outgoing LSs of RAN #46 in Sanya, China, 01.12.-04.12.2009: status Fri 04.12.2009 (4 outgoing LSs) RP-091421@ LS on Minimization of drive tests for E-UTRAN and UTRAN (to: OMA DM; cc: RAN2, SA5; contact: O2) RP-091447 LS on providing backhaul signalling in support of time and frequency synchronisation using network listening (to: RAN3, RAN4; cc: RAN2; contact: Qualcomm) RP-091454 LS on approval of Stage 2 description for CS Fallback to CDMA2000 1x for dual receiver (to: SA; cc: SA2; contact: Ericsson) RP-091455 LS on CS Fallback to CDMA2000 1x for dual receiver UEs (to: 3GPP2 TSG-A, 3GPP2 TSG-C, 3GPP2 TSG-X; cc: SA, SA2; contact: Ericsson) @: LS was already sent out during the RAN meeting *: agreed by email after the RAN meeting