3GPP TDocs (written contributions) at meeting

Meeting: R1-52 - 2008-02-11 to 2008-02-15, Sorrento

meeting id: 26784 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R1-080630 Draft Agenda for RAN1#52 meeting RAN1 Chairman Approved
R1-080631 Draft report of RAN1#51 bis meeting MCC Support Approved
R1-080632 Response LS on BCCH transmission RAN2, Ericsson Noted
R1-080633 On the Gap of Distributed Allocation Mitsubishi Electric Not treated
R1-080634 Evaluation of Metrics for Control of Intercell Interference for Enhanced Uplink in cell-FACH InterDigital Communications LLC Revised
R1-080635 Reply LS on various aspects related to GERAN to E-UTRAN interworking RAN2, Qualcomm Noted
R1-080636 LS on LS on enhancing radio bearer parameters in 34.108 for 64QAM, MIMO and Enhanced Layer 2 RAN2, Nokia Noted
R1-080637 LS on RACH retransmission delay RAN2, Panasonic Noted
R1-080638 Further details on dedicated RS structure for DL beamforming Qualcomm Europe Not treated
R1-080639 RS power balancing in the spatial domain and interference estimation issues Qualcomm Europe Not treated
R1-080640 Specification details for PRS sequences Qualcomm Europe Noted
R1-080641 PDCCH formats and contents Qualcomm Europe Not treated
R1-080642 PDCCH format for Paging Qualcomm Europe Not treated
R1-080643 Resource allocation header for DL assignments Qualcomm Europe Not treated
R1-080644 PHICH resource allocation Qualcomm Europe Not treated
R1-080645 On the size of the CCE Qualcomm Europe Not treated
R1-080646 Limiting the number of PDCCH blind decodes Qualcomm Europe Not treated
R1-080647 UL ACK/NAK resource allocation Qualcomm Europe Revised
R1-080648 Support of ACK repetition in the UL of E-UTRA Qualcomm Europe Not treated
R1-080649 UL control details for TDD Qualcomm Europe Not treated
R1-080650 Details of control and data multiplexing in PUSCH Qualcomm Europe Not treated
R1-080651 More results on the value of the Nd=3 option for DL distributed transmissions Qualcomm Europe Not treated
R1-080652 Completing the scrambling details in the specifications Qualcomm Europe Not treated
R1-080653 Draft CR for 36.212 Qualcomm Europe Endorsed - Revised
R1-080654 On the signalling of Data/RS power ratio for PDSCH with 16QAM Qualcomm Europe Not treated
R1-080655 Link analysis of PUCCH vs. CQI payload size Qualcomm Europe Not treated
R1-080656 Bitwidths for CQI reporting on PUCCH for MIMO support Qualcomm Europe Missing
R1-080657 System analysis comparing best-M and cycling CQI report mechanisms Qualcomm Europe Missing
R1-080658 Feedback needed in support of TDD precoding Qualcomm Europe Not treated
R1-080659 Calibration procedures for TDD beamforming Qualcomm Europe Not treated
R1-080660 Introduction of optimized FS2 for TDD RITT Noted
R1-080661 Summary of Reflector Discussions on EUTRA DL RS Samsung Noted
R1-080662 Summary of Reflector Discussions on EUTRA UL RS Samsung Noted
R1-080663 DCI Payload Formats and Contents Samsung Not treated
R1-080664 Compact UL-SCH Assignment in E-UTRA Samsung Not treated
R1-080665 PCFICH Mapping for One Transmitter Antenna Samsung Not treated
R1-080666 Subset selection for precoding Samsung Not treated
R1-080667 Way forward on downlink PMI indication Samsung, ZTE, Huawei, LGE Not treated
R1-080668 PHICH linking to downlink CCE Samsung, Panasonic Not treated
R1-080669 HARQ process indication for DL-SCH Samsung Not treated
R1-080670 PDCCH CRC length Samsung Not treated
R1-080671 RV and NDI indication in downlink assignment Samsung Not treated
R1-080672 MCS/TBS indication for DL-SCH and UL-SCH Samsung Not treated
R1-080673 TBS table design for DL-SCH and UL-SCH Samsung Not treated
R1-080674 Details of PHICH allocation Samsung Not treated
R1-080675 Configuration of PDCCH candidate sets for the control of blind decoding attempts Samsung Not treated
R1-080676 ACK/NAK DTX Detection in the PUSCH Samsung Not treated
R1-080677 ACK/NAK Repetitions in E-UTRA UL Samsung Not treated
R1-080678 Multiplexing ACK/NAK in the PUSCH Samsung Not treated
R1-080679 Multiplexing Control and Data in the PUSCH Samsung Not treated
R1-080680 Slot-level UL ACK/NACK Cyclic Shift/Orthogonal Cover Remapping Samsung Not treated
R1-080681 UL ACK/NACK resource indication for DL persistent scheduling Samsung, NTT DoCoMo, Panasonic, Qualcomm Noted
R1-080682 Robust RE mapping of control and data on PUSCH Samsung Not treated
R1-080683 Frequency Hopping Pattern for PUSCH Samsung, LGE, NEC, Qualcomm, ZTE Revised
R1-080684 PDSCH-to-RE mapping robust against CCFI reception errors Samsung Not treated
R1-080685 RV definition for UL-SCH Samsung Noted
R1-080686 Adjustment to starting positions of redundancy versions for turbo code rate matching Samsung Not treated
R1-080687 CRC generator polynomial for PDCCH Samsung Noted
R1-080688 Transmission Power Control Using DM RS for UL VoIP Samsung Not treated
R1-080689 Further discussion on data power setting for PDSCH Samsung Not treated
R1-080690 Power Scaling and DL RS boosting Samsung Not treated
R1-080691 Summary of email discussion on CQI reporting Samsung Noted
R1-080692 Further considerations on MIMO CQI Samsung Not treated
R1-080693 SU-MIMO PMI feedback and Compression Samsung Not treated
R1-080694 CQI Reporting for MU-MIMO Samsung Not treated
R1-080695 CQI report format Samsung Not treated
R1-080696 E-DCH transmission timing for Enhanced Uplink in Cell_FACH Samsung Noted
R1-080697 On the interference prior to the completion of contention resolution Samsung Noted
R1-080698 Edge treatment for MIMO CQI compression Marvell Not treated
R1-080699 Bit permutation for CQI coding Marvell Not treated
R1-080700 Sounding Reference Signal In Support of Scheduling Request in E-UTRA Texas Instruments Not treated
R1-080701 Some Options for Cyclic Shift Hopping Texas Instruments Not treated
R1-080702 CRC Length for PDCCH Texas Instruments Not treated
R1-080703 PDCCH Content and Formats Texas Instruments Not treated
R1-080704 Consideration of Supportable MCS for E-UTRA DL Texas Instruments Revised
R1-080705 Channelization for Scheduling Request Indicator on PUCCH Texas Instruments Revised
R1-080706 Resource allocation for Scheduling Request Indicator on PUCCH Texas Instruments Not treated
R1-080707 Cell Specific CS Hopping and Slot Based CS/OC Remapping on PUCCH Texas Instruments Noted
R1-080708 Separate Rank and CQI Feedback in PUCCH Texas Instruments Not treated
R1-080709 Simultaneous ACK/NAK and SR Transmission in Uplink Texas Instruments Not treated
R1-080710 Considerations on Data and Control Multiplexing on PUSCH Texas Instruments Not treated
R1-080711 CQI Reporting Procedure for E-UTRA Texas Instruments Revised
R1-080712 CQI, PMI, and Rank Reports for E-UTRA Texas Instruments Not treated
R1-080713 CQI and PMI Report Combinations on PUSCH Texas Instruments Revised - Noted
R1-080714 Rank and PMI Feedback Rate – Analysis Texas Instruments Not treated
R1-080715 Rank Feedback Rate – System Simulation Texas Instruments Not treated
R1-080716 CQI/PMI Feedback Rate – System Simulation Texas Instruments Not treated
R1-080717 TS 36.213 v8.1.0 CR Motorola Revised
R1-080718 Short CP Dedicated Reference Symbol Pattern Simulation Results Motorola Revised
R1-080719 Hopping Patterns for UL RS Motorola Noted
R1-080720 Cyclic Shift values for UL RS Motorola Not treated
R1-080721 Indication of UE Antenna Selection for PUSCH Motorola Not treated
R1-080722 Open Issues on UL Sounding RS Motorola Not treated
R1-080723 Multiplexing of SRS and PUSCH Motorola Not treated
R1-080724 PHICH Transmission for 1 Tx Antenna Motorola Not treated
R1-080725 PCFICH Transmission for 1 Tx Antenna Motorola Not treated
R1-080726 Downlink Control Signalling for TDD Motorola Not treated
R1-080727 TBS and MCS Signaling and Tables Motorola Not treated
R1-080728 On NDI and RV in LTE downlink Motorola Not treated
R1-080729 PHICH resource signaling for TDD and FDD Motorola Revised
R1-080730 PDCCH Formats and Contents Motorola Not treated
R1-080731 PDCCH Search Space Assignment & Signaling Motorola Not treated
R1-080732 PDCCH Coverage 1248 vs 124 vs 12348 with limited PC dynamic range Motorola Withdrawn
R1-080733 DRX and Change Update Rate for Broadcast LTE L1 Parameters Motorola Withdrawn
R1-080734 PHICH Assignment for TDD and FDD Motorola Not treated
R1-080735 PDCCH Performance vs WB CQI update rate Motorola Not treated
R1-080736 Repetition of UL ACK/NACK on PUCCH Motorola Not treated
R1-080737 ACK/NACK and SR Multiplexing Motorola Not treated
R1-080738 UL ACK/NACK for TDD Motorola Noted
R1-080739 Uplink Control Signaling with Persistent Scheduling Motorola Not treated
R1-080740 Details of A/N subcode for extended CP Motorola Not treated
R1-080741 Control and Data Multiplexing on PUSCH Motorola Not treated
R1-080742 Impact of PUSCH Puncturing to Accommodate ACK/NACK Motorola Not treated
R1-080743 System Results for Nd=3 Motorola Missing
R1-080744 Downlink DVRB email reflector summary Motorola Noted
R1-080745 Uplink SCH Hopping email reflector summary Motorola Noted
R1-080746 PDCCH Scrambling and ACK/NAK detection Motorola Not treated
R1-080747 RS, Control, and Data in DwPTS Motorola Noted
R1-080748 Shortened RB definition for Subframes 0 and 5 (with SCH & BCH) Motorola Not treated
R1-080749 Remaining issues on UL/DL PC Motorola Not treated
R1-080750 PHICH power borrowing from PDCCH Motorola Not treated
R1-080751 Uplink Inter-Cell Power Control: X2 Messages Motorola Not treated
R1-080752 Observations on UL ICIC Motorola Not treated
R1-080753 Frequency-selective CQI report on PUCCH for Single Tx and TxD Motorola, Freescale, Samsung, Panasonic, NTT DoCoMo, Texas Instruments Noted
R1-080754 Frequency-selective CQI report on PUCCH for SU-MIMO Motorola, Freescale, Samsung, Panasonic, Texas Instruments Noted
R1-080755 CQI modes for E-UTRA Motorola Not treated
R1-080756 Performance of CQI/PMI schemes for PUCCH Motorola Noted
R1-080757 25.212 CR260 (Rel-8, F) Correction of RV mapping in HS-SCCH type 3 for 64-QAM support QUALCOMM Europe Noted
R1-080758 PHICH Resource Allocated scheme ZTE Not treated
R1-080759 Details for ACK/NACK subcode design ZTE Agreed
R1-080760 1.28Mcps TDD 64-QAM modulation indication and feedback ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio Agreed
R1-080761 Correction on PRACH Sequence Ordering Table ZTE, RITT Revised
R1-080762 Performance analysis for LBRM ZTE Noted
R1-080763 VoIP capacity Improvement by optimization CQI in PUCCH SHARP Revised
R1-080764 CQI, PMI, and rank report feedback interval SHARP Revised
R1-080765 Persistent CQI/PMI/rank reporting on PUCCH/PUSCH SHARP Revised
R1-080766 UL Sub-frame Bundling and VoIP coverage Nortel Noted
R1-080767 Perforamnce evaluation of Dedicated RS Structures for Beam-Forming Transmission Nortel Not treated
R1-080768 Channel Estimation Performance Evaluation on PDCCH in BF Zones Nortel Not treated
R1-080769 Further discussion on DL/UL signaling channel supporting rank adaptation for high mobility UE Nortel Not treated
R1-080770 MCS Table Design for eNB Nortel Not treated
R1-080771 Discussion on the PHICH linkage to uplink transmission Nortel Not treated
R1-080772 Further discussion on the DVRB mapping scheme Nortel Not treated
R1-080773 Power Balancing for 4 Tx Antennas Nortel Not treated
R1-080774 UL MU-MIMO scheduling for high mobility Nortel Not treated
R1-080775 Need of procedure for supporting MU-MIMO Nortel Not treated
R1-080776 PHICH Index Mapping for Uplink Transmission for E-UTRA InterDigital Communications LLC Not treated
R1-080777 Downlink Control Signaling for MU-MIMO InterDigital Communications LLC Not treated
R1-080778 ZC Sequence Ordering for Short RACH ZTE Revised
R1-080779 Remaining Issues on UL DM RS Sequence Hopping ZTE Not treated
R1-080780 Simulation on the 64-QAM modulation indication scheme for 1.28Mcps TDD ZTE Missing
R1-080781 RS configuration in DwPTS TD Tech Noted
R1-080782 25.224 CR0174 (Rel-7, F) on EUL power control clarification TD Tech Not treated
R1-080783 25.221 CR0152 (Rel7,F) E-AGCH timing for 1.28Mcps TDD EUL CATT Agreed
R1-080784 25.221CR0153 (Rel7,F) Clarification of the description about E-PUCH for 1.28Mcps TDD EUL CATT Agreed
R1-080785 25.222 CR0144 (Rel7,F) Some corrections for 1.28Mcps TDD EUL CATT Revised
R1-080786 25.224 CR0175 (Rel7,F) Clarification of the E-AGCH monitering for 1.28Mcps TDD EUL CATT Noted
R1-080787 25.224 CR0176 (Rel7,F) Improvement of the UL synchronisation of E-PUCH for 1.28Mcps TDD EUL CATT Agreed
R1-080788 25.224 CR0177 (Rel7,F) Clarification and Correction of E-PUCH power control for LCR TDD CATT Noted - Revised
R1-080789 25.224 Cr0178 (Rel7,F) Improvement of the non-scheduled E-DCH transmission procedure for 1.28Mcps TDD EUL CATT Noted
R1-080790 25.222 CR0145 (Rel7,F) Clarification on TFCI mapping for 1.28Mcps TDD MBMS CATT Revised
R1-080791 System Simulation Results of 2×2 MIMO for 1.28Mcps TDD CATT Noted
R1-080792 Analysis on MIMO schemes for 1.28Mcps TDD CATT, TD-TECH Noted
R1-080793 Analysis on CQI and HARQ feedback for Enhanced CELL_FACH state Huawei Noted
R1-080794 Discussion on resource allocation scheme for Enhanced CELL-FACH State Huawei Noted
R1-080795 UE specific reference pattern CATT, CMCC, RITT Not treated
R1-080796 Multiplexing of UE-specific RS and cell-specific RS in DL CATT Not treated
R1-080797 Multi-TTI Scheduling for LTE TDD UL CATT Not treated
R1-080798 Indication of UL/DL allocation for TDD on PBCH CATT, Huawei Not treated
R1-080799 Sounding reference signals in UpPTS for TDD CATT, CMCC, RITT Noted
R1-080800 Usage of DwPTS for TDD CATT Noted
R1-080801 On UE measurements for TDD asymmetry scenario CATT, Huawei, RITT Revised
R1-080802 On antenna calibration of LTE CATT Not treated
R1-080803 UL Sounding RS Control Signaling for Closed Loop Antenna Selection Mitsubishi Electric Not treated
R1-080804 Parameter in TS36.306 to indicate whether UE supports UL transmit diversity Mitsubishi Electric Noted
R1-080805 Potential issues with large DRX cycles QUALCOMM Europe Noted
R1-080806 Reducing smallest E-TFCI value QUALCOMM Europe Noted
R1-080807 Code Impact of Proposal for Enhancing HS-DSCH Serving Cell Change Based on New Channel Similar to E-RGCH QUALCOMM Europe Noted
R1-080808 Link Analysis of AICH/E-AICH E-DCH Resource Allocation scheme QUALCOMM Europe Noted
R1-080809 Collision/Blocking Probability Analysis of AICH/E-AICH E-DCH Resource Allocation scheme QUALCOMM Europe Noted
R1-080810 Error Performance Analysis of AICH/E-AICH based E-DCH resource allocation scheme QUALCOMM Europe Noted
R1-080811 Link Impact due to E-DCH Collisions in CELL_FACH QUALCOMM Europe Noted
R1-080812 Impact of Intercell Interference with EUL in CELL_FACH QUALCOMM Europe Noted
R1-080813 List of E-DCH resource parameters QUALCOMM Europe Noted
R1-080814 System Performance of Uplink Interference Cancellation in Sync E-DCH Simulation Scenarios QUALCOMM Europe Revised
R1-080815 Improving reliability of HS-PDSCH Serving Cell Change procedure QUALCOMM Europe Noted
R1-080816 Draft TR QUALCOMM Europe Noted
R1-080817 Open issues on UE-specific RS Philips Not treated
R1-080818 UE-specific RS pattern Philips Missing
R1-080819 Configuration of PDCCH blind decoding sets Philips, NXP Not treated
R1-080820 PDCCH message information content for persistent scheduling Philips, NXP Not treated
R1-080821 Resource allocation signalling on PDCCH Philips, NXP Not treated
R1-080822 Distributed Resource Allocation Signalling on PDCCH Philips, NXP Not treated
R1-080823 PDCCH message information content for UL resource allocation Philips, NXP Not treated
R1-080824 PDSCH timing for power saving for paging in idle mode Philips, NXP Not treated
R1-080825 Way forward on Distributed DVRB for EUTRA downlink Philips Noted
R1-080826 MBSFN remaining issues Philips Not treated
R1-080827 Codebook for MU-MIMO Philips, NXP Not treated
R1-080828 CQI definition for MU-MIMO Philips, NXP Not treated
R1-080829 UE procedure for ACK/NACK detection Philips, NXP Not treated
R1-080830 Remaining issues on E-RACH procedure Philips Noted
R1-080831 UL coverage considerations for VoIP transmission Philips, NXP Noted
R1-080832 25212CR0261 (Rel-8, F), Correction to RV-coding in case of simultaneous usage of 64QAM and MIMO Nokia, Nokia Siemens Networks Agreed
R1-080833 25214CR0479 (Rel-7, F), Correction to UE grant monitoring Nokia, Nokia Siemens Networks Noted - Revised
R1-080834 25214CR0480 (Rel-8, A), Correction to UE grant monitoring Nokia, Nokia Siemens Networks Noted - Revised
R1-080835 25211CRdraft (Rel-8, B), Introduction of E-AICH for the purpose of E-DCH Resource Configuration Allocation Qualcomm Europe, Ericsson, Huawei, Motorola, NEC, Nokia, Nokia Siemens Networks, NXP, Philips Endorsed
R1-080836 E-AICH resource assignment performance results Nokia, Nokia Siemens Networks Noted
R1-080837 25214CRdraft (Rel-8, B), RACH procedure relation to Enhanced Uplink for CELL_FACH state Nokia, Nokia Siemens Networks Noted
R1-080838 25215CRdraft (Rel-8, B), UPH measurement support for Enhanced Uplink for CELL_FACH state Nokia, Nokia Siemens Networks Endorsed
R1-080839 Text proposal on S-EDCH CM & PAPR effects Nokia Siemens Networks, Nokia Noted - Revised
R1-080840 Text proposal - system simulation results Nokia Siemens Networks, Nokia Noted - Revised
R1-080841 Text proposal on DL channel structure impact Nokia Siemens Networks, Nokia Noted - Revised
R1-080842 Text proposal on impact to L1 procedures Nokia Siemens Networks, Nokia Noted - Revised
R1-080843 Text proposal on impact to L2/3 procedures Nokia Siemens Networks, Nokia Noted - Revised
R1-080844 Text proposal on impacts to the specifications Nokia Siemens Networks, Nokia Noted - Revised
R1-080845 Text proposal on synchronisation Nokia Siemens Networks, Nokia Noted - Revised
R1-080846 Text proposal on backward compatibility Nokia Siemens Networks, Nokia Noted - Revised
R1-080847 Text proposal on complexity analysis Nokia Siemens Networks, Nokia Noted - Revised
R1-080848 Text proposal on conclusion Nokia Siemens Networks, Nokia Noted - Revised
R1-080849 Simulation results of HS-PDSCH serving cell change in Manhattan environment Nokia, Nokia Siemens Networks Noted
R1-080850 UE specific PDCCH scrambling for blind detection complexity reduction Mitsubishi Electric Not treated
R1-080851 Initialisation of shift registers for PDCCH scrambling Mitsubishi Electric Not treated
R1-080852 Length of the reserved period in half-duplex FDD Mitsubishi Electric Withdrawn
R1-080853 DL:UL Allocation for TDD Motorola Not treated
R1-080854 Dynamic DVRB signaling Motorola Not treated
R1-080855 Open issues on UL slot hopping Motorola Not treated
R1-080856 Distributed Virtual Resource Block Mapping for Persistent Resource Allocation as VoIP Alcatel-Lucent Not treated
R1-080857 Signaling of non-compact Resource Allocation in DL Control Channel Alcatel-Lucent Noted
R1-080858 Semi-Static Interference Coordination Method Alcatel-Lucent Not treated
R1-080859 Support for Semi-Static Inter cell Interference Coordination Alcatel-Lucent, Nortel Networks Not treated
R1-080860 Signaling of Slot Based Frequency Hopping with grant based frequency shift information for UL Transmission Alcatel-Lucent Noted
R1-080861 Clarification on Uplink Power Control to support UL ICIC Alcatel-Lucent Noted
R1-080862 eNodeB Indicator definition for “Maximum Tx Power per PRB normalized” Alcatel-Lucent Not treated
R1-080863 X2-signalling of eNodeB Max Tx Power per PRB report Alcatel-Lucent Not treated
R1-080864 Performance of PMI Compression Schemes for E-UTRA Icera Semiconductor Not treated
R1-080865 On Uplink coverage for LTE Ericsson Noted
R1-080866 Uplink DM RS, discussion/proposals on remaining issues Ericsson Noted
R1-080867 Uplink SRS, discussion/proposals on remaining issues Ericsson Missing
R1-080868 On TBS sizes for LTE Ericsson Withdrawn
R1-080869 Summary of e-mail discussion on downlink control signaling Ericsson Noted
R1-080870 Combination of ACK/NACKs for TDD Ericsson Noted
R1-080871 Summary of e-mail discussion on uplink control signaling Ericsson Noted
R1-080872 Initialization of the 31-Gold sequence generator Ericsson Noted
R1-080873 On the design of DwPTS Ericsson Noted
R1-080874 On the remaining DL-UL allocation Ericsson Withdrawn
R1-080875 On Antenna Configuration Detection and Transmission of Synchronization Signal Ericsson Not treated
R1-080876 On HARQ operation for MIMO Ericsson Not treated
R1-080877 Extending Codeword to Layer Mapping for Efficient Support of Retransmissions Ericsson Noted
R1-080878 On Radio Problem Detection Ericsson Withdrawn
R1-080879 Power Control for PRACH Ericsson Not treated
R1-080880 Power Control for Retransmissions Ericsson Not treated
R1-080881 Range and representation of delta_MCS Ericsson Not treated
R1-080882 Completion of Open Issues on Power Control Command Ericsson Not treated
R1-080883 Uplink power control, removal of unnecessary options Ericsson Not treated
R1-080884 Additional RSRP reporting trigger for ICIC Ericsson Not treated
R1-080885 System Level Evaluation of Closed-Loop Large Delay CDD Ericsson Not treated
R1-080886 Signaling Requirements for 2 Tx Precoding Ericsson Not treated
R1-080887 CQI Measurement Methodology Ericsson Noted
R1-080888 Detection of Duplex Ericsson Not treated
R1-080889 Maximum Timing Advance for TDD Ericsson Not treated
R1-080890 Uplink ACK/NACK timing for TDD Ericsson Not treated
R1-080891 Number of DL HARQ processes for TDD Ericsson Not treated
R1-080892 Number of UL HARQ processes and HARQ timing for TDD Ericsson Not treated
R1-080893 On MBSFN neighbour cell indicators for UE measurements for TDD Ericsson Not treated
R1-080894 Draft LS on MBSFN neighbour cell indicators for UE measurements for TDD Ericsson Not treated
R1-080895 Sorting of PRACH root sequences for preamble format 4 Ericsson Noted
R1-080896 On remaining PRACH issues for TDD Ericsson Not treated
R1-080897 Draft reply LS on RACH retransmission delay Ericsson Noted
R1-080898 Draft CR to 36.211 v8.1.0 including decisions from RAN1#51bis Ericsson Endorsed - Revised
R1-080899 On the location of ACK/NACK bits on UL PUSCH Fujitsu Not treated
R1-080900 Physical-layer parameters to be configured by RRC Ericsson Noted
R1-080901 Holes in the L1 specification Ericsson Missing
R1-080902 Initial Multi-Carrier HSPA performance evaluation Ericsson Noted
R1-080903 On the introduction of a second UE DRX cycle in CELL_DCH Ericsson Noted
R1-080904 HS-SCCH orders for HS-SCCH-less operation Ericsson Noted
R1-080905 Further simulation results for AICH-based resource allocation signaling in Enhanced CELL_FACH Ericsson Noted
R1-080906 Timing and acknowledgement signaling for EUL in CELL_FACH Ericsson Noted
R1-080907 Inter-cell interference issues for EUL in CELL_FACH Ericsson Noted
R1-080908 System performance of Synchronized E-DCH Ericsson Revised
R1-080909 Requirements for E-DCH TDM support Ericsson Noted
R1-080910 PAPR for Synchronized E-DCH Ericsson Noted
R1-080911 HS Serving Cell Change Enhancements Ericsson Noted
R1-080912 Power Offsets to Support Data and Control Multiplexing for Persistent PUSCH Alcatel-Lucent Not treated
R1-080913 Performance Comparison of Solutions for Subframe Bundling Alcatel-Lucent Noted
R1-080914 Implications of Solutions for Subframe Bundling Alcatel-Lucent Noted
R1-080915 RACH Frequency position LG Electronics Not treated
R1-080916 On the need of ramping step size zero for FDD PRACH LG Electronics Not treated
R1-080917 Way Forward on Orthogonal Sequences for DL Reference signals Nokia, Nokia Siemens Networks Revised
R1-080918 SRS Position for EUTRA FDD/TDD Nokia, Nokia Siemens Networks Not treated
R1-080919 Slot-based CS/OC re-mapping for PUCCH Nokia Siemens Networks, Nokia Revised
R1-080920 CS hopping for DM RS Nokia Siemens Networks, Nokia Not treated
R1-080921 SRS Bandwidth Selection Nokia Siemens Networks, Nokia Not treated
R1-080922 A proposal for LTE TDD Uplink Multi-TTI Scheduling Nokia, Nokia Siemens Networks Not treated
R1-080923 PHICH resource mapping/dimensioning for TDD Nokia, Nokia Siemens Networks Not treated
R1-080924 DCI and CCE size Nokia, Nokia Siemens Networks Not treated
R1-080925 Associated PDCCH signaling for PCH, RACH response and BCCH transmission on PDSCH Nokia, Nokia Siemens Networks Revised
R1-080926 Downlink resource assignment structure for LTE Nokia, Nokia Siemens Networks Revised
R1-080927 PHICH and mapping to PHICH groups Nokia, Nokia Siemens Networks Not treated
R1-080928 Reducing the decoding complexity of the PDCCH Nokia, Nokia Siemens Networks Revised
R1-080929 MBMS single-cell p-t-m related control signaling Nokia, Nokia Siemens Networks Revised
R1-080930 On the need for memoryless DL control information Nokia, Nokia Siemens Networks Not treated
R1-080931 ACK/NACK channelization for PRBs containing both ACK/NACK and CQI Nokia Siemens Networks, Nokia, Texas Instruments Agreed
R1-080932 Simultaneous transmission of ACK/NACK and SR Nokia Siemens Networks, Nokia Noted
R1-080933 DTX detection in case of simultaneous transmission of SR and ACK/NACK Nokia Siemens Networks, Nokia Not treated
R1-080934 Capacity and coverage analysis for the number of CQI bits carried on PUCCH Nokia Siemens Networks, Nokia Not treated
R1-080935 Avoiding PUSCH error situations caused by DL allocation grant signalling failure (FDD/TDD) Nokia Siemens Networks, Nokia Not treated
R1-080936 Open items of control signaling on PUSCH Nokia Siemens Networks, Nokia Revised
R1-080937 Orthogonal Cover Design for Scheduling Request Nokia Siemens Networks, Nokia Revised
R1-080938 Comparison of single-sequence and multi sequence modulation with existing DM RS sequence set Nokia Siemens Networks, Nokia Revised
R1-080939 Implicit Mapping of ACK/NACK resources Nokia Siemens Networks, Nokia Revised
R1-080940 Scrambling Sequence Initialization Nokia Siemens Networks, Nokia Noted
R1-080941 Physical Channel/signals arrangement in DwPTS Nokia, Nokia Siemens Networks Noted
R1-080942 L1 Support of Dedicated MBSFN Carriers Nokia Siemens Networks, Nokia, Huawei, Ericsson, LGE Revised
R1-080943 Multi-cell PBCH Coverage and Capacity Nokia Siemens Networks, Nokia Revised
R1-080944 CRC Mask Selection for PBCH Nokia Siemens Networks, Nokia Revised
R1-080945 Simulation results on RV usage for uplink HARQ Nokia Siemens Networks, Nokia Noted
R1-080946 Way forward on RV usage for uplink HARQ Nokia Siemens Networks, Nokia, Motorola, Ericsson, LGE, ZTE Noted
R1-080947 Triggers for Power Headroom Reports in EUTRAN Uplink Nokia Siemens Networks, Nokia Not treated
R1-080948 Summary of power control email discussion Nokia Siemens Networks Noted
R1-080949 On Definition and Usage of the Uplink Overload Indicator Nokia Siemens Networks, Nokia Not treated
R1-080950 Performance of Proactive Uplink ICIC under Fractional Load Nokia Siemens Networks, Nokia Not treated
R1-080951 Frequency selective CQI reporting on PUCCH Nokia Siemens Networks, Nokia Not treated
R1-080952 Rank reporting on PUCCH Nokia Siemens Networks, Nokia Revised
R1-080953 Number of spatially multiplexed users for LTE DL MU-MIMO Nokia, Nokia Siemens Networks Revised
R1-080954 Channel Quality Indicator for LTE MU-MIMO Nokia, Nokia Siemens Networks Revised
R1-080955 Effect of Precoding Granularity on LTE Multiuser MIMO Nokia, Nokia Siemens Networks Revised
R1-080956 DL signaling for closed loop antenna selection in LTE UL Nokia Siemens Networks, Nokia, Ericsson Revised
R1-080957 UL HARQ Timing of TDD Nokia, Nokia Siemens Networks Not treated
R1-080958 HARQ Numbers of LTE TDD considering the proposal of special subframe Nokia, Nokia Siemens Networks Not treated
R1-080959 Definition of Antenna Connector for eNB Measurements Nokia Siemens Networks, Nokia Agreed
R1-080960 Update to 36.214 Nokia Endorsed - Revised
R1-080961 TDD RACH Configurations Nokia, Nokia Siemens Networks Withdrawn
R1-080962 Limitations of CQI Compression for Dual Codeword MIMO Alcatel-Lucent Not treated
R1-080963 Hopping of UL DM-RS Qualcomm Europe Noted
R1-080964 Multiplexing of SR and ACK/NAK transmission on PUCCH Qualcomm Europe Not treated
R1-080965 Support of DTX signalling for CQI transmission with normal CP Qualcomm Europe Not treated
R1-080966 Interference between Sounding Reference Signal and PRACH Texas Instruments Not treated
R1-080967 Comparison of Different ACK/NAK in CQI RS Transmission Schemes Texas Instruments Not treated
R1-080968 CQI and PMI feedback on PUSCH for rank-1 precoding Huawei Not treated
R1-080969 Signaling of MU-MIMO precoding vector Huawei Not treated
R1-080970 Performance Evaluation of the Rotational CDM for L1/L2 Control Channel KDDI Not treated
R1-080971 Gain of CAZAC sequence hopping for ACK/NACK and CQI Signals in PUCCH KDDI Not treated
R1-080972 Multiplexing of Scheduling Request and ACK/NACK Signals in E-UTRA Uplink KDDI Not treated
R1-080973 Joint Transport Format and Redundancy Version signaling with explicit NDI Panasonic Noted
R1-080974 MCS table definition and analysis of related MAC padding overhead Panasonic Not treated
R1-080975 PDCCH payload formats, sizes and CCE aggregation Panasonic Revised
R1-080976 Implicit assignment of PHICH Panasonic Resubmission of R1-080135 - Not treated
R1-080977 DL D-VRB to PRB mapping Panasonic Revised
R1-080978 Necessity of the scrambling for ACK/NACK on PUCCH Panasonic Revised
R1-080979 Necessity of the scrambling for the reference signal of CQI in PUCCH Panasonic Resubmission of R1-080143 - Not treated
R1-080980 Mapping position of control channel for Uplink Shared Channel Panasonic Resubmission of R1-080141 - Not treated
R1-080981 ACK/NACK repetition and Implicit Resource Allocation for PUCCH Panasonic Resubmission of R1-080142 - Not treated
R1-080982 Proposal for the implicit resource mapping for UL ACK/NACK channels Panasonic