3GPP TDocs (written contributions) at meeting
Meeting: GP-43 - 2009-08-31 to 2009-09-04, Vancouver
meeting id: GP-43 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
GP‑091077 | Draft Agenda for TSG GERAN no. 43 in Vancouver | GERAN Chairman | - |
GP‑091078 | Draft Agenda for TSG GERAN WG1 during TSG GERAN no.43 in Vancouver | GERAN WG1 Chairman | - |
GP‑091079 | Draft Agenda for TSG GERAN WG2 during TSG GERAN no. 43 in Vancouver | GERAN WG2 Chairman | - |
GP‑091080 | Draft Agenda for TSG GERAN WG3new during TSG GERAN no. 43 in Vancouver | GERAN WG3 Convenor | - |
GP‑091081 | 3GPP GERAN Workplan | Vodafone Group Plc | - |
GP‑091082 | CR 45.005-0260 Reference performance EGPRS2, UL, Sensitivity (Rel-7) | MCC | - |
GP‑091083 | CR 51.021-0075 Inclusion of deleted paragraph and correction of a misplaced sentence (Rel-8) | MCC | - |
GP‑091084 | CR 51.021-0053 rev 1 EVM for EGPRS2 (Rel-8) | MCC | - |
GP‑091085 | CR 51.010-2-0592 Changes in the applicability of test case 34.4.2 from C215 to C253 (Rel-99) | NOKIA Corporation | - |
GP‑091086 | CR 51.010-1-4209 New Test case 58a.1.15 fo LATRED feature (Rel-7) | NOKIA Corporation | WITHDRAWN |
GP‑091087 | CR 51.010-2-0593 New Test case 58a.1.15 fo LATRED feature (Rel-7) | NOKIA Corporation | WITHDRAWN |
GP‑091088 | GELTE Workplan | NOKIA Corporation | - |
GP‑091089 | CR 51.010-1-4210 26.6.5.x Data bearers not correctly foreseen in handover test cases (Rel-8) | Rohde&Schwarz | - |
GP‑091090 | CR 51.010-2-0594 26.6.5.x Applicability incorrect for data bearers for handover test cases (Rel-8) | Rohde&Schwarz | - |
GP‑091091 | CR 51.010-1-4211 41.6.* Packet Measurement Reports missing in Test Sequence (Rel-8) | Rohde&Schwarz | - |
GP‑091092 | CR 51.010-1-4212 58b.1.2 EGPRS DOWNLINK RLC DATA BLOCK sent in step 20 (Rel-8) | Rohde&Schwarz | WITHDRAWN |
GP‑091093 | CR 51.010-1-4213 58a.1.18 New Latred Test Case: Downlink TBF, with concurrent Uplink TBF PAN Reaction Time, Event Based FANR (Rel-8) | Rohde&Schwarz | - |
GP‑091094 | CR 51.010-1-4214 58a.1.19 New Latred Test Case: Concurrent Uplink and Downlink TBFs, FANR/PAN, RLC Unacknowledged Mode (Rel-8) | Rohde&Schwarz | - |
GP‑091095 | CR 51.010-2-0595 58a.a.* Introduction of Latred, FANR/PAN Test Cases (Rel-8) | Rohde&Schwarz | - |
GP‑091096 | CR 51.010-2-0596 Introduction of band specific normalisation factors for AMR link adaptation test cases | Qualcomm Europe S.A.R.L. | POSTPONED |
GP‑091097 | Discussion paper for eCall | Qualcomm Europe S.A.R.L. | - |
GP‑091098 | Draft New WID for eCall | Qualcomm Europe S.A.R.L. | - |
GP‑091099 | Workplan for eCall (replaced by GP-091506) | Qualcomm Europe S.A.R.L. | - |
GP‑091100 | CR 51.010-1-4215 15.8: addition of alternative way to trigger uplink data transfer using test mode defined in 3GPP TS 44.014 (subclause 5.4) (Rel-8) | AT4 wireless S.A., Sierra Wireless | WITHDRAWN |
GP‑091101 | CR 51.010-1-4216 New Test case 58b.1.3- Single Carrier Concurrent TBF/Downlink TBF reconfigured to DLDC configuration / Uplink single carrier TBF reallocated to Carrier 2/Uplink modified to DLDC (Rel-8) | Research In Motion UK Ltd | - |
GP‑091102 | CR 51.010-1-4217 New Test case 58b.1.4- Single Carrier Uplink TBF with no Downlink TBF / DLDC TBF established / Uplink DLDC TBF (on both carrier 1 and carrier 2)/ Uplink TBF Reconfigured to Single Carrier TBF (Rel-8) | Research In Motion UK Ltd | - |
GP‑091103 | CR 51.010-1-4218 New Test case 58b.1.5- Single Carrier Downlink TBF with No Uplink TBF/ Downlink reconfigured to DLDC TBF/ Uplink TBF established (Rel-8) | Research In Motion UK Ltd | - |
GP‑091104 | CR 51.010-1-4219 New Test Case 58b.2.3 – Concurrent Downlink Dual Carrier TBF / Frequency Hopping (Rel-8) | Research In Motion UK Ltd | - |
GP‑091105 | CR 51.010-1-4220 New Test Case 58b.2.4 – Concurrent Downlink Dual Carrier TBF / Downlink Dual Carrier Configuration / Channel Quality Reporting (Rel-8) | Research In Motion UK Ltd | - |
GP‑091106 | CR 51.010-1-4221 New Test Case 58b.2.5-Concurrent Downlink Dual Carrier TBF / Downlink Dual Carrier Configuration in Dual Transfer Mode (Rel-8) | Research In Motion UK Ltd | - |
GP‑091107 | CR 51.010-1-4222 New Test Case 58b.2.6- Concurrent Downlink Dual Carrier TBF / Extended Dynamic allocation (Rel-8) | Research In Motion UK Ltd | - |
GP‑091108 | CR 51.010-1-4223 New Test Case 58b.2.7- Concurrent Downlink Dual Carrier TBF / Downlink Dual Carrier Configuration/ Extended RLC/MAC control message segmentation (Rel-8) | Research In Motion UK Ltd | - |
GP‑091109 | CR 51.010-1-4224 New Test Case 58b.3.2- Downlink Dual Carrier Configuration/ Abnormal Case/ Frequencies not within same band/ Access Retry (Rel-8) | Research In Motion UK Ltd | - |
GP‑091110 | CR 51.010-1-4225 New Test Case 58b.3.3- Downlink Dual Carrier Configuration/ Abnormal case / UL Single Carrier TBF / Frequency violations (Rel-8) | Research In Motion UK Ltd | - |
GP‑091111 | CR 51.010-2-0597 Addition of new PICS items and new test Downlink Dual Carrier test cases (Rel-8) | Research In Motion UK Ltd | - |
GP‑091112 | WG3 Work Plan Downlink Dual Carrier test cases- MS Conformance Test Specifications | Research In Motion UK Ltd | - |
GP‑091113 | CR 51.010-1-4226 New Test Case 58a.2.11- Concurrent RTTI TBF / Downlink Dual Carrier configuration (Rel-8) | Research In Motion UK Ltd | - |
GP‑091114 | CR 51.010-1-4227 New Test Case 58a.2.12- Concurrent RTTI TBF/ Dual Transfer Mode (Rel-8) | Research In Motion UK Ltd | - |
GP‑091115 | CR 51.010-2-0598 Addition of new RTTI test cases – 58a.2.11 and 58a.2.12 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091116 | CR 51.010-1-4228 Change in Qoffset value in test case 20.25.3 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091117 | CR 51.010-1-4229 Addition of Specific PICS statements in section 58b.1.1, 58b.1.2, 58b.2.1, 58b.2.1, 58b.2.8 and 58b.3.1 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091118 | CR 51.010-1-4230 58b.2.1 – Additional test requirement (Rel-8) | Research In Motion UK Ltd | - |
GP‑091119 | CR 51.010-1-4231 orrection to test case 52.1.2.1.9.3 – Packet Uplink Assignment / Two phase access / Radio Access Capabilities at step 5 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091120 | REDHOT and HUGE Workplan | NOKIA Corporation | - |
GP‑091121 | RAN5 EPS (E-UTRAN & EPC) TC prose specification requirements | Samsung Electronics Co., Ltd | - |
GP‑091122 | GERAN WG3 PRD#09 v1.0 "G3 Electronic agreement" | G3 Convenor (Samsung) | - |
GP‑091123 | CR 51.010-1-4234 26.7.4.5.5.x - Test Case initial conditions modified for updating PLMN (Rel-8) | Anite | - |
GP‑091124 | CR 51.010-1-4235 58a.x-REDUCED_LATENCY_ACCESS bit set to 1 in GPRS Cell Options IE (Rel-8) | Anite | - |
GP‑091125 | CR 51.010-1-4236 58a.2.8 – Removed redundant step 4 (Rel-8) | Anite | - |
GP‑091126 | CR 51.010-1-4232 Section 14.16.1 reference table_51.010-1 (Rel-8) | CGC | - |
GP‑091127 | CR 51.010-1-4233 Aligning the abbreviation of FDN in 51.010-1 (Rel-8) | CGC | - |
GP‑091128 | CR 51.010-2-0599 Aligning the abbreviation of FDN in 51.010-2 (Rel-8) | CGC | - |
GP‑091129 | Discussion of EVM requirement for EGPRS2 for Repeater | Andrew Wireless Systems GmbH | - |
GP‑091130 | CR 45.005-0261 Introduction of EVM requirement for EGPRS2 for Repeater (Rel-7) | Andrew Wireless Systems GmbH | - |
GP‑091131 | CR 51.026-0009 Introduction of EVM requirement for EGPRS2 for Repeater (Rel-7) | Andrew Wireless Systems GmbH | - |
GP‑091132 | CR 45.005-0262 Introduction of EVM requirement for EGPRS2 for Repeater (Rel-8) | Andrew Wireless Systems GmbH | - |
GP‑091133 | CR 51.026-0010 Introduction of EVM requirement for EGPRS2 for Repeater (Rel-8) | Andrew Wireless Systems GmbH | - |
GP‑091134 | System impact of requirements for multicarrier repeater (revised in GP-091565) | Andrew Wireless Systems GmbH | - |
GP‑091135 | CR 45.005-0228 rev 1 Introduction of a new multicarrier Repeater class (Rel-8) | Andrew Wireless Systems GmbH | REJECTED |
GP‑091136 | CR 51.026-0005 rev 1 Introduction of a new multicarrier Repeater class (Rel-8) | Andrew Wireless Systems GmbH | REJECTED |
GP‑091137 | CR 45.003-0127 Various minor corrections on EGPRS2 (Rel-7) | Alcatel-Lucent | - |
GP‑091138 | CR 45.003-0128 Various minor corrections on EGPRS2 (Rel-8) | Alcatel-Lucent | - |
GP‑091139 | 3GPP GERAN Workplan | Vodafone Group Plc | - |
GP‑091140 | Revised Draft Agenda for TSG GERAN WG2 during TSG GERAN no. 43 in Vancouver | GERAN WG2 Chairman | - |
GP‑091141 | CR 43.064-0080 Removal of PNCH and CPNCH channels (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091142 | CR 45.003-0129 Correction of UBS-12 puncturing with PAN included (Rel-7) | Research In Motion UK Ltd. | - |
GP‑091143 | CR 45.003-0130 Correction of UBS-12 puncturing with PAN included (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091144 | Mapping of SACCH for VAMOS | Research In Motion UK Ltd. | - |
GP‑091145 | Draft CR 45.001 Modified SACCH mapping for VAMOS | Research In Motion UK Ltd. | - |
GP‑091146 | Draft CR 45.002 Modified SACCH mapping for VAMOS | Research In Motion UK Ltd. | - |
GP‑091147 | Draft CR 45.008 Modified SACCH mapping for VAMOS | Research In Motion UK Ltd. | - |
GP‑091148 | CR 51.010-1-4237 Release-dependent methods and requirements for audio testing (Rel-8) | CETECOM | - |
GP‑091149 | CR 51.010-2-0600 Introduction of new PICS “TSPC_MS_AUDIO_RELEASE” (Rel-8) | CETECOM | - |
GP‑091150 | CR 51.010-2-0601 Addition of TSPC_MS_HIGHER_LAYER_RELEASE in column Specific PICS Statements of Table B.1 (Rel-8) | CETECOM | - |
GP‑091151 | CR 51.010-1-4239 34.2.2 update of expected sequence (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091152 | WG3 Work Plan, LATRED Test Cases | Telefon AB LM Ericsson | - |
GP‑091153 | CR 51.010-1-4240 New Test Cases 58a.2.3 and 58a.2.4 for LATRED feature (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091154 | CR 51.010-2-0602 New Test Cases 58a.2.3 and 58a.2.4 for LATRED feature (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091155 | CR 51.010-2-0603 Correct test case numbering for 31.4.2.1.x and 31.4.4.1.1 to match 51.010-1 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091156 | CR 51-010-1-4238 Correction to Test Case 58b.1.2 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091157 | CR 51.010-2-0604 26.12.2.1 - Changes to Test Case numbering (Rel-8) | Anite | - |
GP‑091158 | CR 43.059-0076 Changes to Stage II allowing parallel positioning (Rel-9) | TruePosition, Nokia Siemens Networks | - |
GP‑091159 | CR 48.071-0035 Changes to Stage III enabling parallel positioning (Rel-9) | TruePosition, Nokia Siemens Networks | - |
GP‑091160 | Priority based reselection to UTRAN | Panasonic (PMCDE), SAMSUNG Electronics Co. | - |
GP‑091161 | CR 45.008-0393 Priority based reselection to UTRAN (Rel-8) | Panasonic (PMCDE), SAMSUNG Electronics Co. | - |
GP‑091162 | Draft LS on Capability of Priority based reselection to UMTS | Panasonic (PMCDE), SAMSUNG Electronics Co. | WITHDRAWN |
GP‑091163 | Measurements on higher priority inter-RAT frequency | Panasonic (PMCDE) | - |
GP‑091164 | CR 45.008-0394 Measurements on higher priority inter-RAT frequency (Rel-8) | Panasonic (PMCDE) | - |
GP‑091165 | CR 45.008-0395 Clarification on CSG PSC/ PCI split information (Rel-8) | Panasonic (PMCDE) | - |
GP‑091166 | CR 44.018-0746 Clarifications on common priorities (Rel-8) | Panasonic (PMCDE), SAMSUNG Electronics Co. | - |
GP‑091167 | CR 44.060-1232 Clarifications on common priorities (Rel-8) | Panasonic (PMCDE), SAMSUNG Electronics Co. | - |
GP‑091168 | CR 44.018-0747 Clarifications of DEFAULT_XXX_PRIORITY in individual priorities (Rel-8) | Panasonic (PMCDE) | - |
GP‑091169 | CR 44.060-1233 Clarifications of DEFAULT_XXX_PRIORITY in individual priorities (Rel-8) | Panasonic (PMCDE) | - |
GP‑091170 | CR 44.060-1234 Clarification on the MS behaviour upon PCCO failure (Rel-8) | Panasonic (PMCDE) | - |
GP‑091171 | CR 44.031-0202 Correction to pseudo-segmentation rules for GANSS Assistance Data (Rel-8) | Qualcomm Europe S.A.R.L. | - |
GP‑091172 | Text Proposal for GANSS Minimum Performance Requirements Baseline Text: Correction to nominal signal levels | Qualcomm Europe S.A.R.L. | - |
GP‑091173 | Text Proposal for GANSS Minimum Performance Requirements Baseline Text: Multipath Test | Qualcomm Europe S.A.R.L. | - |
GP‑091174 | Text Proposal for GANSS Minimum Performance Requirements Baseline Text: WLS procedure | Qualcomm Europe S.A.R.L. | - |
GP‑091175 | Text Proposal for GANSS Minimum Performance Requirements Baseline Text: Specification GGTO Accuracy | Qualcomm Europe S.A.R.L. | - |
GP‑091176 | Necessity of measurement report of CSG cells in Rel-8 | LG Electronics Inc. | - |
GP‑091177 | CR 45.008-0396 Clarification of measurement report considering CSG cells in Rel-8 (Rel-8) | LG Electronics Inc. | - |
GP‑091178 | General assumption regarding inbound mobility to CSG cell | LG Electronics Inc. | - |
GP‑091179 | Measurement Control and Reporting method for inbound mobility to CSG cell | LG Electronics Inc. | - |
GP‑091180 | CR 44.018-0748 Minor correction on Channel Description 2,3 IE (Rel-9) | LG Electronics Inc. | - |
GP‑091181 | PB False Detection | Huawei Technologies Co., Ltd. | - |
GP‑091182 | Delay Analysis of PB solution | Huawei Technologies Co., Ltd. | - |
GP‑091183 | CR 43.064-0077 rev 1 Support of DTX for Conversational Services (Rel-9) | Huawei Technologies Co., Ltd. | POSTPONED |
GP‑091184 | Usage of parameters for measurement control | Huawei Technologies Co., Ltd. | - |
GP‑091185 | CR 45.008-0397 Correction on Measurement Control (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091186 | Maintenance of E-UTRAN Neighbor Cell List | Huawei Technologies Co., Ltd. | - |
GP‑091187 | CR 44.018-0749 Miscellaneous corrections on GELTE(Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091188 | CR 44.018-0750 Miscellaneous corrections on GELTE(Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091189 | CR 44.060-1235 Miscellaneous corrections on GELTE(Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091190 | CR 44.060-1236 Miscellaneous corrections on GELTE(Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091191 | Inbound Mobility from GERAN to HeNB | Huawei Technologies Co., Ltd. | - |
GP‑091192 | Inbound Mobility from GERAN to HNB | Huawei Technologies Co., Ltd. | - |
GP‑091193 | Some Concerns on MTTI | Huawei Technologies Co., Ltd. | - |
GP‑091194 | L2S mapping method for WIDER | Huawei Technologies Co., Ltd. | - |
GP‑091195 | On System Performance Evaluation Method for WIDER | Huawei Technologies Co., Ltd | - |
GP‑091196 | CR 45.914-0009 Updates for Shifted SACCH (Rel-8) | Huawei Technologies Co., Ltd | - |
GP‑091197 | Updated SACCH performance for VAMOS lev2 and nonSAIC receiver | Huawei Technologies Co., Ltd. | - |
GP‑091198 | CR 45.001-0058 Introduction of Shifted SACCH scheme for VAMOS(Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091199 | CR 45.002-0137 rev1 Introduction of Shifted SACCH mapping for VAMOS (Rel-9) | Huawei Technologies Co., Ltd. | POSTPONED |
GP‑091200 | CR 51.010-1-4241 Changes to test cases for TDD_Qoffset (Rel-7) | CMCC | WITHDRAWN |
GP‑091201 | CR 51.010-1-4242 Changes to test cases for TDD_Qoffset (Rel-8) | CMCC | - |
GP‑091202 | CR 51.010-1-4243 Test for MS with no UTRAN-TDD capability while SI2QUATER containing UTRAN-TDD Neighbor Cells is broadcasted on BCCH (Rel-7) | CMCC | WITHDRAWN |
GP‑091203 | CR 51.010-1-4244 Test for MS with no UTRAN-TDD capability while SI2QUATER containing UTRAN-TDD Neighbor Cells is broadcasted on BCCH (Rel-8) | CMCC | - |
GP‑091204 | MCC TF 160 Sept Report | MCC TF 160 | - |
GP‑091205 | CR 51.010-5-0084 Update for the latest version of TTCN (Rel-8) | MCC TF 160 | - |
GP‑091206 | CR 51.010-5-0085 GCF WI-010: Adaptation to TSO o_P_CheckClassmark3 for Rel8 (Rel-8) | MCC TF 160 | - |
GP‑091207 | CR 45.008-0398 3G_SEARCH_PRIO definition update (Rel-8) | Alcatel-Lucent | - |
GP‑091208 | Link-2-System mapping | ZTE Corporation | - |
GP‑091209 | System Performance Evaluation with Frequency Hopping Schemes for VAMOS (revised in GP-091677) | ZTE Corporation | - |
GP‑091210 | CR 49.031-0064 Code Identification of LMU-based Positioning Methods (Rel-8) | Andrew Corporation | - |
GP‑091211 | G2-42 Meeting Report | MCC | - |
GP‑091212 | New WID on 128 bit encryption for GSM and GPRS | Orange SA, Telefon AB LM Ericsson, Vodafone Group Plc | - |
GP‑091213 | DTX-Based Repeated SACCH for VAMOS | Research In Motion UK Ltd. | - |
GP‑091214 | Impact of DTX on VAMOS Level 2 Terminal Performance | NOKIA Corporation | - |
GP‑091215 | Text Proposal for GANSS Minimum Performance Requirements Baseline Text: Satellite constellation and assistance data | Qualcomm Europe S.A.R.L. | - |
GP‑091216 | Text Proposal for GANSS Minimum Performance Requirements Baseline Text: Sensitivity Test | Qualcomm Europe S.A.R.L. | - |
GP‑091217 | Supporting H(e)NB inbound mobility | Samsung Electronics Co. | - |
GP‑091218 | Soft Pairing for VAMOS | Samsung Electronics Co. | - |
GP‑091219 | Enhanced channel organization schemes for half-rate SACCH | Samsung Electronics Co. | - |
GP‑091220 | Comparison of frequency hopping schemes in VAMOS | Samsung Electronics Co. | - |
GP‑091221 | Discussion on test cases required for A-GNSS | Spirent | WITHDRAWN |
GP‑091222 | Mobility to UTRAN CSG Cells | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091223 | Measurement Reporting of CSG Cells | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091224 | Mobility from GERAN to CSG Cells | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091225 | CR 48.103-0002 Miscellaneous corrections (Rel-8) | ZTE Corporation | - |
GP‑091226 | Draft_CR_Local_Call_Local_Switch | ZTE Corporation | WITHDRAWN |
GP‑091227 | CR 44.018-0751 Broadcast of 3G legacy parameters in idle mode (Rel-8) | Alcatel-Lucent | - |
GP‑091228 | CR 44.018-0752 Broadcast of 3G legacy parameters in idle mode (Rel-9) | Alcatel-Lucent | - |
GP‑091229 | CR 44.060-1237 Broadcast of 3G legacy parameters in idle mode (Rel-8) | Alcatel-Lucent | - |
GP‑091230 | CR 44.060-1238 Broadcast of 3G legacy parameters in idle mode (Rel-9) | Alcatel-Lucent | - |
GP‑091231 | CR 44.018-0753 Individual Priorities coding optimization (Rel-8) | Alcatel-Lucent | - |
GP‑091232 | CR 44.018-0754 Individual Priorities coding optimization (Rel-9) | Alcatel-Lucent | - |
GP‑091233 | CR 44.060-1239 Individual Priorities coding optimization (Rel-8) | Alcatel-Lucent | - |
GP‑091234 | CR 44.060-1240 Individual Priorities coding optimization (Rel-9) | Alcatel-Lucent | - |
GP‑091235 | CR 45.004-0013 Introduction of VAMOS modulation (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, Vodafone Group Plc | POSTPONED |
GP‑091236 | CR 45.005-0263 Introduction of VAMOS performance requirements (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | POSTPONED |
GP‑091237 | CR 45.008-0399 Introduction of VAMOS power control (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091238 | Specification of VAMOS performance requirements | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091239 | Text Proposal for GANSS Minimum Performance Requirements Baseline Text: Coarse time assistance scenario | NOKIA Corporation | - |
GP‑091240 | Text Proposal for GANSS Minimum Performance Requirements Baseline Text: Fine time assistance scenario | NOKIA Corporation | - |
GP‑091241 | Galileo signal levels in sensitivity tests | NOKIA Corporation | - |
GP‑091242 | Single Antenna Interference Cancellation for Higher Order Modulation | Com-Research GmbH | - |
GP‑091243 | Single Antenna Interference Cancellation for O-TCH Speech Channels | Com-Research GmbH | - |
GP‑091244 | CR 44.018-0755 Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-8) | MOTOROLA Ltd, Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091245 | CR 44.060-1241 Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-8) | MOTOROLA Ltd, Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091246 | WITHDRAWN | - | WITHDRAWN |
GP‑091247 | CR 44.060-1242 Essential correction to ASN.1 coding introduced when Rel-8 extensions were added (Rel-8) | MOTOROLA Ltd | - |
GP‑091248 | CR 04.60-B144 Essential correction to PSI3 quarter information elements to align with TS 44.018 (R99) | MOTOROLA Ltd | - |
GP‑091249 | CR 43.129-0073 Handing of START_PS at handover from UTRAN to GERAN (Rel-6) | Telefon AB LM Ericsson | POSTPONED |
GP‑091250 | CR 43.129-0074 Handing of START_PS at handover from UTRAN to GERAN (Rel-7) | Telefon AB LM Ericsson | POSTPONED |
GP‑091251 | CR 43.129-0071 rev 1 Inclusion of radio access capabilities (Rel-8) | Telefon AB LM Ericsson | POSTPONED |
GP‑091252 | CR 45.005-0236 rev 3 Spectrum due to modulation and wide band noise, narrow pulse EGPRS2-B (Rel-7) | Telefon AB L M Ericsson, Marvell Switzerland | - |
GP‑091253 | CR 45.005-0237 rev 3 Spectrum due to modulation 4and wide band noise, narrow pulse EGPRS2-B (Rel-8) | Telefon AB L M Ericsson, Marvell Switzerland | - |
GP‑091254 | CR 51.021-0054 rev 2 Requirements for Spectrum due to Modulation and wideband noise for EGPRS2-B with narrow pulse-shaping filter (Rel-7) | Telefon AB L M Ericsson | - |
GP‑091255 | CR 51.021-0055 rev 2 Requirements for Spectrum due to Modulation and wideband noise for EGPRS2-B with narrow pulse-shaping filter (Rel-8) | Telefon AB L M Ericsson | - |
GP‑091256 | CR 45.005-0243 rev 1 Reference performance EGPRS2-A, 400 kHz Adjacent channel interference (Rel-7) | Telefon AB L M Ericsson, Nokia Siemens Networks, ST-Ericsson (France) SAS | - |
GP‑091257 | CR 45.005-0244 rev 1 Reference performance EGPRS2-A, 400 kHz Adjacent channel interference (Rel-8) | Telefon AB L M Ericsson, Nokia Siemens Networks, ST-Ericsson (France) SAS | - |
GP‑091258 | CR 51.021-0056 rev 1 Reference performance EGPRS2-A, 400 kHz adjacent channel (Rel-7) | Telefon AB L M Ericsson | - |
GP‑091259 | CR 51.021-0057 rev 1 Reference performance EGPRS2-A, 400 kHz adjacent channel (Rel-8) | Telefon AB L M Ericsson | - |
GP‑091260 | CR 45.005-0264 Reference performance EGPRS2-B, UL, 400 kHz Adjacent channel interference (Rel-7) | Telefon AB L M Ericsson | POSTPONED |
GP‑091261 | CR 45.005-0265 Reference performance EGPRS2-B, UL, 400 kHz Adjacent channel interference (Rel-8) | Telefon AB L M Ericsson | POSTPONED |
GP‑091262 | CR 45.005-0266 Reference performance EGPRS2-B, UL, without brackets, 400 kHz Adjacent channel interference (Rel-7) | Telefon AB L M Ericsson | WITHDRAWN |
GP‑091263 | CR 45.005-0267 Reference performance EGPRS2-B, UL, without brackets, 400 kHz Adjacent channel interference (Rel-8) | Telefon AB L M Ericsson | WITHDRAWN |
GP‑091264 | CR 51.021-0076 Reference performance EGPRS2-B, UL, 400 kHz Adjacent channel interference (Rel-7) POSTPONED | Telefon AB L M Ericsson | - |
GP‑091265 | CR 51.021-0077 Reference performance EGPRS2-B, UL, 400 kHz Adjacent channel interference (Rel-8) POSTPONED | Telefon AB L M Ericsson | - |
GP‑091266 | Collected peformance requirements for EGPRS2-LATRED (revised in GP-091493) | Telefon AB LM Ericsson, Huawei Technologies. Co Ltd, Marvell Switzerland, NOKIA Corporation, Nokia Siemens Networks, ST-Ericsson (France) SAS | - |
GP‑091267 | Collected peformance requirements for EGPRS2+MSRD | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091268 | CR 45.005-0268 Relaxation of reference performance EGPRS2-A, DL, Co-channel and Adj-channel (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091269 | CR 45.005-0269 Relaxation of reference performance EGPRS2-A, DL, Co-channel and Adj-channel (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091270 | CR 45.005-0270 Removal of brackets, EGPRS2-A, UL (Rel-7) | Telefon AB LM Ericsson, Huawei Technologies Ltd. | POSTPONED |
GP‑091271 | CR 45.005-0271 Removal of brackets, EGPRS2-A, UL (Rel-8) | Telefon AB LM Ericsson, Huawei Technologies Ltd. | POSTPONED |
GP‑091272 | CR 51.021-0078 Removal of brackets, EGPRS2-A, UL (Rel-7) | Telefon AB LM Ericsson | POSTPONED |
GP‑091273 | CR 51.021-0079 Removal of brackets, EGPRS2-A, UL (Rel-8) | Telefon AB LM Ericsson | POSTPONED |
GP‑091274 | CR 45.005-0272 Reference performance EGPRS2-B, UL, Sensitivity and Reduced Latency (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091275 | CR 45.005-0273 Reference performance EGPRS2-B, UL, Sensitivity and Reduced Latency (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091276 | CR 45.005-0274 Reference performance EGPRS2-B without brackets, UL, Sensitivity and Reduced Latency (Rel-7) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091277 | CR 45.005-0275 Reference performance EGPRS2-B without brackets, UL, Sensitivity and Reduced Latency (Rel-8) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091278 | CR 51.021-0080 Reference performance EGPRS2-B, UL, Sensitivity and Reduced Latency (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091279 | CR 51.021-0081 Reference performance EGPRS2-B, UL, Sensitivity and Reduced Latency (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091280 | CR 45.005-0276 Reference performance EGPRS2-B, UL, Co-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091281 | CR 45.005-0277 Reference performance EGPRS2-B, UL, Co-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091282 | CR 45.005-0278 Reference performance EGPRS2-B without brackets, UL, Co-channel (Rel-7) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091283 | CR 45.005-0279 Reference performance EGPRS2-B without brackets, UL, Co-channel (Rel-8) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091284 | CR 51.021-0082 Reference performance EGPRS2-B, UL, Co-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091285 | CR 51.021-0083 Reference performance EGPRS2-B, UL, Co-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091286 | CR 45.005-0280 Reference performance EGPRS2-B, UL, Adj-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091287 | CR 45.005-0281 Reference performance EGPRS2-B, UL, Adj-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091288 | CR 45.005-0282 Reference performance EGPRS2-B without brackets, UL, Adj-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091289 | CR 45.005-0283 Reference performance EGPRS2-B without brackets, UL, Adj-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091290 | CR 51.021-0084 Reference performance EGPRS2-B, UL, Adj-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091291 | CR 51.021-0085 Reference performance EGPRS2-B, UL, Adj-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091292 | Single antenna requirements for EGPRS2-B, UL | Telefon AB LM Ericsson | - |
GP‑091293 | Collected performance - Single antenna requirements for EGPRS2-B, UL | Telefon AB LM Ericsson | - |
GP‑091294 | CR 45.005-0284 Single antenna requirements for EGPRS2-B, UL (Rel-9) | Telefon AB LM Ericsson | POSTPONED |
GP‑091295 | CR 45.005-0285 Removal of brackets, RMS EVM EGPRS2, Base station (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091296 | CR 45.005-0286 Removal of brackets, RMS EVM EGPRS2, Base station (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091297 | CR 51.021-0086 Removal of brackets, modulation accuracy EGPRS2 (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091298 | CR 51.021-0087 Removal of brackets, modulation accuracy EGPRS2 (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091299 | CR 45.008-0400 Removal of brackets, BCCH backoff (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091300 | CR 45.008-0401 Removal of brackets, BCCH backoff (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091301 | CR 45.005-0287 Removal of brackets: NER, Adj-ch signal levels and Pico-BTS requirements for EGPRS2 (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091302 | CR 45.005-0288 Removal of brackets: NER, Adj-ch signal levels and Pico-BTS requirements for EGPRS2 (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091303 | CR 51.021-0088 Removal of brackets: NER for EGPRS2 (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091304 | CR 51.021-0089 Removal of brackets: NER for EGPRS2 (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091305 | Control channel performance for VAMOS | Telefon AB LM Ericsson | - |
GP‑091306 | Adaptive symbol constellation system performance evaluation DL | Telefon AB LM Ericsson | - |
GP‑091307 | Updated basic OSC system performance evaluation, DL | Telefon AB LM Ericsson | - |
GP‑091308 | CR 45.914-0002 rev 1 SAM – Single Antenna MIMO – for MUROS (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091309 | CR 45.914-0003 rev 1 L2S mapping verifications for MUROS (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091310 | CR 45.914-0010 System performance results for adaptive symbol constellation (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091311 | CR 45.005-0289 Correction of lower frequency offset limit for exceptions in requirements for Spectrum due to modulation and wide band noise for MCBTS (Rel-8) | Telefon AB LM Ericsson | POSTPONED |
GP‑091312 | CR 51.021-0090 Correction of exceptions in requirements for Spectrum due to modulation and wide band noise for MCBTS (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091313 | CR 51.021-0091 Clarification of exceptions in requirements for Spectrum due to modulation and wide band noise for MCBTS in single carrier operation (Rel-8) | Telefon AB LM Ericsson, Motorola Ltd. | - |
GP‑091314 | CR 51.021-0092 Introduction of test case for unwanted emissions in multicarrier operation with the carriers spread over the declared operating bandwidth of the MCBTS (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091315 | CR 45.005-0290 Introduction of Minimum receiver performance for multicarrier BTS declared as Multi-standard capable base station (MSR BS) (Rel-9) | Telefon AB LM Ericsson | - |
GP‑091316 | CR 45.005-0291 Introduction of entry points to mark relevant Single RAT requirements referred to by MSR BS TS (Rel-9) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091317 | CR 45.001-0059 Removal T-GSM 900 (Rel-6) | Telefon AB LM Ericsson | - |
GP‑091318 | CR 45.001-0060 Removal T-GSM 900 (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091319 | CR 45.001-0061 Removal T-GSM 900 (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091320 | CR 45.005-0292 Removal T-GSM 900 (Rel-6) | Telefon AB LM Ericsson | - |
GP‑091321 | CR 45.005-0293 Removal T-GSM 900 (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091322 | CR 45.005-0294 Removal T-GSM 900 (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091323 | CR 45.005-0295 Introduction of requirements for protection of services in the new frequency bands 1880-1920 MHz and 2300-2400 MHz available for 3GPP access technologies (Rel-8) | Telefon AB LM Ericsson, Motorola Ltd | - |
GP‑091324 | CR 51.021-0093 Introduction of test cases for requirements for protection of services in the new frequency bands: 1880-1920 MHz and 2300-2400 MHz available for 3GPP access technologies (Rel-8) | Telefon AB LM Ericsson, Motorola Ltd | - |
GP‑091325 | Fast Feedback Channel | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091326 | CR 45.008-0402 Correction of parameter range for THRESH_GSM_low and clarification of THRESH_priority_search usage (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091327 | CR 43.064-0081 Stage 2 Description of EFTA (Rel-9) | Telefon AB LM Ericsson | REJECTED |
GP‑091328 | CR 45.005-0296 Reference performance EGPRS2-B, DL, Sensitivity (updates and additions) (Rel-7) | Telefon AB L M Ericsson, NOKIA Corporation, Marvell Switzerland | - |
GP‑091329 | CR 45.005-0297 Reference performance EGPRS2-B, DL, Sensitivity (updates and additions) (Rel-8) | Telefon AB L M Ericsson, NOKIA Corporation, Marvell Switzerland | - |
GP‑091330 | CR 45.005-0298 Reference performance EGPRS2-B, DL, Co-channel (updates and additions) (Rel-7) | Telefon AB L M Ericsson, NOKIA Corporation, Marvell Switzerland | - |
GP‑091331 | CR 45.005-0299 Reference performance EGPRS2-B, DL, Co-channel (updates and additions) (Rel-8) | Telefon AB L M Ericsson, NOKIA Corporation, Marvell Switzerland | - |
GP‑091332 | CR 45.008-0403 Essential GELTE corrections (Rel-8) | Nokia Siemens Networks, NOKIA Corporation, Panasonic (PMCDE) | - |
GP‑091333 | CR 45.008-0404 Essential GELTE corrections (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, Panasonic (PMCDE) | WITHDRAWN |
GP‑091334 | CR 45.008-0405 Support of hybrid cells (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091335 | On the proposed blocking requirements for EGPRS2 | Nokia Siemens Networks | - |
GP‑091336 | Comments to Power level when accessing BTS (GP-090728) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091337 | Updated link level model and interference profiles for WIDER | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091338 | Updated link to system interface for WIDER | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091339 | System simulation results for WIDER | Nokia Siemens Networks, NOKIA Corporation | WITHDRAWN |
GP‑091340 | Mobility Requirements towards Home (e)Node B | Vodafone Group Plc | - |
GP‑091341 | On the Application of Inband Spurious Emission Requirements for MCBTS | Nokia Siemens Networks | - |
GP‑091342 | CR 45.005-0300 Correction of application of inband spurious emission requirements for MCBTS (Rel-8) | Nokia Siemens Networks | REJECTED |
GP‑091343 | CR 45.005-0301 Introduction of MCBTS capability for operating split frequency allocation (Rel-8) | Nokia Siemens Networks | - |
GP‑091344 | CR 51.021-0094 Correction of application of inband spurious emission requirements for MCBTS (Rel-8) | Nokia Siemens Networks | REJECTED |
GP‑091345 | CR 51.021-0095 Correction of MCBTS capability for operating split frequency allocation (Rel-8) | Nokia Siemens Networks | - |
GP‑091346 | CR 51.021-0096 Correction of measurement method for unwanted emissions with multiple carriers active (Rel-8) | Nokia Siemens Networks | WITHDRAWN |
GP‑091347 | Shifted SACCH | Marvell Switzerland | - |
GP‑091348 | DTX Configurations for VAMOS | Marvell Switzerland | - |
GP‑091349 | CR 45.008-0406 Treatment of "Not allowed cell" in priority-based reselection (Rel-8) | Research in Motion UK Ltd | WITHDRAWN |
GP‑091350 | MTTI – Overview and benefits | Research in Motion UK Ltd. | - |
GP‑091351 | Transmission of Common Priorities to mobiles in Packet Transfer Mode | Research in Motion UK Ltd | - |
GP‑091352 | CR 51.010-1-4234 rev 1 26.7.4.5.5.x - Test Case initial conditions modified for updating PLMN (Rel-8) | Anite | - |
GP‑091353 | Analysis of GNSS Minimum Performances and Recommendations (Discussion Paper) | Thales | - |
GP‑091354 | CR 43.064-0082 Stage 2 Description of EFTA (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | WITHDRAWN |
GP‑091355 | CR 44.060-1244 CR 44.060-xxxx EGPRS 2 Header Format to be used for MCS-5/6 (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091356 | CR 44.060-1245 EGPRS 2 Header Format to be used for MCS-5/6 (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091357 | CR 44.060-1246 EGPRS 2 Header Format to be used for MCS-5/6 (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091358 | CR 44.060-1247 Correction on Erroneous Interpretation of Length Indicator Value (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091359 | CR 44.060-1248 Correction on Erroneous Interpretation of Length Indicator Value (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091360 | CR 44.060-1249 Correction on Erroneous Interpretation of Length Indicator Value (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091361 | EMST Discussion Paper | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091362 | CR 44.060-1250 EMST (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091363 | CR 44.060-1251 Clarifying MS PAN Poll Response (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS, Research in Motion UK Ltd. | - |
GP‑091364 | CR 44.060-1252 Clarifying MS PAN Poll Response (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS, Research in Motion UK Ltd. | - |
GP‑091365 | CR 44.060-1253 Clarifying MS PAN Poll Response (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS, Research in Motion UK Ltd. | - |
GP‑091366 | CR 44.018-0756 Fixing Reference to Cell Identity (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091367 | Discussion paper on GPRS P-channels | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091368 | CR 44.018-0757 Clarifying Mobile Time Difference (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091369 | CR 44.018-0758 Introduction of support for A5/4 (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson (France) SAS, Vodafone Group Plc | - |
GP‑091370 | CR 44.008-0316 Introduction of support for A5/4 (Rel-9) | Telefon AB LM Ericsson, Vodafone Group Plc | - |
GP‑091371 | Handling of INTER RAT HANDOVER INFO during PS HO | Telefon AB LM Ericsson | - |
GP‑091372 | CR 44.018-0759 Addition of AMR WB indication to the System Information 3 (Rel-5) | Telefon AB LM Ericsson | - |
GP‑091373 | CR 44.018-0780 Addition of AMR WB indication to the System Information 3 (Rel-6) | Telefon AB LM Ericsson | - |
GP‑091374 | CR 44.018-0781 Addition of AMR WB indication to the System Information 3 (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091375 | CR 44.018-0782 Addition of AMR WB indication to the System Information 3 (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091376 | CR 44.018-0783 Addition of AMR WB indication to the System Information 3 (Rel-9) | Telefon AB LM Ericsson | - |
GP‑091377 | CR 48.103-0003 AoIP - Clarification to the RTCP usage (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091378 | CR 48.103-0004 AoIP- Corrections on description of IP-Multiplexing (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091379 | Draft spec for BSC-CBC Cell Broadcast Service Protocol | Telefon AB LM Ericsson, AT&T | - |
GP‑091380 | CR 44.031-0197 rev 2 Addition of DGNSS Validity Period (Rel-9) | Qualcomm Europe S.A.R.L., Thales | - |
GP‑091381 | MS inter-RAT Capabilities Transfer during inter-RAT PS Handover | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091382 | CR 43.129-0072 rev 1 Introduction of PS Handover Complete Acknowledge Message (Rel-8) | NOKIA Corporation, Nokia Siemens Networks | POSTPONED |
GP‑091383 | CR 48.018-0288 rev 1 Introduction of PS Handover Complete Acknowledge Message (Rel-8) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091384 | CR 43.129-0075 Introduction of PS Handover Complete Acknowledge Message (Rel-6) | NOKIA Corporation, Nokia Siemens Networks | POSTPONED |
GP‑091385 | CR 48.018-0289 Introduction of PS Handover Complete Acknowledge Message (Rel-6) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091386 | CR 43.129-0076 Introduction of PS Handover Complete Acknowledge Message (Rel-7) | NOKIA Corporation, Nokia Siemens Networks | POSTPONED |
GP‑091387 | CR 48.018-0290 Introduction of PS Handover Complete Acknowledge Message (Rel-7) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091388 | CR 44.018-0784 Essential GELTE corrections (Rel-8) | Nokia Siemens Networks, NOKIA Corporation, Panasonic (PMCDE) | - |
GP‑091389 | CR 44.018-0785 Essential GELTE corrections (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, Panasonic (PMCDE) | - |
GP‑091390 | CR 44.060-1254 Essential GELTE corrections (Rel-8) | Nokia Siemens Networks, NOKIA Corporation, Panasonic (PMCDE) | - |
GP‑091391 | CR 44.060-1255 Essential GELTE corrections (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, Panasonic (PMCDE) | - |
GP‑091392 | CR 48.018-0291 Corrections to eNB identifiers (Rel-8) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091393 | Concerns on support inbound handover to CSG cells | Huawei Technologies Co., Ltd. | - |
GP‑091394 | CR 44.018-0786 Corrections to / specification of the conditions for inclusion of the frequency parameters IEs (Rel-7) | Research In Motion UK Ltd. | - |
GP‑091395 | CR 44.018-0787 Corrections to / specification of the conditions for inclusion of the frequency parameters IEs (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091396 | CR 44.018-0788 Corrections to / specification of the conditions for inclusion of the frequency parameters IEs (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091397 | CR 44.060-1256 Correction of GP-081290 implementation error and frequency parameters related miscellaneous corrections (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091398 | CR 44.060-1257 Correction of GP-081290 implementation error and frequency parameters related miscellaneous corrections (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091399 | CR 44.060-1258 Definition of and reference to default PDCH pairs numbering for RTTI (Rel-7) | Research In Motion UK Ltd. | - |
GP‑091400 | CR 44.060-1259 Definition of and reference to default PDCH pairs numbering for RTTI (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091401 | CR 44.060-1260 Definition of and reference to default PDCH pairs numbering for RTTI (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091402 | CR 44.318-0113 Corrections to Information Elements coding (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091403 | CR 44.060-1261 Optimized DRX mode (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091404 | CR 44.018-0789 Optimized DRX mode (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091405 | CR 44.018-0790 Miscellaneous CSN.1 errors corrections (Rel-7) | Research In Motion UK Ltd. | - |
GP‑091406 | CR 44.018-0791 Miscellaneous CSN.1 errors corrections (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091407 | CR 44.018-0792 Miscellaneous CSN.1 errors corrections (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091408 | CR 44.060-1262 Miscellaneous CSN.1 errors corrections (Rel-7) | Research In Motion UK Ltd. | - |
GP‑091409 | CR 44.060-1263 Miscellaneous CSN.1 errors corrections (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091410 | CR 44.060-1264 Miscellaneous CSN.1 errors corrections (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091411 | CR 44.018-0761 Misc. corrections on priority handling (Rel-8) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091412 | CR 44.018-0762 Misc. corrections on priority handling (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091413 | CR 44.060-1265 Misc. corrections on priority handling (Rel-8) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091414 | CR 44.060-1266 Misc. corrections on priority handling (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091415 | CR 44.018-0763 Support of PACKET SI STATUS for SI2quater with E-UTRAN information (Rel-8) | NOKIA Corporation, Nokia Siemens Networks | POSTPONED |
GP‑091416 | CR 44.018-0764 Support of PACKET SI STATUS for SI2quater with E-UTRAN information (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | POSTPONED |
GP‑091417 | CR 44.060-1267 Support of PACKET SI STATUS for SI2quater with E-UTRAN information (Rel-8) | NOKIA Corporation, Nokia Siemens Networks | POSTPONED |
GP‑091418 | CR 44.060-1268 Support of PACKET SI STATUS for SI2quater with E-UTRAN information (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | POSTPONED |
GP‑091419 | CR 44.060-1269 NPM Transfer Time Correction (Rel-7) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091420 | CR 44.060-1270 NPM Transfer Time Correction (Rel-8) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091421 | CR 44.060-1271 NPM Transfer Time Correction (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091422 | CR 44.060-1272 Dynamic Timeslot Reduction (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091423 | Draft CR 24.008-xxxx Introduction of Dynamic Timeslot Reduction capability (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091424 | CR 44.018-0765 Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | MOTOROLA Ltd, Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091425 | CR 44.060-1273 Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | MOTOROLA Ltd, Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091426 | CR 44.060-1274 Essential correction to ASN.1 coding introduced when Rel-8 extensions were added (Rel-9) | MOTOROLA Ltd | - |
GP‑091427 | CR 44.060-1275 Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-8) | MOTOROLA Ltd, Nokia Siemens Networks | WITHDRAWN |
GP‑091428 | CR 45.002-0140 Introduction of VAMOS multiplexing and multiple access (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091429 | CR 51.010-1-4245 Removal of Specific PICS “Support of SMS over GPRS” in the test case 34.4.2 (R99) | NOKIA Corporation | - |
GP‑091430 | CR 44.060-1109 rev 10 Enhanced Multiplexing for Single TBF (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091431 | CR 44.018-0688 rev 11 Enhanced Multiplexing for Single TBF (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091432 | Draft CR 24.008-xxxx Introduction of Enhanced Multiplexing for Single TBF capability (Rel-9) | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091433 | CR 44.060-1276 PAN BS_CV_MAX value: removal of square brackets (Rel-7) | Research in Motion UK Ltd, Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091434 | CR 44.060-1277 PAN BS_CV_MAX value: removal of square brackets (Rel-8) | Research in Motion UK Ltd, Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091435 | CR 44.060-1278 PAN BS_CV_MAX value: removal of square brackets (Rel-9) | Research in Motion UK Ltd, Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091436 | CR 44.318-0114 Cells permitted to be reported in Handover procedures (Rel-8) | Research in Motion UK Ltd., T-Mobile USA | - |
GP‑091437 | CR 44.318-0115 Reporting of UTRAN/GERAN cells for GAN to non-GAN handover (Rel-8) | Research in Motion UK Ltd., T-Mobile USA | - |
GP‑091438 | CR 44.060-1225 rev 1 Priority of EGPRS PDAN vs. TENTATIVE_ACK blocks with PAN (Rel-7) | Research in Motion UK Ltd, Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091439 | CR 44.060-1226 rev 1 Priority of EGPRS PDAN vs. TENTATIVE_ACK blocks with PAN (Rel-8) | Research in Motion UK Ltd, Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091440 | CR 44.060-1279 Priority of EGPRS PDAN vs. TENTATIVE_ACK blocks with PAN (Rel-9) | Research in Motion UK Ltd, Telefon AB LM Ericsson, ST-Ericsson (France) SAS | - |
GP‑091441 | CR 44.018-0766 Editorial correction to SI5bis requirements (Rel-9) | Research in Motion UK Ltd. | - |
GP‑091442 | CR 44.018-0767 Reduction of signalling space required for Individual Priorities (Rel-8) | Research in Motion UK Ltd. | - |
GP‑091443 | CR 44.018-0768 Reduction of signalling space required for Individual Priorities (Rel-9) | Research in Motion UK Ltd. | - |
GP‑091444 | Dynamic Timeslot Reduction – Feature options | Research in Motion UK Ltd. | - |
GP‑091445 | CR 44.060-1223 rev 1 Multiple TTI TBF (Rel-9) | Research in Motion UK Ltd. | - |
GP‑091446 | CR 44.060-1224 rev 1 Multiple TTI TBF messages (Rel-9) | Research in Motion UK Ltd. | - |
GP‑091447 | DRAFT CR 24.008 Multiple TTI TBF | Research in Motion UK Ltd. | - |
GP‑091448 | CR 44.060-1280 Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-9) | MOTOROLA Ltd, Nokia Siemens Networks | WITHDRAWN |
GP‑091449 | E-UTRAN neighbour cell list identifiers in measurement reporting | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091450 | Efficient coding of individual priorities | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091451 | Reply LS on possible AS impacts from UE mode operation | TSG CT WG1 | - |
GP‑091452 | LS on Draft ITU-T Recommendation on Requirements for Land Mobile Alerting Broadcast Capabilities for Civic Purposes | ITU-T SG2 | - |
GP‑091453 | Response LS to Draft ITU-T Recommendation on Requirements for Land Mobile Alerting Broadcast Capabilities for Civic Purposes | GSMA North America | - |
GP‑091454 | Response LS to Draft ITU-T Recommendation on Requirements for Land Mobile Alerting Broadcast Capabilities for Civic Purposes | TIA TR-45.8 | - |
GP‑091455 | Liaison statement concerning GCF decision to remove certification requirements for GSM/(E)GPRS P-channels (PBCCH/PCCCH) | GCF-CAG | - |
GP‑091456 | PTCRB LS on P-Channels | PTCRB | - |
GP‑091457 | LS on Coexistence Study between MCBTS and UMTS900 | ETSI TC MSG | - |
GP‑091458 | LS on CBS activation time for ETWS information in TS 23.041 | TSG RAN WG2 | - |
GP‑091459 | LS on PS handover without data radio bearers | TSG RAN WG2 | - |
GP‑091460 | LS on INTER RAT HANDOVER INFO during inter-RAT PS handover | TSG RAN WG2 | - |
GP‑091461 | Reply LS on possible AS impacts from UE mode operation | TSG RAN WG2 | - |
GP‑091462 | Reply LS on reselection from GERAN to E-UTRAN | TSG RAN WG2 | - |
GP‑091463 | Reply LS on treatment of Not Allowed E-UTRAN cells | TSG RAN WG2 | - |
GP‑091464 | LS on presentation of TS22.368 for information | TSG SA WG1 | - |
GP‑091465 | Reply LS on reselection from GERAN to E-UTRAN | TSG SA WG1 | - |
GP‑091466 | Answer LS on "Local Call Local Switch" | TSG SA WG1 | - |
GP‑091467 | LS on Principles for voice domain selection | TSG SA WG2 | - |
GP‑091468 | Reply LS on potential ETWS security threat in UTRAN | TSG SA WG3 | - |
GP‑091469 | Reply LS on UE Capability Transfer during inter-RAT handover | TSG SA WG3 | - |
GP‑091470 | LS on Local Call Local Switch LI proposals | TSG SA WG3 LI | - |
GP‑091471 | Response to Liaison statement on Draft ITU-T Recommendation on Requirements for Land Mobile Alerting Broadcast Capabilities for Civic Purposes | TSG SA | - |
GP‑091472 | Reply LS on Discussion on release dependent requirements for audio testing | TSG SA WG4 | - |
GP‑091473 | Draft CR 48.008: Introduction of Local Call Local Switch procedures | Nokia Siemens Networks, ZTE Corporation | - |
GP‑091474 | Enhancements for BSS internal handover procedure with MSC support | Nokia Siemens Networks | - |
GP‑091475 | CR 43.059-0076 rev 1 Changes to Stage II allowing parallel positioning (Rel-9) | TruePosition, Nokia Siemens Networks | - |
GP‑091476 | CR 48.071-0035 rev 1 Changes to Stage III enabling parallel positioning (Rel-9) | TruePosition, Nokia Siemens Networks | - |
GP‑091477 | On VAMOS pulse and alpha adaptation | MOTOROLA S.A.S | - |
GP‑091478 | TSG WG GERAN3 Work Item Status | ETSI Secretariat | - |
GP‑091479 | CR 51.010-1-4246 Formal closing of 51.010-1 V7.12.0 (Rel-7) | ETSI Secretariat | - |
GP‑091480 | CR 51.010-2-0592 rev 1 Changes in the applicability of test case 34.4.2 from C215 to C253 (R99) | NOKIA Corporation | - |
GP‑091481 | CR 48.103-0002 rev 1 Miscellaneous corrections (Rel-8) | ZTE Corporation | - |
GP‑091482 | DRAFT Meeting Minutes of VAMOS telco #6 | WI Rapporteur | - |
GP‑091483 | Meeting Minutes of VAMOS telco#4 | WI Rapporteur | - |
GP‑091484 | Meeting Minutes of VAMOS telco#5 | WI Rapporteur | - |
GP‑091485 | Work Plan for VAMOS | WI Rapporteur | - |
GP‑091486 | Work Plan for MUROS | WI Rapporteur | - |
GP‑091487 | CR 45.005-0280 rev 1 Reference performance EGPRS2-B, UL, Adj-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091488 | CR 45.005-0281 rev 1 Reference performance EGPRS2-B, UL, Adj-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091489 | CR 45.005-0282 rev 1 Reference performance EGPRS2-B without brackets, UL, Adj-channel (Rel-7) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091490 | CR 45.005-0283 rev 1 Reference performance EGPRS2-B without brackets, UL, Adj-channel (Rel-8) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091491 | CR 51.021-0084 rev 1 Reference performance EGPRS2-B, UL, Adj-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091492 | CR 51.021-0085 rev 1 Reference performance EGPRS2-B, UL, Adj-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091493 | Collected peformance requirements for EGPRS2-LATRED (revision of GP-091266) | Telefon AB LM Ericsson, Huawei Technologies. Co Ltd, Marvell Switzerland, NOKIA Corporation, Nokia Siemens Networks, ST-Ericsson (France) SAS | - |
GP‑091494 | CR 51.021-0092 rev 1 Introduction of test case for unwanted emissions in multicarrier operation with the carriers spread over the declared operating bandwidth of the MCBTS (Rel-8) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091495 | CR 45.005-0302 Addition of requirement to test intra BSS IM attenuation at maximum carrier frequency spacing (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091496 | System simulation results for WIDER - revised | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091497 | CR 44.018-0769 Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-8) | MOTOROLA Ltd, Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091498 | CR 44.018-0770 Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-9) | MOTOROLA Ltd, Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091499 | LS on Information on Standardization Needs for GSM-R / E-GSM-R (Extension) | ETSI TC RT | - |
GP‑091500 | LS on Status of the MSR Work Item | TSG RAN WG4 | - |
GP‑091501 | LS on Coexistence Study between MCBTS and UMTS900 | TSG RAN WG4 | - |
GP‑091502 | CR 51.021-0097 Clarification of need for single carrier measurements for MCBTS (Rel-8) | Alcatel-Lucent | REJECTED |
GP‑091503 | E-UTRA Support on P-Channels | NOKIA Corporation, Nokia Siemens Networks | - |
GP‑091504 | Control Channel Optimization for VAMOS | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091505 | LS on Change to description of mobile station classmark 2 | TSG CT WG1 | - |
GP‑091506 | Workplan for eCall (replaces GP-091099) | Qualcomm Europe S.A.R.L. | - |
GP‑091507 | Way Forward for Control Channel Improvement on VAMOS | Huawei Technologies Co., Ltd | - |
GP‑091508 | LS on IWF Rate Change Procedure with AoIP | TSG CT WG4 | - |
GP‑091509 | LS on BSS internal handover procedure with MSC support | TSG CT WG4 | - |
GP‑091510 | LS on cell reselection between UMTS/LTE and GERAN using priorities | TSG RAN WG2 | - |
GP‑091511 | Reply LS to S3-091054 on potential ETWS security threat in UTRAN | TSG RAN WG2 | - |
GP‑091512 | CR 51.021-0098 Introduction of test case for unwanted emissions in multicarrier operation with the carriers spread over the declared maximum Base Station RF bandwidth of the MCBTS (Rel-8) | Nokia Siemens Networks | - |
GP‑091513 | Draft Reply to Liaison statement concerning GCF decision to remove certification requirements for GSM/(E)GPRS P-channels (PBCCH/PCCCH) (To: GCF-CAG, Cc : GSMA) | TSG GERAN | - |
GP‑091514 | Draft Reply to LS on P-Channels (To: PTCRB, Cc : GSMA) | TSG GERAN | - |
GP‑091515 | Work Plan for VAMOS | WI Rapporteur | - |
GP‑091516 | Collected performance requirements for EGPRS2-LATRED (revision of GP-091266) | Telefon AB LM Ericsson, Huawei Technologies. Co Ltd, Marvell Switzerland, NOKIA Corporation, Nokia Siemens Networks, ST-Ericsson (France) SAS | - |
GP‑091517 | CR 51.021-0080 rev 1 Reference performance EGPRS2-B, UL, Sensitivity and Reduced Latency (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091518 | CR 51.021-0081 rev 1 Reference performance EGPRS2-B, UL, Sensitivity and Reduced Latency (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091519 | CR 51.021-0082 rev 1 Reference performance EGPRS2-B, UL, Co-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091520 | CR 51.021-0083 rev 1 Reference performance EGPRS2-B, UL, Co-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091521 | LS on Progress of Local Call Local Switch Feasibility Study | TSG CT WG4 | - |
GP‑091522 | LS on IWF Rate Change Procedure with AoIP | G2 | - |
GP‑091523 | LS on BSS internal handover procedure with MSC support | G2 | - |
GP‑091524 | CR 44.060-1281 Essential correction to PSI3 quarter information elements to align with TS 44.018 (Rel-9) | Motorola | - |
GP‑091525 | CR 44.060-1247 rev 1 Correction on Erroneous Interpretation of Length Indicator Value (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091526 | CR 44.060-1248 rev 1 Correction on Erroneous Interpretation of Length Indicator Value (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091527 | CR 44.060-1249 rev 1 Correction on Erroneous Interpretation of Length Indicator Value (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091528 | CR 44.018-0786 rev 1 Corrections to / specification of the conditions for inclusion of the frequency parameters IEs (Rel-7) | Research In Motion UK Ltd. | - |
GP‑091529 | CR 44.018-0787 rev 1 Corrections to / specification of the conditions for inclusion of the frequency parameters IEs (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091530 | CR 44.018-0788 rev 1 Corrections to / specification of the conditions for inclusion of the frequency parameters IEs (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091531 | CR 44.060-1244 rev 1 EGPRS 2 Header Format to be used for MCS-5/6 (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091532 | CR 44.060-1245 rev 1 EGPRS 2 Header Format to be used for MCS-5/6 (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091533 | CR 44.060-1246 rev 1 EGPRS 2 Header Format to be used for MCS-5/6 (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091534 | CR 44.060-1251 rev 1 Clarifying MS PAN Poll Response (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson, Research in Motion UK Ltd. | - |
GP‑091535 | CR 44.060-1252 rev 1 Clarifying MS PAN Poll Response (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson, Research in Motion UK Ltd. | - |
GP‑091536 | CR 44.060-1253 rev 1 Clarifying MS PAN Poll Response (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson, Research in Motion UK Ltd. | - |
GP‑091537 | CR 44.018-0746 rev 1 Clarifications on common priorities (Rel-8) | Panasonic, Samsung | - |
GP‑091538 | CR 44.060-1232 rev 1 Clarifications on common priorities (Rel-8) | Panasonic, Samsung | - |
GP‑091539 | CR 44.018-0747 rev 1 Clarifications of DEFAULT_XXX_PRIORITY in individual priorities (Rel-8) | Panasonic | - |
GP‑091540 | CR 44.060-1233 rev 1 Clarifications of DEFAULT_XXX_PRIORITY in individual priorities (Rel-8) | Panasonic | - |
GP‑091541 | CR 44.018-0771 Clarifications on common priorities (Rel-9) | Panasonic, Samsung | - |
GP‑091542 | CR 44.060-1282 Clarifications on common priorities (Rel-9) | Panasonic, Samsung | - |
GP‑091543 | CR 44.018-0772 Clarifications of DEFAULT_XXX_PRIORITY in individual priorities (Rel-9) | Panasonic | - |
GP‑091544 | CR 44.060-1283 Clarifications of DEFAULT_XXX_PRIORITY in individual priorities (Rel-9) | Panasonic | - |
GP‑091545 | CR 44.018-0761 rev 1 Misc. corrections on priority handling (Rel-8) | Nokia Corporation, Nokia Siemens Networks | - |
GP‑091546 | CR 44.018-0762 rev 1 Misc. corrections on priority handling (Rel-9) | Nokia Corporation, Nokia Siemens Networks | - |
GP‑091547 | CR 44.060-1265 rev 1 Misc. corrections on priority handling (Rel-8) (Rel-8) | Nokia Corporation, Nokia Siemens Networks | - |
GP‑091548 | CR 44.060-1266 rev 1 Misc. corrections on priority handling (Rel-9) (Rel-9) | Nokia Corporation, Nokia Siemens Networks | - |
GP‑091549 | CR 44.060-1234 rev 1 Clarification on the MS behaviour upon PCCO failure (Rel-8) | Panasonic | - |
GP‑091550 | CR 44.060-1284 Clarification on the MS behaviour upon PCCO failure (Rel-9) | Panasonic | - |
GP‑091551 | CR 51.010-2-0604 rev 1 26.12.2.1 - Changes to Test Case numbering (Rel-8) | Anite | - |
GP‑091552 | GERAN WG3 PRD#09 v1.0 "G3 Electronic agreement" | G3 Convenor (Samsung) | - |
GP‑091553 | Workplan for eCall | QUALCOMM EUROPE | - |
GP‑091554 | Work plan for P-channel changes | Ericsson | - |
GP‑091555 | CR 51.010-1-4242 rev 1 Changes to test cases for TDD_Qoffset (Rel-8) | CMCC | - |
GP‑091556 | CR 51.010-1-4244 rev 1 Test for MS with no UTRAN-TDD capability while SI2QUATER containing UTRAN-TDD Neighbor Cells is broadcasted on BCCH (Rel-8) | CMCC | - |
GP‑091557 | CR 51.010-1-4231 rev 1 Correction to test case 52.1.2.1.9.3 – Packet Uplink Assignment / Two phase access / Radio Access Capabilities at step 5. (Rel-8) | Research In Motion UK Ltd | - |
GP‑091558 | CR 51.010-1-4233 rev 1 Aligning the abbreviation of FDN in 51.010-1 (Rel-8) | CGC | - |
GP‑091559 | CR 51.010-1-4232 rev 1 Section 14.16.1 reference table_51.010-1 (Rel-8) | CGC | - |
GP‑091560 | CR 51.010-2-0599 rev 1 Aligning the abbreviation of FDN in 51.010-2 (Rel-8) | CGC | - |
GP‑091561 | CR 51.021-0084 rev 2 Reference performance EGPRS2-B, UL, Adj-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091562 | CR 51.021-0085 rev 2 Reference performance EGPRS2-B, UL, Adj-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091563 | CR 45.005-0296 rev 1 Reference performance EGPRS2-B, DL, Sensitivity (updates and additions) (Rel-7) | Telefon AB L M Ericsson, NOKIA Corporation, Marvell Switzerland | - |
GP‑091564 | CR 45.005-0297 rev 1 Reference performance EGPRS2-B, DL, Sensitivity (updates and additions) (Rel-8) | Telefon AB L M Ericsson, NOKIA Corporation, Marvell Switzerland | - |
GP‑091565 | System impact of requirements for multicarrier repeater (revision of GP-091134) | Andrew Wireless Systems GmbH | - |
GP‑091566 | CR 45.005-0261 rev 1 Introduction of EVM requirement for EGPRS2 for Repeater (Rel-7) | Andrew Wireless Systems GmbH | - |
GP‑091567 | CR 45.005-0289 rev 1 Correction of lower frequency offset limit for exceptions in requirements for Spectrum due to modulation and wide band noise for MCBTS (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091568 | CR 51.021-0090 rev 1 Correction of exceptions in requirements for Spectrum due to modulation and wide band noise for MCBTS (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091569 | CR 51.021-0091 rev 1 Clarification of exceptions in requirements for Spectrum due to modulation and wide band noise for MCBTS in single carrier operation (Rel-8) | Telefon AB LM Ericsson, Motorola Ltd. | - |
GP‑091570 | CR 51.021-0098 rev 1 Introduction of test case for unwanted emissions in multicarrier operation with the carriers spread over the declared maximum Base Station RF bandwidth of the MCBTS (Rel-8) | Nokia Siemens Networks | - |
GP‑091571 | CR 51.010-1-4239 rev 1 34.2.2 update of expected sequence (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091572 | CR 51.010-1-4246 Formal closing of 51.010-1 V7.12.0 (Rel-8) | Project Manager | - |
GP‑091573 | CR 51.010-1-4233 rev 2 Aligning the abbreviation of FDN in 51.010-1 (Rel-8) | CGC | - |
GP‑091574 | CR 51.010-1-4244 rev 2 Test for MS with no UTRAN-TDD capability while SI2QUATER containing UTRAN-TDD Neighbor Cells is broadcasted on BCCH (Rel-8) | CMCC, Rohde&Schwarz | - |
GP‑091575 | CR 51.010-2-0599 rev 2 Aligning the abbreviation of FDN in 51.010-2 (Rel-8) | CGC | - |
GP‑091576 | CR 51.010-2-0603 rev 1 Correct test case numbering for 31.4.2.1.x and 31.4.4.1.1 to match 51.010-1 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091577 | CR 51.010-2-0604 rev 2 26.12.2.1 - Changes to Test Case numbering (Rel-8) | Anite | - |
GP‑091578 | CR 51.010-1-4247 New Test Case 58a.1.16 for LATRED feature (Rel-8) | NOKIA Corporation | - |
GP‑091579 | CR 51.010-2-0605 New Test Case 58a.1.16 for LATRED feature (Rel-8) | NOKIA Corporation | - |
GP‑091580 | CR 51.010-1-4213 rev 1 58a.1.18 New Latred Test Case: Downlink TBF, with Concurrent Uplink TBF, PAN Reaction Time, Event Based FANR (Rel-8) | Rohde&Schwarz | - |
GP‑091581 | CR 45.005-0302 rev 1 Addition of requirement to test intra BSS IM attenuation at maximum carrier frequency spacing (Rel-8) | Telefon AB LM Ericsson | POSTPONED |
GP‑091582 | CR 45.005-0303 Restructuring TS 45.005 to facilitate referencing to relevant Single RAT requirements from MSR BS TS (Rel-9) | Telefon AB LM Ericsson | - |
GP‑091583 | CR 45.005-0301 rev 1 Introduction of MCBTS capability for operating split frequency allocation (Rel-8) | Nokia Siemens Networks | - |
GP‑091584 | Draft reply to LS on Status of the MSR Work Item (To: TSG RAN WG4, Cc: TSG RAN) | TSG GERAN WG1 | - |
GP‑091585 | CR 45.005-0290 rev 1 Introduction of Minimum receiver performance for multicarrier BTS declared as Multi-standard capable base station (MSR BS) (Rel-9) | Telefon AB LM Ericsson | - |
GP‑091586 | CR 45.005-0303 rev 1 Restructuring TS 45.005 to facilitate referencing to relevant Single RAT requirements from MSR BS TS (Rel-9) | Telefon AB LM Ericsson | - |
GP‑091587 | CR 51.021-0095 rev 1 Correction of MCBTS capability for operating split frequency allocation (Rel-8) | Nokia Siemens Networks | - |
GP‑091588 | CR 45.008-0402 rev 1 Correction of parameter range for THRESH_GSM_low and clarification of THRESH_priority_search usage (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091589 | CR 45.008-0403 rev 1 Essential GELTE corrections (Rel-8) | Nokia Siemens Networks, NOKIA Corporation, Panasonic (PMCDE) | - |
GP‑091590 | CR 45.008-0397 rev 1 Correction on Measurement Control (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091591 | CR 44.018-0784 rev 1 Essential GELTE corrections (Rel-8) | Nokia Siemens Networks, Nokia Corporation, Panasonic | - |
GP‑091592 | CR 44.018-0785 rev 1 Essential GELTE corrections (Rel-9) | Nokia Siemens Networks, Nokia Corporation, Panasonic | - |
GP‑091593 | CR 44.060-1254 rev 1 Essential GELTE corrections (Rel-8) | Nokia Siemens Networks, Nokia Corporation, Panasonic | - |
GP‑091594 | CR 44.060-1255 rev 1 Essential GELTE corrections (Rel-9) | Nokia Siemens Networks, Nokia Corporation, Panasonic | - |
GP‑091595 | CR 44.060-1250 rev 1 EMST (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091596 | CR 44.018-0749 rev 1 Miscellaneous corrections on GELTE (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091597 | CR 44.018-0750 rev 1 Miscellaneous corrections on GELTE (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091598 | CR 44.060-1235 rev 1 Miscellaneous corrections on GELTE (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091599 | CR 44.060-1236 rev 1 Miscellaneous corrections on GELTE (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091600 | CR 44.018-0751 rev 1 Broadcast of 3G legacy parameters in idle mode (Rel-8) | Alcatel-Lucent | - |
GP‑091601 | CR 44.018-0752 rev 1 Broadcast of 3G legacy parameters in idle mode (Rel-9) | Alcatel-Lucent | - |
GP‑091602 | CR 44.018-0755 rev 1: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-8) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091603 | CR 44.018-0765 rev 1: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091604 | CR 44.060-1241 rev 1: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-8) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091605 | CR 44.060-1273 rev 1: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091606 | Reply LS on INTER RAT HANDOVER INFO during inter-RAT PS Handover | G2 | - |
GP‑091607 | Addition of AMR WB indication to the System Information 3 | G2 | - |
GP‑091608 | CR 43.059-0076 rev 2 Changes to Stage II allowing parallel positioning (Rel-9) | TruePosition, Nokia Siemens Networks | - |
GP‑091609 | CR 48.071-0035 rev 2 Changes to Stage III enabling parallel positioning (Rel-9) | TruePosition, Nokia Siemens Networks | - |
GP‑091610 | CR 44.060-1286: Correction of GP-081290 implementation error (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091611 | CR 51.010-1-4214 rev 1 58a.1.19 New Latred Test Case: Concurrent Uplink and Downlink TBFs, FANR/PAN, RLC Unacknowledged Mode (Rel-8) | Rohde&Schwarz | - |
GP‑091612 | CR 51.010-1-4231 rev 2 Correction to test case 52.1.2.1.9.3 – Packet Uplink Assignment / Two phase access / Radio Access Capabilities at step 5 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091613 | CR 51.010-2-0597 rev 1 Addition of new PICS items and new test Downlink Dual Carrier test cases (Rel-8) | Research In Motion UK Ltd | - |
GP‑091614 | CR 51.010-1-4226 rev 1 New Test Case 58a.2.11- Concurrent RTTI TBF / Downlink Dual Carrier configuration (Rel-8) | Research In Motion UK Ltd | - |
GP‑091615 | CR 51.010-1-4227 rev 1 New Test Case 58a.2.12- Concurrent RTTI TBF/ Dual Transfer Mode (Rel-8) | Research In Motion UK Ltd | - |
GP‑091616 | CR 51.010-2-0598 rev 1 Addition of new RTTI test cases – 58a.2.11 and 58a.2.12 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091617 | CR 51.010-1-4235 rev 1 58a.x-REDUCED_LATENCY_ACCESS bit set to 1 in GPRS Cell Options IE (Rel-8) | Anite | - |
GP‑091618 | CR 51.010-1-4216 rev 1 New Test case 58b.1.3- Single Carrier Concurrent TBF/Downlink TBF reconfigured to DLDC configuration / Uplink single carrier TBF reallocated to Carrier 2/Uplink modified to DLDC (Rel-8) | Research In Motion UK Ltd | - |
GP‑091619 | CR 51.010-1-4217 rev 1 New Test case 58b.1.4- Single Carrier Uplink TBF with no Downlink TBF / DLDC TBF established / Uplink DLDC TBF (on both carrier 1 and carrier 2)/ Uplink TBF Reconfigured to Single Carrier TBF (Rel-8) | Research In Motion UK Ltd | - |
GP‑091620 | CR 51.010-1-4218 rev 1 New Test case 58b.1.5- Single Carrier Downlink TBF with No Uplink TBF/ Downlink reconfigured to DLDC TBF/ Uplink TBF established (Rel-8) | Research In Motion UK Ltd | - |
GP‑091621 | CR 51.010-1-4219 rev 1 New Test Case 58b.2.3 – Concurrent Downlink Dual Carrier TBF / Frequency Hopping (Rel-8) | Research In Motion UK Ltd | - |
GP‑091622 | CR 51.010-1-4220 rev 1 New Test Case 58b.2.4 – Concurrent Downlink Dual Carrier TBF / Downlink Dual Carrier Configuration / Channel Quality Reporting (Rel-8) | Research In Motion UK Ltd | - |
GP‑091623 | CR 51.010-1-4221 rev 1 New Test Case 58b.2.5-Concurrent Downlink Dual Carrier TBF / Downlink Dual Carrier Configuration in Dual Transfer Mode (Rel-8) | Research In Motion UK Ltd | - |
GP‑091624 | CR 51.010-1-4222 rev 1 New Test Case 58b.2.6- Concurrent Downlink Dual Carrier TBF / Extended Dynamic allocation (Rel-8) | Research In Motion UK Ltd | - |
GP‑091625 | CR 51.010-1-4223 rev 1 New Test Case 58b.2.7- Concurrent Downlink Dual Carrier TBF / Downlink Dual Carrier Configuration/ Extended RLC/MAC control message segmentation. (Rel-8) | Research In Motion UK Ltd | - |
GP‑091626 | CR 51.010-1-4224 rev 1 New Test Case 58b.3.2- Downlink Dual Carrier Configuration/ Abnormal Case/ Frequencies not within same band/ Access Retry (Rel-8) | Research In Motion UK Ltd | - |
GP‑091627 | CR 51.010-1-4225 rev 1 New Test Case 58b.3.3- Downlink Dual Carrier Configuration/ Abnormal case / UL Single Carrier TBF / Frequency violations (Rel-8) | Research In Motion UK Ltd | - |
GP‑091628 | CR 51.010-1-4229 rev 1 Addition of Specific PICS statements in section 58b.1.1, 58b.1.2, 58b.2.1, 58b.2.1, 58b.2.8 and 58b.3.1 (Rel-8) | Research In Motion UK Ltd | - |
GP‑091629 | REDHOT and HUGE Workplan | Nokia Corporation | - |
GP‑091630 | GELTE Workplan | NOKIA Corporation | - |
GP‑091631 | CR 51.010-2-0606 Formal closing of 51.010-2 V7.12.0 (Rel-8) | ETSI Secretariat | - |
GP‑091632 | RAN5 EPS (E-UTRAN & EPC) TC prose specification requirements | Samsung | - |
GP‑091633 | Response LS on removal of certification requirements for GSM/(E)GPRS P-channels (PBCCH/PCCCH) | TSG WG GERAN3 | - |
GP‑091634 | Correction of test case numbering for 31.4.2.1.x, 31.4.4.1.1 and 26.12.2.1 in 51.010-2 | TSG WG GERAN3 | - |
GP‑091635 | CR 51.010-2-0607 Introduction of Test for MS with no UTRAN-TDD capability while SI2QUATER containing UTRAN-TDD Neighbor Cells is broadcasted on BCCH (Rel-8) | CMCC, Rohde&Schwarz | - |
GP‑091636 | CR 51.010-2-0595 rev 1 58a.1.* Introduction of Latred, FANR/PAN Test Cases (Rel-8) | Rohde&Schwarz | - |
GP‑091637 | LS on new GERAN2 LTE interworking TCs | TSG WG GERAN3 | - |
GP‑091638 | Report from the GERAN WG G3new #43 Meeting | ETSI Secretariat | - |
GP‑091639 | TSG GERAN WG3 chairman's report | GERAN WG3 Chairman | - |
GP‑091640 | CR 45.004-0014 Introduction of VAMOS AQPSK Modulation (Rel-8) | Motorola Ltd., Telecom Italia S.p.A., Samsung Electronics Co, Marvell Switzerland, Qualcomm Europe S.A.R., ZTE Corporation | POSTPONED |
GP‑091641 | CR 44.060-1287: Correction of GP-081290 implementation error (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091642 | CR 44.060-1285: Frequency parameters related miscellaneous corrections (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091643 | CR 44.060-1263 rev 1: Miscellaneous CSN.1 errors corrections (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091644 | CR 44.018-0758 rev 1: Introduction of support for A5/4 (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson, Vodafone Group Plc | - |
GP‑091645 | CR 48.008-0316 rev 1: Introduction of support for A5/4 (Rel-9) | Telefon AB LM Ericsson, Vodafone Group Plc | - |
GP‑091646 | LS on Progress of Local Call Local Switch Feasibility Study (C4-092745) | G2 | - |
GP‑091647 | CR 44.318-0114 rev 1: Cells permitted to be reported in Handover procedures (Rel-9) | Research in Motion UK Ltd., T-Mobile USA | - |
GP‑091648 | CR 44.318-0115 rev 1: Reporting of UTRAN/GERAN cells for GAN to non-GAN handover (Rel-9) | Research in Motion UK Ltd., T-Mobile USA | - |
GP‑091649 | Draft spec for BSC-CBC Cell Broadcast Service Protocol | Telefon AB LM Ericsson, AT&T | - |
GP‑091650 | CR 44.018-0756 rev 1: Fixing Reference to Cell Identity (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091651 | CR 44.060-1264 rev 1: Miscellaneous CSN.1 errors corrections (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091652 | CR 44.318-0113 rev 1: Corrections to Information Elements coding (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091653 | CR 44.318-0116: Corrections to Information Elements coding (Rel-6) | Research In Motion UK Ltd. | - |
GP‑091654 | CR 44.318-0117: Corrections to Information Elements coding (Rel-7) | Research In Motion UK Ltd. | - |
GP‑091655 | CR 44.318-0118: Corrections to Information Elements coding (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091656 | Draft CR 24.008 Introduction of Enhanced Multiplexing for Single TBF capability | Nokia Corp; Nokia Siemens Networks | - |
GP‑091657 | LS on Introduction of Enhanced Multiplexing for Single TBF capability | G2 | - |
GP‑091658 | CR 44.018-0769 rev 1: Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-8) | MOTOROLA Ltd, Nokia Siemens Networks, Nokia | - |
GP‑091659 | CR 44.018-0770 rev 1: Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-9) | MOTOROLA Ltd, Nokia Siemens Networks, Nokia | - |
GP‑091660 | CR 44.060-1244 rev 2: EGPRS 2 Header Format to be used for MCS-5/6 (Rel-7) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091661 | CR 45.008-0394 rev 1 Measurements on higher priority inter-RAT frequency (Rel-8) | Panasonic (PMCDE) | - |
GP‑091662 | CR 45.008-0393 rev 1 Priority based reselection to UTRAN (Rel-8) | Panasonic (PMCDE), SAMSUNG Electronics Co. | - |
GP‑091663 | CR 45.005-0304 Removal of blocking, IM characteristics and AM suppression receiver requirements for QPSK, 16QAM and 32QAM modulations introduced in EGPRS2 (Rel-7) | Telefon AB LM Ericsson, Nokia Siemens Networks, Huawei Technologies Co., Ltd., , Reserch in Motion UK Ltd. | - |
GP‑091664 | CR 45.005-0305 Removal of blocking, IM characteristics and AM suppression receiver requirements for QPSK, 16QAM and 32QAM modulations introduced in EGPRS2 (Rel-8) | Telefon AB LM Ericsson, Nokia Siemens Networks, Huawei Technologies Co., Ltd., , Reserch in Motion UK Ltd. | - |
GP‑091665 | CR 45.008-0396 rev 1 Clarification of measurement report considering CSG cells in Rel-8 (Rel-8) | LG Electronics Inc. | POSTPONED |
GP‑091666 | CR 45.008-0395 rev 1 Clarification on CSG PSC/ PCI split information (Rel-8) | Panasonic (PMCDE) | - |
GP‑091667 | CR 51.021-0304 Removal of blocking, IM characteristics and AM suppression receiver requirements for QPSK, 16QAM and 32QAM modulations introduced in EGPRS2 (Rel-7) | Telefon AB LM Ericsson, Nokia Siemens Networks, Huawei Technologies Co., Ltd., Reserch in Motion UK Ltd. | - |
GP‑091668 | CR 51.021-0305 Removal of blocking, IM characteristics and AM suppression receiver requirements for QPSK, 16QAM and 32QAM modulations introduced in EGPRS2 (Rel-8) | Telefon AB LM Ericsson, Nokia Siemens Networks, Huawei Technologies Co., Ltd., Reserch in Motion UK Ltd. | - |
GP‑091669 | On the wider pulse shape for VAMOS | Telefon AB LM Ericsson, Telecom Italia S.p.A., Reserch in Motion UK Ltd., Samsung electronics Co, LG Electronics Inc., Motorola Ltd, Marvell Switzerland, Qualcomm Europe S.A.R.L., Huawei Technologies Co., Ltd., ZTE Corporation | - |
GP‑091670 | CR 45.001-0058 rev 1 Introduction of Shifted SACCH scheme for VAMOS (Rel-9) | Huawei Technologies Co., Ltd, Research In Motion UK Ltd, Marvell Switzerland, Samsung Electronics Co., Com-Research GmbH, INTERDIGITAL COMMUNICATIONS, China Mobile Com. Corporation, VODAFONE Group Plc | POSTPONED |
GP‑091671 | Shifted SACCH - Concept Description (revised in GP-091678) | Huawei Technologies Co., Ltd, Research In Motion UK Ltd, Marvell Switzerland, Samsung Electronics Co., INTERDIGITAL COMMUNICATIONS, China Mobile Com. Corporation | - |
GP‑091672 | CR 45.001-0062 Repeated SACCH support for VAMOS (Rel-9) | Nokia Siemens Networks, NOKIA Corporation, Telefon AB LM Ericsson | POSTPONED |
GP‑091673 | CR 45.005-0280 rev 2 Reference performance EGPRS2-B, UL, Adj-channel (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091674 | CR 45.005-0281 rev 2 Reference performance EGPRS2-B, UL, Adj-channel (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091675 | Revised Meeting Minutes of VAMOS telco#5 | WI Rapporteur | - |
GP‑091676 | Work Plan for VAMOS | WI Rapporteur | - |
GP‑091677 | System Performance Evaluation with Frequency Hopping Schemes for VAMOS (revision of GP-091209) | ZTE Corporation | - |
GP‑091678 | Shifted SACCH - Concept Description (revision of GP-091671) | Huawei Technologies Co., Ltd, Research In Motion UK Ltd, Marvell Switzerland, Samsung Electronics Co., INTERDIGITAL COMMUNICATIONS, China Mobile Com. Corporation, Telefon AB LM Ericsson | - |
GP‑091679 | CR 45.008-0407 EGPRS2 link quality reporting – removal of brackets (Rel-7) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091680 | CR 45.008-0408 EGPRS2 link quality reporting – removal of brackets (Rel-8) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091681 | CR 51.021-0304 rev 1 Removal of blocking, IM characteristics and AM suppression receiver requirements for QPSK, 16QAM and 32QAM modulations introduced in EGPRS2 (Rel-7) | Telefon AB LM Ericsson, Nokia Siemens Networks, Huawei Technologies Co., Ltd., Reserch in Motion UK Ltd. | - |
GP‑091682 | CR 45.005-0306 Additional GANSS Minimum Performance Requirements (Rel-9) | Qualcomm Europe S.A.R.L., SIRF Technology Inc., NOKIA Corporation, Spirent Communications, Thales | - |
GP‑091683 | GERAN#43 AGNSSPTP-Perfreq Status | WI Rapporteur | - |
GP‑091684 | CR 45.008-0409 Qsearch_C_E-UTRAN_Initial coding modification (Rel-8) | Alcatel-Lucent | - |
GP‑091685 | CR 45.008-0398 rev 1 3G_SEARCH_PRIO definition update (Rel-8) | Alcatel-Lucent | - |
GP‑091686 | CR 45.002-0140 rev 1 Introduction of VAMOS multiplexing and multiple access (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091687 | CR 45.008-0399 rev 1 Introduction of VAMOS power control (Rel-9) | Nokia Siemens Networks, NOKIA Corporation | - |
GP‑091688 | CR 43.059-0076 rev 3 Changes to Stage II allowing parallel positioning (Rel-9) | TruePosition, Nokia Siemens Networks | POSTPONED |
GP‑091689 | CR 48.071-0035 rev 3 Changes to Stage III enabling parallel positioning (Rel-9) | TruePosition, Nokia Siemens Networks | - |
GP‑091690 | CR 43.064-0080 rev 1 Removal of PNCH and CPNCH channels (Rel-8) | Research In Motion UK Ltd. | - |
GP‑091691 | CR 44.060-1245 rev 2: EGPRS 2 Header Format to be used for MCS-5/6 (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091692 | CR 44.060-1246 rev 2: EGPRS 2 Header Format to be used for MCS-5/6 (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091693 | CR 44.060-1252 rev 2: Clarifying MS PAN Poll Response (Rel-8) | Telefon AB LM Ericsson, ST-Ericsson, Research in Motion UK Ltd. | - |
GP‑091694 | CR 44.060-1253 rev 2: Clarifying MS PAN Poll Response (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson, Research in Motion UK Ltd. | - |
GP‑091695 | CR 44.060-1277 rev 1: PAN BS_CV_MAX value: removal of square brackets (Rel-8) | Research in Motion UK Ltd, Telefon AB LM Ericsson, ST-Ericsson | - |
GP‑091696 | CR 44.318-0113 rev 2: Corrections to Information Elements coding (Rel-9) | Research In Motion UK Ltd. | - |
GP‑091697 | CR 44.018-0767 rev 1: Reduction of signalling space required for Individual Priorities (Rel-8) | Research in Motion UK Ltd, Alcatel-Lucent | - |
GP‑091698 | CR 44.018-0768 rev 1: Reduction of signalling space required for Individual Priorities (Rel-9) | Research in Motion UK Ltd, Alcatel-Lucent | WITHDRAWN |
GP‑091699 | CR 44.060-1282 rev 1: Clarifications on common priorities (Rel-9) | Panasonic, Samsung | - |
GP‑091700 | CR 44.018-0771 rev 1: Clarifications on common priorities (Rel-9) | Panasonic, Samsung | - |
GP‑091701 | CR 44.018-0761 rev 2: Misc. corrections on priority handling (Rel-8) | Nokia Corporation, Nokia Siemens Networks | - |
GP‑091702 | CR 44.018-0762 rev 2: Misc. corrections on priority handling (Rel-9) | Nokia Corporation, Nokia Siemens Networks | - |
GP‑091703 | CR 44.060-1265 rev 2: Misc. corrections on priority handling (Rel-8) (Rel-8) | Nokia Corporation, Nokia Siemens Networks | - |
GP‑091704 | CR 44.060-1266 rev 2: Misc. corrections on priority handling (Rel-9) (Rel-9) | Nokia Corporation, Nokia Siemens Networks | - |
GP‑091705 | CR 44.060-1234 rev 2: Clarification on the MS behaviour upon PCCO failure (Rel-8) | Panasonic | - |
GP‑091706 | CR 44.060-1284 rev 1: Clarification on the MS behaviour upon PCCO failure (Rel-9) | Panasonic | - |
GP‑091707 | CR 44.018-0750 rev 2: Miscellaneous corrections on GELTE (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091708 | CR 44.018-0751 rev 2: Broadcast of 3G legacy parameters in idle mode (Rel-8) | Alcatel-Lucent | - |
GP‑091709 | CR 44.018-0752 rev 2: Broadcast of 3G legacy parameters in idle mode (Rel-9) | Alcatel-Lucent | - |
GP‑091710 | CR 44.018-0755 rev 2: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-8) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091711 | CR 44.018-0765 rev 2: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091712 | CR 44.060-1241 rev 2: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-8) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091713 | CR 44.060-1273 rev 2: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091714 | CR 44.018-0769 rev 2: Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-8) | MOTOROLA Ltd, Nokia Siemens Networks, Nokia | - |
GP‑091715 | CR 44.018-0770 rev 2: Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-9) | MOTOROLA Ltd, Nokia Siemens Networks, Nokia | - |
GP‑091716 | Draft spec for BSC-CBC Cell Broadcast Service Protocol | Telefon AB LM Ericsson, AT&T | - |
GP‑091717 | CR 48.008-0316 rev 2: Introduction of support for A5/4 (Rel-9) | Telefon AB LM Ericsson, Vodafone Group Plc | - |
GP‑091718 | Reply LS on PS handover without data radio bearers (To RAN WG2) | Nokia Siemens Networks | - |
GP‑091719 | CR 44.018-0772 rev 1: Clarifications of DEFAULT_XXX_PRIORITY in individual priorities (Rel-9) | Panasonic | WITHDRAWN |
GP‑091720 | CR 44.060-1234 rev 3: Clarification on the MS behaviour upon PCCO failure (Rel-8) | Panasonic | - |
GP‑091721 | CR 44.060-1284 rev 2: Clarification on the MS behaviour upon PCCO failure (Rel-9) | Panasonic | - |
GP‑091722 | LS on addition of AMR WB indication to the System Information 3 | G2 | - |
GP‑091723 | CR 44.018-0750 rev 3: Miscellaneous corrections on GELTE (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091724 | CR 44.318-0114 rev 2: Cells permitted to be reported in Handover procedures (Rel-9) | Research in Motion UK Ltd., T-Mobile USA | - |
GP‑091725 | CR 44.318-0115 rev 2: Reporting of UTRAN/GERAN cells for GAN to non-GAN handover (Rel-9) | Research in Motion UK Ltd., T-Mobile USA | - |
GP‑091726 | CR 44.060-1235 rev 2: Miscellaneous corrections on GELTE (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091727 | CR 44.060-1236 rev 2: Miscellaneous corrections on GELTE (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091728 | CR 44.018-0765 rev 3: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091729 | CR 44.060-1241 rev 3: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-8) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091730 | CR 44.060-1273 rev 3: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091731 | 3GPP GERAN Workplan | Vodafone Group Plc | - |
GP‑091732 | CR 45.008-0409 rev 1 Qsearch_C_E-UTRAN_Initial coding modification (Rel-8) | Alcatel-Lucent | - |
GP‑091733 | CR 45.008-0402 rev 2 Correction of parameter range for THRESH_GSM_low and clarification of THRESH_priority_search usage (Rel-8) | Telefon AB LM Ericsson | - |
GP‑091734 | CR 45.008-0394 rev 2 Measurements on higher priority inter-RAT frequency (Rel-8) | Panasonic (PMCDE) | - |
GP‑091735 | CR 51.021-0098 rev 2 Introduction of test case for unwanted emissions in multicarrier operation with the carriers spread over the declared maximum Base Station RF bandwidth of the MCBTS (Rel-8) | Nokia Siemens Networks | POSTPONED |
GP‑091736 | CR 45.005-0301 rev 2 Introduction of MCBTS capability for operating split frequency allocation (Rel-8) | Nokia Siemens Networks | - |
GP‑091737 | CR 51.021-0095 rev 2 Correction of MCBTS capability for operating split frequency allocation (Rel-8) | Nokia Siemens Networks | POSTPONED |
GP‑091738 | CR 45.005-0303 rev 2 Restructuring TS 45.005 to facilitate referencing to relevant Single RAT requirements from MSR BS TS (Rel-9) | Telefon AB LM Ericsson | - |
GP‑091739 | CR 45.005-0296 rev 2 Reference performance EGPRS2-B, DL, Sensitivity (updates and additions) (Rel-7) | Telefon AB L M Ericsson, NOKIA Corporation, Marvell Switzerland | - |
GP‑091740 | CR 45.005-0297 rev 2 Reference performance EGPRS2-B, DL, Sensitivity (updates and additions) (Rel-8) | Telefon AB L M Ericsson, NOKIA Corporation, Marvell Switzerland | - |
GP‑091741 | CR 44.018-0769 rev 3: Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-8) | MOTOROLA Ltd, Nokia Siemens Networks, Nokia | - |
GP‑091742 | CR 44.018-0770 rev 3: Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-9) | MOTOROLA Ltd, Nokia Siemens Networks, Nokia | - |
GP‑091743 | P-CR to TR 23.889 Chapter 12 | Nokia Siemens Networks | - |
GP‑091744 | LS on BSS internal handover procedure with MSC support | G2 | - |
GP‑091745 | Reply LS on INTER RAT HANDOVER INFO during inter-RAT PS Handover | G2 | - |
GP‑091746 | LS on addition of AMR WB indication to the System Information 3 | G2 | - |
GP‑091747 | LS on Progress of Local Call Local Switch Feasibility Study (C4-092745) | G2 | - |
GP‑091748 | Reply LS on PS handover without data radio bearers | G2 | - |
GP‑091749 | CR 44.060-1235 rev 3: Miscellaneous corrections on GELTE (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091750 | CR 44.060-1236 rev 3: Miscellaneous corrections on GELTE (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑091751 | CR 44.018-0765 rev 4: Definition of use of E-UTRAN_BA_IND and MP_CHANGE_MARK with E-UTRAN related information and other clarifications (Rel-9) | Motorola, Nokia Siemens Networks, Nokia | - |
GP‑091752 | CR 44.018-0770 rev 4: Definition of how to handle notification of change in 3G CSG and E-UTRAN CSG description (Rel-9) | MOTOROLA Ltd, Nokia Siemens Networks, Nokia | - |
GP‑091753 | P-CR to TR 23.889 Chapter 12 | Nokia Siemens Networks | WITHDRAWN |
GP‑091754 | LS on addition of AMR WB indication to the System Information 3 | G2 | - |
GP‑091755 | LS on BSS internal handover procedure with MSC support | G2 | - |
GP‑091756 | Reply LS on PS handover without data radio bearers | G2 | - |
GP‑091757 | CR 43.129-0071 rev 2 Inclusion of radio access capabilities (Rel-8) | Telefon AB LM Ericsson | WITHDRAWN |
GP‑091758 | Draft spec for BSC-CBC Cell Broadcast Service Protocol | Telefon AB LM Ericsson, AT&T | - |
GP‑091759 | Chairman's presentation of the outcome from G2-43 | G2 Chairman | - |
GP‑091760 | G2-43 Meeting Report | MCC | - |
GP‑091761 | CR 45.005-0272 rev 1 Reference performance EGPRS2-B, UL, Sensitivity and Reduced Latency (Rel-7) | Telefon AB LM Ericsson | - |
GP‑091762 | Draft reply to LS on Status of the MSR Work Item (To: TSG RAN WG4, Cc: TSG RAN) | TSG GERAN WG1 | - |
GP‑091763 | Considerations on operational requirements for MCBTS | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
GP‑091764 | CR 51.021-0101 Clarification of measurement of unwanted emissions for MCBTS (Rel-8) | Nokia Siemens Networks, Telefon AB LM Ericsson | POSTPONED |
GP‑091765 | Chairman's report of GERAN WG1#43 (slides) | TSG GERAN WG1 Chairman | - |
GP‑091766 | Draft Report of TSG GERAN WG1 during TSG GERAN #43, version 0.0.1 | MCC | - |
GP‑091767 | TR 45.913 Optimized transmit pulse shape for downlink Enhanced General Packet Radio Service (EGPRS2-B) v 1.2.0 | Rapporteur | - |
GP‑091768 | CR 45.008-0397 rev 2 Correction on Measurement Control (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑091769 | Updated Chairman's report of GERAN WG1#43 (slides) | TSG GERAN WG1 Chairman | - |
GP‑091770 | Reply to LS on Status of the MSR Work Item (To: TSG RAN WG4, Cc: TSG RAN) | TSG GERAN WG1 | - |
GP‑091771 | CR 45.005-0303 rev 3 Restructuring TS 45.005 to facilitate referencing to relevant Single RAT requirements from MSR BS TS (Rel-9) | Telefon AB LM Ericsson | - |
GP‑091772 | Chairman's presentation of the outcome from G2-43 | G2 Chairman | - |
GP‑091773 | Reply LS on Progress of Local Call Local Switch Feasibility Study (C4-092745) (To: CT4, Cc: SA3-LI) | G2 | - |
GP‑091774 | Reply to LS on Status of the MSR Work Item (To: TSG RAN WG4, Cc: TSG RAN) | TSG GERAN WG1 | - |
GP‑091775 | TSG GERAN WG3 chairman's report | GERAN WG3 Chairman | - |
page generated from database: 2024-04-22 07:58:53