3GPP TDocs (written contributions) at meeting
Meeting: R4-93 - 2019-11-18 to 2019-11-22, Reno, Nevada
meeting id: R4-93 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑1913100 | Agenda for RAN4 #93 | RAN4 Chairman | imported from 3GU |
R4‑1913101 | RAN4 #92-Bis Meeting Report | ETSI MCC | imported from 3GU |
R4‑1913102 | LS on channel quality report for LTE-M | RAN1, Samsung | imported from 3GU |
R4‑1913103 | LS on PUR transmission for NB-IoT/eMTC | RAN1, Futurewei | imported from 3GU |
R4‑1913104 | LS on applicable timing for pathloss RS activated/updated by MAC-CE | RAN1, LG Electronics | imported from 3GU |
R4‑1913105 | LS on SRS for NR Positioning | RAN1, Intel Corp. | imported from 3GU |
R4‑1913106 | LS on NR V2X synchronization procedures | RAN1, CATT | imported from 3GU |
R4‑1913107 | Reply LS on UL-SL prioritization | RAN1, OPPO | imported from 3GU |
R4‑1913108 | LS on uplink TDM pattern for LTE DAPS based enhanced make-before-break HO | RAN2, Qualcomm | imported from 3GU |
R4‑1913109 | LS on UE feature list format for Release-16 UE capability | RAN2, Intel | imported from 3GU |
R4‑1913110 | LS to RAN1&4 on UE capabilities on DAPS HO | RAN2, Intel | imported from 3GU |
R4‑1913111 | LS to RAN1 on CSI/SRS reporting | RAN2, vivo | imported from 3GU |
R4‑1913112 | Reply LS to RAN1 on SFTD measurement | RAN2, Huawei | imported from 3GU |
R4‑1913113 | Reply LS on FR2 Pmax | RAN2, Huawei | imported from 3GU |
R4‑1913114 | LS on BCS reporting for EN-DC BC | RAN2, Huawei | imported from 3GU |
R4‑1913115 | LS on direct Scell activation in RRC resume message | RAN2, Qualcomm | imported from 3GU |
R4‑1913116 | Liaison Statement on CCSA progress on NR FR1 OTA | CCSA TC9 WG1 | imported from 3GU |
R4‑1913117 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1913118 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1913119 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1913120 | Correction to misused variables in intra-frequency cell identification requirements | ZTE Corporation | imported from 3GU |
R4‑1913121 | Correction to the starting point of the DRX cycle length interval | ZTE Corporation | imported from 3GU |
R4‑1913122 | Discussion on RSSI measurement for NR-U | ZTE Corporation | imported from 3GU |
R4‑1913123 | CR to 38.133 R15 Add the missing units to DRX cycle values | ZTE Corporation | imported from 3GU |
R4‑1913124 | Discussion on inter-RAT SFTD measurement towards NR-U | ZTE Corporation | imported from 3GU |
R4‑1913125 | CR for spec structure to address NR-U in 38.133 | ZTE Corporation | imported from 3GU |
R4‑1913126 | CR to address NR-U in SFTD measurements in 36.133 | ZTE Corporation | imported from 3GU |
R4‑1913127 | TP to TR 38.820: NR UE System Noise Figure | Qualcomm Incorporated | imported from 3GU |
R4‑1913128 | TP to TR 38.820 on General Spectrum Emission Mask for NR UE 7-24 | Qualcomm Incorporated | imported from 3GU |
R4‑1913129 | LTE CA_NS_04 AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1913130 | [DRAFT] LS on UE capability of intraBandENDC-Support | Qualcomm Incorporated | imported from 3GU |
R4‑1913131 | Intra-band Contiguous ULCA MPR Evaluation and Specification | Qualcomm Incorporated | imported from 3GU |
R4‑1913132 | n28 30MHz AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1913133 | On FR2 CA capability signalling | Qualcomm Incorporated | imported from 3GU |
R4‑1913134 | LS on implicit support of CA fall-back configurations in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1913135 | CR to 38.101-2: DMRS exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1913136 | CR to 38.101-2: DMRS exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1913137 | On CA Bandwidth Definitions | Qualcomm Incorporated | imported from 3GU |
R4‑1913138 | CR to 38.101-1: DMRS Exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1913139 | CR to 38.101-1: DMRS Exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1913140 | FR2 DL Intra-band CA BW Enhancement Feature Parameters | Qualcomm Incorporated | imported from 3GU |
R4‑1913141 | TP to TR38.831: FR2 UE architectures for DL Intra-band CA BW Enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1913142 | LS on FR2 DL Intra-band CA BW Enhancement Feature Parameters | Qualcomm Incorporated | imported from 3GU |
R4‑1913143 | FR2 NC UL CA back-off simulations – select cases | Qualcomm Incorporated | imported from 3GU |
R4‑1913144 | TP to TR38.831: On REFSENS for Inter-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑1913145 | FR2 Beam Correspondence using SSB only | Qualcomm Incorporated | imported from 3GU |
R4‑1913146 | On Improvement of Spherical Coverage for PC3 | Qualcomm Incorporated | imported from 3GU |
R4‑1913147 | On FR2 OTA testability of UE Tx Modulation Quality requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1913148 | On enabling single AoA testing for FR2 inter-band DL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1913149 | n38 Wide BW AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1913150 | n1 Wide BW AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1913151 | n26 AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1913152 | n26 REFSENS | Qualcomm Incorporated | imported from 3GU |
R4‑1913153 | n1 REFSENS | Qualcomm Incorporated | imported from 3GU |
R4‑1913154 | CR to align NS27 AMPR to CA_NS_10 AMPR for 40MHz BW at the center of band 48. | Qualcomm Incorporated | imported from 3GU |
R4‑1913155 | CR to 36.101 to revise LTE CA_NS_04 AMPR for BW class D | Qualcomm Incorporated | imported from 3GU |
R4‑1913156 | CR to 36.101 to revise LTE CA_NS_04 AMPR for BW class D | Qualcomm Incorporated | imported from 3GU |
R4‑1913157 | CR to 36.101 to revise CA_NS_04 AMPR for BW Class C | Qualcomm Incorporated | imported from 3GU |
R4‑1913158 | CR to 36.101 to revise CA_NS_04 AMPR for BW Class C | Qualcomm Incorporated | imported from 3GU |
R4‑1913159 | CR to 36.101 rel. 15 to fix Out-of-band Blocking issue for bands 38, 41 | Qualcomm Incorporated | imported from 3GU |
R4‑1913160 | CR to 36.101 rel. 15 to fix Out-of-band Blocking issue for bands 38, 41 | Qualcomm Incorporated | imported from 3GU |
R4‑1913161 | CR to 36.101 rel. 15 to fix Out-of-band Blocking issue for bands 38, 41 | Qualcomm Incorporated | imported from 3GU |
R4‑1913162 | CR for 38.101- RX Out-of-Band Blocking for B38 and B41 | Qualcomm Incorporated | imported from 3GU |
R4‑1913163 | CR for 38.101- RX Out-of-Band Blocking for B38 and B41 | Qualcomm Incorporated | imported from 3GU |
R4‑1913164 | CR for 38.101-1 n5 aggressor to EUTRA B26 victim coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1913165 | CR for 38.101-1 n5 aggressor to EUTRA B26 victim coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1913166 | CR for 38.101-1 n39 AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1913167 | CR for 38.101-1 n39 AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1913168 | CR for 38.101-3 EN-DC RX Out-of-Band Blocking for shared bands and bands in close proximity | Qualcomm Incorporated | imported from 3GU |
R4‑1913169 | CR for 38.101-3 EN-DC RX Out-of-Band Blocking for shared bands and bands in close proximity | Qualcomm Incorporated | imported from 3GU |
R4‑1913170 | CR to 38.101-3 Missing Harmonic Mixing MSD for DC_3_n77/n78 | Qualcomm Incorporated | imported from 3GU |
R4‑1913171 | CR to 38.101-3 Missing Harmonic Mixing MSD for DC_3_n77/n78 | Qualcomm Incorporated | imported from 3GU |
R4‑1913172 | CR for 38.101-3 EN-DC DL Synchronous Carriers | Qualcomm Incorporated | imported from 3GU |
R4‑1913173 | CR for 38.101-3 EN-DC DL Synchronous Carriers | Qualcomm Incorporated | imported from 3GU |
R4‑1913174 | CR for TS 38.101-3: Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | Qualcomm Incorporated | imported from 3GU |
R4‑1913175 | CR for TS 38.101-3: Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | Qualcomm Incorporated | imported from 3GU |
R4‑1913176 | CR for 38.101-3 EN-DC 5_nX and X_n5 aggressor to EUTRA B26 coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1913177 | CR for 38.101-3 EN-DC 5_nX and X_n5 aggressor to EUTRA B26 coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1913178 | CR to 36.101 rel. 15 to fix Out-of-band Blocking issue for bands 32 | Qualcomm Incorporated | imported from 3GU |
R4‑1913179 | CR to 36.101 rel. 15 to fix Out-of-band Blocking issue for bands 32 | Qualcomm Incorporated | imported from 3GU |
R4‑1913180 | High power user equipment (Band 12, Band 5) | US Cellular Corporation | imported from 3GU |
R4‑1913181 | 5GHz SEM comparison analysis | CableLabs | imported from 3GU |
R4‑1913182 | Discussion on approaches to address NR-U in 36.133 and 38.133 | ZTE Corporation | imported from 3GU |
R4‑1913183 | On NR CA PDSCH normal demodulation requirements | China Telecom | imported from 3GU |
R4‑1913184 | Discussion on PMI reporting requirements for larger number of Tx ports | China Telecom | imported from 3GU |
R4‑1913185 | CR work split for NR performance requirement enhancement WI | China Telecom | imported from 3GU |
R4‑1913186 | On CA CQI requirements in Rel-16 | China Telecom | imported from 3GU |
R4‑1913187 | On PUSCH demodulation requirements | China Telecom | imported from 3GU |
R4‑1913188 | Summary of ideal and impairment results for FR2 PUSCH 2T2R MCS12 | China Telecom | imported from 3GU |
R4‑1913189 | Remaining general issues for BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1913190 | CR to TS 38.141-1: Further update of applicability rule for BS conducted demodulation test (Rel-15) | China Telecom | imported from 3GU |
R4‑1913191 | CR to TS 38.141-1: Further update of applicability rule for BS conducted demodulation test (Rel-16) | China Telecom | imported from 3GU |
R4‑1913192 | CR to TS 38.141-2: Further update of applicability rule for BS radiated demodulation test (Rel-15) | China Telecom | imported from 3GU |
R4‑1913193 | CR to TS 38.141-2: Further update of applicability rule for BS radiated demodulation test (Rel-16) | China Telecom | imported from 3GU |
R4‑1913194 | CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH (Rel-15) | China Telecom | imported from 3GU |
R4‑1913195 | CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH (Rel-16) | China Telecom | imported from 3GU |
R4‑1913196 | CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH (Rel-15) | China Telecom | imported from 3GU |
R4‑1913197 | CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH (Rel-16) | China Telecom | imported from 3GU |
R4‑1913198 | CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH (Rel-15) | China Telecom | imported from 3GU |
R4‑1913199 | CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH (Rel-16) | China Telecom | imported from 3GU |
R4‑1913200 | RF time mask requirements to allow Tx switching between two uplink carriers | China Telecom | imported from 3GU |
R4‑1913201 | Draft CR to TS 38.101-1: Switching time mask between two uplink carriers in UL CA and SUL | China Telecom | imported from 3GU |
R4‑1913202 | Draft CR to TS 38.101-3: Switching time mask between two uplink carriers in EN-DC | China Telecom | imported from 3GU |
R4‑1913203 | LS on UE capability and RRC signalling for switching between two uplink carriers | China Telecom | imported from 3GU |
R4‑1913204 | View on RRM interruption and delay requirement for switching between two uplink carriers | China Telecom | imported from 3GU |
R4‑1913205 | Rel. 16 FR2 Beam Correspondence | Qualcomm Incorporated | imported from 3GU |
R4‑1913206 | Maximum use of the power between 23dBm and 26dBm for PC2 UE | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913207 | [Draft] LS on enhancement of high power UE | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913208 | TR 37.825 v0.4.0 Finalization | CMCC | imported from 3GU |
R4‑1913209 | CR for REL-16 TS 38.307 for PC2 EN-DC TDD+TDD | CMCC | imported from 3GU |
R4‑1913210 | CR for REL-15 TS 38.307 for PC2 EN-DC TDD+TDD | CMCC | imported from 3GU |
R4‑1913211 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.101-1 | CMCC | imported from 3GU |
R4‑1913212 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.104 | CMCC | imported from 3GU |
R4‑1913213 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.141-1 | CMCC | imported from 3GU |
R4‑1913214 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.141-2 | CMCC | imported from 3GU |
R4‑1913215 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 36.104 | CMCC | imported from 3GU |
R4‑1913216 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 36.141 | CMCC | imported from 3GU |
R4‑1913217 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.104 | CMCC | imported from 3GU |
R4‑1913218 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.141 | CMCC | imported from 3GU |
R4‑1913219 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.105 | CMCC | imported from 3GU |
R4‑1913220 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.145-1 | CMCC | imported from 3GU |
R4‑1913221 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 37.145-2 | CMCC | imported from 3GU |
R4‑1913222 | TX diversity situation | Qualcomm Incorporated | imported from 3GU |
R4‑1913223 | UL MIMO correction on reference planes | Qualcomm Incorporated | imported from 3GU |
R4‑1913224 | CR on UL MIMO correction of reference planes (Cat.F) | Qualcomm Incorporated | imported from 3GU |
R4‑1913225 | CR on UL MIMO correction on reference planes (Cat.A) | Qualcomm Incorporated | imported from 3GU |
R4‑1913226 | UL MIMO TX EVM test condition changes | Qualcomm Incorporated | imported from 3GU |
R4‑1913227 | CR to 38.101-1: TX EVM for UL MIMO condition change | Qualcomm Incorporated | imported from 3GU |
R4‑1913228 | CR to 38.101-1: TX EVM for UL MIMO condition change (Cat.A) | Qualcomm Incorporated | imported from 3GU |
R4‑1913229 | Super UL open items discussion | Qualcomm Incorporated | imported from 3GU |
R4‑1913230 | P-MPR and headroom reportting for MPE | Qualcomm Incorporated | imported from 3GU |
R4‑1913231 | Interband CA spherical coverage | Qualcomm Incorporated | imported from 3GU |
R4‑1913232 | P_CMAX clarification | Qualcomm Incorporated | imported from 3GU |
R4‑1913233 | CR on clarifying the P_CMAX sentence for CA | Qualcomm Incorporated | imported from 3GU |
R4‑1913234 | CR on clarifying the P_CMAX sentence for CA | Qualcomm Incorporated | imported from 3GU |
R4‑1913235 | Specification of UE antenna gain range | ANRITSU LTD | imported from 3GU |
R4‑1913236 | Specification of UE antenna gain range | ANRITSU LTD | imported from 3GU |
R4‑1913237 | Draft TR 38.716-02-00 Rel-16 NR inter-band CA/DC for 2 bands DL with up to 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913238 | draft TR 38.716-03-02 Rel-16 NR inter-band CA/DC for 3 bands DL with 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913239 | On channel raster for n90 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913240 | Draft CR for TS 38.104 on removal of SCS based channel raster for n90 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913241 | Draft CR for TS 38.101-1 on removal of SCS based channel raster for n90 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913242 | CR for 38.141-1 Conducted test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913243 | CR for TS 38.141-2 Radiated test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913244 | CR for 38.104: Performance requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913245 | CR for 38.104: Performance requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913246 | CR for 38.141-1 Conducted test requirements for NR multi-slot PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913247 | CR for TS 38.141-2 Radiated test requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1913248 | Add RRM Test case setup for 1 AoA in Rx beam peak and 1 in non Rx beam peak | ANRITSU LTD | imported from 3GU |
R4‑1913249 | Add RRM Test case setup for 1 AoA in Rx beam peak and 1 in non Rx beam peak | ANRITSU LTD | imported from 3GU |
R4‑1913250 | Update of Parameters, Test case A.7.7.1.1 FR2 Intra-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1913251 | Update of Parameters, Test case A.7.7.1.1 FR2 Intra-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1913252 | Views on test methods for high DL power and low UL power TCs | ROHDE & SCHWARZ | imported from 3GU |
R4‑1913253 | Views on testability of inter-band CA in FR2 | ROHDE & SCHWARZ | imported from 3GU |
R4‑1913254 | Update of Parameters, Test case A.5.7.1.1 FR2 Intra-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1913255 | Update of Parameters, Test case A.5.7.1.1 FR2 Intra-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1913256 | Update of Parameters, Test case A.7.7.1.2 FR2 Inter-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1913257 | Update of Parameters, Test case A.7.7.1.2 FR2 Inter-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1913258 | Update of Parameters, Test case A.5.7.1.2 FR2 Inter-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1913259 | Update of Parameters, Test case A.5.7.1.2 FR2 Inter-frequency SS-RSRP accuracy | ANRITSU LTD | imported from 3GU |
R4‑1913260 | Correction to Random access test case in FR1 for PSCell in EN-DC | ANRITSU LTD | imported from 3GU |
R4‑1913261 | Correction to Random access test case in FR1 for PSCell in EN-DC | ANRITSU LTD | imported from 3GU |
R4‑1913262 | SLS results for PRS-RSTD & PRS-RSRP measurement | MediaTek inc. | imported from 3GU |
R4‑1913263 | Discussion on FR2 RSTD reference point | MediaTek inc. | imported from 3GU |
R4‑1913264 | Discussion on PRS-RSTD measurement | MediaTek inc. | imported from 3GU |
R4‑1913265 | Discussion on PRS-RSRP measurement | MediaTek inc. | imported from 3GU |
R4‑1913266 | Discussion on cell-phase synchronization between gNBs | MediaTek inc. | imported from 3GU |
R4‑1913267 | PDSCH simulation results for HST channels | MediaTek inc. | imported from 3GU |
R4‑1913268 | PDSCH simulation results for high-speed TDL channels | MediaTek inc. | imported from 3GU |
R4‑1913269 | Discussion on HST transmission scheme | MediaTek inc. | imported from 3GU |
R4‑1913270 | Introduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913271 | Remove double entry of CA_41F | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913272 | Correction of Note number in Table 5.6.1-1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913273 | Correction of Note number in Table 5.6.1-1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913274 | DeltaTib for CA_1-7-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913275 | DeltaTib for CA_1-7-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913276 | DeltaTib for CA_1-7-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913277 | Addition of 25, 30 and 40 MHz to NR band n25 in TS 38.101-1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913278 | Addition of 25, 30 and 40 MHz to NR band n25 in TS 38.104 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913279 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913280 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913281 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913282 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913283 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913284 | Sync raster to SSB resource element mapping | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913285 | TP to TR 36.716-03-02 for 3DL/2UL CA_1A-7A-20A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913286 | Draft CR for 3DL/2UL CA_1A-7A-20A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913287 | Draft CR for 4DL/2UL CA_1A-3A-7A-20A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913288 | TP to TR 36.716-03-02 for 3DL/2UL CA_2-13-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913289 | Draft CR for 3DL/2UL CA_2-13-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913290 | TP to TR 36.716-03-02 for 3DL/2UL CA_2-46-48 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913291 | Draft CR for 3DL/2UL CA_2-46-48 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913292 | TP to TR 36.716-03-02 for 3DL/2UL CA_2-46-66 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913293 | Draft CR for 3DL/2UL CA_2-46-66 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913294 | CR on handover 36.133 | MediaTek inc. | imported from 3GU |
R4‑1913295 | CR on handover 38.133 | MediaTek inc. | imported from 3GU |
R4‑1913296 | CR on handover 36.133 -R16 | MediaTek inc. | imported from 3GU |
R4‑1913297 | CR on handover 38.133 - R16 | MediaTek inc. | imported from 3GU |
R4‑1913298 | CR on the BWP switch test cases EN-DC FR1 (section A.4.5.6) | MediaTek inc. | imported from 3GU |
R4‑1913299 | CR on the BWP switch test cases EN-DC FR2 (section A.5.5.6) | MediaTek inc. | imported from 3GU |
R4‑1913300 | CR on the BWP switch test cases SA FR1 (section A.6.5.6) | MediaTek inc. | imported from 3GU |
R4‑1913301 | CR on the BWP switch test cases SA FR2 (section A.7.5.6) | MediaTek inc. | imported from 3GU |
R4‑1913302 | CR on the BWP switch test cases EN-DC FR1 (section A.4.5.6) | MediaTek inc. | imported from 3GU |
R4‑1913303 | CR on the BWP switch test cases EN-DC FR2 (section A.5.5.6) | MediaTek inc. | imported from 3GU |
R4‑1913304 | CR on the BWP switch test cases SA FR1 (section A.6.5.6) | MediaTek inc. | imported from 3GU |
R4‑1913305 | CR on the BWP switch test cases SA FR2 (section A.7.5.6) | MediaTek inc. | imported from 3GU |
R4‑1913306 | Link-level simulation results for NR V2X synchronization | MediaTek inc. | imported from 3GU |
R4‑1913307 | Link-level simulation results for NR V2X S-RSRP measurements | MediaTek inc. | imported from 3GU |
R4‑1913308 | Discussion on NR V2X synchronization related requirement | MediaTek inc. | imported from 3GU |
R4‑1913309 | Discussion on NR V2X interruption requirement | MediaTek inc. | imported from 3GU |
R4‑1913310 | DraftCR on NR V2X initiation SLSS 38.133 -R16 | MediaTek inc. | imported from 3GU |
R4‑1913311 | Discussion on Interruption at SRS carrier switch | MediaTek inc. | imported from 3GU |
R4‑1913312 | Discussion on Multiple SCell activation | MediaTek inc. | imported from 3GU |
R4‑1913313 | Discussion on CGI reading requirement for NR | MediaTek inc. | imported from 3GU |
R4‑1913314 | Discussion on remaining issues in TCI state switch | MediaTek inc. | imported from 3GU |
R4‑1913315 | DraftCR on TCI state switch | MediaTek inc. | imported from 3GU |
R4‑1913316 | Discussion on CSI-RS configuration update for CQI reporting and Spatial Relation switch | MediaTek inc. | imported from 3GU |
R4‑1913317 | Discussion on high power UE (PC2) for EN-DC FDD-TDD | Samsung | imported from 3GU |
R4‑1913318 | TP for TR 37.815 high power UE (PC2) for EN-DC FDD-TDD | Samsung | imported from 3GU |
R4‑1913319 | Discussion on Uplink full power transmission | Samsung | imported from 3GU |
R4‑1913320 | Further discussion on scope of IAB RRM requirement | Samsung | imported from 3GU |
R4‑1913321 | CR to TS38.133 on correction for BWP switching with SCS changing (Section 8.2.1.2.7, 8.2.2.2.5 and 8.6.2) | Samsung | imported from 3GU |
R4‑1913322 | CR to TS38.133 on correction for BWP switching with SCS changing (Section 8.2.1.2.7, 8.2.2.2.5 and 8.6.2) | Samsung | imported from 3GU |
R4‑1913323 | Further discussion on L1-SINR measurement and reporting | Samsung | imported from 3GU |
R4‑1913324 | Further discussion on RRM requirement for SCell beam failure recovery | Samsung | imported from 3GU |
R4‑1913325 | Further discussion on enhancement on UL/DL beam selection with reduced latency and overhead | Samsung | imported from 3GU |
R4‑1913326 | Discussion on inter-band DL CA in FR2 | Samsung | imported from 3GU |
R4‑1913327 | Discussion on Rel-16 beam correspondence side condition | Samsung | imported from 3GU |
R4‑1913328 | TP for TR 36.716-03-02: CA_3BDL_46-48-66_2UL_48A-66A | Samsung, Verizon | imported from 3GU |
R4‑1913329 | Discussion on BCS reporting for EN-DC BC | Samsung | imported from 3GU |
R4‑1913330 | Reply LS on BCS reporting for EN-DC BC | Samsung | imported from 3GU |
R4‑1913331 | Further discussion on DSS in LTE refarming bands | Samsung | imported from 3GU |
R4‑1913332 | Updated IAB TR | Samsung | imported from 3GU |
R4‑1913333 | Discussion on IAB-MT capability | Samsung | imported from 3GU |
R4‑1913334 | Further simulation on IAB-MT ACLR and TX min power | Samsung | imported from 3GU |
R4‑1913335 | Further discussion on IAB system parameters | Samsung | imported from 3GU |
R4‑1913336 | TP for TS38.174: IAB system parameters | Samsung | imported from 3GU |
R4‑1913337 | TP for TS38.174: IAB system parameters | Samsung | imported from 3GU |
R4‑1913338 | Switching time between IAB-MT and IAB-DU | Samsung | imported from 3GU |
R4‑1913339 | IAB RX out of band blocking | Samsung | imported from 3GU |
R4‑1913340 | IAB RX spurious emission | Samsung | imported from 3GU |
R4‑1913341 | View on MPE enhancements | Samsung | imported from 3GU |
R4‑1913342 | UE RF requirements for n259 | Samsung | imported from 3GU |
R4‑1913343 | CR on correction of NR PUCCH format2 performance requirements (Rel-15) for TS 38.104 | Samsung | imported from 3GU |
R4‑1913344 | CR on correction of NR PUCCH format2 performance requirements (Rel-16) for TS 38.104 | Samsung | imported from 3GU |
R4‑1913345 | CR on correction of NR PUCCH format2 conducted performance requirements (Rel-15) for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1913346 | CR on correction of NR PUCCH format2 conducted performance requirements (Rel-16) for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1913347 | CR on correction of NR PUCCH format2 radiated performance requirements (Rel-15) for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1913348 | CR on correction of NR PUCCH format2 radiated performance requirements (Rel-16) for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1913349 | CR on correction of NR UCI on PUSCH performance requirements (Rel-15) for TS 38.104 | Samsung | imported from 3GU |
R4‑1913350 | CR on correction of NR UCI on PUSCH performance requirements (Rel-16) for TS 38.104 | Samsung | imported from 3GU |
R4‑1913351 | CR on correction of NR UCI on PUSCH conducted performance requirements (Rel-15) for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1913352 | CR on correction of NR UCI on PUSCH conducted performance requirements (Rel-16) for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1913353 | CR on correction of NR UCI on PUSCH radiated performance requirements (Rel-15) for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1913354 | CR on correction of NR UCI on PUSCH radiated performance requirements (Rel-16) for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1913355 | CR on correction on FRC table for FR1 PUSCH performance requirements (Rel-15) for TS 38.104 | Samsung, China Telecom | imported from 3GU |
R4‑1913356 | CR on correction on FRC table for FR1 PUSCH performance requirements (Rel-16) for TS 38.104 | Samsung, China Telecom | imported from 3GU |
R4‑1913357 | CR on correction on FRC table for FR1 PUSCH conducted performance requirements (Rel-15) for TS 38.141-1 | Samsung,China Telecom | imported from 3GU |
R4‑1913358 | CR on correction on FRC table for FR1 PUSCH conducted performance requirements (Rel-16) for TS 38.141-1 | Samsung,China Telecom | imported from 3GU |
R4‑1913359 | CR on correction on FRC table for FR1 PUSCH radicated performance requirements (Rel-15) for TS 38.141-2 | Samsung,China Telecom | imported from 3GU |
R4‑1913360 | CR on correction on FRC table for FR1 PUSCH radicated performance requirements (Rel-16) for TS 38.141-2 | Samsung,China Telecom | imported from 3GU |
R4‑1913361 | Summary of ideal and impairment results for UCI on PUSCH | Samsung | imported from 3GU |
R4‑1913362 | View on BS demodulation requirement in Rel-16 | Samsung | imported from 3GU |
R4‑1913363 | Initial simulation results for NR demoduation performance in Rel-16 | Samsung | imported from 3GU |
R4‑1913364 | Discussion and initial simulation results for NR HST PUSCH | Samsung | imported from 3GU |
R4‑1913365 | View on UL timing requirement for NR HST | Samsung | imported from 3GU |
R4‑1913366 | Discussion and initial simulation results for NR HST PRACH | Samsung | imported from 3GU |
R4‑1913367 | Simulation results for HST PUSCH in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1913368 | Simulation results for HST PRACH in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1913369 | Summary of ideal and impairment results for LTE Rel-16 HST BS demodulation requirement | Samsung | imported from 3GU |
R4‑1913370 | View on URLLC performance requirements in NR Rel-16 | Samsung | imported from 3GU |
R4‑1913371 | Simulation results of UE demodulation requirements for LTE NR co-existence scenario in TDD | Samsung | imported from 3GU |
R4‑1913372 | Simulation results of Type I PMI test cases | Samsung | imported from 3GU |
R4‑1913373 | Initial simulation results for PMI reporting with type II codebook | Samsung | imported from 3GU |
R4‑1913374 | Simulation results for UE demodulation requirements under HST single tap | Samsung | imported from 3GU |
R4‑1913375 | CR for 38.101-3: Correction to DC Config and dual UL interferer (Rel-15) | Samsung | imported from 3GU |
R4‑1913376 | CR for 38.101-3: Correction to DC Config and dual UL interferer (Rel-16) | Samsung | imported from 3GU |
R4‑1913377 | CR for 38.101-3: Correction to EN-DC and NE-DC Configurations (Rel-15) | Samsung | imported from 3GU |
R4‑1913378 | CR for 38.101-3: Correction to EN-DC and NE-DC Configurations (Rel-16) | Samsung | imported from 3GU |
R4‑1913379 | Test case design for PMI reporting with Type II codebook | Samsung | imported from 3GU |
R4‑1913380 | CR for correction on Rel-14 eFDMIMO PMI test cases with advanced codebook for TS 36.101 (Rel-14) | Samsung | imported from 3GU |
R4‑1913381 | CR for correction on Rel-14 eFDMIMO PMI test cases with advanced codebook for TS 36.101 (Rel-15) | Samsung | imported from 3GU |
R4‑1913382 | CR for correction on Rel-14 eFDMIMO PMI test cases with advanced codebook for TS 36.101 (Rel-16) | Samsung | imported from 3GU |
R4‑1913383 | [DRAFT] Reply LS on clarification about CSI-RS measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1913384 | CR on NR SRS carrier switching interruption in TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1913385 | Discussion on quality reporting in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1913386 | [draft] reply LS on channel quality report for LTE-MTC | Huawei, HiSilicon | imported from 3GU |
R4‑1913387 | Discussion on direct Scell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1913388 | [draft] reply LS on direct SCell activation in RRC resume message | Huawei, HiSilicon | imported from 3GU |
R4‑1913389 | Discussion on reference point for UE timing related measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1913390 | Discussion on reference point for gNB timing related measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1913391 | [draft] reply LS on Reference Point for Timing Related Measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1913392 | [draft] reply LS on UE capabilities on DAPS HO | Huawei, HiSilicon | imported from 3GU |
R4‑1913393 | On NR Rel-15 BS demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913394 | CR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913395 | CR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913396 | CR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913397 | CR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913398 | CR for 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913399 | CR for 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913400 | NR Rel-16 HST BS demodulation PUSCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913401 | NR Rel-16 HST BS demodulation PRACH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913402 | On NR Rel-16 HST BS demodulation PUSCH requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913403 | On NR Rel-16 HST BS demodulation PRACH requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913404 | On NR Rel-16 HST BS demodulation UL timing adjustment requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913405 | NR Rel-16 performance requirement enhancement BS demodulation simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913406 | On NR Rel-16 high reliability BS demodulation requirements and test feasibility | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913407 | IAB MT receiver maximum input level requirement in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1913408 | IAB MT RF co-existence requirements in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1913409 | Definition of IAB channel bandwidth | Qualcomm Incorporated | imported from 3GU |
R4‑1913410 | LS to RAN2 on definition of IAB MT channel bandwidth | Qualcomm Incorporated | imported from 3GU |
R4‑1913411 | Discussion on directional requirements for IAB nodes | Qualcomm Incorporated | imported from 3GU |
R4‑1913412 | Overview of IAB RF requirements in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1913413 | Synchronization raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1913414 | Channel raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1913415 | dCR channel raster in band n46 for NR-U operation | Qualcomm Incorporated | imported from 3GU |
R4‑1913416 | WID on Introduction of NR Band n53 | GLOBALSTAR Inc. | imported from 3GU |
R4‑1913417 | CR to TS 38.101-4: Corrections for applicability rules (R15) | Intel Corporation | imported from 3GU |
R4‑1913418 | CR to TS 38.101-4: Editorial corrections for PDSCH RMC (R15) | Intel Corporation | imported from 3GU |
R4‑1913419 | CR to TS 38.101-4: Introduction of NE-DC and NR-DC SDR requirements (R15) | Intel Corporation | imported from 3GU |
R4‑1913420 | Discussion on NR CA UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1913421 | Simulation results for NR FR1 Normal CA requirements | Intel Corporation | imported from 3GU |
R4‑1913422 | Summary of Normal CA simulation results (NR FR1 FDD) | Intel Corporation | imported from 3GU |
R4‑1913423 | Summary of Normal CA simulation results (NR FR1 TDD) | Intel Corporation | imported from 3GU |
R4‑1913424 | CR to TS 38.101-4: FRC for FR1 Normal CA requirements (R16) | Intel Corporation | imported from 3GU |
R4‑1913425 | Simulation results for TDD LTE-NR coexistence requirements | Intel Corporation | imported from 3GU |
R4‑1913426 | CR to TS 38.101-4: LTE-NR coexistence requirements for TDD mode (R16) | Intel Corporation | imported from 3GU |
R4‑1913427 | Discussion on NR V2X S-SSB design | Intel Corporation | imported from 3GU |
R4‑1913428 | Views on DL transmission schemes for NR HST-SFN | Intel Corporation | imported from 3GU |
R4‑1913429 | Views on NR UE demodulation requirements for HST-SFN scenario with JT operation | Intel Corporation | imported from 3GU |
R4‑1913430 | Views on NR UE demodulation requirements for HST single tap scenario | Intel Corporation | imported from 3GU |
R4‑1913431 | Views on NR UE demodulation requirements for HST scenario with fading channel conditions | Intel Corporation | imported from 3GU |
R4‑1913432 | Views on network assistance signaling for NR HST scenarios | Intel Corporation | imported from 3GU |
R4‑1913433 | [draft] LS on network assistance signaling for NR HST scenarios | Intel Corporation | imported from 3GU |
R4‑1913434 | Simulation results for LTE HST bidirectional SFN CA scenario | Intel Corporation | imported from 3GU |
R4‑1913435 | Simulation results for LTE HST bidirectional SFN scenario | Intel Corporation | imported from 3GU |
R4‑1913436 | WF on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1913437 | NR RRM requirements for handover with simultaneous Rx/Tx | Intel Corporation | imported from 3GU |
R4‑1913438 | CR for NR RRM requirements for handover with simultaneous Rx/Tx | Intel Corporation | imported from 3GU |
R4‑1913439 | NR RRM requirements for conditional handover | Intel Corporation | imported from 3GU |
R4‑1913440 | CR for NR RRM requirements for conditional handover | Intel Corporation | imported from 3GU |
R4‑1913441 | CR on handover RRM requirement (section 6.1.1.5) (R15) | Intel Corporation | imported from 3GU |
R4‑1913442 | CR on handover RRM requirement (section 6.1.1.5) (R16) | Intel Corporation | imported from 3GU |
R4‑1913443 | CR on test cases for EN-DC FR2 inter-frequency measurement (section A.5.6.2) (R15) | Intel Corporation | imported from 3GU |
R4‑1913444 | CR on test cases for EN-DC FR2 inter-frequency measurement (section A.5.6.2) (R16) | Intel Corporation | imported from 3GU |
R4‑1913445 | CR on test cases for SA FR2 inter-frequency measurement (section A.7.6.2) (R15) | Intel Corporation | imported from 3GU |
R4‑1913446 | CR on test cases for SA FR2 inter-frequency measurement (section A.7.6.2) (R16) | Intel Corporation | imported from 3GU |
R4‑1913447 | CR on test cases for Redirection from NR in FR2 to NR in FR2 (section A.7.3.2.3) (R15) | Intel Corporation | imported from 3GU |
R4‑1913448 | CR on test cases for Redirection from NR in FR2 to NR in FR2 (section A.7.3.2.3) (R16) | Intel Corporation | imported from 3GU |
R4‑1913449 | CR on test cases for FR2 handover (section A.7.3.1) (R15) | Intel Corporation | imported from 3GU |
R4‑1913450 | CR on test cases for FR2 handover (section A.7.3.1) (R16) | Intel Corporation | imported from 3GU |
R4‑1913451 | Simulation results for CSI-RS L3 measurement for FR1 | Intel Corporation | imported from 3GU |
R4‑1913452 | Discussion about intra-frequency definition of CSI-RS based L3 measurement | Intel Corporation | imported from 3GU |
R4‑1913453 | Discussion about inter-frequency measurement without gap | Intel Corporation | imported from 3GU |
R4‑1913454 | Simulation results about RSS for Rel-16 additional MTC enhancements for LTE | Intel Corporation | imported from 3GU |
R4‑1913455 | Discussion on SIB reading impacts on cell reselection requirements of NR-U | Intel Corporation | imported from 3GU |
R4‑1913456 | Further discussion on HO requirements of NR-U | Intel Corporation | imported from 3GU |
R4‑1913457 | Discussion on NR-U RLM requirements | Intel Corporation | imported from 3GU |
R4‑1913458 | Further discussion on TS 38.133 specification structure for NR positioning RRM requirements | Intel Corporation | imported from 3GU |
R4‑1913459 | [draftCR] TS 38.133 structure for NR positioning RRM requirements | Intel Corporation | imported from 3GU |
R4‑1913460 | Discussion on NR UE PRS RSTD measurement requirements | Intel Corporation | imported from 3GU |
R4‑1913461 | Link-level simulation assumptions for PRS RSTD measurement | Intel Corporation | imported from 3GU |
R4‑1913462 | Discussion on NR UE RX-TX time difference measurement requirements | Intel Corporation | imported from 3GU |
R4‑1913463 | Considerations on gNB measurement requirements for NR positioning | Intel Corporation | imported from 3GU |
R4‑1913464 | WF on gNB requirements for NR positioning | Intel Corporation | imported from 3GU |
R4‑1913465 | On reference point for timing related measurements | Intel Corporation | imported from 3GU |
R4‑1913466 | MPR enhancement with Pi/2 BPSK DMRS | Intel Corporation | imported from 3GU |
R4‑1913467 | CR to TS 38.101-1 Almost contiguous A-MPR (R15) | Intel Corporation | imported from 3GU |
R4‑1913468 | CR to TS 38.101-1 Almost contiguous A-MPR (R16) | Intel Corporation | imported from 3GU |
R4‑1913469 | CR to TS 38.101-2 Editorial error correction (R15) | Intel Corporation | imported from 3GU |
R4‑1913470 | Clarification on EN-DC dynamic power sharing | Intel Corporation | imported from 3GU |
R4‑1913471 | On FR2 inter-band UL CA | Intel Corporation | imported from 3GU |
R4‑1913472 | On Full tx power measurement | Intel Corporation | imported from 3GU |
R4‑1913473 | CR to 38.101-1 (Rel-15) Transmit power for UL-MIMO | Intel Corporation | imported from 3GU |
R4‑1913474 | CR to 38.101-1 (Rel-16) Transmit power for UL-MIMO | Intel Corporation | imported from 3GU |
R4‑1913475 | CR to 38.101-1 (Rel-15) to clarify measurement interval and observation window on frequency error | Intel Corporation | imported from 3GU |
R4‑1913476 | CR to 38.101-1 (Rel-16) to clarify measurement interval and observation window on frequency error | Intel Corporation | imported from 3GU |
R4‑1913477 | CR to 38.101-2 (Rel-15) to clarify measurement interval and observation window on frequency error | Intel Corporation | imported from 3GU |
R4‑1913478 | CR to 38.101-2 (Rel-16) to clarify measurement interval and observation window on frequency error | Intel Corporation | imported from 3GU |
R4‑1913479 | Discussion on open issues related to TCI state switching | Intel Corporation | imported from 3GU |
R4‑1913480 | CR to 38.133 on TCI state switching (Section 8.10) (R15) | Intel Corporation | imported from 3GU |
R4‑1913481 | CR to 38.133 on TCI state switching (Section 8.10) (R16) | Intel Corporation | imported from 3GU |
R4‑1913482 | Discussion on test feasibility and methodology for URLLC | Intel Corporation | imported from 3GU |
R4‑1913483 | Discussion on test cases for URLLC features | Intel Corporation | imported from 3GU |
R4‑1913484 | Discussion on requirements for BWP switching on multiple CCs | Intel Corporation | imported from 3GU |
R4‑1913485 | Simulation results for PMI test cases with 16,32 ports | Intel Corporation | imported from 3GU |
R4‑1913486 | Discussion on PMI test cases with 16, 32 ports | Intel Corporation | imported from 3GU |
R4‑1913487 | System-level evaluations for PRS-RSTD and PRS-RSRP | Intel Corporation | imported from 3GU |
R4‑1913488 | CR on corrections for MIMO Correlation Matrices | Qualcomm Incorporated | imported from 3GU |
R4‑1913489 | CR on corrections for FR1 PDSCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1913490 | CR on corrections for FR2 PDSCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1913491 | CR on corrections for FR1 CSI Reporting performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1913492 | CR on corrections for FR2 CSI Reporting performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1913493 | TP to TR 38.883 Updated link level simulation results for FR2 DL 256QAM | Qualcomm Incorporated | imported from 3GU |
R4‑1913494 | Views on Tests for High Speed Train Scenarios | Qualcomm Incorporated | imported from 3GU |
R4‑1913495 | Views on URLLC Testability and test cases | Qualcomm Incorporated | imported from 3GU |
R4‑1913496 | Views on NR CA PDSCH Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1913497 | Remaining issues on cell detection and serving cell measurement for NR-U | Apple | imported from 3GU |
R4‑1913498 | CR on UE measurements capability and reporting criteria for NR-U | Apple | imported from 3GU |
R4‑1913499 | CR on measurement gap applicability requirement for SRVCC | Apple | imported from 3GU |
R4‑1913500 | On activation delay extension due to multiple SCell activations | Apple | imported from 3GU |
R4‑1913501 | Way forward on activation delay extension due to multiple SCell activations | Apple | imported from 3GU |
R4‑1913502 | On scheduling restriction for inter-frequency measurement without gap | Apple | imported from 3GU |
R4‑1913503 | On applicable timing for pathloss RS activated/updated by MAC-CE | Apple | imported from 3GU |
R4‑1913504 | Reply LS on applicable timing for pathloss RS activated/updated by MAC-CE | Apple | imported from 3GU |
R4‑1913505 | On CSI-RS configuration update for CQI | Apple | imported from 3GU |
R4‑1913506 | On RRM impact of Tx switching | Apple | imported from 3GU |
R4‑1913507 | On defintion of CSI-RS based intra-frequency and inter-frequency layers | Apple | imported from 3GU |
R4‑1913508 | Performance of NR SLSS synchronization on S-SSB structure | LG Electronics | imported from 3GU |
R4‑1913509 | NR V2X SL scenario on RRM impact | LG Electronics | imported from 3GU |
R4‑1913510 | Discussion of gNB in FR2 as timing reference source | LG Electronics | imported from 3GU |
R4‑1913511 | Simulation results of NR SLSS synchronization | LG Electronics | imported from 3GU |
R4‑1913512 | Discussion of Synchronization requirements for NR V2X | LG Electronics | imported from 3GU |
R4‑1913513 | Simulation results of S-RSRP measurement accuracy | LG Electronics | imported from 3GU |
R4‑1913514 | Discussion of measurement requirements for NR V2X | LG Electronics | imported from 3GU |
R4‑1913515 | Discussion of interruption for NR V2X | LG Electronics | imported from 3GU |
R4‑1913516 | WF on NR V2X RRM requirement | LG Electronics | imported from 3GU |
R4‑1913517 | draft CR of NR V2X RRM(introduction & reliability of GNSS signal) | LG Electronics | imported from 3GU |
R4‑1913518 | Format misalignment on NS_47 protection requirement table | SoftBank Corp. | imported from 3GU |
R4‑1913519 | CR to TS 38.101-2 on beam correspondence side condition applicability | Samsung | imported from 3GU |
R4‑1913520 | CR to TS 38.101-2 on beam correspondence side condition applicability | Samsung | imported from 3GU |
R4‑1913521 | Discussion on more enhancement to beam correspondence in Rel-16 | Samsung | imported from 3GU |
R4‑1913522 | Discussion on FR1 MIMO OTA environmental condition | Samsung | imported from 3GU |
R4‑1913523 | Discussion on polarization mismatch for UL TX test | Samsung | imported from 3GU |
R4‑1913524 | Discussion on antenna array assumption for measurement grids | Samsung | imported from 3GU |
R4‑1913525 | Proposal of mandatory/optional on n41-30MHz | SoftBank Corp., KDDI Corporation | imported from 3GU |
R4‑1913526 | On addition of "brand new" CBWs | SoftBank Corp. | imported from 3GU |
R4‑1913527 | Clarification for the definition of the UL duty cycle. | Apple Inc. | imported from 3GU |
R4‑1913528 | [draft] LS on clarification for the definition of the UL duty cycle | Apple Inc. | imported from 3GU |
R4‑1913529 | Further considerations on the in-carrier bands and wideband operation for NR-U | Apple Inc. | imported from 3GU |
R4‑1913530 | Further considerations on the uplink duty cycle enhancements for the MPE scenario | Apple Inc. | imported from 3GU |
R4‑1913531 | Motivation for LTE/NR spectrum sharing in band 48/n48 frequency range and specification impact analysis | Apple Inc. | imported from 3GU |
R4‑1913532 | New WID: LTE/NR spectrum sharing in band 48/n48 frequency range | Apple Inc. | imported from 3GU |
R4‑1913533 | Introduction of LTE/NR spectrum sharing in band 48/n48 frequency range | Apple Inc. | imported from 3GU |
R4‑1913534 | Solutions for unusual Spectrum allocations for NR bands | Apple | imported from 3GU |
R4‑1913535 | Specification simplification and fallbacks | Apple | imported from 3GU |
R4‑1913536 | Remaining issues with the FR2 UL inter-band CA feature | Apple Inc. | imported from 3GU |
R4‑1913537 | Views on beam correspondence enhancements | Apple Inc. | imported from 3GU |
R4‑1913538 | Views on FR2 frequency separation class enhancement | Apple Inc. | imported from 3GU |
R4‑1913539 | CR to 38.101-2 on FR2 frequency separation class enhancement | Apple Inc. | imported from 3GU |
R4‑1913540 | FR2 DL inter-band CA architecture considerations | Apple Inc. | imported from 3GU |
R4‑1913541 | EIS requirements for FR2 DL inter-band CA | Apple Inc. | imported from 3GU |
R4‑1913542 | Non-simultaneous Tx for FR2 intra-band NC UL CA | Apple Inc. | imported from 3GU |
R4‑1913543 | Non-simultaneous Tx for FR2 inter-band UL CA | Apple Inc. | imported from 3GU |
R4‑1913544 | Impact of FR2 UL CA aggregate BW beyond 800 MHz on transmit power control | Apple Inc. | imported from 3GU |
R4‑1913545 | Derivation of spherical coverage EIRP and EIS for band n259 | Apple Inc. | imported from 3GU |
R4‑1913546 | Multi-band framework for band n259 | Apple Inc. | imported from 3GU |
R4‑1913547 | FR2 test method enhancement informal email discussion on the polarization basis mismatch objective | Apple Inc. | imported from 3GU |
R4‑1913548 | Views on test methodology for inter-band (FR2+FR2) CA | Apple Inc. | imported from 3GU |
R4‑1913549 | Study on enhanced test methods for FR2 in NR adhoc meeting notes | Apple Inc. | imported from 3GU |
R4‑1913550 | Way forward on enhanced test methods for FR2 in NR | Apple Inc. | imported from 3GU |
R4‑1913551 | Discussion on clarification of Tx diversity in R15 | vivo | imported from 3GU |
R4‑1913552 | further discussion on ENDC power class in R15 | vivo | imported from 3GU |
R4‑1913553 | WF on Rel-15 EN-DC power class | vivo | imported from 3GU |
R4‑1913554 | Draft LS on clarification of ENDC power class in R15 | vivo | imported from 3GU |
R4‑1913555 | CR to 38.101-3: clarification of ENDC power class in R15 | vivo | imported from 3GU |
R4‑1913556 | Support of two LTE configurations in option3 for EN-DC (FDD+TDD) HPUE | vivo | imported from 3GU |
R4‑1913557 | TP for TR 37.815 of the solution option3 for SAR limits | vivo | imported from 3GU |
R4‑1913558 | Discussion on optimization of power class fall back | vivo | imported from 3GU |
R4‑1913559 | Discussion on number of active probes in FR1 | vivo | imported from 3GU |
R4‑1913560 | TP to TR 38.827 on FR1 layout | vivo | imported from 3GU |
R4‑1913561 | Discussion on NSA FDD-TDD high power UE | Xiaomi | imported from 3GU |
R4‑1913562 | CR to TS 38.141-1: Corrections to BS classes and transmit configurations | CMCC | imported from 3GU |
R4‑1913563 | CR to TS 38.141-2: Update to Table C.1-2 FR2 OTA transmitter tests | CMCC | imported from 3GU |
R4‑1913564 | CR to TS 37.104: Correction to Tx transient period of MSR | CMCC | imported from 3GU |
R4‑1913565 | CR to TS 37.141: Corresponding mirror CR on Tx transient period of MSR | CMCC | imported from 3GU |
R4‑1913566 | Discussion BS classes for 7 to 24GHz | CMCC | imported from 3GU |
R4‑1913567 | RRM measurement relaxation for UE power saving | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913568 | RRM core requirements on L1-SINR | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913569 | CSI-RS parameters for RRM core requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913570 | Definition of intra-frequency measurement for CSI-RS based L3 measurement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913571 | QCL assumptions for CSI-RS based L3 measurement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913572 | Views on high-speed train tests for NR | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913573 | Views on normal PDSCH demodulation test for CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1913574 | TP for TR 37.716-21-21 to include DC_2A-7A_n38A-n78A | Intel Corporation | imported from 3GU |
R4‑1913575 | [Draft] Reply LS on BCS reporting for EN-DC BC | Intel Corporation | imported from 3GU |
R4‑1913576 | Indication and reporting enhancements to mitigate RLF | Intel Corporation | imported from 3GU |
R4‑1913577 | CR on TCI state switch | MediaTek inc. | imported from 3GU |
R4‑1913578 | CR on TCI state switch - R16 | MediaTek inc. | imported from 3GU |
R4‑1913579 | CR on clarification on RSSI measurement requirement R13 | MediaTek inc. | imported from 3GU |
R4‑1913580 | CR on clarification on RSSI measurement requirement R14 | MediaTek inc. | imported from 3GU |
R4‑1913581 | CR on clarification on RSSI measurement requirement R15 | MediaTek inc. | imported from 3GU |
R4‑1913582 | CR on clarification on RSSI measurement requirement R16 | MediaTek inc. | imported from 3GU |
R4‑1913583 | UE UL timing adjustment due to Rx beam change | MediaTek inc. | imported from 3GU |
R4‑1913584 | CR on TC with monitoring PDCCH not in first 3 OFDM symbols R15 | MediaTek inc. | imported from 3GU |
R4‑1913585 | CR on TC with monitoring PDCCH not in first 3 OFDM symbols R16 | MediaTek inc. | imported from 3GU |
R4‑1913586 | Discussion on BWP requirements for multiple CCs | MediaTek inc. | imported from 3GU |
R4‑1913587 | Inter-frequency measurement requirement without MG | MediaTek inc. | imported from 3GU |
R4‑1913588 | Simulation results for CSI-RS measurement BW | MediaTek inc. | imported from 3GU |
R4‑1913589 | Definition of Intra and inter frequency for CSI-RS RRM | MediaTek inc. | imported from 3GU |
R4‑1913590 | Discussion on measurement capability for CSI-RS RRM | MediaTek inc. | imported from 3GU |
R4‑1913591 | Cell identification requirements for CSI-RS RRM | MediaTek inc. | imported from 3GU |
R4‑1913592 | Simulation results for Cell identification | MediaTek inc. | imported from 3GU |
R4‑1913593 | Simulation results for measurement accuracy | MediaTek inc. | imported from 3GU |
R4‑1913594 | Beam management in HST | MediaTek inc. | imported from 3GU |
R4‑1913595 | Discussion on legacy impact due to dual SMTC in IDLE mode | MediaTek inc. | imported from 3GU |
R4‑1913596 | Further reply LS on second SMTC periodicity in idle mode | MediaTek inc. | imported from 3GU |
R4‑1913597 | CR for TS38.104: Corrections on channel bandwdith for band n34 | ZTE Corporation | imported from 3GU |
R4‑1913598 | CR for TS38.104: Corrections on channel bandwdith for band n34 | ZTE Corporation | imported from 3GU |
R4‑1913599 | CR to TS38.104: Editorial corrections | ZTE Corporation | imported from 3GU |
R4‑1913600 | CR to TS38.104: Editorial corrections | ZTE Corporation | imported from 3GU |
R4‑1913601 | CR to TS38.101-3: Correction on channel spacing for intra-band EN-DC carriers (section 5.4B.1) | ZTE Corporation | imported from 3GU |
R4‑1913602 | CR to TS38.101-3: Correction on channel spacing for intra-band EN-DC carriers (section 5.4B.1) | ZTE Corporation | imported from 3GU |
R4‑1913603 | CR to TS 38.101-1: Replace CBW with symbols defined in the specification | ZTE Corporation | imported from 3GU |
R4‑1913604 | CR to TS 38.101-1: Replace CBW with symbols defined in the specification | ZTE Corporation | imported from 3GU |
R4‑1913605 | CR to TS 38.101-2: Correctin on CA NRACLR | ZTE Corporation | imported from 3GU |
R4‑1913606 | CR to TS 38.101-2: Correctin on CA NRACLR | ZTE Corporation | imported from 3GU |
R4‑1913607 | CR to TS 38.101-2: Correctin on FInterferer (offset) for CA ACS | ZTE Corporation | imported from 3GU |
R4‑1913608 | CR to TS 38.101-2: Correctin on FInterferer (offset) for CA ACS | ZTE Corporation | imported from 3GU |
R4‑1913609 | TP for TR37.716-21-11_ DC_1A-20A_n38A | ZTE Corporation | imported from 3GU |
R4‑1913610 | TP for TR37.716-21-11_ DC_3A-20A_n38A | ZTE Corporation | imported from 3GU |
R4‑1913611 | TP for TR37.716-21-21_ DC_1A-3A_n38A-n78A | ZTE Corporation | imported from 3GU |
R4‑1913612 | TP for TR37.716-21-21_ DC_1A-7A-20A_n3A-n78A | ZTE Corporation | imported from 3GU |
R4‑1913613 | TP for TR37.716-31-11_ DC_1A-3A-20A_n38A | ZTE Corporation | imported from 3GU |
R4‑1913614 | TP for TR37.716-31-11_ DC_1A-7A-20A_n3A | ZTE Corporation | imported from 3GU |
R4‑1913615 | TP for TR37.716-31-11_ DC_1A-20A-38A_n78A | ZTE Corporation | imported from 3GU |
R4‑1913616 | TP for TR37.716-31-11_ DC_3A-20A-38A_n78A | ZTE Corporation | imported from 3GU |
R4‑1913617 | TP for TR37.716-41-11_ DC_1A-3A-20A-38A_n78A | ZTE Corporation | imported from 3GU |
R4‑1913618 | BS-BS co-existence analysis for the new wider channel bandwidth band n28 | ZTE Corporation | imported from 3GU |
R4‑1913619 | Discussion on BS RF requirement for the new wider channel bandwidth band n28 | ZTE Corporation | imported from 3GU |
R4‑1913620 | TP for TR38.888: Adding new wider channel bandwidth for BS | ZTE Corporation | imported from 3GU |
R4‑1913621 | TP for TR38.888: BS-BS co-existence analysis | ZTE Corporation | imported from 3GU |
R4‑1913622 | CR for TS38.104: Introduce new wider channel bandwidth for band n28 | ZTE Corporation | imported from 3GU |
R4‑1913623 | CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1913624 | CR to reflect the completed NR inter band CA DC combinations for 2 bands DL with up to 2 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1913625 | CR to reflect the completed NR inter band CA DC combinations for 3 bands DL with 2 bands UL into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1913626 | CR to reflect the completed NR inter band CA DC combinations for 3 bands DL with 2 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1913627 | CR to reflect the completed ENDC combinations for 3 bands DL with 3 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1913628 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Corporation | imported from 3GU |
R4‑1913629 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 3 bands DL with 2 bands UL | ZTE Corporation | imported from 3GU |
R4‑1913630 | Revised WID: Dual Connectivity (EN-DC) with 3 bands DL and 3 bands UL | ZTE Corporation | imported from 3GU |
R4‑1913631 | TR 37.716-33 v0.1.0: Dual Connectivity (EN-DC) with 3 bands DL and 3 bands UL | ZTE Corporation | imported from 3GU |
R4‑1913632 | Motivation on new Basket WI for EN-DC including 3 bands inter-band NR CA | ZTE Corporation | imported from 3GU |
R4‑1913633 | New proposed WID on EN-DC of x bands (x=1,2,3) LTE inter-band CA (xDL/1UL) and 3 bands NR inter-band CA (3DL/1UL) | ZTE Corporation | imported from 3GU |
R4‑1913634 | Adding Band40 for UE category 1bis into Rel-16 TS 36.101 | CMCC | imported from 3GU |
R4‑1913635 | CR for REL-16 TS36.307 for adding B40 to UE category 1bis | CMCC | imported from 3GU |
R4‑1913636 | Draft CR for TS 38.101-1: Support of n78(2A) in CA_3_ n78 | SoftBank Corp. | imported from 3GU |
R4‑1913637 | TP for TR 37.716-41-11: EN-DC_1-3-8-42_n77 | SoftBank Corp. | imported from 3GU |
R4‑1913638 | TP for TR 37.716-21-21: EN-DC_1-8_n3-n28 | SoftBank Corp. | imported from 3GU |
R4‑1913639 | TP for TR 36.716-04-01: LTE CA_1-8-11-42 | SoftBank Corp. | imported from 3GU |
R4‑1913640 | CR to 38.104 on Editorial corrections (Rel-15) | Ericsson | imported from 3GU |
R4‑1913641 | CR to 38.104 on Editorial corrections (Rel-16) | Ericsson | imported from 3GU |
R4‑1913642 | CR to 38.104 on Corrections from endorsed draft CRs (Rel-15) | Ericsson | imported from 3GU |
R4‑1913643 | CR to 38.104 on Corrections from endorsed draft CRs (Rel-16) | Ericsson | imported from 3GU |
R4‑1913644 | CR to 38.104 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1913645 | CR to 38.104 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1913646 | CR to 38.141-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1913647 | CR to 38.141-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1913648 | CR to 37.105 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1913649 | CR to 37.105 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1913650 | CR to 37.145-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1913651 | CR to 37.145-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1913652 | CR to 37.104 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913653 | CR to 37.104 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913654 | CR to 37.141 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913655 | CR to 37.141 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913656 | CR to 37.105 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913657 | CR to 37.105 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913658 | CR to 37.145-1 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913659 | CR to 37.145-1 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913660 | CR to 37.145-2 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913661 | CR to 37.145-2 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1913662 | [Draft] LS response on Test methods for Over-the-Air Total Radiated Power field measurements for IMT radio equipment utilizing active antennas | Ericsson | imported from 3GU |
R4‑1913663 | [Draft] LS response on CEPT activities on measurement of 5G AAS in the field | Ericsson | imported from 3GU |
R4‑1913664 | TP for TR 37.716-21-21: EN-DC_1-11_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1913665 | n259 PC3 single-band spherical coverage requirement | MediaTek Beijing Inc. | imported from 3GU |
R4‑1913666 | TP for TR 37.716-21-21: EN-DC_8-11_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1913667 | n259 associated multi-band relaxation | MediaTek Beijing Inc. | imported from 3GU |
R4‑1913668 | TP for TR 37.716-21-21: EN-DC_8-11_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1913669 | FR2 PC1/2/4 multi-band relaxation | MediaTek Beijing Inc. | imported from 3GU |
R4‑1913670 | TP for TR 37.716-21-21: EN-DC_1-8-11_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1913671 | FR2 inter-band DL CA relaxation framework | MediaTek Beijing Inc. | imported from 3GU |
R4‑1913672 | TP for TR 38.716-04-01: NR CA_n3-n28-n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1913673 | TP for TR 38.716-04-01: NR CA_n3-n28-n78-n257 | SoftBank Corp. | imported from 3GU |
R4‑1913674 | FR2 SISO enhancement for polarization mismatch | MediaTek Beijing Inc. | imported from 3GU |
R4‑1913675 | FR2 MIMO test method | MediaTek Beijing Inc. | imported from 3GU |
R4‑1913676 | MIMO BS assumption and channel model definition | MediaTek Beijing Inc. | imported from 3GU |
R4‑1913677 | TP for TR37.716-21-21: IMD2 MSD for DC_3_n3-n77 | MediaTek Inc., CHTTL | imported from 3GU |
R4‑1913678 | TP for TR37.716-21-21: IMD2 MSD for DC_3_n3-n78 | MediaTek Inc., CHTTL | imported from 3GU |
R4‑1913679 | Further discussion on switching requirements between case1 and case2 | CMCC | imported from 3GU |
R4‑1913680 | Further discussion on inter-frequency measurement without gap | CMCC | imported from 3GU |
R4‑1913681 | Way forward on inter-frequency measurement without MG | CMCC | imported from 3GU |
R4‑1913682 | CR on introducing inter-frequency measurements without measurement gap (9.1.5, 9.1.6, 9.3.1, 9.3.4, 9.3.5) | CMCC | imported from 3GU |
R4‑1913683 | Discussion on test applicability for NR CA PDSCH normal demodulation | CMCC | imported from 3GU |
R4‑1913684 | CR to remove square brackets for n90 in TS38.101-1 | CMCC | imported from 3GU |
R4‑1913685 | CR to remove square brackets for n90 in TS38.101-3 | CMCC | imported from 3GU |
R4‑1913686 | CR to remove square brackets for n90 in TS38.104 | CMCC | imported from 3GU |
R4‑1913687 | CR to add n90 in the NR operating bands in FR1 (3.5.2) | CMCC | imported from 3GU |
R4‑1913688 | TP for TR 37.823 Specific aspects for TDD | Huawei Technologies R&D UK | imported from 3GU |
R4‑1913689 | TR38.827 v0.5.0 NR MIMO OTA | CAICT | imported from 3GU |
R4‑1913690 | Pre-emptive solution for MPE issues mitigation | InterDigital Communications | imported from 3GU |
R4‑1913691 | CR for TS38.101-1, Editorial corrections | CATT | imported from 3GU |
R4‑1913692 | CR for TS38.101-1, Editorial corrections | CATT | imported from 3GU |
R4‑1913693 | CR for TS38.101-1, Remove useless notes for UE channel bandwidth | CATT | imported from 3GU |
R4‑1913694 | CR for TS38.101-1, Remove useless notes for UE channel bandwidth | CATT | imported from 3GU |
R4‑1913695 | CR for adding SAR requirement for EN-DC PC2 UE | CATT, CMCC | imported from 3GU |
R4‑1913696 | CR for introducing RF requirement for EN-DC PC2 UE | CATT, CMCC | imported from 3GU |
R4‑1913697 | Discussion on requirement for PDCCH-based power saving signal channel | CATT | imported from 3GU |
R4‑1913698 | Further discussion on switching time for maximum MIMO layer adaptation | CATT | imported from 3GU |
R4‑1913699 | WF on switching and interruption for MIMO layer adaption | CATT | imported from 3GU |
R4‑1913700 | LS on switching and interruption time for MIMO layer adaption | CATT | imported from 3GU |
R4‑1913701 | CR for specifying requirements for power saving | CATT | imported from 3GU |
R4‑1913702 | Discuss on the channel arrangement design for NR V2X UE | CATT | imported from 3GU |
R4‑1913703 | TP for channel arrangement design for NR V2X UE | CATT | imported from 3GU |
R4‑1913704 | LS on channel arrangement design for NR V2X in FR1 | CATT | imported from 3GU |
R4‑1913705 | Impact of positioning measurement on RRM measurement | CATT | imported from 3GU |
R4‑1913706 | Discussion on reference point for gNB timing related measurements | CATT | imported from 3GU |
R4‑1913707 | Response LS on Reference Point for Timing Related Measurements in FR2 | CATT | imported from 3GU |
R4‑1913708 | Discussion on transient period in S-SSB design for NR V2X | CATT | imported from 3GU |
R4‑1913709 | Draft reply LS on transient period in S-SSB design for NR V2X | CATT | imported from 3GU |
R4‑1913710 | TP for RF requirements for NR V2X | CATT | imported from 3GU |
R4‑1913711 | Updates to PRACH requirements in TS 38.104 for Rel-15 | CATT | imported from 3GU |
R4‑1913712 | Updates to PRACH conducted tests in TS 38.141-1 for Rel-15 | CATT | imported from 3GU |
R4‑1913713 | Updates to PRACH OTA tests in TS 38.141-2 for Rel-15 | CATT | imported from 3GU |
R4‑1913714 | Updates to PRACH requirements in TS 38.104 for Rel-16 | CATT | imported from 3GU |
R4‑1913715 | Updates to PRACH conducted tests in TS 38.141-1 for Rel-16 | CATT | imported from 3GU |
R4‑1913716 | Updates to PRACH OTA tests in TS 38.141-2 for Rel-16 | CATT | imported from 3GU |
R4‑1913717 | Further discussion on reference point for timing related measurements in FR2 | CATT | imported from 3GU |
R4‑1913718 | Response LS on Reference Point for UE Timing Measurements | CATT | imported from 3GU |
R4‑1913719 | Discussion on RSTD Measurement Report Mapping | CATT | imported from 3GU |
R4‑1913720 | Discussion on UE Rx-Tx time difference report mapping | CATT | imported from 3GU |
R4‑1913721 | Link-level simulation Assumptions for RSTD measurement | CATT | imported from 3GU |
R4‑1913722 | Discussion on frequency layer and measurement gap | CATT | imported from 3GU |
R4‑1913723 | Link-level simulation results of measurement accuracy in NR HST | CATT | imported from 3GU |
R4‑1913724 | Link-level simulation results of cell identification in NR HST | CATT | imported from 3GU |
R4‑1913725 | Discussion on HST PUSCH demodulation requirement | CATT | imported from 3GU |
R4‑1913726 | Discussion on HST PRACH demodulation requirement | CATT | imported from 3GU |
R4‑1913727 | Discussion on PUSCH performance requirement with 30% throughput metric | CATT | imported from 3GU |
R4‑1913728 | CR for TS38.104: Introduce PUSCH performance requirements at 30% throughput testing point | CATT | imported from 3GU |
R4‑1913729 | CR for TS38.141-1: Introduce PUSCH performance requirements at 30% throughput testing point | CATT | imported from 3GU |
R4‑1913730 | CR for TS38.141-2: Introduce PUSCH performance requirements at 30% throughput testing point | CATT | imported from 3GU |
R4‑1913731 | CR for TS38.141-1: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1913732 | CR for TS38.141-1: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1913733 | Updated simulation results for 256QAM for FR2 | CATT | imported from 3GU |
R4‑1913734 | TP for TR 38.883: Updated link level simulation for 256QAM for FR2 | CATT | imported from 3GU |
R4‑1913735 | Discussion on cell re-selection requirements in idle mode under HST scenarios | CATT | imported from 3GU |
R4‑1913736 | Discussion on Cell identification requirements in connected mode under HST scenarios | CATT | imported from 3GU |
R4‑1913737 | CR on cell re-selection requirements for NR HST | CATT | imported from 3GU |
R4‑1913738 | CR on cell identification requirements for NR HST | CATT | imported from 3GU |
R4‑1913739 | Further discussion on RRM measurement relaxation for NR power saving | CATT | imported from 3GU |
R4‑1913740 | WF on RRM measurement relaxation for Power Saving | CATT | imported from 3GU |
R4‑1913741 | Discussion on interruption requirements for NR V2X | CATT | imported from 3GU |
R4‑1913742 | CR on interruption requirements for NR V2X | CATT | imported from 3GU |
R4‑1913743 | CR to 36.133 on interruption requirements for NR V2X | CATT | imported from 3GU |
R4‑1913744 | Further discussion on CSI-RS measurement bandwidth for RRM measurement requirement | CATT | imported from 3GU |
R4‑1913745 | Further discussion on SI-RS based intra-frequency and inter-frequency measurement definition | CATT | imported from 3GU |
R4‑1913746 | LS on CSI-RS based intra-frequency and inter-frequency Measurement definition | CATT | imported from 3GU |
R4‑1913747 | Discussion on CSI-RS based UE measurement capabilities | CATT | imported from 3GU |
R4‑1913748 | Discussion on CSI-RS based measurement requirements | CATT | imported from 3GU |
R4‑1913749 | WF on RRM requirements for CSI-RS based measurement | CATT | imported from 3GU |
R4‑1913750 | Editorial correction for SCell activation and deactivation delay | CATT | imported from 3GU |
R4‑1913751 | TP on UE spurious emission requirements for band n28 | CATT, CBN | imported from 3GU |
R4‑1913752 | UE co-existence reuiqrements for band n28 into 38.101-1 | CATT, CBN | imported from 3GU |
R4‑1913753 | UE co-existence reuiqrements for band n28 into 38.101-3 | CATT, CBN | imported from 3GU |
R4‑1913754 | In troducing UE co-existence reuiqrements for band n28 into 36.101 | CATT, CBN | imported from 3GU |
R4‑1913755 | Introducing new channel bandwidth for band n28 into 38.104 | CATT, CBN | imported from 3GU |
R4‑1913756 | Further discussion on super uplink | CATT | imported from 3GU |
R4‑1913757 | TR 38.716-03-01 v 0.2.0 | CATT | imported from 3GU |
R4‑1913758 | Introducing NR inter-band CA for 3DL Bands and 1UL band for 38.101-1 | CATT | imported from 3GU |
R4‑1913759 | Introducing NR inter-band CA for 3DL Bands and 1UL band for 38.101-3 | CATT | imported from 3GU |
R4‑1913760 | Revised WID: Rel-16 NR inter-band CA for 3 bands DL with 1 band UL | CATT | imported from 3GU |
R4‑1913761 | On RF aspects of PI/2 BPSK DMRS | Qualcomm Incorporated | imported from 3GU |
R4‑1913762 | CR to TS 37.145-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913763 | CR to TS 37.145-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913764 | CR to TS 37.145-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913765 | CR to TS 37.145-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913766 | CR to TR 37.842: Clarification on mapping of different transceiver units to a common TAB connector | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913767 | CR to TS 37.141: Correction of references for NB-IoT testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913768 | CR to TS 37.141: Correction of references for NB-IoT testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913769 | CR to TS 37.141: Correction of references for NB-IoT testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913770 | CR to TS 37.141: Correction of references for NB-IoT testing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913771 | CR to TS 38.817-02: Clarification on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913772 | CR to TS 38.104: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1913773 | CR to TS 38.104: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1913774 | CR to TS 38.141-1: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1913775 | CR to TS 38.141-1: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1913776 | CR to TS 38.141-2: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1913777 | CR to TS 38.141-2: Correction on interference level of receiver dynamic range requirement | Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1913778 | CR to TS 38.817-02: Clarification on interfering signal frequency offsets of receiver in-band selectivity and blocking requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913779 | CR to TS 38.104: Finalization of interfering RB centre frequency offsets in receiver narrowband blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913780 | CR to TS 38.104: Finalization of interfering RB centre frequency offsets in receiver narrowband blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913781 | CR to TS 38.141-1: Finalization of interfering RB centre frequency offsets in receiver narrowband blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913782 | CR to TS 38.141-1: Finalization of interfering RB centre frequency offsets in receiver narrowband blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913783 | CR to TR 38.104: Correction of table reference of interfering signal for ACS requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913784 | CR to TR 38.104: Correction of table reference of interfering signal for ACS requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913785 | Calculation of interfering signal frequency offsets for receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913786 | CR to TR 38.817-02: Clarification on interfering signal frequency offsets for receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913787 | CR to TS 38.104: Correction on interfering signal frequency offsets for receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913788 | CR to TS 38.104: Correction on interfering signal frequency offsets for receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913789 | CR to TS 38.141-1: Correction on interfering signal frequency offsets for receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913790 | CR to TS 38.141-1: Correction on interfering signal frequency offsets for receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913791 | CR to TS 38.141-2: Correction on interfering signal frequency offsets for receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913792 | CR to TS 38.141-2: Correction on interfering signal frequency offsets for receiver intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913793 | CR to TS 38.141-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913794 | CR to TS 38.141-2: Clarification of conformance testing for same beams | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913795 | TP to TR 37.824: Update of MSR specification impact for NB-IoT operation within NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913796 | TP to TR 37.824: Update of synchronization between NB-IoT and NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913797 | Draft CR to TS 38.141-1: Introduction of NB-IoT operation in NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913798 | TP to TR 38.820: Update of applicability of BS requirement sets for 7-24 GHz frequency range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913799 | TP to TR 38.820: Update of applicability of BS requirement sets for 7-24 GHz frequency range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913800 | Emission Mask Considerations for NR-U DL single 20 MHZ channel and wideband carrier operation modes | Charter Communications | imported from 3GU |
R4‑1913801 | TX full power capability | Qualcomm Incorporated | imported from 3GU |
R4‑1913802 | Correction to UE Transmit timing test cases for FR1 | ANRITSU LTD | imported from 3GU |
R4‑1913803 | Correction to UE Transmit timing test cases for FR1 | ANRITSU LTD | imported from 3GU |
R4‑1913804 | Cat-1bis clarifications to RRM | Sequans Communications | imported from 3GU |
R4‑1913805 | PFSCH MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1913806 | [NR ULCA] ACLR Requirement for Contiguous Case | Skyworks Solutions Inc. | imported from 3GU |
R4‑1913807 | [NR ULCA] Image Issue for in Gap ACLR | Skyworks Solutions Inc. | imported from 3GU |
R4‑1913808 | Adding band n71 and n28 to 4 Rx antenna ports support in 38.101-1 | T-Mobile USA Inc., CBN | imported from 3GU |
R4‑1913809 | [NRU] Accommodating Image and Carrier for UE Wideband Operation | Skyworks Solutions Inc. | imported from 3GU |
R4‑1913810 | [NRU] Measurements for PC5 and PC3 Definition | Skyworks Solutions Inc. | imported from 3GU |
R4‑1913811 | Introduction of New FR1 Channel Bandwidths and Related SU | Skyworks Solutions Inc. | imported from 3GU |
R4‑1913812 | Revision of WID on addition of 25, 30, 35 and 40 MHz channel bandwidth for NR band n25 | T-Mobile USA Inc. | imported from 3GU |
R4‑1913813 | HST UE Demod Simulation and Impairment Results | Qualcomm Incorporated | imported from 3GU |
R4‑1913814 | On HST RRM Test Definition | Qualcomm Incorporated | imported from 3GU |
R4‑1913815 | CR: RRM test definition for Rel-16 HST | Qualcomm Incorporated | imported from 3GU |
R4‑1913816 | On LTE-based 5G terrestrial broadcast | Qualcomm Incorporated | imported from 3GU |
R4‑1913817 | CR: RRM core requirement for 5G broadcast | Qualcomm Incorporated | imported from 3GU |
R4‑1913818 | On NR V2X Synchronization Source Selection Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1913819 | On NR V2X Resource Selection and Congestion Control Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1913820 | On NR V2X Distance-Based HARQ For Groupcast | Qualcomm Incorporated | imported from 3GU |
R4‑1913821 | On NR V2X RRM Requirement | Qualcomm Incorporated | imported from 3GU |
R4‑1913822 | CR: RRM core requirement for NR V2X | Qualcomm Incorporated | imported from 3GU |
R4‑1913823 | [DRAFT] Reply LS on UL-SL prioritization for NR V2X operation | Qualcomm Incorporated | imported from 3GU |
R4‑1913824 | On NR HST RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1913825 | [Draft] Reply LS on MOP for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1913826 | NR-U bandwidth parts for wideband operation | Qualcomm Incorporated | imported from 3GU |
R4‑1913827 | NR-U wideband emissions | Qualcomm Incorporated | imported from 3GU |
R4‑1913828 | NR-U single carrier interlaced waveform and emissions | Qualcomm Incorporated | imported from 3GU |
R4‑1913829 | Addition of new bandwidths: mandatory vs. optional | Qualcomm Incorporated | imported from 3GU |
R4‑1913830 | Designation of new bandwidths to a legacy band | Qualcomm Incorporated | imported from 3GU |
R4‑1913831 | Release independence of NR bands with new bandwidths added | Qualcomm Incorporated | imported from 3GU |
R4‑1913832 | V2X RF considerations | Qualcomm Incorporated | imported from 3GU |
R4‑1913833 | FDD-TDD EN-DC reporting options | Qualcomm Incorporated | imported from 3GU |
R4‑1913834 | TP to TR 38.820 on Transceiver technology for NR UE 7-24 | Spreadtrum Communications | imported from 3GU |
R4‑1913835 | TP for TR 38.716-02-00: CA_n2A_n5A | Verizon, Nokia | imported from 3GU |
R4‑1913836 | CR to TS 38.101-2 on corrections to intra-band contiguous CA for band n258 (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1913837 | TP for TR 38.716-02-00: CA_n5A_n260A | Verizon, Nokia | imported from 3GU |
R4‑1913838 | TP for TR 38.716-02-00: CA_n5A_n261A | Verizon, Nokia | imported from 3GU |
R4‑1913839 | TP for TR 38.716-02-00: CA_n66A_n260A | Verizon, Nokia | imported from 3GU |
R4‑1913840 | UE requirement to allow Tx switching between two uplink carriers | Spreadtrum Communications | imported from 3GU |
R4‑1913841 | CR to TS 38.101-3 on inter-band EN-DC configurations including FR2 for five bands (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1913842 | TP for TR 38.716-02-00: CA_n66A_n261A | Verizon, Nokia | imported from 3GU |
R4‑1913843 | CR to TS 38.101-3 on single UL allowed for inter-band CA configurations (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1913844 | Revised the bandwidth combination set defined for n48B CA | Verizon, Nokia | imported from 3GU |
R4‑1913845 | CR to TS 38.101-3 on corrections to delta TIB for EN-DC (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1913846 | Updated TR 37.716-11-11 V0.8.0 Rel16 1 LTE band + 1 NR band EN-DC | CHTTL | imported from 3GU |
R4‑1913847 | Revised WID for EN-DC of 1 band LTE + 1 band NR | CHTTL | imported from 3GU |
R4‑1913848 | CR to TS 38.101-3 on corrections to delta TIB for EN-DC (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1913849 | CR on introduction of completed EN-DC of 1 band LTE and 1 band NR | CHTTL | imported from 3GU |
R4‑1913850 | Discussion on remaining issues of FDD-TDD HPUE study item | CHTTL | imported from 3GU |
R4‑1913851 | CR to TS 38.101-1 on A-MPR table cleanup (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1913852 | CR for TS 38.101-1: Editorial correction for n2 uplink configuration note index in Table 7.3.2-3 | MediaTek Inc. | imported from 3GU |
R4‑1913853 | CR for TS 38.101-1: Editorial correction for n2 uplink configuration note index in Table 7.3.2-3 | MediaTek Inc. | imported from 3GU |
R4‑1913854 | TP for TR 36.716-03-02: CA_1-3-7-8, CA_1-3-3-7-8, CA_1-3-7-7-8, CA_1-3-3-7-7-8 xDL/2UL combinations | CHTTL | imported from 3GU |
R4‑1913855 | CR to TS 38.101-1 on A-MPR table cleanup (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1913856 | CR on measurement delay requirements for LTE HST in TS36.133 (section 4.2.2.3) | CMCC | imported from 3GU |
R4‑1913857 | CR on inter-RAT measurement in TS38.133 (section 9.4.2, 9.4.3) | CMCC | imported from 3GU |
R4‑1913858 | CR on inter-RAT measurement in TS38.133 (section 9.4.2, 9.4.3) | CMCC | imported from 3GU |
R4‑1913859 | CR on E-UTRA Inter-frequency Measurements when Configured with E-UTRA-NR Dual Connectivity Operation in TS36.133 (section 8.17.3) | CMCC | imported from 3GU |
R4‑1913860 | CR on E-UTRA Inter-frequency Measurements when Configured with E-UTRA-NR Dual Connectivity Operation in TS36.133 (section 8.17.3) | CMCC | imported from 3GU |
R4‑1913861 | Discussion on CSI-RS based RRM requirements | CMCC | imported from 3GU |
R4‑1913862 | Updated simulation results for UE demodulation in single carrier for HST-SFN | CMCC | imported from 3GU |
R4‑1913863 | Discussion on mandating gap patterns for Rel-16 NR | CMCC | imported from 3GU |
R4‑1913864 | LS on the UE capability and network assistance signalling on UE demodulation for NR HST in R16 | CMCC | imported from 3GU |
R4‑1913865 | LS on the UE capability and network assistance signalling RRM enhancement for NR HST in R16 | CMCC | imported from 3GU |
R4‑1913866 | Further discussion on UE demodulation for NR support of high speed scenario | CMCC | imported from 3GU |
R4‑1913867 | Further discussion on BS demodulation for NR support of high speed scenario | CMCC | imported from 3GU |
R4‑1913868 | General discussion on RRM for NR support of high speed scenario | CMCC | imported from 3GU |
R4‑1913869 | Discussion on inter-RAT measurement requirements for NR HST | CMCC | imported from 3GU |
R4‑1913870 | WF on UE demodulation for NR HST | CMCC | imported from 3GU |
R4‑1913871 | WF on RRM for NR HST | CMCC | imported from 3GU |
R4‑1913872 | TP for TR 37.716-21-21: UE requirements for DC_3-8_n1-n78, DC_7-8_n1-n78 | CHTTL | imported from 3GU |
R4‑1913873 | CR for TS 38.101-2: Editorial correction on MPR for contiguous CA notation | MediaTek Inc. | imported from 3GU |
R4‑1913874 | TP for TR 37.716-21-21: UE requirements for DC_3-7-8_n1-n78 | CHTTL | imported from 3GU |
R4‑1913875 | CR for TS 38.101-2: Editorial correction on MPR for contiguous CA notation | MediaTek Inc. | imported from 3GU |
R4‑1913876 | CR to TS 38.101-3 on inter-band CA, EN-DC, NE-DC and NR-DC configurations (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1913877 | CR for TS 38.101-1: Removing CA configurations for CA_n77D/E, CA_n78D/E, and CA_n79D/E | MediaTek Inc. | imported from 3GU |
R4‑1913878 | TP for TR 37.716-31-11: UE requirements for DC_3-3-7-8_n78, DC_3-7-7-8_n78, DC_3-3-7-7-8_n78 | CHTTL | imported from 3GU |
R4‑1913879 | CR for TS 38.101-1: Removing CA configurations for CA_n77D/E, CA_n78D/E, and CA_n79D/E | MediaTek Inc. | imported from 3GU |
R4‑1913880 | TP for TR 37.716-11-11: UE requirements for DC_3_n3 | CHTTL | imported from 3GU |
R4‑1913881 | TP for TR 37.716-11-11: UE requirements for DC_3_n3 | CHTTL | imported from 3GU |
R4‑1913882 | TP for TR 37.716-11-11: UE requirements for DC_3_n3 | CHTTL | imported from 3GU |
R4‑1913883 | TP for TR 37.716-11-11: UE requirements for DC_3_n3 | CHTTL | imported from 3GU |
R4‑1913884 | TP for TR 37.716-11-11: UE requirements for DC_3_n3 | CHTTL | imported from 3GU |
R4‑1913885 | TP for TR 37.716-11-11: UE requirements for DC_3_n3 | CHTTL | imported from 3GU |
R4‑1913886 | FR1 CA bandwidth class definition | MediaTek Inc. | imported from 3GU |
R4‑1913887 | CR for TS 38.101-1: CA bandwidth class definition amendment | MediaTek Inc. | imported from 3GU |
R4‑1913888 | CR for TS 38.101-1: CA bandwidth class definition amendment | MediaTek Inc. | imported from 3GU |
R4‑1913889 | CR for TS 38.101-2: CA bandwidth class definition amendment | MediaTek Inc. | imported from 3GU |
R4‑1913890 | CR for TS 38.101-2: CA bandwidth class definition amendment | MediaTek Inc. | imported from 3GU |
R4‑1913891 | CR to TS 38.101-3: clarification for MPR statement | CHTTL, Huawei, HiSilicon | imported from 3GU |
R4‑1913892 | CR for TS 38.101-3: Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | MediaTek Inc., Qualcomm Inc. | imported from 3GU |
R4‑1913893 | CR for TS 38.101-3: Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | MediaTek Inc., Qualcomm Inc. | imported from 3GU |
R4‑1913894 | CR to TS 38.101-3: clarification for MPR statement | CHTTL, Huawei, HiSilicon | imported from 3GU |
R4‑1913895 | CR for TS 38.101-1: Fix out-of-band blocking issue for n50 and n75 | MediaTek Inc. | imported from 3GU |
R4‑1913896 | CR for TS 38.101-1: Fix out-of-band blocking issue for n50 and n75 | MediaTek Inc. | imported from 3GU |
R4‑1913897 | DraftCR to TS38.133 on SINR mapping tables for L1-SINR (Section 10.1.16) | Samsung | imported from 3GU |
R4‑1913898 | CR to TS38.133 on L1-SINR Measurement Requirement (Section 3.3 and 9) | Samsung | imported from 3GU |
R4‑1913899 | CR to TS38.133 on SCell Beam Failure Recovery (Section 8.5) | Samsung | imported from 3GU |
R4‑1913900 | CR to TS 38.101-3 on inter-band CA, EN-DC, NE-DC and NR-DC configurations (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1913901 | Beam correspondence for initial access | MediaTek Inc. | imported from 3GU |
R4‑1913902 | Draft TR 38.883 for FR2 DL 256QAM v0.2.0 | China Telecom | imported from 3GU |
R4‑1913903 | BS RF requirements for FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1913904 | UE RF requirements for FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1913905 | TP for TR 38.883: Specification impact for FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1913906 | Aspects of FR2 inter-band UL CA | MediaTek Inc. | imported from 3GU |
R4‑1913907 | CR to TS 38.101-1 on corrections to channel raster entries for NR band (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1913908 | CR for TS 38.101-3: Removing MSD requirements for EN-DC combinations due to receiver even order harmonic mixing with UL 3rd harmonic | MediaTek Inc., CHTTL | imported from 3GU |
R4‑1913909 | TP for TR 37.716-11-11: Self-interference analyses | MediaTek Inc. | imported from 3GU |
R4‑1913910 | CR to TS 38.101-1 on corrections to channel raster entries for NR band (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1913911 | UE reference architecture for NR FDD bands with variable duplex | MediaTek Inc. | imported from 3GU |
R4‑1913912 | CR to TS 38.101-3: adding missing 90MHz channel BW support for n77, n78 related CA | CHTTL, Ericsson | imported from 3GU |
R4‑1913913 | CR to TS 38.101-2 on corrections to channel raster entries for NR band (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1913914 | Discussion on measurement accuracy requirements for NR-U | ZTE Corporation | imported from 3GU |
R4‑1913915 | CR to 38.133 R16 Add the missing units to DRX cycle values (Cat A) | ZTE Corporation | imported from 3GU |
R4‑1913916 | CR to TS 38.101-2 on corrections to channel raster entries for NR band (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1913917 | CR to TS 38.101-3: adding missing 90MHz channel BW support for n77, n78 related CA | CHTTL, Ericsson | imported from 3GU |
R4‑1913918 | CR to TS 38.104 on corrections to channel raster entries for NR band (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1913919 | CR to TS 38.104 on corrections to channel raster entries for NR band (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1913920 | Enhancement on FR2 MPE mitigation | ZTE Corporation | imported from 3GU |
R4‑1913921 | Measurement interval of frequency error in FR1 and FR2 (2) | Anritsu Corporation | imported from 3GU |
R4‑1913922 | CR to measurement interval of frequency error in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1913923 | CR to measurement interval of frequency error in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1913924 | CR to measurement interval of frequency error in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1913925 | CR to measurement interval of frequency error in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1913926 | On undetermined Tx DC location (2) | Anritsu Corporation | imported from 3GU |
R4‑1913927 | CR to transmit modulation quality in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1913928 | CR to transmit modulation quality in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1913929 | CR to transmit modulation quality in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1913930 | CR to transmit modulation quality in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1913931 | Test system for inter-band DL CA in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1913932 | On-to-on transient period measurement in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1913933 | Views on polarization mismatch between DUT and TE | Anritsu Corporation | imported from 3GU |
R4‑1913934 | IAB RRM requirements | AT&T | imported from 3GU |
R4‑1913935 | IAB DC and CA requirements | AT&T | imported from 3GU |
R4‑1913936 | Discussion on SRS-RSRP measurement requirements for CLI | LG Electronics Inc. | imported from 3GU |
R4‑1913937 | Simulation results for SRS-RSRP measurement accuracy | LG Electronics Inc. | imported from 3GU |
R4‑1913938 | CR for Abbreviations for cross link interference (section 3) | LG Electronics Inc. | imported from 3GU |
R4‑1913939 | CR for cross link interference measurements (section 9) | LG Electronics Inc. | imported from 3GU |
R4‑1913940 | CR for conditions for cross link interference measurements (section B) | LG Electronics Inc. | imported from 3GU |
R4‑1913941 | Discussion on EIS test methodology for polarization mismatch | LG Electronics Inc. | imported from 3GU |
R4‑1913942 | Discussion on test method for demodulation in FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1913943 | TP on summary of self-interference analysis for new x bands (x=3,4,5) DL with 2 bands UL | LG Electronics Polska | imported from 3GU |
R4‑1913944 | TP on summary of self-interference analysis for new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in Rel-16 | LG Electronics Polska | imported from 3GU |
R4‑1913945 | TP for TR 37.716-21-11: MSD for EN-DC_1-8_n28 | LG Electronics Polska | imported from 3GU |
R4‑1913946 | Potential A-MPR improvement for 29dBm HPUE B41/n41 EN-DC | LG Electronics Polska | imported from 3GU |
R4‑1913947 | Discussion on enhancement for RLF mitigation due to MPE on FR2 | LG Electronics Polska | imported from 3GU |
R4‑1913948 | Discussion on enhancement of BC in Rel-16 at FR2 | LG Electronics Polska | imported from 3GU |
R4‑1913949 | TP on NR V2X UE RF requirements for supporting 30MHz CBW and 256QAM at n47 | LG Electronics Polska | imported from 3GU |
R4‑1913950 | Consideration on 30MHz channel BW necessity for NR V2X service | LG Electronics Polska | imported from 3GU |
R4‑1913951 | TP on general Tx/Rx requirements for NR V2X UE at licensed bands | LG Electronics Polska | imported from 3GU |
R4‑1913952 | Consideration RF architecture for NR V2X UE | LG Electronics Polska | imported from 3GU |
R4‑1913953 | TP on RF core requirements for con-current operation of NR V2X UE | LG Electronics Polska | imported from 3GU |
R4‑1913954 | TP on additional On/OFF Switching Time Mask for TDM operation between LTE SL and NR SL at n47 | LG Electronics Polska | imported from 3GU |
R4‑1913955 | Discussion on channel raster of NR V2X | LG Electronics Polska | imported from 3GU |
R4‑1913956 | CR on NR MTTD and MRTD definition for R15 | Apple | imported from 3GU |
R4‑1913957 | CR on NR MTTD and MRTD definition for R16 | Apple | imported from 3GU |
R4‑1913958 | Draft reply LS on UL-SL prioritization | LG Electronics Polska | imported from 3GU |
R4‑1913959 | Ad-hoc meeting minutes for NR V2X with sidelink | LG Electronics Polska | imported from 3GU |
R4‑1913960 | EIRP test methodology for polarization mismatch | LG Electronics Polska | imported from 3GU |
R4‑1913961 | TR 36.716-03-02 v0.8.0 update: LTE-A x bands DL (x=3,4,5) with 2 bands UL inter-band CA in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1913962 | Revised WID on LTE-A inter-band CA for x bands (x=3,4,5) DL with 2 bands UL in Rel-16 | LG Electronics France | imported from 3GU |
R4‑1913963 | Introduction of LTE-A inter-band CA for x bands (x=3,4,5) DL with 2 bands UL into TS36.101 | LG Electronics France | imported from 3GU |
R4‑1913964 | TR 37.716-21-21 v0.8.0 update: LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1913965 | Revised WID on LTE (xDL/UL x=1.2,3,4) with NR 2 bands (2DL/1UL) EN DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1913966 | Introducing CR on new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1913967 | TR38.886 v0.4.0 | LG Electronics France | imported from 3GU |
R4‑1913968 | Band Combinations for NR V2X | Dish Network | imported from 3GU |
R4‑1913969 | Corrections Intra-band CA simultaneous TX/RX requirements | Dish Network | imported from 3GU |
R4‑1913970 | Removal of brackets from MPR and MSD 38.101-3 REL15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913971 | Removal of brackets from MPR and MSD 38.101-3 REL16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913972 | Removal of brackets from reciever requirements in 38.101-1 REL-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913973 | Removal of brackets from reciever requirements in 38.101-1 REL-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913974 | Frequency separation class clarification REL-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913975 | Frequency separation class clarification REL-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913976 | EN-DC grouping correction for FR1 only configurations REL-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913977 | Introduction of almost contiguous MPR for PC2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913978 | Extension of CA BW class B | Nokia, Verizon | imported from 3GU |
R4‑1913979 | A-MPR FR1 intraband contiguous UL CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913980 | TR 38.831 v0.1.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913981 | FR2 Intraband Non-contiguous UL CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913982 | FR2 MPR enhancement CIM-3 Study | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913983 | Boosting of shaped FR2 PI/2 PBSK | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913984 | Discussion on reply LS on BCS reporting for EN-DC BC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913985 | TP to TR 38.716-02-00: Addition of CA_n28A-n78A | Nokia | imported from 3GU |
R4‑1913986 | TP to TR 37.716-21-21: Addition of 3_n1-n28 | Nokia | imported from 3GU |
R4‑1913987 | TP to TR 37.716-21-21: Addition of DC_ 20A_n1A-n28A | Nokia | imported from 3GU |
R4‑1913988 | n26 A-MPR | Nokia | imported from 3GU |
R4‑1913989 | CA_48B A-MPR additional results | Nokia | imported from 3GU |
R4‑1913990 | Correction to intraband contiguous CA out-of-band blocking table REL-12 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913991 | Correction to intraband contiguous CA in-band and out-of-band blocking tables REL-13 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913992 | Correction to intraband contiguous CA in-band and out-of-band blocking tables REL-14 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913993 | Correction to intraband contiguous CA in-band and out-of-band blocking tables REL-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913994 | Correction to intraband contiguous CA in-band and out-of-band blocking tables REL-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1913995 | Further considerations on NR UE power saving RRM | vivo | imported from 3GU |
R4‑1913996 | Further discussion on switching and interruption time for UE antenna switching | vivo | imported from 3GU |
R4‑1913997 | Considerations on BWP switching on multiple CCs | vivo | imported from 3GU |
R4‑1913998 | Editorial correction for SCell activation and deactivation delay | CATT | imported from 3GU |
R4‑1913999 | Discussion on one shot timing adjustment for UE UL timing adjustment | NEC | imported from 3GU |
R4‑1914000 | Discussion on problem of TCI state known status mismatch | NEC | imported from 3GU |
R4‑1914001 | Discussion on number of samples for CLI measurement accuracy | NEC | imported from 3GU |
R4‑1914002 | RRM requirements for conditional handover | NEC | imported from 3GU |
R4‑1914003 | MR-DC: Direct SCell activation delay requirements | NEC | imported from 3GU |
R4‑1914004 | Draft CR on corrections on NR intra frequency measurement reporting requirements (Section 9.2.4) | NEC | imported from 3GU |
R4‑1914005 | Requirements for BWP switch delay on multiple CC | NEC | imported from 3GU |
R4‑1914006 | CR to 38.817-02:In-band and out-of-band boundaries for FR1 (5.10) | NEC | imported from 3GU |
R4‑1914007 | CR to 37.145-2: OTA ACLR R15 (6.7.3) | NEC | imported from 3GU |
R4‑1914008 | CR to 37.145-2: OTA ACLR R16 (6.7.3) | NEC | imported from 3GU |
R4‑1914009 | CR to 38.141-2: OTA ACLR (6.7.3) | NEC | imported from 3GU |
R4‑1914010 | CR to 38.141-2: OTA receiver intermodulation procedure (7.8) | NEC | imported from 3GU |
R4‑1914011 | CR to 38.141-2: OTA transmitter spurious emissions (6.7) | NEC | imported from 3GU |
R4‑1914012 | CR to 38.141-2: OTA receiver spurious emissions (7.7) | NEC | imported from 3GU |
R4‑1914013 | TP for TR 38.716-02-00 CA_n3-n77 | KDDI | imported from 3GU |
R4‑1914014 | TP for TR 38.716-03-02 CA_n3A-n78A-n257 | KDDI | imported from 3GU |
R4‑1914015 | TP for TR 38.716-03-02 CA_n3A-n77(2A)-n257 | KDDI | imported from 3GU |
R4‑1914016 | TP for TR 38.716-03-02 CA_n3A-n77A-n257 | KDDI | imported from 3GU |
R4‑1914017 | TP for TR 37.716-11-11 DC_3A_n77(2A) | KDDI | imported from 3GU |
R4‑1914018 | TP for TR 37.716-21-11 DC_1A-3A_n77(2A) | KDDI | imported from 3GU |
R4‑1914019 | TP for TR 37.716-21-11 DC_1A-18A_n3A | KDDI | imported from 3GU |
R4‑1914020 | TP for TR 37.716-21-11 DC_1A-28A_n3A | KDDI | imported from 3GU |
R4‑1914021 | draft CR for introduce DC of LTE 2bands + NR 1band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1914022 | TP for TR 37.716-31-11 DC_28-41-42_n257 | KDDI | imported from 3GU |
R4‑1914023 | draft CR for introduce DC of LTE 4bands + NR 1band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1914024 | TP for TR 37.716-21-21 DC_18A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914025 | TP for TR 37.716-21-21 DC_18A_n3A-n78A | KDDI | imported from 3GU |
R4‑1914026 | TP for TR 37.716-21-21 DC_1_n3A-n257 | KDDI | imported from 3GU |
R4‑1914027 | TP for TR 37.716-21-21 DC_18A_n3A-n257 | KDDI | imported from 3GU |
R4‑1914028 | TP for TR 37.716-21-21 DC_28A_n3A-n257 | KDDI | imported from 3GU |
R4‑1914029 | TP for TR 37.716-21-21 DC_28A_n3A-n78A | KDDI | imported from 3GU |
R4‑1914030 | TP for TR 37.716-21-21 DC_1A-18A_n3A-n78A | KDDI | imported from 3GU |
R4‑1914031 | TP for TR 37.716-21-21 DC_1A-28A_n3A-n78A | KDDI | imported from 3GU |
R4‑1914032 | TP for TR 37.716-21-21 DC_1A-18A_n3A-n257 | KDDI | imported from 3GU |
R4‑1914033 | TP for TR 37.716-21-21 DC_1A-28A_n3A-n257 | KDDI | imported from 3GU |
R4‑1914034 | TP for TR 37.716-21-21 DC_41_n78A-n257 | KDDI | imported from 3GU |
R4‑1914035 | TP for TR 37.716-21-21 DC_42_n78A-n257 | KDDI | imported from 3GU |
R4‑1914036 | TP for TR 37.716-21-21 DC_28_n78A-n257 | KDDI | imported from 3GU |
R4‑1914037 | TP for TR 37.716-21-21 DC_1A-41_n78A-n257 | KDDI | imported from 3GU |
R4‑1914038 | TP for TR 37.716-21-21 DC_3A-41A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914039 | TP for TR 37.716-21-21 DC_3A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914040 | TP for TR 37.716-21-21 DC_41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914041 | TP for TR 37.716-21-21 DC_1A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914042 | TP for TR 37.716-21-21 DC_1A-18A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914043 | TP for TR 37.716-21-21 DC_3A-18A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914044 | TP for TR 37.716-21-21 DC_18A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914045 | TP for TR 37.716-21-21 DC_3A-28A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914046 | TP for TR 37.716-21-21 DC_28A-41A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914047 | TP for TR 37.716-21-21 DC_28A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914048 | TP for TR 37.716-21-21 DC_1A-28A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914049 | TP for TR 37.716-21-21 DC_1A-3A-41A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914050 | TP for TR 37.716-21-21 DC_1A-3A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914051 | TP for TR 37.716-21-21 DC_1A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914052 | TP for TR 37.716-21-21 DC_3A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914053 | TP for TR 37.716-21-21 DC_1A-3A-18A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914054 | TP for TR 37.716-21-21 DC_1A-18A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914055 | TP for TR 37.716-21-21 DC_3A-18A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914056 | TP for TR 37.716-21-21 DC_3A-28A-41A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914057 | TP for TR 37.716-21-21 DC_3A-28A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914058 | TP for TR 37.716-21-21 DC_28A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914059 | TP for TR 37.716-21-21 DC_1A-3A-28A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914060 | TP for TR 37.716-21-21 DC_1A-28A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914061 | TP for TR 37.716-21-21 DC_1A-3A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914062 | TP for TR 37.716-21-21 DC_1A-3A-18A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914063 | TP for TR 37.716-21-21 DC_3A-28A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914064 | TP for TR 37.716-21-21 DC_1A-3A-28A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1914065 | Discussion on NR SCell activation | MediaTek inc. | imported from 3GU |
R4‑1914066 | CR for SCell activation delay in FR2 | MediaTek inc. | imported from 3GU |
R4‑1914067 | CR for SCell activation delay in FR2 | MediaTek inc. | imported from 3GU |
R4‑1914068 | Discussion on scheduling restriction due to L1-RSRP measurement | MediaTek inc. | imported from 3GU |
R4‑1914069 | CR for scheduling restriction due to L1-RSRP measurement | MediaTek inc. | imported from 3GU |
R4‑1914070 | CR for scheduling restriction due to L1-RSRP measurement | MediaTek inc. | imported from 3GU |
R4‑1914071 | CR on SSB based RLM test cases for EN-DC FR2 (Section A.5.5.1) | MediaTek inc. | imported from 3GU |
R4‑1914072 | CR on SSB based RLM test cases for EN-DC FR2 (Section A.5.5.1) | MediaTek inc. | imported from 3GU |
R4‑1914073 | CR on SSB based RLM test cases for SA FR2 (Section A.7.5.1) | MediaTek inc. | imported from 3GU |
R4‑1914074 | CR on SSB based RLM test cases for SA FR2 (Section A.7.5.1) | MediaTek inc. | imported from 3GU |
R4‑1914075 | Discussion on handover requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1914076 | Discussion on SCell activation and deactivation requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1914077 | Discussion on RLM requirement for NR-U | MediaTek inc. | imported from 3GU |
R4‑1914078 | Discussion on UE capability for NR-U | MediaTek inc. | imported from 3GU |
R4‑1914079 | Discussion on RRM requirements for BFR on Scell | MediaTek inc. | imported from 3GU |
R4‑1914080 | NR FR2 BS Tx EVM for DL 256QAM | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914081 | TP to TR 38.883 Updated FR2 DL 256QAM link level simulation results | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914082 | Remaining issues for NR BS performance | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914083 | Views on 30% TP test point for BS demodulation | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914084 | BS RF requirement for Band n259 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914085 | CR to TS 38.104 Update the tables for in-band and out-of-band boundary and step frequencies for Band n259 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914086 | CR to TS 38.141-2 Update the tables for in-band and out-of-band boundary and step frequencies for Band n259 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914087 | BS measurement uncertainty and test tolerance for Band n259 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914088 | Views on PUSCH for LTE HST enhancement | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914089 | CR to TS 36.104: Introduction of PUSCH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914090 | CR to TS 36.141: Introduction of PUSCH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914091 | CR to TS 36.104: Introduction of PRACH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914092 | CR to TS 36.141: Introduction of PRACH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914093 | Views on NR PUSCH for high speed | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914094 | Views on NR PRACH for high speed | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914095 | CR for TS 38.104: Introduction of NR PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914096 | CR for TS 38.141-1: Introduction of NR PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914097 | CR for TS 38.141-2: Introduction of NR PUSCH performance requirements for HST | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914098 | CR for TS 38.104: Introduction of NR PUSCH performance requirements for UL timing adjustment | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914099 | CR for TS 38.141-1: Introduction of NR PUSCH performance requirements for UL timing adjustment | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914100 | CR for TS 38.141-2: Introduction of NR PUSCH performance requirements for UL timing adjustment | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914101 | CR for TS 38.104: Introduction of NR PRACH performance requirements for restricted set type A and B | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914102 | CR for TS 38.141-1: Introduction of NR PRACH performance requirements for restricted set type A and B | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914103 | CR for TS 38.141-2: Introduction of NR PRACH performance requirements for restricted set type A and B | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914104 | Views on gNB measurement for NR positioning | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914105 | CR to 38.101-1: Editorial correction of UL RMCs | Rohde & Schwarz | imported from 3GU |
R4‑1914106 | CR to 38.101-1: Editorial correction of UL RMCs | Rohde & Schwarz | imported from 3GU |
R4‑1914107 | TP for TR 37.815: Conclusion of SI for FDD+TDD EN-DC HPUE | China Unicom | imported from 3GU |
R4‑1914108 | Reply LS to RAN2 on UE capabilities on DAPS HO | Intel Corporation | imported from 3GU |
R4‑1914109 | TP for TR 37.716-21-21 to include DC_2A-7C_n38A-n78A | Intel Corporation | imported from 3GU |
R4‑1914110 | CR on SSB setting for new gap and SMTC setting (Section A.3.10) | MediaTek inc. | imported from 3GU |
R4‑1914111 | CR on SSB setting for new gap and SMTC setting (Section A.3.10) | MediaTek inc. | imported from 3GU |
R4‑1914112 | CR on TS38.133 for EN-DC SS-SINR tests with PSCell in FR1 (Section A.4.7.3) | MediaTek inc. | imported from 3GU |
R4‑1914113 | CR on TS38.133 for EN-DC SS-SINR tests with PSCell in FR1 (Section A.4.7.3) | MediaTek inc. | imported from 3GU |
R4‑1914114 | CR on TS38.133 for SA SS-SINR tests with PCell in FR1 (Section A.6.7.3) | MediaTek inc. | imported from 3GU |
R4‑1914115 | CR on TS38.133 for SA SS-SINR tests with PCell in FR1 (Section A.6.7.3) | MediaTek inc. | imported from 3GU |
R4‑1914116 | Discussion on UE dynamic adaptation to the maximum number of MIMO layers | MediaTek inc. | imported from 3GU |
R4‑1914117 | Discussion on RRM measurement relaxation for RRC_IDLE/INACTIVE | MediaTek inc. | imported from 3GU |
R4‑1914118 | Discussion on IDLE/INACTIVE mode CA measurement | MediaTek inc. | imported from 3GU |
R4‑1914119 | Discussion on fast SCell activation | MediaTek inc. | imported from 3GU |
R4‑1914120 | WF on dormancy behavior | MediaTek inc. | imported from 3GU |
R4‑1914121 | Discussion on requirement of conditional handover | MediaTek inc. | imported from 3GU |
R4‑1914122 | Discussion on mandatory MG patterns | MediaTek inc. | imported from 3GU |
R4‑1914123 | LS on new capability for NR measurement and mandatory MG patterns in Rel-16 | MediaTek inc. | imported from 3GU |
R4‑1914124 | CR for asynchronous operation for NR CA n78-n79 | NTT DOCOMO INC. | imported from 3GU |
R4‑1914125 | Feasible configurations for HST scenario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914126 | CR on introducing UE demodulation tests for 500km/h velocity | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914127 | Views on beam correspondence enhancement in Rel-16 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914128 | The necessity of UE capability signalling on NS value | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914129 | CR for correction on NW signalling architecture of NS value in TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914130 | CR for correction on NW signalling architecture of NS value in TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914131 | Removal of contradicting fall-back specification for intra-band non-contigous CA/DC | Ericsson | imported from 3GU |
R4‑1914132 | Removal of contradicting fall-back specification for intra-band non-contigous CA/DC | Ericsson | imported from 3GU |
R4‑1914133 | Removal of contradicting fall-back specification for intra-band non-contigous CA/DC | Ericsson | imported from 3GU |
R4‑1914134 | Removal of contradicting fall-back specification for intra-band non-contigous CA/DC | Ericsson | imported from 3GU |
R4‑1914135 | PC2 by UL-MIMO or transparent TxD and relation to eMIMO full power transmission | Ericsson | imported from 3GU |
R4‑1914136 | Correction of transmitter characteristics for UL-MIMO: powerclass 2 and fallback | Ericsson | imported from 3GU |
R4‑1914137 | Pcmax for EN-DC: applicability of NS values and removal of a duty-cycle capability | Ericsson | imported from 3GU |
R4‑1914138 | Pcmax for EN-DC: applicability of NS values and removal of a duty-cycle capability | Ericsson | imported from 3GU |
R4‑1914139 | Correction of Pcmax for CA | Ericsson | imported from 3GU |
R4‑1914140 | Correction of Pcmax for CA | Ericsson | imported from 3GU |
R4‑1914141 | On the metrics for enhanced MPE indication | Ericsson, Sony | imported from 3GU |
R4‑1914142 | Test configuration for beam correspondence during initital access | Ericsson, Sony | imported from 3GU |
R4‑1914143 | Specification of channel raster design and intra-carrier GB for wideband operation | Ericsson | imported from 3GU |
R4‑1914144 | SEM for NR-U operation in Band n46 | Ericsson | imported from 3GU |
R4‑1914145 | Introduction of timing requirements for FDD bands with variable duplex | Ericsson | imported from 3GU |
R4‑1914146 | Introduction of variable-duplex FDD bands | Ericsson | imported from 3GU |
R4‑1914147 | FDD-TDD PC2 Option 6 slightly modified | Ericsson | imported from 3GU |
R4‑1914148 | TP for 37.815: FDD-TDD PC2 Option 6 | Ericsson | imported from 3GU |
R4‑1914149 | CR for agreed MPR CA for FR2 intra-band contiguous | NTT DOCOMO INC. | imported from 3GU |
R4‑1914150 | Further discussion on simplification of EN-DC configuration including FR2 | NTT DOCOMO INC. | imported from 3GU |
R4‑1914151 | About Tx diversity measurements | OPPO | imported from 3GU |
R4‑1914152 | About Tx switching between two uplink carriers | OPPO | imported from 3GU |
R4‑1914153 | About MPE enhancements | OPPO | imported from 3GU |
R4‑1914154 | Draft LS on FR2 MPE enhancements | OPPO | imported from 3GU |
R4‑1914155 | About HPUE power class fall back | OPPO | imported from 3GU |
R4‑1914156 | Draft LS on linear assumption of maxUplinkdutycycle capability | OPPO | imported from 3GU |
R4‑1914157 | About MIMO OTA environmental condition in FR1 | OPPO | imported from 3GU |
R4‑1914158 | Discussion on the deviation confinement of Tx-Rx separation for asymmetric bandwidth under variable duplex operation | Huawei, HiSilicon | imported from 3GU |
R4‑1914159 | Proposal of Rel-16 new basket WI for EN-DC of LTE CA xDL1UL bands(x=2,3,4)+NR FR1 1DL1UL band+NR FR2 1DL/1UL band | NTT DOCOMO INC. | imported from 3GU |
R4‑1914160 | Further discussion on channel raster for NR V2X | vivo | imported from 3GU |
R4‑1914161 | Further discussion on transient period in S-SSB structure for NR V2X | vivo | imported from 3GU |
R4‑1914162 | Simulation results for IAB in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1914163 | Simulation results for IAB in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1914164 | Discussion on the switching between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1914165 | Views on DL interruptions during UE switching between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1914166 | TP on channel raster and sync raster for NR V2X | vivo | imported from 3GU |
R4‑1914167 | CR to 38.101-1 for FDD bands with variable duplex | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1914168 | CR to 38.104 for FDD bands with variable duplex | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1914169 | CR to 38.141-1 for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1914170 | CR to 38.101-1 on UE requirements for switch between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1914171 | CR to 38.101-3 on UE requirements for switch between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1914172 | CR to TS 38.133: capturing agreements for inter-RAT measurements (9.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914173 | Initial analysis for power imbalance for FR2 inter-band CA | NTT DOCOMO INC. | imported from 3GU |
R4‑1914174 | Initial analysis for power imbalance for FR2 inter-band CA | NTT DOCOMO INC. | imported from 3GU |
R4‑1914175 | Initial analysis for power imbalance for FR2 inter-band CA | NTT DOCOMO INC. | imported from 3GU |
R4‑1914176 | Discussion on RLM in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914177 | Intra-frequency measurement requirements in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914178 | Inter-frequency measurement requirements in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914179 | RSSI and Channel Occupancy Measurements in NR-U and LTE-LAA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914180 | On Active BWP switch delay in NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914181 | CR to 38.133 to address NR-U inter-RAT measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914182 | CR to 36.133 to address inter-RAT NR-U measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914183 | CR to 38.133 to address NR-U inter-frequency measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914184 | CR to 38.133 to address NR-U handover requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914185 | CR to 36.133 to address handover to NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914186 | B3_n50 MSD due to cross band isolation and TP for TR 37.716-11-11 | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1914187 | Simulation results on Rel-16 NR PUSCH with 30% throughput | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1914188 | Simulation results on HST NR PUSCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1914189 | Simulation results on HST NR PRACH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1914190 | n28 supporting 30MHz REFSENS evaluation | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1914191 | n259 associated band specific requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1914192 | Handover delay requirement for conditional handover | NTT DOCOMO, INC | imported from 3GU |
R4‑1914193 | CR for TS 38.101-3: MSD due to cross band isolation | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1914194 | CR to TS 37.113 Add the transmitter exclusion band for MSR BS(subclause 4.4.1) | ZTE Corporation | imported from 3GU |
R4‑1914195 | CR to TS 37.113 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1914196 | CR to TS 37.113 Correction on radiated emission subclause 8.2 | ZTE Corporation | imported from 3GU |
R4‑1914197 | CR to TS 37.113 Correction on transient phenomena performance criteria subclause6.2 | ZTE Corporation | imported from 3GU |
R4‑1914198 | CR to TS 37.114 Add the transmitter exclusion band for AAS BS(subclause 4.1.1) | ZTE Corporation | imported from 3GU |
R4‑1914199 | CR to TS 37.114 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1914200 | CR to TS 37.114 Correction on notes in subclause 7.1 | ZTE Corporation | imported from 3GU |
R4‑1914201 | CR to TS 38.113 Add the transmitter exclusion band for NR BS(subclause 4.4.1) | ZTE Corporation | imported from 3GU |
R4‑1914202 | CR to TS 38.113 Correction on abbreviations(subclause 3.3 & 8.2.1.2) | ZTE Corporation | imported from 3GU |
R4‑1914203 | CR to TS 38.113 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1914204 | CR to TS 38.113 Editorial Corrections(clause 2 & subclause 3.1)_r1 | ZTE Corporation | imported from 3GU |
R4‑1914205 | Further discussion on transmitter exclusion band for MSR,AAS and NR BS | ZTE Corporation | imported from 3GU |
R4‑1914206 | CR to TS 38.141-2 some clean up of subclause 6.3.5 and 6.4.1 | ZTE Corporation | imported from 3GU |
R4‑1914207 | CR to TS 38.141-2 some clean up of subclause 6.3.5 and 6.4.1 | ZTE Corporation | imported from 3GU |
R4‑1914208 | on how to handle IAB EMC | ZTE Corporation | imported from 3GU |
R4‑1914209 | on IAB EMC emission requirement | ZTE Corporation | imported from 3GU |
R4‑1914210 | on IAB EMC immunity requirement | ZTE Corporation | imported from 3GU |
R4‑1914211 | on ICS 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1914212 | TP to TR 38.820 on ICS 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1914213 | TP to TR IAB EMC emission requirements | ZTE Corporation | imported from 3GU |
R4‑1914214 | TP to TR IAB EMC General part | ZTE Corporation | imported from 3GU |
R4‑1914215 | TP to TR IAB EMC immunity requirements | ZTE Corporation | imported from 3GU |
R4‑1914216 | TS skeleton of IAB EMC | ZTE Corporation | imported from 3GU |
R4‑1914217 | CR for TS 38.101-3: Additional out-of-band blocking exceptions for inter-band EN-DC | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1914218 | On IAB class | Ericcson | imported from 3GU |
R4‑1914219 | IAB MT Maximum Tx power | Ericcson | imported from 3GU |
R4‑1914220 | IAB min Tx power | Ericcson | imported from 3GU |
R4‑1914221 | on maximum input level, ACS and in-band blocking requirement of IAB MT | Ericcson | imported from 3GU |
R4‑1914222 | Min Tx power simulation results updates- layout 1 | Ericcson | imported from 3GU |
R4‑1914223 | remaining issue for channel raster of NR-U 5GHz band | Ericcson | imported from 3GU |
R4‑1914224 | remianing issue for SSB raster of NR-U 5GHz band | Ericcson | imported from 3GU |
R4‑1914225 | TR 37.823 LTE-M coexisting with NR v 0.2.0 | Ericcson | imported from 3GU |
R4‑1914226 | Further discussion on switching period between case 1 and case 2 | vivo | imported from 3GU |
R4‑1914227 | Further analysis of RF requirements for eMIMO UL Full Power Tx | vivo | imported from 3GU |
R4‑1914228 | CR for TS 38.101-3: Additional out-of-band blocking exceptions for inter-band EN-DC | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1914229 | Discussion on intra-carrier guardband | ZTE Corporation | imported from 3GU |
R4‑1914230 | Discussion on channel raster for NR-U | ZTE Corporation | imported from 3GU |
R4‑1914231 | Discussion on sync raster for NR-U | ZTE Corporation | imported from 3GU |
R4‑1914232 | simulation results for NR-U BS RX FRC | ZTE Corporation | imported from 3GU |
R4‑1914233 | NR-U BS REFSENS and dynamic range requirement | ZTE Corporation | imported from 3GU |
R4‑1914234 | NR-U BS ICS requirement | ZTE Corporation | imported from 3GU |
R4‑1914235 | simulation results for FR2 IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1914236 | simulation results for FR1 IAB coexistence study | ZTE Corporation | imported from 3GU |
R4‑1914237 | Discussion on IAB system parameters | ZTE Corporation | imported from 3GU |
R4‑1914238 | frequency error requirement for IAB | ZTE Corporation | imported from 3GU |
R4‑1914239 | Discussion on IAB BC requirement | ZTE Corporation | imported from 3GU |
R4‑1914240 | New proposed WID on Introduction of standalone NB-IoT into AAS spec | ZTE Corporation | imported from 3GU |
R4‑1914241 | Introduction of NB-IoT into TS37.141 | ZTE Corporation | imported from 3GU |
R4‑1914242 | CR to TS38.104: further updates on the abbreviations (section 3.3)-R15 | ZTE Corporation | imported from 3GU |
R4‑1914243 | CR to TS38.104: further updates on the abbreviations (section 3.3)-R16 | ZTE Corporation | imported from 3GU |
R4‑1914244 | CR to TS38.141-1: further updates on the abbreviations (section 3.3)-R15 | ZTE Corporation | imported from 3GU |
R4‑1914245 | CR to TS38.141-1: further updates on the abbreviations (section 3.3)-R16 | ZTE Corporation | imported from 3GU |
R4‑1914246 | CR to TS38.141-2: further updates on the abbreviations (section 3.3)-R15 | ZTE Corporation | imported from 3GU |
R4‑1914247 | CR to TS38.141-2: further updates on the abbreviations (section 3.3)-R16 | ZTE Corporation | imported from 3GU |
R4‑1914248 | CR to TS38.141-1: Editorial corrections-R15 | ZTE Corporation | imported from 3GU |
R4‑1914249 | CR to TS38.141-1: Editorial corrections-R16 | ZTE Corporation | imported from 3GU |
R4‑1914250 | CR to TS37.105 Corrections on NBB requirement (section 7.4 and 10.5) | ZTE Corporation | imported from 3GU |
R4‑1914251 | CR to TS37.105 Corrections on NBB requirement (section 7.4 and 10.5) | ZTE Corporation | imported from 3GU |
R4‑1914252 | CR to TS37.145-1 Corrections on NBB requirement (section 7.4.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1914253 | CR to TS37.145-1 Corrections on NBB requirement (section 7.4.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1914254 | CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2 | ZTE Corporation | imported from 3GU |
R4‑1914255 | CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1914256 | CR to TS37.104 Corrections on NBB requirement (section 7.4.2) | ZTE Corporation | imported from 3GU |
R4‑1914257 | CR to TS37.104 Corrections on NBB requirement (section 7.4.2) | ZTE Corporation | imported from 3GU |
R4‑1914258 | CR to TS37.141 Corrections on NBB requirement (section 7.4) | ZTE Corporation | imported from 3GU |
R4‑1914259 | CR to TS37.141 Corrections on NBB requirement (section 7.4) | ZTE Corporation | imported from 3GU |
R4‑1914260 | IAB-Node coexistence simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914261 | IAB-Node blocking and maximum input power requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914262 | On IAB-Node power classes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914263 | On IAB-Node beam correspondence | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914264 | IAB-Node frequency error requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914265 | FR2 DL 256QAM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914266 | TP to TR 38.820: Improvements on power amplifier section | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914267 | TP to TR 38.820: Conclusions on signal quality | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914268 | CR to TS 37.145-2: Requirement set applicability | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914269 | CR to TS 37.145-2: Requirement set applicability | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914270 | UE capability aspects for new NR FDD bands with variable duplex | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914271 | Switching period between case 1 and case 2 for two NR FR1 carriers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914272 | Switching time between NR between FR1 uplink carriers | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1914273 | [NR ULCA] Types of Contiguous and Non-contiguous Allocations for Class B and C NR UL CA | Skyworks Solutions Inc. | imported from 3GU |
R4‑1914274 | UE FR2 MPE enhancements and solutions | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914275 | FR2 BC enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914276 | CR to 37.141: Update of procedure in Modulation quality test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914277 | CR to 37.141: Update of procedure in Modulation quality test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914278 | CR to 38.141-1 additional updates on clarification for NR TM1.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914279 | CR to 38.141-1 additional updates on clarification for NR TM1.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914280 | CR to 38.141-2 additional updates on clarification for NR TM1.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914281 | CR to 38.141-2 additional updates on clarification for NR TM1.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914282 | CR to 38.141-2 updates on clarification for NR TM1.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914283 | CR to 38.141-2 updates on clarification for NR TM1.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914284 | Draft CR to TS 38.104: Introduction of NR-U in core specification – General part | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914285 | Draft CR to TS 38.104: Introduction of NR-U in core specification – Tx part | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914286 | Draft CR to TS 38.104: Introduction of NR-U in core specification – Rx part | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914287 | Band n46 channel raster | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914288 | Draft CR to 38.104 Implementation of NR-U channel and synchronization raster for band n46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914289 | Draft CR to 38.104: NR-U Fixed Reference Channels | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914290 | Band n46 sync raster | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914291 | CR to 38.141-1: Annex H.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914292 | CR to 38.141-2: Annex L.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914293 | CR to 38.141-1: Annex H.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914294 | CR to 38.141-2: Annex L.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914295 | updated TP for TR 38.716-02-00: CA_n7-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1914296 | updated TP for TR 38.716-02-00: CA_n1A-n3(2A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914297 | TP for TR 38.716-02-00: CA_n20-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1914298 | TP for TR 38.716-03-01: CA_n1A-n3A-n41A_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1914299 | TP for TR 38.716-03-02: CA_n1A-n3A-n41A with two UL bands | Huawei, HiSilicon | imported from 3GU |
R4‑1914300 | updated TP for TR 38.716-01-01: DL_n3(2A)_UL_n3A | Huawei, HiSilicon | imported from 3GU |
R4‑1914301 | updated TP for TR 37.716-11-11: adding configuration DC_3C_n1A | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1914302 | updated TP for TR 37.716-11-11: adding configuration DC_7C_n1A | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1914303 | draft CR for 38.101-3: adding configurations DC_7C_n78(2A) | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1914304 | draft CR for 38.101-3: adding configurations DC_3C_n78(2A) | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1914305 | draft CR for 38.101-3: adding configurations DC_1A-3A_n78(2A), DC_1A-3C_n78(2A) | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1914306 | draft CR for 38.101-3: adding configurations DC_1A-7A_n78(2A), DC_1A-7C_n78(2A) | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1914307 | draft CR for 38.101-3: adding configurations DC_3A-7A_n78(2A), DC_3A-7C_n78(2A), DC_3C-7A_n78(2A), DC_3C-7C_n78(2A) | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1914308 | updated TP for TR 37.716-31-11: DC_1-3-7_n78 to add DC_1A-3A-7A_n78(2A), DC_1A-3C-7A_n78(2A), DC_1A-3A-7C_n78(2A) | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1914309 | TP for TR 37.716-31-11: DC_3A-7A-20A_n1A and DC_3C-7A-20A_n1A | Huawei, HiSilicon | imported from 3GU |
R4‑1914310 | TP for TR 37.716-21-11: DC_2A-4A_n38A | Huawei, HiSilicon | imported from 3GU |
R4‑1914311 | TP for TR 37.716-21-11: DC_2A-4A_n41A | Huawei, HiSilicon | imported from 3GU |
R4‑1914312 | TP for TR 37.716-21-11: DC_1A-3A_n41A | Huawei, HiSilicon | imported from 3GU |
R4‑1914313 | TP for TR 37.716-21-11: DC_7A-20A_n1A | Huawei, HiSilicon | imported from 3GU |
R4‑1914314 | updated TP for TR 37.716-21-11: adding configuration DC_3C-20A_n1A | Huawei, HiSilicon | imported from 3GU |
R4‑1914315 | updated TP for TR 37.716-21-11: adding configuration DC_3A-7C_n1A, DC_3C-7A_n1A and DC_3C-7C_n1A | Huawei, HiSilicon | imported from 3GU |
R4‑1914316 | TP for TR 36.716-03-02: CA_1A-7A-20A with two UL bands | Huawei, HiSilicon, Orange | imported from 3GU |
R4‑1914317 | TP for TR 36.716-03-02: CA_1A-3A-7A-20A with two UL bands | Huawei, HiSilicon, Orange | imported from 3GU |
R4‑1914318 | Revised WID on Band combinations for SA NR Supplementary uplink (SUL), NSA NR SUL, NSA NR SUL with UL sharing from the UE perspective (ULSUP) | Huawei, HiSilicon | imported from 3GU |
R4‑1914319 | CR for 38.101-1 introduce SUL band combination CA_n78(2A)_SUL_n78A-n86A | Huawei, HiSilicon | imported from 3GU |
R4‑1914320 | CR for 38.101-3 introduce SUL band combination DC_66A_n78(2A)_SUL_n78A-n86A | Huawei, HiSilicon | imported from 3GU |
R4‑1914321 | CR for 38.101-3: correct MSD exception for DC_2_n78(Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1914322 | CR for 38.101-3: correct MSD exception for DC_2_n78(Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1914323 | CR for 38.101-1: add BCS1 configurations for CA_n78(2A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914324 | Revised WID on Dual Connectivity (EN-DC) of 4 bands LTE inter-band CA (4DL/1UL) and 1 NR band (1DL/1UL) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914325 | CR to introduce new combinations of LTE 4band + NR 1band for TS 38.101-3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914326 | draftTR 37.716-41-11 v0.6.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914327 | TP for 37.716-21-21 to introduce DC_3-20A_n1A-n28A | Nokial, BT | imported from 3GU |
R4‑1914328 | TP for 37.716-21-11 to introduce DC_2-12_n2 | Nokia, AT&T | imported from 3GU |
R4‑1914329 | TP for 37.716-31-11 to introduce DC_2-12-30_n2 | Nokia, AT&T | imported from 3GU |
R4‑1914330 | TP for 37.716-31-11 to introduce DC_2-12-66_n2 | Nokia, AT&T | imported from 3GU |
R4‑1914331 | TP for 37.716-41-11 to introduce DC_2-12-30-66_n2 | Nokia, AT&T | imported from 3GU |
R4‑1914332 | NR-U - Baseline Spectral Emission Mask | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914333 | NR-U - Definition of guardbands | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914334 | NR-U - Sheduling of Type-1 intra-carrier guardbands | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914335 | NR-U - Channel access for 60MHz channels | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914336 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1914337 | Introduction of CA PDSCH demodulation requirements with HST-SFN | Ericsson | imported from 3GU |
R4‑1914338 | Simulation results of PUSCH for LTE HST | Ericsson | imported from 3GU |
R4‑1914339 | Simulation results of PRACH for LTE HST | Ericsson | imported from 3GU |
R4‑1914340 | View of UE/BS demodulation requirements for additional enhancements for NB-IoT | Ericsson | imported from 3GU |
R4‑1914341 | Discussion on channel quality reporting for eMTC | Ericsson | imported from 3GU |
R4‑1914342 | Introduction of DL channel quality report for eMTC | Ericsson | imported from 3GU |
R4‑1914343 | RLM for enhanced MPDCCH | Ericsson | imported from 3GU |
R4‑1914344 | Work plan of UE/BS demodulation performance part for additional MTC enhancements for LTE | Ericsson | imported from 3GU |
R4‑1914345 | View of UE/BS demodulation requirements for additional MTC enhancements for LTE | Ericsson | imported from 3GU |
R4‑1914346 | Transmission scheme in NR PDSCH demodulation requirements for HST | Ericsson | imported from 3GU |
R4‑1914347 | Simulation results of NR PDSCH demodulation requirements with CA | Ericsson | imported from 3GU |
R4‑1914348 | Simulation results of NR PDSCH demodulation requirements for TDD LTE-NR coexistence | Ericsson | imported from 3GU |
R4‑1914349 | Release independent UE demodulation and CSI reporting requirement for Rel-16 | Ericsson | imported from 3GU |
R4‑1914350 | RLM for NR HST | Ericsson | imported from 3GU |
R4‑1914351 | Beam management for high speed train scenario | Ericsson | imported from 3GU |
R4‑1914352 | SI acquisition in NR-U | Ericsson | imported from 3GU |
R4‑1914353 | SIB1 acquisition time in NR-U | Ericsson | imported from 3GU |
R4‑1914354 | Beam management in NR-U | Ericsson | imported from 3GU |
R4‑1914355 | Draft CR: Introduction of link recovery requirements with CCA | Ericsson | imported from 3GU |
R4‑1914356 | L1-RSRP measurements in NR-U | Ericsson | imported from 3GU |
R4‑1914357 | Draft CR: Introduction of L1-RSRP measurement requirements with CCA | Ericsson | imported from 3GU |
R4‑1914358 | Discussion on L1-SINR measurement requirements | Ericsson | imported from 3GU |
R4‑1914359 | Discussion on link recovery procedure for Scell | Ericsson | imported from 3GU |
R4‑1914360 | Discussion on applicable timing for pathloss RS activated/updated by MAC-CE | Ericsson | imported from 3GU |
R4‑1914361 | LS response on applicable timing for pathloss RS activated/updated by MAC-CE | Ericsson | imported from 3GU |
R4‑1914362 | Editorial correction of TS 38.133 A.3 | Ericsson | imported from 3GU |
R4‑1914363 | Editorial correction of TS 38.133 A.3 | Ericsson | imported from 3GU |
R4‑1914364 | Correction of L1-RSRP reporting test parameters for EN-DC | Ericsson | imported from 3GU |
R4‑1914365 | Correction of L1-RSRP reporting test parameters for EN-DC | Ericsson | imported from 3GU |
R4‑1914366 | HST network assisted signalling | Ericsson | imported from 3GU |
R4‑1914367 | Simulation results for CSI - PMI test cases | Ericsson | imported from 3GU |
R4‑1914368 | Simulation results for NR UE HST Single tap | Ericsson | imported from 3GU |
R4‑1914369 | Way forward on PMI reporting requirements for Tx ports larger than 9 and up to 32 | Ericsson | imported from 3GU |
R4‑1914370 | Editorial change on reference PDCCH payload size | Ericsson | imported from 3GU |
R4‑1914371 | Editorial change on reference PDCCH payload size | Ericsson | imported from 3GU |
R4‑1914372 | Editorial CR to correct PMI test cases | Ericsson | imported from 3GU |
R4‑1914373 | Editorial CR to correct PMI test cases | Ericsson | imported from 3GU |
R4‑1914374 | Simulation assumptions for NR PMI reporting requirements for more than 8 Tx ports | Ericsson | imported from 3GU |
R4‑1914375 | Simulation results for HST - Multi-Path Fading test cases | Ericsson | imported from 3GU |
R4‑1914376 | CR to TS 38.104 - NB-IoT introduction | Ericsson | imported from 3GU |
R4‑1914377 | CR to TS 36.101 - NB-IoT in NR in-band support clarifications | Ericsson | imported from 3GU |
R4‑1914378 | CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1914379 | CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1914380 | CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1914381 | CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1914382 | CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1914383 | CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1914384 | CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1914385 | CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1914386 | CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1914387 | CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1914388 | BS demodulation - remaining open issues | Ericsson | imported from 3GU |
R4‑1914389 | Inconsistency resolution in between CS14 and TC22 | Ericsson | imported from 3GU |
R4‑1914390 | CR to TS 37.141 - CS14-TC22 inconsistency fix | Ericsson | imported from 3GU |
R4‑1914391 | CR to TS 37.141 - CS14-TC22 inconsistency fix | Ericsson | imported from 3GU |
R4‑1914392 | Band n1 - wider CBW - UE REFSENS for 40MHz CBW | Ericsson | imported from 3GU |
R4‑1914393 | Band n1 - wider CBW - UE A-MPR simulation results | Ericsson | imported from 3GU |
R4‑1914394 | Band n38 - wider CBW - Clarifications | Ericsson | imported from 3GU |
R4‑1914395 | Band n38 - wider CBW - UE A-MPR simulation results | Ericsson | imported from 3GU |
R4‑1914396 | CR to 38.101-1 - Band n75 - wider CBW | Ericsson | imported from 3GU |
R4‑1914397 | CR to 38.104 - Band n75 - wider CBW | Ericsson | imported from 3GU |
R4‑1914398 | Brand new Channel BW management | Ericsson | imported from 3GU |
R4‑1914399 | New basket WID on adding CBW to existing NR bands - Open issue | Ericsson | imported from 3GU |
R4‑1914400 | New basket WID on adding channel bandwidth support to existing NR bands. | Ericsson | imported from 3GU |
R4‑1914401 | Band n25 - New channel bandwidth 35MHz | Ericsson | imported from 3GU |
R4‑1914402 | New WI - Addition of wider channel bandwidth in NR band n65 | Ericsson | imported from 3GU |
R4‑1914403 | New WI - Addition of wider channel bandwidth in NR band n3 | Ericsson | imported from 3GU |
R4‑1914404 | Views on the delay requirements for UE switching between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1914405 | Views on the interruption requirements for UE switching between 1Tx carrier and 2Tx carrier | Huawei, HiSilicon | imported from 3GU |
R4‑1914406 | CR on the BWP switch TCI state before MAC activation R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914407 | CR on the BWP switch TCI state before MAC activation R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914408 | Discussion on the cell reselection criteria and side conditions | Huawei, HiSilicon | imported from 3GU |
R4‑1914409 | CR on the cell reselection criteria and side conditions R15 | Huawei, HiSilicon, Anritsu | imported from 3GU |
R4‑1914410 | CR on the cell reselection criteria and side conditions R16 | Huawei, HiSilicon, Anritsu | imported from 3GU |
R4‑1914411 | CR on cell-reselection test cases for NR SA FR2 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914412 | CR on cell-reselection test cases for NR SA FR2 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914413 | Discussion on the RRM requirements for IAB system | Huawei, HiSilicon | imported from 3GU |
R4‑1914414 | discussion on the BWP switch delay requirements for multiple CC cases | Huawei, HiSilicon | imported from 3GU |
R4‑1914415 | discussion on the BWP switch interruption requirements for multiple CC cases | Huawei, HiSilicon | imported from 3GU |
R4‑1914416 | endorsed CR on intra-frequency measurement and reporting for EN-DC FR2 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914417 | endorsed CR on intra-frequency measurement and reporting for EN-DC FR2 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914418 | endorsed CR on intra-frequency measurement and reporting for NR SA FR2 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914419 | endorsed CR on intra-frequency measurement and reporting for NR SA FR2 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914420 | endorsed CR on RLM scheduling restrictions for EN-DC FR2 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914421 | endorsed CR on RLM scheduling restrictions for EN-DC FR2 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914422 | endorsed CR on RLM scheduling restrictions for NR SA FR2 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914423 | endorsed CR on RLM scheduling restrictions for NR SA FR2 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914424 | Correction to BWP switching delay | Huawei, Hisilicon | imported from 3GU |
R4‑1914425 | Correction to BWP switching delay_r16 | Huawei, Hisilicon | imported from 3GU |
R4‑1914426 | Correction to FR1 SA inter-RAT measurement test cases | Huawei, Hisilicon | imported from 3GU |
R4‑1914427 | Correction to FR1 SA inter-RAT measurement test cases_r16 | Huawei, Hisilicon | imported from 3GU |
R4‑1914428 | Correction to interruption test cases | Huawei, Hisilicon | imported from 3GU |
R4‑1914429 | Correction to interruption test cases_r16 | Huawei, Hisilicon | imported from 3GU |
R4‑1914430 | Correction to PRACH configuration index in test cases | Huawei, Hisilicon | imported from 3GU |
R4‑1914431 | Correction to PRACH configuration index in test cases_r16 | Huawei, Hisilicon | imported from 3GU |
R4‑1914432 | CR on the TCI state switching (section 8.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1914433 | CR on the TCI state switching (section 8.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1914434 | Discussion on measurement relaxation in power saving | Huawei, HiSilicon | imported from 3GU |
R4‑1914435 | Discussion on RRM requirement for MIMO layer adaption case2 | Huawei, HiSilicon | imported from 3GU |
R4‑1914436 | Definition for the CSI-RS based intra-frequency and inter-frequency measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1914437 | Discussion on CSI-RS based L3 measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914438 | Discussion on the RRM requirements in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1914439 | Simulation results for measurement accuracy in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1914440 | Simulation results for cell identification in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1914441 | Discussion on SS-SINR in NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1914442 | Discussion on SRS carrier switching interruption | Huawei, HiSilicon | imported from 3GU |
R4‑1914443 | [Draft] LS on inter-frequency measurement requirement without MG | Huawei, HiSilicon | imported from 3GU |
R4‑1914444 | CR on gap sharing and CSSF for Inter-frequency measurement requirement without MG | Huawei, HiSilicon | imported from 3GU |
R4‑1914445 | Discussion on mandatory gap pattern in R-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914446 | LS on mandatory gap patterns in R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914447 | CR on UMTS inter-RAT measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914448 | CR on CSSF for SRVCC | Huawei, HiSilicon | imported from 3GU |
R4‑1914449 | CR on measurement capability for NR- UMTS for SRVCC | Huawei, HiSilicon | imported from 3GU |
R4‑1914450 | Correction on the TCI state switching (section 8.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1914451 | Correction on the TCI state switching (section 8.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1914452 | Adding the IE flag in R16 HST | Huawei, HiSilicon, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914453 | Discussion on RRM requirements for DAPS in femobility | Huawei, HiSilicon | imported from 3GU |
R4‑1914454 | CR on RRM requirements for DAPS in femobility | Huawei, HiSilicon | imported from 3GU |
R4‑1914455 | CR on the conditional handover in TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914456 | Way forward on feMob in LTE R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914457 | Open issues for CLI SRS-RSRP measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914458 | Simulation results for timing error impact on CLI measurement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914459 | Discussion on CSI-RS measurement bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914460 | CSI-RS based intra-f and inter-f measurement definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914461 | CR to 38.133 CSI-RS based intra-frequency and inter-frequency measurements definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914462 | Simulation results for CSI-RS based measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914463 | Discussion on number of carriers to measure in euCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914464 | CR on Number of carriers to monitor for IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914465 | CR on Number of carriers to monitor for IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914466 | Correction RAN4 requirements for a Dormant Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914467 | Correction RAN4 requirements for a Dormant Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914468 | Measurements interruption requirements for an SCell in Dormant state | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914469 | Measurements interruption requirements for an SCell in Dormant state | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914470 | Correction to interruption requirement introduction to include dormant Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914471 | Correction to interruption requirement introduction to include dormant Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914472 | Removal of brackets from euCA performance requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914473 | Removal of brackets from euCA performance requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914474 | Correction to test case A.8.16.104 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914475 | Correction to test case A.8.16.104 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914476 | Correction to S-measure threshold applicability in IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914477 | Correction to S-measure threshold applicability in IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914478 | CHO interruption requirements for LTE | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914479 | CR Introduction of handover delay requirements for conditional handover (section 5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914480 | Discussion on principles for Early Measurements and reporting in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914481 | Discussion on NR Inter-RAT measurements for early measurement reporting | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914482 | Introduction of NR Inter-RAT measurement for Idle Mode CA measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914483 | CHO interruption requirements for NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914484 | CR Introduction of handover delay requirements for conditional handover (section 6.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914485 | UE switching and interruption times for dynamic MIMO layer adaptations in UE Power Saving schemes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914486 | UE switching and interruption times for dynamic MIMO layer adaptations in UE Power Saving schemes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914487 | RRM requirements for UE power saving | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914488 | LS on introduction of carrier specific thresholds for UE Power Saving schemes | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914489 | Release independent RRM requirements for NR Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914490 | RRM requirements for IAB | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914491 | Concerning one shot timing adjustment | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914492 | CR to clarify and update QCL applicability (section 3.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914493 | CR to clarify and update QCL applicability (section 3.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914494 | [V2X] TP to clean up NR V2X coexistence simulation assumption | Huawei, HiSilicon | imported from 3GU |
R4‑1914495 | [V2X] TP to add some abbreviations | Huawei, HiSilicon | imported from 3GU |
R4‑1914496 | [V2X] TP on MPR simulation assumption for NR V2X in band n47 | Huawei, HiSilicon | imported from 3GU |
R4‑1914497 | [SUL n95] Discussion on 7.5kHz shift for band n95 | Huawei, HiSilicon | imported from 3GU |
R4‑1914498 | [n28BW] TP on BS RF requirements for adding wider channel bandwidth in band n28 | Huawei, HiSilicon, CBN | imported from 3GU |
R4‑1914499 | [n28BW] Discussion on UE RF REFSENS for 30MHz channel bandwidth in band n28 | Huawei, HiSilicon, CBN | imported from 3GU |
R4‑1914500 | [n28BW] TP on UE RF REFSENS for 30MHz channel bandwidth in band n28 | Huawei, HiSilicon, CBN | imported from 3GU |
R4‑1914501 | [n28BW] initial MPR simulations results for UL 30MHz channel bandwidth in band n28 | Huawei, HiSilicon | imported from 3GU |
R4‑1914502 | [n28BW] initial AMPR simulations results for NS_18 UL 30MHz channel bandwidth in band n28 | Huawei, HiSilicon | imported from 3GU |
R4‑1914503 | [n28BW] TP to add UE Tx requirements for 30MHz channel bandwidth in band n28 | Huawei, HiSilicon | imported from 3GU |
R4‑1914504 | CR for 38133 editorial for section 8.1,8.8,8.9,8.10,8.11 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914505 | CR for 38133 editorial for section 8.5 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914506 | CR for 38133 editorial for section 9.3 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914507 | CR for 36133 editorial for section 7.6 and 7.31 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914508 | CR for 36133 editorial for section 8.1.2.4 and 8.17.4 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914509 | CR on 38133 for removal the duplicated reference in section 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914510 | CR on 38133 for section 11 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914511 | CR for 38133 editorial for section 8.1,8.8,8.9,8.10,8.11 in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914512 | CR for 38133 editorial for section 8.5 in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914513 | CR for 38133 editorial for section 9.3 in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914514 | CR for 36133 editorial for section 7.6 and 7.31 in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914515 | CR for 36133 editorial for section 8.1.2.4 and 8.17.4 in Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914516 | CR on 38133 for removal the duplicated reference in section 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914517 | CR on 38133 for section 11 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914518 | CR on TC of UE transmit timing (A.4.4.1.1, A.5.4.1.1, A.6.4.1.1, A.7.4.1.1) Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914519 | CR on TC of UE transmit timing (A.4.4.1.1, A.5.4.1.1, A.6.4.1.1, A.7.4.1.1) Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914520 | About NSA FDD-TDD HPUE SAR | OPPO | imported from 3GU |
R4‑1914521 | On correlation and beamwitdh | Ericsson | imported from 3GU |
R4‑1914522 | On interferer signal aspects for co-location requirement | Ericsson | imported from 3GU |
R4‑1914523 | CR to TS 37.145-2: Additional information about alignment needed for TRP measurements in Annex F.1 | Ericsson | imported from 3GU |
R4‑1914524 | CR to TS 37.145-2: Additional information about alignment needed for TRP measurements in Annex F.1 | Ericsson | imported from 3GU |
R4‑1914525 | Draft specification text for IAB reference sensitivity in subclause 7.2 and subclause 10.3 | Ericsson | imported from 3GU |
R4‑1914526 | CR to TS 38.141-2: Additional information about alignment needed for TRP measurements in Annex I | Ericsson | imported from 3GU |
R4‑1914527 | CR to TS 38.141-2: Additional information about alignment needed for TRP measurements in Annex I | Ericsson | imported from 3GU |
R4‑1914528 | TP to TR 38.820: Update of technical background for BS out-of-band blocking in subclause 7.4.2.5 | Ericsson | imported from 3GU |
R4‑1914529 | TP to TR 38.820: Editorial improvement of structure for co-location requirements in subclause 7.4 | Ericsson | imported from 3GU |
R4‑1914530 | CR to TR 37.843: Improvement of RC technical background in subclause 10.5.2.3A | Ericsson | imported from 3GU |
R4‑1914531 | TP to TR 38.820: Adding information in TX requirement overview tables in subclause 7.4.1.1 | Ericsson | imported from 3GU |
R4‑1914532 | TP to TR 38.820: Adding information in RX requirement overview tables in subclause 7.4.2.1 | Ericsson | imported from 3GU |
R4‑1914533 | TP to TR 38.820: Phase noise trends and example parameterized phase noise model in subclause 5.5.3 and Annex | Ericsson | imported from 3GU |
R4‑1914534 | On FR1 OTA ACLR MU harmonization | Ericsson | imported from 3GU |
R4‑1914535 | TP for TR 36.716-03-02: CA_1A-7A-20A with two UL bands | Huawei, HiSilicon, Orange | imported from 3GU |
R4‑1914536 | TP for TR 36.716-03-02: CA_1A-3A-7A-20A with two UL bands | Huawei, HiSilicon, Orange | imported from 3GU |
R4‑1914537 | MU analysis on n259 for BS RF conformance | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1914538 | System simulation results and RRM Requirements NR HST | Nokia Corporation | imported from 3GU |
R4‑1914539 | Analysis of the relationship between BLER, confidence level and test time | Ericsson | imported from 3GU |
R4‑1914540 | Views on ultra-reliability testing in RAN4 | Ericsson | imported from 3GU |
R4‑1914541 | On BS URLLC selected feature requirements | Ericsson | imported from 3GU |
R4‑1914542 | On UE URLLC selected feature requirements | Ericsson | imported from 3GU |
R4‑1914543 | On parameters for 30% throughput requirement | Ericsson | imported from 3GU |
R4‑1914544 | On PUSCH antenna configurations | Ericsson | imported from 3GU |
R4‑1914545 | On NR UL timing adjustment | Ericsson | imported from 3GU |
R4‑1914546 | On Doppler for 500 km/h for 15 kHz SCS for NR PUSCH HST scenarios | Ericsson | imported from 3GU |
R4‑1914547 | Initial simulation results for Rel-16 NR HST and UL timing adjustment PUSCH demodulation performance at UE speed of 350 km/h | Ericsson | imported from 3GU |
R4‑1914548 | Further elaboration on UE tolerances for 30 kHz SCS for NR PUSCH HST scenarios | Ericsson | imported from 3GU |
R4‑1914549 | Further elaboration on front-loaded DM-RS symbol for NR HST PUSCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1914550 | Discussion on PRACH simulation parameters | Ericsson | imported from 3GU |
R4‑1914551 | Discussion and proposals on preamble reselection for restricted set with 500km/h | Ericsson | imported from 3GU |
R4‑1914552 | Discussion and proposals on PRACH Doppler for 350km/h | Ericsson | imported from 3GU |
R4‑1914553 | Simulation results for PRACH HST with 350km/hour | Ericsson | imported from 3GU |
R4‑1914554 | Simulation results for PRACH HST with 500km/hour | Ericsson | imported from 3GU |
R4‑1914555 | Interruption requirements with BWP switch on multiple CCs | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914556 | 38.133 CR on interruption requirements for BWP switch on multiple CCs (8.2.1.2.7, 8.2.2.2.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914557 | 36.133 CR on interruption requirements for BWP switch on multiple CCs (7.32.2.7, 7.36.2.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914558 | Further elaboration on NR Test Model | Ericsson | imported from 3GU |
R4‑1914559 | CR to TS 38.141-1: Random data content for NR BS Test Models | Ericsson | imported from 3GU |
R4‑1914560 | CR to TS 38.141-1: Random data content for NR BS Test Models | Ericsson | imported from 3GU |
R4‑1914561 | CR to TS 38.141-2: Random data content for NR BS Test Models | Ericsson | imported from 3GU |
R4‑1914562 | CR to TS 38.141-2: Random data content for NR BS Test Models | Ericsson | imported from 3GU |
R4‑1914563 | CR to TS 38.141-1: Correcting TM 3.3 Definition | Ericsson, Keysight | imported from 3GU |
R4‑1914564 | CR to TS 38.141-1: Correcting TM 3.3 Definition | Ericsson, Keysight | imported from 3GU |
R4‑1914565 | CR to TS 38.141-1: Editoral Changes of NR TM Power Balancing Readability | Ericsson | imported from 3GU |
R4‑1914566 | CR to TS 38.141-1: Editoral Changes of NR TM Power Balancing Readability | Ericsson | imported from 3GU |
R4‑1914567 | TP to TR 38.820: Updated Noise Figure Values | Ericsson | imported from 3GU |
R4‑1914568 | TP to TR 38.883: Updated Section 5 System level simulation | Ericsson | imported from 3GU |
R4‑1914569 | TP to TR 38.883: Section 7 Demod test challenges | Ericsson | imported from 3GU |
R4‑1914570 | CR to TS 38.141-2: EVM level added for 256 QAM | Ericsson | imported from 3GU |
R4‑1914571 | CR to TS 38.104: EVM level added for 256 QAM | Ericsson | imported from 3GU |
R4‑1914572 | TP on power boosting | Huawei, HiSilicon | imported from 3GU |
R4‑1914573 | TP on summary of co-existence study | Huawei, HiSilicon | imported from 3GU |
R4‑1914574 | CR to TS 37.104: introduction of NB-IoT operation in NR in-band | Huawei, HiSilicon | imported from 3GU |
R4‑1914575 | EVM requirements for DL 256QAM | Huawei, HiSilicon | imported from 3GU |
R4‑1914576 | Channel arrangement for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914577 | Synchronization raster for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914578 | Guard band on wideband operation | Huawei, HiSilicon | imported from 3GU |
R4‑1914579 | Unwanted emission mask for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914580 | Open issues on adding channel bandwidths in band n77/78 | Huawei, HiSilicon | imported from 3GU |
R4‑1914581 | CR for TS 38.307: additional UE channel bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑1914582 | CR for TS 38.101: adding wider channel bandwidths | Huawei, HiSilicon | imported from 3GU |
R4‑1914583 | CR for TS 38.104: adding wider channel bandwidths in Band n77/n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1914584 | CR to 38.101-1: Addition of channel bandwidth for band n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1914585 | CR for TS 38.104: Addition channel bandwidth of 40MHz for n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1914586 | Further discussion on the support of asymmetric channel bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑1914587 | A-MPR simulation results for n1 25MHz | Huawei, HiSilicon, China Unicom | imported from 3GU |
R4‑1914588 | A-MPR simulation results for n1 30 MHz | Huawei, HiSilicon, China Unicom | imported from 3GU |
R4‑1914589 | CR to 38.104: Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1914590 | CR to 38.104: Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1914591 | CR to 38.141-2: Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1914592 | CR to 38.141-2: Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1914593 | Correction to co-existene and co-loaction spurious emissions applicability range | Huawei, HiSilicon | imported from 3GU |
R4‑1914594 | Correction to co-existene and co-loaction spurious emissions applicability range | Huawei, HiSilicon | imported from 3GU |
R4‑1914595 | TR 37.716-21-11 v0.8.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1914596 | Revised WID: Dual Connectivity (EN-DC) of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1914597 | CR on introduction of completed EN-DC of 2 bands LTE and 1 band NR from RAN4#92bis and RAN4#93 into TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1914598 | draft CR: clean-up on EN-DC of 2 bands LTE and 1 band NR in TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1914599 | TP for TR 37.716-11-11: DL_2A_n7(2A) and DL_5A_n7(2A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914600 | TP for TR 37.716-11-11: DC_12_n7 | Huawei, HiSilicon | imported from 3GU |
R4‑1914601 | TP for TR 37.716-21-21:DC_5A_n7A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1914602 | TP for TR 37.716-21-21:DC_7A_n7A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1914603 | TP for TR 37.716-21-21:DC_66A_n7A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1914604 | TP for TR 37.716-21-21:DC_12A_n7A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1914605 | TP for TR 37.716-41-11:DC_2-7-13-66_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1914606 | Discussion on FR2 inter-band DL CA timing requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914607 | Discussion on FR2 intra-band DL CA enhancement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914608 | View on NFTF and DNF test methods | MVG Industries, SONY | imported from 3GU |
R4‑1914609 | CR to TR 37.843 Addition of Plane Wave Synthesizer MU calibration and test procedure for In-band TRP requirements-2. | CAICT | imported from 3GU |
R4‑1914610 | Number of bands and CCs to be considered in Rel-16 NR-U WI | Ericsson | imported from 3GU |
R4‑1914611 | Removing editorial notes on MTTD for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1914612 | Removing editorial notes on MTTD for intra-band EN-DC | Ericsson | imported from 3GU |
R4‑1914613 | Removing requirements related to inter-band EN-DC and NE-DC synchronous requirements | Ericsson, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914614 | Removing requirements related to inter-band EN-DC and NE-DC synchronous requirements | Ericsson, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914615 | MRTD and MTTD requirements for asynchronous NR-NR DC | Ericsson | imported from 3GU |
R4‑1914616 | Regarding MIMO layer switching for UE power saving work | Ericsson | imported from 3GU |
R4‑1914617 | Further discussions on timing reference cell adaptation under DL LBT failure in reference cell | Ericsson | imported from 3GU |
R4‑1914618 | Draft CR on UE transmit timing accuracy under DL LBT failure | Ericsson | imported from 3GU |
R4‑1914619 | TP to TR 38.820: Active RFFE technology for UE | NXP Semiconductors Netherlands | imported from 3GU |
R4‑1914620 | Editorial corrections to measurement accuracy tests | Ericsson | imported from 3GU |
R4‑1914621 | Editorial corrections to measurement accuracy tests | Ericsson | imported from 3GU |
R4‑1914622 | Corrections to SS-RSRQ and SS-SINR OTA tests with SA | Ericsson | imported from 3GU |
R4‑1914623 | Corrections to SS-RSRQ and SS-SINR OTA tests with SA | Ericsson | imported from 3GU |
R4‑1914624 | Corrections to SS-RSRQ and SS-SINR OTA tests with EN-DC | Ericsson | imported from 3GU |
R4‑1914625 | Corrections to SS-RSRQ and SS-SINR OTA tests with EN-DC | Ericsson | imported from 3GU |
R4‑1914626 | Editorial corrections to section 9.2 | Ericsson | imported from 3GU |
R4‑1914627 | Editorial corrections to section 9.2 | Ericsson | imported from 3GU |
R4‑1914628 | Updates to outline specification structure for 36.133 and 38.133 NR-U requirements | Ericsson | imported from 3GU |
R4‑1914629 | Introduction of handover requirements for SRVCC in section 6.1.2 | Ericsson | imported from 3GU |
R4‑1914630 | Corrections to band applicability of measurement accuracy tests | Ericsson | imported from 3GU |
R4‑1914631 | Corrections to band applicability of measurement accuracy tests | Ericsson | imported from 3GU |
R4‑1914632 | Introduction of bandwidth limited OCNG for OTA testing | Ericsson | imported from 3GU |
R4‑1914633 | Introduction of bandwidth limited OCNG for OTA testing | Ericsson | imported from 3GU |
R4‑1914634 | Discussion on Conditional handover requirements for NR | Ericsson | imported from 3GU |
R4‑1914635 | Requirements for conditional handover and conditional PSCell change in NR | Ericsson | imported from 3GU |
R4‑1914636 | Discussion on simultaneous RX-TX handover requirements for NR | Ericsson | imported from 3GU |
R4‑1914637 | Requirements for idle operation in NR high speed | Ericsson | imported from 3GU |
R4‑1914638 | Requirements for DRX operation in NR high speed | Ericsson | imported from 3GU |
R4‑1914639 | Requirements for non DRX operation in NR high speed | Ericsson | imported from 3GU |
R4‑1914640 | Simulation results for measurements in high speed | Ericsson | imported from 3GU |
R4‑1914641 | Further considerations on CGI reading requirements in autonomous gaps for R16 | Ericsson | imported from 3GU |
R4‑1914642 | Addition of LTE CGI reading requirements in NE-DC and EN-DC for 36.133 | Ericsson | imported from 3GU |
R4‑1914643 | Addition of NR autonomous gap interruption requirements in EN-DC and NE-DC for CGI reading of an EUTRA target cell | Ericsson | imported from 3GU |
R4‑1914644 | Mandatory gap patterns in NR RRM enhancement | Ericsson | imported from 3GU |
R4‑1914645 | Backwards compatible requirements and signaling for NR-only measurement gaps | Ericsson | imported from 3GU |
R4‑1914646 | LS on mandatory gap patterns for release 16 | Ericsson | imported from 3GU |
R4‑1914647 | Discussion on Conditional handover requirements for LTE | Ericsson | imported from 3GU |
R4‑1914648 | Requirements for conditional handover and conditional PSCell change in LTE | Ericsson | imported from 3GU |
R4‑1914649 | Discussion on simultaneous RX-TX handover requirements for LTE | Ericsson | imported from 3GU |
R4‑1914650 | SA interruption requirements for NR-U | Ericsson | imported from 3GU |
R4‑1914651 | General sections updates for NR-U | Ericsson | imported from 3GU |
R4‑1914652 | General sections updates for NR-U | Ericsson | imported from 3GU |
R4‑1914653 | Introduction of NR-U in CSSFoutside_gap and CSSFwithin_gap requirements | Ericsson | imported from 3GU |
R4‑1914654 | Gap applicability for NR-U | Ericsson | imported from 3GU |
R4‑1914655 | Corrections to test cases for SA FR2 inter-frequency measurement (section A.7.6.2) | Ericsson | imported from 3GU |
R4‑1914656 | Corrections to test cases for SA FR2 inter-frequency measurement (section A.7.6.2) | Ericsson | imported from 3GU |
R4‑1914657 | On per-NR U measurement gap | Ericsson | imported from 3GU |
R4‑1914658 | CR Corrections to EVM 38.141-1 Annex H.7 | Futurewei | imported from 3GU |
R4‑1914659 | CR Corrections to EVM 38.141-1 Annex H.7 | Futurewei | imported from 3GU |
R4‑1914660 | CR Corrections to EVM 38.141-2 Annex L.7 | Futurewei | imported from 3GU |
R4‑1914661 | CR Corrections to EVM 38.141-2 Annex L.7 | Futurewei | imported from 3GU |
R4‑1914662 | CR Frame averaging for EVM Annex B and C in TS 38.104 | Futurewei | imported from 3GU |
R4‑1914663 | CR Frame averaging for EVM Annex B and C in TS 38.104 | Futurewei | imported from 3GU |
R4‑1914664 | CR Corrections to EVM 38.141-2 Annex L.4 | Futurewei | imported from 3GU |
R4‑1914665 | CR Corrections to EVM 38.141-2 Annex L.4 | Futurewei | imported from 3GU |
R4‑1914666 | CR Modulation fallback for total power dynamic range in 37.145-1 clause 6.3.4.4.1.4 | Futurewei | imported from 3GU |
R4‑1914667 | CR Modulation fallback for total power dynamic range in 37.145-1 clause 6.3.4.4.1.4 | Futurewei | imported from 3GU |
R4‑1914668 | CR Modulation fallback for total power dynamic range in 37.145-2 clause 6.4.4.4.2.4 | Futurewei | imported from 3GU |
R4‑1914669 | CR Modulation fallback for total power dynamic range in 37.145-2 clause 6.4.4.4.2.4 | Futurewei | imported from 3GU |
R4‑1914670 | Sync raster design for NR-U | Futurewei | imported from 3GU |
R4‑1914671 | Draft CR for Sync raster design for NR-U in 38.104 | Futurewei | imported from 3GU |
R4‑1914672 | Draft CR for Sync raster design for NR-U in 38.101-1 | Futurewei | imported from 3GU |
R4‑1914673 | Channel raster design for NR-U | Futurewei | imported from 3GU |
R4‑1914674 | Draft CR for Channel raster design for NR-U in 38.104 | Futurewei | imported from 3GU |
R4‑1914675 | Guard band design for NR-U | Futurewei | imported from 3GU |
R4‑1914676 | draftCR for 38.104: Performance requirements for FR2 PUSCH 2T2R 16QAM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914677 | draftCR for 38.141-2: Radiated test requirements for FR2 PUSCH 2T2R 16QAM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1914678 | Revised WID Basket WI for LTE Intra-band CA Rel-16 | Ericsson | imported from 3GU |
R4‑1914679 | Revised WID NR Intra-band Rel-16 | Ericsson | imported from 3GU |
R4‑1914680 | Revised WID LTE 3DL and one NR band Rel-16 | Ericsson | imported from 3GU |
R4‑1914681 | Revised WID 4 bands NR CA Rel-16 | Ericsson | imported from 3GU |
R4‑1914682 | TR 38.716-01-01 v0.8.0 Rel-16 NR Intra-band | Ericsson | imported from 3GU |
R4‑1914683 | TR 37.716-31-11 v0.8.0 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1914684 | TR 38.716-04-01 v0.1.0 Rel-16 NR Inter-band 4 bands CA | Ericsson | imported from 3GU |
R4‑1914685 | CR introduction of Rel-16 LTE Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑1914686 | CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1914687 | CR introduction completed band combinations 38.716-01-01 -> 38.101-2 | Ericsson | imported from 3GU |
R4‑1914688 | CR introduction completed band combinations 37.716-31-11 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1914689 | CR introduction completed band combinations 38.716-04-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1914690 | CR introduction completed band combinations 38.716-04-01 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1914691 | TP for TR 37 716-31-11 to to remove ?TIB and ?RIB values for FR2 combinations | Ericsson | imported from 3GU |
R4‑1914692 | CR to 38.101-3 to remove duplicate combinations | Ericsson | imported from 3GU |
R4‑1914693 | Draft LS reply to RAN2 about BCS reporting for EN-DC | Ericsson | imported from 3GU |
R4‑1914694 | TP for TR 36.716-04-01 to align band 7 BW values for CA_1-3-7-28 configurations | Ericsson, Telstra, Nokia | imported from 3GU |
R4‑1914695 | draft CR to 38.101-3 new configurations for 1_n7, 3_n1, 3_n7, 7_n1, 7_n3 | Ericsson, BT plc, Telstra | imported from 3GU |
R4‑1914696 | draft CR to 38.101-3 new configurations for 3-20_n1, 3-7_n1 | Ericsson, BT plc, Telstra | imported from 3GU |
R4‑1914697 | TP for TR 38.716-02-00 to include CA_n1-n7 | Ericsson, BT plc | imported from 3GU |
R4‑1914698 | TP for TR 37.716-21-21 to include DC_3_n1-n7 | Ericsson, BT plc | imported from 3GU |
R4‑1914699 | TP for TR 38.716-01-01 to include CA_n7B UL | Ericsson, Telstra | imported from 3GU |
R4‑1914700 | TP for TR 37 716-11-11 to include DC_28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914701 | TP for TR 37 716-21-11 to include DC_1-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914702 | TP for TR 37 716-21-11 to include DC_3-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914703 | TP for TR 37 716-31-11 to include DC_1-3-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914704 | draft Rel-16 CR to 38.101-3 to add missing UL configurations for 1-3-7_n5-n78 and 1-3-28_n5-n78 | Ericsson, Telstra | imported from 3GU |
R4‑1914705 | TP for TR 37 716-11-11 to include DC_7_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914706 | TP for TR 37 716-21-11 to include DC_1-7_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914707 | TP for TR 37 716-21-11 to include DC_3-7_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914708 | TP for TR 37 716-21-11 to include DC_7-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914709 | TP for TR 37 716-31-11 to include DC_3-7-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914710 | TP for TR 37 716-31-11 to include DC_1-3-7_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914711 | TP for TR 37 716-31-11 to include DC_1-7-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914712 | TP for TR 37 716-41-11 to include DC_1-3-7-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1914713 | TP for TR 37 716-21-11 to include DC_12-66_n66 | Ericsson, AT&T | imported from 3GU |
R4‑1914714 | TP for TR 37 716-31-11 to include DC_2-12-66_n66 | Ericsson, AT&T | imported from 3GU |
R4‑1914715 | TP for TR 37 716-31-11 to include DC_2-30-66_n66 | Ericsson, AT&T | imported from 3GU |
R4‑1914716 | TP for TR 37 716-31-11 to include DC_12-30-66_n66 | Ericsson, AT&T | imported from 3GU |
R4‑1914717 | TP for TR 37 716-41-11 to include DC_2-12-30-66_n66 | Ericsson, AT&T | imported from 3GU |
R4‑1914718 | CR to 38.101-3 to add missing ?TIB and ?RIB values for DC_12-30_n66 | Ericsson | imported from 3GU |
R4‑1914719 | draft CR to 38.101-3 new configurations for 2_n38, 2_n71, 66_n71 and 2_78 | Ericsson, Rogers | imported from 3GU |
R4‑1914720 | draft CR to 38.101-3 new configurations for 2-7_n71, 2-66_n71, 2-7_n66, 2-66_n66 and 2-66_n78 | Ericsson, Rogers | imported from 3GU |
R4‑1914721 | Remaining discussions on IDLE mode cell re-selection requirements for NR-U standalone | Ericsson | imported from 3GU |
R4‑1914722 | Remaining discussions on serving cell evaluations for NR-U standalone | Ericsson | imported from 3GU |
R4‑1914723 | Remaining discussions on handover requirements for NR-U | Ericsson | imported from 3GU |
R4‑1914724 | Discussions on paging interruptions for NR-U | Ericsson | imported from 3GU |
R4‑1914725 | Draft CR: NR-U requirements for IDLE/INACTIVE states | Ericsson | imported from 3GU |
R4‑1914726 | RSS based measurement simulation results and discussions | Ericsson | imported from 3GU |
R4‑1914727 | Remaining discussions transmission using PUR for MTC | Ericsson | imported from 3GU |
R4‑1914728 | Rel-16 MTC WUS simulation results | Ericsson | imported from 3GU |
R4‑1914729 | Way forward on Rel-16 MTC RRM enhancement | Ericsson | imported from 3GU |
R4‑1914730 | Remaining discussions on RRM requirements for NB-IoT PUR | Ericsson | imported from 3GU |
R4‑1914731 | Remaining discussions on non-anchor carrier RRM measurements | Ericsson | imported from 3GU |
R4‑1914732 | Discussions related to interruptions requirements for NR SL V2X | Ericsson | imported from 3GU |
R4‑1914733 | Applicability of relaxed neighbour cell monitoring for category M1/M2 | Ericsson | imported from 3GU |
R4‑1914734 | Applicability of relaxed neighbour cell monitoring for category M1/M2 | Ericsson | imported from 3GU |
R4‑1914735 | Correction of feMTC test cases | Ericsson | imported from 3GU |
R4‑1914736 | Correction of feMTC test cases | Ericsson | imported from 3GU |
R4‑1914737 | Cat-1bis clarification to RSRQ measurements | Sequans Communications, Ericsson | imported from 3GU |
R4‑1914738 | Cat-1bis clarification to RSRQ measurements | Sequans Communications, Ericsson | imported from 3GU |
R4‑1914739 | On the feasibility of testing previously conducted quantities in RC | Bluetest AB | imported from 3GU |
R4‑1914740 | Echo Delay Profile for Testing UE Performance in MBSFN | EBU/BBC/IRT | imported from 3GU |
R4‑1914741 | [draft] Reply LS on direct SCell activation in RRC resume message | ZTE Corporation | imported from 3GU |
R4‑1914742 | Discussion on direct SCell activation in RRC resume | ZTE Corporation | imported from 3GU |
R4‑1914743 | Discussion on UE performance requirements for additional MTC enhancements for LTE | Huawei, Hisilicon | imported from 3GU |
R4‑1914744 | Discussion on BS performance requirements for additional MTC enhancements for LTE | Huawei, Hisilicon | imported from 3GU |
R4‑1914745 | Simulation results for PMI test of Tx ports larger than 8 and up to 32 | Huawei, Hisilicon | imported from 3GU |
R4‑1914746 | Discussion on PMI test for Tx ports larger than 8 and up to 32 | Huawei, Hisilicon | imported from 3GU |
R4‑1914747 | Ideal and impairment simulation results for LTE HST PRACH performance | Huawei, Hisilicon | imported from 3GU |
R4‑1914748 | Discussion and simulation results for NR HST PRACH format 0 | Huawei, Hisilicon | imported from 3GU |
R4‑1914749 | Discussion and simulation results for NR HST PRACH short sequence format | Huawei, Hisilicon | imported from 3GU |
R4‑1914750 | [7to24] Discussion on BS classes | Huawei | imported from 3GU |
R4‑1914751 | [7to24] Discussion on BS type terminology | Huawei | imported from 3GU |
R4‑1914752 | [7to24] TP to TR 38.820 BS terminology clean up | Huawei | imported from 3GU |
R4‑1914753 | [7to24] TP to TR 38.820 BS Rx conducted sensitivity | Huawei | imported from 3GU |
R4‑1914754 | [7to24] TP to TS 38.820 BS Rx spurious emissions | Huawei | imported from 3GU |
R4‑1914755 | [7to24] TP to TR 38.820 BS RX summary table update | Huawei | imported from 3GU |
R4‑1914756 | [7to24] TP to TR 38.820 BS TX summary table update | Huawei | imported from 3GU |
R4‑1914757 | [IAB] Discuss FR2 IAB-MT blocking | Huawei | imported from 3GU |
R4‑1914758 | [IAB] Discussion on system parameters | Huawei | imported from 3GU |
R4‑1914759 | [IAB] Discussion on transmitter OFF power | Huawei | imported from 3GU |
R4‑1914760 | [IAB] TP to TR 38.xxx Antenna assumptions | Huawei | imported from 3GU |
R4‑1914761 | [IAB] TP to TR 38.xxx Architecture | Huawei | imported from 3GU |
R4‑1914762 | [IAB] TP to TR 38.xxx Co-location scenarios | Huawei | imported from 3GU |
R4‑1914763 | [IAB] TP to TR 38.xxx System parameters | Huawei | imported from 3GU |
R4‑1914764 | [IAB] TP to TR 38.174 System parameters | Huawei | imported from 3GU |
R4‑1914765 | CR to TS 37.145-2 - reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1914766 | CR to TS 37.145-2 - reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1914767 | TRP measurements in the field | Huawei | imported from 3GU |
R4‑1914768 | Further discussion on one shot timing adjustment requirements | ZTE | imported from 3GU |
R4‑1914769 | Remaining issues on NR reporting criteria | ZTE | imported from 3GU |
R4‑1914770 | CR to 38.133 NR reporting criteria | ZTE | imported from 3GU |
R4‑1914771 | CR to 38.133 NR reporting criteria | ZTE | imported from 3GU |
R4‑1914772 | CR to 36.133 on NR reporting criteria | ZTE | imported from 3GU |
R4‑1914773 | CR to 36.133 on NR reporting criteria | ZTE | imported from 3GU |
R4‑1914774 | CR to 38.133 on CGI reading of NR cell | ZTE | imported from 3GU |
R4‑1914775 | CR to 38.133 on CGI reading of LTE cell | ZTE | imported from 3GU |
R4‑1914776 | CR to 38.133 on interruption requirements for CGI reading | ZTE | imported from 3GU |
R4‑1914777 | CR to 36133 on CGI reading of NR cell | ZTE | imported from 3GU |
R4‑1914778 | CR to 36.133 on CGI reading of LTE cell | ZTE | imported from 3GU |
R4‑1914779 | CR to 36.133 on interruption requirements for CGI reading | ZTE | imported from 3GU |
R4‑1914780 | CR to 38.133 on SRS carrier switching interruption requirements | ZTE | imported from 3GU |
R4‑1914781 | CR to 36.133 on SRS carrier switching interruption requirements | ZTE | imported from 3GU |
R4‑1914782 | LS on CGI reading with autonomous gaps | ZTE | imported from 3GU |
R4‑1914783 | LS on mandatory of measurement gap patterns | ZTE | imported from 3GU |
R4‑1914784 | Reply LS on applicable timing for pathloss RS activated/updated by MAC-CE | ZTE | imported from 3GU |
R4‑1914785 | Simulation assumption on SIB1 decoding for NR CGI reading | ZTE | imported from 3GU |
R4‑1914786 | Further discussion on NR CGI reading with autonomous gaps | ZTE | imported from 3GU |
R4‑1914787 | Further discussion on mandatary of measurement gap patterns | ZTE | imported from 3GU |
R4‑1914788 | Further discussion on SRS carrier switching RRM requirements | ZTE | imported from 3GU |
R4‑1914789 | Discussion on UE measurement capability of CSI-RS based RRM measurements | ZTE | imported from 3GU |
R4‑1914790 | Discussion on definition of CSI-RS based RRM measurements | ZTE | imported from 3GU |
R4‑1914791 | Discussion on AC-CE based PL RS update | ZTE | imported from 3GU |
R4‑1914792 | Way forward on R16 NR RRM enhancements – CGI reading | ZTE | imported from 3GU |
R4‑1914793 | Way forward on R16 NR RRM enhancements – SRS carrier switching | ZTE | imported from 3GU |
R4‑1914794 | Way forward on R16 NR RRM enhancements – mandatory of gap patterns | ZTE | imported from 3GU |
R4‑1914795 | Options to optimize the polarization mismatch | ROHDE & SCHWARZ | imported from 3GU |
R4‑1914796 | Plane Wave Synthesizer – Pending MU terms | ROHDE & SCHWARZ | imported from 3GU |
R4‑1914797 | CR to TR 37.843: Completion of MU terms for PWS. | ROHDE & SCHWARZ | imported from 3GU |
R4‑1914798 | NR MIMO OTA ad-hoc meeting minutes | CAICT | imported from 3GU |
R4‑1914799 | Proposals on concluding NR MIMO OTA | CAICT | imported from 3GU |
R4‑1914800 | CR on maintaining core requirements and tests for V2X synchronization reference source selection/reselection R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1914801 | CR on maintaining core requirements and tests for V3X synchronization reference source selection/reselection R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914802 | CR on maintaining core requirements and tests for V4X synchronization reference source selection/reselection R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914803 | CR on maintaining interruption tests due to V2X sidelink communication R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1914804 | CR on maintaining interruption tests due to V2X sidelink communication R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914805 | CR on maintaining interruption tests due to V2X sidelink communication R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914806 | CR on numerology switching delay and interruptions requirements with FeMBMS for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1914807 | CR on cell phase synchronization accuracy for MBMS services for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1914808 | CR on MBSFN RSRP report mapping with new numerology for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1914809 | CR on MBSFN RSRQ report mapping with new numerology for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1914810 | CR on MBSFN Measurements in idle mode for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1914811 | CR on MBSFN Measurements in connected mode for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1914812 | Discussion on remaining issues on UE one-shot timing adjustment requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914813 | CR on one-shot timing adjustment requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914814 | CR on one-shot timing adjustment requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914815 | CR on interruption requirements due to one-shot timing adjustment | Huawei, HiSilicon | imported from 3GU |
R4‑1914816 | CR on interruption requirements due to one-shot timing adjustment | Huawei, HiSilicon | imported from 3GU |
R4‑1914817 | CR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1914818 | CR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1914819 | CR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1914820 | CR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1914821 | CR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1914822 | CR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1914823 | CR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1914824 | CR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1914825 | Further discussion on DAPS handover requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914826 | CR on introducing DAPS handover requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914827 | Futher discussion on conditional handover requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914828 | CR on introducing conditional handover requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914829 | CR on introducing UE sidelink timing requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1914830 | Simulation results of SyncRef UE identification for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1914831 | Discussion on SyncRef UE identification requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1914832 | Discussion on measurement requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1914833 | Discussion on interruption requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1914834 | Further discussion on L1-SINR measurement requirement for NR eMIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1914835 | CR on introducing L1-SINR mapping in TS38.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914836 | Further discussion on SCell BFR measurements for NR eMIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1914837 | Simulation results of CSI-RSRP measurements for NR mobility | Huawei, HiSilicon | imported from 3GU |
R4‑1914838 | Discussion on CSI-RS based measurement requirements for NR mobility | Huawei, HiSilicon | imported from 3GU |
R4‑1914839 | CR on delay uncertainty of RRC Release with redirection requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914840 | CR on delay uncertainty of RRC Release with redirection requirements in TS 38.133 (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914841 | CR on known condition of PSCell addition requirement in NE-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1914842 | CR on known condition of PSCell addition requirement in NE-DC (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914843 | CR on known condition of PSCell addition requirement in NR DC | Huawei, HiSilicon | imported from 3GU |
R4‑1914844 | CR on known condition of PSCell addition requirement in NR DC (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914845 | CR on RRC Re-establishment requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914846 | CR on RRC Re-establishment requirements in TS 38.133 (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914847 | CR on scope of interruption requirements of EN-DC in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914848 | CR on scope of interruption requirements of EN-DC in TS 38.133 (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914849 | CR on scope of MTTD requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914850 | CR on scope of MTTD requirements in TS 38.133 (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914851 | CR on SSB-based RLM test case for EN-DC FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1914852 | CR on SSB-based RLM test case for EN-DC FR1 (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914853 | CR on SSB-based RLM test case for NR SA FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1914854 | CR on SSB-based RLM test case for NR SA FR1 (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914855 | Editorial CR on section 8.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1914856 | Editorial CR on section 8.2 (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914857 | CR on Active TCI state switching Requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1914858 | CR on Active TCI state switching Requirement (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914859 | CR on NR inter-frequency identification | Huawei, HiSilicon | imported from 3GU |
R4‑1914860 | CR on NR inter-frequency identification (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914861 | CR on NR intra-frequency measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1914862 | CR on NR intra-frequency measurements (Cat A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914863 | CR for introduction of RRC_INACTIVE state moblity requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914864 | CR for introduction of RRC_IDLE state moblity requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914865 | CR for introduction of Intra-frequency measurements without measurement gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1914866 | CR for introduction of Intra-frequency measurements with measurement gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1914867 | CR for introduction of Intra-frequency measurements requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914868 | CR for introduction of Interruption due to Active BWP switching Requirements in SA for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914869 | CR for introduction of Interruption due to Active BWP switching Requirements in NR-DC for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914870 | CR for introduction of Interruption due to Active BWP switching Requirements in EN-DC for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914871 | CR for introduction of Active TCI state switching delay with CCA Requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914872 | CR for introduction of Active BWP switching delay requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914873 | CR on UE measurement capability for EN-DC with CCA | Huawei, HiSilicon | imported from 3GU |
R4‑1914874 | Discussion on Active BWP switching requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914875 | Discussion on handover delay requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914876 | Discussion on measurement requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914877 | Discussion on PSCell addition requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914878 | Discussion on RLM Out-of-Sync in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914879 | Discussion on RRC Re-establishment in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914880 | Discussion on RRC release with redirection requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914881 | Discussion on SCell activation requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914882 | Discussion on Serving cell evaluation requirements in NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1914883 | CR on measurement requriements for RSRP change based TA validation | Huawei, HiSilicon | imported from 3GU |
R4‑1914884 | CR on non-anchor RRM measurement requirements in Rel-16 NB IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1914885 | CR on serving cell measurement configured with WUS in Rel-16 NB IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1914886 | Discussion on PUR in Rel-16 NB IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1914887 | Discussion on the non-anchor measurement conditions in Rel-16 NB IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1914888 | Discussion on the non-anchor RRM measurement requirements in Rel-16 NB IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1914889 | Way forward on RRM requirements of R16 enhancement for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1914890 | Correction to direct Scell activation requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914891 | Correction to direct Scell activation requirements R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914892 | Correction to direct Scell activation during HO requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914893 | Correction to direct Scell activation during HO requirements R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914894 | Adding interruption length requirements for direct Scell activation R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914895 | Adding interruption length requirements for direct Scell activation R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914896 | Update to interruption requirements due to measurement on dormant Scell R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914897 | Update to interruption requirements due to measurement on dormant Scell R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1914898 | Adding interruption length requirements for dormant state transition R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914899 | Adding interruption length requirements for dormant state transition R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1914900 | Discussion on FR2 measurement outside gap | Huawei, HiSilicon, MediaTek | imported from 3GU |
R4‑1914901 | CR on FR2 measurement requriements outside gaps (section 9.1.5.1) | Huawei, HiSilicon, MediaTek | imported from 3GU |
R4‑1914902 | CR on FR2 measurement requriements outside gaps (section 9.1.5.1) (cat-A) | Huawei, HiSilicon, MediaTek | imported from 3GU |
R4‑1914903 | Correction on inter-frequency RSTD measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914904 | Correction on inter-frequency RSTD measurement requirements (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914905 | Correction on CSSF within measurement gap (section 9.1.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1914906 | Correction on CSSF within measurement gap (section 9.1.5.2) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914907 | CR on RLM scheduling restriction (section 8.1.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1914908 | CR on RLM scheduling restriction (section 8.1.7) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914909 | CR on SCell activation requirements (section 8.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1914910 | CR on SCell activation requirements (section 8.3.2) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914911 | CR to add QCL definition (section 3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1914912 | CR to add QCL definition (section 3.6) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914913 | Discussion on remaining issues in FR2 RRM test setup | Huawei, HiSilicon | imported from 3GU |
R4‑1914914 | CR on power offset in TRS RMC (A.3.17) | Huawei, HiSilicon | imported from 3GU |
R4‑1914915 | CR on power offset in TRS RMC (A.3.17) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914916 | CR to introduce new PDCCH RMC (A.3.1.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1914917 | CR to introduce new PDCCH RMC (A.3.1.3.2) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914918 | Maintenance CR for measurement accuracy (section 10.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1914919 | Maintenance CR for measurement accuracy (section 10.1) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914920 | FR1 CSI-RS RLM test OOS/IS non-DRX for EN-DC (section A.4.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1914921 | FR1 CSI-RS RLM test OOS/IS non-DRX for EN-DC (section A.4.5.1) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914922 | FR2 CSI-RS RLM test OOS/IS non-DRX for EN-DC (section A.4.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1914923 | FR2 CSI-RS RLM test OOS/IS non-DRX for EN-DC (section A.4.5.1) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914924 | FR1 CSI-RS RLM test OOS/IS non-DRX for SA (section A.6.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1914925 | FR1 CSI-RS RLM test OOS/IS non-DRX for SA (section A.6.5.1) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914926 | FR2 CSI-RS RLM test OOS/IS non-DRX for SA (section A.6.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1914927 | FR2 CSI-RS RLM test OOS/IS non-DRX for SA (section A.6.5.1) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914928 | L1-RSRP delay test FR1 EN-DC (section A.4.6.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1914929 | L1-RSRP delay test FR1 EN-DC (section A.4.6.3) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914930 | L1-RSRP delay test FR2 EN-DC (section A.5.6.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1914931 | L1-RSRP delay test FR2 EN-DC (section A.5.6.3) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914932 | L1-RSRP delay test FR1 SA (section A.6.6.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1914933 | L1-RSRP delay test FR1 SA (section A.6.6.4) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914934 | L1-RSRP delay test FR2 SA (section A.7.6.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1914935 | L1-RSRP delay test FR2 SA (section A.7.6.3) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914936 | CR to inter-frequency RSRP accuracy test FR2 EN-DC (section A.5.7.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1914937 | CR to inter-frequency RSRP accuracy test FR2 EN-DC (section A.5.7.1.2) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914938 | L1-RSRP accuracy test FR2 EN-DC (section A.5.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1914939 | L1-RSRP accuracy test FR2 EN-DC (section A.5.7.4) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914940 | L1-RSRP accuracy test FR2 SA (section A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1914941 | L1-RSRP accuracy test FR2 SA (section A.7.7.4) (cat-A) | Huawei, HiSilicon | imported from 3GU |
R4‑1914942 | Discussion on remaining issues in CLI measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1914943 | CR to introduce CLI measurement accuracy requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914944 | CR on measurement gap interruption due to async NR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1914945 | CR on Interruptions at PSCell/SCell addition/release in async NR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1914946 | Introducing euCA related interruption requirements for EN-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914947 | Introducing euCA related interruption requirements for NE-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914948 | Introducing euCA related interruption requirements for EN-DC in 38.133 (section 8.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1914949 | Introducing euCA related interruption requirements for NE-DC in 38.133 (section 8.2.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1914950 | Discussion on early measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1914951 | CR on direct SCell activation delay | Huawei, HiSilicon | imported from 3GU |
R4‑1914952 | Discussion on fast Scell access | Huawei, HiSilicon | imported from 3GU |
R4‑1914953 | Discussion on gNB requirements for NR positioning | Huawei, HiSilicon | imported from 3GU |
R4‑1914954 | Discussion on RSTD measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1914955 | Discussion on PRS-RSRP measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1914956 | Discussion on Rx-Tx time difference measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1914957 | Further simulation results for NR positioning | Huawei, HiSilicon | imported from 3GU |
R4‑1914958 | Discussion on RLF prevention mechanism for URLLC | Huawei, HiSilicon | imported from 3GU |
R4‑1914959 | On synchronization assumption for CSI-RS measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914960 | On CSI-RS measurement capability | Huawei, HiSilicon | imported from 3GU |
R4‑1914961 | Discussion on multiple SCell activation | Huawei, HiSilicon | imported from 3GU |
R4‑1914962 | Discussion on NR CGI reading requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914963 | Simulation assumption for RMSI reading in CGI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914964 | Discussion on LTE CGI reading requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1914965 | CR on interruption due to autonomous gaps in LTE CGI reading in 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914966 | CR on inter-RAT LTE CGI reading in 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914967 | CR on interruption due to autonomous gaps in LTE CGI reading in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914968 | CR on intra- and inter-frequency LTE CGI reading requirements in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1914969 | CR on MPDCCH parameters for quality reporting | Huawei, HiSilicon | imported from 3GU |
R4‑1914970 | CR on accuracy requriements for quality report in eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1914971 | CR on report mapping for quality report in eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1914972 | Discussion on PUR in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1914973 | CR on measurement requriements for RSRP change based TA validation | Huawei, HiSilicon | imported from 3GU |
R4‑1914974 | Discussion on RSS measurement in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1914975 | WF on Rel-16 eMTC RRM | Huawei, HiSilicon | imported from 3GU |
R4‑1914976 | TP to TR 38.827 v0.5.0 on FR1 MIMO OTA test methods | CAICT | imported from 3GU |
R4‑1914977 | Views on test methods for inter-band CA | CAICT | imported from 3GU |
R4‑1914978 | Side conditions for L1-SINR measurement | Qualcomm | imported from 3GU |
R4‑1914979 | Scell beam failure recovery | Qualcomm | imported from 3GU |
R4‑1914980 | Applicable timing for pathloss RS activated/updated by MAC-CE | Qualcomm | imported from 3GU |
R4‑1914981 | Reply LS on applicable timing for pathloss RS activated/updated by MAC-CE | Qualcomm | imported from 3GU |
R4‑1914982 | RRC connection mobility control requirements for IAB MTs | Qualcomm | imported from 3GU |
R4‑1914983 | MT timing related requirements | Qualcomm | imported from 3GU |
R4‑1914984 | DU timing related requirements | Qualcomm | imported from 3GU |
R4‑1914985 | MT DU switching time in an IAB node | Qualcomm | imported from 3GU |
R4‑1914986 | Additional RRM requirements for IAB nodes | Qualcomm | imported from 3GU |
R4‑1914987 | Discussion regarding NR-U handover | Qualcomm | imported from 3GU |
R4‑1914988 | SI Decoding during RRC Mobility Control in NR-U | Qualcomm | imported from 3GU |
R4‑1914989 | RLM and link recovery procedure in NR-U | Qualcomm | imported from 3GU |
R4‑1914990 | RRM measurement relaxation for power saving | Qualcomm | imported from 3GU |
R4‑1914991 | Impact of cross slot scheduling offset on DCI based activation timeline | Qualcomm | imported from 3GU |
R4‑1914992 | TP to TR 38.827 v0.5.0 on channel model validation procedure | CAICT | imported from 3GU |
R4‑1914993 | CR to TR 37.843: Power Density limitation for PWS. | ROHDE & SCHWARZ | imported from 3GU |
R4‑1914994 | TP to TR 38.827 v0.5.0 on FR1 preliminary MU assessment | CAICT | imported from 3GU |
R4‑1914995 | Analysis on TRMS vs MARSS based on measurement results | CAICT, SAICT | imported from 3GU |
R4‑1914996 | FR1 MIMO OTA Channel model validation results | CAICT | imported from 3GU |
R4‑1914997 | CR to 36133 on CGI reading of NR cell | ZTE | imported from 3GU |
R4‑1914998 | CR to 36.133 on CGI reading of LTE cell | ZTE | imported from 3GU |
R4‑1914999 | CR to 36.133 on interruption requirements for CGI reading | ZTE | imported from 3GU |
R4‑1915000 | CR to 36.133 on SRS carrier switching interruption requirements | ZTE | imported from 3GU |
R4‑1915001 | Further analysis of one shot timing adjustment requirements | Ericsson | imported from 3GU |
R4‑1915002 | Threshold for one shot UE timing adjustment requirements | Ericsson | imported from 3GU |
R4‑1915003 | Threshold for one shot UE timing adjustment requirements | Ericsson | imported from 3GU |
R4‑1915004 | RRC connection mobility control requirements for IAB | Ericsson | imported from 3GU |
R4‑1915005 | IAB-MT timing related requirements | Ericsson | imported from 3GU |
R4‑1915006 | Further analysis of RRM Requirement for IAB | Ericsson | imported from 3GU |
R4‑1915007 | Maximum CCA failures in RRC re-establishment for unknown cell in NR-U | Ericsson | imported from 3GU |
R4‑1915008 | Further analysis of active BWP switching in NR-U | Ericsson | imported from 3GU |
R4‑1915009 | UE Autonomous Timing Adjustment Requirement under High Speed Scenario | Ericsson | imported from 3GU |
R4‑1915010 | BWP switching delay due to BWP switching on multiple CCs | Ericsson | imported from 3GU |
R4‑1915011 | Interruption due to BWP switching on multiple CCs | Ericsson | imported from 3GU |
R4‑1915012 | CR to TS 37.145-2: correction of the direction to be tested for the BS demodulation requirements, Rel-15 | Huawei | imported from 3GU |
R4‑1915013 | CR to TS 37.145-2: correction of the direction to be tested for the BS demodulation requirements, Rel-16 | Huawei | imported from 3GU |
R4‑1915014 | CR to TR 38.817-02: terminology corrections, Rel-15 | Huawei | imported from 3GU |
R4‑1915015 | CR to TS 38.104: OTA TAE correction, Rel-15 | Huawei | imported from 3GU |
R4‑1915016 | CR to TS 38.104: OTA TAE correction, Rel-16 | Huawei | imported from 3GU |
R4‑1915017 | CR to TS 38.141-1: removal of [] for multiple requirements, Rel-15 | Huawei | imported from 3GU |
R4‑1915018 | CR to TS 38.141-1: removal of [] for multiple requirements, Rel-16 | Huawei | imported from 3GU |
R4‑1915019 | CR to TS 38.141-2: correction of the multipath fading reference for BS demodulation requirements, Rel-15 | Huawei | imported from 3GU |
R4‑1915020 | CR to TS 38.141-2: correction of the multipath fading reference for BS demodulation requirements, Rel-16 | Huawei | imported from 3GU |
R4‑1915021 | TR 38.820, v0.4.0: implementation of TPs from RAN4#93 | Huawei | imported from 3GU |
R4‑1915022 | TP to TR 38.820: cleanup | Huawei | imported from 3GU |
R4‑1915023 | TP to TR 38.820: NR BS transmitted signal quality requirements | Huawei | imported from 3GU |
R4‑1915024 | TP to TR 38.820: NR BS in-channel selectivity (ICS) for 7-24 GHz range | Huawei | imported from 3GU |
R4‑1915025 | TP to TR 38.820: clarification on the IM | Huawei | imported from 3GU |
R4‑1915026 | Analysis of the IAB scenario for 7-24 GHz | Huawei | imported from 3GU |
R4‑1915027 | TP to TR 38.820: IAB scenario for 7-24GHz | Huawei | imported from 3GU |
R4‑1915028 | CR to TS 38.104: MR BS class terminology correction, Rel-15 | Huawei | imported from 3GU |
R4‑1915029 | CR to TS 38.104: MR BS class terminology correction, Rel-16 | Huawei | imported from 3GU |
R4‑1915030 | CR to TS 38.141-1: MR BS class terminology correction, Rel-15 | Huawei | imported from 3GU |
R4‑1915031 | CR to TS 38.141-1: MR BS class terminology correction, Rel-16 | Huawei | imported from 3GU |
R4‑1915032 | CR to TS 38.141-2: BS demodulation MU/TT: [] removal, Rel-15 | Huawei | imported from 3GU |
R4‑1915033 | CR to TS 38.141-2: BS demodulation MU/TT: [] removal, Rel-16 | Huawei | imported from 3GU |
R4‑1915034 | CR to TS 38.141-2: Additional Tx spur for FR2 - removal, Rel-15 | Huawei | imported from 3GU |
R4‑1915035 | CR to TS 38.141-2: Additional Tx spur for FR2 - removal, Rel-16 | Huawei | imported from 3GU |
R4‑1915036 | CR to TS 38.141-2: Calibration procedure for radiated FR2 measurements, Rel-15 | Huawei | imported from 3GU |
R4‑1915037 | CR to TS 38.141-2: Calibration procedure for radiated FR2 measurements, Rel-16 | Huawei | imported from 3GU |
R4‑1915038 | Further discussion on external TR for OTA measurement aspects | Huawei | imported from 3GU |
R4‑1915039 | CCDF analysis result with use of random data in Test Model payload | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915040 | NR-U UE power class | Sony | imported from 3GU |
R4‑1915041 | Enhanced reporting for beam correspondence in poor SNR condition | Sony | imported from 3GU |
R4‑1915042 | Views on SSB only and CSI-RS only beam correspondence | Sony, Ericsson | imported from 3GU |
R4‑1915043 | Views on inter-band CA spherical coverage requirement | Sony, Ericsson | imported from 3GU |
R4‑1915044 | Spherical coverage and multi-band relaxation for n259 | Sony, Ericsson | imported from 3GU |
R4‑1915045 | Views on the UE rotations and orientations in FR2 MIMO OTA test | Sony, MVG Industries | imported from 3GU |
R4‑1915046 | TP to TR 38.820 updated on UE RF Requirement | Sony, Ericsson | imported from 3GU |
R4‑1915047 | A-MPR&MPR improvements for DC_(n)41 DC_41_n41 and DC_3_n3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915048 | Channel Model Validation for MIMO OTA FR1 Testing | Spirent Communications | imported from 3GU |
R4‑1915049 | Adding SDL to 38.307 | Dish Network | imported from 3GU |
R4‑1915050 | CR 38.133 (8.3.2) Amendment of requirements depending on T_SMTC_Max | Ericsson | imported from 3GU |
R4‑1915051 | CR 38.133 (8.3.2) Amendment of requirements depending on T_SMTC_Max | Ericsson | imported from 3GU |
R4‑1915052 | CR 38.133 (8.3.3) Correction of SCell deactivation delay | Ericsson | imported from 3GU |
R4‑1915053 | CR 38.133 (8.3.3) Correction of SCell deactivation delay | Ericsson | imported from 3GU |
R4‑1915054 | CR 38.133 (A.7.5.7) TCs for PSCell addition and release delay | Ericsson | imported from 3GU |
R4‑1915055 | CR 38.133 (A.7.5.7) TCs for PSCell addition and release delay | Ericsson | imported from 3GU |
R4‑1915056 | On Direct SCell activation | Ericsson | imported from 3GU |
R4‑1915057 | On SFTD for NR-U scenario B | Ericsson | imported from 3GU |
R4‑1915058 | On activation of multiple SCells | Ericsson | imported from 3GU |
R4‑1915059 | On remaining CLI RRM open issues | Ericsson | imported from 3GU |
R4‑1915060 | Updated Spatial Filtering, Thresholding, and DoT for FR1 | Spirent Communications | imported from 3GU |
R4‑1915061 | Views on polarization mismatch between DUT and TE | Anritsu Corporation | imported from 3GU |
R4‑1915062 | Range length and probe layout considerations in 5G NR FR2 | Spirent Communications | imported from 3GU |
R4‑1915063 | On general time mask for NR V2X UE | OPPO | imported from 3GU |
R4‑1915064 | On switching time mask for different co-existence scenarios for NR V2X UE | OPPO | imported from 3GU |
R4‑1915065 | draft reply LS on UL and SL prioritization for NR-V2X | OPPO | imported from 3GU |
R4‑1915066 | On switching time for MIMO layer adaption on power saving | OPPO | imported from 3GU |
R4‑1915067 | On power saving RRM requirements | OPPO | imported from 3GU |
R4‑1915068 | Discussion on inter-frequency measurement requirement | OPPO | imported from 3GU |
R4‑1915069 | CR on requirements of NR interfrequency measurement (9.3.1) | OPPO | imported from 3GU |
R4‑1915070 | CR on requirements of NR interfrequency measurement (9.3.4,9,3,5) | OPPO | imported from 3GU |
R4‑1915071 | On Measurement capability of CSI-RS L3 measurement | OPPO | imported from 3GU |
R4‑1915072 | Sensitivity of PSP to UE position in test volume | Spirent Communications | imported from 3GU |
R4‑1915073 | TP on Minimum Range Lengths for NR FR1 MIMO OTA Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915074 | RTS Text Proposal for NR FR1 MIMO OTA | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915075 | On UL UBF for NR FR2 MIMO OTA | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915076 | On path delay grids for NR FR1 and FR2 channel models | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915077 | Channel Model Validation for FR1 MIMO OTA | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915078 | Channel Model Validation for FR2 MIMO OTA | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915079 | System Implementation of FR2 3D MPAC Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915080 | On White Box Testing | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915081 | On Relaxation of Low UL and High DL Test Cases | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915082 | On Minimizing Impact of Polarization Basis Mismatch | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1915083 | Revised WID: Rel16 LTE inter-band CA for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1915084 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in TS36101 | Qualcomm Incorporated | imported from 3GU |
R4‑1915085 | TR 36.716-02-01-030 Rel-16 2 Bands DL and 1 Band UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1915086 | Discussion on FR2 UE demodulation test methodology | Qualcomm Incorporated | imported from 3GU |
R4‑1915087 | Draft CR on TR38.810 for UE demudulation and CSI testing methodlogy | Qualcomm Incorporated | imported from 3GU |
R4‑1915088 | Consideration on environmental conditions for NR FR1 MIMO OTA | Qualcomm Incorporated | imported from 3GU |
R4‑1915089 | Draft CR for TS38.101-4: Angle of arrival for radiated UE demodulation testing | Qualcomm Incorporated | imported from 3GU |
R4‑1915090 | Views on UE orientations and test positions for FR2 MIMO OTA | Qualcomm Incorporated | imported from 3GU |
R4‑1915091 | Adding 64QAM RMC for NR FR2 MIMO OTA | Qualcomm Incorporated | imported from 3GU |
R4‑1915092 | Adding SDL to 38.307 | Dish Network | imported from 3GU |
R4‑1915093 | CR for Addition of test applicability rule for LTE HST CA test(Re-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915094 | Simulation results for LTE HST CA performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915095 | Simulation results for LTE HST single tap performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915096 | Discussion and simulation results for LTE HST BS demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915097 | CR for FeNB-IoT NPRACH TDD performance requirements for 36.104(Re-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915098 | CR for FeNB-IoT NPRACH TDD performance requirements for 36.104(Re-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915099 | CR for FeNB-IoT NPRACH TDD conformance testing for 36.141(Re-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915100 | CR for FeNB-IoT NPRACH TDD conformance testing for 36.141(Re-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915101 | Simulation results for FeNB-IoT NPRACH TDD | Huawei, HiSilicon | imported from 3GU |
R4‑1915102 | Discussion on FeNB-IoT NPRACH TDD performance requirements derivation | Huawei, HiSilicon | imported from 3GU |
R4‑1915103 | Summary of simulation results for FeNB-IoT NPRACH TDD formats | Huawei, HiSilicon | imported from 3GU |
R4‑1915104 | Discussion on LTE UE performance requirements for additional enhancements for NB-IOT | Huawei, HiSilicon | imported from 3GU |
R4‑1915105 | Discussion on LTE BS performance requirements for additional enhancements for NB-IOT | Huawei, HiSilicon | imported from 3GU |
R4‑1915106 | Discussion on intra-band contiguous CA performance requirements for FDD with minimum channel spacing | Huawei, HiSilicon | imported from 3GU |
R4‑1915107 | CR for intra-band contiguous CA performance requirements for FDD with minimum channel spacing | Huawei, HiSilicon | imported from 3GU |
R4‑1915108 | WF on intra-band contiguous CA performance requirements for FDD with minimum channel spacing | Huawei, HiSilicon | imported from 3GU |
R4‑1915109 | Simulation results for LTE-NR coexistence for TDD | Huawei, HiSilicon | imported from 3GU |
R4‑1915110 | Simulation results for NR FR1 normal CA UE performance requirements for FDD | Huawei, HiSilicon | imported from 3GU |
R4‑1915111 | Simulation results on NR FR1 normal CA UE performance requirements for TDD | Huawei, HiSilicon | imported from 3GU |
R4‑1915112 | Discsussion on NR normal CA performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915113 | draftCR: test structure for NR FR1 CA normal demodulation requirements for 4Rx | Huawei, HiSilicon | imported from 3GU |
R4‑1915114 | Discussion on the PUSCH performance requirements at 30% max throughput test point | Huawei, HiSilicon | imported from 3GU |
R4‑1915115 | Simulation results for NR FR2 PUSCH performance requirements with 2T2R and MCS12 | Huawei, HiSilicon | imported from 3GU |
R4‑1915116 | Discussion on NR Rel-15 left open issues for BS performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915117 | Discussion on transmission schemes for NR HST UE demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915118 | Discussion on network assistance and UE capability signaling for NR HST | Huawei, HiSilicon | imported from 3GU |
R4‑1915119 | Discussion and simulation results on NR UE HST performance requirements under SFN | Huawei, HiSilicon | imported from 3GU |
R4‑1915120 | Discussion and simulation results on NR UE HST performance requirements under single-tap | Huawei, HiSilicon | imported from 3GU |
R4‑1915121 | Discussion and simulation results on NR UE HST performance requirements under multi-path fading channel | Huawei, HiSilicon | imported from 3GU |
R4‑1915122 | Discussion and simulation results on NR BS HST performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915123 | Discussion on the UL timing adjustment | Huawei, HiSilicon | imported from 3GU |
R4‑1915124 | Discussion and simulation results for URLLC high reliability test feasibility | Huawei, HiSilicon | imported from 3GU |
R4‑1915125 | Discussion on URLLC UE demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915126 | Discussion on URLLC BS demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915127 | CR on demodulation performance requirements for EN-DC including FR1 and FR2 CCs | Huawei, HiSilicon | imported from 3GU |
R4‑1915128 | CR: Correction on NR PDCCH demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915129 | CR on CSI reporting requirements for EN-DC including FR1 and FR2 CCs | Huawei, HiSilicon | imported from 3GU |
R4‑1915130 | CR on NE-DC and NGEN-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915131 | CR on NR-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915132 | CR: Removal of the square brackets for uncertainty and TT for OTA tests in 38.141-2 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915133 | CR: Removal of the square brackets for uncertainty and TT for OTA tests in 38.141-2 (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915134 | CR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-1 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915135 | CR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-1 (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915136 | CR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-2 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915137 | CR: Updates to manufacture's declarations for demodulation requirements in TS 38.141-2 (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915138 | CR: Updates for PUCCH formats 3 and 4 performance requirements in TS 38.104 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915139 | CR: Updates for PUCCH formats 3 and 4 performance requirements in TS 38.104 (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915140 | CR: Updates for PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915141 | CR: Updates for PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915142 | CR: Updates for PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915143 | CR: Updates for PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915144 | Motivation of new SI on adding regular CBW and irregular BW for NR | Huawei, HiSilicon, Etisalat | imported from 3GU |
R4‑1915145 | New SID on adding regular CBW and irregular BW for NR | Huawei, HiSilicon, Etisalat | imported from 3GU |
R4‑1915146 | Motivation of new WID on supporting overlapping CA for LTE | Huawei, HiSilicon | imported from 3GU |
R4‑1915147 | New WID on supporting overlapping CA for LTE | Huawei, HiSilicon | imported from 3GU |
R4‑1915148 | On NRU UE Output power | LG Electronics Finland | imported from 3GU |
R4‑1915149 | Measurement accuracy simulation results for Rel-16 NR high speed train | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915150 | On NRU UE Spectrum emission mask | LG Electronics Finland | imported from 3GU |
R4‑1915151 | Further considerations on the interruption time for simultaneous Tx/Rx with the source and target cells | Apple | imported from 3GU |
R4‑1915152 | CR to TS 36.104: capturing agreements for PRACH high speed mode restricted set type B | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915153 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1915154 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1915155 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1915156 | Clarifications on RSSI and Channel Occupancy measurement requirements in LTE LAA | Qualcomm Incorporated | imported from 3GU |
R4‑1915157 | Connected mode channel quality report for UE category NB1 | Qualcomm Incorporated | imported from 3GU |
R4‑1915158 | MSG3-based channel quality report in non-anchor carrier for UE category NB1 | Qualcomm Incorporated | imported from 3GU |
R4‑1915159 | NB-IoT PUR transmit timing requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1915160 | Introduction of addition and release of NR PSCell operating with CCA in EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1915161 | Introduction of activation and deactivation delay requirements for SCells operating with CCA | Qualcomm Incorporated | imported from 3GU |
R4‑1915162 | Correction of subclause numbering and references in clause 5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915163 | Correction of reference in subclause 5.3.2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915164 | Correction of reference in subclause 5.3.2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915165 | Correction of reference in subclause 5.3.2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915166 | TP for TR 37.823: Correction to n90 frequency band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915167 | Simulation results and specification aspects for RSS based RSRP measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915168 | Draft LS on RSS based RSRP measurement performance in collision scenarios | Nokia | imported from 3GU |
R4‑1915169 | TA offset setting for NR coexistence with NB-IoT | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915170 | On channel quality reporting for NB-IoT in RRC connected mode | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915171 | On gNB measurement requirements for NR positioning | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915172 | System-level simulation results for RSTD in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915173 | CR to TS 36.141: capturing agreements on PRACH high speed mode restricted set type B | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915174 | On UE capabilities for NR DAPS | Qualcomm Incorporated | imported from 3GU |
R4‑1915175 | Draft reply to LS on UE capabilities on DAPS HO | Qualcomm Incorporated | imported from 3GU |
R4‑1915176 | On conditional PSCell addition and change | Qualcomm Incorporated | imported from 3GU |
R4‑1915177 | On DL PRS RSRP measurements for NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1915178 | On DL PRS RSTD measurements in NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1915179 | On UE capabilities for LTE DAPS | Qualcomm Incorporated | imported from 3GU |
R4‑1915180 | On measurement accuracy requirements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1915181 | On measurement requirements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1915182 | On MTC channel quality reporting | Qualcomm Incorporated | imported from 3GU |
R4‑1915183 | On gNB requirements for NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1915184 | Remaining issues on NB-IoT PUR | Qualcomm Incorporated | imported from 3GU |
R4‑1915185 | On PSCell addition and release delay requirements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1915186 | On reference point for timing related measurements in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1915187 | Remaining issues on MTC PUR | Qualcomm Incorporated | imported from 3GU |
R4‑1915188 | Simulation results for RSS-based RSRP measurements | Qualcomm Incorporated | imported from 3GU |
R4‑1915189 | On RSSI and channel occupancy measurements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1915190 | On SCell activation and deactivation requirements in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1915191 | On UE Rx-Tx time difference measurements for NR positioning | Qualcomm Incorporated | imported from 3GU |
R4‑1915192 | On UE-based positioning performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1915193 | system level simulation results for DL PRS side conditions | Qualcomm Incorporated | imported from 3GU |
R4‑1915194 | On impact of PRS on existing RRM requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1915195 | Remaining issues on RRM measurements in non-anchor carrier for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R4‑1915196 | On BWP switching requirements for NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1915197 | CR for 38.101-1: Making 90 MHz channel bandwidth mandatory for n41, n78 and n90 | Sprint Corporation | imported from 3GU |
R4‑1915198 | New SID: Efficient utilization of licensed spectrum that is not aligned with existing NR channel bandwidths | Sprint Corporation | imported from 3GU |
R4‑1915199 | Motivation for new SID on Efficient utilization of licensed spectrum that is not aligned with existing NR channel bandwidths | Sprint Corporation | imported from 3GU |
R4‑1915200 | Existing NR mechanisms for new channel bandwidths | Sprint Corporation | imported from 3GU |
R4‑1915201 | CR for 38.101-1: adding 30 MHz CHBW to NS_04 for n41 | Sprint Corporation | imported from 3GU |
R4‑1915202 | CR for 38.101-3: Clarification of the notation for intra-band EN-DC combinations | Sprint Corporation | imported from 3GU |
R4‑1915203 | Mirror CR for 38.101-3: Clarification of the notation for intra-band EN-DC combinations | Sprint Corporation | imported from 3GU |
R4‑1915204 | 29 dBm HPUE regulatory aspects | Sprint Corporation | imported from 3GU |
R4‑1915205 | 29 dBm HPUE Design factors including thermal and industrial design | Sprint Corporation | imported from 3GU |
R4‑1915206 | 29 dBm HPUE power class number and power tolerance | Sprint Corporation | imported from 3GU |
R4‑1915207 | Revised WID for 29 dBm HPUE | Sprint Corporation | imported from 3GU |
R4‑1915208 | Workplan for n26 | Sprint Corporation | imported from 3GU |
R4‑1915209 | Revised WID: Introduction of NR Band n26 | Sprint Corporation | imported from 3GU |
R4‑1915210 | BS demodulation simulation results of PRACH preamble restricted set type B for Rel-16 LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915211 | Draft LS reply on NR V2X S-SSB design | Intel Corporation | imported from 3GU |
R4‑1915212 | BS demodulation simulation results of PUSCH for Rel-16 LTE HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915213 | CR to TS 38.817-02: aligning TRP MU for CATR (subclause 12.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915214 | On CSI-RS measurement capability | Huawei, HiSilicon | imported from 3GU |
R4‑1915215 | TP for TR 38.888 on Footnote for 30MHz Channel Bandwidth in Band n28 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915216 | CR to TS 38.133: New common section with OTA related definitions for FR2 testing (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1915217 | CR to TS 38.133: New common section with OTA related definitions for FR2 testing (Rel-16) | Rohde & Schwarz | imported from 3GU |
R4‑1915218 | CR to TS 38.810: Quiet Zone validation for RRM testing | Rohde & Schwarz | imported from 3GU |
R4‑1915219 | CR to TS 38.133: Configuration of NR FR1 cell in NR FR1-FR2 tests (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1915220 | CR to TS 38.133: Configuration of NR FR1 cell in NR FR1-FR2 tests (Rel-16) | Rohde & Schwarz | imported from 3GU |
R4‑1915221 | CR to TS 38.133: Clarificatins to Antenna Configurations for FR2 (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1915222 | CR to TS 38.133: Clarificatins to Antenna Configurations for FR2 (Rel-16) | Rohde & Schwarz | imported from 3GU |
R4‑1915223 | CR to TS 38.133: Corrections to CORESET RMCs (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1915224 | CR to TS 38.133: Corrections to CORESET RMCs (Rel-16) | Rohde & Schwarz | imported from 3GU |
R4‑1915225 | CR to TS 38.133: Corrections to FR2 test configurations (Rel-15) | Rohde & Schwarz | imported from 3GU |
R4‑1915226 | CR to TS 38.133: Corrections to FR2 test configurations (Rel-16) | Rohde & Schwarz | imported from 3GU |
R4‑1915227 | CR to TS 38.171: Corrections to A-GNSS requirements with NR | Rohde & Schwarz | imported from 3GU |
R4‑1915228 | Discussion on TRP MU discrepancies for CATR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915229 | CR to 38.101-3-f70 Corrections to MSD Due to Cross-band Isolation for EN-DC in FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915230 | Discussion of angular misalignment and error analysis in peak based TRP measurement procedures | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915231 | CR to 38.101-3-g10 Corrections to MSD Due to Cross-band Isolation for EN-DC in FR1 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915232 | Editorial updates (section 9.4) | Ericsson | imported from 3GU |
R4‑1915233 | Editorial updates (section 9.4) | Ericsson | imported from 3GU |
R4‑1915234 | Correction in interruption requirements (section 8.2) | Ericsson, ZTE | imported from 3GU |
R4‑1915235 | Correction in interruption requirements (section 8.2) | Ericsson, ZTE | imported from 3GU |
R4‑1915236 | Editorial updates (Annex B) | Ericsson | imported from 3GU |
R4‑1915237 | Editorial updates (Annex B) | Ericsson | imported from 3GU |
R4‑1915238 | Editorial updates (36.133, section 8.19) | Ericsson | imported from 3GU |
R4‑1915239 | Editorial updates (36.133, section 8.19) | Ericsson | imported from 3GU |
R4‑1915240 | Further discussion on early measurements reporting in NR | Ericsson | imported from 3GU |
R4‑1915241 | On direct SCell activation in RRC resume | Ericsson | imported from 3GU |
R4‑1915242 | LS response on direct SCell activation in RRC resume | Ericsson | imported from 3GU |
R4‑1915243 | WF on RRM requirements | Ericsson | imported from 3GU |
R4‑1915244 | On RSSI and channel occupancy | Ericsson | imported from 3GU |
R4‑1915245 | On SCell activation delay | Ericsson | imported from 3GU |
R4‑1915246 | On active TCI state switching | Ericsson | imported from 3GU |
R4‑1915247 | On PSCell addition and release | Ericsson | imported from 3GU |
R4‑1915248 | On RLM in NR-U | Ericsson | imported from 3GU |
R4‑1915249 | RLM requirements in NR-U | Ericsson | imported from 3GU |
R4‑1915250 | On the impact of UL LBT on measurement reporting | Ericsson | imported from 3GU |
R4‑1915251 | On intra-frequency measurements in NR-U | Ericsson | imported from 3GU |
R4‑1915252 | On inter-frequency measurements in NR-U | Ericsson | imported from 3GU |
R4‑1915253 | On measurement reporting criteria | Ericsson | imported from 3GU |
R4‑1915254 | On reference point for UE timing related measurements | Ericsson | imported from 3GU |
R4‑1915255 | Response LS on reference point for UE timing related measurements | Ericsson | imported from 3GU |
R4‑1915256 | Updated system-level simulation results for PRS RSTD and RSRP | Ericsson | imported from 3GU |
R4‑1915257 | Link-level simulation assumptions for PRS RSTD and RSRP | Ericsson | imported from 3GU |
R4‑1915258 | UE measurements for OTDOA | Ericsson | imported from 3GU |
R4‑1915259 | UE measurements for multi-RTT | Ericsson | imported from 3GU |
R4‑1915260 | UE measurements for E-CID | Ericsson | imported from 3GU |
R4‑1915261 | On NR HST scenarios and configurations applicable for RRM requirements | Ericsson | imported from 3GU |
R4‑1915262 | CR to 38.101-3-g10 Merging close proximity and cross band isolation MSD clauses | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915263 | CR to TR 37.843: adding background information on angular alignment in subclause 10.8.4 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1915264 | CR to 38.101-1-f70 Corrections to Transient Time Masks | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915265 | CR to 38.101-1-g10 Corrections to Transient Time Masks | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915266 | EMC for MSR and AAS BS: Proposal for reduction of test configurations | Ericsson | imported from 3GU |
R4‑1915267 | Correction of limit for TX spurios BS type 1-H | Ericsson | imported from 3GU |
R4‑1915268 | Correction of limit for TX spurios BS type 1-H | Ericsson | imported from 3GU |
R4‑1915269 | Corrections of references in measurement uncertainty table | Ericsson | imported from 3GU |
R4‑1915270 | Corrections of references in measurement uncertainty table | Ericsson | imported from 3GU |
R4‑1915271 | Corrections of references in measurement uncertainty table | Ericsson | imported from 3GU |
R4‑1915272 | Corrections of references in measurement uncertainty table | Ericsson | imported from 3GU |
R4‑1915273 | Clarification for the number of interfering signals | Ericsson | imported from 3GU |
R4‑1915274 | Clarification for the number of interfering signals | Ericsson | imported from 3GU |
R4‑1915275 | Clarification for the number of interfering signals | Ericsson | imported from 3GU |
R4‑1915276 | Clarification for the number of interfering signals | Ericsson | imported from 3GU |
R4‑1915277 | Editorial corrections | Ericsson | imported from 3GU |
R4‑1915278 | Editorial corrections | Ericsson | imported from 3GU |
R4‑1915279 | Editorial corrections | Ericsson | imported from 3GU |
R4‑1915280 | Editorial corrections | Ericsson | imported from 3GU |
R4‑1915281 | Alignement of testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1915282 | Correction on testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1915283 | Correction on testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1915284 | Removal of FFS and brackets in RF requirements | Ericsson | imported from 3GU |
R4‑1915285 | Removal of FFS and brackets in RF requirements | Ericsson | imported from 3GU |
R4‑1915286 | Removal of FFS and brackets in RF requirements | Ericsson | imported from 3GU |
R4‑1915287 | Removal of FFS and brackets in RF requirements | Ericsson | imported from 3GU |
R4‑1915288 | Correction on testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1915289 | Correction on testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1915290 | Proposal for EVM measurement interval to include symbols with transient period | Qualcomm Inc. | imported from 3GU |
R4‑1915291 | CR to TR 37.843: Removing square brackets in TRP MU for CATR in subclause 10.4 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915292 | CR to 38.101-2-g10 Corrections to maximum output power reduction for power class 3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915293 | CR: Updates to NR RMC for UE performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915294 | CR: Updates to NR EN-DC SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑1915295 | Discussions on RRM impact of NR UE power saving | Ericsson | imported from 3GU |
R4‑1915296 | Proposal for DFT-S-OFDM Transient Period Capability Requirements and testability | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915297 | On S-SSB Transient Period | Futurewei | imported from 3GU |
R4‑1915298 | Proposal for CP-OFDM Transient Period Capability Requirements and testability | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915299 | Proposal on Transient Period Signaling Values | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915300 | Refinements to Region 1 Extension for Power Class 3 Operation in FR2 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915301 | Values for Transient period capability | Qualcomm Inc. | imported from 3GU |
R4‑1915302 | [DRAFT] Reply LS to RAN1 on NR V2X S-SSB design | Futurewei | imported from 3GU |
R4‑1915303 | CR for transient period capability | Qualcomm Inc. | imported from 3GU |
R4‑1915304 | On UL-SL Prioritization | Futurewei | imported from 3GU |
R4‑1915305 | [DRAFT] Reply LS to RAN2 on UL-SL Prioritization | Futurewei | imported from 3GU |
R4‑1915306 | CR for TR 38.810: editorial changes | Intel Corporation | imported from 3GU |
R4‑1915307 | CR for TS 38.101-2: power classes and maxUplinkDutyCycle-FR2 | Intel Corporation | imported from 3GU |
R4‑1915308 | CR for TS 38.101-2: power classes and maxUplinkDutyCycle-FR2 | Intel Corporation | imported from 3GU |
R4‑1915309 | Transient period between S-PSS and S-SSS transmissions for V2X | Qualcomm Inc. | imported from 3GU |
R4‑1915310 | Draft TR37.824 v0.3.0 Coexistence between NB-IoT and NR | Futurewei | imported from 3GU |
R4‑1915311 | Switching and interruption times for MIMO only change | Qualcomm Inc. | imported from 3GU |
R4‑1915312 | Views on dynamic spectrum sharing between LTE band 48 and NR band n48 | Google Inc. | imported from 3GU |
R4‑1915313 | UE capability of requiring no guard period for SRS with frequency hopping and antenna switching | Qualcomm Inc. | imported from 3GU |
R4‑1915314 | Reply LS on UE capability of requiring no guard period for SRS with frequency hopping and antenna switching | Qualcomm Inc. | imported from 3GU |
R4‑1915315 | TP to TR38.831: RF requirement Update from DL Intra-band CA BW Enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1915316 | On FR2 Initial access beam correspondence | Qualcomm Incorporated | imported from 3GU |
R4‑1915317 | On UE to UE Coexistence study of NR V2X at 5.9GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1915318 | On reference point for base station timing related measurements | Ericsson LM | imported from 3GU |
R4‑1915319 | MSD and MPR for ULSUP FDM combinations | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915320 | Revised WI: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915321 | TR 36.716-04-01 v0.7.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915322 | Introduction of channel spacing between E-UTRA and NR carriers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915323 | Introduction of channel spacing between E-UTRA and NR carriers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915324 | Introduction of channel spacing between E-UTRA and NR carriers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915325 | Introduction of channel spacing between E-UTRA and NR carriers | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915326 | Narrowband blocking corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915327 | Narrowband blocking corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915328 | Narrowband blocking corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915329 | Narrowband blocking corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915330 | CS17 corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915331 | CS17 corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915332 | NB-IoT corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915333 | NB-IoT corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915334 | NB-IoT corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915335 | NB-IoT corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915336 | Draft Response LS on reference point for base station timing related measurements | Ericsson LM | imported from 3GU |
R4‑1915337 | CR on 38133 for MRTD and MTTD in intra-band EN-DC | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1915338 | CR on 38133 for MRTD and MTTD in intra-band EN-DC | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1915339 | Proposal for Improved B41/n41 EN-DC A-MPR Curves | SPRINT Corporation | imported from 3GU |
R4‑1915340 | TP to TR 38.887 on BS specific RF requirements | Ericsson | imported from 3GU |
R4‑1915341 | updated draft TR 38.887 on introduction of band n259 | Ericsson | imported from 3GU |
R4‑1915342 | TP to TR 38.887 on BS specific RF requirements | Ericsson | imported from 3GU |
R4‑1915343 | updated draft TR 38.887 on introduction of band n259 | Ericsson | imported from 3GU |
R4‑1915344 | BS specific RF requirements for Band n259 | Ericsson | imported from 3GU |
R4‑1915345 | Discussion on the practical outcome of Multiband relaxation in certification | Ericsson | imported from 3GU |
R4‑1915346 | CR to 38.101-3 on uplink power control for non synchronous NR-DC between FR1 and FR2 | Ericsson | imported from 3GU |
R4‑1915347 | CR to 38.101-3 on only synchronous NR-DC between FR1 and FR2 support in Rel-15 | Ericsson | imported from 3GU |
R4‑1915348 | draftCR to 38.104 on introduction of band n46 | Ericsson | imported from 3GU |
R4‑1915349 | draftCR to 38.101-1 on introduction of band n46 | Ericsson | imported from 3GU |
R4‑1915350 | On NR-V2X UE RF requirements. | Huawei, HiSilicon | imported from 3GU |
R4‑1915351 | On transient period for S-SSB | Huawei, HiSilicon | imported from 3GU |
R4‑1915352 | Draft reply LS on NR V2X S-SSB design | Huawei, HiSilicon | imported from 3GU |
R4‑1915353 | UE RF requirements for n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1915354 | TP for TR38.887 UE RF requirements for n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1915355 | Consideration on eMIMO full power transmission | Huawei, HiSilicon | imported from 3GU |
R4‑1915356 | On Pi/2 BPSK DMRS | Huawei, HiSilicon | imported from 3GU |
R4‑1915357 | On EN-DC power class | Huawei, HiSilicon | imported from 3GU |
R4‑1915358 | Draft reply LS on BCS reporting for EN-DC BC | Huawei, HiSilicon | imported from 3GU |
R4‑1915359 | CR for 38.101-3 Correction of EN-DC BCS | Huawei, HiSilicon | imported from 3GU |
R4‑1915360 | CR for 38.101-3 Correction of EN-DC BCS | Huawei, HiSilicon | imported from 3GU |
R4‑1915361 | draft reply LS on DC location | Huawei, HiSilicon | imported from 3GU |
R4‑1915362 | Draft reply LS on UE capability of guard period for SRS with frequency hopping and antenna switching | Huawei, HiSilicon | imported from 3GU |
R4‑1915363 | On new SRS requirements for LTE eMIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1915364 | Introduction of completed LTE CA for 2 bands DL with 2 bands UL into Rel-16 TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1915365 | Revised WID for LTE inter-band CA for 2 bands DL with 2 bands UL | Huawei, HiSilicon | imported from 3GU |
R4‑1915366 | CR for 38.101-1 power class and configure transmitted power | Huawei, HiSilicon | imported from 3GU |
R4‑1915367 | On transient period UE capability | Huawei, HiSilicon | imported from 3GU |
R4‑1915368 | On switching time for MIMO layer/antenna number adaption | Huawei, HiSilicon | imported from 3GU |
R4‑1915369 | On FR2 UE demodulation and CSI testing methodology | Huawei, HiSilicon | imported from 3GU |
R4‑1915370 | On power class and configured transmit power | Huawei, HiSilicon | imported from 3GU |
R4‑1915371 | On beam correspondence for Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1915372 | CR for 38.101-3 correction for intra-band EN-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1915373 | CR for 38.101-3 intra-band EN-DC MPR/AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1915374 | CR for 38.101-2 on NS_202 band defintion | Huawei, HiSilicon | imported from 3GU |
R4‑1915375 | CR for 38.101-2 draft CR on side condition for BC | Huawei, HiSilicon | imported from 3GU |
R4‑1915376 | CR for 38.101-2 on MPE enhancement on FR2 Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1915377 | Introduction of completed R16 3DL band combinations to TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1915378 | CR for 36.101 UE-to-UE coexistence for V2X_v16 | Huawei, HiSilicon | imported from 3GU |
R4‑1915379 | CR for 36.101 UE-to-UE coexistence for V2X _v15 | Huawei, HiSilicon | imported from 3GU |
R4‑1915380 | CR for 36.101 UE-to-UE coexistence for V2X_v14 | Huawei, HiSilicon | imported from 3GU |
R4‑1915381 | On intra-band DL CA requirement for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1915382 | On inter-band CA for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1915383 | On MPE enhancement for Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1915384 | TP for TR 38.820: scope of NR UE RF | Huawei, HiSilicon | imported from 3GU |
R4‑1915385 | TP for TR 38.820: UE RF Tx requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1915386 | TP for TR 38.820: UE RF testability | Huawei, HiSilicon | imported from 3GU |
R4‑1915387 | Revised WID for LTE inter-band CA for 3 bands DL with 1 bands UL | Huawei, HiSilicon | imported from 3GU |
R4‑1915388 | CR for intra-band DL contiguous CA RF requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915389 | CR for intra-band UL CA RF requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915390 | On EIS test metric_Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1915391 | On intra-band UL CA MPR_FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1915392 | CR on 38133 CGI reading of LTE cell in EN-DC and NE-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915393 | CR on 36133 CGI reading of LTE cell in EN-DC and NE-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915394 | Clarifications on LTE-LAA RSSI and Channel Occupancy measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915395 | Clarifications on LTE-LAA RSSI and Channel Occupancy measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915396 | Clarifications on LTE-LAA RSSI and Channel Occupancy measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915397 | Clarifications on LTE-LAA RSSI and Channel Occupancy measurement requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915398 | DC_(n)41 and DC_41_n41 Data in support for MPR&R Improvements | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915399 | Rx image for FR1 NR intra-band CA and intra-band EN-DC | NTT DOCOMO INC. | imported from 3GU |
R4‑1915400 | Experimental Measurements for n26 20MHz CBW REFSENS | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915401 | On Tx DC location | Huawei, HiSilicon | imported from 3GU |
R4‑1915402 | Discussion on early measurement reporting | Qualcomm Incorporated | imported from 3GU |
R4‑1915403 | Discussion on BWP switch for multiple cells | Qualcomm Incorporated | imported from 3GU |
R4‑1915404 | Discussion on interruptions during SRS carrier switching | Qualcomm Incorporated | imported from 3GU |
R4‑1915405 | Discussion on mandatory measurement gaps | Qualcomm Incorporated | imported from 3GU |
R4‑1915406 | Discussion on requirements for inter-frequency measurements without gap | Qualcomm Incorporated | imported from 3GU |
R4‑1915407 | Discussion on multiple SCell activation | Qualcomm Incorporated | imported from 3GU |
R4‑1915408 | Discussion on intra and inter-frequency definition for CSI-RS based RRM measurements | Qualcomm Incorporated | imported from 3GU |
R4‑1915409 | CR for MAC-CE based TCI State switch for ENDC (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1915410 | CR for MAC-CE based TCI State switch for NR SA (Section A.7.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1915411 | CR for RRC based TCI State switch for NR SA (Section A.7.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1915412 | CR for RRC based TCI State switch for EN-DC (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1915413 | CR for FR1 handover test cases (Section A.6.3.1.1, A.6.3.1.2, A.6.3.1.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1915414 | CR on MTTD for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1915415 | MTTD For Intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1915416 | Handling of New Channel Bandwidths | Qualcomm Incorporated | imported from 3GU |
R4‑1915417 | WF on FR1 UE RF requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1915418 | Draft CR for Frequency Awareness in MPR for intra-band EN-DC | SPRINT Corporation | imported from 3GU |
R4‑1915419 | NR V2X Operating Scenarios | Vodafone | imported from 3GU |
R4‑1915420 | System-level simulation results for RSTD in NR | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915421 | Rel-16 Spherical coverage enhancement | NTT DOCOMO INC. | imported from 3GU |
R4‑1915422 | TP for TR 36.716-03-01 for 3DL/1UL CA_2-7-13, CA_7-13-66 | Huawei, HiSilicon, TELUS, Bell Mobility | imported from 3GU |
R4‑1915423 | TP for TR 36.716-02-01 for 2DL/1UL CA_7-13, CA_2-13 | TELUS | imported from 3GU |
R4‑1915424 | n259 UE spherical coverage: preliminary estimate | Qualcomm Incorporated | imported from 3GU |
R4‑1915425 | TP for TR 36.716-02-01 for 2DL/1UL CA_7-13, CA_2-13 | Huawei, HiSilicon, TELUS, Bell Mobility | imported from 3GU |
R4‑1915426 | TP for TR 36.716-04-01 for 4DL/1UL CA_2-7-13-66 | Huawei, HiSilicon, TELUS, Bell Mobility | imported from 3GU |
R4‑1915427 | Missing Requirements for Dynamic Power Sharing | Motorola Mobility España SA | imported from 3GU |
R4‑1915428 | Further consideration about HPUE LTE FDD + TDD NR | NTT DOCOMO INC. | imported from 3GU |
R4‑1915429 | Experimental measurements for n1 40MHz REFSENS and n34 protection | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915430 | V2X RF considerations | Qualcomm Incorporated | imported from 3GU |
R4‑1915431 | Experimental measurements for n28 30MHz REFSENS | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915432 | Correction to the starting point of the DRX cycle length interval | ZTE Corporation | imported from 3GU |
R4‑1915433 | CR to 36.101 to revise LTE CA_NS_04 AMPR for BW class D | Qualcomm Incorporated | imported from 3GU |
R4‑1915434 | CR to 38.101-1: TX EVM for UL MIMO condition change | Qualcomm Incorporated | imported from 3GU |
R4‑1915435 | CR for TS 38.104 on removal of SCS based channel raster for n90 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915436 | CR for TS 38.101-1 on removal of SCS based channel raster for n90 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915437 | CR for 38.141-1 Conducted test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915438 | CR for 38.141-1 Conducted test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915439 | CR for TS 38.141-2 Radiated test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915440 | CR for TS 38.141-2 Radiated test requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915441 | CR for 38.104: Performance requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915442 | CR for 38.104: Performance requirements for NR PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915443 | CR for 38.104: Performance requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915444 | CR for 38.104: Performance requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915445 | CR for 38.141-1 Conducted test requirements for NR multi-slot PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915446 | CR for 38.141-1 Conducted test requirements for NR multi-slot PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915447 | CR for TS 38.141-2 Radiated test requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915448 | CR for TS 38.141-2 Radiated test requirements for NR multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1915449 | Correction of Note number in Table 5.6.1-1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915450 | CR on handover 36.133 -R16 | MediaTek inc. | imported from 3GU |
R4‑1915451 | CR on the BWP switch test cases EN-DC FR1 (section A.4.5.6) | MediaTek inc. | imported from 3GU |
R4‑1915452 | CR on the BWP switch test cases EN-DC FR2 (section A.5.5.6) | MediaTek inc. | imported from 3GU |
R4‑1915453 | CR on the BWP switch test cases SA FR1 (section A.6.5.6) | MediaTek inc. | imported from 3GU |
R4‑1915454 | CR on the BWP switch test cases SA FR2 (section A.7.5.6) | MediaTek inc. | imported from 3GU |
R4‑1915455 | CR on the BWP switch test cases EN-DC FR1 (section A.4.5.6) | MediaTek inc. | imported from 3GU |
R4‑1915456 | CR on the BWP switch test cases EN-DC FR2 (section A.5.5.6) | MediaTek inc. | imported from 3GU |
R4‑1915457 | CR on the BWP switch test cases SA FR1 (section A.6.5.6) | MediaTek inc. | imported from 3GU |
R4‑1915458 | CR on the BWP switch test cases SA FR2 (section A.7.5.6) | MediaTek inc. | imported from 3GU |
R4‑1915459 | CR on correction of NR UCI on PUSCH radiated performance requirements (Rel-15) for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1915460 | CR on NR SRS carrier switching interruption in TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915461 | CR for NR RRM requirements for handover with simultaneous Rx/Tx | Intel Corporation | imported from 3GU |
R4‑1915462 | CR for NR RRM requirements for conditional handover | Intel Corporation | imported from 3GU |
R4‑1915463 | CR on handover RRM requirement (section 6.1.1.5) (R15) | Intel Corporation | imported from 3GU |
R4‑1915464 | CR on test cases for EN-DC FR2 inter-frequency measurement (section A.5.6.2) (R15) | Intel Corporation | imported from 3GU |
R4‑1915465 | CR on test cases for SA FR2 inter-frequency measurement (section A.7.6.2) (R15) | Intel Corporation | imported from 3GU |
R4‑1915466 | CR on test cases for Redirection from NR in FR2 to NR in FR2 (section A.7.3.2.3) (R15) | Intel Corporation | imported from 3GU |
R4‑1915467 | CR on test cases for FR2 handover (section A.7.3.1) (R15) | Intel Corporation | imported from 3GU |
R4‑1915468 | CR to TS 38.101-2 Editorial error correction (R16) | Intel Corporation | imported from 3GU |
R4‑1915469 | CR on corrections for MIMO Correlation Matrices | Qualcomm Incorporated | imported from 3GU |
R4‑1915470 | CR on corrections for FR1 PDSCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1915471 | CR on corrections for FR2 PDSCH demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1915472 | CR on corrections for FR1 CSI Reporting performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1915473 | CR on corrections for FR2 CSI Reporting performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑1915474 | CR to TS 38.101-2 on beam correspondence side condition applicability | Samsung | imported from 3GU |
R4‑1915475 | CR to 38.101-2 on FR2 frequency separation class enhancement | Apple Inc. | imported from 3GU |
R4‑1915476 | CR to 38.101-3: clarification of ENDC power class in R16 | vivo | imported from 3GU |
R4‑1915477 | CR to TS 38.141-1: Corrections to BS classes and transmit configurations | CMCC | imported from 3GU |
R4‑1915478 | CR to TS 38.141-2: Update to Table C.1-2 FR2 OTA transmitter tests | CMCC | imported from 3GU |
R4‑1915479 | CR to TS 37.104: Correction to Tx transient period of MSR | CMCC | imported from 3GU |
R4‑1915480 | CR to TS 37.104: Correction to Tx transient period of MSR | CMCC | imported from 3GU |
R4‑1915481 | CR to TS 37.141: Corresponding mirror CR on Tx transient period of MSR | CMCC | imported from 3GU |
R4‑1915482 | CR to TS 37.141: Corresponding mirror CR on Tx transient period of MSR | CMCC | imported from 3GU |
R4‑1915483 | CR for TS38.104: Corrections on channel bandwdith for band n34 | ZTE Corporation | imported from 3GU |
R4‑1915484 | CR to TS38.104: Editorial corrections | ZTE Corporation | imported from 3GU |
R4‑1915485 | CR to TS38.101-3: Correction on channel spacing for intra-band EN-DC carriers (section 5.4B.1) | ZTE Corporation | imported from 3GU |
R4‑1915486 | CR to TS 38.101-1: Replace CBW with symbols defined in the specification | ZTE Corporation | imported from 3GU |
R4‑1915487 | CR to TS 38.101-2: Correctin on CA NRACLR | ZTE Corporation | imported from 3GU |
R4‑1915488 | CR to TS 38.101-2: Correctin on FInterferer (offset) for CA ACS | ZTE Corporation | imported from 3GU |
R4‑1915489 | CR for TS38.104: Introduce new wider channel bandwidth for band n28 | ZTE Corporation | imported from 3GU |
R4‑1915490 | Adding Band40 for UE category 1bis into Rel-16 TS 36.101 | CMCC | imported from 3GU |
R4‑1915491 | CR for REL-16 TS36.307 for adding B40 to UE category 1bis | CMCC | imported from 3GU |
R4‑1915492 | CR to 37.104 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1915493 | CR to 37.141 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1915494 | CR to 37.105 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1915495 | CR to 37.145-1 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1915496 | CR to 37.145-2 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1915497 | CR to remove square brackets for n90 in TS38.104 | CMCC | imported from 3GU |
R4‑1915498 | Updates to PRACH requirements in TS 38.104 for Rel-15 | CATT | imported from 3GU |
R4‑1915499 | Updates to PRACH conducted tests in TS 38.141-1 for Rel-15 | CATT | imported from 3GU |
R4‑1915500 | Updates to PRACH OTA tests in TS 38.141-2 for Rel-15 | CATT | imported from 3GU |
R4‑1915501 | CR for TS38.104: Introduce PUSCH performance requirements at 30% throughput testing point | CATT | imported from 3GU |
R4‑1915502 | CR for TS38.141-1: Introduce PUSCH performance requirements at 30% throughput testing point | CATT | imported from 3GU |
R4‑1915503 | CR for TS38.141-2: Introduce PUSCH performance requirements at 30% throughput testing point | CATT | imported from 3GU |
R4‑1915504 | CR for TS38.141-1: correction on NR TM1.1 | CATT | imported from 3GU |
R4‑1915505 | UE co-existence reuiqrements for band n28 into 38.101-3 | CATT, CBN | imported from 3GU |
R4‑1915506 | CR: RRM core requirement for 5G broadcast | Qualcomm Incorporated | imported from 3GU |
R4‑1915507 | Designation of new bandwidths to a legacy band | Qualcomm Incorporated | imported from 3GU |
R4‑1915508 | CR to TS 38.101-2 on corrections to intra-band contiguous CA for band n258 (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1915509 | CR to TS 38.101-3 on inter-band EN-DC configurations including FR2 for five bands (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1915510 | CR to TS 38.101-3 on corrections to delta TIB for EN-DC (Rel-15) | ZTE Corporation | imported from 3GU |
R4‑1915511 | CR on measurement delay requirements for LTE HST in TS36.133 (section 4.2.2.3) | CMCC | imported from 3GU |
R4‑1915512 | CR on inter-RAT measurement in TS38.133 (section 9.4.2, 9.4.3) | CMCC | imported from 3GU |
R4‑1915513 | CR on inter-RAT measurement in TS38.133 (section 9.4.2, 9.4.3) | CMCC | imported from 3GU |
R4‑1915514 | CR on E-UTRA Inter-frequency Measurements when Configured with E-UTRA-NR Dual Connectivity Operation in TS36.133 (section 8.17.3) | CMCC | imported from 3GU |
R4‑1915515 | CR on E-UTRA Inter-frequency Measurements when Configured with E-UTRA-NR Dual Connectivity Operation in TS36.133 (section 8.17.3) | CMCC | imported from 3GU |
R4‑1915516 | CR for Abbreviations for cross link interference (section 3) | LG Electronics Inc. | imported from 3GU |
R4‑1915517 | CR for cross link interference measurements (section 9) | LG Electronics Inc. | imported from 3GU |
R4‑1915518 | CR for conditions for cross link interference measurements (section B) | LG Electronics Inc. | imported from 3GU |
R4‑1915519 | EN-DC grouping correction for FR1 only configurations REL-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915520 | Introduction of almost contiguous MPR for PC2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915521 | CR to 38.141-2: OTA ACLR (6.7.3) | NEC | imported from 3GU |
R4‑1915522 | CR to 38.141-2: OTA receiver intermodulation procedure (7.8) | NEC | imported from 3GU |
R4‑1915523 | CR to 38.141-2: OTA transmitter spurious emissions (6.7) | NEC | imported from 3GU |
R4‑1915524 | CR to 38.141-2: OTA receiver spurious emissions (7.7) | NEC | imported from 3GU |
R4‑1915525 | CR for SCell activation delay in FR2 | MediaTek inc. | imported from 3GU |
R4‑1915526 | CR for scheduling restriction due to L1-RSRP measurement | MediaTek inc. | imported from 3GU |
R4‑1915527 | CR on SSB based RLM test cases for EN-DC FR2 (Section A.5.5.1) | MediaTek inc. | imported from 3GU |
R4‑1915528 | CR on SSB based RLM test cases for SA FR2 (Section A.7.5.1) | MediaTek inc. | imported from 3GU |
R4‑1915529 | CR for asynchronous operation for NR CA n78-n79 | NTT DOCOMO INC. | imported from 3GU |
R4‑1915530 | CR for asynchronous operation for NR CA n78-n79 | NTT DOCOMO INC. | imported from 3GU |
R4‑1915531 | CR for correction on NW signalling architecture of NS value in TS 38.101-1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1915532 | CR for correction on NW signalling architecture of NS value in TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1915533 | Removal of contradicting fall-back specification for intra-band non-contigous CA/DC | Ericsson | imported from 3GU |
R4‑1915534 | CR for agreed MPR CA for FR2 intra-band contiguous | NTT DOCOMO INC. | imported from 3GU |
R4‑1915535 | CR for agreed MPR CA for FR2 intra-band contiguous | NTT DOCOMO INC. | imported from 3GU |
R4‑1915536 | CR for TS 38.101-3: MSD due to cross band isolation | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1915537 | CR to TS 38.113 Add the transmitter exclusion band for NR BS(subclause 4.4.1) | ZTE Corporation | imported from 3GU |
R4‑1915538 | CR to TS 38.113 Correction on abbreviations(subclause 3.3 & 8.2.1.2) | ZTE Corporation | imported from 3GU |
R4‑1915539 | CR to TS 38.113 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1915540 | CR to TS 38.113 Editorial Corrections(clause 2 & subclause 3.1)_r1 | ZTE Corporation | imported from 3GU |
R4‑1915541 | CR for TS 38.101-3: Additional out-of-band blocking exceptions for inter-band EN-DC | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1915542 | CR for TS 38.101-3: Additional out-of-band blocking exceptions for inter-band EN-DC | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1915543 | CR to TS 37.145-2: Requirement set applicability | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915544 | CR to 37.141: Update of procedure in Modulation quality test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915545 | CR to 38.141-1 additional updates on clarification for NR TM1.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915546 | CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1915547 | CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1915548 | CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1915549 | CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1915550 | CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1915551 | Correction to BWP switching delay | Huawei, Hisilicon | imported from 3GU |
R4‑1915552 | Correction to PRACH configuration index in test cases | Huawei, Hisilicon | imported from 3GU |
R4‑1915553 | CR to 38.133 CSI-RS based intra-frequency and inter-frequency measurements definition | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915554 | Correction to S-measure threshold applicability in IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915555 | CR for 38133 editorial for section 8.1,8.8,8.9,8.10,8.11 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915556 | CR for 38133 editorial for section 8.5 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915557 | CR for 38133 editorial for section 9.3 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915558 | CR for 36133 editorial for section 7.6 and 7.31 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915559 | CR for 36133 editorial for section 8.1.2.4 and 8.17.4 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915560 | CR on 38133 for removal the duplicated reference in section 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915561 | CR on 38133 for section 11 in Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915562 | CR on TC of UE transmit timing (A.4.4.1.1, A.5.4.1.1, A.6.4.1.1, A.7.4.1.1) Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915563 | CR to TS 37.145-2: Additional information about alignment needed for TRP measurements in Annex F.1 | Ericsson | imported from 3GU |
R4‑1915564 | CR to TS 38.141-1: Random data content for NR BS Test Models | Ericsson | imported from 3GU |
R4‑1915565 | CR to TS 38.141-1: Random data content for NR BS Test Models | Ericsson | imported from 3GU |
R4‑1915566 | CR to TS 38.141-2: Random data content for NR BS Test Models | Ericsson | imported from 3GU |
R4‑1915567 | CR to TS 38.141-2: Random data content for NR BS Test Models | Ericsson | imported from 3GU |
R4‑1915568 | CR to TS 38.141-1: Correcting TM 3.3 Definition | Ericsson, Keysight | imported from 3GU |
R4‑1915569 | CR to TS 38.141-1: Correcting TM 3.3 Definition | Ericsson, Keysight | imported from 3GU |
R4‑1915570 | CR to TS 38.141-1: Editoral Changes of NR TM Power Balancing Readability | Ericsson | imported from 3GU |
R4‑1915571 | CR to TS 38.141-1: Editoral Changes of NR TM Power Balancing Readability | Ericsson | imported from 3GU |
R4‑1915572 | CR to TS 38.141-2: EVM level added for 256 QAM | Ericsson | imported from 3GU |
R4‑1915573 | CR to TS 38.104: EVM level added for 256 QAM | Ericsson | imported from 3GU |
R4‑1915574 | CR to 38.141-2: Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1915575 | MRTD and MTTD requirements for asynchronous NR-NR DC | Ericsson | imported from 3GU |
R4‑1915576 | Editorial corrections to measurement accuracy tests | Ericsson | imported from 3GU |
R4‑1915577 | Editorial corrections to measurement accuracy tests | Ericsson | imported from 3GU |
R4‑1915578 | Corrections to SS-RSRQ and SS-SINR OTA tests with EN-DC | Ericsson | imported from 3GU |
R4‑1915579 | Editorial corrections to section 9.2 | Ericsson | imported from 3GU |
R4‑1915580 | Editorial corrections to section 9.2 | Ericsson | imported from 3GU |
R4‑1915581 | Introduction of bandwidth limited OCNG for OTA testing | Ericsson | imported from 3GU |
R4‑1915582 | Requirements for conditional handover and conditional PSCell change in NR | Ericsson | imported from 3GU |
R4‑1915583 | Addition of LTE CGI reading requirements in NE-DC and EN-DC for 36.133 | Ericsson | imported from 3GU |
R4‑1915584 | Requirements for conditional handover and conditional PSCell change in LTE | Ericsson | imported from 3GU |
R4‑1915585 | CR Frame averaging for EVM Annex B and C in TS 38.104 | Futurewei | imported from 3GU |
R4‑1915586 | CR to 38.101-3 to remove duplicate combinations | Ericsson | imported from 3GU |
R4‑1915587 | CR to 38.101-3 to add missing ?TIB and ?RIB values for DC_12-30_n66 | Ericsson | imported from 3GU |
R4‑1915588 | Applicability of relaxed neighbour cell monitoring for category M1/M2 | Ericsson | imported from 3GU |
R4‑1915589 | Correction of feMTC test cases | Ericsson | imported from 3GU |
R4‑1915590 | Cat-1bis clarification to RSRQ measurements | Sequans Communications, Ericsson | imported from 3GU |
R4‑1915591 | CR to TS 37.145-2 - reverberation chamber in-band TRP procedures | Huawei | imported from 3GU |
R4‑1915592 | CR on numerology switching delay and interruptions requirements with FeMBMS for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1915593 | CR on cell phase synchronization accuracy for MBMS services for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1915594 | CR on MBSFN RSRP report mapping with new numerology for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1915595 | CR on MBSFN RSRQ report mapping with new numerology for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1915596 | CR on MBSFN Measurements in idle mode for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1915597 | CR on MBSFN Measurements in connected mode for LTE-based 5G broadcast | Huawei, HiSilicon | imported from 3GU |
R4‑1915598 | CR on one-shot timing adjustment requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915599 | CR on interruption requirements due to one-shot timing adjustment | Huawei, HiSilicon | imported from 3GU |
R4‑1915600 | CR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1915601 | CR on correcting CSI-RS based BFD and link recovery tests for SA in FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1915602 | CR on correcting CSI-RS based BFD and link recovery tests for EN-DC in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1915603 | CR on correcting CSI-RS based BFD and link recovery tests for SA in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1915604 | CR on introducing DAPS handover requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915605 | CR on introducing conditional handover requirements in TS38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915606 | CR on introducing UE sidelink timing requirements for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1915607 | CR on introducing L1-SINR mapping in TS38.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1915608 | CR on delay uncertainty of RRC Release with redirection requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915609 | CR on known condition of PSCell addition requirement in NE-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1915610 | CR on known condition of PSCell addition requirement in NR DC | Huawei, HiSilicon | imported from 3GU |
R4‑1915611 | CR on RRC Re-establishment requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915612 | CR on scope of interruption requirements of EN-DC in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915613 | CR on scope of MTTD requirements in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915614 | CR on SSB-based RLM test case for EN-DC FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1915615 | CR on SSB-based RLM test case for NR SA FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1915616 | Editorial CR on section 8.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1915617 | CR on Active TCI state switching Requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1915618 | CR on NR inter-frequency identification | Huawei, HiSilicon | imported from 3GU |
R4‑1915619 | CR on NR intra-frequency measurements | Huawei, HiSilicon | imported from 3GU |
R4‑1915620 | CR for introduction of RRC_INACTIVE state moblity requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1915621 | CR for introduction of RRC_IDLE state moblity requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1915622 | CR for introduction of Intra-frequency measurements without measurement gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1915623 | CR for introduction of Intra-frequency measurements with measurement gaps | Huawei, HiSilicon | imported from 3GU |
R4‑1915624 | CR for introduction of Intra-frequency measurements requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1915625 | CR for introduction of Interruption due to Active BWP switching Requirements in SA for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1915626 | CR for introduction of Interruption due to Active BWP switching Requirements in NR-DC for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1915627 | CR for introduction of Interruption due to Active BWP switching Requirements in EN-DC for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1915628 | CR for introduction of Active TCI state switching delay with CCA Requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1915629 | CR for introduction of Active BWP switching delay requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1915630 | CR on UE measurement capability for EN-DC with CCA | Huawei, HiSilicon | imported from 3GU |
R4‑1915631 | CR on measurement requriements for RSRP change based TA validation | Huawei, HiSilicon | imported from 3GU |
R4‑1915632 | TP for TR 38.716-01-01 to include CA_n7B UL | Ericsson, Telstra | imported from 3GU |
R4‑1915633 | TP for TR 38.716-02-00 to include CA_n1-n7 | Ericsson, BT plc | imported from 3GU |
R4‑1915634 | TP for TR 38.716-02-00: CA_n66A_n260A | Verizon, Nokia | imported from 3GU |
R4‑1915635 | TP for TR 38.716-02-00: CA_n66A_n261A | Verizon, Nokia | imported from 3GU |
R4‑1915636 | TP for TR 37.716-11-11 DC_3A_n77(2A) | KDDI | imported from 3GU |
R4‑1915637 | updated TP for TR 37.716-11-11: adding configuration DC_3C_n1A | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1915638 | draft CR for 38.101-3: adding configurations DC_3C_n78(2A) | Huawei, HiSilicon, BT plc | imported from 3GU |
R4‑1915639 | TP to TR 38.716-02-00: Addition of CA_n28A-n78A | Nokia | imported from 3GU |
R4‑1915640 | TP for TR 37 716-21-11 to include DC_1-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1915641 | draft CR to 38.101-3 new configurations for 2-7_n71, 2-66_n71, 2-7_n66, 2-66_n66 and 2-66_n78 | Ericsson, Rogers | imported from 3GU |
R4‑1915642 | TP for TR 37.716-41-11: EN-DC_1-3-8-42_n77 | SoftBank Corp. | imported from 3GU |
R4‑1915643 | TP for TR 37.716-41-11:DC_2-7-13-66_n66 | Huawei, HiSilicon | imported from 3GU |
R4‑1915644 | TP for TR 37 716-41-11 to include DC_1-3-7-28_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1915645 | TP for TR 37 716-41-11 to include DC_2-12-30-66_n66 | Ericsson, AT&T | imported from 3GU |
R4‑1915646 | TP to TR 37.716-21-21: Addition of 3_n1-n28 | Nokia | imported from 3GU |
R4‑1915647 | TP to TR 37.716-21-21: Addition of DC_ 20A_n1A-n28A | Nokia | imported from 3GU |
R4‑1915648 | TP for TR 37.716-21-21 DC_18A_n3A-n78A | KDDI | imported from 3GU |
R4‑1915649 | TP for TR 37.716-21-21 DC_28A_n3A-n78A | KDDI | imported from 3GU |
R4‑1915650 | TP for TR 37.716-21-21 DC_1A-18A_n3A-n78A | KDDI | imported from 3GU |
R4‑1915651 | TP for TR 37.716-21-21 DC_1A-28A_n3A-n78A | KDDI | imported from 3GU |
R4‑1915652 | TP for 37.716-21-21 to introduce DC_3-20A_n1A-n28A | Nokial, BT | imported from 3GU |
R4‑1915653 | TP for TR 37.716-21-21:DC_12A_n7A-n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1915654 | TP for TR 37.716-21-21 DC_1A-18A_n3A-n257 | KDDI | imported from 3GU |
R4‑1915655 | TP for TR 37.716-21-21 DC_1A-28A_n3A-n257 | KDDI | imported from 3GU |
R4‑1915656 | TP for TR 37.716-21-21 DC_1A-41_n78A-n257 | KDDI | imported from 3GU |
R4‑1915657 | TP for TR 37.716-21-21 DC_3A-41A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915658 | TP for TR 37.716-21-21 DC_3A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915659 | TP for TR 37.716-21-21 DC_41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915660 | TP for TR 37.716-21-21 DC_1A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915661 | TP for TR 37.716-21-21 DC_1A-18A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915662 | TP for TR 37.716-21-21 DC_3A-18A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915663 | TP for TR 37.716-21-21 DC_18A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915664 | TP for TR 37.716-21-21 DC_3A-28A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915665 | TP for TR 37.716-21-21 DC_28A-41A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915666 | TP for TR 37.716-21-21 DC_28A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915667 | TP for TR 37.716-21-21 DC_1A-28A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915668 | TP for TR 37.716-21-21 DC_1A-3A-41A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915669 | TP for TR 37.716-21-21 DC_1A-3A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915670 | TP for TR 37.716-21-21 DC_1A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915671 | TP for TR 37.716-21-21 DC_3A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915672 | TP for TR 37.716-21-21 DC_1A-3A-18A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915673 | TP for TR 37.716-21-21 DC_1A-18A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915674 | TP for TR 37.716-21-21 DC_3A-18A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915675 | TP for TR 37.716-21-21 DC_3A-28A-41A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915676 | TP for TR 37.716-21-21 DC_3A-28A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915677 | TP for TR 37.716-21-21 DC_28A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915678 | TP for TR 37.716-21-21 DC_1A-3A-28A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915679 | TP for TR 37.716-21-21 DC_1A-28A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915680 | TP for TR 37.716-21-21 DC_1A-3A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915681 | TP for TR 37.716-21-21 DC_1A-3A-18A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915682 | TP for TR 37.716-21-21 DC_3A-28A-41A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915683 | TP for TR 37.716-21-21 DC_1A-3A-28A-42A_n78A-n257 | KDDI | imported from 3GU |
R4‑1915684 | TP for TR 38.716-03-02 CA_n3A-n78A-n257 | KDDI | imported from 3GU |
R4‑1915685 | TP for TR 38.716-03-02 CA_n3A-n77(2A)-n257 | KDDI | imported from 3GU |
R4‑1915686 | TP for TR 38.716-03-02 CA_n3A-n77A-n257 | KDDI | imported from 3GU |
R4‑1915687 | TP for TR 38.716-03-02: CA_n1A-n3A-n41A with two UL bands | Huawei, HiSilicon | imported from 3GU |
R4‑1915688 | TP for TR 37.716-11-11: DL_2A_n7(2A) and DL_5A_n7(2A) | Huawei, HiSilicon | imported from 3GU |
R4‑1915689 | TP for TR 37.716-11-11: DC_12_n7 | Huawei, HiSilicon | imported from 3GU |
R4‑1915690 | TP for TR 37.716-21-11: MSD for EN-DC_1-8_n28 | LG Electronics Polska | imported from 3GU |
R4‑1915691 | TP for TR 37 716-11-11 to include DC_7_n7 | Ericsson, Telstra | imported from 3GU |
R4‑1915692 | TP for TR 37.716-21-21 to include DC_2A-7C_n38A-n78A | Intel Corporation | imported from 3GU |
R4‑1915693 | TP for TR 36.716-04-01: LTE CA_1-8-11-42 | SoftBank Corp. | imported from 3GU |
R4‑1915694 | TP for TR 38.716-02-00: CA_n2A_n5A | Verizon, Nokia | imported from 3GU |
R4‑1915695 | TP for TR37.716-21-21: IMD2 MSD for DC_3_n3-n77 | MediaTek Inc., CHTTL | imported from 3GU |
R4‑1915696 | TP for TR37.716-21-21: IMD2 MSD for DC_3_n3-n78 | MediaTek Inc., CHTTL | imported from 3GU |
R4‑1915697 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915698 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915699 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915700 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915701 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915702 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915703 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915704 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915705 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915706 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915707 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915708 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915709 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915710 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915711 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915712 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915713 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915714 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915715 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915716 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915717 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915718 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915719 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915720 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915721 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915722 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915723 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915724 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915725 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915726 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915727 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915728 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915729 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915730 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915731 | (reserved) | ad-hoc for basket WIs | imported from 3GU |
R4‑1915732 | CR on non-anchor RRM measurement requirements in Rel-16 NB IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1915733 | CR on serving cell measurement configured with WUS in Rel-16 NB IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1915734 | CR to TR 37.843: Power Density limitation for PWS. | ROHDE & SCHWARZ | imported from 3GU |
R4‑1915735 | CR to TS 38.104: MR BS class terminology correction, Rel-15 | Huawei | imported from 3GU |
R4‑1915736 | CR for Addition of test applicability rule for LTE HST CA test(Re-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915737 | CR for FeNB-IoT NPRACH TDD performance requirements for 36.104(Re-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915738 | CR for FeNB-IoT NPRACH TDD conformance testing for 36.141(Re-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915739 | CR for intra-band contiguous CA performance requirements for FDD with minimum channel spacing | Huawei, HiSilicon | imported from 3GU |
R4‑1915740 | CR for 38.101-3: Clarification of the notation for intra-band EN-DC combinations | Sprint Corporation | imported from 3GU |
R4‑1915741 | Editorial updates (section 9.4) | Ericsson | imported from 3GU |
R4‑1915742 | Correction in interruption requirements (section 8.2) | Ericsson, ZTE | imported from 3GU |
R4‑1915743 | Editorial updates (Annex B) | Ericsson | imported from 3GU |
R4‑1915744 | CR to 38.101-3-g10 Merging close proximity and cross band isolation MSD clauses | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915745 | Corrections of references in measurement uncertainty table | Ericsson | imported from 3GU |
R4‑1915746 | Corrections of references in measurement uncertainty table | Ericsson | imported from 3GU |
R4‑1915747 | Clarification for the number of interfering signals | Ericsson | imported from 3GU |
R4‑1915748 | Clarification for the number of interfering signals | Ericsson | imported from 3GU |
R4‑1915749 | Editorial corrections | Ericsson | imported from 3GU |
R4‑1915750 | Editorial corrections | Ericsson | imported from 3GU |
R4‑1915751 | Correction on testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1915752 | Removal of FFS and brackets in RF requirements | Ericsson | imported from 3GU |
R4‑1915753 | Removal of FFS and brackets in RF requirements | Ericsson | imported from 3GU |
R4‑1915754 | Correction on testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1915755 | CR to 38.101-2-g10 Corrections to maximum output power reduction for power class 3 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1915756 | CR for TR 38.810: editorial changes | Intel Corporation | imported from 3GU |
R4‑1915757 | CR for TS 38.101-2: power classes and maxUplinkDutyCycle-FR2 | Intel Corporation | imported from 3GU |
R4‑1915758 | CR to 38.101-3 on only synchronous NR-DC between FR1 and FR2 support in Rel-16 | Ericsson | imported from 3GU |
R4‑1915759 | CR for 38.101-3 Correction of EN-DC BCS | Huawei, HiSilicon | imported from 3GU |
R4‑1915760 | CR for 38.101-3 correction for intra-band EN-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1915761 | CR for 38.101-3 intra-band EN-DC MPR/AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1915762 | CR for 38.101-2 on NS_202 band defintion | Huawei, HiSilicon | imported from 3GU |
R4‑1915763 | CR for 38.101-2 draft CR on side condition for BC | Huawei, HiSilicon | imported from 3GU |
R4‑1915764 | CR for MAC-CE based TCI State switch for ENDC (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1915765 | CR for MAC-CE based TCI State switch for ENDC (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1915766 | CR for MAC-CE based TCI State switch for NR SA (Section A.7.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1915767 | CR for MAC-CE based TCI State switch for NR SA (Section A.7.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1915768 | CR for RRC based TCI State switch for NR SA (Section A.7.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1915769 | CR for RRC based TCI State switch for NR SA (Section A.7.5.7) | Qualcomm Incorporated | imported from 3GU |
R4‑1915770 | CR for RRC based TCI State switch for EN-DC (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1915771 | CR for RRC based TCI State switch for EN-DC (Section A.5.5.8) | Qualcomm Incorporated | imported from 3GU |
R4‑1915772 | CR for FR1 handover test cases (Section A.6.3.1.1, A.6.3.1.2, A.6.3.1.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1915773 | CR for FR1 handover test cases (Section A.6.3.1.1, A.6.3.1.2, A.6.3.1.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1915774 | CR on MTTD for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1915775 | CR on MTTD for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1915776 | (reserved) | RD session | imported from 3GU |
R4‑1915777 | WF on NR-U RRM Requirements ^^(all agreements in RAN4#93) | Ericsson, Qualcomm Inc. | imported from 3GU |
R4‑1915778 | Summary of offline discussion on Draft CRs for NR-U | Ericsson | imported from 3GU |
R4‑1915779 | NR-U RRM ad-hoc minutes | Ericsson | imported from 3GU |
R4‑1915780 | CR to introduce CLI measurement accuracy requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915781 | Draft reply to LS on UE capabilities on DAPS HO | Qualcomm Incorporated | imported from 3GU |
R4‑1915782 | CR Introduction of handover delay requirements for conditional handover (section 6.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915783 | WF on NR V2X RRM requirement | LG Electronics | imported from 3GU |
R4‑1915784 | draft CR of NR V2X RRM(introduction & reliability of GNSS signal) | LG Electronics | imported from 3GU |
R4‑1915785 | CR: RRM core requirement for NR V2X | Qualcomm Incorporated | imported from 3GU |
R4‑1915786 | CR to 36.133 on NR reporting criteria | ZTE | imported from 3GU |
R4‑1915787 | CR on corrections on NR intra frequency measurement reporting requirements (Section 9.2.4) | NEC | imported from 3GU |
R4‑1915788 | CR on corrections on NR intra frequency measurement reporting requirements (Section 9.2.4) | NEC | imported from 3GU |
R4‑1915789 | Summary of offline discussion on FR2 measurement outside gap | Ericsson | imported from 3GU |
R4‑1915790 | Way forward on one shot timing adjustment NR RRM requirements | ZTE, Ericsson | imported from 3GU |
R4‑1915791 | CR on NR MTTD and MRTD definition for R15 | Apple | imported from 3GU |
R4‑1915792 | CR to clarify and update QCL applicability (section 3.6) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915793 | CR on SCell activation requirements (section 8.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1915794 | CR to 38.133 on TCI state switching (Section 8.10) (R15) | Intel Corporation | imported from 3GU |
R4‑1915795 | DraftCR on NR V2X initiation SLSS 38.133 -R16 | MediaTek inc. | imported from 3GU |
R4‑1915796 | CR on interruption requirements for NR V2X | CATT | imported from 3GU |
R4‑1915797 | Ad-hoc minutes for NR V2X RRM | LGE | imported from 3GU |
R4‑1915798 | Way forward on NR IAB RRM | Qualcomm, AT&T, NOKIA, CMCC | imported from 3GU |
R4‑1915799 | Summary of offline discussion on NR IAB RRM | Qualcomm | imported from 3GU |
R4‑1915800 | [draftCR] TS 38.133 structure for NR positioning RRM requirements | Intel Corporation | imported from 3GU |
R4‑1915801 | Response LS on Reference Point for Timing Related Measurements in FR2 | CATT | imported from 3GU |
R4‑1915802 | (reserved) | RD session | imported from 3GU |
R4‑1915803 | (reserved) | RD session | imported from 3GU |
R4‑1915804 | NR UE Demodulation ad hoc minutes #2 | China Telecom | imported from 3GU |
R4‑1915805 | CR to TS 38.101-4: Corrections for applicability rules (R15) | Intel Corporation | imported from 3GU |
R4‑1915806 | CR: Updates to NR EN-DC SDR tests | Huawei, HiSilicon | imported from 3GU |
R4‑1915807 | Editorial CR to correct PMI test cases | Ericsson | imported from 3GU |
R4‑1915808 | CR on NE-DC and NGEN-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915809 | CR on NR-DC performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915810 | CR to TS 38.141-1: Further update of applicability rule for BS conducted demodulation test (Rel-15) | China Telecom | imported from 3GU |
R4‑1915811 | CR to TS 38.141-1: Further update of applicability rule for BS conducted demodulation test (Rel-16) | China Telecom | imported from 3GU |
R4‑1915812 | CR to TS 38.141-2: Further update of applicability rule for BS radiated demodulation test (Rel-15) | China Telecom | imported from 3GU |
R4‑1915813 | CR to TS 38.141-2: Further update of applicability rule for BS radiated demodulation test (Rel-16) | China Telecom | imported from 3GU |
R4‑1915814 | CR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915815 | CR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915816 | CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH (Rel-15) | China Telecom | imported from 3GU |
R4‑1915817 | CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH (Rel-16) | China Telecom | imported from 3GU |
R4‑1915818 | CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH (Rel-15) | China Telecom | imported from 3GU |
R4‑1915819 | CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH (Rel-16) | China Telecom | imported from 3GU |
R4‑1915820 | CR on correction of NR UCI on PUSCH performance requirements (Rel-15) for TS 38.104 | Samsung | imported from 3GU |
R4‑1915821 | CR on correction of NR UCI on PUSCH performance requirements (Rel-16) for TS 38.104 | Samsung | imported from 3GU |
R4‑1915822 | CR on correction of NR UCI on PUSCH conducted performance requirements (Rel-15) for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1915823 | CR on correction of NR UCI on PUSCH conducted performance requirements (Rel-16) for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1915824 | CR on correction of NR UCI on PUSCH radiated performance requirements (Rel-16) for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1915825 | CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH (Rel-15) | China Telecom | imported from 3GU |
R4‑1915826 | CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH (Rel-16) | China Telecom | imported from 3GU |
R4‑1915827 | CR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915828 | CR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915829 | CR for 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915830 | CR for 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915831 | CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1915832 | CR on correction of NR PUCCH format2 conducted performance requirements (Rel-15) for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1915833 | CR on correction of NR PUCCH format2 conducted performance requirements (Rel-16) for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1915834 | CR on correction of NR PUCCH format2 radiated performance requirements (Rel-15) for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1915835 | CR on correction of NR PUCCH format2 radiated performance requirements (Rel-16) for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1915836 | CR: Updates for PUCCH formats 3 and 4 performance requirements in TS 38.104 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915837 | CR: Updates for PUCCH formats 3 and 4 performance requirements in TS 38.104 (Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1915838 | CR: Updates for PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915839 | CR: Updates for PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1915840 | Summary of simulation and impairments results for NR BS Demodulation requirementss | China Telecom | imported from 3GU |
R4‑1915841 | Draft CR on TR38.810 for UE demudulation and CSI testing methodlogy | Qualcomm Incorporated | imported from 3GU |
R4‑1915842 | (reserved) | RD session | imported from 3GU |
R4‑1915843 | CR on direct SCell activation delay | Huawei, HiSilicon | imported from 3GU |
R4‑1915844 | Reply LS on direct SCell activation in RRC resume message | RAN4 | imported from 3GU |
R4‑1915845 | WF on RRM measurement relaxation for Power Saving | CATT | imported from 3GU |
R4‑1915846 | LS on RRM measurement relaxation for Power Saving | CATT | imported from 3GU |
R4‑1915847 | WF on SIB reading for cell reselection and HO in NR-U | Intel | imported from 3GU |
R4‑1915848 | (reserved) | RD session | imported from 3GU |
R4‑1915849 | Reply LS on applicable timing for pathloss RS activated/updated by MAC-CE | Apple | imported from 3GU |
R4‑1915850 | Way forward on NR eMIMO RRM | Samsung | imported from 3GU |
R4‑1915851 | Simulation assumption on SIB1 decoding for NR CGI reading | ZTE | imported from 3GU |
R4‑1915852 | Way forward on BWP switching on multiple CCs | Intel | imported from 3GU |
R4‑1915853 | Way forward on inter-frequency measurement without MG | CMCC | imported from 3GU |
R4‑1915854 | (reserved) | RD session | imported from 3GU |
R4‑1915855 | LS on the UE capability and network assistance signalling RRM enhancement for NR HST in R16 | RAN4 | imported from 3GU |
R4‑1915856 | (reserved) | RD session | imported from 3GU |
R4‑1915857 | Simulation results of Type I PMI test cases | Samsung | imported from 3GU |
R4‑1915858 | Way forward on PMI reporting requirements for Tx ports larger than 9 and up to 32 | Ericsson, Samsung | imported from 3GU |
R4‑1915859 | Simulation assumptions for NR PMI reporting requirements for more than 8 Tx ports | Ericsson | imported from 3GU |
R4‑1915860 | Simulation results for LTE-NR coexistence for TDD | Huawei, HiSilicon | imported from 3GU |
R4‑1915861 | Way forward on NR CA PDSCH requirements | Intel | imported from 3GU |
R4‑1915862 | Summary of simulation results for TDD LTE-NR coexistence requirements | Huawei | imported from 3GU |
R4‑1915863 | Simulation assumption for NR CA PDSCH normal demodulation requirements | Intel | imported from 3GU |
R4‑1915864 | CR work split for NR performance requirement enhancement WI | China Telecom | imported from 3GU |
R4‑1915865 | Initial simulation results for NR demoduation performance in Rel-16 | Samsung | imported from 3GU |
R4‑1915866 | Ad-hoc minutes for NR URLLC test feasibility | Ericsson | imported from 3GU |
R4‑1915867 | Way forward on NR URLLC demodulation and CSI requirements | Huawei | imported from 3GU |
R4‑1915868 | Ad hoc minutes for R16 NR HST demodulation | CMCC | imported from 3GU |
R4‑1915869 | WF on UE demodulation for NR HST | CMCC | imported from 3GU |
R4‑1915870 | Way forward on NR HST PUSCH demodulation requirements | Huawei | imported from 3GU |
R4‑1915871 | Way forward on NR HST PRACH requirements | Samsung | imported from 3GU |
R4‑1915872 | Summary of NR HST PRACH simulation results | CATT | imported from 3GU |
R4‑1915873 | LS on the UE capability and network assistance signalling on UE demodulation for NR HST in R16 | CMCC | imported from 3GU |
R4‑1915874 | Discussion and initial simulation results for NR HST PRACH | Samsung | imported from 3GU |
R4‑1915875 | Way forward on NR HST PRACH requirements | Samsung | imported from 3GU |
R4‑1915876 | (reserved) | RD session | imported from 3GU |
R4‑1915877 | Way forward on LTE UE and BS performance requirements for additional enhancements for NB-IOT | Huawei, HiSilicon | imported from 3GU |
R4‑1915878 | CR on introducing UE demodulation tests for 500km/h velocity | NTT DOCOMO, INC. | imported from 3GU |
R4‑1915879 | Introduction of CA PDSCH demodulation requirements with HST-SFN | Ericsson | imported from 3GU |
R4‑1915880 | Simulation results for HST PRACH in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1915881 | CR to TS 36.104: Introduction of PUSCH performance requirements for enhanced HST scenario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1915882 | CR to TS 36.141: Introduction of PUSCH performance requirements for enhanced HST scenario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1915883 | CR to TS 36.104: Introduction of PRACH performance requirements for enhanced HST scenario | NTT DOCOMO, INC., Nokia, Ericsson | imported from 3GU |
R4‑1915884 | CR to TS 36.141: Introduction of PRACH performance requirements for enhanced HST senario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1915885 | Way forward on LTE FDD intra-band contiguous CA performance with minimum channel spacing | Huawei, HiSilicon, China Telecom, MediaTek | imported from 3GU |
R4‑1915886 | Way forward on NR HST PUSCH demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1915887 | WF on RRM for NR HST | CMCC | imported from 3GU |
R4‑1915888 | Further reply LS on second SMTC periodicity in idle mode | MediaTek inc. | imported from 3GU |
R4‑1915889 | Way forward on Rel-16 MTC RRM enhancement | Ericsson, Nokia, Nokia Shanghai Bell, Qualcomm Incorporated, Huawei, HiSilicon | imported from 3GU |
R4‑1915890 | Way forward on RRM requirements of R16 enhancement for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1915891 | (reserved) | RD session | imported from 3GU |
R4‑1915892 | Ad Hoc minutes for NR Rel-15 RRM Perf | Huawei | imported from 3GU |
R4‑1915893 | Void | Void | imported from 3GU |
R4‑1915894 | Specification of UE antenna gain range | ANRITSU LTD | imported from 3GU |
R4‑1915895 | CR on SSB setting for new gap and SMTC setting (Section A.3.10) | MediaTek inc. | imported from 3GU |
R4‑1915896 | CR on test cases for FR2 handover (section A.7.3.1) (R16) | Intel Corporation | imported from 3GU |
R4‑1915897 | Correction to Random access test case in FR1 for PSCell in EN-DC | ANRITSU LTD | imported from 3GU |
R4‑1915898 | CR on test cases for Redirection from NR in FR2 to NR in FR2 (section A.7.3.2.3) (R16) | Intel Corporation | imported from 3GU |
R4‑1915899 | CR on TC of UE transmit timing (A.4.4.1.1, A.5.4.1.1, A.6.4.1.1, A.7.4.1.1) Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915900 | CR on TC of UE transmit timing (A.4.4.1.1, A.5.4.1.1, A.6.4.1.1, A.7.4.1.1) Rel-16 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915901 | FR2 CSI-RS RLM test OOS/IS non-DRX for EN-DC (section A.4.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1915902 | FR2 CSI-RS RLM test OOS/IS non-DRX for SA (section A.6.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1915903 | Corrections to test cases for SA FR2 inter-frequency measurement (section A.7.6.2) | Ericsson | imported from 3GU |
R4‑1915904 | L1-RSRP delay test FR1 EN-DC (section A.4.6.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1915905 | CR on Number of carriers to monitor for IDLE mode measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915906 | Cat-1bis clarification to RSRQ measurements | Ericsson | imported from 3GU |
R4‑1915907 | CR on maintaining core requirements and tests for V2X synchronization reference source selection/reselection R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1915908 | CR on maintaining interruption tests due to V2X sidelink communication R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1915909 | Way forward on LTE UE and BS performance requirements for additional enhancements for NB-IOT | Huawei, HiSilicon | imported from 3GU |
R4‑1915910 | Draft CR on TR38.810 for UE demudulation and CSI testing methodlogy | Qualcomm Incorporated | imported from 3GU |
R4‑1915911 | CR for TS38.101-4: Angle of arrival for radiated UE demodulation testing | Qualcomm Incorporated | imported from 3GU |
R4‑1915912 | CR to TS 38.101-4: Corrections for applicability rules (R15) | Intel Corporation | imported from 3GU |
R4‑1915913 | Way forward on NR URLLC demodulation and CSI requirements | Huawei | imported from 3GU |
R4‑1915914 | Way forward on NR HST PRACH requirements | Samsung | imported from 3GU |
R4‑1915915 | WF on UE demodulation for NR HST | CMCC | imported from 3GU |
R4‑1915916 | LS on the UE capability and network assistance signalling on UE demodulation for NR HST in R16 | CMCC | imported from 3GU |
R4‑1915917 | ad-hoc for LTE/NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1915918 | Ad-hoc for CSI-RS based L3 measurement | CATT | imported from 3GU |
R4‑1915919 | WF on SIB reading for cell reselection and HO in NR-U | Intel | imported from 3GU |
R4‑1915920 | Way forward on LTE mobility enhancement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915921 | draft CR of NR V2X RRM(introduction & reliability of GNSS signal) | LG Electronics | imported from 3GU |
R4‑1915922 | CR: RRM core requirement for NR V2X | Qualcomm Incorporated | imported from 3GU |
R4‑1915923 | CR to 36.133 on interruption requirements for NR V2X | CATT | imported from 3GU |
R4‑1915924 | (reserved) | RD session | imported from 3GU |
R4‑1915925 | WF on RRM measurement relaxation for Power Saving | CATT | imported from 3GU |
R4‑1915926 | WF on UE demodulation for NR HST | CMCC | imported from 3GU |
R4‑1915927 | Way forward on LTE FDD intra-band contiguous CA performance with minimum channel spacing | Huawei, HiSilicon, China Telecom, MediaTek | imported from 3GU |
R4‑1915928 | [draftCR] TS 38.133 structure for NR positioning RRM requirements | Intel Corporation | imported from 3GU |
R4‑1915929 | Reply LS on applicable timing for pathloss RS activated/updated by MAC-CE | RAN4 | imported from 3GU |
R4‑1915930 | Way forward on R16 NR RRM enhancements – SRS carrier switching | ZTE | imported from 3GU |
R4‑1915931 | Way forward on activation delay extension due to multiple SCell activations | Apple | imported from 3GU |
R4‑1915932 | Way forward on R16 NR RRM enhancements – CGI reading | ZTE | imported from 3GU |
R4‑1915933 | Way forward on BWP switching on multiple CCs | Intel Corporation | imported from 3GU |
R4‑1915934 | CR on FR2 measurement requriements outside gaps (section 9.1.5.1) | Huawei, HiSilicon, MediaTek | imported from 3GU |
R4‑1915935 | Correction on CSSF within measurement gap (section 9.1.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1915936 | Update on requirements related to inter-band EN-DC and NE-DC synchronous requirements | Ericsson, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915937 | WF on TCI state and spatial relation switch | Mediatek Inc. | imported from 3GU |
R4‑1915938 | CR on scope of interruption requirements of EN-DC in TS 38.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1915939 | CR to TS 38.171: Corrections to A-GNSS requirements with NR | Rohde & Schwarz | imported from 3GU |
R4‑1915940 | Editorial updates (section 9.4) | Ericsson | imported from 3GU |
R4‑1915941 | Editorial updates (Annex B) | Ericsson | imported from 3GU |
R4‑1915942 | L1-RSRP delay test FR1 SA (section A.6.6.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1915943 | CR Introduction of handover delay requirements for conditional handover (section 5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915944 | CR on RRM requirements for DAPS in femobility | Huawei, HiSilicon | imported from 3GU |
R4‑1915945 | CR: RRM core requirement for 5G broadcast | Qualcomm Incorporated | imported from 3GU |
R4‑1915946 | WF on RRM measurement relaxation for Power Saving | CATT | imported from 3GU |
R4‑1915947 | Way forward on one shot timing adjustment NR RRM requirements | ZTE, Ericsson | imported from 3GU |
R4‑1915948 | CR on RRM requirements for DAPS in femobility | Huawei, HiSilicon | imported from 3GU |
R4‑1915949 | (reserved) | RD session | imported from 3GU |
R4‑1915950 | (reserved) | RD session | imported from 3GU |
R4‑1915951 | (reserved) | RD session | imported from 3GU |
R4‑1915952 | (reserved) | RD session | imported from 3GU |
R4‑1915953 | (reserved) | RD session | imported from 3GU |
R4‑1915954 | (reserved) | RD session | imported from 3GU |
R4‑1915955 | (reserved) | RD session | imported from 3GU |
R4‑1915956 | (reserved) | RD session | imported from 3GU |
R4‑1915957 | (reserved) | RD session | imported from 3GU |
R4‑1915958 | (reserved) | RD session | imported from 3GU |
R4‑1915959 | (reserved) | RD session | imported from 3GU |
R4‑1915960 | (reserved) | RD session | imported from 3GU |
R4‑1915961 | (reserved) | RD session | imported from 3GU |
R4‑1915962 | (reserved) | RD session | imported from 3GU |
R4‑1915963 | (reserved) | RD session | imported from 3GU |
R4‑1915964 | (reserved) | RD session | imported from 3GU |
R4‑1915965 | (reserved) | RD session | imported from 3GU |
R4‑1915966 | (reserved) | RD session | imported from 3GU |
R4‑1915967 | (reserved) | RD session | imported from 3GU |
R4‑1915968 | (reserved) | RD session | imported from 3GU |
R4‑1915969 | (reserved) | RD session | imported from 3GU |
R4‑1915970 | (reserved) | RD session | imported from 3GU |
R4‑1915971 | (reserved) | RD session | imported from 3GU |
R4‑1915972 | (reserved) | RD session | imported from 3GU |
R4‑1915973 | (reserved) | RD session | imported from 3GU |
R4‑1915974 | (reserved) | RD session | imported from 3GU |
R4‑1915975 | (reserved) | RD session | imported from 3GU |
R4‑1915976 | (reserved) | (reserved) | imported from 3GU |
R4‑1915977 | WF on number of bands and CCs to be considered in Rel-16 NR-U WI | Ericsson | imported from 3GU |
R4‑1915978 | CISPR liaison statement to 3GPP via ETSI | CISPR | imported from 3GU |
R4‑1915979 | WF on NR-U spectral emission mask | Nokia, Nokia Shanghai Bell, CableLabs, Charter | imported from 3GU |
R4‑1915980 | WF on Guard band design for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1915981 | draftCR channel raster in band n46 for NR-U operation | Qualcomm Incorporated | imported from 3GU |
R4‑1915982 | Draft CR for Sync raster design for NR-U in 38.104 | Futurewei | imported from 3GU |
R4‑1915983 | On NRU UE Output power | LG Electronics Finland | imported from 3GU |
R4‑1915984 | [V2X] TP to add some abbreviations | Huawei, HiSilicon | imported from 3GU |
R4‑1915985 | Reply LS to RAN2 on UL-SL Prioritization | Futurewei | imported from 3GU |
R4‑1915986 | Reply LS on transient period in S-SSB design for NR V2X | CATT | imported from 3GU |
R4‑1915987 | WF on channel raster for NR V2X | vivo | imported from 3GU |
R4‑1915988 | TP for RF requirements for NR V2X | CATT | imported from 3GU |
R4‑1915989 | PFSCH MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1915990 | CR to 38.101-3 on uplink power control for non synchronous NR-DC between FR1 and FR2 | Ericsson | imported from 3GU |
R4‑1915991 | Proposal for Improved B41/n41 EN-DC A-MPR Curves | SPRINT Corporation | imported from 3GU |
R4‑1915992 | CR for adding solution for addressing SAR issue for EN-DC PC2 UE | CATT, CMCC | imported from 3GU |
R4‑1915993 | CR for introducing RF requirement for EN-DC PC2 UE | CATT, CMCC | imported from 3GU |
R4‑1915994 | NSA FDD-TDD HPUE adhoc minutes | CHTTL | imported from 3GU |
R4‑1915995 | TP for TR 37.815 high power UE (PC2) for EN-DC FDD-TDD | Samsung | imported from 3GU |
R4‑1915996 | TP for TR 37.815 of the solution option3 for SAR limits | vivo | imported from 3GU |
R4‑1915997 | TP for 37.815: FDD-TDD PC2 Option 6 | Ericsson | imported from 3GU |
R4‑1915998 | TP to 37.815: FDD-TDD PC2 option 5 | NTT DOCOMO | imported from 3GU |
R4‑1915999 | [IAB] TP to TR 38.xxx Antenna assumptions | Huawei | imported from 3GU |
R4‑1916000 | WF on IAB TS specification structure and terminology | Qualcomm Incorporated | imported from 3GU |
R4‑1916001 | TP for TS38.174: IAB system parameters | Samsung | imported from 3GU |
R4‑1916002 | [IAB] TP to TR 38.xxx System parameters | Huawei | imported from 3GU |
R4‑1916003 | [IAB] TP to TR 38.xxx Co-location scenarios | Huawei | imported from 3GU |
R4‑1916004 | WF on switching time for IAB | Qualcomm | imported from 3GU |
R4‑1916005 | DC_(n)41 and DC_41_n41 Data in support for MPR&R Improvements | Skyworks Solutions Inc. | imported from 3GU |
R4‑1916006 | WF on simulation assumption for MPR of Pi/2 BPSK DMRS | Qualcomm Incorporated | imported from 3GU |
R4‑1916007 | WF on eMIMO full power transmission test case | vivo, Intel, OPPO, Samsung | imported from 3GU |
R4‑1916008 | TP for TR 38.883: Specification impact for FR2 DL 256QAM | China Telecom | imported from 3GU |
R4‑1916009 | Proposals on concluding NR MIMO OTA | CAICT | imported from 3GU |
R4‑1916010 | TP to TR38.827 on Updated Spatial Filtering, Thresholding, and DoT for FR1 | Spirent Communications | imported from 3GU |
R4‑1916011 | TP to TR 38.827 v0.5.0 on FR1 MIMO OTA test methods | CAICT | imported from 3GU |
R4‑1916012 | TP to TR 38.827 v0.5.0 on channel model validation procedure | CAICT | imported from 3GU |
R4‑1916013 | TP to TR 38.827 v0.5.0 on FR1 preliminary MU assessment | CAICT | imported from 3GU |
R4‑1916014 | RTS Text Proposal for NR FR1 MIMO OTA | Keysight Technologies UK Ltd, ROHDE & SCHWARZ | imported from 3GU |
R4‑1916015 | CR for intra-band DL contiguous CA RF requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1916016 | WF on Transient period capability | Qualcomm Inc. | imported from 3GU |
R4‑1916017 | On MPE enhancement for Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1916018 | WF on MPE enhancement on FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1916019 | WF on side conditions of SSB based and CSI-RS based beam correspondence tests | Apple Inc. | imported from 3GU |
R4‑1916020 | Ad-hoc meeting #1 and #2 mintues for UE RF FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916021 | WF on FR2 DL Intra-band CA BW Enhancement | Qualcomm, Apple, Nokia, Samsung | imported from 3GU |
R4‑1916022 | WF for FR2 Intraband Non-contiguous UL CA MPR study | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916023 | EIS requirements for FR2 DL inter-band CA | Apple Inc. | imported from 3GU |
R4‑1916024 | WF on FR2 inter-band DL CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916025 | Adding Band40 for UE category 1bis into Rel-16 TS 36.101 | CMCC | imported from 3GU |
R4‑1916026 | CR for REL-16 TS36.307 for adding B40 to UE category 1bis | CMCC | imported from 3GU |
R4‑1916027 | Minutes of Ad-hoc for Rel-15 NR BS RF maintenance | Ericsson | imported from 3GU |
R4‑1916028 | Reply LS on UE capability of guard period for SRS with frequency hopping and antenna switching | Huawei, HiSilicon | imported from 3GU |
R4‑1916029 | CR for TS38.101-1, Clarification and Editorial corrections | CATT | imported from 3GU |
R4‑1916030 | Reply LS on UE capability of guard period for SRS with frequency hopping and antenna switching | Huawei, HiSilicon | imported from 3GU |
R4‑1916031 | Reply LS on BCS reporting for EN-DC BC | Huawei, HiSilicon | imported from 3GU |
R4‑1916032 | CR to TS 38.101-2 on corrections to intra-band contiguous CA for band n258 (Rel-16) | ZTE Corporation | imported from 3GU |
R4‑1916033 | CR for TS 38.101-1: CA bandwidth class definition amendment | MediaTek Inc. | imported from 3GU |
R4‑1916034 | TP for TR38.887 UE RF requirements for n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1916035 | CR to TS38.141-2: further updates on the abbreviations (section 3.3)-R15 | ZTE Corporation | imported from 3GU |
R4‑1916036 | CR to TS37.105 Corrections on NBB requirement (section 7.4 and 10.5) | ZTE Corporation | imported from 3GU |
R4‑1916037 | CR to TS37.145-2 Corrections on NBB requirement (section 7.5.5.1.2 | ZTE Corporation | imported from 3GU |
R4‑1916038 | CR to 37.141: Update of procedure in Modulation quality test | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916039 | CR Modulation fallback for total power dynamic range in 37.145-1 clause 6.3.4.4.1.4 | Futurewei | imported from 3GU |
R4‑1916040 | CR Modulation fallback for total power dynamic range in 37.145-2 clause 6.4.4.4.2.4 | Futurewei | imported from 3GU |
R4‑1916041 | Narrowband blocking corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916042 | Narrowband blocking corrections | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916043 | CR to 38.141-1: Annex H.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916044 | CR to 38.141-2: Annex L.5 Resource element TX power | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916045 | CR to TS 38.141-1: Editoral Changes of NR TM Power Balancing Readability | Ericsson | imported from 3GU |
R4‑1916046 | CR to TS 38.141-1: Editoral Changes of NR TM Power Balancing Readability | Ericsson | imported from 3GU |
R4‑1916047 | CR to TS 38.141-1: MR BS class terminology correction, Rel-15 | Huawei | imported from 3GU |
R4‑1916048 | CR to TR 37.843: adding background information on angular alignment in subclause 10.8.4 | Nokia, Nokia Shanghai Bell, Ericsson | imported from 3GU |
R4‑1916049 | CR to TS 38.141-2: Additional Tx spur for FR2 - removal, Rel-15 | Huawei | imported from 3GU |
R4‑1916050 | CCDF analysis result with use of random data in Test Model payload | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1916051 | Way forward on TRP MU discrepancies | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916052 | WF for random data content of physical channels for NR test modes | Ericsson | imported from 3GU |
R4‑1916053 | Ad-hoc minutes for NR BS conformance | Samsung | imported from 3GU |
R4‑1916054 | WF on RF requirements for n259 | Ericsson | imported from 3GU |
R4‑1916055 | TP to TR 38.887 on BS specific RF requirements | Ericsson | imported from 3GU |
R4‑1916056 | WF on n1 Wide BW RF requirements | Ericsson | imported from 3GU |
R4‑1916057 | CR to 38.101-1 for FDD bands with variable duplex | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1916058 | CR to 38.104 for FDD bands with variable duplex | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1916059 | CR to 38.141-1 for variable duplex FDD bands | Huawei, HiSilicon, Vodafone | imported from 3GU |
R4‑1916060 | n28 30MHz AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1916061 | TP on UE spurious emission requirements for band n28 | CATT, CBN | imported from 3GU |
R4‑1916062 | Experimental measurements for n28 30MHz REFSENS | Skyworks Solutions Inc. | imported from 3GU |
R4‑1916063 | [n28BW] TP on BS RF requirements for adding wider channel bandwidth in band n28 | Huawei, HiSilicon, CBN, ZTE, CATT | imported from 3GU |
R4‑1916064 | TP for TR38.888: BS-BS co-existence analysis | ZTE Corporation | imported from 3GU |
R4‑1916065 | Introducing new channel bandwidth for band n28 into 38.104 | CATT, CBN, ZTE | imported from 3GU |
R4‑1916066 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.101-1 | CMCC | imported from 3GU |
R4‑1916067 | Introduction of 2010-2025MHz SUL band into Rel-16 TS 38.104 | CMCC | imported from 3GU |
R4‑1916068 | n26 REFSENS | Qualcomm Incorporated, Skyworks Solutions Inc. | imported from 3GU |
R4‑1916069 | LS reply on PUR transmission for NB-IoT/eMTC | RAN2, Ericsson | imported from 3GU |
R4‑1916070 | WF on Band n38 wider CBW | Ericsson | imported from 3GU |
R4‑1916071 | CR to TS37.145-1 Corrections on NBB requirement (section 7.4.5.1.2) | ZTE Corporation | imported from 3GU |
R4‑1916072 | CR to 38.141-2 additional updates on clarification for NR TM1.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916073 | CR to TS 38.104: Editorial corrections | Ericsson | imported from 3GU |
R4‑1916074 | CR to TS 38.104: Clarification for the number of interfering signals | Ericsson | imported from 3GU |
R4‑1916075 | CR to TS 38.104: Editorial corrections | Ericsson | imported from 3GU |
R4‑1916076 | CR to TS 38.104: Clarification for the number of interfering signals | Ericsson | imported from 3GU |
R4‑1916077 | WF on IAB EMC requirements | ZTE | imported from 3GU |
R4‑1916078 | AH minutes for NB-IoT and eMTC coexistence with NR | Huawei | imported from 3GU |
R4‑1916079 | Minutes of 7-24GHz SI adhoc | Huawei | imported from 3GU |
R4‑1916080 | CR to TS 37.105: Requirement set applicability | Nokia | imported from 3GU |
R4‑1916081 | CR to TS 37.105: Requirement set applicability | Nokia | imported from 3GU |
R4‑1916082 | Ad-hoc minutes on Tx switching between two uplink carriers | China Telecom | imported from 3GU |
R4‑1916083 | LS on UE capabilities and RRC signalling on Tx switching period delay | Apple | imported from 3GU |
R4‑1916084 | WF on UL switching between two uplink carriers | China Telecom | imported from 3GU |
R4‑1916085 | CR to 38.104 on Editorial corrections (Rel-15) | Ericsson | imported from 3GU |
R4‑1916086 | CR to 38.104 on Editorial corrections (Rel-16) | Ericsson | imported from 3GU |
R4‑1916087 | CR to 38.104 on Corrections from endorsed draft CRs (Rel-15) | Ericsson | imported from 3GU |
R4‑1916088 | LS response on Test methods for Over-the-Air Total Radiated Power field measurements for IMT radio equipment utilizing active antennas | Ericsson | imported from 3GU |
R4‑1916089 | CR to TR 38.817-02: terminology corrections, Rel-15 | Huawei | imported from 3GU |
R4‑1916090 | CR to 38.104: Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1916091 | CR to 38.141-2: Correction on FR2 Category B OBUE mask | Huawei, HiSilicon | imported from 3GU |
R4‑1916092 | CR to 38.104 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916093 | CR to 38.141-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916094 | CR to 37.105 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916095 | CR to 37.145-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916096 | TP on power boosting | Huawei, HiSilicon, Nokia | imported from 3GU |
R4‑1916097 | TP on summary of co-existence study | Huawei, HiSilicon | imported from 3GU |
R4‑1916098 | CR to TS 38.104 - NB-IoT introduction | Ericsson | imported from 3GU |
R4‑1916099 | CR to TS 37.104: introduction of NB-IoT operation in NR in-band | Huawei, HiSilicon | imported from 3GU |
R4‑1916100 | CR to TS 36.101 - NB-IoT in NR in-band support clarifications | Ericsson | imported from 3GU |
R4‑1916101 | WF on testing for NB-IoT operation in NR in-band | Nokia, Ericsson, Huawei, ZTE | imported from 3GU |
R4‑1916102 | TR 38.820, v0.4.0: implementation of TPs from RAN4#93 | Huawei | imported from 3GU |
R4‑1916103 | TP to TR 38.820: cleanup | Huawei | imported from 3GU |
R4‑1916104 | TP to TR 38.820 updated on UE RF Requirement | Sony, Ericsson | imported from 3GU |
R4‑1916105 | TP to TR 38.820: Active RFFE technology for UE | NXP Semiconductors Netherlands | imported from 3GU |
R4‑1916106 | TP for TR 38.820: UE RF testability | Huawei, HiSilicon | imported from 3GU |
R4‑1916107 | TP to TR 38.820 on Transceiver technology for NR UE 7-24 | Spreadtrum Communications, Huawei | imported from 3GU |
R4‑1916108 | TP for TR 38.820: scope of NR UE RF | Huawei, HiSilicon | imported from 3GU |
R4‑1916109 | TP to TR 38.820: Update of technical background for BS out-of-band blocking in subclause 7.4.2.5 | Ericsson | imported from 3GU |
R4‑1916110 | [7to24] TP to TS 38.820 BS Rx spurious emissions | Huawei | imported from 3GU |
R4‑1916111 | TP to TR 38.820 on ICS 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1916112 | TP to TR 38.820: NR BS in-channel selectivity (ICS) for 7-24 GHz range | Huawei | imported from 3GU |
R4‑1916113 | TP to TR 38.820: NR UE System Noise Figure | Qualcomm Incorporated | imported from 3GU |
R4‑1916114 | TP to TR 38.820: clarification on the IM | Huawei | imported from 3GU |
R4‑1916115 | TP to TR 38.820: IAB scenario for 7-24GHz | Huawei | imported from 3GU |
R4‑1916116 | [7to24] TP to TR 38.820 BS terminology clean up | Huawei | imported from 3GU |
R4‑1916117 | TP to TR 38.820: Update of applicability of BS requirement sets for 7-24 GHz frequency range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916118 | TP to TR 38.820: Conclusions on signal quality | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916119 | TP to TR 38.820: Editorial improvement of structure for co-location requirements in subclause 7.4 | Ericsson | imported from 3GU |
R4‑1916120 | [7to24] TP to TR 38.820 BS TX summary table update | Huawei | imported from 3GU |
R4‑1916121 | [7to24] TP to TR 38.820 BS Rx conducted sensitivity | Huawei | imported from 3GU |
R4‑1916122 | TP to TR 38.820: Update of BS requirement sets for 7-24 GHz frequency range | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916123 | [7to24] TP to TR 38.820 BS RX summary table update | Huawei | imported from 3GU |
R4‑1916124 | Experimental measurements for n1 40MHz REFSENS and n34 protection | Skyworks Solutions Inc. | imported from 3GU |
R4‑1916125 | CR for TS 38.101-2: CA bandwidth class definition amendment | MediaTek Inc. | imported from 3GU |
R4‑1916126 | CR for 38.101-1 n39 AMPR | Qualcomm Incorporated | imported from 3GU |
R4‑1916127 | CR to transmit modulation quality in FR1 | Anritsu Corporation | imported from 3GU |
R4‑1916128 | CR to transmit modulation quality in FR2 | Anritsu Corporation | imported from 3GU |
R4‑1916129 | CR to TS 38.101-2: Correctin on CA NRACLR | ZTE Corporation | imported from 3GU |
R4‑1916130 | CR on clarifying the P_CMAX sentence for CA | Qualcomm Incorporated | imported from 3GU |
R4‑1916131 | Correction of Pcmax for CA | Ericsson | imported from 3GU |
R4‑1916132 | Response LS on the testability of FR1 Tx diversity | RAN5, Rohde-schwarz | imported from 3GU |
R4‑1916133 | Meeting minutes for FR1 UE RF Ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1916134 | TP to update Coexistence analysis results | Vodafone | imported from 3GU |
R4‑1916135 | WF on Rx image for FR1 NR intra-band CA and intra-band EN-DC | NTT DOCOMO INC. | imported from 3GU |
R4‑1916136 | Correction of transmitter characteristics for UL-MIMO: powerclass 2 and fallback | Ericsson | imported from 3GU |
R4‑1916137 | CR to 38.101-3: clarification of ENDC power class in R15 | vivo | imported from 3GU |
R4‑1916138 | Correction of transmitter characteristics for UL-MIMO: powerclass 2 and fallback | Ericsson | imported from 3GU |
R4‑1916139 | CR to 38.101-3 on uplink power control for non synchronous NR-DC between FR1 and FR2 | Ericsson | imported from 3GU |
R4‑1916140 | Minutes of FR2 UE RF AH3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916141 | CR for TS 38.101-2: CA bandwidth class definition amendment | MediaTek Inc. | imported from 3GU |
R4‑1916142 | CR for TS 38.101-1: CA bandwidth class definition amendment | MediaTek Inc. | imported from 3GU |
R4‑1916143 | TP on NR V2X UE RF requirements for supporting 30MHz CBW and 256QAM at n47 | LG Electronics Polska | imported from 3GU |
R4‑1916144 | TP on general Tx/Rx requirements for NR V2X UE at licensed bands | LG Electronics Polska | imported from 3GU |
R4‑1916145 | [V2X] TP on MPR simulation assumption for NR V2X in band n47 | Huawei, HiSilicon | imported from 3GU |
R4‑1916146 | LS on channel arrangement design for NR V2X in FR1 | CATT | imported from 3GU |
R4‑1916147 | TP for channel arrangement design for V2X UE | CATT, vivo | imported from 3GU |
R4‑1916148 | TP on modification on Coexistence conclusion for NR V2X | Vodafone | imported from 3GU |
R4‑1916149 | WF for IAB DC/CA requirement | AT&T, Ericsson, AT&T, Verizon, Qualcomm | imported from 3GU |
R4‑1916150 | CR to 38.104 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916151 | CR to 38.141-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916152 | CR to 37.105 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916153 | CR to 37.145-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916154 | Correction on testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1916155 | Correction on testing under extreme conditions for BS output power | Ericsson | imported from 3GU |
R4‑1916156 | CR to TS 38.113 Correction on abbreviations(subclause 3.3 & 8.2.1.2) | ZTE Corporation | imported from 3GU |
R4‑1916157 | CR to TR 37.843 Addition of Plane Wave Synthesizer MU calibration and test procedure for In-band TRP requirements-2. | CAICT | imported from 3GU |
R4‑1916158 | TP to TR 38.820: Active RFFE technology for UE | NXP Semiconductors Netherlands | imported from 3GU |
R4‑1916159 | Meeting minutes for NR-U Ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1916160 | WF on Guard band design for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916161 | IAB Ad Hoc meeting minutes | Qualcomm Incorporated | imported from 3GU |
R4‑1916162 | WF on NR-U simulation assumption | ZTE | imported from 3GU |
R4‑1916163 | TP to TR for UE Coexistence study of NR V2X at 5.9GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1916164 | Reply LS on transient period in S-SSB design for NR V2X | CATT | imported from 3GU |
R4‑1916165 | LS to RAN2 on definition of IAB MT channel bandwidth | Qualcomm Incorporated | imported from 3GU |
R4‑1916166 | [IAB] TP to TR 38.xxx System parameters | Huawei | imported from 3GU |
R4‑1916167 | draftCR channel raster in band n46 for NR-U operation | Qualcomm Incorporated | imported from 3GU |
R4‑1916168 | Meeting minutes for FR1 UE RF Ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1916169 | Meeting minutes for Transient period capability Ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1916170 | WF on MPE enhancement on FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1916171 | LS to RAN2 on MPE | Qualcomm Incorporated | imported from 3GU |
R4‑1916172 | WF on side conditions of SSB based and CSI-RS based beam correspondence tests | Apple Inc. | imported from 3GU |
R4‑1916173 | TR38.827 v0.6.0 NR-MIMO OTA | CAICT | imported from 3GU |
R4‑1916174 | WF on FR2 MIMO OTA | CAICT, Spirent | imported from 3GU |
R4‑1916175 | System Implementation of FR2 3D MPAC Systems | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1916176 | TP to TR on 64QAM RMC for NR FR2 MIMO OTA | Qualcomm Incorporated | imported from 3GU |
R4‑1916177 | Way forward on enhanced test methods for FR2 in NR | Apple Inc. | imported from 3GU |
R4‑1916178 | 29 dBm HPUE power class number and power tolerance | Sprint Corporation | imported from 3GU |
R4‑1916179 | 29 dBm HPUE power class number and power tolerance | Sprint Corporation | imported from 3GU |
R4‑1916180 | LS to RAN2 on FDD bands capability signalling for uplink shaing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1916181 | TP for TR 37.815 of the solution option3 for SAR limits | vivo | imported from 3GU |
R4‑1916182 | TP for TR 37.815 high power UE (PC2) for EN-DC FDD-TDD | Samsung, CHTTL, China Unicom, Vivo, SGS Wireless | imported from 3GU |
R4‑1916183 | LS on MPE enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑1916184 | WF for spherical coverage enhancement^^for FR2 | NTT DOCOMO, Verizon, KDDI, AT&T, SoftBank Corp., T-Mobile USA Inc., CHTTL, Vodafone, Nokia | imported from 3GU |
R4‑1916185 | Reply LS on MOP for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1916186 | WF on support of asymmetric channel bandwidth for n66 | Huawei | imported from 3GU |
R4‑1916187 | Reply LS on MOP for intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1916188 | CR to 38.101-1: DMRS Exceptions | Qualcomm Incorporated | imported from 3GU |
R4‑1916189 | Add RRM Test case setup for 1 AoA in Rx beam peak and 1 in non Rx beam peak | ANRITSU LTD | imported from 3GU |
R4‑1916190 | CR to TS 38.101-2: Correctin on CA NRACLR | ZTE Corporation | imported from 3GU |
R4‑1916191 | CR to 37.145-2 on Receiver spurious emission requirements | Ericsson, NTT DOCOMO, INC. | imported from 3GU |
R4‑1916192 | CR to 37.105 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1916193 | Editorial correction for SCell activation and deactivation delay | CATT | imported from 3GU |
R4‑1916194 | Applicability of relaxed neighbour cell monitoring for category M1/M2 | Ericsson | imported from 3GU |
R4‑1916195 | Correction of feMTC test cases | Ericsson | imported from 3GU |
R4‑1916196 | CR 38.133 (A.7.5.7) TCs for PSCell addition and release delay | Ericsson | imported from 3GU |
R4‑1916197 | Corrections of references in measurement uncertainty table | Ericsson | imported from 3GU |
R4‑1916198 | CR to 37.105 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1916199 | CR to 37.145-2 on Reciever Intermodulation signal offset correction | Ericsson | imported from 3GU |
R4‑1916200 | CR to TS 38.113 Correction on definitions subclause 3.1 | ZTE Corporation | imported from 3GU |
R4‑1916201 | CR to TS 38.113 Editorial Corrections(clause 2 & subclause 3.1)_r1 | ZTE Corporation | imported from 3GU |
R4‑1916202 | CR for 38.101-3 Correction of EN-DC BCS | Huawei, HiSilicon | imported from 3GU |
R4‑1916203 | CR for 38.101-3 correction for intra-band EN-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1916204 | CR for 38.101-3 intra-band EN-DC MPR/AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1916205 | CR for 38.101-2 on NS_202 band defintion | Huawei, HiSilicon | imported from 3GU |
R4‑1916206 | Adding Band40 for UE category 1bis into Rel-16 TS 36.101 | CMCC | imported from 3GU |
R4‑1916207 | CR for REL-16 TS36.307 for adding B40 to UE category 1bis | CMCC | imported from 3GU |
R4‑1916208 | CR to TS 38.101-2: Correctin on CA NRACLR | ZTE Corporation | imported from 3GU |
R4‑1916209 | WF on simulation assumption for MPR of Pi/2 BPSK DMRS | Qualcomm Incorporated | imported from 3GU |
R4‑1916210 | CR to reflect the completed ENDC combinations for 3 bands DL with 3 bands UL into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1916211 | LS response on Test methods for Over-the-Air Total Radiated Power field measurements for IMT radio equipment utilizing active antennas | Ericsson | imported from 3GU |
page generated from database: 2024-04-13 13:51:47