3GPP TDocs (written contributions) at meeting
Meeting: GP-48 - 2010-11-22 to 2010-11-26, San Jose Del Cabo
meeting id: GP-48 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
GP‑101661 | Draft Agenda for TSG GERAN no. 48 in San Jose' del Cabo | GERAN Chairman | - |
GP‑101662 | Draft Agenda for TSG GERAN WG1 during TSG GERAN no. 48 in San Jose' del Cabo | GERAN WG1 Chairman | - |
GP‑101663 | Draft Agenda for TSG GERAN WG2 during TSG GERAN no. 48 in San Jose' del Cabo | GERAN WG2 Chairman | - |
GP‑101664 | Draft Agenda for TSG GERAN WG3new no. 48 ("electronic agreement") (revised in GP-101671) | GERAN WG3 Chairman | - |
GP‑101665 | Reply LS on the elimination of the execution of test cases requiring "Memory Full" condition | TSG CT WG6 | - |
GP‑101666 | Reply to LS on SDCCH only devices and TC applicability | GERAN WG2 | - |
GP‑101667 | Response LS from PTCRB on SDCCH only Devices and TC Applicability | PTCRB | - |
GP‑101668 | Response LS from PTCRB on USIM introduction in TS 51.010 | PTCRB | - |
GP‑101669 | LS on Eliminate execution of test cases requiring “Memory Full” condition | GCF CAG | - |
GP‑101670 | LS on Use of an Antenna Measurement method for GSM Frequency Bands | GCF CAG | - |
GP‑101671 | Draft Agenda for TSG GERAN WG3new no. 48 ("electronic agreement") (revision of GP-101664) | GERAN WG3 Chairman | - |
GP‑101672 | CR 51.010-5-0103 Update for the latest version of TTCN (Rel-9) | TF 160 | - |
GP‑101673 | CR 51.010-5-0104 Correction to test case 20.25.2, 20.25.3, 20.25.4 (Rel-9) | TF 160 | - |
GP‑101674 | CR 36.523-1-1016 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) (Rel-9) | Research in Motion UK Limited | - |
GP‑101675 | CR 36.523-1-1017 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) (Rel-9) | Research in Motion UK Limited | - |
GP‑101676 | CR 36.523-1-1018 Addition of new row for test case 6.2.3.24 and 6.2.3.26 in Table 4-1: Applicability of tests and additional information for testing (Rel-9) | Research in Motion UK Limited | - |
GP‑101677 | CR 51.010-1-4523 Addition of GNSS ‘MO-LR : Multiple RRLP Requests with Different Extended Reference Number’ test case (Rel-9) | Thales | - |
GP‑101678 | CR 51.010-1-4524 Addition of GNSS ‘MO-LR : RR Management Commands’ test case (Rel-9) | Thales | - |
GP‑101679 | CR 51.010-1-4525 Addition of GNSS ‘MT-LR Location Error: GNSS assistance data missing’ test case (Rel-9) | Thales | WITHDRAWN |
GP‑101680 | CR 51.010-1-4526 Addition of GNSS ‘MT-LR Location Error: Requested Method not Supported’ test case (Rel-9) | Thales | - |
GP‑101681 | CR 51.010-1-4527 Addition of GNSS ‘MT-LR : Multiple RRLP Requests with Different Reference Number’ test case (Rel-9) | Thales | - |
GP‑101682 | CR 51.010-1-4528 Addition of GNSS ‘MT-LR : Multiple RRLP Requests with Same Reference Number and Extended Reference Number’ test case (Rel-9) | Thales | - |
GP‑101683 | CR 51.010-1-4529 Addition of GNSS ‘MT-LR : Multiple RRLP Requests with Different Extended Reference Number’ test case (Rel-9) | Thales | - |
GP‑101684 | CR 51.010-1-4530 Addition of GNSS ‘MT-LR : RR Management Commands’ test case (Rel-9) | Thales | - |
GP‑101685 | CR 51-010-1-4531 42.4.8.4.4 BA IND of SI 2 and SI2bis in step 6 to be set to 1 (Rel-9) | Rohde & Schwarz | - |
GP‑101686 | CR 51-010-1-4532 26.9.6a.1.2 T3243 timer adjustment to core specs (Rel-9) | Rohde & Schwarz, Qualcomm Incorporated | - |
GP‑101687 | CR 51-010-1-4533 26.9.6a.1.5 T3242 timer adjustment to core specs (Rel-9) | Rohde & Schwarz, Qualcomm Incorporated | - |
GP‑101688 | CR 51-010-1-4534 26.6.8.4 Test scenario can’t be applied for A5/4 (Rel-9) | Rohde & Schwarz | WITHDRAWN |
GP‑101689 | CR 51-010-2-0679 26.6.8.4 Test scenario can’t be applied for A5/4 (Rel-9) | Rohde & Schwarz | WITHDRAWN |
GP‑101690 | CR 51-010-1-4535 26.7.4.5.5 Additional fields on SIM considered by a note (Rel-9) | Rohde & Schwarz | - |
GP‑101691 | CR 51-010-1-4536 42.7.6 Test procedure and changed to two phase access (Rel-9) | Rohde & Schwarz | - |
GP‑101692 | CR 51-010-2-0680 42.7.6 Test adjusted due to two phase access (Rel-9) | Rohde & Schwarz | - |
GP‑101693 | CR 51-010-1-4542 42.4.6.6 PSI5 to be removed from initial conditions (Rel-9) | Rohde & Schwarz | - |
GP‑101694 | CR 51-010-1-4543 40.2.4.14.3 TBF Starting time offset (Rel-9) | Rohde & Schwarz | - |
GP‑101695 | CR 51-010-1-4537 13.17.2a New Test: Frequency error under multipath and interference conditions for EGPRS2A configuration (Rel-9) | Rohde & Schwarz | - |
GP‑101696 | CR 51-010-1-4538 22.8a New Test: EGPRS2A uplink power control- use of a and GCH parameter (Rel-9) | Rohde & Schwarz | - |
GP‑101697 | CR 51-010-1-4539 22.9a New Test: EGPRS2A uplink power control – independence of TS power control (Rel-9) | Rohde & Schwarz | - |
GP‑101698 | CR 51-010-2-0683 Introduction of applicability of new RF test tescase for EGPRS2A configuration (Rel-9) | Rohde & Schwarz | - |
GP‑101699 | CR 51-010-1-4540 Clarification on dual antenna connection for legacy test requirements (Rel-9) | Rohde & Schwarz | WITHDRAWN |
GP‑101700 | CR 51-010-1-4541 Clarification on active slots configuration for test signals I4 and I5 with a multi-slot test condition (Rel-9) | Rohde & Schwarz | - |
GP‑101701 | CR 36.523-1-1018 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN (Rel-9) | TF 160 | - |
GP‑101702 | CR 51.010-2-0684 Annex A Table A.1/259 – Change “EGPRS Multislot Class 10” to “DTM EGPRS Multislot Class 10” (Rel-9) | CGC | - |
GP‑101703 | CR 36.523-1-1019 New Test Case 6.2.1.6 - Inter-RAT Background HPLMN Search/Search for correct RAT for HPLMN/Automatic Mode (Rel-9) | Research in Motion UK Limited | - |
GP‑101704 | CR 36.523-2-0130 Addition of new Test Case 6.2.1.6 (Rel-9) | Research in Motion UK Limited | - |
GP‑101705 | CR 51-010-1-4544 Additional Pixit Statement for test cases requiring “Memory Full” condition (Rel-9) | Qualcomm Incorporated | - |
GP‑101706 | CR 51.010-2-0685 Applicability of test cases requiring “Memory Full” condition (Rel-9) | Qualcomm Incorporation | WITHDRAWN |
GP‑101707 | LS Response on Eliminate execution of test cases requiring “Memory Full” condition | Qualcomm Incorporation | - |
GP‑101708 | GELTE Workplan | NOKIA Corporation | - |
GP‑101709 | CR 36.523-1-1020 Correction to GERAN-EUTRAN Inter-RAT cell reselection testcases 6.2.3.19,6.2.3.20,6.2.3.21 and 6.2.3.22 (Rel-9) | NOKIA Corporation | WITHDRAWN |
GP‑101710 | CR 36.508-0166 Updation of Common parameters for simulated GERAN cells for supporting GERAN-EUTRAN Inter-RAT cell reselection (Rel-9) | NOKIA Corporation | - |
GP‑101711 | CR 51.010-1-4545 Various tidy-ups of A-GNSS Moblie Originated Location Request test cases (Rel-9) | Thales | - |
GP‑101712 | CR 51.010-2-0686 Addition of test applicability associated to some of the new A-GNSS MO-LR and MT-LR test cases (Rel-9) | Thales | - |
GP‑101713 | Work Items for the TSG WG meeting GERAN3#48 (Electronic) | ETSI Secretariat | - |
GP‑101714 | CR 51.010-2-0687 Section A.4.2 Correction to Table A.1: Types of Mobile Stations (Rel-9) | INFINEON TECHNOLOGIES | WITHDRAWN |
GP‑101715 | CR 36.523-1-1021 New test case 6.2.3.16 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (Priority of E-UTRA cells is lower than the serving cell) (Rel-9) | ST-Ericsson SA | WITHDRAWN |
GP‑101716 | CR 36.523-1-1022 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) (Rel-9) | ST-Ericsson SA | - |
GP‑101717 | CR 36.523-2-0131 New test cases 6.2.3.16 and 6.2.3.17 added Part 2 (Rel-9) | ST-Ericsson SA | - |
GP‑101718 | CR 36.523-1-1023 Modifications to test cash 6.2.2.6 and 6.2.2.7 (Rel-9) | ST-Ericsson SA | - |
GP‑101719 | Discussion paper on GPRS test mode B | Rohde & Schwarz | - |
GP‑101720 | CR 51.010-7-0001 GPS Assistance Data corrections (Rel-9) | Spirent Communications | - |
GP‑101721 | CR 51.010-7-4546 A-GNSS references and editorial corrections (Rel-9) | Spirent Communications | - |
GP‑101722 | A-GNSS Work Plan | Spirent Communications | - |
GP‑101723 | CR 51.010-2-0684 rev 1 Annex A Table A.1/259 – Change “EGPRS Multislot Class 10” to “DTM EGPRS Multislot Class 10” (Rel-9) | CGC | - |
GP‑101724 | CR 51-010-1-4538 rev 1 22.8a New Test: EGPRS2A uplink power control- use of a and GCH parameter (Rel-9) | Rohde & Schwarz | - |
GP‑101725 | CR 36.523-1-1024 Correction to GERAN-EUTRAN Inter-RAT cell reselection testcases 6.2.3.19, 6.2.3.21 and 6.2.3.22 (Rel-9) | NOKIA Corporation | - |
GP‑101726 | CR 36.523-1-1016 rev 1 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) (Rel-9) | Research in Motion UK Limited | - |
GP‑101727 | CR 36.523-1-1017 rev 1 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) (Rel-9) | Research in Motion UK Limited | - |
GP‑101728 | CR 36.523-1-1025 New test case 6.2.3.16 Inter-RAT Cell Reselection / from GSM_Idle to E-UTRAN /based on H_PRIO criteria | ST-Ericsson SA | - |
GP‑101729 | CR 36.523-1-1023 Modifications to test case 6.2.2.6 and 6.2.2.7 | ST-Ericsson SA | - |
GP‑101730 | LS on clarification GPRS test mode B | TSG WG GERAN3 | WITHDRAWN |
GP‑101731 | CR 36.523-2-0131 New test cases 6.2.3.16 and 6.2.3.17 added Part 2 | ST-Ericsson SA | - |
GP‑101732 | CR 36.523-1-1019 New Test Case 6.2.1.6 - Inter-RAT Background HPLMN Search/Search for correct RAT for HPLMN/Automatic Mode. | Research In Motion UK Ltd | - |
GP‑101733 | CR 36.523-2-0128 Addition of new row for test case 6.2.3.24 and 6.2.3.26 in Table 4-1: Applicability of tests and additional information for testing. | Research In Motion UK Ltd | - |
GP‑101734 | CR 36.523-1-1016 New Test Case 6.2.3.24 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE ORDER) | Research In Motion UK Ltd | - |
GP‑101735 | CR 36.523-1-1017 New Test Case 6.2.3.26 - Inter-RAT Autonomous Cell Reselection GPRS Packet_transfer to E-UTRA (NC1 mode) | Research In Motion UK Ltd | - |
GP‑101736 | CR 51.010-1-4535 26.7.4.5.5 Additional fields on SIM considered by a note | Rohde & Schwarz | - |
GP‑101737 | CR 36.523-1-1022 New test case 6.2.3.17 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority E-UTRA cells) | ST-Ericsson SA | WITHDRAWN |
GP‑101738 | LS on dual antenna connection for legacy test requirements | TSG WG GERAN3 | - |
GP‑101739 | CR 51.010-1-4544 Additional Pixit Statement for test cases requiring “Memory Full” condition | Qualcomm Incorporated | - |
GP‑101740 | CR 36.523-2-0130 Addition of new Test Case 6.2.1.6 | Research In Motion UK Ltd | - |
GP‑101741 | CR 51.010-1-4532 26.9.6a.1.2 T3243 timer adjustment to core specs | Rohde & Schwarz, Qualcomm Incorporated | - |
GP‑101742 | REDHOT and HUGE Workplan | ST-Ericsson SA | - |
GP‑101743 | CR 36.508-0166 Updation of Common parameters for simulated GERAN cells for supporting GERAN-EUTRAN Inter-RAT cell reselection | NOKIA Corporation | - |
GP‑101744 | CR 36.523-1-1024 Correction to GERAN-EUTRAN Inter-RAT testcases 6.2.3.19,6.2.3.21 and 6.2.3.22 | NOKIA Corporation | - |
GP‑101745 | CR 36.523-1-1018 Allow test cases 6.2.3.21 and 6.2.3.22 to be implemented in the TTCN | TF160 | - |
GP‑101746 | Progress on LTE interworking TCs | TSG WG GERAN3 | - |
GP‑101747 | GERAN3#48 Chair's report to plenary | TSG WG3 Chairman | - |
GP‑101748 | Draft GERAN3#48 electronic meeting report | ETSI Secretary | - |
GP‑101749 | CR 45.008-0484 MEAN_BEP performance requirements for EGPRS2-A 16-QAM and 32-QAM – removal of brackets (Rel-7) | Research In Motion UK Ltd. | - |
GP‑101750 | CR 45.008-0485 MEAN_BEP performance requirements for EGPRS2-A 16-QAM and 32-QAM – removal of brackets (Rel-8) | Research In Motion UK Ltd. | - |
GP‑101751 | CR 45.008-0486 MEAN_BEP performance requirements for EGPRS2-A 16-QAM and 32-QAM – removal of brackets (Rel-9) | Research In Motion UK Ltd. | - |
GP‑101752 | Enhanced Radio Link Failure | LG Electronics Inc. | - |
GP‑101753 | CR 45.008-0476 rev 1 Correction to inter-RAT cell reselection enhancement (Rel-9) | LG Electronics Inc., Huawei Technologies Co., Ltd. | POSTPONED |
GP‑101754 | CR 44.060-1434 rev 1 Correction to inter-RAT cell reselection enhancement (Rel-9) | LG Electronics Inc., Huawei Technologies Co., Ltd. | - |
GP‑101755 | CR 44.060-1435 rev 1 Correction to inter-RAT cell reselection enhancement (Rel-10) | LG Electronics Inc., Huawei Technologies Co., Ltd. | - |
GP‑101756 | CR 44.060-1466 rev 1 Correction on Cell Change Notification procedure for CSG cell (Rel-9) | LG Electronics Inc. | - |
GP‑101757 | CR 44.060-1467 rev 1 Correction on Cell Change Notification procedure for CSG cell (Rel-10) | LG Electronics Inc. | - |
GP‑101758 | Enhancements of Iur-g interface WID (updated in GP-101955) | CMCC | - |
GP‑101759 | VAMOS uplink interferer levels | Com-Research | - |
GP‑101760 | TIGHTER performance requirements | Com-Research | - |
GP‑101761 | CR 45.005-0406 DL reference performance requirements for EGPRS2-B, USF (Rel-7) | NOKIA Corporation | - |
GP‑101762 | CR 45.005-0407 DL reference performance requirements for EGPRS2-B, USF (Rel-8) | NOKIA Corporation | - |
GP‑101763 | CR 45.005-0408 DL reference performance requirements for EGPRS2-B, USF (Rel-9) | NOKIA Corporation | - |
GP‑101764 | CR 45.005-0409 DL reference performance requirements for EGPRS2-B – 2nd adjacent channel (Rel-7) | NOKIA Corporation | - |
GP‑101765 | CR 45.005-0410 DL reference performance requirements for EGPRS2-B – 2nd adjacent channel (Rel-8) | NOKIA Corporation | - |
GP‑101766 | CR 45.005-0411 DL reference performance requirements for EGPRS2-B – 2nd adjacent channel (Rel-9) | NOKIA Corporation | - |
GP‑101767 | Signal Levels for VAMOS Uplink Interferers | Huawei Technologies Co., Ltd | - |
GP‑101768 | On BTS Energy Saving | Huawei Technologies Co., Ltd | - |
GP‑101769 | Working assumptions for performance comparison | Huawei Technologies Co., Ltd | - |
GP‑101770 | Burst format of Improved Precoded EGPRS2 DL | Huawei Technologies Co., Ltd | - |
GP‑101771 | CR 45.008-0469 rev 1 Clarification on the measurement report (Rel-8) | Huawei Technologies Co., Ltd., LG Electronics Inc. | POSTPONED |
GP‑101772 | CR 45.008-0470 rev 1 Clarification on the measurement report (Rel-9) | Huawei Technologies Co., Ltd., LG Electronics Inc. | POSTPONED |
GP‑101773 | Discussion on reselection to CSG cell in NC2 mode | Huawei Technologies Co., Ltd. | - |
GP‑101774 | CR 44.060-1468 rev 1 Measurement report for CSG cells in case of not supporting PS HO (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑101775 | CR 44.060-1469 rev 1 Measurement report for CSG cells in case of not supporting PS HO (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑101776 | CR 44.060-1462 rev 2 Reporting PLMN ID for CSG cell (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑101777 | CR 44.060-1463 rev 2 Reporting PLMN ID for CSG cell (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑101778 | Further performance evaluation on CCCH enhancements | Huawei Technologies Co., Ltd. | - |
GP‑101779 | Discussion on generation of numeric beta distribution | Huawei Technologies Co., Ltd. | - |
GP‑101780 | CR 48.008-0324 rev 2 Local Call Local Switch procedures (Rel-10) | ZTE Corporation | - |
GP‑101781 | Chairman’s report from GERAN2#47bis meeting | GERAN2 Chairman | - |
GP‑101782 | PSC/PCI Split for Hybrid Cells | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101783 | On CSFB with Redirection & Sys Info | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101784 | CR 44.018-0878 rev 1 CSFB with Redirection & System Information (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101785 | CR 44.018-0879 rev 1 CSFB with Redirection & System Information (Rel-10) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101786 | CR 45.008-0483 CSFB with Redirection & System Information (Rel-9) | NOKIA Corporation, Nokia Siemens Networks, Research In Motion UK Ltd | - |
GP‑101787 | On Removing SACCH Ciphering | NOKIA Corporation | - |
GP‑101788 | GAN support for rove in from LTE and rove out to LTE | Kineto Wireless | - |
GP‑101789 | CR 44.318-0124 rev 1 Changes for LTE (Rel-10) | Kineto Wireless | - |
GP‑101790 | CR 44.318-0125 rev 1 Changes for RFC 4867 BE mode (Rel-10) | Kineto Wireless | - |
GP‑101791 | CR 43.318-0039 Changes for LTE (Rel-10) | Kineto Wireless | - |
GP‑101792 | CR 43.318-0040 Changes for RFC 4867 BE mode (Rel-10) | Kineto Wireless | - |
GP‑101793 | CR 44.060-1470 Reporting Rules for Hybrid Cells not on the CSG Whitelist (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101794 | CR 44.060-1471 Reporting Rules for Hybrid Cells not on the CSG Whitelist (Rel-10) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101795 | CR 44.018-0876 Reporting Rules for Hybrid Cells not on the CSG Whitelist (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101796 | CR 44.018-0877 Reporting Rules for Hybrid Cells not on the CSG Whitelist (Rel-10) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101797 | CR 44.018-0874 Clarification for TSC allocation for VAMOS in DTM (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101798 | CR 44.018-0875 Clarification for TSC allocation for VAMOS in DTM (Rel-10) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101799 | CR 44.060-1464 rev 1 Corrections to CSG and hybrid cell mobility (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101800 | CR 44.060-1465 rev 1 Corrections to CSG and hybrid cell mobility (Rel-10) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101801 | CR 44.060-1473 rev 1 Implementation of GP-101479 (Rel-10) | Research in Motion | - |
GP‑101802 | CR 44.060-1441 rev 3 PLMN-ID Signalling for CSG Cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101803 | CR 44.060-1442 rev 3 PLMN-ID Signalling for CSG Cells (Rel-10) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101804 | CR 45.008-0487 Remove conflicting IRAT measurement requirement (Rel-8) | Qualcomm Incorporated | - |
GP‑101805 | CR 45.008-0488 Remove conflicting IRAT measurement requirement (Rel-9) | Qualcomm Incorporated | - |
GP‑101806 | Capability indication for new performance requirements | Qualcomm Incorporated | - |
GP‑101807 | TIGHTER – Meeting minutes from 3GPP Teleconference #1 (updated in GP-101998) | WI rapporteur | - |
GP‑101808 | TIGHTER – Workplan (updated in GP-101997) | WI rapporteur | - |
GP‑101809 | TIGHTER - Working Assumptions | WI rapporteur | - |
GP‑101810 | TIGHTER Sheet and Current Values | WI rapporteur | - |
GP‑101811 | TIGHTER - Simulation Parameters used for proposed tightening values | NOKIA Corporation | - |
GP‑101812 | G2-47bis Meeting Report | MCC | - |
GP‑101813 | CR 44.060-1443 rev 1 Addition of Packet Cell Change Order for CSG cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, LG Electronics Inc. | - |
GP‑101814 | CR 44.060-1444 rev 1 Addition of Packet Cell Change Order for CSG cells (Rel-10) | Nokia Siemens Networks, NOKIA Corporation, LG Electronics Inc. | POSTPONED |
GP‑101815 | CR 44.018-0864 rev 1 Addition of Packet Cell Change Order for CSG cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, LG Electronics Inc. | POSTPONED |
GP‑101816 | CR 44.018-0871 Addition of Packet Cell Change Order for CSG cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, LG Electronics Inc. | POSTPONED |
GP‑101817 | CR 51.021-0175 Clarification of MCBTS minimum carrier spacing (Rel-8) | Vodafone (all 3GPP IM) | - |
GP‑101818 | CR 51.021-0176 Clarification of MCBTS minimum carrier spacing (Rel-9) | Vodafone (all 3GPP IM) | - |
GP‑101819 | Skeleton TR 45.9xx Solutions for GSM/EDGE BTS Energy Saving | Vodafone (all 3GPP IM), Nokia Siemens Networks | - |
GP‑101820 | Work plan of SI “Solutions for GSM/EDGE BTS Energy Saving” (BTSEnergy) | Vodafone (all 3GPP IM), Nokia Siemens Networks | - |
GP‑101821 | Non-contiguous spectrum block support for MSR | Vodafone (all 3GPP IM) | - |
GP‑101822 | Measurement reporting accuracy in VAMOS mode | NOKIA Corporation | - |
GP‑101823 | Draft CR 45.008 Measurement reporting accuracy requirements for VAMOS mode | NOKIA Corporation | - |
GP‑101824 | CR 45.005-0412 VAMOS performance requirements (Rel-9) | NOKIA Corporation, Nokia Siemens Networks, Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101825 | CR 45.008-0442 rev 3 Corrections to measurement reporting of inter-RAT cells (Rel-8) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101826 | CR 45.008-0443 rev 3 Corrections to measurement reporting of inter-RAT cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101827 | Analysis of measurement reporting for CSG / Hybrid cells | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101828 | CR 45.008-0489 Corrections to CSG requirements (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101829 | CR 45.008-0490 Rules for reporting of detected hybrid cells not as CSG cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101830 | CR 45.005-0359 rev 2 Reduction of the number of multicarrier BTS classes (Rel-8) | Telefon AB LM Ericsson, Nokia Siemens Networks | - |
GP‑101831 | CR 45.005-0360 rev 2 Reduction of the number of multicarrier BTS classes (Rel-9) | Telefon AB LM Ericsson, Nokia Siemens Networks | - |
GP‑101832 | CR 51.021-0136 rev 2 Reduction of the number of multicarrier BTS classes (Rel-8) | Telefon AB LM Ericsson, Nokia Siemens Networks | - |
GP‑101833 | CR 51.021-0137 rev 2 Reduction of the number of multicarrier BTS classes (Rel-9) | Telefon AB LM Ericsson, Nokia Siemens Networks | - |
GP‑101834 | Receiver test requirements for MCBTS | Telefon AB LM Ericsson | - |
GP‑101835 | CR 45.005-0401 rev 1 Clarification of receiver characteristics for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Telefon AB LM Ericsson | - |
GP‑101836 | CR 51.021-0170 rev 1 Modified test of receiver performance for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Telefon AB LM Ericsson | - |
GP‑101837 | Power level when accessing BTS | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101838 | RACH collision simulations | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101839 | CR 45.008-0364 rev 7 Power level for RACH (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA | POSTPONED |
GP‑101840 | CR 44.018-0870 rev 1 Indication of power reduction for RACH (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA | POSTPONED |
GP‑101841 | CR 51.021-0178 Minor error corrections in TS 51.021 (Rel-9) | Telefon AB LM Ericsson | - |
GP‑101842 | CR 45.005-0414 Enhanced numbering of figures and tables (Rel-9) | Telefon AB LM Ericsson | - |
GP‑101843 | System level evaluation of wide pulse shape for VAMOS (update of GP-101543) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101844 | Link performance methodology for system level evaluations (update of GP-101544) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101845 | CR 45.914-0020 System level evaluation and modelling methodology of wide pulse shape for VAMOS (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101846 | On TIGHTER working assumptions | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101847 | Mixed Mode Modulation | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101848 | pCR45.860– Mixed Mode Modulation | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101849 | pCR45.860 – PCE2 impact on legacy performance (revised in GP-102020) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101850 | Burst mapping of PCE2 | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101851 | pCR45.860– Burst mapping of PCE2 (revised in GP-102041) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101852 | DAS-12b and DBS-12b burst formatting | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101853 | pCR45.860 - DAS-12b and DBS-12b burst formatting (revised in GP-102050) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101854 | Blind modulation detection in PCE2 | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101855 | pCR45.860 - Blind modulation detection in PCE2 | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101856 | pCR458.60 – Training symbol placement in PCE2 DL | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101857 | pCR45.860 – PCE2 burst formatting | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101858 | Work plan of SI “Signal Precoding enhancements for EGPRS2 DL“ | WI rapporteur | - |
GP‑101859 | Meeting minutes of SPEED telco#2 | WI rapporteur | - |
GP‑101860 | Draft TR 45.860 Signal Precoding Enhancements for EGPRS2 DL v0.2.0 | WI rapporteur | - |
GP‑101861 | CCCH capacity evaluation - mixed traffic | Telefon AB LM Ericsson | - |
GP‑101862 | GMSK output power decrease on the BCCH carrier | Com-Research | - |
GP‑101863 | Enabling mobility to CSG cells in NC2 mode | Research in Motion UK Ltd. | - |
GP‑101864 | CR 45.010-0061 rev 1 Reaction times for DTR (Rel-10) | Research in Motion UK Ltd | - |
GP‑101865 | CR 45.008-0477 rev 1 Measurement reporting limits for CSG cells (Rel-9) POSTPONED | Research in Motion UK Ltd | - |
GP‑101866 | Correction of the MCBTS intermodulation attenuation requirement for higher carrier spacings (Discussion Paper) | Alcatel-Lucent | - |
GP‑101867 | CR 45.005-0415 Correction of the MCBTS intermodulation attenuation requirement for higher carrier spacings (Rel-8) | Alcatel-Lucent | - |
GP‑101868 | CR 45.005-0416 Correction of the MCBTS intermodulation attenuation requirement for higher carrier spacings (Rel-9) | Alcatel-Lucent | - |
GP‑101869 | CR 51.021-0179 Correction of the MCBTS intermodulation attenuation requirement for higher carrier spacings (Rel-8) | Alcatel-Lucent | - |
GP‑101870 | CR 51.021-0180 Correction of the MCBTS intermodulation attenuation requirement for higher carrier spacings (Rel-9) | Alcatel-Lucent | - |
GP‑101871 | UL interferer levels for VAMOS interference performance requirements (updated in GP-101947) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101872 | Overview of BTS test specification changes for VAMOS | Nokia Siemens Networks | - |
GP‑101873 | CR 51.021-0177 Introduction of test cases and performance requirements for VAMOS (Rel-9) | Nokia Siemens Networks | - |
GP‑101874 | Refined results for OPT2 Tx pulse shape | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101875 | CR 45.914-0021 Correction of verification figures in Tx pulse shape investigation (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101876 | CR 45.002-0149 Introduction of fast downlink frequency switching capability (Rel-10) | Research In Motion UK Ltd. | POSTPONED |
GP‑101877 | Draft CR 24.008 Introduction of fast downlink frequency switching capability (Rel-10) | Research In Motion UK Ltd. | - |
GP‑101878 | On Requirements for Multicarrier Receiver Testing | Nokia Siemens Networks | - |
GP‑101879 | Hybrid MTC Channel | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101880 | Output Power Decrease on BCCH Carrier for GMSK | Nokia Siemens Networks | - |
GP‑101881 | Meeting Minutes of VAMOS Telco#11 | WI Rapporteur | - |
GP‑101882 | Work Plan for VAMOS (updated in GP-101995) | WI Rapporteur | - |
GP‑101883 | Work Plan for MUROS (updated in GP-102001) | WI Rapporteur | - |
GP‑101884 | Issues related to pairing of users in VAMOS/MUROS | SAMSUNG Electronics Co. | WITHDRAWN |
GP‑101885 | Multiplexing multiple MTC devices in a single block period | SAMSUNG Electronics Co. | - |
GP‑101886 | Overload control over the Gb interface | SAMSUNG Electronics Co. | - |
GP‑101887 | On burst structure of precoded EGPRS2 | MOTOROLA S.A.S | - |
GP‑101888 | CR 48.008-0325 rev 2 Support of MOCN by GERAN (Rel-9) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑101889 | CR 48.018-0303 rev 2 Support of MOCN by GERAN (Rel-9) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑101890 | Draft CR 43.130 Enhancements of Iur-g interface v. x.y.z (Rel-10) | Alcatel-Lucent, ZTE, Alcatel-Lucent Shanghai Bell | - |
GP‑101891 | CR 44.018-0880 Controlled Early Classmark Sending option for VAMOS (Rel-9) | Alcatel-Lucent | - |
GP‑101892 | CR 44.018-0881 Controlled Early Classmark Sending option for VAMOS (Rel-10) | Alcatel-Lucent | - |
GP‑101893 | CR 48.008-0326 Kc128 IE use for backward compatibility (Rel-9) | Alcatel-Lucent | - |
GP‑101894 | Packet channel assignments to multiple mobile devices | Qualcomm Incorporated | - |
GP‑101895 | CR 44.060-1472 rev 2 DTR corrections and clarifications (Rel-10) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101896 | Smart Meters System Simulations | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101897 | Shared USF Evaluation | NOKIA Corporation | - |
GP‑101898 | Draft TR 43.868 GERANIMTC v.0.1.0 | WI Rapporteur | - |
GP‑101899 | Realizing the Low Priority Indication | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101900 | CR 44.060-1474 Realizing the Low Priority Indication (Rel10) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101901 | Implicit Immediate Assignment Reject | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101902 | CR 44.018-0882 Implicit Immediate Assignment Reject (Rel10) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101903 | Realizing Extended Access Barring | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101904 | CR 44.018-0883 Realizing Extended Access Barring (Rel10) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑101905 | The need of a new BSSMAP Reroute Complete message (updated in GP-101937) | Telefon AB LM Ericsson, Alcatel-Lucent | - |
GP‑101906 | Peak Load Control for MTC Devices | Nokia Siemens Networks | - |
GP‑101907 | CR 45.914-0022 Update of section 13 (Conclusions) (Rel-9) | Nokia Siemens Networks | - |
GP‑101908 | LS on Enhancements of Iur-g interface | GERAN WG2 | - |
GP‑101909 | LS on SACCH Security | GERAN WG2 | - |
GP‑101910 | LS Response on Harmonised Standards for GSM Mobile Stations | GERAN WG3 | - |
GP‑101911 | LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS on studies in the bands 698-806 MHz and 790-862 MHz related to Resolution 224 (Rev.WRC-07) and Question ITU-R 229/5 | ITU-R Working Party 5D | - |
GP‑101912 | LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.1457-10 TO REVISION 11 | ITU-R Working Party 5D | - |
GP‑101913 | Reply LS to on Enhancements of Iur-g interface | TSG RAN | - |
GP‑101914 | LS on Improved mobile receiver characteristics for GSM-R | ETSI TC RT | - |
GP‑101915 | LS on Coordination issue in relation with TS 100 910 specification | ETSI TC RT | - |
GP‑101916 | LS on eCall AT command (POSTPONED until G3new#49) | TSG SA WG1 | POSTPONED |
GP‑101917 | Reply LS on Release 10 NIMTC Conclusions | TSG SA WG1 | - |
GP‑101918 | LS on Release 10 NIMTC Impacts | TSG SA WG2 | - |
GP‑101919 | LS on Release 10 NIMTC Conclusion | TSG SA WG2 | - |
GP‑101920 | LS on new Study Item on Core Network Overload issues | TSG SA WG2 | - |
GP‑101921 | CR 44.018-0874 rev 1 Clarification for TSC allocation for VAMOS in DTM (Rel-9) | Nokia Siemens Networks, Nokia Corporation, Research In Motion UK Ltd. | - |
GP‑101922 | CR 44.018-0875 rev 1 Clarification for TSC allocation for VAMOS in DTM (Rel-10) | Nokia Siemens Networks, Nokia Corporation, Research In Motion UK Ltd. | - |
GP‑101923 | CR 44.018-0884 Alternating between different neighbour cell description formats, etc (Rel-10) | Vodafone (all 3GPP IM) | - |
GP‑101924 | CR 44.018-0885 Introduction of random fill bits in SI6 (Rel-10) | Vodafone (all 3GPP IM) | - |
GP‑101925 | CR 44.018-0886 Clarification of SI6 content (Rel-10) | Vodafone (all 3GPP IM) | - |
GP‑101926 | CR 44.018-0887 Low priority and/or MTC access awareness for CN and RAN overload control (Rel-10) | Vodafone (all 3GPP IM) | - |
GP‑101927 | CR 44.018-0888 Introduction of truncated IAR in IA rest octets for MTC access (Rel-10) | Vodafone (all 3GPP IM) | - |
GP‑101928 | 3GPP TSG GERAN Work Plan | Vodafone (all 3GPP IM) | - |
GP‑101929 | CR 44.060-1475 Mobility to CSG cells in NC2 mode (Rel-9) | Research in Motion UK Ltd. | - |
GP‑101930 | Entering DTR via PUAN | Research in Motion UK Ltd | - |
GP‑101931 | Collected performance – VAMOS | Work Item Rapporteur | - |
GP‑101932 | CR 51.021-0175 rev 1 Clarification of MCBTS minimum carrier spacing (Rel-8) | Vodafone (all 3GPP IM) | - |
GP‑101933 | WID (Building block): Voice services over Adaptive Multi-user channels on One Slot – BTS conformance testing (revised in GP-101954) | WI Rapporteur | - |
GP‑101934 | Comments to Objectives in SPEED TR | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101935 | CR 45.008-0491Corrections to cell reporting requirements for multi-RAT MS (Rel-8) | Research In Motion UK Ltd. | - |
GP‑101936 | CR 45.008-0492 Corrections to cell reporting requirements for multi-RAT MS (Rel-9) | Research In Motion UK Ltd. | - |
GP‑101937 | The need of a new BSSMAP Reroute Complete message (update of GP-101905) | Telefon AB LM Ericsson, Alcatel-Lucent, Vodafone (all 3GPP IM) | - |
GP‑101938 | Consent of Draft Recommendation L.1400 | ITU-T Study Group 5 Working Party 3 | - |
GP‑101939 | CR 44.060-1476 Coding of Pulse Format IE (Rel-7) | Infineon Technologies | - |
GP‑101940 | CR 44.060-1477 Coding of Pulse Format IE (Rel-8) | Infineon Technologies | - |
GP‑101941 | CR 44.060-1478 Coding of Pulse Format IE (Rel-9) | Infineon Technologies | - |
GP‑101942 | CR 44.060-1479 Coding of Pulse Format IE (Rel-10) | Infineon Technologies | - |
GP‑101943 | LS on CRs for MSR specifications | TSG RAN WG4 | - |
GP‑101944 | LS on Status of the MSR-NC work item | TSG RAN WG4 | - |
GP‑101945 | LS on GSM OTA Requirements and Tests | TSG RAN WG4 | - |
GP‑101946 | Reply LS on RAN sharing for Home(e)NB cells | TSG RAN WG2 | - |
GP‑101947 | UL interferer levels for VAMOS interference (update of GP-101871) | Nokia Siemens Networks, NOKIA Corporation, Telefon AB LM Ericsson | - |
GP‑101948 | Reply LS on PS handover failure during the SRVCC | TSG RAN WG3 | - |
GP‑101949 | Response LS on RAN sharing for Home(e)NB cells | TSG RAN WG3 | - |
GP‑101950 | Reply LS on Enhancements of Iur-g interface | TSG RAN WG3 | - |
GP‑101951 | Reply LS on GERAN and UTRAN handling of RFSP Index/SPID | TSG RAN WG3 | - |
GP‑101952 | LS on CN node selection | TSG SA WG2 | - |
GP‑101953 | GERANIMTC: Discussion on identifiers | Telefon AB LM Ericsson | - |
GP‑101954 | WID (Building block): Voice services over Adaptive Multi-user channels on One Slot – BTS conformance testing (revised in GP-102005) | WI Rapporteur | - |
GP‑101955 | Enhancements of Iur-g interface WID | CMCC | - |
GP‑101956 | VAMOS UL interferer signal levels for performance requirements | Telefon AB LM Ericsson, Nokia Siemens Networks | - |
GP‑101957 | Way of working for TS inclusion of SPEED | WI Rapporteur | WITHDRAWN |
GP‑101958 | CR 51.021-0177 rev 1 Introduction of test cases and performance requirements for VAMOS (Rel-9) | Nokia Siemens Networks | POSTPONED |
GP‑101959 | CR 45.914-0021 rev 1 Correction of verification figures in Tx pulse shape investigation (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101960 | CR 45.914-0021 rev 2 Correction of verification figures in Tx pulse shape investigation (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑101961 | CR 44.018-0889 Introduction of Selective Ciphering on SACCH (Rel-10) | NOKIA Corporation | - |
GP‑101962 | Draft CR 24.008 Introduction of Selective Ciphering on SACCH | NOKIA Corporation | - |
GP‑101963 | Reply LS on GERAN and UTRAN handling of RFSP Index/SPID (C4-103171) | TSG CT4 | - |
GP‑101964 | WITHDRAWN | - | WITHDRAWN |
GP‑101965 | LS on new Study Item on Core Network Overload issues (S3-101400) | SA3 | - |
GP‑101966 | Answer to LS on SACCH Security (S3-101434) | SA3 | - |
GP‑101967 | LS on Enhancements of Iur-g interface | G2 | - |
GP‑101968 | LS on Local Call Local Switch Progress Update (C4-103359) | CT4 | - |
GP‑101969 | CR 44.318-0124 rev 2 Changes for LTE (Rel-10) | Kineto Wireless | - |
GP‑101970 | CR 43.318-0040 rev 1 Changes for RFC 4867 BE mode (Rel-10) | Kineto Wireless | - |
GP‑101971 | CR 44.318-0125 rev 2 Changes for RFC 4867 BE mode (Rel-10) | Kineto Wireless | - |
GP‑101972 | CR 48.008-0324 rev 3 Local Call Local Switch procedures (Rel-10) | ZTE Corporation | - |
GP‑101973 | CR 44.060-1466 rev 2 Correction on Cell Change Notification procedure for CSG cell (Rel-9) | LG Electronics Inc. | - |
GP‑101974 | CR 44.060-1467 rev 2 Correction on Cell Change Notification procedure for CSG cell (Rel-10) | LG Electronics Inc. | - |
GP‑101975 | CR 44.018-0878 rev 2 CSFB with Redirection & System Information (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101976 | CR 44.018-0879 rev 2 CSFB with Redirection & System Information (Rel-10) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑101977 | CR 43.318-0039 rev 1 Changes for LTE (Rel-10) | Kineto Wireless | - |
GP‑101978 | Reply LS on Local Call Local Switch Progress Update | G2 | - |
GP‑101979 | CR 44.060-1474 rev 1 Realizing the Low Priority Indication (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA | WITHDRAWN |
GP‑101980 | CR 44.018-0882 rev 1 Implicit Immediate Assignment Reject (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA | WITHDRAWN |
GP‑101981 | LS on Extended Access Barring | G2 | - |
GP‑101982 | Update WID: Local Call Local Switch (updated in GP-101989) | Huawei Technologies Co., Ltd. | - |
GP‑101983 | CR 44.318-0124 rev 3 Changes for LTE (Rel-10) | Kineto Wireless | - |
GP‑101984 | CR 44.318-0125 rev 3 Changes for RFC 4867 BE mode (Rel-10) | Kineto Wireless | - |
GP‑101985 | CR 48.008-0325 rev 3 Support of MOCN by GERAN (Rel-9) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑101986 | CR 48.018-0303 rev 3 Support of MOCN by GERAN (Rel-9) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑101987 | Draft CR 43.130 Enhancements of Iur-g interface v. x.y.z (Rel-10) | Alcatel-Lucent, ZTE, Alcatel-Lucent Shanghai Bell | - |
GP‑101988 | Updated Working Assumptions of Enhancements of Iur-g Interface | ZTE Corporation, Alcatel-Lucent, Huawei Technologies Co. Ltd, Nokia Siemens Networks | - |
GP‑101989 | Update WID: Local Call Local Switch | Huawei Technologies Co., Ltd. | - |
GP‑101990 | CR 48.103-0005 rev 10 Introduction of Local Call Local Switch support (Rel-10) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
GP‑101991 | Way of Working for TR inclusion for GERANIMTC | WI Rapporteur | - |
GP‑101992 | CR 51.021-0175 rev 2 Clarification of MCBTS minimum carrier spacing (Rel-8) | Vodafone (all 3GPP IM) | - |
GP‑101993 | CR 51.021-0136 rev 3 Reduction of the number of multicarrier BTS classes (Rel-8) | Telefon AB LM Ericsson, Nokia Siemens Networks | - |
GP‑101994 | Revised Meeting Minutes of VAMOS Telco#11 | WI Rapporteur | - |
GP‑101995 | Work Plan for VAMOS (update of GP-101882) | WI Rapporteur | - |
GP‑101996 | CR 45.005-0414 rev 1 Enhanced numbering of figures and tables (Rel-9) | Telefon AB LM Ericsson | - |
GP‑101997 | TIGHTER – Workplan (update of GP-101808) | WI rapporteur | - |
GP‑101998 | TIGHTER – Meeting minutes from 3GPP Teleconference #1 (update of GP-101807) | WI rapporteur | - |
GP‑101999 | CR 45.914-0022 rev 1 Update of section 13 (Conclusions) (Rel-9) | Nokia Siemens Networks | - |
GP‑102000 | CR 45.914-0023 Update of section 13 (Conclusions) (Rel-8) | Nokia Siemens Networks | WITHDRAWN |
GP‑102001 | Work Plan for MUROS (update of GP-101883) | WI Rapporteur | - |
GP‑102002 | Draft CR 45.005 TIGHTER Performance requirements | WI Rapporteur | - |
GP‑102003 | Assumptions for BTS test specification for VAMOS (updated in GP-102018) | WI Rapporteur | - |
GP‑102004 | CR 48.103-0005 rev 9 Introduction of Local Call Local Switch support (Rel-10) | Nokia Siemens Networks | - |
GP‑102005 | WID (Building block): Voice services over Adaptive Multi-user channels on One Slot – BTS conformance testing (revision of GP-101954) | WI Rapporteur | - |
GP‑102006 | pCR45.860 Burst format of Padded HOM (revised in GP-102019) | Huawei Technologies Co., Ltd | - |
GP‑102007 | GERAN3#48 electronic meeting report | ETSI Secretary | - |
GP‑102008 | CR 45.008-0491 rev 1 Corrections to cell reporting requirements for multi-RAT MS (Rel-8) | Research In Motion UK Ltd. | POSTPONED |
GP‑102009 | CR 45.008-0492 rev 1 Corrections to cell reporting requirements for multi-RAT MS (Rel-9) | Research In Motion UK Ltd. | POSTPONED |
GP‑102010 | CR 45.914-0024 System performance comparison of the OPT2 Tx pulse shape (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑102011 | Way of working for TR inclusion of SPEED | WI Rapporteur | - |
GP‑102012 | Collected performance of EGPRS2/LATRED (updated in GP-102042) | Telefon AB LM Ericsson, Huawei Technologies Co., Ltd, Marvell Switzerland, NOKIA Corporation, Nokia Siemens Networks, ST-Ericsson SA | - |
GP‑102013 | CR 51.021-0181 Cleaning-up and reformatting long tables in 51.021 (Rel-9) | Telefon AB LM Ericsson | - |
GP‑102014 | CR 45.914-0022 rev 2 Update of section 13 (Conclusions) (Rel-9) | Nokia Siemens Networks | - |
GP‑102015 | CR 45.008-0490 rev 1 Rules for reporting of detected hybrid cells not as CSG cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | POSTPONED |
GP‑102016 | Draft Reply LS on GSM OTA Requirements and Tests (To: TSG RAN, TSG RAN WG4, Cc: TSG RAN WG5) | CMCC | - |
GP‑102017 | Draft reply to TD GP-101915 Coordination issue in relation with TS 100 910 specification (To: ETSI TC RT, Cc: ECC PT SE7, ETSI TC ERM) | GERAN WG1 | - |
GP‑102018 | Assumptions for BTS test specification for VAMOS (update of GP-102003) | WI Rapporteur | - |
GP‑102019 | pCR45.860 Burst format of Padded HOM (revision of GP-102006) | Huawei Technologies Co., Ltd | - |
GP‑102020 | pCR45.860 – PCE2 impact on legacy performance (revision of GP-101849) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑102021 | CR 44.060-1475 rev 1 Mobility to CSG cells in NC2 mode (Rel-9) | Research in Motion UK Ltd. | - |
GP‑102022 | CR 44.060-1443 rev 2 Addition of Packet Cell Change Order for CSG cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, LG Electronics Inc. | - |
GP‑102023 | CR 44.060-1444 rev 2 Addition of Packet Cell Change Order for CSG cells (Rel-10) | Nokia Siemens Networks, NOKIA Corporation, LG Electronics Inc. | WITHDRAWN |
GP‑102024 | CR 44.018-0864 rev 2 Addition of Packet Cell Change Order for CSG cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, LG Electronics Inc. | WITHDRAWN |
GP‑102025 | CR 44.018-0871 rev 1 Addition of Packet Cell Change Order for CSG cells (Rel-10) | Nokia Siemens Networks, Nokia Corporation, LG Electronics Inc. | WITHDRAWN |
GP‑102026 | CR 44.060-1472 rev 3 DTR corrections and clarifications (Rel-10) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑102027 | LS on Extended Access Barring | G2 | - |
GP‑102028 | CR 44.060-1475 rev 2 Mobility to CSG cells in NC2 mode (Rel-9) | Research in Motion UK Ltd. | - |
GP‑102029 | CR 44.060-1464 rev 2 Corrections to CSG and hybrid cell mobility (Rel-9) | Nokia Siemens Networks, Nokia Corporation | - |
GP‑102030 | CR 44.060-1465 rev 2 Corrections to CSG and hybrid cell mobility (Rel-10) | Nokia Siemens Networks, Nokia Corporation | - |
GP‑102031 | CR 44.060-1466 rev 3 Correction on Cell Change Notification procedure for CSG cell (Rel-9) | LG Electronics Inc. | - |
GP‑102032 | CR 44.060-1467 rev 3 Correction on Cell Change Notification procedure for CSG cell (Rel-10) | LG Electronics Inc. | - |
GP‑102033 | CR 44.018-0878 rev 3 CSFB with Redirection & System Information (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑102034 | CR 44.060-1464 rev 3 Corrections to CSG and hybrid cell mobility (Rel-9) | Nokia Siemens Networks, Nokia Corporation | - |
GP‑102035 | CR 44.060-1465 rev 3 Corrections to CSG and hybrid cell mobility (Rel-10) | Nokia Siemens Networks, Nokia Corporation | - |
GP‑102036 | LS on support for encryption in connection with Iur-g interface | G2 | - |
GP‑102037 | CR 48.008-0325 rev 4 Support of MOCN by GERAN (Rel-9) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑102038 | CR 48.018-0303 rev 4 Support of MOCN by GERAN (Rel-9) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑102039 | LS on Enhancements of Iur-g interface | G2 | - |
GP‑102040 | LS on support for encryption in connection with Iur-g interface (To: TSG SA WG3) | G2 | - |
GP‑102041 | pCR45.860– Burst mapping of PCE2 (revision of GP-101851) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑102042 | Collected performance of EGPRS2/LATRED (update of GP-102012) | Telefon AB LM Ericsson, Huawei Technologies Co., Ltd, Marvell Switzerland, NOKIA Corporation, Nokia Siemens Networks, ST-Ericsson SA | - |
GP‑102043 | CR 51.021-0181 rev 1 Cleaning-up and reformatting long tables in 51.021 (Rel-9) | Telefon AB LM Ericsson | - |
GP‑102044 | CR 45.914-0022 rev 3 Update of section 13 (Conclusions) (Rel-9) | Nokia Siemens Networks | - |
GP‑102045 | CR 51.021-0176 rev 1 Clarification of MCBTS minimum carrier spacing (Rel-9) | Vodafone (all 3GPP IM) | - |
GP‑102046 | CR 45.005-0415 rev 1 Clarification of the measurement of the spectrum exceptions in MCBTS (Rel-8) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑102047 | CR 45.005-0416 rev 1 Clarification of the measurement of the spectrum exceptions in MCBTS (Rel-9) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑102048 | CR 51.021-0179 rev 1 Clarification of the measurement of the spectrum exceptions in MCBTS (Rel-8) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑102049 | CR 51.021-0180 rev 1 Clarification of the measurement of the spectrum exceptions in MCBTS (Rel-9) | Alcatel-Lucent, Telefon AB LM Ericsson | - |
GP‑102050 | pCR45.860 - DAS-12b and DBS-12b burst formatting (revision of GP-101853) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑102051 | CR 51-010-1-4537 rev 1 13.17.2a New Test: Frequency error under multipath and interference conditions for EGPRS2A configuration (Rel-9) | Rohde & Schwarz | - |
GP‑102052 | CR 51-010-1-4538 rev 2 22.8a New Test: EGPRS2A uplink power control- use of a and GCH parameter (Rel-9) | Rohde & Schwarz | - |
GP‑102053 | CR 51-010-1-4539 rev 1 22.9a New Test: EGPRS2A uplink power control – independence of TS power control (Rel-9) | Rohde & Schwarz | - |
GP‑102054 | CR 51-010-2-0683 rev 1 Introduction of applicability of new RF test tescase for EGPRS2A configuration (Rel-9) | Rohde & Schwarz | - |
GP‑102055 | CR 45.005-0401 rev 2 Clarification of receiver characteristics for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Telefon AB LM Ericsson | POSTPONED |
GP‑102056 | CR 51.021-0170 rev 2 Modified test of receiver performance for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Telefon AB LM Ericsson | POSTPONED |
GP‑102057 | Reply to LS on CRs for MSR specifications (To: TSG RAN, TSG RAN WG4) | GERAN WG1 | - |
GP‑102058 | Reply to LS on MSR BS RF requirements for non-contiguous deployments (To: TSG RAN WG4, Cc: TSG RAN) | GERAN WG1 | - |
GP‑102059 | CR 45.008-0483 rev 1 CSFB with Redirection & System Information (Rel-9) | NOKIA Corporation, Nokia Siemens Networks, Research In Motion UK Ltd | - |
GP‑102060 | CR 45.005-0412 rev 1 VAMOS performance requirements (Rel-9) | NOKIA Corporation, Nokia Siemens Networks, Telefon AB LM Ericsson, ST-Ericsson SA | POSTPONED |
GP‑102061 | CR 45.914-0024 rev 1 System performance comparison of the OPT2 Tx pulse shape (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑102062 | CR 45.008-0442 rev 4 Corrections to measurement reporting of inter-RAT cells (Rel-8) | Nokia Siemens Networks, NOKIA Corporation | POSTPONED |
GP‑102063 | CR 45.008-0443 rev 4 Corrections to measurement reporting of inter-RAT cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | POSTPONED |
GP‑102064 | CR 45.010-0061 rev 2 Reaction times for DTR (Rel-10) | Research in Motion UK Ltd | - |
GP‑102065 | CR 45.914-0024 rev 2 System performance comparison of the OPT2 Tx pulse shape (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑102066 | Draft reply to TD GP-101915 Coordination issue in relation with TS 100 910 specification (To: ETSI TC RT, Cc: ECC PT SE7, ETSI TC ERM) | GERAN WG1 | - |
GP‑102067 | TR 43.868 GERANIMTC v0.2.0 | WI Rapporteur | - |
GP‑102068 | Outcome of TSG GERAN WG1 meeting # 48, San Jose' del Cabo, Mexico, 22nd to 26th November, 2010 (slides). | GERAN WG1 Chairman | - |
GP‑102069 | Draft Report of TSG GERAN WG1 meeting during TSG GERAN #48, v. 0.0.1 | GERAN WG1 Secretary (MCC) | - |
GP‑102070 | New WI proposal: Full Support of Multi-Operator Core Network by GERAN | Alcatel-Lucent, Vodafone Group Plc, Telefon AB LM Ericsson | - |
GP‑102071 | CR 44.060-1472 rev 4: DTR corrections and clarifications (Rel-10) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑102072 | LS on Extended Access Barring | G2 | - |
GP‑102073 | CR 44.060-1472 rev 5: DTR corrections and clarifications (Rel-10) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑102074 | Reply LS on Local Call Local Switch Progress Update | G2 | - |
GP‑102075 | WG2 Chairmans presentation | Chairman WG2 | - |
GP‑102076 | Reply LS on Local Call Local Switch Progress Update | G2 | - |
GP‑102077 | Draft GERAN WG2-48 Meeting Report | MCC | - |
GP‑102078 | 3GPP TSG GERAN Work Plan | Editor (Vodafone Group Plc) | - |
GP‑102079 | Draft TR 45.860 Signal Precoding Enhancements for EGPRS2 DL v0.3.0 | WI rapporteur | - |
GP‑102080 | Revised Outcome of TSG GERAN WG1 meeting # 48, San Jose' del Cabo, Mexico, 22nd to 26th November, 2010 (slides) | GERAN WG1 Chairman | - |
GP‑102081 | Revised WG2 Chairmans presentation | Chairman WG2 | - |
page generated from database: 2024-04-13 13:51:47