The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: SP-53 - 2011-09-19 to 2011-09-21, Fukuoka

meeting id: SP-53 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
SP‑110435 Draft agenda for TSG SA meeting #53 TSG SA Chairman Approved
SP‑110436 Draft Report of TSG SA meeting #52 TSG SA Secretary Approved
SP‑110437 LS from ITU-R Study Groups: REVISION OF RECOMMENDATION ITU-R M.1224 ITU-R Study Groups Noted
SP‑110438 LS from GSMA Embedded SIM Task Force: Response to LS on Clarification to eUICC uses cases and Requirements ref: S1-111298 GSMA Embedded SIM Task Force Noted
SP‑110439 LS from ITU-R Study Groups: INVITATION TO REVIEW REPORT ITU-R M.2014-1 ITU-R Study Groups Noted
SP‑110440 LS from SA WG1: LS on MTC Group-Based Triggering SA WG1 Noted
SP‑110441 LS from SA WG2: LS on the introduction of FULL_MOCN-GERAN feature SA WG2 Noted
SP‑110442 LS from the Broadband Forum: LS on QoS requirement for SIPTO traffic to 3GPP Broadband Forum Noted
SP‑110443 LS from CT WG1: Reply LS on Equivalent PLMN identities and MDT CT WG1 Noted
SP‑110444 LS from CT WG1: Reply LS on IMS Application Reference Identifier(IARI) consideration for Charging CT WG1 Noted
SP‑110445 LS from ITU-T Study Group 2: Harmonization of MIs and SCs for civic alerting purposes ITU-T Study Group 2 Noted
SP‑110446 LS from ETSI ISG AFI: Liaison statement to 3GPP ETSI ISG AFI Noted. Forwarded to SA WG5
SP‑110447 LS from ETSI TC M2M: Reply to SA WG3 on potential co-operation between 3GPP work on MTC security and ETSI M2M ETSI TC M2M Noted
SP‑110448 LS from SA WG2: Reply LS to Reply LS on Network Sharing SA WG2 Noted
SP‑110449 LS from SA WG3: Reply LS on MDT privacy and roaming SA WG3 Noted
SP‑110450 LS from the Broadband Forum: WT-134 'Broadband Policy Control Framework (PCF)' Broadband Forum Noted
SP‑110451 LS from the Broadband Forum: WT-203 'Interworking between Next Generation Fixed and 3GPP Wireless Access' Broadband Forum Noted
SP‑110452 Update SID for FS_MAPIM (Multi Access PDN connectivity and IP flow mobility) ZTE Approved
SP‑110453 SA WG2 Chairman's Report to TSG SA#53 SA WG2 Chairman Noted
SP‑110454 3 CRs to 23.060 on SAES (Rel-8, Rel-9, Rel-10) SA WG2 Approved
SP‑110455 3 CRs to 23.167 on IMS_EMER_GPRS_EPS (Rel-9, Rel-10, Rel-11) SA WG2 Approved
SP‑110456 12 CRs to 23.002, 23.272, 23.060, 23.401 and 23.402 on TEI9 (Rel-9, Rel-10) SA WG2 Approved
SP‑110457 1 CR to 23.251 on Full_MOCN-GERAN (Rel-10) SA WG2 Approved
SP‑110458 7 CRs to 23.060 and 23.401 on NIMTC (Rel-10) SA WG2 Approved
SP‑110459 6 CRs to 23.060 and 23.401 on TEI10 (Rel-10) SA WG2 Approved
SP‑110460 5 CRs to 23.002, 23.060 and 23.401 on TEI10 (Rel-10) SA WG2 Approved
SP‑110461 10 CRs to 23.228 and 23.237 on TEI10 (Rel-10, Rel-11) SA WG2 Approved
SP‑110462 1 CR to 23.402 on LOBSTER (Rel-11) SA WG2 Approved
SP‑110463 5 CRs to 23.203 on BBAI (Rel-11) SA WG2 23.203 CR0552R3; 23.203 CR0553R2; 23.203 CR0574R2 and 23.203 CR0575R3 were approved. 23.203 CR0570R3 was revised in SP-110630
SP‑110464 2 CRs to 23.216 and 23.237 on eMPS_SRVCC (Rel-11) SA WG2 Approved
SP‑110465 3 CRs to 23.228 on IPXS (Rel-11) SA WG2 Approved
SP‑110466 1 CR to 23.203 on QoS_SSL (Rel-11) SA WG2 Approved
SP‑110467 6 CRs to 23.203 on SAPP (Rel-11) SA WG2 23.203 CR0555R3 was revised in SP-110649 and the remaining CRs in this pack were approved.
SP‑110468 1 CR to 23.002 on VCSG (Rel-11) SA WG2 Approved
SP‑110469 3 CRs to 23.167, 23.204 and 23.228 on TEI11 (Rel-11) SA WG2 Approved
SP‑110470 Updated WID: SMS submit and delivery without MSISDN in IMS (SMSMI) SA WG2 Approved
SP‑110471 Updated WID: Network Provided Location Information for IMS (NWK-PL2IMS) SA WG2 Alcatel-Lucent and NEC asked to be added as supporting companies. The WID was revised in SP-110631
SP‑110472 Updated Study WID: Study on Multi Access PDN connectivity and IP flow Mobility (FS_MAPIM) SA WG2 Noted. Proposed revision provided in SP-110452
SP‑110473 Updated Study WID: Study on Core Network Overload solutions (FS_CNO) SA WG2 Noted. Proposed revision provided in SP-110496
SP‑110474 New Building Block WID: Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN SA WG2 Proposed revision provided in SP-110482. This was noted and the revised version considered.
SP‑110475 New Feature WID: Single Radio Voice Call Continuity from UTRAN/GERAN to E-UTRAN/HSPA SA WG2 Approved
SP‑110476 New Feature WID: WID for S2a Mobility based On GTP & PMIPv6 for WLAN access to EPC SA WG2 Qualcomm asked whether it was normal to approve a Work tem before the Study Item has completed and what will happen to the Study Item after the WID is approved. It was clarified that procedurally this is acceptable and the normative work should follow the
SP‑110477 TR 23.885: Feasibility Study of Single Radio Voice Call Continuity (SRVCC) from UTRAN/GERAN to E-UTRAN/HSPA; Stage 2 SA WG2 Approved
SP‑110478 TR 23.842: Study on Network Provided Location Information to the IMS SA WG2 Noted
SP‑110479 TS 23.139: 3GPP System-Fixed Broadband Access Network Interworking; Stage 2 SA WG2 Noted
SP‑110480 TR 23.850: Study on Roaming Architecture for Voice over IMS with Local Breakout SA WG2 Noted
SP‑110481 Updated SID for FS_UMONC (Study on Usage monitoring control enhancement) ZTE Revised in SP-110617
SP‑110482 Proposed New Building Block WID on 'Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN ' Alcatel-Lucent Based on agreements for Stage 2 prioritisation, this WID needed to be updated to remove the TR phase. This was revised in SP-110644
SP‑110483 LS from CT WG1: Reply LS on the introduction of FULL-MOCN-GERAN feature CT WG1 Noted
SP‑110484 LS from CT WG1: LS on modification of security context storage rate on the UICC CT WG1 Noted
SP‑110485 LS from RAN WG2: LS on Applicability of ePLMN to MDT RAN WG2 Noted
SP‑110486 LS from CT WG4: LS on authentication signalling with external networks over S2b CT WG4 Noted
SP‑110487 LS from RAN WG3: Response LS on Equivalent PLMN identities and MDT RAN WG3 Noted
SP‑110488 LS from SA WG5: Reply LS to C3-111217 on the work split between SA WG5 and CT WG3 for QoS Control Based on Subscriber Spending Limits (Rel-11 QoS_SSL) SA WG5 Noted
SP‑110489 LS from SA WG5: Reply LS on CT WG3 aspect of QoS Control Based on Subscriber Spending Limits SA WG5 Noted
SP‑110490 LS from SA WG5: Reply LS to LS on Equivalent PLMN identities and MDT SA WG5 Noted
SP‑110491 LS from SA WG5: Reply LS to NGMN NGCOR on Project NGCOR Update SA WG5 Noted
SP‑110492 LS from ITU-R WP 5D: LIAISON STATEMENT TO THE 3GPP ORGANIZATIONAL PARTNERS ON THE COMPLETION OF REC. ITU-R M.[IMT.RSPEC] ITU-R WP 5D Response in SP-110659.
SP‑110493 LS from TSG RAN: Response to ITU-R WP 5D on the completion of Rec. ITU-R M.[IMT.RSPEC] TSG RAN WITHDRAWN
SP‑110494 3GPP Work Plan review at Plenary #53 MCC Work Plan Manager The Work Plan manager revised the slides to make agreed corrections to the slides in SP-110661
SP‑110495 Standardization of Machine-type Communications MCC Work Plan Manager Noted
SP‑110496 Revision for Study on Core Network Overload Solutions Huawei, Hisilicon Approved
SP‑110497 SA WG3 Status Report SA WG3 Chairman Revised in SP-110601
SP‑110498 WI proposal on IMS Firewall traversal SA WG3 Noted. Proposed Update in SP-110605
SP‑110499 WI proposed revision on System Improvements for Machine Type Communication SA WG3 Approved
SP‑110500 35.221 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 1: EEA3 and EIA3 specifications SA WG3 Revised in SP-110565
SP‑110501 35.222 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 2: ZUC specification SA WG3 Revised in SP-110569
SP‑110502 35.223 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 3: Implementors' test data SA WG3 Revised in SP-110566
SP‑110503 35.924 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 4: Design and Evaluation Report SA WG3 WITHDRAWN. See LS in SP-110591
SP‑110504 Release 11 CR to 33.401 on EEA3 and EIA3 (new Encryption & Integrity EPS security Algorithms) SA WG3 Approved
SP‑110505 Release 10 CRs to 33.401 on Relay Node Security SA WG3 Approved
SP‑110506 Release 10 CR to 33.310 on CMPv2 profile (TEI10) SA WG3 Revised in SP-110627
SP‑110507 Release 11 CRs on Security small Enhancements (Sec11) SA WG3 Revised in SP-110563
SP‑110508 Release 10 CRs on Security small Enhancements (TEI10) SA WG3 Revised in SP-110564
SP‑110509 Release 9 CRs on Security small Enhancements (TEI9) SA WG3 Approved
SP‑110510 Release 10 CRs on Lawful Interception (LI10) SA WG3 WITHDRAWN
SP‑110511 Release 11 CRs on Lawful Interception (LI11) SA WG3 Approved
SP‑110512 LS from TSG GERAN: Reply LS on the introduction of FULL-MOCN-GERAN feature TSG GERAN Noted
SP‑110513 LS from TSG GERAN: LS on Service Identification for RRC Improvements in GERAN TSG GERAN Noted
SP‑110514 LS from RAN WG2: Reply LS on modification of security context storage rate on the UICC RAN WG2 Noted
SP‑110515 SA WG5 Status Report SA WG5 Chairman Noted
SP‑110516 30.820 Telecommunication management; Project scheduling and open issues for SA WG5, Release 10 SA WG5 Approved
SP‑110517 32.834 Study on OAM aspects of Inter-RAT Energy Saving SA WG5 Noted
SP‑110518 Revised WID on UTRAN Self-Organizing Networks (SON) management SA WG5 Approved
SP‑110519 Revised WID on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) SA WG5 Approved
SP‑110520 New WID proposal on Carrier Aggregation management SA WG5 NEC asked to be added as a supporting company. The WID was revised in SP-110636
SP‑110521 New WID proposal on 3GPP and WLAN interworking Network Management SA WG5 Approved
SP‑110522 New WID proposal on LTE SON coordination management SA WG5 NEC asked to be added as a supporting company. The WID was revised in SP-110637
SP‑110523 Rel-7 CRs on OAM Maintenance and small Enhancements (OAM7) SA WG5 Approved
SP‑110524 Rel-8 CRs on OAM Maintenance and small Enhancements (OAM8) SA WG5 Approved
SP‑110525 Rel-9 CRs on OAM Maintenance and small Enhancements (OAM9) SA WG5 Approved
SP‑110526 Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) SA WG5 Approved
SP‑110527 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) SA WG5 Revised in SP-110634
SP‑110528 Rel-8 CRs on Charging Management (CH8) SA WG5 Approved
SP‑110529 Rel-9 CRs on Charging Management (CH9) SA WG5 Approved
SP‑110530 Rel-10 CRs on Charging Management (CH10) SA WG5 Approved
SP‑110531 Rel-11 CRs on Charging Management small Enhancements (CH11) SA WG5 Approved
SP‑110532 Rel-9 CRs on 3G HNB and LTE HeNB OAM&P Type 1 Interface (HNB_eHNB-OAM_Type1) SA WG5 Approved
SP‑110533 Rel-8 CRs on 3G Home NodeB OAM&P Type 1 Management Interface (HNB-3G_OAM) SA WG5 Approved
SP‑110534 Rel-10 CRs on Alarm Correlation and Root Cause Analysis (OAM-AC-RCA) SA WG5 Approved
SP‑110535 Rel-11 CRs on CN performance measurements enhancement (OAM-ePM-CN) SA WG5 RIM commented that 32.426 CR0041 introduces new clauses with 'hanging paragraphs'. SA WG5 were asked to correct this. These CRs were then approved.
SP‑110536 Rel-11 CRs on IMS Performance Measurement enhancements (OAM-ePM-IMS) SA WG5 Approved
SP‑110537 Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) SA WG5 Approved
SP‑110538 Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) SA WG5 Approved
SP‑110539 Rel-10 CRs on IRP Solution Set specification organisation improvements (OAM-IRP-SS) SA WG5 Approved
SP‑110540 Rel-11 CRs on UTRAN Self-Organizing Networks (SON) management (OAM-SON-UTRAN) SA WG5 Approved
SP‑110541 Rel-11 CRs on Charging for Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Data Bases (PEST-CH) SA WG5 Approved
SP‑110542 Rel-11 CRs on Charging for QoS Control Based on Subscriber Spending Limits (QoS_SSL) SA WG5 Approved
SP‑110543 SA WG4 Status Report at TSG SA#53 SA WG4 Chairman Noted
SP‑110544 CRs to TS 26.114 on 'Resolving reference to IETF Internet Draft (MTSI-MHI)' (Release 7 and Release 8) SA WG4 Approved
SP‑110545 CRs to TS 26.114 on 'Clarification on SDP negotiation for video (MTSI-eMHI)' (Release 8 until Release 11) SA WG4 Approved
SP‑110546 CRs to TS 26.114 on 'Correction of the reference to the 'a=imageattr' attribute' (MTSI-eMHI-DRASIS)' (Release 8 until Release 11) SA WG4 Approved
SP‑110547 CRs to TS 26.237 on 'Resolving IETF dependencies (IMS_PSS_MBMS_US)' (Release 8 until Release 10) SA WG4 Approved
SP‑110548 CRs to TS 26.090 on 'Correction of equation for pitch sharpening (TEI9)' (Release 9 and Release 10) SA WG4 Approved
SP‑110549 CRs to TS 26.131 and TS.26.132 on 'Enhancements and Addition of Audio Tests to 26.131 and 26.132 (EAAT)' (Release 10) SA WG4 Approved
SP‑110550 CRs to TS 26.234 and TS.26.346 on 'PSS and MBMS enhancements (MBS_enh)' (Release 10) SA WG4 Approved
SP‑110551 CRs to TS 26.114 on 'Correction of functional requirements for jitter buffer management (TEI10, MTSI-MHI)' (Release 10 and Release 11) SA WG4 Approved
SP‑110552 CRs to TS 26.114 on 'Signalling applicable AMR/AMR-WB mode set in SDP answer (TEI10)' (Release 10 and Release 11) SA WG4 Approved
SP‑110553 CR to TS 26.114 on ' Video Codec Enhancement to MTSI (VCEM)' (Release 10 and Release 11) SA WG4 Approved
SP‑110554 New Work Item 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements (EMM)', Feature SA WG4 Approved
SP‑110555 New Work Item 'Enhancement to FEC for MBMS (EMM-EFEC)', Building Block SA WG4 Approved
SP‑110556 New Work Item 'Download Delivery Enhancements for MBMS (EMM-DDE)', Building Block SA WG4 Approved
SP‑110557 New Work Item ' IMS-based PSS and MBMS Streaming Synchronization Enhancements (EMM-IPME)', Building Block SA WG4 Approved
SP‑110558 Progressing Rel-11 Work at TSG SA#53 SA WG2 Chairman Revised in SP-110599
SP‑110559 Prioritization of Near Term MTC Work KDDI, KT Corp., T-Mobile USA, Verizon, Hitachi, NEC Revised in SP-110568
SP‑110560 Outputs of July 2011 multi-SDO workshop on Converged Management of Fixed/Mobile Networks SA WG5 Chairman Noted
SP‑110561 LS from ITU-R Study Groups: LS on 'WIDE-AREA SENSOR AND/OR ACTUATOR NETWORK (WASN) SYSTEMS' ITU-R Study Groups Noted
SP‑110562 LS from ITU-R Study Groups: LS on 'QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVES FOR WIRELESS ACCESS SYSTEMS' ITU-R Study Groups Noted
SP‑110563 Release 11 CRs on Security small Enhancements (Sec11) SA WG3 Approved
SP‑110564 Release 10 CRs on Security small Enhancements (TEI10) SA WG3 Approved
SP‑110565 35.221 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 1: EEA3 and EIA3 specifications SA WG3 Approved
SP‑110566 35.223 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 3: Implementors' test data SA WG3 Approved
SP‑110567 MCC Support Team report MCC (John Meredith) Noted
SP‑110568 Prioritization of Near Term MTC Work KDDI, KT Corp., T-Mobile USA, Hitachi, NEC Revised in SP-110616
SP‑110569 35.222 Specification of the 3GPP Confidentiality and Integrity Algorithms EEA3 & EIA3; Document 2: ZUC specification SA WG3 Approved
SP‑110570 Terms of Reference of Multi SDO Project on Fixed Mobile Convergence Network Management SA WG5 Chairman Noted
SP‑110571 Progressing SIMTC work for Rel-11 Intel Revised in SP-110618
SP‑110572 Status Report from SA WG1 to TSG SA#53 SA WG1 Chairman Revised in SP-110622
SP‑110573 Stage 1 CRs on Local IP Access and Selected Internet IP Traffic Offload (LIPA_SIPTO) SA WG1 Approved
SP‑110574 Stage 1 CRs on TEI Rel-10 (TEI10) SA WG1 Approved. A Liaison Statement to CT WG1 was drafted in SP-110626.
SP‑110575 Stage 1 CRs on Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers (MOSAP) SA WG1 Approved
SP‑110576 Stage 1 CRs on Non Voice Emergency Services (NOVES) SA WG1 Approved
SP‑110577 Stage 1 CRs on Study on Non Voice Emergency Services (FS_NOVES) SA WG1 Approved
SP‑110578 Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) SA WG1 22.368 CR0095R3; 22.368 CR0103R2; 22.368 CR0101R1; 22.368 CR0096R2; 22.368 CR0108R1; 22.368 CR0098R2; 22.368 CR0099R3 Approved. Other CRs revised in SP-110629
SP‑110579 Stage 1 CRs on SIPTO Service Continuity of IP Data Session (SIPTO_SC) SA WG1 Approved
SP‑110580 Stage 1 CRs on Support for 3GPP Voice Interworking with Enterprise IP-PBX (VINE) SA WG1 Morpho Cards GmbH reported some problems and this CR Pack was revised in SP-110632
SP‑110581 Stage 1 CRs on IMS Network-Independent Public User Identities (INIPUI) SA WG1 Approved
SP‑110582 Stage 1 CRs on TEI Rel-11 (TEI11) SA WG1 Approved
SP‑110583 Stage 1 CRs on Proposed New WIDs (not part of an existing feature) SA WG1 WITHDRAWN
SP‑110584 TR 22.988 V1.0.0 on Study on Alternatives to E.164 for Machine-Type Communications (Release 10) SA WG1 Noted
SP‑110585 TR 22.896 V1.0.0 on Study on Continuity of Data Sessions to Local Networks SA WG1 Noted
SP‑110586 TR 22.801 V1.0.0 on Study on non-MTC Mobile Data Applications impacts SA WG1 Noted
SP‑110587 TR 22.895 V1.0.0 on Study on Service aspects of integration of Single Sign-On (SSO) frameworks with 3GPP operator-controlled resources and mechanisms SA WG1 Noted
SP‑110588 WID on IMS-Based Telepresence SA WG1 Approved
SP‑110589 WID on Service and Media Reachability for Users over Restrictive Firewalls SA WG1 After changing the SA WG3 WID to a Study item, this WID needed update to make it a stand-alone WID. Other corrections and clarifications were also suggested and the WID was revised in SP-110641
SP‑110590 WID on Proposal for a study on Proximity-based Services SA WG1 Noted
SP‑110591 LS from ETSI SAGE: 128-EEA3 and 128-EIA3 design and evaluation report ETSI SAGE Noted
SP‑110592 SA WG2 prioritization TeliaSonera WITHDRAWN
SP‑110593 TSG CT Status Report TSG CT Chairman Noted
SP‑110594 Draft TSG CT#53 meeting report TSG CT Secretary (MCC) Noted
SP‑110595 IETF Status Report TSG CT Chairman Noted
SP‑110596 TSG GERAN Status Report TSG GERAN Chairman Noted
SP‑110597 On LTE for public safety Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular Noted
SP‑110598 Updates to the SA WG1 study WID 'Study on Proximity-based Services' Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular Revised in SP-110628
SP‑110599 Progressing Rel-11 Work at TSG SA#53 SA WG2 Chairman Noted
SP‑110600 Draft Agenda for the 3GPP BBF Workshop 09-10 Nov 2011, San Francisco, USA Co-chair of 3GPP-BBF workshop (Balazs Bertenyi). Noted
SP‑110601 SA WG3 Status Report SA WG3 Chairman Noted
SP‑110602 SA WG2 Scheduling Considerations, Details SA WG2 Chairman Noted
SP‑110603 Proposed updated WID: LIPA Mobility and SIPTO at the Local Network (LIMONET) Verizon Wireless WITHDRAWN
SP‑110604 Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) Verizon Wireless It was decided to discuss this off-line and update the WID to take the other comments on BBAI Scoping into account. This was revised in SP-110619
SP‑110605 Proposed Updated WID on ' IMS Firewall Traversal Acme Packet, China Mobile, Ericsson, Huawei, Juniper Networks, Vodafone, ZTE It was proposed to re-work this as a Study WID now and then ask SA WG3 to review the study work and propose a normative WID to TSG SA#54 if considered necessary. This was revised in SP-110640
SP‑110606 Outcome of Operator discussions on SA WG2 work prioritisation GSMA Noted
SP‑110607 LS from TETRA Association: Device to Device Service TETRA Association Noted
SP‑110608 Delivering SIMTC in Release 11 Vodafone Group Noted
SP‑110609 TSG RAN #53 report from TSG RAN Chairman TSG RAN Chairman Revised in SP-110645
SP‑110610 TSG RAN#53 draft meeting report TSG RAN Secretary (MCC) Noted
SP‑110611 Proposed Response to ITU-R WP 5D/TEMP/519 = RP-110933 on the completion of Rec. ITU-R M.[IMT.RSPEC] TSG RAN This LS was reviewed and updated to show source as TSG RAN and TSG SA in SP-110659
SP‑110612 Update Submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Revision 11 of Recommendation ITU-R M.1457 TSG RAN This LS was reviewed and updated to show source as TSG RAN and TSG SA in SP-110658
SP‑110613 Updated information on the roadmap for IMT-2000 CDMA DS & IMT-2000 CDMA TDD TSG RAN This LS was reviewed and updated to show source as TSG RAN and TSG SA and to remove the text on availability of LIMONET, in SP-110660
SP‑110614 Results of RAN WI/SI prioritization at TSG RAN#53 TSG RAN Chairman Noted
SP‑110615 Release 11 prioritization Deutsche Telekom, TeliaSonera, Verizon Wireless, Ericsson Noted
SP‑110616 Prioritization of Near Term MTC Work KDDI, KPN, KT Corp., T-Mobile USA, Hitachi, NEC, Panasonic Noted
SP‑110617 Updated SID for FS_UMONC (Study on Usage monitoring control enhancement) ZTE, China Telecom, Allot This was withdrawn
SP‑110618 Progressing SIMTC work for Rel-11 Intel Noted
SP‑110619 Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) Huawei The changes on changes needed to be removed, the Bratislava header removed and to add a clean version to the zip file, this was updated in SP-110647
SP‑110620 Progressing SIMTC for Release 11 Intel, Vodafone Group Noted
SP‑110621 Release 11 prioritization update Drafting Group Revised in SP-110624
SP‑110622 Status Report from SA WG1 to TSG SA#53 SA WG1 Chairman Noted
SP‑110623 Scheduling picture SA WG1 Chairman Noted
SP‑110624 Release 11 prioritization update Drafting Group Noted
SP‑110625 Release 11 prioritization - output from Operator lunch time session Drafting Group Noted. Option 1 with MTCsp and MTCsms interfaces were endorsed
SP‑110626 LS on Korean Public Alert System in LTE TSG SA Revised in SP-110650
SP‑110627 Release 10 CR to 33.310 on CMPv2 profile (TEI10) TSG SA Approved
SP‑110628 Updates to the SA WG1 study WID 'Study on Proximity-based Services' Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular Vodafone commented it that should also be added, before bullet 5, that this is under network control. It was asked how this could be done if there is no network coverage. Vodafone clarified that it need not be under continuous coverage. Telecom Italia add
SP‑110629 Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) TSG SA Morpho Cards GmbH commented that the note in 22.101 CR0384R3 needed clarification that the configuration 'are mainly based on SMS'. The CR Pack was revised in SP-110651
SP‑110630 1 CR to 23.203 on BBAI (Rel-11) TSG SA Revised in SP-110652
SP‑110631 Updated WID: Network Provided Location Information for IMS (NWK-PL2IMS) SA WG2 Approved
SP‑110632 Stage 1 CRs on Support for 3GPP Voice Interworking with Enterprise IP-PBX (VINE) SA WG1 Approved
SP‑110633 Updates to the SA WG1 study WID 'Study on Proximity-based Services' Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular The WID needed to be updated again to remove revision marks, which was provided in SP-110638
SP‑110634 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) TSG SA Approved
SP‑110635 [DRAFT] Reply LS on the introduction of FULL-MOCN-GERAN feature Renesas Mobile Europe Ltd. [3GPP TSG SA] After some discussion, no agreement could be reached on the deployment issues of making this mandatory or optional and the issue was postponed to the next meeting. This was then noted.
SP‑110636 New WID proposal on Carrier Aggregation management TSG SA Approved
SP‑110637 New WID proposal on LTE SON coordination management TSG SA Approved
SP‑110638 Updates to the SA WG1 study WID 'Study on Proximity-based Services' Alcatel-Lucent, AT&T, Motorola Solutions, NEC, NIST, Nokia Siemens Networks, US Cellular Approved
SP‑110639 [DRAFT] LS on Study item relevant for public safety - direct mode TSG SA This was revised off-line to indicate that TSG SA would like to continue the dialog with the TETRA Association regarding use-cases and scenarios on the use of LTE with respect to the scope of the study, in SP-110648
SP‑110640 Study WID on ' IMS Firewall Traversal TSG SA China Mobile asked for clarification that the aim of the study is to address the service requirements. Clarification of the intention to start a normative work item at TSG SA#54 if the study has progressed enough should be added. This was revised in SP-11
SP‑110641 WID on Service and Media Reachability for Users over Restrictive Firewalls TSG SA The revision marks were accepted and the WID revised in SP-110653
SP‑110642 New Feature WID: WID for S2a Mobility based On GTP & PMIPv6 for WLAN access to EPC SA WG2 Approved
SP‑110643 DRAFT LS on Release 11 Features TSG SA Vodafone commented that the action to TSG GERAN TSG RAN and RAN WG2 should explicitly mention TSG GERAN and TSG RAN in the text. AT&T asked whether it was necessary to add an action to SA WG1 to remove some requirements from the Release. The TSG SA Chairm
SP‑110644 Proposed New Building Block WID on 'Support of IMS Emergency Sessions with Other Media on UTRAN and E-UTRAN ' Alcatel-Lucent Approved
SP‑110645 TSG RAN #53 report from TSG RAN Chairman TSG RAN Chairman Noted
SP‑110646 Results of TSG RAN WI/SI prioritization at TSG RAN#53 and TSG SA#53 TSG RAN Chairman TSG RAN will review their status according to the TSG SA priority agreements and will update the RAN prioritisation accordingly. The TSG RAN Chairman clarified that his report from TSG SA#53 will include this information and will try to explain the impact
SP‑110647 Proposed updated WID: Support for BroadBand Forum Accesses Interworking (BBAI) Huawei Approved
SP‑110648 LS on Study item relevant for public safety - direct mode TSG SA Approved
SP‑110649 Revised CR: 23.203 CR0555R4 TSG SA Approved
SP‑110650 LS on Korean Public Alert System in LTE TSG SA Approved
SP‑110651 Stage 1 CRs on System Improvements to Machine-Type Communications (SIMTC) TSG SA Approved
SP‑110652 1 CR to 23.203 on BBAI (Rel-11) TSG SA Approved
SP‑110653 WID on Service and Media Reachability for Users over Restrictive Firewalls TSG SA Approved
SP‑110654 Study WID on ' IMS Firewall Traversal TSG SA Approved
SP‑110655 DRAFT LS on Release 11 Features TSG SA Revised in SP-110656
SP‑110656 DRAFT LS on Release 11 Features TSG SA Revised in SP-110657
SP‑110657 LS on Release 11 Features TSG SA Approved
SP‑110658 Update Submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Revision 11 of Recommendation ITU-R M.1457 TSG RAN, TSG SA Approved
SP‑110659 Proposed Response to ITU-R WP 5D/TEMP/519 = RP-110933 on the completion of Rec. ITU-R M.[IMT.RSPEC] TSG RAN, TSG SA Approved
SP‑110660 Updated information on the roadmap for IMT-2000 CDMA DS & IMT-2000 CDMA TDD TSG RAN, TSG SA Approved
SP‑110661 3GPP Work Plan review at Plenary #53 MCC Work Plan Manager Noted

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links