3GPP TDocs (written contributions) at meeting
Meeting: S2-97 - 2013-05-27 to 2013-05-31, Busan
meeting id: S2-97 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
S2‑131552 | Draft Agenda for SA WG2#97 | SA WG2 Chairman | Revised in S2-131594 |
S2‑131553 | Draft Report of SA WG2 meeting #96 | SA WG2 Secretary | Approved |
S2‑131554 | LS from CT WG1: LS on clarification of the packet filter precedence value | CT WG1 (C1-124975) | Noted |
S2‑131555 | LS from SA WG1: LS on network charging for CSFB | SA WG1 (S1-124513) | Noted |
S2‑131556 | LS from CT WG1: LS on S1 connection release when rejecting the UE | CT WG1 (C1-130917) | Response in S2-132253 |
S2‑131557 | LS from IEEE OmniRAN Study Group: Interpretations of assumptions in chapter 16 of 3GPP TS 23.402 V11.6.0 (2013-03) on the behavior of a Trusted WLAN Access Network | IEEE OmniRAN Study Group (omniran-13-0024-01-ecsg) | Postponed to meeting #98 |
S2‑131558 | LS from 3GPP2: 3GPP2 Structure and Leadership | 3GPP2 (Corr_to_EO_Re-Structure and Leadership) | Noted |
S2‑131559 | LS from NGNM: List of high level recommendations from NGMN | NGNM (2013_04_04_NGMN-Liaison) | Postponed to meeting #98 |
S2‑131560 | LS from CT WG1: LS on NAT and GIBA | CT WG1 (C1-131743) | Response in S2-132323 |
S2‑131561 | LS from CT WG1: Reply LS on 'Enhancing IMEI based Lawful Interception in IMS' | CT WG1 (C1-131767) | Noted |
S2‑131562 | LS from SA WG3: Reply LS on IMEI based Lawful Interceptions in IMS | SA WG3 (S3-130505) | Noted |
S2‑131563 | LS from SA WG3: LS on update of security clause in TS 23.682 | SA WG3 (S3-130519) | Noted |
S2‑131564 | LS from SA WG3: LS on Notifications on Firewall Traversal from LS Reply SA WG2 S2-130722 and CT WG1 C1-130773 | SA WG3 (S3-130558) | Noted |
S2‑131565 | LS from SA WG3: LS on Applying user consent for SON use cases | SA WG3 (S3-130559) | Noted |
S2‑131566 | LS from SA WG1: LS on Feedback on Proximity Services and Lawful Interception | SA WG1 (S1-132171) | Noted |
S2‑131567 | LS from SA WG4: LS on End-to-end QoS handling of MTSI | SA WG4 (S4-130618) | Response in S2-132324 |
S2‑131568 | LS from RAN WG2: Response LS on E-UTRA Radio Capabilities | RAN WG2 (R2-131513) | Noted |
S2‑131569 | LS from RAN WG2: Response LS on Provisioning of E-UTRA Radio Capabilities in GERAN | RAN WG2 (R2-131514) | Postponed to meeting #98 |
S2‑131570 | Discussion paper on 'Domain selection in the event emergency bearer services are not supported' | Research In Motion UK Ltd | Noted |
S2‑131571 | 23.167 CR0224: Domain selection in the event emergency bearer services are not supported | Research In Motion UK Ltd | Noted |
S2‑131572 | 23.167 CR0225: Domain selection in the event emergency bearer services are not supported | Research In Motion UK Ltd | Noted |
S2‑131573 | 23.167 CR0226: Domain selection in the event emergency bearer services are not supported | Research In Motion UK Ltd | Revised in parallel session in S2-132081 |
S2‑131574 | PSAP call-back for UEs without an MSISDN | Research In Motion UK Ltd | Noted |
S2‑131575 | 23.167 CR0227: PSAP call-back for UEs without an MSISDN | Research In Motion UK Ltd | WITHDRAWN |
S2‑131576 | 23.401 CR2550: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Noted |
S2‑131577 | 23.401 CR2551: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Noted |
S2‑131578 | 23.401 CR2542R1: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Noted |
S2‑131579 | 23.401 CR2543R1: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Revised in parallel session in S2-132082 |
S2‑131580 | 23.060 CR1787: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Noted |
S2‑131581 | 23.060 CR1788: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Noted |
S2‑131582 | 23.060 CR1780R1: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Noted |
S2‑131583 | 23.060 CR1781R1: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Revised in parallel session in S2-132083 |
S2‑131584 | Support of SRVCC for non detectable emergency calls | Research In Motion UK Ltd | Noted |
S2‑131585 | 23.167 CR0221R1: Support of SRVCC for non detectable emergency calls | Research In Motion UK Ltd | Not Handled |
S2‑131586 | 23.401 CR2533R1: Support of SRVCC for non detectable emergency calls | Research In Motion UK Ltd | Not Handled |
S2‑131587 | 23.401 CR2534R1: Support of SRVCC for non detectable emergency calls | Research In Motion UK Ltd | Not Handled |
S2‑131588 | 23.060 CR1789: Support of SRVCC for non detectable emergency calls | Research In Motion UK Ltd | Not Handled |
S2‑131589 | 23.060 CR1790: Support of SRVCC for non detectable emergency calls | Research In Motion UK Ltd | Not Handled |
S2‑131590 | - | Research In Motion UK Ltd | WITHDRAWN |
S2‑131591 | LS from RAN WG3: LS on NAS reject messages in MOCN | RAN WG3 (R3-130774) | Noted |
S2‑131592 | LS from SA WG5: Reply LS on Application Based Charging | SA WG5 (S5-130718) | Response in S2-132221 |
S2‑131593 | LS from SA WG5: LS on PCC for convergence (P4C-F) | SA WG5 (S5-130720) | Postponed to meeting #98 |
S2‑131594 | Draft Agenda for SA WG2#97 | SA WG2 Chairman | Revised in S2-131629 |
S2‑131595 | Work Planning at SA WG2 97 | SA WG2 Chairman | Revised in S2-132254 |
S2‑131596 | Planning Future Meetings | SA WG2 Chairman | Noted |
S2‑131597 | - | Cisco | WITHDRAWN |
S2‑131598 | LS from NGMN P-MCDO: Liaison Letter to 3GPP on Mobile Content Delivery Optimization | NGMN P-MCDO (LS NGMN to 3GPP) | Noted |
S2‑131599 | Key issue for ProSe on Lawful Interception | Telecom Italia, Orange, Telefonica, KPN | Noted |
S2‑131600 | Reply LS on Application Based Charging | Allot Communications | Revised in S2-131807 |
S2‑131601 | Application Based Charging | Allot Communications | Revised in parallel session in S2-132035 |
S2‑131602 | 23.203 CR0808R1: Modifications on Application Based Charging functionality added for TDF | Allot Communications, Openwave, Tekelec, Juniper Networks | Revised in parallel session in S2-132039 |
S2‑131603 | 23.002 CR0264: Introduction of Gyn/Gzn interfaces to the specification | Allot Communications | Revised in S2-131808 |
S2‑131604 | 23.203 CR0809: Functionality of application detection and control in case of PCEF enhanced with ADC | Allot Communications | Revised in parallel session in S2-132040 |
S2‑131605 | 23.203 CR0810: Functionality of application detection and control in case of PCEF enhanced with ADC | Allot Communications | Revised in parallel session in S2-132041 |
S2‑131606 | LS from Wi-Fi Alliance: Hotspot 2.0 Release 2 Draft Technical Specification | Wi-Fi Alliance (LS on Hotspot 2 0 Rel 2 20130423) | Postponed to meeting #98 |
S2‑131607 | Public Safety Group Call use metrics | UK Home Office | Noted |
S2‑131608 | 23.203 CR0799R3: Application Based Charging functionality added for TDF | Allot Communications, Openwave, Tekelec | Revised in parallel session in S2-132038 |
S2‑131609 | LS from SA WG3LI: Reply LS on IMEI based Lawful Interceptions in IMS. | SA WG3LI (SA WG3LI13_063r1) | Noted |
S2‑131610 | RPPF based Solution for Operator Controlled Off-path Congestion Awareness and Notification | China Telecom, KDDI, ZTE, Broadcom Corporation, Intel, China Unicom, Allot Communications, Sandvine, Tekelec, Comverse | Revised in S2-132133 |
S2‑131611 | Proposal for IMS_RegCon | China Mobile, Ericsson, ST-Ericsson, Huawei, Nokia Siemens(?), ZTE(?), Deutsche Telekom(?) | Noted |
S2‑131612 | 23.228 CR1029R1: Location-based IMS registration control | China Mobile, ZTE, Ericsson, Huawei, Nokia Simens Network(?), Deutsche Telekom(?) | Noted |
S2‑131613 | The clarification of the transfer of overload information and control action between MME, SGW and PGW | China Mobile | Noted |
S2‑131614 | The cooperation of Gateway Load Manager and overload control solutions using modification of GTP-C signalling | China Mobile | Merged into S2-132125 |
S2‑131615 | Conclusion for CNO-GTP-C | Ericsson, ST-Ericsson | Revised in S2-132164 |
S2‑131616 | Operator control of RAN congestion handling | Ericsson, ST-Ericsson | Revised in S2-132173 |
S2‑131617 | QoS based congestion feedback | Ericsson, ST-Ericsson | Revised in S2-132139 |
S2‑131618 | ProSe Reference Architecture proposal | Ericsson, ST-Ericsson | Revised in S2-132109 |
S2‑131619 | 23.060 CR1791: Correction to PDN Deactivation for SIPTO@LN | Ericsson, ST-Ericsson | Revised in parallel session in S2-132098 |
S2‑131620 | 23.401 CR2552: DL traffic mapping alignment with 23.060 | Ericsson, ST-Ericsson | Noted |
S2‑131621 | 23.401 CR2553: DL traffic mapping alignment with 23.060 | Ericsson, ST-Ericsson | Noted |
S2‑131622 | 23.401 CR2554: DL traffic mapping alignment with 23.060 | Ericsson, ST-Ericsson | Noted |
S2‑131623 | Differentiated charging of packet marked flows | Ericsson, ST-Ericsson | Not Handled |
S2‑131624 | 23.203 CR0811: Retrieval of access network information at the SDP offer | Ericsson, ST-Ericsson | Merged into S2-132032 |
S2‑131625 | 23.272 CR0869R1: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in parallel session in S2-132059 |
S2‑131626 | 23.272 CR0870R1: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in parallel session in S2-132060 |
S2‑131627 | 23.272 CR0871R1: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in parallel session in S2-132061 |
S2‑131628 | 23.251 CR0092: Correction of BSC indication in Inter RAT Handover | Ericsson, ST-Ericsson | Revised in parallel session in S2-132062 |
S2‑131629 | Updates to Small Data Transmission from RRC Idle Mode solution | NEC | Merged into S2-131997 |
S2‑131630 | Evaluation update to Extended DRX in idle mode solution | NEC | Not Handled |
S2‑131631 | Draft Agenda for SA WG2#97 | SA WG2 Chairman | Revised in S2-132015 |
S2‑131632 | Proposed architectural enhancements and corrections | Ericsson, ST-Ericsson | Revised in parallel session in S2-132044 |
S2‑131633 | Partial conclusions on P4C-F | Ericsson, ST-Ericsson, Allot Communications | Revised in parallel session in S2-132050 |
S2‑131634 | Integrating HS2.0 policies with ANDSF | Ericsson, ST-Ericsson, Qualcomm Incorporated, Research In Motion UK Ltd | Revised in parallel session in S2-132024 |
S2‑131635 | [Draft] LS to Wi-Fi Alliance on HS2.0 updates | Ericsson, ST-Ericsson | Revised in parallel session in S2-132022 |
S2‑131636 | WLAN selection based on separate selection policy sub-tree | Ericsson, ST-Ericsson, Qualcomm Incorporated, Research In Motion UK Ltd | Merged into S2-132027 |
S2‑131637 | How to handle uplink packet for congestion notification | Samsung | Revised in S2-132170 |
S2‑131638 | How to handle roaming and RAN sharing cases for congestion notification | Samsung | Not Handled |
S2‑131639 | - | Samsung | WITHDRAWN |
S2‑131640 | - | Samsung | WITHDRAWN |
S2‑131641 | - | Samsung | WITHDRAWN |
S2‑131642 | SIPTO@LN and PDN connection release | Samsung | WITHDRAWN |
S2‑131643 | Two discovery model | Samsung | Revised in S2-132165 |
S2‑131644 | Enhancement of Service Data Flow filters | Telecom Italia | Not Handled |
S2‑131645 | Enhancement of the FPI solution description | Telecom Italia, Motorola Mobility | Revised in S2-132141 |
S2‑131646 | CN-based Solution for RAN USER Plan Congestion awareness and notification | Sprint | Revised in S2-132171 |
S2‑131647 | Update to Evaluations of some solutions | CATT | Merged into S2-132118 |
S2‑131648 | MTC-IWF selection for Uplink small data | CATT | Not Handled |
S2‑131649 | Update to solution Downlink small data transfer using RRC message | CATT | Noted |
S2‑131650 | Addition of routed mode RG case | CATT | Not Handled |
S2‑131651 | Scenarios of E-UTRAN ProSe Communication with a Relay | CATT | Revised in S2-132113 |
S2‑131652 | Issue of direct communication path release | CATT | Not Handled |
S2‑131653 | Solution of ProSe service architecture | CATT | Noted |
S2‑131654 | Retrieval of ProSe ID | CATT | Not Handled |
S2‑131655 | update key issue of ProSe group communication | CATT | Not Handled |
S2‑131656 | Connection Capability information for network selection | CATT | Revised in parallel session in S2-132019 |
S2‑131657 | WLAN network selection without available ANDSF policies | CATT | Noted |
S2‑131658 | Addition of new alternative to solution 6 and solution 7 | CATT | Revised in parallel session in S2-132020 |
S2‑131659 | Clarification of solution 3 | CATT | Noted |
S2‑131660 | LS from GERAN WG2: Response LS on Enabling HO restrictions to E-UTRAN for rSRVCC | GERAN WG2 (GP-130503) | Noted |
S2‑131661 | LS from TSG GERAN: Reply LS on requesting input on MTCe solutions | TSG GERAN (GP-130535) | Postponed to meeting #98 |
S2‑131662 | LS from GERAN WG2: Reply LS on NAS reject messages in MOCN | GERAN WG2 (GP-130537) | Noted |
S2‑131663 | LS from GERAN WG2: Response LS on Provisioning of E-UTRA Radio Capabilities in GERAN | GERAN WG2 (GP-130562) | Postponed to meeting #98 |
S2‑131664 | 23.401 CR2519R1: Immediate Cancel Location ACK during HSS-initiated detach procedure | Nokia Siemens Networks, Nokia, Huawei, Alcatel-Lucent, Ericsson, ST Ericsson | Revised in parallel session in S2-132063 |
S2‑131665 | 23.401 CR2520R1: Immediate Cancel Location ACK during HSS-initiated detach procedure | Nokia Siemens Networks, Nokia, Huawei, Alcatel-Lucent, Ericsson, ST Ericsson | Revised in parallel session in S2-132064 |
S2‑131666 | 23.060 CR1763R1: Immediate Cancel Location ACK during HSS-initiated detach procedure | Nokia Siemens Networks, Nokia, Huawei, Alcatel-Lucent, Ericsson, ST Ericsson | Revised in parallel session in S2-132065 |
S2‑131667 | 23.060 CR1764R1: Immediate Cancel Location ACK during HSS-initiated detach procedure | Nokia Siemens Networks, Nokia, Huawei, Alcatel-Lucent, Ericsson, ST Ericsson | Revised in parallel session in S2-132066 |
S2‑131668 | 23.203 CR0812: Remove the editor's note of VPLMN-Id provisioning | ZTE, Ericsson | Approved |
S2‑131669 | 23.203 CR0813: Remove the editor's note of VPLMN-Id provisioning | ZTE, Ericsson | Approved |
S2‑131670 | Policy Control for RAN user plane congestion notification | NTT DOCOMO, Intel | Not Handled |
S2‑131671 | C-Plane/PCC based Signalling for RAN User Plane Congestion Notification | NTT DOCOMO, Sprint | Merged into S2-132158 |
S2‑131672 | S1 connection release when rejecting the UE | Huawei, Hisilicon | Noted |
S2‑131673 | 23.272 CR0867R1: SS service ID used in the Paging message | Huawei, Hisilicon | Revised in parallel session in S2-132067 |
S2‑131674 | 23.272 CR0874: How CSFB UE return back to the former LTE PLMN | Huawei, Hisilicon, Yota, Alcatel-Lucent | Revised in parallel session in S2-132069 |
S2‑131675 | Discussion of handling of CS services during IMS Call | Huawei, Hisilicon | Noted |
S2‑131676 | 23.272 CR0875: Clarification for MME selection during NW-initiated CS Service procedure while UE is in IMS VoIP session | Huawei, Hisilicon, NTT DoCoMo | Revised in parallel session in S2-132073 |
S2‑131677 | 23.401 CR2525R2: Unidirectional TAD | Huawei, Hisilicon, Intel | Revised in parallel session in S2-132052 |
S2‑131678 | 23.401 CR2526R2: Unidirectional TAD | Huawei, Hisilicon, Intel | Revised in parallel session in S2-132053 |
S2‑131679 | 23.401 CR2527R2: Unidirectional TAD | Huawei, Hisilicon, Intel | Revised in parallel session in S2-132054 |
S2‑131680 | 23.203 CR0814: PCC support for unidirectional TAD | Huawei, Hisilicon, Intel | Noted |
S2‑131681 | 23.203 CR0815: PCC support for unidirectional TAD | Huawei, Hisilicon, Intel | Noted |
S2‑131682 | 23.203 CR0816: PCC support for unidirectional TAD | Huawei, Hisilicon, Intel | Noted |
S2‑131683 | Evaluation of small data solutions | Huawei, Hisilicon | Revised in parallel session in S2-132114 |
S2‑131684 | Capability handling for T5 small data service | Huawei, Hisilicon | Not Handled |
S2‑131685 | Update and Evaluation of Power Saving State Approach | Huawei, Hisilicon | Revised in S2-132135 |
S2‑131686 | Evaluation of long DRX | Huawei, Hisilicon | Revised in S2-132131 |
S2‑131687 | Prioritization scheme considerations for the FPI marking solution | Huawei, Hisilicon | Not Handled |
S2‑131688 | FPI marking solution for uplink prioritization | Huawei, Hisilicon | Not Handled |
S2‑131689 | PCC-based Solution for traffic optimization | Huawei, Hisilicon | Not Handled |
S2‑131690 | ANDSF MO enhancement with HS2.0 MO and New Policies | Huawei, AT&T, Intel | Revised in parallel session in S2-132021 |
S2‑131691 | Solution 4 clarification on Preferred Service Provider List | Huawei, Hisilicon | Noted |
S2‑131692 | Support load threshold in solution 4 | Huawei, Hisilicon | Noted |
S2‑131693 | Avoid ping-pong and frequent unnecessary selection for load | Huawei, Hisilicon | Revised in parallel session in S2-132058 |
S2‑131694 | Support single solution approach | Huawei, Hisilicon, ZTE, China Telecom, CATT, HTC, Renesas Mobile Europe, LGE | Noted |
S2‑131695 | Solution for EPC-level ProSe Discovery | Intel, III, Sony | Revised in S2-132145 |
S2‑131696 | Solution for EPC Support for WLAN direct communication | Intel, III, Sony | Not Handled |
S2‑131697 | Two solutions for ProSe one-to-many communications | Intel | Revised in S2-131996 |
S2‑131698 | Two solutions for ProSe service continuity | Intel, III, Sony | Not Handled |
S2‑131699 | Update to definitions based on SA WG1 agreements | Intel | Not Handled |
S2‑131700 | Clean-up of Targeted ProSe Discovery based on SA WG1 agreements | Intel | Revised in S2-132161 |
S2‑131701 | GCSE solution based on IMS and eMBMS | Intel | Merged into S2-132219 |
S2‑131702 | Evaluation of GTP-C overload prevention and control | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Cisco | Revised in S2-132124 |
S2‑131703 | Conclusion for GTP-C overload prevention and control | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT &T | Revised in S2-132127 |
S2‑131704 | [DRAFT] LS on GTP-C Load/Overload Control | Alcatel-Lucent | Revised in parallel session in S2-132197 |
S2‑131705 | Revised WID for Web Real Time Communication (WebRTC) Access to IMS | Alcatel-Lucent, AT&T, Broadcom Corporation, China Mobile, China Telecom, Deutsche Telekom, Ericsson, Huawei, Intel , Orange, Qualcomm, Telecom Italia, Verizon | Revised in parallel session in S2-131976 |
S2‑131706 | Squeletton and Scope for IMS_WebRTC TR | Alcatel-Lucent | Revised in parallel session in S2-131977 |
S2‑131707 | 23.228 CR1034: Adding support for IP-PBX in static Mode | Alcatel-Lucent | Noted |
S2‑131708 | 23.228 CR1035: References to ETSI standards | Alcatel-Lucent | Merged into S2-131974 |
S2‑131709 | Network determined end of transmission by monitoring UE activity | Nokia Siemens Networks | Merged into S2-132137 |
S2‑131710 | Analysis of the Small Data Fast Path solution | Nokia Siemens Networks | Merged into S2-132117 |
S2‑131711 | Analysis of the Connectionless Data Transmission, Stateless GW and Optimized SR solutions | Nokia Siemens Networks | Merged into S2-132118 |
S2‑131712 | LS from Broadband Forum: LS on Verification of assumptions for supporting Fixed Access as Trusted Network in interworking scenario (S2-130680 sections 5 & 6) | Broadband Forum (bbf2013.441.00) | Noted |
S2‑131713 | LS from oneM2M: LS on interaction of oneM2M with Underlying Networks | oneM2M (oneM2M-TP-2013-0251R01) | Response in S2-132326 |
S2‑131714 | LS from SA WG1: Reply LS on LS on Notifications on Firewall Traversal from LS Reply SA WG2 S2-130722 and CT WG1 C1-130773 | SA WG1 (S1-133279) | Noted |
S2‑131715 | 23.203 CR0817: Retrieval of access network information at the SDP offer | Ericsson, ST-Ericsson | Merged into S2-132032 |
S2‑131716 | Direct discovery | Alcatel-Lucent; Alcatel-Lucent Shanghai Bell | Revised in S2-132162 |
S2‑131717 | Direct Communications Point to point | Alcatel-Lucent; Alcatel-Lucent Shanghai Bell | Revised in S2-132217 |
S2‑131718 | Group communications solution | Alcatel-Lucent; Alcatel-Lucent Shanghai Bell | Revised in S2-132220 |
S2‑131719 | Solution alternative enhancing existing QoS bearer concept | Nokia Siemens Networks | Revised in S2-132100 |
S2‑131720 | Relationship between QCI and FPI and usage of FPI | Nokia Siemens Networks | Not Handled |
S2‑131721 | Adding DSCP Option for FPI Marking | Nokia Siemens Networks | Not Handled |
S2‑131722 | RAN Congestion Awareness Information | Nokia Siemens Networks | Merged into S2-132140 |
S2‑131723 | 23.228 CR1036: Support of ENUM query in TAS for Number portability | Nokia Siemens Networks | Noted |
S2‑131724 | 23.228 CR1037: Introduction of Network Provided Location Reporting for SIP Messaging | Nokia Siemens Networks | Noted |
S2‑131725 | 23.203 CR0818: Onetime reporting of the present Access Network Information | Nokia Siemens Networks | Merged into S2-132032 |
S2‑131726 | 23.203 CR0819: Onetime reporting of the present Access Network Information | Nokia Siemens Networks | Revised in parallel session in S2-132033 |
S2‑131727 | Connectionless solution adaptations for UTRAN (resubmission of S2-130792) | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in parallel session in S2-132198 |
S2‑131728 | Evaluation considerations for small data solutions | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not Handled |
S2‑131729 | Further details for Stateless Gateway solution (resubmission of S2-130785) | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not Handled |
S2‑131730 | Updates for Small Data Solutions (resubmission of S2-130078/SA WG2#95 and S2-130786/SA WG2#96) | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Merged into S2-132117 |
S2‑131731 | Considerations for power saving state | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not Handled |
S2‑131732 | Procedure for Extended Long DRX Determining | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not Handled |
S2‑131733 | [DRAFT] Reply LS on interaction of oneM2M with Underlying Networks | NEC | Merged into S2-132002 |
S2‑131734 | Evaluation of efficient SD transmission solutions | NEC | Revised in S2-132105 |
S2‑131735 | Updates to Small Data connection release in clause 5.1.1.3.1 (solution 1). | NEC | Merged into S2-131997 |
S2‑131736 | FFS statement resolution in 'Keep UEs in detached state when not communicating' solution. | NEC | Merged into S2-132137 |
S2‑131737 | GTP-C load balancing Mechanism | Cisco, Verizon Wireless, AT&T, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Merged into S2-132125 |
S2‑131738 | GTP-C Overload Control Mechanism | Cisco, Verizon Wireless, AT&T, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in S2-132126 |
S2‑131739 | Extension of the SCI to all 3GPP RATs | Cygnus Broadband, China Mobile, Intel Corporation | Noted |
S2‑131740 | Discussion paper on handling of video traffic | Cygnus Broadband | Not Handled |
S2‑131741 | 23.272 CR0868R1: Enabling terminating CS services for EPS/IMSI attached UE selecting a non-3GPP access | Alcatel-Lucent | Revised in parallel session in S2-132076 |
S2‑131742 | CN signalling for allowing UE return to former LTE PLMN after CSFB | Alcatel-Lucent | WITHDRAWN |
S2‑131743 | 23.272 CR0877: CN signalling for allowing UE return to former LTE PLMN after CSFB | Alcatel-Lucent | Revised in parallel session in S2-132070 |
S2‑131744 | 23.272 CR0852R2: CSFB priority call handling in an eMLPP network | Alcatel-Lucent | Revised in parallel session in S2-132077 |
S2‑131745 | 23.272 CR0853R2: Clarification of procedure of Leaving EUTRAN for CSFB for Dual Rx 1xRTT/EUTRAN UE's | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
S2‑131746 | 23.401 CR2556: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Revised in parallel session in S2-132071 |
S2‑131747 | 23.401 CR2557: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Revised in parallel session in S2-132188 |
S2‑131748 | 23.060 CR1792: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Revised in parallel session in S2-132072 |
S2‑131749 | 23.060 CR1793: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Revised in parallel session in S2-132189 |
S2‑131750 | ANDSF rules: WLAN Selection for camping vs Traffic Steering | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Merged into S2-132027 |
S2‑131751 | WLAN selection for simultaneous VoIMS and home routed services | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in parallel session in S2-132026 |
S2‑131752 | Clarification on VLAN user plane option in solution #1 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Approved |
S2‑131753 | 23.272 CR0878: MSC/VLR selection for MTC devices | Nokia Siemens Networks, Nokia | Approved |
S2‑131754 | 23.272 CR0879: MSC/VLR selection for MTC devices | Nokia Siemens Networks | Revised in parallel session in S2-132078 |
S2‑131755 | 23.203 CR0820: Correction of a single logical DRA entity | China Telecom, China Unicom, China Mobile | Not Handled |
S2‑131756 | 23.203 CR0821: Correction to PCC control at local breakout | China Telecom | Not Handled |
S2‑131757 | Eliminate keep-alive package by network-based always-on solution | China Mobile, CATT, China Telecom, ZTE, Huawei, Nokia, CATR | Revised in S2-132148 |
S2‑131758 | SCI Extension for RAN User Plan congestion mitigation | China Mobile, Cygnus Broadband, Intel | Not Handled |
S2‑131759 | Clarification of GTP-u based RAN Congestion Awareness Solution | China Mobile, NEC, AT&T | Merged into S2-132140 |
S2‑131760 | ProSe Group Formation | Motorola Mobility | Merged into S2-131994 |
S2‑131761 | Solution 3: Structure of ISRP Rule for WLAN Selection | Motorola Mobility | Merged into S2-132027 |
S2‑131762 | Solution 3: Need for the Preferred Service Provider List | Motorola Mobility | Merged into S2-132027 |
S2‑131763 | Update of Solution 3 | Motorola Mobility | Merged into S2-132027 |
S2‑131764 | Support for two types of Rel-12 SaMOG UEs | Motorola Mobility, Cisco, Orange, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, Juniper Networks | Noted |
S2‑131765 | Video Delivery with UE-based Congestion Handling | Motorola Mobility | Not Handled |
S2‑131766 | LS from RAN WG2: LS on Access control for UEs in RRC CONNECTED mode | RAN WG2 (R2-124296) | Response in S2-132295 |
S2‑131767 | Handling IMS congestion from UEs in Connected Mode (LS from RAN WG2) | NTT DOCOMO | Noted |
S2‑131768 | [Draft] Reply LS on Access control for UEs in RRC CONNECTED mode | NTT DOCOMO | Merged into S2-132156 |
S2‑131769 | 23.401 CR2558: Addition of End Marker Support for Handover Scenarios with SGW Relocation | NTT DOCOMO | Revised in parallel session in S2-132079 |
S2‑131770 | 23.401 CR2559: Addition of End Marker Support for Handover Scenarios with SGW Relocation | NTT DOCOMO | Revised in S2-132246 |
S2‑131771 | 23.402 CR1159: Addition of End Marker Support for Handover Scenarios with SGW Relocation | NTT DOCOMO | Revised in parallel session in S2-132080 |
S2‑131772 | 23.402 CR1160: Addition of End Marker Support for Handover Scenarios with SGW Relocation | NTT DOCOMO | Revised in S2-132247 |
S2‑131773 | Additional Aspects for Fast Path Solution | ZTE | Merged into S2-132018 |
S2‑131774 | Clarification on Generating Default DRB for Fast Path Solution | ZTE | Merged into S2-132018 |
S2‑131775 | Overload Control for T4 | ZTE | Not Handled |
S2‑131776 | Consideration of Communication Patterns for UEPCOP Solution Evaluation | ZTE | Revised in S2-132134 |
S2‑131777 | - | ZTE | WITHDRAWN |
S2‑131778 | Key issue on geographical scope of GCSE Group | Nokia Siemens Networks | Revised in S2-132151 |
S2‑131779 | Key issue on adding/removing media | Nokia Siemens Networks | Revised in S2-132152 |
S2‑131780 | Terminology to allow better coherent discussion on GCSE | Nokia Siemens Networks | Revised in S2-132128 |
S2‑131781 | A new solution proposal for GCSE | Nokia Siemens Networks | Revised in S2-132155 |
S2‑131782 | GCSE and geographical scope handling | Nokia Siemens Networks | Not Handled |
S2‑131783 | MuSe and mobility handling | Nokia Siemens Networks | Not Handled |
S2‑131784 | GTP-C principles for S-GW/P-GW overload control | Nokia Siemens Networks | Noted |
S2‑131785 | Network Assisted ProSe discovery and ProSe communication | HTC | Not Handled |
S2‑131786 | Overload handing by UE reachability interrogation from SCS | HTC | Noted |
S2‑131787 | Resolve FFS for Attach/Detach solution | HTC | Merged into S2-132137 |
S2‑131788 | 23.401 CR2560: Handling mobile reachable timer for back-off UE with emergency PDN connection | HTC | Noted |
S2‑131789 | 23.060 CR1794: Handling mobile reachable timer for back-off UE with emergency PDN connection | HTC | Noted |
S2‑131790 | 23.204 CR0100: Adding the interface between IP-SM-GW and MME | HTC | Revised in parallel session in S2-132089 |
S2‑131791 | Way forward on the discussion to start to normative work in P4C-F | Ericsson, ST-Ericsson, Telecom Italia, Orange, Nokia Siemens Networks, ZTE | Not Handled |
S2‑131792 | M2M Messaging over 3GPP access with minimum resource usage | Ericsson, ST-Ericsson | Noted |
S2‑131793 | Addressing concerns with UP optimizations for small data | Ericsson, ST-Ericsson | Revised in S2-132147 |
S2‑131794 | Evaluation of SDDTE transmission efficiency | Ericsson, ST-Ericsson | Not Handled |
S2‑131795 | 23.221 CR0148R5: Enabling CS services when UE gets IMSI detached | Ericsson, ST-Ericsson, Qualcomm, Alcatel Lucent, Huawei, HiSilicon, Nokia, Nokia Siemens Networks, Samsung | Revised in parallel session in S2-132075 |
S2‑131796 | Solution applicability | Ericsson, ST-Ericsson | Noted |
S2‑131797 | Resolution to open issues with T5 Messaging Service | Ericsson, ST-Ericsson | Not Handled |
S2‑131798 | Evaluation criteria | Ericsson, ST-Ericsson | Not Handled |
S2‑131799 | Responses to questions and comments to contribution for network-based congestion awareness design | KDDI, China Telecom, ZTE, Broadcom Corporation, Intel, China Unicom, Allot Communications, Sandvine, Tekelec, Comverse | Revised in S2-132132 |
S2‑131800 | Configuration of ProSe feature support of network in UE | LG Electronics | Not Handled |
S2‑131801 | Solution for EPC-level ProSe Discovery | LG Electronics | Noted |
S2‑131802 | Solution for EPC-level ProSe Discovery with time window | LG Electronics | Not Handled |
S2‑131803 | Solution for EPC-level ProSe Discovery within the different PLMNs | LG Electronics | Not Handled |
S2‑131804 | - | Orange | WITHDRAWN |
S2‑131805 | - | Orange | WITHDRAWN |
S2‑131806 | Solution for ProSe Open Discovery | ETRI | Not Handled |
S2‑131807 | [DRAFT] Reply LS on Application Based Charging | Allot Communications | Revised in S2-132221 |
S2‑131808 | 23.002 CR0264R1: Introduction of Gyn/Gzn interfaces to the specification | Allot Communications | Revised in parallel session in S2-132037 |
S2‑131809 | Solution for ProSe Discovery | ZTE | Revised in S2-132168 |
S2‑131810 | Analysis of the SaMOG phase-2 solutions from the perspective of implementation and flexibility | ZTE, Broadcom Corporation | Noted |
S2‑131811 | Proposed partial conclusions on SaMOG Phase-2 Solution Alternatives | ZTE | Revised in parallel session in S2-132043 |
S2‑131812 | AAA-Based charging corrections and clean up in TR 23.896 | Orange | Merged into S2-132034 |
S2‑131813 | [DRAFT] Reply LS on interaction of oneM2M with Underlying Networks | Qualcomm Incorporated | Merged into S2-132002 |
S2‑131814 | ProSe direct communication modes | Qualcomm Incorporated, U.S. Department of Commerce | Revised in S2-132111 |
S2‑131815 | Autonomous direct communication | Qualcomm Incorporated, U.S. Department of Commerce | Revised in S2-132215 |
S2‑131816 | Network-authorised direct communication | Qualcomm Incorporated, U.S. Department of Commerce | Revised in S2-132216 |
S2‑131817 | Discovery Procedures | Qualcomm Incorporated, U.S. Department of Commerce | Merged into S2-132103 |
S2‑131818 | Assignment of expressions | Qualcomm Incorporated, U.S. Department of Commerce, Motorola Mobility | Not Handled |
S2‑131819 | Discovery identifiers | Qualcomm Incorporated, U.S. Department of Commerce | Noted |
S2‑131820 | Direct communication one-to-many | Qualcomm Incorporated, U.S. Department of Commerce | Not Handled |
S2‑131821 | Charging issue in proactive congestion mitigation | Samsung | Not Handled |
S2‑131822 | UE power consumption gain in the idle mode extended DRX | Samsung | Noted |
S2‑131823 | Updating the WLAN selection solution | Samsung | Noted |
S2‑131824 | - | Samsung | WITHDRAWN |
S2‑131825 | Key Issue on UE-to-Network Relay | Intel | Merged into S2-131995 |
S2‑131826 | 23.060 CR1784R1: Incomplete specification text on link MTU size for IPv6 | Intel, Juniper Networks, Ericsson, ST-Ericsson, Nokia Siemens Networks | Revised in parallel session in S2-132094 |
S2‑131827 | [Draft] LS response on S1 connection release when rejecting the UE | Huawei, Hisilicon | Revised in parallel session in S2-132175 |
S2‑131828 | Prose Service architecture and registration | Huawei, Hisilicon | Revised in S2-132159 |
S2‑131829 | EPC level ProSe Discovery | Huawei, Hisilicon | Noted |
S2‑131830 | Solution: ProSe Direct Discovery | Huawei, Hisilicon | Revised in S2-132167 |
S2‑131831 | TR23.843 chapter revision | Huawei, Hisilicon | Approved |
S2‑131832 | GTP-C signalling Overload further consideration | Huawei, Hisilicon | Noted |
S2‑131833 | Discussion on P-CSCF overload and Emergency/High Priority calls | Samsung | Noted |
S2‑131834 | [DRAFT] Reply LS on Access control for UEs in RRC CONNECTED mode | Samsung | Merged into S2-132156 |
S2‑131835 | Split GCSE Application Server Architecture | ZTE, CATR | Noted |
S2‑131836 | 23.228 CR1031R4: Adding support for IP-PBX in static Mode | Ericsson, ST-Ericsson | Merged into S2-131974 |
S2‑131837 | SRVCC for conference call without I2 | Ericsson, ST-Ericsson | Noted |
S2‑131838 | 23.237 CR0462: Clarification regarding conference call participants leaving the conference | Ericsson, ST-Ericsson | Revised in parallel session in S2-131979 |
S2‑131839 | 23.237 CR0463: Clarification regarding conference call participants leaving the conference | Ericsson, ST-Ericsson | Revised in parallel session in S2-131980 |
S2‑131840 | 23.292 CR0199: Clarification regarding conference call participants leaving the conference | Ericsson, ST-Ericsson | Approved |
S2‑131841 | 23.292 CR0200: Clarification regarding conference call participants leaving the conference | Ericsson, ST-Ericsson | Approved |
S2‑131842 | Configuration when TDF performs enforcement and charging | Allot Communications | Revised in parallel session in S2-132046 |
S2‑131843 | Solution 4 update for separate WLAN Selection Policy | Ericsson, ST-Ericsson, Research In Motion UK Ltd | Merged into S2-132028 |
S2‑131844 | Prose Communication out of network coverage | General Dynamics Broadband UK | Not Handled |
S2‑131845 | Key Issue for GCSE_LTE Architecture | General Dynamics Broadband UK | Noted |
S2‑131846 | Key Issue for GCSE_LTE Service Continuity, Roaming and Interworking | General Dynamics Broadband UK | Revised in S2-132153 |
S2‑131847 | Key Issue for GCSE_LTE Interaction with Proximity Services | General Dynamics Broadband UK | Merged into S2-131995 |
S2‑131848 | 23.401 CR2561: Correction on the applicability of SIPTO@LN at a CSG cell | Research In Motion UK Limited, Alcatel-Lucent, Intel | Approved |
S2‑131849 | 23.060 CR1795: Correction on the applicability of SIPTO@LN at a CSG cell | Research In Motion UK Limited, Alcatel-Lucent, Intel | Approved |
S2‑131850 | ProSe IMS Architecture | NEC | Revised in S2-132160 |
S2‑131851 | GCSE Architecture based on IMS | NEC, Deutsche Telekom | Merged into S2-132219 |
S2‑131852 | Clarification of WLCP functionality | Qualcomm Incorporated, Ericsson, ST-Ericsson, Alcatel Lucent, Alcatel Lucent Shanghai Bell | Revised in parallel session in S2-132042 |
S2‑131853 | Comparison of SaMOG control plane solutions | Qualcomm Incorporated, Ericsson, ST-Ericsson, Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted |
S2‑131854 | SaMOG WLCP Protocol Overview | Qualcomm Incorporated, Ericsson, ST-Ericsson, Alcatel Lucent, Alcatel Lucent Shanghai Bell | Not Handled |
S2‑131855 | Clarifying work split for public safety communications between GCSE_LTE and ProSe | Intel | Noted |
S2‑131856 | Analysis of the TAU delay issue | NTT DOCOMO | Noted |
S2‑131857 | [DRAFT] LS reply on S1 connection release when rejecting the UE | NTT DOCOMO | Noted |
S2‑131858 | 23.401 CR2562: Use of Low Access Priority Indication to select MME | NTT DOCOMO | Revised in parallel session in S2-132086 |
S2‑131859 | 23.236 CR0050: Use of Low Access Priority Indication (LAPI) to select SGSN for PS domain | NTT DOCOMO | Revised in parallel session in S2-132087 |
S2‑131860 | Some key issues for evaluating SDDTE solutions | NTT DOCOMO | Noted |
S2‑131861 | Solution for Key Issue #7 | Intel, AT&T, Huawei, Broadcom | Noted |
S2‑131862 | Cover Sheet for TR 23.865 for information at TSG SA | Intel | Revised in parallel session in S2-132203 |
S2‑131863 | Interim Conclusions | Intel | Revised in parallel session in S2-132029 |
S2‑131864 | Subscriber ID' terminology alignment | CATT | Not Handled |
S2‑131865 | Updates to CN assisted eNB parameter tuning solution | China Unicom | Not Handled |
S2‑131866 | Updates to factors for determining extended DRX | China Unicom | Not Handled |
S2‑131867 | Solution for EPC-level ProSe Discovery with dynamic discoverability settings and permissions | LG Electronics | Not Handled |
S2‑131868 | Solution for ProSe Direct Communication one-to-one with a network initiation | LG Electronics | Not Handled |
S2‑131869 | Solution on Path switching under control of the ProSe server | LG Electronics | Not Handled |
S2‑131870 | Solution Improvement on downlink small data transfer using RRC message | LG Electronics | Noted |
S2‑131871 | UPCON solution based on Local-Use DSCP | Juniper Networks | Not Handled |
S2‑131872 | Mapping between AS Group ID(s) and TMGI(s) | Qualcomm Incorporated | Not Handled |
S2‑131873 | Clarifications on pre-established eMBMS bearers for GCSE | Qualcomm Incorporated | Not Handled |
S2‑131874 | Decision for using PTP or PTM | Qualcomm Incorporated | Revised in S2-132129 |
S2‑131875 | Clarifications on interface between the BMSC and the GCSE AS | Qualcomm Incorporated | Not Handled |
S2‑131876 | Consideration on traffic scenarios for overall evaluation of small data transmission solutions | Intel | Revised in S2-132102 |
S2‑131877 | Cover Sheet for TR 23.887 for information at TSG SA | Intel, Ericsson, KPN | Revised in S2-132319 |
S2‑131878 | Evaluation criterion for efficient small data transmission | Intel | Not Handled |
S2‑131879 | 23.401 CR2563: Consistent description of allowed TFT configurations | Intel | Noted |
S2‑131880 | 23.401 CR2564: Consistent description of allowed TFT configurations | Intel | Noted |
S2‑131881 | 23.401 CR2565: Consistent description of allowed TFT configurations | Intel | Noted |
S2‑131882 | 23.060 CR1768R1: Consistent description of allowed packet filter configurations | Intel, Huawei, Hisilicon | Revised in parallel session in S2-132057 |
S2‑131883 | 23.060 CR1767R1: Consistent description of allowed packet filter configurations | Intel, Huawei, Hisilicon | Revised in parallel session in S2-132056 |
S2‑131884 | 23.060 CR1766R1: Consistent description of allowed packet filter configurations | Intel, Huawei, Hisilicon | Revised in parallel session in S2-132055 |
S2‑131885 | 23.060 CR1796: Fallback to IPv4 when IPv6 is not supported or preferred | China Mobile | Revised in parallel session in S2-132249 |
S2‑131886 | Solving ANDSF Rule Conflicts through Utility Maximization | Broadcom Corporation | Not Handled |
S2‑131887 | Interaction between ANQP/GAS parameters and WLAN_NS | Broadcom Corporation | Not Handled |
S2‑131888 | ProSe EPC Based Discovery Architecture and Procedures | Broadcom Corporation | Not Handled |
S2‑131889 | Architecture Consideration for Service Continuity for ProSe-enabled UEs | Broadcom Corporation | Not Handled |
S2‑131890 | Architecture Consideration on GCSE in multiple PLMN Scenario | Broadcom Corporation | Not Handled |
S2‑131891 | GCSE architectural proposal based on IMS | Broadcom Corporation | Merged into S2-132219 |
S2‑131892 | Cover sheet to present TR 23.839 for approval at the SA plenary | P4C-TI Rapporteur (Alcatel-Lucent) | Revised in parallel session in S2-132031 |
S2‑131893 | UPCON-RAN Congestion Aware Scheduling of Content (key issue + solution) | Alcatel-Lucent. Alcatel-Lucent Shanghai Bell, AT&T | Noted |
S2‑131894 | IP Edge Event-Triggers over Gxd | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in parallel session in S2-132045 |
S2‑131895 | BBF credit re-authorization triggers | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in parallel session in S2-132047 |
S2‑131896 | 23.272 CR0847R2: Clarification on 'SMS in MME' | LG Electronics | Revised in parallel session in S2-132095 |
S2‑131897 | [Draft] Reply LS on End-to-end QoS handling of MTSI | Nokia Siemens Networks | Revised in S2-132016 |
S2‑131898 | ProSe in MOCN networks | ITRI | Not Handled |
S2‑131899 | [DRAFT] LS to RAN WG3: Use of Low Access Priority Indication to select MME/SGSN | NTT DOCOMO | Revised in parallel session in S2-132088 |
S2‑131900 | Optimisation of CN assisted eNB parameter tuning for small data transfer solution | InterDigital Communications | Noted |
S2‑131901 | Key issue on ProSe local path communication | InterDigital Communications | Revised in S2-132112 |
S2‑131902 | Analysis of ProSe and GCSE-LTE service level requirements and evaluation of commonalities and assumptions for ProSe stage 2 | InterDigital Communications | Revised in S2-132142 |
S2‑131903 | Analysis of ProSe and GCSE-LTE service level requirements and evaluation of commonalities and assumptions for GCSE_LTE stage 2 | InterDigital Communications | Not Handled |
S2‑131904 | 23.401 CR2546R3: Correction to PDN Deactivation for SIPTO@LN | Nokia Siemens Networks, Intel, Cisco, Ericsson, ST-Ericsson, Research In Motion UK Limited, Alcatel-Lucent | Revised in parallel session in S2-132174 |
S2‑131905 | Enhancements of Solution 4 description | Nokia Siemens Networks, Nokia, Huawei | Merged into S2-132028 |
S2‑131906 | Solution to utilize both ANDSF and HS2.0 network selection logic | Nokia Siemens Networks, Nokia, | Revised in parallel session in S2-132023 |
S2‑131907 | Unattended traffic limitation in the UE | Qualcomm Incorporated | Revised in S2-132099 |
S2‑131908 | Uplink scheduling prioritization solution | Qualcomm Incorporated | Not Handled |
S2‑131909 | - | Qualcomm Incorporated | WITHDRAWN |
S2‑131910 | Solution to the Key Issue of Video Delivery: Dynamic Adaptive Streaming over HTTP | Qualcomm Incorporated | Not Handled |
S2‑131911 | Comparison of UE power consumption reduction for MTC devices with infrequent mission | Qualcomm Incorporated | Noted |
S2‑131912 | Extended DRX: Selection between idle and connected DRX. | Qualcomm Incorporated | Not Handled |
S2‑131913 | NAS retransmission timers for long DRX cycle | Qualcomm Incorporated | Not Handled |
S2‑131914 | On moving PDN connections to a non-3GPP access (e.g. WLAN) and retaining voice/SMS services | Qualcomm Incorporated | Noted |
S2‑131915 | 23.401 CR2566: Use of MM backoff timer for voice centric devices | Qualcomm Incorporated, Nokia Siemens Networks | Revised in parallel session in S2-132096 |
S2‑131916 | 23.060 CR1797: Use of MM backoff timer for voice centric devices | Qualcomm Incorporated, Nokia Siemens Networks | Revised in S2-132251 |
S2‑131917 | [DRAFT] Reply LS on user experience impact on voice centric devices when PS back-off timer is received | Qualcomm Incorporated, Nokia Siemens Networks | Revised in S2-132320 |
S2‑131918 | ProSe Discovery Solution | Samsung | Merged into S2-132103 |
S2‑131919 | Solution for ProSe Service Continuity | Samsung | Not Handled |
S2‑131920 | Solution for ProSe Discovery Procedure considering User Privacy | Samsung | Not Handled |
S2‑131921 | Solution for Network-assisted ProSe Discovery | Samsung | Not Handled |
S2‑131922 | Solution for NAT-Traversal on Service Continuity aspect | Institute for Information Industry | Not Handled |
S2‑131923 | Solutions for EPC-level Open and for Restricted ProSe Discovery | ITRI | Not Handled |
S2‑131924 | Evaluation of long DRX cycles | ITRI | Noted |
S2‑131925 | 23.682 CR0069R2: Triggering indication added in the CDR | Huawei, Hisilicon, Ericsson, ST-Ericsson | Revised in parallel session in S2-132097 |
S2‑131926 | 23.216 CR0319: Clarification for MME selection of MSC Server during SRVCC procedure | Huawei, Hisilicon, NTT DoCoMo | Revised in parallel session in S2-132074 |
S2‑131927 | P4C_F: Proposal for new Annex in 23.203 for Convergence | Huawei, Hisilicon | Not Handled |
S2‑131928 | 23.203 CR0822: New Annex on support of convergent scenario clause Y.1, Y2 , Y.3 and Y.4 | Huawei, Hisilicon, AT&T | Not Handled |
S2‑131929 | Revision of AAA-based accounting definition | Huawei, Hisilicon | Merged into S2-132034 |
S2‑131930 | 23.139 CR0043: Conclusion on S2a for P4C_TI | Huawei, Hisilicon | Revised in parallel session in S2-132030 |
S2‑131931 | RAN User Plane congestion awareness by control plane signalling | Huawei, Hisilicon | Merged into S2-132158 |
S2‑131932 | Service Provider selection | Huawei, Hisilicon | WITHDRAWN |
S2‑131933 | Selection of Active ISMP/ISRP Rule | Huawei, Hisilicon | Noted |
S2‑131934 | Solution for identifiers used in ProSe direct discovery | Motorola Solutions | Not Handled |
S2‑131935 | Update of solution#1 to support Roaming Consortium OI | LG Electronics | Noted |
S2‑131936 | Update of key issue#4 on WLAN network reselection by using WLAN load Information | LG Electronics | Noted |
S2‑131937 | Solution for triggering service continuity in ProSe | LG Electronics | Not Handled |
S2‑131938 | Solution for deactivation of ProSe communication due to the revocation of ProSe Discovery permission | LG Electronics | Not Handled |
S2‑131939 | Solution for selecting WLAN Direct communication path | LG Electronics | Not Handled |
S2‑131940 | 23.402 CR1161: Clarification on configuration of Inter-APN routing capability | LG Electronics | Noted |
S2‑131941 | Policy-based Congestion Mitigation in the Core Network | NEC, Sprint?, China Unicom, NTT DOCOMO, Intel | Revised in S2-132157 |
S2‑131942 | Uplink Traffic Prioritization during RAN User Plane Congestion | NEC | Not Handled |
S2‑131943 | Congestion notification and mitigation handling in PGW/PCEF | NEC | Not Handled |
S2‑131944 | ProSe Discovery modes | NEC | Not Handled |
S2‑131945 | Update to key issue on Relays | NEC | Revised in S2-132143 |
S2‑131946 | TCP Optimization for Congestion Mitigation | China Mobile | Noted |
S2‑131947 | T5 message integrity protection clarification | NEC | Not Handled |
S2‑131948 | Relay communication for ProSe Service and Public Safety | Institute for Information Industry | Not Handled |
S2‑131949 | 23.228 CR1038: Alignment with stage 3 for the Geographical Identifier | Orange | Revised in parallel session in S2-132084 |
S2‑131950 | Evaluation of IMS_RegCon alternative solutions | Orange, NTT DOCOMO, Telecom Italia, KPN, KDDI, Alcatel-Lucent | Noted |
S2‑131951 | 23.228 CR1039: Location-based IMS registration control with minimal impacts | Orange, NTT DOCOMO, Telecom Italia, KPN, KDDI, Alcatel-Lucent | Noted |
S2‑131952 | 23.251 CR0093: Update to Annex B.2; alignment with stage 3 | TeliaSonera | Approved |
S2‑131953 | Update to Annex B.2; alignment with stage 3 | TeliaSonera | WITHDRAWN |
S2‑131954 | 23.272 CR0861R2: Call Independent supplementary services with CSFB | Nokia | Not Handled |
S2‑131955 | A new sub-alternative for Solution 3 | Nokia | Not Handled |
S2‑131956 | A solution for uplink traffic | Nokia | Not Handled |
S2‑131957 | Evaluation of efficient SDDTE solutions | KPN | Noted |
S2‑131958 | Re-transmission aspects when using long DRX cycle in idle mode | Ericsson, ST-Ericsson | Not Handled |
S2‑131959 | Proposed Handling of TEI12 in Release 12 | SA WG2 Chairman | Noted |
S2‑131960 | 23.228 CR1040: Alignment with stage 3 for the Geographical Identifier | Orange | Revised in parallel session in S2-132085 |
S2‑131961 | - | Alcatel-Lucent. Alcatel-Lucent Shanghai Bell | WITHDRAWN |
S2‑131962 | UPCON-RAN Congestion Aware Fairness & congestion awareness taking into account UE mobility | Alcatel-Lucent. Alcatel-Lucent Shanghai Bell | Not Handled |
S2‑131963 | Further considerations on Architectural Aspects of Group Call unicast/multicast bearer selection | Vodafone | Key Issue part revised to S2-132130. Solutions part revised in S2-132154 |
S2‑131964 | Initial thoughts on UE - 'Group Call Manager' signalling | Vodafone | Noted |
S2‑131965 | Variations on existing UPCON proposals | Vodafone | Not Handled |
S2‑131966 | Solution for ProSe Discovery DISC | Renesas Mobile Europe Ltd. | Noted |
S2‑131967 | Solution for ProSe Discovery P-CR | Renesas Mobile Europe Ltd. | Revised in S2-132166 |
S2‑131968 | ProSe System Architecture | Renesas Mobile Europe Ltd., InterDigital Communications | Revised in S2-132108 |
S2‑131969 | Autonomous ProSe direct communication using EUTRA one-to-one | Renesas Mobile Europe Ltd. | Merged into S2-132215 |
S2‑131970 | Network controlled ProSe direct communication using EUTRA one-to-one | Renesas Mobile Europe Ltd. | Not Handled |
S2‑131971 | Connection setup via ProSe UE-to-Network Relay | Renesas Mobile Europe Ltd. | Not Handled |
S2‑131972 | Connection setup via ProSe UE-to-UE Relay | Renesas Mobile Europe Ltd. | Not Handled |
S2‑131973 | Lawful Interception (LI) Requirement and LI Key issue for ProSe | TPS | Revised in S2-132110 |
S2‑131974 | 23.228 CR1031R5: Adding support for IP-PBX in static Mode | Ericsson, ST-Ericsson, KPN, Deutsche Telekom | Approved |
S2‑131975 | TR Cover sheet for sending TR 23.897 to SA for Approval | Rapporteur | Approved |
S2‑131976 | Revised WID for Web Real Time Communication (WebRTC) Access to IMS | Alcatel-Lucent, AT&T, Broadcom Corporation, China Mobile, China Telecom, Deutsche Telekom, Ericsson, Huawei, Intel , Nokia, Nokia Siemens Networks, NTT, NTT DoCoMo, Orange, Qualcomm, Telecom Italia, T-Mobil, Verizon | Revised in S2-132321 |
S2‑131977 | Squeletton and Scope for IMS_WebRTC TR | Alcatel-Lucent | Revised in S2-132322 |
S2‑131978 | [DRAFT] LS reply on NAT and GIBA | SA WG2 | Revised in S2-132323 |
S2‑131979 | 23.237 CR0462R1: Clarification regarding conference call participants leaving the conference | Ericsson, ST-Ericsson, Nokia Siemens Networks | Approved |
S2‑131980 | 23.237 CR0463R1: Clarification regarding conference call participants leaving the conference | Ericsson, ST-Ericsson, Nokia Siemens Networks | Approved |
S2‑131981 | Report of IMS related parallel sessions | Convenor (Qualcomm) | Noted |
S2‑131982 | - | - | WITHDRAWN |
S2‑131983 | - | - | WITHDRAWN |
S2‑131984 | - | - | WITHDRAWN |
S2‑131985 | - | - | WITHDRAWN |
S2‑131986 | - | - | WITHDRAWN |
S2‑131987 | - | - | WITHDRAWN |
S2‑131988 | - | - | WITHDRAWN |
S2‑131989 | - | - | WITHDRAWN |
S2‑131990 | - | - | WITHDRAWN |
S2‑131991 | - | - | WITHDRAWN |
S2‑131992 | - | - | WITHDRAWN |
S2‑131993 | - | - | WITHDRAWN |
S2‑131994 | Solution for ProSe one-to-many communications | Intel, Motorola Mobility | Revised in S2-132214 |
S2‑131995 | Key Issue on UE-to-Network Relay | Intel, General Dynamics Broadband UK | Revised in S2-132150 |
S2‑131996 | Solution for ProSe one-to-many communications | Intel | Not Handled |
S2‑131997 | Updates to Small Data connection release in clause 5.1.1.3.1 (solution 1). | NEC | Not Handled |
S2‑131998 | LS from GSMA and WBA: Wi-Fi Roaming Task Force - Trusted WiFi and IP address preservation | GSMA and WBA (LS1 22052013) | Noted |
S2‑131999 | LS from GSMA and WBA: Wi-Fi Roaming Task Force - Delivery of voice and real time services over Trusted Wi-Fi | GSMA and WBA (LS2 22052013) | Noted |
S2‑132000 | LS from Wi-Fi Roaming Task Force: Wi-Fi Roaming Task Force - Roaming impacts | Wi-Fi Roaming Task Force (LS3 22052013) | Noted |
S2‑132001 | LS from BBF: Response to 3GPP LS on Verification of assumptions for convergent scenario (bbf2013.084.00;S2-130725) | BBF (bbf2013.483.01) | Noted |
S2‑132002 | [DRAFT] Reply LS on interaction of oneM2M with Underlying Networks | NEC, Qualcomm Incorporated | Revised in S2-132101 |
S2‑132003 | WLAN Selection Based on Modified ANDSF Rules | Motorola Mobility | Merged into S2-132027 |
S2‑132004 | 23.221 CR0156: Switching the voice domain due to the access barred | NTT DOCOMO | Not Handled |
S2‑132005 | LS from CT WG4: LS on Use of ECN in the Context of MPS | CT WG4 (C4-131011) | Postponed to meeting #98 |
S2‑132006 | LS from CT WG1: LS on GERAN Iu mode | CT WG1 (C1-132352) | Postponed to meeting #98 |
S2‑132007 | LS from CT WG1: LS on UE Requirements for PSAP callback | CT WG1 (C1-132674) | Postponed to meeting #98 |
S2‑132008 | LS from CT WG1: Request for clarifications of stage 2 requirements for OPIIS | CT WG1 (C1-132644) | Postponed to meeting #98 |
S2‑132009 | LS from CT WG1: Reply LS on UE's inconsistent behaviour when PS Back-off timer is running | CT WG1 (C1-132609) | Postponed to meeting #98 |
S2‑132010 | LS from CT WG1: Reply LS on support for user location age or timestamp | CT WG1 (C1-132538) | Postponed to meeting #98 |
S2‑132011 | LS from CT WG1: reply to 'LS on End-to-end QoS handling of MTSI' | CT WG1 (C1-132536) | Postponed to meeting #98 |
S2‑132012 | LS from CT WG1: Reply LS to the LS on Optimization of the IMS Information and Security Parameters for CS to PS SRVCC from GERAN to E-UTRAN/HSPA | CT WG1 (C1-132535) | Postponed to meeting #98 |
S2‑132013 | LS from RAN WG2: Reply LS on evaluation of MTCe solutions | RAN WG2 (R2-132189) | Noted |
S2‑132014 | [DRAFT] Reply LS on Request for clarifications of stage 2 requirements for OPIIS | LG Electronics | Not Handled |
S2‑132015 | Draft Agenda for SA WG2#97 | SA WG2 Chairman | Approved |
S2‑132016 | [Draft] Reply LS on End-to-end QoS handling of MTSI | Nokia Siemens Networks | Revised in S2-132324 |
S2‑132017 | LS from CT WG4: LS on Progress of work item Dia_SGSN_GMLC | CT WG4 (C4-130842) | Postponed to meeting #98 |
S2‑132018 | Additional Aspects for Fast Path Solution | ZTE | Not Handled |
S2‑132019 | Connection Capability information for network selection | CATT | Revised in parallel session in S2-132202 |
S2‑132020 | Addition of new alternative to solution 6 and solution 7 | CATT | Noted |
S2‑132021 | ANDSF MO enhancement with HS2.0 MO and New Policies | Huawei, AT&T, Intel | Revised in parallel session in S2-132228 |
S2‑132022 | [DRAFT] LS on re-using HS2.0 MO within ANDSF | Ericsson, ST-Ericsson | Revised in parallel session in S2-132025 |
S2‑132023 | Solution to utilize both ANDSF and HS2.0 network selection logic | Nokia Siemens Networks, Nokia, | Revised in parallel session in S2-132229 |
S2‑132024 | Integrating HS2.0 policies with ANDSF | Ericsson, ST-Ericsson, Qualcomm Incorporated, Research In Motion UK Ltd | Noted |
S2‑132025 | [DRAFT] LS on re-using HS2.0 MO within ANDSF | Ericsson, ST-Ericsson | WITHDRAWN |
S2‑132026 | WLAN selection for simultaneous VoIMS and home routed services | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in parallel session in S2-132230 |
S2‑132027 | WLAN Selection Based on Modified ANDSF Rules | Motorola Mobility, Ericsson, ST-Ericsson, Qualcomm Incorporated, Research In Motion UK Ltd, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in S2-132278 |
S2‑132028 | Solution 4 updates to support a separate WLAN Selection Policy (WLANSP) in ANDSF | Ericsson, ST-Ericsson, Research In Motion UK Ltd | Approved |
S2‑132029 | Interim Conclusions | Intel | Revised in S2-132279 |
S2‑132030 | 23.139 CR0043R1: Conclusion on S2a for P4C_TI | Huawei, AT&T | Approved |
S2‑132031 | Cover sheet to present TR 23.839 for approval at the SA plenary | P4C-TI Rapporteur (Alcatel-Lucent) | Approved |
S2‑132032 | 23.203 CR0818R1: Onetime reporting of the present Access Network Information | Nokia Siemens Networks, Ericsson, ST-Ericsson | Revised in parallel session in S2-132206 |
S2‑132033 | 23.203 CR0819R1: Onetime reporting of the present Access Network Information | Nokia Siemens Networks | Revised in parallel session in S2-132207 |
S2‑132034 | Revision of AAA-based accounting definition | Huawei, Hisilicon | Revised in parallel session in S2-132048 |
S2‑132035 | Revised WID on Application Based Charging | Allot Communications | Approved |
S2‑132036 | 23.002 CR0265: Correction of home routed access PCC architecture | Allot Communications | Approved |
S2‑132037 | 23.002 CR0264R2: Introduction of Gyn/Gzn interfaces to the specification | Allot Communications, Openet, Juniper Networks, NTT DOCOMO, Tekelec | Approved |
S2‑132038 | 23.203 CR0799R4: Application Based Charging functionality added for TDF | Allot Communications, Openwave, Tekelec | Revised in S2-132222 |
S2‑132039 | 23.203 CR0808R2: Modifications on Application Based Charging functionality added for TDF | Allot Communications, Openwave, Tekelec, Juniper Networks | Revised in S2-132223 |
S2‑132040 | 23.203 CR0809R1: Functionality of application detection and control in case of PCEF enhanced with ADC | Allot Communications | Revised in parallel session in S2-132204 |
S2‑132041 | 23.203 CR0810R1: Functionality of application detection and control in case of PCEF enhanced with ADC | Allot Communications | Revised in parallel session in S2-132205 |
S2‑132042 | Clarification of WLCP functionality | Qualcomm Incorporated, Ericsson, ST-Ericsson, Alcatel Lucent, Alcatel Lucent Shanghai Bell | Approved |
S2‑132043 | Proposed partial conclusions on SaMOG Phase-2 Solution Alternatives | ZTE | Revised in S2-132280 |
S2‑132044 | Proposed architectural enhancements and corrections | Ericsson, ST-Ericsson | Revised in parallel session in S2-132208 |
S2‑132045 | IP Edge Event-Triggers over Gxd | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in S2-132313 |
S2‑132046 | Configuration when TDF performs enforcement and charging | Allot Communications | Approved |
S2‑132047 | BBF credit re-authorization triggers | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in parallel session in S2-132209 |
S2‑132048 | Revision of AAA-based accounting definition | Huawei, Hisilicon | Revised in parallel session in S2-132210 |
S2‑132049 | [DRAFT] Reply LS on PCC for convergence (P4C-F) | Orange | Revised in parallel session in S2-132211 |
S2‑132050 | Partial conclusions on P4C-F | Ericsson, ST-Ericsson, Allot Communications | Revised in parallel session in S2-132212 |
S2‑132051 | [DRAFT] LS on PC4_F assumptions and status update | Huawei | Revised in parallel session in S2-132213 |
S2‑132052 | Unidirectional TAD | Huawei, Hisilicon, Intel | WITHDRAWN |
S2‑132053 | Unidirectional TAD | Huawei, Hisilicon, Intel | WITHDRAWN |
S2‑132054 | Unidirectional TAD | Huawei, Hisilicon, Intel | WITHDRAWN |
S2‑132055 | 23.060 CR1766R2: Consistent description of allowed packet filter configurations | Intel, Huawei, Hisilicon | Revised in S2-132267 |
S2‑132056 | 23.060 CR1767R2: Consistent description of allowed packet filter configurations | Intel, Huawei, Hisilicon | Approved |
S2‑132057 | 23.060 CR1768R2: Consistent description of allowed packet filter configurations | Intel, Huawei, Hisilicon | Approved |
S2‑132058 | Avoid ping-pong and frequent unnecessary selection for load | Huawei, Hisilicon | Approved |
S2‑132059 | 23.272 CR0869R2: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in parallel session in S2-132178 |
S2‑132060 | 23.272 CR0870R2: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in parallel session in S2-132179 |
S2‑132061 | 23.272 CR0871R2: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in parallel session in S2-132180 |
S2‑132062 | 23.251 CR0092R1: Correction of BSC indication in Inter RAT Handover | Ericsson, ST-Ericsson | Revised in parallel session in S2-132181 |
S2‑132063 | 23.401 CR2519R2: Immediate Cancel Location ACK during HSS-initiated detach procedure | Nokia Siemens Networks, Nokia, Huawei, Alcatel-Lucent, Ericsson, ST Ericsson | Approved |
S2‑132064 | 23.401 CR2520R2: Immediate Cancel Location ACK during HSS-initiated detach procedure | Nokia Siemens Networks, Nokia, Huawei, Alcatel-Lucent, Ericsson, ST Ericsson | Approved |
S2‑132065 | 23.060 CR1763R2: Immediate Cancel Location ACK during HSS-initiated detach procedure | Nokia Siemens Networks, Nokia, Huawei, Alcatel-Lucent, Ericsson, ST Ericsson | Approved |
S2‑132066 | 23.060 CR1764R2: Immediate Cancel Location ACK during HSS-initiated detach procedure | Nokia Siemens Networks, Nokia, Huawei, Alcatel-Lucent, Ericsson, ST Ericsson | Approved |
S2‑132067 | 23.272 CR0867R2: SS service ID used in the Paging message | Huawei, Hisilicon | Revised in parallel session in S2-132182 |
S2‑132068 | [DRAFT] LS on SS service ID used in the Paging message | SA WG2 | Revised in parallel session in S2-132183 |
S2‑132069 | 23.272 CR0874R1: How CSFB UE return back to the former LTE PLMN | Huawei, Hisilicon, Yota, Alcatel-Lucent | Revised in parallel session in S2-132184 |
S2‑132070 | 23.272 CR0877R1: CN signalling for allowing UE return to former LTE PLMN after CSFB | Alcatel-Lucent | Revised in parallel session in S2-132185 |
S2‑132071 | 23.401 CR2556R1: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Revised in parallel session in S2-132176 |
S2‑132072 | 23.060 CR1792R1: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Revised in parallel session in S2-132177 |
S2‑132073 | 23.272 CR0875R1: Clarification for MME selection during NW-initiated CS Service procedure while UE is in IMS VoIP session | Huawei, Hisilicon, NTT DoCoMo | Revised in parallel session in S2-132186 |
S2‑132074 | Clarification for MME selection of MSC Server during SRVCC procedure | Huawei, Hisilicon, NTT DoCoMo | WITHDRAWN |
S2‑132075 | 23.221 CR0148R6: Enabling CS services when UE gets IMSI detached | Ericsson, ST-Ericsson, Qualcomm, Alcatel Lucent, Huawei, HiSilicon, Nokia, Nokia Siemens Networks, Samsung | Approved |
S2‑132076 | 23.272 CR0868R2: Enabling terminating CS services for EPS/IMSI attached UE selecting a non-3GPP access | Alcatel-Lucent | Approved |
S2‑132077 | 23.272 CR0852R3: CSFB priority call handling in an eMLPP network | Alcatel-Lucent | Noted |
S2‑132078 | 23.272 CR0879R1: MSC/VLR selection for MTC devices | Nokia Siemens Networks, Nokia | Approved |
S2‑132079 | 23.401 CR2558R1: Addition of End Marker Support for Handover Scenarios with SGW Relocation | NTT DOCOMO | Noted |
S2‑132080 | 23.402 CR1159R1: Addition of End Marker Support for Handover Scenarios with SGW Relocation | NTT DOCOMO | Noted |
S2‑132081 | 23.167 CR0226R1: Domain selection in the event emergency bearer services are not supported | Research In Motion UK Ltd | Revised in S2-132264 |
S2‑132082 | 23.401 CR2543R2: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Revised in S2-132259 |
S2‑132083 | 23.060 CR1781R2: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Revised in S2-132266 |
S2‑132084 | 23.228 CR1038R1: Alignment with stage 3 for the Geographical Identifier | Orange | Approved |
S2‑132085 | 23.228 CR1040R1: Alignment with stage 3 for the Geographical Identifier | Orange | Revised in S2-132268 |
S2‑132086 | 23.401 CR2562R1: Use of Low Access Priority Indication to select MME | NTT DOCOMO | Revised in parallel session in S2-132091 |
S2‑132087 | 23.236 CR0050R1: Use of Low Access Priority Indication (LAPI) to select SGSN for PS domain | NTT DOCOMO | Revised in parallel session in S2-132092 |
S2‑132088 | [DRAFT] LS on LAPI for NNSF | SA WG2 | Revised in parallel session in S2-132093 |
S2‑132089 | 23.204 CR0100R1: Adding the interface between IP-SM-GW and MME | HTC | Approved |
S2‑132090 | 23.204 CR0101: Adding the interface between IP-SM-GW and MME | HTC | Revised in S2-132248 |
S2‑132091 | 23.401 CR2562R2: Use of Low Access Priority Indication to select MME | NTT DOCOMO | Revised in S2-132262 |
S2‑132092 | 23.236 CR0050R2: Use of Low Access Priority Indication (LAPI) to select SGSN for PS domain | NTT DOCOMO | Revised in S2-132263 |
S2‑132093 | [DRAFT] LS on LAPI for NNSF | SA WG2 | Revised in S2-132325 |
S2‑132094 | 23.060 CR1784R2: Incomplete specification text on link MTU size for IPv6 | Intel, Juniper Networks, Ericsson, ST-Ericsson, Nokia Siemens Networks | Approved |
S2‑132095 | 23.272 CR0847R3: Clarification on 'SMS in MME' | LG Electronics | Approved |
S2‑132096 | 23.401 CR2566R1: Use of MM backoff timer for voice centric devices | Qualcomm Incorporated, Nokia Siemens Networks | Revised in S2-132250 |
S2‑132097 | 23.682 CR0069R3: Triggering indication added in the CDR | Huawei, Hisilicon, Ericsson, ST-Ericsson | Revised in S2-132252 |
S2‑132098 | 23.060 CR1791R1: Correction to PDN Deactivation for SIPTO@LN | Ericsson, ST-Ericsson | Approved |
S2‑132099 | Unattended traffic limitation in the UE | Qualcomm Incorporated | Revised in S2-132224 |
S2‑132100 | Solution alternative enhancing existing QoS bearer concept | Nokia Siemens Networks | Revised in S2-132225 |
S2‑132101 | [DRAFT] Reply LS on interaction of oneM2M with Underlying Networks | NEC, Qualcomm Incorporated | Revised in S2-132326 |
S2‑132102 | Consideration on traffic scenarios for overall evaluation of small data transmission solutions | Intel | Revised in S2-132243 |
S2‑132103 | Discovery Procedures | Qualcomm Incorporated, U.S. Department of Commerce, Samsung | Revised in S2-132163 |
S2‑132104 | [Draft] LS on requesting input on security aspects for MTCe solutions | SA WG2 | Revised in S2-132327 |
S2‑132105 | - | NEC | WITHDRAWN |
S2‑132106 | LS from RAN WG3: LS on information of progress in the SI on LTE-HRPD SON | RAN WG3 (R3-131134) | Postponed to meeting #98 |
S2‑132107 | LS from RAN WG3: LS on Local Network ID and Mobility | RAN WG3 (R3-131174) | Postponed to meeting #98 |
S2‑132108 | ProSe System Architecture | Renesas Mobile Europe Ltd., InterDigital Communications | Revised in S2-132238 |
S2‑132109 | ProSe Reference Architecture proposal | Ericsson, ST-Ericsson | Revised in S2-132239 |
S2‑132110 | Lawful Interception (LI) Requirement and LI Key issue for ProSe | TPS | Approved |
S2‑132111 | ProSe direct communication modes | Qualcomm Incorporated, U.S. Department of Commerce | Revised in S2-132240 |
S2‑132112 | Key issue on ProSe local path communication | InterDigital Communications | Approved |
S2‑132113 | Scenarios of E-UTRAN ProSe Communication with a Relay | CATT | Noted |
S2‑132114 | Evaluation of small data solutions | Huawei, Hisilicon | Revised in parallel session in S2-132199 |
S2‑132115 | Evaluation | SA WG2 | Not Handled |
S2‑132116 | Summary of Drafting. Discussion on SDDTE Solution Analysis | Verizon, KPN | Noted |
S2‑132117 | Analysis of the Small Data Fast Path solution | Nokia Siemens Networks | Revised in parallel session in S2-132200 |
S2‑132118 | Update to Evaluations of some solutions | CATT, CATR, Nokia Siemens Networks, Nokia, Huawei, HiSilicon | Revised in parallel session in S2-132201 |
S2‑132119 | Report of SDDTE drafting | Intel (Rapporteur) | Noted |
S2‑132120 | - | - | WITHDRAWN |
S2‑132121 | - | - | WITHDRAWN |
S2‑132122 | - | - | WITHDRAWN |
S2‑132123 | - | - | WITHDRAWN |
S2‑132124 | Evaluation of GTP-C overload prevention and control | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Cisco | Approved |
S2‑132125 | GTP-C load balancing Mechanism | Cisco, Verizon Wireless, AT&T, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Approved |
S2‑132126 | GTP-C Overload Control Mechanism | Cisco, Verizon Wireless, AT&T, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in S2-132255 |
S2‑132127 | Conclusion for GTP-C overload prevention and control | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT &T | Revised in parallel session in S2-132194 |
S2‑132128 | Terminology to allow better coherent discussion on GCSE | Nokia Siemens Networks | Approved |
S2‑132129 | Decision for using PTP or PTM | Qualcomm Incorporated | Revised in S2-132271 |
S2‑132130 | Further considerations on Architectural Aspects of Group Call unicast/multicast bearer selection | Vodafone | Revised in S2-132270 |
S2‑132131 | Evaluation of long DRX | Huawei, Hisilicon, ITRI? Samsung? | Revised in S2-132136 |
S2‑132132 | Responses to questions and comments to contribution for network-based congestion awareness design | China Telecom, KDDI, China Unicom, Allot Communications, Broadcom Corporation, Sandvine, Tekelec, ZTE, Comverse, Bell Canada, AT&T, Alcatel-Lucent | Revised in S2-132138 |
S2‑132133 | RPPF based Solution for Operator Controlled Off-path Congestion Awareness and Notification | China Telecom, KDDI, ZTE, Broadcom Corporation, China Unicom, Allot Communications, Sandvine, Tekelec, Comverse, Bell Canada, AT&T, Alcatel-Lucent, Movik, Juniper, Hitachi | Revised in S2-132226 |
S2‑132134 | - | ZTE | WITHDRAWN |
S2‑132135 | Update and Evaluation of Power Saving State Approach | Huawei, Hisilicon | Approved |
S2‑132136 | Evaluation of long DRX | Huawei, Hisilicon, ITRI, Samsung | Approved |
S2‑132137 | FFS statement resolution in 'Keep UEs in detached state when not communicating' solution. | NEC | Approved |
S2‑132138 | Responses to questions and comments to contribution for network-based congestion awareness design | China Telecom, KDDI, China Unicom, Allot Communications, Broadcom Corporation, Sandvine, Tekelec, ZTE, Comverse, Bell Canada, AT&T, Alcatel-Lucent, Movik | Not Handled |
S2‑132139 | QoS based congestion feedback | Ericsson, ST-Ericsson | Revised in S2-132227 |
S2‑132140 | Clarification of GTP-u based RAN Congestion Awareness Solution | China Mobile, NEC, AT&T | Revised in S2-132293 |
S2‑132141 | Enhancement of the FPI solution description | Telecom Italia, Motorola Mobility | Revised in S2-132309 |
S2‑132142 | Analysis of ProSe and GCSE-LTE service level requirements and evaluation of commonalities and assumptions for ProSe stage 2 | InterDigital Communications | Approved |
S2‑132143 | Update to key issue on Relays | NEC | Approved |
S2‑132144 | LS from GSMA IREG: LS on QoS and roaming agreements | GSMA IREG (Packet_doc_65_016_LS_215) | Postponed to meeting #98 |
S2‑132145 | Solution for EPC-level ProSe Discovery | Intel, III, Sony | Approved |
S2‑132146 | LS from CT WG3: Reply LS on End-to-end QoS handling of MTSI | CT WG3 (C3-130837) | Postponed to meeting #98 |
S2‑132147 | Addressing concerns with UP optimizations for small data | Ericsson, ST-Ericsson | Revised in S2-132149 |
S2‑132148 | Eliminate keep-alive package by network-based always-on solution | China Mobile, CATT, China Telecom, ZTE, Huawei, Nokia, CATR | Approved |
S2‑132149 | Addressing concerns with UP optimizations for small data | Ericsson, ST-Ericsson | Revised in S2-132291 |
S2‑132150 | Key Issue on UE-to-Network Relay | Intel, General Dynamics Broadband UK | Revised in S2-132272 |
S2‑132151 | Key issue on geographical scope of GCSE Group | Nokia Siemens Networks | Revised in S2-132273 |
S2‑132152 | Key issue on adding/removing media | Nokia Siemens Networks | Revised in S2-132274 |
S2‑132153 | Key Issue for GCSE_LTE Service Continuity, Roaming and Interworking | General Dynamics Broadband UK | Revised in S2-132275 |
S2‑132154 | Further considerations on Architectural Aspects of Group Call unicast/multicast bearer selection | Vodafone | Approved |
S2‑132155 | A new solution proposal for GCSE | Nokia Siemens Networks | Approved |
S2‑132156 | [Draft] Reply LS on Access control for UEs in RRC CONNECTED mode | NTT DOCOMO | Revised in S2-132295 |
S2‑132157 | Policy-based Congestion Mitigation in the Core Network | NEC, Sprint, China Unicom, NTT DOCOMO, Intel, Allot Communications | Revised in S2-132169 |
S2‑132158 | C-Plane/PCC based Signalling for RAN User Plane Congestion Notification | NTT DOCOMO, Sprint, Huawei, HiSilicon | Revised in S2-132172 |
S2‑132159 | Prose Service architecture and registration | Huawei, Hisilicon | Revised in S2-132241 |
S2‑132160 | ProSe IMS Architecture | NEC | Approved |
S2‑132161 | Clean-up of Targeted ProSe Discovery based on SA WG1 agreements | Intel | Approved |
S2‑132162 | Direct discovery | Alcatel-Lucent; Alcatel-Lucent Shanghai Bell | Approved |
S2‑132163 | Discovery Procedures | Qualcomm Incorporated, U.S. Department of Commerce, Samsung | Revised in S2-132242 |
S2‑132164 | Conclusion for CNO-GTP-C | Ericsson, ST-Ericsson | Noted |
S2‑132165 | Two discovery model | Samsung | Revised in S2-132288 |
S2‑132166 | Solution for ProSe Discovery P-CR | Renesas Mobile Europe Ltd. | Revised in S2-132287 |
S2‑132167 | Solution: ProSe Direct Discovery | Huawei, Hisilicon | Revised in S2-132281 |
S2‑132168 | Solution for ProSe Discovery | ZTE | Revised in S2-132285 |
S2‑132169 | Policy-based Congestion Mitigation in the Core Network | NEC, Sprint, China Unicom, NTT DOCOMO, Intel, Allot Communications | Revised in S2-132311 |
S2‑132170 | How to handle uplink packet for congestion notification | Samsung | Approved |
S2‑132171 | - | Sprint | WITHDRAWN |
S2‑132172 | C-Plane/PCC based Signalling for RAN User Plane Congestion Notification | NTT DOCOMO, Sprint, Huawei, HiSilicon | Approved |
S2‑132173 | Operator control of RAN congestion handling | Ericsson, ST-Ericsson | Revised in S2-132310 |
S2‑132174 | 23.401 CR2546R4: Correction to PDN Deactivation for SIPTO@LN | Nokia Siemens Networks, Intel, Cisco, Ericsson, ST-Ericsson, Research In Motion UK Limited, Alcatel-Lucent | Revised in S2-132269 |
S2‑132175 | [Draft] LS response on S1 connection release when rejecting the UE | Huawei, Hisilicon | Revised in S2-132253 |
S2‑132176 | 23.401 CR2556R2: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Noted |
S2‑132177 | 23.060 CR1792R2: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Noted |
S2‑132178 | 23.272 CR0869R3: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in S2-132256 |
S2‑132179 | 23.272 CR0870R3: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in S2-132257 |
S2‑132180 | 23.272 CR0871R3: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Revised in S2-132258 |
S2‑132181 | 23.251 CR0092R2: Correction of BSC indication in Inter RAT Handover | Ericsson, ST-Ericsson | Approved |
S2‑132182 | 23.272 CR0867R3: SS service ID used in the Paging message | Huawei, Hisilicon | Noted. Technically endorsed |
S2‑132183 | [DRAFT] LS on SS service ID used in the Paging message | SA WG2 | Revised in S2-132296 |
S2‑132184 | 23.272 CR0874R2: How CSFB UE return back to the former LTE PLMN | Huawei, Hisilicon, Yota, Alcatel-Lucent, China Mobile, NEC, CATT, ZTE | Approved |
S2‑132185 | 23.272 CR0877R2: CN signalling for allowing UE return to former LTE PLMN after CSFB | Alcatel-Lucent | Approved |
S2‑132186 | 23.272 CR0875R2: Clarification for MME selection during NW-initiated CS Service procedure while UE is in IMS VoIP session | Huawei, Hisilicon, NTT DoCoMo | Approved |
S2‑132187 | [DRAFT] CSFB priority call handling in a network supporting eMLPP | SA WG2 | Revised in S2-132302 |
S2‑132188 | 23.401 CR2557R1: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Revised in S2-132260 |
S2‑132189 | 23.060 CR1793R1: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Revised in S2-132261 |
S2‑132190 | - | - | WITHDRAWN |
S2‑132191 | - | - | WITHDRAWN |
S2‑132192 | - | - | WITHDRAWN |
S2‑132193 | - | - | WITHDRAWN |
S2‑132194 | Conclusion for GTP-C overload prevention and control | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT &T | Approved |
S2‑132195 | TR Cover sheet for 23.843 | Rapporteur | Approved |
S2‑132196 | - | Rapporteur | WITHDRAWN |
S2‑132197 | LS on GTP-C Load/Overload Control | SA WG2 | Approved |
S2‑132198 | Connectionless solution adaptations for UTRAN (resubmission of S2-130792) | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in S2-132245 |
S2‑132199 | Evaluation of small data solutions | Huawei, Hisilicon | Revised in S2-132304 |
S2‑132200 | Analysis of the Small Data Fast Path solution | Nokia Siemens Networks | Revised in S2-132244 |
S2‑132201 | Update to Evaluations of some solutions | CATT, CATR, Nokia Siemens Networks, Nokia, Huawei, HiSilicon | Revised in S2-132292 |
S2‑132202 | Connection Capability information for network selection | CATT | Approved |
S2‑132203 | Cover Sheet for TR 23.865 for information at TSG SA | Intel | Revised in S2-132328 |
S2‑132204 | 23.203 CR0809R2: Functionality of application detection and control in case of PCEF enhanced with ADC | Allot Communications, Alcatel-Lucent, Cisco, Sandvine, Juniper Networks, Tekelec, Huawei, Ericsson, Nokia Siemens Networks | Approved |
S2‑132205 | 23.203 CR0810R2: Functionality of application detection and control in case of PCEF enhanced with ADC | Allot Communications, Alcatel-Lucent, Cisco, Sandvine, Juniper Networks, NTT DOCOMO, Tekelec, Huawei, Ericsson, Nokia Siemens Networks | Approved |
S2‑132206 | 23.203 CR0818R2: Onetime reporting of the present Access Network Information | Nokia Siemens Networks, Alcatel-Lucent | Approved |
S2‑132207 | 23.203 CR0819R2: Onetime reporting of the present Access Network Information | Nokia Siemens Networks, Alcatel-Lucent | Approved |
S2‑132208 | Proposed architectural enhancements and corrections | Ericsson, ST-Ericsson | Approved |
S2‑132209 | BBF credit re-authorization triggers | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Approved |
S2‑132210 | Revision of AAA-based accounting definition | Huawei, Orange | Revised in S2-132312 |
S2‑132211 | [DRAFT] Response LS on PCC for convergence (P4C-F) | Orange | Noted |
S2‑132212 | Partial conclusions on P4C-F | Ericsson, ST-Ericsson, Allot Communications | Revised in S2-132314 |
S2‑132213 | LS on PC4_F assumptions and status update | SA WG2 | Revised in S2-132329 |
S2‑132214 | Solution for ProSe one-to-many communications | Intel, Motorola Mobility | Approved |
S2‑132215 | Autonomous direct communication | Qualcomm Incorporated, U.S. Department of Commerce | g2168 |
S2‑132216 | Network-authorised direct communication | Qualcomm Incorporated, U.S. Department of Commerce | Revised in S2-132283 |
S2‑132217 | Direct Communications Point to point | Alcatel-Lucent; Alcatel-Lucent Shanghai Bell | Revised in S2-132282 |
S2‑132218 | Report of the MTCe-SDDTE parallel session | SA WG2 Chairman | Noted |
S2‑132219 | GCSE solution based on IMS and eMBMS | Intel, Broadcom Corporation, NEC, Deutsche Telekom | Approved |
S2‑132220 | Group communications solution | Alcatel-Lucent; Alcatel-Lucent Shanghai Bell | Approved |
S2‑132221 | Reply LS on Application Based Charging | SA WG2 | Approved |
S2‑132222 | 23.203 CR0799R5: Application Based Charging functionality added for TDF | Allot Communications, Openwave, Tekelec, Cisco, Juniper Networks, Sandvine | Approved |
S2‑132223 | 23.203 CR0808R3: Modifications on Application Based Charging functionality added for TDF | Allot Communications, Openwave, Tekelec, Juniper Networks | Approved |
S2‑132224 | Unattended traffic limitation in the UE | Qualcomm Incorporated | Approved |
S2‑132225 | Solution alternative enhancing existing QoS bearer concept | Nokia Siemens Networks | Revised in S2-132305 |
S2‑132226 | RPPF based Solution for Operator Controlled Off-path Congestion Awareness and Notification | China Telecom, KDDI, ZTE, Broadcom Corporation, China Unicom, Allot Communications, Sandvine, Tekelec, Comverse, Bell Canada, AT&T, Alcatel-Lucent, Movik, Juniper, Hitachi | Revised in S2-132306 |
S2‑132227 | QoS based congestion feedback | Ericsson, ST-Ericsson | Revised in S2-132307 |
S2‑132228 | ANDSF MO enhancement with HS2.0 MO and New Policies | Huawei, Hisilicon, AT&T, Intel, China Mobile, Vodafone, Samsung, CATT | Approved |
S2‑132229 | Solution to utilize both ANDSF and HS2.0 network selection logic | Nokia Siemens Networks, Nokia, | Revised in S2-132276 |
S2‑132230 | WLAN selection for simultaneous VoIMS and home routed services | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised in S2-132277 |
S2‑132231 | Non-3GPP and PCC/QoS parallel sessions report | Convenor (Telecom Italia) | Noted |
S2‑132232 | - | - | WITHDRAWN |
S2‑132233 | - | - | WITHDRAWN |
S2‑132234 | - | - | WITHDRAWN |
S2‑132235 | - | - | WITHDRAWN |
S2‑132236 | - | - | WITHDRAWN |
S2‑132237 | - | - | WITHDRAWN |
S2‑132238 | ProSe System Architecture | Renesas Mobile Europe Ltd., InterDigital Communications | Revised in S2-132290 |
S2‑132239 | ProSe Reference Architecture proposal | Ericsson, ST-Ericsson | Approved |
S2‑132240 | ProSe direct communication modes | Qualcomm Incorporated, U.S. Department of Commerce, Alcatel-Lucent, NEC | Approved |
S2‑132241 | Prose Service architecture and registration | Huawei, Hisilicon | Revised in S2-132289 |
S2‑132242 | Discovery Procedures | Qualcomm Incorporated, U.S. Department of Commerce, Samsung | Approved |
S2‑132243 | - | Intel | WITHDRAWN |
S2‑132244 | Analysis of the Small Data Fast Path solution | Nokia Siemens Networks, Nokia, Huawei, HiSilicon | Approved |
S2‑132245 | Connectionless solution adaptations for UTRAN (resubmission of S2-130792) | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Approved |
S2‑132246 | 23.401 CR2559R1: Addition of End Marker Support for Handover Scenarios with SGW Relocation | NTT DOCOMO | Approved |
S2‑132247 | 23.402 CR1160R1: Addition of End Marker Support for Handover Scenarios with SGW Relocation | NTT DOCOMO | Approved |
S2‑132248 | 23.204 CR0101R1: Adding the interface between IP-SM-GW and MME | HTC | Approved |
S2‑132249 | 23.060 CR1796R1: Fallback to IPv4 when IPv6 is not supported or preferred | China Mobile | Noted |
S2‑132250 | 23.401 CR2566R2: Use of MM backoff timer for voice centric devices | Qualcomm Incorporated, Nokia Siemens Networks | Revised in S2-132297 |
S2‑132251 | 23.060 CR1797R1: Use of MM backoff timer for voice centric devices | Qualcomm Incorporated, Nokia Siemens Networks | Revised in S2-132298 |
S2‑132252 | 23.682 CR0069R4: Triggering indication added in the CDR | Huawei, Hisilicon, Ericsson, ST-Ericsson | Approved |
S2‑132253 | LS response on S1 connection release when rejecting the UE | SA WG2 | Approved |
S2‑132254 | Work Planning at SA WG2 97 | SA WG2 Chairman | Noted |
S2‑132255 | GTP-C Overload Control Mechanism | Cisco, Verizon Wireless, AT&T, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Approved |
S2‑132256 | 23.272 CR0869R4: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Approved |
S2‑132257 | 23.272 CR0870R4: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Approved |
S2‑132258 | 23.272 CR0871R4: CSFB interactions with IMS Emergency call | Ericsson, ST-Ericsson | Approved |
S2‑132259 | 23.401 CR2543R3: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Revised in S2-132265 |
S2‑132260 | 23.401 CR2557R2: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Approved |
S2‑132261 | 23.060 CR1793R2: Individual subscription migration and subscriber troubleshooting | Alcatel-Lucent, AT&T, HP, Nokia Siemens Networks | Approved |
S2‑132262 | 23.401 CR2562R3: Use of Low Access Priority Indication to select MME | NTT DOCOMO, Intel | Approved |
S2‑132263 | 23.236 CR0050R3: Use of Low Access Priority Indication (LAPI) to select SGSN for PS domain | NTT DOCOMO, Intel | Approved |
S2‑132264 | 23.167 CR0226R2: Domain selection in the event emergency bearer services are not supported | Research In Motion UK Ltd, ATT, Deutsche Telekom, T-Mobile USA | Approved |
S2‑132265 | 23.401 CR2543R4: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Revised in S2-132300 |
S2‑132266 | 23.060 CR1781R3: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Revised in S2-132294 |
S2‑132267 | 23.060 CR1766R3: Consistent description of allowed packet filter configurations | Intel, Huawei, Hisilicon | Revised in S2-132299 |
S2‑132268 | 23.228 CR1040R2: Alignment with stage 3 for the Geographical Identifier | Orange | Approved |
S2‑132269 | 23.401 CR2546R5: Correction to PDN Deactivation for SIPTO@LN | Nokia Siemens Networks, Intel, Cisco, Ericsson, ST-Ericsson, Research In Motion UK Limited, Alcatel-Lucent | Approved |
S2‑132270 | Further considerations on Architectural Aspects of Group Call unicast/multicast bearer selection | Vodafone | Approved |
S2‑132271 | Decision for using PTP or PTM | Qualcomm Incorporated | Approved |
S2‑132272 | Key Issue on UE-to-Network Relay | Intel, General Dynamics Broadband UK | Revised in S2-132316 |
S2‑132273 | Key issue on geographical scope of GCSE Group | Nokia Siemens Networks | Revised in S2-132317 |
S2‑132274 | Key issue on adding/removing media | Nokia Siemens Networks | Approved |
S2‑132275 | Key Issue for GCSE_LTE Service Continuity, Roaming and Interworking | General Dynamics Broadband UK | Approved |
S2‑132276 | Solution to utilize both ANDSF and HS2.0 network selection logic | Nokia Siemens Networks, Nokia, | Revised in S2-132318 |
S2‑132277 | WLAN selection for simultaneous VoIMS and home routed services | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Approved |
S2‑132278 | WLAN Selection Based on Modified ANDSF Rules | Motorola Mobility, Ericsson, ST-Ericsson, Qualcomm Incorporated, Research In Motion UK Ltd, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Approved |
S2‑132279 | Interim Conclusions | Intel, Qualcomm Incorporated | Approved |
S2‑132280 | Proposed partial conclusions on SaMOG Phase-2 Solution Alternatives | ZTE | Approved |
S2‑132281 | Solution: ProSe Direct Discovery | Huawei, Hisilicon | Revised in S2-132286 |
S2‑132282 | Direct Communications Point to point | Alcatel-Lucent; Alcatel-Lucent Shanghai Bell | Approved |
S2‑132283 | Network-authorised direct communication | Qualcomm Incorporated, U.S. Department of Commerce | Revised in S2-132315 |
S2‑132284 | Autonomous direct communication | Qualcomm Incorporated, U.S. Department of Commerce | Approved |
S2‑132285 | Solution for ProSe Discovery | ZTE | Approved |
S2‑132286 | Solution: ProSe Direct Discovery | Huawei, Hisilicon | Approved |
S2‑132287 | Solution for ProSe Discovery P-CR | Renesas Mobile Europe Ltd. | Approved |
S2‑132288 | - | Samsung | WITHDRAWN |
S2‑132289 | Prose Service architecture and registration | Huawei, Hisilicon | Approved |
S2‑132290 | ProSe System Architecture | Renesas Mobile Europe Ltd., InterDigital Communications | Approved |
S2‑132291 | Addressing concerns with UP optimizations for small data | Ericsson, ST-Ericsson | Approved |
S2‑132292 | Update to Evaluations of some solutions | CATT, CATR, Nokia Siemens Networks, Nokia, Huawei, HiSilicon | Revised in S2-132303 |
S2‑132293 | Clarification of GTP-u based RAN Congestion Awareness Solution | China Mobile, NEC, AT&T | Revised in S2-132308 |
S2‑132294 | 23.060 CR1781R4: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Revised in S2-132301 |
S2‑132295 | Reply LS on Access control for UEs in RRC CONNECTED mode | SA WG2 | Approved |
S2‑132296 | LS on SS service ID used in the Paging message | SA WG2 | Approved |
S2‑132297 | 23.401 CR2566R3: Use of MM backoff timer for voice centric devices | Qualcomm Incorporated, Nokia Siemens Networks | Approved |
S2‑132298 | 23.060 CR1797R2: Use of MM backoff timer for voice centric devices | Qualcomm Incorporated, Nokia Siemens Networks | Approved |
S2‑132299 | 23.060 CR1766R4: Consistent description of allowed packet filter configurations | Intel, Huawei, Hisilicon | Approved |
S2‑132300 | 23.401 CR2543R5: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Approved |
S2‑132301 | 23.060 CR1781R5: Correct inconsistency with Stage 1 regarding support for emergency bearer services in the serving network | Research In Motion UK Ltd | Approved |
S2‑132302 | [DRAFT] CSFB priority call handling in a network supporting Multimedia Priority Service | SA WG2 | Revised in S2-132330 |
S2‑132303 | Update to Evaluations of some solutions | CATT, CATR, Nokia Siemens Networks, Nokia, Huawei, HiSilicon | Approved |
S2‑132304 | Evaluation of small data solutions | Huawei, Hisilicon | Approved |
S2‑132305 | Solution alternative enhancing existing QoS bearer concept | Nokia Siemens Networks | Approved |
S2‑132306 | RPPF based Solution for Operator Controlled Off-path Congestion Awareness and Notification | China Telecom, KDDI, ZTE, Broadcom Corporation, China Unicom, Allot Communications, Sandvine, Tekelec, Comverse, Bell Canada, AT&T, Alcatel-Lucent, Movik, Juniper, Hitachi | Approved |
S2‑132307 | QoS based congestion feedback | Ericsson, ST-Ericsson | Revised in S2-132331 |
S2‑132308 | Clarification of GTP-u based RAN Congestion Awareness Solution | China Mobile, NEC, AT&T, Samsung, Nokia Siemens Networks | Revised in S2-132332 |
S2‑132309 | Enhancement of the FPI solution description | Telecom Italia, Motorola Mobility | Approved |
S2‑132310 | Operator control of RAN congestion handling | Ericsson, ST-Ericsson | Revised in S2-132333 |
S2‑132311 | Policy-based Congestion Mitigation in the Core Network | NEC, Sprint, China Unicom, NTT DOCOMO, Intel, Allot Communications | Approved |
S2‑132312 | Revision of AAA-based accounting definition | Huawei, Orange | Noted |
S2‑132313 | IP Edge Event-Triggers over Gxd | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Approved |
S2‑132314 | Partial conclusions on P4C-F | Ericsson, ST-Ericsson, Allot Communications | Approved |
S2‑132315 | Network-authorised direct communication | Qualcomm Incorporated, U.S. Department of Commerce | Approved |
S2‑132316 | Key Issue on UE-to-Network Relay | Intel, General Dynamics Broadband UK | Approved |
S2‑132317 | Key issue on geographical scope of GCSE Group | Nokia Siemens Networks | Approved |
S2‑132318 | Solution to utilize both ANDSF and HS2.0 network selection logic | Nokia Siemens Networks, Nokia, | Approved |
S2‑132319 | Cover Sheet for TR 23.887 for information at TSG SA | MTCe Rapporteurs (Intel, Ericsson, KPN) | Approved |
S2‑132320 | Reply LS on user experience impact on voice centric devices when PS back-off timer is received | SA WG2 | Approved |
S2‑132321 | Revised WID for Web Real Time Communication (WebRTC) Access to IMS | Alcatel-Lucent, AT&T, Broadcom Corporation, China Mobile, China Telecom, Deutsche Telekom, Ericsson, Huawei, Intel , Nokia, Nokia Siemens Networks, NTT, NTT DoCoMo, Orange, Qualcomm, Telecom Italia, T-Mobil, Verizon | Approved |
S2‑132322 | Skeleton for IMS_WebRTC TR | Alcatel-Lucent | Approved |
S2‑132323 | LS reply on NAT and GIBA | SA WG2 | Approved |
S2‑132324 | Reply LS on End-to-end QoS handling of MTSI | SA WG2 | Approved |
S2‑132325 | LS on LAPI for NNSF | SA WG2 | Approved |
S2‑132326 | Reply LS on interaction of oneM2M with Underlying Networks | SA WG2 | Approved |
S2‑132327 | LS on requesting input on security aspects for MTCe solutions | SA WG2 | Approved |
S2‑132328 | Cover Sheet for TR 23.865 for information at TSG SA | Rapporteur (WLAN_NS - Intel) | Approved |
S2‑132329 | LS on PC4_F assumptions and status update | SA WG2 | Approved |
S2‑132330 | CSFB priority call handling in a network supporting Multimedia Priority Service | SA WG2 | Approved |
S2‑132331 | QoS based congestion feedback | Ericsson, ST-Ericsson | Approved |
S2‑132332 | Clarification of GTP-u based RAN Congestion Awareness Solution | China Mobile, NEC, AT&T, Samsung, Nokia Siemens Networks | Approved |
S2‑132333 | Operator control of RAN congestion handling | Ericsson, ST-Ericsson | Approved |
page generated from database: 2024-04-22 07:58:53