3GPP Specification Change Requests

Back to numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 32.251

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - B Rel-6 6.0.0 6.1.0 Add “Furnish Charging Information” procedure for GPRS SP-26 SP-040775 approved S5 S5-40 S5-044796 Agreed 2004-11-20 CH - 2004-11-25
0002 - F Rel-6 6.0.0 6.1.0 Add data description for PS online charging SP-26 SP-040775 approved S5 S5-40 S5-044804 Agreed 2004-11-20 CH - 2004-11-25
0003 - A Rel-6 6.1.0 6.2.0 Conditional criteria for the presence of the External Charging ID in the G-CDR – Align with SA2’s TS 23.228 SP-27 SP-050027 approved S5 S5-41 S5-054179 Agreed 2005-01-28 OAM-CH - 2005-02-07
0004 - F Rel-6 6.1.0 6.2.0 Correction of online charging terminology SP-27 SP-050027 approved S5 S5-41 S5-054173 Agreed 2005-01-28 CH - 2005-02-07
0005 - F Rel-6 6.1.0 6.2.0 Correct support of Termination action SP-27 SP-050027 approved S5 S5-41 S5-054181 Agreed 2005-01-28 CH - 2005-02-07
0006 - F Rel-6 6.1.0 6.2.0 Addition of online charging CCR triggers – Align with TS 23.125 (Overall high level functionality and architecture impacts of flow based charging; Stage 2) SP-27 SP-050027 approved S5 S5-41 S5-054175 Agreed 2005-01-28 CH - 2005-02-07
0007 - F Rel-6 6.1.0 6.2.0 Correct FBC Service Data Flow (SDF) determination with charging rules to align with SA2’s TS 23.125 and CN3’s TS 29.210 SP-27 SP-050027 approved S5 S5-41 S5-054176 Agreed 2005-01-28 CH - 2005-02-07
0008 - F Rel-6 6.1.0 6.2.0 Correction of Service Data Flow (SDF) specific usage duration in flow based charging SP-27 SP-050027 approved S5 S5-41 S5-054177 Agreed 2005-01-28 CH - 2005-02-07
0009 - F Rel-6 6.1.0 6.2.0 Correction of the description of Charging Key – Align with SA2’s 23.125 (Overall high level functionality and architecture impacts of flow based charging; Stage 2) SP-27 SP-050027 approved S5 S5-41 S5-054180 Agreed 2005-01-28 CH - 2005-02-07
0010 - F Rel-6 6.2.0 6.3.0 Correction to scope SP-28 SP-050275 approved S5 S5-42 S5-054435 Agreed 2005-05-13 CH - 2005-05-23
0011 - F Rel-6 6.2.0 6.3.0 Correction to references SP-28 SP-050275 approved S5 S5-42 S5-054447 Agreed 2005-05-13 CH - 2005-05-23
0012 - F Rel-6 6.3.0 6.4.0 Add missing MBMS PS domain offline charging SP-29 SP-050439 approved S5 S5-43 S5-054778 Agreed 2005-09-02 MBMS-CH 10.17 Rel-6 CR (MBMS-CH) - MBMS Charging 2005-09-14
0013 - F Rel-6 6.3.0 - Correct inter-system change at the SGSN SP-29 SP-050435 withdrawn S5 S5-43 S5-054813 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0013 - F Rel-6 6.3.0 6.4.0 Correct inter-system change at the SGSN SP-29 SP-050636 approved S5 (gavin - S5-054813 - 2005-09-01 CH-BC - 2005-09-28
0014 - F Rel-6 6.3.0 - Correct eG-CDR SP-29 SP-050435 withdrawn S5 S5-43 S5-054584 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0014 - F Rel-6 6.3.0 6.4.0 Correct eG-CDR SP-29 SP-050636 approved S5 (patri - S5-054584 - 2005-09-02 CH-BC - 2005-09-28
0015 - F Rel-6 6.3.0 - Add the MS Time Zone to the eG- and G-CDR – Align with TS 29.060 SP-29 SP-050435 revised S5 S5-43 S5-054585 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0015 1 F Rel-6 6.3.0 6.4.0 Add the MS Time Zone to the eG- and G-CDR – Align with TS 29.060 SP-29 SP-050636 approved S5 (geral - S5-054585 - 2005-09-02 CH-BC - 2005-09-28
0016 - F Rel-6 6.3.0 - Add missing User Location Information to the eG- and G-CDR – Align with TS 29.060 SP-29 SP-050435 revised S5 S5-43 S5-054586 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0016 1 F Rel-6 6.3.0 6.4.0 Add missing User Location Information to the eG- and G-CDR – Align with TS 29.060 SP-29 SP-050636 approved S5 (geral - S5-054586 - 2005-09-28 CH-BC - 2005-09-28
0017 - F Rel-6 6.3.0 - Add the CAMEL Charging Information Container parameter to the eG- and G-CDR – Align with TS 29.060 SP-29 SP-050435 revised S5 S5-43 S5-054587 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0017 1 F Rel-6 6.3.0 6.4.0 Add the CAMEL Charging Information Container parameter to the eG- and G-CDR – Align with TS 29.060 SP-29 SP-050636 approved S5 (geral - S5-054587 - 2005-09-02 CH-BC - 2005-09-28
0018 - F Rel-6 6.3.0 - Correct effect of SGSN change on G-CDR SP-29 SP-050435 revised S5 S5-43 S5-054588 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0018 1 F Rel-6 6.3.0 6.4.0 Correct effect of SGSN change on G-CDR SP-29 SP-050636 approved S5 (Benni - S5-054588 - 2005-09-28 CH-BC - 2005-09-28
0019 - F Rel-6 6.3.0 - Add missing served IMEISV in G-CDRs and online charging SP-29 SP-050435 withdrawn S5 S5-43 S5-054589 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0019 - F Rel-6 6.3.0 6.4.0 Add missing served IMEISV in G-CDRs and online charging SP-29 SP-050636 approved S5 (patri - S5-054589 - 2005-09-02 CH-BC - 2005-09-28
0020 - F Rel-6 6.3.0 - Add missing RAT Type to G-CDR/eG-CDR - Align with 29.060 SP-29 SP-050435 withdrawn S5 S5-43 S5-054590 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0020 - F Rel-6 6.3.0 6.4.0 Add missing RAT Type to G-CDR/eG-CDR - Align with 29.060 SP-29 SP-050636 approved S5 (patri - S5-054590 - 2005-09-02 CH-BC - 2005-09-28
0021 - F Rel-6 6.3.0 - Align Flow Based bearer Charging (FBC) information for online and offline charging - Align with TS 23.060 SP-29 SP-050435 withdrawn S5 S5-43 S5-054782 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0021 - F Rel-6 6.3.0 6.4.0 Align Flow Based bearer Charging (FBC) information for online and offline charging - Align with TS 23.060 SP-29 SP-050636 approved S5 (Gavin - S5-054782 - 2005-09-02 CH-BC - 2005-09-28
0022 - F Rel-6 6.3.0 - Correct PS-Furnish-Charging-Information SP-29 SP-050435 withdrawn S5 S5-43 S5-054811 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0022 - F Rel-6 6.3.0 6.4.0 Correct PS-Furnish-Charging-Information SP-29 SP-050636 approved S5 (segur - S5-054811 - 2005-09-02 CH-BC - 2005-09-28
0023 - F Rel-6 6.3.0 - Correct Flow Based bearer Charging (FBC) service data generation SP-29 SP-050435 withdrawn S5 S5-43 S5-054812 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0023 - F Rel-6 6.3.0 - Correct Flow Based bearer Charging (FBC) service data generation SP-29 SP-050639 approved S5 S5-43 S5-054812 agreed 2005-09-02 CH-BC Doc produced after the end of the SP meeting; CR should have been contained in doc SP-050636 but was accidentally omitted. CR approved during the meeting. 2005-10-17
0024 - F Rel-6 6.3.0 6.4.0 Add missing Credit Control Failure Handling and Failover Support SP-29 SP-050437 approved S5 S5-43 S5-054816 Agreed 2005-09-02 IMS2-CH 10.5 Rel-6 CR (IMS2-CH) - IMS Charging 2005-09-14
0025 - F Rel-6 6.4.0 6.5.0 Align Failure Handling procedure with new information added to eGCDRs SP-30 SP-050696 approved S5 S5-44 S5-055012 Agreed 2005-11-11 CH-BC - 2005-11-23
0026 - F Rel-6 6.4.0 6.5.0 Correct the List of Downstream nodes at the SGSN for MBMS charging - Align with 23.246 (MBMS stage 2) SP-30 SP-050697 approved S5 S5-44 S5-054995 Agreed 2005-11-11 MBMS-CH - 2005-11-23
0027 - F Rel-6 6.4.0 6.5.0 Add Abort Session Request as a trigger for starting and stopping PDP context and Flow Based Charging Credit Control sessions SP-30 SP-050696 approved S5 S5-44 S5-055005 Agreed 2005-11-11 CH-BC - 2005-11-23
0028 - F Rel-6 6.4.0 6.5.0 Align with common DCCA principles in 32.299 SP-30 SP-050696 approved S5 S5-44 S5-055009 Agreed 2005-11-11 CH-BC - 2005-11-23
0029 - F Rel-6 6.5.0 6.6.0 Correction of User-Name AVP SP-31 SP-060081 approved S5 S5-45 S5-064349 Agreed 2006-02-17 IMS2-CH 09.30 2006-02-27
0030 - F Rel-6 6.5.0 6.6.0 Correction of G-CDR and PDP context online charging SP-31 SP-060077 approved S5 S5-45 S5-064352 Agreed 2006-02-17 CH-BC 09.30 2006-02-27
0031 - F Rel-6 6.5.0 6.6.0 Align reporting at Service Level with 23.125 SP-31 SP-060077 approved S5 S5-45 S5-064359 Agreed 2006-02-17 CH-BC 09.30 2006-02-27
0032 - F Rel-6 6.5.0 6.6.0 Correction to PS-Information AVP SP-31 SP-060077 approved S5 S5-45 S5-064360 Agreed 2006-02-17 CH-BC 09.30 2006-02-27
0033 - F Rel-6 6.5.0 6.6.0 Triggering for Service Data flow reporting in FBC SP-31 SP-060077 approved S5 S5-45 S5-064372 Agreed 2006-02-17 CH-BC 09.30 2006-02-27
0034 - F Rel-6 6.6.0 6.7.0 Correct information set used for PDP context related charging SP-32 SP-060240 approved S5 S5-47 S5-064673 Agreed 2006-05-12 CH-BC - 2006-05-13
0035 - C Rel-7 6.6.0 - Correction on PS charging information SP-32 SP-060247 revised S5 S5-47 S5-064664 Agreed 2006-05-12 CH7 - 2006-05-13
0035 1 C Rel-7 6.6.0 7.0.0 Correction on PS charging information SP-32 SP-060430 approved SP S5-47 S5-064664 Agreed 2006-06-06 CH7 Tidy up 2006-06-06
0036 - B Rel-7 7.0.1 7.1.0 Add support for location based charging models - Align with SA1's 22.101 Service principles SP-33 SP-060541 approved S5 S5-48 S5-060653 Agreed 2006-07-07 CH7 - 2006-09-15
0037 - F Rel-6 6.7.0 6.8.0 Correction on Flow Based Charging - Align with 23.125 SP-33 SP-060525 approved S5 S5-49 S5-061180 Agreed 2006-09-01 CH-BC - 2006-09-15
0038 - A Rel-7 7.0.1 7.1.0 Correction on Flow Based Charging - Align with 23.125 SP-33 SP-060525 approved S5 S5-49 S5-061181 Agreed 2006-09-01 CH-BC - 2006-09-15
0039 - F Rel-7 7.1.0 7.2.0 Align PDP context level online charging information with PCC charging SP-34 SP-060715 approved Nokia S5-50 S5-061628 Agreed 2006-11-03 CH7 - 2006-11-09
0040 - F Rel-7 7.1.0 7.2.0 Update of Flow Based Charging for PCC - Align with 23.203 SP-34 SP-060714 approved Telefónica S5-50 S5-061711 Agreed 2006-11-03 PCC-CH - 2006-11-09
0041 - B Rel-7 7.1.0 7.2.0 Introduce support of event based charging for PCC - Align with 23.203 SP-34 SP-060714 approved Telefónica S5-50 S5-061714 Agreed 2006-11-03 PCC-CH - 2006-11-09
0042 - F Rel-6 6.8.0 6.9.0 Correction of online charging errors SP-35 SP-070034 approved Nokia (benni.alexander@nokia.com) S5-51 S5-070252 agreed 2007-01-26 CH-BC - 2007-02-16
0043 - B Rel-7 7.2.0 7.3.0 Add charging support for Direct Tunnel SP-35 SP-070043 approved Orange (alain.bibas@orange-ftgroup.com) S5-51 S5-070141 agreed 2007-01-26 CH7 - 2007-02-16
0044 - B Rel-7 7.2.0 7.3.0 Add MCC and MNC in M-CDR SP-35 SP-070043 approved Alcatel-Lucent (Xiaoping.F.She@alcatel-sbell.com.cn, veronique.belfort@alcatel-lucent.fr) S5-51 S5-070170 agreed 2007-01-26 CH7 - 2007-02-16
0045 - B Rel-7 7.2.0 7.3.0 Introduce support for Network Requested Secondary PDP Context Activation for online charging SP-35 SP-070036 approved Vodafone (gavin.wong (at) vodafone.com) S5-51 S5-070227 agreed 2007-01-26 PCC-CH - 2007-02-16
0046 - A Rel-7 7.2.0 7.3.0 Correction of online charging errors SP-35 SP-070034 approved Nokia (benni.alexander@nokia.com) S5-51 S5-070253 agreed 2007-01-26 CH-BC - 2007-02-16
0048 - F Rel-6 6.9.0 6.10.0 Correction on offline charging trigger conditions SP-36 SP-070268 approved S5 S5-52 S5-070669 agreed 2007-04-06 CH - 2007-05-15
0049 - A Rel-7 7.3.0 7.4.0 Correction on offline charging trigger conditions SP-36 SP-070268 approved S5 S5-52 S5-070670 agreed 2007-04-06 CH - 2007-05-15
0050 - F Rel-6 6.9.0 6.10.0 Correction on FBC basic requirements - Align with TS 23.125 SP-36 SP-070268 approved S5 S5-52 S5-070711 agreed 2007-04-06 CH - 2007-05-15
0051 - A Rel-7 7.3.0 7.4.0 Correction on FBC basic requirements - Align with TS 23.203 SP-36 SP-070268 approved S5 S5-52 S5-070712 agreed 2007-04-06 CH - 2007-05-15
0052 - F Rel-7 7.3.0 7.4.0 Correction to eG-CDR Charging triggers SP-36 SP-070270 approved S5 S5-52 S5-070704 agreed 2007-04-06 PCC-CH - 2007-05-15
0053 - B Rel-7 7.3.0 7.4.0 Perform envelope reporting in offline CDRs based on requirements from online charging SP-36 SP-070270 approved S5 S5-52 S5-070706 agreed 2007-04-06 PCC-CH - 2007-05-15
0054 - F Rel-7 7.3.0 7.4.0 Several corrections and alignments on Charging and PCC SP-36 SP-070270 approved S5 S5-52 S5-070709 agreed 2007-04-06 PCC-CH - 2007-05-15
0055 - F Rel-7 7.3.0 7.4.0 Correction on Charging characteristics profile when FBC is used - Align with 23.203 SP-36 SP-070270 approved S5 S5-52 S5-070710 agreed 2007-04-06 PCC-CH - 2007-05-15
0056 - F Rel-7 7.3.0 7.4.0 Correction to the category of the MSCC AVP - Align with TS 23.203 SP-36 SP-070270 approved S5 S5-53 S5-070984 agreed 2007-05-11 PCC-CH - 2007-05-15
0057 - F Rel-7 7.3.0 7.4.0 Correction to the Rule-Base-Name AVP definition - Align with TS 29.212 SP-36 SP-070270 approved S5 S5-53 S5-070987 agreed 2007-05-11 PCC-CH - 2007-05-15
0058 - F Rel-7 7.3.0 7.4.0 Clarification on PCC charging principles - Align with TS 23.203 SP-36 SP-070273 approved S5 S5-53 S5-070986 agreed 2007-05-11 CH7 - 2007-05-15
0059 - F Rel-7 7.4.0 7.5.0 Align Flow Based Charging for PDP context charging SP-37 SP-070608 approved S5 S5-55 S5-071660 agreed 2007-08-31 PCC-CH - 2007-09-12
0060 - F Rel-7 7.4.0 7.5.0 Correction on PCC rule changes - Align with 23.203 and 29.212 SP-37 SP-070608 approved S5 S5-55 S5-071661 agreed 2007-08-31 PCC-CH - 2007-09-12
0061 - C Rel-8 7.4.0 8.0.0 Add service specific charging information for extended packet inspection - Align with 23.203 SP-37 SP-070619 approved S5 S5-55 S5-071662 agreed 2007-08-31 CH8 - 2007-09-12
0062 - B Rel-8 8.0.1 8.1.0 Align with the Rel-8 EPC architecture - Align with stage 2 in 23.401/23.402 SP-39 SP-080060 approved S5 S5-57 S5-080189 agreed 2008-01-11 EPC-CH - 2008-02-27
0063 - B Rel-8 8.0.1 8.1.0 Enhance the PS architecture to correspond with the Rel-8 EPC architecture - Align with stage 2 in 23.401/23.402 SP-39 SP-080060 approved S5 S5-57 S5-080190 agreed 2008-01-11 EPC-CH - 2008-02-27
0064 - B Rel-8 8.1.0 8.2.0 Impact on Charging trigger for EPC Charging SP-40 SP-080274 approved S5 S5-59 S5-080919 agreed 2008-04-25 EPC-CH - 2008-05-29

page generated from database: 2008-07-22 13:13:39