3GPP TS 32.106-5 (click spec number to see fileserver directory for this spec)
Telecommunication management; Configuration Management (CM); Part 5: Basic CM Integration Reference Point (IRP): Information model (including Network Resource Model (NRM)
.
TSG / WG responsible: S5 (click TSG/WG to see its home page)
Work item which gave rise to this spec:  -  (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec:  click here
TSG#8: split into eight parts
Rapporteur: TOCHE, Christian Specification required for: GERAN-based systems and UTRAN- and E-UTRAN-based systems In the table below ... ... click meeting number for meeting details; ... click spec version number to download that version; ... click SDO publication reference to download SDO transposed document. version available 2000-10-10 2000-12-21 2001-04-05 2001-07-03 version available -
Release
Freeze meeting
Freeze date
remarks
SDO publications
R99
SP-10
2000-12-14
TSG#8: multipart split from parent 3.0.1 (not certain this part will be R99) .
ETSI
event
remarks
click ref to download
draft
-
SP-10
RTS/TSGS-0532106-5UR1
SP-11
RTS/TSGS-0532106-5UR2
SP-12
RTS/TSGS-0532106-5UR3
Rel-4
SP-12
2001-06-21
SP-12: withdrawn. RELEASE WITHDRAWN
ETSI
event
remarks
click ref to download
-
Change Requests for this spec: click here.
Genealogy of this spec:
| antecedent(s) | this spec | descendant(s) |
|
32.106 |
32.106-5 | (no descendants) |
page generated from database: 2008-07-04 17:15:55