3GPP TDocs (written contributions) at meeting
Meeting: R1-68b - 2012-03-26 to 2012-03-30, Jeju
meeting id: R1-68b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑120950 | Draft Agenda for RAN1#68bis meeting | RAN1 Chairman | Approved |
R1‑120951 | Final report of RAN1#68 meeting | MCC Support | Approved |
R1‑120952 | Selected highlights from RAN#55 of relevance to RAN1 | RAN1 Chairman | Noted |
R1‑120953 | LS on the RAN2 Multiflow agreements | RAN2, Nokia Siemens Networks | Noted |
R1‑120954 | LS on CA enhancement status in RAN2 | RAN2, Nokia | Noted |
R1‑120955 | LS on network-based positioning | RAN2, Ericsson | Noted |
R1‑120956 | Reply LS on Capability handling of LTE TDD and FDD modes | RAN2, Qualcomm | Noted |
R1‑120957 | LS reply on DTX detection of PUCCH format 2 | RAN2, NTT DoCoMo | Noted |
R1‑120958 | LS on Channelization scenarios for public protection and disaster relief operations in some parts of the UHF band in accordance with Resolution 646 (WRC-03) | RAN4, Nokia Siemens Networks | Noted |
R1‑120959 | LS on Geographically separated antenna and impact on CSI estimation | RAN4, ST-Ericsson | Noted |
R1‑120960 | A review of ePDCCH support for MTC operation | IPWireless Inc. | Not treated |
R1‑120961 | Analysis of company submissions with resulting Text Proposal for single receive RF chain for low cost MTC UEs | IPWireless Inc. | Noted |
R1‑120962 | Analysis of company submissions with resulting Text Proposal for reduced transmit power for low cost MTC UEs | IPWireless Inc. | Noted |
R1‑120963 | Analysis of company submissions with resulting Text Proposal for half duplex operation for low cost MTC UEs | IPWireless Inc. | Noted |
R1‑120964 | Matrix of Potential MTC LTE UE Cost Reductions | IPWireless Inc. | Not treated |
R1‑120965 | Draft LS response on geographically separated antennas | Huawei | Noted |
R1‑120966 | Evaluation on DL throughput performance for UL signaling enhancement | Huawei, HiSilicon | Noted |
R1‑120967 | Simultaneous transmission of periodic CSI and HARQ-ACK in carrier aggregation | Huawei, HiSilicon | Not treated |
R1‑120968 | Multiple periodic CSI reporting in a subframe | Huawei, HiSilicon | Not treated |
R1‑120969 | Simultaneous transmission of SRS and periodic CSI | Huawei, HiSilicon | Not treated |
R1‑120970 | TxD for format 1b with channel selection | Huawei, HiSilicon | Not treated |
R1‑120971 | PDSCH HARQ timing design for TDD inter-band CA with different UL-DL configurations | Huawei, HiSilicon | Not treated |
R1‑120972 | Cross-carrier scheduling design for TDD inter-band CA with different UL-DL configurations | Huawei, HiSilicon | Not treated |
R1‑120973 | PSS/SSS configurations for additional carrier types | Huawei, HiSilicon | Noted |
R1‑120974 | Consideration on simultaneous transmissions for UL channels in case of MTA | Huawei, HiSilicon | Not treated |
R1‑120975 | Rate matching around CRS of neighbor cells | Huawei, HiSilicon | Not treated |
R1‑120976 | Details of CoMP measurement set | Huawei, HiSilicon | Noted |
R1‑120977 | Inter-CSI-RS-resource feedback for CoMP | Huawei, HiSilicon | Noted |
R1‑120978 | Aggregated CSI feedback for CoMP | Huawei, HiSilicon | Not treated |
R1‑120979 | On CoMP with transmission modes 3 and 4 | Huawei, HiSilicon | Not treated |
R1‑120980 | CQI feedback for CoMP | Huawei, HiSilicon | Not treated |
R1‑120981 | Resource-restricted measurements for CoMP feedback | Huawei, HiSilicon | Not treated |
R1‑120982 | CSI feedback modes for CoMP | Huawei, HiSilicon | Not treated |
R1‑120983 | Resources for interference measurements | Huawei, HiSilicon | Noted |
R1‑120984 | Remaining details of CSI-RS configuration | Huawei, HiSilicon | Noted |
R1‑120985 | Remaining issues for PDSCH DMRS sequence | Huawei, HiSilicon | Not treated |
R1‑120986 | Considerations on DCI for DL CoMP | Huawei, HiSilicon | Not treated |
R1‑120987 | Details of PUSCH DMRS for UL CoMP | Huawei, HiSilicon | Not treated |
R1‑120988 | Enhancements of SRS for Rel-11 | Huawei, HiSilicon | Not treated |
R1‑120989 | Enhancements of SRS power control | Huawei, HiSilicon | Not treated |
R1‑120990 | Email discussion summary for SRS power control | Huawei | Noted |
R1‑120991 | Uplink timing advance for CoMP | Huawei, HiSilicon | Noted |
R1‑120992 | Higher layer signalling requirements for CoMP | Huawei, HiSilicon | Not treated |
R1‑120993 | Scrambling sequence for ePDCCH detection | Huawei, HiSilicon | Noted |
R1‑120994 | Usage of ePDCCH signature for ePDCCH detection | Huawei, HiSilicon | Not treated |
R1‑120995 | Random Beamforming vs. SFBC for ePDCCH | Huawei, HiSilicon | Not treated |
R1‑120996 | Antenna port association for ePDCCH | Huawei, HiSilicon | Noted |
R1‑120997 | Discussion on ePDCCH Common search space | Huawei, HiSilicon | Not treated |
R1‑120998 | UE-specific search space for ePDCCH | Huawei, HiSilicon | Not treated |
R1‑120999 | Discussion on CSI feedback for ePDCCH | Huawei, HiSilicon | Not treated |
R1‑121000 | Discussion on PHICH enhancement | Huawei, HiSilicon | Not treated |
R1‑121001 | Analysis on low-cost MTC UE with a single receive chain | Huawei, HiSilicon | Noted |
R1‑121002 | Transmission power reduction for low cost MTC UE and text proposal | Huawei, HiSilicon, China Unicom | Noted |
R1‑121003 | Consideration on HD-FDD for low-cost MTC | Huawei, HiSilicon, China Unicom | Noted |
R1‑121004 | Text proposal for evaluation methodology | Huawei, HiSilicon, CMCC | Revised |
R1‑121005 | Further discussion on coverage enhancement | Huawei, HiSilicon | Noted |
R1‑121006 | Discussion on HSPA control channel efficiency optimization | TD Tech | Noted |
R1‑121007 | Discussion on HSPA signalling enhancement for more efficient resource usage | TD Tech | Noted |
R1‑121008 | Draft skeleton TR for "HSPA feedback and Signalling Efficiency Enhancements for LCR TDD" | TD Tech | Noted - Revised |
R1‑121009 | On PDCCH enhancements for CA | Ericsson, ST-Ericsson | Not treated |
R1‑121010 | On the use of aperiodic and periodic CSI feedback and the impact of periodic CSI dropping | Ericsson, ST-Ericsson | Noted |
R1‑121011 | Multiplexing periodic CSI with CA A/N based on PUCCH Format 3 | Ericsson, ST-Ericsson | Not treated |
R1‑121012 | On the need for TxD for PUCCH Format 1b with Channel Selection | Ericsson, ST-Ericsson | Noted |
R1‑121013 | Remaining PDSCH HARQ timing issues in aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Not treated |
R1‑121014 | Remaining PDSCH cross-carrier scheduling issues in aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Not treated |
R1‑121015 | Remaining PUSCH issues in aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Not treated |
R1‑121016 | Support of half-duplex operations in aggregation of TDD carriers with different UL/DL configurations | Ericsson, ST-Ericsson | Not treated |
R1‑121017 | Further details on design principle for a CRS-free additional carrier type | Ericsson, ST-Ericsson | Noted |
R1‑121018 | Main scenarios and use cases for additional carrier types | Ericsson, ST-Ericsson | Revised |
R1‑121019 | Synchronization performance on additional carrier types | Ericsson, ST-Ericsson | Noted |
R1‑121020 | Channel Prioritization due to Multiple TA | Ericsson, ST-Ericsson | Not treated |
R1‑121021 | Reference signals for ePDCCH | Ericsson, ST-Ericsson | Noted |
R1‑121022 | Search spaces for ePDCCH | Ericsson, ST-Ericsson | Noted |
R1‑121023 | Multiplexing of DCI messages for ePDCCH | Ericsson, ST-Ericsson | Noted |
R1‑121024 | On the restriction of Transport Channel bits | Ericsson, ST-Ericsson | Not treated |
R1‑121025 | Views on ePHICH | Ericsson, ST-Ericsson | Not treated |
R1‑121026 | Discussion on Antenna Ports Co-location | Ericsson, ST-Ericsson | Noted |
R1‑121027 | Summary of email discussion: [68-08] Details of RRC configuration for UL DMRS sequence and CS hopping | Ericsson, ST-Ericsson | Noted |
R1‑121028 | Details about UL DMRS configuration and signalling | Ericsson, ST-Ericsson | Not treated |
R1‑121029 | Details about SRS configuration and power control | Ericsson, ST-Ericsson | Not treated |
R1‑121030 | Enhancements for UL control signalling | Ericsson, ST-Ericsson | Noted |
R1‑121031 | Link level simulation results of enhanced TTI bundling solution for medium rate PUSCH | China Unicom | Noted |
R1‑121032 | Link level simulation results of enhanced TTI bundling solution for UL VoIP | China Unicom | Noted |
R1‑121033 | Consideration on Signalling Support for Non-zero Transmit Power ABS | China Unicom | Not treated |
R1‑121034 | Issue on Interference Measurement Considering eICIC feature | China Unicom | Not treated |
R1‑121035 | UTDOA Positioning L1 Parameters | TruePosition | Noted |
R1‑121036 | Draft LS Response on network-based positioning | TruePosition | Not treated |
R1‑121037 | Size of CoMP measurement set for per-CSI-RS-resource CSI feedback | ZTE | Not treated |
R1‑121038 | Discussion on inter-CSI-RS resource feedback | ZTE | Not treated |
R1‑121039 | Discussion on aggregated PMI feedback | ZTE | Not treated |
R1‑121040 | Consideration on CoMP support based on CRS | ZTE | Not treated |
R1‑121041 | CQI definition for CoMP | ZTE | Not treated |
R1‑121042 | CSI feedback modes for CoMP | ZTE | Not treated |
R1‑121043 | Evaluation and discussion on interference measurement | ZTE | Noted |
R1‑121044 | CSI-RS based received signal quality measurement set configuration | ZTE | Withdrawn |
R1‑121045 | Details of dynamic selection of DMRS sequence initialization parameter | ZTE | Revised |
R1‑121046 | Considerations on CSI-RS configuration | ZTE | Revised |
R1‑121047 | Downlink control signaling for CoMP | ZTE | Not treated |
R1‑121048 | DMRS enhancement for UL CoMP | ZTE | Not treated |
R1‑121049 | Considerations on the enhancement for SRS | ZTE | Not treated |
R1‑121050 | Consideration for PUCCH enhancement | ZTE | Not treated |
R1‑121051 | Discussion on DMRS for enhanced PDCCH | ZTE | Noted |
R1‑121052 | Discussion on DM-RS based enhanced PDCCH transmission | ZTE | Not treated |
R1‑121053 | Consideration on resource configuration for enhanced PDCCH | ZTE | Noted |
R1‑121054 | Consideration on UE monitoring set | ZTE | Not treated |
R1‑121055 | Mapping design for enhanced PDCCH | ZTE | Not treated |
R1‑121056 | TrCH bits restriction for PDSCH scheduled by enhanced PDCCH | ZTE | Not treated |
R1‑121057 | HARQ timing of PDSCH on SCell for TDD CA with different UL-DL configurations | ZTE | Not treated |
R1‑121058 | Scheduling and HARQ timing for cross-carrier PUSCH scheduling for TDD CA with different UL-DL configurations | ZTE | Not treated |
R1‑121059 | On signalling support for reduced power ABS | ZTE | Not treated |
R1‑121060 | Consideration on PDSCH rate matching around CRS of neighbour cells | ZTE | Not treated |
R1‑121061 | Performance evaluation of TDD allocation reconfiguration in multiple pico-cells | ZTE | Noted |
R1‑121062 | Study of backward compatibility requirement in TDD allocation reconfigruaiton | ZTE | Not treated |
R1‑121063 | SRS PC for UL CoMP | ZTE | Not treated |
R1‑121064 | Consideration on remaining issues related to MTA | ZTE | Not treated |
R1‑121065 | RS for Synchronization on Additional Carrier Types | ZTE | Noted |
R1‑121066 | Performance evaluation of bandwidth reduction and peak rate reduction for low cost MTC UEs | ZTE | Not treated |
R1‑121067 | Evaluation/analysis of single receive RF chain and Text Proposal | ZTE | Noted |
R1‑121068 | Evaluation/analysis of reduction of transmit power and Text proposal | ZTE | Noted |
R1‑121069 | Discussion on enhancement for periodic CSI | ZTE | Not treated |
R1‑121070 | Support of simultaneous transmission for periodic CSI and HARQ-ACK | ZTE | Not treated |
R1‑121071 | Transmit diversity for PUCCH format 1b with channel selection | ZTE | Not treated |
R1‑121072 | Discussion on Compact DCI format in PDCCH | ZTE | Not treated |
R1‑121073 | Discussion on HS-PDSCH resource allocation | CATT | Noted |
R1‑121074 | System level evaluation on compact DCI formats | CATT | Not treated |
R1‑121075 | Enhancements on PDCCH search space for CA-capable UEs | CATT | Not treated |
R1‑121076 | Impact on DL throughput with Rel-10 periodic CSI feedback | CATT | Noted |
R1‑121077 | Discussions on multi-CC periodic CSI reporting in LTE-A Rel-11 | CATT | Not treated |
R1‑121078 | Simultaneous transmission of ACK/NAK and periodic CSI in Rel-11 | CATT | Not treated |
R1‑121079 | Enhancements on UL ACK/NAK in Rel-11 carrier aggregation | CATT | Noted |
R1‑121080 | Transmit diversity for PUCCH format 1b with channel selection | CATT | Noted |
R1‑121081 | TDD inter-band carrier aggregation | CATT | Not treated |
R1‑121082 | Design of additional carrier types in Rel-11 | CATT | Noted |
R1‑121083 | Support of multiple timing advances in LTE-A Rel-11 with CA | CATT | Not treated |
R1‑121084 | UL transmission method with multiple timing advances in Rel-11 | CATT | Not treated |
R1‑121085 | On CoMP measurement set size | CATT | Noted |
R1‑121086 | Discussion on inter-CSI-RS-resource feedback | CATT | Not treated |
R1‑121087 | Discussion on aggregated PMI feedback | CATT | Not treated |
R1‑121088 | CQI definition for CoMP | CATT | Not treated |
R1‑121089 | CQI definition for TDD CoMP | CATT | Not treated |
R1‑121090 | Discussion on CSI feedback modes for CoMP | CATT | Not treated |
R1‑121091 | Discussion on interference measurement resources | CATT | Noted |
R1‑121092 | Consideration on interference measurement | CATT | Noted |
R1‑121093 | UE-specific DM-RS configuration | CATT | Noted |
R1‑121094 | Remaining issues on CSI-RS | CATT | Noted |
R1‑121095 | On downlink control signaling for CoMP | CATT | Not treated |
R1‑121096 | On configuration of UE-specific UL DMRS | CATT | Not treated |
R1‑121097 | SRS enhancement for CoMP | CATT | Not treated |
R1‑121098 | SRS power control for DL and UL CoMP | CATT | Not treated |
R1‑121099 | On PUCCH enhancement | CATT | Not treated |
R1‑121100 | Evaluation of DMRS based distributed transmission for E-PDCCH | CATT | Not treated |
R1‑121101 | Discussion on DMRS associated issues in E-PDCCH | CATT | Noted |
R1‑121102 | Considerations on E-PDCCH search space design | CATT | Noted |
R1‑121103 | Resource determination for E-PDCCH transmission | CATT | Noted |
R1‑121104 | PUCCH resource for E-PDCCH | CATT | Not treated |
R1‑121105 | PDSCH TBS determination for additional TDD special subframe configurations | CATT | Noted |
R1‑121106 | Draft CR on inclusion of additional TDD special subframe configurations | CATT | Not treated |
R1‑121107 | Analysis on single receive RF chain for low-cost MTC LTE UEs | CATT | Noted |
R1‑121108 | Analysis on reduction of transmit power for low-cost MTC LTE UEs | CATT | Noted |
R1‑121109 | Text proposal for evaluation methodology on link budget and cell spectral efficiency for TDD | CATT | Revised |
R1‑121110 | Evaluations on coverage enhancement | CATT | Noted |
R1‑121111 | Evaluation on TDD UL-DL reconfiguration for multiple outdoor pico cell scenario | CATT | Noted |
R1‑121112 | TR skeleton of Rel-11 FS_LTE_TDD_eIMTA | CATT | Noted - Revised |
R1‑121113 | Preliminary link level evaluation of enhanced TTI bundling for data | ZTE | Noted |
R1‑121114 | Preliminary link level evaluation of enhanced TTI bundling for VoIP | ZTE | Noted |
R1‑121115 | Discussions on the need of inter-CSI-RS-resource feedback | New Postcom | Not treated |
R1‑121116 | Discussions on aggregated feedback | New Postcom | Not treated |
R1‑121117 | Discussions on per-cell Rel-8 CRS-based feedback for CoMP | New Postcom | Not treated |
R1‑121118 | CQI definition for CoMP | New Postcom | Not treated |
R1‑121119 | Discussions on interference measurement for CoMP | New Postcom | Not treated |
R1‑121120 | Discussion on Tx-based CRS IC employing rate-matching | New Postcom | Not treated |
R1‑121121 | Discussion on signalling support for non-zero transmit power ABS | New Postcom | Not treated |
R1‑121122 | Phase II evaluations for eIMTA | New Postcom | Revised |
R1‑121123 | Evaluation on diversity schemes for E-PDCCH | New Postcom | Not treated |
R1‑121124 | Discussions on CoMP set | New Postcom | Not treated |
R1‑121125 | CSI feedback modes for CoMP | New Postcom | Not treated |
R1‑121126 | Correction to data and control multiplexing | New Postcom | Noted |
R1‑121127 | Discussions on higher-layer signalling requirements for CoMP | New Postcom | Not treated |
R1‑121128 | Subband based CoMP feedback for DPS | Sony Corporation | Not treated |
R1‑121129 | Evaluation of TTI bundling enhancement for medium rate PUSCH | China Telecom | Noted |
R1‑121130 | Evaluation of TTI bundling enhancement for UL VoIP | China Telecom | Noted |
R1‑121131 | On Signaling Assistance for Cell Detection of FeICIC | China Telecom | Not treated |
R1‑121132 | On REs Mapping Design | China Telecom | Not treated |
R1‑121133 | Evaluation/analysis of single receive RF chain for low-cost MTC | Ericsson, ST-Ericsson | Noted |
R1‑121134 | Evaluation/analysis of reduction of transmit power for low-cost MTC | Ericsson, ST-Ericsson | Noted |
R1‑121135 | Evaluation/analysis of half duplex operation for low-cost MTC | Ericsson, ST-Ericsson | Noted |
R1‑121136 | Further input to cost evaluation/analysis for low-cost MTC | Ericsson, ST-Ericsson | Not treated |
R1‑121137 | TDD CA timing difference handling | Panasonic | Noted |
R1‑121138 | Enhancement of periodic CSI for carrier aggregation | Panasonic | Not treated |
R1‑121139 | UL/DL HARQ-ACK timing for TDD inter-band CA | Panasonic | Not treated |
R1‑121140 | Channels and signals for additional carrier type | Panasonic | Not treated |
R1‑121141 | UE behavior for power limitation in multiple TA | Panasonic | Not treated |
R1‑121142 | SCell PRACH transmission timing | Panasonic | Not treated |
R1‑121143 | L1 autonomous stopping behaviour for SCell | Panasonic | Not treated |
R1‑121144 | Required Signalling for Low Power ABS | Panasonic | Noted |
R1‑121145 | On the Impact of Modulation Restrictions in Low Power ABS | Panasonic | Not treated |
R1‑121146 | Signalling Support for CRS Interference Handling in Low Power ABS | Panasonic | Noted |
R1‑121147 | Discussion on Size of CoMP Measurement Set | Panasonic | Not treated |
R1‑121148 | Non-full buffer SU-JT Performance Evaluation of aggregated CQI and co-phasing | Panasonic | Not treated |
R1‑121149 | CQI Definition for CoMP | Panasonic | Not treated |
R1‑121150 | Interference Measurement for Flexible CoMP Operations in Rel-11 | Panasonic | Noted |
R1‑121151 | Discussion on CoMP Measurements | Panasonic | Noted |
R1‑121152 | Further details on DMRS sequence design | Panasonic | Not treated |
R1‑121153 | Further discussion on CSI-RS configuration for CoMP | Panasonic | Not treated |
R1‑121154 | eNB configurations for multiple CSI reporting | Panasonic | Not treated |
R1‑121155 | DCI for Rel-11 CoMP operation | Panasonic | Not treated |
R1‑121156 | Enhancement of PUSCH DMRS orthogonality | Panasonic | Not treated |
R1‑121157 | Discussion on SRS power control enhancement for Rel.11 | Panasonic | Not treated |
R1‑121158 | PUCCH enhancement for UL CoMP | Panasonic | Not treated |
R1‑121159 | CoMP uplink timing advance | Panasonic | Not treated |
R1‑121160 | Further discussion on reference signal for ePDCCH | Panasonic | Noted |
R1‑121161 | ePDCCH performance analysis on Tx diversity | Panasonic | Not treated |
R1‑121162 | Consideration on search space design for ePDCCH | Panasonic | Not treated |
R1‑121163 | Multiplexing of ePDCCHs and ePDCCH RE mapping | Panasonic | Not treated |
R1‑121164 | Restrict the maximum TBS receivable in a TTI | Panasonic | Not treated |
R1‑121165 | Evaluation of diversity gain for different antenna configuration | Panasonic | Noted |
R1‑121166 | Performance of time and frequency tracking in unsynchronized new carriers | MediaTek | Noted |
R1‑121167 | Necessity of higher layer signaling for CRS IC | MediaTek | Not treated |
R1‑121168 | Cell search under 9dB cell selection bias | MediaTek | Not treated |
R1‑121169 | eCCE structure of ePDCCH | MediaTek | Not treated |
R1‑121170 | ePDCCH performance analysis for TxD transmission schemes | MediaTek | Not treated |
R1‑121171 | Utilization of DRS antenna ports for diversity and beamforming schemes in ePDCCH | MediaTek | Not treated |
R1‑121172 | Search space design for ePDCCH | MediaTek | Not treated |
R1‑121173 | Physical structure for DCI multiplexing in ePDCCH | MediaTek | Not treated |
R1‑121174 | On the size of CoMP measurement set | MediaTek | Not treated |
R1‑121175 | On the need of aggregated CQI and inter-CSI-RS-resource feedback | MediaTek | Not treated |
R1‑121176 | Inter-CSI-RS-reosurce feedback for rank-2 CoMP transmission | MediaTek | Not treated |
R1‑121177 | Aggregated PMI feedback and configuration | MediaTek | Not treated |
R1‑121178 | CQI for multi-CSI-RS-resource feedback | MediaTek | Not treated |
R1‑121179 | Periodic CSI feedback | MediaTek | Not treated |
R1‑121180 | Interference measurement for CoMP | MediaTek | Noted |
R1‑121181 | CoMP measurement reporting | MediaTek | Not treated |
R1‑121182 | Analysis of single receive RF chain | MediaTek | Noted |
R1‑121183 | Analysis of reduction in transmit power | MediaTek | Not treated |
R1‑121184 | Analysis of half duplex operation | MediaTek | Noted |
R1‑121185 | Correction to resource mapping for PDSCH | Fujitsu | Noted - Revised |
R1‑121186 | On the need for inter-CSI-RS-resource feedback | Fujitsu | Not treated |
R1‑121187 | Discussion on CQI definition and Rank reporting for DL CoMP | Fujitsu | Not treated |
R1‑121188 | CSI-RS Patterns for Interference Measurements for CoMP | Fujitsu | Noted |
R1‑121189 | Multiple TA Challenges | Fujitsu | Not treated |
R1‑121190 | Discussion on PRS within a CSI-RS resource | Fujitsu | Noted |
R1‑121191 | Antenna ports for ePDCCH detection | Fujitsu | Noted |
R1‑121192 | Diversity schemes for distributed ePDCCH transmission | Fujitsu | Not treated |
R1‑121193 | Summary of email discussion on CSS on ePDCCH | Fujitsu | Noted |
R1‑121194 | Motivation, requirements and design for CSS on ePDCCH | Fujitsu | Not treated |
R1‑121195 | UE-specific Search Space Design for ePDCCH | Fujitsu | Not treated |
R1‑121196 | Multiplexing of DCIs for localized and distributed ePDCCH transmission | Fujitsu | Not treated |
R1‑121197 | Discussion on efficient transmission schemes for ePDCCH | Fujitsu | Noted |
R1‑121198 | Multiplexing efficiency of ePDCCH | Fujitsu | Noted |
R1‑121199 | Requirements and signalling for configuration of UESSS and CSS on ePDCCH | Fujitsu | Not treated |
R1‑121200 | Cross-subframe scheduling by ePDDCH for large PDSCH size | Fujitsu | Not treated |
R1‑121201 | Motivation, requirements and design for ePHICH | Fujitsu | Not treated |
R1‑121202 | Motivation, requirements and design for ePCFICH | Fujitsu | Not treated |
R1‑121203 | On multi-cell periodic CSI reporting | Texas Instruments | Not treated |
R1‑121204 | Multiplexing Periodic CSI and HARQ-ACK on PUCCH | Texas Instruments | Not treated |
R1‑121205 | Network assistance for cell detection for 9 dB bias | Texas Instruments | Noted |
R1‑121206 | Consideration on aggregated PMI feedback for DL CoMP | Texas Instruments | Not treated |
R1‑121207 | Consideration on the CQI defition for CoMP feedback | Texas Instruments | Not treated |
R1‑121208 | CSI feedback modes for DL CoMP | Texas Instruments | Not treated |
R1‑121209 | SRS power control for CoMP | Texas Instruments | Not treated |
R1‑121210 | Uplink control enhancements for CoMP | Texas Instruments | Not treated |
R1‑121211 | On the Need for Timing Advance Specification Changes for UL CoMP | Texas Instruments | Not treated |
R1‑121212 | On the Need for Transmit Diversity in ePDCCH Transmission | Texas Instruments | Not treated |
R1‑121213 | Mapping and Multiplexing of E-PDCCH | Texas Instruments | Not treated |
R1‑121214 | Design considerations for an enhanced PHICH | Texas Instruments | Not treated |
R1‑121215 | Response to LS on network-based positioning | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121216 | Response to LS on geographically separated antennas | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121217 | Remaining issues of pilot design for 4-branch HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121218 | Remaining details of codeword-to-layer mapping for 4-branch HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121219 | Considerations on common E-RGCH for signalling based inter-cell interference control in CELL_FACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121220 | Dynamic Activation and De-activation of MF-HSDPA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121221 | Rank 2 transmission for UL MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121222 | Considerations on transport block sizes for UL MIMO rank 2 transmissions | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121223 | Precoding for the S-E-DPCCH for UL MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121224 | UE Rank Indication for UL MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121225 | Power control for UL MIMO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121226 | Discussion on Periodic CSI Dropping in Carrier Aggregation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121227 | PUCCH format 1b with channel selection Tx Diversity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121228 | Discussion on remaining issues on support of different TDD UL-DL configurations on different bands | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121229 | RS for unsynchronised new carriers | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121230 | Remaining issues of PSS and SSS for unsynchronised new carriers | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121231 | On synchronised new carriers | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121232 | Draft CR to 36.213 for physical layer aspects of multiple TA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121233 | Remaining issues for reduced-power ABS | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121234 | Evaluations of Non-Zero Power ABS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121235 | Further Consideration of CRS Processing in FeICIC | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121236 | 36.214 CR0018r3 UL Relative Time of Arrival | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121237 | Size of CoMP measurement set for per-CSI-RS-resource CSI feedback | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121238 | Further analysis of inter-CSI-RS-resource feedback | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121239 | CQI definition for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121240 | CSI feedback modes for CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121241 | Interference measurement for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121242 | Definition of CSI-RS based received signal quality measurement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑121243 | Remaining issues for Downlink reference signals for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121244 | Downlink control signalling and transmission modes for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121245 | SRS power control for UL CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121246 | PUCCH resource allocation for downlink CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121247 | UCI multiplexing on PUSCH for DL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121248 | Timing alignment for UL CoMP | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121249 | Way forward on timing for UL CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Withdrawn |
R1‑121250 | On the need for RACH enhancement for CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121251 | CoMP Coordination | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑121252 | Search space design for ePDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121253 | DCI multiplexing for ePDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121254 | PHICH Enhancements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121255 | On single receive RF chain for low-cost MTC UEs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121256 | On reduction of maximum transmit power for low-cost MTC UEs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121257 | On half duplex operation for low-cost MTC UEs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121258 | Evaluation of TTI bundling enhancements for PUSCH medium data rate | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121259 | Evaluation of TTI bundling enhancements for UL VoIP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121260 | Discussion of HARQ timing and UL grant with dynamic TDD UL-DL configuration | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑121261 | Periodic CSI multiplexing for Carrier Aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑121262 | Multiplexing of periodic CSI and HARQ-ACK for Carrier Aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑121263 | Views on additional A/N bundling when using PUCCH Format 3 | Nokia Siemens Networks, Nokia | Noted |
R1‑121264 | On Performance of PUCCH Format 1b with Channel Selection Transmit Diversity | Nokia Siemens Networks, Nokia | Noted |
R1‑121265 | Views on inter-band CA with different TDD configurations on different bands | Nokia Siemens Networks, Nokia | Not treated |
R1‑121266 | Time/Frequency Tracking Performance on New Carrier Type | Nokia, Nokia Siemens Networks | Noted |
R1‑121267 | Considerations on Unsynchronised New Carrier Types | Nokia Siemens Networks, Nokia | Not treated |
R1‑121268 | PSS/SSS and Unsynchronized New Carrier Type | Nokia Siemens Networks, Nokia | Noted |
R1‑121269 | New Carrier Type for Synchronized Carriers | Nokia Siemens Networks, Nokia | Noted |
R1‑121270 | Performance of low power ABS with MCS restrictions | Nokia Siemens Networks, Nokia | Not treated |
R1‑121271 | CoMP measurement set size | Nokia Siemens Networks, Nokia | Not treated |
R1‑121272 | Transparent support for Inter-CSI-RS resource phase feedback | Nokia, Nokia Siemens Networks | Not treated |
R1‑121273 | On the need for Inter-CSI-RS resource feedback | Nokia Siemens Networks, Nokia | Not treated |
R1‑121274 | On the need for aggregated PMI feedback | Nokia Siemens Networks, Nokia | Not treated |
R1‑121275 | On the need for per-cell Rel-8 CRS based feedback | Nokia Siemens Networks, Nokia | Not treated |
R1‑121276 | CQI definition for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑121277 | CSI feedback modes for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑121278 | Interference measurement support for R11 | Nokia Siemens Networks, Nokia | Noted |
R1‑121279 | CSI-RS based received signal quality measurement definition | Nokia Siemens Networks, Nokia | Noted |
R1‑121280 | DM RS enhancements for CoMP | Nokia Siemens Networks, Nokia | Revised |
R1‑121281 | Downlink control signaling and transmission mode design for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑121282 | On DM RS Enhancements for UL CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑121283 | On Uplink Sounding Enhancements for CoMP | Nokia Siemens Networks, Nokia | Not treated |
R1‑121284 | Configuration of PUCCH for CoMP Enhancement | Nokia Siemens Networks, Nokia | Noted |
R1‑121285 | Demodulation reference signal for ePDCCH | Nokia, Nokia Siemens Networks | Noted |
R1‑121286 | Signaling ePDCCH presence using demodulation reference signals | Nokia, Nokia Siemens Networks | Not treated |
R1‑121287 | Considerations on search spaces | Nokia, Nokia Siemens Networks | Not treated |
R1‑121288 | Multiplexing of ePDCCH for different users | Nokia, Nokia Siemens Networks | Not treated |
R1‑121289 | Control channel region for ePDCCH | Nokia, Nokia Siemens Networks | Not treated |
R1‑121290 | HARQ-ACK resource allocation for data scheduled via ePDCCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑121291 | Analysis of single receive RF chain for low-cost MTC UE | Nokia Siemens Networks, Nokia | Noted |
R1‑121292 | Analysis of reduction of transmit power for low-cost MTC UE | Nokia Siemens Networks, Nokia | Noted |
R1‑121293 | Analysis of half duplex operation for low-cost MTC UE | Nokia Siemens Networks, Nokia | Noted |
R1‑121294 | Reference spectral efficiency for LTE | Nokia Siemens Networks, Nokia | Noted |
R1‑121295 | Bandwidth reduction methods for low-cost MTC | Nokia Siemens Networks, Nokia | Not treated |
R1‑121296 | Comparison of peak rate reduction methods for low-cost MTC | Nokia Siemens Networks, Nokia | Not treated |
R1‑121297 | Transmission modes for low-cost MTC | Nokia Siemens Networks, Nokia | Not treated |
R1‑121298 | Coverage Enhancements for Medium Data Rate | Nokia Siemens Networks, Nokia | Noted |
R1‑121299 | Coverage Enhancements for VoIP | Nokia Siemens Networks, Nokia | Noted |
R1‑121300 | Evaluation results for LTE_TDD_eIMTA in multiple-outdoor Pico cell scenario | Nokia, Nokia Siemens Networks | Noted |
R1‑121301 | Specification Impact of Non-Zero Power ABS | Hitachi Ltd. | Not treated |
R1‑121302 | Discussion on inter-CSI-RS-resource feedback for JT CoMP | Hitachi Ltd. | Not treated |
R1‑121303 | Discussion on Aggregated CSI Feedback | Hitachi Ltd. | Not treated |
R1‑121304 | Consideration on CSI-RS Configurations | Hitachi Ltd. | Not treated |
R1‑121305 | Remaining issues for DL DMRS for CoMP | Hitachi Ltd. | Not treated |
R1‑121306 | DL throughput performance results with CSI dropping and A-CSI | InterDigital Communications, LLC | Noted |
R1‑121307 | Cross-carrier scheduling for TDD inter-band CA | InterDigital Communications, LLC | Not treated |
R1‑121308 | Non cross-carrier scheduling for TDD inter-band CA | InterDigital Communications, LLC | Not treated |
R1‑121309 | Size of CoMP measurement set | InterDigital Communications, LLC | Not treated |
R1‑121310 | CQI definition for CoMP | InterDigital Communications, LLC | Not treated |
R1‑121311 | Interference Measurement in Rel-11 | InterDigital Communications, LLC | Noted |
R1‑121312 | CoMP measurements | InterDigital Communications, LLC | Noted |
R1‑121313 | Remaining issues for downlink reference signals for CoMP | InterDigital Communications, LLC | Not treated |
R1‑121314 | DM-RS for UL CoMP | InterDigital Communications, LLC | Not treated |
R1‑121315 | SRS power control for UL CoMP | InterDigital Communications, LLC | Not treated |
R1‑121316 | Transmission of uplink control signalling | InterDigital Communications, LLC | Not treated |
R1‑121317 | On ePDCCH Reference Signal | InterDigital Communications, LLC | Noted |
R1‑121318 | Consideration on Search Space Design for ePDCCH in Rel-11 | InterDigital Communications, LLC | Noted |
R1‑121319 | On ePDCCH Multiplexing | InterDigital Communications, LLC | Not treated |
R1‑121320 | Discussion on TBS Restriction for ePDCCH | InterDigital Communications, LLC | Not treated |
R1‑121321 | Consideration on ePHICH in Rel-11 | InterDigital Communications, LLC | Not treated |
R1‑121322 | Analysis of Single Rx RF for Low-Cost UE's | InterDigital Communications, LLC | Noted |
R1‑121323 | Analysis of HD FDD for Low-Cost UE's | InterDigital Communications, LLC | Noted |
R1‑121324 | Evaluation results for improved LTE UL VoIP coverage | InterDigital Communications, LLC | Revised |
R1‑121325 | Draft CR to 36.213 on remoral of square brackets | NEC Group | Noted - Revised |
R1‑121326 | Draft CR to 36.213 on removal of duplicated text on sub-sampling | NEC Group | Withdrawn |
R1‑121327 | Draft CR to 36.212 on data and control multiplexing on PUSCH | NEC Group | Noted - Revised |
R1‑121328 | Support of different TDD UL-DL configurations on different bands | NEC Group | Not treated |
R1‑121329 | Configurable Time-Frequency locations for PSS/SSS signals on the NCT | NEC Group | Revised |
R1‑121330 | Signaling support for non-zero transmission power ABS | NEC Group | Not treated |
R1‑121331 | Decision methods of CoMP measurement set and reporting set | NEC Group | Not treated |
R1‑121332 | CQI definition for CoMP TDD system | NEC Group | Not treated |
R1‑121333 | Discussion on interference measurement for CoMP | NEC Group | Not treated |
R1‑121334 | E-PDCCH transmission schemes and performance evaluations | NEC Group | Not treated |
R1‑121335 | DM-RS antenna port association with E-PDCCH detection | NEC Group | Not treated |
R1‑121336 | E-PDCCH resources configurations | NEC Group | Not treated |
R1‑121337 | DCI multiplexing for E-PDCCH | NEC Group | Not treated |
R1‑121338 | ePDCCH with JT/DPS CoMP | NEC Group | Not treated |
R1‑121339 | Evaluations of multi-cell scenario with traffic triggered DL-UL reconfiguration in TDD | NEC Group | Noted |
R1‑121340 | SRS enhancement for CoMP scenario | New Postcom | Not treated |
R1‑121341 | Uplink control signaling for CoMP scenario | New Postcom | Not treated |
R1‑121342 | HARQ-ACK bundling for uplink control signalling enhancement | New Postcom | Not treated |
R1‑121343 | Periodic CSI issues on uplink control signalling enhancement | New Postcom | Not treated |
R1‑121344 | CSI-RS based RRM measurement for additional carrier type | New Postcom | Not treated |
R1‑121345 | Remaining issues for down reference signals for CoMP | New Postcom | Noted |
R1‑121346 | Consideration of remaining issues for 9dB bias | New Postcom | Noted |
R1‑121347 | Discussion on CoMP and FeICIC | New Postcom | Not treated |
R1‑121348 | Methods of PDSCH HARQ-ACK report with LTE TDD inter-band CA | Sharp | Not treated |
R1‑121349 | Comparison between inter-CSI-RS co-phase and aggregated CQI | Sharp | Not treated |
R1‑121350 | DMRS configuration for UL CoMP | Sharp | Not treated |
R1‑121351 | TPC enhancements of SRS and PUCCH for UL-CoMP | Sharp | Not treated |
R1‑121352 | PUCCH resource management for CoMP Scenarios | Sharp | Noted |
R1‑121353 | ePDCCH DMRS | Sharp | Not treated |
R1‑121354 | Common search space in ePDCCH | Sharp | Not treated |
R1‑121355 | PUCCH resource for ePDCCH | Sharp | Not treated |
R1‑121356 | PDSCH HARQ timing for inter-band CA with different TDD UL-DL configuration | Pantech | Not treated |
R1‑121357 | PUSCH HARQ/scheduling timing for inter-band CA with different TDD UL-DL | Pantech | Not treated |
R1‑121358 | Remaining issues on CSI-RS for DL CoMP | Pantech | Not treated |
R1‑121359 | DL DM-RS enhancements for Rel-11 | Pantech | Not treated |
R1‑121360 | Downlink Control signaling to support CoMP | Pantech | Not treated |
R1‑121361 | UL DM-RS enhancements for Rel-11 | Pantech | Not treated |
R1‑121362 | SRS enhancements for CoMP | Pantech | Not treated |
R1‑121363 | Consideration points for SRS power control | Pantech | Not treated |
R1‑121364 | Enhancements on SRS power control | Pantech | Withdrawn |
R1‑121365 | DM RS port and sequence configuration for ePDCCH | Pantech | Not treated |
R1‑121366 | Views on enhanced PHICH | Pantech | Not treated |
R1‑121367 | PUCCH resource allocation in response to E-PDCCH | Pantech | Not treated |
R1‑121368 | RRM measurement set configuration and management | New Postcom | Not treated |
R1‑121369 | Co-located and non-colocated antenna ports | Renesas Mobile Europe Ltd | Noted |
R1‑121370 | Performance impact of four branch MIMO pilot channel design | Renesas Mobile Europe Ltd. | Noted |
R1‑121371 | Feedback design for 4 Branch Downlink MIMO | Renesas Mobile Europe Ltd. | Noted |
R1‑121372 | Discussion on remaining issues of multiflow | Renesas Mobile Europe Ltd. | Noted |
R1‑121373 | Discussion on SG and E-TFC selection for uplink 64QAM MIMO | Renesas Mobile Europe Ltd. | Noted |
R1‑121374 | Discussion on uplink channel structures for uplink 64QAM MIMO | Renesas Mobile Europe Ltd. | Noted |
R1‑121375 | Discussion on downlink channel structures for uplink 64QAM MIMO | Renesas Mobile Europe Ltd. | Not treated |
R1‑121376 | On HARQ-ACK and Periodic CSI Multiplexing in PUCCH Format 3 | Renesas Mobile Europe Ltd | Not treated |
R1‑121377 | On Encoding for HARQ-ACK and Periodic CSI Multiplexing in PUCCH Format 3 | Renesas Mobile Europe Ltd | Not treated |
R1‑121378 | On UL Control Enhancement for Macro-RRH Deployments | Renesas Mobile Europe Ltd | Not treated |
R1‑121379 | Remain Issues on PDSCH HARQ for CC specific TDD configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑121380 | Remain Issues on PUSCH HARQ-scheduling for CC specific TDD configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑121381 | Discussion on DL cross-carrier scheudling for CC specific TDD configuration | Renesas Mobile Europe Ltd | Not treated |
R1‑121382 | On Time Tracking of unsynchronised New Carrier Type | Renesas Mobile Europe Ltd | Noted |
R1‑121383 | On PSS/SSS for LTE Rel-11 New Carrier Type | Renesas Mobile Europe Ltd | Noted |
R1‑121384 | On Transmission Mode for LTE Rel-11 New Carrier Type | Renesas Mobile Europe Ltd | Noted |
R1‑121385 | Discussion on remaining RAN1 work for feICIC | Renesas Mobile Europe Ltd | Not treated |
R1‑121386 | Size of CoMP measurement set | Renesas Mobile Europe Ltd | Noted |
R1‑121387 | Inter CSI-RS resource feedback | Renesas Mobile Europe Ltd | Not treated |
R1‑121388 | On aggregated CoMP feedabck | Renesas Mobile Europe Ltd | Not treated |
R1‑121389 | DL CoMP rank reporting | Renesas Mobile Europe Ltd | Not treated |
R1‑121390 | CQI feedback options for CoMP | Renesas Mobile Europe Ltd | Not treated |
R1‑121391 | On the CSI feedback modes for CoMP | Renesas Mobile Europe Ltd | Not treated |
R1‑121392 | Further study on interference estimation resources | Renesas Mobile Europe Ltd | Noted |
R1‑121393 | On the configuration of CSI-RS resources for RRM measurement | Renesas Mobile Europe Ltd | Noted |
R1‑121394 | Remaining Issues of Downlink Reference Signals | Renesas Mobile Europe Ltd | Noted |
R1‑121395 | Downlink control signaling for CoMP | Renesas Mobile Europe Ltd | Not treated |
R1‑121396 | Reference signals for ePDCCH | Renesas Mobile Europe Ltd | Noted |
R1‑121397 | Diversity schemes for ePDCCH | Renesas Mobile Europe Ltd | Not treated |
R1‑121398 | On ePDCCH search spaces | Renesas Mobile Europe Ltd | Noted |
R1‑121399 | Resource mapping for ePDCCH | Renesas Mobile Europe Ltd | Not treated |
R1‑121400 | On the need of PHICH enhancements | Renesas Mobile Europe Ltd | Not treated |
R1‑121401 | Further Considerations for Low-Cost MTC LTE UEs | Renesas Mobile Europe Ltd | Not treated |
R1‑121402 | Discussion on additional special subframe configuration for LTE TDD | Ericsson, ST-Ericsson | Noted |
R1‑121403 | Search space design for E-PDCCH | ETRI | Not treated |
R1‑121404 | PUCCH enhancement for CoMP | ETRI | Not treated |
R1‑121405 | Remaining issues for downlink DM RS sequence initialization | ETRI | Not treated |
R1‑121406 | PDSCH RE mapping indication for multi-cell JP CoMP | ETRI | Not treated |
R1‑121407 | Synchronization Signals and Procedure for Unsynchronised New Carriers | HTC | Noted |
R1‑121408 | Aggregation with Synchronised New Carriers | HTC | Noted |
R1‑121409 | Flexible DL DM-RS Configuration for CoMP | HTC | Not treated |
R1‑121410 | Discussion on Reference Signal for E-PDCCH | HTC | Not treated |
R1‑121411 | Search Space Design for E-PDCCH | HTC | Not treated |
R1‑121412 | Discussion on eCCE Definition and Mapping to REs | HTC | Not treated |
R1‑121413 | Half Duplex Operation for Low-Cost MTC UEs | HTC | Not treated |
R1‑121414 | 36.213 CR0378 (Rel-10, F) Correction of FDD channel selection HARQ-ACK and SR transmission | Ericsson, ST-Ericsson | Noted - Revised |
R1‑121415 | Enhancement on Periodic CSI Transmission for Carrier Aggregation | LG Electronics | Not treated |
R1‑121416 | Simultaneous Transmission of HARQ-ACK and CSI on PUCCH Format 3 | LG Electronics | Not treated |
R1‑121417 | Simulation results for joint coding and separate coding for multiplexing HARQ-ACK and CSI on PUCCH format 3 | LG Electronics | Not treated |
R1‑121418 | Support of TxD for PUCCH format 1b with channel selection in Rel-11 | LG Electronics | Not treated |
R1‑121419 | Support of full-duplex operation based TDD CA with different UL-DL configurations | LG Electronics | Not treated |
R1‑121420 | Support of half-duplex operation based TDD CA with different UL-DL configurations | LG Electronics | Not treated |
R1‑121421 | Tracking performance for un-synchronized new carrier | LG Electronics | Not treated |
R1‑121422 | RS transmission for un-synchronized new carrier | LG Electronics | Not treated |
R1‑121423 | Considerations on primary and second synchronization signals for new carrier type | LG Electronics | Withdrawn |
R1‑121424 | Discussion on synchronized new carrier | LG Electronics | Noted |
R1‑121425 | SRS transmission in multiple TA | LG Electronics | Not treated |
R1‑121426 | Power limitation in multiple TA | LG Electronics | Not treated |
R1‑121427 | Text proposal on half-duplex FDD for low-cost MTC UE | LG Electronics | Noted |
R1‑121428 | Text proposal on low cost MTC UE with single RF/RX chain | LG Electronics | Noted |
R1‑121429 | Consideration on necessary signalling for non-zero transmit power ABS | LG Electronics | Not treated |
R1‑121430 | Signaling support for 9dB CRE bias | LG Electronics | Revised |
R1‑121431 | Considerations on CSI Derivation in FeICIC | LG Electronics | Noted |
R1‑121432 | Support for Rate-matching around CRS of Neighbor Cells | LG Electronics | Not treated |
R1‑121433 | Discussions on Interference Coordination between CoMP Clusters | LG Electronics | Not treated |
R1‑121434 | Enhancement to Time-domain Resource Partitioning | LG Electronics | Not treated |
R1‑121435 | Views on Size of CoMP measurement set | LG Electronics | Not treated |
R1‑121436 | Considerations on Inter-CSI-RS-Resource Feedback | LG Electronics | Not treated |
R1‑121437 | Considerations on Aggregated PMI Feedback | LG Electronics | Not treated |
R1‑121438 | Views on per-cell Rel-8 CRS-based feedback | LG Electronics | Not treated |
R1‑121439 | Interference assumption for CoMP CQI calculation | LG Electronics | Not treated |
R1‑121440 | Consideration on CoMP CSI feedback | LG Electronics | Not treated |
R1‑121441 | Consideration on interference measurement for CoMP CSI feedback | LG Electronics | Noted |
R1‑121442 | Consideration on Interference measurement RE configuration | LG Electronics | Revised |
R1‑121443 | CSI-RS based CoMP measurements | LG Electronics | Noted |
R1‑121444 | Dynamic scrambling sequence of DL DM-RS for CoMP | LG Electronics | Noted |
R1‑121445 | Considerations on CSI-RS design for CoMP | LG Electronics | Not treated |
R1‑121446 | Required Downlink Control signaling for CoMP | LG Electronics | Not treated |
R1‑121447 | UL-DMRS enhancements for uplink CoMP | LG Electronics | Revised |
R1‑121448 | SRS Enhancements for CoMP | LG Electronics | Not treated |
R1‑121449 | SRS power control issues for CoMP | LG Electronics | Not treated |
R1‑121450 | PUCCH enhancements for UL-CoMP | LG Electronics | Not treated |
R1‑121451 | Multiple UL timing control | LG Electronics | Not treated |
R1‑121452 | Higher layer signalling requirements for CoMP | LG Electronics | Withdrawn |
R1‑121453 | Details of Reference Signals for E-PDCCH | LG Electronics | Not treated |
R1‑121454 | On the Necessity of Common Search Space on E-PDCCH | LG Electronics | Not treated |
R1‑121455 | E-PDCCH Search Space Configuration | LG Electronics | Not treated |
R1‑121456 | Multiplexing of Different DCI Messages | LG Electronics | Not treated |
R1‑121457 | On DL resource assignment overlapping with E-PDCCH transmissions | LG Electronics | Not treated |
R1‑121458 | Discussion on the TBS size restriction | LG Electronics | Not treated |
R1‑121459 | Considerations on E-PHICH/E-PCFICH design, discussion and decision | LG Electronics | Not treated |
R1‑121460 | Performance Evaluation for LTE_TDD_eIMTA in Multi-cell Scenario | LG Electronics | Not treated |
R1‑121461 | Issues in Further Enhancements to LTE TDD | LG Electronics | Not treated |
R1‑121462 | Deployment scenarios for additional carrier | Ericsson, ST-Ericsson | Noted |
R1‑121463 | UL Control Signaling for Rel-11 CA Enhancement | NTT DoCoMo | Not treated |
R1‑121464 | PDCCH enhancement for different TDD UL-DL configuration on different bands | NTT DoCoMo | Not treated |
R1‑121465 | Views on DL RSs for Unsynchronized New Carrier | NTT DoCoMo | Not treated |
R1‑121466 | Views on Synchronized New Carrier | NTT DoCoMo | Noted |
R1‑121467 | UL transmissions in case of power limitation for multiple TA | NTT DoCoMo | Not treated |
R1‑121468 | Size of CoMP measurement set for Rel-11 CoMP | NTT DoCoMo | Not treated |
R1‑121469 | CSI feedback scheme for Rel-11 CoMP | NTT DoCoMo | Not treated |
R1‑121470 | CQI definition for CoMP | NTT DoCoMo | Not treated |
R1‑121471 | Investigation of Enhanced Interference Measurement Mechanism for Rel-11 | NTT DoCoMo | Noted |
R1‑121472 | DL RS for Rel-11 CoMP | NTT DoCoMo | Noted |
R1‑121473 | Views on UL RS for UL CoMP | NTT DoCoMo | Not treated |
R1‑121474 | DM-RS Antenna Port Association for E-PDCCH in Rel-11 | NTT DoCoMo | Noted |
R1‑121475 | Usage of DM-RS Antenna Port for E-PDCCH Transmission Scheme | NTT DoCoMo | Not treated |
R1‑121476 | On the Need of Common Search Space for E-PDCCH | NTT DoCoMo | Not treated |
R1‑121477 | Resource Mapping Scheme for E-PDCCH | NTT DoCoMo | Noted |
R1‑121478 | Search Space Design for E-PDCCH | Research In Motion UK Limited | Not treated |
R1‑121479 | Support Common Control Channel in E-PDCCH | Research In Motion UK Limited | Not treated |
R1‑121480 | DMRS Port Assignment for E-PDCCH | Research In Motion UK Limited | Noted |
R1‑121481 | Other Control Channel for E-PDCCH | Research In Motion UK Limited | Not treated |
R1‑121482 | Benefits of Transmit Diversity for Channel Selection | Research In Motion UK Limited | Noted |
R1‑121483 | Views on UL SRS power control and other enhancements | Research In Motion UK Limited | Not treated |
R1‑121484 | Views on open Issues of HARQ-ACK Timing in Inter-band CA with Different TDD Configurations | Research In Motion UK Limited | Not treated |
R1‑121485 | Spectral efficiency for MTC and Text Proposal | Institute for Information Industry (III) | Not treated |
R1‑121486 | Further Analysis on Traffic Model and Characteristics for MTC and Text Proposal | Institute for Information Industry (III) | Not treated |
R1‑121487 | On Half-Duplex Operation of a Low-cost MTC UE | Fujitsu | Noted |
R1‑121488 | Non-PHY Implications of a Low-cost MTC UE | Fujitsu | Not treated |
R1‑121489 | Discussion on the features and signaling support for non-zero transmit power ABS | Fujitsu | Not treated |
R1‑121490 | Analysis on the potential network assistance for cell detection | Fujitsu | Not treated |
R1‑121491 | Time and frequency synchronization performance evaluation | Huawei, HiSilicon | Noted |
R1‑121492 | Performance evaluation of reduced CRS transmission for additional carrier types | Huawei, HiSilicon | Noted |
R1‑121493 | On the defininition of the synchronized carrier case | Huawei, HiSilicon | Noted |
R1‑121494 | Control signalling for additional carrier types | Huawei, HiSilicon | Not treated |
R1‑121495 | SRS on a PUCCH-less carrier | Huawei, HiSilicon | Not treated |
R1‑121496 | Updated evaluation results and signaling support of reduced power ABS | Huawei, HiSilicon | Noted |
R1‑121497 | Way forward on UL power control | Huawei, HiSilicon | Withdrawn |
R1‑121498 | PUCCH transmission enhancement | Huawei, HiSilicon | Not treated |
R1‑121499 | Issues with PUCCH and PUSCH power control with CoMP reception | Huawei, HiSilicon | Not treated |
R1‑121500 | Multiplexing of different DCI messages for ePDCCH | Huawei, HiSilicon | Noted |
R1‑121501 | Additional special subframe configuration for LTE TDD | Huawei, HiSilicon | Noted |
R1‑121502 | Evaluation of TDD traffic adaptive DL-UL reconfiguration in the multi-cell scenario | Huawei, HiSilicon | Not treated |
R1‑121503 | Email discussion summary for "no support of spatial processing mode" | Huawei | Noted |
R1‑121504 | UL DM-RS Enhancements for UL CoMP | Fujitsu | Not treated |
R1‑121505 | Consideration on SRS enhancement for CoMP | Fujitsu | Not treated |
R1‑121506 | Enhancements of Power Control for SRS and Channels | Fujitsu | Not treated |
R1‑121507 | Considerations on PUCCH Enhancement for UL CoMP | Fujitsu | Not treated |
R1‑121508 | Evaluation of single receive RF chain for low cost MTC LTE UEs | MStar Semiconductor, Inc. | Not treated |
R1‑121509 | Evaluation of reduction of transmit power for low cost MTC LTE UEs | MStar Semiconductor, Inc. | Not treated |
R1‑121510 | Evaluation of half duplex operation for low cost MTC LTE UEs | MStar Semiconductor, Inc. | Not treated |
R1‑121511 | Analysis of interference measurements approaches for Release-11 | Intel Corporation | Not treated |
R1‑121512 | Discussion on aggregated CQI feedback for JT CoMP | Intel Corporation | Not treated |
R1‑121513 | Discussion on CQI definition for CoMP systems | Intel Corporation | Not treated |
R1‑121514 | Further discussion on per CSI-RS resource feedback for JT CoMP | Intel Corporation | Not treated |
R1‑121515 | Discussion on rank indicator (RI) report for CoMP | Intel Corporation | Not treated |
R1‑121516 | Discussion on X2 interface support for CoMP schemes | Intel Corporation | Not treated |
R1‑121517 | Downlink control signaling for DL CoMP | Intel Corporation | Not treated |
R1‑121518 | Discussion on bandwidth configuration of CSI-RS | Intel Corporation | Noted |
R1‑121519 | Signal quality metrics for CoMP RRM measurements | Intel Corporation | Noted |
R1‑121520 | Remaining details of downlink DM-RS | Intel Corporation | Not treated |
R1‑121521 | Discussion on the maximum size of CoMP measurement set | Intel Corporation | Noted |
R1‑121522 | Periodic and aperiodic CSI feedback modes for DL CoMP | Intel Corporation | Not treated |
R1‑121523 | UE-specific Signaling and Configuration for UL DM-RS | Intel Corporation | Noted |
R1‑121524 | SRS Enhancements for UL CoMP | Intel Corporation | Not treated |
R1‑121525 | UL CoMP Control and Signaling Principles | Intel Corporation | Not treated |
R1‑121526 | Discussion on potential coverage enhancement solutions for UL VoIP | Intel Corporation | Noted |
R1‑121527 | Performance analysis of single receive RF chain strategy for low-cost MTC UEs | Intel Corporation | Noted |
R1‑121528 | Performance analysis of reduction of transmit power strategy for low-cost MTC UEs | Intel Corporation | Noted |
R1‑121529 | Performance analysis of DL-UL interference management and traffic adaptation in multi-cell Pico-Pico deployment scenario | Intel Corporation | Noted |
R1‑121530 | HARQ timing design for TDD Inter-band Carrier Aggregation | Intel Corporation | Not treated |
R1‑121531 | Remaining issues of CA for different TDD UL-DL configurations | Intel Corporation | Not treated |
R1‑121532 | Discussions on Reference Symbol Design for New Carrier Types | Intel Corporation | Not treated |
R1‑121533 | Synchronization on Unsynchronized New Carrier | Intel Corporation | Noted |
R1‑121534 | UE-RS Multiplexing for Multiple CCEs | Intel Corporation | Not treated |
R1‑121535 | Analysis of ePDCCH ICIC | Intel Corporation | Noted |
R1‑121536 | Impact of ePDCCH on PDSCH PRB Bundling | Intel Corporation | Not treated |
R1‑121537 | On the definition of distributed ePDCCH | Intel Corporation | Noted |
R1‑121538 | Views on CRS/PDSCH RE Collision in Joint Transmission | Intel Corporation | Not treated |
R1‑121539 | Discussion on Geographically separated antnennas | Qualcomm Inc. | Not treated |
R1‑121540 | Discussion corrections for handling CSI-RS patterns | Qualcomm Inc. | Noted |
R1‑121541 | Draft CR Corrections for handling CSI-RS patterns | Qualcomm Inc. | Noted |
R1‑121542 | DL control channel enhancements for CA operation | Qualcomm Inc. | Not treated |
R1‑121543 | On reducing periodic CSI dropping for CA operation | Qualcomm Inc. | Not treated |
R1‑121544 | On enhanced A/N bundling for CA operation | Qualcomm Inc. | Noted |
R1‑121545 | TxD scheme for PUCCH format 1b with channel selection | Qualcomm Inc. | Not treated |
R1‑121546 | TxD scheme for PUCCH format 3 | Qualcomm Inc. | Not treated |
R1‑121547 | Support of CA for different TDD UL-DL configurations | Qualcomm Inc. | Revised |
R1‑121548 | RS for unsynchronized carriers | Qualcomm Inc. | Revised |
R1‑121549 | PSS/SSS for new carriers | Qualcomm Inc. | Not treated |
R1‑121550 | Synchronized new carrier | Qualcomm Inc. | Not treated |
R1‑121551 | Power control aspects of multiple TA operation | Qualcomm Inc. | Not treated |
R1‑121552 | Signalling support for non-zero transmit power ABS | Qualcomm Inc. | Not treated |
R1‑121553 | Need for transmitter based solutions | Qualcomm Inc. | Not treated |
R1‑121554 | On the size of the CoMP measurement set | Qualcomm Inc. | Not treated |
R1‑121555 | On the need for inter-CSI-RS-resource feedback | Qualcomm Inc. | Not treated |
R1‑121556 | Aggregated PMI feedback for CoMP | Qualcomm Inc. | Not treated |
R1‑121557 | Supporting CRS-based CoMP operation | Qualcomm Inc. | Not treated |
R1‑121558 | CQI definition for downlink CoMP | Qualcomm Inc. | Not treated |
R1‑121559 | CSI feedback reporting in support of CoMP | Qualcomm Inc. | Not treated |
R1‑121560 | Performance of Dynamic Point Selection in HetNet CoMP | Qualcomm Inc. | Revised |
R1‑121561 | Interference measurement in support of downlink CoMP | Qualcomm Inc. | Noted |
R1‑121562 | CoMP measurement set management measurement accuracy | Qualcomm Inc. | Noted |
R1‑121563 | Remaining issues on DL reference signals for CoMP | Qualcomm Inc. | Not treated |
R1‑121564 | Downlink control signaling in support of downlink CoMP | Qualcomm Inc. | Not treated |
R1‑121565 | DM-RS Enhancements in support of Uplink CoMP | Qualcomm Inc. | Not treated |
R1‑121566 | SRS enhancements in support of Uplink CoMP | Qualcomm Inc. | Not treated |
R1‑121567 | SRS power control | Qualcomm Inc. | Not treated |
R1‑121568 | Uplink control signaling for CoMP | Qualcomm Inc. | Not treated |
R1‑121569 | Uplink timing advance | Qualcomm Inc. | Not treated |
R1‑121570 | Reference signals for e-PDCCH | Qualcomm Inc. | Noted |
R1‑121571 | Search space design for e-PDCCH | Qualcomm Inc. | Noted |
R1‑121572 | Multiplexing of different DCI messages for e-PDCCH | Qualcomm Inc. | Noted |
R1‑121573 | Restriction of maximum TrCh bits | Qualcomm Inc. | Not treated |
R1‑121574 | Evaluation of single RF chain in MTC | Qualcomm Inc. | Not treated |
R1‑121575 | Evaluation of Maximum Power Reduction in MTC | Qualcomm Inc. | Not treated |
R1‑121576 | Evaluation of Half Duplex Operation in MTC | Qualcomm Inc. | Noted |
R1‑121577 | Additional Comments on Cost Evaluation of MTC | Qualcomm Inc. | Not treated |
R1‑121578 | Coverage enhancement solution for medium data rate | Qualcomm Inc. | Withdrawn |
R1‑121579 | Coverage enhancement solution for low data rate | Qualcomm Inc. | Withdrawn |
R1‑121580 | Evaluation of outdoor multiple pico-cell scenario | Qualcomm Inc. | Not treated |
R1‑121581 | Evaluation of outdoor multiple macro-cell scenario | Qualcomm Inc. | Not treated |
R1‑121582 | Remaining aspects of non-zero power ABS for FeICIC | Motorola Mobility | Not treated |
R1‑121583 | EPDCCH Design Aspects | Motorola Mobility | Noted |
R1‑121584 | TrCH restriction for EPDCCH | Motorola Mobility | Not treated |
R1‑121585 | Support for Common Search Space on EPDCCH | Motorola Mobility | Not treated |
R1‑121586 | Reference Signals on New Carrier Type | Motorola Mobility | Withdrawn |
R1‑121587 | CQI definition for CoMP | Motorola Mobility | Not treated |
R1‑121588 | Interference measurement for Rel-11 | Motorola Mobility | Not treated |
R1‑121589 | On Uplink DM-RS and CS hopping Configuration | Motorola Mobility | Not treated |
R1‑121590 | PUCCH Enhancements for UL CoMP | Motorola Mobility | Noted |
R1‑121591 | DL Timing Reference for UL CoMP | Motorola Mobility | Not treated |
R1‑121592 | Consideration on DL-control information at low-cost MTC UEs | ETRI | Not treated |
R1‑121593 | Investigation of UL signaling enhancement for Rel-11 CA | KDDI | Noted |
R1‑121594 | Downlink and uplink performance evaluations of reduced transmit power ABS with dynamic range of -9dB | KDDI | Not treated |
R1‑121595 | Considerations on CoMP network deployment and CoMP standardization in LTE Rel-11 | KDDI | Not treated |
R1‑121596 | Signaling Design of DMRS for UL CoMP | KDDI | Not treated |
R1‑121597 | SRS Enhancements for UL CoMP | KDDI | Not treated |
R1‑121598 | Evaluations for Dynamic ACK/NACK on PUCCH for CoMP Scenario 3 and 4 | KDDI | Noted |
R1‑121599 | Reference signal for ePDCCH transmission | KDDI | Noted |
R1‑121600 | Consideration on RE mapping for distributed ePDCCH transmission with transmission diversity | KDDI | Not treated |
R1‑121601 | Intermittent transmission of enhanced downlink control channels | KDDI | Not treated |
R1‑121602 | DL Throughput Gains from a Compact UL DCI Format | Samsung | Not treated |
R1‑121603 | Performance Aspects for Multi-Cell CSI Reporting | Samsung | Noted |
R1‑121604 | PUCCH Support for Multi-Cell Periodic CSI Reporting | Samsung | Not treated |
R1‑121605 | HARQ-ACK and Periodic CSI Multiplexing | Samsung | Not treated |
R1‑121606 | TDD HARQ-ACK Bundling for PUCCH Format 3 | Samsung | Noted |
R1‑121607 | HARQ-ACK feedback Enhancement for TDD configuration 5 | Samsung | Not treated |
R1‑121608 | HARQ-ACK Bundling in PUSCH | Samsung | Not treated |
R1‑121609 | UL DAI Field for DL CA in FDD | Samsung | Not treated |
R1‑121610 | TxD for PUCCH Format 1b with Channel Selection | Samsung | Not treated |
R1‑121611 | UL HARQ-ACK transmission for multiple PDSCHs in TDD CA | Samsung | Not treated |
R1‑121612 | PDSCH HARQ timing | Samsung | Not treated |
R1‑121613 | PUSCH HARQ timing for 10ms RTT cases in Pcell | Samsung | Not treated |
R1‑121614 | PUSCH HARQ timing for non-10 ms RTT cases in Pcell | Samsung | Not treated |
R1‑121615 | Cross subframe scheduling for TDD CA | Samsung | Not treated |
R1‑121616 | Tracking RS for unsynchronised carriers | Samsung | Revised |
R1‑121617 | Synchronization signal mapping for non-backward compatible carriers. | Samsung | Noted |
R1‑121618 | Maximum output power of PAs and power scaling in UL non-contiguous CA | Samsung | Not treated |
R1‑121619 | Further discussions on signalling support for non-zero transmit power ABS | Samsung | Not treated |
R1‑121620 | Discussions on cell detection issues for FeICIC | Samsung | Not treated |
R1‑121621 | Discussion on the size of CoMP measurement set for CSI feedback | Samsung | Noted |
R1‑121622 | CoMP Feedback including preferred-TP indicator | Samsung | Not treated |
R1‑121623 | Feedback support for multiple interference assumptions | Samsung | Not treated |
R1‑121624 | Discussion on CRS-based CoMP | Samsung | Not treated |
R1‑121625 | Definition of CQI in CoMP | Samsung | Not treated |
R1‑121626 | CSI feedback modes for DL CoMP | Samsung | Not treated |
R1‑121627 | Interference Measurement Resource for Downlink CoMP | Samsung | Not treated |
R1‑121628 | Definition of CSI-RS based received signal quality measurement | Samsung | Noted |
R1‑121629 | Dynamic Switching of DMRS Scrambling for Downlink CoMP | Samsung | Noted |
R1‑121630 | CSI-RS measurement restriction for DL CoMP | Samsung | Noted |
R1‑121631 | Downlink power control allocation for CoMP | Samsung | Not treated |
R1‑121632 | Discussions on Interpretation of ns for CSI-RS scrambling | Samsung | Not treated |
R1‑121633 | PDSCH RE mapping for CoMP among multiple cells | Samsung | Not treated |
R1‑121634 | Downlink Control Signaling for CoMP | Samsung | Not treated |
R1‑121635 | Further discussions on enhanced UL DM RS for UL CoMP | Samsung | Not treated |
R1‑121636 | SRS Enhancements for CoMP | Samsung | Not treated |
R1‑121637 | Enhancements to SRS Transmission Power Control for CoMP | Samsung | Not treated |
R1‑121638 | Further discussions on PUCCH transmissions for UL CoMP | Samsung | Revised |
R1‑121639 | UCI Resource Requirements in UL CoMP | Samsung | Not treated |
R1‑121640 | Timing advance for UL CoMP | Samsung | Noted |
R1‑121641 | Further Discussions on DMRS-Based E-PDCCH Transmission | Samsung | Noted |
R1‑121642 | DMRS scrambling for ePDCCH | Samsung | Not treated |
R1‑121643 | Design Principles of E-PDCCH Search Spaces | Samsung | Not treated |
R1‑121644 | Support of Common Search Space for E-PDCCHs | Samsung | Not treated |
R1‑121645 | Further discussion on E-PDCCH structure | Samsung | Not treated |
R1‑121646 | Distributed Operation of Enhanced Control Channels | Samsung | Not treated |
R1‑121647 | HARQ-ACK PUCCH Resources in Response to E-PDCCH Detections | Samsung | Not treated |
R1‑121648 | Restrictions on Maximum Number of TrCH Bits for E-PDCCH Operation | Samsung | Not treated |
R1‑121649 | ePHICH design for Rel-11 | Samsung | Not treated |
R1‑121650 | Enhanced PCFICH | Samsung | Not treated |
R1‑121651 | Additional special subframe configuration for LTE TDD | Samsung | Noted |
R1‑121652 | Analysis of single receive RF chain for low cost MTC UE | Samsung | Noted |
R1‑121653 | Analysis of transmit power reduction for low cost MTC UE | Samsung | Not treated |
R1‑121654 | Impact of BW reduction on Low-cost MTC UE procedures | Samsung | Not treated |
R1‑121655 | Evaluation of TDD dynamic reconfiguration in multi-cell pico scenario | Samsung | Noted |
R1‑121656 | 25.214 CR0672 (Rel-7, F) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑121657 | 25.214 CR0673 (Rel-8, A) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑121658 | 25.214 CR0674 (Rel-9, A) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑121659 | 25.214 CR0675 (Rel-10, A) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑121660 | 25.214 CR0676 (Rel-11, A) Clarification of DTX/DRX activation status upon RRC reconfiguration | Huawei, HiSilicon | Noted |
R1‑121661 | 25.212 CR0306 (Rel-11, F) Clarification of CLTD Features | Huawei, HiSilicon | Agreed |
R1‑121662 | 25.213 CR0112 (Rel-11, F) Clarification of CLTD Features | Huawei, HiSilicon | Noted - Revised |
R1‑121663 | 25.214 CR0677 (Rel-11, F) Clarification of CLTD Features | Huawei, HiSilicon | Noted - Revised |
R1‑121664 | Pilot design for demodulation for 4-branch MIMO | Huawei, HiSilicon | Noted |
R1‑121665 | Evaluation on gating of common pilots | Huawei, HiSilicon | Noted |
R1‑121666 | Layer Mapping with 2 Codewords | Huawei, HiSilicon | Noted |
R1‑121667 | Consideration on HS-DPCCH design | Huawei, HiSilicon | Noted |
R1‑121668 | Evaluation on Codebook Design for 4Tx MIMO | Huawei, HiSilicon | Noted |
R1‑121669 | HS-SCCH order for Stand-alone HS-DPCCH | Huawei, HiSilicon | Noted |
R1‑121670 | Furhter simulation results on TTI alignment between CELL_FACH and CELL_DCH Ues | Huawei, HiSilicon | Noted |
R1‑121671 | Discussion on Common E-RGCH based interference control | Huawei, HiSilicon | Noted |
R1‑121672 | HARQ-ACK codebook for MF-Tx | Huawei, HiSilicon | Noted |
R1‑121673 | Timing aspects of HS-DPCCH feedback | Huawei, HiSilicon | Noted |
R1‑121674 | Further Considerations on (De-)Activation of MF-Tx | Huawei, HiSilicon | Noted |
R1‑121675 | E-TFC selection for UL MIMO | Huawei, HiSilicon | Noted |
R1‑121676 | Considerations on S-E-DPCCH design | Huawei, HiSilicon | Noted |
R1‑121677 | Impact of introducing UL 64QAM to RAN1 specifications | Huawei, HiSilicon | Noted |
R1‑121678 | Simulation results with Uplink 64QAM | Huawei, HiSilicon | Not treated |
R1‑121679 | On the Design of Power Control for UL MIMO | Huawei, HiSilicon | Not treated |
R1‑121680 | On the Downlink Control Information for UL MIMO | Huawei, HiSilicon | Not treated |
R1‑121681 | Further discussion on DMRS for E-PDCCH | Potevio | Not treated |
R1‑121682 | HARQ/Scheduling timing for inter-band CA with different TDD configurations | Potevio | Not treated |
R1‑121683 | Details of physical channel and layer mapping for HSDPA 4 Branch MIMO | InterDigital Communications, LLC | Noted |
R1‑121684 | Timing specification of HS-DPCCH for HSDPA MF-TX | InterDigital Communications, LLC | Noted |
R1‑121685 | Secondary stream and grant control for HSUPA MIMO | InterDigital Communications, LLC | Noted |
R1‑121686 | S-E-DPCCH physical channel mapping for HSUPA MIMO | InterDigital Communications, LLC | Noted |
R1‑121687 | 64QAM Uplink interleaver design for HSUPA | InterDigital Communications, LLC | Noted |
R1‑121688 | Open issues for different TDD UL-DL configurations | ASUSTeK | Not treated |
R1‑121689 | SRS power control for CoMP | ASUSTeK | Not treated |
R1‑121690 | PUCCH Resource Allocation Corresponding to ePDCCH | ASUSTeK | Not treated |
R1‑121691 | Considerations on SRS enhancement for UL CoMP | HTC | Revised |
R1‑121692 | Timing misalignment in CoMP measurement | HTC | Not treated |
R1‑121693 | DM-RS sequence for UL CoMP | HTC | Revised |
R1‑121694 | Consideration on Transmit Power for Low-Cost MTC UEs | China Unicom | Not treated |
R1‑121695 | Consideration on HD-FDD Operation for Low-Cost MTC UEs | China Unicom | Not treated |
R1‑121696 | Considerations on additional special subframe configuration for LTE TDD | CATR | Noted |
R1‑121697 | Consideration on spatial diversity for distributed transmission of ePDCCH | CATR | Not treated |
R1‑121698 | Analysis of omission HARQ for low-cost MTC LTE UEs | Institute for Information Industry (III) | Not treated |
R1‑121699 | Discussion on enhanced PHICH | ITRI | Not treated |
R1‑121700 | Cross-carrier scheduling and HARQ-ACK timing for different TDD UL-DL configurations | ITRI | Revised |
R1‑121701 | Discussion of the benefit in preventing a Rel-8 UE acquiring the PSS/SSS of a carrier of the new type and the associated approaches | ITRI | Not treated |
R1‑121702 | TP for evaluation/analysis of reduction of transmit power | ITRI | Not treated |
R1‑121703 | 25.214 CRdraft (F, Rel-11), Clarification of TPI initiation from other activation states into activation state 1 | ZTE | Noted - Revised |
R1‑121704 | Discussion on stand-alone HS-DPCCH in CELL_FACH | ZTE | Noted |
R1‑121705 | HS-DPCCH timing and HS-PDSCH subframe pairing for MF-HSDPA | ZTE | Noted |
R1‑121706 | Discussion on using HS-SCCH order to dynamic (de-)activate multiflow operation | ZTE | Noted |
R1‑121707 | Procedure of (de-)activation and DTX/DRX for multiflow operation | ZTE | Noted |
R1‑121708 | Recommendation for bandwidth reduction | Huawei, HiSilicon, CMCC | Noted - Revised |
R1‑121709 | Analysis of specification impact of TDD traffic adaptation | Ericsson, ST-Ericsson | Not treated |
R1‑121710 | On TTI bundling improvements for Coverage Enhancements | Ericsson, ST-Ericsson | Noted |
R1‑121711 | Evaluation of multi-cell scenarios for dynamic TDD traffic adaptation | Ericsson, ST-Ericsson | Noted |
R1‑121712 | Discussion on additional special subframe configuration | CMCC | Noted |
R1‑121713 | Discussion on improving system information detection in the presence of dominant interferers | CMCC | Not treated |
R1‑121714 | Discussion on UL Coverage Enhancement for medium data rate | CMCC | Noted |
R1‑121715 | Discussion on the Support of Common Search Space on ePDCCH | CMCC | Not treated |
R1‑121716 | SRS Power Control | CMCC | Not treated |
R1‑121717 | Discussion on reference signal for additional carrier type in Rel-11 | CMCC | Withdrawn |
R1‑121718 | Discussion on HARQ timing design for inter-band TDD CA with different UL-DL configuration | CMCC | Withdrawn |
R1‑121719 | Email summary on inter-band TDD CA | CMCC | Noted |
R1‑121720 | Text proposal for TR 36.888 on restriction of techniques to low performance MTC UEs | Orange, Vodafone | Noted |
R1‑121721 | Downlink Control Signaling for CoMP | Mitsubishi Electric | Not treated |
R1‑121722 | On e-PDCCH mapping | Mitsubishi Electric | Not treated |
R1‑121723 | On the performance of pilot design options | Nokia Siemens Networks | Noted |
R1‑121724 | Impact of VAM on legacy UEs | Nokia Siemens Networks | Noted |
R1‑121725 | UL feedback design for 4-Tx MIMO | Nokia Siemens Networks | Noted |
R1‑121726 | Multiflow CQI reporting formats | Nokia Siemens Networks | Noted |
R1‑121727 | Multiflow HS-DPCCH timing | Nokia Siemens Networks | Noted |
R1‑121728 | Multiflow and DL DRX timing | Nokia Siemens Networks | Noted |
R1‑121729 | Draft 25.211 CR; Introduction of Multiflow | Nokia Siemens Networks | Not treated |
R1‑121730 | Draft 25.212 CR; Introduction of Multiflow | Nokia Siemens Networks | Not treated |
R1‑121731 | Draft 25.213 CR; Introduction of Multiflow | Nokia Siemens Networks | Not treated |
R1‑121732 | Draft 25.214 CR; Introduction of Multiflow | Nokia Siemens Networks | Not treated |
R1‑121733 | Scheduling and rank selection | Nokia Siemens Networks | Noted |
R1‑121734 | S-E-DPCCH performance with different precoding vectors | Nokia Siemens Networks | Noted |
R1‑121735 | Channel estimation and power control rate impact on HSUPA system performance | Nokia Siemens Networks | Not treated |
R1‑121736 | MIMO HARQ operation | Nokia Siemens Networks | Noted |
R1‑121737 | MIMO and soft handover | Nokia Siemens Networks | Not treated |
R1‑121738 | 16QAM to 64QAM switching point | Nokia Siemens Networks | Not treated |
R1‑121739 | Implicit CSI Feedback Framework for DL CoMP | Ericsson, ST-Ericsson | Not treated |
R1‑121740 | CQI Definition of UE Emulated Intra CoMP Cluster Interference | Ericsson, ST-Ericsson | Not treated |
R1‑121741 | Interference Measurements for CoMP CSI Reporting | Ericsson, ST-Ericsson | Noted |
R1‑121742 | CSI-RS Based Signal Quality Measurements | Ericsson, ST-Ericsson | Noted |
R1‑121743 | Evaluation of the need of aggregated CQI and PMI feedback | Ericsson, ST-Ericsson | Not treated |
R1‑121744 | Size of CoMP Measurement Set | Ericsson, ST-Ericsson | Not treated |
R1‑121745 | Dynamic DM-RS Configuration with preserved DCI Format | Ericsson, ST-Ericsson | Noted |
R1‑121746 | Updated Naming and Definition of the RRM Measurement Set | Ericsson, ST-Ericsson | Noted |
R1‑121747 | SRS for UL CoMP | InterDigital Communications, LLC | Not treated |
R1‑121748 | Text Proposal for clause 8 of 3GPP TR 36.888 | Vodafone Group | Withdrawn |
R1‑121749 | On signalling support for reduced power ABS | Ericsson, ST-Ericsson | Not treated |
R1‑121750 | On network assistance for CRS interference handling at 9dB CRE bias | Ericsson, ST-Ericsson | Noted |
R1‑121751 | Reading System Information at 9 dB range extension | Ericsson, ST-Ericsson | Not treated |
R1‑121752 | On rate matching around CRS of neighbour cells | Ericsson, ST-Ericsson | Withdrawn |
R1‑121753 | Details of dynamic selection of DMRS sequence initialization parameter | ZTE | Noted |
R1‑121754 | Considerations on CSI-RS configuration | ZTE | Noted |
R1‑121755 | Four Branch MIMO Performance with Common Pilot Gating | Ericsson | Noted |
R1‑121756 | Pilot Design for Four Branch MIMO System | Ericsson | Withdrawn |
R1‑121757 | HS-SCCH design for Four Branch MIMO System | Ericsson | Noted |
R1‑121758 | Two Codeword MIMO Structures for Four Branch MIMO System | Ericsson | Noted |
R1‑121759 | Layer Mapping Methods for a 2 Codeword MIMO System | Ericsson | Noted |
R1‑121760 | Number of HARQ Process for Rank 2 in a Four Branch MIMO System | Ericsson | Noted |
R1‑121761 | Precoding Codebook Design for Four Branch MIMO system | Ericsson | Noted |
R1‑121762 | Feedback Channel Design for Four Branch MIMO system | Ericsson | Noted |
R1‑121763 | Network triggered HS-DPCCH and HS-SCCH orders | Ericsson/ST-Ericsson | Noted |
R1‑121764 | TTI alignment between CELL_FACH UEs and between CELL_FACH UEs and CELL_DCH Ues | Ericsson/ST-Ericsson | Revised |
R1‑121765 | Performance evaluation of TDM operation in CELL_FACH state | Ericsson/ST-Ericsson | Noted |
R1‑121766 | On the support of 2 ms per HARQ activation of grants and TTI alignment between CELL_FACH UEs and CELL_FACH and CELL_DCH Ues | Ericsson, ST-Ericsson, Orange, AT&T, SOFTBANK MOBILE, Telefonica | Noted |
R1‑121767 | On HS-DPCCH quality for MF-HSDPA | Ericsson/ST-Ericsson | Noted |
R1‑121768 | On Grant and E-TFC Selection for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted |
R1‑121769 | Some Remaining Aspect for the UL Channel Structure for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted |
R1‑121770 | HARQ and Retransmission Functionality for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Noted |
R1‑121771 | On Downlink Aspects for Uplink MIMO with 64QAM | Ericsson/ST-Ericsson | Not treated |
R1‑121772 | 25.214 CR0678 (Rel-11, F) Introduction of Timing Diagrams for F-TPICH Operation in UL CLTD | Qualcomm Incorporated | Revised |
R1‑121773 | Remaining aspects of Standalone HS-DPCCH in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑121774 | Common Relative Grant for Interference Control in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑121775 | AICH based load balancing in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑121776 | Enabling Softer Handover in CELL_FACH | Qualcomm Incorporated | Noted |
R1‑121777 | HS-DPCCH Formats for Multiflow HSDPA | Qualcomm Incorporated | Noted |
R1‑121778 | Details of Multiflow operation | Qualcomm Incorporated | Noted |
R1‑121779 | HS-SCCH orders in Multiflow HSDPA | Qualcomm Incorporated | Noted |
R1‑121780 | CPC operation in Multiflow HSDPA | Qualcomm Incorporated | Noted |
R1‑121781 | Signaling grants for the secondary E-DPDCH and E-TFCI selection for UL MIMO | Qualcomm Incorporated | Noted |
R1‑121782 | Design Aspects of UL MIMO | Qualcomm Incorporated | Noted |
R1‑121783 | HARQ retransmission operation for UL MIMO | Qualcomm Incorporated | Noted |
R1‑121784 | On SRS configuration for UL RTOA measurements | Ericsson | Not treated |
R1‑121785 | Layer-1 parameters for network based positioning support | MediaTek | Not treated |
R1‑121786 | Considerations on the F-TPICH Combining | Huawei, HiSilicon | Withdrawn |
R1‑121787 | Discussion on aggressor cell’s assistance and synchronization problem | HTC | Not treated |
R1‑121788 | Modulation Switch Point for 64QAM HSUPA | InterDigital Communications, LLC | Not treated |
R1‑121789 | Traffic to total pilot power for 64QAM HSUPA operation | InterDigital Communications, LLC | Not treated |
R1‑121790 | Inter-stream interference for HSUPA MIMO | InterDigital Communications, LLC | Withdrawn |
R1‑121791 | Evaluation results for improved LTE UL VoIP coverage | InterDigital Communications, LLC | Noted |
R1‑121792 | Main scenarios and use cases for additional carrier types | Ericsson, ST-Ericsson | Not treated |
R1‑121793 | Support of CA for different TDD UL-DL configurations | Qualcomm Inc. | Not treated |
R1‑121794 | 25.214 CR0678R1 (Rel-11, F) Introduction of Timing Diagrams for F-TPICH Operation in UL CLTD | Qualcomm Incorporated | Noted - Revised |
R1‑121795 | Performance of Dynamic Point Selection in HetNet CoMP | Qualcomm Inc. | Not treated |
R1‑121796 | Draft LS response on antenna ports co-location | Ericsson | Revised |
R1‑121797 | DM RS enhancements for CoMP | Nokia Siemens Networks, Nokia | Noted |
R1‑121798 | [Draft] LS response on UL positioning parameters | Ericsson, TruePosition, ANDREW Corp. | Noted - Revised |
R1‑121799 | Tracking RS for unsynchronised carriers | Samsung | Noted |
R1‑121800 | Considerations on SRS enhancement for UL CoMP | HTC | Not treated |
R1‑121801 | Phase II evaluations for eIMTA | New Postcom | Noted |
R1‑121802 | [Draft] LS on ITU-T response LS (R1-120864) to NGMN LS (RP-110476) on coordination between ITU-T and 3GPP on synchronization | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑121803 | Correction to resource mapping for PDSCH | Fujitsu | Noted - Revised |
R1‑121804 | 36.212 CR0136 (Rel-10, F) Correction to Data and control multiplexing | NEC Group | Agreed |
R1‑121805 | 36.213 CR0379 (Rel-10, F) Removal of description with square brackets | NEC group, Motorola Mobility | Agreed |
R1‑121806 | Way forward on additional carrier type | Ericsson, ST-Ericsson, Samsung, Intel, NTT DOCOMO, Motorola | Noted |
R1‑121807 | Way forward on synchronisation signal mapping for NCT | Samsung, Qualcomm, HTC, ITRI | Noted |
R1‑121808 | Configurable Time-Frequency locations for PSS/SSS signals on the NCT | NEC Group | Noted |
R1‑121809 | [Draft] LS on the RS for additional carrier types for carrier aggregation enhancement | Alcatel-Lucent | Noted - Revised |
R1‑121810 | Consideration on Interference measurement RE configuration | LG Electronics | Not treated |
R1‑121811 | [Draft] LS on additional special subframe configuration for E-UTRA TDD in Rel-11 | CMCC | Noted - Revised |
R1‑121812 | Way Forward on Interference Measurements | Huawei, HiSilicon, Alcatel Lucent, Alcatel Lucent Shanghai Bell, NEC, NTT Docomo, Panasonic, Samsung | Noted |
R1‑121813 | 25.213 CR0112R1 (Rel-11, F) Clarification of CLTD Features | Huawei, HiSilicon | Agreed |
R1‑121814 | 25.214 CR0677R1 (Rel-11, F) Clarification of CLTD Features | Huawei, HiSilicon | Agreed |
R1‑121815 | 25.214 CRdraft (F, Rel-11), Clarification of TPI initiation from other activation states into activation state 1 | ZTE | Withdrawn |
R1‑121816 | 25.214 CR0678R2 (Rel-11, F) Introduction of Timing Diagrams for F-TPICH Operation in UL CLTD | Qualcomm Incorporated | Noted - Revised |
R1‑121817 | 25.214 CR0678R3 (Rel-11, F) Introduction of Timing Diagrams for F-TPICH Operation in UL CLTD | Qualcomm Incorporated | Revised |
R1‑121818 | LS on Summary of RAN1 agreements on Further Enhancements to CELL_FACH | RAN1, Qualcomm Incorporated | Agreed |
R1‑121819 | TR25.874 v0.1.0 for "HSPA feedback and Signalling Efficiency Enhancements for LCR TDD" | TD Teck | Agreed |
R1‑121820 | LS on the RAN1 agreements on Four Branch MIMO transmission for HSDPA | Ericsson | Noted - Revised |
R1‑121821 | Summary of 4-branch MIMO for HSPA session | HSPA session chairman (Huawei) | Endorsed |
R1‑121822 | Chairman’s notes of the UTRA maintenance | Ad-hoc session chairman (Nokia Siemens Networks) | Endorsed |
R1‑121823 | Chairman’s notes of the MIMO with 64QAM for HSUPA and LCR TDD HSPA feedback and signaling efficiency enhancement study sessions | Ad-hoc session chairman (Nokia Siemens Networks) | Endorsed |
R1‑121824 | 25.214 CR0678R4 (Rel-11, F) Introduction of Timing Diagrams for F-TPICH Operation in UL CLTD | Qualcomm Incorporated | Noted |
R1‑121825 | Text proposal on simulation assumptions of isolated and multi-cell pico scenarios for FS_LTE_TDD_eIMTA | CATT (Rapporteur) | Agreed |
R1‑121826 | TP on evaluation/analysis of single receive RF chain for low-cost MTC devices | IPWireless Inc. (Rapporteur) | Agreed |
R1‑121827 | TP on evaluation/analysis of reduced transmit power for low-cost MTC devices | IPWireless Inc. (Rapporteur) | Agreed |
R1‑121828 | TP on evaluation/analysis of half-duplex operation for low-cost MTC devices | IPWireless Inc. (Rapporteur) | Agreed |
R1‑121829 | void | - | Withdrawn |
R1‑121830 | void | - | Withdrawn |
R1‑121831 | void | - | Withdrawn |
R1‑121832 | [Draft] LS on ITU-T response LS (R1-120864) to NGMN LS (RP-110476) on coordination between ITU-T and 3GPP on synchronization | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted - Revised |
R1‑121833 | Signaling support for 9dB CRE bias | LG Electronics | Not treated |
R1‑121834 | Way Forward on Interference Measurement RE for CoMP | LG Electronics, CATT, Intel | Revised |
R1‑121835 | TR36.828 v0.1.0 Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | CATT | Agreed |
R1‑121836 | Offline discussion on simulation calibration of adaptive UL-DL reconfiguration | Huawei, HiSilicon | Noted - Revised |
R1‑121837 | [Draft] LS on TR skeleton for Rel-11 SI on FS_LTE_TDD_eIMTA | CATT | Noted - Revised |
R1‑121838 | Way forward on CoMP Measurement set size | Qualcomm, Apple, Ericsson, ST-Ericsson, InterDigital, MediaTek, Nokia, Nokia Siemens Networks, Renesas, Texas Instruments | Noted |
R1‑121839 | Way Forward on Interference Measurement RE for CoMP | LG Electronics, CATT, Ericsson, ST-Ericsson, Intel | Noted |
R1‑121840 | DM-RS sequence for UL CoMP | HTC | Not treated |
R1‑121841 | Way forward on PDSCH HARQ timing on Scell in TDD CA | Samsung, Ericsson, ST-Ericsson, InterDigital Communications, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Panasonic | Not treated |
R1‑121842 | [Draft] LS on the Definition of the CoMP Resource Management Set | Ericsson | Noted - Revised |
R1‑121843 | Summary of CoMP UL session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑121844 | Summary of AI 7.2.1.3-7.2.1.5 session | Ad-hoc chairman (Samsung) | Endorsed |
R1‑121845 | Summary of DL CoMP RS session | Ad-hoc chairman (NTT DoCoMo) | Endorsed |
R1‑121846 | Summary of FeICIC session | Ad-hoc chairman (NTT DoCoMo) | Endorsed |
R1‑121847 | Summary of e-PDCCH RS session | Ad-hoc chairman (NTT DoCoMo) | Endorsed |
R1‑121848 | Way Forward on DMRS sequence initialization for PDSCH | ZTE, Samsung, LGE, ETRI, New Postcom | Noted |
R1‑121849 | Way Forward on Transmit Diversity for PUCCH format 1b with channel selection in Rel-11 | CATT, Ericsson, ST-Ericsson, Qualcomm, Texas Instruments, Renesas Mobile Europe Ltd, Intel | Noted |
R1‑121850 | Way Forward on inter-band TDD CA with different UL-DL configurations on different bands in Rel-11 | CATT, ZTE, Intel | Noted |
R1‑121851 | Way Forward on HARQ-ACK enhancements in Rel-11 | CATT, CATR, NSN, Nokia, Potevio, ITRI, ZTE, Ericsson, ST-Ericsson, TI | Noted |
R1‑121852 | Joint proposal on ePDCCH search space | Panasonic, Qualcomm, Motorola Mobility, HTC, Nokia, Nokia Siemens Networks, ZTE, Mediatek, Sharp | Noted |
R1‑121853 | Cross-carrier scheduling and HARQ-ACK timing for different TDD UL-DL configurations | ITRI | Not treated |
R1‑121854 | Wayforward on PDSCH DMRS Sequence | Huawei, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, HiSilicon, Nokia, Nokia Siemens Networks, Renesas, Panasonic, Qualcomm, ST-Ericsson | Noted |
R1‑121855 | Summary of ad-hoc session on geographically separated antennas | Ad-hoc Chairman (Ericsson) | Endorsed |
R1‑121856 | Way forward on Inter-band TDD CA with different configurations | Huawei, HiSilicon, Qualcomm, Potevio | Not treated |
R1‑121857 | Proposal on PDSCH HARQ timing for inter-band CA with different TDD UL-DL configurations | LGE, RIM, Renesas, Pantech | Not treated |
R1‑121858 | Way forward on UL DMRS enhancement | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, CATT, Qualcomm, ZTE | Not treated |
R1‑121859 | Way forward on SRS power control | LG Electronics, Ericsson, ST-Ericsson, Fujitsu, Huawei, HiSilicon, InterDigital, Pantech, Samsung, Sharp | Noted |
R1‑121860 | Way Forward on PUCCH enhancement for CoMP | LG Electronics, Fujitsu, Huawei, HiSilicon, InterDigital, Nokia, NSN, Panasonic, Qualcomm | Noted |
R1‑121861 | UL-DMRS enhancements for uplink CoMP | LG Electronics | Not treated |
R1‑121862 | WF on ePDCCH building block | CATT, CATR, CMCC, Huawei, HiSilicon, LGE, Potevio | Noted |
R1‑121863 | Way forward on timing for UL CoMP | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Motorola Mobility, Nokia, Nokia Siemens Networks, Qualcomm, Texas Instruments | Noted |
R1‑121864 | Way Forward on ePDCCH search space | Alcatel Lucent, Altcatel Lucent Shanghai Bell, CATT, CATR, CMCC, Intel, InterDigital, ITRI, Nokia, Nokia Siemens Networks, Panasonic, Potevio, Renesas, Sharp | Noted |
R1‑121865 | Way Forward on PUSCH DMRS Signaling | Samsung, Huawei, HiSilicon, Intel, Ericsson, ST-Ericsson, Sharp, Nokia, NSN, KDDI, New Postcom, Pantech, Interdigital | Noted |
R1‑121866 | Way Forward on PUCCH sequence for UL CoMP | Samsung, Ericsson, ST-Ericsson, Intel, Sharp, ETRI, ZTE, Texas Instruments, New Postcom, KDDI | Noted |
R1‑121867 | LS on the RAN1 agreements on HSDPA Multiflow | Nokia Siemens Networks | Noted - Revised |
R1‑121868 | Way forward on PUSCH DMRS for UL CoMP | Ericsson, ETRI, Interdigital, Intel, Huawei, Hi-Silicon, Pantech, New Postcom, Sharp, Samsung, ST-Ericsson | Not treated |
R1‑121869 | Further discussions on PUCCH transmissions for UL CoMP | Samsung | Noted |
R1‑121870 | Way Forward on ePDCCH search space design | Samsung, LG Electronics, Qualcomm, Fujitsu | Noted |
R1‑121871 | LS on BS implications due to LP-ABS for feICIC | RAN4, NTT DoCoMo | Noted |
R1‑121872 | Text proposal for evaluation methodology on link budget and cell spectral efficiency for TDD | CATT | Noted |
R1‑121873 | Way Forward on ePDCCH search space | InterDigital, Intel, Ericsson, ST-Ericsson, Panasonic, NTT DoCoMo, Texas Instruments, Nokia, Nokia Siemens Networks, Sharp, KDDI, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121874 | Way Forward on resource mapping for ePDCCH | ZTE, Nokia, Nokia Siemens Networks, New Postcom, Sharp, MediaTek | Noted |
R1‑121875 | Channel Selection TxD Way Forward | Research In Motion, Nokia, Nokia Siemens Networks | Noted |
R1‑121876 | 36.213 CR0378R1 (Rel-10, F) Correction of FDD channel selection HARQ-ACK and SR transmission | Ericsson, ST-Ericsson, CATT | Noted |
R1‑121877 | Discussion on signalling support for CRS interference handling | Qualcomm Inc. | Not treated |
R1‑121878 | TTI alignment between CELL_FACH UEs and between CELL_FACH UEs and CELL_DCH UEs | Ericsson, ST-Ericsson | Noted |
R1‑121879 | Text proposal for evaluation methodology | Huawei, HiSilicon, CMCC, Potevio, New Postcom, CATR | Noted |
R1‑121880 | Way Forward on FeICIC | LG Electronics, Texas Instruments, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, Panasonic | Noted |
R1‑121881 | Way Forward on Power Control | Huawei, Ericsson, ETRI, HiSilicon, Hitachi, HTC, Intel Corporation, InterDigital, ITRI, KDDI, KT, LG Electronics, New Postcom, Research In Motion, Samsung, Sharp, ST-Ericsson | Not treated |
R1‑121882 | Way Forward on SRS Power Control enhancement | CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, CATR, CHTTL, CMCC, Nokia, NSN, Qualcomm, ZTE | Noted |
R1‑121883 | Way Forward on signalling details for reduced power ABS | Ericsson, LG Electronics, Motorola Mobility, NEC, Panasonic, Renesas Mobile Europe Ltd, ST-Ericsson | Noted |
R1‑121884 | Summary of ad-hoc session on AI 6.4 Further Enhancements for Cell_FACH | Rapporteur (Alcatel-Lucent) | Endorsed |
R1‑121885 | Way Forward on cell detection in FeICIC | LG Electronics, Texas Instruments, Pantech | Noted |
R1‑121886 | Way Forward on ePDCCH reference signals | Ericsson, ST-Ericsson, Fujitsu, Samsung, NTT Docomo, InterDigital, Renesas, RIM, Sharp | Noted |
R1‑121887 | WF on support of inter-point phase feedback for JT CoMP | Intel, Nokia, NSN, ZTE, III | Not treated |
R1‑121888 | Way Forward on system information detection | CMCC, CATT, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, LGE, Fujitsu | Revised |
R1‑121889 | Way Forward on uplink coverage enhancements | ZTE, China Telecom, Orange, China Unicom, Nokia, NSN, Ericsson, ST-Ericsson, InterDigital, Intel, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑121890 | Way Forward on CoMP CSI Feedback | Huawei, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CMCC, ETRI, HiSilicon, KDDI, Sharp | Noted |
R1‑121891 | Text proposal on reduction of maximum bandwidth for Section 6.2 of TR 36.888 | Huawei, HiSilicon | Noted - Revised |
R1‑121892 | Way Forward on system information detection | CMCC, CATT, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, LGE | Noted |
R1‑121893 | Way Forward on ePDCCH RS | Huawei, HiSilicon, LG Electronics, Panasonic, RIM, CMCC | Noted |
R1‑121894 | Way Forward on multiplexing CSI and HARQ-ACK | Texas Instruments, CATT, Ericsson, Fujitsu, Huawei, HiSilicon, InterDigital, LG Electronics, Qualcomm, Renesas, Research in Motion, Sharp, ST-Ericsson, ZTE | Noted |
R1‑121895 | Way Forward on DL resource assignment on resources including E-PDCCH | LG Electronics, Panasonic, Pantech | Not treated |
R1‑121896 | Joint proposal on SRS transmission with multiple TA - full overlap case | LG Electronics, CATT, Pantech, Panasonic, Ericsson, ST-Ericsson | Not treated |
R1‑121897 | RS for unsynchronized carriers | Qualcomm Inc. | Withdrawn |
R1‑121898 | Joint proposal on ePDCCH antenna port association | Qualcomm, Panasonic, LGE, Huawei, HiSilicon, MediaTek, NEC, Pantech, CATT, Nokia, Nokia Siemens Networks | Noted |
R1‑121899 | WF on multiplexing of periodic CSI and periodic CSI and HARQ-ACK in DL CA | Samsung, CATT, LG Electronics, Nokia, Nokia Siemens Networks, NTT DOCOMO | Noted |
R1‑121900 | LS on the RS for additional carrier types for carrier aggregation enhancement | RAN1, Alcatel-Lucent | Agreed |
R1‑121901 | LS on feICIC | LG Electronics | Noted - Revised |
R1‑121902 | Draft LS response on antenna ports co-location | Ericsson | Noted - Revised |
R1‑121903 | Resume of Offline Discussions on Antenna Ports Co-location | Ericsson, ST-Ericsson | Noted |
R1‑121904 | WF on CSI-RS Restriction | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, ETRI, Fujitsu, KT, New Postcom, Panasonic, Qualcomm, Samsung | Not treated |
R1‑121905 | Summary on Handling of CSI-RS patterns (1540) | Qualcomm | Noted |
R1‑121906 | WF on reduced power ABS | Huawei, Alcatel Lucent, Alcatel Lucent Shanghai Bell, CATT, CHTTL, HiSilicon, KDDI, Nokia Siemens Networks, ZTE | Not treated |
R1‑121907 | WF on Network Assistance for eICIC | Ericsson, ST-Ericsson, Qualcomm, Texas Instruments, Renesas | Noted |
R1‑121908 | Reply LS on simultaneous transmission of PUSCH/PUCCH/SRS for multiple TA | RAN4, Nokia | Noted |
R1‑121909 | 25.214 CR0678R5 (Rel-11, F) Introduction of Timing Diagrams for F-TPICH Operation in UL CLTD | Qualcomm Incorporated | Agreed |
R1‑121910 | LS on the RAN1 agreements on MIMO with 64QAM for HSUPA | RAN1, Nokia Siemens Networks | Agreed |
R1‑121911 | LS on ITU-T response LS (R1-120864) to NGMN LS (RP-110476) on coordination between ITU-T and 3GPP on synchronization | RAN1, Alcatel-Lucent | Agreed |
R1‑121912 | LS on the Definition of the CoMP Resource Management Set | RAN1, Ericsson | Agreed |
R1‑121913 | LS on additional special subframe configuration for E-UTRA TDD in Rel-11 | RAN1, CMCC | Agreed |
R1‑121914 | LS on the RAN1 agreements on Four Branch MIMO transmission for HSDPA | RAN1, Ericsson | Agreed |
R1‑121915 | LS on the RAN1 agreements on HSDPA Multiflow | RAN1, Nokia Siemens Networks | Agreed |
R1‑121916 | 36.211 CR0169 (Rel-10, F) Correction to resource mapping for PDSCH | Fujitsu | Agreed |
R1‑121917 | Conclusion on calibration assumptions for LTE TDD DL-UL Interference Management and Traffic Adaptation | Rapporteur (Huawei) | Noted |
R1‑121918 | LS on TR skeleton for Rel-11 SI on FS_LTE_TDD_eIMTA | RAN1, CATT | Agreed |
R1‑121919 | LS response on antenna ports co-location | RAN1, Ericsson | Agreed |
R1‑121920 | LS on feICIC | RAN1, LG Electronics | Agreed |
R1‑121921 | LS response on UL positioning parameters | RAN1, Ericsson | Agreed |
R1‑121922 | Text proposal on reduction of maximum bandwidth for Section 6.2 of TR 36.888 | Huawei, HiSilicon | Agreed |
R1‑121923 | Conclusion on further evaluation assumptions for LTE TDD DL-UL Interference Management and Traffic Adaptation | Huawei | Agreed |
R1‑121924 | Text proposal for evaluation methodology | Huawei, HiSilicon, CMCC, Potevio, NewPostcom, CATR | Agreed |
page generated from database: 2024-04-13 13:51:47