3GPP TDocs (written contributions) at meeting
Meeting: R4-90b - 2019-04-08 to 2019-04-12, Xi'an
meeting id: R4-90b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑1902800 | Agenda for RAN4 #90bis | RAN4 Chairman | imported from 3GU |
R4‑1902801 | RAN4#90 Meeting Report | ETSI MCC | imported from 3GU |
R4‑1902802 | LS on UE-UE CLI measurement/reporting and Network coordination mechanism for CLI | RAN1, LG Electronics | imported from 3GU |
R4‑1902803 | LS to ETSI BRAN on EN 301 893 | RAN1, Qualcomm Incorporated | imported from 3GU |
R4‑1902804 | LS on OTA timing alignment for IAB | RAN1, Huawei | imported from 3GU |
R4‑1902805 | Response LS on FR1 range | RAN1, Qualcomm | imported from 3GU |
R4‑1902806 | LS on SL RLM / RLF in NR V2X for unicast | RAN2, Apple | imported from 3GU |
R4‑1902807 | Reply LS to TSG RAN regarding LTE LAA channel combinations for 5GHz | RAN2, Charter | imported from 3GU |
R4‑1902808 | LS on Reporting criteria limitation in MR-DC | RAN2, Ericsson | imported from 3GU |
R4‑1902809 | LS on capability of same UL timing between NR and LTE | RAN2, Huawei | imported from 3GU |
R4‑1902810 | LS on clarification about CSI-RS measurement | RAN2, ZTE | imported from 3GU |
R4‑1902811 | LS on capability of measurement gap patterns | RAN2, MediaTek | imported from 3GU |
R4‑1902812 | RAN2 MR-DC enhancement agreements | RAN2, Vivo | imported from 3GU |
R4‑1902813 | LS on autonomous gap for NR ANR | RAN2, Qualcomm | imported from 3GU |
R4‑1902814 | LS on NR mobility enhancements | RAN2, Intel | imported from 3GU |
R4‑1902815 | LS on SFTD measurement for NR-DC in Rel-15 | RAN2, ZTE | imported from 3GU |
R4‑1902816 | LS on UL sharing applicability in different scenarios | RAN2, Nokia | imported from 3GU |
R4‑1902817 | LS on responsibility over sections of 37.461 | RAN3, Nokia | imported from 3GU |
R4‑1902818 | Reply to GTI LS - 5G NR SA Industry Progress | RAN5, CMCC | imported from 3GU |
R4‑1902819 | LS on SA Option 2 Core Requirement Dependencies | RAN5, CMCC | imported from 3GU |
R4‑1902820 | Response LS on Invitation to Coexistence Workshop in Vienna | RAN, Nokia | imported from 3GU |
R4‑1902821 | Reply LS to IEEE 802.11 working group in relation to certain channel combinations for LAA in 5GHz | RAN, Charter | imported from 3GU |
R4‑1902822 | LS on NR V2X spectrum allocation | 5GAA WG4 | imported from 3GU |
R4‑1902823 | CEPT/ECC developments in the 410 – 470 MHz band | ECC | imported from 3GU |
R4‑1902824 | LS on test methods over-the-air TRP measurements of IMT radio equipment utilizing active antennas | ITU-R WP5D | imported from 3GU |
R4‑1902825 | LS on OTA testing of IoT devices | GSMA | imported from 3GU |
R4‑1902826 | Draft CR for 38.101-1 modification of ACS test parameters case 2 for intra-band contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1902827 | Draft CR for 38.101-1: editoral correction | Huawei, HiSilicon | imported from 3GU |
R4‑1902828 | Draft CR for 38.101-1 definition of Maximum input level for intra-band contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1902829 | Draft CR for 38.101-3 editoral correction for editorial correction for intra-band contiguous EN-DC uplink configuration when Rx requirements are measured | Huawei, HiSilicon | imported from 3GU |
R4‑1902830 | Summary of ideal and impairment results for NR BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1902831 | Ideal simulation results for FR1 PUSCH mapping type B | China Telecom | imported from 3GU |
R4‑1902832 | Impairment simulation results for FR1 PUSCH mapping type B | China Telecom | imported from 3GU |
R4‑1902833 | Further discussion on applicability rule for BS demodulation requirements | China Telecom | imported from 3GU |
R4‑1902834 | Draft CR to TS 38.141-1: Update of applicability rule for BS conducted demodulation test | China Telecom | imported from 3GU |
R4‑1902835 | Draft CR to TS 38.141-2: Update of applicability rule for BS radiated demodulation test | China Telecom | imported from 3GU |
R4‑1902836 | Draft CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1902837 | Draft CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1902838 | Draft CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1902839 | Draft CR to TS 38.104: FRC update for PUSCH FR1 mapping type B and FR2 DMRS 1+1 | China Telecom | imported from 3GU |
R4‑1902840 | Draft CR to TS 38.141-1: FRC update for PUSCH FR1 mapping type B | China Telecom | imported from 3GU |
R4‑1902841 | Draft CR to TS 38.141-2: FRC update for PUSCH FR1 mapping type B and FR2 DMRS 1+1 | China Telecom | imported from 3GU |
R4‑1902842 | Draft CR to TS 38.141-1: Removal of the square brackets on MU and TT for FR1 conducted BS demodulation test | China Telecom | imported from 3GU |
R4‑1902843 | Draft WID on NR performance requirement enhancement | China Telecom | imported from 3GU |
R4‑1902844 | Motivation for new WI on NR performance requirement enhancement | China Telecom | imported from 3GU |
R4‑1902845 | DraftCR to EN-DC of 1 LTE band and 1 NR band for TS 38.101- | Verizon, Ericsson | imported from 3GU |
R4‑1902846 | On FR2 EIS | Qualcomm Incorporated | imported from 3GU |
R4‑1902847 | Draft CR to 38.101-2: FR2 Sensitivity | Qualcomm Incorporated | imported from 3GU |
R4‑1902848 | On FR2 PC1 MPR and OBW | Qualcomm Incorporated | imported from 3GU |
R4‑1902849 | Draft CR to 38.101-2: FR2 PC1 MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1902850 | On FR2 PC3 MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1902851 | Draft CR to 38.101-2: FR2 PC3 MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1902852 | On FR2 MPR for CA | Qualcomm Incorporated | imported from 3GU |
R4‑1902853 | Draft CR to 38.101-2: FR2 PC3 CA MPR enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1902854 | Draft CR to 38.817-01: FR2 CA MPR explained | Qualcomm Incorporated | imported from 3GU |
R4‑1902855 | OTA Test Considerations for UL in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1902856 | Draft CR to 38.101-2: OTA test requirement exception | Qualcomm Incorporated | imported from 3GU |
R4‑1902857 | LS on test-only signalling requirement for FR2 UEs | Qualcomm Incorporated | imported from 3GU |
R4‑1902858 | Draft CR to 38.101-2: FR2 ULMIMO EVM | Qualcomm Incorporated | imported from 3GU |
R4‑1902859 | On DL polarizations employed in OTA FR2 Testing | Qualcomm Incorporated | imported from 3GU |
R4‑1902860 | Draft CR to 38.101-2: Updating MPR wording in ULMIMO section | Qualcomm Incorporated | imported from 3GU |
R4‑1902861 | Draft CR to 38.101-2: Redirecting PC2/PC4 requirements to PC3 requirements where they are aligned | Qualcomm Incorporated | imported from 3GU |
R4‑1902862 | On inter-RAT RSTD measurement requirement | Intel Corporation | imported from 3GU |
R4‑1902863 | CR for inter-RAT RSTD measurement requirement (section 9.4.4) | Intel Corporation | imported from 3GU |
R4‑1902864 | UE behavior on collision of downlink reception | Intel Corporation | imported from 3GU |
R4‑1902865 | Reply LS on UE behavior on reception of channels or RS in the same OFDM symbol | Intel Corporation | imported from 3GU |
R4‑1902866 | Discussion on RAN2 LS on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1902867 | Reply LS on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1902868 | On feasibility of enhanced handover in different scenarios | Intel Corporation | imported from 3GU |
R4‑1902869 | Way forward on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1902870 | Nominal Channel Spacing for CA for FR1 and FR2 | Intel Corporation | imported from 3GU |
R4‑1902871 | Draft CR for Nominal Channel Spacing for CA in TS 38.101-1 | Intel Corporation | imported from 3GU |
R4‑1902872 | Draft CR for Nominal Channel Spacing for CA in TS 38.101-2 | Intel Corporation | imported from 3GU |
R4‑1902873 | Clarification on intra-band EN-DC notation | Intel Corporation | imported from 3GU |
R4‑1902874 | Grouping of EN-DC configuration in TS 38.101-3 | Intel Corporation | imported from 3GU |
R4‑1902875 | Draft CR to optimize EN-DC configuration definition in TS 38.101-3 | Intel Corporation | imported from 3GU |
R4‑1902876 | NR PDSCH UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1902877 | Summary of NR PDSCH demodulation simulation results (FR1 FDD) | Intel Corporation | imported from 3GU |
R4‑1902878 | Summary of NR PDSCH demodulation simulation results (FR1 TDD) | Intel Corporation | imported from 3GU |
R4‑1902879 | Summary of NR PDSCH demodulation simulation results (FR2) | Intel Corporation | imported from 3GU |
R4‑1902880 | Summary of SDR simulation results | Intel Corporation | imported from 3GU |
R4‑1902881 | NR SDR performance requirements | Intel Corporation | imported from 3GU |
R4‑1902882 | Draft CR on FR1 normal PDSCH demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1902883 | Draft CR on FR1 SDR requirements | Intel Corporation | imported from 3GU |
R4‑1902884 | Draft CR on EN-DC SDR requirements | Intel Corporation | imported from 3GU |
R4‑1902885 | Draft CR on DL power allocation for TS 38.101-4 | Intel Corporation | imported from 3GU |
R4‑1902886 | Draft CR on HARQ timing for TDD patterns | Intel Corporation | imported from 3GU |
R4‑1902887 | simulation results of RSS for Rel-16 additional MTC enhancements for LTE | Intel Corporation | imported from 3GU |
R4‑1902888 | Discussion about L1-RSRP measurement requirement for beam reporting | Intel Corporation | imported from 3GU |
R4‑1902889 | Discussion about NR RSRP performance accuracy test for FR2 | Intel Corporation | imported from 3GU |
R4‑1902890 | Discussion about remaining issue about NR RLM | Intel Corporation | imported from 3GU |
R4‑1902891 | Draft CR for remaining issues in RLM requirements(section 8.1.2.1 8.1.2.2 8.1.3.1 8.1.3.2) | Intel Corporation | imported from 3GU |
R4‑1902892 | SS block RSRP performance analysis | Intel Corporation | imported from 3GU |
R4‑1902893 | Further discussion on collision of RRM measurement with UL transmission | Intel Corporation | imported from 3GU |
R4‑1902894 | CR on Scheduling availability for intra-freq meas wo gap for R15 (section 9.2.5.3.1) | Intel Corporation | imported from 3GU |
R4‑1902895 | Reply LS on collision of RRM measurement with UL transmission | Intel Corporation | imported from 3GU |
R4‑1902896 | Futher discussion on MRTD requirement for intra-band NCCA | Intel Corporation | imported from 3GU |
R4‑1902897 | CR on MRTD requirement for intra-band NCCA (section 7.6.4) | Intel Corporation | imported from 3GU |
R4‑1902898 | Further discussion on MTTD and MRTD for intra-band EN-DC | Intel Corporation | imported from 3GU |
R4‑1902899 | CR on MTTD and MRTD for intra-band EN-DC (section 7.5.3 & section 7.6.3) | Intel Corporation | imported from 3GU |
R4‑1902900 | Updated reply LS on intra-band combination for NR-CA and MR-DC | Intel Corporation | imported from 3GU |
R4‑1902901 | Motivation to introduce new SI of MG enh | Intel Corporation | imported from 3GU |
R4‑1902902 | New SI Proposal Study on measurement gap enhancement | Intel Corporation | imported from 3GU |
R4‑1902903 | On scope of non-BL UE in CE mode for R15 eFeMTC WI | Intel Corporation | imported from 3GU |
R4‑1902904 | CR on requirement applicability for non-BL CE UE for R15 | Intel Corporation | imported from 3GU |
R4‑1902905 | CR on requirement applicability for non-BL CE UE for R16 | Intel Corporation | imported from 3GU |
R4‑1902906 | Discussion on SCell activation delay in FR2 | Intel Corporation | imported from 3GU |
R4‑1902907 | CR on TS38.133 for SCell activation in FR2 (Section 8.3.2) | Intel Corporation | imported from 3GU |
R4‑1902908 | Draft CR for NE-DC interruption requirements in TS38.133 (Section 8.2.3.2) | Intel Corporation | imported from 3GU |
R4‑1902909 | Draft CR for NR-NR DC interruption requirements in TS38.133 (Section 8.2.4.2) | Intel Corporation | imported from 3GU |
R4‑1902910 | Discussion on NR-U RRM | Intel Corporation | imported from 3GU |
R4‑1902911 | WF on NR-U RRM | Intel Corporation | imported from 3GU |
R4‑1902912 | Discussion on TS38.133 specification structures for NR-U | Intel Corporation | imported from 3GU |
R4‑1902913 | draft CR to 38.101-1 Correction to Pi/2 BPSK power boosting | Intel Corporation | imported from 3GU |
R4‑1902914 | draft CR to 38.101-2 Add Frequency Separation Class definition | Intel Corporation | imported from 3GU |
R4‑1902915 | draft CR to TR 38.817-01 Frequency separation class, accumulative aggregate bandwidth and MPR for CA explained | Intel Corporation | imported from 3GU |
R4‑1902916 | on PSD check on intra-band EN-DC and NE-DC | Intel Corporation | imported from 3GU |
R4‑1902917 | draft CR to 38.101-3 Update condition to apply MPR/AMPR | Intel Corporation | imported from 3GU |
R4‑1902918 | Configured output power for inter-band EN-DC including both FR1 and FR2 | Intel Corporation | imported from 3GU |
R4‑1902919 | draft CR to 38.101-3 Configured output power for inter-band EN-DC including both FR1 and FR2 | Intel Corporation | imported from 3GU |
R4‑1902920 | Configured output power for inter-band NE-DC | Intel Corporation | imported from 3GU |
R4‑1902921 | draft CR to TS38.101-3 Configured output power for Inter-band NE-DC | Intel Corporation | imported from 3GU |
R4‑1902922 | draft CR to 38.101-2 Correction to ACS and In-band Blocking notes | Intel Corporation | imported from 3GU |
R4‑1902923 | on beam correspondence tolerance requirements | Intel Corporation | imported from 3GU |
R4‑1902924 | on FR2 Tx spurious emission | Intel Corporation | imported from 3GU |
R4‑1902925 | Draft CR to TS 38.101-1 A-MPR Corrections | Intel Corporation | imported from 3GU |
R4‑1902926 | Draft CR to TS 38.101-1 Correction to Pcmax | Intel Corporation | imported from 3GU |
R4‑1902927 | Draft CR to TS38.101-3 Intra-band EN-DC A-MPR | Intel Corporation | imported from 3GU |
R4‑1902928 | Draft CR to TS 38.101-2 PC3 MPR for narrow allocations | Intel Corporation | imported from 3GU |
R4‑1902929 | Draft CR to TS 38.101-2 PC2/PC4 MPR | Intel Corporation | imported from 3GU |
R4‑1902930 | On PC1 MPR and CA MPR | Intel Corporation | imported from 3GU |
R4‑1902931 | Draft CR to TS 38.101-2 PC1 MPR and CA MPR | Intel Corporation | imported from 3GU |
R4‑1902932 | Draft CR to TS 38.101-2 Correction to Pcmax | Intel Corporation | imported from 3GU |
R4‑1902933 | Draft CR to TS 38.101-2 CA maximum input level | Intel Corporation | imported from 3GU |
R4‑1902934 | SNR, Es and Noc setup for NR FR1 and FR2 UE performance requirements | Intel Corporation | imported from 3GU |
R4‑1902935 | NR FR2 RRM test methods: 1AoA Rough/Fine beams antenna gain difference | Intel Corporation | imported from 3GU |
R4‑1902936 | NR FR2 RRM test methods: 2AoA scenario single beam antenna gain difference | Intel Corporation | imported from 3GU |
R4‑1902937 | Discussion on TCI State Switching Requirements | Intel Corporation | imported from 3GU |
R4‑1902938 | Way Forward on TCI State Switching Requirements | Intel Corporation | imported from 3GU |
R4‑1902939 | Discussion on SSB based Beam Failure Detection Requirements | Intel Corporation | imported from 3GU |
R4‑1902940 | Way Forward on SSB based Beam Failure Detection Requirements | Intel Corporation | imported from 3GU |
R4‑1902941 | Discussion on Scale factor N for Beam Failure Detection Requirements | Intel Corporation | imported from 3GU |
R4‑1902942 | Draft CR to 38.133 on Evaluation period in FR2 for Beam Failure Detection (Section 8.5.3) | Intel Corporation | imported from 3GU |
R4‑1902943 | Discussion on Scale factor N for Candidate Beam Detection Requirements | Intel Corporation | imported from 3GU |
R4‑1902944 | Draft CR to 38.133 on Evaluation period in FR2 for Candidate Beam Detection (Section 8.5.6) | Intel Corporation | imported from 3GU |
R4‑1902945 | Draft CR to 38.101-4 on Applicability of requirements (Section 5.1.1.2) | Intel Corporation | imported from 3GU |
R4‑1902946 | NR PDCCH UE Demodulation Requirements | Intel Corporation | imported from 3GU |
R4‑1902947 | NR PBCH UE Demodulation Requirements | Intel Corporation | imported from 3GU |
R4‑1902948 | LTE HST performance evaluation - Bidirectional HST SFN scenario | Intel Corporation | imported from 3GU |
R4‑1902949 | LTE HST performance evaluation - Unidirectional HST SFN scenario | Intel Corporation | imported from 3GU |
R4‑1902950 | Simulation results and discussion on NR CQI reporting | Intel Corporation | imported from 3GU |
R4‑1902951 | Simulation results and discussion on NR PMI reporting | Intel Corporation | imported from 3GU |
R4‑1902952 | Simulation results and discussion on NR RI reporting | Intel Corporation | imported from 3GU |
R4‑1902953 | Draft CR on NR CSI reporting | Intel Corporation | imported from 3GU |
R4‑1902954 | Discussion on the demodulation requirement of Rel.16 LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1902955 | FR2 RRM: 2 AoA Test cases in 38.133 Annex A | ANRITSU LTD | imported from 3GU |
R4‑1902956 | Update of RRM test case A.7.6.2.1 | ANRITSU LTD | imported from 3GU |
R4‑1902957 | Side Conditions for FR2 RRM Requirements in 38.133 | ANRITSU LTD | imported from 3GU |
R4‑1902958 | FR2 Intra- and Inter-frequency SS-RSRP side conditions 10.1.3.1, 10.1.5.1, B.1.2, B.2.2, B.2.3. | ANRITSU LTD | imported from 3GU |
R4‑1902959 | Method to derive Minimum SSB_RP side condition values in B.2 | ANRITSU LTD | imported from 3GU |
R4‑1902960 | Angles of Arrival for UE RRM test cases | ANRITSU LTD | imported from 3GU |
R4‑1902961 | LTE-M PUR RSRP TA Validation Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R4‑1902962 | NB-IOT PUR RSRP TA Validation Design Considerations | Sierra Wireless, S.A. | imported from 3GU |
R4‑1902963 | Views on NR UE CSI Reporting Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1902964 | Draft CR on TDD UL-DL Configurations | Qualcomm Incorporated | imported from 3GU |
R4‑1902965 | Views on PDSCH Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1902966 | Views on General Parameters for NR UE Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1902967 | On UE CBW determination in RRC_idle state | SoftBank Corp. | imported from 3GU |
R4‑1902968 | Considerations on LTE/NR spectrum sharing in n41 | SoftBank Corp. | imported from 3GU |
R4‑1902969 | TP for TR 37.716-31-11: EN-DC_1-3-8_n77 | SoftBank Corp. | imported from 3GU |
R4‑1902970 | TP for TR 37.716-31-11: EN-DC_1-3-8_n79 | SoftBank Corp. | imported from 3GU |
R4‑1902971 | TP for TR 37.716-21-11: EN-DC_1-11_n257 | SoftBank Corp. | imported from 3GU |
R4‑1902972 | TP for TR 37.716-21-11: EN-DC_8-11_n257 | SoftBank Corp. | imported from 3GU |
R4‑1902973 | TP for TR 37.716-21-21: EN-DC_8_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1902974 | Draft CR for TS 38.101-3: Support of DL_n257D in DC_11_n257 | SoftBank Corp. | imported from 3GU |
R4‑1902975 | Draft CR on PRACH and PUCCH format description for EVM in FR1 | Anritsu corporation | imported from 3GU |
R4‑1902976 | Draft CR on PRACH and PUCCH format description for EVM in FR2 | Anritsu corporation | imported from 3GU |
R4‑1902977 | Draft CR to clarify frequency of carrier leakage in RBs for FR1 | Anritsu corporation | imported from 3GU |
R4‑1902978 | Draft CR to clarify frequency of carrier leakage in RBs for FR2 | Anritsu corporation | imported from 3GU |
R4‑1902979 | On UE timing requirement under beam switching for FR2 | Intel Corporation | imported from 3GU |
R4‑1902980 | On the requirement for RRC based BWP switching | Intel Corporation | imported from 3GU |
R4‑1902981 | Reply LS on RRC based BWP switching | Intel Corporation | imported from 3GU |
R4‑1902982 | CR on BWP switching requirement in TS38.133 (Section 8.6) | Intel Corporation | imported from 3GU |
R4‑1902983 | Discussion on interruption requirement due to BWP switching in synchronous EN-DC | Intel Corporation | imported from 3GU |
R4‑1902984 | CR on interruption due to BWP switching in TS36.133 for R15 | Intel Corporation | imported from 3GU |
R4‑1902985 | CR on interruption due to BWP switching in TS36.133 for R16 | Intel Corporation | imported from 3GU |
R4‑1902986 | On UE timing related requirements in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1902987 | On radio link monitoring in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1902988 | On measurement requirement in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1902989 | Performance evaluation for cell identification time in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1902990 | On NR V2X RRM characteristics | Intel Corporation | imported from 3GU |
R4‑1902991 | draft CR to 38.101-3 Update configured output power for intra-band EN-DC | Intel Corporation | imported from 3GU |
R4‑1902992 | Draft CR for TS 38.101-3: Support of DL n257G-I in CA_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1902993 | Draft CR for TS 38.101-3: Support of DL_n257G-I in DC_1_n77-n257 | SoftBank Corp. | imported from 3GU |
R4‑1902994 | Draft CR for TS 38.101-3: Support of DL 41C in DC_28-41_n77, DC_28-41_n78 and DC_28-41_n79 | SoftBank Corp. | imported from 3GU |
R4‑1902995 | TP for TR 37.716-21-11: EN-DC_1-11_n77 | SoftBank Corp. | imported from 3GU |
R4‑1902996 | TP for TR 37.716-21-11: EN-DC_1-11_n78 | SoftBank Corp. | imported from 3GU |
R4‑1902997 | TP for TR 37.716-21-11: EN-DC_8-11_n77 | SoftBank Corp. | imported from 3GU |
R4‑1902998 | TP for TR 37.716-21-11: EN-DC_8-11_n78 | SoftBank Corp. | imported from 3GU |
R4‑1902999 | Initial analysis on handover delay for LTE_feMob | China Telecom | imported from 3GU |
R4‑1903000 | Introduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903001 | TP for TR 36.716-03-01 Introduction of CA_3-7-46 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903002 | TP for TR 37.716-02-00 Introduction of CA_n41-n261 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903003 | TP for TR 37.716-02-00 Introduction of CA_n25-n261 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903004 | TP for TR 37.716-21-11 Introduction of DC_2A-30A_n5A and DC_2A-2A-30A_n5A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903005 | TP for TR 37.716-11-11 Introduction of DC_66A-66A_n5A and DC_66A-66A-66A_n5A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903006 | TP for TR 37.716-11-11 Introduction of DC_2A-2A_n5A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903007 | TR 37.716-21-21 v0.4.0 update: LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1903008 | Revised WID on LTE (xDL/UL x=1.2,3,4) with NR 2 bands (2DL/1UL) EN DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1903009 | Introducing CR on new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1903010 | TP on summary of self-interference analysis for new EN-DC LTE(xDL/1UL)+ NR(2DL/1UL) DC in rel-16 | LG Electronics France | imported from 3GU |
R4‑1903011 | MSD results for new LTE xbands DL_1band UL (x=1,2,3,4) + NR 2bands DL_1band UL DC with self-interference problems | LG Electronics France | imported from 3GU |
R4‑1903012 | TP on MSD analysis results for LTE(2DL/1UL) + NR(1DL/1UL) DC UE | LG Electronics France | imported from 3GU |
R4‑1903013 | Further discussion FBW | CMCC | imported from 3GU |
R4‑1903014 | draft CR to TR 38.817-02 - Addition of FR2 TX ON OFF transient background | CMCC | imported from 3GU |
R4‑1903015 | draft CR to TS 38.141-2 - Addition of FR2 TRP OFF test procedure | CMCC | imported from 3GU |
R4‑1903016 | draft CR to TS 38.141-2 - Addition of FR2 TX transient period test procedure | CMCC | imported from 3GU |
R4‑1903017 | Skeleton for TR37.825 WID on High power UE (power class 2) for EN-DC (1 LTE TDD band + 1 NR TDD band) | CMCC | imported from 3GU |
R4‑1903018 | General part TP for TR37.825: PC2 EN-DC (1 LTE TDD band + 1 NR TDD band) | CMCC | imported from 3GU |
R4‑1903019 | TP for TR37.825 for PC2 EN-DC_41A-79A | CMCC | imported from 3GU |
R4‑1903020 | TP for TR37.825 for PC2 EN-DC_39A-79A | CMCC | imported from 3GU |
R4‑1903021 | TP for TR37.825 for PC2 EN-DC_39A-41A | CMCC | imported from 3GU |
R4‑1903022 | TP for TR37.825 for PC2 EN-DC_(n)41AA | CMCC | imported from 3GU |
R4‑1903023 | TP for TR37.825 for PC2 EN-DC_41A-n41A. | CMCC | imported from 3GU |
R4‑1903024 | SAR requirements for PC2 EN-DC (1 LTE TDD band + 1 NR TDD band) | CMCC | imported from 3GU |
R4‑1903025 | Beam correspondence for tolerance based requirement with UE beam sweeping | LG Electronics France | imported from 3GU |
R4‑1903026 | Consideration on Uldutycycle default value for MPE regulations at FR2 | LG Electronics France | imported from 3GU |
R4‑1903027 | Draft CR on revised configured Tx power for MPE reguratory requirements | LG Electronics France | imported from 3GU |
R4‑1903028 | Work plan of NR V2X | LG Electronics France | imported from 3GU |
R4‑1903029 | Draft reply LS on NR V2X UE RF parameters for NR V2X service at FR1 | LG Electronics France | imported from 3GU |
R4‑1903030 | Initial coexistence simulation assumptions of NR V2X | LG Electronics France | imported from 3GU |
R4‑1903031 | Initial coexistence simulation assumptions of NR V2X | LG Electronics France | imported from 3GU |
R4‑1903032 | Draft CR on editorial error of TS38.101-1 | LG Electronics France | imported from 3GU |
R4‑1903033 | Draft CR on editorial error of TS38.101-2 | LG Electronics France | imported from 3GU |
R4‑1903034 | TP on summary of self-interference analysis for new x bands DL (X=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1903035 | TP for TR 36.716-03-02 LTE-A inter-band CA 3 bands DL with 2 bands DL | LG Electronics Finland | imported from 3GU |
R4‑1903036 | MSD test results for new x bands DL (x=3,4,5) with 2 bands UL CA in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1903037 | TR skeleton for Co-existence study of Cross-Link Interference (CLI) | LG Electronics Finland | imported from 3GU |
R4‑1903038 | Co-existence simulation results of CLI | LG Electronics Finland | imported from 3GU |
R4‑1903039 | TP on CLI scenarios and system level simulation assumption | LG Electronics Finland | imported from 3GU |
R4‑1903040 | TP on initial conclusions of co-existence evaluation of CLI | LG Electronics Finland | imported from 3GU |
R4‑1903041 | TR 36.716-03-02 v0.4.0 update: LTE-A x bands DL (x=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics France | imported from 3GU |
R4‑1903042 | Revised WID on x bands (x=3,4,5) DL with 2 bands UL inter-band CA in rel-16 | LG Electronics France | imported from 3GU |
R4‑1903043 | Introducing CR on new x bands (x=3,4,5) DL with 2 bands UL inter-band CA in TS36.101 rel-16 | LG Electronics France | imported from 3GU |
R4‑1903044 | On beam correspondence EIRP2 test procedure and SRS resources | Fraunhofer HHI, Fraunhofer IIS | imported from 3GU |
R4‑1903045 | Discussion on the FR2 duty cycle capability impact to RMC definition | OPPO | imported from 3GU |
R4‑1903046 | Discussion on the FR2 duty cycle lowest range | OPPO | imported from 3GU |
R4‑1903047 | Discussion on the FR2 duty cycle capability default value | OPPO | imported from 3GU |
R4‑1903048 | Draft CR on time window of UL duty cycle scheduling | OPPO | imported from 3GU |
R4‑1903049 | LS on FR2 maxUplinkDutyCycle capability values | OPPO | imported from 3GU |
R4‑1903050 | Draft CR on ACLR requirement for UL MIMO | OPPO | imported from 3GU |
R4‑1903051 | Discussion on FR2 extreme condition way forward | OPPO | imported from 3GU |
R4‑1903052 | Further discussion on LTE anchor agnostic tests in 38.101-3 | OPPO | imported from 3GU |
R4‑1903053 | Reply LS on LTE anchor agnostic tests in 38.101-3 | OPPO | imported from 3GU |
R4‑1903054 | Discussion on TDD inter-band NSA HPUE SAR | OPPO | imported from 3GU |
R4‑1903055 | Discussion on NSA FDD-TDD HPUE SAR solutions | OPPO | imported from 3GU |
R4‑1903056 | Further views on the impact of polarization basis mismatch between test equipment and UE on the beam correspondence test procedure | Apple Inc. | imported from 3GU |
R4‑1903057 | Views on FR1 MIMO OTA test methodology | Apple Inc. | imported from 3GU |
R4‑1903058 | Views on FR1 boundary frequency in the 7-24 GHz frequency range | Apple Inc. | imported from 3GU |
R4‑1903059 | Views on the relationship between FR2 peak and spherical requirements in core and test specifications | Apple Inc. | imported from 3GU |
R4‑1903060 | Draft LS to RAN5 on the relationship between FR2 peak and spherical requirements in core and test specifications | Apple Inc. | imported from 3GU |
R4‑1903061 | Recommendations on finalizing the FR2 environmental condition and REFSENS aspects | Apple Inc. | imported from 3GU |
R4‑1903062 | Draft CR to 38.817-01 to align system level simulation assumptions with MPR definition | Apple Inc. | imported from 3GU |
R4‑1903063 | Draft CR to 38.101-2: finalizing TPC requirements | Apple Inc. | imported from 3GU |
R4‑1903064 | Updated analysis of FR2 power control tolerance | Apple Inc. | imported from 3GU |
R4‑1903065 | Draft LS to RAN5 on the applicability of UL RMCs to MOP test cases | Apple Inc. | imported from 3GU |
R4‑1903066 | Cross-WG issues related to the development of solutions to mitigate performance under the MPE scenario | Apple Inc. | imported from 3GU |
R4‑1903067 | Draft CR to 38.101-2 on UL RMC slot patterns | Apple Inc. | imported from 3GU |
R4‑1903068 | Draft LS to RAN1 on potential beam management enhancement in maximum permissible exposure scenarios | Apple Inc. | imported from 3GU |
R4‑1903069 | On the relationship between maxUplinkDutyCycle and UL RMC slot patterns | Apple Inc. | imported from 3GU |
R4‑1903070 | Views on the maxUplinkDutyCycle capability values | Apple Inc. | imported from 3GU |
R4‑1903071 | Views on beam correspondence core requirement definition | Apple Inc. | imported from 3GU |
R4‑1903072 | Recommendations for the work plan on Band n259 | Apple Inc. | imported from 3GU |
R4‑1903073 | Views on Band n259 lower limit and overlap with Band n260 | Apple Inc. | imported from 3GU |
R4‑1903074 | Draft CR to 38.101-3 rel. 15 to fix missing SUO note | Apple Inc. | imported from 3GU |
R4‑1903075 | Improving band configuration tables | Apple Inc. | imported from 3GU |
R4‑1903076 | Draft CR to TS 38.101-3 on addition of missing Inter-band EN-DC configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903077 | TP for TR 37.716-21-11 DC_2A-2A-66A-66A_n5A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903078 | TP for TR 37.716-21-11 DC_30A-66A-66A_n5A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903079 | TP for TR 37.716-21-21 DC_1A_n40A-n78A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903080 | TP for TR 37.716-21-21 DC_3A_n40A-n78A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903081 | TP for TR 37.716-31-11 DC_2A-30A-66A_n5A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903082 | TP for TR 37.716-11-11 DC_1A_n258A and DC_1A_n258D | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903083 | Maximum uplink duty cycle for FR2 UE and its implications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903084 | Draft CR to TS38.101-2 on FR2 PC3 UE maxUplinkDutyCycle | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903085 | TP for TR38.716-02-00: Requirements for CA_n66B-n70A | Dish Network | imported from 3GU |
R4‑1903086 | TP for TR38.716-02-00: Requirements for CA_n66(2A)-n70A | Dish Network | imported from 3GU |
R4‑1903087 | TP for TR38.716-02-00: Requirements for CA_n66(2A)-n71A | Dish Network | imported from 3GU |
R4‑1903088 | Inter-band NE-DC - Pcmax requirement definition | InterDigital Communications | imported from 3GU |
R4‑1903089 | Draft CR for Pcmax for Rel-15 inter-band NE-DC within FR1 | InterDigital Communications | imported from 3GU |
R4‑1903090 | Pcmax for Rel-15 intra-band EN-DC within FR1 wrong references - fixes | InterDigital Communications | imported from 3GU |
R4‑1903091 | Intra-band NE-DC - Pcmax requirement definition - specification impact | InterDigital Communications | imported from 3GU |
R4‑1903092 | draftCR to TS 38.101-3: sub-clauses numbering restructuring to accommodate NE-DC and NR-DC | InterDigital Communications | imported from 3GU |
R4‑1903093 | CR to exclude 100kHz for NBIOT for B26 band edge operation | Qualcomm Inc. | imported from 3GU |
R4‑1903094 | CR to exclude 100kHz for NBIOT for B26 band edge operation | Qualcomm Inc. | imported from 3GU |
R4‑1903095 | CR to exclude 100kHz for NBIOT for B26 band edge operation | Qualcomm Inc. | imported from 3GU |
R4‑1903096 | AGC settling time for V2X | Qualcomm Inc. | imported from 3GU |
R4‑1903097 | AMPR sims for CAT M1 and CAT M2 | Qualcomm Inc. | imported from 3GU |
R4‑1903098 | Transient period data on existing LTE phones | Qualcomm Inc. | imported from 3GU |
R4‑1903099 | CR to TS 37.105: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903100 | CR to TS 37.145-1: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903101 | CR to TS 37.145-2: Corrections on out-of-band blocking requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903102 | Draft CR to TS 38.104: Corrections on time alignment error requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903103 | Draft CR to TS 38.141-1: Corrections on time alignment error requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903104 | Draft CR to TS 38.141-2: Corrections on time alignment error requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903105 | Draft CR to TS 38.104: Corrections on terminologies and editorial errors | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903106 | Draft CR to TS 38.104: Clarification on application of interfering signal offsets for ACS, blocking and intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903107 | Draft CR to TS 38.141-1: Clarification on application of interfering signal offsets for ACS, blocking and intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903108 | Draft CR to TS 38.141-2: Clarification on application of interfering signal offsets for ACS, blocking and intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903109 | Draft CR to TS 38.104: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903110 | Draft CR to TS 38.141-1: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903111 | Draft CR to TS 38.141-2: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903112 | System level simulation results for coexistence study between R15 NR and R13/R14/R15 NB-IoT standalone operation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903113 | System level simulation results for coexistence study between R15 NR and R13/R14/R15 NB-IoT standalone operation (with NR channel model) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903114 | Consideration on NB-IoT operation within NR channel bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903115 | System level simulation results for coexistence study on 29dBm UE Power Class for LTE Band 41 and NR Band n41 (urban and suburban areas with 10MHz channel bandwidth) | Nokia, Sprint | imported from 3GU |
R4‑1903116 | System level simulation results for coexistence study on 29dBm UE Power Class for LTE Band 41 and NR Band n41 (rural areas with 10MHz channel bandwidth) | Nokia, Sprint | imported from 3GU |
R4‑1903117 | Summary and conclusions for coexistence study on 29dBm UE Power Class for LTE Band 41 and NR Band n41 | Nokia, Sprint | imported from 3GU |
R4‑1903118 | On NR V2X in-band emission model | Qualcomm Inc. | imported from 3GU |
R4‑1903119 | On Simulation Assumptions for HST Demod Test | Qualcomm Incorporated | imported from 3GU |
R4‑1903120 | Draft CR on DL power allocation for TS 38.101-1 | Intel Corporation | imported from 3GU |
R4‑1903121 | Draft CR on DL power allocation for TS 38.101-2 | Intel Corporation | imported from 3GU |
R4‑1903122 | NR SDR simulation results | Intel Corporation | imported from 3GU |
R4‑1903123 | On SRS antenna switching in FR2 | Intel Corporation | imported from 3GU |
R4‑1903124 | Draft CR on b41-n40 coexistence | Intel Corporation | imported from 3GU |
R4‑1903125 | On NR V2X IBE | Intel Corporation | imported from 3GU |
R4‑1903126 | maxULDutycycle limit parameters | Qualcomm Incorporated | imported from 3GU |
R4‑1903127 | Interpretation of maxULdutycycle with lower powers and P-bit usage in PHR | Qualcomm Incorporated | imported from 3GU |
R4‑1903128 | SRS Switching for FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1903129 | n259 RF parameters | Qualcomm Incorporated | imported from 3GU |
R4‑1903130 | draft CR on maxUplinkdutycycle improvements | Qualcomm Incorporated | imported from 3GU |
R4‑1903131 | Draft CR on FR2 SDR Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1903132 | NR CSI Reporting Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1903133 | SNR value for FR2 RI Test case 8.4.2.2, Test 2 and Test 3 | ANRITSU LTD | imported from 3GU |
R4‑1903134 | Corrections to idle mode CA measurement accuracy test | Qualcomm Incorporated | imported from 3GU |
R4‑1903135 | Corrections to idle mode CA measurement accuracy test | Qualcomm Incorporated | imported from 3GU |
R4‑1903136 | Corrections to TDD in-sync RLM test cases for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R4‑1903137 | Corrections to TDD in-sync RLM test cases for NB-IoT | Qualcomm Incorporated | imported from 3GU |
R4‑1903138 | Corrections to TDD inter-frequency idle state positioning measurement test in NB1 | Qualcomm Incorporated, Huawei, HiSilicon | imported from 3GU |
R4‑1903139 | Corrections to TDD inter-frequency idle state positioning measurement test in NB1 | Qualcomm Incorporated, Huawei, HiSilicon | imported from 3GU |
R4‑1903140 | Definition of BCS support in inter-band EN-DC mode | Qualcomm Incorporated | imported from 3GU |
R4‑1903141 | NR PDCCH Demodulation Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1903142 | NR PDSCH SDR Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1903143 | TP for TR38.716-02-00: 1UL and 2UL for CA_n40-n79 | ZTE Corporation, CMCC | imported from 3GU |
R4‑1903144 | TP for TR37.716-11-11_DC_40A-n79A | ZTE Corporation, CMCC | imported from 3GU |
R4‑1903145 | TP for TR37.815: Required changes in TS 38.101-3 | ZTE Corporation, | imported from 3GU |
R4‑1903146 | MSD analysis on high power UE for DC_3-n78 | ZTE Corporation | imported from 3GU |
R4‑1903147 | Draft CR to reflect the completed NR inter band CA DC combinations into Rel16 TS 38.101-1 | ZTE Corporation | imported from 3GU |
R4‑1903148 | Draft CR to reflect the completed NR inter band CA DC combinations into Rel16 TS 38.101-3 | ZTE Corporation | imported from 3GU |
R4‑1903149 | Draft CR to TS38.101-3_adding some exclusion frequencies for SEM and spurious emission for EN-DC | ZTE Corporation | imported from 3GU |
R4‑1903150 | Draft CR to TS 38.101-3_Spurious emission and Tx IM for inter-band CA between FR1 and FR2 | ZTE Corporation | imported from 3GU |
R4‑1903151 | Draft CR to TS38.101-1_removing DC sections | ZTE Corporation | imported from 3GU |
R4‑1903152 | Discussion on LTE anchor agnostic approach for EN-DC | ZTE Corporation | imported from 3GU |
R4‑1903153 | TR 37.716-00-00 v0.3.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1903154 | Revised WID on Band combinations for SA NR Supplementary uplink (SUL), NSA NR SUL, NSA NR SUL with UL sharing from the UE perspective (ULSUP) | Huawei, HiSilicon | imported from 3GU |
R4‑1903155 | Introduction of completed SUL band combinations into Rel-16 TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1903156 | Introduction of completed SUL band combinations into Rel-16 TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1903157 | TP for TR 37.716-00-00 Specific requirements for SUL_n77_n80 | Huawei, HiSilicon | imported from 3GU |
R4‑1903158 | TP for TR 37.716-00-00 Specific requirements for SUL_n77_n84 | Huawei, HiSilicon | imported from 3GU |
R4‑1903159 | TP for TR 37.716-00-00 Specific requirements for DC_3_SUL_n77_n80 | Huawei, HiSilicon | imported from 3GU |
R4‑1903160 | TP for TR 37.716-00-00 Specific requirements for DC_1_SUL_n77_n84 | Huawei, HiSilicon | imported from 3GU |
R4‑1903161 | TP for TR 37.716-00-00 Specific requirements for DC_1_SUL_n77_n80 | Huawei, HiSilicon | imported from 3GU |
R4‑1903162 | TP for TR 37.716-00-00 Specific requirements for DC_3_SUL_n77_n84 | Huawei, HiSilicon | imported from 3GU |
R4‑1903163 | TP for TR 37.716-00-00 Specific requirements for DC_3_SUL_n78_n84 | Huawei, HiSilicon | imported from 3GU |
R4‑1903164 | TP for TR 37.716-00-00 Updated band combinations for SUL | Huawei, HiSilicon | imported from 3GU |
R4‑1903165 | Introduction of SUL band with same uplink frequency range of n5 | Huawei, HiSilicon | imported from 3GU |
R4‑1903166 | Discussion on UL sharing applicability in different scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑1903167 | Reply LS on UL sharing applicability in different scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑1903168 | Draft CR on SUL band combinations to TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1903169 | Discussion on NBC issue for LTENR spectrum sharing in Band 41n41 | Huawei, HiSilicon | imported from 3GU |
R4‑1903170 | Discussion on channel and synchonization raster for n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1903171 | Draft CR on channel and synchonization raster for n38 to 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1903172 | Draft CR on channel and synchonization raster for n38 to 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1903173 | Channel arrangement for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1903174 | Spectrum utilization improvement in unlicensed bands | Huawei, HiSilicon | imported from 3GU |
R4‑1903175 | Wideband operation at UE for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1903176 | Wideband operation at BS for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1903177 | Discussion on AGC issue for NR V2X | Huawei, HiSilicon | imported from 3GU |
R4‑1903178 | Coexistence issue between sidelink and Uu interface in licensed spectrum | Huawei, HiSilicon | imported from 3GU |
R4‑1903179 | In-device coexistence issue between LTE and NR sidelinks | Huawei, HiSilicon | imported from 3GU |
R4‑1903180 | TP for TR 37.716-21-21 for DC_1-3_n7-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1903181 | TP for TR 37.716-21-21 for DC_1-3_n28-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1903182 | TP for TR 37.716-21-21 for DC_1-7_n28-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1903183 | TP for TR 37.716-21-21 for DC_3-7_n28-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1903184 | TP for TR 37.716-21-21 for DC_1-3-7_n28-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1903185 | TP for TR 38.716-01-01 for DL_n77(2A)_UL_n77A | Huawei, HiSilicon | imported from 3GU |
R4‑1903186 | TP for TR 38.716-01-01 for DL_n78(2A)_UL_n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1903187 | Updated TP for TR 38.716-01-01 for DL_n41(2A)_UL_n41A | Huawei, HiSilicon | imported from 3GU |
R4‑1903188 | TP for TR 38.716-02-00 for CA_n77A-n258A | Huawei, HiSilicon | imported from 3GU |
R4‑1903189 | TP for TR 38.716-02-00 for CA_n78A-n258A | Huawei, HiSilicon | imported from 3GU |
R4‑1903190 | TP for TR 38.716-02-00 for CA_n79A-n258A | Huawei, HiSilicon | imported from 3GU |
R4‑1903191 | TP for TR 37.716-11-11 for DC_1A_n258A | Huawei, HiSilicon | imported from 3GU |
R4‑1903192 | Simulation results about CLI co-existence study for FR1 | Huawei, HiSilicon | imported from 3GU |
R4‑1903193 | Simulation results about CLI co-existence study for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1903194 | TP for TR 38.828 to capture CLI co-existence simulation results | Huawei, HiSilicon | imported from 3GU |
R4‑1903195 | Draft CR for 38.101-1: remove the bracket of UE capability "powerBoosting-pi2BPSK" | Huawei, HiSilicon | imported from 3GU |
R4‑1903196 | TP for TR 36.716-03-02: CA_4DL_1A-3A-8A-38A_2UL_3A-8A | Huawei, HiSilicon | imported from 3GU |
R4‑1903197 | TP for TR 36.716-03-02: CA_3DL_3A-8A-38A_2UL_3A-8A | Huawei, HiSilicon | imported from 3GU |
R4‑1903198 | MSD analysis for LTE band combination CA_3A-8A-38A_2UL_3A-8A | Huawei, HiSilicon | imported from 3GU |
R4‑1903199 | TP for TR 36.716-04-01: CA_3-7-28-40_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1903200 | TP for TR 36.716-04-01: CA_1-3-28-40_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1903201 | TP for TR 36.716-04-01: CA_1-7-28-40_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1903202 | CR for 36.101 adding band 46 for Rx spurious emissions(Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1903203 | CR for 36.101 adding band 46 for Rx spurious emissions(Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1903204 | NR PUSCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903205 | NR PUCCH simulation results | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903206 | On NR BS demodulation remaining general issues | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903207 | On NR PUCCH and PUSCH applicability rules and declarations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903208 | On NR UCI over PUSCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903209 | On NR PUCCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903210 | On NR PRACH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903211 | draftCR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903212 | draftCR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903213 | draftCR for TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903214 | Discussion on remaining issues for RRC-based BWP switching requirements | CATT | imported from 3GU |
R4‑1903215 | CR on RRC-based BWP switch delay | CATT | imported from 3GU |
R4‑1903216 | CR on interruption requirement for RRC-based BWP switch | CATT | imported from 3GU |
R4‑1903217 | Discussion on remaining issues for MTTD and MRTD requirements | CATT | imported from 3GU |
R4‑1903218 | CR on MRTD requirement for intra-band non-contiguous CA | CATT | imported from 3GU |
R4‑1903219 | CR on MTTD requirement for intra-band synchronous EN-DC | CATT | imported from 3GU |
R4‑1903220 | CR to remove MTTD and MRTD requirements for inter-band synchronous EN-DC | CATT | imported from 3GU |
R4‑1903221 | Further discussion on SCell activation requirement for the first SCell in an FR2 band | CATT | imported from 3GU |
R4‑1903222 | CR on SCell activation and deactivation delay requirements | CATT | imported from 3GU |
R4‑1903223 | CR on timing advance adjustment delay | CATT | imported from 3GU |
R4‑1903224 | Discussion on NR V2X RRM impact | CATT | imported from 3GU |
R4‑1903225 | WF on analysis of V2X RRM requirement | CATT | imported from 3GU |
R4‑1903226 | Further discussion on TCI state switching requirements | CATT | imported from 3GU |
R4‑1903227 | CR on TCI state switching delay | CATT | imported from 3GU |
R4‑1903228 | Discussion on RRM requirements for NR mobility enhancements | CATT | imported from 3GU |
R4‑1903229 | Updates to test cases for SCell activationdeactivation in SA | CATT | imported from 3GU |
R4‑1903230 | Updates to test cases for BWP switching in SA (section A.6.5.6.1 and section A.7.5.6.1) | CATT | imported from 3GU |
R4‑1903231 | Updates to test cases for interruption at transitions in EN-DC | CATT | imported from 3GU |
R4‑1903232 | Updates to test cases for interruption due to deactivated SCell operations in EN-DC | CATT | imported from 3GU |
R4‑1903233 | Simulation results for NR PDCCH | CATT | imported from 3GU |
R4‑1903234 | Draft CR on FR2 PDCCH demodulation requirements | CATT | imported from 3GU |
R4‑1903235 | Ideal and impairment results for NR PUSCH | CATT | imported from 3GU |
R4‑1903236 | Ideal and impairment results for NR PUCCH | CATT | imported from 3GU |
R4‑1903237 | Ideal and impairment results for NR PRACH | CATT | imported from 3GU |
R4‑1903238 | Draft CR on PRACH performance requirements in TS38.104 | CATT | imported from 3GU |
R4‑1903239 | Draft CR on PRACH performance requirements in TS38.141-1 | CATT | imported from 3GU |
R4‑1903240 | Draft CR on PRACH performance requirements in TS38.141-2 | CATT | imported from 3GU |
R4‑1903241 | Draft CR for correction on TS38.101-1 | CATT | imported from 3GU |
R4‑1903242 | Adding BCS definition in TS38.101-2 | CATT | imported from 3GU |
R4‑1903243 | Discussion on EN-DC configurations in TS38.101-3 | CATT | imported from 3GU |
R4‑1903244 | Modifying on EN-DC configurations in TS38.101-3 | CATT | imported from 3GU |
R4‑1903245 | Further discussion on SAR requirement for EN-DC PC2 UE | CATT | imported from 3GU |
R4‑1903246 | Draft CR for addition SAR requirement for EN-DC PC2 UE | CATT | imported from 3GU |
R4‑1903247 | Draft CR for TS38.104: Correction on declared EISREFSENS_50M range | CATT | imported from 3GU |
R4‑1903248 | Draft CR for TS38.817-2: Correction on declared EISREFSENS_50M range | CATT | imported from 3GU |
R4‑1903249 | Discussion on FR1 OTA REFSENS | CATT | imported from 3GU |
R4‑1903250 | Draft CR for TS37.843: Correction on FR1 OTA REFSENS | CATT | imported from 3GU |
R4‑1903251 | Discussion on Tx Diversity for TAE requirements | CATT | imported from 3GU |
R4‑1903252 | Draft CR for TS38.141-2: update FR2 TX OFF power test requirement and test procedure | CATT | imported from 3GU |
R4‑1903253 | Discussion on EIRP OFF power for measuring FR2 transient period | CATT | imported from 3GU |
R4‑1903254 | Draft CR for TS 38.141-1: remove references to TX Diversity for TAE requirement | CATT | imported from 3GU |
R4‑1903255 | Draft CR for TS 38.141-2: remove references to TX Diversity for TAE requirement | CATT | imported from 3GU |
R4‑1903256 | CR on adding references to TS38.133 | CATT | imported from 3GU |
R4‑1903257 | Adding new EN-DC configurations | CATT | imported from 3GU |
R4‑1903258 | TP for TR 38.716-02-00: MSD for CA_n8-n41 | CATT | imported from 3GU |
R4‑1903259 | TP for TR 38.716-02-00: Interference analysis for CA_n39A-n79A | CATT | imported from 3GU |
R4‑1903260 | TR Skeleton for NR inter-band CA for 3 bands DL with 1 band UL | CATT | imported from 3GU |
R4‑1903261 | TP for TR 38.xxx: interference analysis for CA_n3A-n41A-n79A with 1 uplink | CATT | imported from 3GU |
R4‑1903262 | TP for TR 38.xxx: interference analysis for CA_n8A-n41A-n79A with 1 uplink | CATT | imported from 3GU |
R4‑1903263 | Transmit ON/OFF power | CATT | imported from 3GU |
R4‑1903264 | Views on NR demodulation and CSI test case setting | MediaTek inc. | imported from 3GU |
R4‑1903265 | Views on NR PDSCH demodulation performance requirement | MediaTek inc. | imported from 3GU |
R4‑1903266 | NR PDSCH simulation result | MediaTek inc. | imported from 3GU |
R4‑1903267 | NR PDSCH HST simulation result | MediaTek inc. | imported from 3GU |
R4‑1903268 | NR PDSCH SDR simulation result | MediaTek inc. | imported from 3GU |
R4‑1903269 | NR CSI CQI simulation result | MediaTek inc. | imported from 3GU |
R4‑1903270 | NR CSI PMI simulation result | MediaTek inc. | imported from 3GU |
R4‑1903271 | NR CSI RI simulation result | MediaTek inc. | imported from 3GU |
R4‑1903272 | Update on simulation results for NR PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903273 | Update on simulation results for NR PUSCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903274 | Update on simulation results for NR PRACH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903275 | Draft CR on TS 38.141-1 Conducted test requirements for PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903276 | Draft CR on TS 38.141-2 Radiated test requirements for PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903277 | Draft CR on TS 38.104 Performance requirement for PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903278 | Further discussion on deriving performance requirements | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903279 | Discussion on multi-slot NR PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903280 | Clarification on BS and UE channel bandwidth | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903281 | Simulation results for multi-slot PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1903282 | TP for 36.716-02-02 on 2BUL_25A-41A_BCS0 | SPRINT Corporation | imported from 3GU |
R4‑1903283 | TP for 36.716-02-02 on 2BUL_25A-26A_BCS0 | SPRINT Corporation | imported from 3GU |
R4‑1903284 | TP for 36.716-02-01 on 1BUL_25A-41A_BCS0 | SPRINT Corporation | imported from 3GU |
R4‑1903285 | LTE TDD ECID Compatibility Issues in Rel-14 | Comtech Telecommunications Cor | imported from 3GU |
R4‑1903286 | Clarification on LS reply on the interruption time during mobility in LTE | Qualcomm Incorporated | imported from 3GU |
R4‑1903287 | Way Forward on UE demod in Rel-16 LTE HST | Qualcomm Incorporated | imported from 3GU |
R4‑1903288 | On simultaneous connectivity to source and target cells for NR mobility | Qualcomm Incorporated | imported from 3GU |
R4‑1903289 | On TA validation for eMTC PUR | Qualcomm Incorporated | imported from 3GU |
R4‑1903290 | On TA validation for NB-IoT PUR | Qualcomm Incorporated | imported from 3GU |
R4‑1903291 | Simulation results for RSS based RRM measurements for MTC | Qualcomm Incorporated | imported from 3GU |
R4‑1903292 | Way Forward on demod aspects of R16 eMTC enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑1903293 | Hypothetical MPDCCH profile for MSG3 quality reporting | Qualcomm Incorporated | imported from 3GU |
R4‑1903294 | Transmit ON/OFF power | CATT | imported from 3GU |
R4‑1903295 | FR2 PC3 maxUplinkDutyCycle default value from UE thermal view | MediaTek Beijing Inc. | imported from 3GU |
R4‑1903296 | Discussion on solutions for EN-DC FDD-TDD High Power UE | CHTTL | imported from 3GU |
R4‑1903297 | TP for TR 37.716-11-11: UE requirements for DC_3-3_n1 | CHTTL | imported from 3GU |
R4‑1903298 | TP for TR 37.716-11-11: UE requirements for DC_7_n1, DC_7-7_n1 | CHTTL | imported from 3GU |
R4‑1903299 | TP for TR 37.716-11-11: UE requirements for DC_3-3_n257 | CHTTL | imported from 3GU |
R4‑1903300 | TP for TR 37.716-21-11: UE requirements for DC_3-7_n1, DC_3-3-7_n1, DC_3-7-7_n1, DC_3-3-7-7_n1 | CHTTL | imported from 3GU |
R4‑1903301 | TP for TR 37.716-21-11: UE requirements for DC_3-3-7_n257, DC_3-3-7-7_n257 | CHTTL | imported from 3GU |
R4‑1903302 | Draft CR to TS 38.101-3 correction for the DC_3_n3 delta R IBNC table | CHTTL, Mediatek | imported from 3GU |
R4‑1903303 | Draft CR to TS 38.101-3 correction for the DC_3_n3 delta R IBNC table | CHTTL, Mediatek | imported from 3GU |
R4‑1903304 | LS on TDD inter-band ENDC maxUplinkDutyCycle capability | OPPO | imported from 3GU |
R4‑1903305 | Follow up on the AAS specifications maintenance work | Huawei | imported from 3GU |
R4‑1903306 | CR to TS 37.145-1: clarification on CSA and RCSA relations for hybrid AAS BS, Rel-15 | Huawei | imported from 3GU |
R4‑1903307 | CR to TS 37.114: Updates for Rx exclusion zone size and terminology for EMC RI testing purposes | Huawei | imported from 3GU |
R4‑1903308 | CR to TS 37.145-1: correction of the throughput calculation in test procedures, Rel-13 | Huawei | imported from 3GU |
R4‑1903309 | CR to TS 37.145-1: correction of the throughput calculation in test procedures, Rel-14 | Huawei | imported from 3GU |
R4‑1903310 | CR to TS 37.145-1: correction of the throughput calculation in test procedures, Rel-15 | Huawei | imported from 3GU |
R4‑1903311 | CR to TS 37.145-1: removal of "hybrid" terminology, Rel-13 | Huawei | imported from 3GU |
R4‑1903312 | CR to TS 37.145-1: removal of "hybrid" terminology, Rel-14 | Huawei | imported from 3GU |
R4‑1903313 | CR to TS 37.145-2: clarification on CSA and RCSA relations for hybrid AAS BS, Rel-15 | Huawei | imported from 3GU |
R4‑1903314 | CR to TS 37.145-1: BS demodulation requirements for NR | Huawei | imported from 3GU |
R4‑1903315 | CR to TS 37.145-2: BS demodulation requirements for NR | Huawei | imported from 3GU |
R4‑1903316 | CR to TS 37.105: addition of Band 35, 36, 37 to Tx spurious colocation requirement | Huawei | imported from 3GU |
R4‑1903317 | CR to TS 37.145-1: updates to Tx spur and co-location blocking | Huawei | imported from 3GU |
R4‑1903318 | CR to TS 37.145-2: updates to Tx spur and Tx co-location | Huawei | imported from 3GU |
R4‑1903319 | Draft CR to TS 38.104: removal of unused definition: "minimum EIRP level under extreme condition" | Huawei | imported from 3GU |
R4‑1903320 | Draft CR to TS 38.104: OSDD information correction | Huawei | imported from 3GU |
R4‑1903321 | Draft CR to TS 38.113: editorial corrections | Huawei | imported from 3GU |
R4‑1903322 | Draft CR to TS 38.113: Updates the Rx exclusion zone terminology | Huawei | imported from 3GU |
R4‑1903323 | Draft CR to TS 38.141-1: performance measure correction for the Rx requirements | Huawei | imported from 3GU |
R4‑1903324 | Draft CR to TS 38.141-1: cleanup | Huawei | imported from 3GU |
R4‑1903325 | Draft CR to TS 38.141-1: annex F (In-channel Tx tests) extensions | Huawei | imported from 3GU |
R4‑1903326 | Draft CR to TS 38.141-2: cleanup | Huawei | imported from 3GU |
R4‑1903327 | Draft CR to TS 38.141-2: annex F (In-channel Tx tests) extensions | Huawei | imported from 3GU |
R4‑1903328 | TR 38.820: updated TR skeleton for 7-24GHz SI | Huawei | imported from 3GU |
R4‑1903329 | EMC emission requirements for 7-24GHz range | Huawei | imported from 3GU |
R4‑1903330 | Draft CR to TS 38.141-1: OSDD information correstion | Huawei | imported from 3GU |
R4‑1903331 | Draft CR to TS 38.141-2: performance measure correction for the Rx requirements | Huawei | imported from 3GU |
R4‑1903332 | Draft CR to TS 38.104: FRC reference corrections for the Rx requirements | Huawei | imported from 3GU |
R4‑1903333 | Draft CR to TS 38.141-1: FRC reference corrections for the Rx requirements | Huawei | imported from 3GU |
R4‑1903334 | Draft CR to TS 38.141-2: FRC reference corrections for the Rx requirements | Huawei | imported from 3GU |
R4‑1903335 | Draft CR to TS 38.104: FRC reference corrections for the BS demod requirements | Huawei | imported from 3GU |
R4‑1903336 | Draft CR to TS 38.141-1: FRC reference corrections for the BS demod requirements | Huawei | imported from 3GU |
R4‑1903337 | Draft CR to TS 38.141-2: FRC reference corrections for the BS demod requirements | Huawei | imported from 3GU |
R4‑1903338 | Draft CR to TS38.104: consideration of suppoted frequency range of the operating band | Huawei | imported from 3GU |
R4‑1903339 | Draft CR to TS 38.141-1: consideration of suppoted frequency range of the operating band | Huawei | imported from 3GU |
R4‑1903340 | Draft CR to TS 38.141-2: consideration of suppoted frequency range of the operating band | Huawei | imported from 3GU |
R4‑1903341 | Draft CR to TS 38.141-1: test setup for TAE | Huawei | imported from 3GU |
R4‑1903342 | EMC immunity requirements for 7-24GHz range | Huawei | imported from 3GU |
R4‑1903343 | BS RF general aspects for 7-24GHz SI | Huawei | imported from 3GU |
R4‑1903344 | HARQ transmissions vs. HARQ re-transmissions in NR BS specifications | Huawei | imported from 3GU |
R4‑1903345 | Discussion on OTA timing alignment for IAB | Samsung | imported from 3GU |
R4‑1903346 | Reply LS on OTA timing alignment for IAB | Samsung | imported from 3GU |
R4‑1903347 | Corrections on EN-DC Reporting Criteria Requirement | Samsung | imported from 3GU |
R4‑1903348 | Correction CR to TS36.133 on capabilities for support of reporting criteria requirement for EN-DC | Samsung | imported from 3GU |
R4‑1903349 | Discussion on reporting criteria limitation in MR-DC | Samsung | imported from 3GU |
R4‑1903350 | Reply LS on reporting criteria limitation in MR-DC | Samsung | imported from 3GU |
R4‑1903351 | Draft CR for NR-DC measurement capability requirement (section 9.1.3) | Samsung | imported from 3GU |
R4‑1903352 | Draft CR for NR-DC applicability rule (section 3.6.2.4) | Samsung | imported from 3GU |
R4‑1903353 | Discussion on SFTD measurements for Rel-15 NR-DC | Samsung | imported from 3GU |
R4‑1903354 | Discussion on Gap Sharing for UE Measurements in NE-DC | Samsung | imported from 3GU |
R4‑1903355 | Darft CR for Measurement Gap Sharing in NE-DC (Section 9.1.2, 9.1.5) | Samsung | imported from 3GU |
R4‑1903356 | Discussion on Gap Sharing for UE Measurements in NR-DC | Samsung | imported from 3GU |
R4‑1903357 | Darft CR for Measurement Gap Sharing in NR-DC (Section 9.1.2, 9.1.5) | Samsung | imported from 3GU |
R4‑1903358 | Beam correspondence tolerance requirement based on simulation | Samsung | imported from 3GU |
R4‑1903359 | Draft CR to TR38.810 on beam correspondence tolerance and spherical coverage test procedure update | Samsung | imported from 3GU |
R4‑1903360 | Updated simulation results for NR PUSCH | Samsung | imported from 3GU |
R4‑1903361 | Updated simulation results for NR PUCCH | Samsung | imported from 3GU |
R4‑1903362 | Initial simulation results for NR UCI on PUSCH | Samsung | imported from 3GU |
R4‑1903363 | Simulation results summary of NR UCI on PUSCH | Samsung | imported from 3GU |
R4‑1903364 | Remaining issues on performance requirements for NR PUSCH in Rel-15 | Samsung | imported from 3GU |
R4‑1903365 | Remaining issues on performance requirements for NR PUCCH in Rel-15 | Samsung | imported from 3GU |
R4‑1903366 | Draft CR on NR PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1903367 | Draft CR on NR PUCCH format2 conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1903368 | Draft CR on NR PUCCH format2 radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1903369 | View on BS performance requirements for high speed scenario in LTE Rel-16 | Samsung | imported from 3GU |
R4‑1903370 | Draft CR: editorial correction on FR1 spurious emission requirement in TS38.104 | Samsung | imported from 3GU |
R4‑1903371 | Further discussion on BS FR2 Category B unwanted emission requriement | Samsung | imported from 3GU |
R4‑1903372 | Draft CR: FR2 Category B unwanted emission requirement in TS38.104 | Samsung | imported from 3GU |
R4‑1903373 | Overview on NR IAB | Samsung | imported from 3GU |
R4‑1903374 | Initial discussion on IAB co-existence study | Samsung | imported from 3GU |
R4‑1903375 | On maxUplinkDutyCycle for MPE regulations | Samsung | imported from 3GU |
R4‑1903376 | Draft CR to add EN-DC configuration DC_2_n260 into TS 38.101-3 | Samsung, Verizon | imported from 3GU |
R4‑1903377 | Draft CR to add EN-DC configuration DC_2_n261 into TS 38.101-3 | Samsung, Verizon | imported from 3GU |
R4‑1903378 | Draft CR to add EN-DC configuration DC_4_n260 into TS 38.101-3 | Samsung, Verizon | imported from 3GU |
R4‑1903379 | Draft CR to add EN-DC configuration DC_4_n261 into TS 38.101-3 | Samsung, Verizon | imported from 3GU |
R4‑1903380 | Simulation results for CQI test cases | Samsung | imported from 3GU |
R4‑1903381 | Discussion on HST test cases | Samsung | imported from 3GU |
R4‑1903382 | Summary of FR1 FDD CSI simulation results | Samsung | imported from 3GU |
R4‑1903383 | Summary of FR1 TDD CSI simulation results | Samsung | imported from 3GU |
R4‑1903384 | Summary of FR2 TDD CSI simulation results | Samsung | imported from 3GU |
R4‑1903385 | Overview on LTE/NR spectrum sharing in Band 41/n41 | Samsung | imported from 3GU |
R4‑1903386 | Draft CR for modification on CSI test cases: 6, 8, 10 | Samsung | imported from 3GU |
R4‑1903387 | Draft CR for adding applicable rules on CSI test cases: 6, 8, 10 | Samsung | imported from 3GU |
R4‑1903388 | Draft CR for Beamforming model: Annex B.4.1 | Samsung | imported from 3GU |
R4‑1903389 | Correction CR to TS36.133 on capabilities for support of reporting criteria requirement for EN-DC | Samsung | imported from 3GU |
R4‑1903390 | FR2 SRS antenna switching | MediaTek Inc. | imported from 3GU |
R4‑1903391 | Draft CR for TS 38.101-2: Corrections to configurations for intra-band non-contiguous CA | MediaTek Inc. | imported from 3GU |
R4‑1903392 | Draft CR for TS 38.101-1: Corrections to EVM equalizer spectrum flatness requirements | MediaTek Inc. | imported from 3GU |
R4‑1903393 | Draft CR for TS 38.101-2: Corrections to EVM equalizer spectrum flatness requirements | MediaTek Inc. | imported from 3GU |
R4‑1903394 | Reconsideration for PC4 REFSENS requirements | MediaTek Inc. | imported from 3GU |
R4‑1903395 | Draft CR for TS 38.101-2: To revise PC4 REFSENS and EIS spherical coverage requirements | MediaTek Inc. | imported from 3GU |
R4‑1903396 | TP for TR 37.716-11-11: Self-interference analyses | MediaTek Inc. | imported from 3GU |
R4‑1903397 | draftCR on handover test case in FR1 (section A.6.3.1.1) | Intel Corporation | imported from 3GU |
R4‑1903398 | draftCR on test case for handover to E-UTRAN (section A.6.3.1.4) | Intel Corporation | imported from 3GU |
R4‑1903399 | draftCR on test cases for inter-frequency measurement in EN-DC with PScell in FR1 (section A.4.6.2) | Intel Corporation | imported from 3GU |
R4‑1903400 | draftCR on test cases for inter-frequency measurement in EN-DC with PScell in FR2 (section A.5.6.2) | Intel Corporation | imported from 3GU |
R4‑1903401 | draftCR on test cases for inter-frequency measurement in SA with PCell in FR1 (section A.6.6.2) | Intel Corporation | imported from 3GU |
R4‑1903402 | Discussion about L1-RSRP measurement accuracy | Intel Corporation | imported from 3GU |
R4‑1903403 | On capability of measurement gap patterns | Intel Corporation | imported from 3GU |
R4‑1903404 | Reply LS on capability of measurement gap patterns | Intel Corporation | imported from 3GU |
R4‑1903405 | CR on capability of measurement gap patterns (section 9.1.2) | Intel Corporation | imported from 3GU |
R4‑1903406 | CR on capability of measurement gap patterns for R15 | Intel Corporation | imported from 3GU |
R4‑1903407 | CR on capability of measurement gap patterns for R16 | Intel Corporation | imported from 3GU |
R4‑1903408 | Draft CR to Rel-14 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1903409 | Draft CR to Rel-15 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1903410 | Draft CR to Rel-16 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1903411 | Remaining parameters for SSB and CSI-RS based RLM | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903412 | On scaling factor N | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903413 | Views on high-speed train tests | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903414 | Simulation results for normal PDSCH demodulation test | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903415 | Simulation results for SDR test in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903416 | Simulation results for PMI test in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903417 | CR to Rel-15 TS 36.101 CA_NS_08 A-MPR | Intel Corporation | imported from 3GU |
R4‑1903418 | Discussion on UE behavior on reception of channels or RS in the same OFDM symbol | LG Electronics Inc. | imported from 3GU |
R4‑1903419 | Reply LS on UE behavior on reception of channels or RS in the same OFDM symbol | LG Electronics Inc. | imported from 3GU |
R4‑1903420 | Draft CR for L1-RSRP reporting requirements for FDM among BM-RS and other RSs (9.5.4) | LG Electronics Inc. | imported from 3GU |
R4‑1903421 | Analysis of antenna gain difference with 1 AoA test setup for RRM performance test | LG Electronics Inc. | imported from 3GU |
R4‑1903422 | TP for TR 38.716-02-00: CA_n1A-n78C with 1UL and 2UL | China Telecom | imported from 3GU |
R4‑1903423 | TP for TR 38.716-02-00: CA_n5A-n78C with 1UL and 2UL | China Telecom | imported from 3GU |
R4‑1903424 | TP for TR 38.716-02-00: CA_n5A-n79C with 1UL and 2UL | China Telecom | imported from 3GU |
R4‑1903425 | draft CR for 38.101-1: Add CA_n3A-n78C with 1UL and 2UL | China Telecom | imported from 3GU |
R4‑1903426 | draft CR for 38.101-3: Reflect the agreed MSD for DC_5_n78 | China Telecom | imported from 3GU |
R4‑1903427 | Analysis of antenna gain difference with 2 AoA test setup for RRM performance test | LG Electronics Inc. | imported from 3GU |
R4‑1903428 | RRM performance test setups for FR2 | LG Electronics Inc. | imported from 3GU |
R4‑1903429 | Discussion on UE capability of UL timing for EN-DC | OPPO | imported from 3GU |
R4‑1903430 | LS reply on capability of same UL timing between NR and LTE | OPPO | imported from 3GU |
R4‑1903431 | Specification structures for TS 37.106 on UE requirements for NR-U channel access | OPPO | imported from 3GU |
R4‑1903432 | LS reply on reporting criteria limitation in MR-DC | OPPO | imported from 3GU |
R4‑1903433 | Discussion on SS rasters for NR-U | OPPO | imported from 3GU |
R4‑1903434 | Further consideration on HPUE for inter-band FDD-TDD EN-DC | OPPO | imported from 3GU |
R4‑1903435 | Revised work plan for CLI RRM | LG Electronics Inc. | imported from 3GU |
R4‑1903436 | Discussion on work scope for CLI RRM | LG Electronics Inc. | imported from 3GU |
R4‑1903437 | Discussion on CLI measurement requirements | LG Electronics Inc. | imported from 3GU |
R4‑1903438 | Simulation assumption for CLI measurement requirements | LG Electronics Inc. | imported from 3GU |
R4‑1903439 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for EN-DC FR2 (section A.5.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1903440 | Draft CR for Intra-frequency SS-RSRQ Accuarcy Test Cases for SA FR2 (section A.7.7.2) | LG Electronics Inc. | imported from 3GU |
R4‑1903441 | Discussion on L1-RSRP measurement accuracy | CMCC | imported from 3GU |
R4‑1903442 | General discussion on high speed scenario | CMCC | imported from 3GU |
R4‑1903443 | Discussion on HST enhancement for RRM requirements | CMCC | imported from 3GU |
R4‑1903444 | Discussion on the CSI-RS based RLM test cases | CMCC | imported from 3GU |
R4‑1903445 | Draft CR on TS38.133 for Intrafrequency cell identification (section 9.2.5.1) | CMCC | imported from 3GU |
R4‑1903446 | Motivation for NR support for High speed train scenario | CMCC | imported from 3GU |
R4‑1903447 | New WID on NR support for high speed train scenario | CMCC | imported from 3GU |
R4‑1903448 | On BS-to-BS co-location requirement technical background | Ericsson | imported from 3GU |
R4‑1903449 | On test aspects related to FR2 OTA transmit ON/OFF power requirement | Ericsson | imported from 3GU |
R4‑1903450 | Draft CR to TR 38.141-2: Addition of TDD OFF level test requirement text in subclause 6.5 | Ericsson | imported from 3GU |
R4‑1903451 | Investigation into base station spurious emissions: models and measurements | Ericsson | imported from 3GU |
R4‑1903452 | Impact of directivity on RC operation and uniformity test | Ericsson | imported from 3GU |
R4‑1903453 | CR to TR 37.843: Addition of RC MU evaluation in subclause 10.5.2.3A.5.2 | Ericsson | imported from 3GU |
R4‑1903454 | CR to TR 38.817-02: Addition of RC MU tables for FR2 for spurious emission in subclause 12.7.1.2.2A | Ericsson | imported from 3GU |
R4‑1903455 | TP to TR 38.820: Addition of example frequencies in subclause 6.2 | Ericsson | imported from 3GU |
R4‑1903456 | Draft CR to TS 38.141-2: Addition of RC test method for spurious emission in subclause 6.7 and 7.7 | Ericsson | imported from 3GU |
R4‑1903457 | Draft CR to TS 38.104: Removal of FFS for FR2 TDD OFF power level requirement in subclause 9.5 | Ericsson | imported from 3GU |
R4‑1903458 | Draft CR to TS 38.141-2: Update with respect to FR2 TDD OFF power in table 4.1.1-1 | Ericsson | imported from 3GU |
R4‑1903459 | Draft CR to TS 38.141-2: Correction to TX requirements with respect to total EIRP in subclause 6.2.4.2, subclause 6.3.4.2 and Annex B.7.1 | Ericsson | imported from 3GU |
R4‑1903460 | Draft CR for TS 38.141-2: Improvements of figures in Annex E | Ericsson | imported from 3GU |
R4‑1903461 | Draft CR to TS 38.141-2: Corrections to improve readability and understanding of Annex I | Ericsson | imported from 3GU |
R4‑1903462 | CR to TR 37.843: Update of RC description in subclause 10.5.2.3A | Ericsson | imported from 3GU |
R4‑1903463 | CR to TS 37.145-2: Corrections related to TRP measurements in Annex F | Ericsson | imported from 3GU |
R4‑1903464 | 7-24 GHz PA considerations and dependencies | Ericsson | imported from 3GU |
R4‑1903465 | TP to TR: 7-24 GHz power amplifier trends | Ericsson | imported from 3GU |
R4‑1903466 | TP to TR: 7-24 GHz Phase Noise trends | Ericsson | imported from 3GU |
R4‑1903467 | On the need for an upper bound for the integration step for TRP | Ericsson | imported from 3GU |
R4‑1903468 | Discussion on LTE/NR spectrum sharing in Band41/n41 | CMCC | imported from 3GU |
R4‑1903469 | Updated PDCCH simulation and impairment results | CMCC | imported from 3GU |
R4‑1903470 | Summary results for alignment and impairments of NR PBCH demodulation tests in Rel-15 | CMCC | imported from 3GU |
R4‑1903471 | Draft CR on PBCH requirements | CMCC | imported from 3GU |
R4‑1903472 | Initial simulation results on NR HST | CMCC | imported from 3GU |
R4‑1903473 | Draft CR on FREF,Shift | CMCC | imported from 3GU |
R4‑1903474 | draft CR of in-band emission for FR2 PC2 | LG Electronics | imported from 3GU |
R4‑1903475 | Antenna gain difference for PC2 1AoA | LG Electronics | imported from 3GU |
R4‑1903476 | Antenna gain difference for PC2 2AoA | LG Electronics | imported from 3GU |
R4‑1903477 | List of RRM core requirements for NR V2X | LG Electronics | imported from 3GU |
R4‑1903478 | RRM specification structure for NR V2X | LG Electronics | imported from 3GU |
R4‑1903479 | TP to TR 38.828: Background | Ericsson | imported from 3GU |
R4‑1903480 | TP to TR 38.828: Inter-Operator interference mechanisms for unsynchronized TDD | Ericsson | imported from 3GU |
R4‑1903481 | TP to TR 38.828: Inter operator interference for co-located BS | Ericsson | imported from 3GU |
R4‑1903482 | Simulation results for 30GHz macro – macro scenario | Ericsson | imported from 3GU |
R4‑1903483 | Simulation results for 4GHz macro-macro scenario | Ericsson | imported from 3GU |
R4‑1903484 | On BS types for the 7-24GHz range | Ericsson | imported from 3GU |
R4‑1903485 | TP to TR 38.820: Impact to BS transmitter requirements | Ericsson | imported from 3GU |
R4‑1903486 | TP to TR 38.820: Impact to BS receiver requirements | Ericsson | imported from 3GU |
R4‑1903487 | 7-24 GHz Filter Aspects | Ericsson | imported from 3GU |
R4‑1903488 | On IAB co-existence and transmission direction | Ericsson | imported from 3GU |
R4‑1903489 | MU for FR2 demodulation requirements | Ericsson, Rohde & Schwarz | imported from 3GU |
R4‑1903490 | Draft CR to 38.141-2: Addition of measurement uncertainty for FR2 performance requirements | Ericsson | imported from 3GU |
R4‑1903491 | Work plan for introduction of GSM, UTRA, E-UTRA and NR capability set(s) (CS(s)) to the multi-standard radio (MSR) specifications | Ericsson | imported from 3GU |
R4‑1903492 | Core requirements update for new capability sets | Ericsson | imported from 3GU |
R4‑1903493 | OBUE requirements update for NR + UTRA/GSM combinations | Ericsson | imported from 3GU |
R4‑1903494 | New capability sets for 37.141 | Ericsson | imported from 3GU |
R4‑1903495 | Correction to unwanted emissions mask for bands n7 and n38 | Ericsson, Huawei | imported from 3GU |
R4‑1903496 | Correction to unwanted emissions mask for bands n7 and n38 | Ericsson, Huawei | imported from 3GU |
R4‑1903497 | Correction to unwanted emissions mask for bands n7 and n38 | Ericsson, Huawei | imported from 3GU |
R4‑1903498 | Correction to unwanted emissions mask for bands n7 and n38 | Ericsson, Huawei | imported from 3GU |
R4‑1903499 | Draft CR to 38.104: Correction to unwanted emissions mask for bands n7 and n38 | Ericsson, Huawei | imported from 3GU |
R4‑1903500 | Draft CR to 38.141-1: Correction to unwanted emissions mask for bands n7 and n38 | Ericsson, Huawei | imported from 3GU |
R4‑1903501 | Discussion on maximum aggregated bandwidth for NR CA and EN-DC | ZTE Corporation | imported from 3GU |
R4‑1903502 | LS on maximum aggregated bandwidth for NR CA and EN-DC combinations | ZTE Corporation | imported from 3GU |
R4‑1903503 | Draft CR to TS 38.101-1 on aggregated bandwidth for intra-band contiguous CA | ZTE Corporation | imported from 3GU |
R4‑1903504 | Draft CR to TS 38.101-2 on intra-band contiguous CA configurations | ZTE Corporation | imported from 3GU |
R4‑1903505 | Draft CR on TS38.133 for CSI-RS based L1-RSRP accuracy requirements (section 10.1.19.2) | CMCC | imported from 3GU |
R4‑1903506 | Draft CR to TS 38.101-1 on description of UE additional output power reduction | ZTE Corporation | imported from 3GU |
R4‑1903507 | Inter-band ENDC Combinations with Narrow Frequency Gap or Overlapping Frequencies | Skyworks Solutions Inc. | imported from 3GU |
R4‑1903508 | Draft CR to TS 38.101-1 on spurious emissions for UE co-existence | ZTE Corporation | imported from 3GU |
R4‑1903509 | Draft CR to TS 38.101-1: Adding CA_n3A-n41C and CA_n3A-n41(2A) with 1UL and 2UL | ZTE Corporation | imported from 3GU |
R4‑1903510 | Preferred Approaches for PA Back-off Optimization for Intra-band EN-DC | Skyworks Solutions Inc. | imported from 3GU |
R4‑1903511 | Updated TR 37.716-11-11_V0.4.0_Rel16_DC band combo of 1 LTE band + 1 NR band | NTT DOCOMO INC. | imported from 3GU |
R4‑1903512 | Draft CR to TS 38.101-3 on some minor corrections | ZTE Corporation | imported from 3GU |
R4‑1903513 | 7.125 - 24.25GHz Frequency Range from a UE Perspective | Skyworks Solutions Inc. | imported from 3GU |
R4‑1903514 | Harmonization of reference sensitivity level for DC clause | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903515 | Removal of reference sensitivity exception due to close proximity of bands for EN-DC in NR FR1 clause | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903516 | A-MPR definition harmonization in 38.101-1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903517 | Addition of missing features for TS 38.307 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903518 | Big CR for TS 38.307 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903519 | Grouping of EN-DC configurations in 38.101-3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903520 | draft CR to remove LTE CA and NR columns | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903521 | Big CR for EN-DC 4 LTE + 1 NR band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903522 | Revised WID of EN-DC 4LTE+1NR band | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903523 | A-MPR Simulations for n41 Protection Requirement in Japan | Nokia | imported from 3GU |
R4‑1903524 | FR2 MPR due to OBW | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903525 | n7 new channel bandwidths REFSENS definition | Nokia | imported from 3GU |
R4‑1903526 | n7 new channel bandwidths A-MPR | Nokia | imported from 3GU |
R4‑1903527 | Work plan for New WID: Power Class 2 UE for LTE bands 31 and 72 | Nokia | imported from 3GU |
R4‑1903528 | UE aspects for New WID: Power Class 2 UE for LTE bands 31 and 72 | Nokia | imported from 3GU |
R4‑1903529 | LTE 410 selfband protection | Nokia | imported from 3GU |
R4‑1903530 | LTE 410 CR for 36.101 | Nokia | imported from 3GU |
R4‑1903531 | LTE 410 TR update | Nokia | imported from 3GU |
R4‑1903532 | TP to TR 36.716-02-01: 28A-66A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903533 | TP to TR 36.716-02-01: 3A-3A-5A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903534 | TP to TR 36.716-02-01: 3A-3A-46C_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903535 | AMX TP to TR 36.716-03-01: 5-7-66 and 5-7-66-66 | Nokia, AMX | imported from 3GU |
R4‑1903536 | AMX TP to TR 36.716-03-01: 3-5-7 and 3-3-5-7 | Nokia, AMX | imported from 3GU |
R4‑1903537 | AMX TP to TR 36.716-03-01: 2A-28A-66A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903538 | AMX TP to TR 36.716-03-01: 3A-3A-5A-28A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903539 | AMX TP to TR 36.716-03-01: 2A-7C-28A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903540 | AMX TP to TR 36.716-03-01: 5A-7C-28A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903541 | AMX TP to TR 36.716-03-01: 1A-3A-3A-5A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903542 | TP to TR 36.716-03-01: 1A-5A-28A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1903543 | BCS1 for CA_n41(2A) | Nokia, TMO US | imported from 3GU |
R4‑1903544 | TP to TR 38.716-02-00: CA_n41x-n71x | Nokia, TMO US | imported from 3GU |
R4‑1903545 | Simplification of non-contiguous intraband channel bandwidth table format | Nokia | imported from 3GU |
R4‑1903546 | Enabling PC2 SISO mode based on PC2 2x2 UL MIMO 2xPC3 PA architecture | Skyworks Solutions Inc. | imported from 3GU |
R4‑1903547 | Handling of frequency overlapping EN-DC | NTT DOCOMO INC. | imported from 3GU |
R4‑1903548 | UE demodulation requirements for 500km/h velocity | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903549 | UE demodulation requirements for carrier aggregation in HST-SFN scenario | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903550 | MRTD requirements for intra-band non-contiguous CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903551 | MTTD requirements for intra-band synchronous EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903552 | [draft] Correction CR on the reference cell for deriving the UE transmit timing | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903553 | draft CR for clarification of frequency overlapping EN-DC B42_n77 and B42_n78 | NTT DOCOMO INC. | imported from 3GU |
R4‑1903554 | Discussion on HPUE to EN-DC(LTE FDD band and NR band) for Rel-16 | China Telecommunications | imported from 3GU |
R4‑1903555 | Discussion on antenna gain difference for 1AoA RRM testing of PC2 | Sumitomo Elec. Industries, Ltd | imported from 3GU |
R4‑1903556 | Handling of Asynchronous operation of B42 and n79 | NTT DOCOMO INC. | imported from 3GU |
R4‑1903557 | 2.5 GHz two PA Back-off Measurements for Baseline and Improved Intra-band ENDC MPR and AMPR | Skyworks Solutions Inc. | imported from 3GU |
R4‑1903558 | LS on extreme temperature condition impact on peak EIRP and peak EIS | OPPO | imported from 3GU |
R4‑1903559 | 2.5 GHz one PA Back-off Measurements for Baseline and Improved Intra-band ENDC MPR and AMPR | Skyworks Solutions Inc. | imported from 3GU |
R4‑1903560 | Draft CR to TS 38.113 (subclause 8.2.1) | ZTE Corporation | imported from 3GU |
R4‑1903561 | discussion on frequency range for RE test R1 | ZTE Corporation | imported from 3GU |
R4‑1903562 | Draft CR to TS 38.113 subclause 4.5 | ZTE Corporation | imported from 3GU |
R4‑1903563 | Further consideration of EMC test wanted signal level | ZTE Corporation | imported from 3GU |
R4‑1903564 | on EMC requirements for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1903565 | on out-of-band blocking test for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1903566 | on test configuration of EMC test. | ZTE Corporation | imported from 3GU |
R4‑1903567 | Draft CR for TS 38.104: Addition of NOTE for transmitter intermodulation requirements in certain regions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903568 | Draft CR for TS 38.141-1: Addition of NOTE for transmitter intermodulation requirements in certain regions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903569 | Draft CR for TS 38.141-2: Addition of NOTE for transmitter intermodulation requirements in certain regions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903570 | Motivation and discussion priority for NR high speed in Rel.15 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903571 | NR PUSCH for high speed in Rel.15 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903572 | NR PRACH for high speed in Rel.15 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903573 | Payload size for UCI on PUSCH | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903574 | BS demodulation for LTE high speed in Rel.16 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903575 | Definition of antenna gain for OTA Transmitter OFF power and OTA Transmitter transient period | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903576 | Directivity of beam-based direction for in-band TX requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903577 | CR to TS37.145-2 Correction on OTA test requirements for spurious emissions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903578 | draft CR for clarification of asynchronous operation of B42 and n79. | NTT DOCOMO INC. | imported from 3GU |
R4‑1903579 | TP for TR 37.716-11-11: Corrections for DC_7_n77 | CHTTL | imported from 3GU |
R4‑1903580 | Discussion on V2X IBE model | CMCC | imported from 3GU |
R4‑1903581 | TP for TR 37.716-11-11: MSD requirements for DC_3_n3 intra-band non-contiguous EN-DC | CHTTL | imported from 3GU |
R4‑1903582 | CR for Applicability in intra-band FR2 | MediaTek inc. | imported from 3GU |
R4‑1903583 | Discussion on requirements for RLM | MediaTek inc. | imported from 3GU |
R4‑1903584 | CR for scheduling availability for RLM | MediaTek inc. | imported from 3GU |
R4‑1903585 | Discussion on RLM scaling factor N for FR2 | MediaTek inc. | imported from 3GU |
R4‑1903586 | Discussion on the first SCell activation in FR2 | MediaTek inc. | imported from 3GU |
R4‑1903587 | Discussion on requirements for BFD | MediaTek inc. | imported from 3GU |
R4‑1903588 | CR for scheduling availability for BFD in intra-band CA | MediaTek inc. | imported from 3GU |
R4‑1903589 | Discussion on requirements for CBD | MediaTek inc. | imported from 3GU |
R4‑1903590 | CR for scheduling availability for CBD | MediaTek inc. | imported from 3GU |
R4‑1903591 | CR for CBD evaluation period with DRX | MediaTek inc. | imported from 3GU |
R4‑1903592 | Discussion on L1-RSRP measurement accuracy | MediaTek inc. | imported from 3GU |
R4‑1903593 | Discussion on CSI-RS based L1-RSRP in FR2 | MediaTek inc. | imported from 3GU |
R4‑1903594 | CR for scheduling availability for L1-RSRP in intra-band CA | MediaTek inc. | imported from 3GU |
R4‑1903595 | CR for SS-RSRP inter frequency absolute accuracy in FR1 in extreme condition | MediaTek inc. | imported from 3GU |
R4‑1903596 | Discussion on test cases for link recovery | MediaTek inc. | imported from 3GU |
R4‑1903597 | Discussion on test cases for L1-RSRP in FR2 | MediaTek inc. | imported from 3GU |
R4‑1903598 | CR on RLM test cases for EN-DC FR1 (Section A.4.5.1) | MediaTek inc. | imported from 3GU |
R4‑1903599 | CR on RLM test cases for EN-DC FR2 (Section A.5.5.1) | MediaTek inc. | imported from 3GU |
R4‑1903600 | CR on RLM test cases for SA FR1 (Section A.6.5.1) | MediaTek inc. | imported from 3GU |
R4‑1903601 | CR on RLM test cases for SA FR2 (Section A.7.5.1) | MediaTek inc. | imported from 3GU |
R4‑1903602 | Draft CR for TR38.101-1 – Update to EVM averaging | Rohde & Schwarz | imported from 3GU |
R4‑1903603 | Draft CR for TR38.101-2 – Update to EVM averaging | Rohde & Schwarz | imported from 3GU |
R4‑1903604 | Draft CR for TR38.101-3 – Clean-up of band configuration tables | Rohde & Schwarz | imported from 3GU |
R4‑1903605 | Draft CR for TR38.101-4 – Corrections TDD UL-DL configurations | Rohde & Schwarz | imported from 3GU |
R4‑1903606 | Draft CR for TR38.810 – Corrections to wording concerning FR2 description | Rohde & Schwarz | imported from 3GU |
R4‑1903607 | Discussion on FR1 Noc and Es level for Demod and SDR | Rohde & Schwarz | imported from 3GU |
R4‑1903608 | Discussion on FR2 SNR range handling for Demod | Rohde & Schwarz | imported from 3GU |
R4‑1903609 | Discussion on testability of FR2 transmitter and reception tests | Rohde & Schwarz | imported from 3GU |
R4‑1903610 | Response LS on testability of FR2 transmitter and reception tests | Rohde & Schwarz | imported from 3GU |
R4‑1903611 | Draft CR for TR38.101-1 – Update to spectrum flatness | Rohde & Schwarz | imported from 3GU |
R4‑1903612 | Draft CR to 38.104: Correction on regional requirements (4.5) | NEC | imported from 3GU |
R4‑1903613 | Draft CR to 38.141-1_Correction on regional requirements (4.4) | NEC | imported from 3GU |
R4‑1903614 | Draft CR to 38.141-2_Correction on regional requirements (4.4) | NEC | imported from 3GU |
R4‑1903615 | Draft CR to 38.141-2_Correction on OTA BS output power requirements (6.3) | NEC | imported from 3GU |
R4‑1903616 | Draft CR to 38.141-2: Correction on OTA occupied bandwidth requirements (6.7.2) | NEC | imported from 3GU |
R4‑1903617 | Draft CR to 38.141-2: Correction on OTA transmitter spurious emissions requirements (6.7.5) | NEC | imported from 3GU |
R4‑1903618 | Draft CR to TS 38.141-2:Overview of radiated Tx requirements (4.1.1) | NEC | imported from 3GU |
R4‑1903619 | Draft CR to 38.141-2: OTA transmitter OFF power for FR2 (6.5) | NEC | imported from 3GU |
R4‑1903620 | RRC based BWP Switching Delay | NEC | imported from 3GU |
R4‑1903621 | Draft CR to 38.133: RRC based BWP switch delay requirements | NEC | imported from 3GU |
R4‑1903622 | SCell Activation delay in FR2 band | NEC | imported from 3GU |
R4‑1903623 | Delay requirements for active TCI state switch | NEC | imported from 3GU |
R4‑1903624 | Draft CR to 38.133: Active TCI state switch delay requirements | NEC | imported from 3GU |
R4‑1903625 | Discussion on inter-RAT NR measurement requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903626 | Correction CR for inter-RAT FR2 measurement in 36.133 before EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903627 | Correction CR for inter-RAT FR2 measurement in 36.133 before EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903628 | Discussion on requirements for TCI state switching | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903629 | Remaining issues on measurement period for L1-RSRP reporting | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903630 | Discussion on test case for L1-RSRP reporting | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903631 | Initial comparison of two option solutions to avoid HPUE exceeding SAR requirement | China Unicom | imported from 3GU |
R4‑1903632 | BS performance requirements for HST at 500 km/hr | Ericsson | imported from 3GU |
R4‑1903633 | CR for extending HST-SFN tests to CA in Rel-16 | Ericsson | imported from 3GU |
R4‑1903634 | Summary of alignment and impairment results for extending HST-SFN tests to CA with multiple bandwidth | Ericsson | imported from 3GU |
R4‑1903635 | UE performance requirements for HST up to 500 km/hr | Ericsson | imported from 3GU |
R4‑1903636 | Draft CR to TS 38.113 Addition NR to the scope | Ericsson | imported from 3GU |
R4‑1903637 | Draft CR to TS 38.113 Correction reference TR 38.817-2 | Ericsson | imported from 3GU |
R4‑1903638 | Draft CR to TS 38.113 Correction to Tables in BS test configurations | Ericsson | imported from 3GU |
R4‑1903639 | Draft CR to TS 38.113 Correction to text in section 6.1 Performance Criteria for continuous phenomena for BS | Ericsson | imported from 3GU |
R4‑1903640 | Draft CR to TS 38.113 Correction to text in section 6.2 Performance Criteria for transient phenomena for BS | Ericsson | imported from 3GU |
R4‑1903641 | Draft CR to TS 38.113 Modification to Note 2 in Section 4.4.2 | Ericsson | imported from 3GU |
R4‑1903642 | CR to 37.114 Subsections index in Section 4.1 | Ericsson | imported from 3GU |
R4‑1903643 | draft CR for modification of Pcmax for NR CA in FR1 | NTT DOCOMO INC. | imported from 3GU |
R4‑1903644 | TR 37.716-21-11 v0.4.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1903645 | Revised WID: Dual Connectivity (EN-DC) of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1903646 | draft CR on introduction of completed EN-DC of 2 bands LTE and 1 band NR into Rel-16 TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1903647 | TP for TR 37.716-21-11: MSD for DC_2-66_n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1903648 | TP for TR 37.716-11-11:MSD for DC_8_n41 | Huawei, HiSilicon | imported from 3GU |
R4‑1903649 | TP for TR 37.716-11-11:DC_13A_n71A | Huawei, HiSilicon | imported from 3GU |
R4‑1903650 | TP for TR 37.716-21-11: DC_7A-7A-66A-66A_n78A, DC_7C-66A-66A_n78A | Huawei, HiSilicon | imported from 3GU |
R4‑1903651 | Draft CR to 38.101-3: DC_1A-8A_n257(D-M), DC_1A-3C_n257(A,D-M) | Huawei, KT, Softbank | imported from 3GU |
R4‑1903652 | TP for TR 37.716-21-11: DC_3C-8A_n257 (A, D-M) | Huawei, KT | imported from 3GU |
R4‑1903653 | CR to reflect agreed MSD analysis of DC_25A-n41A for TR37.863-01-01 | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1903654 | Discussion on Reselection criterion related to rangeToBestCell in Idle Mode | MediaTek inc. | imported from 3GU |
R4‑1903655 | draftCR on rangToBestCell in Idle Mode(section 4.2.2.3 and 4.2.2.4) | MediaTek inc. | imported from 3GU |
R4‑1903656 | draftCR on RRC connection release with redirection(section 6.2.3) | MediaTek inc. | imported from 3GU |
R4‑1903657 | CR on LTE-NR redirection 36.133 | MediaTek inc. | imported from 3GU |
R4‑1903658 | CR on LTE-NR redirection 36.133 | MediaTek inc. | imported from 3GU |
R4‑1903659 | draftCR on msg3 re-transmission(section 6.2.2) | MediaTek inc. | imported from 3GU |
R4‑1903660 | draftCR on msg3 re-transmission test cases(section A.4.3.2, A.5.3., A.6.3.2, A.7.3.2) | MediaTek inc. | imported from 3GU |
R4‑1903661 | draftCR on TS38.133 for BWP switch test case(section A.7.5.6) | MediaTek inc. | imported from 3GU |
R4‑1903662 | On AGC settling time | MediaTek inc. | imported from 3GU |
R4‑1903663 | revised WID on EN-DC of 1 LTE band and 1 NR band | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903664 | General requirements for FR1 DL NCCA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903665 | LTE anchor agnostic approach for spurious emission and REFSENS for Inter-band EN-DC | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903666 | draft reply LS on applicability of LTE anchor agnostic | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903667 | draft CR for clarification on general spurious and REFSENS for Inter-band EN-DC in TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903668 | Introducing P-max in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903669 | draft CR for introduction of P-max to FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903670 | Draft CR to reflect agreed EN-DC of 1 LTE band and 1 NR band in TR 37.716-11-11 for TS 38.101-3 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1903671 | Discussion on the RRM impact from group WUS | Huawei, HiSilicon | imported from 3GU |
R4‑1903672 | Discussion on the preconfigured UL resource | Huawei, HiSilicon | imported from 3GU |
R4‑1903673 | Discussion on the multi carrier operation for NB R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903674 | Way forward on RRM impact of the R16 enhancement for NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1903675 | CR on Cat NB2 UE test cases applicability R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1903676 | CR on Cat NB2 UE test cases applicability R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903677 | CR on Cat NB2 UE test cases applicability R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903678 | Maintenance on HD-FDD inter-frequency re-establishment test cases R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1903679 | Maintenance on HD-FDD inter-frequency re-establishment test cases R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1903680 | Maintenance on HD-FDD inter-frequency re-establishment test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903681 | Maintenance on HD-FDD inter-frequency re-establishment test cases R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903682 | Maintenance on TDD inter-frequency re-establishment test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903683 | Maintenance on TDD inter-frequency re-establishment test cases R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903684 | Maintenance on side conditions for NSSS measurement accuracy requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903685 | Maintenance on side conditions for NSSS measurement accuracy requirements R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903686 | CR on TDD intra frequency idle RSTD accuracy test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903687 | CR on TDD intra frequency idle RSTD accuracy test cases R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903688 | CR on serving cell measurement relaxation for NB-IoT R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903689 | CR on serving cell measurement relaxation for NB-IoT R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903690 | Initial discussions on the RRM requirements for NR-U | Huawei, HiSilicon | imported from 3GU |
R4‑1903691 | draftCR on event triggering and reporting criteria (section 9.1.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1903692 | Reply LS on reporting criteria limitation in MR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1903693 | Maintenance CR on event triggering and reporting criteria R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903694 | Maintenance CR on event triggering and reporting criteria R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903695 | draftCR on MO merging (section 9.1.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903696 | draftCR to clarify in the requirements for RRC re-establishment (section 6.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903697 | maintenance draftCR on redirection requirements (section 6.2.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1903698 | maintenance CR on redirection requirements R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903699 | maintenance CR on redirection requirements R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903700 | Discussion on the BWP switch delay requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1903701 | draftCR on BWP switch delay (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1903702 | Reply LS on RRC processing delay for BWP switching | Huawei, HiSilicon | imported from 3GU |
R4‑1903703 | Discussion on the interruption requirements on other serving CCs due to BWP switch | Huawei, HiSilicon | imported from 3GU |
R4‑1903704 | draftCR on requirements for interruptions due to BWP switch (section 8.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903705 | CR on requirements for interruptions due to BWP switch R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903706 | CR on requirements for interruptions due to BWP switch R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903707 | Reply LS on autonomous gap for NR ANR | Huawei, HiSilicon | imported from 3GU |
R4‑1903708 | draftCR on band grouping tables for FR2 (section 3.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1903709 | draftCR on TCI state configurations for test cases (section A.3.16) | Huawei, HiSilicon | imported from 3GU |
R4‑1903710 | draftCR on the DRX configurations for test cases (section A.3.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1903711 | Maintenance draftCR on the intra-frequency cell search and measurement test cases for FR1 (section A.4.6.1 A.6.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903712 | Maintenance draftCR on the intra-frequency cell search and measurement test cases for FR2 (section A.5.6.1 A.7.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903713 | Maintenance draftCR on idle mode test cases for FR2 (section A.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903714 | Maintenance draftCR on re-establishment test cases for FR1 (section A.6.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903715 | Maintenance draftCR on re-establishment test cases for FR2 (A.7.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903716 | Test case for intra-frequency RRC re-establishment in FR1 without serving cell timing reference (A.6.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903717 | Test case for intra-frequency RRC re-establishment in FR2 without serving cell timing reference (A.7.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903718 | Test cases for RLM scheduling restrictions in FR2 (A.5.5.1.9 and A.7.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1903719 | Correction of inter-RAT EUTRA measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1903720 | Discussion on L1 indication period for RLM and BFD | Huawei, HiSilicon | imported from 3GU |
R4‑1903721 | Correction of L1 indication period for RLM and BFD (section 8.1.6 and 8.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1903722 | Correction of Minimum requirement at transitions for RLM (section 8.1.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1903723 | Correction of TDD UL DL configuration (section A.3.1.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1903724 | Corrections on inter-frequency RS-SINR measurement accuracy test in TS36.133 R13 | Huawei, HiSilicon | imported from 3GU |
R4‑1903725 | Corrections on inter-frequency RS-SINR measurement accuracy test in TS36.133 R14 | Huawei, HiSilicon | imported from 3GU |
R4‑1903726 | Corrections on inter-frequency RS-SINR measurement accuracy test in TS36.133 R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903727 | Corrections on inter-frequency RS-SINR measurement accuracy test in TS36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903728 | Discussion on UE transmit timing adjustment due to UE beam switching | Huawei, HiSilicon | imported from 3GU |
R4‑1903729 | DraftCR on UE transmit timing requirements for Rx beam switching (section 7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903730 | DraftCR on interruption requirements due to UE beam transition in FR2 (new section 8.2.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1903731 | Discussion on MTTD requirements for intra-band sync EN-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1903732 | DraftCR on MTTD requirements for intra-band sync EN-DC (section 7.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1903733 | Discussion on MRTD requirements for intra-band non-contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1903734 | Discussion on remaining issues for CBD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1903735 | DraftCR on modifying candidate beam detection requirements (section 8.5.5 and 8.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1903736 | DraftCR on correcting scheduling restrictions requirements for CBD (section 8.5.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1903737 | Further discussion on UE behaviour on reception of channels or RS in the same OFDM symbol | Huawei, HiSilicon | imported from 3GU |
R4‑1903738 | Reply LS on UE behaviour on reception of channels or RS in the same OFDM symbol | Huawei, HiSilicon | imported from 3GU |
R4‑1903739 | Discussion on remaining issues on SS-RSRP measurement accuracy test setups | Huawei, HiSilicon | imported from 3GU |
R4‑1903740 | DraftCR on introducing new SSB pattern for intra-freq measurement accuracy tests (section A.3.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1903741 | DraftCR on maintaining SS-RSRP measurement accuracy test for EN-DC (section A.4.7.1.1 and A.5.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903742 | DraftCR on maintaining SS-RSRP measurement accuracy test for SA (sectionA.6.7.1.1 and A.7.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903743 | DraftCR on RSRP measurement accuracy tests for inter-RAT E-UTRAN (new section A.6.7.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1903744 | DraftCR on RSRQ measurement accuracy tests for inter-RAT E-UTRAN (new section A.6.7.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1903745 | DraftCR on RS-SINR measurement accuracy tests for inter-RAT E-UTRAN (new section A.6.7.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1903746 | DraftCR on correcting min Io conditions in section B.2.4 | Huawei, HiSilicon | imported from 3GU |
R4‑1903747 | Discussion on RRM impacts of NR mobility enhancements | Huawei, HiSilicon | imported from 3GU |
R4‑1903748 | UE Tx behaviour after MG | Huawei, HiSilicon | imported from 3GU |
R4‑1903749 | CR on UE Tx behavior after MG (section 9.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903750 | Correction CR on UE measurement capability for NE-DC (section 9.1.3.1b, 9.1.3.2b) | Huawei, HiSilicon | imported from 3GU |
R4‑1903751 | Introduction of UE measurement capability for NE-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1903752 | Introduction of UE measurement capability for NE-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1903753 | Discussion on FR2 intra-freqeuncy measurement requriements | Huawei, HiSilicon | imported from 3GU |
R4‑1903754 | CR on FR2 intra-freqeuncy measurement requriements (section 9.1.5.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903755 | Editorial correction on measurement period for de-activated SCell (section 9.2.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903756 | Remaining issues in inter-RAT RSTD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1903757 | CR for inter-RAT RSTD measurement on FDD E-UTRA carrier (section 9.4.4.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903758 | CR for inter-RAT RSTD measurement on TDD E-UTRA carrier (section 9.4.4.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903759 | CR on gap sharing due to cell detection for inter-RAT RSTD (section 9.1.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903760 | Remaining issues in RLM requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1903761 | CR on RLM scheduling restriction (section 8.1.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1903762 | CR on remaining issues in RLM requirements (section 8.1.1, 8.1.2, 8.1.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1903763 | Further discussion on Scell activation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1903764 | CR on SCell activation requirements (section 8.3.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903765 | Discussion on remaining issues in BFD requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1903766 | CR on remaining issues in BFD requirements (section 8.5.1, 8.5.2, 8.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1903767 | CR on BFD scheduling restriction (section 8.5.7) | Huawei, HiSilicon | imported from 3GU |
R4‑1903768 | Further discussion on L1-RSRP accuracy | Huawei, HiSilicon | imported from 3GU |
R4‑1903769 | CR on L1-RSRP accuracy requirements (section 10.1.19, 10.1.20) | Huawei, HiSilicon | imported from 3GU |
R4‑1903770 | Discussion on remaining issues in L1-RSRP measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1903771 | LS on timeRestrictionForChannelMeasurements | Huawei, HiSilicon | imported from 3GU |
R4‑1903772 | CR on L1-RSRP measurement requirements (section 9.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1903773 | CR on scheduling restriction for L1-RSRP (section 9.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1903774 | Further discussion on FR2 side conditions | Huawei, HiSilicon | imported from 3GU |
R4‑1903775 | CR to add side conditions for FR2 in section 10 (section 10.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903776 | CR to add side conditions for FR2 in section B (section B.2.2, B.2.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1903777 | Discussion on remaining issues in AoA setup in FR2 RRM test | Huawei, HiSilicon | imported from 3GU |
R4‑1903778 | Discussion on other remaining issues in FR2 RRM test | Huawei, HiSilicon | imported from 3GU |
R4‑1903779 | CR on AoA setup for FR2 RRM test (section A.3.15) | Huawei, HiSilicon | imported from 3GU |
R4‑1903780 | Update to CSI-RS configuration for RRM test (A.3.14) | Huawei, HiSilicon | imported from 3GU |
R4‑1903781 | Update to SSB configuration for RRM test (A.3.10) | Huawei, HiSilicon | imported from 3GU |
R4‑1903782 | Maintanance of inter-frequency RSRP accuracy test cases for FR1 (section A.4.7.1.2, A.6.7.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903783 | Maintanance of inter-frequency RSRP accuracy test cases for FR2 (section A.5.7.1.2-3, A.7.7.1.2-3) | Huawei, HiSilicon | imported from 3GU |
R4‑1903784 | Further discussion on L1-RSRP test | Huawei, HiSilicon | imported from 3GU |
R4‑1903785 | Way forward on L1-RSRP test | Huawei, HiSilicon | imported from 3GU |
R4‑1903786 | Maintanance of L1-RSRP accuracy test cases for FR2 (section A.5.7.4, A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1903787 | Addition of L1-RSRP delay test in FR1 (section A.4.6, A.6.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1903788 | Addition of L1-RSRP delay test in FR2 (section A.5.6, A.7.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1903789 | CR for applicability of Rel-15 requirements for non-BL R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1903790 | CR for applicability of Rel-15 requirements for non-BL R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903791 | Discussion on DL quality report in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1903792 | Discussion on WUS requirements in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1903793 | Discussion on RRM requirements related to PUR in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1903794 | Discussion on relaxed serving cell monitoring in Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1903795 | Introduction of relaxed serving cell monitoring for Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1903796 | Way forward on RRM for Rel-16 eMTC | Huawei, HiSilicon | imported from 3GU |
R4‑1903797 | Discussion on SFTD for NR-DC | Huawei, HiSilicon | imported from 3GU |
R4‑1903798 | Introduction of requirements for SFTD measurement after NR-DC (section 9.2.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1903799 | Introduction of interruption requirements for SFTD measurement before NR-DC (section 8.2.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1903800 | Correction on PSCell addition requirements for NR-DC (section 8.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1903801 | Initial discussion on RRM requirements for CLI measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1903802 | CR on applicability of GP with short MGL in 38.133 (section 9.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903803 | CR on applicability of gap in LTE, ENDC and NEDC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1903804 | CR on applicability of gap in LTE, ENDC and NEDC in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903805 | Correction on the gap starting point and Tmg in TS 38.133 (section 9.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903806 | CR for starting point of measurement gap in LTE, ENDC and NEDC in TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1903807 | CR for starting point of measurement gap in LTE, ENDC and NEDC in TS 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903808 | CR on default gap sharing scheme in 38.133 (section 9.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903809 | CR on default gap sharing scheme in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1903810 | CR on default gap sharing scheme in 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903811 | CR on the serving carriers applicability (section 3.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1903812 | Discussion on LS on collision of RRM measurement resources with uplink transmissions in FR1 TDD | Huawei, HiSilicon | imported from 3GU |
R4‑1903813 | CR on Scheduling availability for collision of RRM measurement resources with uplink transmissions in FR1 TDD (Section 9.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903814 | CR on colliding condition for inter-f measurement in idle mode(section 4.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1903815 | CR on first attempt condition in handover (section 6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1903816 | Discussion on known cell condition in FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1903817 | CR on interruption requirements in TS36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1903818 | CR on interruption requirements in TS36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903819 | CR on PSCell addtion in ENDC in TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1903820 | CR on PSCell addtion in ENDC in TS 36.133 R16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903821 | Discussion on TCI state switching requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1903822 | CR on the definition of known TCI state (section 2 and section 8) | Huawei, HiSilicon | imported from 3GU |
R4‑1903823 | Discussion on RRM requirements of even further mobility enhancement in LTE | Huawei, HiSilicon | imported from 3GU |
R4‑1903824 | Discussion on CA capability on LTE high speed in Rel.16 | Huawei, HiSilicon | imported from 3GU |
R4‑1903825 | [DRAFT] Draft LS on CA capability on HST | Huawei, HiSilicon | imported from 3GU |
R4‑1903826 | Discussion on the RRM requirements in HST | Huawei, HiSilicon | imported from 3GU |
R4‑1903827 | Discussion on NR-U impact on RRM requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903828 | Details of UE CLI measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903829 | skeleton TR 38.xxx-xx-xx Rel-16 NR inter-band CA DC for 3 bands DL with 2 bands UL | ZTE Corporation | imported from 3GU |
R4‑1903830 | Draft CR to TS 38.141-1: Correction on applicability of test configurations for multi-band operation (section 4.8.4) | ZTE Corporation | imported from 3GU |
R4‑1903831 | Draft CR to TS 38.141-2: Correction on manufacturer’s declrations related to multi-band operation(section 4.6) | ZTE Corporation | imported from 3GU |
R4‑1903832 | Discussion on the Nominal channel spacing for CA | ZTE Corporation | imported from 3GU |
R4‑1903833 | Draft CR to TS 38.104: Nominal channel spacing for NR (section 5.4) | ZTE Corporation | imported from 3GU |
R4‑1903834 | Draft CR to TS 38.101-1: Nominal channel spacing for NR (section 5.4A.1) | ZTE Corporation | imported from 3GU |
R4‑1903835 | Draft CR to TS 38.101-2: Nominal channel spacing for NR (section 5.4) | ZTE Corporation | imported from 3GU |
R4‑1903836 | Draft CR to TS 38.104: Correction on description on multi-band operation in section 4.8 | ZTE Corporation | imported from 3GU |
R4‑1903837 | Discussion on UEM requirements for MSR new RAT combination | ZTE Corporation | imported from 3GU |
R4‑1903838 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Corporation | imported from 3GU |
R4‑1903839 | TP for TR 38.716-02-00: 1UL and 2UL for CA_n3A-n8A | ZTE Corporation | imported from 3GU |
R4‑1903840 | TP for TR 38.716-02-00: 2UL for CA_n8A-n79A | ZTE Corporation | imported from 3GU |
R4‑1903841 | Discussion on NR and MTC coexistence | ZTE Corporation | imported from 3GU |
R4‑1903842 | Discussion on NR and NB-IoT coexistence | ZTE Corporation | imported from 3GU |
R4‑1903843 | Further discussion on 41&n41 spectrum sharing | ZTE Corporation | imported from 3GU |
R4‑1903844 | Further discussion on BS intra-band NCCA TAE requirement | ZTE Corporation | imported from 3GU |
R4‑1903845 | Frequency band for NR and LTE-MTC | Huawei, HiSilicon | imported from 3GU |
R4‑1903846 | Feasible placement for LTE-M coexistence with NR | Huawei, HiSilicon | imported from 3GU |
R4‑1903847 | TR skeleton for coexistence of NB-IoT with NR | Huawei, HiSilicon | imported from 3GU |
R4‑1903848 | Frequency band for NR and NB-IoT | Huawei, HiSilicon | imported from 3GU |
R4‑1903849 | NB-IoT standalone operating | Huawei, HiSilicon | imported from 3GU |
R4‑1903850 | NB-IoT operating in NR guard band | Huawei, HiSilicon | imported from 3GU |
R4‑1903851 | System scenarios of NB-IoT coexistence with NR | Huawei, HiSilicon | imported from 3GU |
R4‑1903852 | Channel raster, subcarrier and PRB alignment | Huawei, HiSilicon | imported from 3GU |
R4‑1903853 | Power boosting for coexistence of NB-IoT with NR | Huawei, HiSilicon | imported from 3GU |
R4‑1903854 | Draft CR to 38.104: NR CA channel spacing | Huawei, HiSilicon | imported from 3GU |
R4‑1903855 | BS RF requirements on adding wider channel bandwidths in Band n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1903856 | UE RF requirements on adding wider channel bandwidths in Band n38 | Huawei, HiSilicon | imported from 3GU |
R4‑1903857 | Further consideration on UE reference sensitivity requirements on adding wider channel bandwidths in Band n7 | Huawei, HiSilicon | imported from 3GU |
R4‑1903858 | On MSR new CS | Huawei, HiSilicon | imported from 3GU |
R4‑1903859 | TX RF requirements for MSR new CS | Huawei, HiSilicon | imported from 3GU |
R4‑1903860 | RX RF requirements for MSR new CS | Huawei, HiSilicon | imported from 3GU |
R4‑1903861 | CR to 36.104: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1903862 | CR to 36.104: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1903863 | CR to 36.104: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1903864 | CR to 36.104: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1903865 | CR to 36.141: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1903866 | CR to 36.141: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1903867 | CR to 36.141: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1903868 | CR to 36.141: category B option 2 unwanted emissions for 2500-2690 MHz band | Huawei, Ericsson | imported from 3GU |
R4‑1903869 | CR to 37.141: Correcton on Definition of Capability Sets (CS) | Huawei, HiSilicon | imported from 3GU |
R4‑1903870 | CR to 37.141: Correcton on Definition of Capability Sets (CS) | Huawei, HiSilicon | imported from 3GU |
R4‑1903871 | Further discussion on FR2 MRTD requirement | ZTE Corporation | imported from 3GU |
R4‑1903872 | Further discussion on FR2 ON/OFF power | ZTE Corporation | imported from 3GU |
R4‑1903873 | Further discussion on Tx diversity and TM for TAE requirement | ZTE Corporation | imported from 3GU |
R4‑1903874 | Further discussion on NR TM for TAE requirement | ZTE Corporation | imported from 3GU |
R4‑1903875 | Correction of PUSCH demodulation requirements for eFeMTC (36.104) | Ericsson | imported from 3GU |
R4‑1903876 | Correction of PUSCH demodulation requirements for eFeMTC (36.104) | Ericsson | imported from 3GU |
R4‑1903877 | Correction of PUSCH demodulation requirements for eFeMTC (36.141) | Ericsson | imported from 3GU |
R4‑1903878 | Correction of PUSCH demodulation requirements for eFeMTC (36.141) | Ericsson | imported from 3GU |
R4‑1903879 | Finalize UE demodulation requirements for CRS-IM | Ericsson | imported from 3GU |
R4‑1903880 | Finalize UE demodulation requirements for CRS-IM | Ericsson | imported from 3GU |
R4‑1903881 | Finalize UE demodulation requirements for sTTI | Ericsson | imported from 3GU |
R4‑1903882 | Finalize UE demodulation requirements for sTTI | Ericsson | imported from 3GU |
R4‑1903883 | Finalize CQI reporting test for sTTI | Ericsson | imported from 3GU |
R4‑1903884 | Finalize CQI reporting test for sTTI | Ericsson | imported from 3GU |
R4‑1903885 | Discussion on channel quality reporting for NB-IoT | Ericsson | imported from 3GU |
R4‑1903886 | Discussion on channel quality reporting for eMTC | Ericsson | imported from 3GU |
R4‑1903887 | Alignment of FR2 DL scheduling of DL RMC with UL RMC | Ericsson | imported from 3GU |
R4‑1903888 | Draft CR: Alignment of FR2 DL scheduling of DL RMC with UL RMC | Ericsson | imported from 3GU |
R4‑1903889 | Impact of maxUplinkDutyCycle to UE demodulation and RRM requirements | Ericsson | imported from 3GU |
R4‑1903890 | Discussion on L1-RSRP reporting delay | Ericsson | imported from 3GU |
R4‑1903891 | CR 38.133 (10.1.19) L1-RSRP reporting delay | Ericsson | imported from 3GU |
R4‑1903892 | Discussion on L1-RSRP accuracy requirements | Ericsson | imported from 3GU |
R4‑1903893 | CR 38.133 (2 and 9.5.3) L1-RSRP accuracy requirements for FR1 | Ericsson | imported from 3GU |
R4‑1903894 | CR 38.133 (B.2.4.2) Correction of CSI-RS based L1-RSRP reporting condition | Ericsson | imported from 3GU |
R4‑1903895 | Simulation results of NR PBCH demodulation | Ericsson | imported from 3GU |
R4‑1903896 | Addition of alternative TDD configuration for UE demodulation requirements | Ericsson, NTT DOCOMO, SoftBank, KDDI | imported from 3GU |
R4‑1903897 | draft CR to TS38.104 on TAE requirement (Section 6.5.3 and 9.6.3) | ZTE Corporation | imported from 3GU |
R4‑1903898 | CR on threshold for FS3 channel occupancy test R13 | MediaTek inc. | imported from 3GU |
R4‑1903899 | CR on threshold for FS3 channel occupancy test R14 | MediaTek inc. | imported from 3GU |
R4‑1903900 | CR on threshold for FS3 channel occupancy test R15 | MediaTek inc. | imported from 3GU |
R4‑1903901 | CR on threshold for FS3 channel occupancy test R16 | MediaTek inc. | imported from 3GU |
R4‑1903902 | UE UL timing adjustment due to Rx beam change | MediaTek inc. | imported from 3GU |
R4‑1903903 | MTTD and MRTD for intra-band EN-DC | MediaTek inc. | imported from 3GU |
R4‑1903904 | MRTD and MTTD of FR2 intra-band NCCA | MediaTek inc. | imported from 3GU |
R4‑1903905 | Remaining Issues on BWP Switch Delay | MediaTek inc. | imported from 3GU |
R4‑1903906 | CR on BWP switch delay in TS38.133 (Section 8.6) | MediaTek inc. | imported from 3GU |
R4‑1903907 | Remaining Issues on BWP Switch Interruption | MediaTek inc. | imported from 3GU |
R4‑1903908 | CR on BWP switch interruption in TS38.133 (Section 8.2) | MediaTek inc. | imported from 3GU |
R4‑1903909 | CR on BWP switch interruption in TS36.133 R15 | MediaTek inc. | imported from 3GU |
R4‑1903910 | CR on BWP switch interruption in TS36.133 R16 | MediaTek inc. | imported from 3GU |
R4‑1903911 | Array gain in RSRP reporting | MediaTek inc. | imported from 3GU |
R4‑1903912 | Gain difference between rough and fine Rx beams in FR2 RRM testing | MediaTek inc. | imported from 3GU |
R4‑1903913 | Rough and fine beam assumptions for FR2 RRM test cases | MediaTek inc. | imported from 3GU |
R4‑1903914 | Measurement outside gap in FR2 for partially-overlapped SMTC occasions | MediaTek inc. | imported from 3GU |
R4‑1903915 | CR introducing test cases for direct activation of Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903916 | CR introducing test cases for direct activation of Scell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903917 | UE TCI state switch requirements discussion | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903918 | L1-RSRP CSI-RS Measurement Bandwidth | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903919 | Updated simulation results for L1-RSRP accuracy measurements for FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903920 | Updated simulation results for L1-RSRP accuracy measurements for FR2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903921 | CSI-RS and SSB L1-RSRP accuracy requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903922 | CR for L1-RSRP accuracy requirements FR1 (section 10.1.19) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903923 | CR for L1-RSRP accuracy requirements FR2 (section 10.1.20) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903924 | L1-RSRP Reporting Delay Requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903925 | CR for L1-RSRP Reporting Delay Requirements in section 9.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903926 | L1-RSRP measurement and reporting editorials | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903927 | Clarifying editorial correction to 9.5.1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903928 | Clarifying editorial correction to 9.5.3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903929 | Correction of references in 9.5.3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903930 | Include MAC trigger in aperiodic reporting (section 9.5.4 ) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903931 | Renaming of ‘BM’ to correct RS abbreviation (section 9.5.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903932 | Clarifying editorial correction (section 9.5.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903933 | CSI-RS L1-RSRP Measurement Period Requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903934 | CR for CSI-RS L1-RSRP measurement period Requirements (section 9.5.4.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903935 | Finalization of Beam Failure Detection | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903936 | Editrorial updates and clarifications to sections 8.5.3, 8.5.4, 8.5.5 and 8.5.6 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903937 | Minimum Requirements for CSI-RS based BFD | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903938 | CR Beam Failure Detection requirements in section 8.5.2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903939 | CR to Link Recovery Procedures introduction section 8.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903940 | Scaling of CSI-RS based requirements in DRX | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903941 | CR removing scaling of CSI-RS based requirements in DRX for FR2 in 8.1.3, 8.5.3 and 8.5.6 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903942 | CR Corrections to Minimum requirement for L1 indication (section 8.5.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903943 | Beam Candidate Detection Latencies | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903944 | CR Beam Candidate Detection Latencies section 8.5.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903945 | CR for removing band n48 from Rel-15 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1903946 | Introduction of R16 3DL band combinations to TS 36.101 | KDDI Corporation | imported from 3GU |
R4‑1903947 | Introduction of R16 3DL band combinations to TS 36.101 | KDDI Corporation | imported from 3GU |
R4‑1903948 | draft CR to TS38.141-01 on TAE requirement (Section 6.5.4) | ZTE Corporation | imported from 3GU |
R4‑1903949 | On the carrier frequency mapping and CA channel spacing | Ericsson | imported from 3GU |
R4‑1903950 | Corrections to channel raster mapping and CA channel spacing | Ericsson | imported from 3GU |
R4‑1903951 | Corrections to channel raster mapping and CA channel spacing | Ericsson | imported from 3GU |
R4‑1903952 | Corrections to channel raster mapping and CA channel spacing | Ericsson | imported from 3GU |
R4‑1903953 | Correction to carrier spacing for EN-DC | Ericsson | imported from 3GU |
R4‑1903954 | Correction to MPR, Pcmax and Pumax for CA | Ericsson | imported from 3GU |
R4‑1903955 | Increasing the configured EN-DC power for FDD-TDD (PC3) | Ericsson | imported from 3GU |
R4‑1903956 | Removal of the PSD condition for intra-band EN-DC power control | Ericsson | imported from 3GU |
R4‑1903957 | Applicability of SA requirements for UE configured with EN-DC (Pcmax) | Ericsson | imported from 3GU |
R4‑1903958 | Completion of defintions of EN-DC configured power | Ericsson | imported from 3GU |
R4‑1903959 | Corrections to MPR and A-MPR for intra-band EN-DC (Pcmax) | Ericsson | imported from 3GU |
R4‑1903960 | Correction of power tolerances for configured output power | Ericsson | imported from 3GU |
R4‑1903961 | Introduction of P-Max for FR2 | Ericsson | imported from 3GU |
R4‑1903962 | On the P-MPR needed for compliance with MPE requirements and relation to FR2 UL duty cycle | Ericsson, Sony | imported from 3GU |
R4‑1903963 | Amendment of the absolute power tolerance requirement | Ericsson | imported from 3GU |
R4‑1903964 | Amendment of the relative power tolerance requirement | Ericsson | imported from 3GU |
R4‑1903965 | On the 100 kHz raster and 7.5 kHz UL shift for LTE/NR sharing in B41/Bn41 | Ericsson | imported from 3GU |
R4‑1903966 | Increasing the configured EN-DC power for FDD-TDD (PC3 and PC2) | Ericsson | imported from 3GU |
R4‑1903967 | draft CR to TS38.141-02 on TAE requirement (Section 6.6.4) | ZTE Corporation | imported from 3GU |
R4‑1903968 | Further discussion on TS38.104 Annex B for EVM measurement | ZTE Corporation | imported from 3GU |
R4‑1903969 | TP for MU analysis of Dynamic Beamforming Compact Range Chamber measurement in EIRP and EIS | CAICT | imported from 3GU |
R4‑1903970 | draft CR to TS 38.104 on EVM measurement (Annex B and C) | ZTE Corporation | imported from 3GU |
R4‑1903971 | Introduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | KDDI Corporation | imported from 3GU |
R4‑1903972 | Further discussion on TS38.141-01 Annex F for EVM measurement | ZTE Corporation | imported from 3GU |
R4‑1903973 | Draft CR to 38.141-01 with corrections and additions to Annex F | ZTE Corporation | imported from 3GU |
R4‑1903974 | Further discussion on TS38.141-02 Annex F for EVM measurement | ZTE Corporation | imported from 3GU |
R4‑1903975 | Editorial corrections for 36.101 CA OOB additional spectrum emission requirements | Ericsson | imported from 3GU |
R4‑1903976 | Editorial corrections for 36.101 CA OOB additional spectrum emission requirements | Ericsson | imported from 3GU |
R4‑1903977 | Simulation results for NR UE CSI tests | Ericsson | imported from 3GU |
R4‑1903978 | NR HST UE demodulation work scope | Ericsson | imported from 3GU |
R4‑1903979 | NR UE performance test open issues | Ericsson | imported from 3GU |
R4‑1903980 | Simulation results for NR UE PDCCH demodulation tests | Ericsson | imported from 3GU |
R4‑1903981 | Simulation results for NR UE PDSCH demodulation tests | Ericsson | imported from 3GU |
R4‑1903982 | Way forward on NR UE demodulation work scope for Rel-16 | Ericsson | imported from 3GU |
R4‑1903983 | Draft CR to 38.141-02 with corrections and additions to Annex F | ZTE Corporation | imported from 3GU |
R4‑1903984 | Further discussion on NR TM configurations | ZTE Corporation | imported from 3GU |
R4‑1903985 | draft CR to TS38.141-01 on NR FR1 test model(Section 4.9.2) | ZTE Corporation | imported from 3GU |
R4‑1903986 | TP for TR 38.716-02-00: CA_n1-n257 | KDDI | imported from 3GU |
R4‑1903987 | draft CR to TS38.141-02 on NR FR2 test model(Section 4.9.2) | ZTE Corporation | imported from 3GU |
R4‑1903988 | Overview on system parameters for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1903989 | draft CR for introduce DC of LTE 3band + NR 1band for TS 38.101-3 | KDDI | imported from 3GU |
R4‑1903990 | Overview on TX requirement for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1903991 | Overview on RX requirement for 7-24GHz | ZTE Corporation | imported from 3GU |
R4‑1903992 | TP for TR 37.716-21-21: DC_3A_n1A-n79A | KDDI | imported from 3GU |
R4‑1903993 | TP for TR 37.716-21-21: DC_3A_n1A-n257A | KDDI | imported from 3GU |
R4‑1903994 | On performance of existing RF connector and probe technology | LG Electronics Finland | imported from 3GU |
R4‑1903995 | draft CR to introduce n18 to TS 38.101-1 | KDDI | imported from 3GU |
R4‑1903996 | draft CR to introduce n18 to TS 38.104 | KDDI | imported from 3GU |
R4‑1903997 | draft CR to introduce n18 to TS 38.133 | KDDI | imported from 3GU |
R4‑1903998 | On AGC settling time and IBE for NR V2X | LG Electronics Finland | imported from 3GU |
R4‑1903999 | draft CR to introduce n18 to TS 38.141-1 | KDDI | imported from 3GU |
R4‑1904000 | UL 7.5kHz frequency shift support of n18 | KDDI | imported from 3GU |
R4‑1904001 | Draft CR for TS 38.101-2 – UE coordinate system | Rohde & Schwarz | imported from 3GU |
R4‑1904002 | Discussion on EN-DC notation with intraband contiguous parts | ROHDE & SCHWARZ | imported from 3GU |
R4‑1904003 | draft CR to introduce 30MHz bandwidth of n41 into TS 38.101-1 | KDDI | imported from 3GU |
R4‑1904004 | UE reporting supported transient time parameters - gNB usage | Ericsson | imported from 3GU |
R4‑1904005 | Introduction of band n14 - draft CR to TS 38.104 | Ericsson | imported from 3GU |
R4‑1904006 | Introduction of band n14 - draft CR to TS 38.141-1 | Ericsson | imported from 3GU |
R4‑1904007 | Introduction of band n14 - draft CR to TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1904008 | Introduction of band n14 - draft CR to TS 38.101-1 | Ericsson | imported from 3GU |
R4‑1904009 | Introduction of band n14 - draft CR to TS 38.133 | Ericsson | imported from 3GU |
R4‑1904010 | Introduction of band n30 - draft CR to TS 38.104 | Ericsson | imported from 3GU |
R4‑1904011 | Introduction of band n30 - draft CR to TS 38.141-1 | Ericsson | imported from 3GU |
R4‑1904012 | Introduction of band n30 - draft CR to TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1904013 | Introduction of band n30 - draft CR to TS 38.101-1 | Ericsson | imported from 3GU |
R4‑1904014 | Introduction of band n30 - draft CR to TS 38.133 | Ericsson | imported from 3GU |
R4‑1904015 | CR to TS 36.101 - NB-IoT band 4 fix | Ericsson | imported from 3GU |
R4‑1904016 | CR to TS 36.101 - NB-IoT band 4 fix | Ericsson | imported from 3GU |
R4‑1904017 | NB-IoT - NR coexistence : SCS based channel raster | Ericsson | imported from 3GU |
R4‑1904018 | NB-IoT - NR coexistence : BS RF topics | Ericsson | imported from 3GU |
R4‑1904019 | TP to the new TR related to NB-IoT - NR coexistence – channel raster | Ericsson | imported from 3GU |
R4‑1904020 | 29dBm UE - Simulation results for urban and suburban areas | Ericsson | imported from 3GU |
R4‑1904021 | 29dBm UE - Simulation results for rural areas | Ericsson | imported from 3GU |
R4‑1904022 | BS demodulation simulations results | Ericsson | imported from 3GU |
R4‑1904023 | BS demodulation simulations results for UCI on PUSCH | Ericsson | imported from 3GU |
R4‑1904024 | Draft CR to TS 38.104 Applicability rules for BS demodulation | Ericsson | imported from 3GU |
R4‑1904025 | Draft CR to TS 38.141-1 Adding new agreed applicability rules for BS demodulation | Ericsson | imported from 3GU |
R4‑1904026 | Draft CR to TS 38.141-2 Adding new agreed applicability rules for BS demodulation | Ericsson | imported from 3GU |
R4‑1904027 | Draft CR to TS 38.141-1 Adding required vendor declaration items for BS demodulation | Ericsson | imported from 3GU |
R4‑1904028 | Draft CR to TS 38.141-2 Adding required vendor declaration items for BS demodulation | Ericsson | imported from 3GU |
R4‑1904029 | Draft CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1904030 | Draft CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1904031 | Draft CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1904032 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1904033 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1904034 | HST for NR BS demod in Rel-15 | Ericsson | imported from 3GU |
R4‑1904035 | PUSCH demodulation open issues | Ericsson | imported from 3GU |
R4‑1904036 | Further considerations for NR UCI on PUSCH and UCI on PUCCH | Ericsson | imported from 3GU |
R4‑1904037 | Draft CR to TS 38.104 BS demodulation PRACH Missed detection error clarification | Ericsson | imported from 3GU |
R4‑1904038 | Draft CR to TS 38.141-1 BS demodulation PRACH Missed detection error clarification | Ericsson | imported from 3GU |
R4‑1904039 | Draft CR to TS 38.141-2 BS demodulation PRACH Missed detection error clarification | Ericsson | imported from 3GU |
R4‑1904040 | Draft CR to TS 38.141-1 BS demodulation PUCCH test procedure update | Ericsson | imported from 3GU |
R4‑1904041 | Draft CR to TS 38.141-2 BS demodulation PUCCH test procedure update | Ericsson | imported from 3GU |
R4‑1904042 | draft CR to introduce 30MHz bandwidth of n41 to TS 38.104 | KDDI | imported from 3GU |
R4‑1904043 | Draft CR to TS38.101-4: Correction to FR1 PDSCH test cases | MediaTek inc. | imported from 3GU |
R4‑1904044 | Draft CR to TS38.101-4: Correction to FR2 PDSCH test cases | MediaTek inc. | imported from 3GU |
R4‑1904045 | Draft CR to TS38.101-4: Correction to FR1 CSI test cases | MediaTek inc. | imported from 3GU |
R4‑1904046 | Draft CR to TS38.101-4: Correction to FR2 CSI test cases | MediaTek inc. | imported from 3GU |
R4‑1904047 | Further discussion on compatibility issue of LTE/NR spectrum sharing in Band 41/n41 | KDDI | imported from 3GU |
R4‑1904048 | Draft CR for TR38.810 – Polarization notation | Rohde & Schwarz | imported from 3GU |
R4‑1904049 | Draft CR for TR38.810 – PolLink and PolMeas definition | Rohde & Schwarz, Intel Corporation | imported from 3GU |
R4‑1904050 | Draft CR for TR38.810 – UE coordinate system | Rohde & Schwarz, Keysight Technologies | imported from 3GU |
R4‑1904051 | Introduction of R16 3DL band combinations to TS 36.101 | KDDI | imported from 3GU |
R4‑1904052 | Effect of frequency on channel model scaling for FR1 | Rohde & Schwarz | imported from 3GU |
R4‑1904053 | ntroduction of LTE inter-band Carrier Aggregation for x bands DL (x=4, 5) with 1 band UL to TS36.101 | KDDI | imported from 3GU |
R4‑1904054 | Effect of frequency on probe arrangement vs. Spatial Correlation | Rohde & Schwarz | imported from 3GU |
R4‑1904055 | Update 4Rx Requirement for Band 30 | PCTEST Engineering Lab | imported from 3GU |
R4‑1904056 | CR to TS 38.104 on Combined updates from RAN4 #90bis | Ericsson | imported from 3GU |
R4‑1904057 | Implementing Spurious emission Category B in FR2 | Ericsson | imported from 3GU |
R4‑1904058 | Status of Category B spurious emissions after public consultation of ERC Recommendation 74-01 | Ericsson | imported from 3GU |
R4‑1904059 | Draft CR to TS 38.104 on Spurious emission Category B in FR2 | Ericsson | imported from 3GU |
R4‑1904060 | Draft CR to TS 38.141-2 on Spurious emission Category B in FR2 | Ericsson | imported from 3GU |
R4‑1904061 | CR to 37.104 on Corrections for NR | Ericsson | imported from 3GU |
R4‑1904062 | Update 4Rx Requirement for Band 30 | PCTEST Engineering Lab | imported from 3GU |
R4‑1904063 | TP for TR37.716-11-11 for DC_13A_n66A | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1904064 | Way Forward on AoA for FR2 RRM Testing | Qualcomm Incorporated, KDDI, Verizon | imported from 3GU |
R4‑1904065 | Antenna Gain for Rough beams and RRM Side Conditions in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1904066 | AoA Setup for FR2 RRM Testing | Qualcomm Incorporated | imported from 3GU |
R4‑1904067 | Way Forward on FR2 RRM Side conditions for PC3 | Qualcomm Incorporated, KDDI, Verizon | imported from 3GU |
R4‑1904068 | IAB RAN4 Work Plan and Initial Considerations | Qualcomm Incorporated | imported from 3GU |
R4‑1904069 | LTE/NR Spectrum Sharing in Band 41 Frequency Range | Qualcomm Incorporated | imported from 3GU |
R4‑1904070 | 7-24 GHz Receiver Aspects | Ericsson | imported from 3GU |
R4‑1904071 | NR-U and BS RF Transmit Requirements | Ericsson | imported from 3GU |
R4‑1904072 | NR-U and BS RF Receiver Requirements | Ericsson | imported from 3GU |
R4‑1904073 | TAE Requirement and TX Diversity | Ericsson | imported from 3GU |
R4‑1904074 | Draft CR to TS 38.104: Time Alignment Error | Ericsson | imported from 3GU |
R4‑1904075 | Draft CR to TS 38.141-1: Section 6.5.4 Time Alignment Error | Ericsson | imported from 3GU |
R4‑1904076 | Draft CR to TS 38.141-2: Section 6.6.4 OTA Time Alignment Error | Ericsson | imported from 3GU |
R4‑1904077 | Further Aspects towards NR Test Model Design | Ericsson | imported from 3GU |
R4‑1904078 | Draft CR to TS 38.141-1: Section 4.9.2.2 NR FR1 Test Models | Ericsson | imported from 3GU |
R4‑1904079 | Draft CR to TS 38.141-1: Section 4.9.2.3 Data content of physical channels and signals | Ericsson | imported from 3GU |
R4‑1904080 | Draft CR to TS 38.141-2: Section 4.9.2.3 Data content of physical channels and signals | Ericsson | imported from 3GU |
R4‑1904081 | Draft CR to 38.141-1 with corrections and additions to Annex F | Ericsson | imported from 3GU |
R4‑1904082 | Draft CR to 38.141-2 with corrections and additions to Annex F | Ericsson | imported from 3GU |
R4‑1904083 | TP for TR37.716-21-11 for DC_2A-66A _n5A | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1904084 | TP to TR 38.716-02-00 CA_n78A-n257G,H,I,J,K,L,M with 1UL | LG Uplus | imported from 3GU |
R4‑1904085 | Revised WID: Rel16 LTE inter-band CA for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1904086 | Update TR scope for LTE inter-band Carrier Aggregation for 2 bands DL with 1 band UL | Qualcomm Incorporated | imported from 3GU |
R4‑1904087 | Introduction of Rel-16 LTE inter-band CA for 2 bands DL with 1 band UL combinations in TS36101 | Qualcomm Incorporated | imported from 3GU |
R4‑1904088 | TR 36.716-02-01-030 Rel-16 2 Bands DL and 1 Band UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑1904089 | Setup and parameters for 2AoA RRM testing | Qualcomm Incorporated | imported from 3GU |
R4‑1904090 | Draft CR to TR 38.810 on FR2 RRM test methods | Qualcomm Incorporated | imported from 3GU |
R4‑1904091 | Test condition and test setup for FR2 NR MIMO OTA | Qualcomm Incorporated | imported from 3GU |
R4‑1904092 | Discussion on SFTD measurements for NR-DC in Rel-15 | ZTE | imported from 3GU |
R4‑1904093 | Way forward on SFTD measurement for NR-DC | ZTE, Ericsson | imported from 3GU |
R4‑1904094 | Draft reply LS on SFTD measurements for NR-DC | ZTE | imported from 3GU |
R4‑1904095 | draft Reply LS on clarification of CSI-RS based RRM measurement | ZTE | imported from 3GU |
R4‑1904096 | On clarification of CSI-RS based RRM measurement | ZTE | imported from 3GU |
R4‑1904097 | Draft CR to 38.133 on correction of SFTD accuracy requirements for NE-DC (Section 10.1.21) | ZTE | imported from 3GU |
R4‑1904098 | Draft CR to 38.133 on correction of MRTD requirements for NR-DC (Section 7.6.6) | ZTE | imported from 3GU |
R4‑1904099 | Draft CR to 38.133 on correction of MRTD requirements for NE-DC (Section 7.6.5) | ZTE | imported from 3GU |
R4‑1904100 | MRTD for non-contiguous CA | ZTE | imported from 3GU |
R4‑1904101 | Demodulation performance for NPRACH FDD preamble format 2 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904102 | Demodulation performance for NPRACH TDD preamble formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904103 | Test Model TM2 Synchronization | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904104 | Corrections to demodulation performance for new NPRACH formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904105 | Proposal on filling remaining RBs of first two symbols in Test Model | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904106 | Corrections to demodulation performance for new NPRACH formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904107 | Corrections to demodulation performance for new NPRACH formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904108 | NR V2X Band Plan and RF Requirements | Huawei Technologies (Korea) | imported from 3GU |
R4‑1904109 | Test Equipment MU values for BS demodulation conformance testing | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904110 | Corrections to demodulation performance for new NPRACH formats | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904111 | FR2 Txoff power pass/fail and Txon/off transient time measurements | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904112 | Simulation results for RSS based RSRP measurements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904113 | TR Skeleton for NR inter-band CA for 3 bands DL with 1 band UL | CATT | imported from 3GU |
R4‑1904114 | Draft CR to TS38.141-2: OTA transmit ON/OFF power Procedure BS type 2-O (6.5.1.4, 6.5.1.5) | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904115 | Several corrections to TS 38.133 (multiple clauses affected) | Rohde & Schwarz | imported from 3GU |
R4‑1904116 | Study of Channel Model impact on FR2 MPAC test solution | Spirent Communications | imported from 3GU |
R4‑1904117 | Discuss out of band blocking requirement | Huawei | imported from 3GU |
R4‑1904118 | Discuss FR2 TX OFF requirement | Huawei | imported from 3GU |
R4‑1904119 | Discuss FR2 TX OFF MU | Huawei | imported from 3GU |
R4‑1904120 | draft CR to TR 38.817-02 - FR2 TX OFF background | Huawei | imported from 3GU |
R4‑1904121 | draft CR to TR 38.817-02 - FR2 TX OFF MU budget | Huawei | imported from 3GU |
R4‑1904122 | draft CR to TS 38.141-2 - FR2 TX OFF update procedure and MU and TT tables. | Huawei | imported from 3GU |
R4‑1904123 | Discuss IAB scenarios and co-location | Huawei | imported from 3GU |
R4‑1904124 | Discuss IAB scenarios and co-existence | Huawei | imported from 3GU |
R4‑1904125 | TP to TR38.828 skelton | Huawei | imported from 3GU |
R4‑1904126 | TP to TR38.828, capture CLI simulation assumptions. | Huawei | imported from 3GU |
R4‑1904127 | 7-24GHz - discuss implications of FR1 and FR2 architectures | Huawei | imported from 3GU |
R4‑1904128 | 7-24GHz - discuss ACIR requirements and potential frequency ranges of interest | Huawei | imported from 3GU |
R4‑1904129 | 7-24GHz - discuss TX IMD and co-location requirements | Huawei | imported from 3GU |
R4‑1904130 | [7-24GHz] discussion on specification structure (BS) | Huawei | imported from 3GU |
R4‑1904131 | FR2 Tx Off power measurement MU table | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904132 | Es/Iot for Tsearch in handover | Ericsson | imported from 3GU |
R4‑1904133 | Side condition for handover in section 6.1 | Ericsson | imported from 3GU |
R4‑1904134 | Side condition for NR handover | Ericsson | imported from 3GU |
R4‑1904135 | High speed RRM requirements for Scell | Ericsson | imported from 3GU |
R4‑1904136 | Introduction of enhanced measurements for high speed train for Scells | Ericsson | imported from 3GU |
R4‑1904137 | Known cell condition for FR2 | Ericsson | imported from 3GU |
R4‑1904138 | Gap sharing for NE-DC and NR-DC | Ericsson | imported from 3GU |
R4‑1904139 | Gap sharing for NE-DC in section 9.1.2.1b | Ericsson | imported from 3GU |
R4‑1904140 | Gap sharing for NR-DC in section 9.1.2.1a and 9.1.2.1c | Ericsson | imported from 3GU |
R4‑1904141 | Further considerations on collision of RRM measurement resources for intra-frequency neighbour cell measurements with uplink transmissions in serving cell in FR1 TDD | Ericsson | imported from 3GU |
R4‑1904142 | Response LS on Collision of RRM resources with UL transmission in FR1 TDD | Ericsson, Vivo | imported from 3GU |
R4‑1904143 | Discussion on autonomous gap for NR ANR | Ericsson | imported from 3GU |
R4‑1904144 | Reply LS on autonomous gap for NR ANR | Ericsson | imported from 3GU |
R4‑1904145 | Autonomous gaps to NR cells for 2G/3G/4G ANR in 38.133 in EN-DC in section 9.4.6 (new) | Ericsson | imported from 3GU |
R4‑1904146 | Correction of supported gap pattern in setion 9.1.2 and 9.4.1 | Ericsson | imported from 3GU |
R4‑1904147 | Reply on NR mobility enhancement | Ericsson | imported from 3GU |
R4‑1904148 | Considerations on NR mobility enhancements | Ericsson | imported from 3GU |
R4‑1904149 | SS-RSRP accuracy considerations with cross correlation | Ericsson | imported from 3GU |
R4‑1904150 | Link level simulation results for SS-RSRP accuracy with cross correlation | Ericsson | imported from 3GU |
R4‑1904151 | Considerations on remaining open issues in OTA RRM test setups | Ericsson | imported from 3GU |
R4‑1904152 | Ideal SS-RSRP for RRM testing | Ericsson | imported from 3GU |
R4‑1904153 | Discussion on impact of rough and fine beams at system level | Ericsson | imported from 3GU |
R4‑1904154 | Workplan for Rel-16 NR-unlicensed WI RRM work in RAN4 | Ericsson | imported from 3GU |
R4‑1904155 | Overview of requirements for NR unlicenced scenario B | Ericsson | imported from 3GU |
R4‑1904156 | RRM specification structure for NR unlicenced | Ericsson | imported from 3GU |
R4‑1904157 | Agreements on specification structure for NR-U RRM in 38.133 and 36.133 | Ericsson | imported from 3GU |
R4‑1904158 | TR 38.716-02-00 v0.4.0 Rel-16 NR inter-band CA DC for 2 bands DL with up to 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1904159 | NR MIMO OTA Ad-hoc meeting notes | CAICT | imported from 3GU |
R4‑1904160 | WF on NR MIMO OTA | CAICT | imported from 3GU |
R4‑1904161 | Test parameters for 2nd priority TDD configuration | NTT DOCOMO, INC. | imported from 3GU |
R4‑1904162 | On TRS configuration for FR2 PDSCH demodulation requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑1904163 | Power imbalance requirement for intra-band EN-DC/NR CA in Rel.15 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1904164 | Views on nominal channel spacing for CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑1904165 | UE MIMO OTA R16 Channel Model Validation for FR1 and FR2 | Spirent Communications | imported from 3GU |
R4‑1904166 | Clarification in bands grouping (sections 3.5 and 3.6) | Ericsson | imported from 3GU |
R4‑1904167 | On SDL bands support in 38.133 | Ericsson | imported from 3GU |
R4‑1904168 | Adding SDL band group in requirements (sections 10.1 and B.2) | Ericsson | imported from 3GU |
R4‑1904169 | Adding SDL band group in test cases (sections A.4.7 and A.6.7) | Ericsson | imported from 3GU |
R4‑1904170 | Clean up in inter-RAT E-UTRA requirements (sections 2 and 9.4) | Ericsson | imported from 3GU |
R4‑1904171 | On remaining issues for inter-RAT RSTD measurements | Ericsson | imported from 3GU |
R4‑1904172 | E-UTRAN time acquisition requirements for E-UTRA FDD RSTD measurements (section 9.4) | Ericsson | imported from 3GU |
R4‑1904173 | E-UTRAN time acquisition requirements for E-UTRA TDD RSTD measurements (section 9.4) | Ericsson | imported from 3GU |
R4‑1904174 | LS response on reporting criteria limitation in MR-DC | Ericsson | imported from 3GU |
R4‑1904175 | LS response on clarification about CSI-RS measurement | Ericsson | imported from 3GU |
R4‑1904176 | Overview of requirements for NR CA in NR-U | Ericsson | imported from 3GU |
R4‑1904177 | WF on RRM requirements in NR-U | Ericsson | imported from 3GU |
R4‑1904178 | Correction in reporting criteria requirements (section 9.1.4) | Ericsson | imported from 3GU |
R4‑1904179 | UE measurements capability for NR-DC (sections 3.6.2 and 9.1.3) | Ericsson | imported from 3GU |
R4‑1904180 | UE measurements capability for NE-DC (section 9.1.3) | Ericsson | imported from 3GU |
R4‑1904181 | Removal of NSA terminology in 38.133 (sections 3.3, 7.5, 8.2, and 9.1) | Ericsson | imported from 3GU |
R4‑1904182 | TP to TR38.827 on Reference coordinate system | CAICT, SAICT | imported from 3GU |
R4‑1904183 | Proposals on NR MIMO OTA | CAICT, SAICT | imported from 3GU |
R4‑1904184 | Correction CR to TS36.133 on capabilities for support of reporting criteria requirement for EN-DC | Samsung | imported from 3GU |
R4‑1904185 | Evaluation of options for filling RB in PDCCH | Huawei, HiSilicon | imported from 3GU |
R4‑1904186 | Clarifying EVM measurements for test model | Huawei, HiSilicon | imported from 3GU |
R4‑1904187 | Discussion of synchronization procedures for TM2 test model | Huawei, HiSilicon | imported from 3GU |
R4‑1904188 | Corrections to the Sync Raster Spreadsheet | Huawei, HiSilicon | imported from 3GU |
R4‑1904189 | TP for placing PDCCH close to PDSCH for TM2 synchronization | Huawei, HiSilicon | imported from 3GU |
R4‑1904190 | AGC settling time analysis | Huawei, HiSilicon | imported from 3GU |
R4‑1904191 | On ETC FR2 EIRP and EIS Testing | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904192 | On Polarization Mismatch Impact | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904193 | On UBF for RX Test Cases | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904194 | Draft CR for TR38.810: UBF for RX Test Cases | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904195 | Draft CR for TR38.810: Interpolation at or near the Pole for TRP | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904196 | Impact of 2D vs. 3D channel models on spatial correlation | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904197 | On Channel model implementations | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904198 | On Output Phase Calibration for MPAC Methodology | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1904199 | Draft CR on PDSCH DL RMC | Qualcomm Incorporated | imported from 3GU |
R4‑1904200 | Filling PDCCH in test models in 38.141-1 subclause 4.9.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904201 | Filling PDCCH in test models in 38.141-2 subclause 4.9.2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904202 | Corrections to TS38.141-1 subclause 6.5.3.5 EVM measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1904203 | Corrections to TS38.141-2 subclause 6.6.3.5 EVM measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1904204 | Corrections to 38.104 subclauses 6.5.2.3 and 9.6.2.3.1 EVM procedure | Huawei, HiSilicon | imported from 3GU |
R4‑1904205 | CR to TR 38.817-01 on GSCN raster ranges | Huawei, HiSilicon | imported from 3GU |
R4‑1904206 | Editorial corrections to TS 38.141-1 | Ericsson | imported from 3GU |
R4‑1904207 | Editorial corrections to TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1904208 | Clarification on radiated power definitions in TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1904209 | Editorial corrections to TS 37.145-2 | Ericsson | imported from 3GU |
R4‑1904210 | Clarification on polarizations to be tested | Ericsson | imported from 3GU |
R4‑1904211 | Correction on rated carrier TRP | Ericsson | imported from 3GU |
R4‑1904212 | Correction of RIB definition | Ericsson | imported from 3GU |
R4‑1904213 | Clarification on beam identifier declaration | Ericsson | imported from 3GU |
R4‑1904214 | Removal of RIB declarations | Ericsson | imported from 3GU |
R4‑1904215 | Correction of TRP formula in Fibonacci grid | Ericsson | imported from 3GU |
R4‑1904216 | Upper bound on the reference steps for TRP calculation | Ericsson | imported from 3GU |
R4‑1904217 | Upper bound on the reference steps for TRP calculation | Ericsson | imported from 3GU |
R4‑1904218 | Upper bound on the reference steps for TRP calculation | Ericsson | imported from 3GU |
R4‑1904219 | Upper bound on the reference steps for TRP calculation | Ericsson | imported from 3GU |
R4‑1904220 | Addition of 8Rx release independent features in TS 36.307 (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑1904221 | Addition of 8Rx release independent features in TS 36.307 (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑1904222 | Addition of 8Rx release independent features in TS 36.307 (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1904223 | Discussion on the open issues for NR Rel-15 UE demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1904224 | Simulation results for NR PDSCH demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1904225 | Discuss on HST demodulation requirements for Rel-15 NR UE | Huawei, HiSilicon | imported from 3GU |
R4‑1904226 | Discussion on simulation requirements of NR performance RI tests | Huawei, HiSilicon | imported from 3GU |
R4‑1904227 | draftCR: Correction on FR2 TRS config | Huawei, HiSilicon | imported from 3GU |
R4‑1904228 | Simulation results for NR Rel-15 PUSCH | Huawei, HiSilicon | imported from 3GU |
R4‑1904229 | Discuss on HST demodulation requirements for NR Rel-15 BS | Huawei, HiSilicon | imported from 3GU |
R4‑1904230 | draftCR: Measurement system set-up and TT in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904231 | draftCR: Updates to PUCCH formats 3 and 4 performance requirements in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1904232 | draftCR: Updates to PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1904233 | draftCR: Updates to PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904234 | draftCR: Correlation matrix for 8Rx in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1904235 | draftCR: Correlation matrix for 8Rx in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1904236 | draftCR: Correlation matrix for 8Rx in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904237 | Beam Correspondence, remaining X and Y | Sony, Ericsson | imported from 3GU |
R4‑1904238 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson | imported from 3GU |
R4‑1904239 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson | imported from 3GU |
R4‑1904240 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson | imported from 3GU |
R4‑1904241 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson | imported from 3GU |
R4‑1904242 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson | imported from 3GU |
R4‑1904243 | CR of adding LTE B42/B43 for UE category NB1/NB2 and CAT_M1/M2 in R16 | Ericsson | imported from 3GU |
R4‑1904244 | CR of adding LTE B42/B43 for UE category NB1 and CAT_M1 in R16 | Ericsson | imported from 3GU |
R4‑1904245 | CR of adding LTE B42/B43 for UE category NB1 and CAT_M1 in R16 | Ericsson | imported from 3GU |
R4‑1904246 | CR of adding LTE B42/B43 for UE category NB1 and CAT_M1 in R16 | Ericsson | imported from 3GU |
R4‑1904247 | CR of adding LTE B42/B43 for UE category NB2 and CAT_M2 in R16 | Ericsson | imported from 3GU |
R4‑1904248 | CR of adding LTE B42/B43 for UE category NB2 and CAT_M2 in R16 | Ericsson | imported from 3GU |
R4‑1904249 | CR of adding LTE B42/B43 for UE category NB2 and CAT_M2 in R16 | Ericsson | imported from 3GU |
R4‑1904250 | B42_B43 A-MPR simulation result | Ericsson | imported from 3GU |
R4‑1904251 | RF work plan for IAB WI | Ericsson | imported from 3GU |
R4‑1904252 | IAB frequency band | Ericsson | imported from 3GU |
R4‑1904253 | Regulation aspect for IAB operation within adjacent TDD network | Ericsson | imported from 3GU |
R4‑1904254 | Scope of RF work for IAB | Ericsson | imported from 3GU |
R4‑1904255 | SSB raster of NR-U | Ericsson | imported from 3GU |
R4‑1904256 | AGC settling time discussion | Ericsson | imported from 3GU |
R4‑1904257 | On IBE requirement discussion | Ericsson | imported from 3GU |
R4‑1904258 | In-device co-existing | Ericsson | imported from 3GU |
R4‑1904259 | R16 NR v2x scope discussoin | Ericsson | imported from 3GU |
R4‑1904260 | TR skeleton proposal | Ericsson | imported from 3GU |
R4‑1904261 | TP proposal for TR LTE-M and NR coexistance | Ericsson | imported from 3GU |
R4‑1904262 | LTE-M and NR coexistance | Ericsson | imported from 3GU |
R4‑1904263 | CAT-M1 A-MPR discussion | Ericsson | imported from 3GU |
R4‑1904264 | CR for correcting A-MPR for subPRB for CAT-M1 and CAT-M2 | Ericsson | imported from 3GU |
R4‑1904265 | CR for correcting A-MPR for subPRB for CAT-M1 and CAT-M2 type A | Ericsson | imported from 3GU |
R4‑1904266 | Beam Correspondence Rel-16, DL reference signal | Sony | imported from 3GU |
R4‑1904267 | Reply LS on capability of same UL timing between NR and LTE | Intel Corporation | imported from 3GU |
R4‑1904268 | Draft CR on Applicability of requirements for FR1 CSI Reporting Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1904269 | Nominal channel spacing for CA and definition of contiguous/non-contiguous CA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904270 | draft CR nominal channel spacing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904271 | draft CR nominal channel spacing | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904272 | Discussion on LTE/NR spectrum sharing in Band 41/n41 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904273 | Draft CR to TS 38.101-4 on SNR, Es and Noc setup | Intel Corporation | imported from 3GU |
R4‑1904274 | Draft CR to TR 38.810 on NR FR2 RRM test methods | Intel Corporation | imported from 3GU |
R4‑1904275 | Draft CR to TR 38.810 on NR FR2 UE demodulation test methods | Intel Corporation | imported from 3GU |
R4‑1904276 | New WID on NR RRM requirements enhancement | ZTE | imported from 3GU |
R4‑1904277 | Motivation on NR RRM requirements enhancement | ZTE | imported from 3GU |
R4‑1904278 | Draft CR on FR2 CSI Reporting Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1904279 | CR on reselection criterion in idle mode (4.2.2.3, 4.2.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904280 | CR on reselection criterion in inter-RAT NR measurements (36.133-rel15) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904281 | CR on reselection criterion in inter-RAT NR measurements (36.133-rel16) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904282 | CR on MRTD and MTTD in inter-band EN-DC (7.5.2, 7.6.2) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904283 | Discussion on MTTD for intra-band sync EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904284 | CR on MTTD in intra-band EN-DC (7.5.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904285 | Discussion on MRTD in intra-band NR NCCA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904286 | CR on MRTD in intra-band NR NCCA (7.6.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904287 | Discussion on SCell activation delay in EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904288 | CR on SCell activation delay in EN-DC (8.3) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904289 | Discussion on PSCell addition delay in EN-DC | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904290 | CR on NR PSCell addition delay in EN-DC (36.133-rel15) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904291 | CR on NR PSCell addition delay in EN-DC (36.133-rel16) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904292 | TC SA CSI-based RLM in FR1 (A.6.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904293 | TC SA CSI-based RLM in FR2 (A.7.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904294 | TC for CSI-RS based BFD and LR procedures in FR1 in EN-DC (A.4.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904295 | TC for CSI-RS based BFD and LR procedures in FR2 in EN-DC (A.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904296 | TC for CSI-RS based BFD and LR procedures in FR1 in SA(A.6.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904297 | TC for CSI-RS based BFD and LR procedures in FR2 in SA (A.7.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904298 | TC scheduling restriction during SSB based BFD and LR in FR1 in EN-DC (A.4.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904299 | TC scheduling restriction during SSB based BFD and LR in FR2 in EN-DC (A.5.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904300 | TC scheduling restriction during SSB based BFD and LR in FR1 in SA (A.6.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904301 | TC scheduling restriction during SSB based BFD and LR in FR2 in SA (A.7.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904302 | TC for E-UTRA cell reselection to NR target cell (A.8.x) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904303 | Considerations on SRS-RSRP measurements for CLI | Ericsson | imported from 3GU |
R4‑1904304 | Considerations on RSSI measurements for CLI | Ericsson | imported from 3GU |
R4‑1904305 | CR 38.133 (9.6) Introduction of NE-DC SFTD core requirements | Ericsson, ZTE | imported from 3GU |
R4‑1904306 | CR 38.133 (A.3.3) Correction of DRX reference configurations | Ericsson | imported from 3GU |
R4‑1904307 | On TCI state selection at SCell activation of first cell in FR2 band | Ericsson | imported from 3GU |
R4‑1904308 | On L1-RSRP reporting at SCell activation | Ericsson | imported from 3GU |
R4‑1904309 | CR 38.133 (8.3.2, 10.1.6) L1-RSRP reporting at SCell activation | Ericsson | imported from 3GU |
R4‑1904310 | CR 38.133 (A.8) Restructuring of section A.8 TCs E-UTRA standalone | Ericsson | imported from 3GU |
R4‑1904311 | CR 38.133 (A.6.5) Correction of DRX parameters for RLM and BFD in FR1 | Ericsson | imported from 3GU |
R4‑1904312 | CR 38.133 (A.7.5) Correction of DRX parameters for RLM and BFD in FR2 | Ericsson | imported from 3GU |
R4‑1904313 | CR 38.133 (A.6.6) Correction of DRX parameters for event triggered reporting | Ericsson | imported from 3GU |
R4‑1904314 | Simulation results for Dynamic TDD coexistence | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904315 | On UL sharing applicability in different scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904316 | Draft Response LS on UL sharing applicability in different scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904317 | Integrated access and backhaul in RAN4 specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904318 | On IAB-node RF requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904319 | BS RF technology aspects for 7-24 GHz | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904320 | draft CR to 38.101-3: ULSUP-TDM related clarifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904321 | Synchronization raster in NR-U | Qualcomm Incorporated | imported from 3GU |
R4‑1904322 | Overview of IAB co-existence study for definition of RF requirements: Simulation methodology and assumptions | Qualcomm Incorporated | imported from 3GU |
R4‑1904323 | Analysis of CLI impact on network performance | Qualcomm Incorporated | imported from 3GU |
R4‑1904324 | NR PBCH Demodulation Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1904325 | UTRA ACLR applicability for n34 and n39 | Skyworks Solutions Inc. | imported from 3GU |
R4‑1904326 | Draft CR for CORESET RMC Update (Section A.3.1.3) | Qualcomm Incorporated | imported from 3GU |
R4‑1904327 | Draft CR PDSCH RMC Update (Section A.3.1.1) | Qualcomm Incorporated | imported from 3GU |
R4‑1904328 | draftCR for TDD UL-DL configuration for 120kHZ SCS (Section A.3.1.4) | Qualcomm Incorporated | imported from 3GU |
R4‑1904329 | UL Timing adjustment on UE beam switch | Qualcomm Incorporated | imported from 3GU |
R4‑1904330 | Scell activation timeline in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1904331 | Known cell condition for Scell activation in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1904332 | Test Setup for RRM tests in FR2 | Qualcomm Incorporated | imported from 3GU |
R4‑1904333 | RRC based BWP swtich delay | Qualcomm Incorporated | imported from 3GU |
R4‑1904334 | Delay Requirements for active TCI state switch for PDCCH and PDSCH | Qualcomm Incorporated | imported from 3GU |
R4‑1904335 | DraftCR TS 38.101 Corrections to NS_100 UTRA ACLR frequency band list | Skyworks Solutions Inc. | imported from 3GU |
R4‑1904336 | TR skeleton TR38.xxx v0.0.1: V2X Services based on NR; User Equipment (UE) radio transmission and reception | LG Electronics France | imported from 3GU |
R4‑1904337 | TP on the operating scenarios for NR V2X Service | LG Electronics France | imported from 3GU |
R4‑1904338 | Bandplan and channelization for NR-U in 5GHz | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1904339 | Discussions on bandplan for NR-U in 6GHz | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1904340 | WF for NR-U Band plan work | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1904341 | Uncertainty budget values for the FR2 transmitter ON/OFF power requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904342 | Regulatory situation and discussion on bandplan for 37-43.5 GHz range | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1904343 | Optional transient time capability signaling for REL-16 UEs | Skyworks Solutions Inc. | imported from 3GU |
R4‑1904344 | Further Analysis of UE Timing Requirements under Beam Switch | Ericsson | imported from 3GU |
R4‑1904345 | Section 7.1: UE Transmit Timing Requirements under Beam Switch | Ericsson | imported from 3GU |
R4‑1904346 | Analysis of RRC based BWP switching delay | Ericsson | imported from 3GU |
R4‑1904347 | Section 8.6.3: RRC based BWP switching delay requirement | Ericsson | imported from 3GU |
R4‑1904348 | Analysis of interruption due to RRC based BWP switching | Ericsson | imported from 3GU |
R4‑1904349 | Section 8.2: Interruption Requirement for RRC based BWP Switching | Ericsson | imported from 3GU |
R4‑1904350 | Interruption Requirement for RRC based BWP Switching on LTE Serving Cells | Ericsson | imported from 3GU |
R4‑1904351 | Interruption Requirement for RRC based BWP Switching on LTE Serving Cells | Ericsson | imported from 3GU |
R4‑1904352 | Section A.3.3.9-A.3.3.10: E-UTRA DRX cycle configurations for Phase IV inter-RAT test cases | Ericsson | imported from 3GU |
R4‑1904353 | Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case in FR1 | Ericsson | imported from 3GU |
R4‑1904354 | Section A.8.4.2.1: Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case without SSB index and non-DRX in FR1 | Ericsson | imported from 3GU |
R4‑1904355 | Section A.8.4.2.2: Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case without SSB index and in DRX in FR1 | Ericsson | imported from 3GU |
R4‑1904356 | Section A.8.4.2.3: Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case with SSB index and non-DRX in FR1 | Ericsson | imported from 3GU |
R4‑1904357 | Section A.8.4.2.4: Phase IV-47: E-UTRAN inter-RAT NR cell search and measurement delay test case with SSB index and in DRX in FR1 | Ericsson | imported from 3GU |
R4‑1904358 | Analysis of UE Transmit Timing Requirements under HST | Ericsson | imported from 3GU |
R4‑1904359 | UE Autonomous Timing Adjustment Requirement under HST | Ericsson | imported from 3GU |
R4‑1904360 | WiFi PA measurements for NR-U operation in the 5925-7125MHz range | Skyworks Solutions Inc. | imported from 3GU |
R4‑1904361 | Draft CR on FR2 PDSCH Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1904362 | Draft CR to TS 38.817-02: adding background information and MU for the FR2 TX ON/OFF power requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904363 | Back-off measurements for REL-16 DC_(n)71AA PSD checks and A-MPR optimization | Skyworks Solutions Inc. | imported from 3GU |
R4‑1904364 | Draft CR to TS 38.141-2: updating FR2 OTA TX ON/OFF power procedure | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904365 | MRTD and MTTD requirements for intra-band synchronous EN-DC | Ericsson | imported from 3GU |
R4‑1904366 | Draft CR for TS 38.133: MRTD and MTTD for intra-band synchornous EN-DC | Ericsson | imported from 3GU |
R4‑1904367 | Incompatible NR TDD 3GPP specification due to new definition of UE TxRx switching times between cells | Ericsson | imported from 3GU |
R4‑1904368 | Draft CR for TS 38.133: Removal of UE transition times for intra-band CA and correct MRTD for intra-band NC CA | Ericsson | imported from 3GU |
R4‑1904369 | Correction to NR BS TAE for intra-band non-contiguous CA | Ericsson | imported from 3GU |
R4‑1904370 | Draft CR to TS 38.104: Correction to NR BS TAE for intra-band non-contiguous CA | Ericsson | imported from 3GU |
R4‑1904371 | Discussions on capability of same UL timing between NR and LTE | Ericsson | imported from 3GU |
R4‑1904372 | Reply LS to RAN2 on capability of same UL timing between NR and LTE | Ericsson | imported from 3GU |
R4‑1904373 | Discussions on UE capability for Rel-15 late drop items (RAN2 LS ref: R2-1816066) | Ericsson | imported from 3GU |
R4‑1904374 | Reply LS to RAN2 UE capability for Rel-15 late drop items | Ericsson | imported from 3GU |
R4‑1904375 | Discussion on wideband carrier operation for Rel-16 NR-U | Ericsson | imported from 3GU |
R4‑1904376 | Reply LS on wideband carrier operation for NR-U | Ericsson | imported from 3GU |
R4‑1904377 | Draft CR to TS 38.817-02: updating table 12.10.1-1 for the FR2 TX ON/OFF requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904378 | New frequency range for NR band n259 | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1904379 | Scope and workplan for introduction of Band n259 WI | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1904380 | On Maximum Doppler shift in uplink for Rel-16 HST at 500 km/h | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904381 | Summary of Rel-16 RRM and Demod discussion in RP#83 | Intel | imported from 3GU |
R4‑1904382 | On Rel-16 HST scenarios for BS demodulation | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904383 | Initial system simulation results for Rel-16 HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904384 | NR PDSCH Demodulation Performance Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑1904385 | Way forward on system simulation assumptions for Rel-16 HST | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904386 | draftCR: Updates to FR1 PDCCH demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1904387 | Discussion on the declaration of supported feature parameterization | Huawei, HiSilicon | imported from 3GU |
R4‑1904388 | draftCR: Addition of declaration of the supported features in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1904389 | draftCR: Addition of declaration of the supported features in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904390 | CR: Updates to V2X test applicability(Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1904391 | CR: Updates to V2X test applicability(Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1904392 | CR on antenna configurations for NB-IoT demodualtion performance requirements (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑1904393 | CR on antenna configurations for NB-IoT demodualtion performance requirements (Rel-14) | Huawei, HiSilicon | imported from 3GU |
R4‑1904394 | CR on antenna configurations for NB-IoT demodualtion performance requirements (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1904395 | CR on antenna configurations for NB-IoT demodualtion performance requirements (Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1904396 | Draft CR to TS 38.141-2: Corrections to improve information quality in Annex I | Ericsson India Private Limited | imported from 3GU |
R4‑1904397 | CR to TS 37.145-2: Corrections related to TRP measurements in Annex F | Ericsson India Private Limited | imported from 3GU |
R4‑1904398 | Revised WID Basket WI for LTE Intra-band CA Rel-16 | Ericsson | imported from 3GU |
R4‑1904399 | Revised WID NR Intra-band Rel-16 | Ericsson | imported from 3GU |
R4‑1904400 | Revised WID LTE 3DL and one NR band Rel-16 | Ericsson | imported from 3GU |
R4‑1904401 | TR 36.716-01-01 v0.4.0 Rel-16 LTE Intra-band | Ericsson | imported from 3GU |
R4‑1904402 | TR 38.716-01-01 v0.4.0 Rel-16 NR Intra-band | Ericsson | imported from 3GU |
R4‑1904403 | TR 37.716-31-11 v0.4.0 Rel-16 DC combinations LTE 3DL and one NR band | Ericsson | imported from 3GU |
R4‑1904404 | TP for 38.716-01-01 for updated scope from RAN #83 | Ericsson | imported from 3GU |
R4‑1904405 | TP for 37.716-31-11 for updated scope from RAN #83 | Ericsson | imported from 3GU |
R4‑1904406 | Introduction of Rel-16 LTE Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑1904407 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-1 | Ericsson | imported from 3GU |
R4‑1904408 | draft CR introduction completed band combinations 38.716-01-01 -> 38.101-2 | Ericsson | imported from 3GU |
R4‑1904409 | draft CR introduction completed band combinations 37.716-31-11 -> 38.101-3 | Ericsson | imported from 3GU |
R4‑1904410 | draft Rel-15 CR for editorial corrections in 38.101-1 | Ericsson | imported from 3GU |
R4‑1904411 | draft Rel-15 CR for editorial corrections in 38.101-2 | Ericsson | imported from 3GU |
R4‑1904412 | TP for TR 37.716-11-11 to include DC_5A-n2 | Ericsson, AT&T | imported from 3GU |
R4‑1904413 | TP for TR 37.716-11-11 to include DC_12A-n2 | Ericsson, AT&T | imported from 3GU |
R4‑1904414 | TP for TR 37.716-11-11 to include DC_30A-n2 | Ericsson, AT&T | imported from 3GU |
R4‑1904415 | TP for TR 37.716-11-11 to include DC_66A-n2 | Ericsson, AT&T | imported from 3GU |
R4‑1904416 | TP for TR 37.716-11-11 to include DC_20A_n1A | Ericsson, Swisscom | imported from 3GU |
R4‑1904417 | TP for TR 37.716-11-11 to include DC_20A_n3A | Ericsson, Swisscom | imported from 3GU |
R4‑1904418 | TP for TR 37.716-11-11 to include DC_8A_n3A | Ericsson, Swisscom | imported from 3GU |
R4‑1904419 | TP for TR 37.716-11-11 to include DC_8A_n1A | Ericsson, Swisscom | imported from 3GU |
R4‑1904420 | TP for TR 37.716-21-11 to include DC_1A-20A_n3A | Ericsson, Swisscom | imported from 3GU |
R4‑1904421 | TP for TR 37.716-21-11 to include DC_3A-20A_n1A | Ericsson, Swisscom | imported from 3GU |
R4‑1904422 | TP for TR 37.716-11-11 to include DC_1_n3 | Ericsson, Swisscom | imported from 3GU |
R4‑1904423 | TP for TR 37.716-11-11 to include DC_12A_n258A | Ericsson, US Cellular | imported from 3GU |
R4‑1904424 | TP for TR 37.716-11-11 to include DC_71A_n258A | Ericsson, US Cellular | imported from 3GU |
R4‑1904425 | TP for TR 37.716-11-11 to include DC_5A_n258A | Ericsson, US Cellular | imported from 3GU |
R4‑1904426 | TP for TR 37.716-11-11 to include DC_2A_n258A | Ericsson, US Cellular | imported from 3GU |
R4‑1904427 | TP for TR 37.716-11-11 to include DC_66A_n258A | Ericsson, US Cellular | imported from 3GU |
R4‑1904428 | TP for TR 37.716-11-11 to include DC_71_n5 | Ericsson, US Cellular | imported from 3GU |
R4‑1904429 | TP for TR 37.716-11-11 to include DC_40_n78 | Ericsson, Telefonica | imported from 3GU |
R4‑1904430 | TP for TR 38.716-02-00 to include CA_n40-n78 | Ericsson | imported from 3GU |
R4‑1904431 | TP for TR 37.716-11-11 to include DC_2_n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904432 | TP for TR 37.716-11-11 to include DC_66_n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904433 | TP for TR 38.716-02-00 to include CA_n41A-n260A, CA_n41A-n260(2A) | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904434 | TP for TR 38.716-02-00 to include CA_n25A-n260A, CA_n25A-n260(2A) | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904435 | TP for TR 38.716-02-00 to include CA_n25A-n41A, CA_n25(2A)-n41A, CA_n25A-n41C, CA_n25A-n41(2A) | Ericsson, Sprint, T-Mobile US | imported from 3GU |
R4‑1904436 | TP for TR 38.716-02-00 to include CA_n25A-n71A | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904437 | TP for TR 37.716-11-11 to include DC_66_n25 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904438 | TP for TR 37.716-21-21 to include DC_66_n25-n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904439 | TP for TR 37.716-11-11 to include DC_1A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904440 | TP for TR 37.716-11-11 to include DC_3A_n5A, DC_3C_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904441 | TP for TR 37.716-11-11 to include DC_7A_n5A, DC_7C_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904442 | TP for TR 37.716-11-11 to include DC_28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904443 | TP for TR 37.716-21-11 to include DC_1A-3A_n5A, 1A-3C_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904444 | TP for TR 37.716-21-11 to include DC_1A-7A_n5A, 1A-7C_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904445 | TP for TR 37.716-21-11 to include DC_1A-28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904446 | TP for TR 37.716-21-11 to include DC_3A-7A_n5A, 3C-7A_n5A, 3A-7C_n5A, 3C-7C_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904447 | TP for TR 37.716-21-11 to include DC_3A-28A_n5A, 3C-28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904448 | TP for TR 37.716-21-11 to include DC_7A-28A_n5A, 7C-28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904449 | TP for TR 37.716-31-11 to include DC_1-3-7_n5 | Ericsson, Telstra | imported from 3GU |
R4‑1904450 | TP for TR 37.716-31-11 to include DC_1-3-28_n5 | Ericsson, Telstra | imported from 3GU |
R4‑1904451 | TP for TR 37.716-31-11 to include DC_1-7-28_n5 | Ericsson, Telstra | imported from 3GU |
R4‑1904452 | TP for TR 37.716-31-11 to include DC_3-7-28_n5 | Ericsson, Telstra | imported from 3GU |
R4‑1904453 | TP for TR 37.716-41-11 to include DC_1-3-7-28_n5 | Ericsson, Telstra | imported from 3GU |
R4‑1904454 | TP for TR 37.716-41-11 to include DC_1A-3C-7C-28A_n78A | Ericsson, Telstra | imported from 3GU |
R4‑1904455 | Rel-16 draft CR 38.101-2 to include missing fallbacks n260 and n261 | Ericsson, Verizon | imported from 3GU |
R4‑1904456 | Discussion on time mask for Rel-15 | Huawei, HiSilicon | imported from 3GU |
R4‑1904457 | draftCR Onoff time mask for TS 38.101-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1904458 | Discussion on extreme condition test for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904459 | Discussion On RF exposure compliance for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904460 | Draft CR for 38.101-1 CA Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1904461 | Draft CR for 38.101-2 multi-band relaxation | Huawei, HiSilicon | imported from 3GU |
R4‑1904462 | Draft CR for 38.101-2 reference waveform for FR2 CA | Huawei, HiSilicon | imported from 3GU |
R4‑1904463 | Draft CR for 38.101-3 intra-band EN-DC AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1904464 | Draft CR for 38.101-3 intra-band EN-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1904465 | Draft CR for 38.101-3 inter-band NE-DC Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1904466 | Draft CR on EN-DC uplink configuration | Huawei, HiSilicon | imported from 3GU |
R4‑1904467 | On uplink configuration of EN-DC combinations | Huawei, HiSilicon | imported from 3GU |
R4‑1904468 | Draft CR on UE to UE coexistence for TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1904469 | On beam correspondence | Huawei, HiSilicon | imported from 3GU |
R4‑1904470 | on introducing Power class 5 for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904471 | on separation class UE capability for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904472 | Draft CR for 38.101-2 frequency separation class | Huawei, HiSilicon | imported from 3GU |
R4‑1904473 | Draft CR on FR2 CA MPR and AMPR for PC4 | Huawei, HiSilicon | imported from 3GU |
R4‑1904474 | on UE transient period evaluation | Huawei, HiSilicon | imported from 3GU |
R4‑1904475 | Draft CR for 38.101-2 PC3 MPR | Huawei, HiSilicon | imported from 3GU |
R4‑1904476 | on DMRS based transmission for LTE HST Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1904477 | initial simulation results for LTE Rel16 HST | Huawei, HiSilicon | imported from 3GU |
R4‑1904478 | draftCR on RMC for demod requirement for 38.101-4 | Huawei, HiSilicon | imported from 3GU |
R4‑1904479 | simulation results on NR SDR demod requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1904480 | simulation results for NR PUCCH demod perf | Huawei, HiSilicon | imported from 3GU |
R4‑1904481 | Discussion On 7-24GHz UE RF requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1904482 | revised WID for LTE 3DL/1UL CA Rel-16 | Huawei, HiSilicon | imported from 3GU |
R4‑1904483 | Introduction of completed R16 3DL band combinations to TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1904484 | Discussion on UE behavior after MG | MediaTek inc. | imported from 3GU |
R4‑1904485 | CR on TS38.133 for UE behavior after MG (Section 9.1.2) | MediaTek inc. | imported from 3GU |
R4‑1904486 | CR on TS36.133 for UE behavior after MG (Section 8.1.2) | MediaTek inc. | imported from 3GU |
R4‑1904487 | CR on TS36.133 for UE behavior after MG (Section 8.1.2) | MediaTek inc. | imported from 3GU |
R4‑1904488 | Discussion on gap pattern signaling | MediaTek inc. | imported from 3GU |
R4‑1904489 | CR on TS38.133 for gap pattern signaling (Section 9.1.2) | MediaTek inc. | imported from 3GU |
R4‑1904490 | CR on TS36.133 for gap pattern signaling (Section 8.1.2.1) | MediaTek inc. | imported from 3GU |
R4‑1904491 | CR on TS36.133 for gap pattern signaling (Section 8.1.2.1) | MediaTek inc. | imported from 3GU |
R4‑1904492 | Discussion on collision of measurement resources with UL transmissions | MediaTek inc. | imported from 3GU |
R4‑1904493 | CR on TS38.133 for Scheduling availability (Section 9.2.5.3) | MediaTek inc. | imported from 3GU |
R4‑1904494 | CR on TS38.133 for definition of detectable cell (Section 9.2.4.3, Section 9.3.6.3) | MediaTek inc. | imported from 3GU |
R4‑1904495 | CR on TS38.133 for timing advance adjustment (Section 7.3) | MediaTek inc. | imported from 3GU |
R4‑1904496 | CR on TS38.133 for EN-DC TA accuracy (Section A.4.4.3, Section A.5.4.3) | MediaTek inc. | imported from 3GU |
R4‑1904497 | CR on TS38.133 for SA TA accuracy (Section A.6.4.3, Section A.7.4.3) | MediaTek inc. | imported from 3GU |
R4‑1904498 | CR on TS38.133 for EN-DC SS-SINR tests with PSCell in FR1 (Section A.4.7.3) | MediaTek inc. | imported from 3GU |
R4‑1904499 | CR on TS38.133 for SA SS-SINR tests with PSCell in FR1 (Section A.6.7.3) | MediaTek inc. | imported from 3GU |
R4‑1904500 | CR on TS38.133 E-UTRAN – NR inter-RAT measurements test case with FR1 target cell (Section A.8.X) | MediaTek inc. | imported from 3GU |
R4‑1904501 | Handover to known FR2 cell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904502 | CR section 6.1.1.4, 6.1.1.5 Handover to known FR2 cell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904503 | CR section 8.1.2.1, 8.1.3.1: Remaining parameters for SSB and CSI-RS based RLM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904504 | CR section 8.1.2.2, 8.1.3.2 Scaling factor N for SSB and CSI-RS RLM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904505 | CR section 8.1.1, 8.1.2.1, 8.1.3.1 Requirement for simultaneous SSB and CSI-RS RLM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904506 | On RRC-based BWP switch requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904507 | CR section 8.6 RRC based BWP switch delay | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904508 | Response LS on RRC processing delay for BWP switching | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904509 | CR section 8.2 Corrections on interruption requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904510 | TC A.4.5.6.1.2 EN-DC FR1 DL active BWP switch with SCell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904511 | TC A.5.5.6.1.2 EN-DC FR2 DL active BWP switch with SCell | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904512 | TC A.4.5.6.2.1 EN-DC FR1 DL active RRC BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904513 | TC A.5.5.6.2.1 EN-DC FR2 DL active RRC BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904514 | TC A.6.5.6.2.1 SA FR1 DL active RRC BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904515 | TC A.7.5.6.2.1 SA FR2 DL active RRC BWP switch | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904516 | Introduction of completed LTE CA for 2 bands DL with 2 bands UL into Rel-16 TS 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑1904517 | TP for TR 36.716-03-02: 1A-1A-3C-5A_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1904518 | TP for TR 36.716-03-02: 1A-1A-3C-28A_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1904519 | On late drop UE capabilities | Huawei, HiSilicon | imported from 3GU |
R4‑1904520 | Reply LS on late drop UE capabilities | Huawei, HiSilicon | imported from 3GU |
R4‑1904521 | On SRS antenna switching for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904522 | Further consideration on FDD+TDD HPUE | Huawei, HiSilicon | imported from 3GU |
R4‑1904523 | TP for TR 37.815 TDM pattern solution for SAR limits | Huawei, HiSilicon | imported from 3GU |
R4‑1904524 | On NE-DC RF requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1904525 | Draft CR for TR 38.101-3 NE-DC RF requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1904526 | On new NR band n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1904527 | BS RF requirements for n259 | Huawei, HiSilicon | imported from 3GU |
R4‑1904528 | draft CR for 38.101-1 clarification on UL MIMO power class | Huawei, HiSilicon | imported from 3GU |
R4‑1904529 | draft CR for 38.101-1 update of UL MIMO requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1904530 | Discussion on MOP for UL MIMO | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1904531 | Draft CR for TS 38.101-1 Reference waveform for UL MIMO MOP | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1904532 | Reply LS to RAN5 on MOP for UL MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑1904533 | Reply LS on capability of same UL timing between NR and LTE | Huawei, HiSilicon | imported from 3GU |
R4‑1904534 | Consideration on channel bandwidth set for NR CA | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1904535 | Draft CR for TS 38.101-1 Correction of channel bandwidth set for NR CA | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1904536 | Draft CR for TS 38.101-2 Correction of channel bandwidth set for NR CA | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑1904537 | Draft CR for TR 38.101-1 correction of A-MPR for NS_04 | Huawei, HiSilicon | imported from 3GU |
R4‑1904538 | Draft CR on UE optional bandwidth for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904539 | TP for TR 38.716-11-11: DC_25A-25A_n41 | Sprint Corporation | imported from 3GU |
R4‑1904540 | TP for TR 38.716-01-01: CA_n25(2A) | Sprint Corporation | imported from 3GU |
R4‑1904541 | Discussion document for CA_NS_04 A-MPR Corrections | Sprint Corporation | imported from 3GU |
R4‑1904542 | CR for TS 36.101: CA_NS_04 A-MPR Corrections | Sprint Corporation | imported from 3GU |
R4‑1904543 | Shadow CR for TS 36.101: CA_NS_04 A-MPR Corrections (Rel-16) | Sprint Corporation | imported from 3GU |
R4‑1904544 | CR for TS 36.101: Add B25 MSD for CA_25-41 | Sprint Corporation | imported from 3GU |
R4‑1904545 | UE Coexistence table harmonization in 38.101-3 | Sprint Corporation | imported from 3GU |
R4‑1904546 | Draft CR for 38.101-3: Editorial harmonization of UE Coexistence tables | Sprint Corporation | imported from 3GU |
R4‑1904547 | SAR considerations for UL + SUL in FR1 | Sprint Corporation | imported from 3GU |
R4‑1904548 | PC2 for FDD + TDD LTE CA and NR CA | Sprint Corporation | imported from 3GU |
R4‑1904549 | Draft CR for 38.101-3: NS_04 Allocation Aware A-MPR | Sprint Corporation | imported from 3GU |
R4‑1904550 | CDL Angle Modifications | Spirent Communications | imported from 3GU |
R4‑1904551 | Response LS on the testability of FR2 transmitter and reception tests | Qualcomm Incorporated | imported from 3GU |
R4‑1904552 | Discussion on response LS to R4-1900018 | Qualcomm Incorporated | imported from 3GU |
R4‑1904553 | Draft CR to 38.101-2: FR2 power dynamics DTX removal | Qualcomm Incorporated | imported from 3GU |
R4‑1904554 | Draft CR to 38.101-1: FR1 power dynamics DTX removal | Qualcomm Incorporated | imported from 3GU |
R4‑1904555 | FR2 Beam Pointing Parameter Error Limits | Qualcomm Incorporated | imported from 3GU |
R4‑1904556 | Upper bound on angular step for TRP calculation | Ericsson LM | imported from 3GU |
R4‑1904557 | Addition channel bandwidth of 30MHz for n50 in TS 38.101-1 | Huawei, HiSilicon, Etisalat | imported from 3GU |
R4‑1904558 | Addition channel bandwidth of 30MHz for n50 in TS 38.104 | Huawei, HiSilicon, Etisalat | imported from 3GU |
R4‑1904559 | Draft: Update NS_42 into TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑1904560 | TP to TR 38.716-02-00: CA_n41A_n50A | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1904561 | TP to TR 38.716-02-00: CA_n50A_n78A | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1904562 | MSD analysis for CA_n28_n50 | Huawei, Hisilicon | imported from 3GU |
R4‑1904563 | TP to TR 38.716-02-00: CA_n28A_n50A | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1904564 | Correction of section numbering in handover requirements | Ericsson | imported from 3GU |
R4‑1904565 | Correction of section numbering in handover requirements | Ericsson | imported from 3GU |
R4‑1904566 | Correction of section numbering in handover requirements | Ericsson | imported from 3GU |
R4‑1904567 | Correction to side conditions for cat-M | Ericsson | imported from 3GU |
R4‑1904568 | Correction to side conditions for cat-M | Ericsson | imported from 3GU |
R4‑1904569 | Discussions on applicability of non-BL CE UE requirements in release 15 | Ericsson, Qualcomm Incorporated | imported from 3GU |
R4‑1904570 | Applicability of non-BL CE UE requirements in release 15 | Ericsson, Qualcomm Incorporated | imported from 3GU |
R4‑1904571 | Applicability of non-BL CE UE requirements in release 15 | Ericsson, Qualcomm Incorporated | imported from 3GU |
R4‑1904572 | Discussions on release 16 MTC WUS impact on RRM | Ericsson | imported from 3GU |
R4‑1904573 | Discussions on RRM requirements for transmissions using PUR for MTC | Ericsson | imported from 3GU |
R4‑1904574 | Impact of MPDCCH improvement on RLM | Ericsson | imported from 3GU |
R4‑1904575 | Discussions on measurement relaxation for Rel-16 MTC | Ericsson | imported from 3GU |
R4‑1904576 | Discussions on RSS based RRM measurements for MTC | Ericsson | imported from 3GU |
R4‑1904577 | Way forward on Rel-16 MTC RRM enhancement | Ericsson | imported from 3GU |
R4‑1904578 | Discussions on RRM requirements for transmissions using PUR for NB-IoT | Ericsson | imported from 3GU |
R4‑1904579 | Discussion on non-anchor carrier RRM measurements for NB-IoT | Ericsson | imported from 3GU |
R4‑1904580 | Discussions on release 16 NB-IoT WUS impact on RRM | Ericsson | imported from 3GU |
R4‑1904581 | Agreements for Rel-16 NB-IoT RRM enhancement | Ericsson | imported from 3GU |
R4‑1904582 | Overview of RRM requirements for NR-U scenario C | Ericsson | imported from 3GU |
R4‑1904583 | Maintenance CR on serving cell relaxation requirements for release 15 NB-IoT | Ericsson | imported from 3GU |
R4‑1904584 | Maintenance CR on serving cell relaxation requirements for release 15 NB-IoT | Ericsson | imported from 3GU |
R4‑1904585 | RSS based measurement simulation results | Ericsson | imported from 3GU |
R4‑1904586 | MPAC setup -Feasibility study | MVG Industries | imported from 3GU |
R4‑1904587 | Draft CR for correction of out-of-band blocking exceptions for CA in TS 38.101-1 | Vodafone Romania S.A. | imported from 3GU |
R4‑1904588 | Revised WI: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904589 | Updated scope of TR: Rel'16 LTE inter-band CA for x bands DL (x=4, 5) with 1 band UL | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904590 | TR 36.716-04-01 v0.3.0 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904591 | TR 38.873 V0.0.1 | Nokia | imported from 3GU |
R4‑1904592 | TR 38.873 V0.1.0 | Nokia | imported from 3GU |
R4‑1904593 | CR to 25.104: Introduction of co-existence requirements with Band n48 | Nokia | imported from 3GU |
R4‑1904594 | CR to 25.141: Introduction of co-existence requirements with Band n48 | Nokia | imported from 3GU |
R4‑1904595 | CR to 36.104: Introduction of co-existence requirements with Band n48 | Nokia | imported from 3GU |
R4‑1904596 | CR to 36.141: Introduction of co-existence requirements with Band n48 | Nokia | imported from 3GU |
R4‑1904597 | CR to 37.104: Introduction of Band n48 | Nokia | imported from 3GU |
R4‑1904598 | CR to 37.141: Introduction of Band n48 | Nokia | imported from 3GU |
R4‑1904599 | On new Capability Set in MSR specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904600 | CR to 36.104: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1904601 | CR to 36.104: Corrections to blocking performance requirements for Home BS | Nokia | imported from 3GU |
R4‑1904602 | CR to 36.104: Corrections to blocking performance requirements for Home BS | Nokia | imported from 3GU |
R4‑1904603 | CR to 36.141: Corrections to blocking performance requirements for Home BS | Nokia | imported from 3GU |
R4‑1904604 | CR to 36.141: Corrections to blocking performance requirements for Home BS | Nokia | imported from 3GU |
R4‑1904605 | Corrections to operation in Band 46 and 49 | Nokia | imported from 3GU |
R4‑1904606 | Corrections to operation in Band 46 and 49 | Nokia | imported from 3GU |
R4‑1904607 | Draft CR for correction of out-of-band blocking exceptions for SUL in TS 38.101-1 | Vodafone Romania S.A. | imported from 3GU |
R4‑1904608 | Draft CR for the addition of mandatory simultaneous Rx/Tx capability for DC38_n78 in TS 38.101-3 | Vodafone Romania S.A. | imported from 3GU |
R4‑1904609 | Draft CR for 38.101-1 NR Pcmax | Huawei, HiSilicon | imported from 3GU |
R4‑1904610 | MSD results due to cross-band Tx-Rx interference for DC_7_n78 and DC_38_n78 | Vodafone Romania S.A. | imported from 3GU |
R4‑1904611 | Editorial updates and clarifications to sections 8.5.1 | Nokia Corporation | imported from 3GU |
R4‑1904612 | Clarifications to UL MIMO and Tx Diversity requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1904613 | Corrections to Pcmax for EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1904614 | EN-DC emission sensitivity to power backoff | Qualcomm Incorporated | imported from 3GU |
R4‑1904615 | Maximum output power for UL MIMO | Qualcomm Incorporated | imported from 3GU |
R4‑1904616 | [Draft] Reply LS on MOP for UL MIMO | Qualcomm Incorporated | imported from 3GU |
R4‑1904617 | NR-U UE general Tx requirements approach | Qualcomm Incorporated | imported from 3GU |
R4‑1904618 | Guardbands for NR-U wideband operation | Qualcomm Incorporated | imported from 3GU |
R4‑1904619 | SAR mitigation for PC2 FDD-TDD EN-DC in FR1 | Qualcomm Incorporated | imported from 3GU |
R4‑1904620 | Modification of reference sensitivity and general spurious emissions in 38.101-3 | Qualcomm Incorporated | imported from 3GU |
R4‑1904621 | [Draft] Reply LS on applicability of LTE anchor agnostic to specific RF test cases | Qualcomm Incorporated | imported from 3GU |
R4‑1904622 | Emission requirements for non-contiguous intra-band EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1904623 | [Draft] Reply LS on out-of-band emission requirements for intraband non-contiguous EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1904624 | UE Capabilities for inter-band EN-DC A-MPR | Sprint Corporation | imported from 3GU |
R4‑1904625 | Draft CR to 38.101-1. Clarify EN-DC category for requirements of carrier imbalance | Qualcomm Incorporated | imported from 3GU |
R4‑1904626 | Correction to 256QAM and 1024QAM test models and declarations for NR and E-UTRA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904627 | Draft CR to 38.141-2 clause 4.9.2.3 – correction NcellID | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904628 | Discussion on “reference signal” in BS specifications | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904629 | Draft CR to 38.104: EVM frame structure correction | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904630 | Draft CR to 38.141-1 with updates of Annex F | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904631 | Draft CR to 38.141-2 with updates of Annex F | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904632 | LS reply on wideband carrier operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904633 | Discussion on channel bandwidths for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904634 | Required changes for TS 37.107 specification for NR-U introduction | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904635 | Required changes for TS 38.104 specification for NR-U introduction | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904636 | Discussion on spectrum utilization for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904637 | Discussion on wideband carrier operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904638 | Filling remaining PRBs for test models | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904639 | Draft CR to 38.101-3 on DC_n41-41 – B40 coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1904640 | Fr2 Test Equipment Limitations | ETS-Lindgren Europe | imported from 3GU |
R4‑1904641 | LS on FR2 maxUplinkDutycycle | Qualcomm Incorporated | imported from 3GU |
R4‑1904642 | Scaling of Channel Model and UE Antenna Element Pattern for FR2 | Qualcomm UK Ltd | imported from 3GU |
R4‑1904643 | Draft CR to 38.101-1. Correct FR1 NBB Offsets for NR bands < 2.7GHz | Qualcomm Incorporated | imported from 3GU |
R4‑1904644 | Draft CR to 38.101-1. Corrections to FR1 NS_37, NS_38, and NS_39 RB map headings and values | Qualcomm Incorporated | imported from 3GU |
R4‑1904645 | Narrow Band Blocking | Qualcomm Incorporated | imported from 3GU |
R4‑1904646 | TP for TR 37.716-11-11: MSD for DC_8_n41 | Qualcomm Incorporated | imported from 3GU |
R4‑1904647 | Draft CR: introduction of single tap high speed channel model | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R4‑1904648 | EN DC B42 + n79 revisited | Qualcomm Incorporated | imported from 3GU |
R4‑1904649 | n30 A-MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1904650 | n41 A-MPR for N-star (Japan) | Qualcomm Incorporated | imported from 3GU |
R4‑1904651 | n7 wide bandwidth B38 coexistence | Qualcomm Incorporated | imported from 3GU |
R4‑1904652 | DC_3_n3 One and Two UL MSD Test Points for TS and TR | Skyworks Solutions Inc. | imported from 3GU |
R4‑1904653 | Range of Interruption Uncertainty for Handover Delay | Qualcomm UK Ltd | imported from 3GU |
R4‑1904654 | Further discussion on collision of RRM measurement resources with uplink transmissions in FR1 TDD | vivo | imported from 3GU |
R4‑1904655 | Discussion on PC2 EN-DC UE(1 LTE FDD band and 1 NR band) for Rel-16 | vivo | imported from 3GU |
R4‑1904656 | Discussion on FR2 maximum UL duty cycle | vivo | imported from 3GU |
R4‑1904657 | Measurement results for UE transient period | vivo | imported from 3GU |
R4‑1904658 | Discussion on MSD requirements applicability for CA_n3A-n78A and DC_3C_78A | vivo | imported from 3GU |
R4‑1904659 | Dicussion on NR V2X | vivo | imported from 3GU |
R4‑1904660 | Discussion on maximum duty cycle for TDD EN-DC HPUE | vivo | imported from 3GU |
R4‑1904661 | Draft reply LS on out-of-band emission requirements for intra-band non-contiguous EN-DC | vivo | imported from 3GU |
R4‑1904662 | Change description 4.2(e) in Applicability of minimum requirements for TS 38.101-3 | vivo | imported from 3GU |
R4‑1904663 | Range of Interruption Uncertainty for Handover Delay | Qualcomm UK Ltd | imported from 3GU |
R4‑1904664 | Parameters of UE capability maxUplinkDutyCycle for FR2 | Intel Corporation | imported from 3GU |
R4‑1904665 | Views on open issues in UE RF test methods | Intel Corporation | imported from 3GU |
R4‑1904666 | Draft CR: addtion of correlation matrix | Huawei Tech.(UK) Co., Ltd | imported from 3GU |
R4‑1904667 | Draft CR for clarification of MPR for CA in FR2 for TS 38.101-2 | NTT DOCOMO INC. | imported from 3GU |
R4‑1904668 | Revision of MSD test point offset for CA_n3A-n78A in 38.101-1 | vivo | imported from 3GU |
R4‑1904669 | Revision of MSD test point offset for CA_n3A-n78A in 37.865-01-01 | vivo | imported from 3GU |
R4‑1904670 | Revision of MSD test point offset for DC_3C_78A in 38.101-3 | vivo | imported from 3GU |
R4‑1904671 | Revision of MSD test point offset for DC_3C_78A in 37.863-02-01 | vivo | imported from 3GU |
R4‑1904672 | LS on EN-DC BCS handling | Qualcomm Incorporated | imported from 3GU |
R4‑1904673 | LS on FR2 maxUplinkDutycycle | Qualcomm Incorporated | imported from 3GU |
R4‑1904674 | Draft CR for 38.101-3: NS_04 A-MPR power class relationship clarification | Sprint Corporation | imported from 3GU |
R4‑1904675 | Channel model for NR MIMO OTA in FR1 | NTT DOCOMO, INC | imported from 3GU |
R4‑1904676 | On the SCG MPR/A-MPR and Pcmax for EN-DC with Dynamic Power Sharing | Motorola Mobility España SA | imported from 3GU |
R4‑1904677 | Concern over P-MPR definition in FR2 | MediaTek Inc. | imported from 3GU |
R4‑1904678 | Draft CR for Multi-band relaxation to TS 38.101-2 | NTT DOCOMO, INC | imported from 3GU |
R4‑1904679 | On RRM aspects for additional NB-IoT enhancements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904680 | LS on FR2 maxUplinkDutyCycle | L.M. Ericsson Limited | imported from 3GU |
R4‑1904681 | CR on UE Tx behavior after MG (section 9.1.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1904682 | Reply LS on collision of RRM measurement with UL transmission | Intel Corporation | imported from 3GU |
R4‑1904683 | CR on TS38.133 for Scheduling availability (Section 9.2.5.3) | MediaTek inc. | imported from 3GU |
R4‑1904684 | Reply LS on UE behavior on reception of channels or RS in the same OFDM symbol | LG Electronics Inc. | imported from 3GU |
R4‑1904685 | E-UTRAN time acquisition requirements for E-UTRA FDD RSTD measurements (section 9.4) | Ericsson | imported from 3GU |
R4‑1904686 | CR for inter-RAT RSTD measurement on TDD E-UTRA carrier (section 9.4.4.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1904687 | CR on gap sharing due to cell detection for inter-RAT RSTD (section 9.1.5.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1904688 | Clean up in inter-RAT E-UTRA requirements (sections 2 and 9.4) | Ericsson | imported from 3GU |
R4‑1904689 | CR on reselection criterion in idle mode (4.2.2.3, 4.2.2.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904690 | DraftCR on interruption requirements due to UE beam transition in FR2 (new section 8.2.5) | Huawei, HiSilicon | imported from 3GU |
R4‑1904691 | Section 7.1: UE Transmit Timing Requirements under Beam Switch | Ericsson | imported from 3GU |
R4‑1904692 | CR for scheduling availability for RLM | MediaTek inc. | imported from 3GU |
R4‑1904693 | CR on remaining issues in RLM requirements (section 8.1.1, 8.1.2, 8.1.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1904694 | Draft CR on TS38.133 for CSI-RS based L1-RSRP accuracy requirements (section 10.1.19.2) | CMCC | imported from 3GU |
R4‑1904695 | CR on SCell activation and deactivation delay requirements | CATT | imported from 3GU |
R4‑1904696 | Way forward on FR2 SCell activation delay | Qualcomm | imported from 3GU |
R4‑1904697 | Way forward on definition of known cell for PSCell addtion | RD sessionNokia | imported from 3GU |
R4‑1904698 | Simulation results for SDR test in FR2 | NTT DOCOMO, INC. | imported from 3GU |
R4‑1904699 | Reply on NR mobility enhancement | Ericsson | imported from 3GU |
R4‑1904700 | Way Forward on TCI State Switching Requirements | Intel Corporation | imported from 3GU |
R4‑1904701 | draftCR on BWP switch delay (section 8.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1904702 | draftCR on requirements for interruptions due to BWP switch (section 8.2) | Huawei, HiSilicon | imported from 3GU |
R4‑1904703 | Interruption Requirement for RRC based BWP Switching on LTE Serving Cells | Ericsson | imported from 3GU |
R4‑1904704 | CR to Link Recovery Procedures introduction section 8.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904705 | CR for scheduling availability for BFD in intra-band CA | MediaTek inc. | imported from 3GU |
R4‑1904706 | CR on remaining issues in BFD requirements (section 8.5.1, 8.5.2, 8.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1904707 | DraftCR on correcting scheduling restrictions requirements for CBD (section 8.5.8) | Huawei, HiSilicon | imported from 3GU |
R4‑1904708 | CR Beam Candidate Detection Latencies section 8.5.5 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904709 | CR on scheduling restriction for L1-RSRP (section 9.5.6) | Huawei, HiSilicon | imported from 3GU |
R4‑1904710 | CR on L1-RSRP measurement requirements (section 9.5.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1904711 | Way forward on RRM requirements for simultaneous SSB and CSI-RS | Huawei | imported from 3GU |
R4‑1904712 | Ad hoc minutes for BS demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1904713 | WF on requirement SNR derivation procedure | Nokia, Nokia Shanghai Bell, ZTE | imported from 3GU |
R4‑1904714 | Excel Script for Deriving NR Performance Requirements | ZTE | imported from 3GU |
R4‑1904715 | Way forward on general part of NR BS demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑1904716 | Way forward on performance requirements of UCI multiplexing on PUSCH | Samsung | imported from 3GU |
R4‑1904717 | WF on NR PUSCH demodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904718 | Way forward for NR PUCCH performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1904719 | Way forward for multi-slot PUCCH performance requirements | ZTE | imported from 3GU |
R4‑1904720 | Way forward on high speed related requirements for NR BS demodulation in Rel-15 | NTT DOCOMO | imported from 3GU |
R4‑1904721 | Draft CR to TS 38.141-1: Update of applicability rule for BS conducted demodulation test | China Telecom | imported from 3GU |
R4‑1904722 | Draft CR to TS 38.141-2: Update of applicability rule for BS radiated demodulation test | China Telecom | imported from 3GU |
R4‑1904723 | Draft CR to TS 38.104: Update of performance requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1904724 | Draft CR to TS 38.141-1: Update of conducted test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1904725 | Draft CR to TS 38.141-2: Update of radiated test requirements for DFT-s-OFDM based PUSCH | China Telecom | imported from 3GU |
R4‑1904726 | draftCR for 38.104 on PUSCH requirements with CP-OFDM and FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904727 | draftCR for 38.141-1: Conducted test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904728 | draftCR for TS 38.141-2: Radiated test requirements for CP-OFDM based PUSCH in FR1 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904729 | Draft CR on PRACH performance requirements in TS38.104 | CATT | imported from 3GU |
R4‑1904730 | Draft CR on PRACH performance requirements in TS38.141-1 | CATT | imported from 3GU |
R4‑1904731 | Draft CR on PRACH performance requirements in TS38.141-2 | CATT | imported from 3GU |
R4‑1904732 | Draft CR on TS 38.141-1 Conducted test requirements for PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1904733 | Draft CR on TS 38.141-2 Radiated test requirements for PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1904734 | Draft CR on TS 38.104 Performance requirement for PUCCH format 1 | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1904735 | Draft CR on NR PUCCH format2 performance requirements for TS 38.104 | Samsung | imported from 3GU |
R4‑1904736 | Draft CR on NR PUCCH format2 conducted performance requirements for TS 38.141-1 | Samsung | imported from 3GU |
R4‑1904737 | Draft CR on NR PUCCH format2 radiated performance requirements for TS 38.141-2 | Samsung | imported from 3GU |
R4‑1904738 | Draft CR to TS 38.141-2 Adding required vendor declaration items for BS demodulation | Ericsson | imported from 3GU |
R4‑1904739 | Draft CR to TS 38.104 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1904740 | Draft CR to TS 38.141-1 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1904741 | Draft CR to TS 38.141-2 BS demodulation PUCCH format 0 requirements | Ericsson | imported from 3GU |
R4‑1904742 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1904743 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1904744 | draftCR: Measurement system set-up and TT in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904745 | draftCR: Updates to PUCCH formats 3 and 4 performance requirements in TS 38.104 | Huawei, HiSilicon | imported from 3GU |
R4‑1904746 | draftCR: Updates to PUCCH formats 3 and 4 conducted conformance testing in TS 38.141-1 | Huawei, HiSilicon | imported from 3GU |
R4‑1904747 | draftCR: Updates to PUCCH format 3 and 4 radiated conformance testing in TS 38.141-2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904748 | Updated simulation results for NR PUCCH | Samsung | imported from 3GU |
R4‑1904749 | Simulation results summary of NR UCI on PUSCH | Samsung | imported from 3GU |
R4‑1904750 | draftCR on RMC for demod requirement for 38.101-4 | Huawei, HiSilicon, Intel Corporationm,Qualcomm Incorporated, Rohde & Schwarz | imported from 3GU |
R4‑1904751 | Clarification on step 5 and step 6 for delay profiles calculation in B.2.1 | Huawei, HiSilicon | imported from 3GU |
R4‑1904752 | Ad hoc minutes for NR UE demodulation performance requirements | Samsung | imported from 3GU |
R4‑1904753 | WF on Noc, Es power setting | Intel | imported from 3GU |
R4‑1904754 | WF on generic and PDSCH requirements | Intel | imported from 3GU |
R4‑1904755 | Way forward on SDR test cases | NTT DOCOMO | imported from 3GU |
R4‑1904756 | Draft CR on FR1 normal PDSCH demodulation requirements | Intel Corporation | imported from 3GU |
R4‑1904757 | Draft CR on FR2 PDSCH Demodulation Performance Tests | Qualcomm Incorporated | imported from 3GU |
R4‑1904758 | Draft CR on EN-DC SDR requirements | Intel Corporation | imported from 3GU |
R4‑1904759 | Addition of alternative TDD configuration for UE demodulation requirements | Ericsson, NTT DOCOMO, SoftBank, KDDI | imported from 3GU |
R4‑1904760 | Simulation summary of L1-RSRP accuracy | Ericsson | imported from 3GU |
R4‑1904761 | Summary of NR PDCCH demodulation requirements | Ericsson | imported from 3GU |
R4‑1904762 | Performance evaluation for cell identification time in LTE high speed scenario | Intel Corporation | imported from 3GU |
R4‑1904763 | Way forward on CLI measurement | LG Electronics | imported from 3GU |
R4‑1904764 | Draft CR on TDD UL-DL Configurations | Qualcomm Incorporated | imported from 3GU |
R4‑1904765 | Draft CR on FR2 PDCCH demodulation requirements | CATT | imported from 3GU |
R4‑1904766 | draftCR: Updates to FR1 PDCCH demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑1904767 | Draft CR for Beamforming model: Annex B.4.1 | Samsung | imported from 3GU |
R4‑1904768 | Draft CR for modification on CSI test cases: 6, 8, 10 | Samsung | imported from 3GU |
R4‑1904769 | FR2 Intra- and Inter-frequency SS-RSRP side conditions 10.1.3.1, 10.1.5.1, B.1.2, B.2.2, B.2.3. | ANRITSU LTD | imported from 3GU |
R4‑1904770 | Way Forward on AoA for FR2 RRM Testing | Qualcomm Incorporated, KDDI, Verizon | imported from 3GU |
R4‑1904771 | Discussion on gap pattern signaling | MediaTek inc. | imported from 3GU |
R4‑1904772 | CR on TS38.133 for gap pattern signaling (Section 9.1.2) | MediaTek inc. | imported from 3GU |
R4‑1904773 | CR on TS36.133 for gap pattern signaling (Section 8.1.2.1) | MediaTek inc. | imported from 3GU |
R4‑1904774 | AoA Setup for FR2 RRM Testing (Section A.3.15) | Qualcomm Incorporated | imported from 3GU |
R4‑1904775 | LS on AoA Setup for FR2 RRM Testing | Qualcomm | imported from 3GU |
R4‑1904776 | Draft CR on FR1 SDR requirements | Intel Corporation | imported from 3GU |
R4‑1904777 | Draft CR on FR2 SDR Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑1904778 | Draft CR on PDSCH DL RMC | Qualcomm Incorporated | imported from 3GU |
R4‑1904779 | Draft CR to TS38.101-4: Correction to FR1 CSI test cases | MediaTek inc. | imported from 3GU |
R4‑1904780 | Draft CR to TS38.101-4: Correction to FR2 CSI test cases | MediaTek inc. | imported from 3GU |
R4‑1904781 | Ad hoc minutes for NR RRM measurement | Ericsson | imported from 3GU |
R4‑1904782 | Ad hoc minutes for NR RRM signalling characteristic | Intel | imported from 3GU |
R4‑1904783 | Ad hoc minutes for NR FR2 RRM test setup | Ericsson | imported from 3GU |
R4‑1904784 | Ad hoc minutes for NR RRM test cases | Huawei | imported from 3GU |
R4‑1904785 | Draft CR to TR 38.810 on NR FR2 RRM test methods | Intel Corporation | imported from 3GU |
R4‑1904786 | Draft CR to TR 38.810 on FR2 RRM test methods | Qualcomm Incorporated | imported from 3GU |
R4‑1904787 | CR 38.133 (2 and 9.5.3) L1-RSRP accuracy requirements for FR1 | Ericsson | imported from 3GU |
R4‑1904788 | draftCR on the DRX configurations for test cases (section A.3.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1904789 | CR 38.133 (A.3.3) Correction of DRX reference configurations | Ericsson | imported from 3GU |
R4‑1904790 | Section A.3.3.9-A.3.3.10: E-UTRA DRX cycle configurations for Phase IV inter-RAT test cases | Ericsson | imported from 3GU |
R4‑1904791 | DraftCR on correcting min Io conditions in section B.2.4 | Huawei, HiSilicon | imported from 3GU |
R4‑1904792 | Way Forward on UE demod in Rel-16 LTE HST | Qualcomm Incorporated | imported from 3GU |
R4‑1904793 | Way forward on BS demodulation requirements for HST enhancement | NTT DOCOMO | imported from 3GU |
R4‑1904794 | WF on Noc, Es power setting | Intel | imported from 3GU |
R4‑1904795 | LS on NR PBCH testing | Intel | imported from 3GU |
R4‑1904796 | Draft CR to 38.101-4 on applicable SNR level for FR2 | Qualcomm | imported from 3GU |
R4‑1904797 | Draft CR to TR 38.810 on NR FR2 UE demodulation test methods | Intel Corporation | imported from 3GU |
R4‑1904798 | Draft CR to TS 38.141-1 Adding required vendor declaration items for BS demodulation | Ericsson | imported from 3GU |
R4‑1904799 | Draft CR to TS 38.104: FRC update for PUSCH FR1 mapping type B and FR2 DMRS 1+1 | China Telecom | imported from 3GU |
R4‑1904800 | Update on simulation results for NR PUCCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1904801 | Update on simulation results for NR PUSCH | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1904802 | Draft CR to TS 38.141-1: FRC update for PUSCH FR1 mapping type B | China Telecom | imported from 3GU |
R4‑1904803 | Draft CR to TS 38.141-2: FRC update for PUSCH FR1 mapping type B and FR2 DMRS 1+1 | China Telecom | imported from 3GU |
R4‑1904804 | Way forward on RRM requirements for Rel-16 LTE HST enhancement | Qualcomm | imported from 3GU |
R4‑1904805 | Simulation assumption for CLI measurement requirements | LG Electronics Inc. | imported from 3GU |
R4‑1904806 | Way forward on Rel-16 MTC RRM enhancement | Ericsson, Qualcomm Incorporated, Huawei, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904807 | Way forward on RRM impact of the R16 enhancement for NB-IoT | Huawei, HiSilicon, Ericsson, Qualcomm, Nokia | imported from 3GU |
R4‑1904808 | Update of simulation assumptions for Rel-16 MTC RRM | Ericsson, Qualcomm Incorporated, Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904809 | CR on Cat NB2 UE test cases applicability R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1904810 | Reply LS on reporting criteria limitation in MR-DC | Samsung | imported from 3GU |
R4‑1904811 | Correction in reporting criteria requirements (section 9.1.4) | Ericsson | imported from 3GU |
R4‑1904812 | Maintenance CR on event triggering and reporting criteria R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1904813 | Introduction of UE measurement capability for NE-DC in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1904814 | Draft CR to 38.133 on correction of MRTD requirements for NE-DC (Section 7.6.5) | ZTE | imported from 3GU |
R4‑1904815 | Update to CSI-RS configuration for RRM test (A.3.14) | Huawei, HiSilicon | imported from 3GU |
R4‑1904816 | Draft CR : Clarification on step 5 and step 6 for delay profiles calculation (38.104) | Huawei, HiSilicon | imported from 3GU |
R4‑1904817 | Draft CR: Clarification on step 5 and step 6 for delay profiles calculation (38.141-1) | Huawei, HiSilicon | imported from 3GU |
R4‑1904818 | Draft CR: Clarification on step 5 and step 6 for delay profiles calculation (38.141-2) | Huawei, HiSilicon | imported from 3GU |
R4‑1904819 | DraftCR on MTTD requirements for intra-band sync EN-DC (section 7.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1904820 | Way forward on L1-RSRP accuracy requirements | Ericsson, Nokia, CMCC | imported from 3GU |
R4‑1904821 | UE measurements capability for NE-DC (section 9.1.3) | Ericsson | imported from 3GU |
R4‑1904822 | Way forward on cell detection for inter-RAT RSTD measurement | Ericsson | imported from 3GU |
R4‑1904823 | Reply LS on SFTD measurements for NR-DC in Rel-15 | ZTE | imported from 3GU |
R4‑1904824 | UE measurements capability for NR-DC (sections 3.6.2 and 9.1.3) | Ericsson | imported from 3GU |
R4‑1904825 | WF on RRM requirements in NR-U | Ericsson | imported from 3GU |
R4‑1904826 | Reply LS on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1904827 | Way forward on NR mobility enhancement | Intel Corporation | imported from 3GU |
R4‑1904828 | WF on analysis of V2X RRM requirement | CATT | imported from 3GU |
R4‑1904829 | Reply LS on autonomous gap for NR ANR | Ericsson | imported from 3GU |
R4‑1904830 | Reply LS to RAN2 on capability of same UL timing between NR and LTE | Ericsson | imported from 3GU |
R4‑1904831 | draft Reply LS on clarification of CSI-RS based RRM measurement | ZTE | imported from 3GU |
R4‑1904832 | Way Forward on UE demod in Rel-16 LTE HST | Qualcomm Incorporated | imported from 3GU |
R4‑1904833 | Draft CR to TS 38.101-4 on SNR, Es and Noc setup | Intel Corporation | imported from 3GU |
R4‑1904834 | Introduction of requirements for SFTD measurement after NR-DC (section 9.2.5) | Huawei, HiSilicon, Samsung | imported from 3GU |
R4‑1904835 | Maintenance on TDD inter-frequency re-establishment test cases R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1904836 | LS on Noc, Es power setting | Intel | imported from 3GU |
R4‑1904837 | CR for SS-RSRP inter frequency absolute accuracy in FR1 in extreme condition | MediaTek inc. | imported from 3GU |
R4‑1904838 | DraftCR on maintaining SS-RSRP measurement accuracy test for EN-DC (section A.4.7.1.1 and A.5.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1904839 | DraftCR on maintaining SS-RSRP measurement accuracy test for SA (sectionA.6.7.1.1 and A.7.7.1.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1904840 | Way Forward on TCI State Switching Requirements | Intel Corporation | imported from 3GU |
R4‑1904841 | Draft CR for L1-RSRP reporting requirements for FDM among BM-RS and other RSs (9.5.4) | LG Electronics Inc. | imported from 3GU |
R4‑1904842 | Draft CR to TS 38.104 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1904843 | Draft CR to TS 38.141-2 BS demodulation CP-OFDM PUSCH FR2 requirements | Ericsson | imported from 3GU |
R4‑1904844 | Draft CR to TR 38.810 on NR FR2 RRM test methods | Intel Corporation | imported from 3GU |
R4‑1904845 | Way forward on definition of known cell for PSCell addtion | RD sessionNokia | imported from 3GU |
R4‑1904846 | Reply LS on UE behavior on reception of channels or RS in the same OFDM symbol | LG Electronics Inc. | imported from 3GU |
R4‑1904847 | CR on reselection criterion in inter-RAT NR measurements (36.133-rel15) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904848 | Side condition for NR handover | Ericsson | imported from 3GU |
R4‑1904849 | Side condition for handover in section 6.1 | Ericsson | imported from 3GU |
R4‑1904850 | Section 7.1: UE Transmit Timing Requirements under Beam Switch | Ericsson | imported from 3GU |
R4‑1904851 | WF on BS TAE and MRTD specification | Ericsson | imported from 3GU |
R4‑1904852 | Clarification in bands grouping (sections 3.5 and 3.6) | Ericsson | imported from 3GU |
R4‑1904853 | CR on PSCell addtion in ENDC in TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑1904854 | CR section 8.1.2.1, 8.1.3.1: Remaining parameters for SSB and CSI-RS based RLM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904855 | Maintenance draftCR on idle mode test cases for FR2 (section A.7.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1904856 | Maintenance draftCR on re-establishment test cases for FR2 (A.7.3.2.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1904857 | TC SA CSI-based RLM in FR1 (A.6.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904858 | TC SA CSI-based RLM in FR2 (A.7.5.1) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904859 | Test cases for RLM scheduling restrictions in FR2 (A.5.5.1.9 and A.7.5.1.9) | Huawei, HiSilicon | imported from 3GU |
R4‑1904860 | Updates to test cases for interruption at transitions in EN-DC | CATT | imported from 3GU |
R4‑1904861 | Updates to test cases for interruption due to deactivated SCell operations in EN-DC | CATT | imported from 3GU |
R4‑1904862 | Updates to test cases for SCell activationdeactivation in SA | CATT | imported from 3GU |
R4‑1904863 | Updates to test cases for BWP switching in SA (section A.6.5.6.1 and section A.7.5.6.1) | CATT | imported from 3GU |
R4‑1904864 | CR on TCI state switching delay | CATT | imported from 3GU |
R4‑1904865 | TC for CSI-RS based BFD and LR procedures in FR1 in EN-DC (A.4.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904866 | TC for CSI-RS based BFD and LR procedures in FR2 in EN-DC (A.5.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904867 | TC for CSI-RS based BFD and LR procedures in FR1 in SA(A.6.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904868 | TC for CSI-RS based BFD and LR procedures in FR2 in SA (A.7.5.5) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904869 | Maintenance draftCR on the intra-frequency cell search and measurement test cases for FR2 (section A.5.6.1 A.7.6.1) | Huawei, HiSilicon | imported from 3GU |
R4‑1904870 | draftCR on test cases for inter-frequency measurement in SA with PCell in FR2 (section A.7.6.2) | Intel Corporation | imported from 3GU |
R4‑1904871 | Maintanance of L1-RSRP accuracy test cases for FR2 (section A.5.7.4, A.7.7.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1904872 | TC for E-UTRA cell reselection to NR target cell (A.8.x) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904873 | CR on TS38.133 E-UTRAN – NR inter-RAT measurements test case with FR1 target cell (Section A.8.X) | MediaTek inc. | imported from 3GU |
R4‑1904874 | Correction of Minimum requirement at transitions for RLM (section 8.1.4) | Huawei, HiSilicon | imported from 3GU |
R4‑1904875 | CR section 8.1.1, 8.1.2.1, 8.1.3.1 Requirement for simultaneous SSB and CSI-RS RLM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904876 | Editrorial updates and clarifications to sections 8.5.3, 8.5.4, 8.5.5 and 8.5.6 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904877 | CR Corrections to Minimum requirement for L1 indication (section 8.5.4) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904878 | Reply LS on autonomous gap for NR ANR | Ericsson | imported from 3GU |
R4‑1904879 | Reply LS to RAN2 on capability of same UL timing between NR and LTE | Ericsson | imported from 3GU |
R4‑1904880 | TC for E-UTRA cell reselection to NR target cell (A.8.x) | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904881 | TP for TR 37.716-31-11 DC_2A-30A-66A_n5A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904882 | TP for TR 37.716-11-11 DC_1A_n258A and DC_1A_n258D | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904883 | TP for TR 37.716-21-21 for DC_1-3_n7-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1904884 | TP for TR 37.716-21-21 for DC_3-7_n28-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1904885 | TP for TR 37.716-21-21 for DC_1-3-7_n28-n78 | Huawei, HiSilicon | imported from 3GU |
R4‑1904886 | TP for TR 36.716-04-01: CA_3-7-28-40_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1904887 | TP for TR 36.716-04-01: CA_1-3-28-40_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1904888 | TP for TR 36.716-04-01: CA_1-7-28-40_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1904889 | TP for TR 36.716-03-02: CA_3DL_3A-8A-38A_2UL_3A-8A | Huawei, HiSilicon | imported from 3GU |
R4‑1904890 | TP on summary of self-interference analysis for new x bands DL (X=3,4,5) with 2 bands UL inter-band CA in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1904891 | BCS1 for CA_n41(2A) | Nokia, TMO US | imported from 3GU |
R4‑1904892 | Simplification of non-contiguous intraband channel bandwidth table format | Nokia | imported from 3GU |
R4‑1904893 | TP for TR 38.716-02-00: Interference analysis for CA_n39A-n79A | CATT | imported from 3GU |
R4‑1904894 | TR 38.716-02-00 v0.4.0 Rel-16 NR inter-band CA DC for 2 bands DL with up to 2 bands UL | ZTE Wistron Telecom AB | imported from 3GU |
R4‑1904895 | TP for TR 37.716-11-11 to include DC_20A_n1A | Ericsson, Swisscom | imported from 3GU |
R4‑1904896 | TP for TR 37.716-11-11 to include DC_40_n78 | Ericsson, Telefonica | imported from 3GU |
R4‑1904897 | TP for TR 38.716-02-00: 2UL for CA_n8A-n79A | ZTE Corporation | imported from 3GU |
R4‑1904898 | TP to TR 38.716-02-00: CA_n41A_n50A | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1904899 | TP for TR 37.716-21-21 DC_1A_n40A-n78A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904900 | TP for TR 37.716-21-21 DC_3A_n40A-n78A | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904901 | TP for TR 38.716-11-11: DC_25A-25A_n41 | Sprint Corporation | imported from 3GU |
R4‑1904902 | TP to TR 38.716-02-00: CA_n28A_n50A | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1904903 | TP for 36.716-02-01 on 1BUL_25A-41A_BCS0 | SPRINT Corporation | imported from 3GU |
R4‑1904904 | TP for 36.716-02-02 on 2BUL_25A-41A_BCS0 | SPRINT Corporation | imported from 3GU |
R4‑1904905 | TP for TR 37.716-21-11: EN-DC_1-11_n77 | SoftBank Corp. | imported from 3GU |
R4‑1904906 | TP to TR 36.716-02-01: 3A-3A-46C_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1904907 | TP for TR37.716-11-11 for DC_13A_n66A | Shanghai Chen Si Electronics | imported from 3GU |
R4‑1904908 | TP for TR 37.716-41-11 to include DC_1-3-7-28_n5 | Ericsson, Telstra | imported from 3GU |
R4‑1904909 | TP for TR 37.716-21-11 to include DC_3A-20A_n1A | Ericsson, Swisscom | imported from 3GU |
R4‑1904910 | TP for TR 36.716-03-02: CA_4DL_1A-3A-8A-38A_2UL_3A-8A | Huawei, HiSilicon | imported from 3GU |
R4‑1904911 | TP for TR 37.716-21-11 to include DC_1A-20A_n3A | Ericsson, Swisscom | imported from 3GU |
R4‑1904912 | WF on improving EN-DC configuration tables in 38.101-3 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904913 | TP for TR 37.716-00-00 Some corrections for SUL | Huawei, HiSilicon | imported from 3GU |
R4‑1904914 | Editorial corrections for 36.101 CA OOB additional spectrum emission requirements | Ericsson | imported from 3GU |
R4‑1904915 | CR for 36.101 adding band 46 for Rx spurious emissions(Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1904916 | CR for 36.101 adding band 46 for Rx spurious emissions(Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1904917 | CR to exclude 100kHz for NBIOT for B26 band edge operation | Qualcomm Inc. | imported from 3GU |
R4‑1904918 | CR for correcting A-MPR for subPRB for CAT-M1 and CAT-M2 | Ericsson | imported from 3GU |
R4‑1904919 | CR for correcting A-MPR for subPRB for CAT-M1 and CAT-M2 type A | Ericsson | imported from 3GU |
R4‑1904920 | TP to TR 36.716-02-01: 28A-66A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1904921 | TP to TR 36.716-03-01: 1A-5A-28A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1904922 | AMX TP to TR 36.716-03-01: 3A-3A-5A-28A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1904923 | AMX TP to TR 36.716-03-01: 5A-7C-28A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1904924 | TP for TR 36.716-03-02: 1A-1A-3C-28A_BCS0 | Huawei, HiSilicon | imported from 3GU |
R4‑1904925 | Draft CR for improving EN-DC configuration tables in TS38.101-3 | CATT | imported from 3GU |
R4‑1904926 | Summary and conclusions for coexistence study on 29dBm UE Power Class for LTE Band 41 and NR Band n41 | Nokia, Sprint | imported from 3GU |
R4‑1904927 | Draft CR to clarify frequency of carrier leakage in RBs for FR1 | Anritsu corporation | imported from 3GU |
R4‑1904928 | Draft CR to TS 38.101-1 on description of UE additional output power reduction | ZTE Corporation | imported from 3GU |
R4‑1904929 | draft Rel-15 CR for editorial corrections in 38.101-1 | Ericsson, Skyworks | imported from 3GU |
R4‑1904930 | Draft CR to 38.101-2: Updating MPR wording in ULMIMO section | Qualcomm Incorporated | imported from 3GU |
R4‑1904931 | Draft CR to clarify frequency of carrier leakage in RBs for FR2 | Anritsu corporation | imported from 3GU |
R4‑1904932 | Draft CR on editorial error of TS38.101-2 | LG Electronics France | imported from 3GU |
R4‑1904933 | Draft CR on UE optional bandwidth for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904934 | Harmonization of reference sensitivity level for DC clause | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904935 | Change description 4.2(e) in Applicability of minimum requirements for TS 38.101-3 | vivo | imported from 3GU |
R4‑1904936 | TR 36.716-03-01 v0.3.0 | Huawei, HiSilicon | imported from 3GU |
R4‑1904937 | Shadow CR for TS 36.101: CA_NS_04 A-MPR Corrections (Rel-16) | Sprint Corporation | imported from 3GU |
R4‑1904938 | Meeting minutes for intra-band EN-DC ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑1904939 | LS on EN-DC BCS handling | Qualcomm Incorporated | imported from 3GU |
R4‑1904940 | draft CR for clarification of frequency overlapping EN-DC B42_n77 and B42_n78 | NTT DOCOMO INC. | imported from 3GU |
R4‑1904941 | draft CR to 38.101-1 Correction to Pi/2 BPSK power boosting | Intel Corporation | imported from 3GU |
R4‑1904942 | draft CR for 38.101-1 clarification on UL MIMO power class | Huawei, HiSilicon | imported from 3GU |
R4‑1904943 | Draft LS to RAN5 on the relationship between FR2 peak and spherical requirements in core and test specifications | Apple Inc. | imported from 3GU |
R4‑1904944 | Draft CR to 38.101-2: FR2 PC3 CA MPR enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑1904945 | Draft CR to TS38.101-3_adding some exclusion frequencies for SEM and spurious emission for EN-DC | ZTE Corporation | imported from 3GU |
R4‑1904946 | Draft CR to TS 38.101-3 on some minor corrections | ZTE Corporation | imported from 3GU |
R4‑1904947 | TP for TR 37.716-11-11 to include DC_12A-n2 | Ericsson, AT&T | imported from 3GU |
R4‑1904948 | TP for TR 37.716-11-11 to include DC_2_n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904949 | TP for TR 37.716-11-11 to include DC_66_n41 | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904950 | Meeting minutes for intra-band EN-DC ad-hoc part2 | Qualcomm Incorporated | imported from 3GU |
R4‑1904951 | Draft CR for 38.101-3 intra-band EN-DC AMPR | Huawei, HiSilicon | imported from 3GU |
R4‑1904952 | Corrections to MPR and A-MPR for intra-band EN-DC (Pcmax) | Ericsson | imported from 3GU |
R4‑1904953 | Draft CR for 38.101-3: NS_04 A-MPR power class relationship clarification | Sprint Corporation | imported from 3GU |
R4‑1904954 | CR for TS 36.101: Add B25 MSD for CA_25-41 | Sprint Corporation | imported from 3GU |
R4‑1904955 | CR for TS 36.101: CA_NS_04 A-MPR Corrections | Sprint Corporation | imported from 3GU |
R4‑1904956 | Draft CR for TS 38.101-2: Corrections to configurations for intra-band non-contiguous CA | MediaTek Inc. | imported from 3GU |
R4‑1904957 | Draft CR for TR38.101-1 – Update to EVM averaging | Rohde & Schwarz | imported from 3GU |
R4‑1904958 | Draft CR for TR38.101-1 – Update to spectrum flatness | Rohde & Schwarz | imported from 3GU |
R4‑1904959 | Draft CR on UE to UE coexistence for TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1904960 | Reply LS on out-of-band emission requirements for intraband non-contiguous EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1904961 | Draft CR for TR38.101-2 – Update to EVM averaging | Rohde & Schwarz | imported from 3GU |
R4‑1904962 | Draft CR to 38.101-2: FR2 ULMIMO EVM | Qualcomm Incorporated | imported from 3GU |
R4‑1904963 | LS on demodulation of FR2 UE UL by TE | Qualcomm Incorporated | imported from 3GU |
R4‑1904964 | Draft CR to 38.817-01: FR2 CA MPR explained | Qualcomm Incorporated | imported from 3GU |
R4‑1904965 | Draft CR to 38.101-2: FR2 PC1 MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1904966 | Draft CR to TS 38.101-2 CA maximum input level | Intel Corporation | imported from 3GU |
R4‑1904967 | Draft CR for 38.101-1 definition of Maximum input level for intra-band contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑1904968 | TP for TR 37.716-11-11 to include DC_28A_n5A | Ericsson, Telstra | imported from 3GU |
R4‑1904969 | Draft CR for 38.101-1: editoral correction | Huawei, HiSilicon | imported from 3GU |
R4‑1904970 | MSD test results for new x bands DL (x=3,4,5) with 2 bands UL CA in rel-16 | LG Electronics Finland | imported from 3GU |
R4‑1904971 | TP to TR 38.716-02-00: CA_n50A_n78A | Huawei, Hisilicon, Etisalat | imported from 3GU |
R4‑1904972 | Revised WID on Rel-16 NR Inter-band Carrier Aggregation/Dual Connectivity for 2 bands DL with x bands UL (x=1,2) | ZTE Corporation | imported from 3GU |
R4‑1904973 | TP for TR 38.716-02-00: MSD for CA_n8-n41 | CATT | imported from 3GU |
R4‑1904974 | TP for TR 37.716-11-11: MSD requirements for DC_3_n3 intra-band non-contiguous EN-DC | CHTTL | imported from 3GU |
R4‑1904975 | Draft CR to TS 38.101-3 on addition of missing Inter-band EN-DC configurations | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1904976 | Revised WID: Dual Connectivity (EN-DC) of 2 bands LTE inter-band CA (2DL/1UL) and 1 NR band (1DL/1UL) | Huawei, HiSilicon | imported from 3GU |
R4‑1904977 | WF on PC2 EN-DC (1 LTE TDD band + 1 NR TDD band) | CMCC | imported from 3GU |
R4‑1904978 | Correction of RefSens exceptions due to UL harmonic interference for NR CA in 38.101-1 | vivo | imported from 3GU |
R4‑1904979 | Revision of MSD test point offset for DC_3C_78A in 38.101-3 | vivo | imported from 3GU |
R4‑1904980 | WF on RefSens exceptions due to UL harmonic interference for SA CA and EN-DC | vivo | imported from 3GU |
R4‑1904981 | MSD analysis on high power UE for DC_3-n78 | ZTE Corporation | imported from 3GU |
R4‑1904982 | WF for EN-DC FDD-TDD High Power UE | CHTTL | imported from 3GU |
R4‑1904983 | CR for 36.101 adding band 46 for Rx spurious emissions(Rel-15) | Huawei, HiSilicon | imported from 3GU |
R4‑1904984 | AMX TP to TR 36.716-03-01: 5A-7C-28A_BCS0 | Nokia, AMX | imported from 3GU |
R4‑1904985 | CR for 36.101 adding band 46 for Rx spurious emissions(Rel-16) | Huawei, HiSilicon | imported from 3GU |
R4‑1904986 | Draft CR for TS 38.101-2: Corrections to EVM equalizer spectrum flatness requirements | MediaTek Inc. | imported from 3GU |
R4‑1904987 | Draft CR for correction on TS38.101-1 | CATT | imported from 3GU |
R4‑1904988 | Draft CR to 38.101-1. Clarify EN-DC category for requirements of carrier imbalance | Qualcomm Incorporated | imported from 3GU |
R4‑1904989 | Reply LS on out-of-band emission requirements for intraband non-contiguous EN-DC | Qualcomm Incorporated | imported from 3GU |
R4‑1904990 | FR2 TPC adhoc minutes | Apple Inc. | imported from 3GU |
R4‑1904991 | maxULDutycycle and ETC FR2 AH minutes | Qualcomm Incorporated | imported from 3GU |
R4‑1904992 | WF on transient period capability | Qualcomm Inc., Ericsson | imported from 3GU |
R4‑1904993 | WF on handling of LTE anchor agnostic | NTT DOCOMO, INC. | imported from 3GU |
R4‑1904994 | draft CR to 38.101-2 Correction to ACS and In-band Blocking notes | Intel Corporation | imported from 3GU |
R4‑1904995 | draft CR to 38.101-3 Configured output power for inter-band EN-DC including both FR1 and FR2 | Intel Corporation | imported from 3GU |
R4‑1904996 | Draft CR to 38.101-2: FR2 PC3 and PC1 MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1904997 | TP for TR 38.716-02-00 to include CA_n25A-n71A | Ericsson, T-Mobile US | imported from 3GU |
R4‑1904998 | WF on SRS antenna switching for FR2 | Huawei, HiSilicon | imported from 3GU |
R4‑1904999 | TP for TR 38.716-02-00 to include CA_n25A-n71A | Ericsson, T-Mobile US | imported from 3GU |
R4‑1905000 | WF on transient period capability | Qualcomm Inc., Ericsson | imported from 3GU |
R4‑1905001 | WF on PC2 EN-DC (1 LTE TDD band + 1 NR TDD band) | CMCC | imported from 3GU |
R4‑1905002 | LS on FR2 maxUplinkDutyCycle capability values | OPPO | imported from 3GU |
R4‑1905003 | Draft CR to 38.101-2: FR2 PC3 and PC1 MPR | Qualcomm Incorporated | imported from 3GU |
R4‑1905004 | WF for EN-DC FDD-TDD High Power UE | CHTTL | imported from 3GU |
R4‑1905005 | Draft CR for 38.101-2 frequency separation class | Huawei, HiSilicon | imported from 3GU |
R4‑1905006 | Void | Void | imported from 3GU |
R4‑1905007 | Void | Void | imported from 3GU |
R4‑1905008 | Void | Void | imported from 3GU |
R4‑1905009 | Void | Void | imported from 3GU |
R4‑1905010 | Void | Void | imported from 3GU |
R4‑1905011 | Void | Void | imported from 3GU |
R4‑1905012 | Void | Void | imported from 3GU |
R4‑1905013 | Void | Void | imported from 3GU |
R4‑1905014 | Void | Void | imported from 3GU |
R4‑1905015 | Void | Void | imported from 3GU |
R4‑1905016 | Void | Void | imported from 3GU |
R4‑1905017 | Void | Void | imported from 3GU |
R4‑1905018 | Void | Void | imported from 3GU |
R4‑1905019 | Void | Void | imported from 3GU |
R4‑1905020 | Void | Void | imported from 3GU |
R4‑1905021 | Void | Void | imported from 3GU |
R4‑1905022 | Void | Void | imported from 3GU |
R4‑1905023 | Void | Void | imported from 3GU |
R4‑1905024 | Void | Void | imported from 3GU |
R4‑1905025 | Void | Void | imported from 3GU |
R4‑1905026 | Void | Void | imported from 3GU |
R4‑1905027 | Void | Void | imported from 3GU |
R4‑1905028 | Void | Void | imported from 3GU |
R4‑1905029 | Void | Void | imported from 3GU |
R4‑1905030 | Void | Void | imported from 3GU |
R4‑1905031 | Void | Void | imported from 3GU |
R4‑1905032 | Void | Void | imported from 3GU |
R4‑1905033 | Void | Void | imported from 3GU |
R4‑1905034 | Void | Void | imported from 3GU |
R4‑1905035 | Void | Void | imported from 3GU |
R4‑1905036 | Void | Void | imported from 3GU |
R4‑1905037 | Void | Void | imported from 3GU |
R4‑1905038 | Void | Void | imported from 3GU |
R4‑1905039 | Void | Void | imported from 3GU |
R4‑1905040 | Void | Void | imported from 3GU |
R4‑1905041 | Void | Void | imported from 3GU |
R4‑1905042 | Void | Void | imported from 3GU |
R4‑1905043 | Void | Void | imported from 3GU |
R4‑1905044 | Void | Void | imported from 3GU |
R4‑1905045 | Void | Void | imported from 3GU |
R4‑1905046 | Void | Void | imported from 3GU |
R4‑1905047 | Void | Void | imported from 3GU |
R4‑1905048 | Void | Void | imported from 3GU |
R4‑1905049 | Void | Void | imported from 3GU |
R4‑1905050 | Void | Void | imported from 3GU |
R4‑1905051 | Void | Void | imported from 3GU |
R4‑1905052 | Void | Void | imported from 3GU |
R4‑1905053 | Void | Void | imported from 3GU |
R4‑1905054 | Void | Void | imported from 3GU |
R4‑1905055 | Void | Void | imported from 3GU |
R4‑1905056 | Void | Void | imported from 3GU |
R4‑1905057 | Void | Void | imported from 3GU |
R4‑1905058 | Void | Void | imported from 3GU |
R4‑1905059 | Void | Void | imported from 3GU |
R4‑1905060 | Void | Void | imported from 3GU |
R4‑1905061 | Void | Void | imported from 3GU |
R4‑1905062 | Void | Void | imported from 3GU |
R4‑1905063 | Void | Void | imported from 3GU |
R4‑1905064 | Void | Void | imported from 3GU |
R4‑1905065 | Void | Void | imported from 3GU |
R4‑1905066 | Void | Void | imported from 3GU |
R4‑1905067 | Void | Void | imported from 3GU |
R4‑1905068 | Void | Void | imported from 3GU |
R4‑1905069 | Void | Void | imported from 3GU |
R4‑1905070 | Void | Void | imported from 3GU |
R4‑1905071 | Void | Void | imported from 3GU |
R4‑1905072 | Void | Void | imported from 3GU |
R4‑1905073 | Void | Void | imported from 3GU |
R4‑1905074 | Void | Void | imported from 3GU |
R4‑1905075 | Void | Void | imported from 3GU |
R4‑1905076 | Void | Void | imported from 3GU |
R4‑1905077 | Void | Void | imported from 3GU |
R4‑1905078 | Void | Void | imported from 3GU |
R4‑1905079 | Void | Void | imported from 3GU |
R4‑1905080 | Void | Void | imported from 3GU |
R4‑1905081 | LS on RRC parameters for NR CLI-handling | RAN1, LG Electronics | imported from 3GU |
R4‑1905082 | WF for UE specificiation structure for NE-DC | InterDigital Communications | imported from 3GU |
R4‑1905083 | Reply LS to RAN2 UE capability for Rel-15 late drop items | Ericsson | imported from 3GU |
R4‑1905084 | Work plan of NR V2X | LG Electronics France | imported from 3GU |
R4‑1905085 | Draft CR for TR 38.101-3 NE-DC RF requirement | Huawei, HiSilicon | imported from 3GU |
R4‑1905086 | WF for inter-band NE-DC Pcmax | InterDigital Communications | imported from 3GU |
R4‑1905087 | Draft CR for Pcmax for Rel-15 inter-band NE-DC within FR1 | InterDigital Communications | imported from 3GU |
R4‑1905088 | WF for NR-U Band plan work | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1905089 | Specification structures for TS 37.106 on UE requirements for NR-U channel access | OPPO | imported from 3GU |
R4‑1905090 | TR skeleton for Co-existence study of Cross-Link Interference (CLI) | LG Electronics Finland | imported from 3GU |
R4‑1905091 | TP to TR 38.828: Background | Ericsson | imported from 3GU |
R4‑1905092 | TP on CLI scenarios and system level simulation assumption | LG Electronics Finland | imported from 3GU |
R4‑1905093 | TP to TR 38.828: Inter-Operator interference mechanisms for unsynchronized TDD | Ericsson | imported from 3GU |
R4‑1905094 | TP to TR 38.828: Inter operator interference for co-located BS | Ericsson | imported from 3GU |
R4‑1905095 | Summary of simulations results for co-existence study for CLI | Huawei | imported from 3GU |
R4‑1905096 | TR skeleton TR38.886 v0.0.1: V2X Services based on NR; User Equipment (UE) radio transmission and reception | LG Electronics France | imported from 3GU |
R4‑1905097 | LS on NR V2X Sidelink Operation | Vodafone | imported from 3GU |
R4‑1905098 | WF on coexistence scenarios for NR V2X | Qualcomm | imported from 3GU |
R4‑1905099 | Draft CR for TR38.810: Interpolation at or near the Pole for TRP | Keysight Technologies UK Ltd | imported from 3GU |
R4‑1905100 | Response LS on the testability of FR2 transmitter and reception tests | Qualcomm Incorporated | imported from 3GU |
R4‑1905101 | Reply LS on Capability signalling of phase discontinuity | RAN1, Intel | imported from 3GU |
R4‑1905102 | CR to TR 38.810 | Intel | imported from 3GU |
R4‑1905103 | TP to TR38.827 on Reference coordinate system | CAICT, SAICT | imported from 3GU |
R4‑1905104 | IAB RAN4 Work Plan and Initial Considerations | Qualcomm Incorporated | imported from 3GU |
R4‑1905105 | Summary of IAB operating scenarios | Ericsson | imported from 3GU |
R4‑1905106 | Simulation scenarios and assumption for simulator alignment purpose | Qualcomm Incorporated | imported from 3GU |
R4‑1905107 | CR to 36.104: Introduction of Band 87 and 88 | Nokia | imported from 3GU |
R4‑1905108 | TP proposal for TR LTE-M and NR coexistance | Ericsson | imported from 3GU |
R4‑1905109 | TR skeleton for coexistence of NB-IoT with NR | Huawei, HiSilicon, nokia | imported from 3GU |
R4‑1905110 | Draft CR to 38.141-1_Correction on regional requirements (4.4) | NEC | imported from 3GU |
R4‑1905111 | Draft CR to 38.141-2_Correction on regional requirements (4.4) | NEC | imported from 3GU |
R4‑1905112 | Draft CR to TS 38.141-2:Overview of radiated Tx requirements (4.1.1) | NEC | imported from 3GU |
R4‑1905113 | CR to TS 37.145-2: updates to Tx spur and Tx co-location | Huawei | imported from 3GU |
R4‑1905114 | CR to TS 37.145-2: Corrections related to TRP measurements in Annex F | Ericsson | imported from 3GU |
R4‑1905115 | Clarification on polarizations to be tested | Ericsson | imported from 3GU |
R4‑1905116 | Correction of TRP formula in Fibonacci grid | Ericsson | imported from 3GU |
R4‑1905117 | Corrections to TS38.141-1 subclause 6.5.3.5 EVM measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1905118 | Corrections to TS38.141-2 subclause 6.6.3.5 EVM measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1905119 | draft CR to TS38.141-2 on section 4.9.2.3 header | Nokia | imported from 3GU |
R4‑1905120 | Modification for filler bits option 10 | Huawei, HiSilicon | imported from 3GU |
R4‑1905121 | draft CR to TS38.141-1 on test model(Section 4.9.2) | Huawei, HiSilicon, Ericsson, ZTE | imported from 3GU |
R4‑1905122 | draft CR to TS38.141-2 on test model(Section 4.9.2) | ZTE Corporation | imported from 3GU |
R4‑1905123 | WF on TAE | Huawei, HiSilicon | imported from 3GU |
R4‑1905124 | draft CR to 38.141-1 for TAE requirements | CATT | imported from 3GU |
R4‑1905125 | draft CR to 38.141-2 for TAE requirements | CATT | imported from 3GU |
R4‑1905126 | draft CR to 38.104 for TAE requirements | Ericsson | imported from 3GU |
R4‑1905127 | WF on open issues of Annex F for EVM measurement | Ericsson, Keysight, ZTE | imported from 3GU |
R4‑1905128 | Draft CR to 38.141-01 with corrections and additions to Annex F | ZTE Corporation | imported from 3GU |
R4‑1905129 | draft CR to TS38.141-2 on FR2 OFF power test procedure | Ericsson | imported from 3GU |
R4‑1905130 | draft CR to TS38.141-2 on TT and MU tables for FR2 OFF power | Huawei, HiSilicon | imported from 3GU |
R4‑1905131 | draft CR to TR38.817-02 on TT and MU tables for FR2 OFF power | Huawei, HiSilicon | imported from 3GU |
R4‑1905132 | draft CR to TR38.817-02 on background for FR2 OFF power | Nokia, Nokia Shanghai Bell, CMCC | imported from 3GU |
R4‑1905133 | Nominal Channel Spacing for CA for FR1 and FR2 | ZTE | imported from 3GU |
R4‑1905134 | Draft Response LS on UL sharing applicability in different scenarios | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905135 | Draft CR on SUL band combinations to TS 38.101-3 | Huawei, HiSilicon | imported from 3GU |
R4‑1905136 | Draft CR to TS38.104: consideration of suppoted frequency range of the operating band | Huawei | imported from 3GU |
R4‑1905137 | Transmit ON/OFF power | CATT | imported from 3GU |
R4‑1905138 | Transmit ON/OFF power | CATT | imported from 3GU |
R4‑1905139 | draft CR to TS 38.104 on EVM measurement (Annex B and C) | ZTE Corporation | imported from 3GU |
R4‑1905140 | Draft CR: editorial correction on FR1 spurious emission requirement in TS38.104 | Samsung | imported from 3GU |
R4‑1905141 | Draft CR: editorial correction on FR1 spurious emission requirement in TS38.141-1 | Samsung | imported from 3GU |
R4‑1905142 | Draft CR: editorial correction on FR1 spurious emission requirement in TS38.141-2 | Samsung | imported from 3GU |
R4‑1905143 | Draft CR for TS 38.104: Addition of NOTE for transmitter intermodulation requirements in certain regions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1905144 | Draft CR to TS 38.104: FRC reference corrections for the Rx requirements | Huawei | imported from 3GU |
R4‑1905145 | Draft CR to TS 38.104: Clarification on application of interfering signal offsets for ACS, blocking and intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905146 | Draft CR to TS 38.141-1: Clarification on application of interfering signal offsets for ACS, blocking and intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905147 | Draft CR to TS 38.141-2: Clarification on application of interfering signal offsets for ACS, blocking and intermodulation requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905148 | Draft CR to TS 38.104: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905149 | Draft CR to TS 38.141-1: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905150 | Draft CR to TS 38.141-2: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905151 | Draft CR to TS 38.113: editorial corrections | Huawei | imported from 3GU |
R4‑1905152 | Draft CR to TS 38.113 Correction reference TR 38.817-2 | Ericsson | imported from 3GU |
R4‑1905153 | CR to 37.114 Subsections index in Section 4.1 | Ericsson | imported from 3GU |
R4‑1905154 | Draft CR to TS 38.113: Updates the Rx exclusion zone terminology | Huawei | imported from 3GU |
R4‑1905155 | CR to TS 37.114: Updates for Rx exclusion zone size and terminology for EMC RI testing purposes | Huawei | imported from 3GU |
R4‑1905156 | CR to TS 37.105: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905157 | CR to TS 37.145-1: Corrections on out-of-band blocking requirement | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905158 | CR to TS 37.145-2: Corrections on out-of-band blocking requirements | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905159 | CR to TS 37.145-1: clarification on CSA and RCSA relations for hybrid AAS BS, Rel-15 | Huawei | imported from 3GU |
R4‑1905160 | CR to TS 37.145-2: clarification on CSA and RCSA relations for hybrid AAS BS, Rel-15 | Huawei | imported from 3GU |
R4‑1905161 | CR to TS37.145-2 Correction on OTA test requirements for spurious emissions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1905162 | CR to TS 37.145-1: BS demodulation requirements for NR | Huawei | imported from 3GU |
R4‑1905163 | CR to TS 37.145-2: BS demodulation requirements for NR | Huawei | imported from 3GU |
R4‑1905164 | OBUE requirements update for NR + UTRA/GSM combinations | Ericsson | imported from 3GU |
R4‑1905165 | WF on New capability sets for MSR | Ericsson, Huawei, Vodafone, Nokia | imported from 3GU |
R4‑1905166 | CR for MU analysis of Dynamic Beamforming Compact Range Chamber measurement in EIRP and EIS | CAICT, SRTC | imported from 3GU |
R4‑1905167 | CR to TS 37.145-2: Corrections related to TRP measurements in Annex F | Ericsson India Private Limited | imported from 3GU |
R4‑1905168 | Upper bound on angular step for TRP calculation | Ericsson LM | imported from 3GU |
R4‑1905169 | Correction to unwanted emissions mask for bands n7 and n38 | Ericsson, Huawei | imported from 3GU |
R4‑1905170 | Correction to unwanted emissions mask for bands n7 and n38 | Ericsson, Huawei | imported from 3GU |
R4‑1905171 | Correction to 256QAM and 1024QAM test models and declarations for NR and E-UTRA | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905172 | Editorial corrections to TS 38.141-1 | Ericsson | imported from 3GU |
R4‑1905173 | Clarification on radiated power definitions in TS 38.141-2 | Ericsson | imported from 3GU |
R4‑1905174 | Draft CR to TS 38.141-1: FRC reference corrections for the Rx requirements | Huawei | imported from 3GU |
R4‑1905175 | Draft CR to TS 38.141-2: FRC reference corrections for the Rx requirements | Huawei | imported from 3GU |
R4‑1905176 | Draft CR to TS 38.141-1: consideration of suppoted frequency range of the operating band | Huawei | imported from 3GU |
R4‑1905177 | Draft CR to TS 38.141-2: consideration of suppoted frequency range of the operating band | Huawei | imported from 3GU |
R4‑1905178 | Draft CR to TS 38.141-1: test setup for TAE | Huawei | imported from 3GU |
R4‑1905179 | Draft CR for TS 38.141-1: Addition of NOTE for transmitter intermodulation requirements in certain regions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1905180 | CR to TR 37.843: Addition of RC MU evaluation in subclause 10.5.2.3A.5.2 | Ericsson | imported from 3GU |
R4‑1905181 | CR to TR 38.817-02: Addition of RC MU tables for FR2 for spurious emission in subclause 12.7.1.2.2A | Ericsson | imported from 3GU |
R4‑1905182 | Draft CR to TS 38.141-2: Addition of RC test method for spurious emission in subclause 6.7 and 7.7 | Ericsson | imported from 3GU |
R4‑1905183 | Draft CR for TS 38.141-2: Improvements of figures in Annex E | Ericsson | imported from 3GU |
R4‑1905184 | Draft CR to TS 38.141-2: Correction on manufacturer’s declrations related to multi-band operation(section 4.6) | ZTE Corporation | imported from 3GU |
R4‑1905185 | Draft CR for TS 38.141-2: Addition of NOTE for transmitter intermodulation requirements in certain regions | NTT DOCOMO, INC. | imported from 3GU |
R4‑1905186 | Beam corresponding adhoc meeting minute | Samsung | imported from 3GU |
R4‑1905187 | draft CR to introduce n18 to TS 38.104 | KDDI | imported from 3GU |
R4‑1905188 | draft CR to introduce n18 to TS 38.141-1 | KDDI | imported from 3GU |
R4‑1905189 | draft CR to introduce n18 to TS 38.101-1 | KDDI | imported from 3GU |
R4‑1905190 | WF on LTE/NR spectrum sharing in Band 41/n41 | KDDI | imported from 3GU |
R4‑1905191 | Discussion on LTE/NR spectrum sharing in Band41/n41 | CMCC | imported from 3GU |
R4‑1905192 | Discussion on LTE/NR spectrum sharing in Band41/n41 | CMCC | imported from 3GU |
R4‑1905193 | Introduction of SUL band with same uplink frequency range of n5 | Huawei, HiSilicon | imported from 3GU |
R4‑1905194 | Draft CR to 38.141-2 with updates of Annex F | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905195 | New frequency range for NR band n259 | Ericsson GmbH, Eurolab | imported from 3GU |
R4‑1905196 | TR 38.820: updated TR skeleton for 7-24GHz SI | Huawei | imported from 3GU |
R4‑1905197 | WF for UE requirements type study within the 7-24GHz | Huawei, HiSilicon | imported from 3GU |
R4‑1905198 | WF on General aspects for 7 -24GHz SI | Huawei | imported from 3GU |
R4‑1905199 | WF on BS study for 7 -24 GHz | Ericsson, Huawei | imported from 3GU |
R4‑1905200 | Draft CR to TS 38.141-2: Addition of RC test method for spurious emission in subclause 6.7 and 7.7 | Ericsson | imported from 3GU |
R4‑1905201 | CR to TR38.817-02 on TT and MU tables for FR2 OFF power | Huawei, HiSilicon | imported from 3GU |
R4‑1905202 | CR to TR38.817-02 on background for FR2 OFF power | Nokia, Nokia Shanghai Bell, CMCC | imported from 3GU |
R4‑1905203 | WF on coexistence of NB-IoT with NR | Huawei, HiSilicon, Ericsson, CHTTL, SGS Wireless, Nokia, ZTE, Dish, T-Mobile USA | imported from 3GU |
R4‑1905204 | CR to TR 38.817-01 on GSCN raster ranges | Huawei, HiSilicon, Ericsson | imported from 3GU |
R4‑1905205 | Ad-Hoc Meeting Minutes for Beam Correspondence (2nd Round) | Samsung | imported from 3GU |
R4‑1905206 | NR-U Ad Hoc minutes | Ericsson | imported from 3GU |
R4‑1905207 | LS reply on wideband carrier operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905208 | Reply LS to RAN2 UE capability for Rel-15 late drop items | Ericsson | imported from 3GU |
R4‑1905209 | LS reply on wideband carrier operation for NR-U | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905210 | TP on CLI scenarios and system level simulation assumption | LG Electronics Finland | imported from 3GU |
R4‑1905211 | Meeting minutes on AH sessions for NR V2X UE | LG Electronics France | imported from 3GU |
R4‑1905212 | WF on RF parameters for NR V2X | LG Electronics France | imported from 3GU |
R4‑1905213 | Draft reply LS on NR V2X UE RF parameters for NR V2X service at FR1 | LG Electronics France | imported from 3GU |
R4‑1905214 | Corrections to TS38.141-1 subclause 6.5.3.5 EVM measurement | Huawei, HiSilicon | imported from 3GU |
R4‑1905215 | Draft merged CR to 38.141-1 | Huawei | imported from 3GU |
R4‑1905216 | Draft merged CR to 38.141-2 | Huawei | imported from 3GU |
R4‑1905217 | WF on BS study for 7 -24 GHz | Ericsson, Huawei | imported from 3GU |
R4‑1905218 | WF on analysis of V2X RRM requirement | CATT | imported from 3GU |
R4‑1905219 | Maintenance CR on event triggering and reporting criteria R15 | Huawei, HiSilicon | imported from 3GU |
R4‑1905220 | DraftCR on MTTD requirements for intra-band sync EN-DC (section 7.5.3) | Huawei, HiSilicon | imported from 3GU |
R4‑1905221 | AoA Setup for FR2 RRM Testing (Section A.3.15) | Qualcomm Incorporated | imported from 3GU |
R4‑1905222 | LS on AoA Setup for FR2 RRM Testing | Qualcomm | imported from 3GU |
R4‑1905223 | CR section 8.1.1, 8.1.2.1, 8.1.3.1 Requirement for simultaneous SSB and CSI-RS RLM | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905224 | Editrorial updates and clarifications to sections 8.5.3, 8.5.4, 8.5.5 and 8.5.6 | Nokia, Nokia Shanghai Bell | imported from 3GU |
R4‑1905225 | Void | Void | imported from 3GU |
R4‑1905226 | Void | Void | imported from 3GU |
R4‑1905227 | Void | Void | imported from 3GU |
R4‑1905228 | Void | Void | imported from 3GU |
R4‑1905229 | Void | Void | imported from 3GU |
R4‑1905230 | Draft CR to TS 38.101-1: Implementation of endorsed draft CRs from RAN4#90bis | Qualcomm Incorporated | imported from 3GU |
R4‑1905231 | Draft CR to TS 38.101-2: Implementation of endorsed draft CRs from RAN4#90bis | Qualcomm Incorporated | imported from 3GU |
R4‑1905232 | Draft CR to TS 38.101-3: Implementation of endorsed draft CRs from RAN4#90bis | Qualcomm Incorporated | imported from 3GU |
R4‑1905233 | Draft CR to TS 38.101-4: Implementation of endorsed draft CRs from RAN4#90bis | Samsung | imported from 3GU |
R4‑1905234 | Draft CR to TS 38.133: Implementation of endorsed draft CRs from RAN4#90bis | Intel Corporation | imported from 3GU |
R4‑1905235 | Draft CR to TS 38.113: Implementation of endorsed draft CRs from RAN4#90bis | ZTE | imported from 3GU |
R4‑1905236 | Void | Void | imported from 3GU |
R4‑1905237 | Void | Void | imported from 3GU |
R4‑1905238 | WF on RF parameters for NR V2X UE | LG Electronics France | imported from 3GU |
R4‑1905239 | Reply LS on NR V2X UE RF parameters for NR V2X service | LG Electronics France | imported from 3GU |
R4‑1905240 | Nominal Channel Spacing for CA for FR1 and FR2 | ZTE | imported from 3GU |
R4‑1905241 | Reply LS on NR V2X UE RF parameters for NR V2X service | LG Electronics France | imported from 3GU |
R4‑1905242 | WF on BS study for 7 -24 GHz | Ericsson, Huawei | imported from 3GU |
page generated from database: 2024-04-13 13:51:47