3GPP TDocs (written contributions) at meeting
Meeting: C4-38b - 2008-04-07 to 2008-04-11, Jeju Island
meeting id: C4-38b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C4‑080576 | Draft Agenda | CT4 chairman | Revised |
C4‑080577 | Detailed agenda & time plan for CT4 #38bis: status at document deadline | CT4 chairman | Revised |
C4‑080578 | Detailed agenda & time plan for CT4 #38bis: status on eve of meeting | CT4 chairman | Agreed |
C4‑080579 | Proposed allocation of documents to agenda items for CT4 #38bis: status at document deadline | CT4 chairman | Revised |
C4‑080580 | Proposed allocation of documents to agenda items for CT4 #38bis status on eve of meeting | CT4 chairman | Noted |
C4‑080581 | Summary report from CT#39 & SA #39,Puerto Vallarta, Mexico | CT4 chairman | Noted |
C4‑080582 | Work Plan | MCC | Noted |
C4‑080583 | Future meetings | MCC | Noted |
C4‑080584 | Core Network Impacts for A-Interface User Plane over IP | LM Ericsson | Revised |
C4‑080585 | Draft of 3GPP TS 29.274v0.1.0 | Rapporteur | Noted |
C4‑080586 | Pseudo-CR on GTPv2 protocol stack | Nokia Siemens Networks | Agreed |
C4‑080587 | Pseudo-CR on GTPv2 Header format | Nokia Siemens Networks, ZTE, Nortel | Revised |
C4‑080588 | Discussion on coding of Octet 1 of the GTPv2 Header | Nokia Siemens Networks | Revised |
C4‑080589 | Pseudo-CR on Information Element order in a GTPv2 message | Nokia Siemens Networks | Withdrawn |
C4‑080590 | Pseudo-CR on GTPv2 message types for S11 interface | Nokia Siemens Networks | Revised |
C4‑080591 | Pseudo-CR on GTPv2 information element types for S11 interface | Nokia Siemens Networks | Revised |
C4‑080592 | Pseudo-CR on deafault bearer activation procedure across S11 interface | Nokia Siemens Networks | Revised |
C4‑080593 | Pseudo-CR on EPS bearer update procedure across S11 interface | Nokia Siemens Networks | Revised |
C4‑080594 | Pseudo-CR on EPS bearer deactivation across S11 interface | Nokia Siemens Networks | Revised |
C4‑080595 | Discussion on user plane for GTPv2 | Nokia Siemens Networks | Postponed |
C4‑080596 | Pseudo-CR on the scope of GTPv2 spec | Nokia Siemens Networks | Revised |
C4‑080597 | Essential correction to the Initiate PDP Context Activation Response message | Nokia Siemens Networks | Revised |
C4‑080598 | Essential correction to the Initiate PDP Context Activation Response message | Nokia Siemens Networks | Revised |
C4‑080599 | Corrections to Call Forwarding procedures | Nortel Networks | Postponed |
C4‑080600 | 23.231- SIP-I impact on Call Forwarding procedures | Nortel Networks | Revised |
C4‑080601 | 23.231 - SIP-I impact on IWF for Mobile-Originating and Mobile-Terminating procedures | Nortel Networks | Revised |
C4‑080602 | Serving GW Change Indication | ZTE | Revised |
C4‑080603 | UE Request PDN Disconnection and Connectivity | ZTE | Revised |
C4‑080604 | PDN GW Initiated Bearer Modification without bearer QoS Update | ZTE | Withdrawn |
C4‑080605 | Correction on message name on S4 interface | ZTE | Withdrawn |
C4‑080606 | Optimize Idle HO between E-UTRAN and CDMA2000 | ZTE | Revised |
C4‑080607 | Correction to the behavior of the HSS defined in the SiFC feature | ZTE | Revised |
C4‑080608 | 29.803 Discussion on the Diameter Protocol Application for S6a interface | ZTE | Noted |
C4‑080609 | Solution on Assignment of Different S-CSCF | ZTE | Noted |
C4‑080610 | 23.820 Editorial corrections to Section 6.3.1 | ZTE | Revised |
C4‑080611 | 23.820 Discussion on Explicit registration status return against the request for stored S-CSCF info | ZTE | Revised |
C4‑080612 | 23.231 Pseudo-CR on MGW selection procedures in SIP-I based Nc | Alcatel-Lucent, LM Ericsson | Revised |
C4‑080613 | 23.231 Pseudo-CR on DTMF handling in SIP-I based Nc | Alcatel-Lucent, LM Ericsson | Postponed |
C4‑080614 | 29.235 Draft CR on DTMF interworking procedures in SIP-I based Nc | Alcatel-Lucent, LM Ericsson | Postponed |
C4‑080615 | 29.231 Pseudo-CR on MGW Id and use of unspecified connection address | LM Ericsson | Revised |
C4‑080616 | 23.231 Pseudo-CR on call clearing clarifications in SIP-I based Nc | LM Ericsson | Withdrawn |
C4‑080617 | 29.231 Pseudo-CR on call clearing clarifications in SIP-I based Nc | LM Ericsson | Revised |
C4‑080618 | 23.231 AoC | Alcatel-Lucent | Agreed |
C4‑080619 | 23.231 UUS | Alcatel-Lucent | Agreed |
C4‑080620 | 23.231 Call barring services | Alcatel-Lucent | Agreed |
C4‑080621 | 23.231 CNAP | Alcatel-Lucent | Agreed |
C4‑080622 | 23.231 IST | Alcatel-Lucent | Agreed |
C4‑080623 | 23.231 Resource Priority Header | Alcatel-Lucent | Revised |
C4‑080624 | 29.231 Resource Priority Header | Alcatel-Lucent | Revised |
C4‑080625 | 29.231 Amendment & endorsement for RFC 3262 | Alcatel-Lucent | Revised |
C4‑080626 | 29.231 Amendment & endorsement for RFC 3311 | Alcatel-Lucent | Revised |
C4‑080627 | 29.231 Amendment & endorsement for RFC 3312 | Alcatel-Lucent | Withdrawn |
C4‑080628 | 29.882 CAT TR - Editorial corrections | Alcatel-Lucent | Agreed |
C4‑080629 | 29.882 CAT TR - Documenting terminating MSC solution in a dedicated sub-clause | Alcatel-Lucent | Revised |
C4‑080630 | 29.882 CAT TR skeleton for subclause 11 Conclusions & recommendations | Alcatel-Lucent | Revised |
C4‑080631 | 29.882 CAT service requirements | Alcatel-Lucent | Revised |
C4‑080632 | 29.882 Video CAT ALERTING vs CONNECT approaches | Alcatel-Lucent | Revised |
C4‑080633 | 29.882 CAT interactions with Lawful Interception | Alcatel-Lucent | Revised |
C4‑080634 | 29.882 CAT interactions with ODB | Alcatel-Lucent | Agreed |
C4‑080635 | 29.882 CAT interactions with USSD | Alcatel-Lucent | Withdrawn |
C4‑080636 | 29.882 CAT interactions with TFO / TrFO | Alcatel-Lucent | Withdrawn |
C4‑080637 | 29.882 CAT interworking with IMS | Alcatel-Lucent | Withdrawn |
C4‑080638 | 29.882 Stop CAT & Copy CAT commands | Alcatel-Lucent | Revised |
C4‑080639 | 29.882 Signalling for handling CAT-A & CAT-B priority | Alcatel-Lucent | Revised |
C4‑080640 | 29.882 (G)MSC Server switch architecture Trigger points in the call | Alcatel-Lucent | Revised |
C4‑080641 | 29.882 (G)MSC Server switch architecture two-way inband info | Alcatel-Lucent | Revised |
C4‑080642 | 29.882 CAT interaction with CF option to stop CAT-B when C is alerted | Alcatel-Lucent, China Mobile | Revised |
C4‑080643 | 29.882 Call waiting CAT | Alcatel-Lucent | Agreed |
C4‑080644 | Paging optimization with A/Iu flex | Alcatel-Lucent | Noted |
C4‑080645 | Paging optimization with A/Iu flex | Alcatel-Lucent | Agreed |
C4‑080646 | Paging optimization with A/Iu flex | Alcatel-Lucent | Agreed |
C4‑080647 | Paging optimization with A/Iu flex | Alcatel-Lucent | Agreed |
C4‑080648 | Paging optimization with A/Iu flex | Alcatel-Lucent | Agreed |
C4‑080649 | (29.882) CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Revised |
C4‑080650 | (29.882) (G)MSC Server switch architecture use based on UE capabilities | Nokia Siemens Networks | Agreed |
C4‑080651 | (29.882) Speech call in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Revised |
C4‑080652 | (29.882) Speech call in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Revised |
C4‑080653 | (29.882) Trigger points in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Revised |
C4‑080654 | (29.882) Trigger points in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Revised |
C4‑080655 | (29.882) Trigger methods in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Revised |
C4‑080656 | (29.882) Trigger methods in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Revised |
C4‑080657 | (29.882) Call forwarding in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Agreed |
C4‑080658 | (29.882) Call forwarding in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Revised |
C4‑080659 | (29.882) Advice of charge for alternatives with Connect during alerting phase | Nokia Siemens Networks | Revised |
C4‑080660 | S6a Update Location Procedures | Nortel | Revised |
C4‑080661 | S6a Authentication Information Procedures | Nortel | Postponed |
C4‑080662 | S6a Insert Subscriber Data Procedures | Nortel | Withdrawn |
C4‑080663 | S6a Cancel Procedures | Nortel | Withdrawn |
C4‑080664 | PDN GW Procedures | Nortel | Noted |
C4‑080665 | GTPv2 User plane handling | Nortel | Postponed |
C4‑080666 | TS 29.277 Skeleton | Nortel | Agreed |
C4‑080667 | TS 29.277 Update scope section | Nortel | Revised |
C4‑080668 | TS 29.277 Update General Section | Nortel | Revised |
C4‑080669 | TS 29.277 Update S102 Message Header | Nortel | Revised |
C4‑080670 | TS 29.277 Update S102 Messages | Nortel | Revised |
C4‑080671 | TS 29.277 Updat S102 Information Elements | Nortel | Revised |
C4‑080672 | SLF redirect Diameter Application ID | Nortel | Withdrawn |
C4‑080673 | SLF redirect Diameter Application ID | Nortel | Withdrawn |
C4‑080674 | Introduction of ISR (Idle-mode Signalling Reduction) | Huawei | Revised |
C4‑080675 | Rel8 Gr interface | Huawei | Revised |
C4‑080676 | S13 interface | Huawei | Revised |
C4‑080677 | Impact of IWF Working Method on 29.803 | Huawei | Postponed |
C4‑080678 | Update of Scope | Huawei | Revised |
C4‑080679 | Update to References and Abbreviations | Huawei | Revised |
C4‑080680 | General Description and Requirements | Huawei | Revised |
C4‑080681 | Functional Requirements of Network Entities | Huawei | Postponed |
C4‑080682 | Protocol Specification and Implementation | Huawei | Postponed |
C4‑080683 | Discussion on Insert Subscriber Data Procedures | Huawei | Withdrawn |
C4‑080684 | Procedure Descriptions and InsertSubscriberData | Huawei | Postponed |
C4‑080685 | Delete Subscriber Data | Huawei | Postponed |
C4‑080686 | Diameter Protocol Codes Assignments for S6a | Huawei | Postponed |
C4‑080687 | Pseudo CR to 29.273 on SWm reference point description | Huawei | Revised |
C4‑080688 | Analysis on Create Dedicated Bearer Messages for S11 Interface Based on GTP Protocol | Huawei | Revised |
C4‑080689 | Analysis on Create Default Bearer Messages for S11 Interface Based on GTP Protocol | Huawei | Revised |
C4‑080690 | Analysis on Request Bearer Resource Allocation Message for S11 Interface Based on GTP Protocol | Huawei | Revised |
C4‑080691 | Analysis on Request Bearer Resource Release Message for S11 Interface Based on GTP Protocol | Huawei | Revised |
C4‑080692 | Format of EPS Bearer Identity for GTPv2 | Huawei | Withdrawn |
C4‑080693 | Discussion on grouped IE mechanism in GTP v2 | Huawei | Noted |
C4‑080694 | Decision on end marker solution | Huawei | Agreed |
C4‑080695 | Alignment of GTP support in GTP v2 | Huawei | Revised |
C4‑080696 | Adding UE Capability As One Service Point Trigger | Huawei | Postponed |
C4‑080697 | Possible Solutions to Different S-CSCF Assignment | Huawei | Noted |
C4‑080698 | Network Side Bearer Establishment behaviour for CSD | Huawei | Withdrawn |
C4‑080699 | Handling of precondition by the GMSC | Huawei | Withdrawn |
C4‑080700 | Interactions with CAMEL | Huawei | Agreed |
C4‑080701 | Interactions with OR | Huawei | Agreed |
C4‑080702 | Interactions with GTT | Huawei | Postponed |
C4‑080703 | Interactions with Emergency Calls | Huawei | Revised |
C4‑080704 | Interactions with Subscriber and Equipment Trace | Huawei | Revised |
C4‑080705 | Usage of the Call Type Discrimination IE and Text Telephony IE on Reserve RTP connection | Huawei | Postponed |
C4‑080706 | Usage of the Call Type Discrimination IE and Text Telephony IE on Configure RTP connection | Huawei | Postponed |
C4‑080707 | Usage of the Call Type Discrimination IE and Text Telephony IE on Reserve and Configure RTP connection | Huawei | Postponed |
C4‑080708 | Interfaces description for CAT architecture | Huawei | Revised |
C4‑080709 | Fallback call flows for (G)MSC Server bridge architecture | Huawei | Agreed |
C4‑080710 | Interaction of Line identification services with (G)MSC Server bridge architecture and CAT Server switch architecture | Huawei | Agreed |
C4‑080711 | Interaction of Call forwarding services with (G)MSC Server bridge architecture and CAT Server switch architecture | Huawei | Agreed |
C4‑080712 | Interaction of Closed user group with (G)MSC Server bridge architecture and CAT Server switch architecture | Huawei | Agreed |
C4‑080713 | Interaction of User to User signalling with (G)MSC Server bridge architecture and CAT Server switch architecture | Huawei | Agreed |
C4‑080714 | Interaction of Advice of charge with (G)MSC Server bridge architecture and CAT Server switch architecture | Huawei | Revised |
C4‑080715 | Interaction of VGCS and VBS with (G)MSC Server bridge architecture and CAT Server switch architecture | Huawei | Agreed |
C4‑080716 | Interaction of Charging with (G)MSC Server bridge architecture and CAT Server switch architecture | Huawei | Revised |
C4‑080717 | CAT Service Notification | Huawei | Noted |
C4‑080718 | CAT stop method | Huawei | Revised |
C4‑080719 | SCP based architecture | Huawei | Noted |
C4‑080720 | Speech call flow for SCP based architecture | Huawei | Withdrawn |
C4‑080721 | Multimedia call flow for SCP based architecture | Huawei | Withdrawn |
C4‑080722 | Clarification on Attach/TAU Mapping Procedures | Huawei | Revised |
C4‑080723 | Mapping Procedures for Scenario Two | Huawei | Withdrawn |
C4‑080724 | Mapping Procedures for Scenario Three | Huawei | Withdrawn |
C4‑080725 | Messaging Support for Network Based Location Technologies on the User Plan | Polaris Wireless | Noted |
C4‑080726 | Addition of "Network Location Information" Assistance Data indicator in SS LCS MO-LR message | Polaris Wireless | Postponed |
C4‑080727 | 29.273 S6c/H2 functionality in TS 29.273 | Qualcomm, TeliaSonera | Revised |
C4‑080728 | 29.273 S6c/H2 protocol in TS 29.273 | Qualcomm, TeliaSonera | Revised |
C4‑080729 | IMS public and private user identity derivation in 3GPP2 | Qualcomm | Revised |
C4‑080730 | CAT Server switch Architecture-correction of normal multimedia call flow | China mobile | Revised |
C4‑080731 | GMSC switch Architecture-correction of normal speech call flow | China mobile | Revised |
C4‑080732 | GMSC switch Architecture-correction of multimedia call flow | China mobile | Revised |
C4‑080733 | 29.274 Psudo CR on reliable delivery of signaling message | CATT | Revised |
C4‑080734 | 29.803 PDN GW information during TAU/Handover procedure | CATT | Noted |
C4‑080735 | SAE Interworking with pre Rel-8 HPLMN | Nokia Siemens Networks | Noted |
C4‑080736 | ODB for 3GPP access in EPS | Nokia Siemens Networks | Revised |
C4‑080737 | S6a / Gr signalling optimization for co-located MME/SGSNs | Nokia Siemens Networks | Postponed |
C4‑080738 | Use of MME-Number and HSS-Number in S6a messages | Nokia Siemens Networks | Postponed |
C4‑080739 | Use of S6a Update Location message | Nokia Siemens Networks | Withdrawn |
C4‑080740 | Pseudo-CR on Restoration for EPS | Nokia Siemens Networks | Noted |
C4‑080741 | Pseudo-CR on MAP Gr+ enhancements for EPS | Nokia Siemens Networks | Revised |
C4‑080742 | 29.272 Pseudo-CR on S6a Update Location | Nokia Siemens Networks | Revised |
C4‑080743 | 29.272 Pseudo-CR on S6a Cancel Location | Nokia Siemens Networks | Postponed |
C4‑080744 | 29.272 Pseudo-CR on S6a Purge MS | Nokia Siemens Networks | Postponed |
C4‑080745 | 29.272 Pseudo-CR on S6a Notification | Nokia Siemens Networks | Postponed |
C4‑080746 | 29.272 Pseudo-CR on S6a Authentication Information Retrieval | Nokia Siemens Networks | Postponed |
C4‑080747 | 29.272 Pseudo-CR on S6a Reset | Nokia Siemens Networks | Postponed |
C4‑080748 | 29.805 Pseudo-CR on Location of IWF | Nokia Siemens Networks | Revised |
C4‑080749 | Originating services after call forwarding | Nokia Siemens Networks | Revised |
C4‑080750 | EPS TS 29.276 S101, S103 Interfaces General | Alcatel-Lucent | Agreed |
C4‑080751 | EPS TS 29.276 S101, S103 Interfaces Scope | Alcatel-Lucent | Agreed |
C4‑080752 | EPS TS 29.276 S101 Message Header | Alcatel-Lucent | Agreed |
C4‑080753 | EPS TS 29.276 S101 Messages and Message Formats | Alcatel-Lucent | Agreed |
C4‑080754 | EPS TS 29.276 S101 Information Elements | Alcatel-Lucent | Revised |
C4‑080755 | EPS TS 29.276 S103 Interface Definition | Alcatel-Lucent | Agreed |
C4‑080756 | DSAI Corrections | Alcatel-Lucent | Agreed |
C4‑080757 | DSAI Corrections | Alcatel-Lucent | Revised |
C4‑080758 | Adding the Deletion Notification of a Public Identity to the AS | Alcatel-Lucent | Revised |
C4‑080759 | Impacts of CS-IBCF and CS-TrGW definition in stage 2 and stage 3 specifications | Telecom Italia | Revised |
C4‑080760 | ME Identity Check | Samsung | Revised |
C4‑080761 | Pseudo CR to 29.275 General Description | Huawei | Noted |
C4‑080762 | Pseudo CR to 29.275 Proxy Binding Update Message | Huawei | Revised |
C4‑080763 | Clarify messaging conference requirements | Huawei | Revised |
C4‑080764 | Introduction of procedure for Messaging Conference | Huawei | Revised |
C4‑080765 | Clarify floor control requirements and procedures | Huawei | Revised |
C4‑080766 | Clarification of several inconsistencies in procedure | Huawei | Postponed |
C4‑080767 | Clarification of subscribers' roles in CW procedure | Huawei | Postponed |
C4‑080768 | Correction of the inconsistencies in several procedures description | Huawei | Postponed |
C4‑080769 | Extension to the Sh-Pull for PNM | Huawei | Revised |
C4‑080770 | Extension to the Sh-Pull for PNM | Huawei | Revised |
C4‑080771 | Triggering methods of Terminating MSC Server switch based solution | SK Telecom | Revised |
C4‑080772 | Triggering points of Terminating MSC Server switch based solution | SK Telecom | Revised |
C4‑080773 | Multimedia call flows for Terminating MSC Server switch based solution | SK Telecom | Revised |
C4‑080774 | Call forwarding service for speech call in Terminating MSC Server switch based solution | SK Telecom | Revised |
C4‑080775 | Call forwarding service for multimedia call in Terminating MSC Server switch based solution | SK Telecom | Revised |
C4‑080776 | 29.273 AAA support for Proxy Mobile IPv6 | TeliaSonera | Revised |
C4‑080777 | 29.275 Proxy Mobile IPv6 multiple PDN support | TeliaSonera | Noted |
C4‑080778 | PDN GW Procedures- S2a and S2b | Nortel | Withdrawn |
C4‑080779 | 23.231 Pseudo-CR on Rapporteurs Editorial Changes | Vodafone | Agreed |
C4‑080780 | 23.231 Pseudo-CR on Compatibility issues for a SIP-I based Nc Interface | Vodafone | Revised |
C4‑080781 | 23.231 Pseudo-CR on Timers for a SIP-I based Nc Interface | Vodafone | Agreed |
C4‑080782 | Usage of H.248.45 MGC Information Package | Vodafone | Agreed |
C4‑080783 | WID - IMS Centralized Service Control Protocol, Addressing, Subscriber Data (ICSPASD) | Vodafone, Ericsson | Revised |
C4‑080784 | Addition of IMS Centralized Services related identities | Vodafone | Revised |
C4‑080785 | Minor corrections to the IMS section | Vodafone | Agreed |
C4‑080786 | 23.231 Interactions between IuFP and RTP | Nokia Siemens Networks | Revised |
C4‑080787 | 23.231 Recommending early access bearer assignment procedure if the core-network side bearer is not yet established when the MSC server sends the SETUP? | Nokia Siemens Networks | Revised |
C4‑080788 | 23.231 Procedure definition when a BYE is receivied by the Originating MSC-S during call clearing from the Originating MSC-S | Nokia Siemens Networks | Revised |
C4‑080789 | 23.231 Definition of additional cases for call clearing when alternative responses are received by the Originating MSC-S during call establishment | Nokia Siemens Networks | Agreed |
C4‑080790 | 23.231 Definition of exceptions or clarifications to the procedure for Call Clearing received from a Peer SIP-I Node | Nokia Siemens Networks | Revised |
C4‑080791 | 23.231 Operation Aspects | Nokia Siemens Networks | Agreed |
C4‑080792 | 23.231 Interactions with DTMF | Nokia Siemens Networks | Postponed |
C4‑080793 | Principles of DTMF Handling | Nokia Siemens Networks | Noted |
C4‑080794 | 23.231 Interworking Function | Nokia Siemens Networks | Revised |
C4‑080795 | Optimised / Deferred MGW Selection | Nokia Siemens Networks | Noted |
C4‑080796 | E-UTRAN Initial Attach Procedure for PMIP based S5/S8 | Nokia Siemens Networks, Nokia | Noted |
C4‑080797 | E-UTRAN Detach Procedure for PMIP based S5/S8 | Nokia Siemens Networks, Nokia | Noted |
C4‑080798 | Alignment of renamed SAE interfaces against TR 29.803 | Huawei | Revised |
C4‑080799 | NAI for Trusted Non-3GPP Access | Nortel | Revised |
C4‑080800 | Security Aspects for PMIP | Nortel | Noted |
C4‑080801 | PDN GW Procedures- S2a and S2b | Nortel | Withdrawn |
C4‑080802 | TS29.275 skeleton | NTT DoCoMo | Revised |
C4‑080803 | TS29.275 scope | NTT DoCoMo | Revised |
C4‑080804 | TS29.275 references, definitions, abbreviations | NTT DoCoMo | Revised |
C4‑080805 | PMIPv6 PBU/PBA parameters lists | NTT DoCoMo | Noted |
C4‑080806 | PMIPv6 mobillity management procedures description | NTT DoCoMo | Noted |
C4‑080807 | PMIP based S5b/S8b interfaces procedures description | NTT DoCoMo | Noted |
C4‑080808 | PMIP based S2a/S2b interfaces procedures description | NTT DoCoMo | Noted |
C4‑080809 | 29.803 Pseudo-CR on GRE key for PMIP | LM Ericsson | Withdrawn |
C4‑080810 | 29.803 Pseudo-CR on UE Requested PDN Connectivity Procedure | LM Ericsson | Withdrawn |
C4‑080811 | 29.274 Pseudo-CR on Grouped IEs for GTPv2 | LM Ericsson | Revised |
C4‑080812 | 29.274 Pseudo-CR on Comprehension Requirements for Information Elements | LM Ericsson | Agreed |
C4‑080813 | 29.274 Pseudo-CR on Presence Requirements on Information Elements | LM Ericsson | Agreed |
C4‑080814 | 29.274 Pseudo-CR on UDP Source Port IE in GTP Error Indication | LM Ericsson | Noted |
C4‑080815 | 29.274 Pseudo-CR on Requirements on CN nodes employing DNS | LM Ericsson | Withdrawn |
C4‑080816 | 29.274 Pseudo-CR on PGW node selection based on DNS based SRV | LM Ericsson | Noted |
C4‑080817 | 29.274 Pseudo-CR on GW node selection based on DNS | LM Ericsson | Noted |
C4‑080818 | 29.274 Pseudo-CR on GTP IE for "offending IE" | LM Ericsson | Revised |
C4‑080819 | Realm and Host to be used for Charging | LM Ericsson, Alcatel-Lucent, Telecom Italia, Huawe | Revised |
C4‑080820 | Realm and Host to be used for Charging | LM Ericsson, Alcatel-Lucent, Telecom Italia, Huawe | Revised |
C4‑080821 | Discussion on the requirement to send associated private user identities (TR 23.820) | LM Ericsson | Postponed |
C4‑080822 | Removal of Editors notes in TR 23.820 | LM Ericsson | Revised |
C4‑080823 | Conclusion on the P-CSCF Service Interruption Scenario (TR 23.820) | LM Ericsson | Postponed |
C4‑080824 | Principles for S6a ISD/DSD definition | Nokia Siemens Networks | Noted |
C4‑080825 | Further GTPv2 developments | Rapporteur | Noted |
C4‑080826 | Removal of Informative SIP Digest Annex for NGN R2 | Alcatel-Lucent | Revised |
C4‑080827 | LS on maintenance of ETSI TISPAN common IMS documents | ETSI TISPAN WG2, WG3 | Noted |
C4‑080828 | Transfer of TISPAN H248 Items to 3GPP | ETSI TISPAN WG 3 | Noted |
C4‑080829 | LS on PNE Networks | TSG CT WG1 | Noted |
C4‑080830 | LS on proposal of M-TMSI encoding scheme in the EPS | TSG CT WG1 | Noted |
C4‑080831 | Liaison to establish working assumptions for the scope of responsibility for optimized handover specification | TSG CT WG1 | Noted |
C4‑080832 | EPS Session management procedure optimisations | TSG CT WG1 | Noted |
C4‑080833 | Reply LS to 3GPP CT4 on new work item H.248.Resman | ITU SG16 | Noted |
C4‑080834 | LS to 3GPP CT4 on requirements for MSRP support package and for RTP multiplexing package | ITU SG16 | Noted |
C4‑080835 | LS on the introduction of A interface user plane over IP | TSG GERAN | Noted |
C4‑080836 | Reply-LS on “subscriber type” indication via S1 | TSG RAN WG2 | Noted |
C4‑080837 | LS on Reply to on LS on SAE Interworking with Pre-REL8 system | TSG SA WG1 | Noted |
C4‑080838 | LS on Renaming SAE Interfaces | TSG SA WG2 | Noted |
C4‑080839 | LS response on Core Network Centric Intra Domain Connection of RAN Nodes to Multiple CN Nodes | TSG SA WG2 | Noted |
C4‑080840 | Reply LS on Subscriber data storage for EPC | TSG SA WG2 | Noted |
C4‑080841 | LS on CS Fallback | TSG SA WG2 | Noted |
C4‑080842 | Reply to LS on Message Unprotected between UE and P-CSCF | TSG SA WG3 | Noted |
C4‑080843 | LS on Support of Information Elements for Charging in GTPv2 | TSG SA WG5 | Noted |
C4‑080844 | LS on Diameter Routing Considerations | TSG SA WG5 | Noted |
C4‑080845 | Reply LS on Removal of GTP´ in EPS | TSG SA WG5 | Noted |
C4‑080846 | LS on Release 8 non-essential SAE features | TSG SA | Noted |
C4‑080847 | Introduction of ISR (Idle-mode Signalling Reduction) | Huawei | Revised |
C4‑080848 | Rel8 Gr interface | Huawei | Revised |
C4‑080849 | XML example | Nokia Siemens Networks | Agreed |
C4‑080850 | Realm and Host to be used for Charging | LM Ericsson, Alcatel-Lucent, Telecom Italia, Huawe | Revised |
C4‑080851 | 23.231- SIP-I impact on Call Forwarding procedures | Nortel Networks | Revised |
C4‑080852 | Pseudo-CR on MAP Gr+ enhancements for EPS | Nokia Siemens Networks | Noted |
C4‑080853 | Reply LS on Release-8 EPS Naming Considerations | GSMA PACK | Noted |
C4‑080854 | LS on Diameter-based protocols usage and recommendations in 3GPP | TSG CT WG3 | Noted |
C4‑080855 | ME Identity Check | Samsung | Noted |
C4‑080856 | NAI for Trusted Non-3GPP Access | Nortel | Revised |
C4‑080857 | LS on Diameter Routing Considerations | TSG CT WG3 | Noted |
C4‑080858 | LS on “Changes to the format of TMGI” | TSG RAN WG3 | Revised |
C4‑080859 | Impacts of CS-IBCF and CS-TrGW definition in stage 2 and stage 3 specifications | Telecom Italia | Noted |
C4‑080860 | Introduction of ISR (Idle-mode Signalling Reduction) | Huawei | Revised |
C4‑080861 | Rel8 Gr interface | Huawei | Agreed |
C4‑080862 | S13 interface in TR | Huawei | Agreed |
C4‑080863 | S13 interface in TS 29.272 | Huawei | Revised |
C4‑080864 | SAE Interworking with pre Rel-8 HPLMN | Nokia Siemens Networks | Revised |
C4‑080865 | ODB for 3GPP access in EPS | Nokia Siemens Networks | Agreed |
C4‑080866 | LS on ODB barring categories for EPS | NTT DoCoMo | Approved |
C4‑080867 | Alignment of renamed SAE interfaces against TR 29.803 | Huawei | Agreed |
C4‑080868 | Reply LS on RAN3 requirements for GTPv2 | TSG RAN WG3 | Revised |
C4‑080869 | IMS public and private user identity derivation in 3GPP2 | Qualcomm | Revised |
C4‑080870 | Pseudo CR to 29.275 Proxy Binding Update Message | Huawei | Noted |
C4‑080871 | Optimize Idle HO between E-UTRAN and CDMA2000 | ZTE | Withdrawn |
C4‑080872 | EPS TS 29.276 S101 Information Elements | Alcatel-Lucent | Agreed |
C4‑080873 | TS 29.277 Update scope section | Nortel | Agreed |
C4‑080874 | TS 29.277 Update General Section | Nortel | Agreed |
C4‑080875 | TS 29.277 Update S102 Message Header | Nortel | Agreed |
C4‑080876 | TS 29.277 Update S102 Messages | Nortel | Agreed |
C4‑080877 | TS 29.277 Updat S102 Information Elements | Nortel | Agreed |
C4‑080878 | Pseudo CR to 29.273 on SWm reference point description | Huawei | Withdrawn |
C4‑080879 | 29.273 AAA support for Proxy Mobile IPv6 | TeliaSonera | Agreed |
C4‑080880 | Reply LS on “Changes to the format of TMGI” | TSG RAN WG2 | Revised |
C4‑080881 | 29.273 S6c/H2 functionality in TS 29.273 | Qualcomm, TeliaSonera | Revised |
C4‑080882 | 29.273 S6c/H2 protocol in TS 29.273 | Qualcomm, TeliaSonera | Agreed |
C4‑080883 | TS29.275 skeleton | NTT DoCoMo | Agreed |
C4‑080884 | TS29.275 scope | NTT DoCoMo | Agreed |
C4‑080885 | Serving GW Change Indication | ZTE | Agreed |
C4‑080886 | UE Request PDN Disconnection and Connectivity | ZTE | Revised |
C4‑080887 | TS29.275 references, definitions, abbreviations | NTT DoCoMo | Agreed |
C4‑080888 | Draft 29.275 0.1.0 | NTT DoCoMo | Agreed |
C4‑080889 | NAI for Trusted Non-3GPP Access | Nortel | Postponed |
C4‑080890 | Alignment of GTP support in GTP v2 | Huawei | Agreed |
C4‑080891 | Pseudo-CR on the scope of GTPv2 spec | Nokia Siemens Networks | Agreed |
C4‑080892 | Pseudo-CR on GTPv2 Header format | Nokia Siemens Networks, ZTE, Nortel, Alcatel-Lucent, Verizon, Motorola | Agreed |
C4‑080893 | Discussion on coding of Octet 1 of the GTPv2 Header | Nokia Siemens Networks, ZTE, Nortel, Alcatel-Lucent, Verizon, Motorola | Agreed |
C4‑080894 | 29.272 Pseudo-CR on S6a Update Location | Nokia Siemens Networks | Revised |
C4‑080895 | WID - IMS Centralized Service Control Protocol, Addressing, Subscriber Data (ICSPASD) | Vodafone, Ericsson | Revised |
C4‑080896 | 29.274 Pseudo-CR on Grouped IEs for GTPv2 | LM Ericsson | Agreed |
C4‑080897 | Pseudo-CR on GTPv2 message types for S11 interface | Nokia Siemens Networks | Revised |
C4‑080898 | (29.882) Advice of charge for alternatives with Connect during alerting phase | Huawei, Nokia Siemens Networks | Agreed |
C4‑080899 | Interfaces description for CAT architecture | Huawei | Revised |
C4‑080900 | Pseudo-CR on GTPv2 information element types for S11 interface | Nokia Siemens Networks | Agreed |
C4‑080901 | 29.882 CAT TR - Documenting terminating MSC solution in a dedicated sub-clause | Alcatel-Lucent | Revised |
C4‑080902 | 29.882 CAT TR skeleton for subclause 11 Conclusions & recommendations | Alcatel-Lucent | Agreed |
C4‑080903 | 29.882 CAT service requirements | Alcatel-Lucent | Agreed |
C4‑080904 | 29.882 Video CAT ALERTING vs CONNECT approaches | Alcatel-Lucent | Revised |
C4‑080905 | 29.882 CAT interactions with Lawful Interception | Alcatel-Lucent | Revised |
C4‑080906 | 29.882 Stop CAT & Copy CAT commands | Alcatel-Lucent | Revised |
C4‑080907 | 29.882 Signalling for handling CAT-A & CAT-B priority | Alcatel-Lucent | Revised |
C4‑080908 | 29.882 (G)MSC Server switch architecture Trigger points in the call | Alcatel-Lucent | Agreed |
C4‑080909 | CAT interactions with lawful interception | Alcatel-Lucent | Revised |
C4‑080910 | (29.882) CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Agreed |
C4‑080911 | (29.882) Speech call in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Agreed |
C4‑080912 | (29.882) Speech call in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Agreed |
C4‑080913 | (29.882) Trigger points in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Revised |
C4‑080914 | (29.882) Trigger points in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Revised |
C4‑080915 | 29.273 S6c/H2 functionality in TS 29.273 | Qualcomm, TeliaSonera | Agreed |
C4‑080916 | Correction to the behavior of the HSS defined in the SiFC feature | ZTE | Agreed |
C4‑080917 | IMS public and private user identity derivation in 3GPP2 | Qualcomm | Agreed |
C4‑080918 | Originating services after call forwarding | Nokia Siemens Networks | Revised |
C4‑080919 | DSAI Corrections | Alcatel-Lucent | Agreed |
C4‑080920 | DSAI Corrections | Alcatel-Lucent | Agreed |
C4‑080921 | DSAI Corrections | Alcatel-Lucent | Agreed |
C4‑080922 | Extension to the Sh-Pull for PNM | Huawei | Postponed |
C4‑080923 | Extension to the Sh-Pull for PNM | Huawei | Postponed |
C4‑080924 | WID - IMS Centralized Service Control Protocol, Addressing, Subscriber Data (ICSPASD) | Vodafone, Ericsson | Endorsed |
C4‑080925 | Realm and Host to be used for Charging | LM Ericsson, Alcatel-Lucent, Telecom Italia, Huawe | Agreed |
C4‑080926 | 23.820 Editorial corrections to Section 6.3.1 | ZTE | Agreed |
C4‑080927 | 23.820 Discussion on Explicit registration status return against the request for stored S-CSCF info | ZTE | Withdrawn |
C4‑080928 | Removal of Editors notes in TR 23.820 | LM Ericsson | Revised |
C4‑080929 | Realm and Host to be used for Charging | LM Ericsson, Alcatel-Lucent, Telecom Italia, Huawe | Agreed |
C4‑080930 | Clarify messaging conference requirements | Huawei | Agreed |
C4‑080931 | Introduction of procedure for Messaging Conference | Huawei | Revised |
C4‑080932 | Clarify floor control requirements and procedures | Huawei | Withdrawn |
C4‑080933 | LS on Requirements for MSRP support package and for RTP multiplexing package | - | Approved |
C4‑080934 | LS reply on the introduction of A interface user plane over IP | Ericsson | Revised |
C4‑080935 | Core Network Impacts for A-Interface User Plane over IP | LM Ericsson | Agreed |
C4‑080936 | 23.231- SIP-I impact on Call Forwarding procedures | Nortel Networks | Agreed |
C4‑080937 | 29.272 Pseudo-CR on S6a Purge MS | Nokia Siemens Networks | Agreed |
C4‑080938 | 23.231 Pseudo-CR on MGW selection procedures in SIP-I based Nc | Alcatel-Lucent, LM Ericsson | Agreed |
C4‑080939 | 29.231 Pseudo-CR on call clearing clarifications in SIP-I based Nc | LM Ericsson | Agreed |
C4‑080940 | 29.231 Pseudo-CR on MGW Id and use of unspecified connection address | LM Ericsson | Postponed |
C4‑080941 | 29.231 Amendment & endorsement for RFC 3262 | Alcatel-Lucent | Agreed |
C4‑080942 | 29.231 Amendment & endorsement for RFC 3311 | Alcatel-Lucent | Agreed |
C4‑080943 | Interactions with Emergency Calls | Huawei | Agreed |
C4‑080944 | Interactions with Subscriber and Equipment Trace | Huawei | Agreed |
C4‑080945 | Pseudo-CR on EPS bearer deactivation across S11 interface | Nokia Siemens Networks | Agreed |
C4‑080946 | UE Request PDN Disconnection and Connectivity | ZTE | Agreed |
C4‑080947 | Analysis on Create Dedicated Bearer Messages for S11 Interface Based on GTP Protocol | Huawei | Revised |
C4‑080948 | Analysis on Request Bearer Resource Allocation Message for S11 Interface Based on GTP Protocol | Huawei | Agreed |
C4‑080949 | Analysis on Request Bearer Resource Release Message for S11 Interface Based on GTP Protocol | Huawei | Agreed |
C4‑080950 | LS Response on Diameter Routing Considerations | Ericsson | Approved |
C4‑080951 | 29.274 Psudo CR on reliable delivery of signaling message | CATT | Agreed |
C4‑080952 | 29.803 Psudo CR on reliable delivery of signaling message | Huawei, | Agreed |
C4‑080953 | 29.274 Pseudo-CR on GTP IE for "offending IE" | LM Ericsson | Agreed |
C4‑080954 | Reply LS on media requirements for SIP-I based Nc | TSG SA WG4 | Noted |
C4‑080955 | Pseudo-CR on deafault bearer activation procedure across S11 interface | Nokia Siemens Networks | Revised |
C4‑080956 | Analysis on Create Default Bearer Messages for S11 Interface Based on GTP Protocol | Huawei | Agreed |
C4‑080957 | Pseudo-CR on EPS bearer update procedure across S11 interface | Nokia Siemens Networks | Agreed |
C4‑080958 | GMSC switch Architecture-correction of normal speech call flow | China mobile | Agreed |
C4‑080959 | Transfer of data during an emergency call (EDATA) | T-Mobile | Noted |
C4‑080960 | (29.882) Trigger methods in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Agreed |
C4‑080961 | Principles of introduction of Grouped IE mechanisms | Huawei | Revised |
C4‑080962 | LS on Messaging Support for Network Based Location Technologies on the User Plan | Polaris Wireless | Revised |
C4‑080963 | Removal of Informative SIP Digest Annex for NGN R2 | Alcatel-Lucent | Revised |
C4‑080964 | LS on Transfer of PDCP Status Information | TSG RAN WG3 | Noted |
C4‑080965 | CS Fallback | NTT DoCoMo | Endorsed |
C4‑080966 | 29.882 CAT TR - Documenting terminating MSC solution in a dedicated sub-clause | Alcatel-Lucent | Agreed |
C4‑080967 | 29.882 Video CAT ALERTING vs CONNECT approaches | Alcatel-Lucent | Revised |
C4‑080968 | 29.882 CAT interactions with Lawful Interception | Alcatel-Lucent | Agreed |
C4‑080969 | CAT interactions with lawful interception | Alcatel-Lucent | Revised |
C4‑080970 | 29.882 Stop CAT & Copy CAT commands | Alcatel-Lucent | Agreed |
C4‑080971 | 29.882 Signalling for handling CAT-A & CAT-B priority | Alcatel-Lucent | Agreed |
C4‑080972 | (29.882) Trigger points in CAT Server switch architecture with routing back to GMSC Server | Nokia Siemens Networks | Agreed |
C4‑080973 | (29.882) Trigger points in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Agreed |
C4‑080974 | Interfaces description for CAT architecture | Huawei | Agreed |
C4‑080975 | 29.882 (G)MSC Server switch architecture two-way inband info | Alcatel-Lucent | Agreed |
C4‑080976 | GMSC switch Architecture-correction of multimedia call flow | China mobile | Agreed |
C4‑080977 | 29.882 CAT interaction with CF option to stop CAT-B when C is alerted | Alcatel-Lucent | Agreed |
C4‑080978 | (29.882) Trigger methods in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Agreed |
C4‑080979 | (29.882) Call forwarding in (G)MSC server switch architecture use based on UE capabilities | Nokia Siemens Networks | Agreed |
C4‑080980 | Interaction of Charging with (G)MSC Server bridge architecture and CAT Server switch architecture | Huawei | Agreed |
C4‑080981 | S6a interface and IWF interworking procedures | GTPv2 drafting session | Revised |
C4‑080982 | LS on CT4 Principle Agreements for S6a | Huawei | Approved |
C4‑080983 | S6a Update Location Procedures | Nortel | Withdrawn |
C4‑080984 | CAT Server switch Architecture-correction of normal multimedia call flow | China mobile | Agreed |
C4‑080985 | Update of Scope | Huawei | Revised |
C4‑080986 | Triggering points of Terminating MSC Server switch based solution | SK Telecom | Postponed |
C4‑080987 | Principles of introduction of Grouped IE mechanisms | Huawei | Noted |
C4‑080988 | Call forwarding service for speech call in Terminating MSC Server switch based solution | SK Telecom | Revised |
C4‑080989 | Call forwarding service for speech call in Terminating MSC Server switch based solution | SK Telecom | Agreed |
C4‑080990 | Call forwarding service for multimedia call in Terminating MSC Server switch based solution | SK Telecom | Revised |
C4‑080991 | 29.272 Pseudo-CR on S6a Update Location | Nokia Siemens Networks | Agreed |
C4‑080992 | 23.231 Pseudo-CR on Compatibility issues for a SIP-I based Nc Interface | Vodafone | Agreed |
C4‑080993 | Update of Scope | Huawei | Agreed |
C4‑080994 | Update to References and Abbreviations | Huawei | Agreed |
C4‑080995 | 23.231 Interactions between IuFP and RTP | Nokia Siemens Networks | Agreed |
C4‑080996 | General Description and Requirements | Huawei | Agreed |
C4‑080997 | 23.231 Recommending early access bearer assignment procedure if the core-network side bearer is not yet established when the MSC server sends the SETUP? | Nokia Siemens Networks | Postponed |
C4‑080998 | Clarification on Attach/TAU Mapping Procedures | Huawei | Agreed |
C4‑080999 | 23.231 Procedure definition when a BYE is receivied by the Originating MSC-S during call clearing from the Originating MSC-S | Nokia Siemens Networks | Agreed |
C4‑081000 | 23.231 Definition of exceptions or clarifications to the procedure for Call Clearing received from a Peer SIP-I Node | Nokia Siemens Networks | Agreed |
C4‑081001 | 29.805 Pseudo-CR on Location of IWF | Nokia Siemens Networks | Agreed |
C4‑081002 | 23.231 Resource Priority Header | Alcatel-Lucent | Postponed |
C4‑081003 | 29.231 Resource Priority Header | Alcatel-Lucent | Postponed |
C4‑081004 | LS reply on the introduction of A interface user plane over IP | Ericsson | Approved |
C4‑081005 | Introduction of ISR (Idle-mode Signalling Reduction) | Huawei | Agreed |
C4‑081006 | S13 interface in TS 29.272 | Huawei | Agreed |
C4‑081007 | SAE Interworking with pre Rel-8 HPLMN | Nokia Siemens Networks | Approved |
C4‑081008 | TS 29.803 v0.7.0 | Huawei | Agreed |
C4‑081009 | S6a interface and IWF interworking procedures | GTPv2 drafting session | Agreed |
C4‑081010 | TS 29.272 v0.1.0 | Huawei | Agreed |
C4‑081011 | Pseudo-CR on GTPv2 message types for S11 interface | Nokia Siemens Networks | Agreed |
C4‑081012 | LS on Different S-CSCF Assignment | Huawei | Approved |
C4‑081013 | Pseudo-CR on deafault bearer activation procedure across S11 interface | Nokia Siemens Networks | Agreed |
C4‑081014 | Analysis on Create Dedicated Bearer Messages for S11 Interface Based on GTP Protocol | Huawei | Agreed |
C4‑081015 | TS 29.274 v0.2.0 | Nokia Siemens Networks | Agreed |
C4‑081016 | TS 29.276 v0.1.0 | Alcatel-Lucent | Agreed |
C4‑081017 | TS 29.273 v0.1.0 | Ericsson | Agreed |
C4‑081018 | TS 29.277 v0.1.0 | Nortel Networks | Agreed |
C4‑081019 | LS on Messaging Support for Network Based Location Technologies on the User Plan | Polaris Wireless | Approved |
C4‑081020 | Removal of Editors notes in TR 23.820 | LM Ericsson | Agreed |
C4‑081021 | TR 23.820 v1.2.0 | Ericsson | Agreed |
C4‑081022 | TR 29.805 v0.3.0 | huawei | Agreed |
C4‑081023 | 29.882 Video CAT ALERTING vs CONNECT approaches | Alcatel-Lucent | Agreed |
C4‑081024 | TS 23.231 v1.1.0 | Vodafone | Agreed |
C4‑081025 | TS 29.231 v1.1.0 | Ericsson | Agreed |
C4‑081026 | CAT interactions with lawful interception | Alcatel-Lucent | Approved |
C4‑081027 | TR 29.882 v0.4.0 | China Mobile | Agreed |
C4‑081028 | Call forwarding service for speech call in Terminating MSC Server switch based solution | SK Telecom | Agreed |
C4‑081029 | Call forwarding service for multimedia call in Terminating MSC Server switch based solution | SK Telecom | Revised |
C4‑081030 | Introduction of procedure for Messaging Conference | Huawei | Withdrawn |
C4‑081031 | Call forwarding service for multimedia call in Terminating MSC Server switch based solution | SK Telecom | Agreed |
C4‑081032 | Output Documents | Chairman | Noted |
page generated from database: 2024-04-13 13:51:47