Click on the Tdoc to open its file.
| TDoc | Title | Source | Remarks |
| R1-080630 | Draft Agenda for RAN1#52 meeting | RAN1 Chairman | Approved |
| R1-080631 | Draft report of RAN1#51 bis meeting | MCC Support | Approved |
| R1-080632 | Response LS on BCCH transmission | RAN2, Ericsson | Noted |
| R1-080633 | On the Gap of Distributed Allocation | Mitsubishi Electric | Not treated |
| R1-080634 | Evaluation of Metrics for Control of Intercell Interference for Enhanced Uplink in cell-FACH | InterDigital Communications LLC | Revised |
| R1-080635 | Reply LS on various aspects related to GERAN to E-UTRAN interworking | RAN2, Qualcomm | Noted |
| R1-080636 | LS on LS on enhancing radio bearer parameters in 34.108 for 64QAM, MIMO and Enhanced Layer 2 | RAN2, Nokia | Noted |
| R1-080637 | LS on RACH retransmission delay | RAN2, Panasonic | Noted |
| R1-080638 | Further details on dedicated RS structure for DL beamforming | Qualcomm Europe | Not treated |
| R1-080639 | RS power balancing in the spatial domain and interference estimation issues | Qualcomm Europe | Not treated |
| R1-080640 | Specification details for PRS sequences | Qualcomm Europe | Noted |
| R1-080641 | PDCCH formats and contents | Qualcomm Europe | Not treated |
| R1-080642 | PDCCH format for Paging | Qualcomm Europe | Not treated |
| R1-080643 | Resource allocation header for DL assignments | Qualcomm Europe | Not treated |
| R1-080644 | PHICH resource allocation | Qualcomm Europe | Not treated |
| R1-080645 | On the size of the CCE | Qualcomm Europe | Not treated |
| R1-080646 | Limiting the number of PDCCH blind decodes | Qualcomm Europe | Not treated |
| R1-080647 | UL ACK/NAK resource allocation | Qualcomm Europe | Revised |
| R1-080648 | Support of ACK repetition in the UL of E-UTRA | Qualcomm Europe | Not treated |
| R1-080649 | UL control details for TDD | Qualcomm Europe | Not treated |
| R1-080650 | Details of control and data multiplexing in PUSCH | Qualcomm Europe | Not treated |
| R1-080651 | More results on the value of the Nd=3 option for DL distributed transmissions | Qualcomm Europe | Not treated |
| R1-080652 | Completing the scrambling details in the specifications | Qualcomm Europe | Not treated |
| R1-080653 | Draft CR for 36.212 | Qualcomm Europe | Endorsed - Revised |
| R1-080654 | On the signalling of Data/RS power ratio for PDSCH with 16QAM | Qualcomm Europe | Not treated |
| R1-080655 | Link analysis of PUCCH vs. CQI payload size | Qualcomm Europe | Not treated |
| R1-080656 | Bitwidths for CQI reporting on PUCCH for MIMO support | Qualcomm Europe | Missing |
| R1-080657 | System analysis comparing best-M and cycling CQI report mechanisms | Qualcomm Europe | Missing |
| R1-080658 | Feedback needed in support of TDD precoding | Qualcomm Europe | Not treated |
| R1-080659 | Calibration procedures for TDD beamforming | Qualcomm Europe | Not treated |
| R1-080660 | Introduction of optimized FS2 for TDD | RITT | Noted |
| R1-080661 | Summary of Reflector Discussions on EUTRA DL RS | Samsung | Noted |
| R1-080662 | Summary of Reflector Discussions on EUTRA UL RS | Samsung | Noted |
| R1-080663 | DCI Payload Formats and Contents | Samsung | Not treated |
| R1-080664 | Compact UL-SCH Assignment in E-UTRA | Samsung | Not treated |
| R1-080665 | PCFICH Mapping for One Transmitter Antenna | Samsung | Not treated |
| R1-080666 | Subset selection for precoding | Samsung | Not treated |
| R1-080667 | Way forward on downlink PMI indication | Samsung, ZTE, Huawei, LGE | Not treated |
| R1-080668 | PHICH linking to downlink CCE | Samsung, Panasonic | Not treated |
| R1-080669 | HARQ process indication for DL-SCH | Samsung | Not treated |
| R1-080670 | PDCCH CRC length | Samsung | Not treated |
| R1-080671 | RV and NDI indication in downlink assignment | Samsung | Not treated |
| R1-080672 | MCS/TBS indication for DL-SCH and UL-SCH | Samsung | Not treated |
| R1-080673 | TBS table design for DL-SCH and UL-SCH | Samsung | Not treated |
| R1-080674 | Details of PHICH allocation | Samsung | Not treated |
| R1-080675 | Configuration of PDCCH candidate sets for the control of blind decoding attempts | Samsung | Not treated |
| R1-080676 | ACK/NAK DTX Detection in the PUSCH | Samsung | Not treated |
| R1-080677 | ACK/NAK Repetitions in E-UTRA UL | Samsung | Not treated |
| R1-080678 | Multiplexing ACK/NAK in the PUSCH | Samsung | Not treated |
| R1-080679 | Multiplexing Control and Data in the PUSCH | Samsung | Not treated |
| R1-080680 | Slot-level UL ACK/NACK Cyclic Shift/Orthogonal Cover Remapping | Samsung | Not treated |
| R1-080681 | UL ACK/NACK resource indication for DL persistent scheduling | Samsung, NTT DoCoMo, Panasonic, Qualcomm | Noted |
| R1-080682 | Robust RE mapping of control and data on PUSCH | Samsung | Not treated |
| R1-080683 | Frequency Hopping Pattern for PUSCH | Samsung, LGE, NEC, Qualcomm, ZTE | Revised |
| R1-080684 | PDSCH-to-RE mapping robust against CCFI reception errors | Samsung | Not treated |
| R1-080685 | RV definition for UL-SCH | Samsung | Noted |
| R1-080686 | Adjustment to starting positions of redundancy versions for turbo code rate matching | Samsung | Not treated |
| R1-080687 | CRC generator polynomial for PDCCH | Samsung | Noted |
| R1-080688 | Transmission Power Control Using DM RS for UL VoIP | Samsung | Not treated |
| R1-080689 | Further discussion on data power setting for PDSCH | Samsung | Not treated |
| R1-080690 | Power Scaling and DL RS boosting | Samsung | Not treated |
| R1-080691 | Summary of email discussion on CQI reporting | Samsung | Noted |
| R1-080692 | Further considerations on MIMO CQI | Samsung | Not treated |
| R1-080693 | SU-MIMO PMI feedback and Compression | Samsung | Not treated |
| R1-080694 | CQI Reporting for MU-MIMO | Samsung | Not treated |
| R1-080695 | CQI report format | Samsung | Not treated |
| R1-080696 | E-DCH transmission timing for Enhanced Uplink in Cell_FACH | Samsung | Noted |
| R1-080697 | On the interference prior to the completion of contention resolution | Samsung | Noted |
| R1-080698 | Edge treatment for MIMO CQI compression | Marvell | Not treated |
| R1-080699 | Bit permutation for CQI coding | Marvell | Not treated |
| R1-080700 | Sounding Reference Signal In Support of Scheduling Request in E-UTRA | Texas Instruments | Not treated |
| R1-080701 | Some Options for Cyclic Shift Hopping | Texas Instruments | Not treated |
| R1-080702 | CRC Length for PDCCH | Texas Instruments | Not treated |
| R1-080703 | PDCCH Content and Formats | Texas Instruments | Not treated |
| R1-080704 | Consideration of Supportable MCS for E-UTRA DL | Texas Instruments | Revised |
| R1-080705 | Channelization for Scheduling Request Indicator on PUCCH | Texas Instruments | Revised |
| R1-080706 | Resource allocation for Scheduling Request Indicator on PUCCH | Texas Instruments | Not treated |
| R1-080707 | Cell Specific CS Hopping and Slot Based CS/OC Remapping on PUCCH | Texas Instruments | Noted |
| R1-080708 | Separate Rank and CQI Feedback in PUCCH | Texas Instruments | Not treated |
| R1-080709 | Simultaneous ACK/NAK and SR Transmission in Uplink | Texas Instruments | Not treated |
| R1-080710 | Considerations on Data and Control Multiplexing on PUSCH | Texas Instruments | Not treated |
| R1-080711 | CQI Reporting Procedure for E-UTRA | Texas Instruments | Revised |
| R1-080712 | CQI, PMI, and Rank Reports for E-UTRA | Texas Instruments | Not treated |
| R1-080713 | CQI and PMI Report Combinations on PUSCH | Texas Instruments | Revised - Noted |
| R1-080714 | Rank and PMI Feedback Rate – Analysis | Texas Instruments | Not treated |
| R1-080715 | Rank Feedback Rate – System Simulation | Texas Instruments | Not treated |
| R1-080716 | CQI/PMI Feedback Rate – System Simulation | Texas Instruments | Not treated |
| R1-080717 | TS 36.213 v8.1.0 CR | Motorola | Revised |
| R1-080718 | Short CP Dedicated Reference Symbol Pattern Simulation Results | Motorola | Revised |
| R1-080719 | Hopping Patterns for UL RS | Motorola | Noted |
| R1-080720 | Cyclic Shift values for UL RS | Motorola | Not treated |
| R1-080721 | Indication of UE Antenna Selection for PUSCH | Motorola | Not treated |
| R1-080722 | Open Issues on UL Sounding RS | Motorola | Not treated |
| R1-080723 | Multiplexing of SRS and PUSCH | Motorola | Not treated |
| R1-080724 | PHICH Transmission for 1 Tx Antenna | Motorola | Not treated |
| R1-080725 | PCFICH Transmission for 1 Tx Antenna | Motorola | Not treated |
| R1-080726 | Downlink Control Signalling for TDD | Motorola | Not treated |
| R1-080727 | TBS and MCS Signaling and Tables | Motorola | Not treated |
| R1-080728 | On NDI and RV in LTE downlink | Motorola | Not treated |
| R1-080729 | PHICH resource signaling for TDD and FDD | Motorola | Revised |
| R1-080730 | PDCCH Formats and Contents | Motorola | Not treated |
| R1-080731 | PDCCH Search Space Assignment & Signaling | Motorola | Not treated |
| R1-080732 | PDCCH Coverage 1248 vs 124 vs 12348 with limited PC dynamic range | Motorola | Withdrawn |
| R1-080733 | DRX and Change Update Rate for Broadcast LTE L1 Parameters | Motorola | Withdrawn |
| R1-080734 | PHICH Assignment for TDD and FDD | Motorola | Not treated |
| R1-080735 | PDCCH Performance vs WB CQI update rate | Motorola | Not treated |
| R1-080736 | Repetition of UL ACK/NACK on PUCCH | Motorola | Not treated |
| R1-080737 | ACK/NACK and SR Multiplexing | Motorola | Not treated |
| R1-080738 | UL ACK/NACK for TDD | Motorola | Noted |
| R1-080739 | Uplink Control Signaling with Persistent Scheduling | Motorola | Not treated |
| R1-080740 | Details of A/N subcode for extended CP | Motorola | Not treated |
| R1-080741 | Control and Data Multiplexing on PUSCH | Motorola | Not treated |
| R1-080742 | Impact of PUSCH Puncturing to Accommodate ACK/NACK | Motorola | Not treated |
| R1-080743 | System Results for Nd=3 | Motorola | Missing |
| R1-080744 | Downlink DVRB email reflector summary | Motorola | Noted |
| R1-080745 | Uplink SCH Hopping email reflector summary | Motorola | Noted |
| R1-080746 | PDCCH Scrambling and ACK/NAK detection | Motorola | Not treated |
| R1-080747 | RS, Control, and Data in DwPTS | Motorola | Noted |
| R1-080748 | Shortened RB definition for Subframes 0 and 5 (with SCH & BCH) | Motorola | Not treated |
| R1-080749 | Remaining issues on UL/DL PC | Motorola | Not treated |
| R1-080750 | PHICH power borrowing from PDCCH | Motorola | Not treated |
| R1-080751 | Uplink Inter-Cell Power Control: X2 Messages | Motorola | Not treated |
| R1-080752 | Observations on UL ICIC | Motorola | Not treated |
| R1-080753 | Frequency-selective CQI report on PUCCH for Single Tx and TxD | Motorola, Freescale, Samsung, Panasonic, NTT DoCoMo, Texas Instruments | Noted |
| R1-080754 | Frequency-selective CQI report on PUCCH for SU-MIMO | Motorola, Freescale, Samsung, Panasonic, Texas Instruments | Noted |
| R1-080755 | CQI modes for E-UTRA | Motorola | Not treated |
| R1-080756 | Performance of CQI/PMI schemes for PUCCH | Motorola | Noted |
| R1-080757 | 25.212 CR260 (Rel-8, F) Correction of RV mapping in HS-SCCH type 3 for 64-QAM support | QUALCOMM Europe | Noted |
| R1-080758 | PHICH Resource Allocated scheme | ZTE | Not treated |
| R1-080759 | Details for ACK/NACK subcode design | ZTE | Agreed |
| R1-080760 | 1.28Mcps TDD 64-QAM modulation indication and feedback | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio | Agreed |
| R1-080761 | Correction on PRACH Sequence Ordering Table | ZTE, RITT | Revised |
| R1-080762 | Performance analysis for LBRM | ZTE | Noted |
| R1-080763 | VoIP capacity Improvement by optimization CQI in PUCCH | SHARP | Revised |
| R1-080764 | CQI, PMI, and rank report feedback interval | SHARP | Revised |
| R1-080765 | Persistent CQI/PMI/rank reporting on PUCCH/PUSCH | SHARP | Revised |
| R1-080766 | UL Sub-frame Bundling and VoIP coverage | Nortel | Noted |
| R1-080767 | Perforamnce evaluation of Dedicated RS Structures for Beam-Forming Transmission | Nortel | Not treated |
| R1-080768 | Channel Estimation Performance Evaluation on PDCCH in BF Zones | Nortel | Not treated |
| R1-080769 | Further discussion on DL/UL signaling channel supporting rank adaptation for high mobility UE | Nortel | Not treated |
| R1-080770 | MCS Table Design for eNB | Nortel | Not treated |
| R1-080771 | Discussion on the PHICH linkage to uplink transmission | Nortel | Not treated |
| R1-080772 | Further discussion on the DVRB mapping scheme | Nortel | Not treated |
| R1-080773 | Power Balancing for 4 Tx Antennas | Nortel | Not treated |
| R1-080774 | UL MU-MIMO scheduling for high mobility | Nortel | Not treated |
| R1-080775 | Need of procedure for supporting MU-MIMO | Nortel | Not treated |
| R1-080776 | PHICH Index Mapping for Uplink Transmission for E-UTRA | InterDigital Communications LLC | Not treated |
| R1-080777 | Downlink Control Signaling for MU-MIMO | InterDigital Communications LLC | Not treated |
| R1-080778 | ZC Sequence Ordering for Short RACH | ZTE | Revised |
| R1-080779 | Remaining Issues on UL DM RS Sequence Hopping | ZTE | Not treated |
| R1-080780 | Simulation on the 64-QAM modulation indication scheme for 1.28Mcps TDD | ZTE | Missing |
| R1-080781 | RS configuration in DwPTS | TD Tech | Noted |
| R1-080782 | 25.224 CR0174 (Rel-7, F) on EUL power control clarification | TD Tech | Not treated |
| R1-080783 | 25.221 CR0152 (Rel7,F) E-AGCH timing for 1.28Mcps TDD EUL | CATT | Agreed |
| R1-080784 | 25.221CR0153 (Rel7,F) Clarification of the description about E-PUCH for 1.28Mcps TDD EUL | CATT | Agreed |
| R1-080785 | 25.222 CR0144 (Rel7,F) Some corrections for 1.28Mcps TDD EUL | CATT | Revised |
| R1-080786 | 25.224 CR0175 (Rel7,F) Clarification of the E-AGCH monitering for 1.28Mcps TDD EUL | CATT | Noted |
| R1-080787 | 25.224 CR0176 (Rel7,F) Improvement of the UL synchronisation of E-PUCH for 1.28Mcps TDD EUL | CATT | Agreed |
| R1-080788 | 25.224 CR0177 (Rel7,F) Clarification and Correction of E-PUCH power control for LCR TDD | CATT | Noted - Revised |
| R1-080789 | 25.224 Cr0178 (Rel7,F) Improvement of the non-scheduled E-DCH transmission procedure for 1.28Mcps TDD EUL | CATT | Noted |
| R1-080790 | 25.222 CR0145 (Rel7,F) Clarification on TFCI mapping for 1.28Mcps TDD MBMS | CATT | Revised |
| R1-080791 | System Simulation Results of 2×2 MIMO for 1.28Mcps TDD | CATT | Noted |
| R1-080792 | Analysis on MIMO schemes for 1.28Mcps TDD | CATT, TD-TECH | Noted |
| R1-080793 | Analysis on CQI and HARQ feedback for Enhanced CELL_FACH state | Huawei | Noted |
| R1-080794 | Discussion on resource allocation scheme for Enhanced CELL-FACH State | Huawei | Noted |
| R1-080795 | UE specific reference pattern | CATT, CMCC, RITT | Not treated |
| R1-080796 | Multiplexing of UE-specific RS and cell-specific RS in DL | CATT | Not treated |
| R1-080797 | Multi-TTI Scheduling for LTE TDD UL | CATT | Not treated |
| R1-080798 | Indication of UL/DL allocation for TDD on PBCH | CATT, Huawei | Not treated |
| R1-080799 | Sounding reference signals in UpPTS for TDD | CATT, CMCC, RITT | Noted |
| R1-080800 | Usage of DwPTS for TDD | CATT | Noted |
| R1-080801 | On UE measurements for TDD asymmetry scenario | CATT, Huawei, RITT | Revised |
| R1-080802 | On antenna calibration of LTE | CATT | Not treated |
| R1-080803 | UL Sounding RS Control Signaling for Closed Loop Antenna Selection | Mitsubishi Electric | Not treated |
| R1-080804 | Parameter in TS36.306 to indicate whether UE supports UL transmit diversity | Mitsubishi Electric | Noted |
| R1-080805 | Potential issues with large DRX cycles | QUALCOMM Europe | Noted |
| R1-080806 | Reducing smallest E-TFCI value | QUALCOMM Europe | Noted |
| R1-080807 | Code Impact of Proposal for Enhancing HS-DSCH Serving Cell Change Based on New Channel Similar to E-RGCH | QUALCOMM Europe | Noted |
| R1-080808 | Link Analysis of AICH/E-AICH E-DCH Resource Allocation scheme | QUALCOMM Europe | Noted |
| R1-080809 | Collision/Blocking Probability Analysis of AICH/E-AICH E-DCH Resource Allocation scheme | QUALCOMM Europe | Noted |
| R1-080810 | Error Performance Analysis of AICH/E-AICH based E-DCH resource allocation scheme | QUALCOMM Europe | Noted |
| R1-080811 | Link Impact due to E-DCH Collisions in CELL_FACH | QUALCOMM Europe | Noted |
| R1-080812 | Impact of Intercell Interference with EUL in CELL_FACH | QUALCOMM Europe | Noted |
| R1-080813 | List of E-DCH resource parameters | QUALCOMM Europe | Noted |
| R1-080814 | System Performance of Uplink Interference Cancellation in Sync E-DCH Simulation Scenarios | QUALCOMM Europe | Revised |
| R1-080815 | Improving reliability of HS-PDSCH Serving Cell Change procedure | QUALCOMM Europe | Noted |
| R1-080816 | Draft TR | QUALCOMM Europe | Noted |
| R1-080817 | Open issues on UE-specific RS | Philips | Not treated |
| R1-080818 | UE-specific RS pattern | Philips | Missing |
| R1-080819 | Configuration of PDCCH blind decoding sets | Philips, NXP | Not treated |
| R1-080820 | PDCCH message information content for persistent scheduling | Philips, NXP | Not treated |
| R1-080821 | Resource allocation signalling on PDCCH | Philips, NXP | Not treated |
| R1-080822 | Distributed Resource Allocation Signalling on PDCCH | Philips, NXP | Not treated |
| R1-080823 | PDCCH message information content for UL resource allocation | Philips, NXP | Not treated |
| R1-080824 | PDSCH timing for power saving for paging in idle mode | Philips, NXP | Not treated |
| R1-080825 | Way forward on Distributed DVRB for EUTRA downlink | Philips | Noted |
| R1-080826 | MBSFN remaining issues | Philips | Not treated |
| R1-080827 | Codebook for MU-MIMO | Philips, NXP | Not treated |
| R1-080828 | CQI definition for MU-MIMO | Philips, NXP | Not treated |
| R1-080829 | UE procedure for ACK/NACK detection | Philips, NXP | Not treated |
| R1-080830 | Remaining issues on E-RACH procedure | Philips | Noted |
| R1-080831 | UL coverage considerations for VoIP transmission | Philips, NXP | Noted |
| R1-080832 | 25212CR0261 (Rel-8, F), Correction to RV-coding in case of simultaneous usage of 64QAM and MIMO | Nokia, Nokia Siemens Networks | Agreed |
| R1-080833 | 25214CR0479 (Rel-7, F), Correction to UE grant monitoring | Nokia, Nokia Siemens Networks | Noted - Revised |
| R1-080834 | 25214CR0480 (Rel-8, A), Correction to UE grant monitoring | Nokia, Nokia Siemens Networks | Noted - Revised |
| R1-080835 | 25211CRdraft (Rel-8, B), Introduction of E-AICH for the purpose of E-DCH Resource Configuration Allocation | Qualcomm Europe, Ericsson, Huawei, Motorola, NEC, Nokia, Nokia Siemens Networks, NXP, Philips | Endorsed |
| R1-080836 | E-AICH resource assignment performance results | Nokia, Nokia Siemens Networks | Noted |
| R1-080837 | 25214CRdraft (Rel-8, B), RACH procedure relation to Enhanced Uplink for CELL_FACH state | Nokia, Nokia Siemens Networks | Noted |
| R1-080838 | 25215CRdraft (Rel-8, B), UPH measurement support for Enhanced Uplink for CELL_FACH state | Nokia, Nokia Siemens Networks | Endorsed |
| R1-080839 | Text proposal on S-EDCH CM & PAPR effects | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080840 | Text proposal - system simulation results | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080841 | Text proposal on DL channel structure impact | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080842 | Text proposal on impact to L1 procedures | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080843 | Text proposal on impact to L2/3 procedures | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080844 | Text proposal on impacts to the specifications | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080845 | Text proposal on synchronisation | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080846 | Text proposal on backward compatibility | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080847 | Text proposal on complexity analysis | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080848 | Text proposal on conclusion | Nokia Siemens Networks, Nokia | Noted - Revised |
| R1-080849 | Simulation results of HS-PDSCH serving cell change in Manhattan environment | Nokia, Nokia Siemens Networks | Noted |
| R1-080850 | UE specific PDCCH scrambling for blind detection complexity reduction | Mitsubishi Electric | Not treated |
| R1-080851 | Initialisation of shift registers for PDCCH scrambling | Mitsubishi Electric | Not treated |
| R1-080852 | Length of the reserved period in half-duplex FDD | Mitsubishi Electric | Withdrawn |
| R1-080853 | DL:UL Allocation for TDD | Motorola | Not treated |
| R1-080854 | Dynamic DVRB signaling | Motorola | Not treated |
| R1-080855 | Open issues on UL slot hopping | Motorola | Not treated |
| R1-080856 | Distributed Virtual Resource Block Mapping for Persistent Resource Allocation as VoIP | Alcatel-Lucent | Not treated |
| R1-080857 | Signaling of non-compact Resource Allocation in DL Control Channel | Alcatel-Lucent | Noted |
| R1-080858 | Semi-Static Interference Coordination Method | Alcatel-Lucent | Not treated |
| R1-080859 | Support for Semi-Static Inter cell Interference Coordination | Alcatel-Lucent, Nortel Networks | Not treated |
| R1-080860 | Signaling of Slot Based Frequency Hopping with grant based frequency shift information for UL Transmission | Alcatel-Lucent | Noted |
| R1-080861 | Clarification on Uplink Power Control to support UL ICIC | Alcatel-Lucent | Noted |
| R1-080862 | eNodeB Indicator definition for “Maximum Tx Power per PRB normalized” | Alcatel-Lucent | Not treated |
| R1-080863 | X2-signalling of eNodeB Max Tx Power per PRB report | Alcatel-Lucent | Not treated |
| R1-080864 | Performance of PMI Compression Schemes for E-UTRA | Icera Semiconductor | Not treated |
| R1-080865 | On Uplink coverage for LTE | Ericsson | Noted |
| R1-080866 | Uplink DM RS, discussion/proposals on remaining issues | Ericsson | Noted |
| R1-080867 | Uplink SRS, discussion/proposals on remaining issues | Ericsson | Missing |
| R1-080868 | On TBS sizes for LTE | Ericsson | Withdrawn |
| R1-080869 | Summary of e-mail discussion on downlink control signaling | Ericsson | Noted |
| R1-080870 | Combination of ACK/NACKs for TDD | Ericsson | Noted |
| R1-080871 | Summary of e-mail discussion on uplink control signaling | Ericsson | Noted |
| R1-080872 | Initialization of the 31-Gold sequence generator | Ericsson | Noted |
| R1-080873 | On the design of DwPTS | Ericsson | Noted |
| R1-080874 | On the remaining DL-UL allocation | Ericsson | Withdrawn |
| R1-080875 | On Antenna Configuration Detection and Transmission of Synchronization Signal | Ericsson | Not treated |
| R1-080876 | On HARQ operation for MIMO | Ericsson | Not treated |
| R1-080877 | Extending Codeword to Layer Mapping for Efficient Support of Retransmissions | Ericsson | Noted |
| R1-080878 | On Radio Problem Detection | Ericsson | Withdrawn |
| R1-080879 | Power Control for PRACH | Ericsson | Not treated |
| R1-080880 | Power Control for Retransmissions | Ericsson | Not treated |
| R1-080881 | Range and representation of delta_MCS | Ericsson | Not treated |
| R1-080882 | Completion of Open Issues on Power Control Command | Ericsson | Not treated |
| R1-080883 | Uplink power control, removal of unnecessary options | Ericsson | Not treated |
| R1-080884 | Additional RSRP reporting trigger for ICIC | Ericsson | Not treated |
| R1-080885 | System Level Evaluation of Closed-Loop Large Delay CDD | Ericsson | Not treated |
| R1-080886 | Signaling Requirements for 2 Tx Precoding | Ericsson | Not treated |
| R1-080887 | CQI Measurement Methodology | Ericsson | Noted |
| R1-080888 | Detection of Duplex | Ericsson | Not treated |
| R1-080889 | Maximum Timing Advance for TDD | Ericsson | Not treated |
| R1-080890 | Uplink ACK/NACK timing for TDD | Ericsson | Not treated |
| R1-080891 | Number of DL HARQ processes for TDD | Ericsson | Not treated |
| R1-080892 | Number of UL HARQ processes and HARQ timing for TDD | Ericsson | Not treated |
| R1-080893 | On MBSFN neighbour cell indicators for UE measurements for TDD | Ericsson | Not treated |
| R1-080894 | Draft LS on MBSFN neighbour cell indicators for UE measurements for TDD | Ericsson | Not treated |
| R1-080895 | Sorting of PRACH root sequences for preamble format 4 | Ericsson | Noted |
| R1-080896 | On remaining PRACH issues for TDD | Ericsson | Not treated |
| R1-080897 | Draft reply LS on RACH retransmission delay | Ericsson | Noted |
| R1-080898 | Draft CR to 36.211 v8.1.0 including decisions from RAN1#51bis | Ericsson | Endorsed - Revised |
| R1-080899 | On the location of ACK/NACK bits on UL PUSCH | Fujitsu | Not treated |
| R1-080900 | Physical-layer parameters to be configured by RRC | Ericsson | Noted |
| R1-080901 | Holes in the L1 specification | Ericsson | Missing |
| R1-080902 | Initial Multi-Carrier HSPA performance evaluation | Ericsson | Noted |
| R1-080903 | On the introduction of a second UE DRX cycle in CELL_DCH | Ericsson | Noted |
| R1-080904 | HS-SCCH orders for HS-SCCH-less operation | Ericsson | Noted |
| R1-080905 | Further simulation results for AICH-based resource allocation signaling in Enhanced CELL_FACH | Ericsson | Noted |
| R1-080906 | Timing and acknowledgement signaling for EUL in CELL_FACH | Ericsson | Noted |
| R1-080907 | Inter-cell interference issues for EUL in CELL_FACH | Ericsson | Noted |
| R1-080908 | System performance of Synchronized E-DCH | Ericsson | Revised |
| R1-080909 | Requirements for E-DCH TDM support | Ericsson | Noted |
| R1-080910 | PAPR for Synchronized E-DCH | Ericsson | Noted |
| R1-080911 | HS Serving Cell Change Enhancements | Ericsson | Noted |
| R1-080912 | Power Offsets to Support Data and Control Multiplexing for Persistent PUSCH | Alcatel-Lucent | Not treated |
| R1-080913 | Performance Comparison of Solutions for Subframe Bundling | Alcatel-Lucent | Noted |
| R1-080914 | Implications of Solutions for Subframe Bundling | Alcatel-Lucent | Noted |
| R1-080915 | RACH Frequency position | LG Electronics | Not treated |
| R1-080916 | On the need of ramping step size zero for FDD PRACH | LG Electronics | Not treated |
| R1-080917 | Way Forward on Orthogonal Sequences for DL Reference signals | Nokia, Nokia Siemens Networks | Revised |
| R1-080918 | SRS Position for EUTRA FDD/TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-080919 | Slot-based CS/OC re-mapping for PUCCH | Nokia Siemens Networks, Nokia | Revised |
| R1-080920 | CS hopping for DM RS | Nokia Siemens Networks, Nokia | Not treated |
| R1-080921 | SRS Bandwidth Selection | Nokia Siemens Networks, Nokia | Not treated |
| R1-080922 | A proposal for LTE TDD Uplink Multi-TTI Scheduling | Nokia, Nokia Siemens Networks | Not treated |
| R1-080923 | PHICH resource mapping/dimensioning for TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-080924 | DCI and CCE size | Nokia, Nokia Siemens Networks | Not treated |
| R1-080925 | Associated PDCCH signaling for PCH, RACH response and BCCH transmission on PDSCH | Nokia, Nokia Siemens Networks | Revised |
| R1-080926 | Downlink resource assignment structure for LTE | Nokia, Nokia Siemens Networks | Revised |
| R1-080927 | PHICH and mapping to PHICH groups | Nokia, Nokia Siemens Networks | Not treated |
| R1-080928 | Reducing the decoding complexity of the PDCCH | Nokia, Nokia Siemens Networks | Revised |
| R1-080929 | MBMS single-cell p-t-m related control signaling | Nokia, Nokia Siemens Networks | Revised |
| R1-080930 | On the need for memoryless DL control information | Nokia, Nokia Siemens Networks | Not treated |
| R1-080931 | ACK/NACK channelization for PRBs containing both ACK/NACK and CQI | Nokia Siemens Networks, Nokia, Texas Instruments | Agreed |
| R1-080932 | Simultaneous transmission of ACK/NACK and SR | Nokia Siemens Networks, Nokia | Noted |
| R1-080933 | DTX detection in case of simultaneous transmission of SR and ACK/NACK | Nokia Siemens Networks, Nokia | Not treated |
| R1-080934 | Capacity and coverage analysis for the number of CQI bits carried on PUCCH | Nokia Siemens Networks, Nokia | Not treated |
| R1-080935 | Avoiding PUSCH error situations caused by DL allocation grant signalling failure (FDD/TDD) | Nokia Siemens Networks, Nokia | Not treated |
| R1-080936 | Open items of control signaling on PUSCH | Nokia Siemens Networks, Nokia | Revised |
| R1-080937 | Orthogonal Cover Design for Scheduling Request | Nokia Siemens Networks, Nokia | Revised |
| R1-080938 | Comparison of single-sequence and multi sequence modulation with existing DM RS sequence set | Nokia Siemens Networks, Nokia | Revised |
| R1-080939 | Implicit Mapping of ACK/NACK resources | Nokia Siemens Networks, Nokia | Revised |
| R1-080940 | Scrambling Sequence Initialization | Nokia Siemens Networks, Nokia | Noted |
| R1-080941 | Physical Channel/signals arrangement in DwPTS | Nokia, Nokia Siemens Networks | Noted |
| R1-080942 | L1 Support of Dedicated MBSFN Carriers | Nokia Siemens Networks, Nokia, Huawei, Ericsson, LGE | Revised |
| R1-080943 | Multi-cell PBCH Coverage and Capacity | Nokia Siemens Networks, Nokia | Revised |
| R1-080944 | CRC Mask Selection for PBCH | Nokia Siemens Networks, Nokia | Revised |
| R1-080945 | Simulation results on RV usage for uplink HARQ | Nokia Siemens Networks, Nokia | Noted |
| R1-080946 | Way forward on RV usage for uplink HARQ | Nokia Siemens Networks, Nokia, Motorola, Ericsson, LGE, ZTE | Noted |
| R1-080947 | Triggers for Power Headroom Reports in EUTRAN Uplink | Nokia Siemens Networks, Nokia | Not treated |
| R1-080948 | Summary of power control email discussion | Nokia Siemens Networks | Noted |
| R1-080949 | On Definition and Usage of the Uplink Overload Indicator | Nokia Siemens Networks, Nokia | Not treated |
| R1-080950 | Performance of Proactive Uplink ICIC under Fractional Load | Nokia Siemens Networks, Nokia | Not treated |
| R1-080951 | Frequency selective CQI reporting on PUCCH | Nokia Siemens Networks, Nokia | Not treated |
| R1-080952 | Rank reporting on PUCCH | Nokia Siemens Networks, Nokia | Revised |
| R1-080953 | Number of spatially multiplexed users for LTE DL MU-MIMO | Nokia, Nokia Siemens Networks | Revised |
| R1-080954 | Channel Quality Indicator for LTE MU-MIMO | Nokia, Nokia Siemens Networks | Revised |
| R1-080955 | Effect of Precoding Granularity on LTE Multiuser MIMO | Nokia, Nokia Siemens Networks | Revised |
| R1-080956 | DL signaling for closed loop antenna selection in LTE UL | Nokia Siemens Networks, Nokia, Ericsson | Revised |
| R1-080957 | UL HARQ Timing of TDD | Nokia, Nokia Siemens Networks | Not treated |
| R1-080958 | HARQ Numbers of LTE TDD considering the proposal of special subframe | Nokia, Nokia Siemens Networks | Not treated |
| R1-080959 | Definition of Antenna Connector for eNB Measurements | Nokia Siemens Networks, Nokia | Agreed |
| R1-080960 | Update to 36.214 | Nokia | Endorsed - Revised |
| R1-080961 | TDD RACH Configurations | Nokia, Nokia Siemens Networks | Withdrawn |
| R1-080962 | Limitations of CQI Compression for Dual Codeword MIMO | Alcatel-Lucent | Not treated |
| R1-080963 | Hopping of UL DM-RS | Qualcomm Europe | Noted |
| R1-080964 | Multiplexing of SR and ACK/NAK transmission on PUCCH | Qualcomm Europe | Not treated |
| R1-080965 | Support of DTX signalling for CQI transmission with normal CP | Qualcomm Europe | Not treated |
| R1-080966 | Interference between Sounding Reference Signal and PRACH | Texas Instruments | Not treated |
| R1-080967 | Comparison of Different ACK/NAK in CQI RS Transmission Schemes | Texas Instruments | Not treated |
| R1-080968 | CQI and PMI feedback on PUSCH for rank-1 precoding | Huawei | Not treated |
| R1-080969 | Signaling of MU-MIMO precoding vector | Huawei | Not treated |
| R1-080970 | Performance Evaluation of the Rotational CDM for L1/L2 Control Channel | KDDI | Not treated |
| R1-080971 | Gain of CAZAC sequence hopping for ACK/NACK and CQI Signals in PUCCH | KDDI | Not treated |
| R1-080972 | Multiplexing of Scheduling Request and ACK/NACK Signals in E-UTRA Uplink | KDDI | Not treated |
| R1-080973 | Joint Transport Format and Redundancy Version signaling with explicit NDI | Panasonic | Noted |
| R1-080974 | MCS table definition and analysis of related MAC padding overhead | Panasonic | Not treated |
| R1-080975 | PDCCH payload formats, sizes and CCE aggregation | Panasonic | Revised |
| R1-080976 | Implicit assignment of PHICH | Panasonic | Resubmission of R1-080135 - Not treated |
| R1-080977 | DL D-VRB to PRB mapping | Panasonic | Revised |
| R1-080978 | Necessity of the scrambling for ACK/NACK on PUCCH | Panasonic | Revised |
| R1-080979 | Necessity of the scrambling for the reference signal of CQI in PUCCH | Panasonic | Resubmission of R1-080143 - Not treated |
| R1-080980 | Mapping position of control channel for Uplink Shared Channel | Panasonic | Resubmission of R1-080141 - Not treated |
| R1-080981 | ACK/NACK repetition and Implicit Resource Allocation for PUCCH | Panasonic | Resubmission of R1-080142 - Not treated |
| R1-080982 | Proposal for the implicit resource mapping for UL ACK/NACK channels | Panasonic |