The 5G Standard



3GPP active work programme


Click on UID to show list of all TSs and TRs associated with this work item.

Click on WI code to see a list of TSs and TRs specifically resulting from this work item.

Click on the percentage completion to see a list of approved Change Requests associated with this work item.

The "impact" shows an empirical best-guess of which TSs and TRs are likely to be modified as a result of the WI.

Work Items which have been abandoned are greyed out, and the TSG meeting at which they were abandoned is shown in the final column.

UID code title release lead body completion %
done
WID TDoc WID history created date last updated remarks abandoned
380060 IPinterc IP Interconnection of Services Rel-8 C3, S5, S2, S1 06/03/2009

100

SP-080565 history 2007/12/13 02/08/2010 SP#43 completed
380061 - ... Stage 1 for IPinterc Rel-8 S1 12/03/2008

100

SP-080565 history 2007/12/13 02/08/2010 SP#39 completed.
7005 IMS_NNI ... System enhancements for interconnection interfaces between two IMSs Rel-8 C3, S5, S2 06/03/2009

100

SP-080554 history 2006/02/16 02/08/2010 CP#43 completed
360024 - ...... Stage 2 for IMS_NNI Rel-8 S2 06/12/2007

100

SP-080554 history 2007/06/22 02/08/2010 SP#38 completed
360011 FBI2-IOPSI ...... IMS inter-operator service interconnection interface Rel-8 C3 06/03/2009

100

CP-080578 history 2007/06/20 02/08/2010 CP#43 completed
330011 FBI2-TISP2-CH ...... Charging harmonization for NGN between 3GPP and ATIS-TMOC Rel-8 S5 07/12/2006

100

SP-060545 history 2006/10/09 03/03/2008 SP#34 completed
7007 FBI2-TISP2-c1 ...... Deleted - Protocol impact of FBI for TISPAN R2 Rel-8 C1 15/03/2007

100

history 2006/02/16 24/03/2009 SP#38 stopped SP-38
7006 FBI2-TISP2-s2 ...... Deleted (never approved) - Stage 2 of FBI for TISPAN R2 - Rel 8 Rel-8 S2 30/11/2007

100

history 2006/02/16 24/03/2009 SP#36 stopped SP-36