Tdoc List

2008-02-25 10:15

Tdoc Title Source Doc-type Doc-for Agenda Avail Treated Decision Wdrn Replaced-by Replaces
S5-080301 Agenda WG Chairman agenda - 2 Yes Yes approved No
S5-080302 Report of the last SA5 meeting MCC report - 4.1 Yes Yes revised No S5-080489
S5-080303 SA5 status report at the last SA meeting MCC report - 4.2 No No withdrawn before the meeting Yes
S5-080304 Liaison Statement Status BEFORE this meeting WG Vice Chair Tdoc - 4.3 No No not to be produced in future Yes
S5-080305 Liaison Statement Status AFTER this meeting WG Vice Chair Tdoc - 4.3 No No not to be produced in future Yes
S5-080306 SA5 Structure and Meeting Facility Requirements WG Vice Chair Tdoc - 5.1 No No not available, withdrawn Yes
S5-080307 Draft TS/TR Management Process WG Vice Chair Tdoc - 5.1 No No produced after the meeting No S5-080404
S5-080308 SA5 Meeting Calendar WG Chairman Tdoc - 5.2 Yes Yes agreed No
S5-080309 R8 Deliverables due for the NEXT SA plenary MCC Tdoc - 8 Yes Yes revised (updated online) No S5-080546
S5-080310 TR 30.818 Project scheduling and open issues for SA5 Release 8 MCC Tdoc - 8 Yes Yes revised (updated online) No S5-080547
S5-080311 OAM Time Plan OAM Chair Tdoc - 6 Yes Yes approved with modifications No
S5-080312 OAM Detailed Report from LAST Meeting OAM Chair report - 6 Yes Yes approved (include Ericsson's comments in S5-080312r1) No
S5-080313 OAM Action Item Register (from previous meetings, LSs, Conference Calls) OAM Chair Tdoc - 6 Yes Yes revised No S5-080480
S5-080314 OAM Executive Report from THIS Meeting OAM Chair report - 6 Yes Yes noted No
S5-080315 OAM Detailed Report from THIS Meeting OAM Chair report - 6 No Yes to be produced 1 week after the meeting No
S5-080316 CH Agenda and Time Plan CH Chair agenda - 7 Yes Yes approved No
S5-080317 CH Detailed Report from LAST Meeting CH Chair report - 7 Yes Yes approved No
S5-080318 CH List of documents CH Chair Tdoc - 7 Yes Yes noted No
S5-080319 CH Executive Report from THIS Meeting CH Chair report - 7 Yes Yes noted No
S5-080320 CH Detailed Report from THIS Meeting CH Chair report - 7 No Yes to be produced 1 week after the meeting No
S5-080321 TS 32.280-011 Advice of Charge (AoC) service MCC TS - 7.3 Yes Yes noted No
S5-080322 RESUBMISSION S5-080025 LS_in from 3GPP2 to SA5 on A Number Of 3GPP SA5 R7 Items 3GPP2 i/c LS - 6.1 Yes Yes noted (ongoing actions to be followed up in the newly created Action Register) No
S5-080323 Updated ALL 25 CRs form SA5#57 for CH (9) and OAM (16) MCC Tdoc - 4.2 Yes Yes to be confirmed during the SWG Executive Report to S5#58 closing plenary No
S5-080324 RESUBMISSION S5-080223 LS_in Reply from TMF mTOP to TISPAN (copy SA5) on joint activities in Service Management and Subscription Management (related to S5-080251 LS_out SA5 reply to TISPAN S5-080027/ 15bTD431r2) TMF mTOP i/c LS - 6 Yes Yes noted (no reply needed) No
S5-080325 R8 CR 32.251 Clarification of Offline Charging Architecture for EPC Charging Nokia Siemens Networks CR - 7.2 Yes Yes revised No S5-080500
S5-080326 New BB-level WID on Management of Self-Organising Networks (SON) - based on T-Mobile S5-080202 MCC new WID - 6.20 Yes Yes revised before the meeting No S5-080439
S5-080327 New WT-level WID on Self-Configuration of eNodeBs - based on NSN S5-080070 MCC new WID - 6.20 Yes Yes revised before the meeting No S5-080372
S5-080328 New WT-level WID on SON Neighbour Cell List (NCL) handling architecture - based on Ericsson S5-080172 MCC new WID - 6.20 Yes Yes revised before the meeting No S5-080429
S5-080329 New WT-level WID on SON self-optimization handling - based on Huawei S5-080243 MCC new WID - 6.20 Yes Yes noted No S5-080441
S5-080330 TR 32.822-014 Study on System Maintenance over Itf-N ZTE TR - 6.11 Yes Yes revised before the meeting No S5-080341
S5-080331 RESUBMISSION S5-080071 Self-Configuration: SW download Nokia Siemens Networks Tdoc - 6.7 Yes Yes not agreed (more offline discussion needed) No
S5-080332 Self-Optimization generic procedure/use case and its re-use Nokia Siemens Networks Tdoc - 6.7 Yes Yes not agreed (more discussion needed/brainstorming-like for breakout session) No
S5-080333 TS 32.122-113 Advanced Alarm Management Information Service latest draft Nokia Siemens Networks TS - 6.3 Yes Yes revised before the meeting No S5-080338
S5-080334 TS 32.123-003 Advanced Alarm Management Information CORBA Solution Set latest draft Nokia Siemens Networks TS - 6.3 Yes Yes revised before the meeting No S5-080339
S5-080335 LS_in Reply from SA3 to SA5 on Home NodeB OAM Domain Security S3a071054 i/c LS - 6.7 Yes Yes noted (no reply needed) No
S5-080336 LS_in from SA2 to SA5 on the need of charging characteristics S2-080954 i/c LS - 7 Yes Yes replied in S5-080501 No S5-080501
S5-080337 TS 32.121-200 Advanced Alarm Management IRP Requirements - for SA Approval (update of S5-080236) MCC / NSN TS - 6.3 Yes Yes approved (for SA Approval) No
S5-080338 TS 32.122-120 Advanced Alarm Management IRP Information Service - for SA Approval (update of S5-080333) MCC / NSN TS - 6.3 Yes Yes revised before the meeting No S5-080371 S5-080333
S5-080339 TS 32.123-010 Advanced Alarm Management IRP CORBA SS - for SA Information (update of S5-080334) MCC / NSN TS - 6.3 Yes Yes approved (for SA Information) No S5-080334
S5-080340 TS 32.153-031 IRP technology specific templates, rules and guidelines (update of S5-080233) MCC / Ericsson TS - 6.2 Yes Yes revised before the meeting No S5-080425
S5-080341 TR 32.822-015 Study on System Maintenance over Itf-N (update of S5-080330) MCC / ZTE TR - 6.11 Yes Yes noted No S5-080330
S5-080342 TS 32.751-003 EPC NRM IRP Requirements MCC / Nortel TS - 6.14 Yes Yes noted (as Latest Draft to base new contributions) No
S5-080343 TS 32.761-003 E-UTRAN NRM IRP Requirements MCC / Ericsson TS - 6.15 Yes Yes noted (as Latest Draft to base new contributions) No
S5-080344 TS 32.752-003 EPC NRM IRP IS MCC / Huawei TS - 6.14 Yes Yes noted (as Latest Draft to base new contributions) No
S5-080345 TS 32.762-003 E-UTRAN NRM IRP IS MCC / Ericsson TS - 6.15 Yes Yes noted (as Latest Draft to base new contributions) No
S5-080346 TR 32.819-002 Element management layer - Operation System Function (E-OSF) definition MCC / China Mobile TR - 6.6 Yes Yes approved (for SA Information) No S5-080415
S5-080347 R8 CR 32.441-710 Add trace functions for EPC and E-UTRAN into the Trace IRP (update of S5-080171) MCC / Ericsson CR - 6.12 Yes Yes revised No S5-080431
S5-080348 TS 32.xyz-004 KPIs for UMTS and GSM MCC / China Mobile TS - 6.9 Yes Yes noted No S5-080421
S5-080349 REVISED S5#57 agreed S5-080186r1: R8 R7 CR 32.297 Correction of errors and inconsistencies - Align with 32.240 MCC / Alcatel-Lucent CR - 7.1 Yes Yes revised before the meeting No
S5-080350 TS 32.275-002 MultiMedia Telephony (MMTel) charging MCC / Alcatel-Lucent TS - 7.4 Yes Yes revised No S5-080510
S5-080351 Updated WID on Advice of Charge (AoC) support in IMS Charging UID 380042 MCC revised WID - 7.3 Yes Yes approved (for updating TR 30.818 WID-collection & 3GPP Work Plan) No
S5-080352 Updated WID on Multimedia Telephony Service and Supplementary Services (MMTel) Charging UID 380041 MCC revised WID - 7.4 Yes Yes approved (for updating TR 30.818 WID-collection & 3GPP Work Plan) No
S5-080353 TR 32.821-024 Study of Self-Organising Networks (SON) related OAM for Home NodeB MCC / Huawei TR - 6.10 Yes Yes noted No
S5-080354 Add additional correction for IBCF into stage 2 flows and data descriptions for IMS Charging - This CR aligns TS 32.260 with TS 23.002 and 23.228. Alcatel-Lucent CR - 7.5 Yes No withdrawn before the meeting Yes
S5-080355 REVISED S5#57 agreed S5-080180r1: R8 32.260 CR#0055 Add IBCF into stage 2 flows and data descriptions for IMS Charging - Align with 23.002, 23.228 Alcatel-Lucent CR - 7.5 Yes Yes revised No S5-080511
S5-080356 REVISED S5#57 agreed S5-080181r1: R8 32.298 CR#0081 Add CDR fields for IBCF Alcatel-Lucent CR - 7.5 Yes Yes revised No S5-080512
S5-080358 On location of AAF and security Ericsson Tdoc - 6.7 Yes Yes noted (more offline discussion needed) No
S5-080359 R8 CR 32.622 Add end point modelling method for reference point Motorola, Nortel, CMCC CR - 6.13 Yes Yes revised No S5-080533
S5-080360 R8 CR 32.152 Add sample for end point modelling for reference point Motorola, Nortel, CMCC CR - 6.13 Yes No withdrawn Yes
S5-080361 RESUBMISSION S5#57 S5-080244 New WID on E-UTRAN Performance measurements Motorola, HUAWEI, Vodafone, Nortel, ZTE, T-Mobile, Nokia Siemens Networks, CMCC, Telecom Italia, Orange, Ericsson new WID - 6.20 Yes Yes revised No S5-080545
S5-080362 RESUBMISSION S5#57 S5-080246 New WID on E-UTRAN Performance measurements Motorola, HUAWEI, Vodafone, Nortel, ZTE, T-Mobile, Nokia Siemens Networks, CMCC, Telecom Italia, Orange, Ericsson new WID - 6.20 Yes No withdrawn Yes
S5-080363 RESUBMISSION S5#57 S5-080097 Specification level requirement on E-UTRAN KPI Motorola Tdoc - 6.7 Yes Yes noted (Align with CMCC contribution & Ericsson comments) No
S5-080364 RESUBMISSION S5#57 S5-080102 White paper on specification level E-UTRAN KPI Motorola Tdoc - 6.7 Yes Yes noted No
S5-080365 RESUBMISSION S5#57 S5-080105 Business level requirement on Performance Management of E-UTRAN and EPC Motorola Tdoc - 6.7 Yes Yes revised No S5-080490
S5-080366 RESUBMISSION S5#57 S5-080106 Specification level requirement on Performance Management of E-UTRAN and EPC Motorola Tdoc - 6.7 Yes Yes agreed (to include the first 3 requirements in TR) No
S5-080367 R8 CR 32.421 Add trace activation failure response Motorola CR - 6.1 Yes Yes revised No S5-080492
S5-080368 R8 CR 32.260 Add number portability and carrier select routing information Ericsson CR - 7.1 Yes Yes revised No S5-080503
S5-080369 R8 CR 32.298 Add number portability and carrier select routing information Ericsson CR - 7.1 Yes Yes revised No S5-080504
S5-080370 R8 CR 32.299 Add number portability and carrier select routing information Ericsson CR - 7.1 Yes Yes revised No S5-080505
S5-080371 TS 32.122-121 Advanced Alarm Management IRP Information Service - for SA Approval (update of S5-080338) Nokia Siemens Networks TS - 6.3 Yes Yes approved (for SA Approval) No S5-080338
S5-080372 New WT-level WID on Self-Configuration of eNodeBs (update of S5-080327) Nokia Siemens Networks new WID 6.20 Yes Yes revised No S5-080478 S5-080327
S5-080373 Accompanying document to New WT-level WID on Self-Configuration of eNodeBs (S5-080372) Nokia Siemens Networks Tdoc 6.20 Yes Yes noted No
S5-080374 Proposal For Skeleton 32.selfConf Concept and Requirements Nokia Siemens Networks TS 6.20 Yes Yes noted No
S5-080375 Proposal For Skeleton 32.selfConf Stage 2 Descriptions (non Itf-N) Nokia Siemens Networks TS 6.20 Yes Yes noted No
S5-080376 LS_in from CT3 to CT4 (copy: SA5) on the Study in TR 29.909 Diameter-based protocols usage and recommendations in 3GPP C3-080242 i/c LS 7 Yes Yes noted (no reply needed) No
S5-080377 Addition of use case Self-healing for TR 32.816 ZTE Tdoc 6.7 Yes Yes not agreed (more discussion needed) No
S5-080378 New WID on Study of Self-healing ZTE new WID 6.20 Yes Yes revised No S5-080523
S5-080379 New description of merge rule for TS 32.122 ZTE, Huawei Tdoc 6.3 Yes Yes not agreed (inclusion/reason: duplication of functionalities) No
S5-080380 R7 CR 32.642-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 25.433 ZTE CR 6.1 Yes Yes approved No
S5-080381 R7 CR 32.643-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 32.642 ZTE CR 6.1 Yes Yes approved No
S5-080382 R7 CR 32.645-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 32.642 ZTE CR 6.1 Yes Yes approved No
S5-080383 R8 CR 32.642-800 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 25.433 ZTE CR 6.1 Yes Yes approved No
S5-080384 Requirements for EPC NRM IRP Nortel, Huawei Tdoc 6.14 Yes Yes agreed (for inclusion in draft TS) No