Click on the Tdoc to open its file.
| TDoc | Title | Source | Remarks |
| R1-081165 | Draft Agenda for RAN1#52bis meeting | RAN1 Chairman | Approved |
| R1-081166 | Draft report of RAN1#52 meeting | MCC Support | Revised |
| R1-081167 | Reply LS on CSG related mobility (stage 2 text) | GERAN, Nokia Siemens Networks | Noted |
| R1-081168 | Reply LS on code rate limitations for HS-DSCH UE cat 13 and 15 | RAN2, Ericsson | Noted |
| R1-081169 | Response LS to RAN5 on HSPA RB and SRB configurations in 34.108 | RAN2, Ericsson | Noted |
| R1-081170 | LS on new MCCH radio bearer configuration in 34.108 | RAN2, Ericsson | Noted |
| R1-081171 | Reply LS on radio problem detection as part of radio link failure handling | RAN2, Ericsson | Noted |
| R1-081172 | LS on the change rate of physical layer parameters | RAN2, Ericsson | Noted |
| R1-081173 | LS on various aspects related to GERAN to E-UTRAN interworking | RAN2, Motorola | Noted |
| R1-081174 | LS on PRB usage measurements in reply to R1-080617 | RAN2, NTT DoCoMo | Noted |
| R1-081175 | Reply LS on Signalling of additional spectrum emission requirements | RAN3, Motorola | Noted |
| R1-081176 | LS on RAN performance monitoring | RAN3, NTT DoCoMo | Noted |
| R1-081177 | LS on Self Configuring and Self Optimizing Network Use Cases and Solutions TR | RAN3, T-Mobile | Noted |
| R1-081178 | LS on UTRAN enhancements for the support of inter-cell interference cancellation | RAN3, Qualcomm | Noted |
| R1-081179 | LS on implications of MIMO precoding schemes on RAN4 requirements | RAN4, Nokia | Noted |
| R1-081180 | LS on Scale of Reported Measurement Quantities | RAN4, Ericsson | Noted |
| R1-081181 | Response to LS on switch time requirements for LTE TDD | RAN4, Ericsson | Noted |
| R1-081182 | LS on signalling Intra/Inter-frequency measurement bandwidth | RAN4, NTT DoCoMo | Noted |
| R1-081183 | LS reply on RAN Performance monitoring | SA5, Nokia Siemens Networks | Noted |
| R1-081184 | Mapping detail for the distributed allocation | Mitsubishi Electric | Not treated |
| R1-081185 | Performance of PMI Compression Schemes for E-UTRA: Results for Rank-1 Precoding | Icera Semiconductor | Not treated |
| R1-081186 | Performance of PMI Compression Schemes for E-UTRA: Results for Rank-2 Precoding | Icera Semiconductor | Not treated |
| R1-081187 | Dedicated RS Design for Extended CP | Nortel | Noted |
| R1-081188 | Impact of Common Reference Signal Density in BF zone | Nortel | Noted |
| R1-081189 | UL RS issue for supporting UL SDMA | Nortel | Withdrawn |
| R1-081190 | MCS Table Design for eNB | Nortel | Not treated |
| R1-081191 | Power Balancing for 4 Tx Antennas | Nortel | Not treated |
| R1-081192 | Further discussion on DL/UL signaling channel supporting rank adaptation for high mobility UE | Nortel | Not treated |
| R1-081193 | Differential PMI feedback | Nortel | Not treated |
| R1-081194 | Need of procedure for supporting MU-MIMO | Nortel | Not treated |
| R1-081195 | PDCCH transport block signaling | Panasonic | Noted - Revised |
| R1-081196 | PDCCH transport block signalling | Panasonic | Not treated |
| R1-081197 | Gap and index interleaver design for DVRB mapping | Panasonic | Not treated |
| R1-081198 | Necessity of the scrambling for ACK/NACK on PUCCH | Panasonic | Not treated |
| R1-081199 | Necessity of the scrambling for the reference signal of CQI in PUCCH | Panasonic | Not treated |
| R1-081200 | ACK/NACK repetition and Implicit Resource Allocation for PUCCH - Resubmission of R1-080981 | Panasonic | Not treated |
| R1-081201 | Sounding RS parameters | Panasonic | Not treated |
| R1-081202 | Effect of set S on CQI reports | Panasonic | Not treated |
| R1-081203 | RI reporting scheme on periodic wideband PUCCH | Panasonic | Not treated |
| R1-081204 | Control signalling for downlink MU-MIMO | Panasonic | Re-submission of R1-080990 |
| R1-081205 | Miscellaneous items on RACH | Panasonic | Noted |
| R1-081206 | BCCH on DL-SCH | Panasonic | Noted |
| R1-081207 | UE soft buffer | Panasonic | Agreed |
| R1-081208 | Summary of Reflector Discussions on EUTRA DL RS | Samsung | Noted |
| R1-081209 | Summary of Reflector Discussions on EUTRA UL RS | Samsung | Noted |
| R1-081210 | SRS transmission in UpPTS | Samsung | Not treated |
| R1-081211 | SRS indication for TDD | Samsung | Not treated |
| R1-081212 | UE-specific search spaces | Samsung | Noted |
| R1-081213 | MCS/TBS indication for DL-SCH and UL-SCH | Samsung | Not treated |
| R1-081214 | TBS table design for DL-SCH and UL-SCH | Samsung | Not treated |
| R1-081215 | DL PHICH Remapping with UL RB Size | Samsung | Not treated |
| R1-081216 | DCI Payload Formats and Contents | Samsung | Not treated |
| R1-081217 | Compact UL-SCH Assignment in E-UTRA | Samsung | Not treated |
| R1-081218 | Results for the linkage between PUSCH MCS and ACK/NACK resource amount on PUSCH | Samsung | Noted |
| R1-081219 | CCE to uplink ACK/NACK mapping in TDD | Samsung | Noted |
| R1-081220 | Multiplexing of Rank and CQI/PMI in PUSCH channel | Samsung | Revised |
| R1-081221 | ACK/NAK DTX Detection in the PUSCH | Samsung | Not treated |
| R1-081222 | ACK/NAK Repetitions in E-UTRA UL | Samsung | Not treated |
| R1-081223 | Multiplexing Control and Data in the PUSCH | Samsung | Not treated |
| R1-081224 | Increasing PUCCH Multiplexing Capacity | Samsung | Not treated |
| R1-081225 | Remaining details on uplink PUSCH hopping | Samsung | Revised |
| R1-081226 | Correction to UE PUSCH Hopping procedure | Samsung | Revised |
| R1-081227 | DVRB to PRB mapping in DwPTS | Samsung | Not treated |
| R1-081228 | PDSCH-to-RE mapping robust against CCFI reception errors | Samsung | Not treated |
| R1-081229 | On Gold sequence initialization | Samsung | Noted |
| R1-081230 | Further discussion on data power setting for PDSCH | Samsung | Not treated |
| R1-081231 | Power Scaling and DL RS boosting | Samsung | Not treated |
| R1-081232 | RE puncturing pattern for RS boosting | Samsung | Not treated |
| R1-081233 | Transmission Power Control Using DM RS for UL VoIP | Samsung | Noted |
| R1-081234 | Summary of email discussion on CQI reporting | Samsung | Noted |
| R1-081235 | SU-MIMO PMI feedback and Compression | Samsung | Not treated |
| R1-081236 | CQI Reporting for MU-MIMO | Samsung | Not treated |
| R1-081237 | Relation of Rank report and PUCCH CQI/PMI reports | Samsung | Not treated |
| R1-081238 | Timing for Enhanced Uplink in Cell_FACH | Samsung | Missing |
| R1-081239 | UE procedure after receiving NACK indication | Samsung | Noted |
| R1-081240 | Discussion on HS-PDSCH serving cell change procedure | Samsung | Noted |
| R1-081241 | Considerations on dual-cell HSDPA operation | Samsung | Noted |
| R1-081242 | On overload indicator triggering and reporting format | SHARP | Not treated |
| R1-081243 | VoIP Capacity Improvement by CQI Optimization in PUCCH | SHARP | Not treated |
| R1-081244 | PMI Synchronization Issues | SHARP | Not treated |
| R1-081245 | Further clarification fot the periodic reporting on PUSCH | SHARP | Noted |
| R1-081246 | Text Proposal on sequence ordering table of PRACH | LG Electronics | Noted |
| R1-081247 | Draft response to LS on implications of MIMO precoding schemes on RAN4 requirements | LG Electronics, Samsung, ETRI | Noted |
| R1-081248 | PRS sequence generation for downlink reference signal | LG Electronics | Noted |
| R1-081249 | Consideration on UL sounding operation | LG Electronics | Not treated |
| R1-081250 | Considerations on the design of transport block size table | LG Electronics | Not treated |
| R1-081251 | Randomization Function for PDCCH search space | LG Electronics | Revised |
| R1-081252 | PHICH resource allocation in TDD | LG Electronics | Missing |
| R1-081253 | PMI-field compression in PDCCH contents for 4 Tx MIMO | LG Electronics | Not treated |
| R1-081254 | Downlink Control Signaling for SU-MIMO | LG Electronics | Not treated |
| R1-081255 | Multiplexing of Rank, CQI and Data in PUSCH | LG Electronics | Not treated |
| R1-081256 | Handling problem with uplink ACK/NACK bundling | LG Electronics | Noted |
| R1-081257 | Uplink ACK/NACK resource allocation in TDD | LG Electronics | Revised |
| R1-081258 | Efficient Utilization of Unused PUCCH RB | LG Electronics | Not treated |
| R1-081259 | Consideration on Punctured PUCCH Format | LG Electronics | Not treated |
| R1-081260 | Downlink DVRB interleaver design | LG Electronics | Not treated |
| R1-081261 | SCH structure for dedicated MBMS | LG Electronics | Not treated |
| R1-081262 | Further System Level Evaluation of Closed-loop MIMO | LG Electronics | Not treated |
| R1-081263 | Detail of CQI coding on PUSCH piggybacked from PUCCH | LG Electronics | Noted |
| R1-081264 | Performance of ACK/NACK subcode in joint coding on PUCCH for extended CP | LG Electronics | Noted |
| R1-081265 | Consideration on Per-antenna Power Scaling for Full Power Transmission in 4Tx Antennas | LG Electronics | Not treated |
| R1-081266 | Further Consideration on 2Tx Open-loop SM | LG Electronics | Noted |
| R1-081267 | CQI Table for 4x2 Open Loop MIMO | Infineon Technologies | Not treated |
| R1-081268 | Clarification on the number of codes in HS-SCCH less first transmission | InterDigital Communications LLC | Revised |
| R1-081269 | Potential Issues Related to E-AICH Reliability | InterDigital Communications LLC | Noted |
| R1-081270 | Inter-cell interference with E-DCH in CELL_FACH | InterDigital Communications LLC | Revised |
| R1-081271 | Variable-length Block-Code for CQI on PUSCH | Marvell | Noted |
| R1-081272 | Edge treatment for frequency-selective CQI format on PUSCH | Marvell | Not treated |
| R1-081273 | Edge treatment for spatial differential CQI format on PUCCH | Marvell | Not treated |
| R1-081274 | Physical layer parameters to specify for trasmit antenna selection: Summary of remaining UL SRS related issues and way forward | Mitsubishi Electric | Not treated |
| R1-081275 | Combined fixed and adaptive resource allocation method for inter-cell interference coordination | Mitsubishi Electric | Not treated |
| R1-081276 | RACH email reflector summary | Motorola | Noted |
| R1-081277 | Remaining details on UL DM RS hopping pattern generation | Motorola | Missing |
| R1-081278 | Cyclic Shift values for UL RS | Motorola | Not treated |
| R1-081279 | Open Issues on UL Sounding RS | Motorola | Not treated |
| R1-081280 | Multiplexing of SRS and PUSCH | Motorola | Not treated |
| R1-081281 | Way forward on Indication of UE antenna selection for PUSCH | Motorola, Mitsubishi, Nortel | Not treated |
| R1-081282 | Uplink Grant Signalling for TDD | Motorola | Not treated |
| R1-081283 | Control Signalling for Single-Cell MBMS Transmission | Motorola | Not treated |
| R1-081284 | TBS and MCS Signaling and Tables | Motorola | Noted - Revised |
| R1-081285 | PHICH/UL Grant Resource Assignment and Dimensioning for TDD | Motorola | Noted |
| R1-081286 | PHICH resource signaling for TDD and FDD | Motorola | Not treated |
| R1-081287 | Open Issues on PDCCH Formats and Contents | Motorola | Not treated |
| R1-081288 | CCE Sizing | Motorola | Missing |
| R1-081289 | PDCCH Search Space Assignment Hashing Function | Motorola | Revised - Noted |
| R1-081290 | PDCCH Coverage 1248 vs 124 vs 12 with limited PC dynamic range | Motorola | Not treated |
| R1-081291 | Repetition of UL ACK/NACK on PUCCH | Motorola | Noted |
| R1-081292 | Uplink ACK/NACK for TDD | Motorola | Noted |
| R1-081293 | PUCCH ACK/NACK Transmission and Index Mapping for TDD | Motorola | Noted |
| R1-081294 | PUCCH CQI Payload Coverage Analysis | Motorola | Not treated |
| R1-081295 | Resource Provision for UL control in PUSCH | Motorola | Noted |
| R1-081296 | Control and Data Multiplexing on PUSCH | Motorola | Not treated |
| R1-081297 | Remaining details on Nd=2 DVRB operation | Motorola | Not treated |
| R1-081298 | Downlink DVRB email reflector summary | Motorola | Noted |
| R1-081299 | Uplink SCH Hopping email reflector summary | Motorola | Noted |
| R1-081300 | Remaining details on Nd=2 DVRB operation | Motorola | Missing |
| R1-081301 | Open issues on UL slot hopping | Motorola | Not treated |
| R1-081302 | PRACH Configuration for TDD | Motorola | Withdrawn |
| R1-081303 | Remaining DL:UL Allocation for TDD | Motorola | Noted |
| R1-081304 | RV for UL Subframe Bundling | Motorola | Not treated |
| R1-081305 | 36.213 CR0003 (Rel-8, F) Correct PUCCH assignment timing in section 10.1 and document formating | Motorola | Noted - Revised |
| R1-081306 | 36.213 CR0004 (Rel-8, F) Modify DL power control nomenclature to match R1-081134 | Motorola | Withdrawn |
| R1-081307 | 36.213 CR0005 (Rel-8, B) Proposed: intra-CCE REG EPRE requirement | Motorola | Revised |
| R1-081308 | Po for PUCCH and PUSCH | Motorola | Withdrawn |
| R1-081309 | Small fixes needed for UL-PC | Motorola | Noted |
| R1-081310 | Per Antenna Power Scaling on the PDSCH | Motorola | Not treated |
| R1-081311 | PHICH and PDCCH Power Control requirement | Motorola | Revised |
| R1-081312 | Set S for CQI feedback | Motorola | Not treated |
| R1-081313 | Timing relationship between RI, WB- and FS-CQI/PMI Reports on PUCCH | Motorola | Not treated |
| R1-081314 | Interference measurement for CQI report | Motorola | Withdrawn |
| R1-081315 | Mapping of precoded WB CQI to non-precoded WB CQI | Motorola | Missing |
| R1-081316 | LBRM for TDD | Motorola | Noted |
| R1-081317 | Resource allocation type modification to reduce PDCCH overhead | ASUSTeK | Not treated |
| R1-081318 | Dual Cell HSDPA Operation Consideration | HUAWEI | Noted |
| R1-081319 | Disscussion on the inter-cell interference for EUL | HUAWEI | Missing |
| R1-081320 | Default E-DCH resource | NEC Group | Noted |
| R1-081321 | DRS Pattern for Extended CP | CATT | Noted |
| R1-081322 | Overhead Reduction for BF | CATT | Revised |
| R1-081323 | DL HARQ timing for TDD | CATT | Noted |
| R1-081324 | Multi-TTI Scheduling for LTE TDD UL | CATT | Not treated |
| R1-081325 | Multiple ACK/NACKs transmission for TDD | CATT | Noted |
| R1-081326 | Indication of PHICH resource for TDD | CATT, RITT | Noted |
| R1-081327 | Sounding reference signals in UpPTS for TDD | CATT, CMCC, RITT, Ericsson, Huawei | Not treated |
| R1-081328 | UL HARQ timing for TDD | CATT | Noted |
| R1-081329 | LBRM for TDD | CATT | Noted |
| R1-081330 | On antenna calibration of LTE | CATT | Not treated |
| R1-081331 | Control Region on the PUSCH | Freescale Semiconductor | Not treated |
| R1-081332 | SRS Bandwidth and Starting Point Signaling | Freescale Semiconductor | Not treated |
| R1-081333 | CCE Size Selection and the Hashing Function | Freescale Semiconductor | Missing |
| R1-081334 | 25.224 CR0174R1 (Rel-7, Cat F) on EUL power control clarification for 1.28Mcps TDD | TD Tech | Agreed |
| R1-081335 | 25.224 CR0180 (Rel-7, Cat F) on power offset clarification for 1.28Mcps TDD | TD Tech | Withdrawn |
| R1-081336 | 25.222 CR0147 (Rel-7, Cat F) on E-HICH coding clarification for 1.28Mcps TDD | TD Tech | Revised |
| R1-081337 | 25.224 CR0181 (Rel-7, Cat F) on E-AGCH/E-HICH joint power control for 1.28Mcps TDD | TD Tech | Revised |
| R1-081338 | Dedicated RS design w/wo overhead reduction | TD Tech | Noted |
| R1-081339 | ACK/NACK Multiplexing in PUSCH in TDD | TD Tech | Noted |
| R1-081340 | Frequency hopping for TDD RACH | TD Tech | Noted |
| R1-081341 | DRX aspect in 1.28Mcps TDD enhanced CELL_FACH scope | TD Tech | Not treated |
| R1-081342 | Simulation results for standalone midamble | TD Tech | Revised |
| R1-081343 | Standalone midamble usage for ACK/NACK feedback in enhanced CELL_FACH state for 1.28Mcps TDD | TD Tech | Noted |
| R1-081344 | Mapping between HS-DSCH RNTI and E-RNTI in Ehanced CELL_FACH for 1.28mcps | TD Tech | Revised |
| R1-081345 | Procedural analysis of Enhanced Uplink for CELL_FACH state | TD Tech | Not treated |
| R1-081346 | Resource allocation method analysis of Enhanced Uplink for CELL_FACH state | TD Tech | Not treated |
| R1-081347 | Discussion on reducing downlink signalling overhead in eFACH state | TD Tech | Noted |
| R1-081348 | Uplink reference signal design for 1.28Mcps TDD CPC scope | TD Tech | Not treated |
| R1-081349 | Some suggestions on scheduling in CPC for 1.28Mcps TDD | TD Tech | Noted |
| R1-081350 | DTX/DRX aspect for 1.28Mcps TDD CPC | TD Tech | Missing |
| R1-081351 | MIMO simulation results for 1.28Mcps TDD HSPA+ scope | TD Tech | Noted |
| R1-081352 | Text proposal to TR 25.824 for 1.28Mcps TDD Layer 2 Enhancement | TD Tech | Agreed |
| R1-081353 | Performance Targets for AICH/E-AICH based E-DCH Resource Allocation Scheme | Qualcomm Europe | Noted |
| R1-081354 | Efficient utilization of DL HS-resources in CELL_FACH | Qualcomm Europe | Noted |
| R1-081355 | Link Analysis of HS-SCCH based and E-RGCH based Serving Cell Change Command Schemes | Qualcomm Europe | Noted |
| R1-081356 | Link Analysis of Dual Scrambling Code and CQI31 based Serving Cell Change Confirmation schemes | Qualcomm Europe | Noted |
| R1-081357 | Inter-cell Interference Cancellation in CELL_DCH and CELL_FACH | Qualcomm Europe | Noted |
| R1-081358 | HS-DPCCH Design for Dual Carrier HSDPA | Qualcomm Europe | Noted |
| R1-081359 | Link Analysis of HS-DPCCH ACK/NACK for Dual Carrier HSDPA | Qualcomm Europe | Noted |
| R1-081360 | Link Analysis of HS-DPCCH CQI for Dual Carrier HSDPA | Qualcomm Europe | Noted |
| R1-081361 | System Benefits of Dual Carrier HSDPA | Qualcomm Europe | Noted |
| R1-081362 | TR skeleton | Qualcomm Europe | Revised |
| R1-081363 | Introduction of 25.321 CR on EUL TBS table change | RITT, TD Tech, CATT, ZTE, Spreadtrum | Noted |
| R1-081364 | Sounding Reference Signal In Support of Scheduling Request in E-UTRA | Texas Instruments | Not treated |
| R1-081365 | UL DM RS Cyclic Shift Values and Hopping Formula | Texas Instruments | Not treated |
| R1-081366 | Views on SRS Parameters | Texas Instruments | Not treated |
| R1-081367 | PDCCH Content and Formats | Texas Instruments | Not treated |
| R1-081368 | Blind decoding for PDCCH | Texas Instruments | Missing |
| R1-081369 | Supportable MCS for E-UTRA Downlink | Texas Instruments | Not treated |
| R1-081370 | Coding of control information on PUSCH | Texas Instruments | Not treated |
| R1-081371 | Error protection of CQI reporting | Texas Instruments | Not treated |
| R1-081372 | ACK/NAK Repetition in EUTRA Uplink | Texas Instruments | Not treated |
| R1-081373 | Explicit DTX Signaling with ACK/NAK Bundling in TDD | Texas Instruments, Huawei | Noted |
| R1-081374 | On Remaining Issues of PUCCH Slot Based CS/OC Remapping | Texas Instruments, Samsung, Panasonic | Not treated |
| R1-081375 | Dynamic ACK/NAK Channelization on PUCCH | Texas Instruments | Not treated |
| R1-081376 | SRI Resource Configuration on PUCCH | Texas Instruments | Not treated |
| R1-081377 | Performance of Scheduling Requests through SRI and PRACH | Texas Instruments | Not treated |
| R1-081378 | Interference between Sounding Reference Signal and PRACH | Texas Instruments | Not treated |
| R1-081379 | Performance of wideband precoding and small delay CDD | Texas Instruments | Noted |
| R1-081380 | Analysis on Downlink Power Setting | Texas Instruments | Revised |
| R1-081381 | Dynamic Range of Downlink Power Setting | Texas Instruments | Not treated |
| R1-081382 | Remaining Issues on CQI/PMI/RI Reporting | Texas Instruments | Revised |
| R1-081383 | CQI Reporting on PUSCH | Texas Instruments | Not treated |
| R1-081384 | TDD Uplink HARQ Timing Design | CMCC, Huawei | Revised |
| R1-081385 | CQI Table for 2x2 Open Loop MIMO | Infineon Technologies | Not treated |
| R1-081386 | Downlink Control Signaling for MU-MIMO | InterDigital Communications LLC | Not treated |
| R1-081387 | PDCCH MIMO Format Options for e-UTRA | InterDigital Communications LLC | Not treated |
| R1-081388 | Way forward on mandatory DRS operation for LTE TDD UE | CMCC, RITT, CATT, Huawei, ZTE, TD-Tech | Noted |
| R1-081389 | Remaining Issue of Soft Buffer Configuration in LBRM for Dual Codeword MIMO | Freescale Semiconductor | Not treated |
| R1-081390 | Remaining Issue for Rank feedback configuration | Freescale Semiconductor | Not treated |
| R1-081391 | 25.224 CR0182 (Rel-7, F) Use of Special Bursts for DTX on FACH in 1.28 Mcps TDD | Spreadtrum Communications | Revised |
| R1-081392 | SCH design for dedicated MBMS | Huawei | Not treated |
| R1-081393 | Control Signaling of MBMS Single-Cell Transmission | Huawei | Resubmission of R1-081026 |
| R1-081394 | Proposal of CG sequence hopping in group planning - Resubmission of R1-081025 | Huawei | Not treated |
| R1-081395 | Consideration on identification of interior users/exterior users for ICIC | Huawei | Not treated |
| R1-081396 | Downlink Multiplexing for Persistent and Dynamic scheduling | NEC Group | Not treated |
| R1-081397 | Details of the Common and UE Specific Search spaces | NEC Group | Missing |
| R1-081398 | Remaining issues for DVRB to PRB mapping | NEC Group | Not treated |
| R1-081399 | 25.222 CR0148 (Rel7, F) Clarification of TRRI on E-AGCH for 1.28Mcps TDD EUL | CATT, TD-Tech, ZTE | Revised |
| R1-081400 | 25.222 CR0149 (Rel7, F) Correction and clarification of some E-HICH coding issues for 1.28 Mcps TDD EUL | CATT, TD-Tech | Revised |
| R1-081401 | 25.224 CR0183 (Rel7, F) Correction of E-PUCH power control for 1.28Mcps TDD EUL | CATT | Agreed |
| R1-081402 | 25.224 CR0184 (Rel7, F) Clarification of the E-AGCH monitering for 1.28Mcps TDD EUL | CATT | Revised |
| R1-081403 | Solutions for CPC for 1.28Mcps TDD | CATT | Noted |
| R1-081404 | Simulation Results of 8×2 MIMO schemes for 1.28Mcps TDD system | CATT | Noted |
| R1-081405 | Sounding RS Parameters in E-UTRA Uplink | NTT DoCoMo | Not treated |
| R1-081406 | Hashing Function Generation for PDCCH Blind Decoding | NTT DoCoMo | Not treated |
| R1-081407 | Necessity of ACK/NACK Repetition | NTT DoCoMo | Not treated |
| R1-081408 | Investigation on Throughput Performance of MU-MIMO in E-UTRA Downlink | NTT DoCoMo | Not treated |
| R1-081409 | 25.223 CR0052 (Rel-8, B) Introduction the 64QAM constellation for 1.28 Mcps TDD HSDPA | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio | Agreed |
| R1-081410 | PHICH Resource Mapping in TDD | ZTE | Not treated |
| R1-081411 | PUSCH Hopping Resource Allocation Via Grant | ZTE | Noted |
| R1-081412 | DVRB To PRB Mapping | ZTE | Revised |
| R1-081413 | ACK/CQI Joint Encoding on PUCCH with Extended CP | ZTE, CHTTL | Revised |
| R1-081414 | ACK/CQI Joint Encoding on PUCCH with Normal CP | ZTE, CHTTL | Revised |
| R1-081415 | Support to Live-Change of Downlink-Uplink Allocation Ratio in LTE TDD | ZTE | Noted |
| R1-081416 | Signaling of the Precoder for DL MU-MIMO | ZTE, CHTTL | Not treated |
| R1-081417 | Dedicated RS Pattern for Extended CP | ZTE | Noted |
| R1-081418 | Implicit Mapping of AKC/NACK Resources | ZTE | Not treated |
| R1-081419 | Modification of Cyclic Shift Hopping for CQI | ZTE | Not treated |
| R1-081420 | Improvement of Random Access Preamble Timing for FDD | ZTE | N |
| R1-081421 | Configurations and Location Mapping for TDD PRACH | ZTE, CHTTL | Revised |
| R1-081422 | PHICH Resource Mapping in TDD | ZTE | Withdrawn |
| R1-081423 | Handover Region Based Cell Interior/Edge Users Classification Method for ICIC Applications | CHTTL, ITRI | Not treated |
| R1-081424 | 25213CR0092 (Rel-7, F) Range of E-DCH amplitude ratios with QPSK | Nokia, Nokia Siemens Networks | Noted - Revised |
| R1-081425 | 25213CR0093 (Rel-8, A) Range of E-DCH amplitude ratios with QPSK | Nokia, Nokia Siemens Networks | Noted - Revised |
| R1-081426 | 25214CR0481 (Rel-7, F) CPC DRX cycle change clarification | Nokia, Nokia Siemens Networks, Alcatel-Lucent | Revised |
| R1-081427 | 25214CR0482 (Rel-8, A) CPC DRX cycle change clarification | Nokia, Nokia Siemens Networks, Alcatel-Lucent | Revised |
| R1-081428 | On the benefits of Intercell interference cancellation to HSPA networks | Nokia Siemens Networks | Noted |
| R1-081429 | Draft 25211 CR on AICH/E-AICH | Nokia Siemens Networks, Nokia | Noted |
| R1-081430 | On L1 synchronisation | Nokia Siemens Networks, Nokia | Noted |
| R1-081431 | Draft 25214 CR on L1 synchronisation and random access procedure | Nokia Siemens Networks, Nokia | Noted |
| R1-081432 | Channel timings after acquisition | Nokia Siemens Networks, Nokia, Samsung | Noted |
| R1-081433 | Proposed method for improving the reliability of the HS-PDSCH Serving Cell Change procedure | Nokia, Nokia Siemens Networks | Noted |
| R1-081434 | Considerations on the dual cell HSDPA operation | Nokia, Nokia Siemens Networks | Noted |
| R1-081435 | Analysis of Inter-Cell Interference in CELL_FACH | Qualcomm Europe | Noted |
| R1-081436 | System Performance of ICIC | Qualcomm Europe | Revised |
| R1-081437 | Dual Carrier HSDPA assumptions and standards impact | Qualcomm Europe | Noted |
| R1-081438 | Dual Carrier operation for CELL_DCH | Qualcomm Europe | Noted |
| R1-081439 | Optionality of E-DPCCH power boosting | NEC, Fujitsu, Motorola, Panasonic, Sharp | Noted |
| R1-081440 | RACH location in the frequency domain | LG Electronics | Not treated |
| R1-081441 | Comments and Simulation Results Related to RAN2 LS on BCCH Transmission (R1-080632) | Nokia Siemens Networks, Nokia | Noted |
| R1-081442 | UE Specific RS pattern for extended CP | Nokia, Nokia Siemens Networks | Noted |
| R1-081443 | Confliction between UE Specific RS with P/S-SCH and P-BCH | Nokia, Nokia Siemens Networks | Noted |
| R1-081444 | Cyclic shift value definition for PUSCH demodulation RS | Nokia Siemens Networks, Nokia | Not treated |
| R1-081445 | Frequency hopping arrangement for SRS | Nokia Siemens Networks, Nokia | Not treated |
| R1-081446 | SRS Bandwidth Selection | Nokia Siemens Networks, Nokia | Not treated |
| R1-081447 | PDCCH decoding complexity and associated hashing functions | Nokia, Nokia Siemens Networks | Not treated |
| R1-081448 | DCI and CCE size | Nokia, Nokia Siemens Networks | Not treated |
| R1-081449 | Associated PDCCH signaling for PCH, RACH response and BCCH transmission on PDSCH | Nokia, Nokia Siemens Networks | Not treated |
| R1-081450 | LTE TDD UL Multi-TTI Scheduling | Nokia, Nokia Siemens Networks | Not treated |
| R1-081451 | General on PDCCH DL/UL grant of TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-081452 | Downlink scheduling for ACK/NACK bundling | Nokia, Nokia Siemens Networks | Not treated |
| R1-081453 | PHICH resource mapping and dimensioning for TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-081454 | Chicken-and-egg problem of PHICH resource indication in TDD | Nokia, Nokia Siemens Networks | Noted |
| R1-081455 | Multiplexing between Rank and SR | Nokia Siemens Networks, Nokia | Not treated |
| R1-081456 | DTX detection in case of simultaneous transmission of SR and ACK/NACK | Nokia Siemens Networks, Nokia | Not treated |
| R1-081457 | Linkage between PUSCH MCS and amount of resources for ACK/NACK on PUSCH | Nokia Siemens Networks, Nokia | Noted |
| R1-081458 | Avoiding PUSCH error situations caused by DL allocation grant signalling failure | Nokia Siemens Networks, Nokia | Not treated |
| R1-081459 | CQI+Ack/Nack Subcode details | Nokia Siemens Networks, Nokia | Noted |
| R1-081460 | Channelization of SRI and persistent ACK/NACK on PUCCH | Nokia Siemens Networks, Nokia | Not treated |
| R1-081461 | Coverage Comparison between PUSCH, PUCCH and RACH | Nokia Siemens Networks, Nokia, CATT | Noted |
| R1-081462 | DL EPRE Setting | Nokia, Nokia Siemens Networks | Not treated |
| R1-081463 | Summary of power control email discussion | Nokia Siemens Networks | Noted |
| R1-081464 | Triggers for Power Headroom Reports in EUTRAN Uplink | Nokia Siemens Networks, Nokia | Noted |
| R1-081465 | Definition of Relative Narrowband TX Power Indicator for DL ICIC | Nokia Siemens Networks, Nokia | Noted |
| R1-081466 | Definition of the uplink overload indicator | Nokia Siemens Networks, Nokia | Noted |
| R1-081467 | CQI estimation methodology | Nokia Siemens Networks, Nokia | Noted |
| R1-081468 | Configuration of periodic CQI reporting on PUSCH | Nokia Siemens Networks, Nokia | Not treated |
| R1-081469 | Number of spatially multiplexed users for LTE DL MU-MIMO | Nokia, Nokia Siemens Networks | Not treated |
| R1-081470 | Channel Quality Indicator for LTE MU-MIMO | Nokia, Nokia Siemens Networks | Not treated |
| R1-081471 | Effect of Precoding Granularity on LTE Multiuser MIMO | Nokia, Nokia Siemens Networks | Not treated |
| R1-081472 | DL signaling for closed loop antenna selection in LTE UL | Nokia, Nokia Siemens Networks, Ericsson | Noted |
| R1-081473 | DL HARQ Timing for TDD(Timing btw PDSCH and UL AckNack) | Nokia, Nokia Siemens Networks | Noted |
| R1-081474 | UL HARQ Timing for TDD(Timing btw PUSCH and PHICH/Grant) | Nokia, Nokia Siemens Networks | Noted |
| R1-081475 | Soft Buffer Allocation | Nokia, Nokia Siemens Networks | Noted |
| R1-081476 | RS power boosting and interference estimation issues | Qualcomm Europe | Not treated |
| R1-081477 | Frequency shift for UE specific RS | Qualcomm Europe | Not treated |
| R1-081478 | Remaining issues for UL DM-RS hopping | Qualcomm Europe | Not treated |
| R1-081479 | Remaining issues on PDCCH formats and contents | Qualcomm Europe | Not treated |
| R1-081480 | PDCCH format for Paging | Qualcomm Europe | Not treated |
| R1-081481 | Remaining issues on PDCCH search space definitions | Qualcomm Europe | Not treated |
| R1-081482 | Specification details for PHICH transmission for extended CP and more | Qualcomm Europe | Not treated |
| R1-081483 | Conveying MCS and TB size via PDCCH | Qualcomm Europe | Not treated |
| R1-081484 | On the need for MCS with code rate > 1 for UL transmissions | Qualcomm Europe | Not treated |
| R1-081485 | Control in support of DL MU-MIMO operation | Qualcomm Europe | Not treated |
| R1-081486 | UL control details for TDD | Qualcomm Europe | Noted |
| R1-081487 | Support of DTX signalling for CQI transmission with normal CP | Qualcomm Europe | Not treated |
| R1-081488 | Limiting the constellation size of ACK transmissions in PUSCH | Qualcomm Europe | Noted |
| R1-081489 | Improved staggering pattern for PUCCH format 1 | Qualcomm Europe | Not treated |
| R1-081490 | Confirmation of various UL transmission configurations | Qualcomm Europe | Not treated |
| R1-081491 | Further details on DL distributed transmissions | Qualcomm Europe | Not treated |
| R1-081492 | Issues with current scrambling sequence generation | Qualcomm Europe | Noted |
| R1-081493 | Antenna configuration for mixed unicast/MBSFN subframes | Qualcomm Europe | Not treated |
| R1-081494 | On the signalling of Data/RS power ratio for PDSCH with 16QAM | Qualcomm Europe | Not treated |
| R1-081495 | Feedback needed in support of TDD precoding | Qualcomm Europe | Not treated |
| R1-081496 | Definition of measurement gaps in 36.213 | Qualcomm Europe | Not treated |
| R1-081497 | Further details on UL ACK/NAK resource allocation | Qualcomm Europe | Not treated |
| R1-081498 | Support of ACK repetition in the UL of E-UTRA | Qualcomm Europe | Not treated |
| R1-081499 | Further details on coding of UL control information | Qualcomm Europe | Noted |
| R1-081500 | Clarifications on UE selected CQI reports | Qualcomm Europe | Noted |
| R1-081501 | Interleaver for PUCCH | Qualcomm Europe | Not treated |
| R1-081502 | PUCCH format 1 transmission | Qualcomm Europe | Noted |
| R1-081503 | Remaining issues on UE-specific RS | Philips | Not treated |
| R1-081504 | Analysis of search space design for PDCCH blind decoding | Philips | Noted |
| R1-081505 | Hashing function for starting-point of UE-specific search space | Philips | Missing |
| R1-081506 | PDCCH message information content for persistent scheduling | Philips, NXP | Not treated |
| R1-081507 | Distributed Resource Allocation Signalling on PDCCH | Philips, NXP | Not treated |
| R1-081508 | Index for PDCCH signalling of UL resource allocation in conjunction with DRX | Philips, NXP | Not treated |
| R1-081509 | PDCCH message for paging | Philips, NXP | Not treated |
| R1-081510 | Codebook for MU-MIMO | Philips, NXP | Not treated |
| R1-081511 | CQI definition for MU-MIMO | Philips, NXP | Not treated |
| R1-081512 | UE procedure for ACK/NACK detection | Philips, NXP | Noted |
| R1-081513 | RACH procedure for E-DCH in Cell_FACH | Philips | Noted |
| R1-081514 | 25.213 CR0094 (Rel-7, F) Restricted Beta Factor Combinations for UL 16QAM | Ericsson | Revised |
| R1-081515 | 25.212 CR0262 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Noted |
| R1-081516 | 25.214 CR0483 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Revised |
| R1-081517 | EUL coverage enhancements | Ericsson |