The 5G Standard



3GPP active work programme


Click on UID to show list of all TSs and TRs associated with this work item.

Click on WI code to see a list of TSs and TRs specifically resulting from this work item.

Click on the percentage completion to see a list of approved Change Requests associated with this work item.

The "impact" shows an empirical best-guess of which TSs and TRs are likely to be modified as a result of the WI.

Work Items which have been abandoned are greyed out, and the TSG meeting at which they were abandoned is shown in the final column.

UID code title release lead body completion %
done
WID TDoc WID history created date last updated remarks abandoned
500026 vSRVCC Single Radio Video Call Continuity for 3G-CS Rel-11 C4, C3, C1, S2 15/06/2012

100

SP-100704 history 2010/11/26 18/06/2012 CP#56 completed. Provide Single Radio VIDEO Call Continuity from E-UTRAN to UTRAN-CS based on the agreed architecture alternative in TR 23.886
500126 - ... Stage 2 for Single Radio Video Call Continuity for 3G-CS Rel-11 S2 21/09/2011

100

SP-100704 history 2010/11/26 18/06/2012 SP#53 completed. Triggered by Feasibility Study on video call handover capability in TR 23.886 UID_470048 Study on Single Radio Video Call Continuity for 3G-CS (FS_vSRVCC)
520005 vSRVCC-CT ... CN aspects of Single Radio Video Call Continuity for 3G-CS Rel-11 C4, C3, C1 15/06/2012

100

CP-120278 history 2011/05/18 06/06/2012 Stage 3. CP#56 completed
520105 - ...... CT1 aspects of Single Radio Video Call Continuity for 3G-CS Rel-11 C1 15/06/2012

100

CP-120278 history 2011/05/18 06/06/2012 CP#56 completed
520205 - ...... CT3 aspects of Single Radio Video Call Continuity for 3G-CS Rel-11 C3 02/12/2011

100

CP-120278 history 2011/05/18 06/06/2012 CP#54 completed
520305 - ...... CT4 aspects of Single Radio Video Call Continuity for 3G-CS Rel-11 C4 02/12/2011

100

CP-120278 history 2011/05/18 06/06/2012 CP#54 completed