3GPP TDocs (written contributions) at meeting

Meeting: S5-58 - 2008-02-18 to 2008-02-22, Malta

meeting id: 26666 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
S5-080301 Agenda WG Chairman approved
S5-080302 Report of the last SA5 meeting MCC revised
S5-080303 SA5 status report at the last SA meeting MCC withdrawn before the meeting
S5-080304 Liaison Statement Status BEFORE this meeting WG Vice Chair not to be produced in future
S5-080305 Liaison Statement Status AFTER this meeting WG Vice Chair not to be produced in future
S5-080306 SA5 Structure and Meeting Facility Requirements WG Vice Chair not available, withdrawn
S5-080307 Draft TS/TR Management Process WG Vice Chair produced after the meeting
S5-080308 SA5 Meeting Calendar WG Chairman agreed
S5-080309 R8 Deliverables due for the NEXT SA plenary MCC revised (updated online)
S5-080310 TR 30.818 Project scheduling and open issues for SA5 Release 8 MCC revised
S5-080311 OAM Time Plan OAM Chair approved with modifications
S5-080312 OAM Detailed Report from LAST Meeting OAM Chair approved (include Ericsson's comments in S5-080312r1)
S5-080313 OAM Action Item Register (from previous meetings, LSs, Conference Calls) OAM Chair revised
S5-080314 OAM Executive Report from THIS Meeting OAM Chair noted
S5-080315 OAM Detailed Report from THIS Meeting OAM Chair to be produced 1 week after the meeting
S5-080316 CH Agenda and Time Plan CH Chair approved
S5-080317 CH Detailed Report from LAST Meeting CH Chair approved
S5-080318 CH List of documents CH Chair noted
S5-080319 CH Executive Report from THIS Meeting CH Chair noted
S5-080320 CH Detailed Report from THIS Meeting CH Chair to be produced 1 week after the meeting
S5-080321 TS 32.280-011 Advice of Charge (AoC) service MCC noted
S5-080322 RESUBMISSION S5-080025 LS_in from 3GPP2 to SA5 on A Number Of 3GPP SA5 R7 Items 3GPP2 noted (ongoing actions to be followed up in the newly created Action Register)
S5-080323 Updated ALL 25 CRs form SA5#57 for CH (9) and OAM (16) MCC to be confirmed during the SWG Executive Report to S5#58 closing plenary
S5-080324 RESUBMISSION S5-080223 LS_in Reply from TMF mTOP to TISPAN (copy SA5) on joint activities in Service Management and Subscription Management (related to S5-080251 LS_out SA5 reply to TISPAN S5-080027/ 15bTD431r2) TMF mTOP noted (no reply needed)
S5-080325 R8 CR 32.251 Clarification of Offline Charging Architecture for EPC Charging Nokia Siemens Networks revised
S5-080326 New BB-level WID on Management of Self-Organising Networks (SON) - based on T-Mobile S5-080202 MCC revised before the meeting
S5-080327 New WT-level WID on Self-Configuration of eNodeBs - based on NSN S5-080070 MCC revised before the meeting
S5-080328 New WT-level WID on SON Neighbour Cell List (NCL) handling architecture - based on Ericsson S5-080172 MCC revised before the meeting
S5-080329 New WT-level WID on SON self-optimization handling - based on Huawei S5-080243 MCC noted
S5-080330 TR 32.822-014 Study on System Maintenance over Itf-N ZTE revised before the meeting
S5-080331 RESUBMISSION S5-080071 Self-Configuration: SW download Nokia Siemens Networks not agreed (more offline discussion needed)
S5-080332 Self-Optimization generic procedure/use case and its re-use Nokia Siemens Networks not agreed (more discussion needed/brainstorming-like for breakout session)
S5-080333 TS 32.122-113 Advanced Alarm Management Information Service latest draft Nokia Siemens Networks revised before the meeting
S5-080334 TS 32.123-003 Advanced Alarm Management Information CORBA Solution Set latest draft Nokia Siemens Networks revised before the meeting
S5-080335 LS_in Reply from SA3 to SA5 on Home NodeB OAM Domain Security S3a071054 noted (no reply needed)
S5-080336 LS_in from SA2 to SA5 on the need of charging characteristics S2-080954 replied in S5-080501
S5-080337 TS 32.121-200 Advanced Alarm Management IRP Requirements - for SA Approval (update of S5-080236) MCC / NSN approved
S5-080338 TS 32.122-120 Advanced Alarm Management IRP Information Service - for SA Approval (update of S5-080333) MCC / NSN revised before the meeting
S5-080339 TS 32.123-010 Advanced Alarm Management IRP CORBA SS - for SA Information (update of S5-080334) MCC / NSN approved
S5-080340 TS 32.153-031 IRP technology specific templates, rules and guidelines (update of S5-080233) MCC / Ericsson revised before the meeting
S5-080341 TR 32.822-015 Study on System Maintenance over Itf-N (update of S5-080330) MCC / ZTE noted
S5-080342 TS 32.751-003 EPC NRM IRP Requirements MCC / Nortel noted (as Latest Draft to base new contributions)
S5-080343 TS 32.761-003 E-UTRAN NRM IRP Requirements MCC / Ericsson noted (as Latest Draft to base new contributions)
S5-080344 TS 32.752-003 EPC NRM IRP IS MCC / Huawei noted (as Latest Draft to base new contributions)
S5-080345 TS 32.762-003 E-UTRAN NRM IRP IS MCC / Ericsson noted (as Latest Draft to base new contributions)
S5-080346 TR 32.819-002 Element management layer - Operation System Function (E-OSF) definition MCC / China Mobile approved
S5-080347 R8 CR 32.441-710 Add trace functions for EPC and E-UTRAN into the Trace IRP (update of S5-080171) MCC / Ericsson revised
S5-080348 TS 32.xyz-004 KPIs for UMTS and GSM MCC / China Mobile noted
S5-080349 REVISED S5#57 agreed S5-080186r1: R8 R7 CR 32.297 Correction of errors and inconsistencies - Align with 32.240 MCC / Alcatel-Lucent revised before the meeting
S5-080350 TS 32.275-002 MultiMedia Telephony (MMTel) charging MCC / Alcatel-Lucent revised
S5-080351 Updated WID on Advice of Charge (AoC) support in IMS Charging UID 380042 MCC approved (for updating TR 30.818 WID-collection & 3GPP Work Plan)
S5-080352 Updated WID on Multimedia Telephony Service and Supplementary Services (MMTel) Charging UID 380041 MCC approved (for updating TR 30.818 WID-collection & 3GPP Work Plan)
S5-080353 TR 32.821-024 Study of Self-Organising Networks (SON) related OAM for Home NodeB MCC / Huawei noted
S5-080354 Add additional correction for IBCF into stage 2 flows and data descriptions for IMS Charging - This CR aligns TS 32.260 with TS 23.002 and 23.228. Alcatel-Lucent withdrawn before the meeting
S5-080355 REVISED S5#57 agreed S5-080180r1: R8 32.260 CR#0055 Add IBCF into stage 2 flows and data descriptions for IMS Charging - Align with 23.002, 23.228 Alcatel-Lucent revised
S5-080356 REVISED S5#57 agreed S5-080181r1: R8 32.298 CR#0081 Add CDR fields for IBCF Alcatel-Lucent revised
S5-080358 On location of AAF and security Ericsson noted (more offline discussion needed)
S5-080359 R8 CR 32.622 Add end point modelling method for reference point Motorola, Nortel, CMCC revised
S5-080360 R8 CR 32.152 Add sample for end point modelling for reference point Motorola, Nortel, CMCC withdrawn
S5-080361 RESUBMISSION S5#57 S5-080244 New WID on E-UTRAN Performance measurements Motorola, HUAWEI, Vodafone, Nortel, ZTE, T-Mobile, Nokia Siemens Networks, CMCC, Telecom Italia, Orange, Ericsson revised
S5-080362 RESUBMISSION S5#57 S5-080246 New WID on E-UTRAN Performance measurements Motorola, HUAWEI, Vodafone, Nortel, ZTE, T-Mobile, Nokia Siemens Networks, CMCC, Telecom Italia, Orange, Ericsson withdrawn
S5-080363 RESUBMISSION S5#57 S5-080097 Specification level requirement on E-UTRAN KPI Motorola noted (Align with CMCC contribution & Ericsson comments)
S5-080364 RESUBMISSION S5#57 S5-080102 White paper on specification level E-UTRAN KPI Motorola noted
S5-080365 RESUBMISSION S5#57 S5-080105 Business level requirement on Performance Management of E-UTRAN and EPC Motorola revised
S5-080366 RESUBMISSION S5#57 S5-080106 Specification level requirement on Performance Management of E-UTRAN and EPC Motorola agreed (to include the first 3 requirements in TR)
S5-080367 R8 CR 32.421 Add trace activation failure response Motorola revised
S5-080368 R8 CR 32.260 Add number portability and carrier select routing information Ericsson revised
S5-080369 R8 CR 32.298 Add number portability and carrier select routing information Ericsson revised
S5-080370 R8 CR 32.299 Add number portability and carrier select routing information Ericsson revised
S5-080371 TS 32.122-121 Advanced Alarm Management IRP Information Service - for SA Approval (update of S5-080338) Nokia Siemens Networks approved
S5-080372 New WT-level WID on Self-Configuration of eNodeBs (update of S5-080327) Nokia Siemens Networks revised
S5-080373 Accompanying document to New WT-level WID on Self-Configuration of eNodeBs (S5-080372) Nokia Siemens Networks noted
S5-080374 Proposal For Skeleton 32.selfConf Concept and Requirements Nokia Siemens Networks noted
S5-080375 Proposal For Skeleton 32.selfConf Stage 2 Descriptions (non Itf-N) Nokia Siemens Networks noted
S5-080376 LS_in from CT3 to CT4 (copy: SA5) on the Study in TR 29.909 Diameter-based protocols usage and recommendations in 3GPP C3-080242 noted (no reply needed)
S5-080377 Addition of use case Self-healing for TR 32.816 ZTE not agreed (more discussion needed)
S5-080378 New WID on Study of Self-healing ZTE revised
S5-080379 New description of merge rule for TS 32.122 ZTE, Huawei not agreed (inclusion/reason: duplication of functionalities)
S5-080380 R7 CR 32.642-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 25.433 ZTE approved
S5-080381 R7 CR 32.643-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 32.642 ZTE approved
S5-080382 R7 CR 32.645-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 32.642 ZTE approved
S5-080383 R8 CR 32.642-800 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 25.433 ZTE approved
S5-080384 Requirements for EPC NRM IRP Nortel, Huawei agreed (for inclusion in draft TS)
S5-080385 Entity Object Model of EPC NRM IRP (IS) Huawei, Nortel revised
S5-080386 Link Object Model of EPC NRM IRP (IS) Huawei, Nortel revised
S5-080387 MME Pool Object Model Huawei, Nortel noted (update in line with comments made)
S5-080388 Home NodeB Specification level requirement Huawei not agreed
S5-080389 Mapping of 3GPP use cases to NGMN use cases for LTE SON Huawei not agreed (need for offline discussion/depends on S5-080393 agreement)
S5-080390 Measurements for Mobility robustness optimization Huawei not agreed (more offline discussion needed)
S5-080391 Solution for use case Mobility robustness optimization Huawei not agreed (need to clarify the scope, update in line with comments made)
S5-080392 SON architecture for self optimization Huawei revised
S5-080393 SON Use Case Alignment Huawei not agreed (need for offline discussion/wait for RAN3 TR)
S5-080394 TR 32.816-132 Study on Management of E-UTRAN and EPC MCC / Ericsson agreed as new Latest Draft
S5-080395 Draft v100 report 3GPP/3GPP2 Common IMS Workshop, Puerto Vallarta, MEXICO, 24–25 Jan 2008 MCC noted (no action assigned to SA5)
S5-080396 CIMS-080020 Common IMS Management - Endorsed by the 3GPP/3GPP2 workshop MCC / Alcatel-Lucent noted (start study of 3GPP/3GPP2 OAM alignment)
S5-080397 Specification Level Requirements for EPC NRM IRP Nortel, Huawei noted (need more study on requirements and adequate wording shall/should)
S5-080398 Discussion on Gy in EPC Ericsson noted
S5-080399 Rel-8 CR 32.251 Offline charging architecture Ericsson withdrawn
S5-080400 LS_in from CT3 to SA5 on Diameter Routing Considerations C3-080183 replied in S5-080502
S5-080401 New WID on 3GPP2 Input to Common IMS (3GPP SA-wide WID) 3GPP2 revised for feeding to SA Mar 2008 plenary
S5-080402 List of action items_from_S5-57_status_2008-02-04 MCC revised (updated online)
S5-080403 AoC architecture, functional entities and interfaces Ericsson revised
S5-080404 Revised TS/TR Management Process MCC reviewed and updated to S5-080307
S5-080405 REVISED S5#57 agreed S5-080186r1: R7 CR 32.297 Correction of errors and inconsistencies Alcatel-Lucent revised before the meeting
S5-080406 New WID Key Performance Indicators (KPIs) for E-UTRAN Ericsson revised
S5-080407 Standardization scope for LTE KPIs (accompanying document to Proposal on new WID Key Performance Indicators (KPIs) for E-UTRAN) Ericsson noted
S5-080409 Requirements for Automatic Neighbour Relations Ericsson not agreed (more discussion needed/align with RAN3)
S5-080410 Inter-RAT/Frequency Automatic Neighbour Relations Ericsson not agreed (more discussion needed / no major objection)
S5-080411 NR White List, NR Black List and Automatic NR List Ericsson revised before the meeting
S5-080412 EP IOC modelling for ENBFunction Ericsson agreed (the modelling)
S5-080413 Add EPC Pool Management Requirements 32.816 Ericsson not agreed
S5-080414 R8 CR 32.101 Remove statement about the Release 7 preferred technologies Ericsson not agreed (more offline discussion needed)
S5-080415 CMCC draft TR 32.819 E-OSF China Mobile withdrawn before the meeting
S5-080416 CMCC Use case for CircuitEndPointSubgroup IOC China Mobile not agreed
S5-080417 R7 CR 32.632-800 Add CircuitEndPointSubgroup IOC– Align with 32.407 China Mobile revised before the meeting
S5-080418 R7 CR 32.633-730 Add CircuitEndPointSubgroup CORBA SS– Align with 32.407 China Mobile revised before the meeting
S5-080419 R7 CR 32.635-730 Add CircuitEndPointSubgroup XML file definition– Align with 32.407 China Mobile revised before the meeting
S5-080420 R8 32.405-810 Add measurements related to HSUPA release China Mobile revised
S5-080421 Skeleton of draft specification KPI R8 32.xyz China Mobile revised before the meeting
S5-080422 KPI overview part of draft specification KPI China Mobile agreed (for inclusion in draft TS)
S5-080423 Proposal for KPI category China Mobile revised
S5-080424 Input UTRAN KPIs defined in 32.814 China Mobile noted (update in line with comments)
S5-080425 Update of 32.153-031 For information to SA Ericsson revised before the meeting
S5-080426 Minutes of Joint SA5-SG4 meeting 2008-01-21 Ericsson noted
S5-080427 Proposal for SA5-SG4 methodology alignment process Ericsson noted
S5-080428 Upgrade of 32.154 to Rel-8 Ericsson approved (for automatic upgrade to Rel-8)
S5-080429 New WID SON Neighbour Cell List Management Ericsson revised
S5-080430 Editor's proposal 32.816 Ericsson agreed for inclusion in version 1.3.2
S5-080431 R8 CR 32.441 Introduction of EPC and E-UTRAN in Trace IRP (update of S5-080171) Ericsson noted (update in line with comments made)
S5-080432 On the location of the AAF and the OAM CO_EF Nokia Siemens Networks noted (more discussion needed)
S5-080433 Time synchronization requirement for TR 32.822 ZTE not agreed
S5-080434 Time synchronization solution for TR 32.822 ZTE noted (more discussion needed)
S5-080435 Neighbour Relation Lists properties and definitions Ericsson not agreed (more discussion needed)
S5-080436 Resources monitoring requirement for TR 32.822 ZTE revised
S5-080437 Resources monitoring solution for TR 32.822 ZTE noted (updates needed)
S5-080438 New WID Alignment with eTOM and NGNM TeliaSonera revised
S5-080439 New BB-level WID on Management of Self-Organising Networks (SON) T-Mobile, Vodafone, Telefonica, Telecom Italia revised
S5-080440 R8 CR 32.102-810 Update with NGNM architectural concepts - Align with M.3060/Y.2401 TeliaSonera postponed (old version 710 i/o 810)
S5-080441 New WID SON self-optimisation & self-healing T-Mobile, Vodafone, Telefonica revised
S5-080442 New WID Self-Configuration of eNodeBs T-Mobile, Vodafone, Telefonica, Telecom Italia noted
S5-080443 New WID SON Neighbour Cell List (NCL) handling T-Mobile, Vodafone, Telefonica noted
S5-080444 Complete early session setup online charging flow Huawei withdrawn
S5-080446 Add online charging correlation scenarios Huawei withdrawn
S5-080447 Adding Signalling Based Trace Activation procedures in E-UTRAN Nokia Siemens Networks revised
S5-080448 E-UTRAN measurements Nokia Siemens Networks noted
S5-080449 R7 CR 32.409 Correction of registration measurements in CSCF Nokia Siemens Networks revised before the meeting
S5-080450 Update of SON architecture for self optimization Huawei, China Mobile, Telecom Italia not agreed (more offline discussion needed / breakout)
S5-080451 REVISED S5-080411 NR White List, NR Black List and Automatic NR List Ericsson not agreed (more offline discussion needed)
S5-080452 R8 CR 32.409-800 correction of BGCF related measurement - Align with 23.228 China Mobile revised before the meeting
S5-080453 OAM Aspects of the RLF-based neighbour list optimization Qualcomm Europe noted (more discussion needed)
S5-080454 R8 CR 32.409-800 Add registration related measurement per access technology China Mobile revised before the meeting
S5-080455 DRAFT TS 32.154-800 Backward and Forward Compatibility (BFC): Concept and definitions MCC withdrawn
S5-080456 R8 CR 32.299 Corrections on Diameter AVP for SMS Charging Nokia Siemens Networks approved
S5-080457 New WID on EPC Performance Measurements China Mobile revised
S5-080458 R8 CR 32.274 Correction on Service Information for SMS Charging Nokia Siemens Networks approved
S5-080459 REVISED S5-080449 R7 CR 32.409 Correction of registration measurements in CSCF MCC / Nokia Siemens Networks revised
S5-080460 REVISED S5-080452 R8 CR 32.409-800 correction of BGCF related measurement - Align with 23.228 MCC / China Mobile approved
S5-080461 REVISED S5-080454 R8 CR 32.409-800 Add registration related measurement per access technology MCC / China Mobile, Motorola approved
S5-080462 REVISED S5-080417 R8 CR 32.632-800 Add CircuitEndPointSubgroup IOC – Align with 32.407 MCC / China Mobile not agreed
S5-080463 REVISED S5-080418 R8 CR 32.633-730 Add CircuitEndPointSubgroup CORBA SS – Align with 32.407 MCC / China Mobile not agreed
S5-080464 REVISED S5-080419 R8 CR 32.635-730 Add CircuitEndPointSubgroup XML file definition – Align with 32.407 MCC / China Mobile not agreed
S5-080465 E-UTRAN Modelling - RESUBMISSION S5A071021 / S5-071856 Ericsson noted (update in line with comments made)
S5-080466 TS 32.153-031 for SA Information (replaces S5-080425) Ericsson approved
S5-080467 Minutes of conf. call on Methodology with ITU-T etc 12 Feb. Ericsson noted
S5-080468 Proposal for methodology alignment process v3 (update of S5-080427) Ericsson agreed (the process proposed)
S5-080469 Methodology alignment living list v2 Ericsson noted
S5-080470 REVISED S5#57 agreed S5-080186r1: R7 CR 32.297 Correction of errors and inconsistencies Alcatel-Lucent revised
S5-080471 Responses to Questions for SA5 OAM SWG on SON by Vodafone and T-Mobile as comments to conference call minutes, 14 Feb 2008 Ericsson noted
S5-080472 ZTE Responses to Questions for SA5 OAM SWG on SON as comments to conference call minutes, 14 Feb 2008 ZTE noted
S5-080473 Minutes of the SA5 OAM SWG Conference Call on SON Work Items, 14 Feb 2008 Vodafone noted
S5-080474 LS_in from RAN3 to SA5 on RAN performance monitoring R3-080530 replied in S5-080482
S5-080475 LS_in from RAN3 to SA5 on Self Configuring and Self Optimizing Network Use Cases and Solutions TR R3-080536 noted (no reply needed)
S5-080476 Clarification of terminology specific to Automatic Neighbour Relation (ANR) Huawei noted
S5-080477 LS_in from RAN2 to SA5 on RAN performance monitoring R2-081364 replied in S5-080482
S5-080478 New WT-level WID on Self-Establishment of eNBs (update of S5-080372) Nokia Siemens Networks revised
S5-080479 Changes in S5-080478 New WT-level WID on Self-Establishment of eNBs Nokia Siemens Networks noted
S5-080480 OAM Action Item Register (from previous meetings, LSs, Conference Calls) OAM Chair noted
S5-080481 New BB-level WID on Management of Self-Organising Networks (SON) T-Mobile, Vodafone, Telefonica, Telecom Italia revised
S5-080482 LS_out reply to RAN3 on RAN performance monitoring OAM SWG (Gyula) revised
S5-080483 Minutes of Meeting on Joint XML Guidelines Ericsson noted
S5-080484 S5-eP0021 Email approval = Action S5-57/21 6.7 S5-080240, S5-080249 Alternative 1/2 - LS_out reply to RAN2 (S5-080036) on RACH optimisation use case SWG OAM Chair to update LS for email approval OAM Chair LS NOT agreed OAM Chair revised
S5-080485 S5-eP0024 Email approval = Action S5-57/11 6.7 S5-080239 LS_out reply to RAN3 (S5-080031) on Automatic Neighbour Relation function Ericsson to update LS for email approval Ericsson LS NOT agreed Ericsson revised
S5-080486 S5-eP0025 Email approval = Action S5-57/22 6.7 S5-080242 LS_out to RAN3 NSN to update LS for email approval NSN LS NOT agreed NSN revised
S5-080487 List of action items_from_S5-57_status_2008-02-04 MCC noted
S5-080488 New WID on 3GPP2 Input to Common IMS (3GPP SA-wide WID) ALU/SA5 for SA Mar 2008 plenary attention (via ALU)
S5-080489 Report of the last SA5 meeting MCC approved
S5-080490 Business level requirement on Performance Management of E-UTRAN and EPC Motorola agreed (for inclusion in draft TR)
S5-080491 LS_out RAN3 on (see S5-080453) OAM (Amer) revised
S5-080492 R8 CR 32.421 Add trace activation failure response Motorola approved
S5-080493 CR Add Signalling Based Trace Activation procedures in E-UTRAN Nokia Siemens Networks approved
S5-080494 Resources monitoring requirement for TR 32.822 ZTE agreed (for inclusion in draft TR)
S5-080495 New WID on EPC Performance measurements China Mobile, Nortel, ZTE, Huawei approved
S5-080496 New WID Key Performance Indicators (KPIs) for E-UTRAN Ericsson revised
S5-080497 New BB-level WID Management of Self-Organising Networks (SON) T-Mobile, Vodafone, Telefonica, Telecom Italia revised
S5-080498 New WID Alignment with eTOM and NGNM TeliaSonera, Nortel, T-Mobile, Telefonica approved
S5-080499 New WT-level WID on Self-Establishment of eNBs Nokia Siemens Networks revised
S5-080500 R8 CR 32.251 Clarification of Offline Charging Architecture for EPC Charging Nokia Siemens Networks withdrawn
S5-080501 LS_out reply to SA2 (S2-080954 / S5-080336) on the need of charging characteristics / Support of Information Elements for Charging in GTPv2 SA5 CH approved
S5-080502 LS_out reply to CT3 (C3-080183 / S5-080400) on Diameter Routing Considerations SA5 CH approved
S5-080503 R8 CR 32.260 Add number portability and carrier select routing information Ericsson approved
S5-080504 R8 CR 32.298 Add number portability and carrier select routing information Ericsson approved
S5-080505 R8 CR 32.299 Add number portability and carrier select routing information Ericsson approved
S5-080506 REVISED S5#57 agreed S5-080186r1: R7 CR 32.297 Correction of errors and inconsistencies Alcatel-Lucent approved (S5-080506r1)
S5-080507 AoC architecture, functional entities and interfaces Ericsson revised
S5-080508 LS_out to SA2 on Support of Radius/Diameter Accounting application (use of Gi on S-GW) SA5 CH approved
S5-080509 LS_out reply to CT4 (C4-071927 / S5-080034) on Removal of GTP´ in EPS SA5 CH approved
S5-080510 TS 32.275-002 MultiMedia Telephony (MMTel) charging MCC / Alcatel-Lucent to be updated as latest draft
S5-080511 REVISED S5#57 agreed S5-080180r1: R8 32.260 CR#0055 Add IBCF into stage 2 flows and data descriptions for IMS Charging - Align with 23.002, 23.228 Alcatel-Lucent approved
S5-080512 REVISED S5#57 agreed S5-080181r1: R8 32.298 CR#0081 Add CDR fields for IBCF Alcatel-Lucent approved
S5-080513 AoC architecture, functional entities and interfaces Ericsson agreed (for inclusion in draft TS)
S5-080514 Discussion paper on AoC Amdocs noted
S5-080520 New WID SON Automatic Neighbour Relation (ANR) Management Ericsson revised
S5-080521 New WT-level WID on SON self-optimization handling Huawei, T-Mobile, Vodafone, Telefonica revised
S5-080522 Breakout session-1 report on Harmonized ANR definitions Ericsson (Per) noted (more discussion needed)
S5-080523 New WID on Study of Self-healing ZTE approved
S5-080524 Breakout session report on Requirements for Self- NSN (Olaf) agreed (to include in draft TR)
S5-080525 Breakout session report on Requirements for Pool Management to 32816 Ericsson (Edwin) agreed (for inclusion in draft TR)
S5-080526 Breakout session report on : use case solution Architecture Ericsson (YangLI) agreed (for inclusion in draft TR)
S5-080527 LS_in from RAN1 to RAN3 (copy SA5) on High Interference Indicator R1-081148 noted (no reply needed)
S5-080528 Entity Object Model of EPC NRM IRP (IS) Huawei, Nortel for email agreement (to include in draft TS)
S5-080529 Link Object Model of EPC NRM IRP (IS) Huawei, Nortel for email agreement (to include in draft TS)
S5-080530 R7 CR 32.409 Correction of registration measurements in CSCF Nokia Siemens Networks approved
S5-080531 R8 32.405-810 Add measurements related to HSUPA release China Mobile approved
S5-080532 Breakout session-2 report on Harmonized ANR definitions Ericsson (Per) NOT agreed by OAM SWG (try getting consensus by email)
S5-080533 R8 CR 32.622 Add end point modelling method for reference point Motorola, Nortel, CMCC approved
S5-080534 Proposal for KPI category China Mobile agreed (for inclusion in draft TS)
S5-080535 R8 CR 32.409 Correction of registration measurements in CSCF Nokia Siemens Networks approved
S5-080536 New WID Key Performance Indicators (KPIs) for E-UTRAN Ericsson approved
S5-080537 LS_out reply to RAN2 (S5-080036/R2-075464) cc: RAN3 on RACH optimisation use case OAM SWG (Christian) approved (reviewed post-meeting by SA5 Chair)
S5-080538 LS_out reply to RAN3 (S5-080031/R3-072401) cc: RAN2, RAN4 on Automatic Neighbour Relation function OAM SWG (Christian) approved
S5-080539 LS_out to RAN3 on SON OAM Architecture Definition Procedure OAM SWG (Olaf) approved
S5-080540 LS_out reply to RAN2/3 on RAN performance monitoring OAM SWG (Gyula) approved
S5-080541 New BB-level WID on Management of Self-Organizing Networks (SON) T-Mobile, Vodafone, Telefonica, Telecom Italia, etc. approved
S5-080542 New WT-level WID on Self-Establishment of eNBs Nokia Siemens Networks, etc. approved
S5-080543 New WT-level WID on SON Automatic Neighbour Relation (ANR) Management Ericsson, etc. approved
S5-080544 New WT-level WID on SON Self-Optimization & Self-Healing handling T-Mobile, Vodafone, Telefonica, Huawei. etc. approved
S5-080545 New WID on E-UTRAN Performance measurements Motorola, HUAWEI, Vodafone, Nortel, ZTE, T-Mobile, Nokia Siemens Networks, CMCC, Telecom Italia, Orange, Ericsson approved
S5-080546 R8 Deliverables due for the NEXT SA plenary MCC produced after the meeting
S5-080547 TR 30.818 Project scheduling and open issues for SA5 Release 8 MCC produced after the meeting
S5-080548 LS_out RAN3 on (see S5-080453) OAM (Amer, Christian) email approved

page generated from database: 2008-07-02 14:59:20