CCDF Keysight Technologies UK Ltd, Verizon, ETS-Lindgren Europe CR Agreement Yes
Yesr1 changes over changes. r2
revised No R5‑202720  
    R5‑202720 CR to 38.521-2 to correct Clenshaw-Curtis Weights at the Poles for CDF/CCDF Keysight Technologies UK Ltd, Verizon, ETS-Lindgren Europe CR Agreement Yes
Yes
agreed No   R5‑202119
    R5‑202120 CR to 38.521-2 to correct Clenshaw-Curtis Weight Equations Keysight Technologies UK Ltd, Verizon, ETS-Lindgren Europe CR Agreement Yes
Yes
agreed No    
    R5‑202121 CR to 38.521-2 to properly define Link and Meas Angles Keysight Technologies UK Ltd CR Agreement Yes
Yesr1
revised No R5‑202721  
    R5‑202721 CR to 38.521-2 to properly define Link and Meas Angles Keysight Technologies UK Ltd CR Agreement Yes
Yeswrong Tdoc# on cover.
revised No R5‑203117 R5‑202121
    R5‑203117 CR to 38.521-2 to properly define Link and Meas Angles Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑202721
    R5‑202122 CR to 38.521-2 to clarify the applicability of QoQZ validation Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑202381 CR to 38.521-2: On the order of test steps for output power dynamics test cases Keysight Technologies UK Ltd CR Agreement Yes
Yesr1
revised No R5‑202943  
    R5‑202943 CR to 38.521-2: On the order of test steps for output power dynamics test cases Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑202381
5.3.2.5.1 Tx Requirements (Clause 6) R5‑201328 Add n261 to FR2 ACLR requirements Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No    
    R5‑201329 Add NS 202 requirements to FR2 additional spurious emission test case Qualcomm Finland RFFE Oy CR Agreement Yes
Yesr1
revised No R5‑202885  
    R5‑202885 Add NS 202 requirements to FR2 additional spurious emission test case Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑201329
    R5‑201330 Update to UBF command implementation for Relative power sub tests Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No    
    R5‑201795 Introduction of New TC 6.4A.2.2.4 Carrier leakage for 5UL CA LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑201796 Introduction of New TC 6.4A.2.2.5 Carrier leakage for 6UL CA LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑201797 Introduction of New TC 6.4A.2.2.6 Carrier leakage for 7UL CA LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑201811 Introduction of New TC 6.4A.2.2.7 Carrier leakage for 8UL CA LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑201812 Introduction of New TC 6.4A.2.3.2 In-band emissions for 3UL CA LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑201813 Introduction of New TC 6.4A.2.3.3 In-band emissions for 4UL CA LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑201814 Introduction of New TC 6.4A.2.3.4 In-band emissions for 5UL CA LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑201815 Introduction of New TC 6.4A.2.3.5 In-band emissions for 6UL CA LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑201849 Updating common uplink allocation for PC1 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201850 Cleaning up references to common uplink configuration Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201851 Updating test requirements of 6.2.3 AMPR for NS_201 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑202028 Beam correspondence - SRS configuration corrections in section 6.6.1 Keysight Technologies UK Ltd CR Agreement Yes
YesOverlapping with R5-202408. r1 R4-2008014 was not agreed because more time was requested for further study so conclusion is to postpone further discussion to Aug meeting.
revised No R5‑202995  
    R5‑202995 Beam correspondence - SRS configuration corrections in section 6.6.1 Keysight Technologies UK Ltd CR Agreement No
Yeswithdrawn after the meeting based on RAN4 outcome.
withdrawn Yes   R5‑202028
    R5‑202045 Correction of test metric in minimum conformace requirements and some test style in 6.3.2 of SA FR2 R15 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑202083 Addition of Quiet Zone size above 30cm to TS 38.521-2 ROHDE & SCHWARZ CR Agreement Yes
YesAuthor confirmed no conflict, : based on outcome of discussion paper, propose to mark this CR as ""Not Pursued""."
not pursued No    
    R5‑202130 Editorial correction of test case 6.5.1 Occupied bandwidth to align with core spec KTL CR Agreement Yes
Yesr1
revised No R5‑202893  
    R5‑202893 Editorial correction of test case 6.5.1 Occupied bandwidth to align with core spec KTL CR Agreement Yes
Yes
agreed No   R5‑202130
    R5‑202131 Editorial correction of Tx test cases for Out of band emission to align with core spec KTL CR Agreement Yes
Yesr1
revised No R5‑202894  
    R5‑202894 Editorial correction of Tx test cases for Out of band emission to align with core spec KTL CR Agreement Yes
Yes
agreed No   R5‑202131
    R5‑202132 Update to test case 6.5A.1.1 Occupied bandwidth for 2UL CA KTL, NTT DOCOMO INC. CR Agreement Yes
Yesr2
revised No R5‑202824  
    R5‑202824 Update to test case 6.5A.1.1 Occupied bandwidth for 2UL CA KTL, NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202132
    R5‑202133 Update to 6 test cases 6.5A.1.x Occupied bandwidth for 3 to 8 UL CA KTL CR Agreement Yes
Yes"Version inconsistency, Release inconsistency -3GU: 15.3.0 / CR coversheet: 16.3.0 -3GU: Rel-15 / CR coversheet: Rel-16" reissued as R5-202501 because of wrong Rel and version
withdrawn Yes    
    R5‑202501 Update to 6 test cases 6.5A.1.x Occupied bandwidth for 3 to 8 UL CA KTL, NTT DOCOMO INC. CR Agreement Yes
Yesr2
revised No R5‑202827  
    R5‑202827 Update to 6 test cases 6.5A.1.x Occupied bandwidth for 3 to 8 UL CA KTL, NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202501
    R5‑202134 Update to test case 6.5A.2.1.1 Spectrum Emission Mask for 2UL CA KTL, NTT DOCOMO INC. CR Agreement Yes
Yesr2
revised No R5‑202825  
    R5‑202825 Update to test case 6.5A.2.1.1 Spectrum Emission Mask for 2UL CA KTL, NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202134
    R5‑202135 Update to 6 test cases 6.5A.2.1.x Spectrum Emission Mask for 3 to 8 UL CA KTL CR Agreement Yes
Yes
agreed No    
    R5‑202136 Update to test case 6.5A.2.2.1 Adjacent channel leakage ratio for 2UL CA KTL, NTT DOCOMO INC. CR Agreement Yes
Yesr2
revised No R5‑202826  
    R5‑202826 Update to test case 6.5A.2.2.1 Adjacent channel leakage ratio for 2UL CA KTL, NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202136
    R5‑202137 Update to 6 test cases 6.5A.2.2.x Adjacent channel leakage ratio for 3 to 8 UL CA KTL CR Agreement Yes
Yes
agreed No    
    R5‑202199 Clarification of disabling Tx diversity for FR2 UE for SA FR2 testing Huawei, HiSilicon CR Agreement Yes
Yesr2
revised No R5‑202895  
    R5‑202895 Clarification of disabling Tx diversity for FR2 UE for SA FR2 testing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑202199
    R5‑202209 Updates of Test Points of Tx CA test cases NTT DOCOMO INC. CR Agreement Yes
Yesr2
revised No R5‑202896  
    R5‑202896 Updates of Test Points of Tx CA test cases NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202209
    R5‑202288 Correction on txDirectCurrentLocation in FR2 SA tests Anritsu CR Agreement Yes
Yesr1
revised No R5‑202897  
    R5‑202897 Correction on txDirectCurrentLocation in FR2 SA tests Anritsu CR Agreement Yes
Yes
agreed No   R5‑202288
    R5‑202396 Additions to Initial Conditions and Messages for SRS time mask with UL MIMO Samsung R&D Institute UK CR Agreement Yes
Yesr1 was prooduced to remove the overlap with Ericsson’s CR in R5-201939.
revised No R5‑202722  
    R5‑202722 Additions to Initial Conditions and Messages for SRS time mask with UL MIMO Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑202396
    R5‑202408 Addition to Beam Correspondence test Samsung R&D Institute UK CR Agreement Yes
Yesconflict with Keysight's R5-202028
withdrawn Yes    
    R5‑202450 Correction of Spectrum Emission Mask CA test cases ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202456 Update on transmit modulation quality test cases ROHDE & SCHWARZ CR Agreement Yes
Yeslate doc r1
revised No R5‑202898  
    R5‑202898 Update on transmit modulation quality test cases ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑202456
5.3.2.5.2 Rx Requirements (Clause 7) R5‑201938 Aligning test procedure for Rx beam peak direction Ericsson CR Agreement Yes
Yesr1
revised No R5‑202723  
    R5‑202723 Aligning test procedure for Rx beam peak direction Ericsson CR Agreement Yes
Yes
agreed No   R5‑201938
    R5‑201939 Updating SRS config table in test case 6.3D.3.4 Ericsson CR Agreement Yes
Yesr1
revised No R5‑202828  
    R5‑202828 Updating SRS config table in test case 6.3D.3.4 Ericsson CR Agreement Yes
Yes
agreed No   R5‑201939
    R5‑202046 Correction of uplink configuration table number in minimum conformace requirements and test requirement table of 7.4 of SA FR2 R15 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑202289 Update to SA FR2 Receiver Spurious Emission Test Case Anritsu CR Agreement Yes
Yesr2
revised No R5‑202899  
    R5‑202899 Update to SA FR2 Receiver Spurious Emission Test Case Anritsu CR Agreement Yes
Yes
agreed No   R5‑202289
    R5‑202447 Editorial correction to the test requirement of in-band blocking ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
5.3.2.5.3 Clauses 1-5 / Annexes R5‑201453 Updates of MU and TT in TS 38.521-2 NTT DOCOMO INC. CR Agreement Yes
Yesmerged into R5-202290
withdrawn Yes    
    R5‑201835 Correction of FR2 PUCCH EVM definition Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
    R5‑202027 Beam correspondence - SRS configuration corrections in annex K.1.1 Keysight Technologies UK Ltd CR Agreement Yes
YesR4-2008014 was not agreed because more time was requested for further study so conclusion is to postpone further discussion to Aug meeting. Withdrawn after the meeting based on RAN4 outcome.
withdrawn Yes    
    R5‑202044 Alignment of section 3 and 5 with core spec of SA FR2 R15 CAICT CR Agreement Yes
Yesr1
revised No R5‑202724  
    R5‑202724 Alignment of section 3 and 5 with core spec of SA FR2 R15 CAICT CR Agreement Yes
Yes
agreed No   R5‑202044
    R5‑202245 Core spec alignment of k1 value for RF test cases Qualcomm Wireless GmbH CR Agreement Yes
Yesr1 pending RAN4 verdict of R4-2007279 (agreed).
revised No R5‑202968  
    R5‑202968 Core spec alignment of k1 value for RF test cases Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No   R5‑202245
    R5‑202290 Updates of FR2 MU and TT in TS 38.521-2 Anritsu, NTT DOCOMO INC. CR Agreement Yes
Yescl. aff. r4
revised No R5‑202900  
    R5‑202900 Updates of FR2 MU and TT in TS 38.521-2 Anritsu, NTT DOCOMO INC. CR Agreement Yes
Yesfirst agreed, then a conflict with KTL's R5-202894 was spotted concerning Step 3.
revised No R5‑202990 R5‑202290
    R5‑202990 Updates of FR2 MU and TT in TS 38.521-2 Anritsu, NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202900
    R5‑202406 Receiver characteristics testing update to 38.521-2 Samsung R&D Institute UK CR Agreement Yes
Yes
revised No R5‑202808  
    R5‑202808 Receiver characteristics testing update to 38.521-2 Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑202406
    R5‑202453 CR to TR 38.521-2 on DUT alignment options ROHDE & SCHWARZ CR Agreement Yes
YesKeysight could not agree to limiting the tablet positioning to a single alignment option. We cannot make assumptions on antenna placements for laptops and since the re-positioning concept is an integral aspect of NR FR2 UE RF testing including QoQZ, we cannot agree not to include this concept for laptops. KEYS, R&S comment to the CR no agreement, w/draw or not pursued R&S: preference is not pursued"
not pursued No    
    R5‑202504 CR on EVM Window Centre Timing Definition in FR2 Skyworks Solutions Inc. CR Agreement Yes
Yeslate doc
agreed No    
5.3.2.6 TS 38.521-3                      
5.3.2.6.1 Tx Requirements (Clause 6) R5‑201601 Correction on the channel bandwidth to use in section 6.5B.3.3 Keysight Technologies UK Ltd CR Agreement Yes
Yesr2
revised No R5‑202725  
    R5‑202725 Correction on the channel bandwidth to use in section 6.5B.3.3 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑201601
    R5‑201602 Setting p-MaxEUTRA to avoid limiting NR power in section 6.5B Keysight Technologies, OPPO Mobile Telecom CR Agreement Yes
Yesr2
revised No R5‑202726  
    R5‑202726 Setting p-MaxEUTRA to avoid limiting NR power in section 6.5B Keysight Technologies, OPPO Mobile Telecom CR Agreement Yes
Yes
agreed No   R5‑201602
    R5‑201836 Correction to TC 6.2B.4.1.3 Rohde & Schwarz CR Agreement Yes
Yesr1 remove overlap with R5-201858.
revised No R5‑202727  
    R5‑202727 Correction to TC 6.2B.4.1.3 Rohde & Schwarz CR Agreement Yes
Yes
agreed No   R5‑201836
    R5‑201842 Skipping 2Rx testing on bands where UE support 4Rx for NSA test cases Huawei, HiSilicon, Samsung, Bureau Veritas CR Agreement Yes
YesDish did not agree to this interpretation, 2Rx antenna port testing is required, and furthermore, this is a RAN4 required change. r2
revised No R5‑202944  
    R5‑202944 Skipping 2Rx testing on bands where UE support 4Rx for NSA test cases Huawei, HiSilicon, Samsung, Bureau Veritas CR Agreement Yes
YesAs per offline discussion on topic of skipping 2Rx testing, it was agreed with an approach of adding a NOTE in every configuration table. This approach is implemented in R5-202941 for TS 38.521-1, but in R5-202944 for TS 38.521-3 there was no time to do it. Will bring a CR for 38.521-3 for next meeting.
withdrawn Yes   R5‑201842
    R5‑201853 Updating 6.2B.1.1 MOP for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202945  
    R5‑202945 Updating 6.2B.1.1 MOP for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201853
    R5‑201854 Updating 6.2B.1.2 MOP for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202946  
    R5‑202946 Updating 6.2B.1.2 MOP for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201854
    R5‑201855 Update of 6.2B.1.3 MOP for inter-band EN-DC Huawei, HiSilicon, Samsung CR Agreement Yes
Yes
agreed No    
    R5‑201858 Updating 6.2B.4.x configured output power test cases for FR1 EN-DC Huawei, HiSilicon, Samsung CR Agreement Yes
Yes"Title inconsistency -3G 6.2B.4.missing! r1
revised No R5‑202728  
    R5‑202728 Updating 6.2B.4.x configured output power test cases for FR1 EN-DC Huawei, HiSilicon, Samsung CR Agreement Yes
Yes
agreed No   R5‑201858
    R5‑201859 Updating A-SE to align test points with A-MPR Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201870 Update of test configuration in 6.5B.3.3.2 for UE co-existence Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑201908 Addition of 6.2B.1.3A UE Maximum Output Power for inter-band NE-DC Huawei,Hisilicon CR Agreement Yes
YesRAN5 plan for Option 4,5 and 7 is still under discussion, and the referenced NE-DC configuration (DC_n1A_28A) have not been assigned to any company.
withdrawn Yes    
    R5‑201909 Addition of 6.2B.4.1.3A Configured Output Power level for inter-band NE-DC Huawei,Hisilicon CR Agreement Yes
Yessame as R5-201908
withdrawn Yes    
    R5‑201910 Addition of 6.2B.1.5D UE Maximum Output Power for Inter-Band EN-DC including both FR1 and FR2 for UL-MIMO Huawei,Hisilicon CR Agreement Yes
Yesr1
revised No R5‑202829  
    R5‑202829 Addition of 6.2B.1.5D UE Maximum Output Power for Inter-Band EN-DC including both FR1 and FR2 for UL-MIMO Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑201910
    R5‑201911 Addition of 6.2B.5.1.1 Configured Output Power Level for Inter-band NR-DC between FR1 and FR2 Huawei,Hisilicon CR Agreement Yes
Yesr1
revised No R5‑202830  
    R5‑202830 Addition of 6.2B.5.1.1 Configured Output Power Level for Inter-band NR-DC between FR1 and FR2 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑201911
    R5‑201946 Updates to 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC Ericsson CR Agreement Yes
Yesr2
revised No R5‑202947  
    R5‑202947 Updates to 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No   R5‑201946
    R5‑201947 Updates to 6.5B.2.1.1, Spectrum emissions mask for intra-band contiguous EN-DC Ericsson CR Agreement Yes
Yesr3
revised No R5‑202948  
    R5‑202948 Updates to 6.5B.2.1.1, Spectrum emissions mask for intra-band contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No   R5‑201947
    R5‑201948 Updates to 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC Ericsson CR Agreement Yes
Yesr2
revised No R5‑202949  
    R5‑202949 Updates to 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No   R5‑201948
    R5‑202173 correction 6.3B.1.3 to include anchor agnostic approach applies T-Mobile USA Inc. CR Agreement Yes
YesR5 r1
revised No R5‑202729  
    R5‑202729 correction 6.3B.1.3 to include anchor agnostic approach applies T-Mobile USA Inc. CR Agreement Yes
Yes
agreed No   R5‑202173
    R5‑202200 Clarification of disabling Tx diversity for FR2 UE for NSA FR2 testing Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202730  
    R5‑202730 Clarification of disabling Tx diversity for FR2 UE for NSA FR2 testing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑202200
    R5‑202207 Updation of 6.5B.3.3.1 Guangdong OPPO Mobile Telecom. CR Agreement Yes
Yesr1
revised No R5‑202731  
    R5‑202731 Updation of 6.5B.3.3.1 Guangdong OPPO Mobile Telecom. CR Agreement Yes
Yes
agreed No   R5‑202207
    R5‑202208 Updation of 6.5B.3.3.2 Guangdong OPPO Mobile Telecom. CR Agreement Yes
Yesmerged into R5-201602.
withdrawn Yes    
    R5‑202216 Updates of Tx test cases for EN-DC including FR2 NTT DOCOMO INC. CR Agreement Yes
Yesr1
revised No R5‑202959  
    R5‑202959 Updates of Tx test cases for EN-DC including FR2 NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202216
    R5‑202230 Update to configured output power relaxation due to inter-band EN-DC in 38.521-3 ZTE Corporation CR Agreement Yes
Yesr1
revised No R5‑202964  
    R5‑202964 Update to configured output power relaxation due to inter-band EN-DC in 38.521-3 ZTE Corporation CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑202230
    R5‑202292 Correction on txDirectCurrentLocation in NSA tests Anritsu CR Agreement Yes
Yesfocus on single carrier and inter-band EN-DC(anchor agnostic applies) as a start point Anritsu feedback :as I focus on single carrier and inter-band EN-DC(anchor agnostic applies) as a start point. not necessary to have this change can be w/drawn"
withdrawn Yes    
    R5‑202294 Correction to Frequency error for Intra-band contiguous EN-DC Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202295 Correction to PRACH configuration for intra-band EN-DC tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202395 Power control for EN-DC Samsung R&D Institute UK CR Agreement Yes
Yesr2
revised No R5‑202901  
    R5‑202901 Power control for EN-DC Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑202395
    R5‑202421 Update Uplink power control window size for NSA TX TCs QUALCOMM Europe Inc. - Italy CR Agreement Yes
Yes
agreed No    
    R5‑202476 Addition of UL-MIMO EN-DC tests in Clause 6 Qualcomm Austria RFFE GmbH CR Agreement Yes
Yesr1
revised No R5‑202732  
    R5‑202732 Addition of UL-MIMO EN-DC tests in Clause 6 Qualcomm Austria RFFE GmbH CR Agreement Yes
Yes
agreed No   R5‑202476
    R5‑202478 Common updates across tests in Clause 6 Qualcomm Austria RFFE GmbH CR Agreement Yes
Yesr1
revised No R5‑202733  
    R5‑202733 Common updates across tests in Clause 6 Qualcomm Austria RFFE GmbH CR Agreement Yes
Yes
agreed No   R5‑202478
5.3.2.6.2 Rx Requirements (Clause 7) R5‑201783 Updated structure for RefSens for EN-DC within FR1 more than 2CCs Bureau Veritas, Huawei, HiSilicon CR Agreement Yes
Yesr2
revised No R5‑202902  
    R5‑202902 Updated structure for RefSens for EN-DC within FR1 more than 2CCs Bureau Veritas, Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201783
    R5‑201860 Updating REFSENS for 1A_n78A and 3A_n78A Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202903  
    R5‑202903 Updating REFSENS for 1A_n78A and 3A_n78A Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201860
    R5‑201912 Addition of 7.4B.3A Maximum Input Level for inter-band NE-DC Huawei,Hisilicon CR Agreement Yes
Yessame as R5-201908
withdrawn Yes    
    R5‑202030 Completion of TC 7.6B.3.3 OOBB Inter-band EN-DC 2CCs within FR1 R15 CAICT CR Agreement Yes
Yesr1
revised No R5‑202991  
    R5‑202991 Completion of TC 7.6B.3.3 OOBB Inter-band EN-DC 2CCs within FR1 R15 CAICT CR Agreement Yes
Yes
agreed No   R5‑202030
    R5‑202031 Completion of TC 7.7B.3 Spurious Response Inter-band EN-DC 2CCs within FR1 R15 CAICT CR Agreement Yes
Yesr1
revised No R5‑202992  
    R5‑202992 Completion of TC 7.7B.3 Spurious Response Inter-band EN-DC 2CCs within FR1 R15 CAICT CR Agreement Yes
Yes
agreed No   R5‑202031
    R5‑202032 Correction of Initial condition for OOBB intra-band contiguous EN-DC 2 CCs in FR1 in TC 7.6B.3.1 R15 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑202033 Alignment of requirements in 7.6B and 7.7B with core spec for Intra-band contiguous EN-DC in FR1 R15 CAICT CR Agreement Yes
Yesr1
revised No R5‑202993  
    R5‑202993 Alignment of requirements in 7.6B and 7.7B with core spec for Intra-band contiguous EN-DC in FR1 R15 CAICT CR Agreement Yes
Yes
agreed No   R5‑202033
    R5‑202112 Introduction of Rx test cases for EN-DC within FR1 3CCs NTT DOCOMO INC. CR Agreement Yes
Yes() in Word name r1
revised No R5‑202904  
    R5‑202904 Introduction of Rx test cases for EN-DC within FR1 3CCs NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202112
    R5‑202204 Updating REFSENS for several 3CC configurations Huawei, HiSilicon CR Agreement Yes
Yesmerged into R5-202428.
withdrawn Yes    
    R5‑202219 Introduction of Spurious Emissions for inter-band EN-DC including FR2 2CCs NTT DOCOMO INC. CR Agreement Yes
Yes() overlapped with Anritsu's R5-202296.
withdrawn Yes    
    R5‑202231 Update to REFSENS relaxation due to inter-band EN-DC in 38.521-3 ZTE Corporation CR Agreement Yes
Yesr1
revised No R5‑202965  
    R5‑202965 Update to REFSENS relaxation due to inter-band EN-DC in 38.521-3 ZTE Corporation CR Agreement Yes
Yesagreed after the meeting.
agreed No   R5‑202231
    R5‑202293 Correction to 7.3B.2.3 test configuration for EN-DC 26_n79 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202296 Update to NSA FR2 Receiver Spurious Emission Test Case Anritsu, NTT DOCOMO INC. CR Agreement Yes
Yesr1
revised No R5‑202905  
    R5‑202905 Update to NSA FR2 Receiver Spurious Emission Test Case Anritsu, NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202296
    R5‑202428 Add 7.3B.2.3_1.2 Reference sensitivity for EN-DC within FR1v - 4 CCs QUALCOMM Europe Inc. - Italy CR Agreement Yes
Yes() r2
revised No R5‑202906  
    R5‑202906 Add 7.3B.2.3_1.2 Reference sensitivity for EN-DC within FR1v - 4 CCs QUALCOMM Europe Inc. - Italy CR Agreement Yes
Yes
agreed No   R5‑202428
    R5‑202429 Update for 7.3A.3 for CA without EN-DC QUALCOMM Europe Inc. - Italy CR Agreement Yes
Yes
agreed No    
    R5‑202477 Addition of UL-MIMO EN-DC tests in Clause 7 Qualcomm Austria RFFE GmbH CR Agreement Yes
Yesr1
revised No R5‑202734  
    R5‑202734 Addition of UL-MIMO EN-DC tests in Clause 7 Qualcomm Austria RFFE GmbH CR Agreement Yes
Yes
agreed No   R5‑202477
    R5‑202479 Common updates across tests in Clause 7 Qualcomm Austria RFFE GmbH CR Agreement Yes
Yesr1
revised No R5‑202735  
    R5‑202735 Common updates across tests in Clause 7 Qualcomm Austria RFFE GmbH CR Agreement Yes
Yes
agreed No   R5‑202479
5.3.2.6.3 Clauses 1-5 / Annexes R5‑201454 Updates of MU and TT in TS 38.521-3 NTT DOCOMO INC. CR Agreement Yes
Yesmerged into R5-202291
withdrawn Yes    
    R5‑201600 LTE Channel BW clarification in case of LTE CA in EN-DC FR2 test cases Keysight Technologies UK Ltd CR Agreement Yes
Yesis not needed. (no more than 1 EUTRA CC will be needed)
withdrawn Yes    
    R5‑201721 Update Annex F.4 Uplink Power window explanation ANRITSU LTD CR Agreement Yes
Yes
agreed No    
    R5‑201787 Updated to EN-DC Rel-16 band information in clause 5 Bureau Veritas CR Agreement No
Yes
withdrawn Yes    
    R5‑202291 Updates of FR2 MU and TT in TS 38.521-3 Anritsu, NTT DOCOMO INC. CR Agreement Yes
Yescl. aff. r2
revised No R5‑202907  
    R5‑202907 Updates of FR2 MU and TT in TS 38.521-3 Anritsu, NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑202291
    R5‑202393 Addition of Intra-band non-contiguous EN-DC combination Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No    
    R5‑202407 Receiver characteristics testing update to 38.521-3 Samsung R&D Institute UK CR Agreement Yes
Yes
revised No R5‑202809  
    R5‑202809 Receiver characteristics testing update to 38.521-3 Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑202407
    R5‑202475 TS 38.521-3 Section 1-5 and Annex updates to align with core specification Qualcomm Austria RFFE GmbH CR Agreement Yes
Yes
agreed No    
5.3.2.7 TS 38.521-4                      
5.3.2.7.1 Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6) R5‑201816 Correction to TC 5.2.3.1.1_4 4Rx FDD FR1 PDSCH mapping Type A performance LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑202240 Configuration of p-ZP-CSI-RS-ResourceSet for PDSCH Demod test cases Qualcomm Wireless GmbH CR Agreement No
Yeslate doc changes are captured in doc 2255
withdrawn Yes    
    R5‑202242 Clarification of propagation condition for Demod test cases during call setup Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No    
    R5‑202248 Message exception correction for Demod test cases Qualcomm Wireless GmbH CR Agreement Yes
Yesr1
revised No R5‑202736  
    R5‑202736 Message exception correction for Demod test cases Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No   R5‑202248
    R5‑202297 Correction to 4Rx FDD FR1 periodic CQI reporting under AWGN conditions for both SA and NSA Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202298 Correction to 4Rx TDD FR1 RI reporting Anritsu CR Agreement Yes
Yesr2
revised No R5‑202831  
    R5‑202831 Correction to 4Rx TDD FR1 RI reporting Anritsu CR Agreement Yes
Yesagreed, but uploaded with wrong contents, so revised again.
revised No R5‑202979 R5‑202298
    R5‑202979 Correction to 4Rx TDD FR1 RI reporting Anritsu CR Agreement Yes
Yes
agreed No   R5‑202831
    R5‑202300 Correction to CSI reporting test cases missing MIMO correlation matrixes Anritsu CR Agreement Yes
Yesr2 R4-2006541 was revised to R4-2008752 and agreed.
revised No R5‑202980  
    R5‑202980 Correction to CSI reporting test cases missing MIMO correlation matrixes Anritsu CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑202300
    R5‑202301 Correction to FR1 aperiodic subband CQI reporting under fading conditions Anritsu CR Agreement Yes
Yesr1
revised No R5‑202737  
    R5‑202737 Correction to FR1 aperiodic subband CQI reporting under fading conditions Anritsu CR Agreement Yes
Yes
agreed No   R5‑202301
    R5‑202302 Correction to FR1 Single PMI with 8Tx TypeI - SinglePanel codebook for both SA and NSA Anritsu CR Agreement Yes
Yesr1
revised No R5‑202738  
    R5‑202738 Correction to FR1 Single PMI with 8Tx TypeI - SinglePanel codebook for both SA and NSA Anritsu CR Agreement Yes
Yes
agreed No   R5‑202302
    R5‑202305 Correction to frequencyDomainAllocation for PDSCH demod test cases Anritsu CR Agreement Yes
Yescovered by R5-202248r1 (Qualcomm).
withdrawn Yes    
    R5‑202306 Correction to message exception and test description in RI tests Anritsu CR Agreement Yes
Yesr1
revised No R5‑202739  
    R5‑202739 Correction to message exception and test description in RI tests Anritsu CR Agreement Yes
Yes
agreed No   R5‑202306
    R5‑202307 Editorial correction on the table numbers for Minimum Test Time Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202308 Editorial correction to 4x4 MIMO PDSCH demodulation tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202448 Addition of message exceptions for PDSCH test cases ROHDE & SCHWARZ CR Agreement Yes
Yesr3
revised No R5‑202832  
    R5‑202832 Addition of message exceptions for PDSCH test cases ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑202448
5.3.2.7.2 Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8) R5‑201949 Updates to 8.2.2.2.2.1, 2Rx TDD FR2 aperiodic CQI reporting under fading performance for both SA and NSA Ericsson CR Agreement Yes
Yesr1
revised No R5‑202989  
    R5‑202989 Updates to 8.2.2.2.2.1, 2Rx TDD FR2 aperiodic CQI reporting under fading performance for both SA and NSA Ericsson CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201949
    R5‑202201 Clarification of disabling Tx diversity for FR2 UE for FR2 Demod testing Huawei, HiSilicon CR Agreement Yes
Yesr2
revised No R5‑202908  
    R5‑202908 Clarification of disabling Tx diversity for FR2 UE for FR2 Demod testing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑202201
    R5‑202247 Update to FR2 PDSCH Demod test case Qualcomm Wireless GmbH, Anritsu CR Agreement Yes
Yesr2
revised No R5‑202740  
    R5‑202740 Update to FR2 PDSCH Demod test case Qualcomm Wireless GmbH, Anritsu CR Agreement Yes
Yes
agreed No   R5‑202247
    R5‑202299 Correction to 7.2.2.2.1_1 FR2 PDSCH demodulation test Anritsu CR Agreement Yes
Yescovered by R5-202247.
withdrawn Yes    
    R5‑202303 Correction to FR2 CQI reporting tests Anritsu CR Agreement Yes
Yesr1
revised No R5‑202981  
    R5‑202981 Correction to FR2 CQI reporting tests Anritsu CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑202303
    R5‑202304 Correction to FR2 PDCCH demodulation tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202310 Introduction of 8.4.2.2.1 2Rx TDD FR2 RI reporting for both SA and NSA Anritsu CR Agreement Yes
Yesr1
revised No R5‑202741  
    R5‑202741 Introduction of 8.4.2.2.1 2Rx TDD FR2 RI reporting for both SA and NSA Anritsu CR Agreement Yes
Yes
agreed No   R5‑202310
5.3.2.7.3 Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10)                      
5.3.2.7.4 Clauses 1-4 / Annexes R5‑201945 Updated to Annex A and B for performance tests Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑202309 Editorial correction to Annex C.2 Anritsu CR Agreement Yes
Yesr1
revised No R5‑202742  
    R5‑202742 Editorial correction to Annex C.2 Anritsu CR Agreement Yes
Yes
agreed No   R5‑202309
    R5‑202311 Updates of FR2 MU and TT in TS 38.521-4 Anritsu CR Agreement Yes
Yesr1
revised No R5‑202766  
    R5‑202766 Updates of FR2 MU and TT in TS 38.521-4 Anritsu CR Agreement Yes
Yes
agreed No   R5‑202311
    R5‑202412 Update Wireless isolation procedure Keysight Technologies UK Ltd CR Agreement Yes
Yesr1
revised No R5‑202743  
    R5‑202743 Update Wireless isolation procedure Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑202412
5.3.2.8 TS 38.522 R5‑201755 Correction to applicability of RF EN-DC FR1 and FR2 TCs Tejet CR Agreement Yes
Yesmerged into R5-201786.
withdrawn Yes    
    R5‑201786 TP updated to applicability table Bureau Veritas, Samsung, TTA, Huawei, HiSilicon, Ericsson, Sporton, CMCC, Rohde & Schwarz, Guangdong OPPO Mobile Telecom, Tejet, CAICT, Qualcomm, Anritsu CR Agreement Yes
Yesr1 merged content from R5-201755, R5-202260, R5-201830. r3
revised No R5‑202960  
    R5‑202960 TP updated to applicability table Bureau Veritas, Samsung, TTA, Huawei, HiSilicon, Ericsson, Sporton, CMCC, Rohde & Schwarz, Guangdong OPPO Mobile Telecom, Tejet, CAICT, Qualcomm, Anritsu CR Agreement Yes
Yesremove Additional information to FR1 TC6.2.1/6.2.2 for UL MIMO support since test case CR is not agreed yet Add an editor’s note for future handling of ‘tested bands’ column and ‘branch’ column. Understanding is handling of “Branch“ mentioned in proposals1/2 in R5-202919 is not endorsed and will be revisited in future meeting." First agreed, then revised further.
revised No R5‑203114 R5‑201786
    R5‑203114 TP updated to applicability table Bureau Veritas, Samsung, TTA, Huawei, HiSilicon, Ericsson, Sporton, CMCC, Rohde & Schwarz, Guangdong OPPO Mobile Telecom, Tejet, CAICT, Qualcomm, Anritsu CR Agreement Yes
Yes
agreed No   R5‑202960
    R5‑201823 Correction of SS-SINR applicability ROHDE & SCHWARZ CR Agreement No
Yes
withdrawn Yes    
    R5‑201830 Correction of SS-SINR applicability ROHDE & SCHWARZ CR Agreement Yes
Yes"Correction NR completed test case overlap with 201786 addressed by w/drawing 201786 pending overlap with R5-202262 (Anritsu) BV: offline discussion, intention to have the 1830 agreed in principle and then merge TS38.522 combo CR 1786 R&S: withdrawn and content merged into 1786"
withdrawn Yes    
    R5‑201843 Skipping 2Rx testing on bands where UE support 4Rx Huawei, HiSilicon, Samsung CR Agreement Yes
YesDish did not agree to this interpretation, 2Rx antenna port testing is required, and furthermore, this is a RAN4 required change. r1
revised No R5‑202810  
    R5‑202810 Skipping 2Rx testing on bands where UE support 4Rx Huawei, HiSilicon, Samsung CR Agreement Yes
Yes
withdrawn Yes   R5‑201843
    R5‑202260 Update of table 4.1.3-1 Guangdong OPPO Mobile Telecom. CR Agreement Yes
Yesmerged into R5-201786.
withdrawn Yes    
    R5‑202262 Correction to test case applicability regarding txDirectCurrentLocation Anritsu CR Agreement Yes
Yes"Associated discussion R5-202417 Author confirmed no overlap Depends on the outcome of discussion 2417 during the meeting, may not needed RAN5 RF decided to use option2 prop1 of 2417 hence this can be w/drawn"
withdrawn Yes    
5.3.2.9 TS 38.533 R5‑202142 Correction to Test Applicability for 4.6.1.3 EN-DC FR1 event-triggered reporting with gap in non-DRX Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
revised No R5‑202812  
    R5‑202812 Correction to Test Applicability for 4.6.1.3 EN-DC FR1 event-triggered reporting with gap in non-DRX Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202142
    R5‑202143 Correction to Test Applicability for 4.6.1.4 EN-DC FR1 event-triggered reporting with gap in DRX Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
available No R5‑202813  
    R5‑202813 Correction to Test Applicability for 4.6.1.4 EN-DC FR1 event-triggered reporting with gap in DRX Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202143
    R5‑202144 Correction to Test Applicability & Message Exception for 4.6.1.6 EN-DC FR1 event-triggered reporting with gap in non-DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
revised No R5‑202814  
    R5‑202814 Correction to Test Applicability & Message Exception for 4.6.1.6 EN-DC FR1 event-triggered reporting with gap in non-DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202144
    R5‑202145 Correction to Test Applicability for 6.6.1.3 NR SA FR1 event-triggered reporting with gap in non-DRX Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
revised No R5‑202815  
    R5‑202815 Correction to Test Applicability for 6.6.1.3 NR SA FR1 event-triggered reporting with gap in non-DRX Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202145
    R5‑202146 Correction to Test Applicability for 6.6.1.4 NR SA FR1 event-triggered reporting with gap in DRX Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
revised No R5‑202816  
    R5‑202816 Correction to Test Applicability for 6.6.1.4 NR SA FR1 event-triggered reporting with gap in DRX Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202146
    R5‑202147 Correction to Test Applicability and Message Exception for 6.6.1.6 NR SA FR1 event-triggered reporting with gap in non-DRX with SSB index reading Qualcomm Finland RFFE Oy CR Agreement Yes
Yesmeetg date
revised No R5‑202961  
    R5‑202961 Correction to Test Applicability and Message Exception for 6.6.1.6 NR SA FR1 event-triggered reporting with gap in non-DRX with SSB index reading Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202147
    R5‑202148 Correction to Message Exception for 4.6.1.5 EN-DC FR1 event-triggered reporting without gap in non-DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑202149 Correction to Message Exception for 6.6.1.6 NR SA FR1 event-triggered reporting with gap in non-DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
Yes"Corrections to already completed / validated RRM test cases Author requested to withdraw due to overlap"
withdrawn Yes    
    R5‑202150 Correction to Message Exception for 4.6.2.5 EN-DC FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
Yesr1
revised No R5‑202950  
    R5‑202950 Correction to Message Exception for 4.6.2.5 EN-DC FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202150
    R5‑202151 Correction to Message Exception for 4.6.2.6 EN-DC FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
Yesr1
revised No R5‑202951  
    R5‑202951 Correction to Message Exception for 4.6.2.6 EN-DC FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202151
    R5‑202152 Correction to Message Exception for 6.6.2.5 NR SA FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
YesQC: No overlap, but might need to WITHDRAW R5-202152, as per some discussion ongoing"
withdrawn Yes    
    R5‑202153 Correction to Message Exception for 6.6.2.6 NR SA FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Finland RFFE Oy CR Agreement Yes
Yes"Corrections to already completed / validated RRM test cases Author requested to withdraw"
withdrawn Yes    
    R5‑202154 Correction to Test Requirements in 4.4.1.1, Table 4.4.1.1.5-5 to include TT values from Annex F Qualcomm Finland RFFE Oy CR Agreement Yes
Yesr1
revised No R5‑202909  
    R5‑202909 Correction to Test Requirements in 4.4.1.1, Table 4.4.1.1.5-5 to include TT values from Annex F Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202154
    R5‑202155 Correction to Test Requirements in 6.4.1.1, Table 6.4.1.1.5-5 to include TT values from Annex F Qualcomm Finland RFFE Oy CR Agreement Yes
Yesr1
revised No R5‑202910  
    R5‑202910 Correction to Test Requirements in 6.4.1.1, Table 6.4.1.1.5-5 to include TT values from Annex F Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202155
    R5‑202156 Correction to SMTC pattern and Message Exception in 4.7.1.2.1 Qualcomm Finland RFFE Oy CR Agreement Yes
Yesr2 "Revised from: R5-202156r1. r2: Corrected the typo in RAN4 CR number from R4-2001679 to R4-2006179, also corrected the meeting end date to May29th. offline discussion, may withdrawn and merged content into 1825r2 Revised to: R5-202873. "
revised No R5‑202873  
    R5‑202873 Correction to SMTC pattern and Message Exception in 4.7.1.2.1 Qualcomm Finland RFFE Oy CR Agreement No
Yes
withdrawn Yes   R5‑202156
    R5‑202157 Correction to SMTC pattern and Message Exception in 4.7.1.2.2 Qualcomm Finland RFFE Oy CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑202158 Correction to SMTC pattern and Message Exception in 4.7.2.2.1 Qualcomm Finland RFFE Oy CR Agreement Yes
Yes"CR # inconsistency -3GU: 0701 / CR coversheet: 701" r2 "Revised from: R5-202158r1. r2: Corrected CR number on cover page (701) to match with 3GU (0701), and also correctde the RAN4 CR typo, corrected it from R4-2001679 to R4-2006179. Also corrected the end date of meeting on cover page. Check for overlap offline discussion, may withdrawn and merged content into 1827r2 Revised to: R5-202874. "
revised No R5‑202874  
    R5‑202874 Correction to SMTC pattern and Message Exception in 4.7.2.2.1 Qualcomm Finland RFFE Oy CR Agreement No
Yes
withdrawn Yes   R5‑202158
    R5‑202159 Correction to SMTC pattern and Message Exception in 4.7.2.2.2 Qualcomm Finland RFFE Oy CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑202418 Update 6.5.1.1 and CSI-ReportConfig in Annex H Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑202437 Correction to Test Requirement for 4.4.3.1 by updating TT values from Annex F Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
revised No R5‑202817  
    R5‑202817 Correction to Test Requirement for 4.4.3.1 by updating TT values from Annex F Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202437
    R5‑202438 Correction to Test Requirement for 4.4.3.1 by updating TT values from Annex F. Qualcomm Finland RFFE Oy CR Agreement No
Yes
withdrawn Yes    
    R5‑202439 Correction to Test Requirement for 6.4.3.1 by updating TT values from Annex F Qualcomm Finland RFFE Oy CR Agreement Yes
Yeswrong meeting date. r1
revised No R5‑202911  
    R5‑202911 Correction to Test Requirement for 6.4.3.1 by updating TT values from Annex F Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202439
    R5‑202440 Annex I RRM OTA procedures update to add RSRPB based UE Positioning Method for FR2 Qualcomm Finland RFFE Oy CR Agreement Yes
YesTdoc # r1
revised No R5‑202912  
    R5‑202912 Annex I RRM OTA procedures update to add RSRPB based UE Positioning Method for FR2 Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑202440
5.3.2.9.1 EN-DC with all NR cells in FR1 (Clause 4) R5‑201666 Update FR1 Test Tolerance of 4.5.2.5 E-UTRAN SCC in sync Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202996  
    R5‑202996 Update FR1 Test Tolerance of 4.5.2.5 E-UTRAN SCC in sync Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201666
    R5‑201667 Update FR1 Test Tolerance of 4.5.2.6 E-UTRAN SCC in async Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202997  
    R5‑202997 Update FR1 Test Tolerance of 4.5.2.6 E-UTRAN SCC in async Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201667
    R5‑201668 Update FR1 Test Tolerance of 4.5.3.1 SCell activation 160ms Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202998  
    R5‑202998 Update FR1 Test Tolerance of 4.5.3.1 SCell activation 160ms Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201668
    R5‑201669 Update FR1 Test Tolerance of 4.5.3.2 SCell activation 320ms Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202999  
    R5‑202999 Update FR1 Test Tolerance of 4.5.3.2 SCell activation 320ms Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201669
    R5‑201670 Update FR1 Test Tolerance of 4.5.3.3 unknown SCell activation Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑203000  
    R5‑203000 Update FR1 Test Tolerance of 4.5.3.3 unknown SCell activation Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201670
    R5‑201678 Correction to TC 4.7.2.2.1 for some typos Huawei, HiSilicon CR Agreement Yes
Yesoverlapped with R&S R5-201827, R5-201616.
withdrawn Yes    
    R5‑201685 Update of 4.5.3.0 minimum requirements for Scell activation Huawei, HiSilicon CR Agreement Yes
Yesr2
revised No R5‑203091  
    R5‑203091 Update of 4.5.3.0 minimum requirements for Scell activation Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201685
    R5‑201821 Correction of SS-SINR applicability -NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑201824 Corrections to 4.7.1.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑201825 Corrections to 4.7.1.2 ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202977  
    R5‑202977 Corrections to 4.7.1.2 Rohde & Schwarz, Qualcomm Finland RFFE Oy CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201825
    R5‑201826 Corrections to 4.7.2.1 ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202969  
    R5‑202969 Corrections to 4.7.2.1 ROHDE & SCHWARZ CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201826
    R5‑201827 Corrections to 4.7.2.2 ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202978  
    R5‑202978 Corrections to 4.7.2.2 Rohde & Schwarz, Qualcomm Finland RFFE Oy CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201827
    R5‑201828 Corrections to 4.7.3.1 ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202970  
    R5‑202970 Corrections to 4.7.3.1 ROHDE & SCHWARZ CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201828
    R5‑201829 Corrections to 4.7.3.2 ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202971  
    R5‑202971 Corrections to 4.7.3.2 ROHDE & SCHWARZ CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201829
    R5‑202263 Core alignment in 4.6.1.5 and 4.6.1.6 Event Triggered Reporting with SSB time index detection Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202265 Correction on EN-DC FR1 radio link monitoring out-of-sync test Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202267 Correction to EN-DC FR1 radio link monitoring tests Anritsu CR Agreement Yes
Yesr1
revised No R5‑202744  
    R5‑202744 Correction to EN-DC FR1 radio link monitoring tests Anritsu CR Agreement Yes
Yes
agreed No   R5‑202267
    R5‑202269 Correction to FR1 UE transmit timing accuracy Anritsu CR Agreement Yes
Yesr1
revised No R5‑202982  
    R5‑202982 Correction to FR1 UE transmit timing accuracy Anritsu CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑202269
    R5‑202271 Correction to Message Exception for FR1 Event Triggered Reporting tests Anritsu CR Agreement Yes
Yeschange is not needed.
withdrawn Yes    
    R5‑202390 Addition of new RRM Test Case 4.5.4.1 Samsung R&D Institute UK CR Agreement Yes
Yesr1
revised No R5‑202700  
    R5‑202700 Addition of new RRM Test Case 4.5.4.1 Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑202390
    R5‑202413 Update 4.5.1.3 and 4.5.1.4 test procedure Keysight Technologies UK Ltd CR Agreement Yes
Yesincluded in R5-202267 (Anritsu).
withdrawn Yes    
    R5‑202414 Clarification cell2 SS-RSRP in 4.7.1.2.1 Keysight Technologies UK Ltd CR Agreement Yes
Yesr1
revised No R5‑202745  
    R5‑202745 Clarification cell2 SS-RSRP in 4.7.1.2.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑202414
    R5‑202495 Correction of RRM Test Case 4.6.2.1 MediaTek Inc. CR Agreement Yes
YesHuawei CR R5-201676 also fixed the issue
withdrawn Yes    
    R5‑202499 Correction of RRM Test Case 4.6.2.2 MediaTek Inc. CR Agreement Yes
YesHuawei CR R5-201676 also fixed the issue
withdrawn Yes    
5.3.2.9.2 EN-DC with at least 1 NR Cell in FR2 (Clause5) R5‑201392 Addition of minimum conformance requirements 5.7.1.0 - EN-DC FR2 SS-RSRP accuracy Huawei, HiSilicon CR Agreement Yes
Yesoverlapped with R&S R5-202063.
withdrawn Yes    
    R5‑201405 Addition to minimum coformance requirement 5.5.5.0.3 - scheduling restriction for BFD and CBD Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201406 Addition to NR test case 5.5.5.5 scheduling avaliable restriction Huawei, HiSilicon CR Agreement Yes
YesTdoc # r1
revised No R5‑202746  
    R5‑202746 Addition to NR test case 5.5.5.5 scheduling avaliable restriction Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201406
    R5‑201407 Addition to minimum coformance requirement 5.5.8.0 - TCI-state switch Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201408 Addition to NR test case 5.5.8.1 MAC-CE based TCI switch Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201409 Addition to NR test case 5.5.8.2 RRC based TCI switch Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201679 Update of TC 5.6.1.1 event-triggered without gap non-DRX Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201680 Update of TC 5.6.1.2 event-triggered without gap DRX Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201681 Update of TC 5.6.1.3 event-triggered with gap non-DRX Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201682 Update of TC 5.6.1.4 event-triggered with gap DRX Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑202063 Minimum requirements SS-RSRP NSA FR2 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202064 Addition 5.7.1.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202065 Addition 5.7.1.2 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202066 Addition 5.7.1.3 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202067 Minimum requirements SS-RSRQ NSA FR2 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202068 Addition 5.7.2.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202069 Addition 5.7.2.2 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202070 Minimum requirements SS-SINR NSA FR2 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202071 Addition 5.7.3.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202072 Addition 5.7.3.2 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202095 Correction of AoA configuration for FR2 SA Inter-freq measurement test cases in clause 5.6.2 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑202268 Correction to EN-DC FR2 RRC-based DL active BWP switch in non-DRX in synchronous ENDC Anritsu CR Agreement Yes
Yesr2 R4-2006079 was withdrawn for further discussion for next RAN4 meeting.
revised No R5‑202983  
    R5‑202983 Correction to EN-DC FR2 RRC-based DL active BWP switch in non-DRX in synchronous ENDC Anritsu CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑202268
    R5‑202270 Correction to FR2 UE transmit timing accuracy Anritsu CR Agreement Yes
Yesr2
revised No R5‑202984  
    R5‑202984 Correction to FR2 UE transmit timing accuracy Anritsu CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑202270
    R5‑202277 Editorial Correction to FR2 Interruption test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202415 Alignment 5.4.1.1 test procedure with 4.4.1.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
5.3.2.9.3 NR Standalone in FR1 (Clause 6) R5‑201410 Addition to NR test case 6.3.2.1.3 FR1-FR1 RRC re-establishment without serving cell timing Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202833  
    R5‑202833 Addition to NR test case 6.3.2.1.3 FR1-FR1 RRC re-establishment without serving cell timing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201410
    R5‑201614 Corrections to 6.7.1.2 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202972  
    R5‑202972 Corrections to 6.7.1.2 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201614
    R5‑201615 Corrections to 6.7.2.1 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202973  
    R5‑202973 Corrections to 6.7.2.1 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201615
    R5‑201616 Corrections to 6.7.2.2 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202974  
    R5‑202974 Corrections to 6.7.2.2 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201616
    R5‑201617 Corrections to 6.7.3.1 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202975  
    R5‑202975 Corrections to 6.7.3.1 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201617
    R5‑201618 Corrections to 6.7.3.2 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesr2
revised No R5‑202976  
    R5‑202976 Corrections to 6.7.3.2 and core spec alignment ROHDE & SCHWARZ CR Agreement Yes
Yesagreed after the meeting
agreed No   R5‑201618
    R5‑201619 Corrections to 6.7.1.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑201671 Addition FR1 Test Tolerance of 6.5.5.1 SSB BFD non-DRX Huawei, HiSilicon CR Agreement Yes
Yesr2
revised No R5‑203095  
    R5‑203095 Addition FR1 Test Tolerance of 6.5.5.1 SSB BFD non-DRX Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201671
    R5‑201672 Addition FR1 Test Tolerance of 6.5.5.2 SSB BFD DRX Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑203096  
    R5‑203096 Addition FR1 Test Tolerance of 6.5.5.2 SSB BFD DRX Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201672
    R5‑201673 Update FR1 Test Tolerance of 6.5.5.3 CSI-RS BFD non-DRX Huawei, HiSilicon CR Agreement Yes
Yesr2
revised No R5‑203097  
    R5‑203097 Update FR1 Test Tolerance of 6.5.5.3 CSI-RS BFD non-DRX Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201673
    R5‑201674 Update FR1 Test Tolerance of 6.5.5.4 CSI-RS BFD DRX Huawei, HiSilicon CR Agreement Yes
Yesr2
revised No R5‑203098  
    R5‑203098 Update FR1 Test Tolerance of 6.5.5.4 CSI-RS BFD DRX Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201674
    R5‑201675 Update FR1 Test Tolerance of 6.5.4.1 UL carrier RRC reconfiguration delay Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑203092  
    R5‑203092 Update FR1 Test Tolerance of 6.5.4.1 UL carrier RRC reconfiguration delay Huawei, HiSilicon CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑201675
    R5‑201676 Correction to inter-freq measurement TCs for SSB configuration Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201677 Correction to TC 6.3.2.3.1 for the test procedure Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201822 Correction of SS-SINR applicability -SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑202264 Core alignment in 6.6.1.2 NR SA FR1 event-triggered reporting without gap in DRX Anritsu CR Agreement Yes
Yesr1
revised No R5‑202985  
    R5‑202985 Core alignment in 6.6.1.2 NR SA FR1 event-triggered reporting without gap in DRX Anritsu CR Agreement Yes
Yes
agreed No   R5‑202264
    R5‑202266 Correction on NR SA FR1 - E-UTRAN event-triggered reporting tests Anritsu CR Agreement Yes
Yesr1
revised No R5‑202747  
    R5‑202747 Correction on NR SA FR1 - E-UTRAN event-triggered reporting tests Anritsu CR Agreement Yes
Yes
agreed No   R5‑202266
    R5‑202272 Correction to NR E-UTRA reselection tests Anritsu CR Agreement Yes
Yesr1
revised No R5‑202986  
    R5‑202986 Correction to NR E-UTRA reselection tests Anritsu CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑202272
    R5‑202273 Correction to NR SA FR1 - E-UTRA RRC Connection release with redirection Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑202274 Correction to NR SA FR1 handover test cases Anritsu CR Agreement Yes
Yesr2 R4-2006071 was revised to R4-2008539 and agreed.
revised No R5‑202987  
    R5‑202987 Correction to NR SA FR1 handover test cases Anritsu CR Agreement Yes
YesAgreed after the meeting.
agreed No   R5‑202274
    R5‑202275 Correction to SA event triggered reporting tests with per-UE gaps Anritsu CR Agreement Yes
Yesr1 R4-2006073 was withdrawn for further discussion for next RAN4 meeting.
revised No R5‑202988  
    R5‑202988 Correction to SA event triggered reporting tests with per-UE gaps Anritsu CR Agreement Yes
Yeswithdrawn after the meeting.
withdrawn Yes   R5‑202275
    R5‑202416 Alignment 6.4.1.1 test procedure with 4.4.1.1 Keysight Technologies UK Ltd CR Agreement Yes
Yesincluded in R5-202269 (Anritsu).
withdrawn Yes    
    R5‑202419 Update 6.5.1.2 message content exception and test procedure Keysight Technologies UK Ltd CR Agreement Yes
Yesr1
revised No R5‑202748  
    R5‑202748 Update 6.5.1.2 message content exception and test procedure Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑202419
    R5‑202489 Correction of RRM Test Case 6.1.1.1 MediaTek Inc. CR Agreement Yes
Yesr1
revised No R5‑202749  
    R5‑202749 Correction of RRM Test Case 6.1.1.1 MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑202489
    R5‑202490 Correction of RRM Test Case 6.1.1.2 MediaTek Inc. CR Agreement Yes
Yesr1
revised No R5‑202750  
    R5‑202750 Correction of RRM Test Case 6.1.1.2 MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑202490
    R5‑202496 Correction of RRM Test Case 6.4.1.1 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
5.3.2.9.4 NR standalone with at least one NR cell in FR2 (Clause7) R5‑201393 Addition of minimum conformance requirements 7.7.1.0 - SA FR2 SS-RSRP accuracy Huawei, HiSilicon CR Agreement Yes
Yesoverlapped with R&S R5-202073.
withdrawn Yes    
    R5‑201394 Correction to NR test case 7.7.1.3.1 SA FR2 SS-RSRP absolute accuracy Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202834  
    R5‑202834 Correction to NR test case 7.7.1.3.1 SA FR2 SS-RSRP absolute accuracy Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201394
    R5‑201395 Correction to NR test case 7.7.1.3.2 SS-RSRP relative accuracy Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201411 Addition to NR test case 7.3.2.1.3 FR2-FR2 RRC re-establishment without serving cell timing Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202835  
    R5‑202835 Addition to NR test case 7.3.2.1.3 FR2-FR2 RRC re-establishment without serving cell timing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201411
    R5‑201412 Addition to minimum conformance requirements 7.5.1.0.5 - Scheduling restriction for RLM Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201413 Addition to NR test case 7.5.1.9 FR2 RLM scheduling restrictions Huawei, HiSilicon CR Agreement Yes
Yesr1
revised No R5‑202836  
    R5‑202836 Addition to NR test case 7.5.1.9 FR2 RLM scheduling restrictions Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑201413
    R5‑201414 Addition to minimum Conformance Requirements 7.5.6.1.0 - DCI-based DL active BWP switch Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201415 Addition to NR test case 7.5.6.1.3 FR2 DCI-based DL active BWP switch non-DRX Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑201683 Update of TC 7.1.1.1 intra-freq cell re-selection Huawei, HiSilicon, MediaTek Inc. CR Agreement Yes
Yesr2
revised No R5‑202751