3GPP Specification detail
Back to numbering scheme page
Back to series index
3GPP TR
23.912
(click spec number to see fileserver directory for this spec)
Technical report on Super-Charger
.
TSG / WG responsible: C4
(click TSG/WG to see its home page)
Work item which gave rise to this spec: 
-
 (click WI code to see Work Item details in the Work Plan)
Work items which may have impacted this spec: 
click here
CP-27: change of WG as a result of closure of CN and T.
Rapporteur: SHARP, Iain
Specification required for: GERAN-based systems and UTRAN- and E-UTRAN-based systems
In the table below ...
... click meeting number for meeting details;
... click spec version number to download that version;
... click SDO publication reference to download SDO transposed document.
| Release |
Freeze meeting |
Freeze date |
remarks |
SDO publications |
| R99 |
SP-05 |
1999-10-13 |
. |
ETSI |
| |
event |
version |
available |
remarks |
click ref to download |
| |
Creation of WI by WG/TB |
0.0.1 |
1999-10-13 |
|
- |
| Rel-4 |
SP-11 |
2001-03-22 |
. |
ETSI |
| |
event |
version |
available |
remarks |
click ref to download |
| Rel-5 |
NP-15 |
2002-03-08 |
2002-06-21: Kymalainen: no need to upgrade to Rel-5. RELEASE WITHDRAWN |
ETSI |
| |
event |
version |
available |
remarks |
click ref to download |
Change Requests for this spec: click here.
Genealogy of this spec:
| antecedent(s) |
this spec |
descendant(s) |
|
(no antecedents)
|
23.912 |
(no descendants)
|
page generated from database: 2008-07-22 13:10:18