3GPP Specification Change Requests

Back to numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 32.250

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-6 6.0.0 6.1.0 Add missing charging principles for CAMEL CPH – Align with CN2's 23.078 SP-25 SP-040549 approved S5 S5-39 S5-044563 Agreed 2004-08-20 CH-BC - 2004-09-13
0002 - F Rel-6 6.1.0 6.2.0 Correction on the use of ‘reference point’ and ‘interface’ – Align with TR 21.905 SP-28 SP-050275 approved S5 S5-42 S5-054284 Agreed 2005-05-13 CH - 2005-05-23
0003 - F Rel-6 6.1.0 6.2.0 Correction to scope SP-28 SP-050275 approved S5 S5-42 S5-054434 Agreed 2005-05-13 CH - 2005-05-23
0004 - F Rel-6 6.1.0 6.2.0 Correction to references SP-28 SP-050275 approved S5 S5-42 S5-054446 Agreed 2005-05-13 CH - 2005-05-23
0005 - B Rel-6 6.2.0 - Add CS Voice Video Switching Redial flag - Align with 24.008 and SA2 TR 23.903 SP-29 SP-050435 withdrawn S5 S5-43 S5-054581 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0005 - B Rel-6 6.2.0 6.3.0 Add CS Voice Video Switching Redial flag - Align with 24.008 and SA2 TR 23.903 SP-29 SP-050636 approved S5 (gavi - S5-054581 - 2005-09-02 CH-BC - 2005-09-28
0006 - F Rel-6 6.2.0 - Correct CS offline charging architecture - Align with TS 23.002 SP-29 SP-050435 withdrawn S5 S5-43 S5-054582 Agreed 2005-09-02 CH-BC 10.30 Rel-6 CR (CH-BC) - Bearer Charging 2005-09-14
0006 - F Rel-6 6.2.0 6.3.0 Correct CS offline charging architecture - Align with TS 23.002 SP-29 SP-050636 approved S5 (alain - S5-054582 - 2005-09-02 CH-BC - 2005-09-28
0007 - F Rel-6 6.3.0 6.4.0 Correction on service change indication (SCUDIF) - Align with 22.115, 23.172 SP-31 SP-060078 approved S5 S5-45 S5-064361 Agreed 2006-02-17 SCUDIF 09.30 2006-02-27
0008 - F Rel-6 6.4.0 6.5.0 Correction on service change initiator - Align with 23.172 SP-32 SP-060245 approved S5 S5-47 S5-064648 Agreed 2006-05-12 SCUDIF - 2006-05-13
0009 - F Rel-6 6.5.0 6.6.0 Correction on service change indication - Align with SA1's 22.115 SP-33 SP-060523 approved S5 S5-49 S5-060882 Agreed 2006-09-01 SCUDIF - 2006-09-15
0010 - B Rel-7 6.6.0 7.0.0 Introduce CS charging implications of VCC SP-35 SP-070039 approved Orange (alain.bibas@orange-ftgroup.com) S5-51 S5-070120 agreed 2007-01-26 VCC-CH - 2007-02-16
0011 - B Rel-7 6.6.0 7.0.0 Add MCC MNC in Location/change of location field SP-35 SP-070043 approved Alcatel-Lucent (Xiaoping.F.She@alcatel-sbell.com.cn, veronique.belfort@alcatel-lucent.fr) S5-51 S5-070168 agreed 2007-01-26 CH7 - 2007-02-16
0012 - F Rel-6 6.6.0 6.7.0 Correction on MOC CDRs - Align with ITU ISUP Q.763 SP-36 SP-070268 approved S5 S5-52 S5-070667 agreed 2007-04-06 CH - 2007-05-15
0013 - A Rel-7 7.0.0 7.1.0 Correction on MOC CDRs - Align with ITU ISUP Q.763 SP-36 SP-070268 approved S5 S5-52 S5-070668 agreed 2007-04-06 CH - 2007-05-15

page generated from database: 2008-07-02 14:52:40