3GPP Specification Change Requests

Back to numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 34.121

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - D R99 3.0.1 3.1.0 Editorial corrections to clauses 2, 3, 4 and 5.1 TP-08 TP-000090 approved T1 - T1-000059 AGREED 2000-05-21 - - -
0002 - C R99 3.0.1 3.1.0 Modifications to clause 5.4 ""Output Power Dynamics in the Uplink"" TP-08 TP-000090 approved T1 - T1-000060 AGREED 2000-06-14 - - -
0003 - B R99 3.0.1 3.1.0 Out-of-synchronisation handling of the UE TP-08 TP-000090 approved T1 - T1-000061 AGREED 2000-06-14 - - -
0004 - D R99 3.0.1 3.1.0 Modifications to clauses 5.8, 5.9, 5.10 and 5.11 TP-08 TP-000090 approved T1 - T1-000062 AGREED 2000-06-14 - - -
0005 - F R99 3.0.1 3.1.0 Modifications to Chapter 6 ""Receiver Characteristics"" TP-08 TP-000090 approved T1 - T1-000063 AGREED 2000-06-14 - - -
0006 - F R99 3.0.1 3.1.0 Modifications to Annex D, Annex E, Annex G and Annex H TP-08 TP-000090 approved T1 - T1-000067 AGREED 2000-06-14 - - -
0007 - B R99 3.0.1 - Interpretation of measurement results TP-08 TP-000090 rejected T1 - T1-000068 AGREED 2000-06-14 - - -
0008 - F R99 3.0.1 3.1.0 Modifications to clauses 5.5, 5.6 and 5.7 TP-08 TP-000090 approved T1 - T1-000069 AGREED 2000-06-14 - - -
0009 - F R99 3.0.1 3.1.0 Modifications to Chapter 7 ""Performance requirements"" TP-08 TP-000090 approved T1 - T1-000070 AGREED 2000-06-14 - - -
0010 - F R99 3.0.1 3.1.0 Modifications to test power control in downlink TP-08 TP-000090 approved T1 - T1-000071 AGREED 2000-06-14 - - -
0011 - F R99 3.0.1 3.1.0 Modifications to clause 5.13 ""Transmit Modulation"" TP-08 TP-000090 approved T1 - T1-000072 AGREED 2000-06-14 - - -
0012 - F R99 3.0.1 3.1.0 Modifications to test for inner loop power control in the uplink TP-08 TP-000090 approved T1 - T1-000073 AGREED 2000-06-14 - - -
0013 - F R99 3.0.1 3.1.0 Revision of Annex B: Global in-channel Tx test TP-08 TP-000090 approved T1 - T1-000074 AGREED 2000-06-14 - - -
0014 - B R99 3.0.1 3.1.0 Blind transport format detection TP-08 TP-000090 approved T1 - T1-000075 AGREED 2000-06-14 - - -
0015 - D R99 3.0.1 3.1.0 Removal of Annex I ""Open Items"" TP-08 TP-000090 approved T1 - T1-000077 AGREED 2000-06-14 - - -
0016 - C R99 3.0.1 3.1.0 Modifications to Chapter 8 ""Requirements for support of RRM"" TP-08 TP-000090 approved T1 - T1-000117 AGREED 2000-06-14 - - -
0017 - F R99 3.0.1 3.1.0 Modifications to Annex C ""Measurement channels"" TP-08 TP-000090 approved T1 - T1-000118 AGREED 2000-06-14 - - -
0018 - F R99 3.0.1 3.1.0 Idle mode test cases (test of performance requirements) TP-08 TP-000090 approved T1 - T1-000119 AGREED 2000-06-14 - - -
0019 - F R99 3.1.0 3.2.0 Editorial corrections for References and Frequency Stability (2, 5.2, 5.3) TP-09 TP-000163 approved T1 T1-08 T1-000131 AGREED 2000-09-04 - - -
0020 - F R99 3.1.0 3.2.0 Corrections for Output Power Dynamics in the Uplink (5.4) TP-09 TP-000163 approved T1 T1-08 T1-000132 AGREED 2000-09-04 - - -
0021 - F R99 3.1.0 3.2.0 Transients for uplink inner loop power control (5.4.2.4.2) TP-09 TP-000163 approved T1 T1-08 T1-000133 AGREED 2000-09-04 - - -
0022 - F R99 3.1.0 3.2.0 Transmit On/Off power (5.5.2.4.2) TP-09 TP-000163 approved T1 T1-08 T1-000134 AGREED 2000-09-04 - - -
0023 - F R99 3.1.0 3.2.0 Change of TFC (5.6.4.2) TP-09 TP-000163 approved T1 T1-08 T1-000135 AGREED 2000-09-04 - - -
0024 - F R99 3.1.0 3.2.0 Clarification of the definition on Peak Code Domain Error (5.13.2.1) TP-09 TP-000163 approved T1 T1-08 T1-000139 AGREED 2000-09-04 - - -
0025 - F R99 3.1.0 3.2.0 UE interfering signal definition (6.3, 6.4, 6.5, 6.7) TP-09 TP-000163 approved T1 T1-08 T1-000140 AGREED 2000-09-04 - - -
0026 - F R99 3.1.0 3.2.0 Performance requirements (7.1, 7.2, 7.3, 7.4, 7.5) TP-09 TP-000163 approved T1 T1-08 T1-000143 AGREED 2000-09-04 - - -
0027 - F R99 3.1.0 3.2.0 CR on clause 7.6 and 7.7 in TS34.121 (7.6, 7.7) TP-09 TP-000163 approved T1 T1-08 T1-000144 AGREED 2000-09-04 - - -
0028 - F R99 3.1.0 3.2.0 Performance requirements (7.9, 7.10, 7.11) TP-09 TP-000163 approved T1 T1-08 T1-000146 AGREED 2000-09-04 - - -
0029 - F R99 3.1.0 3.2.0 Corrections for Annex D (Annex-D) TP-09 TP-000163 approved T1 T1-08 T1-000147 AGREED 2000-09-04 - - -
0030 - F R99 3.1.0 3.2.0 Corrections for Annex E (Annex-E) TP-09 TP-000163 approved T1 T1-08 T1-000148 AGREED 2000-09-04 - - -
0031 - F R99 3.1.0 3.2.0 Corrections for Transmit ON/OFF Power, Change of TFC and Power setting in uplink compressed mode (5.5, 5.6, 5.7) TP-09 TP-000163 approved T1 T1-08 T1-000149 AGREED 2000-09-04 - - -
0032 - F R99 3.1.0 3.2.0 Corrections for power setting in uplink compressed mode (5.7) TP-09 TP-000163 approved T1 T1-08 T1-000136 AGREED 2000-09-04 - - -
0033 - B R99 3.1.0 3.2.0 CR for subclause 7.8: Power control in downlink (7.8) TP-09 TP-000163 approved T1 T1-08 T1-000145 AGREED 2000-09-04 - - -
0034 - F R99 3.1.0 3.2.0 Corrections to clause 5.8, 5.9, 5.10, 5.11 and 5.12 TP-09 TP-000163 approved T1 T1-08 T1-000137 AGREED 2000-09-04 - - -
0035 - F R99 3.1.0 3.2.0 Corrections to EVM and PCDE formulae (B.2.7.1, B2.7.2) TP-09 TP-000163 approved T1 T1-08 T1-000138 AGREED 2000-09-04 - - -
0036 - F R99 3.1.0 3.2.0 New initial conditions for Spurious emission test case (6.8.4.1) TP-09 TP-000163 approved T1 T1-08 T1-000141 AGREED 2000-09-04 - - -
0037 - F R99 3.1.0 3.2.0 C.4.1 UL reference measurement channel for BTFD performance requirement (C.4.1) TP-09 TP-000163 approved T1 T1-08 T1-000142 AGREED 2000-09-04 - - -
0038 - D R99 3.2.0 3.3.0 Corrections to Chapter 3 ""Definitions, symbols, abbreviations and equations"" TP-10 TP-000216 approved T1 T1-09 T1-000247 AGREED 2000-11-20 - - -
0039 - D R99 3.2.0 3.3.0 Vocabulary Corrections TP-10 TP-000216 approved T1 T1-09 T1-000253 AGREED 2000-11-20 - - -
0040 - F R99 3.2.0 3.3.0 Reference Measurement Channels in Annex C TP-10 TP-000216 approved T1 T1-09 T1-000238 AGREED 2000-11-20 - - -
0041 - F R99 3.2.0 3.3.0 Inclusion of OCNS definition for performance tests TP-10 TP-000216 approved T1 T1-09 T1-000241 AGREED 2000-11-20 - - -
0042 - F R99 3.2.0 3.3.0 Handling of measurement uncertainties in UE conformance testing (FDD) TP-10 TP-000216 approved T1 T1-09 T1-000250 AGREED 2000-11-20 - - -
0043 - F R99 3.2.0 3.3.0 Update of Idle mode test cases TP-10 TP-000216 approved T1 T1-09 T1-000252 AGREED 2000-11-20 - - -
0044 - F R99 3.2.0 3.3.0 UE emission mask measurement filter definition correction TP-10 TP-000216 approved T1 T1-09 T1-000254 AGREED 2000-11-20 - - -
0045 - F R99 3.2.0 3.3.0 New structure of TS 34.121 TP-10 TP-000216 approved T1 T1-09 T1-000255 AGREED 2000-11-20 - - -
0046 - F R99 3.2.0 3.3.0 Test for combining TPC commands in soft handover TP-10 TP-000216 approved T1 T1-09 T1-000239 AGREED 2000-11-20 - - -
0047 - F R99 3.2.0 3.3.0 Corrections to power control tests TP-10 TP-000216 approved T1 T1-09 T1-000240 AGREED 2000-11-20 - - -
0048 - F R99 3.2.0 3.3.0 Correction to Open Loop Power Control in Uplink TP-10 TP-000216 approved T1 T1-09 T1-000242 AGREED 2000-11-20 - - -
0049 - F R99 3.2.0 3.3.0 Correction to Transmit ON/OFF Time mask TP-10 TP-000216 approved T1 T1-09 T1-000243r AGREED 2000-11-20 - - -
0050 - F R99 3.2.0 3.3.0 Correction to Spurious Emission test TP-10 TP-000216 approved T1 T1-09 T1-000244 AGREED 2000-11-20 - - -
0051 - F R99 3.2.0 3.3.0 Correction of spurious emission measurement procedure TP-10 TP-000216 approved T1 T1-09 T1-000245 AGREED 2000-11-20 - - -
0052 - F R99 3.2.0 3.3.0 Out-of-synchronization handling of output power TP-10 TP-000216 approved T1 T1-09 T1-000246 AGREED 2000-11-20 - - -
0053 - F R99 3.2.0 3.3.0 Clarification of test procedure and test requirement for receiver blocking and spurious response. TP-10 TP-000216 approved T1 T1-09 T1-000248 AGREED 2000-11-20 - - -
0054 - F R99 3.2.0 3.3.0 Subclause 7.8 Power control in downlink TP-10 TP-000216 approved T1 T1-09 T1-000249 AGREED 2000-11-20 - - -
0055 - F R99 3.2.0 3.3.0 Downlink compressed mode TP-10 TP-000216 approved T1 T1-09 T1-000251 AGREED 2000-11-20 - - -
0056 - F R99 3.3.0 3.4.0 CR on Test tolerance for 6.5 Blocking Characteristics TP-11 TP-010019 approved T1 T1-10 T1-010020 AGREED 2001-03-17 - - -
0057 - F R99 3.3.0 3.4.0 CR on Test tolerance for 6.7 Intermodulation Characteristics TP-11 TP-010019 approved T1 T1-10 T1-010025 AGREED 2001-03-17 - - -
0058 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.5.1 Test Tolerance for Transmit OFF power TP-11 TP-010019 approved T1 T1-10 T1-010027 AGREED 2001-03-17 - - -
0059 - F R99 3.3.0 3.4.0 CR on Test tolerance for 6.6 Spurious Response TP-11 TP-010019 approved T1 T1-10 T1-010028 AGREED 2001-03-17 - - -
0060 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.11 Test Tolerance for Transmit Spurious emissions TP-11 TP-010019 approved T1 T1-10 T1-010029 AGREED 2001-03-17 - - -
0061 - F R99 3.3.0 3.4.0 CR on Test tolerance for Annex.F TS34.121 TP-11 TP-010019 approved T1 T1-10 T1-010030 AGREED 2001-03-17 - - -
0062 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.2 Maximum output power TP-11 TP-010019 approved T1 T1-10 T1-010031 AGREED 2001-03-17 - - -
0063 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.4.3 Minimum Output Power TP-11 TP-010019 approved T1 T1-10 T1-010032 AGREED 2001-03-17 - - -
0064 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.9 Spectrum Emission Mask TP-11 TP-010019 approved T1 T1-10 T1-010033 AGREED 2001-03-17 - - -
0065 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.10 ACLR TP-11 TP-010019 approved T1 T1-10 T1-010034 AGREED 2001-03-17 - - -
0066 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.12 Transmit Intermodulation TP-11 TP-010019 approved T1 T1-10 T1-010035 AGREED 2001-03-17 - - -
0067 - F R99 3.3.0 3.4.0 CR on Test tolerance for 6.2 Reference Sensitivity Level TP-11 TP-010019 approved T1 T1-10 T1-010036 AGREED 2001-03-17 - - -
0068 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.3 Frequency Error TP-11 TP-010019 approved T1 T1-10 T1-010037 AGREED 2001-03-17 - - -
0069 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.8 Occupied Bandwidth TP-11 TP-010019 approved T1 T1-10 T1-010038 AGREED 2001-03-17 - - -
0070 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.13.1 EVM TP-11 TP-010019 approved T1 T1-10 T1-010039 AGREED 2001-03-17 - - -
0071 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.13.2 PCDE TP-11 TP-010019 approved T1 T1-10 T1-010040 AGREED 2001-03-17 - - -
0072 - F R99 3.3.0 3.4.0 CR on Test tolerance for 5.4.4 Out of Synchronisation transmit power TP-11 TP-010019 approved T1 T1-10 T1-010041 AGREED 2001-03-17 - - -
0073 - F R99 3.3.0 3.4.0 CR on Test tolerance for 6.4 ACS TP-11 TP-010019 approved T1 T1-10 T1-010042 AGREED 2001-03-17 - - -
0074 - F R99 3.3.0 3.4.0 CR on Test tolerance for 6.8 RX Spurious Emissions TP-11 TP-010019 approved T1 T1-10 T1-010108 AGREED 2001-03-17 - - -
0075 - F R99 3.3.0 3.4.0 CR on corrections to DL compressed mode TP-11 TP-010019 approved T1 T1-10 T1-010021 AGREED 2001-03-17 - - -
0076 - F R99 3.3.0 3.4.0 CR on Corrections to DL 384kbps and BTFD measurement channels TP-11 TP-010019 approved T1 T1-10 T1-010022 AGREED 2001-03-17 - - -
0077 - F R99 3.3.0 3.4.0 CR on Corrections to Maximum output power TP-11 TP-010019 approved T1 T1-10 T1-010023 AGREED 2001-03-17 - - -
0078 - F R99 3.3.0 3.4.0 CR on RX spurious emissions TP-11 TP-010019 approved T1 T1-10 T1-010024 AGREED 2001-03-17 - - -
0079 - D R99 3.3.0 3.4.0 CR on Editorial correction to channel number TP-11 TP-010019 approved T1 T1-10 T1-010026 AGREED 2001-03-17 - - -
0080 - F R99 3.3.0 3.4.0 CR Correction of Annex-E and reference information to Annex E TP-11 TP-010019 approved T1 T1-10 T1-010043 AGREED 2001-03-17 - - -
0081 - D R99 3.3.0 3.4.0 Editorial corrections TP-11 TP-010019 approved T1 T1-10 T1-010044 AGREED 2001-03-17 - - -
0082 1 F R99 3.3.0 3.4.0 Regional requirements on Test Tolerance TP-11 TP-010076 approved T1 - - - 2001-03-17 - Presented directly to TP-11 -
0083 - F R99 3.4.0 3.5.0 CR: Addition of Test System uncertainties and Test Tolerances TP-12 TP-010119 approved T1 T1-11 T1-010139 AGREED 2001-05-17 - 0 -
0084 - F R99 3.4.0 3.5.0 CR: Measurement accuracy of CPICH RSCP TP-12 TP-010119 approved T1 T1-11 T1-010140 AGREED 2001-05-17 - 0 -
0085 - F R99 3.4.0 3.5.0 CR: Measurement accuracy of CPICH Ec/Io TP-12 TP-010119 approved T1 T1-11 T1-010141 AGREED 2001-05-17 - 0 -
0086 - F R99 3.4.0 3.5.0 CR: Modifications to the structure of RRM test cases (FDD) TP-12 TP-010119 approved T1 T1-11 T1-010142 AGREED 2001-05-17 - 0 -
0087 - F R99 3.4.0 3.5.0 Maintenance CR: Propagation condition 250 km/h TP-12 TP-010119 approved T1 T1-11 T1-010143 AGREED 2001-05-17 - 0 -
0088 - F R99 3.4.0 3.5.0 Maintenance CR: Removal of square brackets TP-12 TP-010119 approved T1 T1-11 T1-010144 AGREED 2001-05-17 - 0 -
0089 - F R99 3.4.0 3.5.0 Maintenance CR: Tx power for Rx characteristics measurement TP-12 TP-010119 approved T1 T1-11 T1-010145 AGREED 2001-05-17 - 0 -
0090 - F R99 3.4.0 3.5.0 Maintenance CR: Correction of Definition of multi-code OCNS signal TP-12 TP-010119 approved T1 T1-11 T1-010146 AGREED 2001-05-17 - 0 -
0091