Click on the Tdoc to open its file.
| TDoc | Title | Source | Remarks |
| S5-080301 | Agenda | WG Chairman | approved |
| S5-080302 | Report of the last SA5 meeting | MCC | revised |
| S5-080303 | SA5 status report at the last SA meeting | MCC | withdrawn before the meeting |
| S5-080304 | Liaison Statement Status BEFORE this meeting | WG Vice Chair | not to be produced in future |
| S5-080305 | Liaison Statement Status AFTER this meeting | WG Vice Chair | not to be produced in future |
| S5-080306 | SA5 Structure and Meeting Facility Requirements | WG Vice Chair | not available, withdrawn |
| S5-080307 | Draft TS/TR Management Process | WG Vice Chair | produced after the meeting |
| S5-080308 | SA5 Meeting Calendar | WG Chairman | agreed |
| S5-080309 | R8 Deliverables due for the NEXT SA plenary | MCC | revised (updated online) |
| S5-080310 | TR 30.818 Project scheduling and open issues for SA5 Release 8 | MCC | revised |
| S5-080311 | OAM Time Plan | OAM Chair | approved with modifications |
| S5-080312 | OAM Detailed Report from LAST Meeting | OAM Chair | approved (include Ericsson's comments in S5-080312r1) |
| S5-080313 | OAM Action Item Register (from previous meetings, LSs, Conference Calls) | OAM Chair | revised |
| S5-080314 | OAM Executive Report from THIS Meeting | OAM Chair | noted |
| S5-080315 | OAM Detailed Report from THIS Meeting | OAM Chair | to be produced 1 week after the meeting |
| S5-080316 | CH Agenda and Time Plan | CH Chair | approved |
| S5-080317 | CH Detailed Report from LAST Meeting | CH Chair | approved |
| S5-080318 | CH List of documents | CH Chair | noted |
| S5-080319 | CH Executive Report from THIS Meeting | CH Chair | noted |
| S5-080320 | CH Detailed Report from THIS Meeting | CH Chair | to be produced 1 week after the meeting |
| S5-080321 | TS 32.280-011 Advice of Charge (AoC) service | MCC | noted |
| S5-080322 | RESUBMISSION S5-080025 LS_in from 3GPP2 to SA5 on A Number Of 3GPP SA5 R7 Items | 3GPP2 | noted (ongoing actions to be followed up in the newly created Action Register) |
| S5-080323 | Updated ALL 25 CRs form SA5#57 for CH (9) and OAM (16) | MCC | to be confirmed during the SWG Executive Report to S5#58 closing plenary |
| S5-080324 | RESUBMISSION S5-080223 LS_in Reply from TMF mTOP to TISPAN (copy SA5) on joint activities in Service Management and Subscription Management (related to S5-080251 LS_out SA5 reply to TISPAN S5-080027/ 15bTD431r2) | TMF mTOP | noted (no reply needed) |
| S5-080325 | R8 CR 32.251 Clarification of Offline Charging Architecture for EPC Charging | Nokia Siemens Networks | revised |
| S5-080326 | New BB-level WID on Management of Self-Organising Networks (SON) - based on T-Mobile S5-080202 | MCC | revised before the meeting |
| S5-080327 | New WT-level WID on Self-Configuration of eNodeBs - based on NSN S5-080070 | MCC | revised before the meeting |
| S5-080328 | New WT-level WID on SON Neighbour Cell List (NCL) handling architecture - based on Ericsson S5-080172 | MCC | revised before the meeting |
| S5-080329 | New WT-level WID on SON self-optimization handling - based on Huawei S5-080243 | MCC | noted |
| S5-080330 | TR 32.822-014 Study on System Maintenance over Itf-N | ZTE | revised before the meeting |
| S5-080331 | RESUBMISSION S5-080071 Self-Configuration: SW download | Nokia Siemens Networks | not agreed (more offline discussion needed) |
| S5-080332 | Self-Optimization generic procedure/use case and its re-use | Nokia Siemens Networks | not agreed (more discussion needed/brainstorming-like for breakout session) |
| S5-080333 | TS 32.122-113 Advanced Alarm Management Information Service latest draft | Nokia Siemens Networks | revised before the meeting |
| S5-080334 | TS 32.123-003 Advanced Alarm Management Information CORBA Solution Set latest draft | Nokia Siemens Networks | revised before the meeting |
| S5-080335 | LS_in Reply from SA3 to SA5 on Home NodeB OAM Domain Security | S3a071054 | noted (no reply needed) |
| S5-080336 | LS_in from SA2 to SA5 on the need of charging characteristics | S2-080954 | replied in S5-080501 |
| S5-080337 | TS 32.121-200 Advanced Alarm Management IRP Requirements - for SA Approval (update of S5-080236) | MCC / NSN | approved |
| S5-080338 | TS 32.122-120 Advanced Alarm Management IRP Information Service - for SA Approval (update of S5-080333) | MCC / NSN | revised before the meeting |
| S5-080339 | TS 32.123-010 Advanced Alarm Management IRP CORBA SS - for SA Information (update of S5-080334) | MCC / NSN | approved |
| S5-080340 | TS 32.153-031 IRP technology specific templates, rules and guidelines (update of S5-080233) | MCC / Ericsson | revised before the meeting |
| S5-080341 | TR 32.822-015 Study on System Maintenance over Itf-N (update of S5-080330) | MCC / ZTE | noted |
| S5-080342 | TS 32.751-003 EPC NRM IRP Requirements | MCC / Nortel | noted (as Latest Draft to base new contributions) |
| S5-080343 | TS 32.761-003 E-UTRAN NRM IRP Requirements | MCC / Ericsson | noted (as Latest Draft to base new contributions) |
| S5-080344 | TS 32.752-003 EPC NRM IRP IS | MCC / Huawei | noted (as Latest Draft to base new contributions) |
| S5-080345 | TS 32.762-003 E-UTRAN NRM IRP IS | MCC / Ericsson | noted (as Latest Draft to base new contributions) |
| S5-080346 | TR 32.819-002 Element management layer - Operation System Function (E-OSF) definition | MCC / China Mobile | approved |
| S5-080347 | R8 CR 32.441-710 Add trace functions for EPC and E-UTRAN into the Trace IRP (update of S5-080171) | MCC / Ericsson | revised |
| S5-080348 | TS 32.xyz-004 KPIs for UMTS and GSM | MCC / China Mobile | noted |
| S5-080349 | REVISED S5#57 agreed S5-080186r1: R8 R7 CR 32.297 Correction of errors and inconsistencies - Align with 32.240 | MCC / Alcatel-Lucent | revised before the meeting |
| S5-080350 | TS 32.275-002 MultiMedia Telephony (MMTel) charging | MCC / Alcatel-Lucent | revised |
| S5-080351 | Updated WID on Advice of Charge (AoC) support in IMS Charging UID 380042 | MCC | approved (for updating TR 30.818 WID-collection & 3GPP Work Plan) |
| S5-080352 | Updated WID on Multimedia Telephony Service and Supplementary Services (MMTel) Charging UID 380041 | MCC | approved (for updating TR 30.818 WID-collection & 3GPP Work Plan) |
| S5-080353 | TR 32.821-024 Study of Self-Organising Networks (SON) related OAM for Home NodeB | MCC / Huawei | noted |
| S5-080354 | Add additional correction for IBCF into stage 2 flows and data descriptions for IMS Charging - This CR aligns TS 32.260 with TS 23.002 and 23.228. | Alcatel-Lucent | withdrawn before the meeting |
| S5-080355 | REVISED S5#57 agreed S5-080180r1: R8 32.260 CR#0055 Add IBCF into stage 2 flows and data descriptions for IMS Charging - Align with 23.002, 23.228 | Alcatel-Lucent | revised |
| S5-080356 | REVISED S5#57 agreed S5-080181r1: R8 32.298 CR#0081 Add CDR fields for IBCF | Alcatel-Lucent | revised |
| S5-080358 | On location of AAF and security | Ericsson | noted (more offline discussion needed) |
| S5-080359 | R8 CR 32.622 Add end point modelling method for reference point | Motorola, Nortel, CMCC | revised |
| S5-080360 | R8 CR 32.152 Add sample for end point modelling for reference point | Motorola, Nortel, CMCC | withdrawn |
| S5-080361 | RESUBMISSION S5#57 S5-080244 New WID on E-UTRAN Performance measurements | Motorola, HUAWEI, Vodafone, Nortel, ZTE, T-Mobile, Nokia Siemens Networks, CMCC, Telecom Italia, Orange, Ericsson | revised |
| S5-080362 | RESUBMISSION S5#57 S5-080246 New WID on E-UTRAN Performance measurements | Motorola, HUAWEI, Vodafone, Nortel, ZTE, T-Mobile, Nokia Siemens Networks, CMCC, Telecom Italia, Orange, Ericsson | withdrawn |
| S5-080363 | RESUBMISSION S5#57 S5-080097 Specification level requirement on E-UTRAN KPI | Motorola | noted (Align with CMCC contribution & Ericsson comments) |
| S5-080364 | RESUBMISSION S5#57 S5-080102 White paper on specification level E-UTRAN KPI | Motorola | noted |
| S5-080365 | RESUBMISSION S5#57 S5-080105 Business level requirement on Performance Management of E-UTRAN and EPC | Motorola | revised |
| S5-080366 | RESUBMISSION S5#57 S5-080106 Specification level requirement on Performance Management of E-UTRAN and EPC | Motorola | agreed (to include the first 3 requirements in TR) |
| S5-080367 | R8 CR 32.421 Add trace activation failure response | Motorola | revised |
| S5-080368 | R8 CR 32.260 Add number portability and carrier select routing information | Ericsson | revised |
| S5-080369 | R8 CR 32.298 Add number portability and carrier select routing information | Ericsson | revised |
| S5-080370 | R8 CR 32.299 Add number portability and carrier select routing information | Ericsson | revised |
| S5-080371 | TS 32.122-121 Advanced Alarm Management IRP Information Service - for SA Approval (update of S5-080338) | Nokia Siemens Networks | approved |
| S5-080372 | New WT-level WID on Self-Configuration of eNodeBs (update of S5-080327) | Nokia Siemens Networks | revised |
| S5-080373 | Accompanying document to New WT-level WID on Self-Configuration of eNodeBs (S5-080372) | Nokia Siemens Networks | noted |
| S5-080374 | Proposal For Skeleton 32.selfConf Concept and Requirements | Nokia Siemens Networks | noted |
| S5-080375 | Proposal For Skeleton 32.selfConf Stage 2 Descriptions (non Itf-N) | Nokia Siemens Networks | noted |
| S5-080376 | LS_in from CT3 to CT4 (copy: SA5) on the Study in TR 29.909 Diameter-based protocols usage and recommendations in 3GPP | C3-080242 | noted (no reply needed) |
| S5-080377 | Addition of use case Self-healing for TR 32.816 | ZTE | not agreed (more discussion needed) |
| S5-080378 | New WID on Study of Self-healing | ZTE | revised |
| S5-080379 | New description of merge rule for TS 32.122 | ZTE, Huawei | not agreed (inclusion/reason: duplication of functionalities) |
| S5-080380 | R7 CR 32.642-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 25.433 | ZTE | approved |
| S5-080381 | R7 CR 32.643-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 32.642 | ZTE | approved |
| S5-080382 | R7 CR 32.645-730 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 32.642 | ZTE | approved |
| S5-080383 | R8 CR 32.642-800 Add missing multi-frequency attributes for 1.28Mcps TDD - Align with 25.433 | ZTE | approved |
| S5-080384 | Requirements for EPC NRM IRP | Nortel, Huawei | agreed (for inclusion in draft TS) |
| S5-080385 | Entity Object Model of EPC NRM IRP (IS) | Huawei, Nortel | revised |
| S5-080386 | Link Object Model of EPC NRM IRP (IS) | Huawei, Nortel | revised |
| S5-080387 | MME Pool Object Model | Huawei, Nortel | noted (update in line with comments made) |
| S5-080388 | Home NodeB Specification level requirement | Huawei | not agreed |
| S5-080389 | Mapping of 3GPP use cases to NGMN use cases for LTE SON | Huawei | not agreed (need for offline discussion/depends on S5-080393 agreement) |
| S5-080390 | Measurements for Mobility robustness optimization | Huawei | not agreed (more offline discussion needed) |
| S5-080391 | Solution for use case Mobility robustness optimization | Huawei | not agreed (need to clarify the scope, update in line with comments made) |
| S5-080392 | SON architecture for self optimization | Huawei | revised |
| S5-080393 | SON Use Case Alignment | Huawei | not agreed (need for offline discussion/wait for RAN3 TR) |
| S5-080394 | TR 32.816-132 Study on Management of E-UTRAN and EPC | MCC / Ericsson | agreed as new Latest Draft |
| S5-080395 | Draft v100 report 3GPP/3GPP2 Common IMS Workshop, Puerto Vallarta, MEXICO, 24–25 Jan 2008 | MCC | noted (no action assigned to SA5) |
| S5-080396 | CIMS-080020 Common IMS Management - Endorsed by the 3GPP/3GPP2 workshop | MCC / Alcatel-Lucent | noted (start study of 3GPP/3GPP2 OAM alignment) |
| S5-080397 | Specification Level Requirements for EPC NRM IRP | Nortel, Huawei | noted (need more study on requirements and adequate wording shall/should) |
| S5-080398 | Discussion on Gy in EPC | Ericsson | noted |
| S5-080399 | Rel-8 CR 32.251 Offline charging architecture | Ericsson | withdrawn |
| S5-080400 | LS_in from CT3 to SA5 on Diameter Routing Considerations | C3-080183 | replied in S5-080502 |
| S5-080401 | New WID on 3GPP2 Input to Common IMS (3GPP SA-wide WID) | 3GPP2 | revised for feeding to SA Mar 2008 plenary |
| S5-080402 | List of action items_from_S5-57_status_2008-02-04 | MCC | revised (updated online) |
| S5-080403 | AoC architecture, functional entities and interfaces | Ericsson | revised |
| S5-080404 | Revised TS/TR Management Process | MCC | reviewed and updated to S5-080307 |
| S5-080405 | REVISED S5#57 agreed S5-080186r1: R7 CR 32.297 Correction of errors and inconsistencies | Alcatel-Lucent | revised before the meeting |
| S5-080406 | New WID Key Performance Indicators (KPIs) for E-UTRAN | Ericsson | revised |
| S5-080407 | Standardization scope for LTE KPIs (accompanying document to Proposal on new WID Key Performance Indicators (KPIs) for E-UTRAN) | Ericsson | noted |
| S5-080409 | Requirements for Automatic Neighbour Relations | Ericsson | not agreed (more discussion needed/align with RAN3) |
| S5-080410 | Inter-RAT/Frequency Automatic Neighbour Relations | Ericsson | not agreed (more discussion needed / no major objection) |
| S5-080411 | NR White List, NR Black List and Automatic NR List | Ericsson | revised before the meeting |
| S5-080412 | EP IOC modelling for ENBFunction | Ericsson | agreed (the modelling) |
| S5-080413 | Add EPC Pool Management Requirements 32.816 | Ericsson | not agreed |
| S5-080414 | R8 CR 32.101 Remove statement about the Release 7 preferred technologies | Ericsson | not agreed (more offline discussion needed) |
| S5-080415 | CMCC draft TR 32.819 E-OSF | China Mobile | withdrawn before the meeting |
| S5-080416 | CMCC Use case for CircuitEndPointSubgroup IOC | China Mobile | not agreed |
| S5-080417 | R7 CR 32.632-800 Add CircuitEndPointSubgroup IOC– Align with 32.407 | China Mobile | revised before the meeting |
| S5-080418 | R7 CR 32.633-730 Add CircuitEndPointSubgroup CORBA SS– Align with 32.407 | China Mobile | revised before the meeting |
| S5-080419 | R7 CR 32.635-730 Add CircuitEndPointSubgroup XML file definition– Align with 32.407 | China Mobile | revised before the meeting |
| S5-080420 | R8 32.405-810 Add measurements related to HSUPA release | China Mobile | revised |
| S5-080421 | Skeleton of draft specification KPI R8 32.xyz | China Mobile | revised before the meeting |
| S5-080422 | KPI overview part of draft specification KPI | China Mobile | agreed (for inclusion in draft TS) |
| S5-080423 | Proposal for KPI category | China Mobile | revised |
| S5-080424 | Input UTRAN KPIs defined in 32.814 | China Mobile | noted (update in line with comments) |
| S5-080425 | Update of 32.153-031 For information to SA | Ericsson | revised before the meeting |
| S5-080426 | Minutes of Joint SA5-SG4 meeting 2008-01-21 | Ericsson | noted |
| S5-080427 | Proposal for SA5-SG4 methodology alignment process | Ericsson | noted |
| S5-080428 | Upgrade of 32.154 to Rel-8 | Ericsson | approved (for automatic upgrade to Rel-8) |
| S5-080429 | New WID SON Neighbour Cell List Management | Ericsson | revised |
| S5-080430 | Editor's proposal 32.816 | Ericsson | agreed for inclusion in version 1.3.2 |
| S5-080431 | R8 CR 32.441 Introduction of EPC and E-UTRAN in Trace IRP (update of S5-080171) | Ericsson | noted (update in line with comments made) |
| S5-080432 | On the location of the AAF and the OAM CO_EF | Nokia Siemens Networks | noted (more discussion needed) |
| S5-080433 | Time synchronization requirement for TR 32.822 | ZTE | not agreed |
| S5-080434 | Time synchronization solution for TR 32.822 | ZTE | noted (more discussion needed) |
| S5-080435 | Neighbour Relation Lists properties and definitions | Ericsson | not agreed (more discussion needed) |
| S5-080436 | Resources monitoring requirement for TR 32.822 | ZTE | revised |
| S5-080437 | Resources monitoring solution for TR 32.822 | ZTE | noted (updates needed) |
| S5-080438 | New WID Alignment with eTOM and NGNM | TeliaSonera | revised |
| S5-080439 | New BB-level WID on Management of Self-Organising Networks (SON) | T-Mobile, Vodafone, Telefonica, Telecom Italia | revised |
| S5-080440 | R8 CR 32.102-810 Update with NGNM architectural concepts - Align with M.3060/Y.2401 | TeliaSonera | postponed (old version 710 i/o 810) |
| S5-080441 | New WID SON self-optimisation & self-healing | T-Mobile, Vodafone, Telefonica | revised |
| S5-080442 | New WID Self-Configuration of eNodeBs | T-Mobile, Vodafone, Telefonica, Telecom Italia | noted |
| S5-080443 | New WID SON Neighbour Cell List (NCL) handling | T-Mobile, Vodafone, Telefonica | noted |
| S5-080444 | Complete early session setup online charging flow | Huawei | withdrawn |
| S5-080446 | Add online charging correlation scenarios | Huawei | withdrawn |
| S5-080447 | Adding Signalling Based Trace Activation procedures in E-UTRAN | Nokia Siemens Networks | revised |
| S5-080448 | E-UTRAN measurements | Nokia Siemens Networks | noted |
| S5-080449 | R7 CR 32.409 Correction of registration measurements in CSCF | Nokia Siemens Networks | revised before the meeting |
| S5-080450 | Update of SON architecture for self optimization | Huawei, China Mobile, Telecom Italia | not agreed (more offline discussion needed / breakout) |
| S5-080451 | REVISED S5-080411 NR White List, NR Black List and Automatic NR List | Ericsson | not agreed (more offline discussion needed) |
| S5-080452 | R8 CR 32.409-800 correction of BGCF related measurement - Align with 23.228 | China Mobile | revised before the meeting |
| S5-080453 | OAM Aspects of the RLF-based neighbour list optimization | Qualcomm Europe | noted (more discussion needed) |
| S5-080454 | R8 CR 32.409-800 Add registration related measurement per access technology | China Mobile | revised before the meeting |
| S5-080455 | DRAFT TS 32.154-800 Backward and Forward Compatibility (BFC): Concept and definitions | MCC | withdrawn |
| S5-080456 | R8 CR 32.299 Corrections on Diameter AVP for SMS Charging | Nokia Siemens Networks | approved |
| S5-080457 | New WID on EPC Performance Measurements | China Mobile | revised |
| S5-080458 | R8 CR 32.274 Correction on Service Information for SMS Charging | Nokia Siemens Networks | approved |
| S5-080459 | REVISED S5-080449 R7 CR 32.409 Correction of registration measurements in CSCF | MCC / Nokia Siemens Networks | revised |
| S5-080460 | REVISED S5-080452 R8 CR 32.409-800 correction of BGCF related measurement - Align with 23.228 | MCC / China Mobile | approved |
| S5-080461 | REVISED S5-080454 R8 CR 32.409-800 Add registration related measurement per access technology | MCC / China Mobile, Motorola | approved |
| S5-080462 | REVISED S5-080417 R8 CR 32.632-800 Add CircuitEndPointSubgroup IOC – Align with 32.407 | MCC / China Mobile | not agreed |
| S5-080463 | REVISED S5-080418 R8 CR 32.633-730 Add CircuitEndPointSubgroup CORBA SS – Align with 32.407 | MCC / China Mobile | not agreed |
| S5-080464 | REVISED S5-080419 R8 CR 32.635-730 Add CircuitEndPointSubgroup XML file definition – Align with 32.407 | MCC / China Mobile | not agreed |
| S5-080465 | E-UTRAN Modelling - RESUBMISSION S5A071021 / S5-071856 | Ericsson | noted (update in line with comments made) |
| S5-080466 | TS 32.153-031 for SA Information (replaces S5-080425) | Ericsson | approved |
| S5-080467 | Minutes of conf. call on Methodology with ITU-T etc 12 Feb. | Ericsson | noted |
| S5-080468 | Proposal for methodology alignment process v3 (update of S5-080427) | Ericsson | agreed (the process proposed) |
| S5-080469 | Methodology alignment living list v2 | Ericsson | noted |
| S5-080470 | REVISED S5#57 agreed S5-080186r1: R7 CR 32.297 Correction of errors and inconsistencies | Alcatel-Lucent | revised |
| S5-080471 | Responses to Questions for SA5 OAM SWG on SON by Vodafone and T-Mobile as comments to conference call minutes, 14 Feb 2008 | Ericsson | noted |
| S5-080472 | ZTE Responses to Questions for SA5 OAM SWG on SON as comments to conference call minutes, 14 Feb 2008 | ZTE | noted |
| S5-080473 | Minutes of the SA5 OAM SWG Conference Call on SON Work Items, 14 Feb 2008 | Vodafone | noted |
| S5-080474 | LS_in from RAN3 to SA5 on RAN performance monitoring | R3-080530 | replied in S5-080482 |
| S5-080475 | LS_in from RAN3 to SA5 on Self Configuring and Self Optimizing Network Use Cases and Solutions TR | R3-080536 | noted (no reply needed) |
| S5-080476 | Clarification of terminology specific to Automatic Neighbour Relation (ANR) | Huawei | noted |
| S5-080477 | LS_in from RAN2 to SA5 on RAN performance monitoring | R2-081364 | replied in S5-080482 |
| S5-080478 | New WT-level WID on Self-Establishment of eNBs (update of S5-080372) | Nokia Siemens Networks | revised |
| S5-080479 | Changes in S5-080478 New WT-level WID on Self-Establishment of eNBs | Nokia Siemens Networks | noted |
| S5-080480 | OAM Action Item Register (from previous meetings, LSs, Conference Calls) | OAM Chair | noted |
| S5-080481 | New BB-level WID on Management of Self-Organising Networks (SON) | T-Mobile, Vodafone, Telefonica, Telecom Italia | revised |
| S5-080482 | LS_out reply to RAN3 on RAN performance monitoring | OAM SWG (Gyula) | revised |
| S5-080483 | Minutes of Meeting on Joint XML Guidelines | Ericsson | noted |
| S5-080484 | S5-eP0021 Email approval = Action S5-57/21 6.7 S5-080240, S5-080249 Alternative 1/2 - LS_out reply to RAN2 (S5-080036) on RACH optimisation use case SWG OAM Chair to update LS for email approval OAM Chair LS NOT agreed | OAM Chair | revised |
| S5-080485 | S5-eP0024 Email approval = Action S5-57/11 6.7 S5-080239 LS_out reply to RAN3 (S5-080031) on Automatic Neighbour Relation function Ericsson to update LS for email approval Ericsson LS NOT agreed | Ericsson | revised |
| S5-080486 | S5-eP0025 Email approval = Action S5-57/22 6.7 S5-080242 LS_out to RAN3 NSN to update LS for email approval NSN LS NOT agreed | NSN | revised |
| S5-080487 | List of action items_from_S5-57_status_2008-02-04 | MCC | noted |
| S5-080488 | New WID on 3GPP2 Input to Common IMS (3GPP SA-wide WID) | ALU/SA5 | for SA Mar 2008 plenary attention (via ALU) |
| S5-080489 | Report of the last SA5 meeting | MCC | approved |
| S5-080490 | Business level requirement on Performance Management of E-UTRAN and EPC | Motorola | agreed (for inclusion in draft TR) |
| S5-080491 | LS_out RAN3 on (see S5-080453) | OAM (Amer) | revised |
| S5-080492 | R8 CR 32.421 Add trace activation failure response | Motorola | approved |
| S5-080493 | CR Add Signalling Based Trace Activation procedures in E-UTRAN | Nokia Siemens Networks | approved |
| S5-080494 | Resources monitoring requirement for TR 32.822 | ZTE | agreed (for inclusion in draft TR) |
| S5-080495 | New WID on EPC Performance measurements | China Mobile, Nortel, ZTE, Huawei | approved |
| S5-080496 | New WID Key Performance Indicators (KPIs) for E-UTRAN | Ericsson | revised |
| S5-080497 | New BB-level WID Management of Self-Organising Networks (SON) | T-Mobile, Vodafone, Telefonica, Telecom Italia | revised |
| S5-080498 | New WID Alignment with eTOM and NGNM | TeliaSonera, Nortel, T-Mobile, Telefonica | approved |
| S5-080499 | New WT-level WID on Self-Establishment of eNBs | Nokia Siemens Networks | revised |
| S5-080500 | R8 CR 32.251 Clarification of Offline Charging Architecture for EPC Charging | Nokia Siemens Networks | withdrawn |
| S5-080501 | LS_out reply to SA2 (S2-080954 / S5-080336) on the need of charging characteristics / Support of Information Elements for Charging in GTPv2 | SA5 CH | approved |
| S5-080502 | LS_out reply to CT3 (C3-080183 / S5-080400) on Diameter Routing Considerations | SA5 CH | approved |
| S5-080503 | R8 CR 32.260 Add number portability and carrier select routing information | Ericsson | approved |
| S5-080504 | R8 CR 32.298 Add number portability and carrier select routing information | Ericsson | approved |
| S5-080505 | R8 CR 32.299 Add number portability and carrier select routing information | Ericsson | approved |
| S5-080506 | REVISED S5#57 agreed S5-080186r1: R7 CR 32.297 Correction of errors and inconsistencies | Alcatel-Lucent | approved (S5-080506r1) |
| S5-080507 | AoC architecture, functional entities and interfaces | Ericsson | revised |
| S5-080508 | LS_out to SA2 on Support of Radius/Diameter Accounting application (use of Gi on S-GW) | SA5 CH | approved |
| S5-080509 | LS_out reply to CT4 (C4-071927 / S5-080034) on Removal of GTP´ in EPS | SA5 CH | approved |
| S5-080510 | TS 32.275-002 MultiMedia Telephony (MMTel) charging | MCC / Alcatel-Lucent | to be updated as latest draft |
| S5-080511 | REVISED S5#57 agreed S5-080180r1: R8 32.260 CR#0055 Add IBCF into stage 2 flows and data descriptions for IMS Charging - Align with 23.002, 23.228 | Alcatel-Lucent | approved |
| S5-080512 | REVISED S5#57 agreed S5-080181r1: R8 32.298 CR#0081 Add CDR fields for IBCF | Alcatel-Lucent | approved |
| S5-080513 | AoC architecture, functional entities and interfaces | Ericsson | agreed (for inclusion in draft TS) |
| S5-080514 | Discussion paper on AoC | Amdocs | noted |
| S5-080520 | New WID SON Automatic Neighbour Relation (ANR) Management | Ericsson | revised |
| S5-080521 | New WT-level WID on SON self-optimization handling | Huawei, T-Mobile, Vodafone, Telefonica | revised |
| S5-080522 | Breakout session-1 report on Harmonized ANR definitions | Ericsson (Per) | noted (more discussion needed) |
| S5-080523 | New WID on Study of Self-healing | ZTE | approved |
| S5-080524 | Breakout session report on Requirements for Self- | NSN (Olaf) | agreed (to include in draft TR) |
| S5-080525 | Breakout session report on Requirements for Pool Management to 32816 | Ericsson (Edwin) | agreed (for inclusion in draft TR) |
| S5-080526 | Breakout session report on : use case solution Architecture | Ericsson (YangLI) | agreed (for inclusion in draft TR) |
| S5-080527 | LS_in from RAN1 to RAN3 (copy SA5) on High Interference Indicator | R1-081148 | noted (no reply needed) |
| S5-080528 | Entity Object Model of EPC NRM IRP (IS) | Huawei, Nortel | for email agreement (to include in draft TS) |
| S5-080529 | Link Object Model of EPC NRM IRP (IS) | Huawei, Nortel | for email agreement (to include in draft TS) |
| S5-080530 | R7 CR 32.409 Correction of registration measurements in CSCF | Nokia Siemens Networks | approved |
| S5-080531 | R8 32.405-810 Add measurements related to HSUPA release | China Mobile | approved |
| S5-080532 | Breakout session-2 report on Harmonized ANR definitions | Ericsson (Per) | NOT agreed by OAM SWG (try getting consensus by email) |
| S5-080533 | R8 CR 32.622 Add end point modelling method for reference point | Motorola, Nortel, CMCC | approved |
| S5-080534 | Proposal for KPI category | China Mobile | agreed (for inclusion in draft TS) |
| S5-080535 | R8 CR 32.409 Correction of registration measurements in CSCF | Nokia Siemens Networks | approved |
| S5-080536 | New WID Key Performance Indicators (KPIs) for E-UTRAN | Ericsson | approved |
| S5-080537 | LS_out reply to RAN2 (S5-080036/R2-075464) cc: RAN3 on RACH optimisation use case | OAM SWG (Christian) | approved (reviewed post-meeting by SA5 Chair) |
| S5-080538 | LS_out reply to RAN3 (S5-080031/R3-072401) cc: RAN2, RAN4 on Automatic Neighbour Relation function | OAM SWG (Christian) | approved |
| S5-080539 | LS_out to RAN3 on SON OAM Architecture Definition Procedure | OAM SWG (Olaf) | approved |
| S5-080540 | LS_out reply to RAN2/3 on RAN performance monitoring | OAM SWG (Gyula) | approved |
| S5-080541 | New BB-level WID on Management of Self-Organizing Networks (SON) | T-Mobile, Vodafone, Telefonica, Telecom Italia, etc. | approved |
| S5-080542 | New WT-level WID on Self-Establishment of eNBs | Nokia Siemens Networks, etc. | approved |
| S5-080543 | New WT-level WID on SON Automatic Neighbour Relation (ANR) Management | Ericsson, etc. | approved |
| S5-080544 | New WT-level WID on SON Self-Optimization & Self-Healing handling | T-Mobile, Vodafone, Telefonica, Huawei. etc. | approved |
| S5-080545 | New WID on E-UTRAN Performance measurements | Motorola, HUAWEI, Vodafone, Nortel, ZTE, T-Mobile, Nokia Siemens Networks, CMCC, Telecom Italia, Orange, Ericsson | approved |
| S5-080546 | R8 Deliverables due for the NEXT SA plenary | MCC | produced after the meeting |
| S5-080547 | TR 30.818 Project scheduling and open issues for SA5 Release 8 | MCC | produced after the meeting |
| S5-080548 | LS_out RAN3 on (see S5-080453) | OAM (Amer, Christian) | email approved |
page generated from database: 2008-07-02 14:59:20