3GPP TDocs (written contributions) at meeting
Meeting: R4-80 - 2016-08-22 to 2016-08-26, Gothenburg
meeting id: R4-80 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑164979 | RAN4-80 Meeting Agenda | Samsung Electronics Co., Ltd | imported from 3GU |
R4‑164980 | RAN4-79 Meeting report | MCC Support | imported from 3GU |
R4‑164981 | RAN4-79-AH Meeting report | MCC Support | imported from 3GU |
R4‑164982 | Text proposal: Near Field Measurement Method using Standard 3GPP Interfaces | KATHREIN-Werke KG | imported from 3GU |
R4‑164983 | Corrections on eMTC RX in TS 36.101 | Sony | imported from 3GU |
R4‑164984 | On the definition of RF conformance measurement reference points | ROHDE & SCHWARZ | imported from 3GU |
R4‑164985 | Correction to clause A.8.5 E-UTRA Measurements test cases | ANRITSU LTD | imported from 3GU |
R4‑164986 | Correction to clause A.8.5 E-UTRA Measurements Test Cases | ANRITSU LTD | imported from 3GU |
R4‑164987 | Correction to clause A.8.5 E-UTRA Measurements Test Cases | ANRITSU LTD | imported from 3GU |
R4‑164988 | Correct UE DL category for 256QAM demodulation | ANRITSU LTD | imported from 3GU |
R4‑164989 | Correct UE DL category for 256QAM demodulation | ANRITSU LTD | imported from 3GU |
R4‑164990 | Correct UE DL category for 256QAM demodulation | ANRITSU LTD | imported from 3GU |
R4‑164991 | Duration of T3 in RRM 3DL Test cases A.8.16.31, 32, 33, 34 | ANRITSU LTD | imported from 3GU |
R4‑164992 | Duration of T3 in RRM 3DL Test cases A.8.16.31, 32, 33, 34 | ANRITSU LTD | imported from 3GU |
R4‑164993 | Duration of T3 in RRM 3DL Test cases A.8.16.31, 32, 33, 34 | ANRITSU LTD | imported from 3GU |
R4‑164994 | Release 14 36.307 CR to make Band 41 power class 2 release independent | SPRINT Corporation | imported from 3GU |
R4‑164995 | Release 13 36.307 CR to make Band 41 power class 2 release independent | SPRINT Corporation | imported from 3GU |
R4‑164996 | Release 12 36.307 CR to make Band 41 power class 2 release independent | SPRINT Corporation | imported from 3GU |
R4‑164997 | Release 11 36.307 CR to make Band 41 power class 2 release independent | SPRINT Corporation | imported from 3GU |
R4‑164998 | Release 10 36.307 CR to make Band 41 power class 2 release independent | SPRINT Corporation | imported from 3GU |
R4‑164999 | Duration of T3 in RRM 4DL/5DL Test cases A.8.16.55, 56, 73, 74 | ANRITSU LTD | imported from 3GU |
R4‑165000 | Duration of T3 in RRM 4DL/5DL Test cases A.8.16.55, 56, 73, 74. | ANRITSU LTD | imported from 3GU |
R4‑165001 | UE reference architecture and other considerations at millimeter wave | Intel Corporation | imported from 3GU |
R4‑165002 | UE Maximum Output Power | Intel Corporation | imported from 3GU |
R4‑165003 | Definitions of TX parameters | Intel Corporation | imported from 3GU |
R4‑165004 | CA_12A-12A configurations for REFSENS test | Intel Corporation | imported from 3GU |
R4‑165005 | On NB-IoT enhancement additional power class | Intel Corporation | imported from 3GU |
R4‑165006 | On NB-IoT REFSENS with repetition | Intel Corporation | imported from 3GU |
R4‑165007 | NR coexistence study methodology and assumption | Intel Corporation | imported from 3GU |
R4‑165008 | Preliminary simulation results of NR coexistence study for calibration | Intel Corporation | imported from 3GU |
R4‑165009 | Discussion on LTE DL Control Channels IM UE Capabilities | Intel Corporation | imported from 3GU |
R4‑165010 | Draft LS on LTE DL Control Channel IM UE capabilities | Intel Corporation | imported from 3GU |
R4‑165011 | LTE DL Control Channels IM impairments simulation results | Intel Corporation | imported from 3GU |
R4‑165012 | Summary of LTE DL Control Channels IM impairments results (FDD) | Intel Corporation | imported from 3GU |
R4‑165013 | Summary of LTE DL Control Channels IM impairments results (TDD) | Intel Corporation | imported from 3GU |
R4‑165014 | CR on finalization of enhanced PDCCH/PCFICH performance requirements for the DL Control Channel IM | Intel Corporation, ZTE | imported from 3GU |
R4‑165015 | CR on finalization of enhanced PDCCH/PCFICH performance requirements for the DL Control Channel IM | Intel Corporation, ZTE | imported from 3GU |
R4‑165016 | EB/FD-MIMO PDSCH demodulation performance requirements | Intel Corporation | imported from 3GU |
R4‑165017 | EB/FD-MIMO Class B K>1 CRI reporting performance requirements | Intel Corporation | imported from 3GU |
R4‑165018 | EB/FD-MIMO measurements restrictions performance requirements | Intel Corporation | imported from 3GU |
R4‑165019 | eD2D UE-NW Relaying RRM performance requirements | Intel Corporation | imported from 3GU |
R4‑165020 | eD2D UE demodulation performance requirements | Intel Corporation | imported from 3GU |
R4‑165021 | CR on introduction of OOC D2D Discovery demodulation performance requirements | Intel Corporation | imported from 3GU |
R4‑165022 | CR on introduction of OOC D2D Discovery demodulation requirements | Intel Corporation | imported from 3GU |
R4‑165023 | V2V REFSENS demodulation performance simulation results | Intel Corporation | imported from 3GU |
R4‑165024 | Discussion on V2V RRM Impacts | Intel Corporation | imported from 3GU |
R4‑165025 | Discussion on V2V UE transmit frequency error requirements | Intel Corporation | imported from 3GU |
R4‑165026 | New Work Item Proposal: Enhanced CRS and SU-MIMO Interference Mitigation Performance Requirements for LTE | Intel Corporation, Huawei, LGE | imported from 3GU |
R4‑165027 | Motivation for Enhanced CRS Interference Mitigation Performance Requirements for LTE | Intel Corporation, Huawei, LGE | imported from 3GU |
R4‑165028 | MPDCCH simulation results and discussion | Intel Corporation | imported from 3GU |
R4‑165029 | MPDSCH simulation results and discussion | Intel Corporation | imported from 3GU |
R4‑165030 | Consideration on NR RRM | Intel Corporation | imported from 3GU |
R4‑165031 | Further consideration on eLAA measurement requirements | Intel Corporation | imported from 3GU |
R4‑165032 | Discussion on the network assistant signaling for ehanced RRM requirements in HST | Intel Corporation | imported from 3GU |
R4‑165033 | Discussion on MCS and scenario selection, and UE demodulation performance for bidirectional HST SFN channels | Intel Corporation | imported from 3GU |
R4‑165034 | Discussion on UE demodulation performance for unidirectional HST SFN channels | Intel Corporation | imported from 3GU |
R4‑165035 | Network-assisted signaling for performance enhancement in high speed scenarios | Intel Corporation | imported from 3GU |
R4‑165036 | Analysis on CQI reporting in high speed scenarios | Intel Corporation | imported from 3GU |
R4‑165037 | Discussion on NPBCH Demodulation for NB-IoT | Intel Corporation | imported from 3GU |
R4‑165038 | Discussion on NPDCCH Demodulation for NB-IoT | Intel Corporation | imported from 3GU |
R4‑165039 | Discussion on NPDSCH Demodulation for NB-IoT | Intel Corporation | imported from 3GU |
R4‑165040 | 4 RX AP UE PDSCH SDR/CA tests and tests applicability | Intel Corporation | imported from 3GU |
R4‑165041 | Discussion on Homogenous network CRS-IM UE capability introduction | Intel Corporation | imported from 3GU |
R4‑165042 | LS to RAN2 on Homogenous network CRS-IM UE capability introduction | Intel Corporation | imported from 3GU |
R4‑165043 | Discussion on LAA UE PDSCH performance evaluation | Intel Corporation | imported from 3GU |
R4‑165044 | Discussion on LAA CSI performance evaluation | Intel Corporation | imported from 3GU |
R4‑165045 | Discussion on LAA control channel test conditions | Intel Corporation | imported from 3GU |
R4‑165046 | Discussion on MuST UE Parameter detection | Intel Corporation | imported from 3GU |
R4‑165047 | Discussion on multi-user scenarios in MuST usecases | Intel Corporation | imported from 3GU |
R4‑165048 | Simulation results of UCG parameters for eMTC | Intel Corporation | imported from 3GU |
R4‑165049 | Way forward on UCG parameters for eMTC | Intel Corporation | imported from 3GU |
R4‑165050 | Testability considerations for NR | Intel Corporation | imported from 3GU |
R4‑165051 | RAN4 work plan for eMob | Intel Corporation | imported from 3GU |
R4‑165052 | On defining the performance requirement framework | Intel Corporation | imported from 3GU |
R4‑165053 | MIMO OTA evening adhoc notes | Intel Corporation | imported from 3GU |
R4‑165054 | MIMO OTA way forward | Intel Corporation | imported from 3GU |
R4‑165055 | On eMTC RLM for CEModeA | Intel Corporation | imported from 3GU |
R4‑165056 | On eMTC RLM for CEModeB | Intel Corporation | imported from 3GU |
R4‑165057 | On measurement accuracy for NB-IoT | Intel Corporation | imported from 3GU |
R4‑165058 | On Cell ID for NB-IoT | Intel Corporation | imported from 3GU |
R4‑165059 | On Tx Timing accuracy for NB-IoT | Intel Corporation | imported from 3GU |
R4‑165060 | On RLM for NB-IoT | Intel Corporation | imported from 3GU |
R4‑165061 | On PHR for NB-IoT | Intel Corporation | imported from 3GU |
R4‑165062 | On enhancement of RRM for eNB-IoT | Intel Corporation | imported from 3GU |
R4‑165063 | On further enhancements for RRM in FeMTC | Intel Corporation | imported from 3GU |
R4‑165064 | Consideration on RAN4 NR SI work | NTT DOCOMO INC, INC | imported from 3GU |
R4‑165065 | Consideration of RAN4 NR-AH in June 2017 | NTT DOCOMO INC, INC., Qualcomm Incorporated | imported from 3GU |
R4‑165066 | Necessity of consideration of both requirements and testability | NTT DOCOMO INC, INC. | imported from 3GU |
R4‑165067 | MSD for CA_8A-41A 2DL/2UL | ZTE, Nubia | imported from 3GU |
R4‑165068 | MSD for CA_8A-46A 2DL/1UL | ZTE, Nubia | imported from 3GU |
R4‑165069 | TP for TR36.714-02-02: Discussions to complete 2UL/2DL of 41A-42A | SoftBank Corp. | imported from 3GU |
R4‑165070 | TP for TR36.714-03-01: Finalization of 3DL/1UL CA of B1+B8+B28 and B3+B8+B28 | SoftBank Corp. | imported from 3GU |
R4‑165071 | Corrections of CA 1+41+42 and 3+41+42 | SoftBank Corp., KDDI | imported from 3GU |
R4‑165072 | Corrections of CA 8-42-42 | SoftBank Corp. | imported from 3GU |
R4‑165073 | TP for TR 36.714-02-01: Capture feasible studies for Band 3 and Band 39 2DL/1UL CA | ZTE, Nubia, CMCC | imported from 3GU |
R4‑165074 | New work item proposal: Band 11 support in NB-IoT | SoftBank Corp. | imported from 3GU |
R4‑165075 | TP for TR 36.714-02-01: Filter information for Band 3 and Band 39 2DL/1UL CA | ZTE, Nubia, CMCC | imported from 3GU |
R4‑165076 | TR skeleton of TR36.745: Feasibility study on global application of LTE Band 11 and of LTE Band 21 UEs | SoftBank Corp. | imported from 3GU |
R4‑165077 | TP for TR36.745: Background and protection requirements (section 4) | SoftBank Corp. | imported from 3GU |
R4‑165078 | TP for TR36.745: Simulation conditions (section 5) | SoftBank Corp. | imported from 3GU |
R4‑165079 | Status on LTE OTA performance requirement in China market | CATR | imported from 3GU |
R4‑165080 | MPAC measurement results of TD-LTE devices on TRP and TRS performance | CATR | imported from 3GU |
R4‑165081 | Improving the single antenna port description in UL-MIMO clauses | Huawei, Hisilicon | imported from 3GU |
R4‑165082 | Improving the single antenna port description in UL-MIMO clauses | Huawei, Hisilicon | imported from 3GU |
R4‑165083 | Improving the single antenna port description in UL-MIMO clauses | Huawei, Hisilicon | imported from 3GU |
R4‑165084 | Improving the single antenna port description in UL-MIMO clauses | Huawei, Hisilicon | imported from 3GU |
R4‑165085 | Improving the single antenna port description in UL-MIMO clauses | Huawei, Hisilicon | imported from 3GU |
R4‑165086 | TR 36.714-03-01: 3DL/1UL inter-band CA R14 v0.3.0 | Huawei, Hisilicon | imported from 3GU |
R4‑165087 | TP for TR 36.714-03-01: update the scope | Huawei, Hisilicon | imported from 3GU |
R4‑165088 | Introduction of completed R14 3DL band combinations to TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑165089 | Introduction of completed R14 3DL band combinations to TS 36.104 | Huawei, Hisilicon | imported from 3GU |
R4‑165090 | Introduction of completed R14 3DL band combinations to TS 36.141 | Huawei, Hisilicon | imported from 3GU |
R4‑165091 | Revised WID: 3DL 1UL basket WI | Huawei, Hisilicon | imported from 3GU |
R4‑165092 | TP for TR 36.714-03-01: CA_3DL_28A-41A-42A _BCS0 clause | Huawei, Hisilicon | imported from 3GU |
R4‑165093 | TP for TR 36.714-04-01: Clauses for CA_4DL_28A-41A-42C_BCS0 and CA_4DL_28A-41C-42A_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑165094 | TP for TR 36.714-05-01: CA_5DL_28A-41C-42C_BCS0 clause | Huawei, Hisilicon | imported from 3GU |
R4‑165095 | Correction of CA_42-42 sub-block CA configuration | Huawei, Hisilicon | imported from 3GU |
R4‑165096 | Correction of CA_42-42 sub-block CA configuration | Huawei, Hisilicon | imported from 3GU |
R4‑165097 | Discussion of the CA REFSENS harmonic formula | Huawei, Hisilicon | imported from 3GU |
R4‑165098 | Correction of the CA REFSENS harmonic formula | Huawei, Hisilicon | imported from 3GU |
R4‑165099 | Correction of the CA REFSENS harmonic formula | Huawei, Hisilicon | imported from 3GU |
R4‑165100 | Correction of the CA REFSENS harmonic formula | Huawei, Hisilicon | imported from 3GU |
R4‑165101 | Correction of the CA REFSENS harmonic formula | Huawei, Hisilicon | imported from 3GU |
R4‑165102 | Adding UL configuration for CA_28A-42A and CA_28A-42C | Huawei, Hisilicon | imported from 3GU |
R4‑165103 | Adding UL configuration for CA_28A-42A and CA_28A-42C | Huawei, Hisilicon | imported from 3GU |
R4‑165104 | Introduction 4Rx feature for B40 single carrier and CA_3-40 | Huawei, Hisilicon | imported from 3GU |
R4‑165105 | WF on MUST General Issues | MediaTek Inc. | imported from 3GU |
R4‑165106 | Draft reply LS on blind detection evaluations | MediaTek Inc. | imported from 3GU |
R4‑165107 | Blind Detection Evaluation on Interference Existence for Cases 1 and 2 in CRS-based TM | MediaTek Inc. | imported from 3GU |
R4‑165108 | Square bracket removal for RLM antenna connection for 4 Rx capable UEs | Ericsson | imported from 3GU |
R4‑165109 | Square bracket removal for RLM antenna connection for 4 Rx capable UEs | Ericsson | imported from 3GU |
R4‑165110 | Low density gap patterns for measurement gap enhancement | Ericsson | imported from 3GU |
R4‑165111 | Discussion on information needed by RAN2 to proceed with signalling design for gaps for interruption control | Ericsson | imported from 3GU |
R4‑165112 | Discussion on information needed by RAN2 to proceed with signalling design for per component carrier measurement gaps | Ericsson | imported from 3GU |
R4‑165113 | Discussion on information needed by RAN2 to proceed with signalling design for gaps for short gap length | Ericsson | imported from 3GU |
R4‑165114 | [DRAFT] LS on Measurement gap enhancement To : RAN WG2 CC: RAN WG1 | Ericsson | imported from 3GU |
R4‑165115 | Remaining RRM issues for high speed scenarios in RRC connected state | Ericsson | imported from 3GU |
R4‑165116 | Remaining RRM issues for high speed scenarios in idle mode | Ericsson | imported from 3GU |
R4‑165117 | LAA channel occupancy test | Ericsson | imported from 3GU |
R4‑165118 | LAA channel occupancy test | Ericsson | imported from 3GU |
R4‑165119 | LBT model for LAA RRM tests | Ericsson | imported from 3GU |
R4‑165120 | LBT model for LAA RRM tests | Ericsson | imported from 3GU |
R4‑165121 | LAA Average RSSI accuracy test | Ericsson | imported from 3GU |
R4‑165122 | LAA Average RSSI accuracy test | Ericsson | imported from 3GU |
R4‑165123 | Test case list for LAA RRM | Ericsson | imported from 3GU |
R4‑165124 | Considerations related to RAN2 questions on mobility enhancements and RACHless handover | Ericsson | imported from 3GU |
R4‑165125 | [DRAFT] Reply LS on the feasibility of mobility enhancement solutions To : RAN WG2 CC: RAN WG1, RAN WG3 | Ericsson | imported from 3GU |
R4‑165126 | Considerations on NR RRM testing | Ericsson | imported from 3GU |
R4‑165127 | Focus areas and planning for RRM Issues | Ericsson | imported from 3GU |
R4‑165128 | Impact of decisions on bandwidth and subcarrier spacing on RRM requirements | Ericsson | imported from 3GU |
R4‑165129 | Blind Detection Evaluation on Power Ratio for Cases 1 and 2 in CRS-based TM | MediaTek Inc. | imported from 3GU |
R4‑165130 | Blind Detection Evaluation for Case 1 in DMRS-based TM | MediaTek Inc. | imported from 3GU |
R4‑165131 | Blind Detection Evaluation for Case 3 in CRS-based TM | MediaTek Inc. | imported from 3GU |
R4‑165132 | Blind Detection Evaluation for Case 3 in DMRS-based TM | MediaTek Inc. | imported from 3GU |
R4‑165133 | Blind Detection Conclusions for MUST Case 1 and 2 | MediaTek Inc. | imported from 3GU |
R4‑165134 | Blind Detection Conclusions for MUST Case 3 | MediaTek Inc. | imported from 3GU |
R4‑165135 | Correction of CA_42-42 sub-block CA configuration | Huawei, Hisilicon | imported from 3GU |
R4‑165136 | Correction of CA_42-42 sub-block CA configuration | Huawei, Hisilicon | imported from 3GU |
R4‑165137 | ETSI standards / 3GPP specifications for BB-PPDR equipment; technical conditions in CEPT | ECC CEPT | imported from 3GU |
R4‑165138 | INCREASING LEVELS OF RF NOISE IN THE ENVIRONMENT AND CONSEQUENT INTERFERENCE TO RADIOCOMMUNICATION SERVICES | ITU Working Party 1A | imported from 3GU |
R4‑165139 | WORK TOWARDS REVISION 1 OF RECOMMENDATIONS ITU-R M.2070 AND M.2071 | ITU Working Party 5D | imported from 3GU |
R4‑165140 | Updated characteristics of terrestrial IMT systems for frequency sharing / interference analysis in the frequency range between 24.25 GHz and 86 GHz | ITU Working Party 5D | imported from 3GU |
R4‑165141 | MODELLING AND SIMULATION OF IMT NETWORKS FOR USE IN SHARING AND COMPATIBILITY STUDIES | ITU Working Party 5D | imported from 3GU |
R4‑165142 | Reply LS on Parameters for WP5D sharing and compatibility studies | 3GPP RAN WG1 | imported from 3GU |
R4‑165143 | LS on OTDOA for the same PCI | 3GPP RAN WG1 | imported from 3GU |
R4‑165144 | LS on RAN1 agreements potentially related to RAN2 in sidelink-based V2V | 3GPP RAN WG1 | imported from 3GU |
R4‑165145 | LS on RAN1 Agreements in MUST | 3GPP RAN WG1 | imported from 3GU |
R4‑165146 | Reply LS on the feasibility of mobility enhancement solutions | 3GPP RAN WG1 | imported from 3GU |
R4‑165147 | LS on NB-IoT Performance | 3GPP RAN WG1 | imported from 3GU |
R4‑165148 | Response LS to IEEE 802.11 regarding LAA | 3GPP RAN WG1 | imported from 3GU |
R4‑165149 | Response LS to Wi-Fi Alliance regarding LAA | 3GPP RAN WG1 | imported from 3GU |
R4‑165150 | Reply LS on continuous uplink transmission in eMTC | 3GPP RAN WG1 | imported from 3GU |
R4‑165151 | LS on UL DM-RS for NPUSCH format 1 | 3GPP RAN WG1 | imported from 3GU |
R4‑165152 | LS on Uplink Capacity Enhancements for LTE | 3GPP RAN WG1 | imported from 3GU |
R4‑165153 | LS to RAN1 on WLAN RSSI | 3GPP RAN WG2 | imported from 3GU |
R4‑165154 | Reply LS to RAN4 on Handover Optimization for HPUE – RAN2 Decisions | 3GPP RAN WG2 | imported from 3GU |
R4‑165155 | LS on the evaluation of simultaneous transmission and reception | 3GPP RAN WG2 | imported from 3GU |
R4‑165156 | Response LS on the feasibility of mobility enhancement solutions | 3GPP RAN WG3 | imported from 3GU |
R4‑165157 | LS on applicability of RF requirements when PUSCH frequency hopping is configured | 3GPP RAN WG5 | imported from 3GU |
R4‑165158 | Reply LS to ITU-R WP5D/TEMP/39(Rev.2) = RP-160508 on Characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz | 3GPP RAN | imported from 3GU |
R4‑165159 | Reply LS on Rel-13 LAA specifications | 3GPP RAN | imported from 3GU |
R4‑165160 | LS on Network Assistance for Network Synchronization in LTE | 3GPP RAN | imported from 3GU |
R4‑165161 | Actions to be launched from reception of LS from CEPT/ECC on ETSI standards / 3GPP specifications for BB-PPDR equipment | Airbus DS SLC | imported from 3GU |
R4‑165162 | CBRS 3.5 GHz band for LTE in the United States | Dish Network | imported from 3GU |
R4‑165163 | Way forward on test configuration | Nokia, Ericsson, Huawei | imported from 3GU |
R4‑165164 | Way forward on NB-IoT test tolerance | Nokia, Ericsson, Huawei | imported from 3GU |
R4‑165165 | Corrections on NB-IoT BS unwanted emissions requirements | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165166 | Corrections on NB-IoT BS unwanted emissions requirements | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165167 | Corrections on NB-IoT BS unwanted emissions requirements | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165168 | Corrections on NB-IoT BS unwanted emissions requirements | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165169 | NB-IoT guard-band operation with 5 MHz E-UTRA channel bandwidth | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165170 | Spurious responses for NB-IoT BS receiver blocking requirements | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165171 | Draft CR: Acceptable uncertainty of Test System Clause 4.1.2 in TS36.141 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165172 | Draft CR: Acceptable uncertainty of Test System Clause 4.1.2 in TS37.141 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165173 | Draft CR: Test configurations Clause 4.10 in TS36.141 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165174 | Draft CR: Test configurations Clause 4.8 in TS37.141 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165175 | Draft CR: Unwanted Emission Clause 6.6 in TS36.141 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165176 | Draft CR: Unwanted Emission Clause 6.6 in TS37.141 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165177 | Draft CR: Test Tolerances and Derivation of Test Requirements Annex G in TS36.141 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165178 | Draft CR: Test Tolerances and Derivation of Test Requirements Annex C in TS37.141 | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165179 | TP for TR 37.871: Necessary changes to the core requirements for Multi-Band Base Station testing with three or more bands | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165180 | TP for TR 37.871: Necessary changes to the test requirements for Multi-Band Base Station testing with three or more bands | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165181 | System level simulation methodology and assumptions for coexistence study for WP5D on new radio access technology | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165182 | Revision of WID: LTE Advanced inter-band CA Rel-14 for 2DL/1UL | Qualcomm Incorporated | imported from 3GU |
R4‑165183 | TR 36.714-02-01 | Qualcomm Incorporated | imported from 3GU |
R4‑165184 | TP: Amedments to the scope of TR 36 714-02-01_Rel14_2DL 1UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑165185 | Introduction of completed combination to 36.101 | Qualcomm Incorporated | imported from 3GU |
R4‑165186 | Introduction of completed combination to 36.104 | Qualcomm Incorporated | imported from 3GU |
R4‑165187 | Introduction of completed combination to 36.141 | Qualcomm Incorporated | imported from 3GU |
R4‑165188 | MSD on 2UL CA_8A-41A | Qualcomm Incorporated | imported from 3GU |
R4‑165189 | MSD for 2UL 3DL CA_3A-7A-8A | Qualcomm Incorporated | imported from 3GU |
R4‑165190 | How to treat MSD on CA_3A-3A-8A | Qualcomm Incorporated | imported from 3GU |
R4‑165191 | MSD for 2UL 3DL CA_1A-3A-40A | Qualcomm Incorporated | imported from 3GU |
R4‑165192 | Next level fallback configurations for xDL 2UL | Qualcomm Incorporated | imported from 3GU |
R4‑165193 | Optional PCell indication in Rel-13 and Rel-14 | Qualcomm Incorporated | imported from 3GU |
R4‑165194 | Removal of B42 and B43 co-existence requirements for asynchronous operation | Qualcomm Incorporated | imported from 3GU |
R4‑165195 | UL256QAM TX challenges | Qualcomm Incorporated | imported from 3GU |
R4‑165196 | UL256QAM System simulation results | Qualcomm Incorporated | imported from 3GU |
R4‑165197 | Preliminary 256 QAM MPR | Qualcomm Incorporated | imported from 3GU |
R4‑165198 | UL256QAM Min power | Qualcomm Incorporated | imported from 3GU |
R4‑165199 | LS Reply on UL256QAM capability | Qualcomm Incorporated | imported from 3GU |
R4‑165200 | Updates on Rayleigh Validation for the RC+CE configuration | ETS-Lindgren Europe | imported from 3GU |
R4‑165201 | TM9 test with new UE behavior of PDSCH collision handling | Qualcomm Incorporated | imported from 3GU |
R4‑165202 | Simulation results for LAA demodulation performance tests | Qualcomm Incorporated | imported from 3GU |
R4‑165203 | Remaining issues on LAA CQI test | Qualcomm Incorporated | imported from 3GU |
R4‑165204 | Simulation results on PDSCH demodulation test for Rel-13 DM-RS enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑165205 | Tablet LTE TRP and TRS measurements for bands 3, 7 and 20 | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑165206 | OTA TRP/TRS framework improvements | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑165207 | TP for TR 36.714-02-01: CA_20A-32A BCS1 | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑165208 | Requirements discussion for CA 7+32 and CA 3+7+32 | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑165209 | correction CR for 36.104(Rel-13) NB-IoT In-channel selectivity | NTT DOCOMO INC. | imported from 3GU |
R4‑165210 | correction CR for 36.104(Rel-14) NB-IoT In-channel selectivity | NTT DOCOMO INC. | imported from 3GU |
R4‑165211 | draft CR for 36.141 In-channel selectivity | NTT DOCOMO INC. | imported from 3GU |
R4‑165212 | draft CR for 37.141 In-channel selectivity | NTT DOCOMO INC. | imported from 3GU |
R4‑165213 | TP for TR 36.714-02-01 2DL1UL CA_19A-46A_BCS0 | NTT DOCOMO INC. | imported from 3GU |
R4‑165214 | TP for TR 36.714-03-01 3DL1UL CA_19A-46C_BCS0 | NTT DOCOMO INC. | imported from 3GU |
R4‑165215 | TP for TR 36.714-04-01 4DL1UL CA_19A-46D_BCS0 | NTT DOCOMO INC. | imported from 3GU |
R4‑165216 | TP for TR 36.714-05-01 5DL1UL CA_19A-46E_BCS0 | NTT DOCOMO INC. | imported from 3GU |
R4‑165217 | TP for TR 36.714-02-01 2DL1UL CA_21A-46A_BCS0 | NTT DOCOMO INC. | imported from 3GU |
R4‑165218 | TP for TR 36.714-03-01 3DL1UL CA_21A-46C_BCS0 | NTT DOCOMO INC. | imported from 3GU |
R4‑165219 | TP for TR 36.714-04-01 4DL1UL CA_21A-46D_BCS0 | NTT DOCOMO INC. | imported from 3GU |
R4‑165220 | TP for TR 36.714-05-01 5DL1UL CA_21A-46E_BCS0 | NTT DOCOMO INC. | imported from 3GU |
R4‑165221 | CR for 36.141(Rel-13) In-channel selectivity | NTT DOCOMO INC. | imported from 3GU |
R4‑165222 | CR for 37.141(Rel-13) In-channel selectivity | NTT DOCOMO INC. | imported from 3GU |
R4‑165223 | CR for 36.141(Rel-14) In-channel selectivity | NTT DOCOMO INC. | imported from 3GU |
R4‑165224 | CR for 37.141(Rel-14) In-channel selectivity | NTT DOCOMO INC. | imported from 3GU |
R4‑165225 | BS RX RF requirements for UL LAA | NTT DOCOMO INC. | imported from 3GU |
R4‑165226 | TP for TR 36.714-03-01 CA_1A-3A-21A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165227 | TP for TR 36.714-03-01 CA_1A-21A-28A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165228 | TP for TR 36.714-03-01 CA_1A-28A-42A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165229 | TP for TR 36.714-03-01 CA_3A-19A-21A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165230 | TP for TR 36.714-03-01 CA_3A-21A-28A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165231 | TP for TR 36.714-03-01 CA_3A-21A-42A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165232 | TP for TR 36.714-03-01 CA_3A-28A-42A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165233 | TP for TR 36.714-03-01 CA_21A-28A-42A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165234 | On EESS protection for Band 21 UEs | NTT DOCOMO, INC. | imported from 3GU |
R4‑165235 | Operating scenarios to enhance the value of the 1.5GHz band | NTT DOCOMO, INC. | imported from 3GU |
R4‑165236 | A solution for maximum use of the 1.5GHz band | NTT DOCOMO, INC. | imported from 3GU |
R4‑165237 | ACLR for eLAA UEs | NTT DOCOMO, INC. | imported from 3GU |
R4‑165238 | TP for TR 36.714-00-02 CA_3A-42C | NTT DOCOMO, INC. | imported from 3GU |
R4‑165239 | TP for TR 36.714-02-02 CA_3A-21A | NTT DOCOMO, INC. | imported from 3GU |
R4‑165240 | Measurement results of LTE BHH TRP/TRS | NTT DOCOMO INC. | imported from 3GU |
R4‑165241 | BHH requirement for UMTS Band VI and XIX | NTT DOCOMO INC. | imported from 3GU |
R4‑165242 | The way to define LTE TRP/TRS requirements | NTT DOCOMO INC. | imported from 3GU |
R4‑165243 | 36.104 CR on bracket removal for BS IRC receiver | China Telecom | imported from 3GU |
R4‑165244 | 36.104 CR on bracket removal for BS IRC receiver | China Telecom | imported from 3GU |
R4‑165245 | 36.884 CR on bracket removal for BS IRC receiver | China Telecom | imported from 3GU |
R4‑165246 | 36.141 CR on bracket removal for BS IRC receiver | China Telecom | imported from 3GU |
R4‑165247 | 36.141 CR on bracket removal for BS IRC receiver | China Telecom | imported from 3GU |
R4‑165248 | Discussion on B41 HPUE | China Telecom | imported from 3GU |
R4‑165249 | Draft CR on transmit power for B41 HPUE | China Telecom | imported from 3GU |
R4‑165250 | Draft CR on ACLR for B41 HPUE | China Telecom | imported from 3GU |
R4‑165251 | Discussion on NR co-existence assumptions | China Telecom | imported from 3GU |
R4‑165252 | On the feasibility of mobility enhancement solutions | China Telecom | imported from 3GU |
R4‑165253 | Assistance information for downlink MUST | China Telecom | imported from 3GU |
R4‑165254 | Motivation for new SI on Interference cancellation receiver for LTE BS | China Telecom, Huawei | imported from 3GU |
R4‑165255 | Draft SID on Interference cancellation receiver for LTE BS | China Telecom, Huawei | imported from 3GU |
R4‑165256 | On power amplifier model for the New Radio | Sumitomo Electric | imported from 3GU |
R4‑165257 | On UE RF high frequency testability | Huawei, Hisilicon | imported from 3GU |
R4‑165258 | TP for TR 37.842: Indoor Anechoic Chamber EIRP testing uncertainty value | Sumitomo Electric | imported from 3GU |
R4‑165259 | On uncertainty value of measurement equipment | Sumitomo Electric | imported from 3GU |
R4‑165260 | On deriving the test tolerance for OTA test | Sumitomo Electric | imported from 3GU |
R4‑165261 | Working Procedure for eLAA example combinations | KDDI Corporation | imported from 3GU |
R4‑165262 | Requests by WP 5D for WRC-19 agenda item 1.13 | Nokia | imported from 3GU |
R4‑165263 | Response to WP 5D for WRC-19 agenda item 1.13 | Nokia | imported from 3GU |
R4‑165264 | Transmitter characteristic to WP 5D for WRC-19 agenda item 1.13 | Nokia | imported from 3GU |
R4‑165265 | Response LS on Characteristics of terrestrial IMT systems for frequency sharing / interference analysis in the frequency range between 24.25 GHz and 86 GHz | Nokia | imported from 3GU |
R4‑165266 | Response LS on Modelling and simulation of IMT networks for use in sharing and compatibility studies | Nokia | imported from 3GU |
R4‑165267 | TP for TR36.714-02-01: Operating bands, Channel bandwidths, Co-existence study and delta Tib/Rib values for CA_8A-46A_BCS0 | ZTE, Nubia | imported from 3GU |
R4‑165268 | TP for TR36.714-03-01: Operating bands, Channel bandwidths, Co-existence study and delta Tib/Rib values for CA_8A-46C_BCS0 | ZTE, Nubia | imported from 3GU |
R4‑165269 | TP for TR36.714-03-01: Operating bands, Channel bandwidths, Co-existence study and delta Tib/Rib values for CA_8B-46A_BCS0 | ZTE, Nubia | imported from 3GU |
R4‑165270 | Work plan for SI on NB-IoT RF requirement for coexistence with CDMA | China Telecom | imported from 3GU |
R4‑165271 | Validation Measurements for the Bluetest RC+CE Test Setup | Bluetest AB | imported from 3GU |
R4‑165272 | CR to TR37.977: Clarification to the Rayleigh Validation | Bluetest AB | imported from 3GU |
R4‑165273 | The Skeleton for TR of NB-IoT RF requirement for coexistence with CDMA | China Telecom | imported from 3GU |
R4‑165274 | Consideration on NB-IoT coexistence with CDMA | China Telecom | imported from 3GU |
R4‑165275 | Corrections on eMTC RX in TS 36.101 | Sony | imported from 3GU |
R4‑165276 | Impact on requiremets for RSTD in shared cells | Ericsson | imported from 3GU |
R4‑165277 | WF on RSTD requirements in shared cells | Ericsson | imported from 3GU |
R4‑165278 | On RSTD measurement report mapping enhancement | Ericsson | imported from 3GU |
R4‑165279 | Higher resolution RSTD measurement report mapping | Ericsson | imported from 3GU |
R4‑165280 | LS on higher resolution RSTD measurement report mapping | Ericsson | imported from 3GU |
R4‑165281 | Simulation assumptions for UE Rx-Tx time difference in FeMTC | Ericsson | imported from 3GU |
R4‑165282 | Simulation assumptions for OTDOA RSTD in FeMTC | Ericsson | imported from 3GU |
R4‑165283 | Specification impacts with eLAA due to UL LBT | Ericsson | imported from 3GU |
R4‑165284 | WF on eLAA RRM requirements | Ericsson | imported from 3GU |
R4‑165285 | eLAA RRM requirements | Ericsson | imported from 3GU |
R4‑165286 | RS-SINR accuracy requirements | Ericsson | imported from 3GU |
R4‑165287 | RS-SINR accuracy requirements | Ericsson | imported from 3GU |
R4‑165288 | On RS-SINR accuracy requirements | Ericsson | imported from 3GU |
R4‑165289 | Intra-frequency FDD test cases for RS-SINR | Ericsson | imported from 3GU |
R4‑165290 | Intra-frequency FDD test cases for RS-SINR | Ericsson | imported from 3GU |
R4‑165291 | Intra-frequency TDD test cases for RS-SINR | Ericsson | imported from 3GU |
R4‑165292 | Intra-frequency TDD test cases for RS-SINR | Ericsson | imported from 3GU |
R4‑165293 | On RS-SINR test cases | Ericsson | imported from 3GU |
R4‑165294 | Applicability of intra-frequency maximum measurement time requirements | Ericsson | imported from 3GU |
R4‑165295 | Applicability of intra-frequency maximum measurement time requirements | Ericsson | imported from 3GU |
R4‑165296 | Applicability of inter-frequency maximum measurement time requirements | Ericsson | imported from 3GU |
R4‑165297 | Applicability of inter-frequency maximum measurement time requirements | Ericsson | imported from 3GU |
R4‑165298 | Known cell requirements | Ericsson | imported from 3GU |
R4‑165299 | Known cell requirements | Ericsson | imported from 3GU |
R4‑165300 | Channel occupancy accuracy requirements | Ericsson, Anritsu | imported from 3GU |
R4‑165301 | Channel occupancy accuracy requirements | Ericsson, Anritsu | imported from 3GU |
R4‑165302 | Further considerations on RRM requirements for NR | Ericsson | imported from 3GU |
R4‑165303 | RRM requirements impacts with SRS carrier based switching | Ericsson | imported from 3GU |
R4‑165304 | LS on SRS carrier based switching | Ericsson | imported from 3GU |
R4‑165305 | Discussion on Lower Maximum Transmit Power Class for Enhanced NB-IoT UE | u-blox AG, Neul | imported from 3GU |
R4‑165306 | Update the power level setting for tests 8.3.1.2 and 8.3.2.3 (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑165307 | Update the power level setting for tests 8.3.1.2 and 8.3.2.3 (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑165308 | Update the power level setting for tests 8.3.1.2 and 8.3.2.3 (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑165309 | Update the power level setting for tests 8.3.1.2 and 8.3.2.3 (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑165310 | On Tx EVM for support of 4Rx UE | Huawei, HiSilicon | imported from 3GU |
R4‑165311 | Further discussion on signalling for control channel IM | Huawei, HiSilicon | imported from 3GU |
R4‑165312 | CR for eMTC PBCH demodulation requirement for enhanced coverage (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑165313 | Evaluation and discussion for eMTC PBCH performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165314 | CR for eMTC PBCH demodulation requirement for enhanced coverage (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑165315 | CR for eMTC M-PDCCH demodulation requirement for CE Mode A (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑165316 | Discussion on remaining issues of MPDCCH performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165317 | CR for eMTC M-PDCCH demodulation requirement for CE Mode A (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑165318 | CR for eMTC M-PDCCH demodulation requirement for CE Mode B (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑165319 | CR for eMTC M-PDCCH demodulation requirement for CE Mode B (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑165320 | Simulation results for M-PDCCH | Huawei, HiSilicon | imported from 3GU |
R4‑165321 | Discussion on remaining issues of eMTC PDSCH demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165322 | Simulation results for eMTC PDSCH | Huawei, HiSilicon | imported from 3GU |
R4‑165323 | Simulation resutls for eMTC PRACH demodulation performance | Huawei | imported from 3GU |
R4‑165324 | CR for eMTC PUCCH performance requirements (Rel-13) | Huawei | imported from 3GU |
R4‑165325 | Impairment simualtion results for eMTC PUCCH demodulation performance | Huawei | imported from 3GU |
R4‑165326 | CR for eMTC PUCCH performance requirements (Rel-14) | Huawei | imported from 3GU |
R4‑165327 | CR for eMTC PUCCH conformance test (Rel-13) | Huawei | imported from 3GU |
R4‑165328 | CR for eMTC PUCCH conformance test (Rel-14) | Huawei | imported from 3GU |
R4‑165329 | CR for eMTC PUSCH performance requirements (Rel-13) | Huawei | imported from 3GU |
R4‑165330 | Impairment simulation results for eMTC PUSCH demodulation performance | Huawei | imported from 3GU |
R4‑165331 | CR for eMTC PUSCH performance requirements (Rel-14) | Huawei | imported from 3GU |
R4‑165332 | CR for eMTC PUSCH conformance test (Rel-13) | Huawei | imported from 3GU |
R4‑165333 | CR for eMTC PUSCH conformance test (Rel-14) | Huawei | imported from 3GU |
R4‑165334 | CR on test applicability and antenna connections for 4Rx UEs (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑165335 | Test applicability and antenna connections of 4Rx UEs demodulation tests | Huawei, HiSilicon | imported from 3GU |
R4‑165336 | Test applicability and antenna connections of 4Rx UEs CSI tests | Huawei, HiSilicon | imported from 3GU |
R4‑165337 | CR on test applicability and antenna connections for 4Rx UEs (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑165338 | CR on CA SDR test | Huawei, HiSilicon | imported from 3GU |
R4‑165339 | Discussion on SDR requirements for CA with 4Rx | Huawei, HiSilicon | imported from 3GU |
R4‑165340 | CR on CA SDR test | Huawei, HiSilicon | imported from 3GU |
R4‑165341 | Discussions on 4Rx tests with CA | Huawei, HiSilicon | imported from 3GU |
R4‑165342 | Remaining issues for eD2D demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165343 | Further discussion on transmission model | Huawei, HiSilicon | imported from 3GU |
R4‑165344 | CR for introducing LAA PDSCH demod performance (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑165345 | CR for introducing LAA PDSCH demod performance (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑165346 | CR for reference channel for LAA demodulation performance (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑165347 | Further discussion on LAA demod requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165348 | CR for reference channel for LAA demodulation performance (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑165349 | Discussion on the OCNG definition for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑165350 | Discussion on the channel estimation length for NB-IoT DL channels | Huawei, HiSilicon | imported from 3GU |
R4‑165351 | Discussion on the anchor and non-anchor carrier demod requirements in NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑165352 | Updated simulation assumptions for NB-IoT UE demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165353 | Simulation results for NPBCH | Huawei, HiSilicon | imported from 3GU |
R4‑165354 | Discussion on the NPDCCH test | Huawei, HiSilicon | imported from 3GU |
R4‑165355 | Simulation results for NPDCCH | Huawei, HiSilicon | imported from 3GU |
R4‑165356 | CR for NPDSCH test and FRC definition (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑165357 | Simulation results for NPDSCH | Huawei, HiSilicon | imported from 3GU |
R4‑165358 | CR for NPDSCH test and FRC definition (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑165359 | Updated simulation assumptions for NB-IoT BS demodulation performance requirements | Huawei | imported from 3GU |
R4‑165360 | Discussion on Cell-ID and NPRACH signature for NPRACH demod requirements | Huawei | imported from 3GU |
R4‑165361 | Simulation results for NPRACH | Huawei | imported from 3GU |
R4‑165362 | CR for NPUSCH format 1 and FRC demod requirements (Rel-13) | Huawei | imported from 3GU |
R4‑165363 | CR for NPUSCH format 1 and FRC demod requirements (Rel-14) | Huawei | imported from 3GU |
R4‑165364 | CR for NPUSCH format 1 and FRC demod conformance test (Rel-13) | Huawei | imported from 3GU |
R4‑165365 | CR for NPUSCH format 1 and FRC demod conformance test (Rel-14) | Huawei | imported from 3GU |
R4‑165366 | CR for NPUSCH format 2 demod conformance test (Rel-13) | Huawei | imported from 3GU |
R4‑165367 | CR for NPUSCH format 2 demod conformance test(Rel-14) | Huawei | imported from 3GU |
R4‑165368 | CR for NPUSCH format 2 demod requirements (Rel-13) | Huawei | imported from 3GU |
R4‑165369 | CR for NPUSCH format 2 demod requirements (Rel-14) | Huawei | imported from 3GU |
R4‑165370 | Simulation results for NPUSCH format 2 | Huawei | imported from 3GU |
R4‑165371 | Simulation results for NPUSCH format 1 | Huawei | imported from 3GU |
R4‑165372 | Demodulation tests for EB/FD-MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑165373 | Simulation results for Class B K>1 | Huawei, HiSilicon | imported from 3GU |
R4‑165374 | Evaluation and discussion on advanced UE performance requirements in SFN scenario | Huawei, HiSilicon | imported from 3GU |
R4‑165375 | Advanced receiver for performance enhancement under SFN scenario | Huawei, HiSilicon | imported from 3GU |
R4‑165376 | Summary of simulation results for performance enhancement under SFN scenario | Huawei, HiSilicon | imported from 3GU |
R4‑165377 | Way forward on UE performance enhancement under SFN scenario | Huawei, HiSilicon | imported from 3GU |
R4‑165378 | Discussion on assisted signalling for demdoualtion performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165379 | Simulation results for ETU600 PUSCH demodualtion performance requirements | Huawei | imported from 3GU |
R4‑165380 | Summary of simulation results for ETU600 PUSCH performance requirements | Huawei | imported from 3GU |
R4‑165381 | CR on ETU600 PUSCH test for 36.104 | Huawei | imported from 3GU |
R4‑165382 | CR on ETU600 PUSCH test for 36.141 | Huawei | imported from 3GU |
R4‑165383 | Discussion and simulation results for V2V senstivity | Huawei, HiSilicon | imported from 3GU |
R4‑165384 | Evaluation on blind detection of assistance parameters for MUST Case 1 | Huawei, HiSilicon | imported from 3GU |
R4‑165385 | Evaluation on blind detection of assistance parameters for MUST Case 2 | Huawei, HiSilicon | imported from 3GU |
R4‑165386 | Discussion on the feasibility of parameter blind detection for MUST Case 1&2 | Huawei, HiSilicon | imported from 3GU |
R4‑165387 | Consideration on parameter blind detection for MUST case 3 | Huawei, HiSilicon | imported from 3GU |
R4‑165388 | Considerations on UL compensation gaps for eMTC | Sony Mobile Communications | imported from 3GU |
R4‑165389 | Creation of REL-14 TS 36.307 | Nokia | imported from 3GU |
R4‑165390 | Correction of REL-8 TS 36.307 references | Nokia | imported from 3GU |
R4‑165391 | Correction of REL-9 TS 36.307 references | Nokia | imported from 3GU |
R4‑165392 | Correction of REL-10 TS 36.307 references | Nokia | imported from 3GU |
R4‑165393 | Correction of REL-11 TS 36.307 references | Nokia | imported from 3GU |
R4‑165394 | Correction of REL-12 TS 36.307 references | Nokia | imported from 3GU |
R4‑165395 | TR 36.714-03-03 V0.2.0 | Nokia | imported from 3GU |
R4‑165396 | REFSENS simulations for CA_12A-12A | Nokia | imported from 3GU |
R4‑165397 | New power class for NB-IoT | Nokia | imported from 3GU |
R4‑165398 | Removal of brackets from category NB1 specification | Nokia | imported from 3GU |
R4‑165399 | Removal of brackets from category NB1 specification | Nokia | imported from 3GU |
R4‑165400 | Correction of category NB1 Pcmax formula | Nokia | imported from 3GU |
R4‑165401 | Correction of category NB1 Pcmax formula | Nokia | imported from 3GU |
R4‑165402 | Editorial correction to category NB1 specifications | Nokia | imported from 3GU |
R4‑165403 | Editorial correction to category NB1 specifications | Nokia | imported from 3GU |
R4‑165404 | Change of NB-IoT term into Category NB1 | Nokia | imported from 3GU |
R4‑165405 | Change of NB-IoT term into Category NB1 | Nokia | imported from 3GU |
R4‑165406 | TP to TR 36.744 : Expected specification changes to TS 36.101 | Nokia | imported from 3GU |
R4‑165407 | TP to TR36.744: A-MPR for 3.5 GHz in US | Nokia | imported from 3GU |
R4‑165408 | UL 256-QAM MPR | Nokia | imported from 3GU |
R4‑165409 | eLAA PA model | Nokia | imported from 3GU |
R4‑165410 | NB-IoT aggregate power control | Nokia | imported from 3GU |
R4‑165411 | Harmonization Campaign: UEs with ATF | ROHDE & SCHWARZ | imported from 3GU |
R4‑165412 | CR: Reference NPRACH Configuration for NB-IoT RRM test cases | Nokia | imported from 3GU |
R4‑165413 | CR: Reference NPRACH Configuration for NB-IoT RRM test cases | Nokia | imported from 3GU |
R4‑165414 | CR: Corrections on Section 4.6 “Cell Selection and Re-selection Requirements for UE category NB1” | Nokia | imported from 3GU |
R4‑165415 | CR: Corrections on Section 4.6 “Cell Selection and Re-selection Requirements for UE category NB1” | Nokia | imported from 3GU |
R4‑165416 | CR: Corrections on Section 8.14 Measurements for UE category NB1 | Nokia | imported from 3GU |
R4‑165417 | CR: Corrections on Section 8.14 Measurements for UE category NB1 | Nokia | imported from 3GU |
R4‑165418 | NB-IoT UL Timing Error | Nokia | imported from 3GU |
R4‑165419 | CR: Cat-M1 Intra-frequency Handover Requirements for CEModeB | Nokia | imported from 3GU |
R4‑165420 | CR: Cat-M1 Intra-frequency Handover Requirements for CEModeB | Nokia | imported from 3GU |
R4‑165421 | CR: Correction of E-CID RSRP measurement requirements for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑165422 | CR: Correction of E-CID RSRP measurement requirements for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑165423 | Discussion: eMTC intra-frequency handover requirements in CEModeB | Nokia | imported from 3GU |
R4‑165424 | CR: OCNG patterns for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑165425 | CR: OCNG patterns for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑165426 | CR: Correction of Cat-M1 Intra-frequency handover test cases for CEModeA | Nokia | imported from 3GU |
R4‑165427 | CR: Correction of Cat-M1 Intra-frequency handover test cases for CEModeA | Nokia | imported from 3GU |
R4‑165428 | CR: Correction of Transmit Timing Accuracy Tests for Cat-M1 UE in CEModeA | Nokia | imported from 3GU |
R4‑165429 | CR: Correction of Transmit Timing Accuracy Tests for Cat-M1 UE in CEModeA | Nokia | imported from 3GU |
R4‑165430 | CR: Cat-M1 Intra-frequency handover test cases for CEModeB | Nokia | imported from 3GU |
R4‑165431 | CR: Cat-M1 Intra-frequency handover test cases for CEModeB | Nokia | imported from 3GU |
R4‑165432 | CR: Cat-M1 PRACH test cases for FDD in Enhanced Coverage | Nokia | imported from 3GU |
R4‑165433 | CR: Cat-M1 PRACH test cases for FDD in Enhanced Coverage | Nokia | imported from 3GU |
R4‑165434 | CR: Cat-M1 PRACH test cases for HD-FDD in Enhanced Coverage | Nokia | imported from 3GU |
R4‑165435 | CR: Cat-M1 PRACH test cases for HD-FDD in Enhanced Coverage | Nokia | imported from 3GU |
R4‑165436 | CR: Cat-M1 PRACH test cases for TDD in Enhanced Coverage | Nokia | imported from 3GU |
R4‑165437 | CR: Cat-M1 PRACH test cases for TDD in Enhanced Coverage | Nokia | imported from 3GU |
R4‑165438 | CR: Add Test tolerances for eMTC BS demodulation performance requirements | Nokia | imported from 3GU |
R4‑165439 | CR: Add Test tolerances for eMTC BS demodulation performance requirements | Nokia | imported from 3GU |
R4‑165440 | CR: Correction on Number of HARQ processes in eMTC BS PUSCH requirements | Nokia | imported from 3GU |
R4‑165441 | CR: Correction on Number of HARQ processes in eMTC BS PUSCH requirements | Nokia | imported from 3GU |
R4‑165442 | CR: OCNG pattern for standalone NB-IoT RRM tests | Nokia | imported from 3GU |
R4‑165443 | CR: OCNG pattern for standalone NB-IoT RRM tests | Nokia | imported from 3GU |
R4‑165444 | NB-IoT UE RLM OOS Test Procedure | Nokia | imported from 3GU |
R4‑165445 | CR: NB-IoT PRACH test cases for In-Band mode in Normal Coverage | Nokia | imported from 3GU |
R4‑165446 | CR: NB-IoT PRACH test cases for In-Band mode in Normal Coverage | Nokia | imported from 3GU |
R4‑165447 | CR: NB-IoT Radio Link Monitoring Performance Test for Out-of-Sync in Normal Coverage | Nokia | imported from 3GU |
R4‑165448 | CR: NB-IoT Radio Link Monitoring Performance Test for Out-of-Sync in Normal Coverage | Nokia | imported from 3GU |
R4‑165449 | CR: NB-IoT Radio Link Monitoring Performance Test for Out-of-Sync in Enhanced Coverage | Nokia | imported from 3GU |
R4‑165450 | CR: NB-IoT Radio Link Monitoring Performance Test for Out-of-Sync in Enhanced Coverage | Nokia | imported from 3GU |
R4‑165451 | CR: Add Test tolerances for NB-IoT BS demodulation performance requirements | Nokia | imported from 3GU |
R4‑165452 | CR: Add Test tolerances for NB-IoT BS demodulation performance requirements | Nokia | imported from 3GU |
R4‑165453 | Ideal Simulation Results for NPUSCH Format 1 | Nokia | imported from 3GU |
R4‑165454 | Ideal Simulation Results for NPUSCH Format 2 | Nokia | imported from 3GU |
R4‑165455 | Impact of Frequency Error on NB-IoT PUSCH Demodulation Performance | Nokia | imported from 3GU |
R4‑165456 | eNB-IoT E-CID Positioning | Nokia | imported from 3GU |
R4‑165457 | FeMTC E-CID Positioning | Nokia | imported from 3GU |
R4‑165458 | FeMTC OTDOA Positioning | Nokia | imported from 3GU |
R4‑165459 | Motivation for new E-UTRA operating Band XY and adding 1.4 and 3 MHz Channel Bandwidths for CGC (Complementary Ground Component) operations in ITU Region 1 | HUGHES Network Systems Ltd | imported from 3GU |
R4‑165460 | Regional requirements on the Adjacent Channel Selectivity for the Public Safety BS in Korea | Korea Testing Laboratory | imported from 3GU |
R4‑165461 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.104 | Korea Testing Laboratory | imported from 3GU |
R4‑165462 | Regional requirements on the Adjacent Channel Selectivity for the Public Safety BS in Korea | Korea Testing Laboratory | imported from 3GU |
R4‑165463 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.104 | Korea Testing Laboratory | imported from 3GU |
R4‑165464 | Minor clarifications in MSR NTC1a and NTC3a | Ericsson | imported from 3GU |
R4‑165465 | On conformance testing of OTA RX sensitivity for AAS BS | Ericsson | imported from 3GU |
R4‑165466 | TP for TS 37.145-2 - conformance of OTA RX sensitivity for AAS | Ericsson | imported from 3GU |
R4‑165467 | On EMC requirements for Rel-14 AAS | Ericsson | imported from 3GU |
R4‑165468 | Guard band requirements for Band 46 MSD | QUALCOMM Incorporated | imported from 3GU |
R4‑165469 | Guard band requirements for Band 46 MSD | QUALCOMM Incorporated | imported from 3GU |
R4‑165470 | Guard band requirements for Band 46 MSD in Rel14 CA combos | QUALCOMM Incorporated | imported from 3GU |
R4‑165471 | Motivation for the Low complexity higher order MIMO | Qualcomm Incorporated | imported from 3GU |
R4‑165472 | Per band signalling bit for CA combinations with band 46 | Skyworks Solutions Inc. | imported from 3GU |
R4‑165473 | MSD for band 42-46 DL CA combination | Skyworks Solutions Inc. | imported from 3GU |
R4‑165474 | MSD and gap for CA combinations with band 46 | Skyworks Solutions Inc. | imported from 3GU |
R4‑165475 | Per band signalling bit for CA combinations with band 46 | Skyworks Solutions Inc. | imported from 3GU |
R4‑165476 | EVM and ACLR Power Amplifier measurement with 256QAM | Skyworks Solutions Inc. | imported from 3GU |
R4‑165477 | Minor clarifications in MSR NTC1a and NTC3a | Ericsson | imported from 3GU |
R4‑165478 | mm wave RFFE technology for NR | Skyworks Solutions Inc. | imported from 3GU |
R4‑165479 | New WID: Low complexity higher order MIMO^^ | Qualcomm Incorporated | imported from 3GU |
R4‑165480 | CR: OCNG patterns for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑165481 | TP for TR 37.842: Completion of TR and missing common uncertainty components | Ericsson | imported from 3GU |
R4‑165482 | Measurement Equipment Uncertainty | Ericsson | imported from 3GU |
R4‑165483 | TP to TR 37.842 Section 10 to Uncertainty budget calculation principle | Ericsson | imported from 3GU |
R4‑165484 | Test Tolerance and Measurement Uncertainty | Ericsson | imported from 3GU |
R4‑165485 | TP for TR 37.842: Near Field Test Method Procedures and Limitations | Ericsson | imported from 3GU |
R4‑165486 | TP for TR 37.842: Near Field Test Method Dynamic Range | Ericsson | imported from 3GU |
R4‑165487 | TP for TR 37.842: Proposed Uncertainty Budget Values for EIRP in CATR | Ericsson, Nokia | imported from 3GU |
R4‑165488 | TP for TR 37.842: Proposed Uncertainty Budget Values for EIS in CATR | Ericsson, Nokia | imported from 3GU |
R4‑165489 | Applicability of core transmitter requirements for frequency hopping | Ericsson | imported from 3GU |
R4‑165490 | Miscellaneous corrections of RF RX requirements for 4 RX AP | Ericsson | imported from 3GU |
R4‑165491 | Miscellaneous corrections of RF RX requirements for 4 RX AP | Ericsson | imported from 3GU |
R4‑165492 | Completion of the RF RX requirements for 4 RX AP | Ericsson | imported from 3GU |
R4‑165493 | Completion of the RF RX requirements for 4 RX AP | Ericsson | imported from 3GU |
R4‑165494 | Feasibility of UE UL beamforming for NR | Ericsson | imported from 3GU |
R4‑165495 | On modelling ACS for receiver antenna arrays | Ericsson | imported from 3GU |
R4‑165496 | Draft Reply LS to RAN5 on applicability of RF requirements when PUSCH frequency hopping is configured | Ericsson | imported from 3GU |
R4‑165497 | Background to changes proposed for revision of ITU-R Rec M.2071 | Ericsson, China Telecom | imported from 3GU |
R4‑165498 | DRAFT LTI on Work towards revision 1 of Recommendations ITU-R M.2070 and M.2071 - Questions for clarification within 3GPP specifications | Ericsson | imported from 3GU |
R4‑165499 | Draft reply LS to CEPT ECC on 3GPP specifications for BB-PPDR equipment; technical conditions in CEPT | Ericsson | imported from 3GU |
R4‑165500 | Discussion on the uplink power control of NR | ZTE Corporation | imported from 3GU |
R4‑165501 | Discussion on spatial pattern for NR ACLR | ZTE Corporation | imported from 3GU |
R4‑165502 | WF on BS demodulation requirements | Ericsson, Nokia, Huawei | imported from 3GU |
R4‑165503 | Simulation result of EB/FD-MIMO PDSCH demodulation test | Ericsson | imported from 3GU |
R4‑165504 | Simulation result of EB/FD-MIMO CRI test | Ericsson | imported from 3GU |
R4‑165505 | Simulation summary of eMTC UE demodulation requirements | Ericsson | imported from 3GU |
R4‑165506 | DL scheduling pattern for Cat-M1 UE demodulation requirements | Ericcson | imported from 3GU |
R4‑165507 | eMTC PBCH simulation result | Ericcson | imported from 3GU |
R4‑165508 | eMTC MPDCCH simulation results | Ericcson | imported from 3GU |
R4‑165509 | eMTC PDSCH simulation results | Ericcson | imported from 3GU |
R4‑165510 | eMTC CQI definition test simulation results | Ericcson | imported from 3GU |
R4‑165511 | eMTC UE-selected subband CQI test simulation results | Ericcson | imported from 3GU |
R4‑165512 | eMTC RLM simulation results | Ericcson | imported from 3GU |
R4‑165513 | Introduction of TM2/TM9 PDSCH demodulation requirements for eMTC | Ericcson | imported from 3GU |
R4‑165514 | Introduction of TM2/TM9 PDSCH demodulation requirements for eMTC | Ericcson | imported from 3GU |
R4‑165515 | Correction of eMTC PDSCH TM6 demodulation requirements | Ericcson | imported from 3GU |
R4‑165516 | Correction of eMTC PDSCH TM6 demodulation requirements | Ericcson | imported from 3GU |
R4‑165517 | Correction of eMTC CQI definition test | Ericcson | imported from 3GU |
R4‑165518 | Correction of eMTC CQI definition test | Ericcson | imported from 3GU |
R4‑165519 | Introduction of UE-selected subband CQI test for eMTC | Ericcson | imported from 3GU |
R4‑165520 | Introduction of UE-selected subband CQI test for eMTC | Ericcson | imported from 3GU |
R4‑165521 | Simulation summary of NB-IoT UE demodulation requirements | Ericcson | imported from 3GU |
R4‑165522 | NPBCH simulation result | Ericcson | imported from 3GU |
R4‑165523 | NPDCCH simulation result | Ericcson | imported from 3GU |
R4‑165524 | NPDSCH simulation result | Ericcson | imported from 3GU |
R4‑165525 | Introduction of NPDCCH demodulation requirements | Ericcson | imported from 3GU |
R4‑165526 | Introduction of NPDCCH demodulation requirements | Ericcson | imported from 3GU |
R4‑165527 | Downlink physical channel setup for NB-IoT UE demodulation requirements | Ericcson | imported from 3GU |
R4‑165528 | Downlink physical channel setup for NB-IoT UE demodulation requirements | Ericcson | imported from 3GU |
R4‑165529 | Discussion on NPRACH demodulation requirements | Ericcson | imported from 3GU |
R4‑165530 | MPDCCH simulation results and discussion | Samsung | imported from 3GU |
R4‑165531 | MPDSCH simulation results and discussion | Samsung | imported from 3GU |
R4‑165532 | PDSCH simulation results | Samsung | imported from 3GU |
R4‑165533 | NPDSCH simulation results and discussion | Samsung | imported from 3GU |
R4‑165534 | Simulation results for NPBCH | ZTE Corporation | imported from 3GU |
R4‑165535 | Simulation results for NPDCCH | ZTE Corporation | imported from 3GU |
R4‑165536 | Simulation results for NPDSCH | ZTE Corporation | imported from 3GU |
R4‑165537 | Simulation results for NPUSCH Format 2 | ZTE Corporation | imported from 3GU |
R4‑165538 | Simulation results for RRM measurement | ZTE Corporation | imported from 3GU |
R4‑165539 | TP for TR 36.714-03-01: CA_1A-5A-46A_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165540 | TP for TR 36.714-03-01: CA_1A-7A-46A_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165541 | TP for TR 36.714-03-01: CA_5A-7A-46A_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165542 | TP for TR 36.714-04-01: CA_1A-5A-46C_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165543 | TP for TR 36.714-04-01: CA_1A-7A-46C_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165544 | TP for TR 36.714-04-01: CA_5A-7A-46C_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165545 | TP for TR 36.714-04-01: CA_1A-5A-7A-46A_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165546 | TP for TR 36.714-05-01: CA_1A-5A-46D_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165547 | TP for TR 36.714-05-01: CA_1A-7A-46D_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165548 | TP for TR 36.714-05-01: CA_5A-7A-46D_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165549 | TP for TR 36.714-05-01: CA_1A-5A-7A-46C_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165550 | TP for TR 36.714-05-01: CA_7A-46E_BCS0 | LG Uplus, LG Electronics | imported from 3GU |
R4‑165551 | Corrections to channel bandwidth for category NB1 in TS36.101 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑165552 | Corrections to channel bandwidth for category NB1 in TS36.101 (Rel-14) | ZTE Corporation, Nubia | imported from 3GU |
R4‑165553 | Time offset discussion for LAA test | Ericsson | imported from 3GU |
R4‑165554 | Simulation results for PDSCH and PDCCH | Ericsson | imported from 3GU |
R4‑165555 | Simulation assumptions for PDCCH | Ericsson | imported from 3GU |
R4‑165556 | CR on aperiodic CSI test in LAA | Ericsson | imported from 3GU |
R4‑165557 | CR on aperiodic CSI test in LAA | Ericsson | imported from 3GU |
R4‑165558 | Introduce signal Model for LAA test | Ericsson | imported from 3GU |
R4‑165559 | Introduce signal Model for LAA test | Ericsson | imported from 3GU |
R4‑165560 | Introduce PDCCH test for LAA demodulation | Ericsson | imported from 3GU |
R4‑165561 | Introduce PDCCH test for LAA demodulation | Ericsson | imported from 3GU |
R4‑165562 | Summary of simulation results for PDCCH and PDSCH | Ericsson | imported from 3GU |
R4‑165563 | Simulation results for REFSENS sensitivity | Ericsson | imported from 3GU |
R4‑165564 | Corrections to operating band unwanted emissions in TS36.104 (Rel-13) | ZTE Corporation | imported from 3GU |
R4‑165565 | Corrections to operating band unwanted emissions in TS36.104 (Rel-14) | ZTE Corporation | imported from 3GU |
R4‑165566 | Corrections to operating band unwanted emissions notes in TS37.104 (Rel-13) | ZTE Corporation | imported from 3GU |
R4‑165567 | Corrections to operating band unwanted emissions notes in TS37.104 (Rel-14) | ZTE Corporation | imported from 3GU |
R4‑165568 | Beam Oriented Co-existence in mmWave Band | ZTE Corporation | imported from 3GU |
R4‑165569 | Discussion on PA Model | ZTE Corporation | imported from 3GU |
R4‑165570 | Discussion on accuracy requirements for RS-SINR measurement | ZTE | imported from 3GU |
R4‑165571 | Discussion on RS-SINR test cases | ZTE | imported from 3GU |
R4‑165572 | CR on RS-SINR TDD-FDD inter-frequency accuracy test case_R13 | ZTE | imported from 3GU |
R4‑165573 | CR on RS-SINR FDD-TDD inter-frequency accuracy test case_R13 | ZTE | imported from 3GU |
R4‑165574 | CR on RS-SINR TDD-FDD inter-frequency accuracy test case_R14 | ZTE | imported from 3GU |
R4‑165575 | CR on RS-SINR FDD-TDD inter-frequency accuracy test case_R14 | ZTE | imported from 3GU |
R4‑165576 | CR on RS-SINR measurement accuracy requirements_R13 | ZTE | imported from 3GU |
R4‑165577 | CR on RS-SINR measurement accuracy requirements_R14 | ZTE | imported from 3GU |
R4‑165578 | Way Forward on accuracy requirements for RS-SINR measurement | ZTE | imported from 3GU |
R4‑165579 | Link level results for RS-SINR measurement | ZTE | imported from 3GU |
R4‑165580 | CR on finalization of enhanced PHICH performance requirements for DL control channel IM_R13 | ZTE, Intel Corporation | imported from 3GU |
R4‑165581 | CR on finalization of enhanced ePDCCH performance requirements for DL control channel IM_R13 | ZTE, Intel Corporation | imported from 3GU |
R4‑165582 | CR on finalization of enhanced PHICH performance requirements for DL control channel IM_R14 | ZTE, Intel Corporation | imported from 3GU |
R4‑165583 | CR on finalization of enhanced ePDCCH performance requirements for DL control channel IM_R14 | ZTE, Intel Corporation | imported from 3GU |
R4‑165584 | Draft reply LS on the feasibility of mobility enhancement solutions | ZTE | imported from 3GU |
R4‑165585 | Discussion on the feasibility of mobility enhancement solutions | ZTE | imported from 3GU |
R4‑165586 | Evaluation on blind detection of interference exsitence for MUST | ZTE | imported from 3GU |
R4‑165587 | Evaluation on blind detection of power ratio for MUST | ZTE | imported from 3GU |
R4‑165588 | Simulation results for V2V adjacent channel co-existence in licensed bands | Ericsson Inc. | imported from 3GU |
R4‑165589 | Simulation results for 4Rx fading CQI test | ZTE | imported from 3GU |
R4‑165590 | Further Simulation results for V2V adjacent co-existence in unlicensed bands | Ericsson Inc. | imported from 3GU |
R4‑165591 | UE RF architectures for multicarrier V2V | Ericsson | imported from 3GU |
R4‑165592 | V2V UE RF Transmit requirements | Ericsson | imported from 3GU |
R4‑165593 | V2V UE RF Receive requirements | Ericsson | imported from 3GU |
R4‑165594 | Power Control for V2V adjacent channel co-existence in licensed bands | Ericsson | imported from 3GU |
R4‑165595 | LS on UL Power Control for V2V | Ericsson | imported from 3GU |
R4‑165596 | Simulation assumptions for V2X adjacent channel coexistence. | Ericsson | imported from 3GU |
R4‑165597 | Discussion on LTE UE TRP and TRS requirements | Guangdong OPPO Mobile Telecom. | imported from 3GU |
R4‑165598 | Simulation assumptions for V2V synchronization and S-RSRP | LG Electronics Inc. | imported from 3GU |
R4‑165599 | Simulation results of SyncRef UE identification for V2V | LG Electronics Inc. | imported from 3GU |
R4‑165600 | TP for TR 36.714-00-00: Additional bandwidth combination set CA_7A-7A | SK Telecom | imported from 3GU |
R4‑165601 | Way forward on UE Capability for UL 256QAM | Qualcomm Incorporated, CMCC, Mediatek, Intel, Motorola Mobility, Sony, OPPO, Vivo, Xiaomi, Coolpad, Blackberry, LGE | imported from 3GU |
R4‑165602 | Simulation results of S-RSRP measurement accuracy for V2V | LG Electronics Inc. | imported from 3GU |
R4‑165603 | TP for TR 36.714-03-01: Analysis for CA_1A_7A_7A | SK Telecom | imported from 3GU |
R4‑165604 | TP for TR 36.714-03-01: Analysis for CA_5A_7A_7A | SK Telecom | imported from 3GU |
R4‑165605 | Discussion on V2V RRM core requirement | LG Electronics Inc. | imported from 3GU |
R4‑165606 | TP for TR 36.714-04-01: Analysis for CA_1A_3A_7A_7A | SK Telecom | imported from 3GU |
R4‑165607 | Title:^^TP for TR 36.714-04-01: Analysis for CA_1A_5A_7A_7A | SK Telecom | imported from 3GU |
R4‑165608 | WF on way to close V2V RRM core requirement timely | LG Electronics Inc. | imported from 3GU |
R4‑165609 | TP for TR 36.714-04-01: Analysis for CA_3A_5A_7A_7A | SK Telecom | imported from 3GU |
R4‑165610 | Title:^^TP for TR 36.714-05-01: Analysis for CA_1A_3A_5A_7A_7A | SK Telecom | imported from 3GU |
R4‑165611 | WF on V2V RRM core requirement | LG Electronics Inc. | imported from 3GU |
R4‑165612 | CR of core requirements for V2V | LG Electronics Inc. | imported from 3GU |
R4‑165613 | CR of S-RSRP measurement accuracy for V2V | LG Electronics Inc. | imported from 3GU |
R4‑165614 | CR of conditions for measurement requirements for V2V | LG Electronics Inc. | imported from 3GU |
R4‑165615 | CR of FDD intrafrequency absolute and relative RSRP accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑165616 | CR of TDD intrafrequency absolute and relative RSRP accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑165617 | CR of FDD intrafrequency RSRQ meaurement accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑165618 | CR of TDD intrafrequency RSRQ meaurement accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑165619 | CR of FDD intrafrequency absolute and relative RSRP accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑165620 | CR of TDD intrafrequency absolute and relative RSRP accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑165621 | CR of FDD intrafrequency RSRQ meaurement accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑165622 | CR of TDD intrafrequency RSRQ meaurement accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑165623 | CR of Applicability of requirements for xDL2UL CA | LG Electronics Inc. | imported from 3GU |
R4‑165624 | Accuracy of RS-SINR measurement | Qualcomm Incorporated | imported from 3GU |
R4‑165625 | Revised WID: Basket WI for LTE Advanced inter-band CA Rel-14 for 4DL/1UL | Ericsson | imported from 3GU |
R4‑165626 | Revised WID: Basket WI for LTE Advanced Intra-band CA | Ericsson | imported from 3GU |
R4‑165627 | Revised WID: updates during meeting of Basket WI for LTE Advanced inter-band CA Rel-14 for 4DL/1UL | Ericsson | imported from 3GU |
R4‑165628 | Revised WID: updates during meeting of Basket WI for LTE Advanced Intra-band CA | Ericsson | imported from 3GU |
R4‑165629 | TR 4DL/1UL TR 36.714-04-01 | Ericsson | imported from 3GU |
R4‑165630 | TR Intra-band TR 36.714-00-00 | Ericsson | imported from 3GU |
R4‑165631 | Introduction of Rel-14 4DL/1UL combinations in 36.101 | Ericsson | imported from 3GU |
R4‑165632 | Introduction of Rel-14 4DL/1UL combinations in 36.104 | Ericsson | imported from 3GU |
R4‑165633 | Introduction of Rel-14 4DL/1UL combinations in 36.141 | Ericsson | imported from 3GU |
R4‑165634 | Introduction of Rel-14 Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑165635 | Introduction of Rel-14 Intra-band combinations in 36.104 | Ericsson | imported from 3GU |
R4‑165636 | Introduction of Rel-14 Intra-band combinations in 36.141 | Ericsson | imported from 3GU |
R4‑165637 | REFSENS requirements for 1A-3A-7A-20A, TP to TR 36.714-04-01 | Ericsson | imported from 3GU |
R4‑165638 | REFSENS requirements for 1A-3A-7A-42A, TP to TR 36.714-04-01 | Ericsson | imported from 3GU |
R4‑165639 | REFSENS requirements for 1A-3A-20A-42A, TP to TR 36.714-04-01 | Ericsson | imported from 3GU |
R4‑165640 | REFSENS requirements for 1A-7A-20A-42A, TP to TR 36.714-04-01 | Ericsson | imported from 3GU |
R4‑165641 | REFSENS requirements for 3A-7A-20A-42A, TP to TR 36.714-04-01 | Ericsson | imported from 3GU |
R4‑165642 | REFSENS requirements for 1A-3A-7A-20A-42A, TP to TR 36.714-05-01 | Ericsson | imported from 3GU |
R4‑165643 | Operating bands, channel BW's, insertion loss and co-existence for 26A-46A, TP to 36.714-02-01 | Ericsson, SouthernLINC Wireless | imported from 3GU |
R4‑165644 | Insertion loss values for 7A-66A, TP to 36.714-02-01 | Ericsson | imported from 3GU |
R4‑165645 | Insertion loss values for 2A-7A-66A, TP to 36.714-03-01 | Ericsson | imported from 3GU |
R4‑165646 | Requirements for 2A-2A-5A-66A, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165647 | Requirements for 2A-2A-13A-66A, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165648 | Requirements for 2A-2A-66A-66A, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165649 | Requirements for 2A-13A-66A-66A, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165650 | Requirements for 2A-13A-66B, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165651 | Requirements for 2A-13A-66C, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165652 | Requirements for 13A-46D, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165653 | Requirements for 13A-66D, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165654 | Requirements for 13A-66A-66C, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165655 | Requirements for 13A-66A-66B, TP to 36.714-04-01 | Ericsson, Verizon | imported from 3GU |
R4‑165656 | Updated simulation results for ePDCCH for DL control channel IM | ZTE | imported from 3GU |
R4‑165657 | Discussion on UE capability signalling for DLCCH-IM | ZTE | imported from 3GU |
R4‑165658 | simulation results for PUSCH demodulation under ETU600 | ZTE | imported from 3GU |
R4‑165659 | LS on CSI measurement ambiguity in LAA | LG Electronics Inc. | imported from 3GU |
R4‑165660 | Simulation results for PDCCH performance for LAA | LG Electronics Inc. | imported from 3GU |
R4‑165661 | Simulation results for PDSCH performance for LAA | LG Electronics Inc. | imported from 3GU |
R4‑165662 | Updated TR36.785 v0.2.0 | LG Electronics Inc. | imported from 3GU |
R4‑165663 | Remaining issue on UE capability signaling for Control Channel IM | LG Electronics Inc. | imported from 3GU |
R4‑165664 | TP on the operating scenarios for V2V Service | LG Electronics Inc. | imported from 3GU |
R4‑165665 | Motivation for Enhanced SU-MIMO Performance requirement for LTE | LG Electronics Inc. | imported from 3GU |
R4‑165666 | TP on V2V Transmitter requirements | LG Electronics Inc. | imported from 3GU |
R4‑165667 | Simulation results for V2V REFSENS requirements | LG Electronics Inc. | imported from 3GU |
R4‑165668 | Summary of simulation results for V2V REFSENS requirements | LG Electronics Inc. | imported from 3GU |
R4‑165669 | Simulation results of FD-MIMO TM9 MU-MIMO requirements | LG Electronics Inc. | imported from 3GU |
R4‑165670 | TP on V2V Receiver requirements | LG Electronics Inc. | imported from 3GU |
R4‑165671 | Simulation results of FD-MIMO Class B K>1 CRI test | LG Electronics Inc. | imported from 3GU |
R4‑165672 | Updated simulation results for MPDCCH performance for CEMode A RLM | Nokia | imported from 3GU |
R4‑165673 | Summary of simulation results for MPDCCH performance for RLM test cases | Nokia | imported from 3GU |
R4‑165674 | CR for Cat-M1 CEMode A RLM test cases: DRX FDD Rel-13 | Nokia | imported from 3GU |
R4‑165675 | CR for Cat-M1 CEMode A RLM test cases: DRX FDD Rel-14 | Nokia | imported from 3GU |
R4‑165676 | CR for Cat-M1 CEMode A RLM test cases: DRX HD-FDD Rel-13 | Nokia | imported from 3GU |
R4‑165677 | CR for Cat-M1 CEMode A RLM test cases: DRX HD-FDD Rel-14 | Nokia | imported from 3GU |
R4‑165678 | CR for Cat-M1 CEMode A RLM test cases: DRX TDD Rel-13 | Nokia | imported from 3GU |
R4‑165679 | CR for Cat-M1 CEMode A RLM test cases: DRX TDD Rel-14 | Nokia | imported from 3GU |
R4‑165680 | Further discussion on eMTC CEMode B RLM test | Nokia | imported from 3GU |
R4‑165681 | Discussion on the candidate solutions for high speed RRM | Nokia | imported from 3GU |
R4‑165682 | Discussion on network signalling for high speed RRM | Nokia | imported from 3GU |
R4‑165683 | Further system level simulation results for high speed mobility | Nokia | imported from 3GU |
R4‑165684 | Discussion on remaining issues for V2V RRM | Nokia | imported from 3GU |
R4‑165685 | Further discussion on RRM impact of SRS switching | Nokia | imported from 3GU |
R4‑165686 | Initial discussion on inter-frequency measurement for FeMTC | Nokia | imported from 3GU |
R4‑165687 | Draft TP on Conclusions of adjacent channel coexistence evaluation | LG Electronics Inc. | imported from 3GU |
R4‑165688 | Proposal of UE demodulation requirement for paging reception for eMTC | Ericsson Japan K.K. | imported from 3GU |
R4‑165689 | Revised adjacent channel coexistence simulation results for V2V service at 2GHz operating frequency | LG Electronics Inc. | imported from 3GU |
R4‑165690 | Adjacent channel coexistence simulation results for V2V service at 5.9GHz operating frequency | LG Electronics Inc. | imported from 3GU |
R4‑165691 | Collections of the adjacent channel coexistence evaluation results for V2V services | LG Electronics Inc. | imported from 3GU |
R4‑165692 | Draft TP on the adjacent channel coexistence evaluation results for V2V services | LG Electronics Inc. | imported from 3GU |
R4‑165693 | Draft CR to introduce V2V services in TS36.101 in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑165694 | Draft CR to introduce V2V services in TS36.307 in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑165695 | Correction on in-band emission requirements for cat M1 UE | Ericsson | imported from 3GU |
R4‑165696 | Correction on in-band emission requirements for cat M1 UE | Ericsson | imported from 3GU |
R4‑165697 | Overview of UL reference measurement channels | Ericsson | imported from 3GU |
R4‑165698 | Overview of UL reference measurement channels | Ericsson | imported from 3GU |
R4‑165699 | Work Plan for Rel-14 FeMTC | Ericsson | imported from 3GU |
R4‑165700 | Lower output power for Rel-14 NB-IoT UE | Ericsson | imported from 3GU |
R4‑165701 | System simulation results for UL 256QAM | Ericsson | imported from 3GU |
R4‑165702 | Link simulation results for UL 256QAM | Ericsson | imported from 3GU |
R4‑165703 | WF on EVM and MPR for UL 256QAM | Ericsson | imported from 3GU |
R4‑165704 | In this paper we discuss the different methods that can be used to address the identified challenge in NB-Iot concerning measurement accuracy and operating in enhanced coverage | Nokia | imported from 3GU |
R4‑165705 | 4 DL CA PCell in FDD FDD-TDD RSRQ for E-UTRAN in Carrier Aggregation | Nokia | imported from 3GU |
R4‑165706 | V2V S-RSRP measurements accuracy analysis | Intel Corporation (UK) Ltd | imported from 3GU |
R4‑165707 | Corrections on NB-IoT BS ACS requirements | ZTE Corporation | imported from 3GU |
R4‑165708 | Discussion on further mobility enhancement | Nokia | imported from 3GU |
R4‑165709 | Draft TR Skeleton for V2X WI | LG Electronics Inc. | imported from 3GU |
R4‑165710 | Workplan for LTE-based V2X WI in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑165711 | Consideration on the high power vehicle for LTE based V2X service | LG Electronics Inc. | imported from 3GU |
R4‑165712 | Discussion on SSTD measurement and reporting mapping | CATT | imported from 3GU |
R4‑165713 | LS for definition of SSTD measurement | CATT | imported from 3GU |
R4‑165714 | Modification on MPDCCH Reference Channel for Cat-M1 TDD UEs in CEModeB for Rel-13 | CATT | imported from 3GU |
R4‑165715 | Modification on MPDCCH Reference Channel for Cat-M1 TDD UEs in CEModeB for Rel-14 | CATT | imported from 3GU |
R4‑165716 | CR on modification for table 7.6.1.1F-1 in TS36.101 for Rel-13 | CATT | imported from 3GU |
R4‑165717 | CR on modification for table 7.6.1.1F-1 in TS36.101 for Rel-14 | CATT | imported from 3GU |
R4‑165718 | CR on modification on report mapping of TADV measurement in TS36.133 for Rel-13 | CATT | imported from 3GU |
R4‑165719 | CR on modification on report mapping of TADV measurement in TS36.133 for Rel-14 | CATT | imported from 3GU |
R4‑165720 | Editing change in TS36.133 for Rel-13 | CATT | imported from 3GU |
R4‑165721 | Editing change in TS36.133 for Rel-14 | CATT | imported from 3GU |
R4‑165722 | TP for TR37.842: Clean up | CATT | imported from 3GU |
R4‑165723 | Discussion on radiated ACLR | CATT | imported from 3GU |
R4‑165724 | Discussions on UE demodulation performance requirements under the SFN scenarios | CATT | imported from 3GU |
R4‑165725 | Discussion on RRM enhancements in DRX under high speed scenarios | CATT | imported from 3GU |
R4‑165726 | Discussion on signalling for UE demodulation under HST scenarios | CATT | imported from 3GU |
R4‑165727 | Simulation results for BS demodulation under ETU600 conditions | CATT | imported from 3GU |
R4‑165728 | Discussion on measurement requirements impacts with eLAA | CATT | imported from 3GU |
R4‑165729 | Test case for LAA SCell activation and deactivation for known SCells without DRX for Rel-13 | CATT, CATR | imported from 3GU |
R4‑165730 | Test case for LAA SCell activation and deactivation for known SCells without DRX for Rel-14 | CATT, CATR | imported from 3GU |
R4‑165731 | Test case for event triggered reporting on LAA deactivated SCells and interruption probability (0.5%) without DRX for Rel-13 | CATT, CATR | imported from 3GU |
R4‑165732 | Test case for event triggered reporting on LAA deactivated SCells and interruption probability (0.5%) without DRX for Rel-14 | CATT, CATR | imported from 3GU |
R4‑165733 | Discussion on RRM requirements impacts with SRS carrier based switching | CATT | imported from 3GU |
R4‑165734 | Simulation results of S-RSRP measurement requirements for V2V services | CATT | imported from 3GU |
R4‑165735 | Simulation results of cell search for V2V services | CATT | imported from 3GU |
R4‑165736 | CR on S-RSRP measurement accuracy requirements for V2V services | CATT | imported from 3GU |
R4‑165737 | CR on S-RSRP measurement requirements for V2V services | CATT | imported from 3GU |
R4‑165738 | UE Timing Advance Adjustment Accuracy Test for Cat-M1 UE in CEModeB for Rel-13 | CATT | imported from 3GU |
R4‑165739 | UE Timing Advance Adjustment Accuracy Test for Cat-M1 UE in CEModeB for Rel-14 | CATT | imported from 3GU |
R4‑165740 | Discussion on signalling for RRM under high speed scenarios | CATT | imported from 3GU |
R4‑165741 | Measurement Reporting Requirements with eLAA | CATT | imported from 3GU |
R4‑165742 | Further evaluation and discussion of 4RX RI requirements | CATT | imported from 3GU |
R4‑165743 | Clarification on UE maximum output power | CATT | imported from 3GU |
R4‑165744 | Clarification on UE maximum output power | CATT | imported from 3GU |
R4‑165745 | Clarification on UE maximum output power | CATT | imported from 3GU |
R4‑165746 | Simulation results for V2V REFSENS | CATT | imported from 3GU |
R4‑165747 | REFSENS requiiements for V2V | CATT | imported from 3GU |
R4‑165748 | Introducation of V2V requirements | CATT | imported from 3GU |
R4‑165749 | Introducation of V2V bands | CATT | imported from 3GU |
R4‑165750 | Introducation of V2V bands | CATT | imported from 3GU |
R4‑165751 | Calibration results for 5G NR | CATT | imported from 3GU |
R4‑165752 | co-existence results for urban macro for 5G NR | CATT | imported from 3GU |
R4‑165753 | co-existence results for dense urban for 5G NR | CATT | imported from 3GU |
R4‑165754 | further considerations on 5G NR co-existence study | CATT | imported from 3GU |
R4‑165755 | Consideration on harmonic impact of licensed bands to Band 46 for 2DL/1UL CA UE | LG Electronics Inc. | imported from 3GU |
R4‑165756 | Updated TR36.714-00-02 v0.3.0 | LG Electronics Inc. | imported from 3GU |
R4‑165757 | Self-desense analysis for 3DLs/2ULs inter-band CA in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑165758 | TP on the operating band and coexistence analysis for inter-band CA_3A-3A-8A band combination in rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑165759 | Corrections to inter-frequency measurements for LAA | Qualcomm Incorporated | imported from 3GU |
R4‑165760 | Measurements for LAA with multiple Scells | Qualcomm Incorporated | imported from 3GU |
R4‑165761 | Gaps for Inter-frequency Measurements per Component Carrier | Qualcomm Incorporated | imported from 3GU |
R4‑165762 | Enhanced Gaps for Inter-frequency Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑165763 | Draft LS out on Rel.13 Capabilities | Qualcomm Incorporated | imported from 3GU |
R4‑165764 | UE Capabilities for Rel.13 | Qualcomm Incorporated | imported from 3GU |
R4‑165765 | Motivation for defining requirements for Cat.1 devices with a single receiver | Qualcomm Incorporated | imported from 3GU |
R4‑165766 | Draft WID: Requirements for Category 1 UEs with single receiver | Qualcomm Incorporated | imported from 3GU |
R4‑165767 | Motivation for study on concurrencies of Advanced Receiver Features and UE Capabilities | Qualcomm Incorporated | imported from 3GU |
R4‑165768 | New Stud Item Proposal: Advanced Receiver Feature Concurrency and Capability Signaling for LTE | Qualcomm Incorporated | imported from 3GU |
R4‑165769 | Simulation Assumptions for NB-IoT Co-existence with CDMA | Qualcomm Incorporated | imported from 3GU |
R4‑165770 | UE RF Requirements for mmWave | Qualcomm Incorporated | imported from 3GU |
R4‑165771 | UE RF Architecture for mmWave | Qualcomm Incorporated | imported from 3GU |
R4‑165772 | UE Conformance Testing for mmWave | Qualcomm Incorporated | imported from 3GU |
R4‑165773 | Regulatory RF Exposure and transmitter requirements for mmWave | Qualcomm Incorporated | imported from 3GU |
R4‑165774 | Correction to RSTD Test Cases for 1.4 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑165775 | Correction to RSTD Test Cases for 1.4 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑165776 | Correction to RSTD Test Cases for 1.4 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑165777 | Correction to RSTD Test Cases for 1.4 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑165778 | Correction to RSTD Test Cases for 1.4 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑165779 | Correction to RSTD Test Cases for 1.4 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑165780 | TP on additional ILs and self interference issues for CA_3A-3A-8A band combination | LG Electronics Inc. | imported from 3GU |
R4‑165781 | TP for 36.714-03-01: clarification of Rx relaxations for inter-band and NC intra-band CA including B3+B3+B7, B3+B7+B7, B7+B7+B8 CA | CHTTL, Qualcomm, Nokia | imported from 3GU |
R4‑165782 | Introduction of additional 3DL/2UL CA band combinations in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑165783 | Measuring unwanted emission total radiated power | Ericsson | imported from 3GU |
R4‑165784 | On OTA receiver blocking | Ericsson | imported from 3GU |
R4‑165785 | Overview of RF core OTA unwanted emission requirements | Ericsson | imported from 3GU |
R4‑165786 | On TRP for wanted signal as reference for unwanted emission requirements | Ericsson | imported from 3GU |
R4‑165787 | TP for TR 37.842: Editorial corrections to transmitter intermodulation in sub-clause 8.2.5 | Ericsson | imported from 3GU |
R4‑165788 | TP for TR 37.842: Removal of FFS in sub-clause 8.2.5.3 | Ericsson | imported from 3GU |
R4‑165789 | Introduction of test method for OTA unwanted emission | Ericsson | imported from 3GU |
R4‑165790 | TP for TR 37.842: Improvement of the beam definition in sub-clause 3.1 and 7.2.2 | Ericsson | imported from 3GU |
R4‑165791 | On OTA testing and environmental conditions | Ericsson | imported from 3GU |
R4‑165792 | TP for TS 37.145-2: Improvements of text in sub-clause 4.8 | Ericsson | imported from 3GU |
R4‑165793 | TP for TS 37.145-2: Improvements on text relating to the reference coordinate system | Ericsson | imported from 3GU |
R4‑165794 | TP for 36.714-04-01: UE requirements for CA_3A_7A-7A-8A | CHTTL, Nokia | imported from 3GU |
R4‑165795 | TP for 36.714-04-01: delta Tib and Rib for CA_3A-3A-7A-7A | CHTTL, Nokia | imported from 3GU |
R4‑165796 | Introduction of additional 4DL/2UL CA band combination in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑165797 | TP for 36.714-04-01: CA_3A-3A-7A-7A operating bands, channel bandwidths and BS co-existence studies | CHTTL, Nokia | imported from 3GU |
R4‑165798 | TP for TR 36.714-02-02: co-existence studies for dual uplink of CA_7A-8A | CHTTL | imported from 3GU |
R4‑165799 | Revised WID for xDL/UL inter-band CA with x=3,4,5 in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑165800 | On specification of OTA AAS receiver blocking requirements | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑165801 | TP for TR 37.871: Conformance testing | Ericsson | imported from 3GU |
R4‑165802 | BS Synchronization issues for eMBMS | Ericsson | imported from 3GU |
R4‑165803 | Results for BS demodulation performance for ETU600 | Ericsson | imported from 3GU |
R4‑165804 | Analysis of BS frequency compensation | Ericsson | imported from 3GU |
R4‑165805 | Correction to Band 66 notes in E-UTRA band groups in Rel-13 | Dish Network | imported from 3GU |
R4‑165806 | Correction to Band 66 notes in E-UTRA band groups in Rel-14 | Dish Network | imported from 3GU |
R4‑165807 | Corrections on NB-IoT BS ACS requirements | ZTE Corporation | imported from 3GU |
R4‑165808 | Work plan on co-existence study for WP 5D | NTT DOCOMO INC. | imported from 3GU |
R4‑165809 | Simulation assumptions for co-existence study for WP 5D | NTT DOCOMO INC. | imported from 3GU |
R4‑165810 | Work for RF parameters except for ACS/ACLR | NTT DOCOMO INC. | imported from 3GU |
R4‑165811 | [draft] Initial reply LS on requested RF parameters | NTT DOCOMO INC. | imported from 3GU |
R4‑165812 | Discussion on modelling and simulation of IMT networks for sharing and compatibility studies used in ITU-R | NTT DOCOMO INC. | imported from 3GU |
R4‑165813 | [draft] reply LS on modelling and simulation of IMT networks for sharing and compatibility studies used in ITU-R | NTT DOCOMO INC. | imported from 3GU |
R4‑165814 | CR on UE Transmit Timing Accuracy Tests for NB-IoT UE | NTT DOCOMO INC. | imported from 3GU |
R4‑165815 | CR on UE Transmit Timing Accuracy Tests for NB-IoT UE | NTT DOCOMO INC. | imported from 3GU |
R4‑165816 | CR on RMCs for NPDSCH and NPDCCH for in-band for NB-IoT test cases | NTT DOCOMO INC. | imported from 3GU |
R4‑165817 | CR on RMCs for NPDSCH and NPDCCH for in-band for NB-IoT test cases | NTT DOCOMO INC. | imported from 3GU |
R4‑165818 | Regulatory framework in 3.5GHz band for UE and BS requirements | Ericsson | imported from 3GU |
R4‑165819 | Channel arrangement for 3.5GHz | Ericsson | imported from 3GU |
R4‑165820 | Overview of BS requirements | Ericsson | imported from 3GU |
R4‑165821 | Overview of UE requirements | Ericsson | imported from 3GU |
R4‑165822 | The SNR analysis based on system-level channel model | MediaTek Inc. | imported from 3GU |
R4‑165823 | View on the reference receiver for high speed train | MediaTek Inc. | imported from 3GU |
R4‑165824 | View on the SNR definition and the connection to the demod and CQI test for high speed train enhancement | MediaTek Inc. | imported from 3GU |
R4‑165825 | Alignment of B46 channel raster in TS 36.101 to the one defined in TS 36.104. | QUALCOMM Incorporated | imported from 3GU |
R4‑165826 | Alignment of B46 channel raster in TS 36.101 to the one defined in TS 36.104. | QUALCOMM Incorporated | imported from 3GU |
R4‑165827 | Removal of square brackets for Cat-0 REFSENS configuration | Ericsson | imported from 3GU |
R4‑165828 | Removal of square brackets for Cat-0 REFSENS configuration | Ericsson | imported from 3GU |
R4‑165829 | Removal of square brackets for Cat-0 REFSENS configuration | Ericsson | imported from 3GU |
R4‑165830 | Throughput test for LAA multi-node tests | Qualcomm Incorporated | imported from 3GU |
R4‑165831 | Methodology and further assumptions for NR coexistence study | Qualcomm Incorporated | imported from 3GU |
R4‑165832 | Calibration curves for NR coexistence in indoor scenario | Qualcomm Incorporated | imported from 3GU |
R4‑165833 | Calibration curves for NR coexistence in urban macro scenario | Qualcomm Incorporated | imported from 3GU |
R4‑165834 | Further MSD and guard band requirements for LAA combos | Qualcomm Incorporated | imported from 3GU |
R4‑165835 | UE and BS channel raster alignment in B46 | Qualcomm Incorporated | imported from 3GU |
R4‑165836 | V2V UE Tx timing requirements | Ericsson | imported from 3GU |
R4‑165837 | Initiation/cease of SLSS requirements for V2V UE | Ericsson | imported from 3GU |
R4‑165838 | Further discussions on handling timing mismatch between GNSS and WAN timing references | Ericsson | imported from 3GU |
R4‑165839 | Discussion on interruptions requirements for V2V | Ericsson | imported from 3GU |
R4‑165840 | Requirement on GNSS source selection for V2V | Ericsson | imported from 3GU |
R4‑165841 | V2V Signals Transmission Dropping for SLSS Reception | Ericsson | imported from 3GU |
R4‑165842 | RRM measurement requirements for Rel-14 feMTC | Ericsson | imported from 3GU |
R4‑165843 | RSRQ measurements under enhanced coverage for feMTC | Ericsson | imported from 3GU |
R4‑165844 | Corrections in Rel-12 Cat-0 requirements | Ericsson | imported from 3GU |
R4‑165845 | Resolving TBDs in HD-FDD RLM test-cases for Rel-12 category 0 UEs | Ericsson | imported from 3GU |
R4‑165846 | Resolving TBDs in HD-FDD RLM test-cases for Rel-12 category 0 UEs | Ericsson | imported from 3GU |
R4‑165847 | E-UTRAN UE Transmit Timing Accuracy Tests for Cat-M1 UE in CEModeB | Ericsson | imported from 3GU |
R4‑165848 | Applicability rule for eMTC test cases in CEModeA and CEModeB | Ericsson | imported from 3GU |
R4‑165849 | SI reading tests for eMTC UEs in CEModeB | Ericsson | imported from 3GU |
R4‑165850 | Correction of references in the cat-M1 UE CONNECTED state requirements | Ericsson | imported from 3GU |
R4‑165851 | Removal of editor’s note in Cat-M1 UE timing requirements | Ericsson | imported from 3GU |
R4‑165852 | RRC Re-establishment test for eMTC UEs in CEModeB | Ericsson | imported from 3GU |
R4‑165853 | Corrections in Rel-12 Cat-0 requirements | Ericsson | imported from 3GU |
R4‑165854 | Resolving TBDs in HD-FDD RLM test-cases for Rel-12 category 0 UEs | Ericsson | imported from 3GU |
R4‑165855 | Corrections in Rel-12 Cat-0 requirements | Ericsson | imported from 3GU |
R4‑165856 | Resolving TBDs in HD-FDD RLM test-cases for Rel-12 category 0 UEs | Ericsson | imported from 3GU |
R4‑165857 | Resolving TBDs in HD-FDD RLM test-cases for Rel-12 category 0 UEs | Ericsson | imported from 3GU |
R4‑165858 | E-UTRAN UE Transmit Timing Accuracy Tests for Cat-M1 UE in CEModeB | Ericsson | imported from 3GU |
R4‑165859 | Applicability rule for eMTC test cases in CEModeA and CEModeB | Ericsson | imported from 3GU |
R4‑165860 | SI reading tests for eMTC UEs in CEModeB | Ericsson | imported from 3GU |
R4‑165861 | Correction of references in the cat-M1 UE CONNECTED state requirements | Ericsson | imported from 3GU |
R4‑165862 | Removal of editor’s note in Cat-M1 UE timing requirements | Ericsson | imported from 3GU |
R4‑165863 | RRC Re-establishment test for eMTC UEs in CEModeB | Ericsson | imported from 3GU |
R4‑165864 | Discussions on UE transmit timing and RLM test cases | Ericsson | imported from 3GU |
R4‑165865 | Applicability rule for NB-IOT test cases in normal and enhanced coverage | Ericsson | imported from 3GU |
R4‑165866 | Inter-frequency cell reselection under enhanced coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑165867 | Intra-frequency cell reselection under enhanced coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑165868 | Intra-frequency cell reselection under normal coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑165869 | Power headroom reporting requirements | Ericsson | imported from 3GU |
R4‑165870 | Applicability rule for NB-IOT test cases in normal and enhanced coverage | Ericsson | imported from 3GU |
R4‑165871 | Inter-frequency cell reselection under enhanced coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑165872 | Intra-frequency cell reselection under enhanced coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑165873 | Intra-frequency cell reselection under normal coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑165874 | Power headroom reporting requirements | Ericsson | imported from 3GU |
R4‑165875 | Power headroom reporting requirements | Ericsson | imported from 3GU |
R4‑165876 | RRM measurement simulation results based on revised simulation assumptions | Ericsson | imported from 3GU |
R4‑165877 | RLM test case: insync with DRX under NC | Ericsson | imported from 3GU |
R4‑165878 | RLM test case: insync with DRX under EC | Ericsson | imported from 3GU |
R4‑165879 | RLM test case: insync with DRX under NC | Ericsson | imported from 3GU |
R4‑165880 | RLM test case: insync with DRX under EC | Ericsson | imported from 3GU |
R4‑165881 | List for RRM Tests for NB-IOT | Ericsson | imported from 3GU |
R4‑165882 | Way forward on power headroom reporting for NB-IOT | Ericsson | imported from 3GU |
R4‑165883 | Work Plan for NB-IoT RRM Performance | Ericsson | imported from 3GU |
R4‑165884 | Correction to DL RMCs for Cell 1 in Test case A 8.16.25 | ANRITSU LTD | imported from 3GU |
R4‑165885 | Correction to DL RMCs for Cell1 in A 8.16.25 | ANRITSU LTD | imported from 3GU |
R4‑165886 | Correction to DL RMCs for Cell1 in A 8.16.25 | ANRITSU LTD | imported from 3GU |
R4‑165887 | pCR to 37.842: Description of the RX OTA sensitivity requirement | Ericsson | imported from 3GU |
R4‑165888 | pCR to 37.842: Description of the radiated TX power requirement | Ericsson | imported from 3GU |
R4‑165889 | OTA demodulation requirement considerations | Ericsson | imported from 3GU |
R4‑165890 | EVM definition | Ericsson | imported from 3GU |
R4‑165891 | Rel-14 AAS WI strategy | Ericsson | imported from 3GU |
R4‑165892 | On receiver requirement metrics | Ericsson | imported from 3GU |
R4‑165893 | RX requirement metric standardization aspects | Ericsson | imported from 3GU |
R4‑165894 | Measurement uncertainty for RX power or SNR based compliance assessment | Ericsson | imported from 3GU |
R4‑165895 | Further simulations on ACLR spatial pattern and co-existence | Ericsson | imported from 3GU |
R4‑165896 | Metric for unwanted emissions and ACLR | Ericsson | imported from 3GU |
R4‑165897 | On NR SI priorities | Ericsson | imported from 3GU |
R4‑165898 | TDD ON/OFF switching for mm wave systems | Ericsson | imported from 3GU |
R4‑165899 | On modelling the spatial shape of ACLR | Ericsson | imported from 3GU |
R4‑165900 | Further elaboration on modulation spectrum and filtering/guard levels | Ericsson | imported from 3GU |
R4‑165901 | Further elaboration on PA models for NR | Ericsson | imported from 3GU |
R4‑165902 | Draft reply LS on PA models | Ericsson | imported from 3GU |
R4‑165903 | Enhancements for measurement gaps in LTE | Nokia | imported from 3GU |
R4‑165904 | Discussion on per-CC enhancements for measurement gaps | Nokia | imported from 3GU |
R4‑165905 | Cell detection simulation results for NB_IoT | Nokia | imported from 3GU |
R4‑165906 | Link level evaluation for RRM measurements for NB-IoT in-band deployment | Nokia | imported from 3GU |
R4‑165907 | Link level evaluation for RRM measurements for NB-IoT stand-alone deployments | Nokia | imported from 3GU |
R4‑165908 | TS 37.141 Corrections | Ericsson | imported from 3GU |
R4‑165909 | TS 37.141 Corrections | Ericsson | imported from 3GU |
R4‑165910 | TS 37.141 Corrections | Ericsson | imported from 3GU |
R4‑165911 | TS 37.145 part 1: Alignment and corrections | Ericsson | imported from 3GU |
R4‑165912 | TS 37.105: Alignment and corrections | Ericsson | imported from 3GU |
R4‑165913 | Link level evaluation for RRM measurements for NB-IoT in-band deployment with power boosting and two NRS Tx sequences | Nokia | imported from 3GU |
R4‑165914 | Complexity discussion regarding algorithms used for NB-IoT RRM measurements | Nokia | imported from 3GU |
R4‑165915 | Cat 3 UE Soft buffer management demodulation for TDD-FDD CA | ANRITSU LTD | imported from 3GU |
R4‑165916 | RRM performance requirements for NB-IoT | Nokia | imported from 3GU |
R4‑165917 | NPDSCH demodulation results in NB-IoT in-band deployment | Nokia | imported from 3GU |
R4‑165918 | Intra-frequency Absolute NRSRP and NRSRQ Accuracy requirements for UE Category NB1 | Nokia | imported from 3GU |
R4‑165919 | Inter-frequency Absolute RSRP Accuracy requirements for UE Category NB1 | Nokia | imported from 3GU |
R4‑165920 | Evaluation result and proposal for eMTC PDSCH demodulation performance requirements | NTT DOCOMO INC. | imported from 3GU |
R4‑165921 | eMTC requirements for intra frequency measurements | NTT DOCOMO INC. | imported from 3GU |
R4‑165922 | Inter-frequency measurement requirements for FeMTC | NTT DOCOMO INC. | imported from 3GU |
R4‑165923 | Enhanced RRM requirements in connected mode under high speed scenario | NTT DOCOMO INC. | imported from 3GU |
R4‑165924 | Simulation results for CRI test | Samsung | imported from 3GU |
R4‑165925 | Further discussion on PDSCH demodulation test | Samsung | imported from 3GU |
R4‑165926 | Summary of CSI results for FD-MIMO (FDD mode) | Samsung | imported from 3GU |
R4‑165927 | Summary of CSI results for FD-MIMO (TDD mode) | Samsung | imported from 3GU |
R4‑165928 | Summary of demodulation results for FD-MIMO | Samsung | imported from 3GU |
R4‑165929 | Update on regulatory aspects | Samsung | imported from 3GU |
R4‑165930 | Discussion on Test Applicability and Antenna Connections for 4RX Capable UE | Samsung | imported from 3GU |
R4‑165931 | Discussion on General Coexistence Scenarios and Simulation Methodology | Samsung | imported from 3GU |
R4‑165932 | Discussion on CDMA2000 1x RF Performance | Samsung | imported from 3GU |
R4‑165933 | Discussion on Detailed Coexistence Simulation Assumptions and Parameters | Samsung, China Telecom | imported from 3GU |
R4‑165934 | Simulation Results on NB-IoT Coexistence Study with CDMA system for Uplink Scenarios | Samsung | imported from 3GU |
R4‑165935 | UL configurations for Non-contiguous CA in Band 7 with 2UL | Samsung | imported from 3GU |
R4‑165936 | Simulation results for NB-IoT PUSCH format 1/2 | Samsung | imported from 3GU |
R4‑165937 | Simulation results for NB-IoT PRACH | Samsung | imported from 3GU |
R4‑165938 | Evaluation results for NR coexistence study in urban macro scenario | Samsung | imported from 3GU |
R4‑165939 | Evaluation results for NR coexistence study in dense urban scenario | Samsung | imported from 3GU |
R4‑165940 | Evaluation results for NR coexistence study in indoor scenario | Samsung | imported from 3GU |
R4‑165941 | Way forward on UE performance part for EB/FD-MIMO | Samsung | imported from 3GU |
R4‑165942 | Introduction of EB/FD-MIMO CRI Test | Samsung | imported from 3GU |
R4‑165943 | Introduction of EB/FD-MIMO PDSCH demodulation test | Samsung | imported from 3GU |
R4‑165944 | Introduction of performance requirments for FD-MIMO Class A and Class B K=1 PMI test cases | Samsung | imported from 3GU |
R4‑165945 | Introduction of FRC for CRI test | Samsung | imported from 3GU |
R4‑165946 | Introduction of EB/FD-MIMO MR funcationality test | Samsung | imported from 3GU |
R4‑165947 | Corrections on TS36.101 for LAA | Samsung | imported from 3GU |
R4‑165948 | Corrections on TS36.101 for LAA | Samsung | imported from 3GU |
R4‑165949 | Editorial correction on TS36.104 for LAA | Samsung | imported from 3GU |
R4‑165950 | Editorial correction on TS36.104 for LAA | Samsung | imported from 3GU |
R4‑165951 | Editorial modification on TS36.101 for NB-IoT | Samsung | imported from 3GU |
R4‑165952 | Editorial modification on TS36.101 for NB-IoT | Samsung | imported from 3GU |
R4‑165953 | Corretion on operationg bands for ProSe | Samsung | imported from 3GU |
R4‑165954 | Corretion on operationg bands for ProSe | Samsung | imported from 3GU |
R4‑165955 | Discussion on multiple component carrier operation in V2V | Samsung | imported from 3GU |
R4‑165956 | Discussion on V2V UE Tx RF requirements at 5.9GHz | Samsung | imported from 3GU |
R4‑165957 | Discussion on V2V UE Rx RF requirements at 5.9GHz | Samsung | imported from 3GU |
R4‑165958 | Consideration Rel-14 parallel WI of V2V and V2X | Samsung | imported from 3GU |
R4‑165959 | Proposal for 4Rx SDR CA tests | NTT DOCOMO INC. | imported from 3GU |
R4‑165960 | CR for UE Demodulation Requirements for DL PDSCH SDR CA requirements | NTT DOCOMO INC. | imported from 3GU |
R4‑165961 | Enhanced RRM requirements in connected mode under high speed scenario | NTT DOCOMO INC. | imported from 3GU |
R4‑165962 | Modification on on RS-SINR measurement accuracy R13 | Huawei, HiSilicon | imported from 3GU |
R4‑165963 | Modification on on RS-SINR measurement accuracy R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165964 | CR on FDD-FDD inter-frequency RS-SINR accuracy test case R13 | Huawei, HiSilicon | imported from 3GU |
R4‑165965 | CR on FDD-FDD inter-frequency RS-SINR accuracy test case R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165966 | CR on TDD-TDD inter-frequency RS-SINR accuracy test case R13 | Huawei, HiSilicon | imported from 3GU |
R4‑165967 | CR on TDD-TDD inter-frequency RS-SINR accuracy test case R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165968 | Discussion on RRM requirement for V2V | Huawei, HiSilicon | imported from 3GU |
R4‑165969 | Introducing interruption requirements for V2V R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165970 | Introducing UE transmit timing requirements for V2V R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165971 | Definition and abbreviation of Frame structure 3 | Huawei, HiSilicon | imported from 3GU |
R4‑165972 | Definition and abbreviation of Frame structure 3 | Huawei, HiSilicon | imported from 3GU |
R4‑165973 | Editorial corrections on LAA requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165974 | Editorial corrections on LAA requirements | Huawei, HiSilicon | imported from 3GU |
R4‑165975 | Intra-frequency event triggered reporting under fading propagation conditions in synchronous cells in non-DRX based on CRS under Operation with Frame Structure 3 | Huawei, HiSilicon | imported from 3GU |
R4‑165976 | Intra-frequency event triggered reporting under fading propagation conditions in synchronous cells in non-DRX based on CRS under Operation with Frame Structure 3 | Huawei, HiSilicon | imported from 3GU |
R4‑165977 | Intra-frequency event triggered reporting under fading propagation conditions in synchronous cells in DRX based on CRS under Operation with Frame Structure 3 | Huawei, HiSilicon | imported from 3GU |
R4‑165978 | Intra-frequency event triggered reporting under fading propagation conditions in synchronous cells in DRX based on CRS under Operation with Frame Structure 3 | Huawei, HiSilicon | imported from 3GU |
R4‑165979 | CR on Infinite measurements in LAA R13 | Huawei, HiSilicon | imported from 3GU |
R4‑165980 | CR on Infinite measurements in LAA R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165981 | Correction on discovery signal conditions R13 | Huawei, HiSilicon | imported from 3GU |
R4‑165982 | Correction on discovery signal conditions R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165983 | Further discussion on RRM impact on eLAA | Huawei, HiSilicon | imported from 3GU |
R4‑165984 | CR on RACH in eLAA | Huawei, HiSilicon | imported from 3GU |
R4‑165985 | CR on UE transmit timing requirements in eLAA | Huawei, HiSilicon | imported from 3GU |
R4‑165986 | Clarification on measurement reporting delay in eLAA | Huawei, HiSilicon | imported from 3GU |
R4‑165987 | Cell detection performance under high speed scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑165988 | Further discussion on enhanced RRM requirements in idle mode under high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑165989 | Enhanced measurement performance in connected mode under high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑165990 | On enhanced RRM requirements in connected mode under high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑165991 | Further discussion on candidate solutions in connected mode under high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑165992 | Modification on inter-frequency CSI-RS related test cases R12 | Huawei, HiSilicon | imported from 3GU |
R4‑165993 | Modification on inter-frequency CSI-RS related test cases R13 | Huawei, HiSilicon | imported from 3GU |
R4‑165994 | Modification on inter-frequency CSI-RS related test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165995 | Modification on CSI-RS related CA test cases R12 | Huawei, HiSilicon | imported from 3GU |
R4‑165996 | Modification on CSI-RS related CA test cases R13 | Huawei, HiSilicon | imported from 3GU |
R4‑165997 | Modification on CSI-RS related CA test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑165998 | Correction on discovery signal conditions for SCE R12 | Huawei, HiSilicon | imported from 3GU |
R4‑165999 | Correction on discovery signal conditions for SCE R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166000 | Correction on discovery signal conditions for SCE R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166001 | Correction of Band group for TDD SCE test R12 | Huawei, HiSilicon | imported from 3GU |
R4‑166002 | Correction of Band group for TDD SCE test R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166003 | Correction of Band group for TDD SCE test R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166004 | Modification on inter-frequency CSI-RS related test cases R12 | Huawei, HiSilicon | imported from 3GU |
R4‑166005 | Modification on inter-frequency CSI-RS related test cases R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166006 | Modification on inter-frequency CSI-RS related test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166007 | Discussion on the RRM impacts of SRS switching | Huawei, HiSilicon | imported from 3GU |
R4‑166008 | E-UTRAN Intra frequency case for Cat-M1 UE in enhanced coverage R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166009 | E-UTRAN Intra frequency case for Cat-M1 UE in enhanced coverage R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166010 | E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166011 | E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166012 | E-UTRAN HD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166013 | E-UTRAN HD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166014 | E-UTRAN TDD- TDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166015 | E-UTRAN TDD- TDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166016 | RSRP Intra frequency case for Cat-M1 UE in CEModeB R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166017 | RSRP Intra frequency case for Cat-M1 UE in CEModeB R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166018 | CR on PRACH configuration reference R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166019 | CR on PRACH configuration reference R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166020 | Discussion on gap enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑166021 | WF on reducing quantization error of OTDOA | Huawei, HiSilicon | imported from 3GU |
R4‑166022 | CR on reducing quantization error of OTDOA | Huawei, HiSilicon | imported from 3GU |
R4‑166023 | Draft LS on reducing quantization error of OTDOA | Huawei, HiSilicon | imported from 3GU |
R4‑166024 | Simulation assumption on RSTD | Huawei, HiSilicon | imported from 3GU |
R4‑166025 | Simulation assumption on UE Rx-Tx | Huawei, HiSilicon | imported from 3GU |
R4‑166026 | Simulation assumption on inter-frequency measurement | Huawei, HiSilicon | imported from 3GU |
R4‑166027 | Discussion on eMTC positioning | Huawei, HiSilicon | imported from 3GU |
R4‑166028 | WF on eMTC positioning | Huawei, HiSilicon | imported from 3GU |
R4‑166029 | discussion on eMTC inter-frequency measurement | Huawei, HiSilicon | imported from 3GU |
R4‑166030 | CR on eMTC positioning | Huawei, HiSilicon | imported from 3GU |
R4‑166031 | Discussion on TDD CEModeB measurement requirement | Huawei, HiSilicon | imported from 3GU |
R4‑166032 | CR on TDD CEModeB measurement requirement R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166033 | CR on TDD CEModeB measurement requirement R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166034 | CR on eMTC maintenance R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166035 | CR on eMTC maintenance R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166036 | CGI requirement for eMTC R13 | Huawei, HiSilicon, Ericsson | imported from 3GU |
R4‑166037 | CGI requirement for eMTC R14 | Huawei, HiSilicon,Ericsson | imported from 3GU |
R4‑166038 | CR on eDRX maintenance R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166039 | CR on eDRX maintenance R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166040 | Correction on UE Category M1 measurement requirement R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166041 | Correction on UE Category M1 measurement requirement R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166042 | Discussion on cell search for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑166043 | CR for NB-IoT RRC re-establishment R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166044 | CR for NB-IoT RRC re-establishment R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166045 | Discussion on define the signal levels for NB-IoT RLM tests | Huawei, HiSilicon | imported from 3GU |
R4‑166046 | HD-FDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 under normal coverage R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166047 | HD-FDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 under normal coverage R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166048 | HD-FDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 under enhanced coverage R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166049 | HD-FDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 under enhanced coverage R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166050 | Draft LS response on Network Assistance for Network Synchronization in LTE | Huawei, HiSilicon | imported from 3GU |
R4‑166051 | Discussion on Network Assistance for Network Synchronization in LTE | Huawei, HiSilicon | imported from 3GU |
R4‑166052 | Simulation assumption on Network Assistance for Network Synchronization in LTE | Huawei, HiSilicon | imported from 3GU |
R4‑166053 | On the evaluation of inter-cell synchronization for MBMS | Huawei, HiSilicon | imported from 3GU |
R4‑166054 | Discussion on requirements of inter-cell synchronization for MBMS | Huawei, HiSilicon | imported from 3GU |
R4‑166055 | Discussion on the RRM impacts of NR | Huawei, HiSilicon | imported from 3GU |
R4‑166056 | Discussion on the testability of NR | Huawei, HiSilicon | imported from 3GU |
R4‑166057 | Discussion on LS of mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R4‑166058 | System level simulation assumption for side condition of CRS | Huawei, HiSilicon | imported from 3GU |
R4‑166059 | Link level simulation assumption for timing accuracy using CRS | Huawei, HiSilicon | imported from 3GU |
R4‑166060 | CR for paging interruption for NB-IoT R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166061 | CR for paging interruption for NB-IoT R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166062 | Modification on requirement of measurement in RRC_CONNECTED for NB-IoT R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166063 | Modification on requirement of measurement in RRC_CONNECTED for NB-IoT R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166064 | Discussion on NRSRP/NRSRQ measurement accuracy | Huawei, HiSilicon | imported from 3GU |
R4‑166065 | Discussion on PHR for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑166066 | CR for PHR reporting requirements R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166067 | CR for PHR reporting requirements R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166068 | CR for Conditions on NSCH Ês/Iot of identified and of the neighbour cell R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166069 | CR for Conditions on NSCH Ês/Iot of identified and of the neighbour cell R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166070 | CR for OCNG pattern for NB-IoT standalone operation R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166071 | CR for OCNG pattern for NB-IoT standalone operation R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166072 | HD-FDD Intra-frequency RRC Re-establishment for UE category NB1 under normal coverage R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166073 | HD-FDD Intra-frequency RRC Re-establishment for UE category NB1 under normal coverage R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166074 | HD-FDD Inter-frequency RRC Re-establishment for UE category NB1 under enhanced coverage R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166075 | HD-FDD Inter-frequency RRC Re-establishment for UE category NB1 under enhanced coverage R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166076 | Draft CR: RMCs for NPDCCH RMCs for standalone and guard band NB-IoT test cases | Huawei, HiSilicon | imported from 3GU |
R4‑166077 | Draft CR: RMCs for NPDSCH RMCs for standalone and guard band NB-IoT test cases | Huawei, HiSilicon | imported from 3GU |
R4‑166078 | Draft CR: OCNG pattern for guard band for NB-IoT test cases | Huawei, HiSilicon | imported from 3GU |
R4‑166079 | Draft CR: RMCs for NPDCCH RMCs for standalone and guard band NB-IoT test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166080 | Draft CR: RMCs for NPDSCH RMCs for standalone and guard band NB-IoT test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166081 | Draft CR: OCNG pattern for guard band for NB-IoT test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166082 | Discussion on applicability of NRSRQ measurement | Huawei, HiSilicon | imported from 3GU |
R4‑166083 | LS on applicability of NRSRQ measurement | Huawei, HiSilicon | imported from 3GU |
R4‑166084 | Introduce inter-frequency NRSRQ measurement accuracy requirement R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166085 | Introduce inter-frequency NRSRQ measurement accuracy requirement R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166086 | Modification on Conditions for NB-IoT inter-frequency Accuracy Requirements for UE Category NB1 R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166087 | Modification on Conditions for NB-IoT inter-frequency Accuracy Requirements for UE Category NB1 R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166088 | CR of test principle for DC test cases with different bandwidth combinations R12 | Huawei, HiSilicon | imported from 3GU |
R4‑166089 | CR of test principle for DC test cases with different bandwidth combinations R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166090 | CR of test principle for DC test cases with different bandwidth combinations R14 | Huawei, HiSilicon | imported from 3GU |
R4‑166091 | Spectrum emission considerations for NR | Nokia | imported from 3GU |
R4‑166092 | On independent design of Tx and Rx units for NR | Nokia | imported from 3GU |
R4‑166093 | PA models for waveform evaluation below 6 GHz | Nokia | imported from 3GU |
R4‑166094 | Discussion on UE RF of multicarrier operation for V2V with 23 dBm maximum transmit power | CMCC | imported from 3GU |
R4‑166095 | Discussion on UE RF requirements on 2UL multicarrier inter-band operation for V2V with 26 dBm maximum transmit power | CMCC | imported from 3GU |
R4‑166096 | Discussion on the blind detection of the interference existence | CMCC | imported from 3GU |
R4‑166097 | LS on progress of performance part for NB-IOT | CMCC,Huawei, HiSilicon | imported from 3GU |
R4‑166098 | Discussion on NB-IoT RRM measurement accuracy | CMCC | imported from 3GU |
R4‑166099 | Discussion on UE demodulation for high speed scenario | CMCC | imported from 3GU |
R4‑166100 | Discussion on network signaling for high speed scenario | CMCC | imported from 3GU |
R4‑166101 | Discussion on 5G simulation assumptions for WP5D evaluation | CMCC | imported from 3GU |
R4‑166102 | Preliminary simulation results of 5G NR for calibration | CMCC | imported from 3GU |
R4‑166103 | Discussion on co-existence study for frequency below 6GHz | CMCC | imported from 3GU |
R4‑166104 | Discussion on RF requirements for 3UL intra-band contiguous CA of CA_40D and CA_41D | CMCC | imported from 3GU |
R4‑166105 | TP on TR 36.714-00-00 for CA_40 and CA_41 | CMCC | imported from 3GU |
R4‑166106 | CR TS 36.104 on NB-IoT power dynamic range for guard band operation | CMCC | imported from 3GU |
R4‑166107 | CR TS 36.104 on NB-IoT power dynamic range for guard band operation | CMCC | imported from 3GU |
R4‑166108 | TP for TR 36.714-04-01 operating bands channel bandwidths for CA_40A-46D_BCS0 | CMCC | imported from 3GU |
R4‑166109 | TP for TR 36.714-04-01 co-existence studies, delta Tib and Rib values for CA_40A-46D_BCS0 | CMCC | imported from 3GU |
R4‑166110 | TP for TR 36.714-04-01 operating bands channel bandwidths for CA_40C-46C_BCS0 | CMCC | imported from 3GU |
R4‑166111 | TP for TR 36.714-04-01 co-existence studies, delta Tib and Rib values for CA_40C-46C_BCS0 | CMCC | imported from 3GU |
R4‑166112 | TP for TR 36.714-04-01 operating bands channel bandwidths for CA_40D-46A_BCS0 | CMCC | imported from 3GU |
R4‑166113 | TP for TR 36.714-04-01 co-existence studies, delta Tib and Rib values for CA_40D-46A_BCS0 | CMCC | imported from 3GU |
R4‑166114 | MSD for CA_8A-41A 2UL. | CMCC | imported from 3GU |
R4‑166115 | TP for TR36.714-02-02 on REFSENS for dual uplink of CA_8A-41A | CMCC | imported from 3GU |
R4‑166116 | Consideration on ACLR for NR | CMCC | imported from 3GU |
R4‑166117 | Discussion on RF requirements for UL 256QAM | CMCC | imported from 3GU |
R4‑166118 | CR on UE RX requirements due to introduction of 10MHz CBW | Huawei, Hisilicon | imported from 3GU |
R4‑166119 | CR to add an informative column to UL Inter-band CA MSD tables | Huawei, Hisilicon | imported from 3GU |
R4‑166120 | CR for fixing power level for TM9 dual layer test in Rel-11 | Ericsson | imported from 3GU |
R4‑166121 | CR for fixing power level for TM9 dual layer test in Rel-12 | Ericsson | imported from 3GU |
R4‑166122 | CR for fixing power level for TM9 dual layer test in Rel-13 | Ericsson | imported from 3GU |
R4‑166123 | CR for fixing power level for TM9 dual layer test in Rel-14 | Ericsson | imported from 3GU |
R4‑166124 | Discussion and simulation results for TM9 tests with new UE behavior | Ericsson | imported from 3GU |
R4‑166125 | UE capability for CC-IM and CRS-IM | Ericsson | imported from 3GU |
R4‑166126 | CR for applicability rule, antenna connection and test method for 4Rx Ues in Rel-13 | Ericsson | imported from 3GU |
R4‑166127 | CR for applicability rule, antenna connection and test method for 4Rx Ues in Rel-14 | Ericsson | imported from 3GU |
R4‑166128 | LS to RAN5 on applicability and antenna connection of 2Rx tests for 4Rx Ues | Ericsson | imported from 3GU |
R4‑166129 | Proposal on SDR CA tests for 4Rx Ues | Ericsson | imported from 3GU |
R4‑166130 | Summary results of SDR CA tests | Ericsson | imported from 3GU |
R4‑166131 | CR for SDR single carrier tests with 4Rx in Rel-13 | Ericsson | imported from 3GU |
R4‑166132 | CR for SDR single carrier tests with 4Rx in Rel-14 | Ericsson | imported from 3GU |
R4‑166133 | CR for SDR CA tests with 4Rx in Rel-13 | Ericsson | imported from 3GU |
R4‑166134 | CR for SDR CA tests with 4Rx in Rel-14 | Ericsson | imported from 3GU |
R4‑166135 | New WI proposal for LTE DL 4Rx with CA in Rel-14 | Ericsson | imported from 3GU |
R4‑166136 | Motivation and general proposal for new WI for LTE DL 4Rx with CA in Rel-14 | Ericsson | imported from 3GU |
R4‑166137 | Draft CR to introduce CA_2DL_2A-7A_2UL_2A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑166138 | Correction to clause A.8.5 E-UTRA Measurements Test Cases | ANRITSU LTD | imported from 3GU |
R4‑166139 | Intermodulation considerations for UL CA including B46 UL | Huawei, Hisilicon | imported from 3GU |
R4‑166140 | MSD for 1+5+40 3DL 2UL CA | Huawei, Hisilicon | imported from 3GU |
R4‑166141 | TP for TR 36.714-03-01: Operating bands, Channel bandwidths, Co-existence study and delta Tib/Rib values for CA_29A-66C and CA_29A-66A-66A | Dish Network, Nokia | imported from 3GU |
R4‑166142 | MSD for 3+7+8 3DL 2UL CA | Huawei, Hisilicon | imported from 3GU |
R4‑166143 | MSD for 8+41 2UL CA | Huawei, Hisilicon | imported from 3GU |
R4‑166144 | Cell identification in V2V | Ericsson | imported from 3GU |
R4‑166145 | RSRP and RSRQ measurements in V2V | Ericsson | imported from 3GU |
R4‑166146 | S-RSRP measurements in V2V | Ericsson | imported from 3GU |
R4‑166147 | Radio measurements for congestion control in V2V | Ericsson | imported from 3GU |
R4‑166148 | GNSS source selection time | Ericsson | imported from 3GU |
R4‑166149 | OCNG pattern for in-band RRM tests | Ericsson | imported from 3GU |
R4‑166150 | OCNG pattern for standalone RRM tests | Ericsson | imported from 3GU |
R4‑166151 | OCNG pattern for in-band RRM tests | Ericsson | imported from 3GU |
R4‑166152 | OCNG pattern for standalone RRM tests | Ericsson | imported from 3GU |
R4‑166153 | REFSENS considerations in CA_12A-12A | Huawei, Hisilicon | imported from 3GU |
R4‑166154 | Introduction of Rel-14 5DL inter-band combinations in 36.101 | Nokia | imported from 3GU |
R4‑166155 | Rx sensitivity for B46 NC CA | Nokia, T-Mobile USA, AT&T, Verizon, US Cellular | imported from 3GU |
R4‑166156 | Introduction of CA_2A-46A-46A, CA_4A-46A-46A and CA_46A-46A-66A | Nokia, T-Mobile USA, AT&T, Verizon, US Cellular | imported from 3GU |
R4‑166157 | TP to 36.714-04-01: Introduction of CA_2A-2A-66B and CA_2A-2A-66C | Nokia, Verizon | imported from 3GU |
R4‑166158 | TP to 36.714-04-01: Introduction of CA_2A-5A-66B, CA_2A-5A-66C and CA_2A-5B-66A | Nokia, Verizon | imported from 3GU |
R4‑166159 | TP to 36.714-04-01: Introduction of CA_2A-66A-66C | Nokia, Verizon | imported from 3GU |
R4‑166160 | TP to 36.714-04-01: Introduction of CA_2A-66D | Nokia, Verizon | imported from 3GU |
R4‑166161 | TP to 36.714-04-01: Introduction of CA_5A-5A-66B and CA_5A-5A-66C | Nokia, Verizon | imported from 3GU |
R4‑166162 | TP to 36.714-04-01: Introduction of CA_5A-5A-66A-66A | Nokia, Verizon | imported from 3GU |
R4‑166163 | TP to 36.714-04-01: Introduction of CA_5A-66D, CA_5B-66B and CA_5B-66C | Nokia, Verizon | imported from 3GU |
R4‑166164 | TP to 36.714-04-01: Introduction of CA_5A-66A-66B and CA_5A-66A-66C | Nokia, Verizon | imported from 3GU |
R4‑166165 | 2UL CA 5+17 correction | Nokia | imported from 3GU |
R4‑166166 | 2UL CA 5+17 correction | Nokia | imported from 3GU |
R4‑166167 | 2UL CA 5+17 correction | Nokia | imported from 3GU |
R4‑166168 | Rel-13 CA corrections | Nokia | imported from 3GU |
R4‑166169 | Rel-13 CA corrections | Nokia | imported from 3GU |
R4‑166170 | Rel-14 CA corrections | Nokia | imported from 3GU |
R4‑166171 | Corrections of CA operating band tables | Nokia | imported from 3GU |
R4‑166172 | Corrections of CA operating band tables | Nokia | imported from 3GU |
R4‑166173 | Initial simulation results for the feasibility study on global application of LTE Band 11 and of LTE Band 21 UEs | Nokia | imported from 3GU |
R4‑166174 | NR UE TX requirement consideration | Nokia | imported from 3GU |
R4‑166175 | mm wave power amplifier AM/AM and AM/PM measurements | Skyworks Solutions Inc. | imported from 3GU |
R4‑166176 | Discussion on Power Spectral Density of UL transmissions in eLAA | BROADCOM LIMITED | imported from 3GU |
R4‑166177 | Summary sheet for 4Rx CQI requirements | Ericsson | imported from 3GU |
R4‑166178 | Discussion on DL PDSCH SDR requirements | Ericsson | imported from 3GU |
R4‑166179 | Corrections of UE CQI requirements for 4Rx | Ericsson | imported from 3GU |
R4‑166180 | Corrections of UE CQI requirements for 4Rx | Ericsson | imported from 3GU |
R4‑166181 | Discussion on missing 4Rx UE CQI performance requirements | Ericsson | imported from 3GU |
R4‑166182 | Addition of UE CQI requirements for 4Rx | Ericsson | imported from 3GU |
R4‑166183 | Addition of UE CQI requirements for 4Rx | Ericsson | imported from 3GU |
R4‑166184 | Discussion about possible Test method for antenna connection for Type 2 4Rx UE | Ericsson | imported from 3GU |
R4‑166185 | Demod simulations for Unidirectional | Ericsson | imported from 3GU |
R4‑166186 | Demod simulations for Bidirectional | Ericsson | imported from 3GU |
R4‑166187 | Discussions on CSI reporting for unidirectional | Ericsson | imported from 3GU |
R4‑166188 | Discussions on CSI reporting for bidirectional | Ericsson | imported from 3GU |
R4‑166189 | HST control channel Performance for unidirectional deployment | Ericsson | imported from 3GU |
R4‑166190 | HST control channel Performance for bidirectional deployment | Ericsson | imported from 3GU |
R4‑166191 | TR 36.714-02-02 v0.3.0 | Huawei | imported from 3GU |
R4‑166192 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.141 | Korea Testing Laboratory | imported from 3GU |
R4‑166193 | RF regulatory requirements for V2V in the European 5.9 GHz ITS band | Ericsson Inc. | imported from 3GU |
R4‑166194 | OTA EVM of AAS base station transmitters | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑166195 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.141 | Korea Testing Laboratory | imported from 3GU |
R4‑166196 | TR 38.803 V0.1.0 | NTT DOCOMO INC. | imported from 3GU |
R4‑166197 | TP on Study item objective for TR 38.803 | NTT DOCOMO INC. | imported from 3GU |
R4‑166198 | TP on Co-existence simulation scenario, assumption, and methodology for TR 38.803 | NTT DOCOMO INC. | imported from 3GU |
R4‑166199 | NR unwanted emissions and related regulation | Ericsson | imported from 3GU |
R4‑166200 | TP for 38.803: Overview of international and regional regulation | Ericsson | imported from 3GU |
R4‑166201 | TP for 38.803: Boundary between spurious and OOB domain | Ericsson | imported from 3GU |
R4‑166202 | Co-existence simulation results for NR below 6 GHz | Ericsson | imported from 3GU |
R4‑166203 | On below 6 GHz requirement re-use for NR | Ericsson | imported from 3GU |
R4‑166204 | DRAFT LS on Characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz | Ericsson | imported from 3GU |
R4‑166205 | DRAFT LS on Modelling and Simulation of IMT Networks for Use in Sharing and Compatibility Studies | Ericsson | imported from 3GU |
R4‑166206 | TP for TR 37.871: Clarification for BS capable of multi-band operation | Ericsson | imported from 3GU |
R4‑166207 | LAA UE and BS unwanted emission mask requirements | Ericsson | imported from 3GU |
R4‑166208 | LAA BS unwanted emission mask requirements in 36.104 | Ericsson | imported from 3GU |
R4‑166209 | LAA BS unwanted emission mask requirements in 36.104 | Ericsson | imported from 3GU |
R4‑166210 | LAA BS unwanted emission mask requirements in 36.141 | Ericsson | imported from 3GU |
R4‑166211 | LAA BS unwanted emission mask requirements in 36.141 | Ericsson | imported from 3GU |
R4‑166212 | TP for TR 37.842: Indoor Anechoic Chamber EIS testing uncertainty value | NEC, SEI | imported from 3GU |
R4‑166213 | TP for TR 37.842: Indoor Anechoic Chamber EIRP testing uncertainty value | NEC | imported from 3GU |
R4‑166214 | Test tolerance values for EIRP and EIS | NEC | imported from 3GU |
R4‑166215 | Correction of AAS Base Station performance targets | NEC | imported from 3GU |
R4‑166216 | TP for TR 37.842: Manufacturer declaration for intra AAS transmitter intermodulation | NEC | imported from 3GU |
R4‑166217 | TP for TS 37.145-1: Editorial correction on table numbers | NEC | imported from 3GU |
R4‑166218 | TP for TS 37.145-2: Editorial correction on table numbers | NEC | imported from 3GU |
R4‑166219 | TP for TS 37.842: Editorial correction on figure numbers | NEC | imported from 3GU |
R4‑166220 | TP for TS 37.145-1: AAS BS Performance Target | NEC | imported from 3GU |
R4‑166221 | Simulation assumptions and preliminary results for NR co-existence study | NEC | imported from 3GU |
R4‑166222 | Discussion on UE autonomous resource selection requirement in V2V | CATT | imported from 3GU |
R4‑166223 | Correction of AAS Base Station performance targets | NEC | imported from 3GU |
R4‑166224 | E-UTRA BHH TRP/TRS performance requirements | Motorola Mobility UK Ltd. | imported from 3GU |
R4‑166225 | Way forward on Manufacturer declaration | Ericsson | imported from 3GU |
R4‑166226 | Way forward on tests strategy | Ericsson | imported from 3GU |
R4‑166227 | Test strategy (add-on) | Ericsson | imported from 3GU |
R4‑166228 | Draft CR NB-IoT TS36-141 3 - Definition, symbols and abbreviations | Ericsson | imported from 3GU |
R4‑166229 | Draft CR NB-IoT TS36-141 4-6 and 4-7 Manufacturer declarations | Ericsson | imported from 3GU |
R4‑166230 | Draft CR NB-IoT TS36-141 4-11 Applicability Configurations | Ericsson | imported from 3GU |
R4‑166231 | Draft CR NB-IoT TS36-141 7-2 REFSENS | Ericsson | imported from 3GU |
R4‑166232 | Draft CR NB-IoT TS37-141 3 Definition, symbols and abbreviations | Ericsson | imported from 3GU |
R4‑166233 | Draft CR 4-6 Manufacturer declarations | Ericsson | imported from 3GU |
R4‑166234 | Draft CR NB-IoT TS37-141 7-2 REFSENS | Ericsson | imported from 3GU |
R4‑166235 | CR NB-IoT TS36-104 7-8 NB Intermodulation | Ericsson | imported from 3GU |
R4‑166236 | CR NB-IoT TS36-104 Power boosting 5 MHz | Ericsson, Nokia | imported from 3GU |
R4‑166237 | CR NB-IoT TS36-104 7-8 NB Intermodulation | Ericsson | imported from 3GU |
R4‑166238 | CR NB-IoT TS36-104 Power boosting 5 MHz | Ericsson, Nokia | imported from 3GU |
R4‑166239 | NB-IoT CDMA coexistence | Ericsson | imported from 3GU |
R4‑166240 | Simulation results for NPUSCH format 1 | Ericsson | imported from 3GU |
R4‑166241 | Simulation results for NPUSCH format 2 | Ericsson | imported from 3GU |
R4‑166242 | Drift model evaluation for NPUSCH simulations | Ericsson | imported from 3GU |
R4‑166243 | CR for correction to some parameters in D2D RRM tests | Qualcomm Incorporated | imported from 3GU |
R4‑166244 | CR for correction to some parameters in D2D RRM tests | Qualcomm Incorporated | imported from 3GU |
R4‑166245 | CR for correction to some parameters in D2D RRM tests | Qualcomm Incorporated | imported from 3GU |
R4‑166246 | Summary of agreement for eD2D performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑166247 | CR on eD2D demodulation performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑166248 | Discussion on eD2D RRM tests | Qualcomm Incorporated | imported from 3GU |
R4‑166249 | CR on eD2D RRM tests | Qualcomm Incorporated | imported from 3GU |
R4‑166250 | DSRC-V2V adjacent channel coexistence in unlicensed ITS (5.9GHz) spectrum | Qualcomm Incorporated | imported from 3GU |
R4‑166251 | Revisit RAN4 assumption on CAM traffic model for coexistence study | Qualcomm Incorporated | imported from 3GU |
R4‑166252 | Link level demodulation performance results of LTE-V2V for coexistence studies | Qualcomm Incorporated | imported from 3GU |
R4‑166253 | RF requirements for LTE-V2V | Qualcomm Incorporated | imported from 3GU |
R4‑166254 | RRM requirements for LTE-V2V | Qualcomm Incorporated | imported from 3GU |
R4‑166255 | Considerations on RRM for NR | Nokia | imported from 3GU |
R4‑166256 | OTA TRP/TRS framework improvements | Vodafone | imported from 3GU |
R4‑166257 | LTE TRP/TRS measurements BHH smartphones with focus on CA support | Vodafone | imported from 3GU |
R4‑166258 | TP for TR 36.714-02-01: CA_1A-3A | Vodafone | imported from 3GU |
R4‑166259 | TP for TR 36.714-02-01: CA_3A-28A | Vodafone | imported from 3GU |
R4‑166260 | TP for TR 36.714-02-01: CA_3A-40A | Vodafone | imported from 3GU |
R4‑166261 | TP for TR 36.714-02-01: CA_3A-41A | Vodafone | imported from 3GU |
R4‑166262 | TP for TR 36.714-02-01: CA_28A-46A operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166263 | TP for TR 36.714-02-01: UE requirement relaxation for CA_28A-46A | Vodafone | imported from 3GU |
R4‑166264 | TP for TR 36.714-03-01: CA_28A-46C operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166265 | TP for TR 36.714-03-01: UE requirement relaxation for CA_28A-46C | Vodafone | imported from 3GU |
R4‑166266 | TP for TR 36.714-04-01: CA_28A-46D operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166267 | TP for TR 36.714-04-01: UE requirement relaxation for CA_28A-46D | Vodafone | imported from 3GU |
R4‑166268 | TP for TR 36.714-05-01: CA_28A-46E operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166269 | TP for TR 36.714-05-01: UE requirement relaxation for CA_28A-46E | Vodafone | imported from 3GU |
R4‑166270 | TP for TR 36.714-02-01: CA_40A-41A operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166271 | TP for TR 36.714-02-01: UE requirement relaxation for CA_40A-41A | Vodafone | imported from 3GU |
R4‑166272 | TP for TR 36.714-02-01: CA_40A-46A operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166273 | TP for TR 36.714-02-01: UE requirement relaxation for CA_40A-46A | Vodafone | imported from 3GU |
R4‑166274 | TP for TR 36.714-03-01: CA_40A-46C operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166275 | TP for TR 36.714-03-01: UE requirement relaxation for CA_40A-46C | Vodafone | imported from 3GU |
R4‑166276 | TP for TR 36.714-04-01: CA_40A-46D operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166277 | TP for TR 36.714-04-01: UE requirement relaxation for CA_40A-46D | Vodafone | imported from 3GU |
R4‑166278 | TP for TR 36.714-05-01: CA_40A-46E operating band and channel bandwidths | Vodafone | imported from 3GU |
R4‑166279 | TP for TR 36.714-05-01: UE requirement relaxation for CA_40A-46E | Vodafone | imported from 3GU |
R4‑166280 | UL 256 QAM Way Forward | Vodafone | imported from 3GU |
R4‑166281 | 3+32 remaining requirements | Vodafone | imported from 3GU |
R4‑166282 | LTE TRP TRS work plan | Vodafone | imported from 3GU |
R4‑166283 | Correction on LBT test procedure | Huawei | imported from 3GU |
R4‑166284 | Correction on LBT test procedure | Huawei | imported from 3GU |
R4‑166285 | work plan for multi-node testing for LAA | Huawei | imported from 3GU |
R4‑166286 | Consideration on multi-node testing | Huawei | imported from 3GU |
R4‑166287 | TP for multi-node testing TR: Scope | Huawei | imported from 3GU |
R4‑166288 | TP for multi-node testing TR: Section 4 and 5 | Huawei | imported from 3GU |
R4‑166289 | SNR and IM consideration on BS RX for eLAA | Huawei | imported from 3GU |
R4‑166290 | REFSENS on BS RX for eLAA | Huawei | imported from 3GU |
R4‑166291 | Dynamic range on BS RX for eLAA | Huawei | imported from 3GU |
R4‑166292 | ICS on BS RX for eLAA | Huawei | imported from 3GU |
R4‑166293 | ACS and Blocking on BS RX for eLAA | Huawei | imported from 3GU |
R4‑166294 | Spurious emission on BS RX for eLAA | Huawei | imported from 3GU |
R4‑166295 | RX intermodulation on BS RX for eLAA | Huawei | imported from 3GU |
R4‑166296 | Draft CR for eLAA BS Rx requirements | Huawei | imported from 3GU |
R4‑166297 | UEM requirement for 10MHz CBW for eLAA | Huawei | imported from 3GU |
R4‑166298 | ACLR requirement for 10MHz CBW for eLAA | Huawei | imported from 3GU |
R4‑166299 | Draft CR for eLAA BS Tx requirements | Huawei | imported from 3GU |
R4‑166300 | Futher consideration on SRS switching time | Huawei, Hisilicon | imported from 3GU |
R4‑166301 | Reply LS on SRS switching time | Huawei, Hisilicon | imported from 3GU |
R4‑166302 | System level simulation results for UL 256QAM | Huawei, Hisilicon | imported from 3GU |
R4‑166303 | Futher consideration on EVM requirement | Huawei, Hisilicon | imported from 3GU |
R4‑166304 | WF on MPR\AMPR simulation assumptions for UL 256QAM | Huawei, Hisilicon | imported from 3GU |
R4‑166305 | TP for 36.785: PRR performance metric for V2V co-existence study | Huawei, Hisilicon | imported from 3GU |
R4‑166306 | Co-existence simulation results for case1 | Huawei | imported from 3GU |
R4‑166307 | Co-existence simulation results for case2 | Huawei | imported from 3GU |
R4‑166308 | Co-existence simulation results for case3 | Huawei | imported from 3GU |
R4‑166309 | Co-existence simulation results for case4 | Huawei | imported from 3GU |
R4‑166310 | V2V UE RF requirements | Huawei, Hisilicon | imported from 3GU |
R4‑166311 | FRC for V2V RF requirements | Huawei, Hisilicon | imported from 3GU |
R4‑166312 | TP for 36.785: UE maximum output power for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166313 | TP for 36.785: Transmit signal quality for V2V for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166314 | TP for 36.785 Out-of-band emissions for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166315 | TP for 36.785: Spurious emissions for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166316 | TP for 36.785: Reference sensitivity for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166317 | TP for 36.785: Maximum input level for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166318 | TP for 36.785: ACS requirement for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166319 | TP for 36.785: Blocking requirements for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166320 | TP for 36.785: Spurious response for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166321 | TP for 36.785: Intermodulation characteristics for V2V | Huawei, Hisilicon | imported from 3GU |
R4‑166322 | RF requirements for HPUE | Huawei, Hisilicon | imported from 3GU |
R4‑166323 | CR for introduction of HPUE | Huawei, Hisilicon | imported from 3GU |
R4‑166324 | Discussion on Band 11 UE emission to protect EESS | Huawei, Hisilicon | imported from 3GU |
R4‑166325 | TP for TR 36.714-02-02: update the scope | Huawei, Hisilicon | imported from 3GU |
R4‑166326 | Revised WID: 2DL 2UL basket WI | Huawei, Hisilicon | imported from 3GU |
R4‑166327 | Introduction of completed R14 2DL2UL band combinations to TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑166328 | TP for TR 37.871: RF bandwidth position | Huawei | imported from 3GU |
R4‑166329 | Test configuration for MB BS testing with three or more bands | Huawei | imported from 3GU |
R4‑166330 | Correction on UEM for standalone NB-IoT BS in TS 36.104 | Huawei | imported from 3GU |
R4‑166331 | Correction on UEM for standalone NB-IoT BS in TS 36.104 | Huawei | imported from 3GU |
R4‑166332 | Correction on UEM for standalone NB-IoT BS in TS 37.104 | Huawei | imported from 3GU |
R4‑166333 | Correction on UEM for standalone NB-IoT BS in TS 37.104 | Huawei | imported from 3GU |
R4‑166334 | Clarification on EARFCN | Huawei | imported from 3GU |
R4‑166335 | Clarification on EARFCN | Huawei | imported from 3GU |
R4‑166336 | Clarification on EARFCN | Huawei | imported from 3GU |
R4‑166337 | Clarification on EARFCN | Huawei | imported from 3GU |
R4‑166338 | Correction on ACS for standalone NB-IoT BS in TS 36.104 | Huawei | imported from 3GU |
R4‑166339 | Correction on ACS for standalone NB-IoT BS in TS 36.104 | Huawei | imported from 3GU |
R4‑166340 | Correction on FRC for EUTRA with in-band NB-IoT in TS 36.104 | Huawei | imported from 3GU |
R4‑166341 | Correction on FRC for EUTRA with in-band NB-IoT in TS 36.104 | Huawei | imported from 3GU |
R4‑166342 | Corrections in 36.101 for NB-IoT UE | Huawei, Hisilicon | imported from 3GU |
R4‑166343 | Corrections in 36.101 for NB-IoT UE | Huawei, Hisilicon | imported from 3GU |
R4‑166344 | NB-IoT UL RMC | Huawei, Hisilicon | imported from 3GU |
R4‑166345 | TP for TR 36.714-02-01: MSD for CA_3A-46A_BCS1 | Huawei, Hisilicon | imported from 3GU |
R4‑166346 | TP for TR 36.714-02-01: MSD for CA_7A-46A_BCS1 | Huawei, Hisilicon | imported from 3GU |
R4‑166347 | TP for TR 36.714-03-01: operating bands, channel bandwidths and MSD for CA_3A-46C_BCS1 | Huawei, Hisilicon | imported from 3GU |
R4‑166348 | TP for TR 36.714-03-01: MSD for CA_7A-46C_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑166349 | TP for TR 36.714-04-01: operating bands, channel bandwidths and MSD for CA_3A-46D_BCS1 | Huawei, Hisilicon | imported from 3GU |
R4‑166350 | TP for TR 36.714-04-01: MSD for CA_7A-46D_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑166351 | TP for TR 36.714-03-01: operating bands, channel bandwidths for CA_1A-46C_BCS1 | Huawei, Hisilicon | imported from 3GU |
R4‑166352 | TP for TR 36.714-03-01: co-existence studies, UE requirements for CA_1A-46C_BCS1 | Huawei, Hisilicon | imported from 3GU |
R4‑166353 | TP for TR 36.714-03-01: operating bands, channel bandwidths for CA_5A-46C_BCS1 | Huawei, Hisilicon | imported from 3GU |
R4‑166354 | TP for TR 36.714-03-01: co-existence studies, UE requirements for CA_5A-46C_BCS1 | Huawei, Hisilicon | imported from 3GU |
R4‑166355 | TP for TR 36.714-02-01: operating bands, channel bandwidths for CA_40A-46A_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑166356 | TP for TR 36.714-02-01: co-existence studies, delta Tib and Rib values for CA_40A-46A_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑166357 | TP for TR 36.714-03-01: operating bands, channel bandwidths for CA_40C-46A_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑166358 | TP for TR 36.714-03-01: co-existence studies, delta Tib and Rib values for CA_40C-46A_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑166359 | TP for TR 36.714-03-01: operating bands, channel bandwidths for CA_40A-46C_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑166360 | TP for TR 36.714-03-01: co-existence studies, delta Tib and Rib values for CA_40A-46C_BCS0 | Huawei, Hisilicon | imported from 3GU |
R4‑166361 | TP for TR 36.714-03-01: UE requirement relaxation for CA_1A-3A-38A | Huawei, Hisilicon | imported from 3GU |
R4‑166362 | Consideration on new power class for NB_IoT | Huawei, Hisilicon | imported from 3GU |
R4‑166363 | Work plan for RAN4 work on V2X | Huawei, Hisilicon | imported from 3GU |
R4‑166364 | Consideration on UE maximum transmission power | Huawei, Hisilicon | imported from 3GU |
R4‑166365 | Discussion on CDMA ACLR and ACS for co-existence simulation | Huawei | imported from 3GU |
R4‑166366 | Draft CR for Clause 5 in 36.141: Operating bands and channel arrangement | Huawei | imported from 3GU |
R4‑166367 | Draft CR for Clause 6.1 in 36.141: test model | Huawei | imported from 3GU |
R4‑166368 | Draft CR for Clause 6 in 36.141: Transmitter characteristics | Huawei | imported from 3GU |
R4‑166369 | Draft CR for Clause 4.7 in 37.141: Capability sets definition | Huawei | imported from 3GU |
R4‑166370 | Draft CR for Clause 4 in 37.141: Operating Bands, RF channles and test models | Huawei | imported from 3GU |
R4‑166371 | Draft CR for Clause 6 in 37.141: Transmitter characteristics | Huawei | imported from 3GU |
R4‑166372 | WF on supported RF configuration for NB-IoT | Huawei | imported from 3GU |
R4‑166373 | WF on NB-IoT test model | Huawei | imported from 3GU |
R4‑166374 | Further discussion of PA model for waveform evaluation | Huawei, Hisilicon | imported from 3GU |
R4‑166375 | Consideration on spectrum emission mask | Huawei, Hisilicon | imported from 3GU |
R4‑166376 | Consideration of BS classes for NR | Huawei, Hisilicon | imported from 3GU |
R4‑166377 | Guard band consideration below 6GHz | Huawei, Hisilicon | imported from 3GU |
R4‑166378 | Further discussion on co-existence simulation assumptions | Huawei, Hisilicon | imported from 3GU |
R4‑166379 | TP for 38.803 on NR co-existence study | Huawei, Hisilicon | imported from 3GU |
R4‑166380 | WF on co-existence simulation assumptions | Huawei, Hisilicon | imported from 3GU |
R4‑166381 | Reply LS on further update of RAN4 PA model discussion | Huawei, Hisilicon | imported from 3GU |
R4‑166382 | 5G NR coexistence calibration in indoor scenario | Huawei, Hisilicon | imported from 3GU |
R4‑166383 | 5G NR coexistence calibration in urban macro scenario | Huawei, Hisilicon | imported from 3GU |
R4‑166384 | 5G NR coexistence calibration in dense urban scenario | Huawei, Hisilicon | imported from 3GU |
R4‑166385 | Updated scope of TR: LTE Advanced inter-band CA Rel-14 for 5DL/1UL | Nokia | imported from 3GU |
R4‑166386 | Revised WI: LTE Advanced inter-band CA Rel-14 for 5DL/1UL | Nokia | imported from 3GU |
R4‑166387 | TR 36.714-05-01 v0.2.0 | Nokia | imported from 3GU |
R4‑166388 | Introduction of 5DL CA combinations to 36.104 | Nokia | imported from 3GU |
R4‑166389 | Introduction of 5DL CA combinations to 36.141 | Nokia | imported from 3GU |
R4‑166390 | TP to TR36.744: Abbreviations | Nokia | imported from 3GU |
R4‑166391 | TP to TR36.744: Background | Nokia | imported from 3GU |
R4‑166392 | TP to TR36.744: Channel numbering | Nokia | imported from 3GU |
R4‑166393 | TP to TR36.744: Band specific issues | Nokia | imported from 3GU |
R4‑166394 | TP to TR36.744: MSR specific issues | Nokia | imported from 3GU |
R4‑166395 | TP to TR36.744: Scope | Nokia | imported from 3GU |
R4‑166396 | TP to TR36.744: Required changes to specifications | Nokia | imported from 3GU |
R4‑166397 | BS additional out-of-band limits for 3.5 GHz in the USA | Nokia | imported from 3GU |
R4‑166398 | Expected changes to 36.104 due to introduction of new 3.5 GHz band in the USA | Nokia | imported from 3GU |
R4‑166399 | Work plan for CBRS 3.5GHz band for LTE in the United States | Nokia, Qualcomm | imported from 3GU |
R4‑166400 | Frequency band arrangement and regulatory background for 3.5GHz band in USA | Nokia, Qualcomm | imported from 3GU |
R4‑166401 | TR 36.744 v0.0.1 | Nokia | imported from 3GU |
R4‑166402 | TC7b correction | Nokia | imported from 3GU |
R4‑166403 | TC7b correction | Nokia | imported from 3GU |
R4‑166404 | TC7b correction | Nokia | imported from 3GU |
R4‑166405 | TC7b correction | Nokia | imported from 3GU |
R4‑166406 | Motivation for new WI proposal: B3/B20 High Power UE | Motorola Solutions UK Ltd. | imported from 3GU |
R4‑166407 | New Work Item Proposal: Add Power Class 1 UE to B3/B20 | Motorola Solutions UK Ltd. | imported from 3GU |
R4‑166408 | On V2V PSBCH demodulation | Intel Corporation (UK) Ltd | imported from 3GU |
R4‑166409 | Inter-frequency event triggered reporting | Nokia | imported from 3GU |
R4‑166410 | Intra-frequency absolute and relative CSI-RSRP accuracies for SCell with FS3 | Nokia | imported from 3GU |
R4‑166411 | Inter-frequency event triggered reporting | Nokia | imported from 3GU |
R4‑166412 | Intra-frequency absolute and relative CSI-RSRP accuracies for SCell with FS3 | Nokia | imported from 3GU |
R4‑166413 | Further discussion on eLAA RRM impacts | Nokia | imported from 3GU |
R4‑166414 | Additional delay with measurement reporting in eLAA | Nokia | imported from 3GU |
R4‑166415 | Clarification for TAGs with FS3 SCells | Nokia | imported from 3GU |
R4‑166416 | LTE tablet TRP and TRS measurements for Bands 3, 7 and 20 | ORANGE | imported from 3GU |
R4‑166417 | Spectrum for New Radio | ORANGE | imported from 3GU |
R4‑166418 | Way Forward on NB-IoT UE RLM Out-of-Sync Test Procedure | Nokia | imported from 3GU |
R4‑166419 | Minutes of AAS adhoc | Huawei | imported from 3GU |
R4‑166420 | TR 37.842 v1.12.0 | Huawei | imported from 3GU |
R4‑166421 | Discussion on the accuracy of different proposed OTA test methods | Huawei | imported from 3GU |
R4‑166422 | TP to TS37.145-2 - clean up | Huawei | imported from 3GU |
R4‑166423 | TP to TS37.145-1 - reference corrections | Huawei | imported from 3GU |
R4‑166424 | Structure for Updating TR37 842 in REL14 | Huawei | imported from 3GU |
R4‑166425 | Antenna pattern TRP estimations | Huawei | imported from 3GU |
R4‑166426 | OTA blocking requirements | Huawei | imported from 3GU |
R4‑166427 | OTA receiver minimum sensitivity | Huawei | imported from 3GU |
R4‑166428 | Error on integration of TRP due to measurement dynamic range | Huawei | imported from 3GU |
R4‑166429 | co-location UEM requirements | Huawei | imported from 3GU |
R4‑166430 | EVM in main lobe | Huawei | imported from 3GU |
R4‑166431 | In-band UEM absolute (dBm) limits | Huawei | imported from 3GU |
R4‑166432 | AAS and NR BS requirements | Huawei | imported from 3GU |
R4‑166433 | Modification on E-UTRA Prose out of band blocking requirement | CATT | imported from 3GU |
R4‑166434 | Modification on E-UTRA Prose out of band blocking requirement | CATT | imported from 3GU |
R4‑166435 | Modification on E-UTRA Prose out of band blocking requirement | CATT | imported from 3GU |
R4‑166436 | Applicability of UTRA Requirements | BlackBerry UK Limited | imported from 3GU |
R4‑166437 | Rayleigh Validation Measurements for different number of fixed input ports in the Reverberation Chamber plus Channel Emulator (RC+CE) Test Methodology | CTTC | imported from 3GU |
R4‑166438 | Device considerations for determination of performance requirements | BlackBerry UK Limited | imported from 3GU |
R4‑166439 | MSD for CA_2A-12A-30A with UL on CA_2A-12A | Qualcomm Incorporated | imported from 3GU |
R4‑166440 | Work Plan for NB-IoT RRM Performance | Ericsson | imported from 3GU |
R4‑166441 | Meeting Minutes for Ad Hoc on NB-IoT RRM | Ericsson | imported from 3GU |
R4‑166442 | OCNG patterns for eMTC | Ericsson | imported from 3GU |
R4‑166443 | OCNG patterns for eMTC | Ericsson | imported from 3GU |
R4‑166444 | Handover requirements in eMTC CEModeB | Ericsson | imported from 3GU |
R4‑166445 | Correction to handover requirements in eMTC CEModeB | Ericsson | imported from 3GU |
R4‑166446 | Correction to handover requirements in eMTC CEModeB | Ericsson | imported from 3GU |
R4‑166447 | Correction to RRC re-establishment requirements in eMTC CEModeB | Ericsson | imported from 3GU |
R4‑166448 | Correction to RRC re-establishment requirements in eMTC CEModeB | Ericsson | imported from 3GU |
R4‑166449 | E-UTRAN UE Timing Advance Adjustment Accuracy Test for NB-IoT UE in Enhanced Coverage | Ericsson | imported from 3GU |
R4‑166450 | E-UTRAN UE Timing Advance Adjustment Accuracy Test for NB-IoT UE in Enhanced Coverage | Ericsson | imported from 3GU |
R4‑166451 | Requirement on GNSS source selection for V2V | Ericsson | imported from 3GU |
R4‑166452 | Proposals for addressing the few remaining open items for the harmonization testing campaign | CTTC | imported from 3GU |
R4‑166453 | Motivation of new proposal for 4Rx SU-MIMO advanced receiver | Huawei, HiSilicon | imported from 3GU |
R4‑166454 | Correction of OCNG (Rel-10) | Huawei, HiSilicon | imported from 3GU |
R4‑166455 | Correction of OCNG (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑166456 | Correction of OCNG (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑166457 | Correction of OCNG (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑166458 | Correction of OCNG (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑166459 | Correction of power parameter for demodulation tests (Rel-10) | Huawei, HiSilicon | imported from 3GU |
R4‑166460 | Correction of power parameter for demodulation tests (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑166461 | Correction of power parameter for demodulation tests (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑166462 | Correction of power parameter for demodulation tests (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑166463 | Correction of power parameter for demodulation tests (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑166464 | Maintenance of BS MMSE-IRC receiver requirements | Huawei | imported from 3GU |
R4‑166465 | Maintenance of BS MMSE-IRC receiver requirements | Huawei | imported from 3GU |
R4‑166466 | Updated CA demodulation performance requirements (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑166467 | Discussion for update of CA demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑166468 | Updated CA demodulation performance requirements (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑166469 | CR: Introduce of new test requirements for new UE behaviour for 2Rx (Rel-13) | Huwei, HiSilicon, Qualcomm | imported from 3GU |
R4‑166470 | CR: Introduce of new test requirements for new UE behaviour for 2Rx (Rel-14) | Huwei, HiSilicon, Qualcomm | imported from 3GU |
R4‑166471 | On eDC demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑166472 | Update the eDC demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑166473 | On eDC demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑166474 | Evaluation and discussion for eMTC CQI definition reporting requirements | Huawei, HiSilicon | imported from 3GU |
R4‑166475 | Evauation and discussion for eMTC subband CQI test PUSCH 2-0 | Huawei, HiSilicon | imported from 3GU |
R4‑166476 | Simulation results for 4Rx CQI definition test under fading condition | Huawei, HiSilicon | imported from 3GU |
R4‑166477 | Simulation results for 4Rx PUCCH 1-1 CQI reporing test for Type-A receiver | Huawei, HiSilicon | imported from 3GU |
R4‑166478 | Correction of test parameters with Class B alternative codebook for one CSI-RS resource configured (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑166479 | Correction of test parameters with Class B alternative codebook for one CSI-RS resource configured (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑166480 | Simulation results for LAA 4 test scenarios of PDSCH Scell test | Huawei, HiSilicon | imported from 3GU |
R4‑166481 | Simulation results for LAA 4 test scenarios of PDCCH test | Huawei, HiSilicon | imported from 3GU |
R4‑166482 | Applicable UE category for LAA | Huawei, HiSilicon | imported from 3GU |
R4‑166483 | Simulation results about LAA aperiodic CSI reporting | Huawei, HiSilicon | imported from 3GU |
R4‑166484 | Summary of NB-IoT BS simulation results | Huawei | imported from 3GU |
R4‑166485 | Evaluation and discussion on SFN scenario with unidirectional RRH arrangment | Huawei, HiSilicon | imported from 3GU |
R4‑166486 | Discussion for CQI test in SFN scenario. | Huawei, HiSilicon | imported from 3GU |
R4‑166487 | NPDCCH Demodulation Performance Simulation Results | QUALCOMM UK Ltd | imported from 3GU |
R4‑166488 | NPDSCH Demodulation Performance Simulation Results | QUALCOMM UK Ltd | imported from 3GU |
R4‑166489 | NPBCH Demodulation Performance Simulation Results | QUALCOMM UK Ltd | imported from 3GU |
R4‑166490 | NRSRP and NRSRQ Measurement Accuracy | QUALCOMM UK Ltd | imported from 3GU |
R4‑166491 | HD-FDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166492 | HD-FDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166493 | TP for TR 36.714-02-01: Reference sensitivity for CA_3A-32A | Qualcomm Incorporated | imported from 3GU |
R4‑166494 | TP for TR 36.714-03-01: Reference sensitivity for CA_3A-20A-32A | Qualcomm Incorporated | imported from 3GU |
R4‑166495 | Applicability of UE RF requirements to PUSCH frequency hopping | Qualcomm Incorporated | imported from 3GU |
R4‑166496 | Reply LS on Applicability of requirements with PUSCH hopping | Qualcomm Incorporated | imported from 3GU |
R4‑166497 | Reference sensitivity exception for CA_20A-38A and CA_7A-20A-38A | Qualcomm Incorporated | imported from 3GU |
R4‑166498 | Reference sensitivity exception for CA_20A-38A and CA_7A-20A-38A | Qualcomm Incorporated | imported from 3GU |
R4‑166499 | General UE Tx requirements for eLAA in Band 46 | Qualcomm Incorporated | imported from 3GU |
R4‑166500 | eLAA UE MPR | Qualcomm Incorporated | imported from 3GU |
R4‑166501 | Basestation Rx requirements for eLAA | Qualcomm Incorporated | imported from 3GU |
R4‑166502 | TP for TR 36.744: UE Tx requirements | Qualcomm Incorporated, Nokia | imported from 3GU |
R4‑166503 | TP for TR 36.744: UE Rx requirements | Qualcomm Incorporated, Nokia | imported from 3GU |
R4‑166504 | TP for TR 36.744: A-MPR for 3.5 GHz band in the US | Qualcomm Incorporated | imported from 3GU |
R4‑166505 | HPUE power class fallback | Qualcomm Incorporated | imported from 3GU |
R4‑166506 | Introduction of power class 2 HPUE in Band 41 | Qualcomm Incorporated, Sprint | imported from 3GU |
R4‑166507 | CR on RLM in-sync without DRX for normal coverage | QUALCOMM UK Ltd | imported from 3GU |
R4‑166508 | CR on RLM in-sync without DRX for extended coverage | QUALCOMM UK Ltd | imported from 3GU |
R4‑166509 | Cell identification Simulation Results | QUALCOMM UK Ltd | imported from 3GU |
R4‑166510 | Correction CR on UE Measurement Capability | QUALCOMM UK Ltd | imported from 3GU |
R4‑166511 | On per-CC based measurement gap configurations | Intel | imported from 3GU |
R4‑166512 | Correction CR on Paging interruption | QUALCOMM UK Ltd | imported from 3GU |
R4‑166513 | CR on NPBCH FRC Test Configuration | QUALCOMM UK Ltd | imported from 3GU |
R4‑166514 | CR on NPBCH RMC Test Configuration | QUALCOMM UK Ltd | imported from 3GU |
R4‑166515 | Correction CR on RRC_IDLE state requirements for NB-IoT | QUALCOMM UK Ltd | imported from 3GU |
R4‑166516 | Filter data for B3+B39 2DL CA | MediaTek Inc. | imported from 3GU |
R4‑166517 | Starting phase impact on throughput for different antenna types | Keysight Technologies UK Ltd | imported from 3GU |
R4‑166518 | Analysis of MPAC throughput consistency for two different channel emulators | Keysight Technologies UK Ltd | imported from 3GU |
R4‑166519 | Missing CA reference sensitivity exceptions | MediaTek Inc. | imported from 3GU |
R4‑166520 | Rel-14 Connected Mode Mobility Enhancement for NB-IoT RLM | QUALCOMM UK Ltd | imported from 3GU |
R4‑166521 | Missing CA reference sensitivity exceptions | MediaTek Inc. | imported from 3GU |
R4‑166522 | [Draft] LS to RAN2 on Rel-14 Connected Mode Mobility Enhancement for NB-IoT RLM | QUALCOMM UK Ltd | imported from 3GU |
R4‑166523 | On carrier bandwidths for NR in below 6GHz and mm-Wave frequencies | Ericsson | imported from 3GU |
R4‑166524 | Further discussions on simulation parameter assumptions for coexistence studies related to mmwave NR systems | Ericsson | imported from 3GU |
R4‑166525 | Simulations results for coexistence studies in mm-wave frequencies | Ericsson | imported from 3GU |
R4‑166526 | Discussion on BS and UE noise figure for mm-waves | Ericsson | imported from 3GU |
R4‑166527 | Way forward on UE and BS NF for mm-waves | Ericsson | imported from 3GU |
R4‑166528 | TP for NR Rel-14 TR 38.803: Simulation assumptions and scenarios | Ericsson | imported from 3GU |
R4‑166529 | TP for NR Rel-14 TR 38.803: LO generation and phase noise aspects for mm-wave technologies | Ericsson | imported from 3GU |
R4‑166530 | TP for NR Rel-14 TR 38.803: PA considerations for mm-wave technologies | Ericsson | imported from 3GU |
R4‑166531 | TP for NR Rel-14 TR 38.803: Noise figure for mm-wave technologies | Ericsson | imported from 3GU |
R4‑166532 | TP for NR Rel-14 TR 38.803: Carrier frequency and mm-wave technology aspects | Ericsson | imported from 3GU |
R4‑166533 | TP for NR Rel-14 TR 38.803: 2.4 Filtering aspects in mm-wave technology | Ericsson | imported from 3GU |
R4‑166534 | Investigations of BS noise figure values on eLAA UL Performance | Ericsson | imported from 3GU |
R4‑166535 | Suitable ACS requirement for BS receiver for UL LAA operation | Ericsson | imported from 3GU |
R4‑166536 | BS receiver requirements for Rel-14 eLAA | Ericsson | imported from 3GU |
R4‑166537 | CR on BS receiver requirements for Rel-14 eLAA | Ericsson | imported from 3GU |
R4‑166538 | UE unwanted emission mask in Rel-14 eLAA | Ericsson | imported from 3GU |
R4‑166539 | CR on UE unwanted emission mask in Rel-14 eLAA | Ericsson | imported from 3GU |
R4‑166540 | LBT functionality requirements for UE in Rel-14 eLAA | Ericsson | imported from 3GU |
R4‑166541 | CR on LBT functionality requirements for UE in Rel-14 eLAA | Ericsson | imported from 3GU |
R4‑166542 | Details on multi-node tests for Rel-13 LAA | Ericsson | imported from 3GU |
R4‑166543 | Skeleton of TR 36.789 for multi-node coexistence test | Ericsson | imported from 3GU |
R4‑166544 | TP on Scope of TR 36.789: multi-node coexistence test | Ericsson | imported from 3GU |
R4‑166545 | TP on co-existence test for TR36.789: multi-node coexistence test | Ericsson | imported from 3GU |
R4‑166546 | Further consideration on SRS switching time | Ericsson | imported from 3GU |
R4‑166547 | Impact of SRS switching on UE RF | Ericsson | imported from 3GU |
R4‑166548 | Correction on subframe pair definition for PCMAX of DC | Ericsson | imported from 3GU |
R4‑166549 | Correction on subframe pair definition for PCMAX of DC | Ericsson | imported from 3GU |
R4‑166550 | Correction on subframe pair definition for PCMAX of DC | Ericsson | imported from 3GU |
R4‑166551 | Removal of brackets and editorial corrections related to LBT functionalities tests | Ericsson | imported from 3GU |
R4‑166552 | Removal of brackets and editorial corrections related to LBT functionalities tests | Ericsson | imported from 3GU |
R4‑166553 | Missing CA reference sensitivity exceptions | MediaTek Inc. | imported from 3GU |
R4‑166554 | Correction to Radio Link Monitoring Requirements for NB-IoT | QUALCOMM UK Ltd | imported from 3GU |
R4‑166555 | Correction CR on RRC_CONNECTED state requirements for NB-IoT | QUALCOMM UK Ltd | imported from 3GU |
R4‑166556 | Analysis and Proposals for RLM Requirements | QUALCOMM UK Ltd | imported from 3GU |
R4‑166557 | Measurement uncertainties and test tolerance derivation for AAS BS OTA tests | Huawei | imported from 3GU |
R4‑166558 | TP to TR 37.842: test equipment uncertainty values for OTA tests | Huawei | imported from 3GU |
R4‑166559 | TP to TR 37.842: EIRP measurement uncertainty values for Near Field test range | Huawei | imported from 3GU |
R4‑166560 | TP to TR 37.842: EIS measurement uncertainty values for Near Field test range | Huawei | imported from 3GU |
R4‑166561 | TP to TR 37.842: Test Tolerance values for the EIRP and EIS tests | Huawei | imported from 3GU |
R4‑166562 | TP to TS 37.145-2: Measurement unceratinties and TT values | Huawei | imported from 3GU |
R4‑166563 | TP to TS 37.145-1 - clean-up | Huawei | imported from 3GU |
R4‑166564 | CR to TS 37.105: Clarification notes for Definitions section | Huawei | imported from 3GU |
R4‑166565 | CR to TS 37.105: Readability improvements and corrections (section 3) | Huawei | imported from 3GU |
R4‑166566 | TP to TR 37.842: clean-up | Huawei | imported from 3GU |
R4‑166567 | TP to TS 37.145-2: Manufacturer declarations consistency improvements | Huawei | imported from 3GU |
R4‑166568 | TP to TR 37.842: AAS BS manufacturer's declarations list update | Huawei | imported from 3GU |
R4‑166569 | TP to TR 37.842: Measurement uncertainty tables alignment for EIRP and EIS | Huawei | imported from 3GU |
R4‑166570 | AAS BS testing procedure: test stages clarification for EIRP/EIS | Huawei | imported from 3GU |
R4‑166571 | TP to TS 37.145-1: Annex C (Test tolerances and derivation of test requirements) | Huawei | imported from 3GU |
R4‑166572 | Power levels for OTA test requirements | Huawei | imported from 3GU |
R4‑166573 | Unwanted emissions tests and wide-band antenna gain considerations | Huawei | imported from 3GU |
R4‑166574 | Discussion on the OTA BS demodulation work arrangement: AAS vs. NR | Huawei | imported from 3GU |
R4‑166575 | Updated values for the alignment of EIRP measurement accuracy for the Near Field test range | Huawei | imported from 3GU |
R4‑166576 | Updated values for the alignment of EIS measurement accuracy for the Near Field test range | Huawei | imported from 3GU |
R4‑166577 | TP to TR 37.842: Near field test range measurement procedures clarifications | Huawei | imported from 3GU |
R4‑166578 | TP to TR 37.145-2: Test Requirements derivation: Annexes A, B, C, E | Huawei | imported from 3GU |
R4‑166579 | TP to TR 37.145-2: definition and test procedure clarifications for EIRP and EIS | Huawei | imported from 3GU |
R4‑166580 | Band 46 Unwanted emission mask correction | Nokia | imported from 3GU |
R4‑166581 | Band 46 Unwanted emission mask correction | Nokia | imported from 3GU |
R4‑166582 | Correction of ACLR and CACLR for Band 46 | Nokia | imported from 3GU |
R4‑166583 | Correction of ACLR and CACLR for Band 46 | Nokia | imported from 3GU |
R4‑166584 | Correction of LBT performance test for LAA | Nokia | imported from 3GU |
R4‑166585 | Correction of LBT performance test for LAA | Nokia | imported from 3GU |
R4‑166586 | On eLAA BS Rx requirements | Nokia | imported from 3GU |
R4‑166587 | On multi-node tests for LAA | Nokia | imported from 3GU |
R4‑166588 | TP for TR 36.714-02-01: CA_2DL_13A-46A_1UL_BCS0 | Nokia, Verizon Wireless | imported from 3GU |
R4‑166589 | TP for TR 36.714-03-01: CA_3DL_13A-46C_1UL_BCS0 | Nokia, Verizon Wireless | imported from 3GU |
R4‑166590 | TP for TR 36.714-04-01: CA_4DL_13A-46D_1UL_BCS0 | Nokia, Verizon Wireless | imported from 3GU |
R4‑166591 | TP for TR 36.714-04-01 with correction to CA_4DL_4A-46A-46C_1UL_BCS0 and CA_4DL_4A-46D_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166592 | TP for TR 36.714-04-01 with correction to CA_4DL_46D-66A_1UL_BCS0 and CA_4DL_46A-46C-66A_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166593 | TP for TR 36.714-03-01: CA_3DL_2A-46A-46A_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166594 | TP for TR 36.714-03-01: CA_3DL_4A-46A-46A_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166595 | TP for TR 36.714-03-01: CA_3DL_46A-46A-66A_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166596 | TP for TR 36.714-04-01: CA_4DL_2A-46A-46C_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166597 | TP for TR 36.714-05-01: CA_5DL_2A-46A-46D_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166598 | TP for TR 36.714-05-01: CA_5DL_4A-46A-46D_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166599 | TP for TR 36.714-05-01: CA_5DL_46A-46D-66A_1UL_BCS0 | Nokia, T-Mobile USA | imported from 3GU |
R4‑166600 | HD-FDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166601 | HD-FDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166602 | Corrections on FD-FDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166603 | Corrections on FD-FDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166604 | Corrections on FD-FDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166605 | Corrections on FD-FDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166606 | Corrections on HD-FDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166607 | Corrections on HD-FDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166608 | Corrections on TDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166609 | Corrections on TDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166610 | Corrections on TDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166611 | Corrections on TDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | imported from 3GU |
R4‑166612 | PUSCH ETU600 simulation results with IM | Nokia | imported from 3GU |
R4‑166613 | Collection of PUSCH ETU600 simulation results | Nokia | imported from 3GU |
R4‑166614 | Simulation results of NPDSCH | Nokia | imported from 3GU |
R4‑166615 | Simulation results of NPDCCH | Nokia | imported from 3GU |
R4‑166616 | Further analysis on NPRACH performance specification | Nokia | imported from 3GU |
R4‑166617 | draft 36.104 CR: NPRACH performance requirements | Nokia | imported from 3GU |
R4‑166618 | WF on NPRACH performance requirements | Nokia | imported from 3GU |
R4‑166619 | 4Rx testing methodology for type 2 UE | Qualcomm Incorporated | imported from 3GU |
R4‑166620 | Open issues in handover in Rel-13 eMTC | Qualcomm Incorporated | imported from 3GU |
R4‑166621 | Simulation results for Rel 13 eMTC PBCH | Qualcomm Incorporated | imported from 3GU |
R4‑166622 | Rel-13 eMTC PDSCH simulation results | Qualcomm Incorporated | imported from 3GU |
R4‑166623 | MPDCCH simulation results | Qualcomm Incorporated | imported from 3GU |
R4‑166624 | Qin and Qout SNR levels for RLM test case in CE mode A | Qualcomm Incorporated | imported from 3GU |
R4‑166625 | RLM enhancements in Further enhanced MTC | Qualcomm Incorporated | imported from 3GU |
R4‑166626 | MCS selection based on realistic SNR levels in HST SFN channel | Qualcomm Incorporated | imported from 3GU |
R4‑166627 | Timing accuracy in CE mode B | Qualcomm Incorporated | imported from 3GU |
R4‑166628 | On the definition of performance requirements for RAT-Independent Indoor Positioning Enhancements | Rohde & Schwarz | imported from 3GU |
R4‑166629 | Applicability of UTRA Requirements | BlackBerry UK Limited | imported from 3GU |
R4‑166630 | TR 38.803 V0.1.0 | NTT DOCOMO INC. | imported from 3GU |
R4‑166631 | TP on Study item objective for TR 38.803 | NTT DOCOMO INC. | imported from 3GU |
R4‑166632 | TP on Co-existence simulation scenario, assumption, and methodology for TR 38.803 | NTT DOCOMO INC. | imported from 3GU |
R4‑166633 | Correction of CR Implementation error to 36.101 | MCC Support | imported from 3GU |
R4‑166634 | Correction of CR Implementation error to 36.101 | MCC Support | imported from 3GU |
R4‑166635 | Correction of CR Implementation error to 36.101 | MCC Support | imported from 3GU |
R4‑166636 | Actions to be launched from reception of LS from CEPT/ECC on ETSI standards / 3GPP specifications for BB-PPDR equipment | Airbus DS SLC | - |
R4‑166637 | Editorial correction to category NB1 specifications | Nokia | - |
R4‑166638 | Way forward on NB-IoT aggregate power control | Nokia | - |
R4‑166639 | Corrections to channel bandwidth for category NB1 in TS36.101 (Rel-13) | ZTE Corporation, Nubia | - |
R4‑166640 | Editorial modification on TS36.101 for NB-IoT | Samsung | - |
R4‑166641 | Corrections in 36.101 for NB-IoT UE | Huawei, Neul, CATT, Nokia, Samsung, ASTRI | - |
R4‑166642 | Corrections on NB-IoT BS unwanted emissions requirements | Nokia, Alcatel-Lucent Shanghai Bell, Huawei | - |
R4‑166643 | Corrections on NB-IoT BS unwanted emissions requirements | Nokia, Alcatel-Lucent Shanghai Bell, Huawei | - |
R4‑166644 | CR for Spurious responses for NB-IoT BS receiver blocking requirements | Nokia, Alcatel-Lucent Shanghai Bell | - |
R4‑166645 | Correction on ACS for standalone NB-IoT BS in TS 36.104 | Huawei, ZTE | - |
R4‑166646 | Simulation results for NPUSCH format 2 | Huawei | - |
R4‑166647 | Editing change in TS36.133 for Rel-13 | CATT | - |
R4‑166648 | Modification on Conditions for NB-IoT inter-frequency Accuracy Requirements for UE Category NB1 R13 | Huawei, HiSilicon | - |
R4‑166649 | Correction CR on UE Measurement Capability for NB-IOT | Qualcomm Incorporated | - |
R4‑166650 | CR for NB-IoT RRC re-establishment R13 | Huawei, HiSilicon | - |
R4‑166651 | CR for Conditions on NSCH s/Iot of identified and of the neighbour cell R13 | Huawei, HiSilicon | - |
R4‑166652 | Way forwared on NB-IoT UL Timing Error | Nokia | - |
R4‑166653 | Cell detection simulation results for NB_IoT | Nokia | imported from 3GU |
R4‑166654 | Way forward on RLM Requirements | QUALCOMM UK Ltd | imported from 3GU |
R4‑166655 | CR for OCNG pattern for NB-IoT standalone operation R13 | Huawei, HiSilicon | - |
R4‑166656 | Way forward on NB-IoT UE simulation | Ericcson | - |
R4‑166657 | Downlink physical channel setup for NB-IoT UE demodulation requirements | Ericsson | - |
R4‑166658 | CR on NPBCH FRC Test Configuration | QUALCOMM UK Ltd | imported from 3GU |
R4‑166659 | CR on NPBCH FRC Test Configuration | QUALCOMM UK Ltd | imported from 3GU |
R4‑166660 | CR on NPBCH RMC Test Configuration | QUALCOMM UK Ltd | - |
R4‑166661 | CR on NPBCH FRC Test Configuration | QUALCOMM UK Ltd | - |
R4‑166662 | Simulation results of NPDCCH | Nokia | - |
R4‑166663 | Introduction of NPDCCH demodulation requirements | Ericsson | - |
R4‑166664 | NPDSCH demodulation results in NB-IoT in-band deployment | Nokia | - |
R4‑166665 | CR for Spurious responses for NB-IoT BS receiver blocking requirements | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑166666 | CR for Spurious responses for NB-IoT BS receiver blocking requirements | Nokia, Alcatel-Lucent Shanghai Bell | - |
R4‑166667 | CR for Spurious responses for NB-IoT BS receiver blocking requirements | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑166668 | Evening AH minutes on BS RF conformance testing | NTT DOCOMO, INC. | - |
R4‑166669 | draft CR for 36.141 In-channel selectivity | NTT DOCOMO INC. | - |
R4‑166670 | Test strategy (add-on) | Ericsson | - |
R4‑166671 | Draft CR NB-IoT TS36.141 4-6 and 4-7 Manufacturer declarations | Ericsson | - |
R4‑166672 | Draft CR NB-IoT TS36.141 4-11 Applicability Configurations | Ericsson | - |
R4‑166673 | Draft CR NB-IoT TS36-141 7-2 REFSENS | Ericsson | - |
R4‑166674 | Response LS on Modelling and simulation of IMT networks for use in sharing and compatibility studies | Nokia | - |
R4‑166675 | DRAFT LS on Characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz | Ericsson | - |
R4‑166676 | CR OCNG pattern for in-band RRM tests | Ericsson | - |
R4‑166677 | CR OCNG pattern for in-band RRM tests | Ericsson | - |
R4‑166678 | Applicability rule for NB-IOT test cases in normal and enhanced coverage | Ericsson | imported from 3GU |
R4‑166679 | Power headroom reporting requirements | Ericsson | - |
R4‑166680 | Inter-frequency cell reselection under enhanced coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑166681 | Intra-frequency cell reselection under enhanced coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑166682 | Intra-frequency cell reselection under normal coverage for NB-IOT | Ericsson | imported from 3GU |
R4‑166683 | CR: Add Test tolerances for NB-IoT BS demodulation performance requirements | Nokia | - |
R4‑166684 | Way forward on Frequency Error on NB-IoT PUSCH Demodulation Performance | Nokia | - |
R4‑166685 | Simulation results for NPUSCH format 1 | Ericsson | - |
R4‑166686 | Way forward on NPBCH Coverage Study | Intel Corporation | - |
R4‑166687 | HD-FDD Intra-frequency RRC Re-establishment for UE category NB1 under normal coverage R13 | Huawei, HiSilicon | - |
R4‑166688 | HD-FDD Inter-frequency RRC Re-establishment for UE category NB1 under enhanced coverage R13 | Huawei, HiSilicon | - |
R4‑166689 | CR: NB-IoT PRACH test cases for In-Band mode in Normal Coverage | Nokia | imported from 3GU |
R4‑166690 | CR on UE Transmit Timing Accuracy Tests for NB-IoT UE | NTT DOCOMO INC. | - |
R4‑166691 | Way forward on alignment of NB-IoT test cases | Ericsson | - |
R4‑166692 | E-UTRAN UE Timing Advance Adjustment Accuracy Test for NB-IoT UE in Enhanced Coverage | Ericsson, Huawei, HiSilicon | - |
R4‑166693 | Way Forward on NB-IoT UE RLM Test parameters | Huawei | imported from 3GU |
R4‑166694 | RLM test case: insync with DRX under NC | Ericsson | imported from 3GU |
R4‑166695 | RLM test case: insync with DRX under EC | Ericsson | imported from 3GU |
R4‑166696 | LS on applicability of NRSRQ measurement | huawei | - |
R4‑166697 | CR on RLM in-sync without DRX for normal coverage | QUALCOMM UK Ltd | imported from 3GU |
R4‑166698 | CR on RLM in-sync without DRX for normal coverage | QUALCOMM UK Ltd | imported from 3GU |
R4‑166699 | CR on RLM in-sync without DRX for extended coverage | QUALCOMM UK Ltd | imported from 3GU |
R4‑166700 | CR on RLM in-sync without DRX for extended coverage | QUALCOMM UK Ltd | imported from 3GU |
R4‑166701 | CR: NB-IoT Radio Link Monitoring Performance Test for Out-of-Sync in Normal Coverage | Nokia | imported from 3GU |
R4‑166702 | CR: NB-IoT Radio Link Monitoring Performance Test for Out-of-Sync in Enhanced Coverage | Nokia | imported from 3GU |
R4‑166703 | Way forward on measurement accuracy for NB-IoT | Nokia | - |
R4‑166704 | HD-FDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 under normal coverage R13 | Huawei, HiSilicon | - |
R4‑166705 | HD-FDD Radio Link Monitoring Test for Out-of-sync in DRX for UE category NB1 under normal coverage R14 | Huawei, HiSilicon | - |
R4‑166706 | Way forward for NR RRM | Ericsson | - |
R4‑166707 | Way forward on co-existence study below 6 GHz for NR | CMCC | - |
R4‑166708 | Evening AH minutes on co-existence study for WP 5D | NTT DOCOMO INC. | - |
R4‑166709 | Way forward on UE RF Requirements for mmWave | Qualcomm Incorporated | - |
R4‑166710 | Way forward on NR BS RF requirements | Huawei | - |
R4‑166711 | Way forward on testability | Intel | - |
R4‑166712 | TP for 38.803: Overview of international and regional regulation | Ericsson | - |
R4‑166713 | TP for 38.803: Boundary between spurious and OOB domain | Ericsson | - |
R4‑166714 | CR NB-IoT TS36-104 Power boosting 5 MHz | Ericsson, Nokia | - |
R4‑166715 | Draft CR for Clause 5 in 36.141: Operating bands and channel arrangement | Huawei | - |
R4‑166716 | Draft CR for Clause 6 in 36.141: Transmitter characteristics | Huawei | - |
R4‑166717 | - | - | - |
R4‑166718 | Correction on FRC for EUTRA with in-band NB-IoT in TS 36.104 | Huawei | - |
R4‑166719 | Way forward on ACLR and ACS modelling for the ITU WP5D simulations | Ericsson | - |
R4‑166720 | Corrections to channel bandwidth for category NB1 in TS36.101 (Rel-13) | ZTE Corporation, Nubia | - |
R4‑166721 | CR to section 7.8 Receiver intermodulation | Ericsson, Nokia, CMCC | - |
R4‑166722 | Draft CR: Acceptable uncertainty of Test System Clause 4.1.2 in TS36.141 | Nokia, Alcatel-Lucent Shanghai Bell | - |
R4‑166723 | Draft CR: Test configurations Clause 4.10 in TS36.141 | Nokia, Alcatel-Lucent Shanghai Bell | - |
R4‑166724 | Draft CR: Test configurations Clause 4.8 in TS37.141 | Nokia, Alcatel-Lucent Shanghai Bell | - |
R4‑166725 | Way forward test model for in-band operation | Huawei | - |
R4‑166726 | Draft CR: Unwanted Emission Clause 6.6 in TS36.141 | Nokia, Alcatel-Lucent Shanghai Bell | - |
R4‑166727 | - | - | - |
R4‑166728 | Draft CR: Test Tolerances and Derivation of Test Requirements Annex G in TS36.141 | Nokia, Alcatel-Lucent Shanghai Bell | - |
R4‑166729 | WF on simulation assumptions of co-existence study for WP 5D | NTT DOCOMO INC. | - |
R4‑166730 | Way forward for PA model investigations for NR | Ericsson | - |
R4‑166731 | Way forward on BS Beamforming Model for the ITU WP5D coexistence simulations | Huawei, Hisilicon | - |
R4‑166732 | Way forward on UE and BS NF for mm-waves | Ericsson | - |
R4‑166733 | WF on UL TPC model and received power model for coexistence study for WP 5D | NTT DOCOMO, INC. | - |
R4‑166734 | LS on Characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz | Ericsson | - |
R4‑166735 | Way forward for NR RRM | Ericsson | - |
R4‑166736 | WF on simulation assumptions of co-existence study for WP 5D | NTT DOCOMO INC. | - |
R4‑166737 | WF on Rel-13 CRS-IM and control channel IM capabilties | Intel | - |
R4‑166738 | Finalizing UE CQI requirements for 4Rx | Ericsson | - |
R4‑166739 | Corrections of UE requirements for 4Rx | Ericsson | - |
R4‑166740 | Rx-Tx time difference reporting | Intel Corporation | - |
R4‑166741 | CR on Rx-Tx timing for TDD E-CID | Intel | imported from 3GU |
R4‑166742 | Evaluation and discussion for eMTC CQI definition reporting requirements | Huawei, HiSilicon | - |
R4‑166743 | Way Forward on accuracy requirements for RS-SINR measurement | ZTE | - |
R4‑166744 | CR on RS-SINR measurement accuracy requirements | ZTE, CMCC | - |
R4‑166745 | Intra-frequency FDD test cases for RS-SINR | Ericsson | - |
R4‑166746 | Intra-frequency TDD test cases for RS-SINR | Ericsson | - |
R4‑166747 | CR on RS-SINR TDD-FDD inter-frequency accuracy test case_R13 | ZTE | - |
R4‑166748 | CR on RS-SINR FDD-TDD inter-frequency accuracy test case_R13 | ZTE | - |
R4‑166749 | CR on FDD-FDD inter-frequency RS-SINR accuracy test case R13 | Huawei, HiSilicon | - |
R4‑166750 | CR on TDD-TDD inter-frequency RS-SINR accuracy test case R13 | Huawei, HiSilicon | imported from 3GU |
R4‑166751 | CR on eD2D RRM tests | Qualcomm Incorporated | - |
R4‑166752 | CR on eD2D demodulation performance requirements | Qualcomm Incorporated | - |
R4‑166753 | CR on eD2D demodulation performance requirements | Qualcomm Incorporated | - |
R4‑166754 | CR of core requirements for V2V service | LG Electronics, Huawei, CATT | - |
R4‑166755 | WF on way to close V2V RRM core requirement timely | LG Electronics Inc.Huawei, CATT | - |
R4‑166756 | On the evaluation of inter-cell synchronization for MBMS | Huawei, HiSilicon | - |
R4‑166757 | Applicability rule for eMTC test cases in CEModeA and CEModeB | Ericsson | imported from 3GU |
R4‑166758 | CR on eMTC maintenance R13 | Huawei, HiSilicon | - |
R4‑166759 | CR: OCNG patterns for Cat-M1 RRM Tests | Nokia | - |
R4‑166760 | CR for Cat-M1 CEMode A RLM test cases: DRX FDD | Nokia | - |
R4‑166761 | CR for Cat-M1 CEMode A RLM test cases: DRX HD-FDD | Nokia | - |
R4‑166762 | CR for Cat-M1 CEMode A RLM test cases: DRX TDD | Nokia | - |
R4‑166763 | HD-FDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | - |
R4‑166764 | Corrections on FD-FDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | - |
R4‑166765 | Corrections on FD-FDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | - |
R4‑166766 | Corrections on HD-FDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | - |
R4‑166767 | Corrections on TDD Radio Link Monitoring Test for Out-of-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | - |
R4‑166768 | Corrections on TDD Radio Link Monitoring Test for In-sync for Cat-M1 UE in CEModeA | Qualcomm Incorporated | - |
R4‑166769 | E-UTRAN Intra frequency case for Cat-M1 UE in enhanced coverage R13 | Huawei, HiSilicon | - |
R4‑166770 | CR: Cat-M1 PRACH test cases for FDD in Enhanced Coverage | Nokia | - |
R4‑166771 | CR: Cat-M1 PRACH test cases for HD-FDD in Enhanced Coverage | Nokia | - |
R4‑166772 | CR: Cat-M1 PRACH test cases for TDD in Enhanced Coverage | Nokia | - |
R4‑166773 | E-UTRAN UE Transmit Timing Accuracy Tests for Cat-M1 UE in CEModeB | Ericsson | - |
R4‑166774 | UE Timing Advance Adjustment Accuracy Test for Cat-M1 UE in CEModeB for Rel-13 | CATT | imported from 3GU |
R4‑166775 | eMTC PBCH simulation result | Ericcson | - |
R4‑166776 | CR for eMTC PBCH demodulation requirement for enhanced coverage (Rel-13) | Huawei, HiSilicon | - |
R4‑166777 | CR for eMTC M-PDCCH demodulation requirement for CE Mode A (Rel-13) | Huawei, HiSilicon | - |
R4‑166778 | CR for eMTC M-PDCCH demodulation requirement for CE Mode B (Rel-13) | Huawei, HiSilicon, Ericsson | - |
R4‑166779 | Introduce signal Model for LAA test | Ericsson | - |
R4‑166780 | Simulation assumptions for PDCCH | Ericsson | - |
R4‑166781 | Introduce PDCCH test for LAA demodulation | Ericsson, Huawei, HiSilicon | - |
R4‑166782 | Introduce aperiodic CSI test for LAA | Ericsson, Huawei, HiSilicon | - |
R4‑166783 | Corrections to inter-frequency measurements for LAA | Qualcomm Incorporated | - |
R4‑166784 | LBT model for LAA RRM tests | Ericsson | - |
R4‑166785 | Inter-frequency event triggered reporting | Nokia | imported from 3GU |
R4‑166786 | WF on eLAA RRM requirements | Ericsson | imported from 3GU |
R4‑166787 | eLAA RRM requirements | Ericsson | - |
R4‑166788 | Clarification for TAGs with FS3 cells | Nokia | - |
R4‑166789 | CR on RACH in eLAA | Huawei, HiSilicon | - |
R4‑166790 | Intra-frequency absolute and relative CSI-RSRP accuracies for SCell with FS3 | Nokia, Anritsu | - |
R4‑166791 | WF on MUST General Issues | MediaTek Inc. | - |
R4‑166792 | Blind Detection Conclusions for MUST Case 1 and 2 | MediaTek Inc. | - |
R4‑166793 | Blind Detection Conclusions for MUST Case 3 | MediaTek Inc. | - |
R4‑166794 | Meeting minutes for 4Rx ad hoc for RRM sessions | Ericsson | - |
R4‑166795 | Introduction of EB/FD-MIMO PDSCH demodulation test | Samsung,Intel,Qualcomm,Ericsson | - |
R4‑166796 | Introduction of EB/FD-MIMO PDSCH demodulation test | Samsung,Intel,Qualcomm,Ericsson | - |
R4‑166797 | Introduction of EB/FD-MIMO CRI Test | Samsung,Qualcomm,Intel,Ericsson | - |
R4‑166798 | Introduction of EB/FD-MIMO CRI Test | Samsung,Qualcomm,Intel,Ericsson | - |
R4‑166799 | Introduction of FRC for CRI test | Samsung | - |
R4‑166800 | Introduction of performance requirments for FD-MIMO Class A and Class B K=1 PMI test cases | Samsung | - |
R4‑166801 | CR: Correction of test parameters with Class B alternative codebook for one CSI-RS resource configured | Huawei, HiSilicon | - |
R4‑166802 | CR on ETU600 PUSCH test for 36.104 | Huawei | - |
R4‑166803 | CR on ETU600 PUSCH test for 36.141 | Huawei | - |
R4‑166804 | LS on high speed enhancement for RRM | Ericsson, Intel | - |
R4‑166805 | Way forward on UE performance enhancement under SFN scenario | Huawei, HiSilicon, NTT DOCOMO, Qualcomm Incorporated, MediaTek Inc. , CMCC, CATT, ZTE, Ericsson | - |
R4‑166806 | LS on reducing quantization error of OTDOA | Huawei, HiSilicon | - |
R4‑166807 | WF on definition of performance requirements for RAT-Independent Indoor Positioning Enhancements | Rohde & Schwarz | - |
R4‑166808 | 36.141 CR on bracket removal for BS IRC receiver | China Telecom | - |
R4‑166809 | WF on measurement gap enhancement | Intel | - |
R4‑166810 | Blind Detection Conclusions for MUST Case 3 | MediaTek Inc. | - |
R4‑166811 | reply LS on blind detection evaluations | MediaTek Inc. | - |
R4‑166812 | CR on eD2D RRM tests | Qualcomm Incorporated | - |
R4‑166813 | CR on inter-frequency infinite measurement in LAA R13 | Huawei, HiSilicon | - |
R4‑166814 | Simulation assumptions for high speed SFN demodulation performance requirements | Huawei, HiSilicon | - |
R4‑166815 | Way forward on CSI reporting performance under SFN scenario | Huawei, HiSilicon | - |
R4‑166816 | CR on finalization of enhanced PDCCH/PCFICH performance requirements for DL control channel IM | Intel Corporation, ZTE | imported from 3GU |
R4‑166817 | Reply LS on the feasibility of mobility enhancement solutions To : RAN WG2 CC: RAN WG1, RAN WG3 | Ericsson | - |
R4‑166818 | Simulation assumptions for UE Rx-Tx time difference in FeMTC | Ericsson | - |
R4‑166819 | Simulation assumption on RSTD | Huawei, HiSilicon | - |
R4‑166820 | CR for introducing LAA PDSCH demodulation performance requirements (Rel-13) | Huawei, HiSilicon, Ericsson, Qualcomm, Intel | - |
R4‑166821 | Summary of simulation results for ETU600 PUSCH performance requirements | Huawei | - |
R4‑166822 | Ad hoc minutes for eMTC | Ericsson | - |
R4‑166823 | Introduction of TM2/TM9 PDSCH demodulation requirements for eMTC | Ericsson | - |
R4‑166824 | Correction of eMTC PDSCH TM6 demodulation requirements | Ericsson | - |
R4‑166825 | Correction of eMTC CQI definition test | Ericsson | - |
R4‑166826 | Introduction of UE-selected subband CQI test for eMTC | Ericsson | - |
R4‑166827 | CR: Add Test tolerances for eMTC BS demodulation performance requirements | Nokia, Huawei | - |
R4‑166828 | CR for eMTC PUCCH performance requirements (Rel-13) | Huawei, Ericsson, Nokia | - |
R4‑166829 | CR: Correction on Number of HARQ processes in eMTC BS PUSCH requirements | Nokia | - |
R4‑166830 | CR: Correction of test parameters with Class B alternative codebook for one CSI-RS resource configured | Huawei, HiSilicon | - |
R4‑166831 | CR on CA SDR test | Huawei, HiSilicon | - |
R4‑166832 | WF on RSTD requirements in shared cells | Ericsson | - |
R4‑166833 | Applicability of intra-frequency maximum measurement time requirements | Ericsson | - |
R4‑166834 | WF on unidirectional demodulation | Ericsson | - |
R4‑166835 | WF on transmit timing accuracy for CEmodeB | Qualcomm | - |
R4‑166836 | WF on MIB acquisition delay in eMTC | Qualcomm | - |
R4‑166837 | Test case list for LAA RRM | Ericsson | - |
R4‑166838 | Intra-frequency absolute and relative CSI-RSRP accuracies for SCell with FS3 | Nokia, Anritsu | - |
R4‑166839 | Introduction of EB/FD-MIMO MR funcationality test | Samsung,Intel,Qualcomm | - |
R4‑166840 | WF on RAN4 NR ad-hoc in 2017 | NTT Docomo | - |
R4‑166841 | LS on progress of performance part for NB-IOT | CMCC,Huawei, HiSilicon | - |
R4‑166842 | Bracket removal for B3 and B39 UE co-existence | China Telecom | - |
R4‑166843 | Bracket removal for B3 and B39 UE co-existence | China Telecom | - |
R4‑166844 | Bracket removal for B3 and B39 UE co-existence | China Telecom | - |
R4‑166845 | - | - | - |
R4‑166846 | Introduction of V2V bands | CATT | - |
R4‑166847 | Introduction of V2V bands | CATT | - |
R4‑166848 | CR to introduce V2V Tx requirements in TS36.101 in Rel-14 | LG Electronics Inc. | - |
R4‑166849 | Introducation of V2V Rx requirements | CATT | - |
R4‑166850 | - | - | - |
R4‑166851 | WF on MSD for B46 | NTT Docomo, qualcomm, Skyworks, MediaTek, LGU+ | - |
R4‑166852 | LAA BS unwanted emission mask requirements in 36.104 | Ericsson, Nokia | - |
R4‑166853 | LAA BS unwanted emission mask requirements in 36.141 | Ericsson, Nokia | - |
R4‑166854 | Correction on LBT test procedure | Huawei | - |
R4‑166855 | CR to TR37.977: Clarification to the Rayleigh Validation | Bluetest | - |
R4‑166856 | Simulation results for V2V REFSENS requirements | LG Electronics Inc. | - |
R4‑166857 | CA_12A-12A configurations for REFSENS test | Inte, Nokia | - |
R4‑166858 | - | - | - |
R4‑166859 | Revision of WID: LTE Advanced inter-band CA Rel-14 for 2DL/1UL | Qualcomm Incorporated | - |
R4‑166860 | TP for TR36.714-02-01: Operating bands, Channel bandwidths, Co-existence study and delta Tib/Rib values for CA_8A-46A_BCS0 | ZTE, Nubia | - |
R4‑166861 | TP for TR 36.714-02-01 2DL1UL CA_19A-46A_BCS0 | NTT DOCOMO INC. | - |
R4‑166862 | TP for TR 36.714-02-01 2DL1UL CA_21A-46A_BCS0 | NTT DOCOMO INC. | - |
R4‑166863 | Operating bands, channel BW's, insertion loss and co-existence for 26A-46A, TP to 36.714-02-01 | Ericsson, SouthernLINC Wireless | - |
R4‑166864 | TP for TR 36.714-02-01: CA_3A-28A | Vodafone | - |
R4‑166865 | TP for TR 36.714-02-01: CA_3A-40A | Vodafone | - |
R4‑166866 | TP for TR 36.714-02-01: CA_3A-41A | Vodafone | - |
R4‑166867 | TP for TR 36.714-02-01: CA_28A-46A operating band and channel bandwidths | Vodafone | - |
R4‑166868 | TP for TR 36.714-02-01: CA_40A-41A operating band and channel bandwidths | Vodafone | - |
R4‑166869 | TP for TR 36.714-02-01: UE requirement relaxation for CA_40A-41A | Vodafone | - |
R4‑166870 | TP for TR 36.714-02-01: CA_40A-46A operating band and channel bandwidths | Vodafone | - |
R4‑166871 | TP for TR 36.714-02-01: Reference sensitivity for CA_3A-32A | Qualcomm Incorporated | - |
R4‑166872 | TP for TR 36.714-02-01: MSD for CA_7A-46A_BCS1 | Huawei, Hisilicon | - |
R4‑166873 | TP for TR 36.714-02-01: CA_2DL_13A-46A_1UL_BCS0 | Nokia, Verizon Wireless | imported from 3GU |
R4‑166874 | Revised WID: 3DL 1UL basket WI | Huawei, Hisilicon | - |
R4‑166875 | Corrections of CA 1+41+42 | SoftBank Corp., KDDI | - |
R4‑166876 | - | - | - |
R4‑166877 | TP for TR 36.714-03-01 3DL1UL CA_19A-46C_BCS0 | NTT DOCOMO INC. | - |
R4‑166878 | TP for TR 36.714-03-01 3DL1UL CA_21A-46C_BCS0 | NTT DOCOMO INC. | - |
R4‑166879 | TP for TR 36.714-03-01: CA_1A-5A-46A_BCS0 | LG Uplus, LG Electronics | - |
R4‑166880 | TP for TR 36.714-03-01: CA_1A-7A-46A_BCS0 | LG Uplus, LG Electronics | - |
R4‑166881 | TP for TR 36.714-03-01: CA_5A-7A-46A_BCS0 | LG Uplus, LG Electronics | - |
R4‑166882 | Introduction of CA_2A-46A-46A, CA_4A-46A-46A and CA_46A-46A-66A | Nokia, T-Mobile USA, AT&T, Verizon, US Cellular | - |
R4‑166883 | TP for TR 36.714-03-01: CA_28A-46C operating band and channel bandwidths | Vodafone | - |
R4‑166884 | TP for TR 36.714-03-01: CA_40A-46C operating band and channel bandwidths | Vodafone | - |
R4‑166885 | TP for TR 36.714-03-01: MSD for CA_7A-46C_BCS0 | Huawei, Hisilicon | - |
R4‑166886 | TP for TR 36.714-03-01: UE requirement relaxation for CA_1A-3A-38A | Huawei, Hisilicon | imported from 3GU |
R4‑166887 | TP for TR 36.714-03-01: Reference sensitivity for CA_3A-20A-32A | Qualcomm Incorporated | - |
R4‑166888 | TP for TR 36.714-03-01: CA_3DL_13A-46C_1UL_BCS0 | Nokia, Verizon Wireless | imported from 3GU |
R4‑166889 | TP for TR 36.714-03-01: co-existence studies, UE requirements for CA_5A-46C_BCS1 | Huawei, Hisilicon | - |
R4‑166890 | - | - | - |
R4‑166891 | - | - | - |
R4‑166892 | - | - | - |
R4‑166893 | - | - | - |
R4‑166894 | - | - | - |
R4‑166895 | - | - | - |
R4‑166896 | TP for TR 36.714-04-01: CA_40A-46D operating band and channel bandwidths | Vodafone | - |
R4‑166897 | TP for TR 36.714-04-01: CA_28A-46D operating band and channel bandwidths | Vodafone | - |
R4‑166898 | TP for TR 36.714-04-01: MSD for CA_7A-46D_BCS0 | Huawei, Hisilicon | - |
R4‑166899 | TP for TR 36.714-04-01: CA_4DL_13A-46D_1UL_BCS0 | Nokia, Verizon Wireless | imported from 3GU |
R4‑166900 | Revised WI: LTE Advanced inter-band CA Rel-14 for 5DL/1UL | Nokia | - |
R4‑166901 | - | - | - |
R4‑166902 | - | - | - |
R4‑166903 | - | - | - |
R4‑166904 | - | - | - |
R4‑166905 | - | - | - |
R4‑166906 | - | - | - |
R4‑166907 | - | - | - |
R4‑166908 | TP for TR 36.714-05-01: CA_28A-46E operating band and channel bandwidths | Vodafone | - |
R4‑166909 | TP for TR 36.714-05-01: CA_40A-46E operating band and channel bandwidths | Vodafone | - |
R4‑166910 | - | - | - |
R4‑166911 | MSD for 2UL 3DL CA_3A-7A-8A | Qualcomm Incorporated | imported from 3GU |
R4‑166912 | TP for MSD level for 3DLs/2ULs inter-band CA in Rel-14 | LG Electronics Inc. | - |
R4‑166913 | Reply LS on SRS switching time | Huawei, Hisilicon | - |
R4‑166914 | Introduction of power class 2 HPUE in Band 41 | Qualcomm Incorporated, Sprint | - |
R4‑166915 | Release 14 36.307 CR to make Band 41 power class 2 release independent | Sprint | - |
R4‑166916 | TP to TR36.744: Channel numbering | Nokia | - |
R4‑166917 | TP for TR 36.744: UE Tx requirements | Qualcomm Incorporated, Nokia | - |
R4‑166918 | TP for TR 36.744: UE Rx requirements | Qualcomm Incorporated, Nokia | - |
R4‑166919 | Expected changes to 36.104 due to introduction of new 3.5 GHz band in the USA | Nokia | - |
R4‑166920 | WF on A-MPR for CRBS 3.5GHz band | Nokia | - |
R4‑166921 | - | - | - |
R4‑166922 | - | - | - |
R4‑166923 | - | - | - |
R4‑166924 | - | - | - |
R4‑166925 | - | - | - |
R4‑166926 | - | - | - |
R4‑166927 | - | - | - |
R4‑166928 | - | - | - |
R4‑166929 | - | - | - |
R4‑166930 | WF on clarification of open technical questions on AAS | Ericsson | - |
R4‑166931 | - | - | - |
R4‑166932 | - | - | - |
R4‑166933 | - | - | - |
R4‑166934 | - | - | - |
R4‑166935 | - | - | - |
R4‑166936 | - | - | - |
R4‑166937 | - | - | - |
R4‑166938 | - | - | - |
R4‑166939 | - | - | - |
R4‑166940 | - | - | - |
R4‑166941 | - | - | - |
R4‑166942 | - | - | - |
R4‑166943 | TP for TR37.842: Clean up | CATT | - |
R4‑166944 | - | - | - |
R4‑166945 | - | - | - |
R4‑166946 | WF on LTE TRP/TRS framework and work plan | Vodafone | - |
R4‑166947 | Applicability of UTRA Requirements | BlackBerry UK Limited | - |
R4‑166948 | TP for TR 37.871: Necessary changes to the test requirements for Multi-Band Base Station testing with three or more bands | Nokia, Alcatel-Lucent Shanghai Bell, Huawei | - |
R4‑166949 | Ad hoc minutes: eLAA RF & LAA multi-node testing | Ericsson | - |
R4‑166950 | Corrections of 3+41+42 | SoftBank Corp., KDDI | - |
R4‑166951 | Corrections of 3+41+42 | SoftBank Corp., KDDI | - |
R4‑166952 | UL 256 QAM Way Forward | Vodafone | - |
R4‑166953 | WF on EVM and MPR for UL 256QAM | Ericsson, Nokia, Huawei | - |
R4‑166954 | WF on MPR\AMPR simulation assumptions for UL 256QAM | Huawei, Hisilicon | - |
R4‑166955 | WF on MCL relaxation for new power Classenhanced NB-IoT | u-blox, Huawe, Neul | - |
R4‑166956 | - | - | - |
R4‑166957 | - | - | - |
R4‑166958 | - | - | - |
R4‑166959 | - | - | - |
R4‑166960 | - | - | - |
R4‑166961 | - | - | - |
R4‑166962 | - | - | - |
R4‑166963 | - | - | - |
R4‑166964 | Introduction of FRC for V2V in TS 36.101 | Huawei, Hisilicon, LGE, CATT | - |
R4‑166965 | - | - | - |
R4‑166966 | - | - | - |
R4‑166967 | - | - | - |
R4‑166968 | - | - | - |
R4‑166969 | TP on Scope of TR 36.789: multi-node coexistence test | Ericsson | - |
R4‑166970 | TP for multi-node testing TR: Section 4 and 5 | Huawei, Ericsson | - |
R4‑166971 | WF on LAA multi-node testing | Huawei | - |
R4‑166972 | LTE TRP/TRS measurements BHH smartphones with focus on CA support | Vodafone | - |
R4‑166973 | CR on UE unwanted emission mask in Rel-14 eLAA | Ericsson | imported from 3GU |
R4‑166974 | WF on UE Tx requirements for eLAA | Qualcomm | - |
R4‑166975 | CR on UE Tx requirements for eLAA | Ericsson | imported from 3GU |
R4‑166976 | CR on UE RX requirements due to introduction of 10MHz CBW | Huawei, Hisilicon | - |
R4‑166977 | LAA BS unwanted emission mask requirements in 36.104 | Ericsson | imported from 3GU |
R4‑166978 | LAA BS unwanted emission mask requirements in 36.141 | Ericsson | imported from 3GU |
R4‑166979 | Draft CR for eLAA BS Tx requirements | Huawei | imported from 3GU |
R4‑166980 | On eLAA BS Rx requirements | Nokia | - |
R4‑166981 | WF on BS Rx requirements for rel-14 eLAA | Huawei | - |
R4‑166982 | Guard band requirements for Band 46 MSD | Qualcomm Incorporated | - |
R4‑166983 | adhoc minutes for V2V WI | LG | - |
R4‑166984 | Workplan for LTE-based V2X WI in Rel-14 | LG Electronics Inc. | - |
R4‑166985 | Draft TR Skeleton for V2X WI | LG Electronics Inc. | - |
R4‑166986 | LS on L1 parameters for Enhanced LAA | RAN WG1 | - |
R4‑166987 | LS on RRC Parameters and PRACH for Enhanced LAA for LTE | RAN WG1 | - |
R4‑166988 | Reply LS on the feasibility of mobility enhancement solutions | RAN WG1 | - |
R4‑166989 | Reply LS on Network Assistance for Network Synchronization in LTE | RAN WG1 | - |
R4‑166990 | LS on Parameters for WP5D sharing and compatibility studies | RAN WG1 | - |
R4‑166991 | LS on RAN1 agreements in sidelink-based V2V | RAN WG1 | - |
R4‑166992 | LS regarding agreements for FeMTC | RAN WG1 | - |
R4‑166993 | WF on EESS protection | NTT Docomo | - |
R4‑166994 | WF on simulation assumptions and methodology for the co-existence study between CDMA and NB-IoT | China Telecom | - |
R4‑166995 | New Work Item Proposal: Add Power Class 1 UE to B3/B20/B28 | Motorola Solutions UK Ltd. | - |
R4‑166996 | WF on eMTC UE demodulation requirements | Ericsson | - |
R4‑166997 | WF on opening issues for eMTC UE demodulation | Huawei, Ericsson | - |
R4‑166998 | Simulation assumption on inter-frequency measurement | Huawei, HiSilicon | imported from 3GU |
R4‑166999 | WF on FeMTC RRM requirement | Ericsson, Nokia, Huawei, HiSilicon | - |
R4‑167000 | Maintenance for BS MMSE-IRC receiver requirements(Rel-13) | Huawei | - |
R4‑167001 | CR on finalization of enhanced PHICH performance requirements for DL control channel IM | ZTE, Intel Corporation | - |
R4‑167002 | CR on finalization of enhanced ePDCCH performance requirements for DL control channel IM | ZTE, Intel Corporation | - |
R4‑167003 | Correction on discovery signal conditions R13 | Huawei, HiSilicon | - |
R4‑167004 | WF on HST RRM | Huawei | imported from 3GU |
R4‑167005 | CR for SDR single carrier tests with 4Rx in Rel-13 | Ericsson | - |
R4‑167006 | CR for applicability rule, antenna connection and test method for 4Rx UEs in Rel-13 | Ericsson | - |
R4‑167007 | WF on 4Rx SDR test | Ericsson | - |
R4‑167008 | WF on antenna connnection | Ericsson | - |
R4‑167009 | LS to RAN5 on applicability and antenna connection of 2Rx tests for 4Rx Ues | Ericsson | - |
R4‑167010 | E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R13 | Huawei, HiSilicon | - |
R4‑167011 | E-UTRAN HD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R13 | Huawei, HiSilicon | - |
R4‑167012 | E-UTRAN TDD-TDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in CEModeB R13 | Huawei, HiSilicon, | - |
R4‑167013 | RSRP Intra frequency case for Cat-M1 UE in CEModeB R13 | Huawei, HiSilicon, | - |
R4‑167014 | CR on PRACH configuration reference R13 | Huawei, HiSilicon | - |
R4‑167015 | V2V ad hoc minutes | Huawei | - |
R4‑167016 | Way forward on eMTC TDD requirement | Huawei, HiSilicon | - |
R4‑167017 | Simulation assumption on eMTC TDD measurement requirement | Huawei, HiSilicon | - |
R4‑167018 | CR on finalization of enhanced PHICH performance requirements for DL control channel IM_R13 | ZTE, Intel Corporation | imported from 3GU |
R4‑167019 | CR on finalization of enhanced ePDCCH performance requirements for DL control channel IM_R13 | ZTE, Intel Corporation | imported from 3GU |
R4‑167020 | Simulation assumption on Network Assistance for Network Synchronization in LTE | Huawei, HiSilicon | imported from 3GU |
R4‑167021 | Updated CA demodulation performance requirements (Rel-13) | Huawei, HiSilicon | - |
R4‑167022 | CR: On eDC demodulation performance requirements | Huawei, HiSilicon | - |
R4‑167023 | CR: Correction of power parameter for demodulation tests | Huawei, HiSilicon | - |
R4‑167024 | LS on Measurement gap enhancement To : RAN WG2 CC: RAN WG1 | Ericsson | - |
R4‑167025 | CR for correction of 4Rx features for release independent in Rel-10 in 36.307 | Ericsson | - |
R4‑167026 | CR for 4Rx requirements for release independent in Rel-13 | Ericsson | - |
R4‑167027 | LS to RAN2 on 4Rx capability clarification for advanced receiver | Ericsson | - |
R4‑167028 | WF on time offset for PCell and LAA SCell in LAA demodulation | Ericsson, Huawei, HiSilicon, ZTE | - |
R4‑167029 | Ad hoc minutes for LAA/eLAA | Huawei | - |
R4‑167030 | WF on eMTC CEMode B RLM test | Nokia, Qualcomm, Ericsson | - |
R4‑167031 | Known cell requirements | Ericsson | - |
R4‑167032 | WF on Rel-13 CRS-IM and control channel IM capabilties | Intel | - |
R4‑167033 | WF on Rel-13 CCH-IM UE capabilties | Intel | - |
R4‑167034 | CR for reference channel for LAA demodulation performance requirements (Rel-13) | Huawei, HiSilicon, Ericsson, Qualcomm, Intel | - |
R4‑167035 | CR on RS-SINR TDD-FDD inter-frequency accuracy test case_R13 | ZTE | - |
R4‑167036 | CR on RS-SINR FDD-TDD inter-frequency accuracy test case | ZTE | - |
R4‑167037 | Way forward on CSI reporting performance under SFN scenario | Huawei, HiSilicon | - |
R4‑167038 | Higher resolution RSTD measurement report mapping | Ericsson | - |
R4‑167039 | WF on reducing quantization error of OTDOA | Huawei, HiSilicon | - |
R4‑167040 | CR on introduction of OOC D2D Discovery demodulation requirements | Intel Corporation, Qualcomm Incorporated | - |
R4‑167041 | Resolving TBDs in HD-FDD RLM test-cases for Rel-12 category 0 UEs | Ericsson | - |
R4‑167042 | Resolving TBDs in HD-FDD RLM test-cases for Rel-12 category 0 UEs | Ericsson | - |
R4‑167043 | Simulation assumption on inter-frequency measurement | Huawei, HiSilicon | - |
R4‑167044 | LS to RAN2 on Homogenous network CRS-IM UE capability introduction | Intel Corporation | imported from 3GU |
R4‑167045 | Draft LS on LTE DL Control Channel IM UE capabilities | Intel Corporation | imported from 3GU |
R4‑167046 | Rel-14 CA corrections | Nokia | - |
R4‑167047 | Introduction 4Rx feature for B40 single carrier and CA_3-40 | Huawei, Hisilicon | imported from 3GU |
R4‑167048 | Miscellaneous corrections of RF RX requirements for 4 RX AP | Ericsson | - |
R4‑167049 | Way forward on UCG parameters for eMTC | Intel Corporation | - |
R4‑167050 | Corrections on eMTC RX in TS 36.101 | Sony | - |
R4‑167051 | Corrections on eMTC RX in TS 36.101 | Sony | - |
R4‑167052 | Corrections for Rel-13 cat M1 UE | Ericsson, Intel | - |
R4‑167053 | Corrections for Rel-14 cat M1 UE | Ericsson, Intel | - |
R4‑167054 | Rel-13 CA corrections | Nokia | - |
R4‑167055 | Corretion on operationg bands for ProSe | Samsung | - |
R4‑167056 | WF on traget SNR evaluation for V2V refsens requirements | LG Electronics, Huawei, Hi-cilicon, Ericsson, CT, CATT, LG Uplus, SKT | - |
R4‑167057 | CR: NPUSCH format 1 and FRC demodulation conformance test (Rel-13) | Huawei | - |
R4‑167058 | Way forward NB-IoT transmission signal pattern for NPDCCH demod performance | Huawei, HiSilicon | - |
R4‑167059 | Way forward NB-IoT transmission signal pattern for NPDSCH demod performance | Huawei, HiSilicon | - |
R4‑167060 | Correction to Radio Link Monitoring Requirements for NB-IoT | Qualcomm Incorporated, Samsung, Nokia Networks, Ericsson, LGE | - |
R4‑167061 | CR on NPBCH Reference Measurement Channel for NB-IoT | Qualcomm Incorporated | - |
R4‑167062 | CR on NPBCH Reference Measurement Channel for NB-IoT | Qualcomm Incorporated | - |
R4‑167063 | CR: Add Test tolerances for NB-IoT BS demodulation performance requirements | Nokia | - |
R4‑167064 | CR: NPUSCH format 2 demodulation conformance test (Rel-13) | Huawei | - |
R4‑167065 | CR: Demodulation requirements for NPUSCH format 2 (Rel-13) | Huawei | - |
R4‑167066 | CR for NB-IoT RRC re-establishment R13 | Huawei, HiSilicon | - |
R4‑167067 | HD-FDD Intra-frequency RRC Re-establishment for UE category NB1 under normal coverage R13 | Huawei, HiSilicon | - |
R4‑167068 | HD-FDD Inter-frequency RRC Re-establishment for UE category NB1 under enhanced coverage R13 | Huawei, HiSilicon | - |
R4‑167069 | Corrections in 36.101 for NB-IoT UE | Huawei, Hisilicon | - |
R4‑167070 | CR on UE Transmit Timing Accuracy Tests for NB-IoT UE | NTT DOCOMO INC. | imported from 3GU |
R4‑167071 | Example NB-IoT RRM test cases | Anritsu | - |
R4‑167072 | CR: Add Test tolerances for NB-IoT BS demodulation performance requirements | Nokia | - |
R4‑167073 | Way forward on NPBCH Coverage Study | Intel Corporation | - |
R4‑167074 | Introduction of NPDCCH demodulation requirements | Ericsson | - |
R4‑167075 | Way forward NB-IoT transmission signal pattern for NPDSCH demod performance | Huawei, HiSilicon | - |
R4‑167076 | Way forward on NPUSCH format 2 test | Huawei, Ericsson, Nokia | - |
R4‑167077 | NR evening AH minutes | NTT DOCOMO INC, INC. | imported from 3GU |
R4‑167078 | Way forward on BS Beamforming Model for the ITU WP5D coexistence simulations | Huawei, Hisilicon | - |
R4‑167079 | WF on simulation assumptions of co-existence study for WP 5D | NTT DOCOMO INC. | - |
R4‑167080 | TP for 38.803: Boundary between spurious and OOB domain | Ericsson | - |
R4‑167081 | HD-FDD Intra-frequency RRC Re-establishment for UE category NB1 under normal coverage R13 | Huawei, HiSilicon | - |
R4‑167082 | HD-FDD Inter-frequency RRC Re-establishment for UE category NB1 under enhanced coverage R13 | Huawei, HiSilicon | - |
R4‑167083 | HD-FDD Intra-frequency RRC Re-establishment for UE category NB1 under normal coverage R14 | Huawei, HiSilicon | - |
R4‑167084 | HD-FDD Inter-frequency RRC Re-establishment for UE category NB1 under enhanced coverage R14 | Huawei, HiSilicon | - |
R4‑167085 | Way forward on NPBCH Coverage Study | Intel Corporation | - |
R4‑167086 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167087 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167088 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167089 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167090 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167091 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167092 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167093 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167094 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167095 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167096 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167097 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167098 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167099 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167100 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167101 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167102 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167103 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167104 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167105 | nn | Booked for Nb-IoT session | imported from 3GU |
R4‑167106 | CR: Demodulation requirements for NPUSCH format 1 (Rel-13) | Huawei | - |
R4‑167107 | Correction of AAS Base Station performance targets | NEC | - |
R4‑167108 | Not used | -- | imported from 3GU |
R4‑167109 | Correction of ACLR and CACLR for Band 46 | Nokia | imported from 3GU |
R4‑167110 | CR on LBT functionality requirements for UE in Rel-14 eLAA | Ericsson | - |
R4‑167111 | CR of OCNG pattern for guard band for NB-IoT test cases | Huawei, HiSilicon | - |
R4‑167112 | LS on the status of High Power UE WI | Sprint | - |
R4‑167113 | LS on NR waveform | RAN WG1 | imported from 3GU |
R4‑167114 | CR: NPDSCH Demodulation requirements and FRC definition for NB-IoT (Rel-13) | Huawei | - |
R4‑167115 | WF on NPRACH performance requirements | Nokia | - |
R4‑167116 | Way forward on Frequency Error on NB-IoT PUSCH Demodulation Performance | Nokia | imported from 3GU |
R4‑167117 | Way forward on NPBCH Coverage Study | Intel Corporation | - |
R4‑167118 | Way forward on measurement accuracy for NB-IoT | Nokia | - |
R4‑167119 | Power headroom reporting requirements | Ericsson | - |
R4‑167120 | Power headroom reporting requirements | Ericsson | - |
R4‑167121 | Way forward on alignment of NB-IoT test cases | Ericsson | - |
R4‑167122 | Example NB-IoT RRM test cases | Anritsu | - |
R4‑167123 | Way forward on UE Beamforming Model for the ITU WP5D coexistence simulations | Qualcomm | - |
R4‑167124 | WF on UL TPC model and Throughput model for coexistence study for WP 5D | NTT DOCOMO, INC. | - |
R4‑167125 | Way forward on co-existence study below 6 GHz for NR | CMCC | - |
R4‑167126 | Way forward on testability | Intel | - |
R4‑167127 | Way forward on BS Beamforming Model for the ITU WP5D coexistence simulations | Huawei, Hisilicon | - |
R4‑167128 | Work plan on NR co-existence study for WP 5D | NTT DOCOMO INC. | - |
R4‑167129 | WF on simulation assumptions of co-existence study for WP 5D | NTT DOCOMO INC. | - |
R4‑167130 | LS on NR waveform | RAN WG1 | - |
R4‑167131 | DRAFT LTI on Work towards revision 1 of Recommendations ITU-R M.2070 and M.2071 - Questions for clarification within 3GPP specifications | Ericsson | - |
R4‑167132 | - | - | - |
R4‑167133 | Correction CACLR for Band 46 | Nokia | - |
R4‑167134 | Correction of CACLR for Band 46 | Nokia | - |
R4‑167135 | Next level fallback configurations for xDL 2UL | Qualcomm Incorporated | - |
R4‑167136 | Introduction of CA_2A-46A-46A, CA_4A-46A-46A and CA_46A-46A-66A | Nokia, T-Mobile USA, AT&T, Verizon, US Cellular | - |
R4‑167137 | Introduction of additional 3DL/2UL CA band combinations in Rel-14 | LG Electronics, SK Telecom, AT&T, KT, NTT DoCoMo | - |
R4‑167138 | Introduction of new 4DL/2UL CA band combination in Rel-14 | LG Electronics, SKT, KT, TELSTRA | - |
R4‑167139 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.104 | Korea Testing Laboratory | - |
R4‑167140 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.104 | KTL, Sync Techno Inc., TTA, SK telecom, LG Uplus | - |
R4‑167141 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.141 | KTL, Sync Techno Inc., TTA, SK telecom, LG Uplus | - |
R4‑167142 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.141 | KTL, Sync Techno Inc., TTA, SK telecom, LG Uplus | - |
R4‑167143 | Correction on LBT test procedure | Huawei, Ericsson, Nokia | - |
R4‑167144 | TP for TR 36.714-02-01: CA_3A-40A | Vodafone | - |
R4‑167145 | TP for TR 36.714-02-01: CA_3A-41A | Vodafone | - |
R4‑167146 | TP for TR 36.714-02-01: CA_28A-46A operating band and channel bandwidths | Vodafone | - |
R4‑167147 | TP for TR 36.714-03-01: CA_28A-46C operating band and channel bandwidths | Vodafone | - |
R4‑167148 | TP for TR 36.714-04-01: CA_28A-46D operating band and channel bandwidths | Vodafone | - |
R4‑167149 | TP for TR 36.714-05-01: CA_28A-46E operating band and channel bandwidths | Vodafone | - |
R4‑167150 | Introduction of V2V opersting bands in TS36.307 Rel-14 | LG Electronics | - |
R4‑167151 | WF on V2X RF requirements. | Qualcomm | - |
R4‑167152 | Reply LS on Applicability of requirements with PUSCH hopping | Qualcomm Incorporated | - |
R4‑167153 | LS for definition of SSTD measurement | CATT | - |
R4‑167154 | Known cell requirements | Ericsson | - |
R4‑167155 | WF on eMTC UE demodulation requirements | Ericsson | - |
R4‑167156 | CR for eMTC M-PDCCH demodulation requirement for CE Mode A (Rel-13) | Huawei, HiSilicon | - |
R4‑167157 | CR: Add Test tolerances for eMTC BS demodulation performance requirements | Nokia | - |
R4‑167158 | WF on time offset for PCell and LAA SCell in LAA demodulation | Ericsson, Huawei, HiSilicon, ZTE | - |
R4‑167159 | Introduce signal model for LAA demodulation | Ericsson | - |
R4‑167160 | Correction on discovery signal conditions in LAA R13 | Huawei, HiSilicon | - |
R4‑167161 | eLAA RRM requirements | Ericsson | - |
R4‑167162 | CR on FDD-FDD inter-frequency RS-SINR accuracy test case R13 | Huawei, HiSilicon, | - |
R4‑167163 | CR on TDD-TDD inter-frequency RS-SINR accuracy test case R13 | Huawei, HiSilicon, | - |
R4‑167164 | CR on RS-SINR TDD-FDD inter-frequency accuracy test case | ZTE | - |
R4‑167165 | CR for SDR - tests with 4Rx in Rel-13 | R4 | - |
R4‑167166 | CR for eMTC M-PDCCH demodulation requirement for CE Mode A (Rel-13) | Huawei, HiSilicon, Ericsson | - |
R4‑167167 | nn | Booked for RRM session | imported from 3GU |
R4‑167168 | nn | Booked for RRM session | imported from 3GU |
R4‑167169 | nn | Booked for RRM session | imported from 3GU |
R4‑167170 | nn | Booked for RRM session | imported from 3GU |
R4‑167171 | nn | Booked for RRM session | imported from 3GU |
R4‑167172 | nn | Booked for RRM session | imported from 3GU |
R4‑167173 | WF on EU refsens for 10MHz eLAA | Huawei, Hi-silicon | - |
R4‑167174 | WF on MCL relaxation for new power Classenhanced NB-IoT | u-blox, Huawe, Neul | - |
R4‑167175 | - | - | - |
R4‑167176 | Introduction of Korea regulatory requirements for PS-LTE BS, band 28, 36.104 | KTL, Sync Techno Inc., TTA, SK telecom, LG Uplus | - |
R4‑167177 | - | - | - |
R4‑167178 | - | - | - |
R4‑167179 | - | - | - |
R4‑167180 | nn | RRM session | imported from 3GU |
R4‑167181 | nn | RRM session | imported from 3GU |
R4‑167182 | nn | RRM session | imported from 3GU |
R4‑167183 | nn | RRM session | imported from 3GU |
R4‑167184 | nn | RRM session | imported from 3GU |
R4‑167185 | nn | RRM session | imported from 3GU |
R4‑167186 | nn | RRM session | imported from 3GU |
R4‑167187 | nn | RRM session | imported from 3GU |
R4‑167188 | nn | RRM session | imported from 3GU |
R4‑167189 | nn | RRM session | imported from 3GU |
R4‑167190 | Revised WID: updates during meeting of Basket WI for LTE Advanced inter-band CA Rel-14 for 4DL/1UL | Ericsson | - |
R4‑167191 | - | - | - |
R4‑167192 | WF on BS Rx requirements for rel-14 eLAA | Huawei | - |
R4‑167193 | WF on UE Tx requirements for eLAA | Qualcomm | - |
R4‑167194 | LAA BS unwanted emission mask requirements in 36.104 | Ericsson, Nokia | - |
R4‑167195 | LAA BS unwanted emission mask requirements in 36.141 | Ericsson, Nokia | - |
R4‑167196 | Introduction of V2V Tx requirements in Rel-14 | LG Electronics, Huawei, CATT | - |
R4‑167197 | Introducation of V2V Rx requirements | CATT | - |
R4‑167198 | LS on UCG parameters for eMTC | Intel | - |
R4‑167199 | Introduction of V2X Rx requirements to 36.101 | CATT, LGE, Huawei | - |
R4‑167200 | LS out on Rel.13 Capabilities | Qualcomm Incorporated | - |
R4‑167201 | WF on LTE TRP/TRS framework and work plan | Vodafone | - |
R4‑167202 | Issam farewell presentation | RAN4 | imported from 3GU |
R4‑167203 | Issam’s Good Bye | Issam | - |
R4‑167204 | CR for eMTC M-PDCCH demodulation requirement for CE Mode A (Rel-14) | Huawei, HiSilicon, Ericsson | - |
page generated from database: 2024-04-22 07:58:53