3GPP TDocs (written contributions) at meeting
Meeting: R1-63 - 2010-11-15 to 2010-11-19, Jacksonville
meeting id: R1-63 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑105825 | Draft Agenda for RAN1#63 meeting | RAN1 Chairman | Approved |
R1‑105826 | Final report of RAN1#62bis meeting | MCC Support | Revised |
R1‑105827 | LS on latest RAN2 agreements on 4C-HSDPA | RAN2, Qualcomm | Noted |
R1‑105828 | LS on RAN2 CA decisions related to RAN1 | RAN2, LGE | Noted |
R1‑105829 | LS on Timing Requirements for Activation and Deactivation of Scells | RAN2, Ericsson | Noted |
R1‑105830 | Draft LS Response on UL Mobility Load Balancing utilising UL TPC parameters | Huawei, HiSilicon | Noted - Revised |
R1‑105831 | Remaining details on PUCCH format 3 for LTE-A TDD | Huawei, HiSilicon | Revised |
R1‑105832 | Signalling design for PUCCH format 3 | Huawei, HiSilicon | Noted |
R1‑105833 | Periodic CQI/PMI/RI reporting for CA | Huawei, HiSilicon | Noted |
R1‑105834 | Simultaneous Transmissions of Uplink Channels or Signals | Huawei, HiSilicon | Not treated |
R1‑105835 | Simultaneous Transmission of CQI and ACK/NACK in Carrier Aggregation | Huawei, HiSilicon | Not treated |
R1‑105836 | Remaining issues of uplink multi-antenna power control | Huawei, HiSilicon | Noted |
R1‑105837 | Consideration on DCI 3/3A for CA | Huawei, HiSilicon | Not treated |
R1‑105838 | Triggering and transmission of aperiodic CSI reports | Huawei, HiSilicon | Noted |
R1‑105839 | Transmitting UCI on PUSCH without UL data | Huawei, HiSilicon | Not treated |
R1‑105840 | Remaining details on CSI-RS | Huawei, HiSilicon | Noted |
R1‑105841 | Further clarifications of PUCCH 2-1 | Huawei, HiSilicon | Not treated |
R1‑105842 | Codebook subset Restriction for 8Tx | Huawei, HiSilicon | Noted |
R1‑105843 | TBS design considerations for higher order MIMO | Huawei, HiSilicon | Noted |
R1‑105844 | Control signalling design for UL MIMO | Huawei, HiSilicon | Noted |
R1‑105845 | Aperiodic feedback in PUSCH with multi-layers | Huawei, HiSilicon | Noted |
R1‑105846 | Channel Interleaver design for UL MIMO | Huawei, HiSilicon | Not treated |
R1‑105847 | Sounding using DMRS | Huawei, HiSilicon | Not treated |
R1‑105848 | Remaining details on UL DM RS | Huawei, HiSilicon | Not treated |
R1‑105849 | Configuration of aperiodic SRS | Huawei, HiSilicon | Noted |
R1‑105850 | R-PDCCH search space size | Huawei, HiSilicon | Not treated |
R1‑105851 | RN Capability | Huawei, Hisilicon | Not treated |
R1‑105852 | Signaling and UE behaviour for resource-specific CSI measurements | Huawei, HiSilicon | Noted |
R1‑105853 | Analysis of Range Expansion with TDM scheme in Het-Net Scenarios | Huawei, Hisilicon | Not treated |
R1‑105854 | CQI enhancement for MU-MIMO | Sony Corporation | Not treated |
R1‑105855 | Update on L1 parameters for WIs CA, ULMA and eDLMA | Ericsson, ST-Ericsson | Noted - Revised |
R1‑105856 | On A/N Bundling for TDD | Ericsson, ST-Ericsson | Noted |
R1‑105857 | PUCCH format 3 resource selection | Ericsson, ST-Ericsson | Revised |
R1‑105858 | Periodic CSI reporting for CA | Ericsson, ST-Ericsson | Noted |
R1‑105859 | Power control for PUCCH format 3 | Ericsson, ST-Ericsson | Not treated |
R1‑105860 | On use cases of DCI format 3/3A | Ericsson, ST-Ericsson | Not treated |
R1‑105861 | Aperiodic CSI reporting for CA | Ericsson, ST-Ericsson | Withdrawn |
R1‑105862 | UCI on PUSCH | Ericsson, ST-Ericsson | Not treated |
R1‑105863 | Coding and resource utilization for UCI on PUSCH | Ericsson, ST-Ericsson | Noted |
R1‑105864 | Remaining details for CA based HetNets | Ericsson, ST-Ericsson | Not treated |
R1‑105865 | Measurements for UE Feedback | Ericsson, ST-Ericsson | Not treated |
R1‑105866 | Spatial down-sampling of 8 TX codebook | Ericsson, ST-Ericsson | Not treated |
R1‑105867 | Enhanced power measurement offset for MU-MIMO | Ericsson, ST-Ericsson | Noted |
R1‑105868 | Performance evaluation of multi-user CQI | Ericsson, ST-Ericsson | Revised |
R1‑105869 | Feedback Enhancement Using PUSCH Mode 3-2 | Ericsson, ST-Ericsson | Noted |
R1‑105870 | On UL transmission modes | Ericsson, ST-Ericsson | Noted |
R1‑105871 | On DCI modes | Ericsson, ST-Ericsson | Revised |
R1‑105872 | Views on UL scrambling | Ericsson, ST-Ericsson | Noted |
R1‑105873 | Resource allocation for UCI on PUSCH | Ericsson, ST-Ericsson | Withdrawn |
R1‑105874 | Remaining issues for PHICH triggered retransmissions | Ericsson, ST-Ericsson | Not treated |
R1‑105875 | On remaining details of DM RS for rank 2 | Ericsson, ST-Ericsson | Not treated |
R1‑105876 | Views on remaining issues for SGH | Ericsson, ST-Ericsson | Not treated |
R1‑105877 | Details of dynamic aperiodic SRS | Ericsson, ST-Ericsson | Noted |
R1‑105878 | 36.216 DraftCR0001 (Rel-10, B) Capturing of further agreements on relaying | Ericsson, Panasonic | Noted - Revised |
R1‑105879 | On details of restricted CSI measurements | Ericsson, ST-Ericsson | Noted |
R1‑105880 | On performance with cell range expansion and non-full buffer traffic | Ericsson, ST-Ericsson | Withdrawn |
R1‑105881 | System Level Simulation of Various PUSCH CSI Feedback Modes for 4Tx | AT&T | Noted |
R1‑105882 | Discussion on CSI-RS collision avoidance | Ericsson, ST-Ericsson | Revised |
R1‑105883 | Details of PUSCH 3-2 for 8TX | Marvell | Noted |
R1‑105884 | CQI Enhancement for PUSCH | Marvell | Revised |
R1‑105885 | Details of PUCCH 1-1 for 8TX | Marvell | Not treated |
R1‑105886 | Details of PUCCH 2-1 for 8TX | Marvell | Revised |
R1‑105887 | Outstanding resource allocation issues for PUCCH Fomat 3 | Texas Instruments | Not treated |
R1‑105888 | Periodic CSI reporting for Carrier Aggregation | Texas Instruments | Not treated |
R1‑105889 | UCI Multiplexing for Simultaneous PUSCH/PUCCH Configuration | Texas Instruments | Not treated |
R1‑105890 | On Rel-10 SRS Power Control | Texas Instruments | Noted |
R1‑105891 | On PUSCH Selection for UCI Transmission | Texas Instruments | Noted |
R1‑105892 | Aperiodic CSI reporting for Carrier Aggregation | Texas Instruments | Noted |
R1‑105893 | Remaining aspects for muting in Rel-10 | Texas Instruments | Not treated |
R1‑105894 | Remaining CSI-RS signaling aspects in Rel-10 | Texas Instruments | Not treated |
R1‑105895 | Finalizing Rel.10 PUCCH mode 1-1 | Texas Instruments | Not treated |
R1‑105896 | Rel.10 MU-MIMO CSI Enhancement for PUSCH Mode 3-1 | Texas Instruments | Noted |
R1‑105897 | On PUSCH mode 3-2 in Rel.10 | Texas Instruments | Noted |
R1‑105898 | DCI Format 4 Fields for Supporting UL SU-MIMO | Texas Instruments | Not treated |
R1‑105899 | Remaining Issues on PHICH-Triggered Retransmissions | Texas Instruments | Not treated |
R1‑105900 | Finalizing Resource Allocation for Aperiodic SRS | Texas Instruments | Not treated |
R1‑105901 | On Frequency Hopping for Aperiodic SRS Transmission | Texas Instruments | Not treated |
R1‑105902 | On CSI measurements on restricted subframes | Texas Instruments | Revised |
R1‑105903 | Further results on cell range expansion | Texas Instruments | Not treated |
R1‑105904 | Power setting and legacy support for macro-femto scenario | Texas Instruments | Not treated |
R1‑105905 | 25.214 CR0628 (Rel-7, F) Clarification of E-DPCCH gain factor quantization in compressed mode | Infineon Technologies | Revised |
R1‑105906 | 25.214 CR0629 (Rel-8, A) Clarification of E-DPCCH gain factor quantization in compressed mode | Infineon Technologies | Revised |
R1‑105907 | 25.214 CR0630 (Rel-9, A) Clarification of E-DPCCH gain factor quantization in compressed mode | Infineon Technologies | Revised |
R1‑105908 | 25.214 CR0631 (Rel-10, A) Clarification of E-DPCCH gain factor quantization in compressed mode | Infineon Technologies | Revised |
R1‑105909 | Remaining issues on TDD ACK/NAK in Rel-10 | CATT | Noted |
R1‑105910 | Design of PUCCH format 1b with channel selection in Rel-10 | CATT | Not treated |
R1‑105911 | Remaining issues on PUCCH format 3 | CATT | Noted |
R1‑105912 | Periodic CQI feedback with CA | CATT | Noted |
R1‑105913 | Combination of UCI transmission on PUCCH in Rel-10 | CATT | Not treated |
R1‑105914 | Power control details for PUCCH format 3 | CATT | Noted |
R1‑105915 | On remaining issues of UL PC in LTE-A | CATT | Not treated |
R1‑105916 | Combination of UCI transmission on PUSCH in Rel-10 | CATT | Noted |
R1‑105917 | Aperiodic CQI feedback with CA | CATT | Noted |
R1‑105918 | Discussion on CSI-RS collision with other signals | CATT | Noted |
R1‑105919 | Consideration on CSI-RS configuration in HetNet | CATT | Not treated |
R1‑105920 | Flexible configuration of PDSCH muting | CATT | Not treated |
R1‑105921 | Consideration on interference measurement | CATT | Not treated |
R1‑105922 | Interference measurement via muted RE | CATT | Not treated |
R1‑105923 | 8Tx codebook subsampling for PUCCH 1-1 mode 2 | CATT | Not treated |
R1‑105924 | Remaining details on PUCCH mode 2-1 | CATT | Not treated |
R1‑105925 | PUSCH mode 3-2 for Rel-10 feedback | CATT | Noted |
R1‑105926 | Remaining issues on UL signaling | CATT | Not treated |
R1‑105927 | Further discussion on DMRS signaling | CATT | Not treated |
R1‑105928 | Signaling and UE behavior for aperiodic SRS | CATT | Not treated |
R1‑105929 | On triggering of aperiodic SRS via DL grants | CATT | Not treated |
R1‑105930 | Remaining details on R-PDCCH search space in Rel-10 | CATT | Not treated |
R1‑105931 | Design of Interleaving R-PDCCH in Rel-10 | CATT | Not treated |
R1‑105932 | Remaining details of Un specification in Rel-10 | CATT | Not treated |
R1‑105933 | Discussion on CSI Feedback and its Impact on the Specification | CATT | Noted |
R1‑105934 | Considerations on Power Setting Solutions in Macro-Femto | CATT | Not treated |
R1‑105935 | Discussion on the Design of ABS Pattern and its Impact on the Measurement | CATT | Not treated |
R1‑105936 | Consideration on Available and Further Techniques for CRS Interference Mitigation | CATT | Not treated |
R1‑105937 | Soft buffer size allocation for Rel-10 UE | CATT | Noted |
R1‑105938 | Remaining details in CSI-RS signaling and PDSCH muting design | New Postcom | Not treated |
R1‑105939 | ABS signaling considerations for LTE-A FDD | New Postcom | Not treated |
R1‑105940 | ABS signaling considerations for LTE-A TDD | New Postcom | Not treated |
R1‑105941 | CQI definition in LTE-A with ABS considerations | New Postcom | Not treated |
R1‑105942 | Remaining issues on uplink power control for LTE-A | New Postcom | Noted |
R1‑105943 | Considerations on TDM eICIC for Macro-Femto | New Postcom | Not treated |
R1‑105944 | Reply LS on Radio Link Monitoring for Carrier Aggregation | RAN4, NTT DoCoMo | Noted |
R1‑105945 | Response LS on Per UE PHR related questions | RAN4, Ericsson | Noted |
R1‑105946 | Open issues for TDD PUCCH A/N | InterDigital Communications LLC | Not treated |
R1‑105947 | Resource Indexing and RB Allocation for PUCCH Format 3 | InterDigital Communications LLC | Not treated |
R1‑105948 | Performance of CQI and ACK/NACK Multiplexed on PUCCH | InterDigital Communications LLC | Not treated |
R1‑105949 | PUSCH selection for transmission of UCI | InterDigital Communications LLC | Noted |
R1‑105950 | Aperiodic CSI triggering for carrier aggregation | InterDigital Communications LLC | Noted |
R1‑105951 | eICIC Macro-Femto time-domain muting and ABS | InterDigital Communications LLC | Not treated |
R1‑105952 | eICIC Macro-Femto transmit power setting | InterDigital Communications LLC | Not treated |
R1‑105953 | Remaining issues on R-PDCCH search space | New Postcom | Not treated |
R1‑105954 | RE mapping of REG level interleaved R-PDCCH | New Postcom | Not treated |
R1‑105955 | Remaining issues for interleaved R-PDCCH | New Postcom | Not treated |
R1‑105956 | Considersitons on interference between DeNB and RN | New Postcom | Not treated |
R1‑105957 | Remaining issues on CSI-RS | ZTE | Not treated |
R1‑105958 | Way Forward on REG Definition for Interleaved R-PDCCH | ZTE, Qualcomm, Huawei, HiSilicon, Samsung, ETRI, NEC, Panasonic | Noted |
R1‑105959 | WF on Un PUCCH | ZTE, Huawei, HiSilicon | Noted |
R1‑105960 | Discussion on Un Downlink Transmission Modes | ZTE | Not treated |
R1‑105961 | Remaining issues on OFDM symbols usable for Un link transmission | ZTE | Not treated |
R1‑105962 | Control signaling design of DCI format 4 for UL MIMO transmission mode_ | ZTE | Not treated |
R1‑105963 | Remaining issues of UCI multiplexing on PUSCH | ZTE | Revised |
R1‑105964 | Remaining issues for UL SU-MIMO in PHICH-triggered retransmission | ZTE | Not treated |
R1‑105965 | Resource allocation for channel selection | ZTE | Withdrawn |
R1‑105966 | Remaining details of PUCCH reporting modes | ZTE | Revised |
R1‑105967 | Remaining details of PUSCH reporting modes | ZTE | Revised |
R1‑105968 | Further Discussion on CQI enhancement for Rel-10 MU-MIMO | ZTE | Withdrawn |
R1‑105969 | Discussion on CRS interference and CSI measurements in macro-pico deployment | ZTE | Noted |
R1‑105970 | Radio link monitoring in macro-femto deployments | ZTE | Not treated |
R1‑105971 | Downlink data channel performance of almost blank subframe solution for Macro + Picos deployment | ZTE | Not treated |
R1‑105972 | Resource indexing for PUCCH format 3 | ZTE | Not treated |
R1‑105973 | UCI multiplexing on PUCCH | ZTE | Not treated |
R1‑105974 | Necessity to support Mode 2 for ACK/NACK feedback using format 3 in LTE-A TDD | ZTE | Not treated |
R1‑105975 | Further clarification on multi-cluster RA on top of the endorsed CR for 36.213 | ZTE | Noted |
R1‑105976 | PUSCH selection for UCI transmission in LTE-Advanced | ZTE | Noted |
R1‑105977 | Aperiodic CSI Triggering for Carrier Aggregation in LTE-Advanced | ZTE | Noted |
R1‑105978 | Remaining issues of aperiodic SRS^^ | ZTE | Not treated |
R1‑105979 | HS-DPCCH Transmission in Enhanced Cell_FACH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑105980 | Editorial corrections for TS36.211 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed in principle |
R1‑105981 | Editorial corrections for TS36.213 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed in principle |
R1‑105982 | Remaining Issues for A/N transmission on PUCCH for TDD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑105983 | Remaining Issues for A/N transmission on PUCCH for TDD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑105984 | Periodic CSI transmission for CA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑105985 | Clarification on power scaling | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑105986 | Remaining issues for selection of PUSCH for UCI transmission | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Revised |
R1‑105987 | Triggering of aperiodic CSI with CA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑105988 | Remaining aspects of CSI-RS issues | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑105989 | Remaining details of CSI resporting modes on PUCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑105990 | PUSCH CSI reporting modes | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑105991 | Codebook subset restriction for TM9 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑105992 | Design of DCI Format 4 | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑105993 | On PUCCH Transmit Diversity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑105994 | UL DMRS Configuration for PHICH-triggered Retransmission | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑105995 | Configuration for Dynamic Aperiodic SRS Triggering | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑105996 | Discussion on Search Space Design for Non-Interleaved R-PDCCH | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑105997 | UTDOA Performance with SRS Interference Cancellation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑105998 | Specification Impact Analysis of UTDOA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑105999 | Specification considerations related to ABS for RLM and RSRP/RSRQ measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑106000 | On restricted CSI measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑106001 | Specification impact of power-setting procedure for Macro-Femto case | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑106002 | Uplink periodic signal transmission over Un link | LG-Ericsson | Not treated |
R1‑106003 | UTDOA Evaluation Summary | TruePosition | Noted |
R1‑106004 | Discussion on A/N Feedback Modes for TDD in Carrier Aggregation | MediaTek | Not treated |
R1‑106005 | Resource Allocation for PUCCH Format 1b with Channel Selection in Carrier Aggregation | MediaTek | Not treated |
R1‑106006 | Views on PHICH-Triggered PUSCH Retransmissions | MediaTek | Not treated |
R1‑106007 | Details on Aperiodic SRS | MediaTek | Noted |
R1‑106008 | Discussion of restricted CSI measurements in Macro-pico | MediaTek | Not treated |
R1‑106009 | Further discussion on HeNB downlink power setting in HetNet | MediaTek | Not treated |
R1‑106010 | Resource indexing for PUCCH format 3 | Samsung | Noted |
R1‑106011 | HARQ-ACK overhead reduction by partial bundling | Samsung | Not treated |
R1‑106012 | Discussion on channel selection for TDD | Samsung | Revised |
R1‑106013 | HARQ-ACK Resource Indication in PUCCH for DL CA | Samsung | Not treated |
R1‑106014 | HARQ-ACK Coding for DL CA with TDD | Samsung | Not treated |
R1‑106015 | Periodic CQI/PMI/RI Reporting with CA | Samsung | Noted |
R1‑106016 | Remaining Issues on concurrent transmission of SRI and CA ACK/NACK in Rel-10 | Samsung | Not treated |
R1‑106017 | Cross-carrier group UL PC for LTE-A | Samsung | Not treated |
R1‑106018 | SRS multiplexing in carrier aggregation | Samsung | Noted |
R1‑106019 | SRS Power Control in Rel.10 | Samsung | Noted |
R1‑106020 | PUCCH Format 3 Transmission Power for DL CA | Samsung | Noted |
R1‑106021 | Transmission power setting formula for PUCCH format 3 | Samsung | Withdrawn |
R1‑106022 | UL SU-MIMO power control and delta_TF setting | Samsung | Revised |
R1‑106023 | Discussion on high payload HARQ-ACK transmission on PUSCH | Samsung | Not treated |
R1‑106024 | PUSCH Selection for UCI Multiplexing with UL CA | Samsung | Noted |
R1‑106025 | Resources for HARQ-ACK and RI Multiplexing in PUSCH | Samsung | Noted |
R1‑106026 | HARQ-ACK Payload in PUSCH for DL CA with TDD | Samsung | Noted |
R1‑106027 | UL DAI for CA | Samsung | Not treated |
R1‑106028 | Aperiodic CSI triggering in carrier aggregation | Samsung | Noted |
R1‑106029 | Simultaneous PUSCH and PUCCH Transmissions | Samsung | Not treated |
R1‑106030 | Avoidance of DMRS collision with PSS and SSS | Samsung | Not treated |
R1‑106031 | Remaining Details on CSI-RS | Samsung | Not treated |
R1‑106032 | Remaining Details on PDSCH RE Muting | Samsung | Not treated |
R1‑106033 | Uneven Periodic Channel Quality Feedback Responding to CSI-RS | Samsung | Not treated |
R1‑106034 | Details on CQI definition for LTE-A | Samsung | Noted |
R1‑106035 | Further details on PUCCH reporting modes 1-1 | Samsung | Not treated |
R1‑106036 | Remaining details on PUCCH feedback mode 2-1 | Samsung | Not treated |
R1‑106037 | Evaluation of PUSCH 3-2 vs. enhanced PUSCH 3-1 | Samsung | Revised |
R1‑106038 | Codebook subset restriction for 8-Tx codebook | Samsung | Noted |
R1‑106039 | PDSCH transmission in MBSFN subframes | Samsung | Noted |
R1‑106040 | Details on DCI format 4 | Samsung | Not treated |
R1‑106041 | Re-using DCI format 0 for UL SU-MIMO | Samsung | Noted |
R1‑106042 | Remaining details of UCI on MIMO PUSCH | Samsung | Not treated |
R1‑106043 | UCI Resources for Single Codeword PUSCH Retransmission | Samsung | Noted |
R1‑106044 | Further issues in PHICH-triggered PUSCH retransmissions | Samsung | Not treated |
R1‑106045 | Aperiodic SRS Multiplexing | Samsung | Not treated |
R1‑106046 | SRS Enhancements in Rel-10 | Samsung | Not treated |
R1‑106047 | Remaining details on R-PDCCH search space design | Samsung | Not treated |
R1‑106048 | Discussion on PCFICH issue in Range expansion | Samsung | Not treated |
R1‑106049 | CSI measurement restriction for macro-pico scenarios | Samsung | Noted |
R1‑106050 | Discussion on DL Power Setting for Heterogeneous Networks | Samsung | Not treated |
R1‑106051 | CSI measurement issue for macro-femeto secnarios | Samsung | Not treated |
R1‑106052 | Opportunistic power control for Hetnet | Samsung | Not treated |
R1‑106053 | ICIC Support for SRS Transmissions | Samsung | Not treated |
R1‑106054 | PUCCH resource allocation with SORTD for channel selection | Pantech | Not treated |
R1‑106055 | Aperiodic CSI triggering for CA | Pantech | Not treated |
R1‑106056 | Subset design for PUCCH CSI mode 2 reporting | Pantech | Not treated |
R1‑106057 | PMI Pairing Table for MU-MIMO CQI Calculation | Pantech | Noted |
R1‑106058 | Remain issues of CS/OCC configuration for uplink DM-RS in LTE-Advanced | Pantech | Noted |
R1‑106059 | Detailed dynamic aperiodic SRS signaling | Pantech | Not treated |
R1‑106060 | ABS pattern in Macro-Femto deployments | Pantech | Not treated |
R1‑106061 | Clarification on inconsistent PDCCH | Panasonic, NTT DOCOMO, HTC | Noted - Revised |
R1‑106062 | Mapping Tables for Format 1b with Channel Selection for TDD | Panasonic | Not treated |
R1‑106063 | ACK/NACK resource indication for SORTD and SDM | Panasonic | Not treated |
R1‑106064 | Periodic CQI/PMI/RI Reporting for Carrier Aggregation | Panasonic | Not treated |
R1‑106065 | Way Forward on Periodic CQI/PMI/RI on PUCCH for CA | Panasonic | Revised |
R1‑106066 | Discussion on various UL transmission configurations | Panasonic | Not treated |
R1‑106067 | Simultaneous transmission of Scheduling request indicator and ACK/NACK information for LTE-Advanced | Panasonic | Not treated |
R1‑106068 | SORTD configurations for ACK/NACK information and SRI | Panasonic | Not treated |
R1‑106069 | Further considerations on ACK/NACK multiplexing schemes on PUSCH | Panasonic | Not treated |
R1‑106070 | SRS power control in Rel.10 | Panasonic | Noted |
R1‑106071 | Aperiodic CQI for Carrier Aggregation | Panasonic, HTC | Not treated |
R1‑106072 | Triggering of multiple aperiodic CQI in one subframe | Panasonic | Noted |
R1‑106073 | Reporting of multiple aperiodic CQI in one subframe | Panasonic | Not treated |
R1‑106074 | Deactivation timer and UCI on PUSCH | Panasonic | Not treated |
R1‑106075 | Views on CSI-RS / muting remaining issues | Panasonic | Not treated |
R1‑106076 | Performance Evaluation of 8Tx Codebook Subsampling in PUCCH 1-1 CSI Mode II | Panasonic | Not treated |
R1‑106077 | Double Codebook PUCCH Reporting in Rel-10 | Panasonic | Not treated |
R1‑106078 | Discussion on Multiple BCI and Delta CQI Reporting | Panasonic | Not treated |
R1‑106079 | Necessary modification for supporting 4 layers per transport block | Panasonic | Noted - Revised |
R1‑106080 | Discussion on remaining details of signalling for SU-MIMO | Panasonic | Not treated |
R1‑106081 | UCI resource size of retransmission on PUSCH with SU-MIMO transmission | Panasonic | Noted |
R1‑106082 | UL DMRS for PHICH triggered retransmission in SU-MIMO | Panasonic | Not treated |
R1‑106083 | OCC and CS for UL DMRS in SU/MU-MIMO | Panasonic | Noted |
R1‑106084 | Sequence Group Hopping of UL DMRS for MU-MIMO | Panasonic | Not treated |
R1‑106085 | Remaining issues on dynamic aperiodic SRS | Panasonic | Not treated |
R1‑106086 | R-PDCCH search space design | Panasonic | Not treated |
R1‑106087 | Resource allocation schemes of R-PDCCH | Panasonic | Not treated |
R1‑106088 | Mapping of physical resources to R-PDCCH | Panasonic | Not treated |
R1‑106089 | Impact of Sparse CCE Utilization on the PDCCH Performance in Macro/Pico HetNets with Cell Range Expansion | Panasonic | Not treated |
R1‑106090 | PDCCH interference Mitigation by Downlink Power Setting for Macro-Femto Scenario | Panasonic | Not treated |
R1‑106091 | DL/UL frame timing synchronization scheme for Heterogeneous Networks | Panasonic | Not treated |
R1‑106092 | Resource allocation for bundled A/N on PUCCH for TDD | Sharp | Not treated |
R1‑106093 | Simultaneous transmission of CQI and ACK/NACK on PUCCH for CA in Rel-10 | Sharp | Noted |
R1‑106094 | Cross carrier power control with group TPC commands | Sharp | Not treated |
R1‑106095 | Definition of Q'min for UCI on PUSCH | Sharp | Not treated |
R1‑106096 | Text Proposal for TxD for PUCCH Format 2a/2b When up to 2 Bits of HARQ-ACK are Reported | Sharp | Not treated |
R1‑106097 | Simulation Results for Multi-shot Dynamic Aperiodic SRS | Sharp | Not treated |
R1‑106098 | Remaining issues on Dynamic Aperiodic SRS signaling | Sharp | Not treated |
R1‑106099 | ACK/NACK on PUCCH for TDD | LG Electronics | Not treated |
R1‑106100 | Further Details on PUCCH Format 3 | LG Electronics | Not treated |
R1‑106101 | UCI Multiplexing on PUCCH | LG Electronics | Not treated |
R1‑106102 | Power Control for PUCCH Format 3 | LG Electronics | Not treated |
R1‑106103 | Consideration on Power Control for UL SU-MIMO | LG Electronics | Not treated |
R1‑106104 | UCI Transmission for Simultaneous PUCCH/PUSCH | LG Electronics | Not treated |
R1‑106105 | UL CC Selection for UCI Transmission on PUSCH | LG Electronics | Not treated |
R1‑106106 | Channel coding for UCI on PUSCH | LG Electronics | Noted |
R1‑106107 | Remaining CA Issues for Cell Activation/Deactivation and CIF | LG Electronics | Not treated |
R1‑106108 | Remaining Details in PUCCH Reporting Modes | LG Electronics, LG Uplus | Not treated |
R1‑106109 | Further Consideration on CQI Enhancement in LTE-A | LG Electronics | Revised |
R1‑106110 | Remaining Issues on PUSCH Transmission Modes and DCI Format Design in LTE-A | LG Electronics | Not treated |
R1‑106111 | Remaining details in UCI multiplexing on PUSCH | LG Electronics | Not treated |
R1‑106112 | Further consideration on UCI multiplexing in conjunction with CA | LG Electronics | Not treated |
R1‑106113 | Remaining Issues on PHICH Triggered SU-MIMO Retransmissions | LG Electronics | Not treated |
R1‑106114 | Discussion on Transmit Diversity for PUCCH Format 3 and for PUCCH format 1b with Channel Selection | LG Electronics | Not treated |
R1‑106115 | Transmission Mode for PUCCH Format 3 | LG Electronics | Not treated |
R1‑106116 | Remaining Issues on UL DM-RS for LTE-Advanced | LG Electronics | Not treated |
R1‑106117 | Details on Dynamic Aperiodic Sounding for LTE-Advanced | LG Electronics | Not treated |
R1‑106118 | Consideration on Cross Carrier Power Control | HTC | Not treated |
R1‑106119 | TPC commands in multiple DL grants | HTC | Not treated |
R1‑106120 | Remaining details on PHR | HTC | Withdrawn |
R1‑106121 | UCI on Simultaneous PUCCH/PUSCH Transmission | HTC | Withdrawn |
R1‑106122 | Triggering of Aperiodic CQI for DL CCs | HTC | Not treated |
R1‑106123 | Disscussion on HeNB measurements and reports | Institute for Information Industry (III), Coiler Corporation | Not treated |
R1‑106124 | Channel Selection Transmit Diversity in Release 10 | Research In Motion UK Limited | Not treated |
R1‑106125 | Remaining issue on power scaling for CA | Research In Motion UK Limited | Noted |
R1‑106126 | Multiplexing SRS and other uplink channels for CA | Research In Motion UK Limited | Not treated |
R1‑106127 | Remaining Details of Aperiodic SRS | Research In Motion UK Limited | Not treated |
R1‑106128 | DAI in UL grant for LTE-A TDD | LG Electronics | Not treated |
R1‑106129 | PUCCH resource allocation for ACK/NACK | LG Electronics | Not treated |
R1‑106130 | Perioidic CSI transmission on PUCCH | LG Electronics | Not treated |
R1‑106131 | SRS power control issue | LG Electronics | Noted |
R1‑106132 | TPC in multiple DL grants | LG Electronics | Not treated |
R1‑106133 | Cross carrier PC with DCI format 3/3A | LG Electronics | Not treated |
R1‑106134 | DL CC selection for aperiodic CSI triggering | LG Electronics | Noted |
R1‑106135 | Remaining Details in Non-interleaving R-PDCCH Transmission | LG Electronics | Not treated |
R1‑106136 | R-PDCCH REG mapping | LG Electronics | Not treated |
R1‑106137 | Way Forward on Un DL Resource Assignment | LG Electronics, Panasonic | Not treated |
R1‑106138 | Transmission modes for Un PDSCH | LG Electronics | Not treated |
R1‑106139 | TBS determination for Un link | LG Electronics | Not treated |
R1‑106140 | Un DL Resource Assignment | LG Electronics | Not treated |
R1‑106141 | Consideration on ACK/NACK blocking in Uu link for TDD | LG Electronics | Not treated |
R1‑106142 | Consideration on Un uplink channel design | LG Electronics | Not treated |
R1‑106143 | Details of eICIC in Macro-Pico case | LG Electronics | Not treated |
R1‑106144 | Impact of CRS interference | LG Electronics | Not treated |
R1‑106145 | Performance of CRE and resource specific CSI | LG Electronics | Not treated |
R1‑106146 | Remaining Issues in Macro-femto Case | LG Electronics | Not treated |
R1‑106147 | Evaluation of control channel coordination in co-channel CSG deployment | LG Electronics | Not treated |
R1‑106148 | Impact of Time domain eICIC on Uplink Interference | LG Electronics | Not treated |
R1‑106149 | Methods to facilitate the inter-cell coordination in heterogeneous networks | LG Electronics | Not treated |
R1‑106150 | ACK/NACK mapping tables for channel selection | Huawei, HiSilicon | Not treated |
R1‑106151 | Uplink ACK/NACK resource allocation for channel selection with ARI | Huawei, HiSilicon | Not treated |
R1‑106152 | ACK/NACK feedback with channal selection for TDD | Huawei, HiSilicon | Noted |
R1‑106153 | Simultaneous transmission of ACK and SR for channel selection in carrier aggregation | Huawei, HiSilicon | Not treated |
R1‑106154 | UCI multiplexing on PUSCH for carrier aggregation | Huawei, HiSilicon | Not treated |
R1‑106155 | Coding and resource mapping for UCI on PUSCH | Huawei, HiSilicon | Revised |
R1‑106156 | Discussion on CSI reporting modes on PUSCH | Huawei, HiSilicon | Noted |
R1‑106157 | Uplink antenna ports | Huawei, HiSilicon | Not treated |
R1‑106158 | Remaining issues for PHICH-triggered PUSCH retransmissions | Huawei, HiSilicon | Not treated |
R1‑106159 | TxD for format 1b with channel selection | Huawei, HiSilicon | Not treated |
R1‑106160 | Aperiodic sounding using DCI format 0 | Huawei, HiSilicon | Not treated |
R1‑106161 | R-PDCCH robustness | Huawei, HiSilicon | Not treated |
R1‑106162 | Details of Rel-8 based REG-level interleaving for R-PDCCH with CRS | Huawei, HiSilicon | Not treated |
R1‑106163 | Shortened format 2/2a/2b for Un PUCCH | Huawei, HiSilicon | Not treated |
R1‑106164 | Supported DCI formats for Un PDSCH/PUSCH transmission | Huawei, HiSilicon | Not treated |
R1‑106165 | Interference coordination for common channels in HetNet | Huawei, HiSilicon | Not treated |
R1‑106166 | Analysis of PCFICH performance issue and possible solutions | Huawei, HiSilicon | Not treated |
R1‑106167 | Downlink power control for macro-femto deployment | Huawei, HiSilicon | Not treated |
R1‑106168 | Evaluation Summary of Network Based Positioning | Andrew Corporation | Noted |
R1‑106169 | Remaining details of non-interleaving R-PDCCH search space | ETRI | Not treated |
R1‑106170 | Uplink power control for PUCCH format 3 | ETRI | Not treated |
R1‑106171 | Resource indication and mapping for PUCCH format 3 | ETRI | Revised |
R1‑106172 | Simultaneous SR and channel-selection based A/N | ETRI | Not treated |
R1‑106173 | Resource allocatioin for channel selection based A/N | ETRI | Not treated |
R1‑106174 | Remaining issue for format 3 resource allocation | NTT DOCOMO | Noted |
R1‑106175 | Remaining issue for Channel selection | NTT DOCOMO | Not treated |
R1‑106176 | Remaining issue of CSI-RS signaling | NTT DOCOMO | Noted |
R1‑106177 | Remaining issue of PDSCH muting | NTT DOCOMO | Not treated |
R1‑106178 | Views on CSI Feedback Signalling on PUCCH for Rel-10 | NTT DOCOMO | Not treated |
R1‑106179 | Views on Feedback Mode 3-2 on PUSCH for Rel-10 | NTT DOCOMO | Noted |
R1‑106180 | Views on MU CQI/PMI Feedback for Rel-10 | NTT DOCOMO | Noted |
R1‑106181 | Remaining issue for aperiodic SRS | NTT DOCOMO | Not treated |
R1‑106182 | Combination of Carrier Aggregation and Relay in Rel-10 | NTT DOCOMO | Not treated |
R1‑106183 | System Evaluation of Relay Performance | NTT DOCOMO | Not treated |
R1‑106184 | Remaining issues on eICIC for Rel-10 | NTT DOCOMO | Noted |
R1‑106185 | Investigation on CRS interference to Downlink Control Channel | NTT DOCOMO | Not treated |
R1‑106186 | Control channel ICIC for macro-femto deployments | NTT DOCOMO | Not treated |
R1‑106187 | Remaining issues on UE category for Rel-10 | NTT DOCOMO | Withdrawn |
R1‑106188 | Summary of email discussion on PUCCH format 1b with channel selection | NTT DOCOMO | Noted |
R1‑106189 | Summary of email discussion on PUCCH format 3 | NTT DOCOMO | Noted |
R1‑106190 | Timing for activation and deactivation of Scells | Nokia, Nokia Siemens Networks | Noted |
R1‑106191 | Remaining Issues on ACK/NAK Feedback in LTE-A TDD | Nokia, Nokia Siemens Networks | Noted |
R1‑106192 | On Mapping Table for Channel Selection | Nokia Siemens Networks, Nokia | Revised |
R1‑106193 | Remaining details for PUCCH A/N (FDD) | Nokia Siemens Networks, Nokia | Not treated |
R1‑106194 | Periodic CSI reporting for Carrier Aggregation | Nokia Siemens Networks, Nokia | Not treated |
R1‑106195 | Remaining issues on uplink power control | Nokia Siemens Networks, Nokia | Noted |
R1‑106196 | TP on type 1 and type 2 power headroom reporting | Nokia Siemens Networks, Nokia | Noted |
R1‑106197 | UCI details for simultaneous PUCCH and PUSCH transmission | Nokia Siemens Networks, Nokia | Not treated |
R1‑106198 | UCI details for carrier aggregation PUSCH | Nokia Siemens Networks, Nokia | Not treated |
R1‑106199 | Aperiodic CSI for carrier aggregation | Nokia Siemens Networks, Nokia | Noted |
R1‑106200 | CSI Ambiguity handling with CC activation/deactivation | Nokia Siemens Networks, Nokia | Not treated |
R1‑106201 | Remaining aspects of CSI-RS design | Nokia, Nokia Siemens Networks | Not treated |
R1‑106202 | Transmit Diversity in CSI-RS Subframes | Nokia, Nokia Siemens Networks | Noted |
R1‑106203 | Finalizing PUCCH signaling design | Nokia, Nokia Siemens Networks | Not treated |
R1‑106204 | On further enhancements of MU-MIMO feedback | Nokia, Nokia Siemens Networks | Noted |
R1‑106205 | On the introduction of PUSCH mode 3-2 | Nokia, Nokia Siemens Networks | Noted |
R1‑106206 | Remaining details of transmission mode 9 control signaling | Nokia, Nokia Siemens Networks | Not treated |
R1‑106207 | UL SU-MIMO control signalling details | Nokia Siemens Networks, Nokia | Noted |
R1‑106208 | On details of UCI multiplexing on PUSCH with SU-MIMO | Nokia Siemens Networks, Nokia | Not treated |
R1‑106209 | Performance evaluation on UL SU-MIMO channel interleaver | Nokia Siemens Networks, Nokia | Not treated |
R1‑106210 | On remaining details of OCC mapping and SGH disabling | Nokia Siemens Networks, Nokia | Noted |
R1‑106211 | On details of dynamic aperiodic SRS configuration | Nokia Siemens Networks, Nokia | Not treated |
R1‑106212 | Remaining Issues on Non-Interleaved R-PDCCH Search Space Design | Nokia, Nokia Siemens Networks | Not treated |
R1‑106213 | Remaining Issues on Un Subframe Configuration | Nokia, Nokia Siemens Networks | Not treated |
R1‑106214 | Discussion on the UL backhaul Design Aspects | Nokia Siemens Networks, Nokia | Not treated |
R1‑106215 | Type-1 Relay Performance for Uplink | Nokia, Nokia Siemens Networks | Not treated |
R1‑106216 | Type-1 Relay Performance for Downlink | Nokia Siemens Networks, Nokia | Not treated |
R1‑106217 | Details of restricted CSI measurements | Nokia Siemens Networks, Nokia | Noted |
R1‑106218 | Implementation of timing Requirements for Activation and Deactivation of SCells in RAN1 specification | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑106219 | Clarification on PRS muting | NEC Group | Revised |
R1‑106220 | Evaluation of MU-MIMO CQI/PMI Reporting Enhancement | NEC Group | Revised |
R1‑106221 | Simulation result of AN error on PUSCH for single layer case | NEC Group | Not treated |
R1‑106222 | On the remaining issues for PHICH triggered retransmission in UL SU-MIMO | NEC Group | Not treated |
R1‑106223 | Search space design and RE mapping for the Non-interleaved R-PDCCH (Mode 2) | NEC Group | Noted |
R1‑106224 | eNB transmission modes for Type 1 Relay Node | NEC Group | Not treated |
R1‑106225 | On the performance evaluation and improvement for relays | NEC Group | Not treated |
R1‑106226 | Performance of Range extension with Time-domain solution | NEC Group | Not treated |
R1‑106227 | Clarification of the power setting with the penetration loss consideration | NEC Group | Not treated |
R1‑106228 | Views on PUSCH based CQI reporting for 4Tx | Intel Corporation (UK) Ltd | Not treated |
R1‑106229 | Remaining aspects of CSI-RS and PDSCH muting configurations | Intel Corporation (UK) Ltd | Not treated |
R1‑106230 | On DCI Format 4 contents | Nokia Siemens Networks, Nokia | Not treated |
R1‑106231 | Minimum Resource Allocation for UCI on PUSCH | InterDigital Communications, LLC | Noted |
R1‑106232 | Aperiodic CQI reporting for multiple DL component carriers | Fujitsu | Not treated |
R1‑106233 | Remaining issues for aperiodic sounding | Fujitsu | Not treated |
R1‑106234 | An eICIC solution for Macro-Femto Deloyment in TDD system | Fujitsu | Not treated |
R1‑106235 | EICIC management via Fake Hybrid mode in Femto cell | Fujitsu | Not treated |
R1‑106236 | Macro UE initiated eICIC through CSG femto eNB | Fujitsu | Not treated |
R1‑106237 | Discussion on "LS on timing requirements for activation and deactivation of Scells" | HTC | Noted |
R1‑106238 | Discussion on virtual PHR | HTC | Withdrawn |
R1‑106239 | Uplink power control for multi-antenna transmission | HTC | Withdrawn |
R1‑106240 | 25.224 CR0260R2(Rel-8, F) Correction of MC-HSDPA DRX for 1.28Mcps TDD | TD Tech | Withdrawn |
R1‑106241 | 25.224 CR0261R2(Rel-9,A) Correction of MC-HSDPA DRX for 1.28Mcps TDD | TD Tech | Withdrawn |
R1‑106242 | 25.224 CR0263R1 (Rel-9, A) Clarification for special burst power calculation for 1.28Mcps TDD | TD Tech | Revised |
R1‑106243 | 25.221 CR0211R2 (Rel-10, B) Introduction of MC-HSUPA for 1.28Mcps TDD | TD Tech, CATT, ZTE, New Postcom | Agreed |
R1‑106244 | 25.223 CR0062R2 (Rel-10, B) Introduction of MC-HSUPA for 1.28Mcps TDD | TD Tech, CATT, ZTE, New Postcom | Agreed |
R1‑106245 | 25.225 CR099R2 (Rel-10, B) Introduction of MC-HSUPA for 1.28Mcps TDD | TD Tech, CATT, ZTE, New Postcom | Agreed |
R1‑106246 | 25.224 CR0259R1(Rel-10, B) Introduction of MU-MIMO for 1.28Mcps TDD | TD Tech, CATT, ZTE, New Postcom | Agreed |
R1‑106247 | Antenna gain infomation in distributed antenna system for 1.28Mcps TDD | TD Tech | Noted |
R1‑106248 | On the applicability of the IE Number of PCCH transmissions in CELL_PCH | Ericsson, ST-Ericsson | Noted |
R1‑106249 | 25.212 CR0290R2 (Rel-10,F) Clarification of 4C-HSDPA | Ericsson, ST-Ericsson, Qualcomm Incorporated | Noted - Revised |
R1‑106250 | 8C-HSDPA | Ericsson | Noted |
R1‑106251 | Multi-point transmission techniques for HSDPA | Ericsson, ST-Ericsson | Noted |
R1‑106252 | Some aspects of DC-HSDPA operation in single frequency network | ZTE | Not treated |
R1‑106253 | Consideration on uplink close loop transmit diversity for HSPA | ZTE | Not treated |
R1‑106254 | Bundling way for Format 1b with channel selection in LTE-A TDD | ZTE | Revised |
R1‑106255 | Downlink Performance Evaluations of the Time Domain eICIC with the Cell Range Expansion for Macro-Pico deployments in HetNet | KDDI | Revised |
R1‑106256 | Remaining details on uplink DM-RS | Mitsubishi Electric | Noted |
R1‑106257 | On synchronization issue for DC-HSUPA | Huawei, HiSilicon | Noted |
R1‑106258 | 25.214 CR0632 (Rel-9, F) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon | Noted - Revised |
R1‑106259 | 25.214 CR0633 (Rel-10, A) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon | Noted - Revised |
R1‑106260 | 25.214 CR0634 (Rel-7, F) Clarification of discontinuous uplink DPCCH transmission and compressed mode | Huawei, HiSilicon | Noted - Revised |
R1‑106261 | 25.214 CR0635 (Rel-8, A) Clarification of discontinuous uplink DPCCH transmission and compressed mode | Huawei, HiSilicon | Noted - Revised |
R1‑106262 | 25.214 CR0636 (Rel-9, A) Clarification of discontinuous uplink DPCCH transmission and compressed mode | Huawei, HiSilicon | Noted - Revised |
R1‑106263 | 25.214 CR0637 (Rel-10, A) Clarification of discontinuous uplink DPCCH transmission and compressed mode | Huawei, HiSilicon | Noted - Revised |
R1‑106264 | Overview of Closed Loop Transmit Diversity | Huawei, HiSilicon | Not treated |
R1‑106265 | Summary from email discussion on Improvements of distributed antenna for 1.28Mcps TDD | ZTE | Noted |
R1‑106266 | Discussion on Improvements of distributed antenna for 1.28Mcps TDD | ZTE | Noted |
R1‑106267 | Skeleton of TR for Improvements of distributed antenna for 1.28Mcps TDD | ZTE | Endorsed |
R1‑106268 | Introduction of TP for Improvements of distributed antenna for 1.28Mcps TDD | ZTE | Noted - Revised |
R1‑106269 | Introduction of MU-MIMO for 1.28Mcps TDD | ZTE | Noted - Revised |
R1‑106270 | Aperiodic CQI feedback on PUSCH for LTE-A | CATR | Not treated |
R1‑106271 | periodic CQI feedback on PUCCH for LTE-A | CATR | Not treated |
R1‑106272 | 25.224 CR0257R3 (Rel-10, B) Introduction of MC-HSUPA for LCR TDD | CATT | Agreed |
R1‑106273 | 25.221 CR0212R1(Rel-10, B) Introduction of MU-MIMO for 1.28Mcps TDD | CATT | Agreed |
R1‑106274 | 25.223 CR0063R1(Rel-10, B) Introduction of MU-MIMO for 1.28Mcps TDD | CATT | Agreed |
R1‑106275 | Performance of time versus carrier bundling for TDD ACK/NACK | Motorola | Noted |
R1‑106276 | CQI reporting for Carrier Aggregation | Motorola | Not treated |
R1‑106277 | Remaining details of CSI feedback on PUCCH and PUSCH | Motorola | Not treated |
R1‑106278 | Downlink System Performance of HetNet with Pico eNB | Motorola | Not treated |
R1‑106279 | Antenna pattern for Pico Cells | Motorola | Not treated |
R1‑106280 | RACH aided initiation of eICIC | Motorola | Not treated |
R1‑106281 | Remaining Detail on UL Power Control In Multi-Antenna Mode | Motorola | Not treated |
R1‑106282 | Parameter Setting during PHICH-Triggered SU-MIMO Re-transmissions | Motorola | Not treated |
R1‑106283 | Resource Allocation for UCI Mutiplexing on PUSCH in UL-MIMO | Motorola | Noted |
R1‑106284 | CSI Reporting Modes and Codebook Subsampling on PUCCH | Motorola | Revised |
R1‑106285 | CSI Reporting Modes and Codebook Subsampling on PUSCH | Motorola | Noted |
R1‑106286 | MU-CQI Discussion for Rel-10 | Motorola | Noted |
R1‑106287 | Remaining Aspects of CSI-RS in Rel-10 Operation | Motorola | Not treated |
R1‑106288 | PUSCH Mode Switching under AGI | Motorola | Noted |
R1‑106289 | On Remaining details on UL SU-MIMO Signalling | Motorola | Not treated |
R1‑106290 | On UL DM-RS SGH Disabling | Motorola | Not treated |
R1‑106291 | On Remaining details on dynamic aperiodic SRS triggering. | Motorola | Not treated |
R1‑106292 | Further details on Cell Range Expansion | Motorola | Not treated |
R1‑106293 | Details of transport block sizes mapped to three and four layers | Motorola | Noted |
R1‑106294 | On remaining details on Relay control signalling | Motorola | Not treated |
R1‑106295 | Periodic CQI reporting for CA | Motorola | Noted |
R1‑106296 | 36.213 Draft CR (Rel-10, B) Intro Rel-10 LTE-A features | Motorola | Noted - Revised |
R1‑106297 | 25.214 CR0638 (Rel-7, F) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106298 | 25.214 CR0639 (Rel-8, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106299 | 25.214 CR0640 (Rel-9, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106300 | 25.214 CR0641 (Rel-10, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106301 | 25.214 CR0642 (Rel-7, F) Correction to the CQI reporting when MAC-ehs is configured | Nokia, Nokia Siemens Networks | Noted |
R1‑106302 | 25.214 CR0643 (Rel-8, A) Correction to the CQI reporting when MAC-ehs is configured | Nokia, Nokia Siemens Networks | Noted |
R1‑106303 | 25.214 CR0644 (Rel-9, A) Correction to the CQI reporting when MAC-ehs is configured | Nokia, Nokia Siemens Networks | Noted |
R1‑106304 | 25.214 CR0645 (Rel-10, A) Correction to the CQI reporting when MAC-ehs is configured | Nokia, Nokia Siemens Networks | Noted |
R1‑106305 | 25.214 CR0646 (Rel-10, F) 4C-HSDPA summary of CQI reporting configurations | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106306 | UE power control in heterogeneous networks | ETRI | Not treated |
R1‑106307 | Consideration on Simultaneous Transmission of SRI and HARQ-ACK in case of channel selection^^ | ASUSTeK | Not treated |
R1‑106308 | Resource size calculation for AN and RI multiplexing on MIMO PUSCH | ASUSTeK | Noted |
R1‑106309 | UCI on PUSCH for carrier aggregation | Potevio | Not treated |
R1‑106310 | Multi-antenna SRS Enhancements for LTE-A | Potevio | Not treated |
R1‑106311 | Remaining Issues on CSI-RS | Potevio | Not treated |
R1‑106312 | Discussion on the solutions for common information interference coordination in TDD systems | CMCC | Not treated |
R1‑106313 | On non-PMI based feedback in Rel-10 | CMCC, CATT | Noted |
R1‑106314 | On utilization of MBSFN subframe for PDSCH transmission | CMCC | Not treated |
R1‑106315 | Discussion on 1st ABS pattern bitmap for TDD | CMCC | Not treated |
R1‑106316 | Un TBS Determination | CMCC, CATT | Not treated |
R1‑106317 | On uplink antenna port configuration | Research In Motion UK Limited | Not treated |
R1‑106318 | Remaining issues for UCI on PUSCH | Research In Motion UK Limited | Not treated |
R1‑106319 | Large Payload ACK/NACK Bits Mapping for TDD | Research In Motion UK Limited | Revised |
R1‑106320 | Way forward on non-interleaving R-PDCCH VRB to PRB mapping for RBG size 3 | Panasonic, LG Electronics | Not treated |
R1‑106321 | Remaining Details on Intra-cell CSI-RS in Rel-10 | LG Electronics | Not treated |
R1‑106322 | Remaining Details on Transmission Mode 9 | LG Electronics | Not treated |
R1‑106323 | On the LTE-Advanced feature support for low capability UEs | IPWireless | Not treated |
R1‑106324 | UE category and capability evolution in future LTE releases | IPWireless | Not treated |
R1‑106325 | System simulation results for UL Closed-Loop Transmit Diversity, HSPA | InterDigital Communications, LLC | Not treated |
R1‑106326 | Link level simulation results for UL Closed-Loop Transmit Diversity, HSPA. | InterDigital Communications, LLC | Not treated |
R1‑106327 | Further details on UE categories | Ericsson, ST-Ericsson | Noted |
R1‑106328 | Power control for channel selection | Ericsson, ST-Ericsson | Noted |
R1‑106329 | DL Carrier Aggregation together with UL Subframe Bundling | Ericsson, ST-Ericsson | Not treated |
R1‑106330 | TDD special subframe configuration for carrier aggregation | Ericsson, ST-Ericsson | Noted |
R1‑106331 | UTDOA simulation results summary and analysis | Ericsson | Noted |
R1‑106332 | On the PUCCH reporting modes for LTE-A CSI feedback | CHTTL | Not treated |
R1‑106333 | On the applicability of Number of PCCH Transmissions in Enhanced CELL_FACH | Qualcomm Incorporated | Noted |
R1‑106334 | Summary of candidate schemes for cell aggregation/switching in HSDPA | Qualcomm Incorporated | Not treated |
R1‑106335 | System Performance Evaluation of DF-DC | Qualcomm Incorporated | Not treated |
R1‑106336 | Introduction to UL MIMO for HSPA | Qualcomm Incorporated | Noted |
R1‑106337 | Consideration of HS-SFN Operation | Qualcomm Incorporated | Noted |
R1‑106338 | Draft CR: Introduction of Rel-10 LTE-Advanced features in 36.212 | Qualcomm Incorporated | Noted - Revised |
R1‑106339 | Remaining details of multi-bit A/N for TDD | Qualcomm Incorporated | Not treated |
R1‑106340 | Remaining details of PUCCH format 3 | Qualcomm Incorporated | Noted |
R1‑106341 | On the mapping table for PUCCH format 1b with channel selection to convey 2, 3, 4 bits | Qualcomm Incorporated | Not treated |
R1‑106342 | PUCCH resources for multi-bit ACK and resource indexing | Qualcomm Incorporated | Not treated |
R1‑106343 | A/N+SR with PUCCH format 1b with channel selection | Qualcomm Incorporated | Not treated |
R1‑106344 | PMI/CQI/RI configuration in support of CA | Qualcomm Incorporated | Noted |
R1‑106345 | Cross-carrier power control with DCI format 3/3A | Qualcomm Incorporated | Not treated |
R1‑106346 | Power control for multi-antenna transmission in Rel-10 | Qualcomm Incorporated | Noted |
R1‑106347 | Power control for multi-codeword transmission in Rel-10 | Qualcomm Incorporated | Noted |
R1‑106348 | Definition of Pcmax,c | Qualcomm Incorporated | Noted |
R1‑106349 | Aperiodic CQI report in CA | Qualcomm Incorporated | Noted |
R1‑106350 | UCI transmission for CA with and without PUSCH present | Qualcomm Incorporated | Not treated |
R1‑106351 | Remaining aspects of CSI RS | Qualcomm Incorporated | Noted |
R1‑106352 | SFBC PDSCH transmission in CSI-RS subframes | Qualcomm Incorporated | Noted |
R1‑106353 | Applicability of muting to certain messages | Qualcomm Incorporated | Not treated |
R1‑106354 | PUCCH 1-1 in support of LTE-A MIMO feedback | Qualcomm Incorporated | Not treated |
R1‑106355 | PUCCH 2-1 LTE-A MIMO feedback performance evaluation | Qualcomm Incorporated | Not treated |
R1‑106356 | PUCCH 2-1 design details in support of LTE-A MIMO feedback | Qualcomm Incorporated | Not treated |
R1‑106357 | PUSCH 3-1 LTE-A MIMO feedback | Qualcomm Incorporated | Noted |
R1‑106358 | PUSCH 3-2 LTE-A MIMO feedback | Qualcomm Incorporated | Noted |
R1‑106359 | Impact of PRB bundling on TDD operation with asymmetric UE antenna configuration | Qualcomm Incorporated | Not treated |
R1‑106360 | Remaining details of feedback for TM9 | Qualcomm Incorporated | Not treated |
R1‑106361 | CSI measurement reference | Qualcomm Incorporated | Noted |
R1‑106362 | Details of DCI format 4 | Qualcomm Incorporated | Noted |
R1‑106363 | UL transmission modes for LTE-A operation | Qualcomm Incorporated | Noted |
R1‑106364 | UL transmission mode configuration | Qualcomm Incorporated | Not treated |
R1‑106365 | Precoder switching for UL Tx | Qualcomm Incorporated | Not treated |
R1‑106366 | Antenna switching for UL MIMO | Qualcomm Incorporated | Not treated |
R1‑106367 | CQI UCI CW selection details | Qualcomm Incorporated | Not treated |
R1‑106368 | CQI only transmission on PUSCH | Qualcomm Incorporated | Noted |
R1‑106369 | Resource allocation for UCI on PUSCH | Qualcomm Incorporated | Not treated |
R1‑106370 | Remaining details for UL MIMO scheme for retransmissions triggered by PHICH | Qualcomm Incorporated | Not treated |
R1‑106371 | TxD scheme for PUCCH format 3 | Qualcomm Incorporated | Not treated |
R1‑106372 | TxD scheme for PUCCH format 1 with channel selection | Qualcomm Incorporated | Not treated |
R1‑106373 | Conveying OCC for PUSCH transmissions | Qualcomm Incorporated | Not treated |
R1‑106374 | Sequence Group Hopping for MU-MIMO operation | Qualcomm Incorporated | Not treated |
R1‑106375 | Further details on aperiodic dynamic SRS | Qualcomm Incorporated | Not treated |
R1‑106376 | Aperiodic SRS triggering in CA scenario | Qualcomm Incorporated | Not treated |
R1‑106377 | Remaining details of R-PDCCH search space | Qualcomm Incorporated | Not treated |
R1‑106378 | Finalizing R-PDCCH interleaver | Qualcomm Incorporated | Not treated |
R1‑106379 | On ambiguous R-PDCCH aggregation levels in multiplexing R-PDCCH with Un PDSCH | Qualcomm Incorporated | Not treated |
R1‑106380 | Details of restricted CSI measurements | Qualcomm Incorporated | Not treated |
R1‑106381 | Updated performance of TDM partition with CRS interference modeling | Qualcomm Incorporated | Not treated |
R1‑106382 | Link performance of DL control channels and PDSCH in presence of CRS interference | Qualcomm Incorporated | Not treated |
R1‑106383 | Techniques to help optimizing the CRE gains | Qualcomm Incorporated | Not treated |
R1‑106384 | Specification impact of time-domain/power-setting solutions | Qualcomm Incorporated | Not treated |
R1‑106385 | Relay Node capability considerations for Machine-Type Communications | IPWireless | Not treated |
R1‑106386 | CSI feedback in large coherence bandwidth environments | Telefonica | Not treated |
R1‑106387 | On Macro-Femto interference handling | Ericsson, ST-Ericsson | Not treated |
R1‑106388 | Liaison Statement to 3GPP on LTE-A Synchronization requirements | ITU-T Study Group 15, Calnex Solutions, Ericsson | Noted |
R1‑106389 | Discussions on Rel-10 PUCCH 1-1 extension | Intel Corporation (UK) Ltd | Not treated |
R1‑106390 | Remaining issues on reference formats for PHR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑106391 | Summary of email discussion on PUCCH/PUSCH selection | Fujitsu | Noted |
R1‑106392 | HSDPA Carrier Aggregation beyond 4C-HSDPA | T-Mobile | Noted |
R1‑106393 | System performance of SFDC-HSDPA | Huawei, HiSilicon | Not treated |
R1‑106394 | Clarification on power scaling | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑106395 | Remaining issues for selection of PUSCH for UCI transmission | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑106396 | Specification considerations related to ABS for RLM and RSRP/RSRQ measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑106397 | On restricted CSI measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑106398 | PUCCH format 3 resource selection | Ericsson, ST-Ericsson | Noted |
R1‑106399 | On CSI measurements on restricted subframes | Texas Instruments | Noted |
R1‑106400 | Evaluation of Inter-cell Interference issues for PUCCH Format 3 | Interdigital Communications, LLC | Revised |
R1‑106401 | On Mapping Table for Channel Selection | Nokia Siemens Networks, Nokia | Not treated |
R1‑106402 | Discussion on E-DPCCH gain factor calculation in compressed mode | Nokia, Nokia Siemens Networks | Withdrawn |
R1‑106403 | 25.214 CRdraft (Rel-7, F) Clarification of E-DPCCH gain factor quantization in compressed mode | Nokia, Nokia Siemens Networks | Withdrawn |
R1‑106404 | Discussion on CSI-RS collision avoidance | Ericsson, ST-Ericsson | Noted |
R1‑106405 | 36.211 Draft CR (Rel-9, F) Clarification on PRS muting | NEC Group, Qualcomm Incorporated | Noted |
R1‑106406 | Resource indication and mapping for PUCCH format 3 | ETRI | Not treated |
R1‑106407 | UL SU-MIMO power control and delta_TF setting | Samsung | Noted |
R1‑106408 | Downlink Performance Evaluations of the Time Domain eICIC with the Cell Range Expansion for Macro-Pico deployments in HetNet | KDDI | Not treated |
R1‑106409 | Remaining issues of UCI multiplexing on PUSCH | ZTE | Not treated |
R1‑106410 | Final report of RAN1#62bis meeting | MCC Support | Approved |
R1‑106411 | Details of PUCCH 2-1 for 8TX | Marvell | Not treated |
R1‑106412 | 36.211 Draft CR (Rel-10, B) Introduction of Rel-10 features | Ericsson | Noted - Revised |
R1‑106413 | Minutes from RAN1#63 HSPA sessions | HSPA session chairman (Ericsson) | Endorsed |
R1‑106414 | 25.222 CR0208 (Rel-10, B) Introduction of MU-MIMO for 1.28Mcps TDD | ZTE | Agreed |
R1‑106415 | TP for Introduction of Improvements of distributed antenna for 1.28Mcps TDD | ZTE | Noted - Revised |
R1‑106416 | 25.214 CR0628R2 (Rel-7, F) Clarification of E-DPCCH gain factor calculation in compressed mode | Nokia, Nokia Siemens Networks | Agreed |
R1‑106417 | 25.214 CR0629R2 (Rel-8, A) Clarification of E-DPCCH gain factor calculation in compressed mode | Nokia, Nokia Siemens Networks | Agreed |
R1‑106418 | 25.214 CR0630R2 (Rel-9, A) Clarification of E-DPCCH gain factor calculation in compressed mode | Nokia, Nokia Siemens Networks | Agreed |
R1‑106419 | 25.214 CR0631R2 (Rel-10, A) Clarification of E-DPCCH gain factor calculation in compressed mode | Nokia, Nokia Siemens Networks | Agreed |
R1‑106420 | 25.214 CR0647 (Rel-7, F) On the applicability of Number of PCCH Transmissions in Enhanced CELL_FACH | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑106421 | 25.214 CR0648 (Rel-8, A) On the applicability of Number of PCCH Transmissions in Enhanced CELL_FACH | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑106422 | 25.214 CR0649 (Rel-9, A) On the applicability of Number of PCCH Transmissions in Enhanced CELL_FACH | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑106423 | 25.214 CR0650 (Rel-10, A) On the applicability of Number of PCCH Transmissions in Enhanced CELL_FACH | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑106424 | 25.214 CR0634R1 (Rel-7, F) Clarification of discontinuous uplink DPCCH transmission and compressed mode | Huawei, HiSilicon, InterDigital Communication LLC, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑106425 | 25.214 CR0635R1 (Rel-8, A) Clarification of discontinuous uplink DPCCH transmission and compressed mode | Huawei, HiSilicon, InterDigital Communication LLC, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑106426 | 25.214 CR0636R1 (Rel-9, A) Clarification of discontinuous uplink DPCCH transmission and compressed mode | Huawei, HiSilicon, InterDigital Communication LLC, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑106427 | 25.214 CR0637R1 (Rel-10, A) Clarification of discontinuous uplink DPCCH transmission and compressed mode | Huawei, HiSilicon, InterDigital Communication LLC, Qualcomm Incorporated, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑106428 | 25.214 CR0638R1 (Rel-7, F) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106429 | 25.214 CR0639R1 (Rel-8, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106430 | 25.214 CR0640R1 (Rel-9, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106431 | 25.214 CR0641R1 (Rel-10, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑106432 | Draft LS to RAN5 on CQI reporting when MAC-ehs is configured | Nokia | Revised |
R1‑106433 | 25.214 CR0632R1 (Rel-9, F) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon | Withdrawn |
R1‑106434 | 25.214 CR0633R1 (Rel-10, A) Correction to CPC procedure for DC-HSUPA | Huawei, HiSilicon | Withdrawn |
R1‑106435 | 25.212 CR0290R3 (Rel-10, F) Clarification of 4C-HSDPA | Ericsson, ST-Ericsson, Qualcomm Incorporated | Agreed |
R1‑106436 | 25.212 CR0294 (Rel-9, F) Clarification of DC-HSDPA-MIMO | Ericsson, ST-Ericsson, Qualcomm Incorporated | Agreed |
R1‑106437 | 25.212 CR0295 (Rel-10, F) 4C-HSDPA summary of CQI reporting configurations | Nokia Siemens Networks, Nokia, Ericsson, ST-Ericsson | Agreed |
R1‑106438 | Discussion on the Un subframe configuration in the presence of almost blank subframe | LGE | Not treated |
R1‑106439 | AGI compensation for UE Tx Power Control Error in Rel-10 UL PC | Sharp | Not treated |
R1‑106440 | Finalizing specification for RE muting | LGE | Not treated |
R1‑106441 | Timing Requirements for Activation and Deactivation of SCells in RAN1 specification | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Agreed |
R1‑106442 | Draft LS reply on Timing Requirements for Activation and Deactivation of Scells | Alcatel-Lucent | Noted - Revised |
R1‑106443 | Draft LS Response on UL Mobility Load Balancing utilising UL TPC parameters | Huawei, HiSilicon | Noted - Revised |
R1‑106444 | Bundling way for Format 1b with channel selection in LTE-A TDD | ZTE | Not treated |
R1‑106445 | Draft reply on LTE-A Synchronization requirements | Ericsson | Withdrawn |
R1‑106446 | Coding and resource mapping for UCI on PUSCH | Huawei, HiSilicon | Noted |
R1‑106447 | Bursty traffic results of Macro/Pico HetNets with Cell Range Expansion | Panasonic | Not treated |
R1‑106448 | 36.211 Draft CR (Rel-10, B) Introduction of Rel-10 features | Ericsson | Noted - Revised |
R1‑106449 | 36.212 Draft CR (Rel-10, B) Introduction of Rel-10 features | Qualcomm Incorporated | Noted - Revised |
R1‑106450 | 36.213 Draft CR (Rel-10, B) Intro Rel-10 LTE-A features | Motorola | Noted - Revised |
R1‑106451 | 25.214 CR0628R1 (Rel-7, F) Clarification of E-DPCCH gain factor quantization in compressed mode | Nokia, Nokia Siemens Networks, Infineon Technologies | Noted - Revised |
R1‑106452 | 25.214 CR0629R1 (Rel-8, A) Clarification of E-DPCCH gain factor quantization in compressed mode | Nokia, Nokia Siemens Networks, Infineon Technologies | Noted - Revised |
R1‑106453 | 25.214 CR0630R1 (Rel-9, A) Clarification of E-DPCCH gain factor quantization in compressed mode | Nokia, Nokia Siemens Networks, Infineon Technologies | Noted - Revised |
R1‑106454 | 25.214 CR0631R1 (Rel-10, A) Clarification of E-DPCCH gain factor quantization in compressed mode | Nokia, Nokia Siemens Networks, Infineon Technologies | Noted - Revised |
R1‑106455 | Remaining details of PUCCH reporting modes | ZTE | Withdrawn |
R1‑106456 | Remaining details of PUSCH reporting modes | ZTE | Noted |
R1‑106457 | 25.224 CR0263R2 (Rel-9, F) Clarification for special burst power calculation for 1.28Mcps TDD | TD Tech, CMCC, CATT, ZTE, Newpostcom | Agreed |
R1‑106458 | LS on inclusion of RF measurements into MDT report | SA5, Motorola | Noted |
R1‑106459 | Way forward on scrambling for UL-MIMO UCI multiplexing | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, Samsung, Texas Instrument, ZTE | Noted |
R1‑106460 | Draft LS on Pcmax,c | Qualcomm Incorporated | Noted - Revised |
R1‑106461 | Proposal for further discussion on CSI restricted measurements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm | Noted |
R1‑106462 | Evaluation of PUSCH 3-2 vs. enhanced PUSCH 3-1 | Samsung | Noted |
R1‑106463 | UTDOA Results | TruePosition | Noted |
R1‑106464 | Evaluation of MU-MIMO CQI/PMI Reporting Enhancement | NEC Group | Noted |
R1‑106465 | LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.1457-10 ^^TO REVISION 11 | ITU-R Working Party 5D | Withdrawn |
R1‑106466 | Performance evaluation of multi-user CQI | Ericsson, ST-Ericsson | Noted |
R1‑106467 | Further Consideration on CQI Enhancement in LTE-A | LG Electronics | Noted |
R1‑106468 | Draft LS on Summary of UTDOA Evaluation in RAN1 | Alcatel-Lucent | Revised |
R1‑106469 | PUSCH CSI reporting modes | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑106470 | CQI Enhancement for PUSCH | Marvell | Noted |
R1‑106471 | Way forward on Placing DL Assignment and UL Grant | LG Electronics, NEC, Samsung, ETRI, ZTE | Not treated |
R1‑106472 | Way forward on Un Subframe Configuration in the Presence of Almost Blank Subframe | LG Electronics, CMCC, Orange, RIM | Not treated |
R1‑106473 | Remaining details of search space design for non-interleaved R-PDCCH | Ericsson, ST-Ericsson, Huawei, HiSilicon, RIM, Vodafone, Qualcomm, ZTE | Noted |
R1‑106474 | On DCI formats | Ericsson, ST-Ericsson | Noted |
R1‑106475 | WF on RN capabilities | Huawei, HiSilicon, ZTE, RIM, NEC, ETRI, Vodafone | Not treated |
R1‑106476 | Proposal on Un TBS Determination | CMCC, CATT, LGE | Not treated |
R1‑106477 | Evaluation of Inter-cell Interference issues for PUCCH Format 3 | Interdigital Communications, LLC | Noted |
R1‑106478 | 36.216 CR0001 (Rel-10, B) Capturing of further agreements on relaying | Panasonic | Agreed |
R1‑106479 | Large Payload ACK/NACK Bits Mapping for TDD | Research In Motion UK Limited | Not treated |
R1‑106480 | Way forward on Transmit Diversity for PUCCH Format 3 | LG Electronics, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Huawei, HiSilicon, Interdigital, ZTE, Pantech, Qualcomm, Mitsubishi Electric, CMCC, CATT, ETRI, HTC, NTT DoCoMo, Sharp, MediaTek | Noted |
R1‑106481 | Discussion on channel selection for TDD | Samsung | Noted |
R1‑106482 | WF on triggering of aperiodic CSI | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm | Noted |
R1‑106483 | Way Forward on Periodic CQI/PMI/RI on PUCCH for CA | Panasonic, Nokia, Nokia Siemens Networks, Motorola, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Texas Instruments | Noted |
R1‑106484 | Way Forward on Triggering Aperiodic CQI-only PUSCH Transmission in UL-MIMO | ZTE, Samsung, Huawei, HiSilicon | Noted |
R1‑106485 | WF on CSI restricted measurements | Ericsson, Nokia, Nokia Siemens Network, ST-Ericsson | Noted |
R1‑106486 | WF on Q'min for UCI on PUSCH | Samsung, Ericsson, ST-Ericsson, Sharp, LGE | Noted |
R1‑106487 | WF on TDD ACK/NACK in Rel-10 | Samsung, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Motorola, NEC, Panasonic | Noted |
R1‑106488 | WF on Precoder Signaling for DCI Format 4 | Ericsson, ST-Ericsson, Qualcomm, TI | Noted |
R1‑106489 | WF on CSI restricted measurements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, Qualcomm | Revised |
R1‑106490 | WF on CSI restricted measurements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, Qualcomm | Noted |
R1‑106491 | Harmonized way forward on finalizing PHICH-Triggered Retransmission | Texas Instruments, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Ericsson, ST-Ericsson, Intel, Mitsubishi, Motorola, Panasonic, Samsung, ZTE | Noted |
R1‑106492 | Way Forward on transmission timing for aperiodic SRS | Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, KDDI, LG Electronics, Motorola, Nokia, Nokia Siemens Networks, NTT DOCOMO, Panasonic, Research In Motion, Sharp, ST-Ericsson, Texas Instruments | Noted |
R1‑106493 | Discussions on aperiodic SRS parameters | Sharp | Noted |
R1‑106494 | Way forward on UL DMRS SGH | Panasonic, Nokia Siemens Network, Nokia, Motorola, Mitsubishi, Qualcomm, CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell | Noted |
R1‑106495 | WF on TDD ACK/NACK in Rel-10 | CATT, CATR, CMCC | Noted |
R1‑106496 | Draft LS on CSI measurements on restricted subframes for eICIC | Fujitsu | Revised |
R1‑106497 | LS on Pcmax,c | RAN1, Qualcomm Incorporated | Agreed |
R1‑106498 | Resource allocation proposal for channel selection | Huawei, HiSilicon | Not treated |
R1‑106499 | ACK/NACK on PUSCH | CATT | Noted |
R1‑106500 | WF on RN Capability | Huawei, HiSilicon, ZTE, RIM, NEC, ETRI, Ericsson, ST-Ericsson, Vodafone, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Orange, Qualcomm, CMCC, Samsung, Deutche Telekom, IPWireless, ITRI, LGE | Agreed |
R1‑106501 | Draft LS on UE categories | Ericsson | Noted - Revised |
R1‑106502 | WF for PUSCH Mode 3-2 for Rel 10 | Alcatel-Lucent, AT&T, Motorola, Qualcomm | Noted |
R1‑106503 | Proposals on TDD ACK/NAK feedback in Rel-10 | Nokia, Nokia Siemens Networks | Noted |
R1‑106504 | CSI Reporting Modes and Codebook Subsampling on PUCCH | Motorola | Not treated |
R1‑106505 | Way Forward on frequency hopping for aperiodic SRS | Alcatel Lucent, Alcatel Lucent Shanghai Bell, KDDI, LG Electronics, Research In Motion, Sharp, Texas Instruments | Noted |
R1‑106506 | Way Forward on Periodic CSI | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CMCC, Huawei, HiSilicon, RIM, Samsung | Noted |
R1‑106507 | WF on CSI enhancement for Rel-10 | Huawei, Ericsson, HiSilicon, ST- Ericsson, Marvell, CHTTL, CATT, ITRI, New Postcom, Motorola | Noted |
R1‑106508 | WF on DCI Format 4 details | Motorola, Huawei, HiSilicon, Alcatel-Lucent, ALU-SB, ZTE, CATT, Nokia, NSN | Noted |
R1‑106509 | Finalization on Mapping Table for FDD/TDD | Panasonic, LG Electronics, NTT DOCOMO, Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Samsung, Huawei, HiSilicon, Pantech, Motorola, NEC | Noted |
R1‑106510 | WF on PUSCH Mode 3-2 | Broadcom, HTC, Intel, LG Electronics, Nokia, Pantech, Qualcomm, RIM, Samsung, Texas Instruments, Nokia Siemens Networks, Vodafone | Noted |
R1‑106511 | WF on soft buffer size allocation for Rel-10 UE | CATT, CATR, Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks | Noted |
R1‑106512 | Aperiodic SRS configuration with DCI formats 0/1a | Samsung | Noted |
R1‑106513 | Soft buffer size allocation for Rel-10 downlink | Huawei, HiSilicon | Noted |
R1‑106514 | WF on further details about PUCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T, CATT, Ericsson, ETRI, HiSilicon, Huawei, Icera Inc., Intel, LG Electronics, LG-Ericsson, LG Uplus,, Nokia, Nokia Siemens Networks, RIM, Potevio, Samsung, ST-Ericsson, Texas Instruments | Agreed |
R1‑106515 | Draft LS on CSI measurements on restricted subframes for eICIC | Fujitsu | Not treated |
R1‑106516 | Necessary modification for supporting 4 layers per transport block | Panasonic | Agreed |
R1‑106517 | Remaining details on PUCCH format 3 for LTE-A TDD | Huawei, HiSilicon | Not treated |
R1‑106518 | WF on the usage of CSI-RS with transmission mode 9 | Ericsson, ST-Ericsson, Huawei, HiSilicon, LG Electronics, Qualcomm, Motorola, Nokia Siemens Networks, Nokia, CMCC, Intel, CATT, Panasonic, NTT DoCoMo, Orange, New Postcom, Potevio | Agreed |
R1‑106519 | Way Forward on collisions with CSI-RS for FDD and TDD | Huawei, HiSilicon, Texas Instruments, NTT DOCOMO, CATT, Panasonic, Ericsson, ST-Ericsson | Noted |
R1‑106520 | Way Forward on CSI-RS and PDSCH muting | Huawei, HiSilicon, Deutsche Telekom, NTT DOCOMO, Vodafone, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Fujitsu, Intel, Motorola, NEC, New Postcom, Panasonic, Qualcomm, Samsung, Sharp, Sony Cooperation, Texas Instruments | Noted |
R1‑106521 | Way Forward on final details on CSI-RS | Huawei, HiSilicon, Panasonic | Noted |
R1‑106522 | Way Forward on CSI-RS and muting configurations exchange over X2 interface | Huawei, HiSilicon, NTT Docomo, Samsung, LG Electronics, CATT, Panasonic | Noted |
R1‑106523 | LS on UE categories | RAN1, Ericsson | Agreed |
R1‑106524 | LS reply on Timing Requirements for Activation and Deactivation of Scells | RAN1, Alcatel-Lucent | Agreed |
R1‑106525 | WF on Periodic CQI/PMI/RI in CA | Ericsson, Motorola, Nokia, NSN, Panasonic,Qualcomm Incorporated, ST-Ericsson, TI | Noted |
R1‑106526 | Draft LS to RAN5 on CQI reporting when MAC-ehs is configured | Nokia | Noted - Revised |
R1‑106527 | Transmission scheme for TM9 in MBSFN subframe with DCI format 1A | LGE, Qualcomm, Samsung, Motorola | Noted |
R1‑106528 | Report of the offline discussion on codebook subset restriction | Samsung | Noted |
R1‑106529 | WF on eICIC | Alcatel-Lucent, ASUSTeK, AT&T, CATT, CATR, CHTTL, CMCC, Deutsche Telecom, Ericsson, ETRI, Fujitsu, HiSilicon, Hitachi, Huawei, HTC, Intel, InterDigital, KDDI, Kyocera, LGE, MediaTek, Motorola, Mitsubishi, Nokia, NSN, et al | Agreed |
R1‑106530 | LS on introduction of radio bearer combination for DC-HSDPA and MIMO | RAN5, Ericsson | Noted |
R1‑106531 | UL MIMO and UL RS Ad-hoc Session Summary | Ad-Hoc chairman (Samsung) | Endorsed |
R1‑106532 | DL RS Ad-hoc Session Summary | Ad-Hoc chairman (NTT DoCoMo) | Endorsed |
R1‑106533 | Summary of ad hoc session of PUSCH/PUCCH/SRS | Ad-Hoc chairman (NTT DoCoMo) | Endorsed |
R1‑106534 | Clarification on relation between PHICH duration and CFI in TS36.211 | NTT DOCOMO, Qualcomm, LGE, CATT, Nokia, NSN, Ericsson, ST-Ericsson, Motorola, Panasonic, Huawei, HiSilicon, NEC, Sharp, Fujitsu, ALU, ASB, TI | Noted |
R1‑106535 | Definition of Almost blank subframe | NTT DoCoMo | Noted |
R1‑106536 | Status of offline discussion on PUCCH/PUSCH/SRS | Fujitsu | Noted |
R1‑106537 | Draft LS on handling of collisions between CSI-RS and SIB | Huawei | Noted - Revised |
R1‑106538 | Proposal on non-interleaving R-PDCCH | Nokia, Nokia Siemens Networks, CATT, CMCC, LG E, Vodafone, Panasonic, ETRI | Noted |
R1‑106539 | 36.213 DraftCR on Clarification on inconsistent PDCCH | Panasonic, NTT DOCOMO, HTC, Motorola, Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Fujitsu | Noted |
R1‑106540 | WF on aperiodic CSI triggerring | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Nokia, Nokia Siemens Networks, Panasonic, Qualcomm, Samsung, Sharp, ST-Ericsson, Texas Instruments | Noted |
R1‑106541 | Draft LS on Summary of UTDOA Evaluation in RAN1 | Alcatel-Lucent | Revised |
R1‑106542 | LTE-A TDD ACK/NACK with channel selection | Huawei, HiSilicon | Noted |
R1‑106543 | Draft LS on Summary of UTDOA Evaluation in RAN1 | Alcatel-Lucent | Noted - Revised |
R1‑106544 | WF on DCI Format for 1 port CSI-RS | CATT, CMCC, Ericsson, ETRI, Intel, Hitachi, HTC, KDDI, KT, NEC, NTT DOCOMO, Pantech, RIM, Samsung, ST-Ericsson | Noted |
R1‑106545 | 25.214 CR0638R2 (Rel-7, F) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑106546 | 25.214 CR0639R2 (Rel-8, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑106547 | 25.214 CR0640R2 (Rel-9, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑106548 | 25.214 CR0641R2 (Rel-10, A) Correction to the single stream CQI reporting in MIMO mode | Nokia Siemens Networks, Nokia, Qualcomm Incorporated | Agreed |
R1‑106549 | LS to RAN5 on CQI reporting when MAC-ehs is configured | RAN1, Nokia | Agreed |
R1‑106550 | LS Response on UL Mobility Load Balancing utilizing ULTPC Parameters | RAN1, Huawei | Agreed |
R1‑106551 | LS on CSI measurements on restricted subframes for eICIC | RAN1, Fujitsu | Agreed |
R1‑106552 | LS on definition of ABS | RAN1, Alcatel-Lucent | Agreed |
R1‑106553 | LS on handling of collisions between CSI-RS and SIB | RAN1, Huawei | Agreed |
R1‑106554 | TR25.865 v1.0.0 Introduction of Improvements of distributed antenna for 1.28Mcps TDD | ZTE | Noted - Revised |
R1‑106555 | 36.211 CR0148 (Rel-10, B) Introduction of Rel-10 LTE-Advanced features in 36.211 | Ericsson | Agreed |
R1‑106556 | 36.212 CR0100 (Rel-10, B) Introduction of Rel-10 LTE-Advanced features in 36.212 | Qualcomm Incorporated | Agreed |
R1‑106557 | 36.213 CR0270 (Rel-10, B) Introduction of Rel-10 LTE-Advanced features in 36.213 | Motorola | Agreed |
R1‑106558 | TR25.865 v1.0.1 Introduction of Improvements of distributed antenna for 1.28Mcps TDD | ZTE | Agreed |
R1‑106559 | LS on Summary of UTDOA Evaluation in RAN1 | RAN1, Alcatel-Lucent | Agreed |
R1‑106560 | 36.201 CR0006 (Rel-10, B) Introduction of Rel-10 LTE-Advanced features in 36.201 | Alcatel-Lucent | Agreed |
R1‑106561 | Update on L1 parameters for WIs CA, ULMA and eDLMA | Ericsson, ST-Ericsson | Agreed |
R1‑106562 | LS on updated parameters for Rel-10 | RAN1, Ericsson | Agreed |
R1‑106563 | LS on RN capabilities | RAN1, Huawei | Agreed |
page generated from database: 2024-04-13 13:51:47