Click on the Tdoc to open its file.
| TDoc | Title | Source | Remarks |
| R1-081710 | Draft Agenda for RAN1#53 meeting | RAN1 Chairman | Approved |
| R1-081711 | Final report of RAN1#52bis meeting | MCC Support | Approved |
| R1-081712 | Efficient Downlink Control Signaling for MU-MIMO | InterDigital Communications, LLC | Not treated |
| R1-081713 | PDCCH MIMO Format Options for E-UTRA | InterDigital Communications, LLC | Not treated |
| R1-081714 | IMT Advanced RAN1 Requirements - An India Perspective | CEWiT | Noted |
| R1-081715 | LS on Release 8 non-essential SAE features | TSG SA, Ericsson | Noted |
| R1-081716 | LS on Decision of MBMS and LCS in SAE Rel8 Scope Discussions | TSG SA, NTT DoCoMo | Noted |
| R1-081717 | LS on Transmission of physical layer parameters | RAN2, Ericsson | Noted |
| R1-081718 | LS on PDCCH for DL data arrival and random access response format | RAN2, Qualcomm | Noted |
| R1-081719 | LS on Earthquake and Tsunami Warning System | SA2, NTT DoCoMo | Noted |
| R1-081720 | LS Request for Evaluation Framework Link Level Data | SA4, Qualcomm | Noted |
| R1-081721 | Requirement for LTE-Advanced | Samsung | Noted |
| R1-081722 | Future 3GPP Radio Technologies for LTE-Advanced | Samsung | Noted |
| R1-081723 | Draft CR on Downlink RS | Samsung | Revised |
| R1-081724 | Draft CR on Uplink RS | Samsung | Revised |
| R1-081725 | Sequence generation for DL cell-specific reference signals | Samsung | Revised |
| R1-081726 | DL PHICH Remapping with UL RB Size | Samsung | Not treated |
| R1-081727 | Results for the linkage between PUSCH MCS and ACK/NACK resource amount on PUSCH | Samsung | Noted |
| R1-081728 | ACK/NAK DTX Detection in the PUSCH | Samsung | Not treated |
| R1-081729 | ACK/NAK Repetitions in E-UTRA UL | Samsung | Not treated |
| R1-081730 | Increasing PUCCH Multiplexing Capacity | Samsung | Not treated |
| R1-081731 | Simplex coding for ACK/NACK bits in PUSCH | Samsung, TI, LGE, Panasonic | Revised |
| R1-081732 | Multiplexing of Rank and CQI/PMI in PUSCH channel | Samsung, TI, LGE, Panasonic | Revised |
| R1-081733 | Summary of Reflector Discussions on EUTRA DL RS | Samsung | Noted |
| R1-081734 | Summary of Reflector Discussions on EUTRA UL RS | Samsung | Noted |
| R1-081735 | PDSCH-to-RE mapping robust against CCFI reception errors | Samsung | Noted |
| R1-081736 | SRS transmission in UpPTS | Samsung | Not treated |
| R1-081737 | SRS indication for TDD | Samsung | Not treated |
| R1-081738 | Views on SRS subframe indication in DBCH | Samsung | Not treated |
| R1-081739 | DVRB to PRB mapping in DwPTS | Samsung | Noted |
| R1-081740 | On DM RS position | Samsung | Noted |
| R1-081741 | RE puncturing pattern for RS boosting | Samsung | Not treated |
| R1-081742 | Draft CR on Sounding RS | Samsung | Revised |
| R1-081743 | Summary of email discussion on CQI reporting | Samsung | Noted |
| R1-081744 | SU-MIMO PMI feedback and Compression | Samsung | Not treated |
| R1-081745 | CQI Reporting for MU-MIMO | Samsung | Not treated |
| R1-081746 | Relation of Rank report and PUCCH CQI/PMI reports | Samsung | Noted |
| R1-081747 | Inter-cell inteference measurement using unused DL PRBs | Samsung | Noted |
| R1-081748 | CCE to uplink ACK/NACK mapping in TDD | Samsung | Not treated |
| R1-081749 | Timing for Enhanced Uplink in Cell_FACH | Samsung | Noted |
| R1-081750 | Reliable transmission of serving cell change acknowledgment | Samsung | Noted |
| R1-081751 | Control channel structure for dual-cell HSDPA | Samsung | Noted |
| R1-081752 | Proposals on PHY related aspects in LTE Advanced | NEC Group | Noted |
| R1-081753 | UL Frequency Hopping Pattern Generation with System Frame Number | NEC Group | Withdrawn |
| R1-081754 | 36211 CR0014 (Rel-8, F) Further Correction of the predefined hopping pattern for PUSCH | NEC Group | Withdrawn |
| R1-081755 | Resource Allocation for the UL Hopping Users | NEC, Motorola, LGE, Samsung, Ericsson | Not treated |
| R1-081756 | 36.213 CR0015 (Rel-8, F) Correction of UE PUSCH frequency hopping procedure | NEC, Samsung, Motorola, LGE, Ericsson | Revised |
| R1-081757 | Bandwidth part sizes for UE selected CQI reports on the PUCCH | NEC Group | Not treated |
| R1-081758 | Further clarification on precoding confirmation | NEC Group | Noted |
| R1-081759 | Evaluation of Mode 1-2 PUSCH based Reporting | NEC Group | Withdrawn |
| R1-081760 | Further clarification on P_A | NEC Group | Noted |
| R1-081761 | Technologies for LTE - Advanced | SHARP | Noted |
| R1-081762 | On overload indicator triggering and reporting format | SHARP | Not treated |
| R1-081763 | Considerations on Set S | SHARP | Not treated |
| R1-081764 | PDCCH format 1/2 resource allocation type modification to reduce overhead | ASUSTeK | Not treated |
| R1-081765 | Discussions on the report format of overload indicator | ZTE | Not treated |
| R1-081766 | Time & Frequency Location Mapping for TDD PRACH | ZTE | Noted |
| R1-081767 | Two-threshold RSRP trigger mechanism | ZTE | Not treated |
| R1-081768 | ACKNAK transmission in PUSCH considering DTX in TDD | ZTE | Not treated |
| R1-081769 | ACKNAK bundling transmission in PUCCH considering DTX in TDD | ZTE | Not treated |
| R1-081770 | Control signalling for supporting of DL MU-MIMO | ZTE | Not treated |
| R1-081771 | On the Remaining Issues of PUCCH slot-based CS/OC remapping | ZTE | Not treated |
| R1-081772 | Modification of Cyclic Shift Hopping for CQI | ZTE | Missing |
| R1-081773 | Technical points for LTE-Advanced | ZTE | Noted |
| R1-081774 | 25.223 CR0053 (Rel-7, F) Correction of uplink multicode capability for 1.28Mcps TDD EUL | CATT | Agreed |
| R1-081775 | Technique proposals for LTE-Advanced | CATT | Noted |
| R1-081776 | Multiple A/Ns transmission for TDD | CATT | Not treated |
| R1-081777 | SRS configurations for TDD | CATT, RITT | Not treated |
| R1-081778 | Considerations for PRACH and SRS in UpPTS | CATT | Noted |
| R1-081779 | DRS power boosting | CATT | Not treated |
| R1-081780 | Soft buffer size for TDD | CATT, RITT, Spreadtrum Communications | Noted |
| R1-081781 | Draft CR on Correction of the description of PUSCH power control for TDD (36.213, F) | CATT, Motorola | Revised |
| R1-081782 | Consideration on the scrambling of PDSCH for MU-MIMO | Huawei | Revised |
| R1-081783 | Consideration on SRI transmission onPUCCH | Huawei | Not treated |
| R1-081784 | Consideration on MCS offset between data and CQI on PUSCH | Huawei | Noted |
| R1-081785 | Proposal on utilizing of reserved CFI state | Huawei | Not treated |
| R1-081786 | SRS transmission subframe configuration | Huawei | Not treated |
| R1-081787 | Proposal of CG sequence hopping in group planning | Huawei | Not treated |
| R1-081788 | Uplink ACK/NAK implicit mapping in TDD | Huawei | Withdrawn |
| R1-081789 | Uplink ACK/NACK bundling configuration in TDD | Huawei | Not treated |
| R1-081790 | Considerations on ACK/NACK bundling and Multi-ACK/NACK multiplexing in TDD | Huawei | Not treated |
| R1-081791 | Technical proposals and considerations for LTE advanced | Panasonic | Noted |
| R1-081792 | PDCCH contents and formats | Panasonic | Revised |
| R1-081793 | Control signalling for downlink MU-MIMO | Panasonic | Not treated |
| R1-081794 | Necessity of the scrambling for ACK/NACK on PUCCH | Panasonic | Not treated |
| R1-081795 | Necessity of the scrambling for the reference signal of CQI in PUCCH | Panasonic | Not treated |
| R1-081796 | ACK/NACK repetition and Implicit Resource Allocation for PUCCH | Panasonic | Not treated |
| R1-081797 | Initialization of the pseudo-random sequence generator for CS hopping | Panasonic | Not treated |
| R1-081798 | Sounding RS bandwidth configuration | Panasonic | Not treated |
| R1-081799 | Configuration and relation of PUCCH CQI elements | Panasonic | Not treated |
| R1-081800 | Testing and CQI | Panasonic | Not treated |
| R1-081801 | Offset between CQI and data MCS on PUSCH | Panasonic | Noted |
| R1-081802 | Reply of RAN2 LS of RACH | Panasonic | Noted |
| R1-081803 | Timing alignment command responding time | Panasonic | Noted |
| R1-081804 | HARQ soft buffer between codewords | Panasonic | Noted |
| R1-081805 | draft CR for 36.212 on resource assignment field for distributed VRB | Panasonic | Revised |
| R1-081806 | draft CR for 36.213 on resource alloaction for distributed VRB | Panasonic | Revised |
| R1-081807 | Clarification on simultaneous transmission of aperiodic CQI and UL ACK/NACK | Panasonic | Noted |
| R1-081808 | On the requirements for LTE-advanced | LG Electronics | Noted |
| R1-081809 | On the Consideration of Technical Candidates for LTE-advanced | LG Electronics | Noted |
| R1-081810 | RB assignment with PDCCH DCI format 1C | LG Electronics | Not treated |
| R1-081811 | Remaining Control Signaling Issues for Downlink MIMO | LG Electronics | Not treated |
| R1-081812 | TP on Punctured PUCCH format | LG Electronics | Not treated |
| R1-081813 | Efficient Utilization of Unused PUCCH RB | LG Electronics | Not treated |
| R1-081814 | Correction on PUCCH Channelization Index | LG Electronics | Revised |
| R1-081815 | Bundled ACK/NACK in TDD | LG Electronics | Not treated |
| R1-081816 | CCE to bundled ACK/NACK index mapping in TDD | LG Electronics | Not treated |
| R1-081817 | Scrambling sequence generation in E-UTRA | LG Electronics | Revised |
| R1-081818 | Introduction of CR for downlink DVRB mapping to PRB | LG Electronics, Panasonic, NEC, Nortel, Motorola, Ericsson | Noted |
| R1-081819 | Draft CR for 36.211 on downlink VRB mapping to PRB for distributed transmission | LG Electronics, Panasonic, NEC, Nortel, Motorola, Ericsson | Revised |
| R1-081820 | Draft CR for clarification of modulation symbols to REs mapping for DVRB | LG Electronics, Panasonic, NEC, Nortel, Motorola, Ericsson | Revised |
| R1-081821 | Remaining Issues on UE feedback | LG Electronics | Not treated |
| R1-081822 | Performance Evaluation of CQI/PMI Feedback Schemes on PUSCH | LG Electronics | Not treated |
| R1-081823 | On the scenario and channel model for LTE-Advanced | CMCC | Noted |
| R1-081824 | Proposal for Improving Interference Estimation | Marvell | Revised |
| R1-081825 | Edge treatment for frequency selective CQI on PUSCH | Marvell | Not treated |
| R1-081826 | Edge treatment for spatial differential CQI format on PUCCH | Marvell | Not treated |
| R1-081827 | Hitachi’s proposals on Physical Layer Aspects for LTE-Advanced | Hitachi, Ltd. | Noted |
| R1-081828 | Enhancement on Technologies for LTE advanced Requirements | Nortel | Noted |
| R1-081829 | PDCCH format for OL MIMO | Nortel | Not treated |
| R1-081830 | View on PHICH Mapping with extended CP for antenna port 1 and 2 | Nortel | Not treated |
| R1-081831 | Performance evaluation of codebook size reduction for 2 Tx | Nortel | Noted |
| R1-081832 | CQI estimation methodology | Nortel | Not treated |
| R1-081833 | Definition of configured set S of CQI reporting subbands | Nortel | Revised |
| R1-081834 | On CSI prediction in LTE | Nortel | Not treated |
| R1-081835 | Differential PMI feedback | Nortel | Not treated |
| R1-081836 | Need of procedure for supporting MU-MIMO | Nortel | Not treated |
| R1-081837 | PDCCH format for support of MU-MIMO operation | Huawei | Not treated |
| R1-081838 | Physical layer technologies for LTE-Advanced | Huawei | Noted |
| R1-081839 | PDCCH format for allocation of dedicated preambles | Nokia, Nokia Siemens Networks | Noted |
| R1-081840 | UL grant for random access message 3 | Nokia, Nokia Siemens Networks | Revised |
| R1-081841 | LTE-A Requirements | Nokia, Nokia Siemens Networks | Noted |
| R1-081842 | LTE-A Proposals for evolution | Nokia Siemens Networks, Nokia | Noted |
| R1-081843 | 36211 CR0012R1 (Rel-8, F) Correction to Limitation of Constellation Size of ACK Transmission in PUSCH | Nokia Siemens Networks, Nokia, Qualcomm | Agreed |
| R1-081844 | Draft CR to 36.211 - Corrections to Secondary Synchronization Signal Mapping | Nokia Siemens Networks, Nokia | Revised |
| R1-081845 | PDCCH DL grant size of LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-081846 | Proposed way forward on DL signalling of UL CL antenna selection | Nokia Siemens Networks, Nokia | Noted |
| R1-081847 | On the PDCCH Format 1C signaling | Nokia, Nokia Siemens Networks | Not treated |
| R1-081848 | Signaling of precoding information | Nokia, Nokia Siemens Networks | Not treated |
| R1-081849 | Signaling of persistent scheduling | Nokia, Nokia Siemens Networks | Not treated |
| R1-081850 | Simulation results: PDCCH hashing function performance of consecutive vs. distributive CCE assignment | Nokia, Nokia Siemens Networks | Withdrawn |
| R1-081851 | On the PUCCH overhead associated with CCE index mapping | Nokia, Nokia Siemens Networks | Not treated |
| R1-081852 | Linkage between PUSCH MCS and amount of control resources on PUSCH | Nokia Siemens Networks, Nokia | Noted |
| R1-081853 | Simulation results: Linkage between PUSCH MCS and amount of control resources on PUSCH | Nokia Siemens Networks, Nokia | Noted |
| R1-081854 | Multiplexing between Rank and SR | Nokia Siemens Networks, Nokia | Not treated |
| R1-081855 | Avoiding PUSCH error situations caused by DL allocation grant signalling failure | Nokia Siemens Networks, Nokia | Not treated |
| R1-081856 | Coverage Comparison between PUSCH, PUCCH and RACH | Nokia Siemens Networks, Nokia | Not treated |
| R1-081857 | Proposed way forward on ACK/NACK repetition on PUCCH | Nokia Siemens Networks, CATT, CMCC, Motorola, Nokia | Not treated |
| R1-081858 | ACKNACK Bundling Details for LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-081859 | Usage of 4th pattern of UL TTI index in LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-081860 | Further Issues with DL RS Initialization | Nokia Siemens Networks, Nokia | Not treated |
| R1-081861 | Clarification to transmission of PMCH subframes in frame structure type 2 | Nokia, Nokia Siemens Networks | Noted |
| R1-081862 | SRS Configurations for LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-081863 | Handling of dynamically varying SRS BW | Nokia Siemens Networks, Nokia | Not treated |
| R1-081864 | Frequency hopping arrangement for SRS | Nokia Siemens Networks, Nokia | Noted |
| R1-081865 | 36.212 CR0004 (Rel-8, F) on ACK insertion into PUSCH | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-081866 | Overload Indicator (OI) Configuration and Reporting Criteria | Nokia Siemens Networks, Nokia | Not treated |
| R1-081867 | Further Discussion on Relative Narrowband TX Power Indicator for DL ICIC | Nokia Siemens Networks, Nokia | Not treated |
| R1-081868 | Number of spatially multiplexed users for LTE DL MU-MIMO | Nokia, Nokia Siemens Networks | Not treated |
| R1-081869 | Channel Quality Indicator for LTE MU-MIMO | Nokia, Nokia Siemens Networks | Not treated |
| R1-081870 | Effect of Precoding Granularity on LTE Multiuser MIMO | Nokia, Nokia Siemens Networks | Not treated |
| R1-081871 | Draft CR to 36.214 - Introduction of eNode B Measurement of Received Interference Power | Nokia Siemens Networks, Nokia | Revised |
| R1-081872 | Further open issues for Soft Buffer Allocation | Nokia, Nokia Siemens Networks | Noted |
| R1-081873 | Semi-Static Interference Coordination Method | Alcatel-Lucent | Noted |
| R1-081874 | Support for Semi-Static Inter cell Interference Coordination | Alcatel-Lucent, Nortel Networks | Not treated |
| R1-081875 | eNodeB Indicator definition for “Maximum Tx Power per PRB normalized” | Alcatel-Lucent | Revised |
| R1-081876 | X2-signalling of eNodeB Max Tx Power per PRB report | Alcatel-Lucent | Not treated |
| R1-081877 | LTE - IMT advanced - Candidate Technologies | Alcatel-Lucent | Revised |
| R1-081878 | 25.212 CR0262r1 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Agreed |
| R1-081879 | 25.214 CR0483r2 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Revised |
| R1-081880 | EUL coverage enhancements | Ericsson | Noted |
| R1-081881 | Timing for EUL in CELL_FACH | Ericsson | Noted |
| R1-081882 | AICH/E-AICH error targets | Ericsson | Noted |
| R1-081883 | HS-PDSCH Serving Cell change enhancements | Ericsson | Noted |
| R1-081884 | Framework for DC-HSDPA operation | Ericsson | Noted |
| R1-081885 | System simulation results for DC-HSDPA operation | Ericsson | Revised |
| R1-081886 | 25.211 Draft CR (Rel-6, F) Correction to E-DCH control channel timing | Qualcomm Europe | Revised |
| R1-081887 | Dynamic uplink load balancing using E-AICH | Qualcomm Europe | Noted |
| R1-081888 | 25.211 CR0254 (Rel-8, B) Introduction of E-AICH for the purpose of E-DCH Resource Configuration Allocation | Qualcomm Europe | Revised |
| R1-081889 | Minimum Error Performance Targets for AICH/E-AICH based E-DCH Resource Allocation Scheme | Qualcomm Europe | Noted |
| R1-081890 | Text proposal for TR on simulation results | Qualcomm Europe | Revised |
| R1-081891 | UE Implementation Impact due to DC-HSDPA | Qualcomm Europe | Noted |
| R1-081892 | Updates to HS-DPCCH Cubic Metric Analysis for DC-HSDPA | Qualcomm Europe | Noted |
| R1-081893 | Responses to the questions on Multi-layer Optimization | KDDI | Noted |
| R1-081894 | 25.214 CR0484 & CR0485 (Rel-7, F; Rel-8, A), Correction to E-DPCCH gain factor calculation | Nokia, Nokia Siemens Networks | Agreed |
| R1-081895 | 25.215 CR0188 (Rel-8, B), E-UTRA measurements for UTRA – E-UTRA interworking | Nokia, Nokia Siemens Networks | Agreed |
| R1-081896 | 25211CRdraft, Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Ericsson, Motorola, NEC, Nokia, NXP, Philips Qualcomm, Samsung | Revised |
| R1-081897 | 25214CRdraft, Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Nokia, Ericsson, InterDigital, Samsung | Revised |
| R1-081898 | AICH/E-AICH perf requirements | Nokia, Nokia Siemens Networks | Noted |
| R1-081899 | On E-DCH random access interference | Nokia, Nokia Siemens Networks | Withdrawn |
| R1-081900 | On E-DCH random access synchronisation and L1-L3 interaction | Nokia, Nokia Siemens Networks | Noted |
| R1-081901 | Performance of HS-PDSCH serving cell change procedure proposal | Nokia, Nokia Siemens Networks | Noted |
| R1-081902 | Compromise proposal for HS-PDSCH serving cell change enhancement | Nokia, Nokia Siemens Networks | Noted |
| R1-081903 | Initial simulation results for dual cell HSDPA operation | Nokia, Nokia Siemens Networks | Noted |
| R1-081904 | HS-DPCCH impact to coverage | Nokia, Nokia Siemens Networks | Noted |
| R1-081905 | Issues with 1/2 subcarrier shift in LTE uplink | NextWave Wireless | Noted |
| R1-081906 | 25.221 CR0156 (Rel-7,cat-F) ""Applicability of sync case 2"" | NextWave Wireless | Agreed |
| R1-081907 | 25.221 CR0157 (Rel-8,cat-A) ""Applicability of sync case 2"" | NextWave Wireless | Agreed |
| R1-081908 | 36.211_CR0013 (Rel-8,cat-F) ""Uplink baseband signal definition"" | NextWave Wireless | Noted |
| R1-081909 | Physical layer parameters to specify for transmit antenna selection: Summary of remaining UL SRS related issues and way forward | Mitsubishi Electric | Noted |
| R1-081910 | Use case of OI/HII indicators for uplink ICIC | Mitsubishi Electric | Not treated |
| R1-081911 | Power Offsets to Support PUSCH Data and Control Multiplexing | Alcatel-Lucent | Not treated |
| R1-081912 | LTE Advanced Requirements | Alcatel-Lucent | Noted |
| R1-081913 | Requirements for LTE Advanced | Motorola | Noted |
| R1-081914 | LTE Advanced Technical Proposal Identification and Grouping | Motorola | Noted |
| R1-081915 | RV for UL Subframe Bundling | Motorola | Noted |
| R1-081916 | Adjustments to UE Downlink Soft Buffer Sizes based on LTE transport block sizes | Motorola | Revised |
| R1-081917 | Definitions for DCI Format 1C | Motorola | Revised |
| R1-081918 | Remaining details of MCS/TBS signalling | Motorola, LGE | Revised |
| R1-081919 | ACK/NACK Bundling for TDD | Motorola, LGE, Qualcomm, Texas Instrument, Huawei | Revised |
| R1-081920 | Multiple ACK/NACK Transmission for TDD | Motorola | Revised |
| R1-081921 | Need for ACK/NACK Repetition | Motorola | Not treated |
| R1-081922 | Resource Provisioning for UL control in PUSCH | Motorola | Noted |
| R1-081923 | Remaining details on ACK/NACK transmission for TDD | Motorola | Not treated |
| R1-081924 | UL DM RS Remaining Issues | Motorola | Revised |
| R1-081925 | UL Sounding RS Remaining Issues | Motorola | Not treated |
| R1-081926 | Set S for CQI Feedback | Motorola | Not treated |
| R1-081927 | Required PUCCH and PUSCH CQI/PMI/RI Reporting Modes | Motorola | Not treated |
| R1-081928 | Way Forward on Indication of UE Antenna Selection for PUSCH | Motorola, Mitsubishi Electric, Nortel | Noted |
| R1-081929 | Impact of Uplink Bundling on TDD | Motorola | Not treated |
| R1-081930 | Calculation of ?TF(TF(i)) for UL-PC | Motorola | Noted |
| R1-081931 | 36.211 CR0015 (Rel-8, F) on PHICH mapping for one and two antenna ports in extended CP | Samsung | Revised |
| R1-081932 | Remaning Issue of Soft Buffer Configuration for Dual Codeword MIMO | Freescale | Noted |
| R1-081933 | Remaning Issue for Rank Feedback Configuration | Freescale | Noted |
| R1-081934 | UE Behavior for the case of Unreliable E-AICH Reception | InterDigital | Noted |
| R1-081935 | 36211 CR007R3 (Rel-8, F) Correction of the predefined hopping pattern for PUSCH | Samsung | Agreed |
| R1-081936 | Introduction of 25.321CR(Rel-7) on 1.28Mcps TDD EUL TBS table change | RITT, TD Tech, CATT, ZTE, Spreadtrum | Endorsed |
| R1-081937 | Draft TR25.824 v0.1.1 | TD Tech | Revised |
| R1-081938 | Text proposal to TR 25.824 on MIMO conclusions | TD Tech | Revised |
| R1-081939 | Draft 1.28Mcps TDD CPC skeleton TR 25.929 v0.0.1 | TD Tech | Agreed |
| R1-081940 | Some considerations on bundling and multiplexing ACK transmission in TDD | TD Tech | Not treated |
| R1-081941 | 2ms/10ms TTI Selection for EUL.doc | Huawei | Noted |
| R1-081942 | Disscussion on dual cell deployment secnarions | Huawei | Noted |
| R1-081943 | A proposal and simulation result of HS-DPCCH Design for DC-HSPA | Huawei | Noted |
| R1-081944 | Preamble sequence selection | LG Electronics | Noted |
| R1-081945 | 36.213 CR0016 (Rel-8, F) on Random accesss preamble selection | LG Electronics | Withdrawn |
| R1-081946 | Skeleton of TR36.913""Requirements for LTE-Advanced"" | LTE-Advanced rapporteur (NTT DoCoMo) | Revised |
| R1-081947 | Views on Requirements for LTE-Advanced | NTT DoCoMo | Noted |
| R1-081948 | Proposals for LTE-Advanced Technologies | NTT DoCoMo | Noted |
| R1-081949 | Views on PDCCH Format 1C | NTT DoCoMo | Not treated |
| R1-081950 | Necessity of ACK/NAK Repetition in PUCCH | NTT DoCoMo, Fujitsu, Mitsubishi Electric, NEC, Panasonic, Sharp, Toshiba Corporation | Noted |
| R1-081951 | Views on SRS Bandwidth Details | NTT DoCoMo | Not treated |
| R1-081952 | Views on Frequency Hopping Method for SRS | NTT DoCoMo | Not treated |
| R1-081953 | Views on CQI Reporting Options in E-UTRA | NTT DoCoMo | Not treated |
| R1-081954 | Draft LS response to Request for Evaluation Framework Link Level Data | Qualcomm Europe | Noted - Revised |
| R1-081955 | LTE Link Level Throughput Data for SA4 Evaluation Framework | Qualcomm Europe | Noted |
| R1-081956 | Evaluation methodology for LTE-A proposals | Qualcomm Europe | Noted |
| R1-081957 | Categorization of technical proposals for the PHY layer of LTE-A | Qualcomm Europe | Noted |
| R1-081958 | PDCCH format in support of DL MIMO and BF operation | Qualcomm Europe | Not treated |
| R1-081959 | Specification details for PHICH transmission for extended CP | Qualcomm Europe | Noted |
| R1-081960 | Control in support of DL MU-MIMO operation | Qualcomm Europe | Not treated |
| R1-081961 | Mapping of PHICH resources from PUSCH and DM-RS transmission | Qualcomm Europe | Not treated |
| R1-081962 | Support of DTX signalling for CQI transmission with normal CP | Qualcomm Europe | Not treated |
| R1-081963 | Improved staggering pattern for PUCCH format 1 | Qualcomm Europe | Not treated |
| R1-081964 | Confirmation of various UL transmission configurations | Qualcomm Europe | Revised |
| R1-081965 | Support of ACK repetition in the UL of E-UTRA | Qualcomm Europe | Not treated |
| R1-081966 | Further details on UL ACK/NAK resource allocation | Qualcomm Europe | Not treated |
| R1-081967 | Interleaver for PUCCH | Qualcomm Europe | Not treated |
| R1-081968 | Antenna configuration for mixed unicast/MBSFN subframes | Qualcomm Europe | Noted |
| R1-081969 | RS power boosting and interference estimation | Qualcomm Europe | Not treated |
| R1-081970 | Frequency shift for UE specific and MBSFN RS | Qualcomm Europe | Noted |
| R1-081971 | 36.212 CR0006 (Rel-8, F) Miscellaneous fixes to 36.212 | Qualcomm Europe | Noted - Revised |
| R1-081972 | Synchronization procedure at the UE | Qualcomm Europe | Noted |
| R1-081973 | Details on specifications aspects for UL ICIC | Qualcomm Europe | Noted |
| R1-081974 | Finalizing DL ICIC for Rel.8 | Qualcomm Europe | Noted |
| R1-081975 | Definition of measurement gaps in 36.213 | Qualcomm Europe | Not treated |
| R1-081976 | Finalizing hopping patterns for UL | Qualcomm Europe | Withdrawn |
| R1-081977 | Details on UL grant portion of RACH MSG2 | Qualcomm Europe | Noted |
| R1-081978 | Details on PDCCH for DL data arrival | Qualcomm Europe | Noted |
| R1-081979 | Enhancements for LTE-Advanced | Texas Instruments | Noted |
| R1-081980 | Remaining Issues on PDCCH Content and Formats | Texas Instruments | Not treated |
| R1-081981 | ACK/NAK Repetition in EUTRA Uplink | Texas Instruments | Not treated |
| R1-081982 | Simultaneous Transmission of the Current and the Repeated ACKNAK | Texas Instruments | Not treated |
| R1-081983 | On Remaining Issues of PUCCH Slot Based CS/OC Remapping | Texas Instruments, Samsung, Panasonic | Not treated |
| R1-081984 | SRI Resource Configuration on PUCCH | Texas Instruments | Not treated |
| R1-081985 | ACK/NAK DTX Detection with ACK/NAK Bundling in TDD | Texas Instruments | Not treated |
| R1-081986 | ACK/NAK DTX Detection for Concurrent Transmission of ACK/NAK and SRI | Texas Instruments | Not treated |
| R1-081987 | Concurrent Transmission of ACK/NAK and CQI in TDD | Texas Instruments | Not treated |
| R1-081988 | Support of Multiple ACK/NAK Transmission in TDD | Texas Instruments | Not treated |
| R1-081989 | Coding of Control Information on PUSCH | Texas Instruments | Not treated |
| R1-081990 | CQI Coding on PUCCH and PUSCH | Texas Instruments | Not treated |
| R1-081991 | Cell Specific SRS Subframe Configuration | Texas Instruments | Not treated |
| R1-081992 | UE Specific SRS Configuration | Texas Instruments | Not treated |
| R1-081993 | Modification on PRBS Initialization for DL RS | Texas Instruments | Revised |
| R1-081994 | Specification on CQI Measurement | Texas Instruments | Revised |
| R1-081995 | CQI Reporting on PUSCH | Texas Instruments | Not treated |
| R1-081996 | Configuration on CQI/PMI/RI Reporting | Texas Instruments | Noted |
| R1-081997 | Performance of CQI Reporting Modes | Texas Instruments | Not treated |
| R1-081998 | Review of LTE advanced requirements | Vodafone Group | Noted |
| R1-081999 | Performance of Frequency-Selective PMI Compression for E-UTRA: Results for Rank-1 Precoding | Icera Semiconductor | Not treated |
| R1-082000 | Performance of Frequency-Selective PMI Compression for E-UTRA: Results for Rank-2 Precoding | Icera Semiconductor | Not treated |
| R1-082001 | On Multiple ACK/NAK for LTE TDD | Ericsson | Not treated |
| R1-082002 | Details of ACK/NAK bundling for LTE TDD | Ericsson | Not treated |
| R1-082003 | 36.211 CR0016 (Rel-8, F) Correction of PUCCH in absence of mixed formats | Ericsson | Revised |
| R1-082004 | MCS and TBS Tables for PUSCH | Ericsson | Not treated |
| R1-082005 | SRS remaining details | Ericsson | Not treated |
| R1-082006 | Draft CR on LTE TDD PRACH time/frequency mapping | Ericsson | Revised |
| R1-082007 | On timing advance offsets for LTE TDD and FDD HD | Ericsson | Noted |
| R1-082008 | Start of RA preamble format 4 | Ericsson | Noted |
| R1-082009 | 36.212 CR0005 (Rel-8, F) Introduction of format 1C | Ericsson | Noted - Revised |
| R1-082010 | Multiplexing of information within CQI, PMI and RI report | Ericsson | Revised |
| R1-082011 | Multiplexing of information fields in DCI formats to PDCCH payload bits | Ericsson | Agreed |
| R1-082012 | 36.213 CR0017 (Rel-8, F) Blind PDCCH decoding | Ericsson | Revised |
| R1-082013 | On radio link problem detection | Ericsson | Withdrawn |
| R1-082014 | Further results on CQI measurement methodology | Ericsson | Noted |
| R1-082015 | Frequency Selective CQI Reporting on PUCCH | Ericsson | Not treated |
| R1-082016 | 36.213 CR0018 (Rel-8, F) Clarification on transmission modes | Ericsson | Revised |
| R1-082017 | Association between DL control channel and UL ACK/NAK resource for LTE TDD | Ericsson | Not treated |
| R1-082018 | On soft buffer usage for LTE TDD | Ericsson | Noted |
| R1-082019 | Summary of e-mail discussions on DL control signaling | Ericsson | Noted |
| R1-082020 | Summary of e-mail discussions on UL control signaling | Ericsson | Noted |
| R1-082021 | Draft LS on power headroom reporting | Ericsson | Noted - Revised |
| R1-082022 | Response on RAN2 LS on transmission of Physical Layer parameters | Ericsson | Revised |
| R1-082023 | LTE-Advanced performance targets | Ericsson | Noted |
| R1-082024 | Discussion on some technology components proposed for LTE-Advanced | Ericsson | Noted |
| R1-082025 | 36.211 CR0017 (Rel-8, F) Specification of CCE size and PHICH resource indication | Ericsson | Agreed |
| R1-082026 | 36.211 CR0018 (Rel-8) Correction of the description of frame structure type 2 | CATT, Ericsson, Nokia, Nokia Siemens Networks | Revised |
| R1-082027 | Refinements on signaling of CQI/precoding information on PDCCH | Ericsson | Revised |
| R1-082028 | Remaining details on control signaling for the MU-MIMO transmission mode | Ericsson | Not treated |
| R1-082029 | LS on RAN2 assumptions on L1 | RAN2, Ericsson | Noted |
| R1-082030 | Way to reduce search space on PDCCH blind decoding | Spreadtrum Communications | Not treated |
| R1-082031 | SRS frequency hopping on UpPTS in LTE-TDD | Spreadtrum Communications | Withdrawn |
| R1-082032 | On the technologies of IMT-advanced | Spreadtrum Communications | Not treated |
| R1-082033 | On the requirements of IMT-advanced | Spreadtrum Communications | Not treated |
| R1-082034 | Candidate Technologies for LTE-Advanced | T-Mobile International | Noted |
| R1-082035 | 36.211 CR0019 (Rel-8, F) On Delta^pucch_shift correction | Ericsson | Agreed |
| R1-082036 | Comments on LTE-Advanced Requirements | Philips, NXP | Noted |
| R1-082037 | Key Physical Layer Technologies to address the LTE-Advanced Requirements | Philips, NXP | Noted |
| R1-082038 | Search space design for PDCCH blind decoding | Philips, NXP | Missing |
| R1-082039 | PDCCH message information content for persistent scheduling | Philips, NXP | Not treated |
| R1-082040 | Distributed Resource Allocation Signalling on PDCCH | Philips, NXP | Missing |
| R1-082041 | Index for PDCCH signalling of UL resource allocation in conjunction with DRX | Philips, NXP | Not treated |
| R1-082042 | 36.211 CR0020 (Rel-8, F) Correction of DL/UL Allocation for TDD | Philips, NXP | Noted |
| R1-082043 | Remaining issues on UE-specific RS | Philips, NXP | Revised |
| R1-082044 | Codebook for MU-MIMO | Philips, NXP | Not treated |
| R1-082045 | CQI definition for MU-MIMO | Philips, NXP | Not treated |
| R1-082046 | RACH procedure for E-DCH in Cell_FACH | Philips, NXP | Noted |
| R1-082047 | On LTE Advanced | Fujitsu | Withdrawn |
| R1-082048 | DC-HSDPA framework assumptions | Qualcomm Europe | Noted |
| R1-082049 | 25.214 CR0486 (Rel-7, F) Clarification of burst transmission during DTX transitions | Qualcomm Europe | Withdrawn |
| R1-082050 | 25.214 CR0487 (Rel-8, A) Clarification of burst transmission during DTX transitions | Qualcomm Europe | Withdrawn |
| R1-082051 | 25.214 CR0488 (Rel-7, F) Correction to attachment method for HS-DSCH in the URA_PCH or CELL_PCH state | Qualcomm Europe | Noted |
| R1-082052 | 25.214 CR0489 (Rel-8, A) Correction to attachment method for HS-DSCH in the URA_PCH or CELL_PCH state | Qualcomm Europe | Noted |
| R1-082053 | Power Scaling and EUL Coverage | Qualcomm Europe | Noted |
| R1-082054 | Physical-layer parameters to be configured by RRC | Ericsson | Revised |
| R1-082055 | Physical-layer parameters to be configured by RRC, explanations | Ericsson | Noted |
| R1-082056 | On 2-Tx Codebook Subset Selection | Nortel | Revised |
| R1-082057 | UL DM RS Remaining Issues | Motorola | Not treated |
| R1-082058 | PDCCH UL Grant Size of LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-082059 | Definitions for DCI Format 1C | Motorola | Not treated |
| R1-082060 | 36.211 CR0015R1 (Rel-8, F) on PHICH mapping for one and two antenna ports in extended CP | Samsung, NEC | Agreed |
| R1-082061 | Summary of e-mail discussion on soft buffer usage on TDD | NTT DoCoMo | Noted |
| R1-082062 |