The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R1-69 - 2012-05-21 to 2012-05-25, Prague

meeting id: R1-69 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R1‑121925 Draft Agenda for RAN1#69 meeting RAN1 Chairman Approved
R1‑121926 Final report of RAN1#68bis meeting MCC Support Revised
R1‑121927 RAN2 status on CA enhancements RAN2, Samsung Noted
R1‑121928 Response LS on network-based positioning RAN3, TruePosition Noted
R1‑121929 LS response on Physical Layer Measurement for Network Positioning RAN3, TruePosition Noted
R1‑121930 LS to RAN1 - UE measurements in support of the two-stage MIMO OTA test method RAN4, Agilent Noted
R1‑121931 Clarifications on CSI-RS based measurement for CoMP RAN4, CATT Noted
R1‑121932 Size of CoMP measurement set for Rel-11 CoMP NTT DOCOMO, NEC Group Noted
R1‑121933 Investigation of aggregated CQI feedback in Rel-11 CoMP NTT DOCOMO Noted
R1‑121934 CQI definition for Rel-11 CoMP NTT DOCOMO Not treated
R1‑121935 Interference measurement mechanisms for Rel-11 NTT DOCOMO Revised
R1‑121936 Multi-cell periodic CSI reporting in a subframe Huawei, HiSilicon Not treated
R1‑121937 Simultaneous transmission of periodic CSI and HARQ-ACK Huawei, HiSilicon Not treated
R1‑121938 Simultaneous transmission of SRS and periodic CSI Huawei, HiSilicon Not treated
R1‑121939 SORTD for format 1b with channel selection Huawei, HiSilicon Noted
R1‑121940 PDSCH HARQ timing design for TDD inter-band CA with different UL-DL configurations Huawei, HiSilicon Not treated
R1‑121941 Cross-carrier scheduling design for TDD inter-band CA with different UL-DL configurations Huawei, HiSilicon Not treated
R1‑121942 Considerations on power limitation due to multiple TA Huawei, HiSilicon Not treated
R1‑121943 Maximum size of CoMP measurement set Huawei, HiSilicon Not treated
R1‑121944 CoMP CQI definition and configuration Huawei, HiSilicon Noted
R1‑121945 On CoMP with transmission modes 3 and 4 Huawei, HiSilicon Not treated
R1‑121946 CSI feedback modes for CoMP Huawei, HiSilicon Noted
R1‑121947 Interference measurement resource configuration and CQI calculation Huawei, HiSilicon Noted
R1‑121948 Granularity of interference measurement resources Huawei, HiSilicon Noted
R1‑121949 Details of CSI-RS based received signal quality measurements Huawei, HiSilicon Not treated
R1‑121950 Remaining issues for DL DMRS Huawei, HiSilicon Noted
R1‑121951 Remaining details of CSI-RS Huawei, HiSilicon Noted
R1‑121952 Considerations on DL and UL DCI for CoMP Huawei, HiSilicon Not treated
R1‑121953 Higher layer signalling requirements for CoMP Huawei, HiSilicon Noted
R1‑121954 Remaining details of PUSCH DMRS for UL CoMP Huawei, HiSilicon Not treated
R1‑121955 Enhancements of SRS for Rel-11 Huawei, HiSilicon Noted
R1‑121956 PUCCH Transmission Enhancement Huawei, HiSilicon Not treated
R1‑121957 Uplink timing advance for CoMP Huawei, HiSilicon Not treated
R1‑121958 Antenna port association for ePDCCH Huawei, HiSilicon Not treated
R1‑121959 Spatial diversity for ePDCCH transmission Huawei, HiSilicon Noted
R1‑121960 Details of ePDCCH scrambling sequence generator initialization Huawei, HiSilicon Not treated
R1‑121961 Usage of ePDCCH signature for ePDCCH detection Huawei, HiSilicon Not treated
R1‑121962 Comparison between puncturing and rate-matching for ePDCCH Huawei, HiSilicon Noted
R1‑121963 eCCE definition for ePDCCH Huawei, HiSilicon Not treated
R1‑121964 Aggregation levels of ePDCCH for localized and distributed transmission Huawei, HiSilicon Not treated
R1‑121965 Need of multiplexing localized and distributed transmission in one PRB pair Huawei, HiSilicon Noted
R1‑121966 Fallback operation for ePDCCH Huawei, HiSilicon Not treated
R1‑121967 Discussion on CSI feedback for ePDCCH Huawei, HiSilicon Not treated
R1‑121968 On the need for ePHICH and ePCFICH Huawei, HiSilicon Noted
R1‑121969 PUCCH ACK/NACK resource allocation for ePDCCH Huawei, HiSilicon Noted
R1‑121970 Text proposal for the technique “Reduction of supported downlink transmission modes” Huawei, HiSilicon Noted
R1‑121971 Recommendations on technique candidates for low-cost MTC Huawei, HiSilicon Noted
R1‑121972 PDSCH HARQ Timing of SCell and PUCCH Collision for Cross-Carrier Scheduling NTT DOCOMO Not treated
R1‑121973 PDCCH Enhancement for Different TDD UL-DL Configuration on Different Bands NTT DOCOMO Not treated
R1‑121974 DM-RS Antenna Port Determination for E-PDCCH NTT DOCOMO Not treated
R1‑121975 Views on Spatial Diversity Scheme for E-PDCCH NTT DOCOMO Not treated
R1‑121976 Design Principle for E-PDCCH Multiplexing NTT DOCOMO Not treated
R1‑121977 Views on Resource Mapping for E-PDCCH NTT DOCOMO Noted
R1‑121978 Search Space Design for E-PDCCH Transmission Scheme NTT DOCOMO Revised
R1‑121979 CSI feedback scheme for Rel-11 CoMP NTT DOCOMO Noted
R1‑121980 Downlink control signaling for Rel-11 CoMP NTT DOCOMO Withdrawn
R1‑121981 Simulation results for discontinuous CQI reporting TD Tech Noted
R1‑121982 Further discussion on HSPA signalling enhancement for more efficient resource usage TD Tech Noted
R1‑121983 TR25.874 v0.2.0 for "HSPA feedback and Signalling Efficiency Enhancements for LCR TDD" TD Tech Agreed
R1‑121984 36.213 CR0378R2 (Rel-10, F) Correction of FDD channel selection HARQ-ACK and SR transmission Ericsson, ST-Ericsson, CATT, Texas Instruments Noted - Revised
R1‑121985 On PDCCH enhancements for CA Ericsson, ST-Ericsson Not treated
R1‑121986 Multi-cell periodic CSI transmission Ericsson, ST-Ericsson Not treated
R1‑121987 Multi-cell HARQ-ACK and Periodic CSI Ericsson, ST-Ericsson Not treated
R1‑121988 PUCCH resource mapping Ericsson, ST-Ericsson Noted
R1‑121989 Support of half-duplex operations in aggregation of TDD carriers with different UL/DL configurations Ericsson, ST-Ericsson Not treated
R1‑121990 Remaining details for DL cross-carrier scheduling Ericsson, ST-Ericsson Not treated
R1‑121991 Remaining details for UL cross-carrier scheduling Ericsson, ST-Ericsson Revised
R1‑121992 PSS/SSS on the new carrier type Ericsson, ST-Ericsson Noted
R1‑121993 Design for synchronized and unsynchronized new carriers Ericsson, ST-Ericsson Not treated
R1‑121994 Transmission modes for the new carrier type Ericsson, ST-Ericsson Not treated
R1‑121995 Resource allocation for the new carrier type Ericsson, ST-Ericsson Withdrawn
R1‑121996 Channel Prioritization due to Multiple TA Ericsson, ST-Ericsson Not treated
R1‑121997 Antenna ports for ePDCCH Ericsson, ST-Ericsson Not treated
R1‑121998 Spatial diversity for ePDCCH Ericsson, ST-Ericsson Noted
R1‑121999 DMRS scrambling for ePDCCH Ericsson, ST-Ericsson Not treated
R1‑122000 Mapping of ePDCCH to RE Ericsson, ST-Ericsson Noted
R1‑122001 DCI multiplexing by eREG Ericsson, ST-Ericsson Not treated
R1‑122002 On aggregation levels for ePDCCH Ericsson, ST-Ericsson Not treated
R1‑122003 Multiplexing of two ePDCCH types Ericsson, ST-Ericsson Noted
R1‑122004 Fallback with ePDCCH Ericsson, ST-Ericsson Not treated
R1‑122005 Reaching peak rate when scheduled with ePDCCH Ericsson, ST-Ericsson Noted
R1‑122006 On the restriction of Transport Channel bits Ericsson, ST-Ericsson Not treated
R1‑122007 On the ePHICH Ericsson, ST-Ericsson Not treated
R1‑122008 TBS determination for additional special subframe configuration Ericsson, ST-Ericsson Not treated
R1‑122009 On DMRS support for additional special subframe configuration Ericsson, ST-Ericsson Noted
R1‑122010 Reduction of supported downlink transmission modes for low-cost MTC UEs Ericsson, ST-Ericsson Noted
R1‑122011 Conclusions from study item on low-cost MTC UEs Ericsson, ST-Ericsson Noted
R1‑122012 Further performance evaluation for low-cost MTC UEs Ericsson, ST-Ericsson Noted
R1‑122013 On TTI bundling enhancements Ericsson, ST-Ericsson Noted
R1‑122014 Conclusions from Coverage Enhancements study item Ericsson, ST-Ericsson Withdrawn
R1‑122015 Traffic adaptation performance in Heterogeneous outdoor deployment Ericsson, ST-Ericsson Noted
R1‑122016 On standardization impact of TDD UL-DL adaptation Ericsson, ST-Ericsson Not treated
R1‑122017 Conclusions on dynamic TDD UL-DL adaptation Ericsson, ST-Ericsson Noted
R1‑122018 Response to LS on CSI-RS based RSRP measurement CATT Noted
R1‑122019 Draft LS response on CSI-RS based RSRP measurement CATT Not treated
R1‑122020 Discussion on non-rectangular resource allocation CATT Noted
R1‑122021 36.212 CR0137 (Rel-10, F) Removal of square brackets for beta_{offset}^{PUSCH} CATT Rejected
R1‑122022 System level evaluation on compact DCI formats CATT Not treated
R1‑122023 Enhancements on PDCCH search space for CA-capable UEs CATT Not treated
R1‑122024 Periodic CSI reporting for multiple DL CCs in LTE-A Rel-11 CATT Not treated
R1‑122025 Transmission methods for multi-CC periodic CSI CATT Not treated
R1‑122026 Simultaneous transmission of ACK/NAK and periodic CSI in Rel-11 CATT Not treated
R1‑122027 Enhancements on HARQ-ACK for Rel-11 carrier aggregation CATT Not treated
R1‑122028 Transmit diversity for PUCCH format 1b with channel selection CATT Noted
R1‑122029 Half duplex operations for TDD inter-band CA CATT Not treated
R1‑122030 Cross carrier scheduling and HARQ-ACK timing for TDD inter-band CA CATT Not treated
R1‑122031 HARQ-ACK feedback for TDD interband CA CATT Noted
R1‑122032 Bandwidth of RS on new carrier type CATT Not treated
R1‑122033 Analysis on remaining issues for new carrier type CATT Noted
R1‑122034 Discussion on NCT measurement performance CATT Withdrawn
R1‑122035 UL power control with multiple timing advances in Rel-11 CATT Not treated
R1‑122036 CQI definition for CoMP CATT Noted
R1‑122037 CQI definition for TDD CoMP CATT Not treated
R1‑122038 TxD CQI based on CSI-RS CATT Not treated
R1‑122039 On CSI feedback modes for CoMP CATT Not treated
R1‑122040 Discussion on interference measurement mechanisms CATT Noted
R1‑122041 Considerations on CSI-RS based RSRP measurement CATT Not treated
R1‑122042 Remaining issues on CSI-RS CATT Noted
R1‑122043 On downlink control signaling for CoMP CATT Not treated
R1‑122044 On configuration of UE-specific UL DMRS CATT Not treated
R1‑122045 SRS enhancement for CoMP CATT Noted
R1‑122046 SRS power control for DL and UL CoMP CATT Not treated
R1‑122047 On PUCCH enhancement CATT Not treated
R1‑122048 Discussion on DMRS associated issues in E-PDCCH CATT Not treated
R1‑122049 Evaluation of DMRS based distributed transmission for E-PDCCH CATT Noted
R1‑122050 Search space design for E-PDCCH CATT Not treated
R1‑122051 Multiplexing and resource mapping for E-PDCCH CATT Not treated
R1‑122052 PUCCH resource for E-PDCCH CATT Not treated
R1‑122053 Reference signals and transmission schemes for additional TDD special subframe configuration CATT Noted
R1‑122054 36.211 CR0170 (Rel-11, B) Inclusion of additional TDD special subframe configurations CATT, CMCC Noted - Revised
R1‑122055 Discussion on reduction of supported downlink transmission modes for low-cost MTC LTE UEs CATT Not treated
R1‑122056 Recommendation for reduction of peak rate for low-cost MTC LTE UEs CATT Not treated
R1‑122057 Recommendations for low-cost MTC UEs based on LTE CATT Noted
R1‑122058 Analysis on TTI bundling enhancement and specification impact CATT Noted
R1‑122059 Evaluation on TDD UL/DL reconfiguration in co-channel macro/pico scenario CATT Noted
R1‑122060 Evaluation on TDD UL/DL reconfiguration in adjacent channel macro/pico scenario CATT Noted
R1‑122061 Discussion on interference migitation schemes for FS_LTE_TDD_eIMTA CATT Noted
R1‑122062 Methods to support different UL/DL reconfiguration time scales for FS_LTE_TDD_eIMTA CATT Not treated
R1‑122063 Draft TP for TR36.828 section 6 CATT Noted - Revised
R1‑122064 Draft TP for TR36.828 section 7 CATT Noted - Revised
R1‑122065 Draft TP for TR36.828 section 8 CATT Noted - Revised
R1‑122066 Definition and configuration of antenna port mapping for ePDCCH Fujitsu Not treated
R1‑122067 Rate matching vs puncturing of ePDCCH Fujitsu Noted
R1‑122068 Definition of eREG and eCCE Fujitsu Not treated
R1‑122069 UE-specific Search Space Design for ePDCCH Fujitsu Not treated
R1‑122070 ePDCCH multiplexing efficiency for localised and distributed ePDCCH Fujitsu Noted
R1‑122071 UE behaviour with ePDCCH and large transport blocks Fujitsu Not treated
R1‑122072 Diversity schemes for distributed ePDCCH transmission Fujitsu Noted
R1‑122073 Motivation, requirements and design for ePHICH Fujitsu Noted
R1‑122074 Motivation, requirements and design for ePCFICH: Fujitsu Noted
R1‑122075 Motivation, requirements and design for CSS on ePDCCH Fujitsu Not treated
R1‑122076 Discussion on CQI definition and Rank reporting for DL CoMP Fujitsu Not treated
R1‑122077 Discussion on CSI feedback modes for CoMP transmission Fujitsu Noted
R1‑122078 Zero-Power CSI-RS Configurations for Interference Measurements in CoMP Fujitsu Not treated
R1‑122079 Discussion on CSI-RS based received signal quality measurement for CoMP Fujitsu Not treated
R1‑122080 Discussion on transmission power setting for DL CoMP Fujitsu Noted
R1‑122081 Discussion on DL CoMP control signalling Fujitsu Not treated
R1‑122082 Consideration on PUCCH transmission enhancement Fujitsu Not treated
R1‑122083 Low-cost MTC UE LSI ASIC: Cost reduction particularities Fujitsu Not treated
R1‑122084 Low-cost MTC UE. Study Item Conclusions Fujitsu Noted
R1‑122085 Discussion on the features and signaling support for non-zero transmit power ABS Fujitsu Noted
R1‑122086 Discussion on the signaling design to address issues for 9dB bias Fujitsu Not treated
R1‑122087 Uplink timing in CoMP scenario Discussion and Decision New Postcom Not treated
R1‑122088 SRS enhancement for CoMP scenario Discussion and Decision New Postcom Noted
R1‑122089 Uplink control signaling in CoMP scenario Discussion and Decision New Postcom Not treated
R1‑122090 Remaining issues on SRS power control in CoMP scenario New Postcom Not treated
R1‑122091 Remaining issues on PUSCH DMRS in CoMP scenario New Postcom Not treated
R1‑122092 Multi-cell periodic CSI multiplexing issues on uplink control signalling enhancement New Postcom Not treated
R1‑122093 Multi-cell HARQ-ACK and periodic CSI multiplexing issues on uplink control signalling enhancement New Postcom Not treated
R1‑122094 HARQ-ACK bundling considerations for uplink control signalling enhancement New Postcom Not treated
R1‑122095 Consideration on PDSCH/PUSCH timing issues for TDD inter-band CA with different UL-DL configuration New Postcom Not treated
R1‑122096 CSI-RS based RRM measurement for additional carrier type New Postcom Not treated
R1‑122097 A subset-CRS based tracking reference signal for unsynschronized new carrier type New Postcom Not treated
R1‑122098 Methods to support different time scales for TDD UL-DL reconfiguration New Postcom Noted
R1‑122099 Views on Detection of SS,MIB and SIB1 for 9dB bias New Postcom Noted
R1‑122100 Evaluation of TDD dynamic reconfiguration in multi-cell pico scenario with macro layer CHTTL Not treated
R1‑122101 Discussion on DMRS usage for enhanced PDCCH ZTE Revised
R1‑122102 Discussion on DM-RS based enhanced PDCCH transmission ZTE Not treated
R1‑122103 Discussion on DMRS scrambling sequence for enhanced PDCCH ZTE Not treated
R1‑122104 Handling of mapping of ePDCCH in presence of other signals ZTE Not treated
R1‑122105 The definitions of eREG and eCCE ZTE Revised
R1‑122106 Discussion on ePDCCH candidates design ZTE Not treated
R1‑122107 Consideration on UE monitoring set ZTE Not treated
R1‑122108 Need for multiplexing of localised and distributed ePDCCH parts in same PRBs ZTE Revised
R1‑122109 TrCH bits restriction for PDSCH scheduled by ePDCCH ZTE Not treated
R1‑122110 HARQ timing of PDSCH on cross-carrier scheduled SCell for TDD CA with different UL-DL configurations ZTE Not treated
R1‑122111 Scheduling and HARQ timing for cross-carrier PUSCH scheduling for TDD CA with different UL-DL configurations ZTE Not treated
R1‑122112 Draft CR to 36.213 on Clarification on Cyclic shift for DM RS and OCC index in UL grant ZTE Rejected
R1‑122113 Transmit diversity for PUCCH format 1b with channel selection ZTE Noted
R1‑122114 Details of Multi-Cell Periodic CSI Multiplexing ZTE Not treated
R1‑122115 Details of Multi-cell HARQ-ACK and Periodic CSI Multiplexing ZTE Not treated
R1‑122116 Discussion on TBS scaling factor for additional TDD special subframe configurations ZTE Noted
R1‑122117 Evaluation/analysis on reduction of supported downlink transmission modes and Text Proposal ZTE Noted
R1‑122118 Conclusion and recommended cost saving techniques for LTE MTC UEs ZTE Noted
R1‑122119 Consideration on remaining issues related to multiple TA ZTE Not treated
R1‑122120 SRS power control for UL COMP ZTE Not treated
R1‑122121 Discussion on Compact DCI format application in PDCCH ZTE Not treated
R1‑122122 RS for unsynchronised New Carrier Type and transmission mode ZTE Not treated
R1‑122123 Discussion on synchronization signal mapping for New Carrier Type ZTE Not treated
R1‑122124 On synchronized New Carrier Type ZTE Not treated
R1‑122125 Further evaluation of TDD IMTA with co-channel deployment of macro-cells and pico-cells ZTE Not treated
R1‑122126 Suggestions to IMTA SI conclusions ZTE Not treated
R1‑122127 On signalling for reduced power ABS ZTE Revised
R1‑122128 Consideration on PDSCH rate matching around CRS of neighbour cells ZTE Not treated
R1‑122129 TTI bundling enhancements details for UL VoIP ZTE Noted
R1‑122130 TTI bundling enhancements details for PUSCH medium data rate ZTE Noted
R1‑122131 Views on size of CoMP measurement set ZTE Noted
R1‑122132 CQI definition for CoMP ZTE Noted
R1‑122133 CoMP CQI for TDD ZTE Not treated
R1‑122134 Consideration on CoMP support based on CRS ZTE Not treated
R1‑122135 CSI feedback modes for CoMP ZTE Noted
R1‑122136 Discussion on aggregated PMI feedback ZTE Not treated
R1‑122137 Discussion on interference measurement ZTE Revised
R1‑122138 Configuration of Interference Measurement Resource ZTE Withdrawn
R1‑122139 Discussion on CoMP Resource Management Set ZTE Not treated
R1‑122140 Further study of restriction in CSI-RS configuration ZTE Not treated
R1‑122141 Other issues on CSI-RS configuration ZTE Not treated
R1‑122142 Further study on dynamic selection in DMRS sequence initialization ZTE Not treated
R1‑122143 Downlink control signaling for CoMP ZTE Not treated
R1‑122144 Consideration on uplink DMRS isssues for UL CoMP ZTE Noted
R1‑122145 Considerations on the enhancement for SRS ZTE Noted
R1‑122146 Consideration for PUCCH enhancement ZTE Not treated
R1‑122147 Uplink timing for CoMP ZTE Not treated
R1‑122148 Further discussion and TP for reduced bandwidth options and cost analysis MediaTek Inc. Noted
R1‑122149 Analysis on TTI bundling enhancement for UL VoIP China Telecom, China Unicom Not treated
R1‑122150 Analysis on TTI bundling enhancement for medium rate PUSCH China Telecom, China Unicom Revised
R1‑122151 Considerations on eCCE design and transmission schemes in ePDCCH China Telecom Revised
R1‑122152 Time location of PSS/SSS in new carrier type MediaTek Inc. Noted
R1‑122153 Transmission modes in new carrier type MediaTek Inc. Not treated
R1‑122154 Need for signaling support for non-zero transmit power ABS MediaTek Inc. Not treated
R1‑122155 Obtaining of system information at 9dB CRE bias MediaTek Inc. Not treated
R1‑122156 UE assumptions on network deployment MediaTek Inc. Not treated
R1‑122157 On the size of CoMP measurement set for CSI feedback MediaTek Inc. Not treated
R1‑122158 CQI feedback to support downlink CoMP MediaTek Inc. Noted
R1‑122159 Periodic CSI feedback MediaTek Inc. Noted
R1‑122160 Further discussion on interference measurement for CoMP MediaTek Inc. Noted
R1‑122161 Further details on CSI-RS based measurement for CoMP resource management set MediaTek Inc. Not treated
R1‑122162 Performance comparison of ePDCCH using single and multiple DRS antenna ports MediaTek Inc. Not treated
R1‑122163 DRS antenna port determination for ePDCCH decoding MediaTek Inc. Not treated
R1‑122164 ePDCCH performance analysis for TxD transmission schemes MediaTek Inc. Noted
R1‑122165 Mapping of ePDCCH in presence of other signals MediaTek Inc. Not treated
R1‑122166 Physical structure for DCI multiplexing in ePDCCH MediaTek Inc. Not treated
R1‑122167 eCCE structure of ePDCCH MediaTek Inc. Not treated
R1‑122168 Necessity of multiplexing of localized and distributed ePDCCH parts in the same PRBs MediaTek Inc. Noted
R1‑122169 Analysis of transmission mode support for MTC devices MediaTek Inc. Not treated
R1‑122170 Observations and views on techniques for low-cost MTC MediaTek Inc. Noted
R1‑122171 Multiplexing of periodic CSI for carrier aggregation Panasonic Not treated
R1‑122172 Multiplexing of periodic CSI and HARQ-ACK for carrier aggregation Panasonic Not treated
R1‑122173 Remaining issues on TDD inter-band CA with different UL-DL configurations Panasonic Revised
R1‑122174 Location of PSS/SSS on additional carrier type Panasonic Noted
R1‑122175 Channels and signals for additional carrier type Panasonic Not treated
R1‑122176 Discussion of the synchronization on additional carrier type Panasonic Not treated
R1‑122177 UE behavior for power limitation in multiple TA Panasonic Not treated
R1‑122178 SCell PRACH transmission timing Panasonic Not treated
R1‑122179 TDD CA timing difference handling Panasonic Not treated
R1‑122180 L1 autonomous stopping behaviour for SCell Panasonic Not treated
R1‑122181 Performance of Low Power ABS with Modulation Restrictions Panasonic Noted
R1‑122182 On the Handling of colliding CRS in HetNet Scenarios with CRE Panasonic Not treated
R1‑122183 System Information Aquisition in HetNet Scenarios with CRE Panasonic Not treated
R1‑122184 CQI feedback levels in ABS Panasonic Not treated
R1‑122185 Discussion on Size of CoMP Measurement Set Panasonic Not treated
R1‑122186 Further Discussions on Aggregated CQI Panasonic Noted
R1‑122187 CQI Definition for CoMP Panasonic Not treated
R1‑122188 CSI feedback configuration, triggering, and behaviour Panasonic Not treated
R1‑122189 Views on CSI-RS based received signal quality measurements Panasonic Noted
R1‑122190 Views on Remaining issues for Downlink DMRS sequence initialization Panasonic Noted
R1‑122191 Views on Remaining issues for CSI-RS configuration Panasonic Not treated
R1‑122192 eNB configurations for multiple CSI reporting Panasonic Not treated
R1‑122193 DCI for Rel-11 CoMP operation Panasonic Not treated
R1‑122194 Enhancement of PUSCH DMRS orthogonality Panasonic Not treated
R1‑122195 Discussion on PUSCH DMRS configuration and signalling Panasonic Not treated
R1‑122196 SRS power control enhancement in Rel.11 Panasonic Not treated
R1‑122197 PUCCH enhancement for UL CoMP Panasonic Not treated
R1‑122198 Association between antenna ports and ePDCCH transmission Panasonic Not treated
R1‑122199 ePDCCH performance analysis on Tx diversity Panasonic Noted
R1‑122200 ePDCCH rate matching / puncturing and colliding signals analysis Panasonic Not treated
R1‑122201 Definitions of eREG and eCCE Panasonic Not treated
R1‑122202 ePDCCH search space design and configuration Panasonic Not treated
R1‑122203 Localized and distributed transmission of ePDCCH Panasonic Not treated
R1‑122204 “Fallback” operation for ePDCCH transmission Panasonic Not treated
R1‑122205 Type 0 and type 2 PDSCH assignment on resources including ePDCCH allocation Panasonic Noted
R1‑122206 Restrict the maximum TBS receivable in a TTI Panasonic Not treated
R1‑122207 The necessity of enhanced PHICH Panasonic Not treated
R1‑122208 Support of transmission schemes and transmission modes Panasonic Noted
R1‑122209 Evaluation on TDD UL/DL reconfiguration with interference mitigation in multi-cell pico scenario CATT Revised
R1‑122210 Single cell indoor deployment where CRS ports are not co-located Andrew Wireless Systems GmbH Noted
R1‑122211 Draft Reply LS on Clarifications on CSI-RS based measurement for CoMP Samsung, Ericsson, ST-Ericsson Noted
R1‑122212 Multi-Cell Periodic CSI Reporting Samsung Not treated
R1‑122213 HARQ-ACK and Periodic CSI Multiplexing Samsung Not treated
R1‑122214 TDD HARQ-ACK Bundling for PUCCH Format 3 Samsung Not treated
R1‑122215 HARQ-ACK feedback Enhancement for TDD configuration 5 Samsung Not treated
R1‑122216 HARQ-ACK Bundling in PUSCH Samsung Not treated
R1‑122217 UL DAI Field in FDD Samsung Not treated
R1‑122218 SORTD for PUCCH Format 1b with Channel Selection Samsung Noted
R1‑122219 Discussion on the maximum number of aggregated cells Samsung Not treated
R1‑122220 Discussion on PUCCH HARQ-ACK transmission Samsung Noted
R1‑122221 HARQ timing for PUSCH Case D on Scheduled Cell Samsung Not treated
R1‑122222 PUSCH HARQ timing for case of 10ms RTT in scheduling cell Samsung Not treated
R1‑122223 Issues on PHICH-less PUSCH HARQ operation in TDD CA Samsung Not treated
R1‑122224 Pcell vs. Scell based timing in case of PDSCH cross-carrier scheduling Samsung Not treated
R1‑122225 PDSCH HARQ timing for more than 2 cell configuration Samsung Not treated
R1‑122226 Details on synchronization signal mapping for New Carrier Type Samsung Not treated
R1‑122227 Further discussions on signalling support for non-zero transmit power ABS Samsung Not treated
R1‑122228 Discussions on cell detection issues for FeICIC Samsung Not treated
R1‑122229 Discussion on the size of CoMP measurement set Samsung Noted
R1‑122230 Need for aggregated CQI across CSI-RS resources Samsung Noted
R1‑122231 Definition of CQI in CoMP Samsung Not treated
R1‑122232 Discussion on CRS-based CoMP Samsung Not treated
R1‑122233 CSI feedback modes for DL CoMP Samsung Noted
R1‑122234 Feedback support for multiple interference assumptions Samsung Not treated
R1‑122235 CoMP Feedback including preferred-TP indicator Samsung Not treated
R1‑122236 Interference Measurement Resource for Downlink CoMP Samsung Not treated
R1‑122237 Remaining issues on CSI-RS based received signal quality measurement Samsung Not treated
R1‑122238 Downlink power control allocation for CoMP Samsung Noted
R1‑122239 CSI-RS measurement restriction for DL CoMP Samsung Not treated
R1‑122240 Additional Details on Dynamic Switching of DMRS Scrambling for Downlink CoMP Samsung Noted
R1‑122241 PDSCH RE mapping for CoMP among multiple cells Samsung Noted
R1‑122242 Downlink Control Signaling for CoMP Samsung Noted
R1‑122243 CoMP RRC parameters Samsung Noted
R1‑122244 Further discussions on enhanced UL DM RS for UL CoMP Samsung Not treated
R1‑122245 SRS Enhancements for CoMP Samsung Noted
R1‑122246 SRS Transmission Power Control for CoMP Samsung Not treated
R1‑122247 PUCCH resource allocation for UL CoMP Samsung Not treated
R1‑122248 Remaining issues on CoMP timing Samsung Revised
R1‑122249 Association between antenna ports and ePDCCH transmission Samsung Not treated
R1‑122250 Discussion on the Spatial Diversity Transmission Scheme for ePDCCH Samsung Noted
R1‑122251 DMRS scrambling for ePDCCH Samsung Not treated
R1‑122252 Mapping Enhanced Control Channels Samsung Not treated
R1‑122253 Distributed Operation and Search Space Design of eCCHs Samsung Not treated
R1‑122254 Localized Operation and Search Space Design of eCCHs Samsung Not treated
R1‑122255 ePDCCH design according to the vailable REs in a PRB pair Samsung Withdrawn
R1‑122256 Multiplexing Distributed and Localized ePDCCHs Samsung Noted
R1‑122257 Fallback Operation for ePDCCH Scheduling Samsung Not treated
R1‑122258 ePHICH design for Rel-11 Samsung Noted
R1‑122259 HARQ-ACK PUCCH Resources in Response to ePDCCH Detections Samsung Noted
R1‑122260 Restrictions on Maximum Number of TrCH Bits for ePDCCH Operation Samsung Not treated
R1‑122261 Enhanced PCFICH Samsung Noted
R1‑122262 Additional special subframe configuration for LTE TDD Samsung Not treated
R1‑122263 Reduction of Downlink transmission modes for MTC devices Samsung Noted
R1‑122264 Cost reduction techniques for low cost MTC UE based on LTE Samsung Noted
R1‑122265 Performance evaluation for co-channel macro-pico scenario Samsung Revised
R1‑122266 Semi-static reconfiguration of TDD UL-DL configuration Samsung Noted
R1‑122267 Dynamic reconfiguration of TDD UL-DL configuration Samsung Noted
R1‑122268 Draft CR for ACK/NACK on SR resource in case of FDD channel selection LG Electronics Noted - Revised
R1‑122269 Multi-cell Periodic CSI Transmission LG Electronics Not treated
R1‑122270 Multi-cell HARQ-ACK and CSI on PUCCH format 3 LG Electronics Not treated
R1‑122271 Simulation results for joint coding and separate coding of HARQ-ACK and CSI on PUCCH format 3 LG Electronics Not treated
R1‑122272 Transmit diversity for PUCCH format 1b with channel selection in Rel-11 LG Electronics Noted
R1‑122273 Details on full-duplex based TDD CA with different UL-DL configurations LG Electronics Not treated
R1‑122274 Issues on half-duplex based TDD CA with different UL-DL configurations LG Electronics Not treated
R1‑122275 Handling the Conflict of PSS/SSS and DM-RS in NCT LG Electronics Noted
R1‑122276 Discussions on synchronized new carrier type LG Electronics Not treated
R1‑122277 Considerations on Transmission Modes and Tracking RS Design in NCT LG Electronics Not treated
R1‑122278 Power limitation in multiple TA LG Electronics Not treated
R1‑122279 SRS transmission in multiple TA LG Electronics Not treated
R1‑122280 Analysis of Spatial Multiplexing Processing Reduction LG Electronics Not treated
R1‑122281 Discussions on Low Cost MTC Study Item Conclusions LG Electronics Noted
R1‑122282 Joint proposal on SRS transmission with multiple TA – full overlap case LG Electronics, CATT, Ericsson, ST-Ericsson Revised
R1‑122283 Consideration on necessary signaling for non-zero transmit power ABS LG Electronics Noted
R1‑122284 signaling support for CRS interference handling LG Electronics Not treated
R1‑122285 Signaling support for 9dB CRE bias LG Electronics Not treated
R1‑122286 Consideration on CSI Derivation in FeICIC LG Electronics Not treated
R1‑122287 Support for rate matching around CRS of neighbor cells LG Electronics Not treated
R1‑122288 Discussions on Interference Coordination between CoMP Clusters LG Electronics Not treated
R1‑122289 Enhancement to Time-domain Resource Partitioning LG Electronics Not treated
R1‑122290 Considerations on Rel-11 CoMP standardization LG Electronics Noted
R1‑122291 Discussion on Size of CoMP measurement set for per-CSI-RS-resource CSI feedback LG Electronics Not treated
R1‑122292 CQI definition for DL CoMP LG Electronics Not treated
R1‑122293 Views on Per-cell Rel-8 CRS-based feedback LG Electronics Not treated
R1‑122294 Consideration on CoMP CSI feedback modes LG Electronics Noted
R1‑122295 Consideration on interference measurement resource LG Electronics Not treated
R1‑122296 Considerations on the definition of CSI-RS based signal quality measurement LG Electronics Not treated
R1‑122297 Remaining details of DL DM-RS sequence for CoMP LG Electronics Revised
R1‑122298 Considerations on CSI-RS configuration for CoMP LG Electronics Not treated
R1‑122299 Required downlink control signalling for CoMP LG Electronics Not treated
R1‑122300 Enhancement of PUSCH DMRS for uplink CoMP LG Electronics Not treated
R1‑122301 SRS Enhancements for CoMP LG Electronics Noted
R1‑122302 Enhancement of SRS power control for CoMP LG Electronics Not treated
R1‑122303 PUCCH enhancement for uplink CoMP LG Electronics Not treated
R1‑122304 Discussions on the association between antenna ports and ePDCCH LG Electronics Not treated
R1‑122305 Considerations on Spatial Diversity in ePDCCH LG Electronics Not treated
R1‑122306 Further discussion on DMRS for ePDCCH LG Electronics Revised
R1‑122307 Handling of mapping of ePDCCH in presence of other signals LG Electronics Not treated
R1‑122308 Discussion on eREG/eCCE definition LG Electronics Not treated
R1‑122309 On ePDCCH Search Space Design Supporting Localized and Distributed Transmission LG Electronics Not treated
R1‑122310 Multiplexing of Localised and Distributed ePDCCH parts in same PRBs LG Electronics Noted
R1‑122311 Fallback Operation for a UE configured with ePDCCH LG Electronics Not treated
R1‑122312 Discussion on PDSCH mapping in presence of ePDCCH LG Electronics Not treated
R1‑122313 Details on TBS Restriction and UE Behaviour LG Electronics Not treated
R1‑122314 Discussion on PUCCH Resource for ePDCCH LG Electronics Noted
R1‑122315 Considerations on Other Control Channels LG Electronics Noted
R1‑122316 Discussion on extended TTI bundling for UL VoIP with Semi-Persistent Scheduling LG Electronics Noted
R1‑122317 Performance Evaluation for LTE_TDD_eIMTA in Multi-cell Scenario LG Electronics Noted
R1‑122318 TDD DL-UL Reconfiguration Methods for eIMTA LG Electronics Not treated
R1‑122319 Interference Coordination Issues for LTE_TDD_eIMTA LG Electronics Noted
R1‑122320 Transmissions of PSS/SSS and DM-RS in Unsynchronised New Carriers HTC Not treated
R1‑122321 Synchronised New Carriers in Rel-11 LTE HTC Not treated
R1‑122322 Resource Allocation in Rel-11 New Carriers HTC Noted
R1‑122323 CQI Definition and Feedback Reduction Mechanism for CoMP HTC Not treated
R1‑122324 CSI-RS based IMR in CoMP HTC Noted
R1‑122325 Remaining issues on CoMP resource management set HTC Not treated
R1‑122326 UL DM-RS considerations for CoMP HTC Not treated
R1‑122327 UL SRS enhancement for CoMP HTC Noted
R1‑122328 SRS power control enhancement for UL CoMP HTC Not treated
R1‑122329 Discussion on ePDCCH Antenna Port Association HTC Not treated
R1‑122330 Evaluation on TxD Transmission for ePDCCH HTC Not treated
R1‑122331 eREG and eCCE Definitions for ePDCCH HTC Not treated
R1‑122332 Fallback Operation for ePDCCH HTC Not treated
R1‑122333 Downlink Control Channels for Bandwidth-reduced Low-cost MTC UEs HTC Not treated
R1‑122334 UE assumptions on colocation of antennas Renesas Mobile Europe Ltd Noted
R1‑122335 Further Results on impact of four branch MIMO pilot channel design Renesas Mobile Europe Ltd. Noted
R1‑122336 HS-SCCH design for Four4 Branch Downlink MIMO Renesas Mobile Europe Ltd. Noted
R1‑122337 Further discussion on feedback design for 4 Branch Downlink MIMO Renesas Mobile Europe Ltd. Noted
R1‑122338 Discussions on Multi-Cell Periodic CSI Multiplexing Renesas Mobile Europe Ltd Not treated
R1‑122339 On HARQ-ACK and Periodic CSI Multiplexing in PUCCH Format 3 Renesas Mobile Europe Ltd Not treated
R1‑122340 Multi-cell HARQ-ACK and Periodic CSI Multiplexing in PUCCH format 2b Renesas Mobile Europe Ltd Not treated
R1‑122341 On Encoding for HARQ-ACK and Periodic CSI Multiplexing in PUCCH Format 3 Renesas Mobile Europe Ltd Not treated
R1‑122342 On UL Control Enhancement for Macro-RRH Deployments Renesas Mobile Europe Ltd Not treated
R1‑122343 Left Issues for half duplex mode of CC specific TDD Configuration Renesas Mobile Europe Ltd Not treated
R1‑122344 Discussion on DL cross-carrier scheudling for CC specific TDD configuration Renesas Mobile Europe Ltd Not treated
R1‑122345 Remain Issues on PUSCH HARQ-scheduling for CC specific TDD configuration Renesas Mobile Europe Ltd Not treated
R1‑122346 On PSS/SSS Mapping in NCT Renesas Mobile Europe Ltd Noted
R1‑122347 On Synchronized New Carrier Type Renesas Mobile Europe Ltd Not treated
R1‑122348 On Use cases for receiver-based techniques Renesas Mobile Europe Ltd Not treated
R1‑122349 Size of CoMP measurement set Renesas Mobile Europe Ltd Not treated
R1‑122350 On CSI feedback processing complexity in CoMP Renesas Mobile Europe Ltd Noted
R1‑122351 On CQI definition for CoMP Renesas Mobile Europe Ltd Not treated
R1‑122352 On the CSI feedback modes for CoMP Renesas Mobile Europe Ltd Not treated
R1‑122353 DL CoMP rank reporting Renesas Mobile Europe Ltd Not treated
R1‑122354 Study on remaining open issues for interference measurement resources Renesas Mobile Europe Ltd Not treated
R1‑122355 CoMP Resource Management Set Configuration Renesas Mobile Europe Ltd Not treated
R1‑122356 UE Assumptions on CSI-RS Transmission Renesas Mobile Europe Ltd Noted
R1‑122357 Transmission mode and DCI content for Release 11 Renesas Mobile Europe Ltd Noted
R1‑122358 Diversity schemes for ePDCCH Renesas Mobile Europe Ltd Noted
R1‑122359 Resource mapping for ePDCCH Renesas Mobile Europe Ltd Noted
R1‑122360 Definition of eCCE and eREG Renesas Mobile Europe Ltd Not treated
R1‑122361 On the need of PHICH enhancements Renesas Mobile Europe Ltd Noted
R1‑122362 Transmission mode for Low-Cost MTC LTE UEs Renesas Mobile Europe Ltd Noted
R1‑122363 Discussion on enhancements for Dynamic TDD UL-DL Configuration Renesas Mobile Europe Ltd Noted
R1‑122364 Further discussion on signalling support for reduced power ABS New Postcom Not treated
R1‑122365 Discussion on the size of CoMP measurement set New Postcom Not treated
R1‑122366 Discussion on CQI definition for CoMP New Postcom Not treated
R1‑122367 Considerations on interference measurement resource for CoMP New Postcom Noted
R1‑122368 Remaining issues for downlink reference signals for CoMP New Postcom Not treated
R1‑122369 Evaluation results for eIMTA Phase-3 scenario New Postcom Revised
R1‑122370 Search space and multiplexing design for ePDCCH New Postcom Not treated
R1‑122371 Spatial diversity for ePDCCH New Postcom Noted
R1‑122372 Updated Phase-2 eIMTA evaluation results New Postcom Not treated
R1‑122373 UL Control Signaling Enhancements for Rel-11 CA Scenarios NTT DOCOMO Not treated
R1‑122374 DL Signals for Unsynchronized New Carrier Type NTT DOCOMO Not treated
R1‑122375 Further View on Synchronized New Carrier Type Scenarios NTT DOCOMO Not treated
R1‑122376 UL Transmissions in Case of Power Limitation for Multiple TA NTT DOCOMO Not treated
R1‑122377 Performance Evaluation of Non-zero Transmit Power ABS for FeICIC NTT DOCOMO Not treated
R1‑122378 Views on UE-Specific DMRS for UL CoMP NTT DOCOMO Not treated
R1‑122379 Enhancement on SRS Power Control NTT DOCOMO Not treated
R1‑122380 Consideration on Multiplexing of Localized and Distributed ePDCCH China Unicom Not treated
R1‑122381 Correction for DMRS group hopping and sequence hopping Sharp, Panasonic Noted - Revised
R1‑122382 PUSCH DMRS for UL CoMP Sharp Not treated
R1‑122383 SRS configuration for UL CoMP Sharp Noted
R1‑122384 SRS power control for UL CoMP Sharp Not treated
R1‑122385 PUCCH configuration for UL CoMP Sharp Not treated
R1‑122386 TPC enhancements of PUCCH for UL-CoMP Sharp Not treated
R1‑122387 DMRS port determination for ePDCCH Sharp Not treated
R1‑122388 Resource mapping for ePDCCH Sharp Not treated
R1‑122389 CCE Aggregation Levels for ePDCCH Sharp Not treated
R1‑122390 Common search space in ePDCCH and fallback operation in Rel-11 Sharp Not treated
R1‑122391 PUCCH resource for ePDCCH Sharp Revised
R1‑122392 Consideration on non 10ms RTT configuration in cross scheduling Potevio Not treated
R1‑122393 HARQ/Scheduling timing details for different TDD configurations Potevio Not treated
R1‑122394 Periodic CSI multiplexing for Carrier Aggregation Nokia Siemens Networks, Nokia Not treated
R1‑122395 Multiplexing of periodic CSI and CA HARQ-ACK on PUCCH Nokia Siemens Networks, Nokia Not treated
R1‑122396 On SORTD for PUCCH Format 1b with channel selection Nokia Siemens Networks, Nokia Not treated
R1‑122397 Full duplex operation with inter-band CA with different TDD configurations on different bands Nokia Siemens Networks, Nokia Not treated
R1‑122398 Half duplex operation with inter-band CA with different TDD configurations on different bands Nokia Siemens Networks, Nokia Not treated
R1‑122399 On the bandwidth of NCT RS port Nokia Siemens Networks, Nokia Withdrawn
R1‑122400 PSS/SSS location on un-synchronized NCT Nokia Siemens Networks, Nokia Not treated
R1‑122401 New Carrier Type for Synchronized Carriers Nokia Siemens Networks, Nokia Not treated
R1‑122402 UL transmissions in case of multiple TA Nokia Siemens Networks, Nokia Not treated
R1‑122403 Performance of LP-ABS in uniform and non-uniform topologies Nokia Siemens Networks, Nokia Not treated
R1‑122404 Remaining issues for signalling support for CRS IC Nokia Siemens Networks, Nokia Noted
R1‑122405 Remaining issues for improving cell detection Nokia Siemens Networks, Nokia Noted
R1‑122406 On UE complexity related to DL CoMP CSI Nokia, Nokia Siemens Networks Not treated
R1‑122407 Size of CoMP measurement set for per-CSI-RS-resource CSI feedback Nokia, Nokia Siemens Networks Noted
R1‑122408 CQI definition for CoMP Nokia Siemens Networks, Nokia Noted
R1‑122409 Per-cell Rel-8 CRS-based feedback Nokia Siemens Networks, Nokia Not treated
R1‑122410 CSI feedback modes for CoMP Nokia Siemens Networks, Nokia Noted
R1‑122411 Interference measurement support for Rel-11 Nokia Siemens Networks, Nokia Not treated
R1‑122412 CSI-RS based channel quality measurement Nokia Siemens Networks, Nokia Not treated
R1‑122413 Remaining issues in DMRS for CoMP Nokia Siemens Networks, Nokia Noted
R1‑122414 Remaining issues in CSI-RS for CoMP Nokia Siemens Networks, Nokia Not treated
R1‑122415 Downlink control signaling and transmission mode design for CoMP Nokia Siemens Networks, Nokia Not treated
R1‑122416 On DM RS Enhancements for UL CoMP Nokia Siemens Networks, Nokia Not treated
R1‑122417 On Uplink Sounding Enhancements for CoMP Nokia Siemens Networks, Nokia Noted
R1‑122418 UL CoMP enhancement for PUCCH Nokia Siemens Networks, Nokia Not treated
R1‑122419 Details of association between antenna ports and ePDCCH transmission Nokia, Nokia Siemens Networks Not treated
R1‑122420 Spatial diversity transmission for ePDCCH Nokia, Nokia Siemens Networks Not treated
R1‑122421 On DM-RS scrambling sequence initialization for ePDCCH Nokia, Nokia Siemens Networks Not treated
R1‑122422 Handling of mapping of ePDCCH in presence of other signals Nokia, Nokia Siemens Networks Noted
R1‑122423 CCE and REG definitions for ePDCCH Nokia, Nokia Siemens Networks Not treated
R1‑122424 Considerations on search spaces Nokia, Nokia Siemens Networks Not treated
R1‑122425 Need for multiplexing of localised and distributed ePDCCH parts in same PRBs Nokia, Nokia Siemens Networks Noted
R1‑122426 Fallback of ePDCCH Nokia, Nokia Siemens Networks Not treated
R1‑122427 Control channel region for ePDCCH Nokia, Nokia Siemens Networks Not treated
R1‑122428 HARQ-ACK resource allocation for data scheduled via ePDCCH Nokia Siemens Networks, Nokia Noted
R1‑122429 TBS optimization for additional special subframe configuration Nokia Siemens Networks, Nokia Not treated
R1‑122430 DM RS for additional special subframe configuration Nokia Siemens Networks, Nokia Not treated
R1‑122431 Analysis of reduction of supported downlink transmission modes for low-cost MTC Nokia Siemens Networks, Nokia Not treated
R1‑122432 Conclusions of Low-cost MTC UEs Study Item Nokia Siemens Networks, Nokia Noted
R1‑122433 Coverage Enhancements for VoIP and Medium Data Rate Nokia Siemens Networks, Nokia Noted
R1‑122434 Evaluation results for LTE_TDD_eIMTA in Macro – outdoor Pico cell scenario Nokia, Nokia Siemens Networks Not treated
R1‑122435 Discussion on Methods to support different time scales for TDD UL-DL reconfiguration Nokia, Nokia Siemens Networks Not treated
R1‑122436 Discussion on study item conclusions Nokia, Nokia Siemens Networks Noted
R1‑122437 Feedback Mechanisms for DL CoMP Operations ITRI Not treated
R1‑122438 Observations on email discussion of calibration on eIMTA evaluation ITRI Not treated
R1‑122439 Evaluation of eIMTA in outdoor-pico scenario with macro layer included ITRI Revised
R1‑122440 Interference mitigation for TDD reconfiguration ITRI Noted
R1‑122441 Investigation on TDD ULDL reconfiguration methods for multiple outdoor pico cell scenario ITRI Not treated
R1‑122442 On half duplex UE operation for TDD CA different TDD UL-DL configuration Pantech Not treated
R1‑122443 PUSCH HARQ/scheduling timing in inter-band CA with different TDD UL-DL configuration Pantech Not treated
R1‑122444 Remaining PDSCH HARQ timing on SCell for inter-band CA TDD Pantech Not treated
R1‑122445 CSI feedback mode for DL CoMP Pantech Not treated
R1‑122446 Aggregated PMI feedback to support DL CoMP Pantech Not treated
R1‑122447 CSI-RS signal quality measurement and measured parameters for CoMP measurement set management Pantech Not treated
R1‑122448 DL DM-RS enhancements for Rel-11 Pantech Noted
R1‑122449 Remaining issues on CSI-RS for DL CoMP Pantech Not treated
R1‑122450 Downlink Control signaling to support CoMP Pantech Not treated
R1‑122451 UL DM-RS enhancements for Rel-11 Pantech Not treated
R1‑122452 SRS enhancements for CoMP Pantech Noted
R1‑122453 Enhancement on SRS power control Pantech Not treated
R1‑122454 Enhancement for PUCCH in Rel-11 Pantech Not treated
R1‑122455 DM RS sequence configuration for ePDCCH Pantech Not treated
R1‑122456 PUCCH resource allocation in response to E-PDCCH Pantech Not treated
R1‑122457 Views on enhanced PHICH Pantech Not treated
R1‑122458 Further discussion of quasi-co-located antenna ports Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122459 Pilot design for 4-branch HSDPA Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122460 Considerations on transport block sizes for UL MIMO rank 2 transmissions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122461 Rank selection in UL MIMO Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122462 Considerations on S-E-DPCCH for UL MIMO Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122463 Uplink power control for HSUPA UL MIMO Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122464 HARQ retransmission in UL MIMO Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122465 Support of Multiple Periodic CSI Reports for Carrier Aggregation Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122466 Support of Multi-Cell HARQ-ACK and Periodic CSI Multiplexing for Carrier Aggregation Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122467 On SORTD for PUCCH Format 1b with channel selection Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122468 Remaining issues on support of different TDD UL-DL configurations on different bands Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Withdrawn
R1‑122469 On the time location of PSS/SSS Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122470 On synchronized new carriers Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122471 On the transmission mode(s) for the new carrier type Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122472 On resource allocation for the new carrier type Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122473 Simultaneous transmissions of multiple UL channels with multiple TA groups Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122474 On signalling support for non-zero transmit power ABS Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122475 Signaling Assist for Broadcast Information for UE in CRE Region Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122476 Discussion of CRS Related Functionalities under CRS Collision Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122477 36.214 CR0018R3 (Rel-11, B) UL Relative Time of Arrival Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Agreed in principle
R1‑122478 Size of CoMP measurement set for per-CSI-RS-resource CSI feedback Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122479 CQI definition for CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122480 CSI feedback modes for CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑122481 Companion CSI feedback Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122482 Interference measurements for CoMP Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122483 CSI-RS based received signal quality measurements Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Revised
R1‑122484 Remaining issues for downlink DM-RS for CoMP Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122485 Remaining issues for CSI-RS for CoMP Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122486 CRS and PDCCH collisions with PDSCH for downlink CoMP Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122487 Downlink control signalling for CoMP Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122488 Some Remaining Aspects of PUCCH Enhancement for UL CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Revised
R1‑122489 Multiple CSI Reports on PUCCH for DL CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Revised
R1‑122490 Simultaneous Transmission Situations of Multiple UCI Reports on PUCCH Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Withdrawn
R1‑122491 UCI multiplexing on PUSCH for DL CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122492 Remaining issues of uplink timing for CoMP Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122493 Association between antenna ports and ePDCCH transmissions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122494 On spatial diversity for ePDCCH Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122495 Remaining Aspects of DMRS for ePDCCH Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122496 Handling of RE Mapping for ePDCCH in Presence of Legacy Signals Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122497 eCCE/eREG Definition for ePDCCH Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122498 Aggregation Levels for ePDCCH Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122499 Multiplexing of Localized and Distributed ePDCCH in Same PRBs Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122500 Fallback operation for ePDCCH Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122501 Restriction of the maximum number of TrCH bits receivable in a TTI Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122502 Remaining issues for ePDCCH Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122503 PHICH Enhancements Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑122504 Reference Signals and Transmission Modes for new Special Subframe Configuration Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122505 On the study item conclusions for low-cost MTC UEs Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122506 Details of possible TTI bundling enhancements for coverage enhancement Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑122507 Evaluations for multiple outdoor pico-cell scenario with macro layer and discussion of interference mitigation Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑122508 Methods to support different time scales for TDD UL-DL reconfiguration Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122509 On the study item conclusions for LTE TDD for DL-UL IMTA Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑122510 Discussion on timing issues with dynamic TDD UL-DL configuration Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122511 Draft LS response on geographically separated antennas Huawei Not treated
R1‑122512 Discussion on antenna ports collocation Huawei, HiSilicon Noted
R1‑122513 Draft LS response on clarifications on CSI-RS based measurement for CoMP Huawei Not treated
R1‑122514 Discussion on CSI-RS based measurement and the usage of the CoMP Resource Management Set Huawei, HiSilicon Noted
R1‑122515 Correction on precoding with DMRS for single layer transmission Huawei, HiSilicon Noted - Revised
R1‑122516 Channel coding for periodic CSI and HARQ-ACK on PUCCH format 3 Huawei, HiSilicon Revised
R1‑122517 Reduced-CRS transmission Huawei, HiSilicon Not treated
R1‑122518 PSS/SSS collisions with DM-RS Huawei, HiSilicon Noted
R1‑122519 DM-RS patterns for additional carrier types Huawei, HiSilicon Noted
R1‑122520 Aspects for the synchronized carrier case Huawei, HiSilicon Not treated
R1‑122521 SRS on a PUCCH-less carrier Huawei, HiSilicon Not treated
R1‑122522 Evaluation of reduced power ABS based on RAN 4 feedback Huawei, HiSilicon Noted
R1‑122523 Remaining issues of 9dB CRE bias Huawei, HiSilicon Noted
R1‑122524 Draft LS on higher-layer signaling requirements for CoMP Huawei Not treated
R1‑122525 TPC enhancements for SRS power control for CoMP Huawei, HiSilicon Not treated
R1‑122526 On the restriction of the maximum TB size with ePDCCH Huawei, HiSilicon Not treated
R1‑122527 Analysis and evaluation of reduction of supported downlink transmission modes Huawei,HiSilicon Noted
R1‑122528 Proposal on the conclusions for coverage enhancement Huawei, HiSilicon Not treated
R1‑122529 Evaluation of TDD traffic adaptive DL-UL reconfiguration in the multi-pico cell scenario Huawei, HiSilicon Noted
R1‑122530 Text Proposal on the observations for multi-cell scenario evaluation Huawei, HiSilicon Noted
R1‑122531 Discussion on the signalling support for non-zero transmit power ABS KDDI Noted
R1‑122532 Sequence Configuration for PUSCH DMRS KDDI Not treated
R1‑122533 SRS Enhancements for UL CoMP KDDI Noted
R1‑122534 Enhancements on PUCCH for CoMP KDDI Not treated
R1‑122535 Remaining aspects of DMRS for ePDCCH KDDI Not treated
R1‑122536 Fallback operations for ePDCCH KDDI Not treated
R1‑122537 Details about UL DMRS configuration and signaling Ericsson, ST-Ericsson Revised
R1‑122538 Details about SRS configuration and power control Ericsson, ST-Ericsson Revised
R1‑122539 Enhancements for UL control signaling Ericsson, ST-Ericsson Revised
R1‑122540 Draft LS response on reference scenarios for antenna ports co-location Ericsson, ST-Ericsson Noted
R1‑122541 Further study on RS and transmission mode for additional special subframe configuration for LTE TDD ZTE Not treated
R1‑122542 Multi cell AN single cell P-CSI multiplexing with PUCCH F1B / CS InterDigital Communications, LLC Not treated
R1‑122543 Multi cell AN single cell P-CSI multiplexing with PUCCH F3 InterDigital Communications, LLC Not treated
R1‑122544 Cross-carrier scheduling for TDD inter-band CA InterDigital Communications, LLC Not treated
R1‑122545 AN bit mapping and resource allocation for TDD inter-band CA InterDigital Communications, LLC Noted
R1‑122546 Power control performance with multiple TA InterDigital Communications, LLC Noted
R1‑122547 Size of CoMP measurement set InterDigital Communications, LLC Noted
R1‑122548 CQI definition for CoMP InterDigital Communications, LLC Noted
R1‑122549 Interference measurements for CoMP InterDigital Communications, LLC Noted
R1‑122550 CSI-RS based received signal quality measurements InterDigital Communications, LLC Not treated
R1‑122551 DM-RS for UL CoMP InterDigital Communications, LLC Not treated
R1‑122552 SRS for UL CoMP InterDigital Communications, LLC Noted
R1‑122553 SRS power control for UL CoMP InterDigital Communications, LLC Revised
R1‑122554 PUCCH enhancements for UL CoMP InterDigital Communications, LLC Not treated
R1‑122555 Antenna port association for ePDCCH transmission InterDigital Communications, LLC Not treated
R1‑122556 Spatial tiversity for ePDCCH distributed transmission InterDigital Communications, LLC Noted
R1‑122557 Remaining DM-RS issues for ePDCCH InterDigital Communications, LLC Not treated
R1‑122558 ePDCCH RE mapping with other signals InterDigital Communications, LLC Not treated
R1‑122559 Definition of eREG and eCCE InterDigital Communications, LLC Not treated
R1‑122560 On eCCE aggregation levels for ePDCCH InterDigital Communications, LLC Not treated
R1‑122561 Multiplexing of localized and distributed transmissions InterDigital Communications, LLC Noted
R1‑122562 On fallback operation in ePDCCH InterDigital Communications, LLC Not treated
R1‑122563 Restriction of maximum TBS for ePDCCH InterDigital Communications, LLC Not treated
R1‑122564 Consideration on ePHICH in Rel-11 InterDigital Communications, LLC Not treated
R1‑122565 Recommended conclusions for R11 SI Low-Cost UE InterDigital Communications, LLC Noted
R1‑122566 Link-level evaluation results for improved LTE UL VoIP coverage InterDigital Communications, LLC Noted
R1‑122567 System-level design consideration for improved LTE UL VoIP coverage InterDigital Communications, LLC Noted
R1‑122568 25212 CR0307 (Rel-11, F), Addition of missing 8C-HSDPA CQI reporting case indices Nokia Siemens Networks Noted - Revised
R1‑122569 Pilot design for 4-branch MIMO Nokia Siemens Networks Noted
R1‑122570 HS-SCCH signaling for 4-branch MIMO Nokia Siemens Networks Noted
R1‑122571 HS-DPCCH design options for 4-branch MIMO Nokia Siemens Networks Noted
R1‑122572 Email discussion summary of cell deactivation with HS-SCCH orders Nokia Siemens Networks Noted
R1‑122573 HARQ-ACK and CQI formats for Multiflow Nokia Siemens Networks Not treated
R1‑122574 Multiflow HS-DPCCH, HARQ-ACK codebooks and cell grouping Nokia Siemens Networks Noted
R1‑122575 Multiflow HS-DPCCH timing Nokia Siemens Networks Noted
R1‑122576 25211 CRdraft, Introduction of HSDPA Multiflow Nokia Siemens Networks Noted - Revised
R1‑122577 25212 CRdraft, Introduction of HSDPA Multiflow Nokia Siemens Networks Noted - Revised
R1‑122578 25213 CRdraft, Introduction of HSDPA Multiflow Nokia Siemens Networks Noted - Revised
R1‑122579 25214 CRdraft, Introduction of HSDPA Multiflow Nokia Siemens Networks Noted - Revised
R1‑122580 SINR-based scheduling for UL MIMO Nokia Siemens Networks Noted
R1‑122581 Simulation results for SINR-based scheduling for UL MIMO Nokia Siemens Networks Noted
R1‑122582 SINR based scheduling for SIMO and CLTD transmission modes Nokia Siemens Networks Noted
R1‑122583 Analysis of DPCCH, E-DPCCH, and S-E-DPCCH power allocation for UL MIMO Nokia Siemens Networks Noted
R1‑122584 S-DPCCH power with rank-2 transmissions Nokia Siemens Networks Noted
R1‑122585 Extension of SF, modulation scheme, and number of PhCHs selection algorithm for 64QAM and UL MIMO Nokia Siemens Networks Not treated
R1‑122586 E-TFC tables design for 64QAM Nokia Siemens Networks Noted
R1‑122587 DL control signalling for UL MIMO Nokia Siemens Networks Noted
R1‑122588 HSUPA MIMO and Soft Handover Nokia Siemens Networks Noted
R1‑122589 Interaction of MIMO and CLTD_Enabled/CLTD_Active Nokia Siemens Networks Noted
R1‑122590 25211 CRdraft, Introduction of UL MIMO and 64QAM Nokia Siemens Networks Revised
R1‑122591 25212 CRdraft, Introduction of UL MIMO and 64QAM Nokia Siemens Networks Revised
R1‑122592 25213 CRdraft, Introduction of UL MIMO and 64QAM Nokia Siemens Networks Revised
R1‑122593 25214 CRdraft, Introduction of UL MIMO and 64QAM Nokia Siemens Networks Revised
R1‑122594 DM-RS antenna port association with ePDCCH transmission NEC Group Not treated
R1‑122595 ePDCCH search space design NEC Group Not treated
R1‑122596 Physical resources block (PRB) configurations for ePDCCH transmission NEC Group Not treated
R1‑122597 ePDCCH transmission schemes and performance evaluations NEC Group Noted
R1‑122598 Configuration of CoMP measurement set NEC Group Not treated
R1‑122599 Remained issues of IMRs for CoMP NEC Group Noted
R1‑122600 ePDCCH with JT/DPS CoMP NEC Group Not treated
R1‑122601 Transmission modes on additional carrier type NEC Group Not treated
R1‑122602 CQI definition for CoMP TDD system NEC Group Not treated
R1‑122603 PDSCH mapping issues in CoMP NEC Group Noted
R1‑122604 PSS/SSS time locations on the NCT NEC Group Not treated
R1‑122605 Signaling support for non-zero transmission power ABS NEC Group Not treated
R1‑122606 Localised E-PDCCH resource configuration and fallback operation NEC Group Not treated
R1‑122607 On the reuse of ePDCCH resources Nokia, Nokia Siemens Networks Noted
R1‑122608 Issues with path loss estimation for power control with CoMP reception Huawei, HiSilicon Not treated
R1‑122609 Calibration results of multi-cell scenario for LTE TDD DL-UL Interference Management and Traffic Adaptation Huawei Noted - Revised
R1‑122610 Open issues for different TDD UL-DL configurations ASUSTeK Not treated
R1‑122611 Power control for multiple timing advances ASUSTeK Not treated
R1‑122612 SRS power control for CoMP ASUSTeK Not treated
R1‑122613 Localized and Distributed ePDCCH USS Candidates in Same Subframe ASUSTeK Not treated
R1‑122614 PUCCH Resource Allocation Corresponding to ePDCCH ASUSTeK Noted
R1‑122615 25.214 CR0679 (Rel-11, F) Clarification of TPI timing for UL CLTD ZTE Noted - Revised
R1‑122616 Reference cell for MF-HSDPA ZTE Noted
R1‑122617 HARQ-ACK codebook for MF-HSDPA ZTE Noted
R1‑122618 HS-DPCCH formats for MF-HSDPA ZTE Not treated
R1‑122619 Remaining issues of DRX / DTX for MF-HSDPA ZTE Noted
R1‑122620 SG interpretation and E-TFC selection for HSUPA MIMO InterDigital Communications, LLC Noted
R1‑122621 Impact of Inter-Stream Interference, HSUPA MIMO InterDigital Communications, LLC Noted
R1‑122622 Performance analysis of uplink 64QAM HSUPA Switching Point InterDigital Communications, LLC Not treated
R1‑122623 Traffic-to-total-pilot power for 64QAM operations for HSUPA InterDigital Communications, LLC Noted
R1‑122624 PDSCH RE mapping indication for multi-cell JP CoMP ETRI Not treated
R1‑122625 Consideration on eREG definition ETRI Withdrawn
R1‑122626 Signal quality metrics for measurement on CoMP resource management set Intel Corporation Revised
R1‑122627 Remaining issues of interference measurements Intel Corporation Revised
R1‑122628 Periodic and aperiodic CSI feedback modes for DL CoMP Intel Corporation Noted
R1‑122629 Downlink control signaling for DL CoMP Intel Corporation Not treated
R1‑122630 Discussion on the maximum size of CoMP measurement set Intel Corporation Not treated
R1‑122631 Discussion on rank indicator (RI) report for CoMP Intel Corporation Not treated
R1‑122632 Discussion on DCI content for DL CoMP Intel Corporation Not treated
R1‑122633 Discussion on cell-specific parameters configuration for CSI-RS Intel Corporation Noted
R1‑122634 Discussion on aggregated CQI feedback for JT CoMP Intel Corporation Not treated
R1‑122635 Configuration and Signaling for UE-specific PUSCH DM-RS Intel Corporation Not treated
R1‑122636 SRS Enhancements for UL CoMP Intel Corporation Noted
R1‑122637 UL CoMP Control and Signaling Principles Intel Corporation Not treated
R1‑122638 Discussion on reduction of supported downlink transmission modes for low-cost MTC UEs Intel Corporation Not treated
R1‑122639 Discussion on low-cost MTC UE study item conclusions Intel Corporation Noted
R1‑122640 Discussion on TTI bundling enhancements for PUSCH VoIP coverage improvement Intel Corporation Noted
R1‑122641 Discussion on TTI bundling enhancements for PUSCH medium data rate coverage improvement Intel Corporation Noted
R1‑122642 Conclusions on the LTE Coverage Enhancements Study Item Intel Corporation Not treated
R1‑122643 Discussion on MCS mismatch between regular and flexible subframes in multi-cell outdoor Pico scenario Intel Corporation Not treated
R1‑122644 Discussion on adaptation time scale in multi-cell outdoor Pico scenario Intel Corporation Noted
R1‑122645 Discussion on network energy saving due to traffic adaptation in multi-cell outdoor Pico scenario Intel Corporation Noted
R1‑122646 Evaluation of Macro-Pico co-channel scenario for the case of dynamic UL-DL reconfiguration on the Pico nodes Intel Corporation Noted
R1‑122647 Discussion on methods to support different time scales for TDD UL-DL reconfiguration Intel Corporation Noted
R1‑122648 Discussion on the eIMTA study item conclusions Intel Corporation Noted
R1‑122649 UE-RS association for ePDCCH Intel Corporation Not treated
R1‑122650 On distributed ePDCCH transmission Intel Corporation Not treated
R1‑122651 Further details of ePDCCH Search Space Intel Corporation Not treated
R1‑122652 On the definition of eCCE/eREG Intel Corporation Not treated
R1‑122653 Impact of ePDCCH on PDSCH PRB Bundling Intel Corporation Not treated
R1‑122654 Considerations on ePHICH Design Intel Corporation Not treated
R1‑122655 Views on CRS/PDSCH RE Collision in Joint Transmission Intel Corporation Noted
R1‑122656 CRS design for NCT – discussion on cell-specific frequency shift Intel Corporation Not treated
R1‑122657 DL Scheduling/HARQ timing issue for inter-band TDD CA Intel Corporation Not treated
R1‑122658 Consideration on Location of PSS/SSS signaling in NCT Intel Corporation Not treated
R1‑122659 Remaining UL transmission issues for inter-band TDD CA Intel Corporation Not treated
R1‑122660 Remaining aspects of non-zero power ABS for FeICIC Motorola Mobility Not treated
R1‑122661 Network Assistance Signaling for FeICIC Motorola Mobility Not treated
R1‑122662 CCE design for EPDCCH Motorola Mobility Not treated
R1‑122663 Handling mapping of EPDCCH in presence of other signals Motorola Mobility Noted
R1‑122664 TrCH restriction for EPDCCH Motorola Mobility Not treated
R1‑122665 SRS Power Offset Determination for DL CoMP Motorola Mobility Not treated
R1‑122666 Uplink Control Signaling for UL CoMP Motorola Mobility Not treated
R1‑122667 DL Timing Reference for UL CoMP Motorola Mobility Revised
R1‑122668 PSS/SSS Placement in new carrier type Motorola Mobility Not treated
R1‑122669 Distributed EPDCCH with Random Precoding Motorola Mobility Noted
R1‑122670 CQI definition for CoMP Motorola Mobility Not treated
R1‑122671 Clarification of DTX/DRX and HS-SCCH less activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122672 25.214 CR0672R1 (Rel-7, F) Clarification of DTX/DRX activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122673 25.214 CR0673R1 (Rel-8, A) Clarification of DTX/DRX activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122674 25.214 CR0674R1 (Rel-9, A) Clarification of DTX/DRX activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122675 25.214 CR0675R1 (Rel-10, A) Clarification of DTX/DRX activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122676 25.214 CR0676R1 (Rel-11, A) Clarification of DTX/DRX activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122677 25.214 CR0680 (Rel-8, F) Clarification of HS-SCCH less activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122678 25.214 CR0681 (Rel-9, A) Clarification of HS-SCCH less activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122679 25.214 CR0682 (Rel-10, A) Clarification of HS-SCCH less activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122680 25.214 CR0683 (Rel-11, A) Clarification of HS-SCCH less activation status upon RRC reconfiguration Huawei, HiSilicon Noted
R1‑122681 25.214 CR0684 (Rel-11, F) Clarification of F-TPICH Transmission Huawei, HiSilicon, Qualcomm Incorporated Noted - Revised
R1‑122682 Further evaluation on pilot design for DL MIMO Huawei, HiSilicon Noted
R1‑122683 HS-SCCH design for DL 4-branch MIMO Huawei, HiSilicon Noted
R1‑122684 HS-DPCCH design for DL 4-branch MIMO Huawei, HiSilicon Noted
R1‑122685 Interleaving design for DL MIMO Huawei, HiSilicon Noted
R1‑122686 Criterion of common E-RGCH monitoring Huawei, HiSilicon Noted
R1‑122687 HARQ Codebook for MF-Tx with MIMO Huawei, HiSilicon Noted
R1‑122688 HS-DPCCH Timing in Case of 7 HARQ Processes Huawei, HiSilicon Noted
R1‑122689 Remaining Timing Issues for HS-DPCCH Huawei, HiSilicon Noted
R1‑122690 HARQ-ACK Repetition in MF-Tx Huawei, HiSilicon Noted
R1‑122691 E-TFC selection and grant signalling for UL MIMO Huawei, HiSilicon Noted
R1‑122692 Discussion on SINR feedback channel design Huawei, HiSilicon Noted
R1‑122693 Boosting design for UL MIMO Huawei, HiSilicon Noted
R1‑122694 On the Design of Power Control for UL MIMO Huawei,HiSilicon Noted
R1‑122695 Simulation results with Uplink 64QAM Huawei, HiSilicon Not treated
R1‑122696 E-HICH design in Uplink MIMO Huawei, HiSilicon Noted
R1‑122697 (De-)Activation of UL MIMO Huawei, HiSilicon Noted
R1‑122698 Further Consideration on the Signaling Support for Reduced Power ABS Hitachi Ltd. Not treated
R1‑122699 CQI Estimation for CoMP Hitachi Ltd. Noted
R1‑122700 Discussion on CSI feedback modes for CoMP Hitachi Ltd. Revised
R1‑122701 Discussion on Aggregated CSI Feedback Hitachi Ltd. Not treated
R1‑122702 Remaining Issues in Interference Measurement Hitachi Ltd. Not treated
R1‑122703 Remaining issues for CSI-RS based receive signal quality measurement Hitachi Ltd. Not treated
R1‑122704 Discussion on parameters configured per CSI-RS port for CoMP Hitachi Ltd. Not treated
R1‑122705 Consideration on signaling of the bandwidth information for CSI-RS Hitachi Ltd. Noted
R1‑122706 Consideration for DL DMRS for CoMP Hitachi Ltd. Not treated
R1‑122707 DMRS scrambling sequence for ePDCCH Hitachi Ltd. Not treated
R1‑122708 Email summary on inter-band TDD CA CMCC Noted
R1‑122709 Bandwidth of the RS port for additional carrier types CMCC Withdrawn
R1‑122710 Autonomous inter-cell interference cancellation CMCC Revised
R1‑122711 System information detection for Rel-11 FeICIC CMCC Noted
R1‑122712 Discussion on SRS Power Control Enhancement CMCC Not treated
R1‑122713 E-CCE/E-REG definition and fallback operation for signaling independent mapping CMCC Not treated
R1‑122714 Discussion of Aggregation Levels for Localized ePDCCH Transmission CMCC Not treated
R1‑122715 Designing the scaling factor of DwPTS for new special subframe configurations CMCC Not treated
R1‑122716 Draft CR on TBS scaling factor for special subframe configuration 9 with normal cyclic prefix and special subframe configuration 7 with extended cyclic prefix CMCC, Huawei, HiSilicon Noted - Revised
R1‑122717 RS and transmission mode of DwPTS for new special subframe configurations CMCC Not treated
R1‑122718 Draft CR on DMRS patterns for special subframe configuration 9 with normal cyclic prefix CMCC, Huawei, HiSilicon Agreed in principle
R1‑122719 Coverage enhancemnet for TTI bundling CMCC Noted
R1‑122720 Simulation results of flexible TDD UL-DL configuration for Set 2 assumption CMCC Noted
R1‑122721 Consideration on E-PDCCH Search Sapce and Multipelxing Design Research In Motion UK Limited Not treated
R1‑122722 On Spatial diversity for E-PDCCH Research In Motion UK Limited Not treated
R1‑122723 DMRS Port Assignment to E-PDCCH and Channel Estimation Complexity Research In Motion UK Limited Not treated
R1‑122724 Other Control Channel for E-PDCCH Research In Motion UK Limited Noted
R1‑122725 Rel-11 Channel Selection Transmit Diversity Alternatives Research In Motion UK Limited Not treated
R1‑122726 HARQ-ACK Transmission for cross-carrier scheduling in Inter-band CA with Different UL/DL Configurations Research In Motion UK Limited Not treated
R1‑122727 SRS Enhancements for Release 11 Research In Motion UK Limited Noted
R1‑122728 Views on SRS power control enhancements Research In Motion UK Limited Not treated
R1‑122729 Design considerations for multi-cell periodic CSI reporting Texas Instruments Not treated
R1‑122730 Design aspects of multiplexing CSI and multi-cell HARQ-ACK on PUCCH Texas Instruments Not treated
R1‑122731 On the maximum size of CoMP measurement set Texas Instruments Not treated
R1‑122732 CSI feedback contents for downlink CoMP Texas Instruments Not treated
R1‑122733 CSI feedback modes for downlink CoMP Texas Instruments Not treated
R1‑122734 Uplink DMRS Configuration for CoMP Texas Instruments Not treated
R1‑122735 Further Discussion on SRS power control for CoMP Texas Instruments Not treated
R1‑122736 Further consideration on uplink control for CoMP Texas Instruments Revised
R1‑122737 On the Need for Timing Advance Specification Changes for UL CoMP Texas Instruments Not treated
R1‑122738 Antenna port configuration for ePDCCH transmissions Texas Instruments Not treated
R1‑122739 On the Need for Transmit Diversity in ePDCCH Transmission Texas Instruments Not treated
R1‑122740 Scrambling sequence initialization of DMRS for ePDCCH Texas Instruments Not treated
R1‑122741 Mapping of ePDCCH in presence of other signals Texas Instruments Not treated
R1‑122742 Aggregation level of ePDCCH under distributed/localized transmission Texas Instruments Not treated
R1‑122743 Need for multiplexing localized and distributed ePDCCHs in one PRB Texas Instruments Noted
R1‑122744 Need for localized and distributed ePDCCH candidates in one sub-frame Texas Instruments Not treated
R1‑122745 Design considerations for an enhanced PHICH Texas Instruments Noted
R1‑122746 Analysis of supported downlink transmission modes for low-cost MTC UEs based on LTE IPWireless Inc. Noted
R1‑122747 Preferred combination of features for a low-cost MTC UE based on LTE IPWireless Inc. Noted
R1‑122748 Low-cost MTC UE Study Item: Conclusions and Recommendations IPWireless Inc. Not treated
R1‑122749 Modified Template for Evaluation Methodology on Link Budget Institute for Information Industry (III) Not treated
R1‑122750 Text Proposal for TR 36.888 on Restriction of Techniques to Low Performance MTC Ues Institute for Information Industry (III) Not treated
R1‑122751 Discussion and Text Proposal for MTC Spectral Efficiency Institute for Information Industry (III) Not treated
R1‑122752 Text Proposal for clause 8 of 3GPP TR 36.888 Vodafone Group, Orange Noted - Revised
R1‑122753 Text Proposal on some aspects of section 9 of 3GPP TR 36.888 Vodafone Group Noted
R1‑122754 Update to 3GPP TR 36.888 to include agreements Vodafone Group Revised
R1‑122755 Discussion on cost savings identified for low-cost MTC LTE UEs MStar Semiconductor, Inc. Noted
R1‑122756 ePDCCH in MBSFN subframes Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑122757 Draft LS on UE measurements in support of the two-stage MIMO OTA test method Qualcomm Inc. Not treated
R1‑122758 Text proposal for 36.214 Qualcomm Inc. Not treated
R1‑122759 Discussion corrections for handling CSI-RS patterns Qualcomm Inc. Noted
R1‑122760 Discussion of transport block vs codeword for CA Qualcomm Inc. Noted
R1‑122761 DL control channel enhancements for CA operation Qualcomm Inc. Not treated
R1‑122762 On reducing periodic CSI dropping for CA operation Qualcomm Inc. Not treated
R1‑122763 On enhanced A/N bundling for CA operation Qualcomm Inc. Not treated
R1‑122764 TxD scheme for PUCCH format 1b with channel selection Qualcomm Inc. Not treated
R1‑122765 TxD scheme for PUCCH format 3 Qualcomm Inc. Not treated
R1‑122766 Support of CA for different TDD UL-DL configurations Qualcomm Inc. Not treated
R1‑122767 RS for unsynchronized carriers Qualcomm Inc. Not treated
R1‑122768 PSS-SSS for new carriers Qualcomm Inc. Not treated
R1‑122769 Synchronized new carrier Qualcomm Inc. Not treated
R1‑122770 Transmission modes for NCT Qualcomm Inc. Noted
R1‑122771 Resource allocation methods for NCT Qualcomm Inc. Revised
R1‑122772 Power control aspects of multiple TA operation Qualcomm Inc. Noted
R1‑122773 Signalling support for non-zero transmit power ABS Qualcomm Inc. Not treated
R1‑122774 Signaling assistance for CRS cancellation Qualcomm Inc. Noted
R1‑122775 Need for transmitter based solutions Qualcomm Inc. Not treated
R1‑122776 On the size of the CoMP measurement set Qualcomm Inc. Noted
R1‑122777 CQI definition for downlink CoMP Qualcomm Inc. Not treated
R1‑122778 Supporting CRS-based CoMP operation Qualcomm Inc. Not treated
R1‑122779 CSI feedback reporting in support of CoMP Qualcomm Inc. Not treated
R1‑122780 Performance of Dynamic Point Selection in HetNet CoMP Qualcomm Inc. Not treated
R1‑122781 Interference measurement in support of downlink CoMP Qualcomm Inc. Noted
R1‑122782 CoMP resource management set accuracy, link results Qualcomm Inc. Not treated
R1‑122783 CoMP resource management set, system simulation results Qualcomm Inc. Not treated
R1‑122784 Remaining issues on DL reference signals for CoMP Qualcomm Inc. Noted
R1‑122785 Downlink control signaling in support of downlink CoMP Qualcomm Inc. Not treated
R1‑122786 DM-RS Enhancements in support of Uplink CoMP Qualcomm Inc. Not treated
R1‑122787 SRS enhancements in support of Uplink CoMP Qualcomm Inc. Noted
R1‑122788 SRS power control Qualcomm Inc. Not treated
R1‑122789 Uplink control signaling for CoMP Qualcomm Inc. Not treated
R1‑122790 Uplink timing advance Qualcomm Inc. Noted
R1‑122791 Reference signals for e-PDCCH Qualcomm Inc. Not treated
R1‑122792 Spatial diversity for e-PDCCH Qualcomm Inc. Not treated
R1‑122793 Remaining aspects of DM-RS for ePDCCH Qualcomm Inc. Not treated
R1‑122794 Mapping of ePDCCH in presence of other signals Qualcomm Inc. Noted
R1‑122795 eREG-eCCE definitions Qualcomm Inc. Not treated
R1‑122796 On Aggregation Levels for ePDCCH Qualcomm Inc. Not treated
R1‑122797 Multiplexing localized and distributed ePDCCH in the same PRBs Qualcomm Inc. Not treated
R1‑122798 On Fallback Operation for e-PDCCH Qualcomm Inc. Not treated
R1‑122799 Restriction of maximum TrCh bits Qualcomm Inc. Not treated
R1‑122800 On the need of ePHICH in Rel-11 Qualcomm Inc. Noted
R1‑122801 TBS scaling factor for new special subframe configuration Qualcomm Inc. Not treated
R1‑122802 Downlink transmission modes for MTC Qualcomm Inc. Noted
R1‑122803 Evaluation of narrow BW operation Qualcomm Inc. Withdrawn
R1‑122804 Additional comments on Cost Evaluation for MTC Qualcomm Inc. Noted
R1‑122805 Coverage Enhancement for Medium Data Rate and VOIP Qualcomm Inc. Noted
R1‑122806 Evaluation of multiple outdoor pico-cell scenario Qualcomm Inc. Noted
R1‑122807 Methods to support different time scales for reconfiguration Qualcomm Inc. Not treated
R1‑122808 Scheduled Common Pilot Performance in a Four branch MIMO System Ericsson Noted
R1‑122809 Dedicated Pilot Perforamnce in a Four branch MIMO System Ericsson Noted
R1‑122810 Overall Summary of Pilot Design Schemes in Four branch MIMO System Ericsson Noted
R1‑122811 HS-SCCH design for Four branch MIMO System Ericsson Noted
R1‑122812 Uplink Feedback Channel Design for Four branch MIMO Sytem Ericsson Noted
R1‑122813 Layer mapping for Four branch MIMO System Ericsson Noted
R1‑122814 Retransmission Operation in a 2 codeword MIMO System Ericsson Noted
R1‑122815 Two Codeword MIMO Structure for Four branch MIMO System Ericsson Noted
R1‑122816 HARQ functionalities in Four branch MIMO System Ericsson Noted
R1‑122817 On VAM for 4-branch MIMO Ericsson Noted
R1‑122818 25.214 Draft CR (HS-DSCH Releated Procedures) Ericsson Withdrawn
R1‑122819 HARQ-ACK codebook for SF-DC MF-HSDPA with MIMO Ericsson, ST-Ericsson Noted
R1‑122820 On Remaining Aspects of Grant and E-TFC Selection for Uplink MIMO with 64QAM Ericsson, ST-Ericsson Noted
R1‑122821 On Power Setting of S-E-DPCCH for Uplink MIMO with 64QAM Ericsson, ST-Ericsson Noted
R1‑122822 On Remaining Aspects Related to 64QAM for UL MIMO with 64QAM Ericsson, ST-Ericsson Not treated
R1‑122823 On Remaining Aspects of the DL Control Channel Design for Uplink MIMO with 64QAM Ericsson, ST-Ericsson Noted
R1‑122824 Email Discussion Summary – HARQ re-transmission Ericsson, ST-Ericsson Noted
R1‑122825 Consideration on Reduction of Transmission Modes for Low-Cost MTC UEs China Unicom Not treated
R1‑122826 On interference mitigation for dynamic TDD traffic adaptation Ericsson, ST-Ericsson Noted
R1‑122827 Performance evaluations on FeICIC based on RAN4 LS Ericsson, ST-Ericsson Noted
R1‑122828 On signalling support for reduced power ABS Ericsson, ST-Ericsson Noted
R1‑122829 On detection of MIB and SIB1 for 9 dB bias Ericsson, ST-Ericsson Not treated
R1‑122830 On rate matching around CRS of neighbour cells Ericsson, ST-Ericsson Not treated
R1‑122831 Correction to assumed CSI-RS transmissions in subfames used for paging Ericsson, ST-Ericsson Revised
R1‑122832 Interpretation of CSI-RS transmissions in subfames used for paging Ericsson, ST-Ericsson Noted
R1‑122833 Size of CoMP Measurement Set Ericsson, ST-Ericsson Noted
R1‑122834 Evaluation of the performance of aggregated CQI Ericsson, ST-Ericsson Noted
R1‑122835 Implicit CSI Feedback Framework for DL CoMP Ericsson, ST-Ericsson Noted
R1‑122836 RI and PMI sharing between multiple CSI Processes Ericsson, ST-Ericsson Not treated
R1‑122837 CQI Definition of UE Emulated Intra CoMP Cluster Interference Ericsson, ST-Ericsson Noted
R1‑122838 On per-cell Rel-8 CRS-based feedback Ericsson, ST-Ericsson Withdrawn
R1‑122839 On CSI feedback modes Ericsson, ST-Ericsson Withdrawn
R1‑122840 Interference Measurements for CoMP CSI Reporting Ericsson, ST-Ericsson Noted
R1‑122841 Definition of Measurements for CoMP Resource Management Ericsson, ST-Ericsson Noted
R1‑122842 Dimensioning of the CoMP Resource Management Set Ericsson, ST-Ericsson Noted
R1‑122843 Control Signaling in Support of CoMP Ericsson, ST-Ericsson Not treated
R1‑122844 Recommendation on defining a new UE category for low-cost MTC Orange, Vodafone Group Not treated
R1‑122845 Text proposal for TR 36.888 on restriction of techniques to low performance MTC UEs Orange Withdrawn
R1‑122846 Views on coverage enhancements Orange Withdrawn
R1‑122847 Standalone HS-DPCCH in CELL_FACH Qualcomm Incorporated Withdrawn
R1‑122848 Common Relative Grant for Interference Control Qualcomm Incorporated Not treated
R1‑122849 25.211 Rel-11 CR Introduction of Further Enhancements of CELL_FACH Qualcomm Incorporated Noted - Revised
R1‑122850 25.212 Rel-11 CR Introduction of Further Enhancements of CELL_FACH Qualcomm Incorporated Noted - Revised
R1‑122851 25.214 Rel-11 CR Introduction of Further Enhancements of CELL_FACH Qualcomm Incorporated Noted - Revised
R1‑122852 Multiflow HSDPA Timing Details Qualcomm Incorporated Noted
R1‑122853 HS-SCCH orders in Multiflow HSDPA and associated HS-DPCCH formats Qualcomm Incorporated Noted
R1‑122854 DF-DC Configuration in Multiflow HSDPA Qualcomm Incorporated Revised
R1‑122855 E-TFC Selection and SG interpretation for UL MIMO Qualcomm Incorporated Not treated
R1‑122856 Details of UL Channel Structure in UL MIMO Qualcomm Incorporated Not treated
R1‑122857 DL Control Channel Design in UL MIMO Qualcomm Incorporated Not treated
R1‑122858 HARQ retransmission operation for UL MIMO Qualcomm Incorporated Not treated
R1‑122859 Text proposal for TR 36.888 on restriction of techniques to low performance MTC Ues Telecom Italia Revised
R1‑122860 Recommendation on defining an MTC specific UE category Telecom Italia Revised
R1‑122861 HARQ operation for UL MIMO Huawei, HiSilicon Noted
R1‑122862 HARQ timing and cross-carrier scheduling for the support of different TDD UL-DL configurations on different bands Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122863 Considerations on DMRS for additional special subframe configuration for LTE TDD CATR Not treated
R1‑122864 Consideration on spatial diversity for distributed transmission of ePDCCH CATR Not treated
R1‑122865 Views of how to handle mapping of ePDCCH in presence of other signals CATR Not treated
R1‑122866 Text Proposal on solutions for LTE Coverage Enhancements ZTE, China Telecom, China Unicom, Orange, Ericsson, ST-Ericsson, Intel, Alcatel Lucent, Alcatel Lucent Shanghai Bell, InterDigital, Nokia Siemens Networks, Nokia, Huawei, HiSilicon, LG Electronics Noted
R1‑122867 Need for multiplexing of localised and distributed ePDCCH parts in same PRBs ZTE Not treated
R1‑122868 Discussion on interference measurement ZTE Noted
R1‑122869 Evaluation of eIMTA in outdoor-pico scenario with macro layer included ITRI Noted
R1‑122870 Remaining issues on TDD inter-band CA with different UL-DL configurations Panasonic Not treated
R1‑122871 Discussion on rules to obey common E-RGCH Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122872 TDD DL-UL Reconfiguration Methods in Carrier Aggregation LG Electronics Not treated
R1‑122873 Remaining details for UL cross-carrier scheduling Ericsson, ST-Ericsson Not treated
R1‑122874 CSI-RS based received signal quality measurements Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑122875 DF-DC Configuration in Multiflow HSDPA Qualcomm Incorporated, Orange Noted
R1‑122876 Resource allocation methods for NCT Qualcomm Inc. Noted
R1‑122877 The definitions of eREG and eCCE ZTE Not treated
R1‑122878 Some Remaining Aspects of PUCCH Enhancement for UL CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122879 Evaluation on TDD UL/DL reconfiguration with interference mitigation in multi-cell pico scenario CATT Noted
R1‑122880 Signal quality metrics for measurement on CoMP resource management set Intel Corporation Noted
R1‑122881 Remaining issues of interference measurements Intel Corporation Not treated
R1‑122882 Details about UL DMRS configuration and signaling Ericsson, ST-Ericsson Revised
R1‑122883 Details about SRS configuration and power control Ericsson, ST-Ericsson Not treated
R1‑122884 Enhancements for UL control signaling Ericsson, ST-Ericsson Not treated
R1‑122885 Performance evaluation for co-channel macro-pico scenario Samsung Noted
R1‑122886 Further discussion on DMRS for ePDCCH LG Electronics Not treated
R1‑122887 Discussion on DMRS usage for enhanced PDCCH ZTE Not treated
R1‑122888 Multiple CSI Reports on PUCCH for DL CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑122889 Evaluation results for eIMTA Phase-3 scenario New Postcom Noted
R1‑122890 Autonomous inter-cell interference cancellation CMCC Not treated
R1‑122891 Remaining details of DL DM-RS sequence for CoMP LG Electronics Not treated
R1‑122892 Final report of RAN1#68bis meeting MCC Support Approved
R1‑122893 Considerations on eCCE design and transmission schemes in ePDCCH China Telecom Not treated
R1‑122894 Draft CR on DMRS patterns for special subframe configuration 9 with normal cyclic prefix CMCC, Huawei, HiSilicon Noted
R1‑122895 Way Forward on the Maximum Size of CoMP Measurement Set Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CMCC, ETRI, Fujitsu, HiSilicon, Hitachi, HTC, Huawei, KDDI, KT, LG Electronics, NEC, NTT DOCOMO, Orange, Panasonic, Pantech, Samsung, Sharp, ZTE Noted
R1‑122896 Draft reply LS on UE measurements in support of the two-stage MIMO OTA test method Qualcomm Noted - Revised
R1‑122897 LS on ITU-T response LS (R3-120470) to NGMN LS (RP-110476) on coordination between ITU-T and 3GPP on synchronization RAN3, Ericsson Noted
R1‑122898 Draft LS response on clarifications on CSI-RS based measurement for CoMP Huawei Noted - Revised
R1‑122899 Search Space Design for E-PDCCH Transmission Scheme NTT DOCOMO Not treated
R1‑122900 36.211 CR0171 (Rel-10, F) Correction for DMRS group hopping and sequence hopping Sharp, Panasonic Agreed
R1‑122901 36.213 CR0381 (Rel-10, F) Correction on transmission mode 9 with a single antenna port transmission Huawei, HiSilicon, CATT, Ericsson, ST-Ercisson, Panasonic, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm Agreed
R1‑122902 36.213 CR0378R3 (Rel-10, F) Correction of FDD channel selection HARQ-ACK and SR transmission Ericsson, ST-Ericsson, CATT, Texas Instruments, LG Electronics Agreed
R1‑122903 Way Forward on localized transmission fallback to distributed transmission on ePDCCH CATT, CATR, CMCC, Potevio, Samsung, Panasonic, Intel, Alcatel Lucent, Altcatel Lucent Shanghai Bell, ASUSTeK, Renesas Mobile Europe Ltd., InterDigital, ITRI Not treated
R1‑122904 WF on ePDCCH building block CATT, CATR, LG Electronics, Potevio, Huawei, HiSilicon, CMCC, Qualcomm Noted
R1‑122905 Joint proposal on SRS transmission with multiple TA – full overlap case LG Electronics, CATT, Ericsson, ST-Ericsson, ZTE, Pantech Noted
R1‑122906 Channel coding for periodic CSI and HARQ-ACK on PUCCH format 3 Huawei, HiSilicon Not treated
R1‑122907 WF on ePDCCH InterDigital, Ericsson, ST-Ericsson, NTT DoCoMo, Renesas Mobile Europe Ltd., Panasonic, Pantech, Intel, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom, KDDI, Texas Instruments Noted
R1‑122908 Evaluation of TDD traffic adaptive DL-UL reconfiguration in the co-channels macro and pico scenario Huawei, HiSilicon Not treated
R1‑122909 Methods to support different time scales for TDD UL-DL reconfiguration Huawei, HiSilicon Not treated
R1‑122910 Draft LS on the RAN1 agreements on Further Enhancements to Cell_FACH for HSPA Qualcomm Incorporated Noted - Revised
R1‑122911 25.214 Rel-11 CR Introduction of Further Enhancements of CELL_FACH Qualcomm Incorporated Withdrawn
R1‑122912 25212 CR0307R1 (Rel-11, F), Addition of missing 8C-HSDPA CQI reporting case indices Nokia Siemens Networks Agreed
R1‑122913 25.214 CR0679R1 (Rel-11, F) Clarification of TPI timing for UL CLTD ZTE, Huawei, HiSilicon, Qualcomm Incorporated, Research In Motion UK Limited, Nokia Siemens Networks, Ericsson, ST-Ericsson Revised
R1‑122914 Draft LS on the RAN1 agreements on Four Branch MIMO transmission for HSDPA Ericsson Revised
R1‑122915 25.214 CR0679R2 (Rel-11, F) Clarification of TPI timing for UL CLTD ZTE, Huawei, HiSilicon, Qualcomm Incorporated, Research In Motion UK Limited, Nokia Siemens Networks, Ericsson, ST-Ericsson Agreed
R1‑122916 LS on RAN1 agreements on MIMO with 64QAM for HSUPA RAN1, Nokia Siemens Networks Agreed
R1‑122917 void - Withdrawn
R1‑122918 void - Withdrawn
R1‑122919 void - Withdrawn
R1‑122920 void - Withdrawn
R1‑122921 void - Withdrawn
R1‑122922 void - Withdrawn
R1‑122923 void - Withdrawn
R1‑122924 void - Withdrawn
R1‑122925 void - Withdrawn
R1‑122926 void - Withdrawn
R1‑122927 void - Withdrawn
R1‑122928 void - Withdrawn
R1‑122929 void - Withdrawn
R1‑122930 Summary of email discussion [69-10]: Details of collision handling and compression/multiplexing in case of 2 or more CSIs being configured in the same reporting instance for CoMP CSI feedback Fujitsu Noted
R1‑122931 Summary of email discussion [69-11]: FFS aspects of aperiodic CSI feedback for CoMP Fujitsu Noted
R1‑122932 void - Withdrawn
R1‑122933 void - Withdrawn
R1‑122934 void - Withdrawn
R1‑122935 void - Withdrawn
R1‑122936 void - Withdrawn
R1‑122937 void - Withdrawn
R1‑122938 void - Withdrawn
R1‑122939 void - Withdrawn
R1‑122940 Way Forward PUCCH format 1b with channel selection Transmit Diversity Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, RIM, LGE Not treated
R1‑122941 Remaining details for S-E-DPDCH and S-DPCCH power setting InterDigital Communications, LLC Noted
R1‑122942 36.213 CR0380 (Rel-11, B) CR for Additional special subframe CMCC, Huawei, HiSilicon, CATT Noted - Revised
R1‑122943 36.211 CR0170R1 (Rel-11, B) CR on additional special configuration CMCC, CATT, Huawei, HiSilicon Noted - Revised
R1‑122944 TP for TR36.828 section 8 CATT Agreed
R1‑122945 Calibration results of multi-cell scenario for LTE TDD DL-UL Interference Management and Traffic Adaptation Rapporteur (Huawei) Not treated
R1‑122946 WF on PUSCH DMRS Signaling ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATR,CHTTL, Potevio, HTC, Qualcomm, Texas Instrument, Motorola Mobility Noted
R1‑122947 Further consideration on uplink control for CoMP Texas Instruments Not treated
R1‑122948 TP for TR36.828 section 7 CATT Agreed
R1‑122949 TP for TR36.828 section 9 CATT Agreed
R1‑122950 TR36.828 v2.0.0 for Rel-11 FS_LTE_TDD_eIMTA CATT Agreed
R1‑122951 WF on Interference measurement in Rel-11 NTT DOCOMO, AT&T, Deutsche Telekom, KT, Vodafone, Institute for Infocomm Research, NEC group, Panasonic, Sharp, Sony Noted
R1‑122952 WF on CQI definition in Rel-11 NTT DOCOMO Noted
R1‑122953 Interference measurement mechanisms for Rel-11 NTT DOCOMO Not treated
R1‑122954 DL Timing Reference for UL CoMP Motorola Mobility Not treated
R1‑122955 Way Forward on Interference Measurements and Rel-11 CQI Huawei, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, HiSilicon, Hitachi, Intel, NEC, Nokia, Nokia Siemens Networks, Samsung, ZTE Noted
R1‑122956 WF on CQI definition CATT, CMCC, LG Electronics, Nokia, Nokia Siemens Networks Noted
R1‑122957 Analysis on TTI bundling enhancement for medium rate PUSCH China Telecom, China Unicom Not treated
R1‑122958 Way Forward on CSI-RS Restriction Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, ETRI, Fujitsu, KT, New Postcom, Panasonic, Pantech, Qualcomm Noted
R1‑122959 Update to 3GPP TR 36.888 to include agreements Vodafone Group Noted
R1‑122960 Summary of the ad-hoc session on quasi-co-located antenna ports Ad-hoc chair (Ericsson) Endorsed
R1‑122961 Way Forward on PDSCH DMRS Sequence Huawei, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, HiSilicon, Nokia, Nokia Siemens Networks,Qualcomm, ST-Ericsson Noted
R1‑122962 WF on PUSCH DMRS parameter details LG Electronics, CATT, ETRI, Huawei, HiSilicon, Intel, InterDigital, KDDI, Nokia, Nokia Siemens Networks, Pantech, Qualcomm, Samsung Noted
R1‑122963 WF on PUSCH DMRS enhancement LG Electronics, Ericsson, ST-Ericsson, ETRI, Intel, InterDigital, Panasonic, Samsung, Sharp Noted
R1‑122964 Way forward on SRS power control LG Electronics, Fujitsu, InterDigital, New Postcom, Pantech, Research In Motion, Samsung, Sharp Noted
R1‑122965 Remaining issues on CoMP timing Samsung Noted
R1‑122966 WF on HARQ-ACK transmission for TDD inter-band CA CATT, Ericsson, ST-Ericsson Noted
R1‑122967 SRS power control for UL CoMP InterDigital Communications, LLC Not treated
R1‑122968 PUCCH resource for ePDCCH Sharp Noted
R1‑122969 Draft LS on Multiflow Timing Qualcomm Noted - Revised
R1‑122970 WF on Power Control Huawei, Ericsson, ETRI, HiSilicon, Hitachi, HTC, Intel Corporation, InterDigital, ITRI, KDDI, KT, LG Electronics, LG-Ericsson, Mediatek, New Postcom, Pantech, Research In Motion, Samsung, Sharp, ST-Ericsson Noted
R1‑122971 Way forward on DL resource assignment on resources including E-PDCCH LG Electronics, CATT, Intel, Pantech Withdrawn
R1‑122972 Way Forward on ePDCCH Antenna Port Huawei, HiSilicon, LG Electronics, RIM, Panasonic Noted
R1‑122973 25.211 CR0295 (Rel-11, B) Introduction of HSDPA Multiflow Nokia Siemens Networks Agreed in principle
R1‑122974 25.212 CR0308 (Rel-11, B) Introduction of HSDPA Multiflow Nokia Siemens Networks Agreed in principle
R1‑122975 25.213 CR0113 (Rel-11, B) Introduction of HSDPA Multiflow Nokia Siemens Networks Agreed
R1‑122976 25.214 CR0685 (Rel-11, B) Introduction of HSDPA Multiflow Nokia Siemens Networks Agreed in principle
R1‑122977 Way forward on AP association Ericsson, ST-Ericsson, Samsung, InterDigital, Alcatel-Lucent, Alcatel Lucent Shanghai Bell Noted
R1‑122978 WF on SRS Power Control enhancement CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, CATR, CHTTL, CMCC, Motorola Mobility, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, Qualcomm, ZTE Noted
R1‑122979 WF on ePDCCH search space Panasonic, Sharp, NTT DOCOMO Noted
R1‑122980 Details about UL DMRS configuration and signaling Ericsson, ST-Ericsson Noted
R1‑122981 Way Forward on UE-specific configurations for SRS KDDI, CATT, Ericsson, HTC, InterDigital, LG Electronics, New Postcom, Nokia, Nokia Siemens Networks, Panasonic, Qualcomm, Research In Motion, Samsung, Sharp, ST-Ericsson, ZTE Noted
R1‑122982 Way Forward on frequency hopping for aperiodic SRS KDDI, Ericsson, LG Electronics, NEC Group, NTT DOCOMO, Nokia Siemens Networks, Nokia, Panasonic, Sharp, ST-Ericsson Not treated
R1‑122983 WF on PUCCH enhancement Panasonic, ETRI, Huawei, HiSilicon, Intel, InterDigital, KDDI, Motorola Mobility, Pantech, Qualcomm Noted
R1‑122984 Discussion on CSI feedback modes for CoMP Hitachi Ltd. Not treated
R1‑122985 Way Forward on SRS Power Control Huawei, Ericsson, HiSilicon, ST-Ericsson Noted
R1‑122986 [DRAFT] LS on Low-Cost MTC UEs based on LTE Huawei Noted - Revised
R1‑122987 Text proposal for TR 36.888 on restriction of techniques to low performance MTC Ues Telecom Italia Noted
R1‑122988 Recommendation on defining an MTC specific UE category Telecom Italia Not treated
R1‑122989 Response LS on UL positioning parameters RAN3, TruePosition Noted
R1‑122990 LS on Definition of LMU as Physical Node RAN3, Ericsson Noted
R1‑122991 Way Forward on ePDCCH Antenna Port LG Electronics, CATT, MediaTek Noted
R1‑122992 WF on signalling details for reduced power ABS Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Fujitsu, Hitatchi Ltd., Intel, LG Electronics, MediaTek Inc., Motorola Mobility, NEC Group, NTT DOCOMO, Panasonic, Qualcomm Inc., Renesas Mobile Europe Ltd., ST-Ericsson, ZTE Revised
R1‑122993 WF on X2 signalling for reduced power ABS for feICIC ZTE, CMCC, Ericsson, Hitachi, Renesas Mobile Europe Ltd, ST-Ericsson Noted
R1‑122994 Summary of UL COMP Ad-hoc Session Ad-hoc chairman (Samsung) Endorsed
R1‑122995 Summary of PUCCH TxD and CA TDD Session Ad-hoc chairman (Samsung) Endorsed
R1‑122996 Summary of DL CoMP RS session Ad-hoc chairman (NTT DoCoMo) Endorsed
R1‑122997 Summary of FeICIC session Ad-hoc chairman (NTT DoCoMo) Endorsed
R1‑122998 Summary of CoMP feedback session Ad-hoc chairman (Samsung) Endorsed
R1‑122999 WF on cell detection in FeICIC LG Electronics, New Postcom, ETRI Not treated
R1‑123000 Way Forward on reduced power ABS Huawei, CMCC, HiSilicon, KDDI, Nokia Siemens Networks, Sharp Noted
R1‑123001 WF on UE behaviour for colliding CRS scenario Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Nokia Siemens Networks, Qualcomm, Renesas Mobile Europe Ltd, Samsung, ST-Ericsson Noted
R1‑123002 On signalling for reduced power ABS ZTE Not treated
R1‑123003 Way forward on system information detection CMCC, CATT, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE,LGE, CATR Noted
R1‑123004 WF on the recommendation of Coverage Enhancements China Telecom, China Unicom, AT&T, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Huawei, HiSilicon, InterDigital, LG Electronics, Intel, Nokia, Nokia Siemens Networks, ZTE Noted
R1‑123005 LS response on the CP length assumption with FeICIC RAN4, Ericsson Noted
R1‑123006 Text proposal on reduction of supported downlink transmission modes for Section 6.7 of TR 36.888 Huawei, HiSilicon (Rapporteur) Noted - Revised
R1‑123007 Text Proposal for clause 8 of 3GPP TR 36.888 Vodafone Group, Orange, [Telecom Italia] Noted - Revised
R1‑123008 WF on Synchronized Carrier in NCT LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Panasonic, CATT, New Postcom, ZTE, Huawei, HiSilicon, NTT Docomo, China Telecom, Pantech Not treated
R1‑123009 Harmonized proposal for SRS power control LG Electronics, CATT, CHTTL, ETRI, Huawei, HiSilicon, HTC, InterDigital, New Postcom Not treated
R1‑123010 [DRAFT] LS on Low-Cost MTC UEs based on LTE Huawei Noted - Revised
R1‑123011 Way Forward on timing for UL CoMP ZTE, CATT, Qualcomm, Texas Instruments Noted
R1‑123012 WF on Handling of PSS/SSS and DM RS in NCT Intel Corporation, Samsung, InterDigital Communications, ITRI, Broadcom, NEC, ETRI, III Noted
R1‑123013 WF on PUCCH Format 1a/1b resource allocation for ePDCCH based HARQ-ACKs Sharp, Nokia Siemens Networks, Nokia, Pantech, Samsung Noted
R1‑123014 Summary of offline discussions on CSI-RSRP measurements for CoMP Huawei Noted
R1‑123015 Summary of ad-hoc session on AI 6.4 Further Enhancements for Cell_FACH Rapporteur (Alcatel-Lucent) Endorsed
R1‑123016 Way Forward on Aperiodic CSI Feedback for CoMP NEC, CATT, Fujitsu, Hitachi, Huawei, HiSilicon, Intel, LG Electronics, Panasonic, Texas Instruments, ZTE Noted
R1‑123017 void - Withdrawn
R1‑123018 TR36.824 v2.0.0 LTE Coverage Enhancements ChinaTelecom (Rapporteur) Agreed
R1‑123019 WF on simultaneous transmission of multiple CSIs Huawei, Hisilicon, Qualcomm, CATT, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Network, ZTE Not treated
R1‑123020 WF on HARQ-ACK enhancements in Rel-11 CATT, CATR, Nokia Siemens Networks, Nokia, Potevio, ITRI, ZTE, Ericsson, ST-Ericsson, Texas Instruments, InterDigital, Panasonic Not treated
R1‑123021 WF on signalling details for reduced power ABS Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, Ericsson, Fujitsu, Hitatchi Ltd., Intel, LG Electronics, MediaTek Inc., Motorola Mobility, NEC Group, NTT DOCOMO, Panasonic, Qualcomm Inc., Renesas Mobile Europe Ltd., ST-Ericsson, ZTE Noted
R1‑123022 Report of off line discussions on Power Control for multiple TA Panasonic Noted
R1‑123023 Aspect of Pcmax definition from offline discussion on multiple TA LGE Noted
R1‑123024 WF on PDSCH RE Mapping for CoMP LG Electronics, ETRI, Huawei, HiSilicon, Pantech, ZTE Noted
R1‑123025 [DRAFT] LS on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA Panasonic, Alcatel Lucent Noted - Revised
R1‑123026 WF on CoMP Transmission Modes Nokia Siemens Networks, Nokia, ALU, ASB, KDDI, Qualcomm, ZTE Not treated
R1‑123027 Way Forward on ePDCCH location determination Huawei, HiSilicon, Nokia, Nokia Siemens Networks Noted
R1‑123028 Way Forward on CoMP Resource Management Set and CSI-RSRP Definition Huawei, Ericsson, HiSilicon, InterDigital, Samsung, ST-Ericsson Noted
R1‑123029 WF on system information and paging detection CMCC, CATT, LGE, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑123030 Chairman’s notes of the UTRA maintenance, MIMO with 64QAM for HSUPA and LCR TDD HSPA feedback and signaling efficiency enhancement study sessions HSPA session chairman (Nokia Siemens Networks) Endorsed
R1‑123031 Summary of Handling Rel-10 CSI-RS Pattern issues Qualcomm Inc., CATT, Panasonic, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CMCC, Samsung, Ericsson, ST-Ericsson, Nokia Siemens Networks, Nokia For email discussion till RAN#70
R1‑123032 Way forward on mapping PDSCH scheduled by ePDCCH LG Electronics, CATT, Ericsson, ST-Ericsson, MediaTek, NEC, Panasonic, Qualcomm Noted
R1‑123033 [Draft] LS on MIB detection in feICIC CMCC Noted - Revised
R1‑123034 LS on TP for co-existence study of FS_LTE_TDD_eIMTA RAN4, CATT Noted
R1‑123035 Summary of 4-branch MIMO for HSPA session HSPA session chairman (Huawei) Endorsed
R1‑123036 36.212 DraftCR on Correction to CSI request field size in DCI format 0 and DCI format 4 Panasonic, Huawei Noted - Revised
R1‑123037 Draft LS on RAN1 agreements on Multiflow HSDPA Qualcomm Noted - Revised
R1‑123038 Correction to assumed CSI-RS transmissions in subfames used for paging Ericsson, ST-Ericsson, Panasonic Noted - Revised
R1‑123039 Draft LS on specifying paging subframes of any UE in a Cell Ericsson, Panasonic Noted - Revised
R1‑123040 WF on Interference measurement in Rel-11 NTT DOCOMO, AT&T, China Telecom, CMCC, Deutsche Telekom, Vodafone, Ericsson, ST-Ericsson, Fujitsu, Institute for Infocom Research, Hitachi, Motorola Mobility, NEC group, NSN, Nokia, Panasonic, Sharp, Sony, Texas Instruments Noted
R1‑123041 Text Proposal for clause 8 of 3GPP TR 36.888 Vodafone Group, Orange, [Telecom Italia] Noted - Revised
R1‑123042 Draft LS on the RAN1 agreements on Four Branch MIMO transmission for HSDPA Ericsson Noted - Revised
R1‑123043 36.213 CR0380R1 (Rel-11, B) CR for Additional special subframe CMCC Noted - Revised
R1‑123044 Reply LS on UE measurements in support of the two-stage MIMO OTA test method RAN1, Qualcomm Agreed
R1‑123045 LS response on Physical Layer Measurement for Network Positioning RAN4, TruePosition Noted
R1‑123046 void - Withdrawn
R1‑123047 25211 CRdraft, Introduction of UL MIMO and 64QAM Nokia Siemens Networks For email discussion till RAN#70
R1‑123048 25212 CRdraft, Introduction of UL MIMO and 64QAM Nokia Siemens Networks For email discussion till RAN#70
R1‑123049 25213 CRdraft, Introduction of UL MIMO and 64QAM Nokia Siemens Networks For email discussion till RAN#70
R1‑123050 25214 CRdraft, Introduction of UL MIMO and 64QAM Nokia Siemens Networks For email discussion till RAN#70
R1‑123051 Draft LS on UE behavior for colliding CRS scenario Qualcomm Noted - Revised
R1‑123052 LS on the RAN1 agreements on Four Branch MIMO transmission for HSDPA RAN1, Ericsson Agreed
R1‑123053 25.211 Rel-11 CR Introduction of Further Enhancements of CELL_FACH Qualcomm Incorporated For email approval till RAN#70
R1‑123054 25.212 Rel-11 CR Introduction of Further Enhancements of CELL_FACH Qualcomm Incorporated For email approval till RAN#70
R1‑123055 25.214 Rel-11 CR Introduction of Further Enhancements of CELL_FACH Qualcomm Incorporated For email approval till RAN#70
R1‑123056 LS on Multiflow Timing RAN1, Qualcomm Agreed
R1‑123057 LS on RAN1 agreements on Multiflow HSDPA RAN1, Qualcomm Agreed
R1‑123058 LS on MIB detection in feICIC RAN1, CMCC Agreed
R1‑123059 LS on UE behavior for colliding CRS scenario RAN1, Qualcomm Agreed
R1‑123060 LS on Low-Cost MTC UEs based on LTE RAN1, Huawei, Vodafone Agreed
R1‑123061 36.212 CR0138 (Rel-10, F) on Correction to CSI request field size in DCI format 0 and DCI format 4 Panasonic, Huawei Agreed
R1‑123062 36.213 CR0380R2 (Rel-11, B) CR for Additional special subframe CMCC Agreed
R1‑123063 36.211 CR0170R2 (Rel-11, B) CR on additional special configuration CMCC, CATT, Huawei, HiSilicon Agreed
R1‑123064 Text Proposal for clause 8 of 3GPP TR 36.888 Vodafone Group, Orange, Telecom Italia Agreed
R1‑123065 36.211 CR0172 (Rel-10, F) Correction to assumed CSI-RS transmissions in subfames used for paging Ericsson, ST-Ericsson, Panasonic Agreed
R1‑123066 LS on specifying paging subframes of any UE with the cell-specific paging configuration RAN1, Ericsson, Panasonic Agreed
R1‑123067 LS on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA RAN1, Panasonic, Alcatel Lucent Agreed
R1‑123068 TP for TR36.828 section 6 CATT, Huawei, HiSilicon Agreed
R1‑123069 Collection of evaluation results for TR36.828 section 6 CATT Agreed
R1‑123070 Text proposal on reduction of supported downlink transmission modes for Section 6.7 of TR 36.888 Huawei, HiSilicon (Rapporteur) Agreed
R1‑123071 LS response on clarifications on CSI-RS based measurement for CoMP RAN1, Huawei Agreed
R1‑123072 E-mail discussion summary for TP to clause 7 of 3GPP TR 36.888 Vodafone Group Agreed
R1‑123073 Text Proposal for clause 7 of 3GPP TR 36.888 Vodafone Group Agreed
R1‑123074 Text Proposal on some aspects of section 9 of 3GPP TR 36.888 Vodafone Group Agreed
R1‑123075 TR 36.888 v2.0.0 update to include agreements from RAN1#69 Vodafone Group Agreed
R1‑123076 LS on SIB-1 acquisition in feICIC RAN1, CMCC Agreed
R1‑123077 LS on CSI-RSRP and CoMP Resource Management Set RAN1, Huawei Agreed
R1‑123078 LS on RAN1 agreements and CRs on Further Enhancements to CELL_FACH RAN1, Qualcomm Agreed
R1‑123079 void - Withdrawn

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links