3GPP Specification detail

Back to numbering scheme page

Back to series index


3GPP TS  32.171  (click spec number to see fileserver directory for this spec)

Telecommunication management; Subscription Management (SuM) Network Resource Model (NRM) Integration Reference Point (IRP): Requirements

.

TSG / WG responsible: S5  (click TSG/WG to see its home page)

Work item which gave rise to this spec:  SuM  (click WI code to see Work Item details in the Work Plan)

Work items which may have impacted this spec:  click here

2004-03-29: S5 Project Manager: ""service operations management"" in title changed to ""telecomunication management"". SP-24: ""resources"" in title changed to ""Network Resource Model (NRM)"".

Rapporteur: DAI, Peng

Specification required for: GERAN-based systems and UTRAN- and E-UTRAN-based systems

In the table below ...

... click meeting number for meeting details;

... click spec version number to download that version;

... click SDO publication reference to download SDO transposed document.

Release Freeze meeting Freeze date remarks SDO publications
Rel-6 SP-26 2004-12-16  . ETSI
  event

version

available

remarks click ref to download
  draft

0.1.0

2003-08-22

-
  SP-22

1.0.0

2004-01-05

SP-030616 -
  SP-24

2.0.0

2004-06-14

SP-040238 -
  SP-24

6.0.0

2004-06-15

-
  SP-26

6.1.0

2005-01-04

DTS/TSGS-0532171v610
Rel-7 SP-36 2007-06-07 . ETSI
  event

version

available

remarks click ref to download
  SP-36

7.0.0

2007-06-20

Upgraded unchanged from Rel-6 RTS/TSGS-0532171v700

Change Requests for this spec: click here.

Genealogy of this spec:

antecedent(s) this spec descendant(s)
(no antecedents) 32.171 (no descendants)

page generated from database: 2008-07-22 13:11:10