3GPP Specification Change Request records for: 29.018

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0000 - B Rel-6 5.5.0 - Addition of IMEISV to Update Location Procedure for ADD function NP-23 NP-040102 revised Ericsson L - - - 2004-03-02 TEI6 - 2004-03-10
0001 B R99 3.0.0 3.1.0 Gs Interface Changes to Support Tunnelling of non-GSM Messages NP-04 N1-99594 approved N1 - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0002 - F R99 3.0.0 3.1.0 Clarification of the null RA and other corrections NP-04 N1-99176 approved N1 - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0003 - F R99 3.0.0 3.1.0 TMSI requested by the MSC trough the Gs interface NP-04 N1-99558 approved N1 - - agreed 1999-06-28 - approved via corresp (28/6/99) -
0003 2 A R99 3.2.0 3.3.0 SGSN reaction upon a RAU request after VLR failure NP-07 NP-000091 approved N1 N1-11 N1-000334 Approved 2000-03-31 GPRS - -
0004 - F R99 3.1.0 3.2.0 Clarify that no acknowledgement is made for TMSI deallocation NP-05 NP-99276 approved N1 - none - 1999-09-29 GPRS Sent directly to the plenery, related to N1-99767, -
0005 1 A R99 3.1.0 3.2.0 TMSI status indication NP-05 NP-99268 approved N1 - N1-99863 agreed 1999-09-21 GPRS CR incorrectly marked as CR 001 -
0006 - A R99 3.1.0 3.2.0 Explicit IMSI detach, abnormal case SGSN side NP-05 NP-99268 approved N1 - N1-99A81 agreed 1999-09-21 GPRS CR incorrectly marked as CR 002 -
0007 3 B R99 3.2.0 3.3.0 Introduction of the Service Area Identification NP-07 NP-000101 approved N1 N1-11 N1-000543 Approved 2000-03-31 TEI - -
0009 - F R99 3.2.0 3.3.0 Encoding of MS classmark in LUP Request NP-07 NP-000091 approved N1 N1-11 N1-000365 Approved 2000-03-31 GPRS - -
0010 - F R99 3.3.0 3.4.0 Reject cause in case of expiry of T6-1 NP-09 NP-000441 approved N1 N1-13 N1-000911 - 2000-09-26 GPRS - -
0011 - F R99 3.4.1 3.5.0 Terminology corrections NP-10 NP-000674 approved N1 N1-14 N1-001267 agreed 2000-11-29 TEI - -
0012 1 F R99 3.5.0 3.6.0 Correction of Length Indicator NP-11 NP-010126 APPROVED N1 C1-15 N1-010177 agreed 2001-12-03 TEI - -
0013 - F R99 3.6.0 3.7.0 Clarify that no acknowledgement is made for TMSI deallocation NP-13 NP-010491 approved N1 C1-19 N1-011169 AGREED 2001-08-17 GPRS - -
0014 - A Rel-4 4.0.0 4.1.0 Clarify that no acknowledgement is made for TMSI deallocation NP-13 NP-010491 approved N1 C1-19 N1-011170 AGREED 2001-08-17 GPRS - -
0015 - F R99 3.6.0 3.7.0 Explicit IMSI detach, abnormal case SGSN side NP-13 NP-010491 approved N1 C1-19 N1-011171 AGREED 2001-08-17 GPRS - -
0016 - A Rel-4 4.0.0 4.1.0 Explicit IMSI detach, abnormal case SGSN side NP-13 NP-010491 approved N1 C1-19 N1-011172 AGREED 2001-08-17 GPRS - -
0017 - F R99 3.6.0 3.7.0 Correction of the length of the Service Area Identifcation NP-13 NP-010494 approved N1 C1-19 N1-011173 AGREED 2001-08-17 2G3Ginterworking - -
0018 - A Rel-4 4.0.0 4.1.0 Correction of the length of the Service Area Identifcation NP-13 NP-010494 approved N1 C1-19 N1-011174 AGREED 2001-08-17 2G3Ginterworking - -
0019 - A R99 3.7.0 3.8.0 Clarification of the periodic routing area update procedure NP-14 NP-010646 APPROVED N1 N1-20 N1-011451 AGREED 2001-10-11 GPRS - -
0020 - A Rel-4 4.1.0 4.2.0 Clarification of the periodic routing area update procedure NP-14 NP-010646 APPROVED N1 N1-20 N1-011452 AGREED 2001-10-11 GPRS - -
0021 - C Rel-5 4.1.0 5.0.0 Support of the feature 'Intra domain connection of RAN nodes to multiple CN nodes' NP-14 - - N1 N1-20 N1-011564 WITHDRAWN 2001-10-11 FLOGER - -
0022 - F R99 3.7.0 3.8.0 Correction of the Location Update for non-GPRS service procedure NP-14 NP-010653 APPROVED N1 N1-21 N1-011808 AGREED 2001-12-04 TEI - -
0023 - A Rel-4 4.1.0 4.2.0 Correction of the Location Update for non-GPRS service procedure NP-14 NP-010653 APPROVED N1 N1-21 N1-011809 AGREED 2001-12-04 TEI WI in this mirror CR shall be equal to the 1808 CR (=TEI) -
0024 - C Rel-5 4.1.0 - Introduction of Intra Domain Connection of RAN NP-14 - - N1 N1-21 N1-011813 REVISED TO 1992 2001-12-04 FLOGER - -
0024 1 C Rel-5 4.1.0 5.0.0 Introduction of Intra Domain Connection of RAN NP-14 NP-010659 APPROVED N1 N1-21 N1-011992 AGREED 2001-12-04 FLOGER - -
0025 - F Rel-5 4.1.0 - Intra-Domain Connection of RAN Nodes to Multiple CN Nodes NP-14 - - N1 N1-21 N1-011939 REVISED TO 1981 2001-12-04 FLOGER - -
0025 1 C Rel-5 4.1.0 5.0.0 Intra-Domain Connection of RAN Nodes to Multiple CN Nodes NP-14 NP-010659 APPROVED N1 N1-21 N1-011981 AGREED 2001-12-04 FLOGER Cat change from F to C decided. -
0026 - F R99 3.8.0 3.9.0 Addition of missing Mobile Station States for UMTS NP-15 NP-020037 approved N1 N1-22 N1-020199 AGREED 2002-01-25 2G3Ginterworking - -
0027 - A Rel-4 4.2.0 4.3.0 Addition of missing Mobile Station States for UMTS NP-15 NP-020037 approved N1 N1-22 N1-020200 AGREED 2002-01-25 2G3Ginterworking - -
0028 - A Rel-5 5.0.0 5.1.0 Addition of missing Mobile Station States for UMTS NP-15 NP-020037 approved N1 N1-22 N1-020201 AGREED 2002-01-25 2G3Ginterworking - -
0029 - F R99 3.9.0 3.10.0 Various clean-up of wrong references, as eg 24.008 instead of 04.18 NP-16 NP-020223 approved N1 N1-23 N1-020853 AGREED 2002-04-06 TEI - -
0030 - F Rel-4 4.3.0 4.4.0 Various clean-up of wrong references, as eg 24.008 instead of 44.018 NP-16 NP-020224 approved N1 N1-23 N1-020854 AGREED 2002-04-06 TEI4 - -
0031 - A Rel-5 5.1.0 5.2.0 Various clean-up of wrong references, as eg 24.008 instead of 44.018 NP-16 NP-020224 approved N1 N1-23 N1-020855 AGREED 2002-04-06 TEI4 - -
0032 - F Rel-5 5.2.0 5.3.0 Clarification of the coding of the Global CN-Id NP-18 NP-020571 approved N1 N1-26 N1-021978 AGREED 2002-09-18 FLOGER - 2002-11-25
0033 - F Rel-5 5.3.0 5.4.0 Addition of IMEISV to BSSAP+-LOCATION-UPDATE-REQUEST message NP-20 NP-030283 APPROVED N1 N1-30 N1-030709 AGREED 2003-05-28 LATE_UE - -
0034 - F Rel-5 5.3.0 - Addition of IMEISV to BSSAP+-PAGING-REQUEST message - - - N1 N1-30 N1-030710 Not available 2003-05-28 LATE_UE - -
0035 - F Rel-5 5.3.0 - Addition of BMUEF to BSSAP+-PAGING-REQUEST message - - - N1 N1-30 N1-030711 Not available 2003-05-28 LATE_UE - -
0036 - F R99 3.10.0 3.11.0 Aligning IMEI in 29.018 with 23.003 NP-21 NP-030405 approved N1 N1-31 N1-031039 AGREED 2003-09-12 TEI - -
0037 - A Rel-4 4.4.0 4.5.0 Aligning IMEI in 29.018 with 23.003 NP-21 NP-030405 approved N1 N1-31 N1-031040 AGREED 2003-09-12 TEI - -
0038 - A Rel-5 5.4.0 5.5.0 Aligning IMEI in 29.018 with 23.003 NP-21 NP-030405 approved N1 N1-31 N1-031041 AGREED 2003-09-12 TEI - -
0039 - F Rel-5 5.4.0 5.5.0 Correction to location update procedures in VLR NP-21 NP-030417 approved N1 N1-31 N1-031120 AGREED 2003-09-12 LATE_UE - -
0040 - F Rel-5 5.5.0 - Addition of new IE for 'GSM call setup delay reduction' - - - N1 N1-32 N1-031647 POSTPONED 2003-11-03 TEI5 - 2004-01-05
0041 1 B Rel-6 5.5.0 - Addition of IMEISV to Update Location Procedure for ADD function NP-23 NP-040123 rejected Ericsson L - - - 2004-03-10 TEI6 - 2004-03-12
0041 2 B Rel-6 5.5.0 6.0.0 Addition of IMEISV to Update Location Procedure for ADD function NP-24 NP-040203 approved N1 N1-34 N1-040920 AGREED 2004-05-18 TEI6 - 2004-06-03
0042 - B Rel-6 6.0.0 - Transfer of selected core network operator id across Gs interface - - - N1 N1-35 N1-041481 REVISED 2004-08-09 NTShar - 2004-09-08
0042 1 B Rel-6 6.0.0 - Transfer of selected core network operator id across Gs interface - - - N1 N1-35 N1-041546 REVISED 2004-09-06 NTShar - 2004-09-08
0042 2 B Rel-6 6.0.0 6.1.0 Transfer of selected core network operator id across Gs interface NP-25 NP-040375 approved N1 N1-35 N1-041615 AGREED 2004-09-06 NTShar - 2004-09-08
0043 - B Rel-6 6.1.0 - Management Based Activation Impacts - - - N1 N1-36 N1-041887 POSTPONED 2004-12-08 OEM -Trace not handled 2004-12-09
0043 - B Rel-6 6.1.0 - Management Based Activation Impacts - - - N1 N1-37 N1-050186 REVISED 2005-03-07 OEM-Trace - 2005-03-09
0043 1 B Rel-6 6.1.0 - Management Based Activation Impacts - - - N1 N1-37 N1-050361 REVISED 2005-03-07 OEM -Trace - 2005-03-09
0043 2 B Rel-6 6.1.0 6.2.0 Management Based Activation Impacts NP-27 NP-050084 approved N1 N1-37 N1-050396 AGREED 2005-03-07 OEM -Trace - 2005-03-09
0043a - B Rel-6 6.1.0 - Management Based Activation Impacts - - - N1 N1-37 N1-050186 REVISED 2005-03-07 OEM -Trace - 2005-03-09
0044 - - Rel-7 - - SGSN Gs behaviour in failvoer situations - - - C1 C1-29 C1-050967 REVISED 2005-09-20 TEI7 - 2005-09-21
0044 1 F Rel-7 6.2.0 - SGSN Gs behaviour in failvoer situations - - - C1 C1-29 C1-051138 REVISED 2005-09-20 TEI7 - 2005-09-21
0044 2 F Rel-7 6.2.0 - SGSN Gs behaviour in failvoer situations - - - C1 C1-29 C1-051171 REVISED 2005-09-20 TEI7 - 2005-09-21
0044 3 F Rel-7 6.2.0 7.0.0 SGSN Gs behaviour in failvoer situations CP-29 CP-050366 approved C1 C1-29 C1-051202 AGREED 2005-09-20 TEI7 - 2005-09-21
0045 - F Rel-6 6.2.0 - Introduction of load re-distribution on the Gs interface - - - C1 C1-40 C1-051430 REVISED 2005-11-28 IUFLEX - 2005-11-28
0045 1 F Rel-6 6.2.0 - Introduction of load re-distribution on the Gs interface - - - N1 C1-40 C1-051585 REVISED 2005-11-28 IUFLEX - 2005-11-28
0045 2 F Rel-6 6.2.0 - Introduction of load re-distribution on the Gs interface CP-30 CP-050547 REVISED C1 C1-40 C1-051676 AGREED 2005-11-28 IUFLEX revised to CP-050557 2005-11-28
0045 3 F Rel-6 6.2.0 6.3.0 Introduction of load re-distribution on the Gs interface CP-30 CP-050556 approved Ericsson C1-40 - - 2005-11-28 IUFLEX conditional on 23.236 CR0029 approval at SP-30 2005-11-28
0046 - A Rel-7 7.0.0 - Introduction of load re-distribution on the Gs interface - - - C1 C1-40 C1-051431 REVISED 2005-11-28 IUFLEX - 2005-11-28
0046 1 A Rel-7 7.0.0 - Introduction of load re-distribution on the Gs interface - - - C1 C1-40 C1-051586 REVISED 2005-11-28 IUFLEX - 2005-11-28
0046 2 A Rel-7 7.0.0 - Introduction of load re-distribution on the Gs interface CP-30 CP-050547 REVISED C1 C1-40 C1-051677 AGREED 2005-11-28 IUFLEX revised to CP-050556 2005-11-28
0046 3 A Rel-7 7.0.0 7.1.0 Introduction of load re-distribution on the Gs interface CP-30 CP-050557 approved Ericsson C1-40 - - 2005-11-28 IUFLEX conditional on 23.236 CR0029 approval at SP-30 2005-11-28
0047 - F Rel-6 6.3.0 6.4.0 Paging during PS domain specific access control CP-31 CP-060114 approved C1 C1-41 C1-060239 agreed 2006-02-02 ACBOP - 2006-03-02
0048 - - - - - - - - - C1 C1-40 - - 2005-11-28 - - 2005-11-28
0048 - A Rel-7 7.1.0 7.2.0 Paging during PS domain specific access control CP-31 CP-060114 approved C1 C1-41 C1-060240 agreed 2006-02-02 ACBOP - 2006-03-02
0049 - F Rel-6 6.4.0 6.5.0 Correction of paging during PS Domain Specific Access Control (DSAC) CP-34 CP-060658 approved C1 C1-44 C1-062120 Agreed 2006-11-23 ACBOP - 2006-11-27
0050 - A Rel-7 7.2.0 7.3.0 Correction of paging during PS Domain Specific Access Control (DSAC) CP-34 CP-060658 approved C1 C1-44 C1-062121 Agreed 2006-11-23 ACBOP - 2006-11-27

page generated from database: 2008-07-22 13:13:33