3GPP Specification detail

Back to numbering scheme page

Back to series index


3GPP TR  25.823  (click spec number to see fileserver directory for this spec)

Feasibility study on synchronized E-DCH for UTRA FDD

.

TSG / WG responsible: R1  (click TSG/WG to see its home page)

Work item which gave rise to this spec:  RANFS-UplinkSync  (click WI code to see Work Item details in the Work Plan)

Work items which may have impacted this spec:  click here

RP37 WI @ RP-070678.

Rapporteur: RANTA-AHO, Karri

Specification required for: UTRAN-based systems

In the table below ...

... click meeting number for meeting details;

... click spec version number to download that version;

... click SDO publication reference to download SDO transposed document.

Release Freeze meeting Freeze date remarks SDO publications
Rel-8 - . ETSI
  event

version

available

remarks click ref to download
  draft

0.1.1

-

email circulation -
  RP-39

0.2.0

2008-03-20

RP-080087 -
  RP-39

8.0.0

2008-03-20

-

Change Requests for this spec: (none).

Genealogy of this spec:

antecedent(s) this spec descendant(s)
(no antecedents) 25.823 (no descendants)

page generated from database: 2008-07-22 13:10:37