3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 05.05

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - 1 Ph1 3.3.1 - Test conditions for spurious emissions smg-20 - approved TMS - - - 1988-11-01 - shall follow T/R 24-1 Evolution 1999-08-15
0002 - D Ph1 3.4.0 - Correction of inaccuracies - Editorial changes smg-22 - approved WP2 - - - 1989-02-24 - - 1999-08-15
0003 - D Ph1 3.4.0 - Measurement settings for the video bandwidth smg-22 - approved WP2 - - - 1989-02-24 - - 1999-08-15
0004 - A Ph1 3.4.0 - Blocking characteristics - cost/performance trade off smg-22 - approved WP2 - - - 1989-02-24 - - 1999-08-15
0005 - A Ph1 3.4.0 - Adjacent channel interference at 600 KHz smg-22 - approved WP2 - - - 1989-02-24 - - 1999-08-15
0006 - A Ph1 3.4.0 - Spurious response rejection smg-22 - approved WP2 - - - 1989-02-24 - - 1999-08-15
0007 - A Ph1 3.4.0 - Reference sensitivity interference performance smg-22 - approved WP2 - - - 1989-02-24 - - 1999-08-15
0008 - D Ph1 3.5.0 - Editorial Modifications smg-24 302/89 approved France - - - 1989-04-01 - - 1999-08-15
0009 - D Ph1 3.5.0 - Specification of the Interfering Signal smg-24 302/89 approved GSM2 - - - 1989-07-18 - - 1999-08-15
0010 - A Ph1 3.5.0 - Erroneous Frame Indication Performance smg-24 302/89 approved GSM2 - - - 1989-06-01 - - 1999-08-15
0011 - D Ph1 3.5.0 - Frame Erasure Rate on Control Channels smg-24 302/89 approved GSM2 - - - 1989-07-18 - - 1999-08-15
0012 - D Ph1 3.5.0 - Frequency Ranges Specified in Rec 05.05 and CEPT Rec T/R 24-01 (Nov 88) smg-24 302/89 approved GSM2 - - - 1989-06-15 - - 1999-08-15
0013 - A Ph1 3.5.0 - Amendment to Blocking Specification smg-24 - withdrawn GSM2 Expert Group - - - 1989-09-27 - part of CR 05.05-17 1999-08-15
0014 - A Ph1 3.5.0 - Addition to ""Spurious Emissions"" Requirement smg-24 - withdrawn GSM2 Expert Group - - - 1989-09-27 - part of CR 05.05-17 1999-08-15
0015 - C Ph1 3.6.0 - Class 5 MS smg-25 440/89 approved UK - - - 1989-10-26 - presented by GSM1 1999-08-15
0016 - D Ph1 3.6.0 - Presentation of Doppler Spectrum Definition smg-25 440/89 approved CNET - - - 1989-12-07 - - 1999-08-15
0017 - A Ph1 3.6.0 - Close Proximity Working of GSM`s MS's -- Blocking and Spurious Emissions Requirements smg-25 479/89 approved GSM2 - - - 1989-12-07 - - 1999-08-15
0018 - A Ph1 3.6.0 - Erroneous Frame Indication Performance smg-25 440/89 approved GSM2 - - - 1989-12-07 - - 1999-08-15
0019 2 A Ph1 3.6.0 - Reference Sensitivity and Interference Performance smg-25b 34/90r1 approved GSM 2 - - - 1990-01-24 - - 1999-08-15
0020 - D Ph1 3.6.0 - Measurement Points for Various Transmitter Specifications smg-25b 9/90 approved GSM 2 - - - 1990-01-16 - - 1999-08-15
0021 - A Ph1 3.6.0 - Editorial Changes and Corrections smg-25b 9/90 approved GSM 2 - - - 1990-01-16 - - 1999-08-15
0022 - A Ph1 3.6.0 - Spurious Emissions Specification Methodology smg-25b 9/90 approved GSM 2 - - - 1990-01-16 - - 1999-08-15
0023 - A Ph1 3.6.0 - Output level dynamic operation smg-25b 9/90 approved GSM 2 - - - 1990-01-16 - - 1999-08-15
0024 - A Ph1 3.6.0 - MS class 2 requirements regarding close proximity working smg-25b 9/90 approved GSM 2 - - - 1990-01-16 - - 1999-08-15
0025 - A Ph1 3.6.0 - Blocking characteristics smg-25b 9/90 approved GSM 2 - - - 1990-01-16 - - 1999-08-15
0026 - A Ph1 3.10.0 - Spectrum due to switching transients smg-26 74/90 approved GSM 2 - - - 1990-02-19 - agreed for phase 1 1999-08-15
0027 - A Ph1 3.11.0 3.12.00 Allowance of a trade off between frame erasure ratio and RBER smg-29 53/91 Approved GSM2 - - - 1991-01-11 - - 1999-08-15
0028 - ? Ph1 3.11.0 Nominal error rates smg-29 54/91 Rejected GSM2 - - - 1991-01-11 - More work is neccessary for Phase 2 1999-08-15
0028 2 C Ph2 3.13.0 - Nominal Error rates - - - GSM2 - - - 1991-06-05 - Approved at GSM2-28; Amended for v 4.0.0 1999-08-15
0028 3 B Ph2 4.0.0 - Nominal error rates smg-01 49/92 Approved GSM2 - - - 1991-11-28 - - 1999-08-15
0029 - A Ph1 3.11.0 3.12.00 Correction of erroneous value in table 2 smg-29 55/91 Approved GSM2 - - - 1991-01-10 - - 1999-08-15
0030 - A Ph1 3.11.0 3.12.00 Spurious emissions affecting specification of spectrum due to modulation smg-29 56/91 Approved GSM2 - - - 1991-01-11 - - 1999-08-15
0031 - E Ph1 3.11.0 3.12.00 Clarifications of required measurement bandwidth smg-29 55/91 Approved GSM2 - - - 1991-01-11 - - 1999-08-15
0032 - A Ph1 3.12.0 3.13.00 Correction of simulation errors in tables 1 & 2 of 05.05 for GSM 900 smg-30 124/91 Approved GSM2 - - - 1991-02-14 - - 1999-08-15
0033 - A Ph1 3.12.0 3.13.00 Change of test of spurious responses to allow realistic exceptions smg-30 125/91 Approved GSM2 - - - 1991-02-14 - - 1999-08-15
0034 - A Ph1 3.12.0 3.01.00 Correction of simulation errors in tables 1 & 2 of 05.05 for DCS 1800 smg-30 126/91 Approved GSM2 - - - 1991-02-14 - - 1999-08-15
0035 1 C Ph2 3.13.0 - Restructuring of blocking and spurious response tests - - - GSM2 - - - 1991-06-05 - Approved at GSM2-28; Amended for v 4.0.0 1999-08-15
0035 2 D Ph2 4.0.0 - Restructuring of blocking and spurious response tests smg-01 49/92 Approved GSM2 - - - 1991-11-28 - - 1999-08-15
0036 1 E Ph2 3.13.0 - Editorial changes to 05.05 - - - GSM2 - - - 1991-06-05 - Approved at GSM2-28 1999-08-15
0036 2 D Ph2 4.0.0 - Editorial changes to 05.05 - - - GSM2 - - - 1991-12-02 - Approved at GSM2-29 1999-08-15
0036 3 D Ph2 4.0.0 - Editorial changes to 05.05 smg-01 49/92 Approved GSM2 - - - 1992-01-09 - - 1999-08-15
0037 1 D Ph2 3.13.0 4.0.0 Combination of 05.05 (GSM 900) and 05.05-DCS (DCS 1800) specifications smg-32 341/91 Approved GSM2 - - - 1991-06-05 - - 1999-08-15
0038 - C Ph2 3.13.0 - Relaxation of tolerance for power control steps for BTS - - - GSM2 - - - 1991-06-05 - Approved at GSM2-28; Amended for v 4.0.0 1999-08-15
0038 2 B Ph2 4.0.0 - Relaxation of tolerence for power control steps for BTS smg-01 49/92 Approved GSM2 - - - 1991-11-28 - - 1999-08-15
0039 1 C Ph2 3.13.0 - Protection of DCS 1800 band from GSM 900 spurious emissions - - - GSM2 - - - 1991-06-05 - Approved at GSM2-28; Amended for v 4.0.0 1999-08-15
0039 2 C Ph2 4.0.0 - Protection of DCS 1800 band from GSM 900 spurious emissions smg-01 49/92 Approved GSM2 - - - 1991-11-28 - - 1999-08-15
0040 - - Ph1 3.13.0 Test time reduction smg-31 245/91 Rejected GSM2 - - - 1991-06-05 - Joint with 11.10-158 No categ. assigned 1999-08-15
0040 1 C Ph2 3.13.0 - Test time reduction - - - GSM2 - - - 1991-07-18 - Approved at GSM2-28; Amended for v 4.0.0 1999-08-15
0040 2 B Ph2 4.0.0 - Modification of test conditions for spurious emissions and for spectrum due to modulation to reduce test time smg-01 49/92 Approved GSM2 - - - 1991-11-28 - - 1999-08-15
0041 - - Ph2 4.0.0 - GSM frequency extension bands smg-01 49/92 Approved GSM2 - - - 1992-01-09 - - 1999-08-15
0042 - - Ph2 4.0.0 - Spectrum due to modulation testing of DCS1800 BTS in frequency hopping mode smg-01 49/92 Approved GSM2 - - - 1992-01-09 - - 1999-08-15
0043 - - Ph2 4.0.0 4.1.0 Switching transients relaxation smg-01 49/92 Approved GSM2 - - - 1992-01-09 - - 1999-08-15
0044 - C Ph2 4.1.0 - Spurious emissions between 600 kHz and 1.8 MHz offset smg-02 198/92 Approved PT 12 - - - 1992-02-18 - - 1999-08-15
0045 - C Ph2 4.1.0 - Spectrum due to modulation measurements for GSM 900 outside 1.8 MHz - - - PT 12 - - - 1992-02-18 - - 1999-08-15
0045 1 B Ph2 4.2.0 - Alignment of spectrum due to modulation and wide band noise requirement with the spurious response requirement ... - - - SMG2 ad hoc - - - 1992-04-27 - outcome of SMG2 ad hoc on RF 1999-08-15
0045 2 B Ph2 4.2.0 - Alignment of spectrum due to modulation and wide band noise requirement with the spurious emission requirement ... - - - SMG2 - - - 1992-05-08 - outcome of SMG2 #2 1999-08-15
0046 - D Ph2 4.1.0 - Clarification of the spurious emissions on extension bands - - - PT 12 - - - 1992-02-19 - - 1999-08-15
0046 1 D Ph2 4.1.0 - Clarification of the spurious emissions on extension bands smg-02 198/92 Approved PT 12 - - - 1992-02-19 - - 1999-08-15
0047 - C Ph2 4.1.0 4.2.0 (p2) Modification of the Intra BTS Intermodulation Test to Allow Linear Amplifiers smg-02 198/92 Approved SMG2 - - - 1902-03-12 - - 1999-08-15
0048 - C Ph2 4.1.0 - Absolute Power Accurary Requirement for Static Power Adjustment in BSs - - - PT 12 - - - 1992-03-12 - approved at SMG2 #1 1999-08-15
0049 - C Ph2 4.2.0 - Intra BTS intermodulation measurement bandwidth - - - SMG2 ad hoc - - - 1992-04-27 - outcome of SMG2 ad hoc on RF 1999-08-15
0049 1 C Ph2 4.2.0 - Intra BTS intermodulation measurement bandwidth - - - SMG2 - - - 1992-05-07 - approved at SMG2 #2 1999-08-15
0049 2 B Ph2 4.2.0 - Intra BTS intermodulation smg-04 461/92 Approved SMG2 - - - 1992-09-02 - - 1999-08-15
0050 - B Ph2 4.2.0 - Alignment of switching transient requirement in GSM 900 - - - SMG2 ad hoc - - - 1992-04-27 - rejected at SMG2 #2 1999-08-15
0051 - D Ph2 4.2.0 - Clarification of the definition of peak hold smg-04 461/92 Approved SMG2 ad hoc - - - 1992-04-29 - - 1999-08-15
0052 - D Ph2 4.2.0 - Editorial change to the table of frequency bands - - - SMG2 - - - 1992-05-25 - - 1999-08-15
0053 - B Ph2 4.2.0 - Alignment of spectrum due to modulation requirement with the spectrum due to switching transient requirement smg-04 461/92 Approved SMG2 - - - 1992-05-08 - - 1999-08-15
0054 - C Ph2 4.2.0 - Mutual protection of GSM 900 and DCS1800 receive bands smg-04 461/92 Approved SMG2 - - - 1992-06-04 - - 1999-08-15
0055 - C Ph2 4.2.0 - E-GSM protection against mobile PBX intermodulation and blocking - - - PT 12 - - - 1992-07-21 - - 1999-08-15
0056 - D Ph1 3.13.0 - Environmental conditions smg-04 460/92 Withdrawn SMG2 - - - 1992-09-02 - - 1999-08-15
0057 - C Ph2 4.2.0 - Clarification of exceptions to spurious emissions for the MS smg-04 461/92 Approved SMG2 - - - 1992-09-02 - - 1999-08-15
0058 - D Ph2 4.2.0 - Alignment between 05.05, 05.08, 04.04, 04.08 and 08.58 smg-04 467/92 Approved SMG2 - - - 1992-09-02 - - 1999-08-15
0059 - C Ph2 4.2.0 - Frequency bands for GSM 900 smg-04 461/92 Approved SMG2 - - - 1992-09-02 - - 1999-08-15
0060 - B Ph2 4.2.0 - Intermodulation specifications for mobile PBXs smg-04 461/92 Approved SMG2 - - - 1992-09-02 - - 1999-08-15
0061 - D Ph1 3.1.0 - Environmental conditions smg-04 482/92 Withdrawn SMG2 - - - 1992-09-02 - - 1999-08-15
0062 - A Ph1 3.13.0 - Adjacent channel rejection, static interferer smg-04 531/92 - Vodafone - - - 1992-09-28 - Approved as rev 1 in 531/92r1 1999-08-15
0062 1 A Ph1 3.13.0 3.14.0 Adjacent channel rejection, static interferer smg-04 531/92r1 Approved Vodafone - - - - - - 1999-08-15
0063 - C Ph2 4.3.0 - Introduction of spectrum due to modulation and noise requirement for GSM 900 beyond 1.8 MHz offset from carrier - - - PT12 - - - 1992-10-21 - - 1999-08-15
0064 - B Ph2 4.3.0 - Changes to spectrum due to modulation requirement - - - PT12 - - - 1992-10-21 - - 1999-08-15
0064 1 B Ph2 4.3.0 - Changes to spectrum due to modulation requirement smg-05 40/93 Approved SMG2 - - - 1992-12-18 - - 1999-08-15
0065 - B Ph2 4.3.0 - E-GSM protection of the BTS blocking requirement - - - PT12 - - - 1992-10-21 - - 1999-08-15
0065 1 B Ph2 4.3.0 - E-GSM protection of the BTS blocking requirement smg-05 40/93 Approved SMG2 - - - 1992-12-18 - - 1999-08-15
0066 - B Ph2 4.3.0 - Tolerance on maximum power level - - - Detecon - - - 1992-08-28 - - 1999-08-15
0067 - D Ph2 4.3.0 - Clarification of the pseudo-random sequence generation in the phase accuracy requirement - - - PT12 - - - 1992-10-21 - - 1999-08-15
0067 - D Ph2 4.3.0 - Clarification of the pseudo random sequence generation in phase accuracy requirement smg-05 40/93 Approved SMG2 - - - 1992-10-21 - - 1999-08-15
0068 - B Ph2 4.3.0 - Improved capasity/quality via greater power control range - - - SMG2 - - - 1992-10-22 - - 1999-08-15
0069 - C Ph2 4.3.0 - Microcell BTS RF parameters - - - SMG2 ad hoc - - - 1992-11-03 - - 1999-08-15
0069 1 B Ph2 4.3.0 - Microcell BTS RF parameters smg-05 40/93 Approved SMG2 - - - 1992-12-18 - - 1999-08-15
0070 - A Ph1-DCS 3.1.0 3.2.0 Adjacent channel rejection, static interferer for 05.05-DCS - - approved PT12 - - - 1992-11-10 - Approved by correspondance 1999-08-15
0071 - C Ph2 4.3.0 - Intra BTS intermodulation attenuation exceptions - - - SMG2 ad hoc - - - 1992-11-03 - - 1999-08-15
0072 - B Ph2 4.3.0 - Performance figures for FACCH smg-05 40/93 Approved SMG2 - - - 1992-12-15 - - 1999-08-15
0073 - B Ph2 4.3.0 - Clarification of blocking and intermodulation signal smg-05 40/93 Approved SMG2 - - - 1992-12-15 - - 1999-08-15
0074 - B Ph2 4.3.0 - Power control range of a MS smg-05 40/93 Approved SMG2 - - - 1992-12-18 - - 1999-08-15
0075 - B Ph2 4.3.0 - Absolute power accuracy requirement for static power adjustement in BSs smg-05 40/93 Approved SMG2 - - - 1992-12-16 - - 1999-08-15
0076 - B Ph2 4.3.0 - Radiated spurious emissions from BTS smg-05 40/93 Approved SMG2 - - - 1992-12-18 - -