3GPP Specification Change Requests

Back to numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 32.421

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-6 6.0.0 6.1.0 Corrections to Trace requirements - alignment with SA2's 23.002 SP-19 SP-030147 approved S5 S5-33 S5-038139 Agreed 2003-02-28 OAM-Trace - 2003-03-12
0002 - F Rel-6 6.1.0 6.2.0 Correction of IMS subscriber identification for Trace SP-22 SP-030612 approved S5 S5-36 S5-032712 Agreed 2003-11-21 OAM-Trace - 2004-01-05
0003 - F Rel-6 6.2.0 6.3.0 Correction in Trace high level architecture SP-23 SP-040116 approved S5 S5-37 S5-042156 Agreed 2004-02-27 OAM-Trace - 2004-03-05
0004 - F Rel-6 6.3.0 6.4.0 Removal of GERAN from Rel-6 32.42x series of Trace specifications SP-25 SP-040542 approved S5 S5-39 S5-042534 Agreed 2004-08-20 OAM-Trace - 2004-09-13
0005 - C Rel-6 6.4.0 6.5.0 Remove requirement for having ASN.1 as Trace record format SP-26 SP-040770 approved S5 S5-40 S5-042737 Agreed 2004-11-20 OAM-Trace - 2004-11-25
0006 - C Rel-6 6.4.0 6.5.0 Remove in Rel-6 the signalling based Trace in IMS due to missing SIP signalling support from CN1/IETF SP-26 SP-040770 approved S5 S5-40 S5-042743 Agreed 2004-11-20 OAM-Trace - 2004-11-25
0007 - F Rel-6 6.5.0 6.6.0 Remove ambiguity on the file format for trace data at the Network Elemets (NEs) SP-27 SP-050043 approved S5 S5-41 S5-058148 Agreed 2005-01-28 OAM-Trace - 2005-02-07
0008 - F Rel-6 6.5.0 6.6.0 Correction to the Scope SP-27 SP-050043 approved S5 S5-41 S5-058153 Agreed 2005-01-28 OAM-Trace - 2005-02-07
0009 - F Rel-6 6.5.0 6.6.0 Correct the list of interfaces trace parameter – Align with 32.422 and 32.423 SP-27 SP-050043 approved S5 S5-41 S5-058175 Agreed 2005-01-28 OAM-Trace - 2005-02-07
0010 - B Rel-6 6.6.0 6.7.0 BM-SC Network Element and Gmb interface addition for MBMS tracing SP-28 SP-050294 approved S5 S5-42 S5-058426 Agreed 2005-05-13 OAM-Trace - 2005-05-25
0011 - B Rel-7 6.7.0 - Add support for UTRAN TDD - Declare RAT Type SP-29 SP-050453 withdrawn S5 S5-43 S5-058744 Agreed 2005-09-02 OAM7-Trace Rel-7 OAM7-Trace 2005-09-15
0011 - B Rel-7 6.7.0 7.0.0 Add support for UTRAN TDD - Declare RAT Type SP-29 SP-050623 approved S5 - S5-058744 - 2005-09-02 OAM7-Trace - 2005-09-28
0012 - B Rel-7 7.0.0 7.1.0 Introduction of Service Level Tracing for IMS SP-31 SP-060100 approved S5 S5-45 S5-068108 Agreed 2006-02-17 OAM7-Trace 10.37 2006-02-27
0013 - C Rel-7 7.1.0 7.2.0 Add Cell Traffic Trace capability to 32.421 Trace concepts and requirements SP-33 SP-060552 approved S5 S5-48 S5-060699 Agreed 2006-07-07 OAM7-Trace - 2006-09-15
0014 - C Rel-8 7.2.0 8.0.0 Add extended trace depth to include Vendor Specific Extension (VSE) SP-37 SP-070614 approved S5 S5-55 S5-071619 agreed 2007-09-08 OAM8 - 2007-09-12
0015 - C Rel-8 7.2.0 8.0.0 Add LTE nodes and interfaces SP-37 SP-070614 approved S5 S5-55 S5-071620 agreed 2007-09-08 OAM8 - 2007-09-12
0016 - B Rel-8 8.0.0 8.1.0 Add trace functionality for E-UTRAN SP-39 SP-080069 approved S5 S5-57 S5-080241 agreed 2008-01-11 OAM8 - 2008-02-27
0017 - B Rel-8 8.0.0 8.1.0 Add trace activation failure response SP-39 SP-080069 approved S5 S5-58 S5-080492 agreed 2008-02-22 OAM8 - 2008-02-27
0018 - C Rel-8 8.1.0 8.2.0 Introduction of UE identifiers for trace in E-UTRAN SP-40 SP-080329 approved S5 S5-55 S5-080833 agreed 2008-04-25 OAM8 - 2008-05-29

page generated from database: 2008-07-02 14:52:40